HomeMy WebLinkAbout2026-09-30 Planning & Transportation Commission Agenda PacketPLANNING AND TRANSPORTATION COMMISSION
Regular Meeting
Wednesday, September 30, 2026
Council Chambers & Hybrid
6:00 PM
Planning and Transportation Commission meetings will be held as “hybrid” meetings with the
option to attend by teleconference/video conference or in person. To maximize public safety
while still maintaining transparency and public access, members of the public can choose to
participate from home or attend in person. Information on how the public may observe and
participate in the meeting is located at the end of the agenda. Masks are strongly encouraged if
attending in person. The meeting will be broadcast on Cable TV Channel 76, live on
YouTube https://www.youtube.com/c/cityofpaloalto, and streamed to Midpen Media
Center https://midpenmedia.org. Commissioner names, biographies, and archived agendas and
minutes are available at http://bit.ly/PaloAltoPTC.
VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/91641559499)
Meeting ID: 916 4155 9499 Phone: 1(669)900-6833
PUBLIC COMMENTS
General Public Comment for items not on the agenda will be accepted for up to three minutes
or an amount of time determined by the Chair. In-person comments will be heard at the
beginning of the agenda and remote comments will be heard at the end of the agenda. All
requests to speak will be taken until 5 minutes after the staff’s presentation. Written public
comments can be submitted in advance to Planning.Commission@PaloAlto.gov and will be
provided to the Commission and available for inspection on the City’s website three days before
the meeting. Please clearly indicate which agenda item you are referencing in your subject line.
Spokespersons that are representing a group of five or more people who are identified as
present at the meeting at the time of the spokesperson's presentation will be allowed up to ten
(10) minutes at the discretion of the Chair, provided that the non-speaking members agree not
to speak individually. The Chair may limit Public Comments to thirty (30) minutes for all
combined speakers. The Chair may reduce the allowed time to speak for Study Sessions and
Action Items to two (2) minutes or less to accommodate a larger number of speakers.
PowerPoints, videos, or other media to be presented during public comment are accepted only
by email to Planning.Commission@PaloAlto.gov at least 24 hours prior to the meeting. Once
received, the Clerk will have them shared at public comment for the specified item. To uphold
strong cybersecurity management practices, USB’s or other physical electronic storage devices
are not accepted.
Signs and symbolic materials less than 2 feet by 3 feet are permitted provided that: (1) sticks,
posts, poles or similar/other type of handle objects are strictly prohibited; (2) the items do not
create a facility, fire, or safety hazard; and (3) persons with such items remain seated when
displaying them and must not raise the items above shoulder level, obstruct the view or passage
of other attendees, or otherwise disturb the business of the meeting.
TIME ESTIMATES
Listed times are estimates only and are subject to change at any time, including while the
meeting is in progress. The Commission reserves the right to use more or less time on any item,
to change the order of items and/or to continue items to another meeting. Particular items may
be heard before or after the time estimated on the agenda. This may occur in order to best
manage the time at a meeting or to adapt to the participation of the public.
CALL TO ORDER/ ROLL CALL
AGENDA CHANGES, ADDITIONS AND DELETIONS
The Chair or Commission majority may modify the agenda order to improve meeting management.
IN-PERSON PUBLIC COMMENT
Members of the public may speak to any item NOT on the agenda. 1-3 minutes depending on number of speakers. In-person
comments will be heard at the beginning of the agenda and remote comments will be heard at the end of the agenda.
CITY OFFICIAL REPORTS
1.Director's Report, Meeting Schedule, and Assignments
ACTION ITEMS
Public Comment is Permitted. Applicants/Appellant Teams: Fifteen (15) minutes, plus three (3) minutes rebuttal. All others:
Three (3) minutes per speaker.
2.Recommendation on an Ordinance Amending Various Palo Alto Municipal Code (PAMC)
Chapters in Title 16 (Building Regulations), Title 18 (Zoning), and Title 21 (Subdivisions
and Other Divisions of Land) of the Palo Alto Municipal Code to Replace Temporary
Ordinances Implementing Senate Bill (SB) 9, SB 450, and Other State Housing Laws. CEQA
Status: Exempt From the Provisions of the California Environmental Quality Act (CEQA)
Pursuant to Public Resources Code Section 21080.17 and CEQA Guidelines Section
15061(b)(3).
6:15 PM – 7:00 PM
3.South Palo Alto Bike/Ped Connectivity: Review of Preferred Design Alternatives and
Network Enhancements for the Midtown Bicycle and Pedestrian Undercrossing; CEQA
Status – Exempt Pursuant to CEQA Guidelines Section 15262.
7:00 PM – 8:00 PM
4.Bryant Street Bike Boulevard and Lincoln Avenue Traffic Calming Project Initial Design
Concepts. CEQA Status: Exempt Pursuant to CEQA Guidelines Section 15301: Existing
Facilities.
8:00 PM – 8:45 PM
COMMISSIONER QUESTIONS, COMMENTS, ANNOUNCEMENTS OR FUTURE MEETINGS AND
AGENDAS
Members of the public may not speak to the item(s).
VIRTUAL PUBLIC COMMENT
Members of the public may speak to any item NOT on the agenda. 1-3 minutes depending on number of speakers. In-person
comments will be heard at the beginning of the agenda and remote comments will be heard at the end of the agenda.
ADJOURNMENT
OTHER INFORMATION
The materials below are provided for informational purposes, not for action or discussion during this meeting’s agenda. Written
public comments may be submitted in advance and will be provided to the Commission and availible for public inspection on the
City’s website three days before the meeting.
A.Public Comment
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email,
teleconference, or by phone.
1.Written public comments may be submitted by email to
Planning.Commission@PaloAlto.gov.
2.Spoken public comments using a computer will be accepted through the teleconference
meeting. To address the Commission, click on the link below to access a Zoom-based
meeting. Please read the following instructions carefully.
◦You may download the Zoom client or connect to the meeting in- browser. If using
your browser, make sure you are using a current, up-to-date browser: Chrome 30,
Firefox 27, Microsoft Edge 12, Safari 7. Certain functionality may be disabled in
older browsers including Internet Explorer.
◦You may be asked to enter an email address and name. We request that you
identify yourself by name as this will be visible online and will be used to notify you
that it is your turn to speak.
◦When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will
activate and unmute speakers in turn. Speakers will be notified shortly before they
are called to speak.
◦When called, please limit your remarks to the time limit allotted. A timer will be
shown on the computer to help keep track of your comments.
3.Spoken public comments using a smart phone will be accepted through the
teleconference meeting. To address the Commission, download the Zoom application
onto your phone from the Apple App Store or Google Play Store and enter the Meeting ID
below. Please follow the instructions above.
4.Spoken public comments using a phone use the telephone number listed below. When
you wish to speak on an agenda item hit *9 on your phone so we know that you wish to
speak. You will be asked to provide your first and last name before addressing the
Commission. You will be advised how long you have to speak. When called please limit
your remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 916 4155 9499 Phone:1-669-900-6833
Americans with Disability Act (ADA) It is the policy of the City of Palo Alto to offer its public
programs, services and meetings in a manner that is readily accessible to all. Persons with
disabilities who require materials in an appropriate alternative format or who require auxiliary
aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at
(650) 329-2550 (voice) or by emailing ada@PaloAlto.gov. Requests for assistance or
accommodations must be submitted at least 24 hours in advance of the meeting, program, or
service.
Item No. 1. Page 1 of 2
Planning & Transportation Commission
Staff Report
From: Planning and Development Services Director
Lead Department: Planning and Development Services
Meeting Date: September 30, 2026
Report #: 2609-6801
TITLE
Director's Report, Meeting Schedule, and Assignments
RECOMMENDATION
Staff recommends that the Planning and Transportation Commission (PTC) review and
comment as appropriate.
BACKGROUND
This document includes the following items:
Upcoming PTC Agenda Items
PTC Meeting Schedule
PTC Representative to City Council (Rotational Assignments)
Commissioners are encouraged to contact Samuel Tavera (Samuel.Tavera@PaloAlto.gov) to
notify staff of any planned absences one month in advance, if possible, to ensure the
availability of a PTC quorum.
PTC Representative to City Council is a rotational assignment where the designated
commissioner represents the PTC’s affirmative and dissenting perspectives to Council
for quasijudicial and legislative matters. Representatives are encouraged to review the City
Council agendas (https://www.cityofpaloalto.org/City-Hall/City-Council/Council-Agendas-
Minutes) for the months of their respective assignments to verify if attendance is needed or
contact staff.
Prior PTC meetings are available online at https://midpenmedia.org/category/government/city-
of-palo-alto/boards-and-commissions/planning-and-transportation-commission.
UPCOMING PTC ITEMS
Item 1
Item 1 Staff Report
Packet Pg. 6
Item No. 1. Page 2 of 2
October 14, 2026
300 Homer Avenue: Use Permit Amendment for the Palo Alto Museum (PAM)
Parking Programs Update and Downtown Parking Modernization Initiatives
ATTACHMENTS
AUTHOR/TITLE:
Item 1
Item 1 Staff Report
Packet Pg. 7
Planning & Transportation Commission
2026 Meeting Schedule
1
2
3
1
1
2026 Schedule
Meeting Dates Time Location Status Planned Absences
1/14/2026 6:00 PM Hybrid Regular
1/28/2026 6:00 PM Hybrid Cancelled
2/11/2026 6:00 PM Hybrid Regular James
2/25/2026 6:00 PM Hybrid Regular Chang
3/11/2026 6:00 PM Hybrid Special James, Ji
3/25/2026 6:00 PM Hybrid Regular
4/8/2026 6:00 PM Hybrid Regular James, Templeton
4/29/2026 6:00 PM Hybrid Regular
5/13/2026 6:00 PM Hybrid Regular Hechtman
5/27/2026 6:00 PM Hybrid Regular
6/10/2026 6:00 PM Hybrid Regular Hechtman
6/24/2026 6:00 PM Hybrid Cancelled Chang
7/8/2026 6:00 PM Hybrid Regular James
7/29/2026 6:00 PM Hybrid Cancelled
8/12/2026 6:00 PM Hybrid Regular
8/26/2026 6:00 PM Hybrid Regular Templeton
9/9/2026 6:00 PM Hybrid Regular
9/30/2026 6:00 PM Hybrid Regular
10/14/2026 6:00 PM Hybrid Regular
10/28/2026 6:00 PM Hybrid Regular
11/11/2026 6:00 PM Hybrid Cancelled
11/18/2026 6:00 PM Hybrid Special Templeton
11/25/2026 6:00 PM Hybrid Cancelled
12/9/2026 6:00 PM Hybrid Regular
12/30/2026 6:00 PM Hybrid Cancelled
2026 Assignments - Council Representation (primary/backup)
January February March April May June
Bryna Chang Allen Akin Bart Hechtman Kevin Ji Todd James Forest Peterson
Todd James Forest Peterson Cari Templeton Bryna Chang Allen Akin Bart Hechtman
July August September October November December
Council Cari Templeton Bryna Chang Allen Akin Bart Hechtman Kevin Ji
Summer Break Kevin Ji Todd James TBD Cari Templeton Bryna Chang
Item 1
Attachment A - 2026 PTC
Schedule & Assignments
Packet Pg. 8
Planning & Transportation Commission
2027 Meeting Schedule
9
0
2
6
2027 Schedule
Meeting Dates Time Location Status Planned Absences
1/13/2027 6:00 PM Hybrid Regular
1/27/2027 6:00 PM Hybrid Regular
2/10/2027 6:00 PM Hybrid Regular
2/24/2027 6:00 PM Hybrid Regular
3/10/2027 6:00 PM Hybrid Regular
3/31/2027 6:00 PM Hybrid Regular
4/14/2027 6:00 PM Hybrid Regular
4/28/2027 6:00 PM Hybrid Regular
5/12/2027 6:00 PM Hybrid Regular
5/26/2027 6:00 PM Hybrid Regular
6/9/2027 6:00 PM Hybrid Regular
6/30/2027 6:00 PM Hybrid Regular
7/14/2027 6:00 PM Hybrid Regular
7/28/2027 6:00 PM Hybrid Regular
8/11/2027 6:00 PM Hybrid Regular
8/25/2027 6:00 PM Hybrid Regular
9/8/2027 6:00 PM Hybrid Regular
9/29/2027 6:00 PM Hybrid Regular
10/13/2027 6:00 PM Hybrid Regular
10/27/2027 6:00 PM Hybrid Regular
11/10/2027 6:00 PM Hybrid Regular
11/24/2027 6:00 PM Hybrid Cancelled
12/8/2027 6:00 PM Hybrid Regular
12/29/2027 6:00 PM Hybrid Cancelled
Item 1
Attachment B - 2027 PTC
Schedule
Packet Pg. 9
Item No. 2. Page 1 of 10
1
0
2
2
2
Planning & Transportation Commission
Staff Report
From: Planning and Development Services Director
Lead Department: Planning and Development Services
Meeting Date: September 30, 2026
Report #: 2606-6497
TITLE
Recommendation on an Ordinance Amending Various Palo Alto Municipal Code (PAMC)
Chapters in Title 16 (Building Regulations), Title 18 (Zoning), and Title 21 (Subdivisions and
Other Divisions of Land) of the Palo Alto Municipal Code to Replace Temporary Ordinances
Implementing Senate Bill (SB) 9, SB 450, and Other State Housing Laws. CEQA Status: Exempt
From the Provisions of the California Environmental Quality Act (CEQA) Pursuant to Public
Resources Code Section 21080.17 and CEQA Guidelines Section 15061(b)(3).
RECOMMENDATION
Staff recommends that the Planning and Transportation Commission (PTC):
1. Recommend that the City Council adopt the draft ordinance (Attachment A), amending
Titles 16, 18, and 21 implementing SB 9, SB 450, and other State housing laws.
EXECUTIVE SUMMARY
On January 13, 2025, City Council adopted Interim Ordinance 5645 amending Palo Alto
Municipal Code (PAMC) Title 16 (Building Regulations), Title 18 (Zoning) and Title 21
(Subdivisions of Land) to implement California Senate Bill (SB) 450 (2024) and adopt Objective
Design Standards for two-story houses. On January 12, 2026, City Council adopted an ordinance
to extend Ordinance 5645 until December 31, 2026.
With the benefit of two years of implementing the objective design standards, the draft
ordinance (Attachment A) includes key modifications to the objective standards. These
modifications improve clarity, further incentivize their use as an alternative to the Individual
Review (IR) process for streamlining purposes, and incorporate the design standards directly
into the code instead of by reference. The other provisions of Ordinance 5645 related to
Section 16.64.040 (Calculation of [Development Impact] Fees) and 18.15 (Density Bonus) are
proposed to be adopted with no changes, as staff have had no concerns with implementation
or usability of them and they meet the requirements of State Law. Attachment A includes
tracked changes that reflect both the temporary ordinance and further changes, as the PTC did
not review the interim ordinance.
Item 2
Item 2 Staff Report
Packet Pg. 10
Item No. 2. Page 2 of 10
1
0
2
2
2
BACKGROUND
Governor Newsom signed Senate Bill (SB) 9 into law on September 16, 2021. SB 9 created a
streamlined process for homeowners to develop two-unit residential projects or subdivide
eligible single-family lots into two parcels. In Palo Alto, this law applies to parcels zoned R-1,
NV-R1, RMD, and RE. Palo Alto implemented SB 9 by adopting an interim ordinance (Ordinance
55381) in 2021 and later codified as Ordinance 55872 on June 12, 2023.
In 2024, Senate Bill (SB) 450 was signed into law, which modified SB 9 in several ways, including
the following key changes:
Specified that projects only be subject to objective standards that apply uniformly in the
underlying zone; and
Required local agencies to review SB 450/SB 9 applications and urban lot split
applications within 60 days of a complete submission, or the application would be
deemed approved.
Council adopted Emergency Ordinance 56413 and Resolution 102104 on December 16, 2024, to
align the PAMC with the requirements under SB 450 among other housing laws. This included
establishing a ministerial review process using the adopted objective design standards (ODS),
requiring only projects that do not elect to meet the ODS to go through the discretionary
Individual Review (IR) process. It also streamlined the objective design standards that were
initially adopted to address SB 9 in an effort to encourage their use, reduce staff time required
to review ODS projects, and clarify interpretation for certain standards. Ordinance 5641 has
been extended twice by Ordinances 5645 and 5691, through December 2025 and December
2026, respectively. Since most of these ordinances were temporary ordinances implemented by
Council, the PTC has not reviewed the SB 9 regulations since February 2023.
There have been approximately 20 property owners that chose to utilize the ministerial review
process for two-story homes, applying the objective standards to their site in-lieu of the
Individual Review process for both SB 9 and non-SB 9 projects.
Applicant Survey
Given the limited use of the ODS in the past two years, as part of the adoption of the subject
ordinance, and consistent with Council’s priority for government efficiency, staff has worked to
identify where barriers to the use of ODS exist, and what might incentivize property owners to
pursue that process as an alternative to Individual Review. To that end, the City prepared a
survey (Attachment C) that requested feedback to inform improvements to the ODS and ODS
1 Ordinance 5538 is available online at:
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=47783&dbid=0&repo=PaloAlto
2 Ordinance 5587 is available online at:
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=48255&dbid=0&repo=PaloAlto
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=48140&dbid=0&repo=PaloAlto
3 Ordinance 5641 is available online at:
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=48320&dbid=0&repo=PaloAlto
4 Res. 10210: https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=62095&dbid=0&repo=PaloAlto
Item 2
Item 2 Staff Report
Packet Pg. 11
Item No. 2. Page 3 of 10
1
0
2
2
2
process. Staff distributed that survey to all applicants that have filed an Individual Review or SB
9 application in the last two years (July 1, 2024, through July 13, 2026). The survey opened on
July 16, 2026, and closed July 31, 2026.
Results of the Applicant Survey
Requests for clarification of the applicability of the ODS.
Suggestions for increased visibility and awareness of the process.
Support for the fact that the ODS process is ministerial and therefore does not include
neighbor input.
A request to add illustrations to the standards, similar to the multiple-family ODS and
Individual Review Guidelines.
Requests for specific changes to standards that have been difficult to interpret, comply
with, and/or inhibit the use of the ODS, including:
o Clarify applicability of certain standards to corner lots.
o Allow a two-car garage (20 feet wide) on the primary frontage, particularly for
lots greater than 75 feet wide because the current limitation is 30% of the house
frontage.
o Allow more than 35% of the allowable FAR on the second story to fit three or
more bedrooms on the second story.
o Allow the standard daylight plane adjacent to single-story houses, particularly in
flood zones, rather than a more stringent one.
o Allow for taller building heights, particularly in flood zones.
ANALYSIS
Item 2
Item 2 Staff Report
Packet Pg. 12
Item No. 2. Page 4 of 10
1
0
2
2
2
Process Changes
The policy and process for building a two-story house using the ODS is proposed to be
consistent with the interim ordinance and in compliance with SB 450. As a new proposal, text
changes in PAMC Chapters 18.10, 18.12, and 18.13 which reference Individual Review, would
be updated to reflect the ODS process first, and provide clarification framing IR as an
alternative process when an applicant chooses not to meet the ODS.
Objective Design Standards Changes
In addition to the summary here, Attachment B provides a side-by-side comparison with the
existing standards. The proposed standards, which were previously adopted in a separate
resolution rather than incorporated into the code, are now included in the Draft Ordinance
(Attachment A). Incorporating these into the code will reduce confusion caused by having two
sets of standards that both apply but that are located in different locations (Resolution posted
to the City’s website and the Zoning Standards that also apply in PAMC Chapter 18.12). These
will also increase the visibility of these standards and make them easier to find.
Staff recommends that the following existing standards be eliminated:
A2: STUCCO TEXTURE: When stucco is used it shall be steel-troweled ‘Smooth’ or ‘Santa
Barbara’ texture as described in the Technical Services Information Bureau, Chapter 5 -
Plaster Textures & Acrylic Finishes (2011). For additions, stucco plaster texture on the
addition shall be allowed to match the stucco texture of the existing house.
A4: DRIVEWAY WIDTH: 18-foot maximum driveway width (inclusive of uncovered
parking) within a front or street side yard setback.
A5: PLANTING STRIP: A minimum two-foot wide, landscaped planting strip is required
between a driveway and/or uncovered parking space and an existing interior lot line.
A15: WINDOW TO WALL DETAILING: Window frames shall be recessed at least 2 inches
from the exterior wall face or have trim at least 2 inches wide and 0.5 inches thick on all
four window sides. Stucco over foam shall not be used as window trim.
A16: WINDOW PATTERNS: Window fenestration with divided lite appearance shall have
exterior applied muntin bars (i.e., true or simulated divided lites).
B3: CONTEXTUAL FIRST FLOOR EAVE HEIGHT: The height of the first floor's street-facing
roof edges (i.e., eaves or parapets) shall not exceed 18 inches above the height of the
first-floor eave or parapet of the homes on the abutting lots at side lot lines as
measured at those homes' eaves nearest the subject lot. This first-floor roof edge height
limit shall also extend 15 feet back from the building corner. This standard shall be 24
inches within a flood zone if either of the abutting homes’ first-floor levels does not
meet current flood zone regulations. This standard applies to the eave side of pitch roof
forms and not the rake side such as at a gable.
B4: CONTEXTUAL SECOND FLOOR EAVE HEIGHT: The height of the upper floor's street-
facing roof edge (eave or parapet) shall not exceed 18 inches above either: (a) the
average height of the upper floor street-facing eave or roof edge of homes to each side,
or (b) in the case of only one home having a second floor, the height of that home's
eaves.
Item 2
Item 2 Staff Report
Packet Pg. 13
Item No. 2. Page 5 of 10
1
0
2
2
2
Through implementation, staff has found these measures to be overly restrictive to residents
without resulting in a meaningful change to the neighborhood character. In accordance with SB
450, standards that apply to SB 9 projects cannot be more restrictive than the standards for
other projects, and these standards do not apply to one-story homes. The 18-foot driveway
width requirement in particular is also more restrictive than requirements in other areas of the
code, which limit driveways for single-family homes to 20 feet. Standards B3 and B4 add
additional height restrictions based on the eave heights of the adjacent home(s). However, the
height standards (A11 and E3) as well as the daylight plane (standard from the R-1 zone or
through ODS C1) currently regulate this. It was also unclear how these two standards should be
applied to corner lots. Other R-1 standards such as second-story equivalency in the FAR
calculation also reduce frequency of substantially tall first floor heights.
Some standards covering roof heights, garage door widths, balconies, and privacy screening are
proposed to be retained but revised.
Roof Heights
A11: ROOF HEIGHT FOR VARIED ROOF PITCHES: Roof height shall be limited to 27 feet
for roofs with pitches 9:12 or greater, 25 feet for roofs with pitches 3:12, up to 9:12, and
22 23 feet for roofs with pitches less than 3:12, inclusive of parapets on flat roofs. In
flood zones, the maximum height is increased by one-half of the increase in elevation
required to reach base flood elevations, up to a maximum increase of 30 inches.
E3: EICHLER TRACT ROOF HEIGHTS: In mapped Eichler Tracts the maximum roof height
shall not exceed 22 23 feet, as measured from existing grade to the roof surface.
Properties in flood zones shall be permitted to increase building height by one-half foot
for each foot that the base flood elevation exceeds the existing grade.
To respond to feedback that a 22-foot height limit is overly restrictive, particularly in flood
zones, staff propose to increase the height limit for flat and low-sloped roofs to 23 feet. This
allows for two floors with up to 10-foot ceiling heights, and one foot for each the foundation,
floor plate, and roof thickness. Some respondents asked staff to explore increasing all height
limits in A11, however staff does not think this is appropriate for the character of the
neighborhood and the intent of the Individual Review Guidelines, which has guided
development in the R-1 zone for several decades.
Garage Location
A6: GARAGE LOCATION: Where the contextual garage setback does not apply, attached
garages adjacent to the front setback must be located a minimum of 5 feet behind
the forwardmost plane of the front facade or 3 feet behind the forwardmost plane of
the street-side façade. The forwardmost façade plane may be a building wall or porch
with posts/columns and must be at least 12 feet wide. In mapped Eichler
neighborhoods (see Section E), this standard does not apply.
Item 2
Item 2 Staff Report
Packet Pg. 14
Item No. 2. Page 6 of 10
1
0
2
2
2
This change clarifies that the contextual garage placement is still applicable to projects using
the ODS process, and aligns the text with standard A1.
Garage Door Widths
A7: GARAGE WIDTH: An attached garage or carport facing the street shall be no more
than 30 percent of the total facade width facing that street, except that it may be 12 20
feet wide in any circumstance.
Balconies
B6: SECOND FLOOR BALCONY LIMITATIONS: No more than one second-floor
deck/balcony shall be permitted per dwelling and shall: (a) only be permitted on a
street-facing or rear facing facade, (b) be located at least 10 feet from any interior side
lot line with a 5.5-foot-tall solid privacy wall or be located at least 30 feet from any
interior side lot line, (c) be located at least 30 feet from the rear lot line, and (d) (c) be
limited in size to no more than 40 50 square feet.
B7: SCREENING LANDSCAPE: For two-story houses, plant screening trees with a species
having a typical mature height of at least 25 feet and mature canopy width of 15 feet at
a quantity of at least one per 25 linear feet along each interior lot line. Existing trees to
be retained that are at least 25 feet tall and 15 feet wide count towards the required
Item 2
Item 2 Staff Report
Packet Pg. 15
Item No. 2. Page 7 of 10
1
0
2
2
2
planting. Three closely spaced tall screening shrubs with a mature height of at least 15 feet and
a mature width of at least 3 feet may be substituted for one screening tree.
B8: PLANTING TYPE AND SIZE: When required, screening trees and shrubs shall be
specified by botanical name with at least 50 percent of screening trees and shrubs being
evergreen. Screening trees shall be specified and planted at 24-inch box size or larger
and 8 feet height or taller. Screening shrubs shall be specified and planted at 15-gallon
size or larger and 8 feet or taller. All trees/shrubs shall be planted in a minimum two-
foot wide planting strip.
ADUs with Urban Lot Splits
A maximum of two units, including an accessory dwelling unit or junior accessory
dwelling unit created pursuant to Chapter 18.09, may be located on any parcel that is
created by an Urban Lot Split under Chapter 21.10. Accessory dwelling units and junior
accessory dwelling units shall not be permitted on any such parcel already containing
two units.
Objective Design Standards for Urban Lot Split Changes
Remove the requirement for all lots greater than 200 feet deep use a flag lot
configuration in an Urban Lot Split.
Remove the shared driveway requirement.
Item 2
Item 2 Staff Report
Packet Pg. 16
Item No. 2. Page 8 of 10
1
0
2
2
2
2,550 square feet, and 35% of this is 892 square feet. Based on recent staff experience
reviewing IR applications, primary bedrooms are around 200-250 square feet, while additional
bedrooms are approximately 100-150 square feet. Bathrooms can be as small as 40 square feet,
or over 100 square feet for a primary suite. Therefore, the current 35% limitation can generally
accommodate a primary suite, two smaller bedrooms, and at least one smaller bathroom on
the second story. However, if desired, the PTC could recommend a shift from 35% to 40%, so
that houses could have up to 40% of their floor area on second story with at least 60%
remaining on the first floor.
Increase the floor area limitation from 800 to 1,200 square feet per unit for SB 9 projects
that result in creation of three or more detached units on a single-family lot. Refine
objective design standards and development standards based on experience with project
applications.
When new land use regulations, impact fees, or procedural changes are being
considered by the Planning and Transportation Commission and City Council, the City
shall prepare an analysis in the accompanying staff report detailing how the regulation
may impact housing production, if at all, and provide recommended solutions to address
those impacts.
Item 2
Item 2 Staff Report
Packet Pg. 17
Item No. 2. Page 9 of 10
1
0
2
2
2
increase density or increase available properties that may be developed, but intends to
incentive development by reducing procedural difficulties.
RESOURCE AND COMMUNITY IMPACT
Item 2
Item 2 Staff Report
Packet Pg. 18
Item No. 2. Page 10 of 10
1
0
2
2
2
relationship between objective standards, discretionary review, and public participation in the
approval of new homes.
STAKEHOLDER ENGAGEMENT
ENVIRONMENTAL REVIEW
ALTERNATIVE ACTIONS
Recommend approval with specific modifications;
Continue the item to a date (un)certain with specific direction, which may also include a
recommendation for extension of the interim ordinance.
Recommend denial and recommend Council extend the interim ordinance an additional
year, with direction to staff on items to incorporate into a permanent ordinance;
ATTACHMENTS
Report Author & Contact Information PTC9 Liaison & Contact Information
9 Emails may be sent directly to the PTC using the following address: planning.commission@cityofpaloalto.org
Item 2
Item 2 Staff Report
Packet Pg. 19
***NOT YET APPROVED***
1
0160212_20260923_ay16
Ordinance No. _____
Ordinance of the Council of the City of Palo Alto Amending Various Chapters of
Title 16 (Building Regula ons), Title 18 (Zoning), and Title 21 (Subdivisions and
Other Divisions of Land) of the Palo Alto Municipal Code to Implement SB 9 and
Related State Housing Laws
The Council of the City of Palo Alto ORDAINS as follows:
Sec on 1. Findings and Declara ons. The City Council finds and declares as follows:
A. On September 16, 2021, Governor Newsom signed into law Senate Bill 9 (SB 9), which
requires, among other things, that local agencies ministerially approve both two-unit
construc on and urban lot splits on single-family zoned lots.
B. On September 19, 2024, the Governor signed Senate Bill 450, effec ve January 1, 2025.
SB 450 amended SB 9 (California Government Code Sec ons 65852.21 and 66411.7) to
create a 60-day meframe for approval or denial of an SB 9 applica on and to require
that SB 9 projects be subject to only those objec ve standards that apply uniformly in
the underlying zone.
C. Addi onally, On September 19, 2024, the Governor of the State of California signed
Senate Bill 937, effec ve January 1, 2025. SB 937 allows housing developers to defer
payment of impact fees un l issuance of a cer ficate of occupancy and freezes fees at
the level in effect at the me of building permit issuance for certain designated
residen al development projects.
D. On September 19, 2024, the Governor signed Assembly Bill 2694, effec ve January 1,
2025. AB 2694 expanded the defini on of a “senior ci zen housing development” in the
Density Bonus Law to include a residen al care facility for the elderly, as defined.
E. On September 22, 2024, the Governor signed Assembly Bill 3116, effec ve January 1,
2025. AB 3116 added a defini on of “student housing development” to the Density
Bonus Law and amended provisions of the Density Bonus Law related to the percentage
density bonus and incen ves or concessions certain student housing developments must
receive.
F. On January 13, 2025 and January 12, 2026, the City Council adopted interim ordinances
5645 and 5691 to address the above stated State laws.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 20
***NOT YET APPROVED***
2
0160212_20260923_ay16
G. On October 10, 2025, the Governor signed Assembly Bill 1061, effec ve January 1, 2026.
AB 1061 narrows the extent to which proper es within historic districts are excluded
from the use of SB 9.
H. The City of Palo Alto now desires to make these temporary ordinances implemen ng
state law permanent, to implement AB 1061, and to include modifica ons to the
objec ve standards to improve their usability.
I. On September 30, 2026 the Planning and Transporta on Commission reviewed a dra
permanent ordinance and recommended adop on of the ordinance to City Council.
SECTION 2. Sec on 18.10.040 (Development Standards) of Title 18 (Zoning) of the
Palo Alto Municipal Code is hereby amended as follows (addi ons underlined; dele ons struck-
through); unchanged text omi ed by bracketed ellipses):
[…]
(i) Individual Review Two Story Development in R-2 and RMD
All construc on of a new singly developed two-story structure; the construc on of a new
second story; or the expansion of an exis ng second story by more than 150 square feet shall
meet the single-family objec ve design standards set forth in Sec on 18.12.045. Projects
complying with the objec ve standards shall be subject to ministerial building permit review.
However, applicants may choose to forgo one or more objec ve standards, in which case the
project no longer qualifies for ministerial review and will be subject to Individual Review as set
forth in Sec ons 18.12.110(d) and 18.77.075. The Individual Review provisions of Sec on
18.12.110 of the Zoning Ordinance shall be applied to any single-family or two-family residence
in the R-2 or RMD districts to those sides of a site that share an interior side lot line with the
interior side or rear lot line of a property zoned for or used for single-family or two-family
dwellings. The individual review criteria shall be applied only to the project’s effects on adjacent
single-family and two-family uses. A project that complies with the objec ve standards for two-
story development adopted by the City Council shall not be subject to individual review.
[…]
SECTION 3. Sec on 18.12.040 (Site Development Standards ) of Chapter 18.12 (R-1
Single-Family Residen al District) of Title 18 (Zoning) of the Palo Alto Municipal Code is hereby
amended as follows (addi ons underlined); unchanged text omi ed by bracketed ellipses).
18.12.040 Site Development Standards
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 21
***NOT YET APPROVED***
3
0160212_20260923_ay16
[…]
(m) In addition to the standards contained in and referenced in this Chapter, two-story
single-family residential development, including the development of a primary residence and
one or more accessory dwelling units and development pursuant to California Government
Code Sections 65852.21 and 66411.7 shall comply with the single family objective standards for
two-story development herein. However, an applicant seeking to deviate from the objective
standards may submit an application for Single Family Individual Review pursuant to Section
18.12.110.
SECTION 4. Section 18.12.040 (Single Family Objective Standards for Two-Story
Development) of Chapter 18.12 (R-1 Single-Family Residential District) of Title 18 (Zoning) of the
Palo Alto Municipal Code is hereby added as follows
18.12.045 Single Family Objective Standards for Two-Story Development
(a) Site Planning and Architectural Details
(1) FRONT SETBACK Where the contextual front yard setback does not apply, the
front setback shall be no less than the average front setback of the homes on lots
to either side of the subject lot, up to a maximum of 25 feet. Otherwise, the
zoning minimum front setback or special setback would still apply.
(2) CONTEXTUAL PORCH ENTRIES: If porches (i.e., roofed, street-facing porches with
posts/ column(s) and more than 3 feet deep), occur on more than half of the
houses on the same side of the block, including the subject site, the proposed
house(s) with street frontage shall include a street-facing porch no less than 4.5
feet deep and 6 feet wide.
(3) GARAGE LOCATION: Where the contextual garage setback does not apply,
attached garages adjacent to the front setback must be located a minimum of 5
feet behind the forwardmost plane of the front facade or 3 feet behind
the forwardmost plane of the street-side façade. The forwardmost façade plane
may be a building wall or porch with posts/columns and must be at least
12 feet wide. In mapped Eichler neighborhoods (see Section E), this standard
does not apply.
(4) GARAGE WIDTH: An attached garage or carport facing the street shall be no more
than 30 percent of the total facade width facing that street, except that it may
be 20 feet wide in any circumstance.
(5) GARAGE DOOR DESIGN AND MATERIALS: The garage door shall match the
material, color, or panel design pattern of the entry door, window fenestration,
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 22
***NOT YET APPROVED***
4
0160212_20260923_ay16
or exterior cladding material.
(6) GARAGE DOOR SIZE: When visible from the street, the maximum garage door
width shall be 16 feet and the maximum garage door height shall be 8 feet. If two
single-wide garage doors are used instead of one double-wide door, each door's
maximum width shall be 9 feet and maximum height 8 feet.
(7) ROOF DECK NOT PERMITTED: A roof deck (i.e., a deck above the first level of
a single-story building or second level of a two-story building) shall not
be permitted.
(8) ROOF HEIGHT FOR VARIED ROOF PITCHES: Roof height shall be limited to 27 feet
for roofs with pitches 9:12 or greater, 25 feet for roofs with pitches 3:12, up to
9:12, and 22 feet for roofs with pitches less than 3:12, inclusive of parapets on
flat roofs. In flood zones, the maximum height is increased by one-half of the
increase in elevation required to reach base flood elevations, up to a maximum
increase of 30 inches.
(9) GABLE ROOF FORMS: No more than three gable forms on an elevation facing a
public street.
(10) BAY WINDOWS: No more than two bay windows on an elevation facing a public
street.
(11) STREET-FACING WINDOWS: Each street-facing building elevation shall have at
least 20 square feet of glazing in a large window, multi-panel window or glazed
door, or bay window form, with minimum dimensions of 3 feet. In an Eichler
tract, clerestory windows may have a reduced minimum dimension.
(b) Second Floor Massing and Privacy
(1) SECOND FLOOR LOCATION: The second-floor area shall not be permitted within
the standard side or rear setbacks of the underlying single-family zoning district.
(2) SECOND FLOOR SIZE: The maximum second-floor area shall not exceed 35 percent
of the allowable gross floor area for the lot, or 400 sf, whichever is larger.
(3) GARAGE HEIGHT AND MASS: Maximum height of a roof over an attached garage
shall not exceed 15 feet in height as measured from existing grade.
The maximum garage wall plate height shall not exceed 10 feet.
(4) SECOND FLOOR BALCONY LIMITATIONS: No more than one second-floor
deck/balcony shall be permitted per dwelling and shall: (a) only be permitted on a
street-facing or rear facing facade, (b) be located at least 10 feet from any interior
side lot line with a 5.5-foot-tall solid privacy wall or be located at least 30 feet from
any interior side lot line, (c) be located at least 30 feet from the rear lot line, and (d)
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 23
***NOT YET APPROVED***
5
0160212_20260923_ay16
(c) be limited in size to no more than 40 50 square feet.
(5) SCREENING LANDSCAPE: For two-story houses, plant screening trees with a species
having a typical mature height of at least 25 feet and mature canopy width of 15
feet at a quantity of at least one per 25 linear feet along each interior lot line.
Existing trees to be retained that are at least 25 feet tall and 15 feet wide count
towards the required planting. Three closely spaced tall screening shrubs with a
mature height of at least 15 feet and a mature width of at least 3 feet may be
substituted for one screening tree.
Privacy screening landscape shall be located to align with proposed second-floor
windows and/or balconies across the side and rear lot lines and between windows
at facing units on a single property.
(6) PLANTING TYPE AND SIZE: When required, screening trees and shrubs shall be
specified by botanical name with at least 50 percent of screening trees and shrubs
being evergreen. Screening trees shall be specified and planted at 24-inch box size
or larger and 8 feet height or taller. Screening shrubs shall be specified and planted
at 15-gallon size or larger and 8 feet or taller. All trees/shrubs shall be planted in a
minimum two foot wide planting strip.
(7) PLANTING ADJACENT PUE’S: Where an easement such as a PUE exists along an
interior lot line, privacy landscaping is required to be planted on the same
side of the easement as the building, but not within the easement.
(8) SECOND FLOOR WINDOW PRIVACY: For any window on an upper floor or in a
stairway, facing an interior lot line that is located less than 20 feet from a side or
rear lot line, one of the following shall be used: (a) permanent obscure glazing to at
least 5 feet from the finished floor, or (b) exterior mounted permanent architectural
privacy screens that block views more than 70%, or (c) windows with sills above 5
feet from the finished floor level. In a stairway, the finished floor is the height of the
landing.
This standard shall also apply to first-floor windows less than 6 feet from a property
line where the finished floor height is 2 feet or more above grade.
(9) SECOND FLOOR OPERABLE WINDOWS ALONG SIDE LOT LINES: Operable casement
windows on the upper level with a sill height less than 5 feet above the finished
floor and within 20 feet of an interior side lot line shall be hinged so the windows
open towards the public street. Horizontal sliding windows shall not
be permitted facing and within 20 feet of an interior side lot line, unless the
windowsill height is at least 5 feet above the finish floor level.
(c) New or Expanded Second Story Development Next to One-Story House(s)
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 24
***NOT YET APPROVED***
6
0160212_20260923_ay16
The following Standards apply when a project includes a new or expanded second story
adjacent to an existing one-story house.
(1) C1: SIDE DAYLIGHT PLANE CLEARANCE: Where a home on an abutting lot across a
side lot line is single-story or has a second-floor area no more than 500 square feet,
the side daylight plane shall be measured from 8 ft above average grade instead of
10 ft. In the case of an Urban Lot Split, the daylight plane only applies to the original
property lines.
In flood zones, the average grade for determining daylight plane is increased by one-
half of the increase in elevation required to reach base flood elevations, up to a
maximum increase of 30 inches.
(2) SINGLE-STORY BUILDING FORMS: Where a home on an abutting lot across a side lot
line is single-story or has a second-floor area no more than 500 square feet, all
houses with frontage on the street shall have either: (a) a one-story building form
(excluding garages) at least 6 feet forward of the second-floor wall face, and at least
10 feet wide; or (b) a protruding porch or one-story roof overhang at least 6 feet
deep, and at least 8 feet wide.
(d) Flag Lots and Substandard Lots
PAMC 18.12.040(c) prohibits second floors on houses on substandard lots. Second stories
are only allowed as a part of an SB 9 project, subject to Standard D1 below.
(1) SECOND FLOOR AREA ON FLAG LOTS AND SUBSTANDARD LOTS: On lots that are flag
lots (or similar lots without street frontage) and/or substandard lots prior to an
Urban Lot Split, a second floor shall only be allowed to facilitate the minimum 800
sf unit size.
(e) Eichler Neighborhoods
The following ODS apply only in mapped Eichler Tracts, as listed on the map published in the
Eichler Design Guidelines (2018)
(1) EICHLER TRACT GARAGES: In mapped Eichler Tracts, a garage or carport may
be located forward of the front facade plane of the house so long as the garage or
carport is: (a) no more than 21 feet wide, (b) has a roof
pitch of 3:12 (slope of 3 ver cal feet for every 12 horizontal feet) or less, and (c) has
a maximum height of no more than 12 feet above exis ng grade.
(2) EICHLER TRACT ROOF HEIGHTS: In mapped Eichler Tracts the maximum roof height
shall not exceed 23 feet, as measured from exis ng grade to the roof surface.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 25
***NOT YET APPROVED***
7
0160212_20260923_ay16
Proper es in flood zones shall be permi ed to increase building height by one-half
foot for each foot that the base flood eleva on exceeds the exis ng grade.
(3) ROOFLINES IN EICHLER TRACTS: In mapped Eichler Tracts rooflines shall meet the
following: (a) roof pitches no more than 3:12, (b) gable, shed, bu erfly, or flat roof
forms, and (c) 2-foot minimum overhangs at eave and rake sides of roof forms for at
least 50 percent of roof edges.
(4) ROOFLINES IN EICHLER TRACTS: In mapped Eichler Tracts rooflines shall meet the
following: (a) roof pitches no more than 3:12, (b) gable, shed, bu erfly, or flat roof
forms, and (c) 2-foot minimum overhangs at eave and rake sides of roof forms for at
least 50 percent of roof edges.
(5) EXTERIOR MATERIALS IN EICHLER TRACTS: In mapped Eichler Tracts, exterior wall
cladding shall be ver cal board channel or flush siding, wood tongue, and groove
board siding, wood nickel-gap siding, smooth fiber cement panels, or metal panels.
Board-form concrete, concrete block, or stucco may be used as a secondary
material, but collec vely, these materials shall not account for more than 30
percent of all non-glazed wall surfaces.
(6) ENTRIES IN EICHLER TRACTS: In mapped Eichler Tracts, a projec ng entry porch shall
not be used. A covered trellis used as a colonnade or a side porch that does not
project forward of the facade at the entry would not be considered an entry porch.
SECTION 5. Sec on 18.12.110 (Single Family Individual Review) of Chapter 18.12 (R-1
Single-Family Residen al District) of Title 18 (Zoning) of the Palo Alto Municipal Code is hereby
amended as follows (addi ons underlined; dele ons struck-through); unchanged text omi ed
by bracketed ellipses):
18.12.110 Single Family Individual Review Two Story Development
[…]
(b) Applicability
The provisions of this Sec on 18.12.110 apply to the construc on that does not comply with
the objec ve standards for two-story development adopted by the City Council. Such
projects include construc on of a new singly developed two-story structure; the
construc on of a new second story; or the expansion of an exis ng second story by more
than 150 square feet in the R-1 single family residen al district. All second-story addi ons
on a site a er November 19, 2001 shall be included in calcula ng whether an addi on is
over 150 square feet.
(c) Single-Family Objec ve Design Standards
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 26
***NOT YET APPROVED***
8
0160212_20260923_ay16
All construc on as described in Sec on 18.12.110 (b) shall meet the single family objec ve
design standards set forth in Sec on 18.12.045. Projects complying with these standards
shall be subject to ministerial building permit review. However, applicants may choose to
forgo one or more objec ve standards, in which case the project no longer qualifies for
ministerial review and will be subject to Individual Review as set forth in
Sec ons 18.12.110(d) and 18.77.075.
(c d) Individual Review Guidelines
The director of planning and development services shall issue guidelines to direct staff and
project applicants in implemen ng the goals and purposes and other provisions of this
chapter. Guidelines establishing substan ve review standards for second story development
shall be presented to the planning and transporta on commission for their comment prior
to adop on or amendment by the director.
(d) (1) Findings
Neither the director, nor the city council on appeal, shall grant an individual review
approval, unless it is found that the applica on is consistent with the individual review
guidelines.
(e) (2) Condi ons
In gran ng individual review approvals, reasonable condi ons or restric ons may be
imposed if appropriate or necessary to protect the public health, safety, general
welfare, or convenience, and to secure the purposes of this tle (Zoning).
(f) (3) Applica on Review and Ac on
Applica ons for individual review approval shall be reviewed and acted upon as set
forth in Sec on 18.77.075.
(4) Preliminary Mee ng with Planning Staff
Project applicants are strongly encouraged, before applying for individual review of a
project, to meet with planning staff to discuss designing a project that promotes the
goals of this chapter and the individual review guidelines, and to discuss the proposed
plans with their neighbors. Projects subject to ODS are also encouraged to meet with
planning staff for a preliminary mee ng to discuss compliance with the ODS standards
before submi ng for building permit.
(h) (5) Changes to Approved Projects
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 27
***NOT YET APPROVED***
9
0160212_20260923_ay16
The director may approve changes to a previously approved individual review project
without following the procedure set forth in Sec on 18.77.075 if those changes do not
affect compliance with the individual review guidelines. Examples of such changes
include:
(1) (A) Reduc ons in window or door size, or reduc ons in the number of windows.
(2) (B) Changes to aspects of the project not reviewed under individual review, such
as materials or non-street-facing first story windows.
(3) (C) Changes that do not affect privacy/streetscape.
(4) (D) Increases in setbacks.
(5) (E) Reduc ons in second floor mass that do not affect privacy or streetscape.
SECTION 6. Sec on 18.13.040(c) (Single-Family and Two-Family Uses) of Chapter
18.13 (Mul ple Family Residen al (RM-20, RM-30 And RM-40) Districts) of Title 18 (Zoning) of
the Palo Alto Municipal Code is hereby amended as follows (addi ons underlined; dele ons
struck-through); unchanged text omi ed by bracketed ellipses):
(c) Single-Family and Two-Family Uses
(1) The regula ons in Chapter 18.12 that apply to the R-1 district shall apply to sites in
single-family use in the mul ple-family residence districts. The regula ons in Chapter
18.10 that apply to the R-2 district may be applied, at the applicant's discre on, to
sites in two-family use in the mul ple-family residence districts, in lieu of the mul -
family standards.
(2) The Single Family Objec ve Design Standards shall be applied to any two-story
single-family or two-family residence in the mul -family districts, to only those sides
of a site that share an interior side lot line with the interior side or rear lot line of a
property zoned for or used for single-family or two-family dwellings.
(3) The Individual Review provisions of Sec on 18.12.110 of the Zoning Ordinance shall
be applied to any single-family or two-family residence in the mul -family districts,
to those sides of a site that share an interior side lot line with the interior side or rear
lot line of a property zoned for or used for single-family or two-family dwellings. The
Individual Review shall not be applied to adjacent uses other than single-family and
two-family uses.
[…]
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 28
***NOT YET APPROVED***
10
0160212_20260923_ay16
SECTION 7. Sec on 18.42.180 (Standards for Two Units on Single Family Zoned Lots
Pursuant to Senate Bill 9) of Chapter 18.42 (Standards for Special Uses) of Title 18 (Zoning) of the
Palo Alto Municipal Code is amended to read as follows (addi ons underlined; dele ons struck-
through; unchanged text omi ed by bracketed ellipses):
18.42.180 Standards for Two Units on Single Family Zoned Lots Pursuant to Senate Bill 9.
(a) Purpose. This sec on sets forth special regula ons applicable to the construc on of two
dwelling units on single family lots in the R-1 (and R-1 subdistricts) and R-E zone districts,
pursuant to California Government Code Sec ons 65852.21 and 66411.7 (SB 9, 2021). In
the event of a conflict between the provisions of this sec on and the generally applicable
regula ons of Chapters 18.10, 18.12, and 18.52-18.80, inclusive, the provisions of this
sec on the more permissive provision shall prevail.
(b) Defini ons. As used in this sec on:
(1) “Specific, adverse impact” means a significant, quan fiable, direct, and unavoidable
impact, based on objec ve, iden fied wri en public health or safety or physical
environmental standards, policies, or condi ons as they existed on the date the
applica on was deemed complete. Inconsistency with the zoning ordinance or
general plan land use designa on shall not cons tute a specific, adverse, impact.
(2) “Sufficient to allow separate conveyance” means the two dwelling units cons tute
clearly defined, separate, and independent housekeeping units without interior
access points to the other dwelling unit.
(3) “Two dwelling units” means the development proposes two new units on a vacant
lot or proposes to add one new unit to one exis ng unit on a lot. This does not include
the development of a single dwelling unit on a vacant lot.
(4) “Unit” means any dwelling unit, including, but not limited to a primary dwelling unit,
an accessory dwelling unit, or a junior accessory dwelling unit.
(c) Applicability. When an applica on is submi ed that includes both (1) the construc on
of two dwelling units under this sec on and (2) other redevelopment work that is not
integral to crea on of a new dwelling unit and would generally require discre onary
review, only the por ons required for construc on of dwelling units shall be reviewed
ministerially. In addi on, this sec on shall not apply in any of the following
circumstances:
(1) Parcels described California Government Code Sec on 65913.4, subdivisions (a)(6)(B)
through (a)(6)(K) inclusive, as that sec on read on September 16, 2021. Such parcels
include, for example, parcels located in wetlands, in very high fire severity zones
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 29
***NOT YET APPROVED***
11
0160212_20260923_ay16
(unless the site has adopted certain fire hazard mi ga on measures), and in special
flood hazard areas or regulatory floodways (unless the site meets certain federal
requirements for development).
(2) Parcels on which an owner of residen al real property has exercised the owner’s
rights under state law to withdraw accommoda ons from rent or lease within the
past 15 years.
(3) The development would require altera on or demoli on of any of the following types
of housing
(A) Housing that is subject to a recorded covenant, ordinance, or law that restricts
rents to levels affordable to persons and families of moderate, low, or very low
income.
(B) Housing that is subject to any form of rent or price control through a public
en ty’s valid exercise of its police power.
(C) Housing that has been occupied by a tenant in the last three years.
(4) The development would result in the demoli on of more than 25 percent of the
exis ng exterior structural walls of a site that has been occupied by a tenant in the
last three years.
(5) (4) The development is located within a historic district or property included on the
State Historic Resources Inventory, as defined in California Public Resources Code
Sec on 5020.1, or within a site that is designated or listed on the City’s historic
inventory.
(6) (5) The building official finds that the development would have a specific, adverse
impact on public health and safety or the physical environment that cannot be
feasibly mi gated or avoided.
(d) Applica on Process.
(1) The Director is authorized to promulgate regula ons, forms, and/or checklists se ng
forth applica on requirements for the development of dwelling units under this
sec on.
(2) The City shall ministerially approve or disapprove an applica on pursuant to this
sec on.
(3) The director of planning shall consider and approve or deny an applica on for a
proposed housing development pursuant to this sec on within 60 days from the
date the City receives a completed applica on. If the director has not approved or
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 30
***NOT YET APPROVED***
12
0160212_20260923_ay16
denied the completed applica on within 60 days, the applica on shall be deemed
approved.
(4) If the director denies an applica on for a proposed housing development pursuant
to this sec on, the director shall, within 60 days of receipt of the completed
applica on, return in wri ng a full set of comments to the applicant with a list of
items that are defec ve or deficient and a descrip on of how the applicant can
remedy the applica on.
(e) Development Standards.
(1) A project proposing two dwelling units on a parcel in the R-1 or RE districts shall be
subject to the development standards set forth in Chapters 18.12 and 18.10,
respec vely except as provided herein.
(2) All construc on pursuant to this sec on shall comply with objec ve design standards
adopted by the City Council for two-story development, except to the extent
necessary to construct a unit of 800 square feet. However, an applicant seeking to
deviate from the objec ve design standards (except to the extent necessary to
construct a unit of 800 square feet) may elect to submit an applica on for under the
base requirements of Chapters 18.10, or 18.12, including, if applicable, Single Family
Individual Review.
(3) If the applica on of any development standard or design standard would necessarily
require that one or more proposed units be less than 800 square feet, such standard
shall be relaxed to the minimum extent necessary to allow construc on of a unit or
units of at least 800 square feet. The Director may publish regula ons governing the
order in which objec ve standards shall be waived or relaxed in such circumstances.
(4) Setbacks from side and rear property lines, including street-side property lines, shall
be no less than four feet, except in the case of exis ng non-complying structures or
structures reconstructed in the same loca on and to the same dimensions as an
exis ng structure, in which case exis ng setbacks less than four feet may be
maintained. No setback is required from an internal lot line newly created pursuant
to Chapter 21.10, for adjacent or connected structures separated by the new lot line,
provided that the structures meet building code safety standards and are sufficient
to allow separate conveyance.
(5) Off-street parking shall be provided pursuant to Chapters 18.52 and 18.54.
(6) In the event that a project is proposed on a site that has been subject to an Urban Lot
Split under Chapter 21.10, and the project would result in three or more detached
units across the two parcels created by the urban lot split, any new units shall not
exceed 800 square feet.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 31
***NOT YET APPROVED***
13
0160212_20260923_ay16
(7) (6) Accessory structures, such as garages and shed are permi ed consistent with the
provisions of the zoning district; however, no accessory structure shall have a floor
area exceeding 500 square feet.
(8) (7) The Director of Public Works may promulgate standards for adjacent public
improvements, such as curb cuts and sidewalks, in rela on to development pursuant
to this Sec on.
(f) General Requirements.
(1) A maximum of two units, including an accessory dwelling unit or junior accessory
dwelling unit created pursuant to Chapter 18.09, may be located on any parcel that
is created by an Urban Lot Split under Chapter 21.10. Accessory dwelling units and
junior accessory dwelling units shall not be permi ed on any such parcel already
containing two units.
(2) On parcels that are not the result of an Urban Lot Split under Chapter 21.10,
accessory dwelling units may be proposed in addi on to the primary dwelling unit or
units, consistent with Chapter 18.09, provided, however, that ADUs associated with
projects proceeding under this Sec on shall not receive any exemp on from Floor
Area Ra o except to the minimum extent required by California Government Code
Sec on 65852.2.
(3) A rental of any unit created pursuant to this Sec on shall be for a term longer than
30 consecu ve days.
(4) For residen al units connected to an onsite wastewater treatment system, a
percola on test completed within the last 5 years, or, if the percola on test has been
recer fied, within the last 10 years.
(5) Each unit shall have a permanent street address.
(6) The owner and all successors in interest in the subject property shall agree to
par cipate in any City survey of proper es that have constructed dwelling units
pursuant to this Sec on.
(g) Effec ve Dates. This sec on shall remain in effect un l such me as Government Code
Sec on 65852.21 is repealed, or superseded, or invalidated by a court of competent
jurisdic on, or its requirements for ministerial approval of no more than two units on a
single family zoned lot are materially amended, whether by legisla on or ini a ve, at
which me this sec on shall become null and void.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 32
***NOT YET APPROVED***
14
0160212_20260923_ay16
SECTION 8. Chapter 21.10 (Urban Lot Splits) of Title 21 (Subdivisions and Other
Divisions of land) of the Palo Alto Municipal Code is amended to read as follows (addi ons
underlined; dele ons struck-through):
Chapter 21.10
PARCEL MAPS FOR URBAN LOT SPLITS IN SINGLE-FAMILY ZONES
Sec on 21.10.010 Purpose
Sec on 21.10.020 Defini ons
Sec on 21.10.030 Applicability
Sec on 21.10.040 General Requirements
Sec on 21.10.050 Applica on and Review of an Urban Lot Split
Sec on 21.10.060 Effec ve dates
Sec on 21.10.010 Purpose
This chapter sets forth special regula ons applicable to the subdivision of a single family lot in the
R-1 district (and R-1 subdistricts) or R-E district into two new lots, pursuant to California
Government Code Sec on 66411.7 (SB 9, 2021).
Sec on 21.10.020 Defini ons
As used in this chapter:
(a) “Ac ng in concert” means pursuing a shared goal to split adjacent lots pursuant to an
agreement or understanding, whether formal or informal.
(b) “Specific, adverse impact” means a significant, quan fiable, direct, and unavoidable
impact, based on objec ve, iden fied wri en public health or safety or physical
environmental standards, policies, or condi ons as they existed on the date the
applica on was deemed complete. Inconsistency with the zoning ordinance or general
plan land use designa on shall not cons tute a specific, adverse, impact.
(c) “Unit” means any dwelling unit, including, but not limited to, a unit or units created
pursuant to Sec on 18.42.180, a primary dwelling unit, an accessory dwelling unit, or a
junior accessory dwelling unit.
(d) “Urban Lot Split” means the subdivision of an exis ng legal parcel in the R-1 district (and
R-1 subdistricts) or R-E district to create no more than two new parcels of approximately
equal area, pursuant to this Chapter and California Government Code Sec on 66411.7.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 33
***NOT YET APPROVED***
15
0160212_20260923_ay16
Sec on 21.10.030 Applicability
The provisions of this chapter shall apply only to lots in the R-1 district (and R-1 subdistricts) or
R-E zone district. Except as modified by this Chapter, all provisions of Title 21 shall apply to an
applica on for urban lot split. An Urban Lot Split is not available in any of the following
circumstances:
(a) A parcel described California Government Code Sec on 65913.4, subdivisions (a)(6)(B)
through (a)(6)(K) inclusive, as that sec on read on September 16, 2021. Such parcels
include, for example, parcels located in wetlands, in very high fire severity zones (unless
the site has adopted certain fire hazard mi ga on measures), and in special flood hazard
areas or regulatory floodways (unless the site meets certain federal requirements for
development).
(b) A parcel on which an owner of residen al real property has exercised the owner’s rights
under state law to withdraw accommoda ons from rent or lease within the past 15 years.
(c) A parcel that was created by prior exercise of an Urban Lot Split.
(d) A parcel adjacent to a parcel that was created by prior exercise of an Urban Lot Split by
the owner, or a person ac ng in concert with the owner of the parcel sought to be split.
(e) The Urban Lot Split would require altera on or demoli on of any of the following types
of housing:
(1) Housing that is subject to a recorded covenant, ordinance, or law that restricts rents
to levels affordable to persons and families of moderate, low, or very low income.
(2) Housing that is subject to any form of rent or price control through a public en ty’s
valid exercise of its police power.
(3) Housing that has been occupied by a tenant in the last three years.
(f) The Urban Lot Split is located within a historic district or property included on the State
Historic Resources Inventory, as defined in California Public Resources Code Sec on
5020.1, or within a site that is designated or listed on the City’s historic inventory.
(g) The building official finds that the development would have a specific, adverse impact on
public health and safety or the physical environment that cannot be feasibly mi gated or
avoided.
Sec on 21.10.040 General Requirements
(a) The minimum size for a parcel created by an Urban Lot Split is 1,200 square feet.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 34
***NOT YET APPROVED***
16
0160212_20260923_ay16
(b) The lots created by an Urban Lot Split must be of approximately equal area, such that no
resul ng parcel shall be smaller than 40 percent of the lot area of the original parcel
proposed for subdivision.
(c) Where exis ng dwelling units on the property are to remain, no lot line may be created
under this Chapter in a manner that would bisect any structure or that would result in
more than two dwelling units on any resul ng parcel.
(d) Newly created lot lines shall not render an exis ng structure noncomplying in any respect
(e.g. floor area ra o, lot coverage, parking), nor increase the degree of noncompliance of
an exis ng noncompliant structure Reserved.
(e) Each parcel shall comply with any objec ve lot design standards for an Urban Lot Splits
adopted by the City Council per Sec on 21.10.045 and consistent with Chapter 66411.7
of the Government Code.
(f) U lity easements shall be shown on the parcel map, and recorded prior to, or concurrent
with final parcel map recorda on.
(g) A covenant necessary for maintenance of stormwater treatment facili es shall be
recorded prior to, or concurrent with final map recorda on.
(h) Exis ng driveways to be demolished shall follow the procedure(s) in 12.08.090 Elimina on
of abandoned driveway.
(i) A maintenance agreement shall be recorded to ensure shared maintenance of any shared
access easements, stormwater treatment, landscaping and private u li es, prior to final
parcel map recorda on.
Sec on 21.10.045 Objec ve Design Standards for an Urban Lot Split
(a) Lot Typology. An Urban Lot Split shall meet one of the three typologies:
(1) Side-by-side. One lot line shall divide the property from front to rear, with street
frontages for both lots.
(2) Flag Lot. Two property lines shall divide the property to create a new flag lot. The
“flagpole” shall be at least 10 feet wide.
(3) Flag Lot with Easement. Two property lines shall divide the property to create a new
flag lot. The “flagpole” shall be an access easement at least 10 feet wide to create
access to the rear lot.
(b) New Lot Lines. One property line may be used to divide an exis ng lot into two side-by-
side lots. Two property lines may be used to create a flag lot. No more than two new lot
lines may be added. The new lot lines, as far as prac cable, shall be parallel or at right
angles to straight streets or radial to curved streets.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 35
***NOT YET APPROVED***
17
0160212_20260923_ay16
(c) Minimum Street Frontage. The minimum street frontage for a side-by-side split shall be
25 feet wide per parcel. The minimum street frontage for a flag lot split shall be 10 feet
wide per parcel.
(d) New Driveways must meet requirements of all applicable standards, including but not
limited to Sec on 18.54 and Sec on 12.08.
(e) If a shared driveway is proposed, it shall be no more than 20 feet wide regardless of the
loca on of the new property line(s). A recorded access easement is required.
Sec on 21.10.050 Applica on and Review of an Urban Lot Split
(a) The director of planning is authorized to promulgate regula ons, forms, and/or checklists
se ng forth applica on requirements for a parcel map for an Urban Lot Split under this
Chapter. An applica on shall include an affidavit from the property owner, signed under
penalty of perjury under the laws of California, that:
(1) The proposed urban lot split would not require or authorize demoli on or altera on
of any of the housing described in Sec on 21.10.030, subdivision (e).
(2) The proposed urban lot split is not on a parcel described in Sec on 21.10.030.
(3) The owner intends to occupy one of the housing units located on a lot created by the
parcel map as their principal residence for a minimum of three years from the date
of the recording of the parcel map.
(4) The rental of any unit on the property shall be for a term longer than 30 consecu ve
days.
(5) The resul ng lots will be for residen al uses only.
(b) A parcel map for an Urban Lot Split must be prepared by a registered civil engineer or
licensed land surveyor in accordance with Government Code sec ons 66444 – 66450 and
this Chapter. Unless more specific regula ons are adopted by the director of planning,
the parcel map shall be in the form and include all of the informa on required of a
Preliminary Parcel Map by Chapter 21.12, as well as any addi onal informa on required
of a Parcel Map by Chapter 21.16. In addi on, the face of the Parcel Map shall contain a
declara on that:
(1) Each lot created by the parcel map shall be used solely for residen al dwellings.
(2) That no more than two dwelling units may be permi ed on each lot.
(3) That rental of any dwelling unit on a lot created by the parcel map shall be for a term
longer than 30 consecu ve days.
(4) A lot created by a parcel map under this Chapter shall not be further subdivided.
(c) Upon receipt of a parcel map for an Urban Lot Split, the director of planning shall transmit
copies to the city engineer, chief building official, director of u li es, chief of police, fire
chief, director of transporta on, and such other departments of the city, and any other
agencies, as may be required by law or deemed appropriate.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 36
***NOT YET APPROVED***
18
0160212_20260923_ay16
(d) The director of planning shall cause a no ce of the pending applica on to be posted at
the site of the proposed Urban Lot Split and for no ce to be mailed to owners and
residents of property within 600 feet of the property.
(e) The director of planning shall ministerially review and approve a parcel map for Urban Lot
Split if they determine that the parcel map applica on meets all requirements of this
Chapter. The director of planning shall deny a parcel map applica on that does not meet
any requirement of this Chapter.
(f) The director of planning shall consider and approve or deny an applica on for an urban
lot split within 60 days from the date the City receives a completed applica on. If the
director has not approved or denied the completed applica on within 60 days, the
applica on shall be deemed approved.
(g) If the director denies an applica on for an urban lot split, the director shall, within 60
days of receipt of the completed applica on, return in wri ng a full set of comments to
the applicant with a list of items that are defec ve or deficient and a descrip on of how
the applicant can remedy the applica on.
(h) (f) The Director of Planning shall determine the appropriate fee required for an
applica on for parcel map for an Urban Lot Split, which may be the fee currently
established for a Preliminary Parcel Map or Parcel Map.
Sec on 21.10.060 Effec ve Dates.
This chapter shall remain in effect un l such me as Government Code Sec on 66411.7 is
repealed or superseded or its requirements for ministerial approval of an Urban Lot Split on a
single family zoned lot are materially amended, whether by legisla on or ini a ve, at which me
this chapter shall become null and void.
SECTION 9. Sec on 16.64.030 (Deferred Payment) of Chapter 16.64 (Development
Fee and In-Lieu Payment Administra on) of Title 16 (Building Regula ons) of the Palo Alto
Municipal Code is hereby amended as follows (addi ons underlined; dele ons struck-through):
16.64.030 Deferred Payment
For residential development only, payment of a fee may be deferred to the date of final building
inspection approval of the development, the development is approved for occupancy. If the
development contains more than one dwelling, the fee shall be paid on a pro rata basis for each
dwelling when it is approved for occupancy.
The fees may be deferred only if provided the owner of the real property for which the fees are
required enters into a recordable agreement with the city prior to issuance of the building
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 37
***NOT YET APPROVED***
19
0160212_20260923_ay16
permit for the development, which from the date of recordation, shall constitute a lien on the
property and shall be enforceable against successors in interest to the property owner. The
agreement shall provide that final occupancy approval shall not be given until the fees are paid.
The director of planning and development services may execute the agreement on behalf of the
city in a form acceptable to the city attorney.
SECTION 10. Section 16.64.040 (Calculation of Fee) of Chapter 16.64 (Development
Fee and In-Lieu Payment Administration) of Title 16 (Building Regulations) of the Palo Alto
Municipal Code is hereby amended as follows (additions underlined; deletions struck-through;
unchanged text omitted by bracketed ellipses):
16.64.040 Calculation of Fee
A fee shall be payable at the rate specified in the council-adopted municipal fee schedule in
effect on the date the fees are paid, except: (1) an that the applicant for a vesting tentative map
for a development project shall pay the fees in effect on the date the application for the vesting
tentative map is deemed complete., and (2) an applicant that defers fees for a designated
residential redevelopment project, as defined in California Government Code Section 66007,
may elect to pay the fees in effect at the time of building permit issuance.
SECTION 11. Section 18.15.020 (Definitions) of Chapter 18.15 (Density Bonus) of Title
18 (Zoning) of the Palo Alto Municipal Code is hereby amended as follows (additions underlined;
deletions struck-through; unchanged text omitted by bracketed ellipses):
18.15.020 Definitions
[…]
(w) “Senior ci zen housing development” means a Development consistent with the
California Fair Employment and Housing Act (Government Code Sec on 12900 et. seq.,
including 12955.9 in par cular), which has been “designed to meet the physical and
social needs of senior ci zens,” and which otherwise qualifies as “housing for older
persons” as that phrase is used in the federal Fair Housing Amendments Act of 1988 (P.L.
100-430) and implemen ng regula ons (24 CFR, part 100, subpart E), and as these
phrases are used in California Civil Code Sec ons 51.2, 51.3, and 51.12. For purposes of
this Chapter, “senior ci zen housing development” includes a shared housing building
development and a residen al care facility for the elderly, as defined in California Health
and Safety Code Sec on 1569.2.
[…]
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 38
***NOT YET APPROVED***
20
0160212_20260923_ay16
(y) “Shared housing unit” means one or more habitable rooms, not within another dwelling
unit, that includes a bathroom, sink, refrigerator, and microwave, is used for permanent
residence, that meets the “minimum room area” specified in Sec on R304 of the
California Residen al Code (Part 2.5 of Title 24 of the California Code of Regula ons),
and complies with the defini on of “guestroom” in Sec on R202 of the California
Residen al Code. If a local ordinance further restricts the a ributes of a shared housing
building beyond the requirements established in this sec on, the local defini on shall
apply to the extent that it does not conflict with the requirements of this sec on.
“Shared housing unit” for purposes of a residen al care facility for the elderly, as defined
in California Health and Safety Code Sec on 1569.2, includes a unit without an individual
kitchen where a unit may be shared by unrelated persons, and a unit where a room that
may be shared by unrelated persons meets the “minimum room area” requirements
specified in Sec on R304 of the California Residen al Code.
(z) “Student housing development” means a development that contains bedrooms
containing two or more bedspaces that have a shared or private bathroom, access to a
shared or private living room and laundry facilities, and access to a shared or private
kitchen.
(y)(aa) "Total units" or "total dwelling units" means a calcula on of the number of units
that:
(1) Excludes a unit added by a density bonus awarded pursuant to this sec on or any
local law gran ng a greater density bonus.
(2) Includes a unit designated to sa sfy an inclusionary zoning requirement of a city,
county, or city and county.
For purposes of calcula ng a density bonus granted pursuant to this sec on for a shared
housing building, "unit" means one shared housing unit and its pro rata share of associated
common area facili es.
(z)(ab) "Very low vehicle travel area" means an urbanized area, as designated by the United
States Census Bureau, where the exis ng residen al development generates vehicle
miles traveled per capita that is below 85 percent of either regional vehicle miles
traveled per capita or city vehicle miles traveled per capita. For purposes of this
paragraph, "area" may include a travel analysis zone, hexagon, or grid. For the purposes
of determining "regional vehicle miles traveled per capita" pursuant to this paragraph, a
"region" is the en rety of incorporated and unincorporated areas governed by a mul -
county or single-county metropolitan planning organiza on, or the en rety of the
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 39
***NOT YET APPROVED***
21
0160212_20260923_ay16
incorporated and unincorporated areas of an individual county that is not part of a
metropolitan planning organiza on.
SECTION 12. Section 18.15.030 (Density Bonuses) of Chapter 18.15 (Density Bonus) of
Title 18 (Zoning) of the Palo Alto Municipal Code is hereby amended as follows (additions
underlined; deletions struck-through; unchanged text omitted by bracketed ellipses):
18.15.030 Density Bonuses
This sec on describes the density bonuses that will be provided, at the request of an applicant,
when that applicant provides restricted affordable units as described below.
[...]
(c) The city shall grant a thirty-five percent (35%) density bonus when an applicant for a
student housing development of five (5) or more dwelling units seeks and agrees to
construct in accordance with the requirements of this sec on and Government Code
Sec on 65915: (1) At, in which at least twenty percent (20%) of the total dwelling units
will be restricted and used for lower income students. For each one percent (1%)
increase in the percentage of restricted lower income units between twenty and twenty-
four percent (20-24%) of total units, a development will receive an addi onal three and
three-quarters percent (3.75%) density bonus up to fi y percent (50%) of the maximum
residen al density.
(2) (1) For purposes of calcula ng a density bonus granted pursuant to this
subparagraph, the term “unit” as used in this subparagraph means one rental bed
and its pro rata share of the associated common area facili es. The units
described in this subparagraph shall be subject to an affordability restric on of 55
years, which shall not e any rental bed reserved for lower income students to a
specific bedroom. Notwithstanding any other law, an affordability restric on
provision, state or county law or policy, or property management policy shall not
prevent a lower income student from sharing a room or unit with a non-lower
income student. Any a empted waiver of the requirements of this clause is void
as against public policy.
(3) (2) All units will be used exclusively for undergraduate, graduate, or professional
students enrolled full me at an ins tu on of higher educa on accredited by the
Western Associa on of Schools and Colleges or the Accredi ng Commission for
Community and Junior Colleges.
(4) (3) The applicant must submits evidence that the applicant entered into an
opera ng agreement or master lease with one or more ins tu ons of higher
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 40
***NOT YET APPROVED***
22
0160212_20260923_ay16
educa on for the ins tu on(s) to occupy all units of the student housing
development with students from that ins tu on(s) or has established a system for
confirming its renters’ status as students to ensure that all units of the student
housing development are occupied with students from an ins tu on of higher
educa on.
(5) (4) The rent provided in the applicable units of the development for lower income
students shall be calculated at thirty percent (30%) of sixty-five percent (65%) of
the area median income for Santa Clara County for a single-room occupancy unit
type.
(6) (5) The applicant will provide priority for the applicable affordable units for lower
income students experiencing homelessness. A homeless service provider, as
defined in paragraph (3) of subdivision (e) of Sec on 103577 of the Health and
Safety Code, or ins tu on of higher educa on that has knowledge of a person's
homeless status may verify a person's status as homeless for purposes of this
subclause.
(6) The student housing development must not be located on a site that pursuant to
Sec on 65915(c)(3) of the California Government Code would require
replacement units for projects with greater than a 35 percent density bonus.
[…]
(i) An Except as provided in subsec on (c)(6) of this Sec on, an applicant (or project) shall be
ineligible for a density bonus or any other incen ves or concessions under this chapter if
the housing development is proposed on any property that includes a parcel or parcels
on which rental dwelling units are located or, if the dwelling units have been vacated or
demolished in the five-year period preceding the applica on, have been subject to a
recorded covenant, ordinance, or law that restricts rents to levels affordable to persons
and families of lower or very low income; subject to any other form of rent or price
control through the City’s valid exercise of its police power; or occupied by lower or very
low income households, unless the proposed housing development replaces those units,
and either of the following applies:
(1) The proposed housing development, inclusive of the units replaced pursuant to
this paragraph, contains affordable units at the percentages set forth in
Sec on 18.15.030.
(2) Each unit in the development, exclusive of a manager’s unit or units, is affordable
to, and occupied by, either a lower or very low income household.
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 41
***NOT YET APPROVED***
23
0160212_20260923_ay16
[…]
SECTION 13. Sec on 18.15.050 (Development Concessions and Incen ves) of Chapter
18.15 (Density Bonus) of Title 18 (Zoning) of the Palo Alto Municipal Code is hereby amended as
follows (addi ons underlined; dele ons struck-through; unchanged text omi ed by bracketed
ellipses):
18.15.050 Development Concessions and Incen ves
This sec on includes provisions for providing concessions or incen ves pursuant to Government
Code Sec on 65915.
(a) By right parking incen ves. Upon request by the applicant, a development that is
eligible for a density bonus may provide parking as provided in this subsec on (a),
consistent with Government Code Sec on 65915(p), inclusive of parking for persons with
a disability and guests:
(1) Zero to one bedroom unit: one on-site parking space;
(2) Two to three bedroom unit: one and one-half on-site parking spaces;
(3) Four or more bedroom unit: two and one-half parking spaces.;
(4) One bedspace in a student housing development: zero parking spaces.
If the total number of spaces required results in a frac onal number, it shall be rounded up to
the next whole number. For purposes of this subsec on, this parking may be provided through
tandem parking or uncovered parking, but not through on-street parking.
[…]
(c) Other incen ves and concessions. A development is eligible for other concessions or
incen ves as follows:
(1) One concession or incen ve for a development that makes at least ten percent
(10%) of the total dwelling units affordable to lower income households; or at least
five percent (5%) of the total dwelling units affordable to very low income
households; or at least ten percent (10%) of the total dwelling units affordable to
moderate income households in a development in which the units are for sale; or
at least twenty percent (20%) of the total units in a student housing development
for low income students, as provided for in 18.15.030(c).
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 42
***NOT YET APPROVED***
24
0160212_20260923_ay16
(2) Two concessions or incen ves for a development that makes at least seventeen
percent (17%) of the total dwelling units affordable to lower income households; or
at least ten percent (10%) of the total dwelling units affordable to very low income
households; or at least twenty percent (20%) of the total dwelling units affordable
to moderate income households in a development in which the units are for sale;
or at least twenty-three percent (23%) of the total units in a student housing
development for low income students, as provided for in 18.15.030(c).
[…]
SECTION 14. If any section, subsection, clause or phrase of this Ordinance is for any
reason held to be invalid, such decision shall not affect the validity of the remaining portion or
sections of the Ordinance. The Council hereby declares that it should have adopted the
Ordinance and each section, subsection, sentence, clause or phrase thereof irrespective of the
fact that any one or more sections, subsections, sentences, clauses or phrases be declared
invalid.
//
//
//
//
//
//
//
//
//
//
//
//
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 43
***NOT YET APPROVED***
25
0160212_20260923_ay16
SECTION 15. The Council finds that the Ordinance is exempt from the California
Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15061(b)(3) because it
can be seen with certainty that there is no possibility that updating the municipal code to
implement existing changes in preemptive state housing law will have a significant effect on the
environment.
SECTION 16. This ordinance shall be effective on the 31st day after its adoption.
INTRODUCED:
PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
City Clerk Mayor
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
Assistant City Attorney City Manager
Director of Planning and
Development Services
Item 2
Attachment A - Draft
Ordinance
Packet Pg. 44
Two-Story Development Objective Design Standards February 2025 Page 1 of 6
Attachment B
Proposed Changes to the Adopted Two-Story Development Objective Design Standards
A1: FRONT SETBACK Where the contextual front yard setback does
not apply, the front setback shall be no less than the average front
setback of the homes on lots to either side of the subject lot, up to
a maximum of 25 feet. Otherwise, the zoning minimum front
setback or special setback would still apply.
No change.
A2: STUCCO TEXTURE: When stucco is used it shall be steel-
troweled ‘Smooth’ or ‘Santa Barbara’ texture as described
in the Technical Services Information Bureau, Chapter 5 - Plaster
Textures & Acrylic Finishes (2011). For additions, stucco plaster
texture on the addition shall be allowed to match the stucco
texture of the existing house.
Eliminate, as it is overly prescriptive.
This change makes the standards more
consistent with what is applicable to single-
story homes to comply with SB 450.
A3: CONTEXTUAL PORCH ENTRIES: If porches (i.e., roofed, street-
facing porches with posts/ column(s) and more than 3
feet deep), occur on more than half of the houses on the same side
of the block, including the subject site, the proposed house(s) with
street frontage shall include a street-facing porch no less than 4.5
feet deep and 6 feet wide.
No change.
A4: DRIVEWAY WIDTH: 18-foot maximum driveway width (inclusive
of uncovered parking) within a front or street side yard setback
Eliminate. The code already restricts the
driveway to a maximum of 20 feet.
A5: PLANTING STRIP: A minimum two-foot wide, landscaped
planting strip is required between a driveway and/or uncovered
parking space and an existing interior lot line.
Eliminate, as it is overly prescriptive.
A6: GARAGE LOCATION: Attached garages adjacent to the front
setback must be located a minimum of 5 feet behind
the forwardmost plane of the front facade or 3 feet behind
the forwardmost plane of the street-side façade.
The forwardmost façade plane may be a building wall or porch with
posts/columns and must be at least 12 feet wide. In mapped
Eichler neighborhoods (see Section E), this standard does not apply.
Text Change:
A6: GARAGE LOCATION: Where the
contextual garage setback does not apply,
attached garages […]
This clarifies application and aligns with
standard A1.
A7: GARAGE WIDTH: An attached garage or carport facing the
street shall be no more than 30 percent of the total facade width
facing that street, except that it may be 12 feet wide in any
circumstance.
Text Change:
A7: GARAGE WIDTH: An attached garage or
carport facing the street shall be no more
than 30 percent of the total facade width
facing that street, except that it may be 12 20
feet wide in any circumstance.
This allows for a standard two-car garage.
A8: GARAGE DOOR DESIGN AND MATERIALS: The garage door shall
match the material, color, or panel design pattern of the entry
door, window fenestration, or exterior cladding material.
No change.
Item 2
Attachment B - Objective
Design Standards Revisions
Packet Pg. 45
Two-Story Development Objective Design Standards February 2025 Page 2 of 6
A9: GARAGE DOOR SIZE: When visible from the street, the
maximum garage door width shall be 16 feet and the maximum
garage door height shall be 8 feet. If two single-wide garage
doors are used instead of one double-wide door, each door's
maximum width shall be 9 feet and maximum height 8 feet.
No change. This is the width of a standard
two-car garage door.
A10: ROOF DECK NOT PERMITTED: A roof deck (i.e., a deck above
the first level of a single-story building or second level of a two-
story building) shall not be permitted.
No change.
A11: ROOF HEIGHT FOR VARIED ROOF PITCHES: Roof height shall be
limited to 27 feet for roofs with pitches 9:12 or greater, 25
feet for roofs with pitches 3:12, up to 9:12, and 22 feet for roofs
with pitches less than 3:12, inclusive of parapets on flat roofs. In
flood zones, the maximum height is increased by one-half of the
increase in elevation required to reach base flood elevations, up to
a maximum increase of 30 inches.
Text change:
A11: ROOF HEIGHT FOR VARIED ROOF
PITCHES: Roof height shall be limited to 27
feet for roofs with pitches 9:12 or greater, 25
feet for roofs with pitches 3:12, up to 9:12,
and 22 23 feet for roofs with pitches less
than 3:12, inclusive of parapets on flat roofs.
In flood zones, the maximum height is
increased by one-half of the increase in
elevation required to reach base flood
elevations, up to a maximum increase of 30
inches.
This allows for increased flexibility in flood
zones.
A12: GABLE ROOF FORMS: No more than three gable forms on an
elevation facing a public street.
No change.
A13: BAY WINDOWS: No more than two bay windows on an
elevation facing a public street.
No change.
A14: STREET-FACING WINDOWS: Each street-facing building
elevation shall have at least 20 square feet of glazing in a large
window, multi-panel window or glazed door, or bay window
form, with minimum dimensions of 3 feet. In an Eichler tract,
clerestory windows may have a reduced minimum dimension.
No change.
A15: WINDOW TO WALL DETAILING: Window frames shall be
recessed at least 2 inches from the exterior wall face or have trim at
least 2 inches wide and 0.5 inches thick on all four window sides.
Stucco over foam shall not be used as window trim.
Eliminate, as it is overly prescriptive. Staff has
also been informed that these are not
standard trim dimensions.
A16: WINDOW PATTERNS: Window fenestration with divided lite
appearance shall have exterior applied muntin bars (i.e., true or
simulated divided lites).
Eliminate, as it is overly prescriptive.
Section B: Second Floor Massing and Privacy
B1: SECOND FLOOR LOCATION: The second-floor area shall not be
permitted within the standard side or rear setbacks of the
underlying single-family zoning district.
No change.
B2: SECOND FLOOR SIZE: The maximum second-floor area shall not
exceed 35 percent of the allowable gross floor area for the lot, or
400 sf, whichever is larger.
No change.
Item 2
Attachment B - Objective
Design Standards Revisions
Packet Pg. 46
Two-Story Development Objective Design Standards February 2025 Page 3 of 6
B3: CONTEXTUAL FIRST FLOOR EAVE HEIGHT: The height of the first
floor's street-facing roof edges (i.e., eaves or parapets) shall not
exceed 18 inches above the height of the first-floor eave or parapet
of the homes on the abutting lots at side lot lines as measured at
those homes' eaves nearest the subject lot. This first-floor roof
edge height limit shall also extend 15 feet back from the building
corner. This standard shall be 24 inches within a flood zone if
either of the abutting homes’ first-floor levels does not meet
current flood zone regulations. This standard applies to the eave
side of pitch roof forms and not the rake side such as at a gable.
Eliminate, as it is redundant with A11 and
C1/the standard daylight plane. The
application of this standard and standard B4
was also unclear for corner lots.
B4: CONTEXTUAL SECOND FLOOR EAVE HEIGHT: The height of the
upper floor's street-facing roof edge (eave or parapet) shall not
exceed 18 inches above either: (a) the average height of the upper
floor street-facing eave or roof edge of homes to each side, or (b) in
the case of only one home having a second floor, the height of that
home's eaves.
See above.
B5: GARAGE HEIGHT AND MASS: Maximum height of a roof over an
attached garage shall not exceed 15 feet in height as measured
from existing grade. The maximum garage wall plate height
shall not exceed 10 feet.
No change.
B6: SECOND FLOOR BALCONY LIMITATIONS: No more than one
second-floor deck/balcony shall be permitted per dwelling and
shall: (a) only be permitted on a street-facing
facade, (b) be located at least 10 feet from any interior side lot line
with a 5.5-foot-tall solid privacy wall or be located at least 30 feet
from any interior side lot line, and (c) be limited in size to no more
than 40 square feet.
Text Change:
B6: SECOND FLOOR BALCONY LIMITATIONS:
No more than one second-floor deck/balcony
shall be permitted per dwelling and shall: (a)
only be permitted on a street-facing or rear
facing facade, (b) be located at least 10 feet
from any interior side lot line with a 5.5-foot-
tall solid privacy wall or be located at least 30
feet from any interior side lot line, (c) be
located at least 30 feet from the rear lot line,
and (d) (c) be limited in size to no more than
40 50 square feet.
Balconies were cited as a major reason why
applicants do not choose the ODS process.
The changes proposed above set privacy
limitations for balconies which are in line
with the IR Guidelines, and propose usable
area without a significant impact to
neighbors.
B7: SCREENING LANDSCAPE: For two-story houses, plant screening
trees with a species having a typical mature height of at least 25
feet and mature canopy width of 15 feet at a quantity of at least
one per 25 linear feet along each interior lot line. Existing trees to
be retained that are at least 25 feet tall and 15 feet wide count
towards the required planting. Three closely spaced tall screening
shrubs with a mature height of at least 15 feet and a mature width
of at least 3 feet may be substituted for one screening tree.
Text Change:
[…]
Privacy screening landscape shall
be located to align with proposed second-
floor windows and/or balconies across the
side and rear lot lines and between windows
at facing units on a single property.
Item 2
Attachment B - Objective
Design Standards Revisions
Packet Pg. 47
Two-Story Development Objective Design Standards February 2025 Page 4 of 6
Privacy screening landscape shall be located to align with proposed
second-floor windows across the side and rear lot lines and
between windows at facing units on a single property.
B8: PLANTING TYPE AND SIZE: When required, screening trees and
shrubs shall be specified by botanical name with at least 50 percent
of screening trees and shrubs being evergreen. Screening trees
shall be specified and planted at 24-inch box size or larger and 8
feet height or taller. Screening shrubs shall be specified and planted
at 15-gallon size or larger and 8 feet or taller.
Text change:
[…] All trees/shrubs shall be planted in a
minimum two foot wide planting strip.
This is for clarification with the elimination of
A5.
B9: PLANTING ADJACENT PUE’S: Where an easement such as a PUE
exists along an interior lot line, privacy landscaping is required to be
planted on the same side of the easement as the building, but not
within the easement.
No change.
B10: SECOND FLOOR WINDOW PRIVACY: For any window on an
upper floor or in a stairway, facing an interior lot line that is located
less than 20 feet from a side or rear lot line, one of the following
shall be used: (a) permanent obscure glazing to at least 5 feet from
the finished floor, or (b) exterior mounted permanent architectural
privacy screens that block views more than 70%, or (c) windows
with sills above 5 feet from the finished floor level. In a stairway,
the finished floor is the height of the landing.
No change.
This standard shall also apply to first-floor windows less than 6 feet
from a property line where the finished floor height is 2 feet or
more above grade.
B11: SECOND FLOOR OPERABLE WINDOWS ALONG SIDE LOT LINES:
Operable casement windows on the upper level with a sill height
less than 5 feet above the finished floor and within 20 feet of an
interior side lot line shall be hinged so the windows open towards
the public street. Horizontal sliding windows shall not
be permitted facing and within 20 feet of an interior side lot line,
unless the windowsill height is at least 5 feet above the finish floor
level.
No change.
Section C: New or Expanded Second Story Development Next to
One-Story House(s)
The following Standards apply when a project includes a new or
expanded second story adjacent to an existing one-story house.
C1: SIDE DAYLIGHT PLANE CLEARANCE: Where a home on an
abutting lot across a side lot line is single-story or has a second-
floor area no more than 500 square feet, the side daylight plane
shall be measured from 8 ft above average grade instead of 10 ft. In
the case of an Urban Lot Split, the daylight plane only applies to the
original property lines.
No change.
In flood zones, the average grade for determining daylight plane is
increased by one-half of the increase in elevation required to reach
base flood elevations, up to a maximum increase of 30 inches.
Item 2
Attachment B - Objective
Design Standards Revisions
Packet Pg. 48
Two-Story Development Objective Design Standards February 2025 Page 5 of 6
C2: SINGLE-STORY BUILDING FORMS: Where a home on an abutting
lot across a side lot line is single-story or has a second-floor area no
more than 500 square feet, all houses with frontage on the street
shall have either: (a) a one-story building form (excluding garages)
at least 6 feet forward of the second-floor wall face, and at least 10
feet wide; or (b) a protruding porch or one-story roof overhang at
least 6 feet deep, and at least 8 feet wide.
No change.
Section D: Flag Lots and Substandard Lots
PAMC 18.12.040(c) prohibits second floors on houses on
substandard lots. Second stories are only allowed as a part of an SB
9 project, subject to Standard D1 below.
D1. SECOND FLOOR AREA ON FLAG LOTS AND SUBSTANDARD LOTS:
On lots that are flag lots (or similar lots without street frontage)
and/or substandard lots prior to an Urban Lot Split, a second floor
shall only be allowed to facilitate the minimum 800 sf unit size.
No change.
Section E: Eichler Neighborhoods
The following ODS apply only in mapped Eichler Tracts, as listed on
the map published in the Eichler Design Guidelines (2018)
E1: EICHLER TRACT GARAGES: In mapped Eichler Tracts, a garage or
carport may be located forward of the front facade plane of the
house so long as the garage or carport is: (a) no more than 21 feet
wide, (b) has a roof pitch of 3:12 (slope of 3 vertical feet
for every 12 horizontal feet) or less, and (c) has a maximum height
of no more than 12 feet above existing grade.
No change.
E3: EICHLER TRACT ROOF HEIGHTS: In mapped Eichler Tracts
the maximum roof height shall not exceed 22 feet, as measured
from existing grade to the roof surface. Properties in flood zones
shall be permitted to increase building height by one-half foot for
each foot that the base flood elevation exceeds the existing grade.
Text Change:
E3: EICHLER TRACT ROOF HEIGHTS: In
mapped Eichler Tracts the maximum roof
height shall not exceed 22 23 feet, as
measured from existing grade to the roof
surface. Properties in flood zones shall
be permitted to increase building height by
one-half foot for each foot that the base flood
elevation exceeds the existing grade.
Staff received feedback stating this was an
overly restrictive height, the proposed change
to 23 feet brings it in line with standard A11.
E4: ROOFLINES IN EICHLER TRACTS: In mapped Eichler Tracts
rooflines shall meet the following: (a) roof pitches no more than
3:12, (b) gable, shed, butterfly, or flat roof forms, and (c) 2-
foot minimum overhangs at eave and rake sides of roof forms for
at least 50 percent of roof edges.
No change.
Item 2
Attachment B - Objective
Design Standards Revisions
Packet Pg. 49
Two-Story Development Objective Design Standards February 2025 Page 6 of 6
E5: EXTERIOR MATERIALS IN EICHLER TRACTS: In mapped Eichler
Tracts, exterior wall cladding shall be vertical board channel or
flush siding, wood tongue, and groove board siding, wood nickel-
gap siding, smooth fiber cement panels, or metal panels. Board-
form concrete, concrete block, or stucco may be used as a
secondary material, but collectively, these materials shall not
account for more than 30 percent of all non-glazed wall surfaces.
No change.
E6: ENTRIES IN EICHLER TRACTS: In mapped Eichler Tracts, a
projecting entry porch shall not be used. A covered trellis used as a
colonnade or a side porch that does not project forward of the
facade at the entry would not be considered an entry porch.
No change.
Item 2
Attachment B - Objective
Design Standards Revisions
Packet Pg. 50
Single-Family Objective Design Standards
Survey 2026
Submitted on 16 July 2026, 3:06pm
Receipt number 1
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have heard of the Objective Design Standards, but have not
used them
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
I am a licensed architect and have worked on numerous two-
story homes in Palo Alto. Based on my experience, I believe the
current objective standards do not adequately account for the
additional constraints of building in flood zones.
For example, the allowable eave height difference between a
proposed home and neighboring homes can become overly
restrictive when a new home must be elevated approximately 5
feet to comply with flood zone requirements. Even well-designed
homes that are compatible with the neighborhood can struggle to
meet these standards because of the required elevation.
I encourage the City to consider incorporating provisions or
exceptions for projects located within special flood hazard areas
so that the objective standards better reflect these unique
conditions.
If you would like to discuss this further, please feel free to email
me at
1 of 2
Item 2
Attachment C - Survey
Results
Packet Pg. 51
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
No
2 of 2
Item 2
Attachment C - Survey
Results
Packet Pg. 52
Single-Family Objective Design Standards
Survey 2026
Submitted on 16 July 2026, 3:49pm
Receipt number 2
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have submitted project(s) using the Individual Review
Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have heard of the Objective Design Standards, but have not
used them
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Individual Review
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
No
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
We don't know too much about Objective Design Standards. We
used IR when we started design our house.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
No
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 53
Single-Family Objective Design Standards
Survey 2026
Submitted on 16 July 2026, 3:52pm
Receipt number 3
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have heard of the Objective Design Standards, but have not
used them
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
Second floor size shall not exceed 35% of the floor area for the
lot - is very restrictive. Many families want a master bedroom
suite and two kids' bedrooms upstairs.
Also, the contextual eave heights are difficult to comply with,
particularly in a flood zone area (extra 6" is simply not enough).
The excessive focus on the homes immediately to either side of
the proposed lot rather than the block as a whole is very limiting.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
No
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 54
Single-Family Objective Design Standards
Survey 2026
Submitted on 16 July 2026, 5:15pm
Receipt number 4
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have heard of the Objective Design Standards, but have not
used them
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
There might be challenges for some irregular lots to meet all
requirements.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 55
Single-Family Objective Design Standards
Survey 2026
Submitted on 16 July 2026, 6:01pm
Receipt number 5
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have completed construction on a project using the Objective
Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Individual Review
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
The objective standards are too restrictive. Height limits are too
low.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
No
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 56
Single-Family Objective Design Standards
Survey 2026
Submitted on 16 July 2026, 6:59pm
Receipt number 7
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I am working on designing a project using the Objective Design
Standards but have not submitted it for review
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
The garage placement and side setbacks
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 57
Single-Family Objective Design Standards
Survey 2026
Submitted on 17 July 2026, 9:01am
Receipt number 8
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have submitted project(s) using the Individual Review
Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have heard of the Objective Design Standards, but have not
used them
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
No
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
Not familiar
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 58
Single-Family Objective Design Standards
Survey 2026
Submitted on 17 July 2026, 9:22am
Receipt number 9
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have submitted project(s) using the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of client interest
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
No
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
We used the objective design standards for an SB9 project, It
was vaguely understood during our review that the same process
may technicly be available for single family units. If this is now
being encouraged as an alternate path to IR, I think encoding it in
18.12 would make that more clear. I only say no to #8 because of
my previous SB( experience.
Worth clarifying: Is the use of ODS still tied to the addition of a
housing unit, or can I use ODS for a demo/replacement or a
significant remodel as well?
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
No
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 59
Single-Family Objective Design Standards
Survey 2026
Submitted on 17 July 2026, 2:09pm
Receipt number 10
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have not heard of the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
No
4. Which process do you prefer for two-story single family
house projects?
Individual Review
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
No
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
have not used it yet
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 60
Single-Family Objective Design Standards
Survey 2026
Submitted on 19 July 2026, 6:56am
Receipt number 11
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have submitted project(s) using the Individual Review
Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have submitted project(s) using the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of client interest
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
I am pleased that the City has decided to incorporate these
Objective Design Standards, as they provide a more streamlined
and predictable path toward obtaining a building permit. I also
appreciate that this process helps reduce delays or objections
from neighbors who may simply oppose a two-story home being
built adjacent to their property, rather than raising concerns
based on objective standards.
I have now worked on several projects utilizing the Objective
Design Standards, and overall, my experience has been positive.
That said, I believe there is still some room for improvement.
Given that these standards are relatively new, it is
understandable that it will take some time for both staff and
applicants to become fully familiar with the process and identify
areas that may benefit from refinement.
Based on my experience with past projects, I have the following
1 of 2
Item 2
Attachment C - Survey
Results
Packet Pg. 61
feedback:
* **Corner Lots:** It would be helpful to add language
addressing corner lots within the applicable guidelines. Corner
lots have unique site conditions, and some of the standards can
be difficult to interpret or apply without specific guidance.
* **A7 ODS – Garage Width:** The garage-width standard feels
somewhat too restrictive. For example, on a 75-foot-wide lot,
even if the house is maximized from setback to setback, the home
would be approximately 63 feet wide. Under the current 30%
standard, the maximum garage width would be only 18.9 feet.
Once exterior wall thickness is taken into account, the resulting
interior width becomes fairly tight for a functional two-car
garage.
As a result, even relatively large properties in neighborhoods
where two-car garages are the predominant pattern may have
difficulty accommodating a properly sized two-car garage. I
would encourage staff to revisit this standard and consider
increasing the maximum garage width to approximately 35%–
40% of the building frontage, or potentially incorporating some
flexibility based on lot width and the prevailing neighborhood
pattern.
* **B2 ODS – Second-Floor Size:** The maximum permitted
second-floor area also feels somewhat restrictive, particularly for
smaller lots. For example, a 6,000-square-foot lot would allow
only approximately 892 square feet on the second floor, which
can make it difficult to accommodate a typical three-bedroom
second-floor layout, including a primary suite.
Staff may want to consider increasing the allowable percentage
to 40%, or establishing a tiered standard based on lot size. For
example, lots of 6,500 square feet or less could be permitted up
to 40%, while lots larger than 6,500 square feet could remain
subject to the current 35% standard. This would provide
additional flexibility for smaller properties while still maintaining
the overall intent of the Objective Design Standards. Basically,
the smaller lots we won't be able to use ODS, because clients
want the 3 bedrooms upstairs.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
No
2 of 2
Item 2
Attachment C - Survey
Results
Packet Pg. 62
Single-Family Objective Design Standards
Survey 2026
Submitted on 20 July 2026, 8:29am
Receipt number 12
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have submitted project(s) using the Individual Review
Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have submitted project(s) using the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
The process is too slow and takes too long. And the outside help
being used by the city miss their deadlines consistently and focus
on nonsense to keep the process going rather than help get the
projects approved quickly. Probably a billable hours thing who
knows...
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 63
Single-Family Objective Design Standards
Survey 2026
Submitted on 20 July 2026, 12:49pm
Receipt number 13
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have submitted project(s) using the Individual Review
Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have not heard of the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
No
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
Lack of client interest
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
I thought Objective Design is for multifamily units? why is this
applied to the single family?
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
No
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 64
Single-Family Objective Design Standards
Survey 2026
Submitted on 29 July 2026, 11:06AM
Receipt number 14
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have heard of the Objective Design Standards, but have not
used them
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
Yes
4. Which process do you prefer for two-story single family
house projects?
Individual Review
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Specific standard(s) which are difficult to comply with or
understand
Other: It was a bit difficult to comprehend. Checklist is too long
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
greater flexibility for flood zone in terms of height and daylight
plane.
Like the design feedback component of the IR, not sure if that will
dissappear with ODS.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 65
Single-Family Objective Design Standards
Survey 2026
Submitted on 29 July 2026, 11:11AM
Receipt number 15
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have submitted project(s) using the Individual Review
Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I am working on designing a project using the Objective Design
Standards but have not submitted it for review
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
No
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
It is a very painful process to work with City of PA. There is an
active effort to make it harder for home owners to get permits.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 66
Single-Family Objective Design Standards
Survey 2026
Submitted on 29 July 2026, 11:23AM
Receipt number 16
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have not heard of the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
No
4. Which process do you prefer for two-story single family
house projects?
Individual Review
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
I am experienced in IR review process but not too familiar with
the objective design standard. Would like to know more about
what it entail.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 67
Single-Family Objective Design Standards
Survey 2026
Submitted on 29 July 2026, 11:38AM
Receipt number 17
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have submitted project(s) using the Individual Review
Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have not heard of the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
No
4. Which process do you prefer for two-story single family
house projects?
Individual Review
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
The usage of diagram and illustration will help designers getting
a holistic understanding of this standard.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 68
Single-Family Objective Design Standards
Survey 2026
Submitted on 29 July 2026, 12:21PM
Receipt number 18
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have not heard of the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
No
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
Lack of client interest
Specific standard(s) which are difficult to comply with or
understand
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
Yes
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
I have submitted one application for a IR review since the ODS
had come into force. At that time I was not aware of the existence
of the ODS. I would have appreciated if the technician handling
the application had reminded me of the ODS. This could have
been done at the first moment when the Development Center has
learnt of the application, so even before the intake meeting.
Incorporating the ODS into the PAMC would have the benefit of it
becoming more visible. I am consulting the PAMC almost daily
and I believe I would have seen it there.
I have submitted about 10 applications for IR review over the
years and I am not sure whether any of them would have
qualified for the ODS. The main reasons why my projects would
not have qualified are the following two:
1. The 2nd floor area would have been more than 35% of the
1 of 2
Item 2
Attachment C - Survey
Results
Packet Pg. 69
allowable floor area on the lot
2. The daylight plane and form limitations next to single story
neighbors are more stringent in the ODS
My projects may have been in conflict with the ODS in other ways
as well, but I believe that my clients would have been agreeable
to modifying the design in order to comply with the ODS. The
above mentioned two issues are real roadblocks.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
2 of 2
Item 2
Attachment C - Survey
Results
Packet Pg. 70
Single-Family Objective Design Standards
Survey 2026
Submitted on 29 July 2026, 3:28PM
Receipt number 19
Related form version 1
Questions
1. What is your familiarity with Palo Alto’s Individual
Review Guidelines?
I have completed construction on a project using the Individual
Review Guidelines
2. What is your familiarity with Palo Alto’s Single-Family
Objective Design Standards?
I have not heard of the Objective Design Standards
3. Did you know that you can use the Single-Family
Objective Design Standards for any two-story single family
house project?
No
4. Which process do you prefer for two-story single family
house projects?
Single-Family Objective Design Standards
5. What barriers, if any, have limited your use of the
Objective Design Standards?
Lack of familiarity with the process
6. Would certain changes make you more likely to use the
Objective Design Standards in the future?
No
7. Please describe your experience, particularly citing any
specific standards or process requirements that you see as
a barrier to Objective Design Standards use:
I wasn't familiar with Objective Design Standards, so haven't
tried to use them.
8. Would incorporating the ODS directly into the Zoning
Code Chapter 18.12 Development Standards (rather than
as a separate document/web location) increase your use of
the Objective Design Standards?
Yes
1 of 1
Item 2
Attachment C - Survey
Results
Packet Pg. 71
Item No. 3. Page 1 of 16
Planning & Transportation Commission
Staff Report
From: Planning and Development Services Director
Lead Department: Transportation
Meeting Date: September 30, 2026
Report #: 2605-6389
TITLE
South Palo Alto Bike/Ped Connectivity: Review of Preferred Design Alternatives and Network
Enhancements for the Midtown Bicycle and Pedestrian Undercrossing; CEQA Status – Exempt
Pursuant to CEQA Guidelines Section 15262.
RECOMMENDATION
Staff recommend the Planning and Transportation Commission (PTC) review:
1. The two preferred design alternatives for a grade separated bicycle and pedestrian rail
crossing in the vicinity of El Dorado Avenue, also known as the Midtown Bicycle and
Pedestrian Undercrossing (Attachment A);
2. The assessment of those alternatives (Attachment B);
3. The initial circulation study (Attachment C); and
4. Draft network enhancements (Attachment D).
In addition, staff recommend the PTC take action to provide a recommendation to the City
Council on up to two preferred design alternatives to advance to 15 percent design and
endorse the accompanying network enhancements for refinement and presentation during the
next phase of community engagement for the South Palo Alto Bike/Ped Connectivity project.
EXECUTIVE SUMMARY
The City of Palo Alto is conducting the South Palo Alto Bike/Ped Connectivity project (project) to
assess ways to improve bicycle and pedestrian access across the Caltrain rail corridor south of
Oregon Expressway. The project responds to a longstanding east-west connectivity barrier and
advances City policy direction to expand safe, comfortable, and direct active transportation
connections, particularly in south Palo Alto.
Consistent with the City Council direction provided on December 1, 2025, staff have refined two
preferred conceptual design alternatives for a Midtown Bicycle and Pedestrian Undercrossing
near El Dorado Avenue:
Item 3
Item 3 Staff Report
Packet Pg. 72
Item No. 3. Page 2 of 16
Alternative A1 – El Dorado Avenue Tunnel + Alma Street Signal: A bicycle and pedestrian
tunnel beneath the Caltrain tracks, with users crossing Alma Street at a new signalized
crossing at El Dorado Avenue.
Alternative A2 – El Dorado Avenue Tunnel Under Alma Street: A fully grade-separated
bicycle and pedestrian tunnel beneath both the Caltrain tracks and Alma Street
Since the December 2025 City Council meeting, staff has further refined both alternatives,
evaluated design variants, assessed planning-level tradeoffs, and prepared draft network
enhancements to connect the proposed crossing to surrounding neighborhoods.
This meeting is intended to obtain PTC feedback on the two alternatives and associated
network enhancements, and, if the PTC chooses, a recommendation to the City Council on up
to two alternatives to advance to 15 percent design. Staff requests that the PTC review:
1. The two preferred design alternatives near El Dorado Avenue (Attachment A);
2. The planning-level assessment of those alternatives (Attachment B);
3. The initial circulation study (Attachment C); and
4. Draft network enhancements (Attachment D) for the Midtown Bicycle and Pedestrian
Undercrossing as part of the South Palo Alto Bike/Ped Connectivity project.
The City Council is the final decision-making body for the project. Staff expect to complete this
phase of community engagement and return to the City Council for consideration in late 2026.
Following City Council direction, staff would prepare 15 percent conceptual designs, revise the
draft network enhancements as appropriate, and develop a funding and implementation plan
for further community review through a public draft report.
BACKGROUND
On January 22, 2013, the City Council approved the Palo Alto Rail Corridor Study (2013)1 which
identified a need for additional grade-separated bicycle and pedestrian crossings, particularly in
the southern portion of the City. This need was reiterated on November 13, 2017, when the
City Council adopted the 2030 Comprehensive Plan.2 The Comprehensive Plan includes Program
T1.19.3 to "increase the number of east-west pedestrian and bicycle crossings across Alma
Street and the Caltrain corridor, particularly south of Oregon Expressway."
On June 2, 2025, the City Council also adopted the Safe Streets and Roads for All (SS4A) Safety
Action Plan3 which includes, “Additional Bicycle and Pedestrian Crossings Along the Caltrain
1 Palo Alto Rail Corridor Study, Approved January 22, 2013;
https://www.paloalto.gov/files/assets/public/v/1/planning-amp-development-services/new-development-
projects/parc-130122-final-report.pdf
2 City of Palo Alto Comprehensive Plan 2030, Adopted November 13, 2017, Amended December 19, 2022;
https://www.paloalto.gov/files/assets/public/v/4/planning-amp-development-services/3.-comprehensive-
plan/comprehensive-plan/full-comp-plan-2030_with-dec19_22-amendments.pdf
3 City of Palo Alto Safe Streets and Roads for All (SS4A) Safety Action Plan, Adopted June 2, 2025;
https://www.paloalto.gov/files/assets/public/v/1/transportation/projects/ss4a-safety-action-plan/palo-alto-
safety-action-plan_final_june_2025.pdf
Item 3
Item 3 Staff Report
Packet Pg. 73
Item No. 3. Page 3 of 16
Corridor” as one of many strategies to help eliminate transportation fatalities and serious
injuries by 2035.
7 to serve as the City’s comprehensive vision and action plan to create a
comfortable, connected, and safe multimodal network for users of all ages and abilities. The
previous 2012 BPTP identified the 1.3-mile distance between the California Avenue
Bike/Pedestrian Tunnel and Meadow Drive as the longest stretch of track barrier in Palo Alto
and recommended a grade-separated pedestrian and bicycle crossing of the Caltrain corridor
and Alma Street in the vicinity of Matadero Creek/Park Boulevard or between Margarita
Avenue and Loma Verde Avenue. The 2026 BPTP update recommends the Midtown Bicycle and
Pedestrian Undercrossing (CROSSING_10), a new bicycle and pedestrian undercrossing of
Caltrain/Alma Street in the vicinity of El Dorado Avenue with enhanced neighborhood
approaches, as a near-term priority project.
8 which
provided a framework for accommodating 6,086 new housing units by 2031 to meet State
requirements. Maintaining quality of life while accommodating growth reinforces the need for
convenient and high-quality pedestrian and bicycle facilities that address everyday trips and
free up roadway capacity.
9
10 The project scope, which
is being undertaken collaboratively with City staff, includes:
7 City Council, June 15, 2026; Action Item #24;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=887144&dbid=0&repo=PaloAlto&searchid=b58d9af
9-1e8f-4dbe-8e51-592decbca911
8 City of Palo Alto 2023-2031 Housing Element, Adopted April 15, 2024, Certified August 20, 2024;
https://paloaltohousingelement.com/wp-content/uploads/2024/08/Palo-Alto-Housing-Element.pdf
9 Santa Clara Countywide Bike Plan, May 2018; https://www.vta.org/projects/santa-clara-countywide-bike-plan-
update-2018 pp. 32, 27, 61.
10 City Council, September 9, 2024; Consent Calendar Item #7;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=6496&dbid=0&repo=PaloAlto&searchid=5ceb3b7e-
41e9-4bf1-9ad4-fb0749407a24
Item 3
Item 3 Staff Report
Packet Pg. 74
Item No. 3. Page 4 of 16
Background review and analysis of existing conditions;
Community outreach and engagement;
Development of design priorities and evaluation criteria;
Development of preliminary conceptual alternatives;
Initial assessment of conceptual alternatives;
Identification of two locally preferred locations and concepts;
15% design of the locally preferred alternatives for new grade-separated
bicycle/pedestrian crossings, plus context-sensitive pedestrian and bicycle
enhancements that link to the existing or planned transportation networks;
Development of an implementation plan and funding strategy; and
Securing funding for future project phases, including preliminary engineering,
environmental documentation, final design, and construction.
On December 1, 2025, the City Council passed a motion for the South Palo Alto Bike/Ped
Connectivity project that directed staff to continue focusing evaluations on two bicycle and
pedestrian rail crossing concepts in the vicinity of El Dorado Avenue (also called Alternatives A1
and A2, with a preference for Alternative A2):
Alternative A1 with a signalized crossing of Alma Street at El Dorado Avenue.
Alternative A2 with a tunnel under both Alma Street and the Caltrain tracks in the
vicinity of El Dorado Avenue. 15
ANALYSIS
The following tasks have been undertaken so far:
Background review and analysis of existing conditions
Community outreach and engagement
Development of design priorities and evaluation criteria
Development of preliminary conceptual alternatives
Initial assessment of conceptual alternatives
Identification of two locally preferred locations and concepts
The community outreach and engagement efforts are described in the Stakeholder Engagement
section below. Efforts related to existing conditions, design priorities and evaluation criteria,
preliminary conceptual alternatives and initial assessment of conceptual alternatives were
15 City Council, December 1, 2025: Action Item #18;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=83952&dbid=0&repo=PaloAlto&searchid=d9f09a55
-fa77-4887-8005-bb508af17995
Item 3
Item 3 Staff Report
Packet Pg. 75
Item No. 3. Page 5 of 16
presented at the PTC meetings on May 14, 2025,17 and September 10, 2025.18 Efforts related to
design of two locally preferred bicycle/pedestrian rail crossings alternatives and accompanying
network enhancements are described below.
El Dorado Avenue Tunnel + Alma Street Signal (Alternative A1)
El Dorado Avenue Tunnel under Alma Street (Alternative A2)
A2a: Ramp on South Side of El Dorado Ave with One-Way Vehicle Travel (Alternative A2)
A2b: Cul-de-sac on El Dorado Ave at Alma St
A2c: Straight Ramp next to Alma St (within existing landscape strip)
A2d: Access from Matadero Creek
A2e: Switchback Ramps next to Alma St
17 Planning and Transportation Commission, May 14, 2025; Study Session Item #4;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7648&dbid=0&repo=PaloAlto&searchid=953eac3d-
214a-4cea-a77b-5cfa3921c24f
18 Planning and Transportation Commission, September 10, 2025; Study Session Item #4;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7671&dbid=0&repo=PaloAlto&searchid=cc55f36b-
8916-4c57-a84c-1aa231dab86e
Item 3
Item 3 Staff Report
Packet Pg. 76
Item No. 3. Page 6 of 16
A2f: Narrow Pedestrian-only Tunnel
To balance user experience, accessibility, utility constraints, and neighborhood impacts,
Alternative A2a was selected as the representative design concept among six explored variants.
Additional information on the exploration of these variants as well as concept drawings for
Alternatives A2a, A2b, and A2c are presented in Attachment B.
On the east side, El Dorado Avenue would be converted to a 13-foot-wide, one-way westbound
street with right-turn-only operations onto Alma Street. The design assumes a slight narrowing
of Alma Street to compress the overall footprint, though it requires longer below-grade
structures and deeper excavation than Alternative A1.
Several design variations remain available for further evaluation as design advances for both
Alternatives A1 and A2, including, but not limited to, refinements to the tunnel height, width
and alignment, portal locations, approach configuration, ramp grades and widths, pedestrian
and bicycle separation, and streetscape integration.
Figure 1: El Dorado Avenue Tunnel + Alma Street Signal (Draft Alternative A1)
Item 3
Item 3 Staff Report
Packet Pg. 77
Item No. 3. Page 7 of 16
Figure 2: El Dorado Avenue Tunnel Under Alma Street (Draft Alternative A2)
Initial Assessment of Preferred Conceptual Alternatives
The conceptual designs for Alternatives A1 and A2 were evaluated against a subset of planning-
level evaluation criteria derived from the prior Alternatives Analysis,21 community feedback,
and direction from the City Council. The purpose of this assessment (Attachment B) is to
compare the two alternatives and support selection of up to two preferred concepts to advance
to 15% design. Because both alternatives remain conceptual, the assessment is intended to
compare relative advantages, disadvantages, and risks at a planning level. Additional design,
technical analysis, agency coordination, and community engagement would be needed as the
selected concept advances.
Table 1 presents a summary of the results from the evaluation of Alternatives A1 and A2. A high
(most desirable) score indicates stronger alignments with community values, and a low (least
desirable) score indicates weaker alignment. Note that the results of these evaluations are one
of several considerations in the process of seeking locally preferred alternatives. Additional
information is presented below and in the Alternatives Assessment (Attachment B).
21 South Palo Alto Bike/Ped Connectivity – Alternatives Analysis, September 2, 2025;
https://www.paloalto.gov/files/assets/public/v/1/transportation/projects/southern-palo-alto-bikeped-railroad-
crossings/spabpc_alternatives_analysis_final_20250902.pdf
Item 3
Item 3 Staff Report
Packet Pg. 78
Item No. 3. Page 8 of 16
Table 1: Preferred Conceptual Alternatives Assessment Summary
Evaluation Criteria A1. El Dorado Ave Tunnel + Alma
St Signal
A2. El Dorado Ave Tunnel Under
Alma St
Personal Security
Utility Impacts
Construction Cost
Construction Duration
Parcel Impacts
Traffic, Parking, and Driveway
Emergency Access
Notes: Alternatives are scored using design priorities and evaluation criteria developed in the previous project phase based on community
input, engineering expertise, and professional judgement. A high (most desirable) score indicates stronger alignment with community values
and a low (least desirable) score indicates weaker alignment. Note that the results of these evaluations are one of several considerations in the
process of seeking locally preferred alternatives.
High (most desirable)Low (least desirable)
Personal Security: Both options align with Crime Prevention Through Environmental
Design (CPTED) principles and current safety standards. Alternative A1 offers a shorter
tunnel but introduces sharp ramp turns, whereas Alternative A2 provides a straighter
alignment with fewer sightline obstructions but a longer enclosed length.
Utility Impacts: Based on readily available information, Alternative A1 anticipates no
major utility conflicts as excavation is limited to the rail corridor. Alternative A2 involves
significant utility risks beneath Alma Street, potentially requiring complex relocations or
deeper excavation.
Construction Cost: Total project costs are estimated at $72M for Alternative A1 and
$87M for Alternative A2 (in 2026 dollars with estimated escalation for future
construction). The $15M variance stems from Alternative A2’s larger structural
footprint, increased excavation, complex shoring/dewatering, and higher utility
relocation risks.
Construction Duration: Alternative A2 requires a longer, more disruptive construction
period due to extensive staging across Alma Street and into the El Dorado Avenue
neighborhood, whereas Alternative A1 limits off-corridor impacts.
Property Impacts: Alternative A1 requires partial property impacts on the west side
only. Alternative A2 requires partial west-side impacts plus the full acquisition of two
east-side properties containing four residential dwelling units (110–130 and 178 El
Dorado Avenue).
Traffic, Parking, and Driveways: Alternative A1 preserves two-way traffic on El Dorado
Avenue, while its signal turn restrictions would redistribute approximately 40 peak-hour
vehicle trips. Alternative A2 converts El Dorado Avenue to one-way westbound,
redistributing 40 peak-hour trips, restricting driveway access for three parcels to right-
in/right-out, altering access for two parcels to left-in/left-out, and removing direct
Item 3
Item 3 Staff Report
Packet Pg. 79
Item No. 3. Page 9 of 16
driveway access for two parcels. Both options remove fewer than 25 parking spaces in
the west-side lot. Alternative A2 eliminates an additional 10 on-street spaces along El
Dorado Avenue. Additional parking adjustments on El Dorado Avenue may be
considered during design refinement to address daylighting, visibility, or emergency
access needs.
Emergency Access: The Palo Alto Fire Department raised no immediate concerns for
Alternative A1 as it would not change vehicle access to residential properties.
Alternative A2 presents greater emergency access challenges because the current
concept includes a narrow 13-foot drive aisle on El Dorado Avenue, impacting access to
multiple properties. Any alternative advanced for further design would be required to
meet applicable fire and emergency response standards, including adequate clear
widths, emergency vehicle access, and water supply access. Alternative A2 is therefore
rated lower than Alternative A1 for this criterion because achieving compliance may
require additional design refinement, construction complexity, parcel impacts,
operational changes, and/or added cost.
Alternative A1 would have fewer utility impacts, lower construction cost and duration, fewer
parcel impacts, more limited effects on traffic, parking, and driveway access and would not
alter emergency access. Alternative A2 scored the lowest/least desirable results across six of
the seven evaluation criteria and had comparable results to Alternative A1 in the category of
personal security.
Circulation Study
The project team prepared an initial circulation study (Attachment C) to assess neighborhood
and circulation effects associated with a new Caltrain bicycle/pedestrian undercrossing
(Alternatives A1 and A2) at El Dorado Avenue (including potential diversion patterns and cul-de-
sac effects) and inform accompanying network enhancements. The analysis compares future
conditions (without the new connection) with each crossing alternative, focusing on key
intersections and corridors most likely to experience changes in traffic volumes. Findings from
this initial study clarify several trade-offs between alternatives and inform complementary
network enhancements or operational strategies that may be needed to enhance safety and
functional circulation under each alternative. The following are key takeaways from the
circulation study:
Meaningful projected use: Estimates prepared by the project team predict that by 2031
the El Dorado tunnel could carry about 70 walk trips and 150 bike trips in the a.m. peak
hour, and roughly 800 walk trips and 1,800 bike trips daily.
Good network fit: Active transportation users will primarily rely on low-volume or low-
stress neighborhood routes suitable for bicycle and pedestrian access such as Bryant,
Cowper, Colorado, Loma Verde, and Park. Adjacent neighborhood streets currently carry
low traffic volumes (under 200 vehicles per hour during peak periods), well within bike
boulevard thresholds.
Item 3
Item 3 Staff Report
Packet Pg. 80
Item No. 3. Page 10 of 16
Limited traffic impacts: Both alternatives cause minimal net traffic disruption, rerouting
fewer than 20 to 40 vehicle trips to adjacent parallel corridors like Colorado Avenue and
Loma Verde Avenue during peak hours.
Access design will shape operations: A signalized Alma Street crossing (Alternative A1)
would preserve two-way El Dorado Avenue access, while the under-Alma Street option
(Alternative A2) would shift more bicycle and pedestrian activity onto El Dorado Avenue
and require more vehicle access changes.
Supportive improvements will be important: Enhancements to surrounding streets
would apply context-appropriate high-visibility crossings, lighting, markings, traffic
control, and wayfinding, consistent with the Safe System Approach and other applicable
safety standards to make tunnel approaches comfortable for all-ages-and-abilities.
Draft Network Enhancements
This project will also deliver a coordinated package of bicycle, pedestrian, operational, and
wayfinding improvements that fully integrate the grade separated bike and pedestrian
undercrossing into the surrounding street network. Together, these network improvements will
ensure the new rail crossing operates as a seamless, intuitive, all ages and abilities facility that
reduces conflicts, shortens travel distances, and meaningfully improves active transportation
connectivity across a longstanding barrier. These enhancements will:
Provide continuous, ADA accessible connections to existing bikeways and sidewalks;
Enhance safety and comfort along approach routes through upgraded context-sensitive
crossings, lighting, traffic calming, and visibility treatments; and
Add clear wayfinding to guides users before, through, and beyond the crossing.
Draft network enhancements (Attachment D) proposed for the undercrossing at El Dorado
Avenue are shown in Figure 3 and described below. Draft network enhancements were
informed by the multimodal traffic counts and circulation study discussed above, community
feedback, as well as adopted City policy and applicable design guidance and standards. The
draft network enhancements presented are preliminary and intended for discussion purposes.
All recommendations are flexible and subject to refinement. Additional community
engagement, technical design work, and agency coordination will be needed.
Item 3
Item 3 Staff Report
Packet Pg. 81
Item No. 3. Page 11 of 16
Figure 3: Draft Network Enhancements
To integrate the crossing seamlessly into the surrounding neighborhood, staff identified a series
of complementary active transportation and streetscape enhancements:
El Dorado Avenue Bikeway and Operations: Establish a new bicycle boulevard from
Alma Street to Cowper Street, install a neighborhood traffic circle at Bryant Street and El
Dorado Avenue, relocate stop signs to cross-streets at Ramona Street and South Court,
and reconstruct El Dorado Avenue with vertical curbs to discourage drivers from
mounting the curb and provide a physical buffer between people walking and vehicle
traffic. Other stop sign relocations/additions may be needed along El Dorado Avenue
based on community preferences, such as at the Waverley Street intersection.
Intersection and Crossing Safety: Install Rectangular Rapid Flashing Beacons (RRFBs) at
Park Boulevard/Portage Avenue, bulb-outs at several intersections along El Dorado
Avenue and Bryant Street, high-visibility crosswalks, daylighting red curbs (Assembly Bill
413 compliance), and overhead lighting.
Corridor and Regional Connectivity: Coordinate with Santa Clara County to implement
intersection modifications at Oregon Expressway/Bryant Street and Oregon
Expressway/Alma Street. Implement "green wave" signal coordination along Alma
Street where it is feasible to manage vehicle speeds and reduce stop-and-go driving.
Placemaking and Park Access: Enhance pedestrian and bicycle paths through Hoover
Park, execute ADA accessibility upgrades along approach routes, and integrate gateway
features, lighting, and community artwork at tunnel entrances.
Item 3
Item 3 Staff Report
Packet Pg. 82
Item No. 3. Page 12 of 16
Stakeholder Input
Need, Timing, and Existing Crossings: Community members identified potential bicycle-
safety and school-route benefits, but also questioned whether an El Dorado Avenue
crossing was warranted given the nearby California Avenue undercrossing, planned rail
grade-separation projects, and potential project cost. Commenters suggested that the
City prioritize enhancement to the California Avenue undercrossing and planned
projects at Churchill Avenue, East Meadow Drive, and Charleston Road; clarify project
sequencing; and assess how future grade separations could affect travel patterns and
use of the California Avenue undercrossing.
Alternatives A1 and A2: Commenters expressed differing views on Alternatives A1 and
A2. Some supported Alternative A1 because of its comparatively simpler design, lower
estimated cost, fewer anticipated utility and emergency-access effects, and avoidance
of residential property acquisition. Some supported advancing A1 to further design, A2
advancing concurrently. Other commenters raised concerns that an at-grade Alma
Street crossing could affect vehicle speeds, signal compliance, queues, turning
movements, crossing delay, and arterial operations. Commenters also raised concerns
that Alternative A2 could require residential property acquisition and utility relocation,
long ADA ramps, construction near residences, and greater cost, schedule, and project-
delivery risks.
Loma Verde–Alma Median Hybrid Plan: Petitioners and correspondents asked the City
to evaluate and compare the Loma Verde–Alma Median Hybrid Plan, displayed in Figure
4 and Attachment E, as an alternative to the El Dorado Avenue alternatives. The concept
includes a signalized crossing at Loma Verde Avenue and Alma Street, a protected
bicycle and pedestrian facility along the Alma Street rail corridor, and an underpass
connection at the El Dorado rail axis to Park Boulevard. Some feedback also suggested
coordinated signal operations at Loma Verde Avenue and El Carmelo Avenue, with Loma
Verde Avenue serving vehicular movements and El Carmelo Avenue serving bicycle and
pedestrian movements, to help manage potential vehicle diversion.
El Dorado Avenue Neighborhood Effects and Network Enhancements: Commenters
raised that El Dorado Avenue’s constrained width, parking conditions, driveway access,
and neighborhood-access function could limit its ability to accommodate a bicycle
boulevard and increased bicycle, e-bike, pedestrian, and vehicle activity. They also
identified potential parking loss, reduced sidewalk accessibility from vehicles parking on
sidewalks, traffic circulation changes, access effects on cul-de-sac streets, and potential
emergency-response delays. Some commenters supported bicycle boulevard
Item 3
Item 3 Staff Report
Packet Pg. 83
Item No. 3. Page 13 of 16
treatments, traffic calming, and measures to discourage cut-through traffic, including potential
access-management measures at the Alma Street/El Dorado Avenue intersection, while others
asked the City to refine, prioritize, or remove individual treatments based on cost,
effectiveness, and traffic conditions.
Technical, Environmental, and Outreach Requests: Commenters requested additional
analysis before the City advances a preferred alignment. Requested topics included
construction cost and duration, pedestrian and bicycle demand, potential student use
and induced demand, parcel impacts, traffic operations, signal treatments, tunnel and
ramp design, accessibility, safety features, construction effects, and school travel
patterns. Commentors also asked the City to assess localized air-quality and noise
effects, as well as the California-Olive-Emerson (COE) Toxic Underground Plume near
the proposed undercrossing, and to continue engagement with immediately affected
residents.
Other Potential Connections: Commenters suggested that the City evaluate potential
connections at East Meadow, Loma Verde Avenue, or El Carmelo Avenue; a north-south
bicycle and pedestrian path along the Alma Street corridor; and a Matadero Creek path
alternative. They requested comparative evaluation of each alternatives’ feasibility,
cost, accessibility, safety, property impacts, environmental considerations, and
emergency-access effects.
Figure 4: Loma Verde – Alma Median Hybrid Plan
Source: Proposed “Loma Verde – Alma Median Hybrid Plan” from Neighborhood Petition Received August 24, 2026
Item 3
Item 3 Staff Report
Packet Pg. 84
Item No. 3. Page 14 of 16
Next Steps
Securing Caltrain Service Agreement to advance the project
Seeking grants and funding
Completing Caltrain Rail Corridor Use Policy review process (Caltrain)
Undertaking preliminary engineering and environmental documentation (Caltrain)
Completing final design (Caltrain)
Obtaining other inter-agency agreements and permits
Securing right of way, acquisition or easements
Completing construction (Caltrain)
Transitioning completed project facilities to Palo Alto
23 The City expects that Caltrain will lead efforts
for preliminary engineering, environmental review, final design, and construction.
FISCAL/RESOURCE IMPACT
23 https://www.caltrain.com/caltrain-corridor-crossings-delivery-guide
Item 3
Item 3 Staff Report
Packet Pg. 85
Item No. 3. Page 15 of 16
On September 9, 2024, the City Council approved the professional services contract (Contract
No. C25191297) with Kittelson & Associates an amount not-to-exceed $499,491 for a two-year
term. On August 10, 2026, the City Council approved Contract Amendment No. 1, extending the
contract term through September 9, 2028, and updated the scope, schedule, rates, and
compensation allocations with no increase to the previously approved not-to-exceed amount.
Sufficient funding for the current project scope outlined in the Background section of this staff
report was appropriated as part of the FY 2027 Adopted Capital Budget for the Bicycle and
Pedestrian Transportation Plan Implementation project (PL- 04010) in the Capital Improvement
Fund. Funding for subsequent phases of the project, including preliminary engineering,
environmental documentation, final design, right-of-way acquisition or easements, permits,
and construction, has not been appropriated through this action. The City anticipates that
additional funding will be required and will pursue grants, regional, state, and federal funding
opportunities, as well as other potential funding sources. Future funding requests will be
brought forward to the City Council for future phases of the project, including full design and
construction, for consideration and appropriation, as appropriate.
STAKEHOLDER ENGAGEMENT
Phase 1 Community Engagement: Establish Design Priorities (Spring 2025) – Completed
Phase 2 Community Engagement: Feedback on Alternatives (Fall 2025) – Completed
Phase 3 Community Engagement: Review Public Draft Report (Fall 2026) – Underway
Phase 4 Community Engagement: Council Adopt Final Report (Spring 2027)
ENVIRONMENTAL REVIEW
Item 3
Item 3 Staff Report
Packet Pg. 86
Item No. 3. Page 16 of 16
have significant impact on the environment. CEQA will be conducted according to State law
should the City proceed on an actual project.
Item 3
Item 3 Staff Report
Packet Pg. 87
Item No. 3. Page 16 of 16
ATTACHMENTS
AUTHOR/TITLE:
Item 3
Item 3 Staff Report
Packet Pg. 88
š
š
€
‚
ƒ„ …† ‡
‡
ˆ
‰„
ƒ
Š
Draft design concepts shown are preliminary and intended for discussion purposes only. All concepts are flexible and subject to refinement. Additional community engagement and technical design work will be needed once locations and basic design concepts have been decided.
‹‹„ …
‰ƒ
Œ
†Š
…
…
‹
‹
Ž
ƒ
‘
‚
11
0
-
1
3
0
E
l
D
o
r
a
d
o
A
v
e
2799 Alma St
2777 Alma St
129 El Dorado Ave
149 El Dorado Ave
178 El Dorado Ave
2800 Emerson St
2745 Alma St
3101 Park Blvd
Item 3
Attachment A - Exhibit 1 El Dorado Avenue Tunnel + Alma Street Signal (Alternative A1)
Packet Pg. 89
11
0
-
1
3
0
E
l
D
o
r
a
d
o
A
v
e
2799 Alma St
2777 Alma St
129 El Dorado Ave
149 El Dorado Ave
178 El Dorado Ave
179 El Dorado Ave
2745 Alma St
3101 Park Blvd
One-way west bound
Draft design concepts shown are preliminar y and intended for discussion purposes only. All concepts are flexible and subject to refinement. Additional community engagement and technical design work will be needed once locations and basic design concepts have been decided.
Item 3
Attachment A - Exhibit 2 El Dorado Avenue Tunnel under Alma Street (Alternative A2)
Packet Pg. 90
July 23, 2026
SOUTH PALO ALTO BIKE/PED CONNECTIVITY
ALTERNATIVES ASSESSMENT
In December 2025, the City Council directed the South Palo Alto Bike/Ped Connectivity team to advance
two alternatives and explore design variations and refinements that would maximize benefits and
minimize impacts of a new tunnel at El Dorado Avenue. Alternatives A1 and A2 are presented in Exhibit 1
and Exhibit 2 and included as Appendix A. This alternatives analysis presents the design concepts and a
summary of the evaluation of potential effects associated with construction of the alternatives. The two
preferred alternatives were assessed against the evaluation criteria presented in Table 1. These criteria are
a subset of those used in the Alternatives Analysis, available online on the project webpage
(www.paloalto.gov/BikePedCrossings), and were selected based on feedback we heard from community
members and the City Council. Additional information about structural, utility, and construction impacts
and considerations are included in Appendix B.
Table 1: Evaluation Criteria
Evaluation Criteria Description
Personal security
turns) and approaches with Crime Prevention Through Environmental Design
(CPTED) best practices. This analysis considers access control to direct people to
designated entrances and exits, as well as maximizing visibility and sightlines to
allow for natural observation of people within the crossing, reducing
Utility impacts
Construction cost tunnel/bridge and new or upgraded facilities required to provide low-stress on-
Construction duration coordination with the Meadow/Charleston Rail Grade Separation Project
Parcel impacts
Emergency access
Oakland, CA 94612
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 91
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 2
Exhibit 1. El Dorado Avenue Tunnel + Alma Street Signal (Alternative A1)
Item 3
Attachment B - Preferred Alternatives
Assessment
Packet Pg. 92
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 3
Exhibit 2. El Dorado Avenue Tunnel Under Alma Street (Alternative A2)
Item 3
Attachment B - Preferred Alternatives
Assessment
Packet Pg. 93
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 4
The conceptual design alternatives have been developed in accordance with applicable design guidelines
and standards, including the Caltrans Highway Design Manual, Caltrain Engineering Standards, Caltrain
Corridor Crossings Delivery Guide dated August 2024, Caltrain Design Criteria, 4th Edition dated January
2024, Caltrain Standards for Design and Maintenance of Structures Revised January 2024, American
Railway Engineering and Maintenance-of-Way Association (AREMA) standards, American Association of
State Highway and Transportation Officials (AASHTO) standards, Americans with Disabilities Act (ADA)
standards, guidance from National Association of City Transportation Officials (NACTO), and informed by
the principles of Crime Prevention Through Environmental Design (CPTED).
Design concepts presented in this analysis are preliminary and intended for discussion purposes
only. All concepts are flexible and subject to refinement. Additional community engagement,
technical design work, and agency coordination will be needed once basic design concepts have
been decided.
EL DORADO AVENUE TUNNEL + ALMA STREET SIGNAL
(ALTERNATIVE A1)
Alternative A1 would construct a bicycle and pedestrian tunnel underneath the railroad tracks near El
Dorado Avenue, with a new signalized crossing of Alma Street. This alternative builds on the tunnel
concept previously presented during Phase 2 and to the City Council in December 2025, with additional
planning-level refinements developed in response to Council direction and community input.
Since the initial concept design was presented, the project team has focused on the following refinements
for Alternative A1:
• Shorten and straighten ramp approaches where feasible. The ramp alignments have been
reviewed to improve directness, sightlines, and visibility while balancing tunnel depth, ramp slope,
tunnel height, available right-of-way, and potential property and parking impacts.
• Evaluate a west-side stair option for more direct pedestrian access. A stairway connection
may be considered on the west side to create a more direct pedestrian route to and from Park
Boulevard, while maintaining an accessible ramped path for people biking, walking, or rolling.
• Improve user comfort and safety. The concept continues to consider opportunities to improve
visibility, lighting, directness, and separation between people walking and biking, consistent with
CPTED principles and other applicable design guidance.
• Confirm feasible Alma Street modifications. The concept identifies potential modifications
along Alma Street to support access to the tunnel, which may include sidewalk widening, curb
extensions, lane shifts, bicycle and pedestrian queuing areas, and intersection treatments at El
Dorado Avenue. The extent of these improvements would be confirmed during future design.
As currently shown, Alternative A1 would include an approximately 110-foot-long tunnel beneath the
railroad tracks. The tunnel and ramp dimensions remain conceptual and would be refined during future
design. For planning purposes, the concept assumes an interior tunnel height of approximately 12 feet,
although final tunnel height, excavation depth, cover requirements, ramp slopes, and ramp lengths would
depend on detailed design requirements, soil conditions, railroad requirements, construction method,
utility constraints, and accessibility standards.
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 94
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 5
On the east side, the tunnel would connect to Alma Street through ramps located within the landscaped
area between Alma Street and the Caltrain right-of-way. A new traffic signal and high-visibility crosswalks
would be provided at Alma Street and El Dorado Avenue to create a controlled crossing for people
walking and biking. On the west side, the tunnel approach would connect toward Park Boulevard through
the existing surface parking lot. The current west-side ramp configuration is conceptual and should be
revisited during future design as more detailed survey, property, and parking information become
available.
Compared to Alternative A2, Alternative A1 is substantially simpler from both a utility and right-of-way
standpoint. Based on available information at this stage, utility impacts appear relatively limited, and no
east-side property acquisition is anticipated. This is a key advantage of A1 relative to A2, which would
extend the tunnel beneath Alma Street and introduce more complex utility, excavation, and right-of-way
impacts. However, unlike A2, Alternative A1 would still require people walking and biking to cross Alma
Street at-grade using a new signalized crossing.
Design Variations. Several design variations may be considered during future design phases for
Alternative A1, including refinements to the traffic control strategy at Alma Street, east- and west-side
ramp configurations, ramp widths, and pedestrian and bicycle separation. These variations remain
available for further evaluation as the design advances and are summarized in the prior Alternatives
Analysis and supporting concept exhibits.
EL DORADO AVENUE TUNNEL UNDER ALMA STREET
(ALTERNATIVE A2)
Alternative A2 was developed following direction from the City Council to explore an option that would
construct a grade-separated bicycle and pedestrian tunnel near El Dorado Avenue under both Alma Street
and the railroad tracks. In response, the project team developed and iteratively refined a set of design
alternatives to address key constraints, community priorities, and technical considerations. The following
variants were developed and explored for Alternative A2 in response to the City Council direction:
• A2a: Ramp on South Side of El Dorado Ave with One-Way Vehicle Travel (Alternative A2)
• A2b: Cul-de-sac on El Dorado Ave at Alma St
• A2c: Straight Ramp next to Alma St (within existing landscape strip)
• A2d: Access from Matadero Creek
• A2e: Switchback Ramps next to Alma St
• A2f: Narrow Pedestrian-only Tunnel
Concept drawings for Alternatives A2a, A2b, and A2c are presented in Appendix B. Based on initial review
and explorations of these variants, Alternative A2a was selected as the representative A2 concept for
purposes of this assessment. Alternative A2d would result in additional parcel and right-of-way impacts
and have less direct alignment with poorer visibility and sightlines. Alternative A2e would result in
additional parcel impacts and Alternative A2f would not provide a bicycle connection. Alternative A2a
would provide the best overall balance among the A2 variants, including user experience due to its direct
alignment and sightlines, accessibility, ramp configuration, utility considerations, traffic, parking, and
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 95
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 6
driveway impacts and emergency access and would result in fewer parcel impacts. Other variants,
including Alternatives A2b and A2c, remain available for further consideration in later design phases. At
this stage, the intent is to identify a range of possible alignment options and evaluate a reasonable
planning-level A2 concept against Alternative A1, while recognizing that the final Alternative A2
configuration could continue to be refined if this alternative is selected to advance.
On the west side, the approach configuration for Alternative A2 would generally mimic Alternative A1,
connecting toward Park Boulevard through the same general area. On the east side, however, the tunnel
would extend beneath Alma Street, requiring a longer below-grade crossing and a more substantial
approach configuration than Alternative A1. To help minimize the overall tunnel length and reduce
impacts to adjacent properties and the surrounding neighborhood, the concept assumes a slight
narrowing of Alma Street in this area. This allows the tunnel and its approaches to return to existing grade
sooner and helps compress the overall footprint of the improvement. Because the crossing extends
beneath both Alma Street and the railroad corridor, Alternative A2 would require a longer tunnel structure
and longer approaches than Alternative A1, but it would provide a fully grade-separated crossing of both
barriers and avoid the need for a new signalized crossing of Alma Street.
Alternative A2 would require more extensive utility coordination, right-of-way review, and excavation than
Alternative A1. Depending on final design, this alternative may also require modifications to curb lines,
retaining elements, drainage infrastructure, and adjacent frontage improvements to accommodate the
tunnel approaches and maintain accessible grades. The concept shown at this stage reflects a
conservative planning-level footprint. As design advances, the alignment and approach configuration can
be further refined, including opportunities to reduce roadway, frontage, property, and neighborhood
impacts where feasible.
Design Variations. Several design variations may be considered during future design phases for
Alternative A2, including refinements to the tunnel alignment, portal locations, approach configuration,
tunnel and ramp widths, pedestrian and bicycle separation, streetscape integration, and emergency
access. These variations remain available for further evaluation as the design advances and are
summarized in the prior alternatives analysis, construction assessment, and supporting concept exhibits.
ASSESSMENT OF ALTERNATIVES
This section presents a planning-level assessment of Alternatives A1 and A2 based on a subset of
evaluation criteria identified for this phase of work. The assessment builds on the prior Alternatives
Analysis, available online on the project webpage (www.paloalto.gov/BikePedCrossings), community input
received during earlier phases of engagement, direction from the City Council, and the current conceptual
design information. The purpose of this assessment is to compare the two alternatives and support
selection of one or two preferred concepts to advance to 15% design.
The alternatives were evaluated based on personal security, utility impacts, construction cost, construction
duration, parcel impacts, traffic, parking, and driveway impacts, and emergency access. Because both
alternatives remain conceptual, the assessment is intended to compare relative advantages,
disadvantages, and risks at a planning level. Additional design, technical analysis, agency coordination,
and community engagement would be needed as the selected concept advances.
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 96
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 7
Personal Security
Both alternatives were designed with consideration for CPTED principles, and relevant safety standards
and design practices and would perform similarly with respect to personal security and opportunities for
natural surveillance. While Alternative A1 would have a slightly shorter tunnel, it would introduce sharp
turns that may reduce visibility in certain areas. While Alternative A2 has a straighter and more direct
tunnel, the tunnel would be longer, providing fewer opportunities to exit.
Utility Impacts
Based on currently available information, Alternative A1 is not anticipated to result in utility impacts. The
tunnel would be limited to the railroad corridor and would not extend beneath Alma Street, where the
more significant existing utility conflicts are located.
Alternative A2 is expected to have greater utility impacts because the tunnel would extend beneath Alma
Street, where existing utilities create a more constrained vertical profile. The current planning-level
concept assumes space between the Alma Street pavement section and the tunnel roof to accommodate
utility crossings, but the final tunnel profile would need to be confirmed through more detailed utility
investigation, potholing, agency coordination, and future design. These utility constraints may affect
tunnel depth, ramp lengths, construction staging, and the extent of any required utility protection,
relocation, or reconstruction.
Construction Cost
Alternative A2 is anticipated to have a higher construction cost than Alternative A1 because it would
require a longer below-grade structure extending beneath both Alma Street and the railroad corridor,
with a larger excavation footprint and more complex construction conditions. In addition to being longer,
the A2 tunnel may also need to be deeper than A1 to pass beneath existing utilities in Alma Street. The
extent of additional depth is not known at this stage and would need to be determined during future
design based on detailed utility investigation, potholing, agency coordination, and confirmation of the
final tunnel profile.
The added length and potential additional depth of the A2 tunnel would increase excavation, structural,
shoring, dewatering, staging, and restoration requirements relative to A1. Alternative A2 also introduces
greater cost risk associated with utility protection, relocation, or reconstruction; roadway and frontage
improvements; and right-of-way impacts. By comparison, A1 would involve a shorter tunnel structure and
a more limited construction footprint, with no known utility impacts and no anticipated east-side parcel
acquisition based on currently available information. Planning level conceptual project cost estimates are
presented in Table 2.
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 97
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 8
Table 2: Planning Level Conceptual Cost Estimates
Phase
A1
Tu
n
n
e
l
+
.
Preliminary Engineering/Environmental Clearance $2,000,000 $2,000,000
Final Design (PS&E) $4,000,000 $4,000,000
Construction $66,000,000 $81,000,000
$72,000,000 $87,000,000
Notes: All costs are shown in 2026 dollars with estimated escalation for future construction.
Construction Duration
Alternative A2 is anticipated to have a longer and more disruptive construction duration than Alternative
A1 because the construction footprint would extend beneath Alma Street and into the El Dorado Avenue
neighborhood. In addition to the longer below-grade crossing, A2 would require more complex staging
and coordination with existing utilities, roadway infrastructure, frontage improvements, and adjacent
residential properties. By comparison, A1 would involve a more limited construction footprint, with less
construction activity east of Alma Street and fewer anticipated neighborhood disruptions.
Parcel Impacts
Both alternatives are anticipated to result in similar right-of-way impacts on the west side of the corridor.
However, alternatives differ substantially on the east side. Alternative A1 would avoid full parcel
acquisition on the east side, while Alternative A2 would require acquisition of two parcels containing four
dwelling units (110-130 El Dorado Avenue and 178 El Dorado Avenue) to accommodate the longer tunnel
and associated approach improvements. Parcel impacts for Alternatives A1 and A2, as well as two other
variants explored for Alternative A2 are listed below:
• Alternative A1 El Dorado Ave Tunnel + Alma St Signal:
o Partial parcel impact on west side only.
• Alternative A2 El Dorado Ave Tunnel Under Alma St:
o Partial parcel impact on west side, plus acquisition of two full parcels (four dwelling units)
on the east side. This alternative would also raise emergency access concerns for three
parcels containing three dwelling units on north side of El Dorado Avenue.
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 98
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 9
• Alternative A2b Cul-de-sac on El Dorado Ave at Alma St:
o Partial parcel impact on west side, plus acquisition of three full parcels (five dwelling
units) and partial impacts on two additional parcels on the east side.
• Alternative A2c Straight Ramp Next to Alma St (within existing landscape strip):
o Partial parcel impact on west side, plus acquisition of two full parcels (two dwelling units)
on east side.
Traffic, Parking, and Driveway Impacts
With Alternative A1, a new traffic signal would be installed at Alma Street/El Dorado Avenue. The signal
would improve crossing safety for pedestrians and bicyclists through the presence of marked crosswalks,
use of countdown timers, and implementation of leading intervals, which can reduce the potential for
conflicts and reduce the frequency and severity of crashes. Installation of a traffic signal would also
introduce a controlled stopping point for vehicles, which would help manage vehicle speeds along the
corridor, reducing the likelihood of high-speed crossing conflicts. Vehicle progression could be optimized,
and vehicle delay would be minimized through coordination with upstream and/or downstream
intersections. Vehicle movements at the intersection may be partially restricted (e.g., right in/right out
only) at certain times. During the weekday a.m. (8-9 a.m.) peak hour, these turn restrictions could result in
the redistribution of approximately 40 vehicles across multiple streets and alternate routes, including
Colorado Avenue and Loma Verde Avenue.1 Additional information on the anticipated changes to travel
patterns and circulation with the new crossing are provided in the Circulation Study, available online on
the project webpage (www.paloalto.gov/BikePedCrossings).
With Alternative A2, El Dorado Avenue would have one 13-foot-wide vehicle travel lane on the segment
adjacent to the pedestrian and bicycle tunnel and would operate one-way westbound with right-turn only
at Alma Street. During the weekday a.m. peak hour (8-9 a.m.), the changes in circulation could result in the
redistribution of approximately 20 drivers turning onto El Dorado Avenue from Alma Street and 20 drivers
making a westbound left-turn from El Dorado Avenue onto Alma Street to alternate routes.
Both alternatives would result in some loss of parking. With Alternatives A1 and A2, the west-side tunnel
ramp connection would require modifications to the existing parking lot that are estimated to remove
fewer than 25 off-street vehicle parking spaces. The future parking lot layout and configuration would
need to be confirmed along with final design of the ramp and stair configuration. With Alternative A2, on-
street parking would be prohibited on both sides of El Dorado Avenue between Alma Street and Emerson
Street for the length of the ramp. This is assumed to result in the loss of about 10 on-street vehicle
parking spaces.
With Alternative A2, the conversion of El Dorado Avenue to one-way westbound operations from Alma
Street to Emerson Street would modify driveway access to the three parcels along the north side of this
segment to be right-in/right-out only. On the south side of the segment, access to two parcels would be
modified to be left-in/left-out only and access to the existing driveways of two parcels on the south side
1 Vehicle volumes rounded up to the nearest 10.
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 99
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 10
of this segment would be removed unless a replacement driveway connection from Alma Street can be
accommodated and accepted by the property owner.
Emergency Access
The City of Palo Alto Fire Department reviewed the latest planning-level conceptual designs. Based on
that review, Alternative A1 does not present any immediate emergency access concerns. In an emergency,
the Fire Department indicated it would likely access the tunnel from Park Boulevard, as shutting down
Alma Street would be more difficult operationally.
By contrast, Alternative A2 (including A2b and A2c) raises substantial fire and emergency access concerns.
In general, the Fire Department indicated that if a vehicle or driveway access to a parcel is removed, the
City would likely need to acquire the entire parcel and remove the building. Future design refinement
would also need to confirm consistency with applicable fire and emergency access requirements,
including clear widths on El Dorado Avenue and adequate water supply access.
• A1 El Dorado Ave Tunnel + Alma St Signal:
o No immediate emergency access concerns were identified.
• A2 El Dorado Ave Tunnel Under Alma St:
o This alternative would place the undercrossing on the south side of El Dorado Avenue
and retain a one-way, 13-foot-wide drive aisle. Although the existing rolled curbs along
the frontage may provide some operational flexibility, the Fire Department indicated that
the available clear width is highly constrained and would need to be closer to the 20-foot
standard. Fire expressed concerns regarding access to 110–130 El Dorado Avenue and
indicated a preference for that parcel to be vacated and the building removed. Additional
concerns were identified for 149 El Dorado Avenue, 129 El Dorado Avenue, and 2799
Alma Street due to the limited clear width on El Dorado Avenue. Adequate water supply
access would also need to be confirmed during future design.
• A2b Cul-de-sac on El Dorado Ave at Alma St:
o This alternative would create more significant emergency access constraints. The Fire
Department indicated it would not be able to access 149 El Dorado Avenue, 129 El
Dorado Avenue, and 110–130 El Dorado Avenue, and that these parcels would likely need
to be vacated and the buildings removed. Fire also noted potential access concerns for
2799 Alma Street.
• A2c Use of Landscaping Strip on Alma St:
o This alternative would provide better fire access than A2 and A2b. However, the Fire
Department indicated that 2777 Alma Street and 2799 Alma Street would likely still need
to be vacated and the buildings removed.
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 100
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 11
ASSESSMENT SUMMARY
The team completed a technical evaluation of the alternatives, considering each of the crossing options
and the corresponding community connections. The assessments are presented in the preceding section
and Table 3 presents a summary of the results. This matrix illustrates the degree to which the preferred
conceptual design alternatives align with each of the selected evaluation criteria, using a scale of high
(black) indicating strong alignment to low (light gray) indicating weak alignment. As shown in Table 3,
Alternative A1 scored higher across five of the seven evaluation criteria compared to Alternative A2.
Alternative A1 would have fewer utility impacts, lower construction cost and duration, fewer parcel
impacts, and would not alter emergency access. Alternative A2 scored the lowest/least desirable results
across five of the seven evaluation criteria and had comparable results to Alternative A1 in the categories
of personal security and traffic, parking, and driveway impacts.
Table 3: Evaluation Summary
Evaluation Criteria A1
Tu
n
n
e
l
+
Si
g
n
a
l
.
Personal Security
Utility Impacts
Construction Cost
Construction Duration
Parcel Impacts
Traffic, Parking, and Driveway Impacts
Emergency Access
Notes: Alternatives are scored using a subset of the evaluation criteria used in the prior Alternatives Analysis, available online on the
project webpage (www.paloalto.gov/BikePedCrossings), and were selected based on community input, engineering expertise, and
professional judgement. Emergency access is identified as a separate evaluation criterion for this phase. A high (most desirable)
score indicates stronger alignment with community values and a low (least desirable) score indicates weaker alignment. Note that
the results of these evaluations are one of several considerations in the process of seeking locally preferred alternatives.
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 101
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Alternatives Assessment Page 12
APPENDICES
Appendix A: Concept Designs
Appendix B: Construction Assessment
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 102
š
š
€
‚
ƒ„ …† ‡
‡
ˆ
‰„
ƒ
Š
Draft design concepts shown are preliminary and intended for discussion purposes only. All concepts are flexible and subject to refinement. Additional community engagement and technical design work will be needed once locations and basic design concepts have been decided.
‹‹„ …
‰ƒ
Œ
†Š
…
…
‹
‹
Ž
ƒ
‘
‚
11
0
-
1
3
0
E
l
D
o
r
a
d
o
A
v
e
2799 Alma St
2777 Alma St
129 El Dorado Ave
149 El Dorado Ave
178 El Dorado Ave
2800 Emerson St
2745 Alma St
3101 Park Blvd
Item 3
Attachment B - Preferred Alternatives Assessment
Packet Pg. 103
11
0
-
1
3
0
E
l
D
o
r
a
d
o
A
v
e
2799 Alma St
2777 Alma St
129 El Dorado Ave
149 El Dorado Ave
178 El Dorado Ave
179 El Dorado Ave
2745 Alma St
3101 Park Blvd
One-way west bound
Draft design concepts shown are preliminar y and intended for discussion purposes only. All concepts are flexible and subject to refinement. Additional community engagement and technical design work will be needed once locations and basic design concepts have been decided.
Item 3
Attachment B - Preferred Alternatives Assessment
Packet Pg. 104
Technical Memorandum
South Palo Alto Bike/Ped Connectivity |1
www.bkf.com/contact
Date:7/17/2026 BKF Job Number: 20241227
Deliver To: Amanda Leahy, AICP
Kittelson & Associates
Subject:South Palo Alto Bike/Ped Connectivity
Construction Assessment of El Dorado Avenue Tunnel
This summary consolidates the current planning-level assessment of the El Dorado Avenue alternatives studied for
the South Palo Alto Bike/Ped Connectivity effort. It focuses on the primary geometric, structural, construction
staging, utility, and right of way considerations for each alternative. The two preferred alternatives for El Dorado
both include a new bicycle and pedestrian undercrossing of the Caltrain corridor. Alternative A.1 would construct a
tunnel beneath the rail corridor only, connecting Park Boulevard to Alma Street and retaining an at-grade crossing
of Alma Street. Alternative A.2 would also construct a tunnel beneath the rail corridor, but would extend farther east
beneath Alma Street and into El Dorado Avenue to provide a fully grade-separated crossing.
For planning purposes, the tunnel concepts assume an interior height of approximately 12 feet. Per the Caltrain
Corridor Crossings Delivery Guide, underpasses may be constructed with as little as 5 feet of cover, measured from
the bottom of railroad ties to the top of structure, where a minimally invasive construction method such as box
jacking or tunneling is used. That said, the actual depth of cover and resulting tunnel profile for this project will
need to be refined during future design based on the selected construction method, subsurface conditions, utility
constraints, structural requirements, and the specific railroad infrastructure present at the crossing.
As part of concept development, a high-level review of fire and emergency access considerations was completed to
help identify major constraints and inform the planning-level comparison of alternatives. This review was not
intended to confirm final fire code compliance. Further coordination with the City and Fire Department will be
needed as the concepts are refined, particularly for alternatives with constrained access conditions.
Alternative A.1
Alternative A.1 connects Park Blvd. to Alma St. and includes a meandering pathway on the west side within the
existing parking lot at the southerly end of 3101 Park Blvd (see Attachment 1). At this stage, there appear to be
multiple ways to accommodate the westside approach, including potential parking lot reconfiguration, landscaping
separation, and a separate pedestrian-only path with stairs to reduce conflicts between pedestrians and bicyclists.
On the east side, the alignment conforms within the existing buffered landscape area along Alma Street and
includes two 90-degree ramps and a staircase with direct access to Alma Street, similar in concept to the City’s
existing Homer Avenue undercrossing. This concept would also require a bulb-out along Alma Street to
accommodate the undercrossing width and associated access improvements, and a new traffic signal and
crosswalks would help serve the crossing location.
From a structural standpoint, Alternative A.1 consists of an approximately 110-foot-long by 24-foot-wide tunnel
beneath the rail corridor, with ramps on each side of the undercrossing and shorter stair connections at each end.
Based on the current concept, the tunnel would likely be constructed using box jacking beneath the active tracks.
This is a meaningful advantage because it avoids excavation at the track location and avoids the need for a
temporary shoofly, while minimizing interruption to rail operations and impacts to the overhead contact system.
Appendix B
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 105
South Palo Alto Bike/Ped Connectivity |2
www.bkf.com/contact
The approach ramps would likely be formed with cast-in-place retaining walls, with shallow foundations anticipated,
subject to geotechnical confirmation. Temporary excavation shoring would likely be required for the deeper ramp
sections and jacking pit/receiving pit construction.
Construction staging for A.1 is comparatively straightforward relative to the A.2 variants because the crossing is
limited to the rail corridor and does not extend beneath Alma Street. Even so, the alternative still carries typical
undercrossing construction risks, including coordination of track closure windows, temporary track support,
excavation support, and potential groundwater and waterproofing challenges depending on subsurface conditions.
Short-term closures would likely still be required to complete final waterproofing and restore the track structure
after box jacking.
At this stage, utility impacts for A.1 appear minimal, and right of way impacts also appear limited. The current
understanding is that only a partial acquisition would be needed on the west side, with no anticipated east side
acquisition impacts. This is a key differentiator relative to the A.2 variants.
Alternative A.2
Alternative A.2 consists of three east-side variants (A.2A, A.2B, and A.2C) that are similar to A.1 in that they continue
to rely on a grade-separated undercrossing concept beneath the rail corridor with ramped access and retaining wall
systems (see Attachments 2-4). However, these variants extend farther east beneath Alma Street and into the El
Dorado area, which materially changes the project complexity. Structurally, the A.2 concepts would likely require a
longer tunnel, with the rail crossing segment still constructed by box jacking and the portion beneath Alma Street
constructed by cut-and-cover. This introduces a more complicated construction sequencing approach than A.1
because Alma Street traffic would need to be maintained through staged construction, likely with temporary lane
shifts and phased tunnel construction beneath the roadway (see Attachment 2 for the conceptual staging
configuration). The cut-and-cover segment and extended ramps would also increase the need for excavation
shoring, traffic handling, and coordination adjacent to existing development. The variants differ primarily in their
east-side tie-in: A.2A maintains limited outbound access, A.2B closes El Dorado Avenue with a cul-de-sac, and A.2C
turns north to connect along Alma Street.
The most significant shared constraint across the A.2 variants is utility conflict. Existing utility information
documents identify several major existing underground facilities in the proposed undercrossing area, including a
24-inch high-pressure gas line, a 12-inch water line, and 8-inch and 18-inch sewer lines. These facilities would need
to be routed around the proposed undercrossing, and because the sewer facilities are gravity lines, their relocation
may be especially challenging depending on available grades. Accommodating these utilities would likely require
lowering the undercrossing profile, which in turn would push the ramps farther outward and increase surface
impacts. In practical terms, this means the east approach may need to drop lower near Alma Street to
accommodate utility conflicts before tying into the tunnel profile beneath the rail corridor, which could increase
ramp length and surface impacts on the El Dorado side. As a result, the A.2 variants should generally be assumed to
have major utility relocation requirements, added cost, greater schedule risk, and increased design coordination
relative to A.1.
These alternatives also create more substantial adjacency and construction concerns near existing residences and
accessways. The proximity of excavation, shoring, and retaining walls to nearby homes and other improvements
raises the potential for settlement, vibration, and access disruptions during construction. In addition, because the
A.2 variants tie into a constrained residential context, they require more extensive roadway reconfiguration and
create more meaningful right of way considerations than A.1. While the structural and utility challenges are broadly
similar across all three A.2 variants, the right of way effects differ based on how each eastern approach is
configured.
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 106
South Palo Alto Bike/Ped Connectivity |3
www.bkf.com/contact
Alternative A.2A
Alternative A.2A places the undercrossing on the south side of El Dorado and retains a one-way 13-foot drive aisle
for outbound neighborhood access to Alma Street (see Attachment 2). Existing rolled curbs along this frontage may
help support emergency access within the constrained layout. In this concept, Alma Street is shifted closer to the rail
corridor so that the undercrossing profile can begin daylighting sooner, with the goal of reducing impacts to
residences along El Dorado Avenue.
Relative to the other A.2 variants, A.2A appears to be the most targeted in terms of right of way impact under the
current best-case layout, but that assumes the utility conflicts can be resolved without driving the profile farther
outward than currently shown. As laid out today, the primary right of way issue is the loss of access to the existing
driveway and parking area at 110-130 El Dorado Avenue. Based on the current concept, that impact could require
full acquisition of the entire parcel unless a replacement driveway connection from Alma Street can be
accommodated and accepted by the property owner.
Accordingly, A.2A may offer some right of way advantage relative to A.2B, but it remains heavily constrained by
utility relocation feasibility and by the ability to preserve or replace property access in a workable manner.
Alternative A.2B
Alternative A.2B closes El Dorado Avenue entirely and allows the undercrossing to conform more directly within the
existing El Dorado Avenue corridor (see Attachment 3). Pedestrian and bicycle circulation can still be maintained in
and around the undercrossing, including stair access from Alma Street, but closure of El Dorado would require a
cul-de-sac to maintain fire access and turnaround capability.
The principal tradeoff with A.2B is that it appears to create the greatest right of way impact among the alternatives
studied. Under the concept reviewed, this option would require three full acquisitions and four partial acquisitions.
The full acquisitions are identified at 110-130, 129, and 149 El Dorado Avenue, while partial acquisitions are
identified at 178 and 179 El Dorado Avenue. The team also evaluated an offset cul-de-sac concept (shown in red) to
reduce some partial takes, but while that could eliminate certain partial impacts, it would likely convert the overall
impact to four full acquisitions with no partial acquisitions. In either case, A.2B appears to carry the heaviest
property impact burden of the alternatives considered. Utility impacts remain significant and generally similar to
those described for A.2A.
Alternative A.2C
Alternative A.2C also extends beneath Alma Street, but then turns 90 degrees and ramps north of El Dorado Avenue
within the landscaped buffer area on the east side of Alma Street between the residences (see Attachment 4). A
potential refinement could allow the east-side ramp to continue further and make a 180-degree turn near 2799
Alma Street to surface closer to El Dorado Avenue, which may improve the east-side tie-in and help address some
of the concerns associated with the current concept. Its main distinction is that it seeks to reduce right of way
impacts by shifting the eastern approach away from some of the more directly affected residential access areas.
This concept appears to reduce right of way impacts relative to A.2B and potentially limits them to two parcels at
2777 and 2799 Alma Street. However, that benefit comes with notable operational and safety drawbacks. The 90-
degree turn beneath El Dorado is not ideal from a user experience standpoint, particularly for bicyclists, and it may
create security and safety concerns because it reduces straight-line visibility compared to the other concepts.
In addition to the major underground utility conflicts common to the A.2 variants, A.2C also appears to introduce
potential overhead utility conflicts because the east-side ramp and associated improvements may extend into the
area of existing utility poles and overhead electrical and fiber lines, which could require pole relocation or other
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 107
South Palo Alto Bike/Ped Connectivity |4
www.bkf.com/contact
utility modifications. While there may be some opportunity to refine the Alma Street alignment and ramp
placement to reduce those impacts, the current planning assumption should be that these overhead lines would
require relocation unless further design work demonstrates otherwise.
Overall Comparison
At a high level, Alternative A.1 appears to be the least complex and least impactful option from a utility and right of
way standpoint and offers a more straightforward construction approach because it avoids extending the crossing
beneath Alma Street. Its primary challenges are those inherent to a rail undercrossing, including box jacking, track
coordination, and potential groundwater-related construction considerations.
By comparison, Alternatives A.2A, A.2B, and A.2C all introduce a similar step increase in complexity because they
extend beneath Alma Street and enter an area with substantial utility conflicts and tighter residential constraints.
Among those variants, A.2A may have the most limited right of way effect if access can be maintained or replaced,
A.2B appears to have the greatest right of way impact, and A.2C may reduce property impacts relative to A.2B but
does so with a less desirable turning movement and additional potential overhead utility issues.
Attachments
1.Alt A.1 Concept Plan
2.Alt A.2A Concept Plan
3.Alt A.2B Concept Plan
4.Alt A.2C Concept Plan
Item 3
Attachment B - Preferred
Alternatives Assessment
Packet Pg. 108
BK
F
E
N
G
I
N
E
E
R
S
17
3
0
N
.
F
I
R
S
T
S
T
R
E
E
T
SU
I
T
E
6
0
0
SA
N
J
O
S
E
,
C
A
9
5
1
1
2
(4
0
8
)
4
6
7
-
9
1
0
0
ww
w
.
b
k
f
.
c
o
m
LEGEND:
TRAFFIC SIGNAL
SO
U
T
H
E
R
N
P
A
L
O
A
L
T
O
B
I
C
Y
C
L
E
A
N
D
P
E
D
E
S
T
R
I
A
N
RA
I
L
R
O
A
D
C
R
O
S
S
I
N
G
S
T
U
D
Y
EL
D
O
R
A
D
O
A
V
E
-
A
L
T
A
.
1
INTERNAL DRAFT FOR
REVIEW AND DISCUSSION
40
scale 1" = 40'
0 40
feet
80
RAMP AND/OR STAIR STRUCTURE
TUNNEL
AT GRADE PATH
BOLLARD
CALTRAIN RIGHT OF WAY
PARCEL IMPACTS
PROPERTY LINE
STAIRS
3101 Park Blvd
11
0
-
1
3
0
E
l
D
o
r
a
d
o
A
v
e
2799 Alma St
2777 Alma St
129 El Dorado Ave
149 El Dorado Ave
178 El Dorado Ave
2800 Emerson St
17
9
E
l
D
o
r
a
d
o
A
v
e
11
0
'
-
0
"
Ja
c
k
e
d
b
o
x
Estimated 140'
long by 40'min
wide jacking pit
14
0
'
-
0
"
24
'
-
0
"
Estimated 25' long
by 40' wide
receiving pit
40'-0"
Item 3
Attachment B - Preferred Alternatives Assessment
Packet Pg. 109
40
scale 1" = 40'
0 40
feet
80
SO
U
T
H
E
R
N
P
A
L
O
A
L
T
O
B
I
C
Y
C
L
E
A
N
D
P
E
D
E
S
T
R
I
A
N
RA
I
L
R
O
A
D
C
R
O
S
S
I
N
G
S
T
U
D
Y
EL
D
O
R
A
D
O
A
V
E
-
A
L
T
A
.
2
A
BK
F
E
N
G
I
N
E
E
R
S
17
3
0
N
.
F
I
R
S
T
S
T
R
E
E
T
SU
I
T
E
6
0
0
SA
N
J
O
S
E
,
C
A
9
5
1
1
2
(4
0
8
)
4
6
7
-
9
1
0
0
ww
w
.
b
k
f
.
c
o
m
LEGEND:
RAMP AND/OR STAIR STRUCTURE
TUNNEL
BOLLARD
STAIRS
CALTRAIN RIGHT OF WAY
PARCEL IMPACTS
PROPERTY LINE
11
0
-
1
3
0
E
l
D
o
r
a
d
o
A
v
e
2799 Alma St
2777 Alma St
129 El Dorado Ave
149 El Dorado Ave
178 El Dorado Ave
2800 Emerson St
17
9
E
l
D
o
r
a
d
o
A
v
e
60
'
-
0
"
Cu
t
a
n
d
c
o
v
e
r
t
u
n
n
e
l
ST
A
G
E
1
Cu
t
&
c
o
v
e
r
tu
n
n
e
l
co
n
s
t
r
u
c
t
i
o
n
ST
A
G
E
1
Al
m
a
T
r
a
f
f
i
c
ST
A
G
E
2
Cu
t
&
C
o
v
e
r
tu
n
n
e
l
co
n
s
t
r
u
c
t
i
o
n
Estimated 140'
long by 40'min
wide jacking pit
14
0
'
-
0
"
24
'
-
0
"
Estimated 25' long
by 40' wide
receiving pit
40'-0"
Ja
c
k
e
d
b
o
x
11
0
'
-
0
"
24
0
'
-
0
"
Ra
m
p
INTERNAL DRAFT FOR
REVIEW AND DISCUSSION
Item 3
Attachment B - Preferred Alternatives Assessment
Packet Pg. 110
BK
F
E
N
G
I
N
E
E
R
S
17
3
0
N
.
F
I
R
S
T
S
T
R
E
E
T
SU
I
T
E
6
0
0
SA
N
J
O
S
E
,
C
A
9
5
1
1
2
(4
0
8
)
4
6
7
-
9
1
0
0
ww
w
.
b
k
f
.
c
o
m
40
scale 1" = 40'
0 40
feet
80
SO
U
T
H
E
R
N
P
A
L
O
A
L
T
O
B
I
C
Y
C
L
E
A
N
D
P
E
D
E
S
T
R
I
A
N
RA
I
L
R
O
A
D
C
R
O
S
S
I
N
G
S
T
U
D
Y
EL
D
O
R
A
D
O
A
V
E
-
A
L
T
A
.
2
B
LEGEND:
RAMP AND/OR STAIR STRUCTURE
TUNNEL
BOLLARD
STAIRS
CALTRAIN RIGHT OF WAY
PARCEL IMPACTS
PROPERTY LINE
INTERNAL DRAFT FOR
REVIEW AND DISCUSSION
11
0
-
1
3
0
E
l
D
o
r
a
d
o
A
v
e
2799 Alma St
2777 Alma St
129 El Dorado Ave
149 El Dorado Ave
178 El Dorado Ave
2800 Emerson St
17
9
E
l
D
o
r
a
d
o
A
v
e
Item 3
Attachment B - Preferred Alternatives Assessment
Packet Pg. 111
40
scale 1" = 40'
0 40
feet
80
SO
U
T
H
E
R
N
P
A
L
O
A
L
T
O
B
I
C
Y
C
L
E
A
N
D
P
E
D
E
S
T
R
I
A
N
RA
I
L
R
O
A
D
C
R
O
S
S
I
N
G
S
T
U
D
Y
EL
D
O
R
A
D
O
A
V
E
-
A
L
T
A
.
2
C
BK
F
E
N
G
I
N
E
E
R
S
17
3
0
N
.
F
I
R
S
T
S
T
R
E
E
T
SU
I
T
E
6
0
0
SA
N
J
O
S
E
,
C
A
9
5
1
1
2
(4
0
8
)
4
6
7
-
9
1
0
0
ww
w
.
b
k
f
.
c
o
m
LEGEND:
RAMP AND/OR STAIR STRUCTURE
TUNNEL
BOLLARD
STAIRS
CALTRAIN RIGHT OF WAY
PARCEL IMPACTS
PROPERTY LINE
INTERNAL DRAFT FOR
REVIEW AND DISCUSSION
11
0
-
1
3
0
E
l
D
o
r
a
d
o
A
v
e
2799 Alma St
2777 Alma St
129 El Dorado Ave
149 El Dorado Ave
178 El Dorado Ave
2800 Emerson St
17
9
E
l
D
o
r
a
d
o
A
v
e
Item 3
Attachment B - Preferred Alternatives Assessment
Packet Pg. 112
July 23, 2026
SOUTH PALO ALTO BIKE/PED CONNECTIVITY
CIRCULATION STUDY
The purpose of this cursory circulation study is to assess neighborhood and circulation effects associated
with a new Caltrain bicycle/pedestrian undercrossing (Alternatives A1 and A2) at El Dorado Avenue
(including potential diversion patterns and cul-de-sac effects) and inform accompanying network
enhancements. The analysis compares future conditions (without the new connection) with each crossing
alternative, focusing on key intersections and corridors most likely to experience changes in traffic
volumes. Findings from this initial study will inform decision-making by clarifying the trade-offs between
alternatives and informing complementary network enhancements or operational strategies that may be
needed to enhance safety and functional circulation under each alternative.
Pedestrian, bicycle, and vehicle counts were collected at 21 intersections on Thursday, March 19, 2026,
between 7 a.m. and 7 p.m. Count locations focus on intersections nearest El Dorado Avenue since those
streets will feel the effects the most. Several intersections were excluded from this initial study, including
nearby intersections on the west-side of the rail corridor since circulation patterns are not expected to
change as much. The analysis considers the following three scenarios:
1. Future Conditions (Without New Connection): Future conditions without a new
bicycle/pedestrian undercrossing. Future weekday a.m. peak hour (8 a.m to 9 a.m.) volumes were
forecast to account for land use and population growth in Palo Alto.1
2. El Dorado Avenue Tunnel + Alma Street Signal (Alternative A1): Future conditions with a new
bicycle/pedestrian tunnel under Caltrain at El Dorado Avenue and a signalized crossing at Alma
Street. Peak period left-turn restrictions were assumed to be implemented at Alma Street/El
Dorado Avenue with this alternative.2
3. El Dorado Avenue Tunnel Under Alma Street (Alternative A2): Future conditions with a new
bicycle/pedestrian tunnel on the south side of El Dorado Avenue extending under both Alma
Street and Caltrain. The intersection of Alma Street/El Dorado Avenue would be reconfigured with
El Dorado Avenue as a one-way westbound roadway with right-out only operations at Alma
Street.3
*All scenarios reflect future year 2031 conditions.
1 Consistent with the demand estimates prepared for the Alternatives Analysis, available on the project webpage
(www.paloalto.gov/BikePedCrossings), an annual growth rate of 1.099 was applied uniformly to all movements to reflect the expected increase in person trips between 2026 and 2031.
2 With Alternative A1 the southbound left-turn and westbound left-turn movements at Alma Street/El Dorado Avenue were
redistributed across the network.
3 With Alternative A2 the southbound left-turn, northbound right-turn, and westbound left-turn movements at Alma Street/El
Dorado Avenue were redistributed across the network.
Oakland, CA 94612
Item 3
Attachment C - Initial
Circulation Study
Packet Pg. 113
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Circulation Study Page 2
The weekday a.m. peak hour was selected for analysis as it represents the period of peak demand for the
new grade-separated crossing.4 The Future Conditions (Without New Connection) Circulation Summary is
presented in Exhibit 1. The Future Conditions with Alternative A1 and A2 Circulation Summary is
presented in Exhibit 2. Existing and future counts for each scenario are included in Appendix A.
Exhibit 1. Future Conditions (Without New Connection) – Circulation Summary
4 Vehicle volumes are rounded up to the nearest 10 and pedestrian and bicycle volumes are rounded up to the nearest 5.
Item 3
Attachment C - Initial
Circulation Study
Packet Pg. 114
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Circulation Study Page 3
Exhibit 2. Future Conditions with Alternative A1 and A2 – Circulation Summary
A summary of findings and key takeaways is described below.
SUMMARY OF FINDINGS
Key Takeaways
• Meaningful projected use: By 2031, the El Dorado tunnel is expected to carry about 70 walk trips
and 150 bike trips in the a.m. peak hour, and roughly 800 walk trips and 1,800 bike trips daily.
• Good network fit: Most connecting streets serving the undercrossing (El Dorado, Bryant, Cowper,
Colorado, Loma Verde, and Park) in the surrounding neighborhoods are low-volume or low-stress
routes suitable for bicycle and pedestrian access.
Item 3
Attachment C - Initial
Circulation Study
Packet Pg. 115
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Circulation Study Page 4
• Limited traffic impacts: Both crossing alternatives would cause little overall change in
neighborhood traffic patterns, with some rerouting on nearby streets.
• Access design will shape operations: A signalized Alma Street crossing (Alternative A1) would
preserve two-way El Dorado Avenue access, while the under-Alma Street option (Alternative A2)
would shift more bicycle and pedestrian activity onto El Dorado Avenue and require more vehicle
access changes.
• Supportive improvements will be important: Enhancements to surrounding streets would
apply context-appropriate high-visibility crossings, lighting, markings, traffic control, and
wayfinding, consistent with the Safe System Approach and other applicable safety standards to
make tunnel approaches comfortable for all-ages-and-abilities.
Additional findings are described in this section.
Future Conditions (Without New Connection)
• Oregon Expressway and Alma Street carry the highest weekday a.m. peak hour vehicle volumes
with about 3,180 vehicles (1,710 westbound and 1,470 eastbound) on Oregon Expressway, south
of Bryant Street and 2,540 vehicles (1,620 northbound and 920 southbound) on Alma Street,
north of El Dorado Avenue. These busier streets are barriers to walking and biking. The network
recommendations consider safer and more comfortable crossings of these streets to improve
access to and from the new tunnel.
• Cowper Street, Waverley Street, Bryant Street, Colorado Avenue, El Dorado Avenue, and El
Carmelo Avenue carry less than 200 vehicles (between 30 and 90 vehicles in each direction)
during the a.m. peak hour. Loma Verde Avenue carries approximately 400 vehicles (200 in each
direction) during the a.m. peak hour. The peak hour and daily vehicle volumes would be under
applicable vehicle volume thresholds for bike boulevards and bike lanes on streets with existing
and proposed bikeways.5
• Pedestrians (180) and bicycles (80) outnumber vehicles (160) at the intersection of Bryant Street
and El Carmelo Avenue, adjacent to El Carmelo Elementary School during the a.m. peak hour. The
network recommendations consider enhancements, such as bulb-outs, to shorten crossing
distances, reduce turning vehicle and bicycle speeds, and provide more space on the street corner
and sidewalk for the relatively high volumes of pedestrians at this location.
• Bicyclists (80 northbound, 25 southbound) outnumber drivers (20 northbound, 25 southbound)
on Bryant Street, between Colorado Avenue and El Dorado Avenue during the a.m. peak hour.
The network recommendations consider installing a traffic circle at the intersection of the Bryant
Street and El Dorado Avenue bike boulevards to reduce speeds, reduce number of crossing
conflicts, and improve traffic flow.
• Approximate weekday a.m. peak hour left-turning vehicle volumes on/off of Alma Street:
o 15 southbound left-turns and 5 westbound left-turns at Colorado Avenue
o 20 southbound left-turns and 20 westbound left-turns at El Dorado Avenue
5 National Association of City Transportation Officials (NACTO) Guidance for Selecting All Ages and Abilities Bikeways.
https://nacto.org/wp-content/uploads/p071_table_PART3-1.png. Daily and peak hour vehicle volume thresholds for bicycle boulevards are 150 vehicles per hour in the peak direction or 2,000 vehicles per day. The daily and peak hour vehicle volume
thresholds for bike lanes are 300 vehicles per hour in the peak direction or 3,000 vehicles per day.
Item 3
Attachment C - Initial
Circulation Study
Packet Pg. 116
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Circulation Study Page 5
o 25 southbound left-turns and 10 westbound left-turns at El Carmelo Avenue
o 80 southbound left-turns and 40 westbound left-turns at Loma Verde Avenue
El Dorado Avenue Tunnel + Alma Street Signal (Alternative A1)
• Under Alternative A1, a new traffic signal at El Dorado Avenue/Alma Street would provide a
controlled crossing opportunity for bicyclists and pedestrians to access the tunnel. The signal
would facilitate crossings for pedestrians and bicyclists through the presence of marked
crosswalks, use of countdown timers, and implementation of leading pedestrian intervals, which
can reduce the potential for conflicts and reduce the frequency and severity of crashes.
Installation of a traffic signal would also introduce a controlled stopping point for vehicles, which
would help manage vehicle speeds along the corridor, reducing the likelihood of high-speed
crossing conflicts. Vehicle progression could be optimized to minimize vehicle delay through
coordination with upstream and/or downstream intersections. Signalization may make this route
more attractive to turning drivers by creating a more convenient and predictable opportunity to
turn left onto or off of Alma Street. Access to El Dorado Avenue, could be managed with the
potential to implement turn restrictions, such as prohibiting left turns and allowing right-
in/right-out only operations during peak periods or other time periods. Based on a review of
potential trip origins and destinations and possible travel routes, approximately 40 drivers that
currently make left turns to or from El Dorado Avenue during the weekday a.m. peak hour were
shifted to alternate routes. This shifting of traffic would result in the reduction of vehicle traffic
volumes on El Dorado Avenue between Alma Street and Emerson Street and changes (increases
and decreases) of fewer than 20 vehicle trips on nearby streets and intersections during the
weekday a.m. peak hour.
• Alternative A1 would maintain two-way vehicle circulation on El Dorado Avenue, which would
help preserve local circulation and driveway access. Signal timing and phasing, including use of
advance detection, crossing time for leading pedestrian intervals, and implementation of turn
restrictions, would continue to be refined throughout the design process and may be modified
after construction.
El Dorado Avenue Tunnel Under Alma Street (Alternative A2)
• Under Alternative A2, the bicycle/pedestrian undercrossing would extend along the south side of
El Dorado Avenue with El Dorado Avenue proposed to be converted to one-way westbound
right-turn only vehicle operations. Drivers that currently turn onto El Dorado Avenue from Alma
Street (20 southbound left-turns, 20 northbound right-turns) or turn left onto Alma Street from El
Dorado Avenue (20 westbound left-turns) would be shifted to alternate routes. This shifting of
traffic would result in the reduction of vehicle traffic volumes on El Dorado Avenue between Alma
Street and Emerson Street and shift fewer than 20 vehicle trips to nearby streets during the
weekday a.m. peak hour.
• As shown in Exhibit 2, with Alternatives A1 and A2, there would be little overall change in traffic
volumes on the tunnel approaches. Vehicle volumes would continue to be relatively low, and daily
and peak hour volumes on streets with existing or proposed bikeways (including El Dorado
Item 3
Attachment C - Initial
Circulation Study
Packet Pg. 117
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Circulation Study Page 6
Avenue, Bryant Street, Cowper Street, Loma Verde Avenue, Colorado Avenue, and Park Boulevard)
would remain under applicable thresholds for those facilities.
Pedestrian and Bicycle Circulation
• Based on the prior Alternatives Analysis, available on the project webpage
(www.paloalto.gov/BikePedCrossings), there would be an estimated total of 70 walk trips and 150
bicycle trips using the undercrossing at El Dorado Avenue during the weekday a.m peak hour in
2031, with an estimated 800 walk and 1,800 bike trips daily. The 70 walk trips are anticipated to
be distributed across the network on the most direct route between destinations. For instance,
150 bike trips are expected to mostly use the existing bicycle boulevards and low-stress routes
including Cowper Street, Bryant Street, Colorado Avenue, Loma Verde Avenue, and Park
Boulevard.
• For Alternative A1, 70 walk and 150 bike trips would cross at the intersection of Alma Street/El
Dorado Avenue to access the undercrossing. With Alternative A2, the tunnel entrance is located
on El Dorado Avenue. Therefore, it is expected that more people would travel along El Dorado
Avenue rather than Alma Street to access the crossing.
APPENDICES
Appendix A: Existing Counts and Future Volumes
Item 3
Attachment C - Initial
Circulation Study
Packet Pg. 118
Existing Weekday AM Peak Hour Vehicle Counts
Intersection N-S Street E-W Street SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL
1 Alma St El Dorado Ave 0 821 16 26 0 17 15 1,465 0 0 0 0
2 Emerson St El Dorado Ave 4 0 1 2 33 1 4 1 4 4 21 7
3 Ramona St El Dorado Ave 4 3 2 1 25 5 9 1 6 2 23 2
4 Bryant St El Dorado Ave 5 3 9 11 21 1 5 3 5 3 29 2
5 South Ct El Dorado Ave 1 3 1 2 26 2 0 2 4 3 38 1
6 Waverley St El Dorado Ave 4 62 2 2 14 35 29 56 12 14 16 7
7 Cowper St El Dorado Ave 42 36 0 0 0 0 0 40 9 16 0 34
8 Alma St Colorado Ave 0 603 12 88 0 4 8 1,500 0 0 0 0
9 Bryant St Colorado Ave 9 12 10 40 63 2 3 17 1 0 23 3
10 Waverley St Colorado Ave 4 53 4 3 82 2 5 47 18 7 20 10
11 Bryant St Oregon Expy 55 14 34 15 1,452 5 9 6 45 11 1,309 17
12 Alma St El Carmelo Ave 0 807 22 56 0 9 9 1,413 0 0 0 0
13 Emerson St El Carmelo Ave 4 0 1 2 40 8 8 0 20 4 28 1
14 Ramona St El Carmelo Ave 2 0 0 1 18 12 31 0 28 6 30 1
15 Bryant St El Carmelo Ave 4 1 0 2 19 34 23 1 8 12 39 1
16 Waverley St El Carmelo Ave 48 63 0 0 0 0 0 41 12 18 0 51
17 Alma St Loma Verde Ave 0 752 71 132 0 36 65 1,284 0 0 0 0
18 Emerson St Loma Verde Ave 4 3 13 9 160 8 5 3 2 6 134 3
19 Ramona St Loma Verde Ave 4 11 8 7 132 17 8 16 5 29 168 13
20 Bryant St Loma Verde Ave 9 2 26 19 199 8 8 1 3 7 156 9
21 Waverley St Loma Verde Ave 5 43 32 21 207 45 35 24 9 6 159 15
NOTES : Peak Hour (8-9 AM) counts collected by Traffic Data Service on Thursday, March 31st, 2026, from 7 AM to 7 PM
SBR: Southbound Right NBR: Northbound Right
SBT: Southbound Through NBT: Northbound Through
SBL: Southbound Left NBL: Northbound Left
WBR: Westbound Right EBR: Eastbound Right
WBT: Westbound Through EBT: Eastbound Through
WBL: Westbound Left EBL: Eastbound Left
1 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 119
Existing Weekday AM Peak Hour Pedestrian Counts
Intersection N-S Street E-W Street SB WB NB EB
1 Alma St El Dorado Ave 0 7 0 0
2 Emerson St El Dorado Ave 3 0 3 1
3 Ramona St El Dorado Ave 0 7 4 0
4 Bryant St El Dorado Ave 6 17 11 5
5 South Ct El Dorado Ave 6 0 11 0
6 Waverley St El Dorado Ave 5 8 23 8
7 Cowper St El Dorado Ave 4 0 8 5
8 Alma St Colorado Ave 0 11 0 0
9 Bryant St Colorado Ave 5 15 9 5
10 Waverley St Colorado Ave 7 5 9 4
11 Bryant St Oregon Expy 0 25 0 0
12 Alma St El Carmelo Ave 0 6 0 0
13 Emerson St El Carmelo Ave 1 1 3 0
14 Ramona St El Carmelo Ave 3 2 16 0
15 Bryant St El Carmelo Ave 10 27 72 53
16 Waverley St El Carmelo Ave 3 0 6 12
17 Alma St Loma Verde Ave 0 6 0 0
18 Emerson St Loma Verde Ave 0 0 13 1
19 Ramona St Loma Verde Ave 19 12 21 20
20 Bryant St Loma Verde Ave 59 7 7 45
21 Waverley St Loma Verde Ave 15 14 5 13
NOTES : Peak Hour (8-9 AM) counts collected by Traffic Data Service on Thursday, March 31st, 2026, from 7 AM to 7 PM
SB: Southbound
WB: Westbound
NB: Northbound
EB: Eastbound
2 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 120
Existing Weekday AM Peak Hour Bike Counts
Intersection N-S Street E-W Street SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL
1 Alma St El Dorado Ave 0 0 0 0 0 0 0 1 0 0 0 0
2 Emerson St El Dorado Ave 0 0 2 0 0 0 2 0 0 0 5 0
3 Ramona St El Dorado Ave 0 0 0 0 0 0 2 0 0 0 13 0
4 Bryant St El Dorado Ave 0 23 0 1 0 14 0 40 0 3 3 7
5 South Ct El Dorado Ave 4 0 0 0 11 0 1 1 0 0 2 1
6 Waverley St El Dorado Ave 2 10 0 0 10 5 0 0 0 2 1 0
7 Cowper St El Dorado Ave 7 21 0 0 0 0 0 17 1 0 0 2
8 Alma St Colorado Ave 0 0 0 0 0 0 0 1 0 0 0 0
9 Bryant St Colorado Ave 0 13 5 26 2 5 1 49 1 2 1 5
10 Waverley St Colorado Ave 5 4 0 0 46 1 0 0 0 2 4 2
11 Bryant St Oregon Expy 0 20 0 0 0 0 0 107 0 0 0 0
12 Alma St El Carmelo Ave 0 0 0 0 0 0 0 0 0 0 0 0
13 Emerson St El Carmelo Ave 0 0 0 0 0 0 2 0 0 1 4 0
14 Ramona St El Carmelo Ave 0 1 0 0 0 1 1 0 0 1 7 0
15 Bryant St El Carmelo Ave 0 43 1 0 0 1 0 33 0 0 4 5
16 Waverley St El Carmelo Ave 1 21 0 0 0 0 0 1 0 5 0 0
17 Alma St Loma Verde Ave 0 0 0 0 0 0 0 0 0 0 0 0
18 Emerson St Loma Verde Ave 1 1 4 0 1 1 1 0 0 1 2 0
19 Ramona St Loma Verde Ave 1 2 1 0 6 1 0 1 0 0 1 1
20 Bryant St Loma Verde Ave 0 14 6 17 4 7 0 21 1 4 2 1
21 Waverley St Loma Verde Ave 0 27 1 0 31 11 0 0 1 1 8 0
NOTES : Peak Hour (8-9 AM) counts collected by Traffic Data Service on Thursday, March 31st, 2026, from 7 AM to 7 PM
SBR: Southbound Right NBR: Northbound Right
SBT: Southbound Through NBT: Northbound Through
SBL: Southbound Left NBL: Northbound Left
WBR: Westbound Right EBR: Eastbound Right
WBT: Westbound Through EBT: Eastbound Through
WBL: Westbound Left EBL: Eastbound Left
3 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 121
Future 2031 Weekday AM Peak Hour Vehicle Counts
Intersection N-S Street E-W Street SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL
1 Alma St El Dorado Ave 0 902 18 29 0 19 16 1,610 0 0 0 0
2 Emerson St El Dorado Ave 4 0 1 2 36 1 4 1 4 4 23 8
3 Ramona St El Dorado Ave 4 3 2 1 27 5 10 1 7 2 25 2
4 Bryant St El Dorado Ave 5 3 10 12 23 1 5 3 5 3 32 2
5 South Ct El Dorado Ave 1 3 1 2 29 2 0 2 4 3 42 1
6 Waverley St El Dorado Ave 4 68 2 2 15 38 32 62 13 15 18 8
7 Cowper St El Dorado Ave 46 40 0 0 0 0 0 44 10 18 0 37
8 Alma St Colorado Ave 0 663 13 97 0 4 9 1,648 0 0 0 0
9 Bryant St Colorado Ave 10 13 11 44 69 2 3 19 1 0 25 3
10 Waverley St Colorado Ave 4 58 4 3 90 2 5 52 20 8 22 11
11 Bryant St Oregon Expy 60 15 37 16 1,596 5 10 7 49 12 1,439 19
12 Alma St El Carmelo Ave 0 887 24 62 0 10 10 1,553 0 0 0 0
13 Emerson St El Carmelo Ave 4 0 1 2 44 9 9 0 22 4 31 1
14 Ramona St El Carmelo Ave 2 0 0 1 20 13 34 0 31 7 33 1
15 Bryant St El Carmelo Ave 4 1 0 2 21 37 25 1 9 13 43 1
16 Waverley St El Carmelo Ave 53 69 0 0 0 0 0 45 13 20 0 56
17 Alma St Loma Verde Ave 0 826 78 145 0 40 71 1,411 0 0 0 0
18 Emerson St Loma Verde Ave 4 3 14 10 176 9 5 3 2 7 147 3
19 Ramona St Loma Verde Ave 4 12 9 8 145 19 9 18 5 32 185 14
20 Bryant St Loma Verde Ave 10 2 29 21 219 9 9 1 3 8 171 10
21 Waverley St Loma Verde Ave 5 47 35 23 227 49 38 26 10 7 175 16
NOTES : Growth Rate of 1.099 was applied to existing volumes uniformly on each movement to represent the growth from 2026 to 2031
SBR: Southbound Right NBR: Northbound Right
SBT: Southbound Through NBT: Northbound Through
SBL: Southbound Left NBL: Northbound Left
WBR: Westbound Right EBR: Eastbound Right
WBT: Westbound Through EBT: Eastbound Through
WBL: Westbound Left EBL: Eastbound Left
Weekday AM Peak Hour: 8 AM - 9 AM
4 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 122
Future 2031 Weekday AM Peak Hour Pedestrian Counts
Intersection N-S Street E-W Street SB WB NB EB
1 Alma St El Dorado Ave 0 8 0 0
2 Emerson St El Dorado Ave 3 0 3 1
3 Ramona St El Dorado Ave 0 8 4 0
4 Bryant St El Dorado Ave 7 19 12 5
5 South Ct El Dorado Ave 7 0 12 0
6 Waverley St El Dorado Ave 5 9 25 9
7 Cowper St El Dorado Ave 4 0 9 5
8 Alma St Colorado Ave 0 12 0 0
9 Bryant St Colorado Ave 5 16 10 5
10 Waverley St Colorado Ave 8 5 10 4
11 Bryant St Oregon Expy 0 27 0 0
12 Alma St El Carmelo Ave 0 7 0 0
13 Emerson St El Carmelo Ave 1 1 3 0
14 Ramona St El Carmelo Ave 3 2 18 0
15 Bryant St El Carmelo Ave 11 30 79 58
16 Waverley St El Carmelo Ave 3 0 7 13
17 Alma St Loma Verde Ave 0 7 0 0
18 Emerson St Loma Verde Ave 0 0 14 1
19 Ramona St Loma Verde Ave 21 13 23 22
20 Bryant St Loma Verde Ave 65 8 8 49
21 Waverley St Loma Verde Ave 16 15 5 14
NOTES : Growth Rate of 1.099 was applied to existing volumes uniformly on each movement to represent the growth from 2026 to 2031
SB: Southbound
WB: Westbound
NB: Northbound
EB: Eastbound
Weekday AM Peak Hour: 8 AM - 9 AM
5 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 123
Future 2031 Weekday AM Peak Hour Bike Counts
Intersection N-S Street E-W Street SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL
1 Alma St El Dorado Ave 0 0 0 0 0 0 0 1 0 0 0 0
2 Emerson St El Dorado Ave 0 0 2 0 0 0 2 0 0 0 5 0
3 Ramona St El Dorado Ave 0 0 0 0 0 0 2 0 0 0 14 0
4 Bryant St El Dorado Ave 0 25 0 1 0 15 0 44 0 3 3 8
5 South Ct El Dorado Ave 4 0 0 0 12 0 1 1 0 0 2 1
6 Waverley St El Dorado Ave 2 11 0 0 11 5 0 0 0 2 1 0
7 Cowper St El Dorado Ave 8 23 0 0 0 0 0 19 1 0 0 2
8 Alma St Colorado Ave 0 0 0 0 0 0 0 1 0 0 0 0
9 Bryant St Colorado Ave 0 14 5 29 2 5 1 54 1 2 1 5
10 Waverley St Colorado Ave 5 4 0 0 51 1 0 0 0 2 4 2
11 Bryant St Oregon Expy 0 22 0 0 0 0 0 118 0 0 0 0
12 Alma St El Carmelo Ave 0 0 0 0 0 0 0 0 0 0 0 0
13 Emerson St El Carmelo Ave 0 0 0 0 0 0 2 0 0 1 4 0
14 Ramona St El Carmelo Ave 0 1 0 0 0 1 1 0 0 1 8 0
15 Bryant St El Carmelo Ave 0 47 1 0 0 1 0 36 0 0 4 5
16 Waverley St El Carmelo Ave 1 23 0 0 0 0 0 1 0 5 0 0
17 Alma St Loma Verde Ave 0 0 0 0 0 0 0 0 0 0 0 0
18 Emerson St Loma Verde Ave 1 1 4 0 1 1 1 0 0 1 2 0
19 Ramona St Loma Verde Ave 1 2 1 0 7 1 0 1 0 0 1 1
20 Bryant St Loma Verde Ave 0 15 7 19 4 8 0 23 1 4 2 1
21 Waverley St Loma Verde Ave 0 30 1 0 34 12 0 0 1 1 9 0
NOTES : Growth Rate of 1.099 was applied to existing volumes uniformly on each movement to represent the growth from 2026 to 2031
SBR: Southbound Right NBR: Northbound Right
SBT: Southbound Through NBT: Northbound Through
SBL: Southbound Left NBL: Northbound Left
WBR: Westbound Right EBR: Eastbound Right
WBT: Westbound Through EBT: Eastbound Through
WBL: Westbound Left EBL: Eastbound Left
Weekday AM Peak Hour: 8 AM - 9 AM
6 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 124
Future 2031 Alt1a and Alt2 Weekday AM Peak Hour Bike Counts
Intersection N-S Street E-W Street SBR SBT SBL WBR WBT WBL NBR NBT NBL EBR EBT EBL
1 Alma St El Dorado Ave 0 0 0 0 130 0 0 1 0 0 20 0
2 Emerson St El Dorado Ave 0 0 2 0 130 0 2 0 0 0 25 0
3 Ramona St El Dorado Ave 0 0 0 0 130 0 2 0 0 0 34 0
4 Bryant St El Dorado Ave 30 25 0 1 40 15 0 44 60 13 11 10
5 South Ct El Dorado Ave 4 0 0 0 52 0 1 1 0 0 10 1
6 Waverley St El Dorado Ave 2 11 0 0 51 5 0 0 0 2 9 0
7 Cowper St El Dorado Ave 8 23 0 0 40 0 0 19 1 0 8 2
8 Alma St Colorado Ave 0 0 0 0 0 0 0 1 0 0 0 0
9 Bryant St Colorado Ave 0 44 5 29 2 5 1 56 1 2 1 5
10 Waverley St Colorado Ave 5 4 0 0 51 1 0 0 0 2 4 2
11 Bryant St Oregon Expy 0 52 0 0 0 0 0 120 0 0 0 0
12 Alma St El Carmelo Ave 0 0 0 0 0 0 0 0 0 0 0 0
13 Emerson St El Carmelo Ave 0 0 0 0 0 0 2 0 0 1 4 0
14 Ramona St El Carmelo Ave 0 1 0 0 0 1 1 0 0 1 8 0
15 Bryant St El Carmelo Ave 0 57 1 0 0 1 0 96 0 0 4 5
16 Waverley St El Carmelo Ave 1 23 0 0 0 0 0 1 0 5 0 0
17 Alma St Loma Verde Ave 0 0 0 0 0 0 0 0 0 0 0 0
18 Emerson St Loma Verde Ave 1 1 4 0 1 1 1 0 0 1 2 0
19 Ramona St Loma Verde Ave 1 2 1 0 7 1 0 1 0 0 1 1
20 Bryant St Loma Verde Ave 0 25 7 19 4 8 0 83 1 4 2 1
21 Waverley St Loma Verde Ave 0 30 1 0 34 12 0 0 1 1 9 0
NOTES : Growth Rate of 1.099 was applied to existing volumes uniformly on each movement to represent the growth from 2026 to 2031
SBR: Southbound Right NBR: Northbound Right
SBT: Southbound Through NBT: Northbound Through
SBL: Southbound Left NBL: Northbound Left
WBR: Westbound Right EBR: Eastbound Right
WBT: Westbound Through EBT: Eastbound Through
WBL: Westbound Left EBL: Eastbound Left
Weekday AM Peak Hour: 8 AM - 9 AM
7 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 125
Future 2031 Weekday AM Peak Hour Multimodal Counts
Peds Bikes Veh All Peds Bikes Veh All
1 Alma St El Dorado Ave 8 1 2,594 2,603 0%0%100%100%
2 Emerson St El Dorado Ave 7 9 90 106 7%8%85%100%
3 Ramona St El Dorado Ave 12 15 91 118 10%13%77%100%
4 Bryant St El Dorado Ave 43 91 107 241 18%38%44%100%
5 South Ct El Dorado Ave 19 20 91 130 15%15%70%100%
6 Waverley St El Dorado Ave 48 30 278 356 13%8%78%100%
7 Cowper St El Dorado Ave 18 48 195 261 7%18%75%100%
8 Alma St Colorado Ave 12 1 2,434 2,447 0%0%99%100%
9 Bryant St Colorado Ave 36 110 201 347 10%32%58%100%
10 Waverley St Colorado Ave 27 64 280 371 7%17%75%100%
11 Bryant St Oregon Expy 27 127 3,266 3,420 1%4%95%100%
12 Alma St El Carmelo Ave 7 0 2,545 2,552 0%0%100%100%
13 Emerson St El Carmelo Ave 5 7 127 139 4%5%91%100%
14 Ramona St El Carmelo Ave 23 11 142 176 13%6%81%100%
15 Bryant St El Carmelo Ave 178 87 158 423 42%21%37%100%
16 Waverley St El Carmelo Ave 23 28 256 307 7%9%83%100%
17 Alma St Loma Verde Ave 7 0 2,572 2,579 0%0%100%100%
18 Emerson St Loma Verde Ave 15 12 385 412 4%3%93%100%
19 Ramona St Loma Verde Ave 79 14 459 552 14%3%83%100%
20 Bryant St Loma Verde Ave 130 77 491 698 19%11%70%100%
21 Waverley St Loma Verde Ave 50 80 660 790 6%10%84%100%
Peds: Pedestrians
Veh: Vehicles
Weekday AM Peak Hour: 8 AM - 9 AM
% Total Hourly CountsIntersection N-S Street E-W Street
8 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 126
Future 2031 Weekday AM Peak Hour Multimodal Counts Graph
Weekday AM Peak Hour: 8 AM - 9 AM
0
500
1000
1500
2000
2500
3000
3500
4000
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
Colorado
Ave
Colorado
Ave
Colorado
Ave
Oregon
Expy
El Carmelo
Ave
El Carmelo
Ave
El Carmelo
Ave
El Carmelo
Ave
El Carmelo
Ave
Loma
Verde Ave
Loma
Verde Ave
Loma
Verde Ave
Loma
Verde Ave
Loma
Verde Ave
Alma St Emerson St Ramona St Bryant St South Ct Waverley
St
Cowper St Alma St Bryant St Waverly St Bryant St Alma St Emerson St Ramona St Bryant St Waverly St Alma St Emerson St Ramona St Bryant St Waverley
St
Pedestrians Bikes Vehicles
9 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 127
Future 2031 Weekday AM Peak Hour Multimodal Counts Graph (Only Bike and Pedestrian)
Weekday AM Peak Hour: 8 AM - 9 AM
8 7 12
43
19
48
18 12
36 27 27
7 5
23
178
23
7 15
79
130
50
1 9
16
99
21
32
53
1
119
69
140
0 7
12
94
30
0
12
15
84
88
0
50
100
150
200
250
300
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
El Dorado
Ave
Colorado
Ave
Colorado
Ave
Colorado
Ave
Oregon
Expy
El Carmelo
Ave
El Carmelo
Ave
El Carmelo
Ave
El Carmelo
Ave
El Carmelo
Ave
Loma
Verde Ave
Loma
Verde Ave
Loma
Verde Ave
Loma
Verde Ave
Loma
Verde Ave
Alma St Emerson
St
Ramona St Bryant St South Ct Waverley
St
Cowper St Alma St Bryant St Waverly St Bryant St Alma St Emerson
St
Ramona St Bryant St Waverly St Alma St Emerson
St
Ramona St Bryant St Waverley
St
Pedestrians Bicycles
10 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 128
Daily Volumes Comparison
N/E S/W N/E S/W N/E S/W N/E S/W N/E S/W N/E S/W
Colorado Bryant Waverley EW 37 105 54 65 370 1,050 540 650 455 850 327 640
El Dorado Ramona Bryant EW 34 31 39 26 340 310 390 260 365 285 323 306
El Carmelo Ramona Bryant EW 52 31 30 20 520 310 300 200 410 255 251 209
Loma Verde Ramona Bryant EW 172 156 271 283 1,720 1,560 2,710 2,830 2,215 2,195 1,481 1,708
Bryant El Dorado Colorado NS 21 9 8 6 210 90 80 60 145 75 159 481
Waverley El Dorado Colorado NS 70 68 36 71 700 680 360 710 530 695 415 582
Cowper NS 49 78 38 81 490 780 380 810 435 795 406 624
Oregon EW 1,337 1,472 1,623 1,093 13,370 14,720 16,230 10,930 14,800 12,825 15,168 14,607
Weekday AM Peak Hour: 8 AM - 9 AM
Based on the Loma Verde/Alma Count Report, the PM peak hour is from 4:45-5:45 PM
Street Name Cross Streets
Bryant
El Dorado
11 of 12
Appendix A
Item 3Attachment C - InitialCirculation Study
Packet Pg. 129
Existing AM Volume Network Tool
Kittelson & Associates, Inc.103 38
0 0 20 0 SB City:
55 14 34 State:
1552 EB 90 1472
0 17 15 0
0 1309 TEV: 2972 11 phf 1452 0
0 11 yyyy mm dd 5 0
1337 270 WB 1352
45 6 9
NB 0 107 0 180 0
30 60
0
615 1588 Kittelson & Associates, Inc.31 60 Kittelson & Associates, Inc.61 60
0 0 0 0 SB City:0 0 13 5 SB City:0 5 4 0 SB City:
0 603 12 State:9 12 10 State:4 53 4 State:
0 EB 90 92 73 EB 90 105 104 EB 90 87
0 0 88 0 5 3 40 26 2 10 3 0
0 0 TEV: 2215 8 phf 0 0 1 23 TEV: 183 9 phf 63 2 4 20 TEV: 255 10 phf 82 46
0 0 yyyy mm dd 4 0 2 0 yyyy mm dd 2 5 2 7 yyyy mm dd 2 1
0 270 WB 20 26 270 WB 36 37 270 WB 29
0 1500 8 1 17 3 18 47 5
NB 0 1 0 180 0 NB 1 49 1 180 0 NB 0 0 0 180 0
607 1508 14 21 62 70
0 0 0
837 1491 Kittelson & Associates, Inc.5 10 Kittelson & Associates, Inc.9 4 Kittelson & Associates, Inc.17 16 Kittelson & Associates, Inc.5 5 Kittelson & Associates, Inc.68 65 Kittelson & Associates, Inc.78 74
0 0 0 0 SB City:0 0 0 2 SB City:0 0 0 0 SB City:0 0 23 0 SB City:0 4 0 0 SB City:0 2 10 0 SB City:0 7 21 0 SB City:
0 821 16 State:4 0 1 State:4 3 2 State:5 3 9 State:1 3 1 State:4 62 2 State:42 36 0 State:
0 EB 90 43 41 EB 90 36 35 EB 90 31 31 EB 90 33 31 EB 90 30 30 EB 90 51 51 EB 90 0
0 0 26 0 0 7 2 0 0 2 1 0 7 2 11 1 1 1 2 0 0 7 2 0 2 34 0 0
0 0 TEV: 2360 1 phf 0 0 5 21 TEV: 82 2 phf 33 0 13 23 TEV: 83 3 phf 25 0 3 29 TEV: 97 4 phf 21 0 2 38 TEV: 83 5 phf 26 11 1 16 TEV: 253 6 phf 14 10 0 0 TEV: 177 7 phf 0 0
0 0 yyyy mm dd 17 0 0 4 yyyy mm dd 1 0 0 2 yyyy mm dd 5 0 3 3 yyyy mm dd 1 14 0 3 yyyy mm dd 2 0 2 14 yyyy mm dd 35 5 0 16 yyyy mm dd 0 0
0 270 WB 31 32 270 WB 26 27 270 WB 34 34 270 WB 43 42 270 WB 39 37 270 WB 47 50 270 WB 0
0 1465 15 4 1 4 6 1 9 5 3 5 4 2 0 12 56 29 9 40 0
NB 0 1 0 180 0 NB 0 0 2 180 0 NB 0 0 2 180 0 NB 0 40 0 180 0 NB 0 1 1 180 0 NB 0 0 0 180 0 NB 1 17 0 180 0
838 1480 5 9 10 16 7 13 8 6 111 97 52 49
0 0 0 0 0 0 0
829 1469 Kittelson & Associates, Inc.5 3 Kittelson & Associates, Inc.2 2 Kittelson & Associates, Inc.5 4 Kittelson & Associates, Inc.111 92
0 0 0 0 SB City:0 0 0 0 SB City:0 0 1 0 SB City:0 0 43 1 SB City:0 1 21 0 SB City:
0 807 22 State:4 0 1 State:2 0 0 State:4 1 0 State:48 63 0 State:
0 EB 90 65 64 EB 90 50 48 EB 90 31 31 EB 90 55 60 EB 90 0
0 0 56 0 0 1 2 0 0 1 1 0 5 1 2 0 0 51 0 0
0 0 TEV: 2316 12 phf 0 0 4 28 TEV: 116 13 phf 40 0 7 30 TEV: 129 14 phf 18 0 4 39 TEV: 144 15 phf 19 0 0 0 TEV: 233 16 phf 0 0
0 0 yyyy mm dd 9 0 1 4 yyyy mm dd 8 0 1 6 yyyy mm dd 12 1 0 12 yyyy mm dd 34 1 5 18 yyyy mm dd 0 0
0 270 WB 31 33 270 WB 37 37 270 WB 61 52 270 WB 62 69 270 WB 0
0 1413 9 20 0 8 28 0 31 8 1 23 12 41 0
NB 0 0 0 180 0 NB 0 0 2 180 0 NB 0 0 1 180 0 NB 0 33 0 180 0 NB 0 1 0 180 0
816 1422 12 28 18 59 47 32 81 53
0 0 0 0 0
823 1416 Kittelson & Associates, Inc.20 15 Kittelson & Associates, Inc.23 36 Kittelson & Associates, Inc.37 29 Kittelson & Associates, Inc.80 60
0 0 0 0 SB City:0 1 1 4 SB City:0 1 2 1 SB City:0 0 14 6 SB City:0 0 27 1 SB City:
0 752 71 State:4 3 13 State:4 11 8 State:9 2 26 State:5 43 32 State:
0 EB 90 168 166 EB 90 177 141 EB 90 156 211 EB 90 226 221 EB 90 273
0 0 132 0 0 3 9 0 1 13 7 0 1 9 19 17 0 15 21 0
0 0 TEV: 2340 17 phf 0 0 2 134 TEV: 350 18 phf 160 1 1 168 TEV: 418 19 phf 132 6 2 156 TEV: 447 20 phf 199 4 8 159 TEV: 601 21 phf 207 31
0 0 yyyy mm dd 36 0 1 6 yyyy mm dd 8 1 0 29 yyyy mm dd 17 1 4 7 yyyy mm dd 8 7 1 6 yyyy mm dd 45 11
0 270 WB 136 143 270 WB 152 210 270 WB 184 172 270 WB 190 180 270 WB 226
0 1284 65 2 3 5 5 16 8 3 1 8 9 24 35
NB 0 0 0 180 0 NB 0 0 1 180 0 NB 0 1 0 180 0 NB 1 21 0 180 0 NB 1 0 0 180 0
788 1349 17 10 57 29 17 12 94 68
0 0 0 0 0
Pedestrian Volumes
Bike Volumes
Alma St
8:00 to 9:00 a.m.
El Dorado Ave
Emerson St
8:00 to 9:00 a.m.
El Dorado Ave
0 Notes
Alma St
8:00 to 9:00 a.m.
Colorado Ave
0
0 11
Vehicle Volumes
0
0 70
3
1
3 Notes
0
0 7
0 Notes
8:00 to 9:00 a.m.
El Dorado Ave
6
5 17
11 Notes
Ramona St
8:00 to 9:00 a.m.
El Dorado Ave
5
8 8
23 Notes
South Ct
8:00 to 9:00 a.m.
El Dorado Ave
6
0 0
8 Notes
Bryant St
8:00 to 9:00 a.m.
Colorado Ave
Waverley St
8:00 to 9:00 a.m.
Colorado Ave
7
4 5
9 Notes
Cowper St
8:00 to 9:00 a.m.
El Dorado Ave
4
5 0
11 Notes
Waverley St
8:00 to 9:00 a.m.
El Dorado Ave
Bryant St
8:00 to 9:00 a.m.
Oregon Expy
0
0 25
5
5 15
0
0 6
0 Notes
0 Notes
Alma St
8:00 to 9:00 a.m.
El Carmelo Ave
Emerson St
8:00 to 9:00 a.m.
El Carmelo Ave
Ramona St
8:00 to 9:00 a.m.
El Carmelo Ave
Bryant St
8:00 to 9:00 a.m.
El Carmelo Ave
9 Notes
4 Notes
Bryant St
3
0 2
16 Notes
1
0 1
3 Notes
Waverley St
8:00 to 9:00 a.m.
El Carmelo Ave
3
12 0
10
53 27
Loma Verde Ave
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
6 Notes
Alma St Emerson St Ramona St Bryant St Waverley St
72 Notes
0 0 19 59 15
Loma Verde Ave Loma Verde Ave Loma Verde Ave Loma Verde Ave
12 45 7 13 14061020
Notes 7 Notes 5 Notes0Notes13Notes21
5
5 5 5 5 5 5 5
5 5
5
5 5 5 5 5
5 5 5 5 5
Appendix A Item 3
Attachment C - Initial Circulation Study
Packet Pg. 130
Future 2031 Volume Network Tool
Kittelson & Associates, Inc.113 42
0 0 22 0 SB City:
60 15 37 State:
1706 EB 90 1618
0 19 16 0
0 1439 TEV: 3266 11 phf 1596 0
0 12 yyyy mm dd 5 0
1469 270 WB 1486
49 7 10
NB 0 118 0 180 0
33 66
0
676 1745 Kittelson & Associates, Inc.34 66 Kittelson & Associates, Inc.67 66
0 0 0 0 SB City:0 0 14 5 SB City:0 5 4 0 SB City:
0 663 13 State:10 13 11 State:4 58 4 State:
0 EB 90 101 80 EB 90 115 114 EB 90 96
0 0 97 0 5 3 44 29 2 11 3 0
0 0 TEV: 2434 8 phf 0 0 1 25 TEV: 201 9 phf 69 2 4 22 TEV: 280 10 phf 90 51
0 0 yyyy mm dd 4 0 2 0 yyyy mm dd 2 5 2 8 yyyy mm dd 2 1
0 270 WB 22 29 270 WB 40 41 270 WB 32
0 1648 9 1 19 3 20 52 5
NB 0 1 0 180 0 NB 1 54 1 180 0 NB 0 0 0 180 0
667 1657 15 23 68 77
0 0 0
920 1639 Kittelson & Associates, Inc.5 11 Kittelson & Associates, Inc.10 4 Kittelson & Associates, Inc.19 18 Kittelson & Associates, Inc.5 5 Kittelson & Associates, Inc.75 71 Kittelson & Associates, Inc.86 81
0 0 0 0 SB City:0 0 0 2 SB City:0 0 0 0 SB City:0 0 25 0 SB City:0 4 0 0 SB City:0 2 11 0 SB City:0 8 23 0 SB City:
0 902 18 State:4 0 1 State:4 3 2 State:5 3 10 State:1 3 1 State:4 68 2 State:46 40 0 State:
0 EB 90 47 45 EB 90 40 38 EB 90 34 34 EB 90 36 34 EB 90 33 33 EB 90 56 56 EB 90 0
0 0 29 0 0 8 2 0 0 2 1 0 8 2 12 1 1 1 2 0 0 8 2 0 2 37 0 0
0 0 TEV: 2594 1 phf 0 0 5 23 TEV: 90 2 phf 36 0 14 25 TEV: 91 3 phf 27 0 3 32 TEV: 107 4 phf 23 0 2 42 TEV: 91 5 phf 29 12 1 18 TEV: 278 6 phf 15 11 0 0 TEV: 195 7 phf 0 0
0 0 yyyy mm dd 19 0 0 4 yyyy mm dd 1 0 0 2 yyyy mm dd 5 0 3 3 yyyy mm dd 1 15 0 3 yyyy mm dd 2 0 2 15 yyyy mm dd 38 5 0 18 yyyy mm dd 0 0
0 270 WB 34 35 270 WB 29 30 270 WB 37 37 270 WB 47 46 270 WB 43 41 270 WB 52 55 270 WB 0
0 1610 16 4 1 4 7 1 10 5 3 5 4 2 0 13 62 32 10 44 0
NB 0 1 0 180 0 NB 0 0 2 180 0 NB 0 0 2 180 0 NB 0 44 0 180 0 NB 0 1 1 180 0 NB 0 0 0 180 0 NB 1 19 0 180 0
921 1626 5 10 11 18 8 14 9 7 122 107 57 54
0 0 0 0 0 0 0
911 1614 Kittelson & Associates, Inc.5 3 Kittelson & Associates, Inc.2 2 Kittelson & Associates, Inc.5 4 Kittelson & Associates, Inc.122 101
0 0 0 0 SB City:0 0 0 0 SB City:0 0 1 0 SB City:0 0 47 1 SB City:0 1 23 0 SB City:
0 887 24 State:4 0 1 State:2 0 0 State:4 1 0 State:53 69 0 State:
0 EB 90 71 70 EB 90 55 53 EB 90 34 34 EB 90 60 66 EB 90 0
0 0 62 0 0 1 2 0 0 1 1 0 5 1 2 0 0 56 0 0
0 0 TEV: 2545 12 phf 0 0 4 31 TEV: 127 13 phf 44 0 8 33 TEV: 142 14 phf 20 0 4 43 TEV: 158 15 phf 21 0 0 0 TEV: 256 16 phf 0 0
0 0 yyyy mm dd 10 0 1 4 yyyy mm dd 9 0 1 7 yyyy mm dd 13 1 0 13 yyyy mm dd 37 1 5 20 yyyy mm dd 0 0
0 270 WB 34 36 270 WB 41 41 270 WB 67 57 270 WB 68 76 270 WB 0
0 1553 10 22 0 9 31 0 34 9 1 25 13 45 0
NB 0 0 0 180 0 NB 0 0 2 180 0 NB 0 0 1 180 0 NB 0 36 0 180 0 NB 0 1 0 180 0
897 1563 13 31 20 65 52 35 89 58
0 0 0 0 0
904 1556 Kittelson & Associates, Inc.22 16 Kittelson & Associates, Inc.25 40 Kittelson & Associates, Inc.41 32 Kittelson & Associates, Inc.88 66
0 0 0 0 SB City:0 1 1 4 SB City:0 1 2 1 SB City:0 0 15 7 SB City:0 0 30 1 SB City:
0 826 78 State:4 3 14 State:4 12 9 State:10 2 29 State:5 47 35 State:
0 EB 90 185 182 EB 90 195 155 EB 90 171 232 EB 90 248 243 EB 90 300
0 0 145 0 0 3 10 0 1 14 8 0 1 10 21 19 0 16 23 0
0 0 TEV: 2572 17 phf 0 0 2 147 TEV: 385 18 phf 176 1 1 185 TEV: 459 19 phf 145 7 2 171 TEV: 491 20 phf 219 4 9 175 TEV: 660 21 phf 227 34
0 0 yyyy mm dd 40 0 1 7 yyyy mm dd 9 1 0 32 yyyy mm dd 19 1 4 8 yyyy mm dd 9 8 1 7 yyyy mm dd 49 12
0 270 WB 149 157 270 WB 167 231 270 WB 202 189 270 WB 209 198 270 WB 248
0 1411 71 2 3 5 5 18 9 3 1 9 10 26 38
NB 0 0 0 180 0 NB 0 0 1 180 0 NB 0 1 0 180 0 NB 1 23 0 180 0 NB 1 0 0 180 0
866 1483 19 11 63 32 19 13 103 75
0 0 0 0 0
Alma St
8:00 to 9:00 a.m.
El Dorado Ave
Emerson St
8:00 to 9:00 a.m.
El Dorado Ave
0 Notes
Alma St
8:00 to 9:00 a.m.
Colorado Ave
0
0 12
Vehicle Volumes
Pedestrian Volumes
Bike Volumes
0
0 80
3
1
3 Notes
0
0 8
0 Notes
8:00 to 9:00 a.m.
El Dorado Ave
7
5 19
12 Notes
Ramona St
8:00 to 9:00 a.m.
El Dorado Ave
5
9 9
25 Notes
South Ct
8:00 to 9:00 a.m.
El Dorado Ave
7
0 0
9 Notes
Bryant St
8:00 to 9:00 a.m.
Colorado Ave
Waverley St
8:00 to 9:00 a.m.
Colorado Ave
8
4 5
10 Notes
Cowper St
8:00 to 9:00 a.m.
El Dorado Ave
4
5 0
12 Notes
Waverley St
8:00 to 9:00 a.m.
El Dorado Ave
Bryant St
8:00 to 9:00 a.m.
Oregon Expy
0
0 27
5
5 16
0
0 7
0 Notes
0 Notes
Alma St
8:00 to 9:00 a.m.
El Carmelo Ave
Emerson St
8:00 to 9:00 a.m.
El Carmelo Ave
Ramona St
8:00 to 9:00 a.m.
El Carmelo Ave
Bryant St
8:00 to 9:00 a.m.
El Carmelo Ave
10 Notes
4 Notes
Bryant St
3
0 2
18 Notes
1
0 1
3 Notes
Waverley St
8:00 to 9:00 a.m.
El Carmelo Ave
3
13 0
11
58 30
Loma Verde Ave
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
7 Notes
Alma St Emerson St Ramona St Bryant St Waverley St
79 Notes
0 0 21 65 16
Loma Verde Ave Loma Verde Ave Loma Verde Ave Loma Verde Ave
13 49 8 14 15071022
Notes 8 Notes 5 Notes0Notes14Notes23
5
5 5 5 5 5 5 5
5 5
5
5 5 5 5 5
5 5 5 5 5
Appendix A
Item 3Attachment C - Initial Circulation Study
Packet Pg. 131
Future 2031 with Alt1A Volume Network Tool
Kittelson & Associates, Inc.113 42
0 0 52 0 SB City:
60 15 37 State:
1706 EB 90 1618
0 19 16 0
0 1439 TEV: 3266 11 phf 1596 0
0 12 yyyy mm dd 5 0
1469 270 WB 1486
49 7 10
NB 0 120 0 180 0
33 66
0
676 1745 Kittelson & Associates, Inc.34 66 Kittelson & Associates, Inc.67 66
0 0 0 0 SB City:0 0 44 5 SB City:0 5 4 0 SB City:
0 645 31 State:10 13 11 State:4 58 4 State:
0 EB 90 113 82 EB 90 115 114 EB 90 96
0 0 97 0 5 3 44 29 2 11 3 0
0 0 TEV: 2446 8 phf 0 0 1 34 TEV: 213 9 phf 69 2 4 25 TEV: 289 10 phf 90 51
0 0 yyyy mm dd 16 0 2 1 yyyy mm dd 2 5 2 14 yyyy mm dd 2 1
0 270 WB 40 39 270 WB 49 50 270 WB 35
0 1648 9 3 19 3 20 52 5
NB 0 1 0 180 0 NB 1 56 1 180 0 NB 0 0 0 180 0
661 1657 16 25 74 77
0 0 0
914 1639 Kittelson & Associates, Inc.3 7 Kittelson & Associates, Inc.11 4 Kittelson & Associates, Inc.19 18 Kittelson & Associates, Inc.5 5 Kittelson & Associates, Inc.79 69 Kittelson & Associates, Inc.87 79
0 0 0 0 SB City:0 0 0 2 SB City:0 0 0 0 SB City:0 30 25 0 SB City:0 4 0 0 SB City:0 2 11 0 SB City:0 8 23 0 SB City:
0 914 0 State:0 2 1 State:2 4 4 State:4 4 10 State:0 4 1 State:4 72 2 State:46 41 0 State:
0 EB 90 28 28 EB 90 31 29 EB 90 29 29 EB 90 33 31 EB 90 31 31 EB 90 56 56 EB 90 0
0 0 29 0 0 4 2 0 0 1 1 0 10 2 12 1 1 1 2 0 0 6 2 0 2 35 0 0
20 0 TEV: 2569 1 phf 0 130 25 11 TEV: 57 2 phf 27 130 34 15 TEV: 75 3 phf 22 130 11 27 TEV: 97 4 phf 20 40 10 38 TEV: 85 5 phf 27 52 9 14 TEV: 278 6 phf 13 51 8 0 TEV: 192 7 phf 0 40
0 0 yyyy mm dd 0 0 0 2 yyyy mm dd 1 0 0 1 yyyy mm dd 5 0 13 2 yyyy mm dd 1 15 0 3 yyyy mm dd 2 0 2 16 yyyy mm dd 40 5 0 17 yyyy mm dd 0 0
0 270 WB 16 17 270 WB 17 18 270 WB 31 32 270 WB 43 42 270 WB 39 36 270 WB 48 52 270 WB 0
0 1610 16 0 1 4 5 1 12 4 3 5 4 2 0 13 62 32 10 44 0
NB 0 1 0 180 0 NB 0 0 2 180 0 NB 0 0 2 180 0 NB 60 44 0 180 0 NB 0 1 1 180 0 NB 0 0 0 180 0 NB 1 19 0 180 0
914 1626 5 6 11 18 8 13 9 7 129 107 57 54
0 0 0 0 0 0 0
904 1614 Kittelson & Associates, Inc.5 3 Kittelson & Associates, Inc.2 2 Kittelson & Associates, Inc.5 4 Kittelson & Associates, Inc.129 101
0 0 0 0 SB City:0 0 0 0 SB City:0 0 1 0 SB City:0 0 57 1 SB City:0 1 23 0 SB City:
0 880 24 State:4 0 1 State:2 0 0 State:4 1 0 State:53 76 0 State:
0 EB 90 71 70 EB 90 55 53 EB 90 34 34 EB 90 60 66 EB 90 0
0 0 62 0 0 1 2 0 0 1 1 0 5 1 2 0 0 56 0 0
0 0 TEV: 2538 12 phf 0 0 4 31 TEV: 127 13 phf 44 0 8 33 TEV: 142 14 phf 20 0 4 43 TEV: 158 15 phf 21 0 0 0 TEV: 263 16 phf 0 0
0 0 yyyy mm dd 10 0 1 4 yyyy mm dd 9 0 1 7 yyyy mm dd 13 1 0 13 yyyy mm dd 37 1 5 20 yyyy mm dd 0 0
0 270 WB 34 36 270 WB 41 41 270 WB 67 57 270 WB 68 76 270 WB 0
0 1553 10 22 0 9 31 0 34 9 1 25 13 45 0
NB 0 0 0 180 0 NB 0 0 2 180 0 NB 0 0 1 180 0 NB 0 96 0 180 0 NB 0 1 0 180 0
890 1563 13 31 20 65 52 35 96 58
0 0 0 0 0
897 1556 Kittelson & Associates, Inc.22 16 Kittelson & Associates, Inc.25 40 Kittelson & Associates, Inc.41 32 Kittelson & Associates, Inc.95 66
0 0 0 0 SB City:0 1 1 4 SB City:0 1 2 1 SB City:0 0 25 7 SB City:0 0 30 1 SB City:
0 819 78 State:4 3 14 State:4 12 9 State:10 2 29 State:12 47 35 State:
0 EB 90 192 189 EB 90 202 162 EB 90 178 239 EB 90 255 250 EB 90 300
0 0 145 0 0 3 10 0 1 14 8 0 1 10 21 19 0 16 23 0
0 0 TEV: 2572 17 phf 0 0 2 147 TEV: 392 18 phf 183 1 1 185 TEV: 466 19 phf 152 7 2 171 TEV: 498 20 phf 226 4 9 175 TEV: 667 21 phf 227 34
0 0 yyyy mm dd 47 0 1 7 yyyy mm dd 9 1 0 32 yyyy mm dd 19 1 4 8 yyyy mm dd 9 8 1 7 yyyy mm dd 49 12
0 270 WB 149 157 270 WB 167 231 270 WB 202 189 270 WB 209 198 270 WB 248
0 1411 71 2 3 5 5 18 9 3 1 9 10 26 38
NB 0 0 0 180 0 NB 0 0 1 180 0 NB 0 1 0 180 0 NB 1 83 0 180 0 NB 1 0 0 180 0
866 1483 19 11 63 32 19 13 103 75
0 0 0 0 0Notes
13 49 8 14 15
0 Notes 14 Notes 23 Notes 8
0 7 1 0 22
Notes 5
Loma Verde Ave Loma Verde Ave Loma Verde Ave Loma Verde Ave Loma Verde Ave
0 0 21 65 16
Notes
Alma St Emerson St Ramona St Bryant St Waverley St
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
58 30 13 0
0 Notes 3 Notes 18 Notes
0 7 0 1 0 2
79 Notes 7
El Carmelo Ave El Carmelo Ave El Carmelo Ave El Carmelo Ave El Carmelo Ave
0 1 3 11 3
Alma St Emerson St Ramona St Bryant St Waverley St
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
12 Notes 25 Notes 9 Notes
5 0
35 Notes 3 Notes 4 Notes 12 Notes
5 19 0 0 9 9081008
El Dorado Ave
35 3 0 7 7 5 4
El Dorado Ave El Dorado Ave El Dorado Ave El Dorado Ave El Dorado Ave El Dorado Ave
Cowper St
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
Alma St Emerson St Ramona St Bryant St South Ct Waverley St
0 Notes 10 Notes 10 Notes
0 12 5 16 4 5
Colorado Ave
0 5 8
0 Notes
Alma St Bryant St Waverley St
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
Bryant St
8:00 to 9:00 a.m.
Oregon Expy
0
0 27
Colorado Ave Colorado Ave
Vehicle Volumes
Pedestrian Volumes
Bike Volumes
5
5 5 5 5 5 5 5
5 5
5
5 5 5 5 5
5 5 5 5 5
Appendix A
Item 3Attachment C - Initial Circulation Study
Packet Pg. 132
Future 2031 with Alt2 Volume Network Tool
Kittelson & Associates, Inc.113 42
0 0 52 0 SB City:
60 15 37 State:
1706 EB 90 1618
0 19 16 0
0 1439 TEV: 3266 11 phf 1596 0
0 12 yyyy mm dd 5 0
1469 270 WB 1486
49 7 10
NB 0 120 0 180 0
33 66
0
676 1745 Kittelson & Associates, Inc.34 66 Kittelson & Associates, Inc.67 66
0 0 0 0 SB City:0 0 44 5 SB City:0 5 4 0 SB City:
0 645 31 State:10 13 11 State:4 58 4 State:
0 EB 90 113 82 EB 90 115 114 EB 90 96
0 0 97 0 5 3 44 29 2 11 3 0
0 0 TEV: 2462 8 phf 0 0 1 42 TEV: 222 9 phf 69 2 4 28 TEV: 296 10 phf 90 51
0 0 yyyy mm dd 16 0 2 2 yyyy mm dd 2 5 2 18 yyyy mm dd 2 1
0 270 WB 56 48 270 WB 57 57 270 WB 38
0 1648 25 3 19 3 20 52 5
NB 0 1 0 180 0 NB 1 56 1 180 0 NB 0 0 0 180 0
661 1673 17 25 78 77
0 0 0
914 1655 Kittelson & Associates, Inc.5 4 Kittelson & Associates, Inc.12 3 Kittelson & Associates, Inc.20 18 Kittelson & Associates, Inc.6 5 Kittelson & Associates, Inc.82 68 Kittelson & Associates, Inc.88 77
0 0 0 0 SB City:0 0 0 2 SB City:0 0 0 0 SB City:0 30 25 0 SB City:0 4 0 0 SB City:0 2 11 0 SB City:0 8 23 0 SB City:
0 914 0 State:0 4 1 State:2 5 4 State:4 5 10 State:0 5 1 State:4 75 2 State:46 42 0 State:
0 EB 90 28 28 EB 90 31 29 EB 90 29 29 EB 90 33 31 EB 90 31 31 EB 90 56 56 EB 90 0
0 0 29 0 0 1 2 0 0 1 1 0 10 2 12 1 1 1 2 0 0 4 2 0 2 33 0 0
20 0 TEV: 2569 1 phf 0 130 25 1 TEV: 44 2 phf 27 130 34 6 TEV: 66 3 phf 22 130 11 20 TEV: 90 4 phf 20 40 10 31 TEV: 78 5 phf 27 52 9 11 TEV: 274 6 phf 13 51 8 0 TEV: 190 7 phf 0 40
0 0 yyyy mm dd 0 0 0 0 yyyy mm dd 1 0 0 1 yyyy mm dd 5 0 13 2 yyyy mm dd 1 15 0 2 yyyy mm dd 2 0 2 14 yyyy mm dd 40 5 0 16 yyyy mm dd 0 0
0 270 WB 0 2 270 WB 6 7 270 WB 22 23 270 WB 35 34 270 WB 32 29 270 WB 45 49 270 WB 0
0 1626 0 0 1 4 5 1 12 4 3 5 4 2 0 13 62 32 10 44 0
NB 0 1 0 180 0 NB 0 0 2 180 0 NB 0 0 2 180 0 NB 60 44 0 180 0 NB 0 1 1 180 0 NB 0 0 0 180 0 NB 1 19 0 180 0
914 1626 5 6 11 18 8 13 10 7 129 107 57 54
0 0 0 0 0 0 0
904 1614 Kittelson & Associates, Inc.5 3 Kittelson & Associates, Inc.2 2 Kittelson & Associates, Inc.5 4 Kittelson & Associates, Inc.129 101
0 0 0 0 SB City:0 0 0 0 SB City:0 0 1 0 SB City:0 0 57 1 SB City:0 1 23 0 SB City:
0 880 24 State:4 0 1 State:2 0 0 State:4 1 0 State:53 76 0 State:
0 EB 90 71 70 EB 90 55 53 EB 90 34 34 EB 90 60 66 EB 90 0
0 0 62 0 0 1 2 0 0 1 1 0 5 1 2 0 0 56 0 0
0 0 TEV: 2538 12 phf 0 0 4 31 TEV: 127 13 phf 44 0 8 33 TEV: 142 14 phf 20 0 4 43 TEV: 158 15 phf 21 0 0 0 TEV: 263 16 phf 0 0
0 0 yyyy mm dd 10 0 1 4 yyyy mm dd 9 0 1 7 yyyy mm dd 13 1 0 13 yyyy mm dd 37 1 5 20 yyyy mm dd 0 0
0 270 WB 34 36 270 WB 41 41 270 WB 67 57 270 WB 68 76 270 WB 0
0 1553 10 22 0 9 31 0 34 9 1 25 13 45 0
NB 0 0 0 180 0 NB 0 0 2 180 0 NB 0 0 1 180 0 NB 0 96 0 180 0 NB 0 1 0 180 0
890 1563 13 31 20 65 52 35 96 58
0 0 0 0 0
897 1556 Kittelson & Associates, Inc.22 16 Kittelson & Associates, Inc.25 40 Kittelson & Associates, Inc.41 32 Kittelson & Associates, Inc.95 66
0 0 0 0 SB City:0 1 1 4 SB City:0 1 2 1 SB City:0 0 25 7 SB City:0 0 30 1 SB City:
0 819 78 State:4 3 14 State:4 12 9 State:10 2 29 State:12 47 35 State:
0 EB 90 192 189 EB 90 202 162 EB 90 178 239 EB 90 255 250 EB 90 300
0 0 145 0 0 3 10 0 1 14 8 0 1 10 21 19 0 16 23 0
0 0 TEV: 2572 17 phf 0 0 2 147 TEV: 392 18 phf 183 1 1 185 TEV: 466 19 phf 152 7 2 171 TEV: 498 20 phf 226 4 9 175 TEV: 667 21 phf 227 34
0 0 yyyy mm dd 47 0 1 7 yyyy mm dd 9 1 0 32 yyyy mm dd 19 1 4 8 yyyy mm dd 9 8 1 7 yyyy mm dd 49 12
0 270 WB 149 157 270 WB 167 231 270 WB 202 189 270 WB 209 198 270 WB 248
0 1411 71 2 3 5 5 18 9 3 1 9 10 26 38
NB 0 0 0 180 0 NB 0 0 1 180 0 NB 0 1 0 180 0 NB 1 83 0 180 0 NB 1 0 0 180 0
866 1483 19 11 63 32 19 13 103 75
0 0 0 0 0Notes
13 49 8 14 15
0 Notes 14 Notes 23 Notes 8
0 7 1 0 22
Notes 5
Loma Verde Ave Loma Verde Ave Loma Verde Ave Loma Verde Ave Loma Verde Ave
0 0 21 65 16
Notes
Alma St Emerson St Ramona St Bryant St Waverley St
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
58 30 13 0
0 Notes 3 Notes 18 Notes
0 7 0 1 0 2
79 Notes 7
El Carmelo Ave El Carmelo Ave El Carmelo Ave El Carmelo Ave El Carmelo Ave
0 1 3 11 3
Alma St Emerson St Ramona St Bryant St Waverley St
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
12 Notes 25 Notes 9 Notes
5 0
0 Notes 38 Notes 4 Notes 12 Notes
5 19 0 0 9 9081008
El Dorado Ave
0 38 0 7 7 5 4
El Dorado Ave El Dorado Ave El Dorado Ave El Dorado Ave El Dorado Ave El Dorado Ave
Cowper St
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
Alma St Emerson St Ramona St Bryant St South Ct Waverley St
0 Notes 10 Notes 10 Notes
0 12 5 16 4 5
Colorado Ave
0 5 8
0 Notes
Alma St Bryant St Waverley St
8:00 to 9:00 a.m.8:00 to 9:00 a.m.8:00 to 9:00 a.m.
Bryant St
8:00 to 9:00 a.m.
Oregon Expy
0
0 27
Colorado Ave Colorado Ave
Vehicle Volumes
Pedestrian Volumes
Bike Volumes
5
5 5 5 5 5 5 5
5 5
5
5 5 5 5 5
5 5 5 5 5
Appendix A
Item 3Attachment C - Initial Circulation Study
Packet Pg. 133
July 23, 2026
SOUTH PALO ALTO BIKE/PED CONNECTIVITY
DRAFT NETWORK ENHANCEMENTS
INTRODUCTION
This project will also deliver a coordinated package of bicycle, pedestrian, operational, and wayfinding
improvements that fully integrate the grade separated bike and pedestrian undercrossing into the
surrounding street network. While the undercrossing itself is a critical piece of infrastructure, its
effectiveness depends on how well it is integrated into the surrounding travel network. Together, these
network improvements will ensure the new rail crossing operates as a seamless, intuitive, all ages and
abilities facility that reduces conflicts, shortens travel distances, and meaningfully improves active
transportation connectivity across a longstanding barrier. These enhancements will:
• provide continuous, ADA accessible connections to existing bikeways and sidewalks;
• enhance safety and comfort along approach routes through upgraded context-sensitive
crossings, lighting, traffic calming, and visibility treatments; and
• add clear wayfinding to guide users before, through, and beyond the crossing.
Draft network enhancements were informed by the multimodal traffic counts and a cursory circulation
study complete for the El Dorado Avenue crossing, what we’ve heard through public engagement, as well
as adopted City policy and applicable design guidance and standards, including:
• City of Palo Alto Safety Action Plan (2025)
• City of Palo Alto Bicycle and Pedestrian Transportation Plan (BPTP) (2026)
• FHWA Manual on Uniform Traffic Control Devices
• FHWA Guide for Improving Pedestrian Safety at Uncontrolled Crossing Locations
• FHWA Pedestrian Safety Guide and Countermeasure Selection System
• NACTO Urban Street Design Guide
• NACTO Urban Bikeway Design Guide
• NACTO Crosswalk Marking Selection Guide
• NACTO Designing for All Ages and Abilities Contextual Guidance for High-Comfort Bicycle
Facilities
The draft network enhancements presented are preliminary and intended for discussion purposes. All
recommendations are flexible and subject to refinement. Additional community engagement, technical
design work, and agency coordination will be needed. The draft network enhancements are shown in
Exhibit 1 and described below.
Oakland, CA 94612
Item 3
Attachment D - Draft
Network Enhancements
Packet Pg. 134
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Network Enhancements Page 2
Exhibit 1. Draft Network Enhancements
Item 3
Attachment D - Draft Network
Enhancements
Packet Pg. 135
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Network Enhancements Page 3
DRAFT NETWORK ENHANCEMENTS
• Create a new bicycle boulevard connection on El Dorado Avenue from Alma Street to
Cowper Street to link the undercrossing to existing bicycle boulevards on Bryant Street and
Cowper Street. The bicycle boulevard would be designed to City standards and best practices
and would include implementation of wayfinding and pavement markings identifying the route
and key destinations.
• Install a neighborhood traffic circle at El Dorado Avenue/Bryant Street, the intersection of
two low-speed, low vehicle volume bicycle boulevards, to reduce potential conflicts between
turning movements at the intersection.1,2 Neighborhood traffic circles introduce horizontal
deflection that encourages drivers to slow as they enter and pass through intersections. By
changing the way drivers navigate intersections, traffic circles reduce potential conflict points and
decrease the likelihood of severe right-angle and head-on crashes. The added deflection and
reduced travel speeds may make local streets less attractive while maintaining local access.
Center islands can incorporate landscaping, public art, stormwater features, or neighborhood
identity elements, enhancing aesthetics and community character.
• Relocate stop signs on El Dorado Avenue at Ramona Street and South Court to the minor
cross-street approaches of the intersection to facilitate through bicycle movements on El Dorado
Avenue bike boulevard.3,4,5 Conduct before/after monitoring of traffic volumes and speeds to
determine if changes in stop control should be accompanied by traffic calming.
• Install curb bulb-outs at Cowper Street/El Dorado Avenue to enhance safety of pedestrian
crossings and improved access to and through Hoover Park. Explore implementation of two-way
separated bikeway on the east side of Cowper Street to connect the new El Dorado Avenue bike
boulevard with the existing path through Hoover Park.
• Coordinate with the County to implement signal timing modifications and install
pavement markings at Oregon Expressway/Bryant Street to accommodate increase in bicycle
traffic along Bryant Street and support safe crossings of Oregon Expressway. Signal
timing/phasing adjustments would include advance detection, a leading pedestrian/bicycle
interval, and increased crossing times for pedestrians and bicyclists. Enhanced pavement
markings would be installed through the intersection to increase visibility of crossing bicyclists.
• Install Rectangular Rapid Flashing Beacon at Park Boulevard/Portage Avenue to
accommodate pedestrian and bicycle movements to/from the undercrossing. The
recommendations include providing a clear and intuitive path and completing the connection for
people walking and biking through the offset intersection between the undercrossing landing
and Portage Avenue.
1 https://nacto.org/publication/urban-bikeway-design-guide/designing-safe-intersections/unsignalized-intersections/roundabouts-and-circular-intersections/
2 https://nacto.org/publication/urban-street-design-guide/intersections/traffic-circle/
3 https://nacto.org/publication/urban-bikeway-design-guide/designing-safe-intersections/unsignalized-intersections/stop-controls/
4 https://oaklandbpac.org/2020/08/07/nbr-implementation-guide-draft/
5 https://mutcd.fhwa.dot.gov/pdfs/11th_Edition/Chapter2b.pdf
Item 3
Attachment D - Draft
Network Enhancements
Packet Pg. 136
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Network Enhancements Page 4
• Provide red curb or curb bulb-outs in advance of crosswalks for daylighting (Assembly Bill
413) to improve sightlines and increase visibility of pedestrians and cross traffic at intersections
along routes to and from the tunnel while maintaining or reducing vehicle turning radii to
decrease turning speeds.
• Stripe high visibility crosswalks to increase visibility of pedestrians at intersections along routes
to and from the tunnel.
• Provide overhead lighting at the tunnel/ramp entrances and along Alma Street, Park
Boulevard, and El Dorado Avenue to enhance safety and comfort accessing the crossing,
particularly during night, early morning, and evening hours.
• Implement “green wave” signal coordination on Alma Street to coordinate signals so that
drivers traveling at a target speed encounter a series of green lights rather than stopping at each
intersection. Signal timing modifications encourage consistent speeds, reduce stop-and-go
driving, and support speed management and safety for all road users.
• Construct accessibility upgrades along approach routes on Alma Street and Park Boulevard to
provide continuous, ADA-compliant access to the tunnel. Location of these upgrades will be
determined during the project’s detailed design phase and in coordination with the City’s ADA
transition plan.
• Explore green stormwater infrastructure and street trees in conjunction with Public Works in
the project’s detailed design phase.
• Incorporate murals, sculptural elements, and gateway features as part of the tunnel/ramp
design and at tunnel or ramp entrances to create a sense of arrival and improve visibility.
Consider community-created artwork or rotating installations to foster ownership and discourage
vandalism. Integrate art with lighting, walls, retaining structures, or high-quality paving materials
to create a safe and welcoming environment.
• Explore bicycle and pedestrian access improvements to the southern entrance of the Cal
Ave Caltrain Station to close a key gap in the network. Consider ways to connect the Cal
Avenue Station over Oregon Expressway to Page Mill Road, over the Page Mill Road Bridge or via
a new connection along the railroad.
• Enhance Pedestrian and Bicycle Path through Hoover Park, including the path around the
baseball field and the path through the park, to provide additional space and separation for
people walking and biking. Consider installing lighting and clear signage and wayfinding along
the route. Explore crossing improvements at the Hoover Park Path/Middlefield Road/Sutter
Avenue intersection, such as construction of curb ramps, high visibility crosswalks, and a
pedestrian hybrid beacon or full signal. Consider implementing bike boulevard treatments on
Sutter Avenue to connect to existing Ross Road Bike Boulevard or improving Middlefield Road to
connect to the existing bike lanes on Colorado Avenue one block north.
• Implement intersection modifications at El Camino Real/Portage Avenue to enhance the
connection across El Camino Real. Consider implementing protected intersection elements, as
well as a two-way separated bikeway on El Camino Real and cross-bike markings with enhanced
signal timing at Hansen Way.
• Implement intersection modifications at El Camino Real/Margarita Avenue/Matadero
Avenue to enhance connection across El Camino Real. Consider implementing protected
intersection elements and installing cross-bike markings with enhanced signal timing.
Item 3
Attachment D - Draft
Network Enhancements
Packet Pg. 137
July 23, 2026
South Palo Alto Bike/Ped Connectivity – Network Enhancements Page 5
• Coordinate with the County to implement intersection modifications at Oregon
Expressway/Alma Street. Explore modifications to intersection geometry and traffic control to
square up and signalize ramps.
• Reconstruct El Dorado Avenue with vertical curbs to more clearly define the roadway edge,
discourage drivers from mounting the curb, and provide a physical buffer between people
walking and vehicle traffic.
Longer term improvements that may be considered to support access to the new undercrossing include:
• Implement volume and speed management measures, such as speed humps or modal filters,
will be considered and implemented in response to traffic volumes and/or speeds that exceed
the thresholds appropriate for bicycle boulevards on El Dorado Avenue and Bryant Street.
Specifically, speeds less than or equal to 20 miles per hour and volumes less than or equal to
2,000 average vehicles per day and less than 50 vehicles per hour per direction during the peak
hour.
• Implement intersection modifications at Colorado Avenue/Alma Street to accommodate
changes in turning movements because of restricted movements at El Dorado Avenue. These
may include restriping to extend left-turn pockets and installing corner bulb-outs and/or
centerline hardening to slow turning vehicles.
• Integrate with planned future network improvements identified in the 2026 BPTP, including
bike boulevards on Park Boulevard, Margarita Avenue, Cowper Street, and Colorado Avenue; bike
lanes on Loma Verde Avenue, and Page Mill Road; and shared use paths on Oregon Expressway
and the Bol Park Path – Chimalus Spur.
Item 3
Attachment D - Draft
Network Enhancements
Packet Pg. 138
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 139
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 140
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 141
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 142
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 143
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 144
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 145
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 146
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 147
Item 3
Attachment E - South Palo
Alto BikePed Project -
Neighborhood Petition
Packet Pg. 148
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 149
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 150
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 151
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 152
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 153
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 154
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 155
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 156
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 157
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 158
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 159
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 160
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 161
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 162
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 163
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 164
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 165
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 166
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 167
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 168
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 169
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 170
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 171
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 172
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 173
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 174
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 175
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 176
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 177
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 178
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 179
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 180
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 181
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 182
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 183
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 184
Item 3
Attachment E - South Palo Alto BikePed
Project - Neighborhood Petition
Packet Pg. 185
SOUTH PALO ALTO BIKE/PED CONNECTIVITY
STAKEHOLDER ENGAGEMENT OVERVIEW
Updated: September 22, 2026
Phase 1 Community Engagement: Establish Design Priorities (Spring 2025) – Completed
The first phase of engagement1 included the following elements.
• Project Webpage (paloalto.gov/BikePedCrossings) with updates on meetings, events
and project materials.
• Project Fact Sheet shared with community members during in-person meetings and
events.
• Mailers sent to more than 1,500 business, community organization and residential
property addresses in the vicinity of the project.
• Small Group Discussions held virtually from November through December 2024
including representatives of the City Schools Transportation Safety Committee (CSTSC),
Pedestrian and Bicycle Advisory Committee (PABAC), Caltrain, Palo Alto Unified School
District, Californians Advocating Responsible Rail Design (CARRD), Silicon Valley Bicycle
Coalition (SVBC), and Stanford University. Participants also shared a list of criteria and
priorities for evaluating alternatives and emphasized the need for easy, well-lit,
accessible, safe crossings that are suitable for all ages and reduce the long distances
between crossings today. Participants also encouraged the team to consider a network
perspective addressing how to get to/from crossing points.
• Community Workshop held at Mitchell Park Community Center on April 2, 2025, and
attended by approximately 50 community members. Community members prioritized
crossings that improved mobility and emphasized their general support for the project
and interest in fast completion. A crossing around Matadero Creek (El Dorado Avenue to
Loma Verde Avenue) was the most popular location amongst attendees, followed by
locations between Meadow Drive and Charleston Road.
• Online Survey was made available on the project webpage from April 1, 2025, to May
22, 2025.2 The City promoted the survey during in-person events, Weekly City Manager
Updates, PaloAltoConnect Blog, social media posts, UpLift Local eNewsletter, and emails
to Neighborhood Associations in south Palo Alto, public and private schools, Stanford
University, and community stakeholders in Mountain View. The survey gathered more
than 700 responses, offering insight into typical travel patterns and preferences
regarding new bike and pedestrian rail crossings.
1 South Palo Alto Bike/Ped Connectivity Phase 1 Community Engagement Summary Report, July 29, 2025;
https://www.paloalto.gov/files/assets/public/v/1/transportation/projects/southern-palo-alto-bikeped-railroad-
crossings/spa_bike-ped-connectivity_phase-1-engagement-report_final_7.29.25.pdf
2 South Palo Alto Bike/Ped Connectivity Survey;
https://communityfeedback.opengov.com/portals/paloalto/Issue_14352
Item 3
Attachment F - Stakeholder
Engagement Overview
Packet Pg. 186
• Pop-Up Events at California Ave Third Thursday (April 17, 2025), Earth Day Festival (April
27, 2025), and Bike to Work Day (May 15, 2025).
• Emails to Principals, PTA Team Presidents, and Traffic Safety Representatives (TSRs) of
all public schools in the southern portion of the City, as well as private schools,
Neighborhood Associations, and businesses in south Palo Alto, in addition to several
public and private schools, Neighborhood Associations, and businesses in Mountain
View to inform them about the project, share ways to provide feedback, promote the
online survey, and ask community partners to spread the word to their networks by via
a communications toolkit.
• Presentations at meetings with the PABAC,3 Planning and Transportation Commission
(PTC),4 Rail Committee,5 City/School Transportation Safety Committee (CSTCS),6 and
Parks and Recreation Commission (PRC)7 in May 2025. In addition, crossing
opportunities near San Antonio Road were discussed at a joint meeting of PABAC and
Mountain View Bicycle/Pedestrian Advisory Committee on August 28, 2024.
Phase 2 Community Engagement: Feedback on Alternatives (Fall 2025) – Completed
The second phase of engagement 8 included the following elements.
• Project Webpage (as in Phase 1)
• Project Fact Sheet (as in Phase 1)
• Mailers sent to around 1,200 business, community organizations and residential
property addresses in the vicinity of the project.
• Community Workshop held at Mitchell Park Community Center on September 9, 2025,
and attended by nearly 40 community members. Community members provided
feedback on the eight preliminary conceptual design alternatives. The most popular
conceptual designs amongst attendees were Loma Verde Ave Tunnel (Alternative B), El
Dorado Ave Tunnel (Alternative A), and San Antonio Bridge Enhancements (Alternative
3 Pedestrian and Bicycle Advisory Committee, May 6, 2025; Discussion Item #7.a.;
https://www.paloalto.gov/files/assets/public/v/1/transportation/bicycling-walking/pabac/pabac-meetings-
2025/2025-05-06_pabac-agenda-packet_final.pdf
4 Planning and Transportation Commission, May 14, 2025; Study Session Item #4;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7648&dbid=0&repo=PaloAlto&searchid=953eac3d-
214a-4cea-a77b-5cfa3921c24f
5 Rail Committee, May 20, 2025; Study Session Item #2;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=9269&dbid=0&repo=PaloAlto&searchid=d661c2c2-
51aa-4f56-bdc3-9882fb61d4e3
6 City/School Transportation Safety Committee, May 22, 2025; https://www.paloalto.gov/Events-Directory/Office-
of-Transportation/May-2025-CitySchool-Transportation-Safety-Committee-Meeting
7 Parks and Recreation Commission, May 27, 2025; Business Items Item #5;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7060&dbid=0&repo=PaloAlto&searchid=b91d0517-
cedc-4099-8940-84b874c6ccd0
8 South Palo Alto Bike/Ped Connectivity Phase 2 Community Engagement Summary Report, January 16, 2026;
https://www.paloalto.gov/files/assets/public/v/1/transportation/projects/southern-palo-alto-bikeped-railroad-
crossings/spa-bikeped-connectivity-phase-2-engagement-report-final-1.16.26.pdf
Item 3
Attachment F - Stakeholder
Engagement Overview
Packet Pg. 187
H). Participants expressed support for alternatives that limit right-of-way impacts,
provide more direct routes, connect to existing bike facilities, grade-separate Alma
Street, and are located further away from existing or planned grade separated rail
crossings. Several participants also suggested changes to assumed tunnel dimensions
such as reducing the height of the tunnel to shorten ramps.
• Online Survey available on the project webpage from August 15, 2025, through October
12, 2025.9 The City promoted the survey as in Phase 1. The survey gathered nearly 500
responses. Respondents provided feedback on the eight preliminary conceptual design
alternatives. Key findings included:
o El Dorado Ave Tunnel (Alternative A) was the favorite alternative amongst
respondents, followed by Loma Verde Ave Tunnel (Alternative B), then San
Antonio Bridge Enhancements (Alternative H).
o Lindero Dr Tunnel with Alma St Signal (Alternative E) was the least favorite
alternative amongst respondents, while Ely Pl Tunnel (Alternative F) ranked
second to last.
o Respondents generally supported alternatives that minimize impacts to
residential properties and that grade-separate Alma Street, due to concerns
about delays to motor vehicle travel and safety concerns for pedestrians and
cyclists crossing Alma Street at new signalized intersections.
o Respondents expressed a desire for high-quality pathways (e.g., wide,
direct/straight, open, well-lit, separate space for cyclists and pedestrians) where
cyclists would not need to dismount.
o Respondents suggested El Dorado Ave Tunnel (Alternative A) would be even
more desirable if it tunneled under Alma Street.
o Several respondents recommended the City consider enhancing the existing
grade-separated rail crossing at California Avenue rather than building a new
crossing nearby.
• Pop-Up Events at Bike Palo Alto (October 5, 2025), California Ave Third Thursday
(October 16, 2025), and other community-wide events through early 2026.
• Emails (as in Phase 1).
9 South Palo Alto Bike/Ped Connectivity Preliminary Design Concept Survey;
https://communityfeedback.opengov.com/portals/paloalto/Issue_14594
Item 3
Attachment F - Stakeholder
Engagement Overview
Packet Pg. 188
• Presentations at meetings with the PTC10, CSTSC11, PABAC 12, Rail Committee 13, and the
City Council 14.
On December 1, 2025, the City Council passed a motion that selected the preliminary
concept design at El Dorado Avenue (also called Alternative A) for further evaluation. 15
Alternative A involves two variants:
• Alternative A1 with a signalized crossing of Alma Street at El Dorado Avenue.
• Alternative A2 with a tunnel under both Alma Street and the Caltrain tracks in the
vicinity of El Dorado Avenue.
Phase 3 Community Engagement Review Public Draft Report (Fall 2026) – Underway
Phase 3 community engagement is currently in progress. During Phase 3, City staff are
presenting two preferred bicycle and pedestrian rail crossing concept design alternatives near
El Dorado Avenue, and additional improvements in the surrounding neighborhoods for initial
review and feedback. Feedback received will be considered in the selection and refinement of
preferred bicycle and pedestrian rail crossing concept designs and improvements along the
corridor to be carried forward into the public draft report. A summary of Phase 3 outreach and
engagement activities is provided below:
• Project Webpage (as in Phases 1 and 2)
• Project Fact Sheet (as in Phases 1 and 2)
• Mailers sent to more than 1,700 business, community organization and residential
property addresses within 1,000 feet of the project.
• Posters placed along El Dorado Avenue and Park Boulevard.
• Community Workshop at Rinconada Library (Embarcadero Room) on August 27, 2026,
from 6:00-7:30 pm., and attended by approximately 90 community members.
Participants provided feedback on the concept designs for Alternatives A1 and A2, as
10 Planning and Transportation Commission, September 10, 2025; Study Session Item #4;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7671&dbid=0&repo=PaloAlto&searchid=cc55f36b-
8916-4c57-a84c-1aa231dab86e
11 City/School Transportation Safety Committee, October 23, 2025; https://www.paloalto.gov/Events-
Directory/Office-of-Transportation/CitySchool-Transportation-Safety-Committee-Meeting
12 Pedestrian and Bicycle Advisory Committee, November 4, 2025;
https://www.paloalto.gov/files/assets/public/v/1/transportation/bicycling-walking/pabac/pabac-meetings-
2025/2025-11-04_pabac-agenda-packet_final.pdf
13 Rail Committee, November 18, 2025; Action Item #1;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=83878&dbid=0&repo=PaloAlto&searchid=e5ce0fb7
-ff7e-4ddf-aa36-356d39a32b5b
14 City Council, December 1, 2025: Action Item #18;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=83952&dbid=0&repo=PaloAlto&searchid=d9f09a55
-fa77-4887-8005-bb508af17995
15 City Council, December 1, 2025: Action Item #18;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=83952&dbid=0&repo=PaloAlto&searchid=d9f09a55
-fa77-4887-8005-bb508af17995
Item 3
Attachment F - Stakeholder
Engagement Overview
Packet Pg. 189
well as accompanying network enhancements. In addition, the resident-developed
“Loma Verde–Alma Median Hybrid Plan” was presented by several community members
at the workshop. Key findings included:
o Many participants expressed a clear preference for further evaluation of a
Hybrid/Loma Verde-based alternative rather than Alternatives A1 and A2.
Supporters viewed Loma Verde Avenue as a more central and appropriately
sized corridor, with stronger connections to schools, parks, the Baylands, and
existing bicycle facilities. Participants also cited the opportunity to avoid
residential property acquisition, major driveway and parking impacts, and the
operational constraints associated with concentrating new bicycle, pedestrian,
and vehicle activity on narrow El Dorado Avenue.
o Both Alternatives A1 and A2 generated substantial concern about neighborhood
safety and circulation. For A1, a limited number of participants supported a new
Alma Street signal as a means of slowing traffic and improving crossing safety.
However, many others were concerned that the signal could attract cut-through
traffic to El Dorado Avenue, create southbound queues on Alma Street, and
increase conflicts between people walking/biking and vehicles. Concerns were
stronger for A2, particularly regarding potential property acquisitions, one-way
operations, parking loss, driveway access, emergency response, utility conflicts,
and cost.
o Participants asked the City to more fully evaluate real-world traffic conditions,
especially afternoon peak-period queueing, the Alma/Oregon/Page Mill area,
emergency access, and likely diversion onto neighborhood streets, before
advancing an El Dorado Avenue concept. Many also requested a more
transparent explanation of how locations were screened, why Loma Verde was
not advanced as a primary alternative, and how project benefits compare with
the nearby California Avenue undercrossing. Several comments raised equity and
displacement concerns, emphasizing that potential effects on renters, affordable
housing, and long-time residents should be carefully addressed through the
alternatives analysis and outreach process.
o Feedback on the draft network enhancements was mixed. Participants generally
supported measures that directly improve walking and bicycling safety, such as
improved crossings, lighting, wayfinding, bicycle infrastructure, traffic calming,
and speed management, particularly along Loma Verde Avenue and school-
access routes. In contrast, neighborhood traffic circles received strong
opposition, with concerns about geometric fit, front-yard impacts, and uncertain
bicycle-safety benefits; curb bulb-outs and vertical curbs also drew mixed
reactions.
• Pop-Up Events at community-wide events.
Item 3
Attachment F - Stakeholder
Engagement Overview
Packet Pg. 190
• Emails (as in Phases 1 and 2). The City received over 50 emails with public comments
and questions. Public comments reflected broad support for improving bicycle and
pedestrian connectivity in south Palo Alto, with differing views regarding the need for an
additional crossing, the preferred location and design, and project timing. The City also
received a petition and additional correspondence requesting removal of Alternatives
A1 and A2 from consideration and a formal evaluation of the “Loma Verde-Alma Median
Hybrid Plan”. A synthesis of public comments received through email is presented in
Attachment G.
• Presentations at meetings with PABAC16 and CSTSC 17. A synthesis of feedback received
during each meeting is presented in Attachment H. Upcoming meetings with PTC, Rail
Committee, and the City Council as tentatively scheduled in Quarter 4 in 2026.
The public draft report will include a funding and implementation plan for up to two preferred
alternatives and additional improvements in the surrounding neighborhoods and will be shared
for feedback as part of Phase 3 of engagement in early 2027. Additional community meetings
are being planned to follow the release of the public draft report.
Phase 4 Community Engagement Council Adopt Final Report (Spring 2027)
A final report will be shared mid 2027 in Phase 4 for community review and potential adoption
by the City Council.
16 Pedestrian and Bicycle Advisory Committee, August 6, 2026; Discussion Item #7.a.;
https://www.paloalto.gov/files/assets/public/v/1/transportation/bicycling-walking/pabac/pabac-meetings-
2026/2026-08-06_pabac-agenda-packet_final_v2.pdf
17 City/School Transportation Safety Committee, August 20, 2026; https://www.paloalto.gov/Events-
Directory/Office-of-Transportation/CSTSC-Meetings-2026-2027
Item 3
Attachment F - Stakeholder
Engagement Overview
Packet Pg. 191
SOUTH PALO ALTO BIKE/PED CONNECTIVITY
PHASE 3 COMMUNITY ENGAGEMENT SUMMARY OF PUBLIC COMMENTS
Updated: September 15, 2026
A synthesis of public comments received through email is presented below:
• General support for improving bicycle and pedestrian connectivity in south Palo
Alto, with differing views on whether an additional crossing is needed, the
appropriate crossing location, the preferred design, and project timing.
• Support for Alternative A1 over Alternative A2 based on the published alternatives
assessment, including A1’s lower estimated cost, fewer anticipated utility and
emergency-access issues, and avoidance of residential property acquisitions. Other
commenters expressed concern that a potential at-grade crossing at Alma Street
could create safety and operational effects associated with vehicle speeds, signal
compliance, traffic queues, turning movements, and arterial operations.
• Concern that Alternative A2 and its variants would require acquisition or removal of
homes, major utility relocations, and more extensive construction near residences,
resulting in increased disruption, risk, cost, and schedule uncertainty.
• Loma Verde–Alma Median Hybrid Plan: The City received a petition, reported to
include more than 130 signatures to date, as well as supplemental correspondence
from residents requesting that the City remove El Dorado Avenue from
consideration and formally evaluate the Loma Verde–Alma Median Hybrid Plan.
While supporting improved bicycle and pedestrian connectivity, petitioners and
commenters raise concerns about driveway and neighborhood access, potential
increases in bicycle, e-bike, and vehicle traffic, emergency access and evacuation
conditions, parking loss, cut-through traffic, school-route safety, potential
environmental effects, private property acquisition, and other neighborhood
impacts associated with the El Dorado Avenue alternatives.
The proposed Hybrid Plan would:
o Locate a signalized crossing at Loma Verde Avenue and Alma Street;
o Shift Alma Street travel lanes eastward; and
o Use available land between Alma Street and the railroad corridor to maximize
feasible space for a combined pedestrian walkway and two -way Class IV
protected bikeway extending from Loma Verde Avenue to the El Dorado rail
undercrossing axis.
Item 3
Attachment G - Phase 3
Community Engagement
Summary of Public
Comments
Packet Pg. 192
The concept would use the El Dorado rail axis for an underpass connection to Park
Boulevard. Petitioners request that the City evaluate the concept’s feasibility,
including roadway geometry, right-of-way, utilities, traffic operations, driveway
access, emergency response, rail-corridor safety, environmental considerations,
cost, and its potential to avoid private property acquisition. Commenters also
request comparative technical and safety evaluation of the Hybrid Plan and a
Matadero Creek path alternative before selecting an El Dorado Avenue alignment.
• Suggestions to evaluate coordinated signals at Loma Verde Avenue and El Carmelo
Avenue, with the Loma Verde Avenue signal serving vehicular movements and the El
Carmelo Avenue signal serving bicycle and pedestrian movements, to reduce
vehicle diversion for the Hybrid Plan.
• Suggestion to evaluate a bicycle-permeable barrier at the Alma Street/El Dorado
Avenue intersection, combined with a traffic signal, to prevent motor vehicles from
entering or exiting El Dorado Avenue while maintaining bicycle access.
• Suggestions to prioritize improvements to the existing California Avenue underpass
and complete planned rail grade-separation projects at Churchill Avenue, East
Meadow Drive, and Charleston Road. Some commenters recommend deferring a
decision on an additional crossing until these projects are operational and post-
implementation bicycle, pedestrian, and vehicle travel patterns can be evaluated.
• Concerns that an El Dorado Avenue undercrossing could duplicate the nearby
California Avenue underpass, may have limited demonstrated demand or school-
access benefit, and may not justify its cost relative to other improvements or
crossing locations. Some commenters identified potential school-route benefits for
some Midtown students and bicycle-safety benefits from an El Dorado crossing.
• Concerns that El Dorado Avenue’s narrow width may not safely accommodate
bicyclists, two-way vehicle traffic, and on-street parking. Commenters note that El
Dorado Avenue functions as an important access route to Alma Street for portions
of the surrounding neighborhood, receives overflow parking from nearby residences,
and includes properties with driveways accessing the street.
• Questions about whether a shared bicycle boulevard is appropriate on El Dorado
Avenue given its constrained width, current parking practices, and role as a
neighborhood access route, including potential conflicts at driveways and
increased bicycle, e-bike, and vehicle volumes. Requests for clarification include
bicycle boulevard design, parking retention, traffic volumes, operations at the El
Dorado Avenue/Alma Street intersection, and proposed traffic-control changes
Item 3
Attachment G - Phase 3
Community Engagement
Summary of Public
Comments
Packet Pg. 193
along El Dorado Avenue, including potential stop-control modifications and a traffic
circle at Bryant Street and El Dorado Avenue.
• Concerns that parking removal, continued sidewalk parking and limited
enforcement, construction activity, traffic calming, and circulation changes could
affect neighborhood access, pedestrian accessibility, emergency response, and
residents reliant on on-street or overflow parking. Commenters specifically raise
concerns regarding access to cul-de-sac streets that depend on El Dorado Avenue
for primary vehicle access, and request analysis of potential emergency-response
delays associated with traffic queues or congestion.
• Requests for assessment of potential localized air-quality and noise effects
associated with changes in traffic operations and volumes, as well as the presence
of the California-Olive-Emerson (COE) Toxic Underground Plume near the proposed
El Dorado Avenue undercrossing.
• Suggestions to consider a more centralized crossing closer to East Meadow or
alternative connections at Loma Verde Avenue or El Carmelo Avenue, including a
north-south shared bicycle and pedestrian path along the Alma Street corridor
connecting to existing and planned crossings.
• Request to evaluate a dedicated bicycle and pedestrian connection along the north
side of Matadero Creek between Alma Street and Bryant Street, including its
feasibility, width, ADA grades, creek-crossing conditions, property/easement
requirements, environmental constraints, cost, and comparative safety and
emergency-access effects.
• Requests additional information and analysis for the El Dorado alternatives,
including alignment with the bicycle path between Portage Avenue and Park
Boulevard, tunnel depth and length, ramp and stair configurations, ADA
requirements, bicycle/pedestrian separation and wayfinding, and potential
construction effects on nearby buildings, and PAUSD school attendance
boundaries, student travel patterns, and Walk and Roll routes.
• Requests for direct notification, additional outreach, and continued engagement
with affected residents as the alignment, ramp configuration, signal design, parking,
circulation, and construction staging are refined. Commenters request that
alternatives remain subject to technical analysis and community review before a
preferred alignment is advanced, with particular concern that outreach may not
have adequately reached Midtown, El Dorado Avenue, and immediately adjoining
residents.
Item 3
Attachment G - Phase 3
Community Engagement
Summary of Public
Comments
Packet Pg. 194
South Palo Alto Bike/Ped Connectivity Phase 3 Community Engagement Synthesis of Standing Meetings
August 20, 2026
Kittelson & Associates, Inc. Page 1
SOUTH PALO ALTO BIKE/PED CONNECTIVITY
PHASE 3 COMMUNITY ENGAGEMENT
SYNTHESIS OF STANDING MEETINGS
Pedestrian and Bicycle Advisory Committee (PABAC) Meeting
(August 6, 2026)
• Generally supportive of Alternative A1 due to its simpler design, fewer implementation
challenges, and stronger likelihood of advancing quickly.
• Some members supported continuing to advance Alternative A2, while others recommended
eliminating A2 to reduce costs, shorten the project development process, and focus resources on
the more feasible alternative.
• Requested additional clarification on key assumptions, including construction cost estimates,
comparison to the Homer Avenue tunnel, anticipated pedestrian and bicycle demand, potential
student use, induced demand, and how parcel impacts were identified for Alternative A2.
• Expressed concern with the feasibility and impacts of Alternative A2, particularly given the
narrow width of El Dorado Avenue, long ADA ramp requirements, potential property impacts, and
emergency access considerations.
• Provided feedback on tunnel and ramp design considerations, including:
ο Consider reduced tunnel height/depth where feasible to shorten ramp lengths and
reduce impacts.
ο Confirm whether tunnel width references clear width or structural width.
ο Consider tunnel safety features such as cameras.
ο Evaluate whether both east-side ramps are necessary or whether one ramp could reduce
cost and travel distance.
• Emphasized that an at-grade Alma Street crossing under Alternative A1 must be safe, low-delay
for bicyclist and pedestrian crossings (e.g., less than one minute), and well-coordinated with
nearby signals to discourage illegal crossings and reduce conflicts.
• Suggested exploring signal treatments for Alternative A1, including a push button, Pedestrian
Hybrid Beacon, advance driver warning, or coordinated signal timing that could support slower
and steadier vehicle progression (i.e., “green wave”) on Alma Street.
• Provided feedback on proposed network enhancements, including:
ο Support for bicycle boulevard treatments and a modal filter on El Dorado Avenue to
discourage cut-through traffic accessing the proposed signal.
ο Support for a roundabout at Bryant Street/El Carmelo Avenue for traffic calming and
safety.
Item 3
Attachment H - Phase 3
Community Engagement
Synthesis of Standing
Meetings
Packet Pg. 195
South Palo Alto Bike/Ped Connectivity Phase 3 Community Engagement Synthesis of Standing Meetings
August 20, 2026
Kittelson & Associates, Inc. Page 2
ο Recommended eliminating the raised intersection at Portage Avenue/Park Boulevard due
to cost and concerns about effectiveness and suggested keeping the raised crosswalk
recently installed at this location.
ο Suggested curb bulb-outs should be focused at intersections with higher traffic volumes
and that bulb-outs at El Carmelo Avenue/Bryant Street and Oregon Avenue/Bryant Street
could be removed to reduce costs.
ο Suggested reducing speed limits on Alma Street.
• Requested clarification on whether network enhancements are included in the project scope and
on the cost/schedule implications of advancing one alternative versus both alternatives to 15%
design.
• PABAC conducted a straw poll:
ο All members present supported advancing Alternative A1 to 15% design.
ο Four members also supported advancing Alternative A2 to 15% design.
City/School Transportation Safety Committee (CSTSC) Meeting
(August 20, 2026)
• Requested clarification on the anticipated difference in construction duration between
Alternatives A1 and A2.
• Requested clarification on whether trips currently using the California Avenue crossing may shift
to the proposed El Dorado Avenue crossing.
• Expressed concern that property impacts associated with Alternative A2 could create project-
delivery risks, including potential cost increases, delays, or impacts to overall project feasibility.
• Requested clarification on the anticipated sequencing of the Rail Grade Separation crossings
relative to the proposed El Dorado Avenue crossing.
Planning and Transportation (PTC) Committee Meeting
(September 30, 2026)
• Forthcoming
Rail Committee Meeting (November 10, 2026)
• Forthcoming
City Council Meeting (December 7, 2026)
• Forthcoming
Item 3
Attachment H - Phase 3
Community Engagement
Synthesis of Standing
Meetings
Packet Pg. 196
Item No. 4. Page 1 of 8
1
0
5
0
4
Planning & Transportation Commission
Staff Report
From: Planning and Development Services Director
Lead Department: Office of Transportation
Meeting Date: September 30, 2026
Report #: 2608-6659
TITLE
Bryant Street Bike Boulevard and Lincoln Avenue Traffic Calming Project Initial Design Concepts.
CEQA Status: Exempt Pursuant to CEQA Guidelines Section 15301: Existing Facilities.
RECOMMENDATION
Review the updated concept plans for portions of Bryant Street and Lincoln Avenue
(Attachment A) and recommend Council direct staff to advance the following elements:
1. Traffic circles at Bryant Street/Lincoln Avenue, Bryant Street/Kingsley Avenue, Waverley
Street/Lincoln Avenue and Bryant Avenue/Addison Avenue intersection (upgraded);
2. Curb extensions at Bryant Street/Channing Avenue and Bryant Street/Homer Avenue
intersections;
3. High-visibility crosswalks and corner daylighting along Bryant Street from Homer to
Embarcadero and at Waverley Street/Lincoln Avenue intersection;
4. Bicycle Boulevard pavement marking along Bryant Street;
5. Short-term parking zone outside the Palo Alto Sub-Acute and Rehabilitation Center; and
6. Pilot left turn restriction from eastbound Embarcadero Road to northbound Bryant
Street.
EXECUTIVE SUMMARY
The City of Palo Alto has developed updated conceptual plans (Attachment A) to advance the
Bryant Street Bike Boulevard Downtown Access project from the 2026 Bicycle and Pedestrian
Transportation Plan (BPTP) and address resident concerns regarding vehicle volumes and
speeds in the vicinity of Bryant Street and Lincoln Avenue intersection. The City initiated the
project in early 2026 after reviewing the outcome of a 2024 Neighborhood Traffic Calming
petition in the context of plans to update the City’s 2001 Traffic Calming Policy and the 2026
BPTP.
Staff has reviewed traffic speeds and volumes and compiled suggested design concepts that
include best practice traffic calming treatments and proven safety countermeasures, and
incorporate recent resident feedback received at a September 10, 2026, Neighborhood
Item 4
Item 4 Staff Report
Packet Pg. 197
Item No. 4. Page 2 of 8
1
0
5
0
4
Meeting. Treatments under consideration include new and updated traffic circles, curb
extensions, high visibility crosswalks, pavement marking, and a pilot left-turn restriction at
Embarcadero Road, to reduce vehicle speeds, enhance pedestrian and bicycle safety along this
school route, and manage cut-through traffic along this segment of Bryant Street.
BACKGROUND
1
2 which also highlighted the early success of Bryant Street Bicycle Boulevard in
maintaining low vehicle volumes (less than 1,000 vehicles per day) and included a toolkit of
potential design guidelines and standards to utilize in upgrading facilities. On March 17, 2014,
City Council subsequently approved executing a contract with Alta Planning + Design to design
bicycle boulevard improvements for several local corridors including Bryant Street.3 Following
Council deliberations on February 24, 2020; however, the second phase of project
implementation, which would have included Bryant Street, was paused due to concerns
regarding initial implementation feedback and staffing capacity.4
5, which reiterated the need to build-
out a local low-stress bicycle network and advance bicycle-related improvements along Bryant
Street under project BLVD_2: Bryant Street Bike Boulevard Downtown Access Project. Also on
June 15, 2026, the City Council adopted the 2027 City’s Capital Budget, which incorporated
1 City of Palo Alto. 2030 Comprehensive Plan. https://www.paloalto.gov/files/assets/public/v/4/planning-amp-development-services/3.-
comprehensive-plan/comprehensive-plan/full-comp-plan-2030_with-dec19_22-amendments.pdf
2 City of Palo Alto. 2012 Bicycle and Pedestrian Transportation Plan.
https://www.paloalto.gov/files/assets/public/transportation/projects/bicycle-pedestrian-transportation-plan_adopted-july-2012.pdf
3 Palo Alto City Council Meeting. March 17, 2024, Action Item: Approval of Five Consultant Contracts Totaling $2,231,211 for Design and
Environmental Review of Bicycle Plan Implementation Projects and Adoption of a Budget Amendment Ordinance for $335,000.
https://www.paloalto.gov/files/assets/public/v/1/agendas-minutes-reports/reports/city-manager-reports-cmrs/year-archive/2014/id-4372.pdf
4 Palo Alto City Council Meeting. February 24, 2020, Action Item: Evaluation of the Neighborhood Traffic Safety and Bicycle Boulevard Phase 1
Project, Including Acceptance of Findings Regarding Increasing Bicycle Usage, Affirmation or Approval of Project Modifications, Affirmation of
Planned Education Activities and Process to Update Community Engagement, and Acknowledgement of Associated Actions by Staff.
https://www.paloalto.gov/files/assets/public/v/1/agendas-minutes-reports/reports/city-manager-reports-cmrs/year-archive/2020/id-
11078.pdf?t=59621.62.
5 City of Palo Alto 2026 Bicycle and Pedestrian Transportation Plan, Project webpage:
https://www.paloalto.gov/Departments/Transportation/Bicycling-Walking/bikepedplan.
Item 4
Item 4 Staff Report
Packet Pg. 198
Item No. 4. Page 3 of 8
1
0
5
0
4
project TR-27000 Transportation Infrastructure Improvements to allow efficient delivery of
small-scale, community-driven improvements including responds to traffic calming petitions.
ANALYSIS
Resident Concerns and Existing Conditions
Table 1: Traffic Calming Program
Metric Threshold
(TC Policy 2001)
Bryant Street
(9/27/2023)Points
Item 4
Item 4 Staff Report
Packet Pg. 199
Item No. 4. Page 4 of 8
1
0
5
0
4
1 85th percentile speed
(miles per hour, mph)
≥32 mph – local street
≥35 mph – collector
24.5 mph NB
26.3 mph SB 0
2 Volume of vehicle traffic
(VPD: vehicles per day)
≥1,200 vpd – local street
≥4,000 vpd – collector
1,940 - 2,190 vpd, 2023
(1,565 vpd, 2015
2,089 vpd, 2026)
1
3
Walking distance to
school, park, community
center, facility for seniors
or people with disabilities,
or site with significant
pedestrian activity (feet)
<1,000 feet ~1,000’ Scott Park
1,100’ Heritage Park 1
4
Evidence of cut-through
(through or non-
neighborhood) traffic
Significant License plate survey
not undertaken N/A
5
Unusual accident history
(except due to parking,
vehicle equipment,
drug/alcohol)
≥6 crashes / 3 years or
≥fatal crash / 3 years
3
(1/1/2019-9/30/2023)0
Total At least 2 of 5 criteria
needed to advance 2
More recent (2026) data collection identifies a prevailing speed of 28 mph along Bryant Street,
daily vehicle volume of 2,089 vehicle per day along Bryant Street, and history of 10 collisions
within the study area over a ten-year period (see Figure 1). Please see Attachment B for maps
of recent reported collisions in the project area and Attachment C for the Data Collection
Summary Memo including the complete turning movement counts.
Figure 1: Reported Collisions on Bryant Street (2016-2024):
Source: California Highway Patrol Statewide Integrated Traffic Records System, 2026
Item 4
Item 4 Staff Report
Packet Pg. 200
Item No. 4. Page 5 of 8
1
0
5
0
4
Staff note that even a number of parameters that do not exceed the City’s traffic calming
thresholds, may still exceed recent road design guidance documents such as the AASHTO Guide
for the Development of Bicycle Facilities (2012), Federal Highway Administration (FHWA)
Bikeway Selection Guide (2019), and National Association of City Transportation Officials
(NACTO) Urban Bikeway Design Guide (2025).11 For example, the above guidelines suggest a
design speed of 20 mph for shared streets or bicycle boulevards and design volume of 1,000
vehicles per day, both of which are lower than prevailing conditions within the project area.
Project Goals
Notwithstanding current traffic calming thresholds, best practice guidance input from
neighbors indicated that concept designs should aim to achieve the following goals:
Reduced vehicular volume along this bicycle boulevard and designated school route;
Reduced collisions and near miss incidents particularly at Bryant/Lincoln intersection;
Reduced motor vehicle speeds; and
Restoration of some on-street parking in this urban neighborhood.
Initial Concept Design
Based on the above goals and best practice guidelines, initial concept designs were developed
for this study area including the following elements:
1.Traffic Circles at Bryant/Kingsley, Lincoln/Waverley, and
Bryant/Addison (upgrade) intersections: Similar to
roundabouts, these treatments include a circular central
island, but with a smaller geometric footprint and potential
for stop-control. Traffic circles are designed to eliminate
severe conflict points (like conflicting left turns) and slow
traffic, which reduces the probability of severe collisions.
Traffic circles are associated with a 3 to 4 mph speed
reduction12 and lower travel speeds are associated with fewer and less severe crashes.
11 United States Department of Transportation Federal Highway Administration, Bikeway Selection Guide, February 2019:
https://highways.dot.gov/sites/fhwa.dot.gov/files/2022-07/fhwasa18077.pdf. American Association of State Highway and Transportation
Officials, Guide for the Development of Bicycle Facilities, 5th Edition:
https://store.transportation.org/item/publicationdetail/5371?srsltid=AU7gw4X0T9w4uGQXhgU0dKf3Z4d4u5msaZzZebrToA1y2GH7K_cU5ON2.
12 Federal Highway Administration (FHWA). Traffic Calming E-Primer: Module 4: Effects of Traffic Calming Measures on Motor Vehicle Speed
and Volume. https://highways.dot.gov/safety/speed management/traffic-calming-eprimer/module-4-effects-traffic-calming-measures-
motor#note17
Item 4
Item 4 Staff Report
Packet Pg. 201
Item No. 4. Page 6 of 8
1
0
5
0
4
2.Curb Extensions (Bulbouts) at Bryant/Channing Ave and
Bryant/Homer intersections: A curb extension is a traffic
calming measure that widens the sidewalk for a short
distance to enhance the pedestrian crossing. This reduces the
crossing distance and allows pedestrians and drivers to see
each other when parked vehicles would otherwise block
visibility.
3.High Visibility Crosswalks at Bryant Street intersections
from Homer to Embarcadero, plus Waverley/Lincoln
intersection. A high-visibility crosswalk has ladder or
continental crosswalk markings made of high visibility
material to improve the visibility of marked crosswalks and
provides motorists with a cue to slow down and yield to
pedestrians. Visibility will also be enhanced with 15 or 20
feet of red curbs in accordance with the Daylighting Law (AB
413).
4.Bicycle Boulevard Pavement Marking along Bryant Street: This treatment aims to
improve driver awareness and enhance wayfinding for bicyclists.
5.Pilot Left Turn Restriction from eastbound Embarcadero
Road to northbound Bryant Street: Pilot installation of a left
turn restrictions from eastbound Embarcadero Road onto
northbound Bryant Street is proposed to reduce vehicle
volumes along this bicycle boulevard. Staff proposes to test
this treatment to better understand implications for Bryant
and parallel streets.
6.Passenger Loading Zone at 911 Bryant Street: A new short-
term loading zone is suggested providing a location for ambulances and caregivers to
drop off and pick up patients outside the Palo Alto Sub-Acute and Rehabilitation Center.
This treatment would also reduce the need for students and other travelers to pass
vehicles by travel in the counterflow direction along Bryant Street.
7. Pilot Diagonal Diverter at Bryant/Lincoln: The initial design concept included a traffic
diverters at Bryant/Lincoln aimed at maintaining low traffic volumes while maintaining
connectivity for vulnerable roadway users along Bryant Street.15 (This item will not
advance as discussed below.)
Attachment D includes a table that outlines the improvements described above, organized by
the specific street or intersection and the corresponding suggested improvement.
Updated Concept Design
15 City of Mountain View, California, Vizion Zero Action Plan & Local Road Safety Plan, September 2024:
https://www.mountainview.gov/home/showpublisheddocument/11378/638840379802630000
Item 4
Item 4 Staff Report
Packet Pg. 202
Item No. 4. Page 7 of 8
1
0
5
0
4
In late August 2026, the City published initial concept plans on the project webpage and
subsequently presented them to corridor residents at a September 10, 2026, Neighborhood
Meeting. Community members provided the following feedback on initial design concepts:
Strong support for Items #1 – 5 above;
Desire to accelerate implementation and obtain PTC recommendation to advance to
100% design;
Recommendation to replace the diagonal diverter at Bryant/Lincoln intersection with a
traffic circle to avoid restricting neighborhood access and mitigate potential impacts to
adjacent streets such as Waverley Street and Emerson Street; and,
Encouragement for City staff to consider efforts to lower posted speed limits of 15 or 20
miles per hour along designated bicycle boulevards.
Next Steps
FISCAL/RESOURCE IMPACT
STAKEHOLDER ENGAGEMENT
Item 4
Item 4 Staff Report
Packet Pg. 203
Item No. 4. Page 8 of 8
1
0
5
0
4
Following this meeting, staff updated the concept plans (Attachment A) to incorporate resident
feedback.
ENVIRONMENTAL REVIEW
ATTACHMENTS
AUTHOR/TITLE:
Item 4
Item 4 Staff Report
Packet Pg. 204
AD
D
I
S
O
N
A
V
E
LI
N
C
O
L
N
A
V
E
BRYANT STKI
N
G
S
L
E
Y
A
V
E
EM
B
A
R
C
A
D
E
R
O
R
D
HO
M
E
R
A
V
E
BRYANT ST CH
A
N
N
I
N
G
A
V
E
Bryant Street Bicycle Boulevard Improvement Project
Not to Scale
CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL
DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED.
Bryant Street
Figure 1
MA
T
C
H
L
I
N
E
MA
T
C
H
L
I
N
E
Item 4Attachment A - Updated 15% ConceptPlans Bryant Lincoln Traffic Calming,dated September 16, 2026
Packet Pg. 205
KI
N
G
S
L
E
Y
A
V
E
CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL
DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED.
WAVERLEY ST
AD
D
I
S
O
N
A
V
E
LI
N
C
O
L
N
A
V
E
Bryant Street Bicycle Boulevard Improvement Project
Waverley Street
Figure 2
Not to Scale
Item 4Attachment A - Updated 15% ConceptPlans Bryant Lincoln Traffic Calming,dated September 16, 2026
Packet Pg. 206
Attachment B:
Maps of Reported Collisions and BPTP Bicycle and Pedestrian High-Injury Network
Reported Collisions on Bryant Street (2016-2024):
Source: California Highway Patrol Statewide Integrated Traffic Records System, 2026
2026 BPTP Bicycle and Pedestrian High-Injury Network
Concentration of
collisions
Item 4
Attachment B - Maps of
Reported Collisions and
BPTP Bicycle and Pedestrian
High-Injury Network
Packet Pg. 207
Bryant Street Data
Collection Memo
Date: June 18, 2026
To: Ozzy Arce and Ria Lo, City of Palo Alto
From: Ari Feinsmith, Ingrid Ballus Armet, and Hugh Louch, Fehr & Peers
Subject: Bryant Street Data Collection
Overview
Fehr & Peers collected volume, speed, and vehicle classification data and reviewed collision data on
Bryant Street and Waverley Street between Homer Avenue and Embarcadero Road as part of the
Bryant Street Bicycle Boulevard project. Fehr & Peers will use this data to develop concept designs
that improve safety and bicyclist comfort.
Turning Movement Counts
Fehr & Peers conducted turning movement counts on Tuesday, May 12, 2026 from 7–9 AM and 3–6
PM at the following locations:
• Bryant Street and Lincoln Avenue
• Bryant Street and Embarcadero Road
Appendix A provides the turning movement counts. The morning peak hour was found to be 8–9 AM
while the afternoon peak hour was found to be 4:30–5:30 PM.
Vehicle Volumes and Speeds
The speed limit on Bryant Street is 25 miles per hour (MPH). Tube counts for speed, classification,
and volumes were collected from Friday, May 8 through Thursday, May 14, 2026. The tubes were
placed at the following locations:
• Bryant Street between Lincoln Avenue and Kingsley Avenue
• Waverly Street between Lincoln Avenue and Kingsley Avenue
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 208
Bryant Street Summary Findings | 2
Appendix A provides the tube counts data. Vehicles generally have slightly higher speeds in the
northbound direction than the southbound direction. 38% of northbound vehicles exceeded 25 MPH,
while 26% of southbound vehicles exceeded 25 MPH. Additionally, the northbound 85th percentile
speed was 28.1 MPH, while the southbound 85th percentile was 27.1 MPH. Speeds are marginally
higher than 2015, which had a bidirectional 85th percentile speed of 26.2 MPH. The 2015 speed data
was collected by Alta Planning + Design and is provided in Appendix B.
Collision Data
Fehr & Peers reviewed collision data from 2016 to 2024 from the California Highway Patrol Statewide
Integrated Traffic Records System (SWITRS) accessed through UC Berkeley SafeTREC’s
Transportation Injury Mapping System (TIMS). Note that 2024 data is provisional. This collision data
was supplemented with documentation by local residents submitted to the City of Palo Alto on
November 6, 2024. Appendix C summarizes the collision data. Figure 1 shows a map of the reported
collisions. Between 2016 and 2024 there were 10 reported collisions on Bryant Street between Homer
Avenue and Embarcadero Road. Collisions occurred most frequently at the intersections of Bryant
Street & Lincoln Avenue and Bryant Street & Channing Avenue. 30% of collisions involved a bicyclist
and at least 50% of collisions were broadside collisions.
Figure 1: Collisions on Bryant Street from 2016-2024
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 209
Bryant Street Summary Findings | 3
Summary
Since 2015, vehicle volumes and speeds on Bryant have increased. Table 1 summarizes the
key findings.
Table 1. Bryant Street Summary of Findings
Bryant 20151 20262 Change (%)
Average Daily Vehicle Trips 1,565 2,089 +34%
Peak Hour Vehicles Trips 213 249 +17%
Peak Hour Bicycle Trips N/A 55 N/A
85th Percentile Speed 26.2 27.6 +5%
Sources:
1. Alta Planning + Design, 2015.
2. Fehr & Peers, 2026.
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 210
X
Appendix A: 2026
Volumes, Speeds, and
Vehicle Classification
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 211
www.idaxdata.com
Date:
Peak Hour Count Period:
Peak Hour:
HV% PHF
EB 0% 0.61
WB 2% 0.84
NB 1% 0.81
SB 3% 0.73
TOTAL 2% 0.92
Peak Hour Count Summaries
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
8:00 AM 0 2 18 0 0 0 16 0 0 0 11 3 0 3 3 2 58 0
8:15 AM 0 1 11 2 0 3 13 7 0 2 12 10 0 1 2 0 64 0
8:30 AM 0 0 5 1 0 0 25 3 0 0 11 6 0 1 10 0 62 0
8:45 AM 0 0 9 0 0 3 23 1 0 5 14 4 0 1 8 1 69 253
0 3 43 3 0 6 77 11 0 7 48 23 0 6 23 3 253
0 0 0 0 0 0 2 0 0 0 1 0 0 0 1 0 4
- 0% 0% 0% - 0% 3% 0% - 0% 2% 0% - 0% 4% 0% 2%
EB WB NB SB EB WB NB SB E W N S
8:00 AM 0 0 0 0 3 3 3 0 4 1 1 2
8:15 AM 0 0 0 1 4 2 7 19 4 4 2 1
8:30 AM 0 2 1 0 0 4 3 4 4 4 0 0
8:45 AM 0 0 0 0 1 9 9 10 1 1 1 3
Peak Hour 0 2 1 1 8 18 22 33 13 10 4 64 81 33
3 11 8
0 29 6
0 9 8
1 32 11
Note: For complete count summary (all intervals), see following pages.
** Heavy Vehicle Classifications include FHWA Classes 4-13.
** Count Summaries include heavy vehicles, but exclude bicycles in overall count.
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Total Total Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
5/12/2026
7:00 AM to 9:00 AM
8:00 AM to 9:00 AM
Peak Hour
Interval
Start
Lincoln Ave Lincoln Ave Bryant St Bryant St
15-min
Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 212
www.idaxdata.com
Count Summaries - All Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 3 1 0 0 8 1 0 1 10 0 0 0 1 0 25 0
7:15 AM 0 0 7 0 0 1 11 0 0 0 12 0 0 0 7 1 39 0
7:30 AM 0 1 4 0 0 4 13 1 0 1 12 0 0 0 2 0 38 0
7:45 AM 0 0 4 2 0 1 15 0 0 0 12 2 0 0 3 2 41 143
8:00 AM 0 2 18 0 0 0 16 0 0 0 11 3 0 3 3 2 58 176
8:15 AM 0 1 11 2 0 3 13 7 0 2 12 10 0 1 2 0 64 201
8:30 AM 0 0 5 1 0 0 25 3 0 0 11 6 0 1 10 0 62 225
8:45 AM 0 0 9 0 0 3 23 1 0 5 14 4 0 1 8 1 69 253
Count Total 0 4 61 6 0 12 124 13 0 9 94 25 0 6 36 6 396
0 3 43 3 0 6 77 11 0 7 48 23 0 6 23 3 253
0 0 0 0 0 0 2 0 0 0 1 0 0 0 1 0 4
- 0% 0% 0% - 0% 3% 0% - 0% 2% 0% - 0% 4% 0% 2%
EB WB NB SB EB WB NB SB E W N S
7:00 AM 1 0 0 0 0 0 1 2 3 0 0 0
7:15 AM 0 1 0 0 0 1 3 3 2 0 0 0
7:30 AM 0 0 0 0 0 0 5 1 0 3 2 2
7:45 AM 0 0 1 0 2 2 6 5 2 1 1 4
8:00 AM 0 0 0 0 3 3 3 0 4 1 1 2
8:15 AM 0 0 0 1 4 2 7 19 4 4 2 1
8:30 AM 0 2 1 0 0 4 3 4 4 4 0 0
8:45 AM 0 0 0 0 1 9 9 10 1 1 1 3
Count Total 1 3 2 1 10 21 37 44 20 14 7 12
Peak Hour 0 2 1 1 8 18 22 33 13 10 4 6
7 112 53
4 81 33
3 11 8
0 29 6
0 9 8
1 32 11
0 6 7
1 15 8
1 3 3
1 7 2
Eastbound Westbound Northbound Southbound
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Total
Interval
Start
Lincoln Ave Lincoln Ave Bryant St Bryant St
15-min
Total
Rolling
Hour
Total
Total Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 213
www.idaxdata.com
Count Summaries - Heavy Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
7:15 AM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 3
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 2
8:30 AM 0 0 0 0 0 0 2 0 0 0 1 0 0 0 0 0 3 5
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
Count Total 0 0 1 0 0 0 3 0 0 0 2 0 0 0 1 0 7
Pk Hr Heavy 0 0 0 0 0 0 2 0 0 0 1 0 0 0 1 0 4
Count Summaries - Bikes
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 2 0 3 0
7:15 AM 0 0 0 0 0 0 1 0 0 1 2 0 0 1 2 0 7 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 2 3 0 0 1 0 6 0
7:45 AM 0 0 0 2 0 0 2 0 0 0 6 0 0 0 5 0 15 31
8:00 AM 0 0 0 3 0 3 0 0 0 3 0 0 0 0 0 0 9 37
8:15 AM 0 0 3 1 0 1 1 0 0 0 7 0 0 0 18 1 32 62
8:30 AM 0 0 0 0 0 1 3 0 0 0 3 0 0 0 4 0 11 67
8:45 AM 0 0 0 1 0 1 8 0 0 0 9 0 0 0 9 1 29 81
Count Total 0 0 3 7 0 6 15 0 0 4 30 3 0 1 41 2 112
Pk Hr Bike 0 0 3 5 0 6 12 0 0 3 19 0 0 0 31 2 81
15-min
Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
Lincoln Ave Lincoln Ave Bryant St Bryant St
Interval
Start
Lincoln Ave Lincoln Ave Bryant St Bryant St
15-min
Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 214
www.idaxdata.com
Date:
Peak Hour Count Period:
Peak Hour:
HV% PHF
EB 0% 0.71
WB 0% 0.70
NB 1% 0.77
SB 0% 0.75
TOTAL 0% 0.85
Peak Hour Count Summaries
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:30 PM 0 0 10 2 0 3 9 0 0 2 20 4 0 5 8 0 63 0
4:45 PM 0 1 17 4 0 1 11 3 0 1 26 2 0 4 18 0 88 0
5:00 PM 0 0 23 6 0 1 4 1 0 0 36 4 0 2 22 2 101 0
5:15 PM 0 0 16 3 0 1 7 1 0 3 39 4 0 4 13 0 91 343
0 1 66 15 0 6 31 5 0 6 121 14 0 15 61 2 343
0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1
- 0% 0% 0% - 0% 0% 0% - 0% 1% 0% - 0% 0% 0% 0%
EB WB NB SB EB WB NB SB E W N S
4:30 PM 0 0 0 0 3 3 7 3 1 1 2 0
4:45 PM 0 0 0 0 1 0 2 7 2 2 0 0
5:00 PM 0 0 0 0 3 1 5 10 2 5 3 0
5:15 PM 0 0 1 0 1 0 12 6 2 2 1 0
Peak Hour 0 0 1 0 8 4 26 26 7 10 6 01 64 23
0 19 10
1 19 5
0 16 4
0 10 4
Note: For complete count summary (all intervals), see following pages.
** Heavy Vehicle Classifications include FHWA Classes 4-13.
** Count Summaries include heavy vehicles, but exclude bicycles in overall count.
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Total Total Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
5/12/2026
3:00 PM to 6:00 PM
4:30 PM to 5:30 PM
Peak Hour
Interval
Start
Lincoln Ave Lincoln Ave Bryant St Bryant St
15-min
Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 215
www.idaxdata.com
Count Summaries - All Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
3:00 PM 0 3 9 1 0 2 7 1 0 1 15 3 0 1 3 0 46 0
3:15 PM 0 0 6 0 0 0 6 2 0 0 21 7 0 2 2 0 46 0
3:30 PM 0 0 8 0 0 1 7 1 0 0 15 3 0 2 5 0 42 0
3:45 PM 0 0 7 0 0 1 9 1 0 1 20 4 0 0 6 0 49 183
4:00 PM 0 2 4 0 0 0 11 1 0 2 16 1 0 2 4 2 45 182
4:15 PM 0 1 16 3 0 0 7 0 0 0 24 2 0 0 9 0 62 198
4:30 PM 0 0 10 2 0 3 9 0 0 2 20 4 0 5 8 0 63 219
4:45 PM 0 1 17 4 0 1 11 3 0 1 26 2 0 4 18 0 88 258
5:00 PM 0 0 23 6 0 1 4 1 0 0 36 4 0 2 22 2 101 314
5:15 PM 0 0 16 3 0 1 7 1 0 3 39 4 0 4 13 0 91 343
5:30 PM 1 0 7 2 0 0 4 3 0 2 31 0 0 4 7 0 61 341
5:45 PM 0 1 8 0 0 1 4 0 0 2 32 3 0 1 7 1 60 313
Count Total 1 8 131 21 0 11 86 14 0 14 295 37 0 27 104 5 754
0 1 66 15 0 6 31 5 0 6 121 14 0 15 61 2 343
0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1
- 0% 0% 0% - 0% 0% 0% - 0% 1% 0% - 0% 0% 0% 0%
EB WB NB SB EB WB NB SB E W N S
3:00 PM 0 0 0 0 2 0 1 6 2 6 3 1
3:15 PM 0 0 0 0 3 0 6 2 2 3 4 2
3:30 PM 0 0 0 0 0 3 11 3 3 5 2 1
3:45 PM 0 0 0 0 1 0 3 5 1 2 0 0
4:00 PM 0 0 1 0 2 0 7 2 4 3 3 0
4:15 PM 0 0 0 0 5 1 3 2 2 1 3 1
4:30 PM 0 0 0 0 3 3 7 3 1 1 2 0
4:45 PM 0 0 0 0 1 0 2 7 2 2 0 0
5:00 PM 0 0 0 0 3 1 5 10 2 5 3 0
5:15 PM 0 0 1 0 1 0 12 6 2 2 1 0
5:30 PM 0 0 0 0 3 1 5 5 0 3 5 3
5:45 PM 0 0 0 0 1 1 6 1 5 2 3 3
Count Total 0 0 2 0 25 10 68 52 26 35 29 11
Peak Hour 0 0 1 0 8 4 26 26 7 10 6 0
2 155 101
1 64 23
0 14 11
0 9 13
0 19 10
1 19 5
0 16 4
0 10 4
1 11 10
0 11 7
0 17 11
0 9 3
0 9 12
0 11 11
Eastbound Westbound Northbound Southbound
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Total
Interval
Start
Lincoln Ave Lincoln Ave Bryant St Bryant St
15-min
Total
Rolling
Hour
Total
Total Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 216
www.idaxdata.com
Count Summaries - Heavy Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
3:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Count Total 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 2
Pk Hr Heavy 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1
Count Summaries - Bikes
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
3:00 PM 0 0 1 1 0 0 0 0 0 0 1 0 0 0 6 0 9 0
3:15 PM 0 0 2 1 0 0 0 0 0 1 5 0 0 0 2 0 11 0
3:30 PM 0 0 0 0 0 2 1 0 0 2 8 1 0 0 3 0 17 0
3:45 PM 0 0 1 0 0 0 0 0 0 0 3 0 0 0 5 0 9 46
4:00 PM 0 0 2 0 0 0 0 0 0 0 7 0 0 0 2 0 11 48
4:15 PM 0 0 5 0 0 0 0 1 0 0 2 1 0 1 1 0 11 48
4:30 PM 0 2 1 0 0 0 0 3 0 0 6 1 0 0 3 0 16 47
4:45 PM 0 0 1 0 0 0 0 0 0 0 2 0 0 0 7 0 10 48
5:00 PM 0 0 3 0 0 0 1 0 0 0 4 1 0 0 10 0 19 56
5:15 PM 0 0 1 0 0 0 0 0 0 1 10 1 0 0 6 0 19 64
5:30 PM 0 0 2 1 0 1 0 0 0 1 3 1 0 0 5 0 14 62
5:45 PM 0 0 1 0 0 1 0 0 0 0 6 0 0 0 1 0 9 61
Count Total 0 2 20 3 0 4 2 4 0 5 57 6 0 1 51 0 155
Pk Hr Bike 0 2 6 0 0 0 1 3 0 1 22 3 0 0 26 0 64
15-min
Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
Lincoln Ave Lincoln Ave Bryant St Bryant St
Interval
Start
Lincoln Ave Lincoln Ave Bryant St Bryant St
15-min
Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 217
www.idaxdata.com
Date:
Peak Hour Count Period:
Peak Hour:
HV% PHF
EB 2% 0.95
WB 2% 0.84
NB 33% 0.38
SB 3% 0.68
TOTAL 2% 0.91
Peak Hour Count Summaries
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
8:00 AM 0 11 168 23 0 7 179 10 0 0 0 0 0 0 0 4 402 0
8:15 AM 0 18 139 38 0 27 217 5 0 0 0 2 0 0 0 5 451 0
8:30 AM 0 12 156 19 0 17 293 5 0 0 0 0 0 1 0 9 512 0
8:45 AM 0 7 195 7 0 1 286 12 0 0 0 1 0 0 0 11 520 1,885
0 48 658 87 0 52 975 32 0 0 0 3 0 1 0 29 1,885
0 1 14 2 0 1 22 0 0 0 0 1 0 1 0 0 42
- 2% 2% 2% - 2% 2% 0% - - - 33% - 100% - 0% 2%
EB WB NB SB EB WB NB SB E W N S
8:00 AM 4 7 0 0 0 0 2 12 2 1 4 2
8:15 AM 6 6 1 0 0 0 7 29 10 20 2 4
8:30 AM 3 5 0 1 0 1 4 6 5 6 2 1
8:45 AM 4 5 0 0 2 0 9 10 4 3 1 4
Peak Hour 17 23 1 1 2 1 22 57 21 30 9 1142 82 71
9 11 14
9 21 12
11 14 9
13 36 36
Note: For complete count summary (all intervals), see following pages.
** Heavy Vehicle Classifications include FHWA Classes 4-13.
** Count Summaries include heavy vehicles, but exclude bicycles in overall count.
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Total Total Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
5/12/2026
7:00 AM to 9:00 AM
8:00 AM to 9:00 AM
Peak Hour
Interval
Start
Embarcadero Rd Embarcadero Rd Bryant St Bryant St
15-min
Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 218
www.idaxdata.com
Count Summaries - All Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 1 89 4 0 4 199 9 0 0 0 1 0 0 0 2 309 0
7:15 AM 0 2 109 2 0 1 229 8 0 0 0 0 0 0 1 9 361 0
7:30 AM 0 4 181 4 0 4 219 9 0 0 0 1 0 0 0 4 426 0
7:45 AM 0 4 161 12 0 4 231 10 0 0 0 0 0 0 0 6 428 1,524
8:00 AM 0 11 168 23 0 7 179 10 0 0 0 0 0 0 0 4 402 1,617
8:15 AM 0 18 139 38 0 27 217 5 0 0 0 2 0 0 0 5 451 1,707
8:30 AM 0 12 156 19 0 17 293 5 0 0 0 0 0 1 0 9 512 1,793
8:45 AM 0 7 195 7 0 1 286 12 0 0 0 1 0 0 0 11 520 1,885
Count Total 0 59 1,198 109 0 65 1,853 68 0 0 0 5 0 1 1 50 3,409
0 48 658 87 0 52 975 32 0 0 0 3 0 1 0 29 1,885
0 1 14 2 0 1 22 0 0 0 0 1 0 1 0 0 42
- 2% 2% 2% - 2% 2% 0% - - - 33% - 100% - 0% 2%
EB WB NB SB EB WB NB SB E W N S
7:00 AM 8 6 0 0 0 0 1 2 0 3 1 1
7:15 AM 5 14 0 0 0 0 3 1 0 0 0 1
7:30 AM 3 8 0 0 0 0 7 1 2 4 0 0
7:45 AM 3 7 0 0 0 0 3 4 0 2 1 3
8:00 AM 4 7 0 0 0 0 2 12 2 1 4 2
8:15 AM 6 6 1 0 0 0 7 29 10 20 2 4
8:30 AM 3 5 0 1 0 1 4 6 5 6 2 1
8:45 AM 4 5 0 0 2 0 9 10 4 3 1 4
Count Total 36 58 1 1 2 1 36 65 23 39 11 16
Peak Hour 17 23 1 1 2 1 22 57 21 30 9 11
96 104 89
42 82 71
9 11 14
9 21 12
11 14 9
13 36 36
11 8 6
10 7 6
14 3 5
19 4 1
Eastbound Westbound Northbound Southbound
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Total
Interval
Start
Embarcadero Rd Embarcadero Rd Bryant St Bryant St
15-min
Total
Rolling
Hour
Total
Total Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 219
www.idaxdata.com
Count Summaries - Heavy Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 8 0 0 0 6 0 0 0 0 0 0 0 0 0 14 0
7:15 AM 0 0 5 0 0 0 14 0 0 0 0 0 0 0 0 0 19 0
7:30 AM 0 0 3 0 0 0 8 0 0 0 0 0 0 0 0 0 11 0
7:45 AM 0 0 3 0 0 0 6 1 0 0 0 0 0 0 0 0 10 54
8:00 AM 0 0 3 1 0 0 7 0 0 0 0 0 0 0 0 0 11 51
8:15 AM 0 0 5 1 0 0 6 0 0 0 0 1 0 0 0 0 13 45
8:30 AM 0 1 2 0 0 1 4 0 0 0 0 0 0 1 0 0 9 43
8:45 AM 0 0 4 0 0 0 5 0 0 0 0 0 0 0 0 0 9 42
Count Total 0 1 33 2 0 1 56 1 0 0 0 1 0 1 0 0 96
Pk Hr Heavy 0 1 14 2 0 1 22 0 0 0 0 1 0 1 0 0 42
Count Summaries - Bikes
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
7:00 AM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 2 0 3 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 3 0 0 0 1 0 4 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 7 0 0 0 1 0 8 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 3 0 0 0 4 0 7 22
8:00 AM 0 0 0 0 0 0 0 0 0 0 2 0 0 0 12 0 14 33
8:15 AM 0 0 0 0 0 0 0 0 0 0 7 0 0 0 29 0 36 65
8:30 AM 0 0 0 0 0 0 1 0 0 0 4 0 0 0 6 0 11 68
8:45 AM 0 0 0 2 0 0 0 0 0 0 9 0 0 0 10 0 21 82
Count Total 0 0 0 2 0 0 1 0 0 0 36 0 0 0 65 0 104
Pk Hr Bike 0 0 0 2 0 0 1 0 0 0 22 0 0 0 57 0 82
15-min
Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
Embarcadero Rd Embarcadero Rd Bryant St Bryant St
Interval
Start
Embarcadero Rd Embarcadero Rd Bryant St Bryant St
15-min
Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 220
www.idaxdata.com
Date:
Peak Hour Count Period:
Peak Hour:
HV% PHF
EB 1% 0.94
WB 1% 0.89
NB 0% 0.56
SB 0% 0.65
TOTAL 1% 0.96
Peak Hour Count Summaries
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
4:30 PM 0 25 266 8 0 1 147 4 0 2 0 2 0 0 0 8 463 0
4:45 PM 0 28 274 15 0 4 163 10 0 0 0 1 0 1 1 5 502 0
5:00 PM 0 33 232 10 0 7 160 7 0 0 0 1 0 0 0 15 465 0
5:15 PM 0 40 246 12 0 3 180 13 0 0 0 3 0 0 0 9 506 1,936
0 126 1,018 45 0 15 650 34 0 2 0 7 0 1 1 37 1,936
0 1 12 0 0 0 7 0 0 0 0 0 0 0 0 0 20
- 1% 1% 0% - 0% 1% 0% - 0% - 0% - 0% 0% 0% 1%
EB WB NB SB EB WB NB SB E W N S
4:30 PM 3 2 0 0 0 0 5 4 4 7 2 1
4:45 PM 2 2 0 0 0 0 3 7 2 4 1 0
5:00 PM 3 1 0 0 0 0 5 8 4 2 1 1
5:15 PM 5 2 0 0 0 0 9 9 0 7 2 1
Peak Hour 13 7 0 0 0 0 22 28 10 20 6 320 50 39
4 13 8
7 18 10
5 9 14
4 10 7
Note: For complete count summary (all intervals), see following pages.
** Heavy Vehicle Classifications include FHWA Classes 4-13.
** Count Summaries include heavy vehicles, but exclude bicycles in overall count.
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Total Total Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
5/12/2026
3:00 PM to 6:00 PM
4:30 PM to 5:30 PM
Peak Hour
Interval
Start
Embarcadero Rd Embarcadero Rd Bryant St Bryant St
15-min
Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 221
www.idaxdata.com
Count Summaries - All Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
3:00 PM 0 12 207 13 0 2 138 7 0 0 0 2 0 0 0 8 389 0
3:15 PM 0 21 221 31 0 14 157 8 0 0 0 2 0 0 1 3 458 0
3:30 PM 0 16 208 11 0 7 168 4 0 0 0 2 0 0 1 6 423 0
3:45 PM 0 18 265 7 0 2 198 8 0 0 0 2 0 0 0 9 509 1,779
4:00 PM 0 15 256 7 0 2 153 3 0 0 0 4 0 0 0 3 443 1,833
4:15 PM 0 23 274 6 0 3 163 7 0 0 0 0 0 0 0 9 485 1,860
4:30 PM 0 25 266 8 0 1 147 4 0 2 0 2 0 0 0 8 463 1,900
4:45 PM 0 28 274 15 0 4 163 10 0 0 0 1 0 1 1 5 502 1,893
5:00 PM 0 33 232 10 0 7 160 7 0 0 0 1 0 0 0 15 465 1,915
5:15 PM 0 40 246 12 0 3 180 13 0 0 0 3 0 0 0 9 506 1,936
5:30 PM 0 23 230 8 0 2 154 12 0 0 0 2 0 0 0 8 439 1,912
5:45 PM 0 23 225 11 0 2 213 20 0 0 0 1 0 0 0 8 503 1,913
Count Total 0 277 2,904 139 0 49 1,994 103 0 2 0 22 0 1 3 91 5,585
0 126 1,018 45 0 15 650 34 0 2 0 7 0 1 1 37 1,936
0 1 12 0 0 0 7 0 0 0 0 0 0 0 0 0 20
- 1% 1% 0% - 0% 1% 0% - 0% - 0% - 0% 0% 0% 1%
EB WB NB SB EB WB NB SB E W N S
3:00 PM 5 4 0 0 0 0 1 5 1 6 3 2
3:15 PM 4 5 0 0 0 0 8 4 5 6 3 2
3:30 PM 1 5 0 0 0 0 13 6 6 4 0 0
3:45 PM 3 6 0 0 0 0 4 3 2 6 1 0
4:00 PM 6 3 0 0 0 0 7 4 1 2 2 0
4:15 PM 4 0 0 0 0 0 3 2 2 1 2 6
4:30 PM 3 2 0 0 0 0 5 4 4 7 2 1
4:45 PM 2 2 0 0 0 0 3 7 2 4 1 0
5:00 PM 3 1 0 0 0 0 5 8 4 2 1 1
5:15 PM 5 2 0 0 0 0 9 9 0 7 2 1
5:30 PM 2 1 0 0 2 0 8 6 2 5 0 0
5:45 PM 4 0 0 0 3 0 5 4 1 5 0 0
Count Total 42 31 0 0 5 0 71 62 30 55 17 13
Peak Hour 13 7 0 0 0 0 22 28 10 20 6 3
73 138 115
20 50 39
3 16 7
4 12 6
4 13 8
7 18 10
5 9 14
4 10 7
9 11 5
4 5 11
6 19 10
9 7 9
9 6 12
9 12 16
Eastbound Westbound Northbound Southbound
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Total
Interval
Start
Embarcadero Rd Embarcadero Rd Bryant St Bryant St
15-min
Total
Rolling
Hour
Total
Total Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 222
www.idaxdata.com
Count Summaries - Heavy Vehicles
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
3:00 PM 0 0 4 1 0 0 4 0 0 0 0 0 0 0 0 0 9 0
3:15 PM 0 0 4 0 0 1 4 0 0 0 0 0 0 0 0 0 9 0
3:30 PM 0 0 1 0 0 0 5 0 0 0 0 0 0 0 0 0 6 0
3:45 PM 0 0 3 0 0 0 6 0 0 0 0 0 0 0 0 0 9 33
4:00 PM 0 1 5 0 0 0 3 0 0 0 0 0 0 0 0 0 9 33
4:15 PM 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 28
4:30 PM 0 0 3 0 0 0 2 0 0 0 0 0 0 0 0 0 5 27
4:45 PM 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 0 4 22
5:00 PM 0 0 3 0 0 0 1 0 0 0 0 0 0 0 0 0 4 17
5:15 PM 0 1 4 0 0 0 2 0 0 0 0 0 0 0 0 0 7 20
5:30 PM 0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0 3 18
5:45 PM 0 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 18
Count Total 0 2 38 2 0 1 30 0 0 0 0 0 0 0 0 0 73
Pk Hr Heavy 0 1 12 0 0 0 7 0 0 0 0 0 0 0 0 0 20
Count Summaries - Bikes
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
3:00 PM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 5 0 6 0
3:15 PM 0 0 0 0 0 0 0 0 0 0 8 0 0 0 4 0 12 0
3:30 PM 0 0 0 0 0 0 0 0 0 0 13 0 0 0 6 0 19 0
3:45 PM 0 0 0 0 0 0 0 0 0 0 4 0 0 0 3 0 7 44
4:00 PM 0 0 0 0 0 0 0 0 0 0 7 0 0 0 4 0 11 49
4:15 PM 0 0 0 0 0 0 0 0 0 0 3 0 0 0 2 0 5 42
4:30 PM 0 0 0 0 0 0 0 0 0 0 5 0 0 0 4 0 9 32
4:45 PM 0 0 0 0 0 0 0 0 0 0 3 0 0 0 7 0 10 35
5:00 PM 0 0 0 0 0 0 0 0 0 0 5 0 0 0 8 0 13 37
5:15 PM 0 0 0 0 0 0 0 0 0 0 9 0 0 0 9 0 18 50
5:30 PM 0 0 0 2 0 0 0 0 0 0 8 0 0 0 6 0 16 57
5:45 PM 0 0 2 1 0 0 0 0 0 0 5 0 0 0 4 0 12 59
Count Total 0 0 2 3 0 0 0 0 0 0 71 0 0 0 62 0 138
Pk Hr Bike 0 0 0 0 0 0 0 0 0 0 22 0 0 0 28 0 50
15-min
Total
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Rolling
Hour
TotalEastbound Westbound Northbound Southbound
Interval
Start
Embarcadero Rd Embarcadero Rd Bryant St Bryant St
Interval
Start
Embarcadero Rd Embarcadero Rd Bryant St Bryant St
15-min
Total
NorCal Project Manager
(415) 444-6376 norcal.projectmanager@idaxdata.com
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 223
Location:
Count Direction:
Date Range:
Site Code:
1 2 3 4 5 6 7 8 9 10 11 12 13
1,039 9,052 817 17 55 26 0 0 0 0 0 0 4
9.4% 82.2% 7.4% 0.2% 0.5% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
922 2,395 254 8 26 6 0 0 1 0 0 0 2
25.5% 66.3% 7.0% 0.2% 0.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1%
1,961 11,447 1,071 25 81 32 0 0 1 0 0 0 6
13.4% 78.3% 7.3% 0.2% 0.6% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
FHWA Vehicle Classification
Class 1 - Motorcycles Class 8 - Four or Fewer Axle Single-Trailer Trucks
Class 2 - Passenger Cars Class 9 - Five-Axle Single-Trailer Trucks
Class 3 - Other Two-Axle, Four-Tire Single Unit Vehicles Class 10 - Six or More Axle Single-Trailer Trucks
Class 4 - Buses Class 11 - Five or fewer Axle Multi-Trailer Trucks
Class 5 - Two-Axle, Six-Tire, Single-Unit Trucks Class 12 - Six-Axle Multi-Trailer Trucks
Class 6 - Three-Axle Single-Unit Trucks Class 13 - Seven or More Axle Multi-Trailer Trucks
Class 7 - Four or More Axle Single-Unit Trucks
Location: Bryant St Between Lincoln Ave and Kingsley Ave
Date Range: 5/8/2026 to 5/14/2026
Site Code: 01
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 4 1 0 0 0 0 0 0 0 0 0 0 5
1:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 3 1 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 0 15 1 0 0 0 0 0 0 0 0 0 0 16
6:00 AM 0 19 4 0 0 0 0 0 0 0 0 0 0 23
7:00 AM 3 32 5 0 1 0 0 0 0 0 0 0 0 41
8:00 AM 9 76 8 0 0 0 0 0 0 0 0 0 0 93
9:00 AM 10 75 9 0 0 0 0 0 0 0 0 0 0 94
10:00 AM 10 60 3 0 1 0 0 0 0 0 0 0 0 74
11:00 AM 9 60 5 0 3 0 0 0 0 0 0 0 0 77
12:00 PM 9 84 14 0 2 1 0 0 0 0 0 0 0 110
1:00 PM 15 80 8 0 1 0 0 0 0 0 0 0 0 104
2:00 PM 14 86 12 0 1 0 0 0 0 0 0 0 0 113
3:00 PM 15 98 19 0 2 1 0 0 0 0 0 0 0 135
4:00 PM 15 118 7 0 0 1 0 0 0 0 0 0 0 141
5:00 PM 17 119 8 1 0 1 0 0 0 0 0 0 1 147
6:00 PM 12 128 10 0 0 0 0 0 0 0 0 0 0 150
7:00 PM 8 156 10 0 0 0 0 0 0 0 0 0 0 174
8:00 PM 1 99 7 0 0 1 0 0 0 0 0 0 0 108
Vehicle Classification Report Summary
Bryant St Between Lincoln Ave and Kingsley Ave
Northbound / Southbound
5/8/2026 to 5/14/2026
01
Total
Volume
Northbound 11,010
Southbound 3,614
Total 14,624
Direction FHWA Vehicle Classification
Friday, May 8, 2026
Time FHWA Vehicle Classification
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 224
9:00 PM 0 57 3 0 0 0 0 0 0 0 0 0 0 60
10:00 PM 1 26 5 0 0 0 0 0 0 0 0 0 0 32
11:00 PM 1 15 0 0 0 0 0 0 0 0 0 0 0 16
149 1,415 140 1 11 5 0 0 0 0 0 0 1
8.7% 82.2% 8.1% 0.1% 0.6% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 1 2 0 0 0 0 0 0 0 0 0 0 0 3
7:00 AM 2 12 1 0 1 0 0 0 0 0 0 0 0 16
8:00 AM 13 35 4 0 1 0 0 0 0 0 0 0 0 53
9:00 AM 7 17 2 0 0 0 0 0 0 0 0 0 0 26
10:00 AM 12 14 2 0 0 0 0 0 0 0 0 0 0 28
11:00 AM 5 32 5 0 0 0 0 0 0 0 0 0 0 42
12:00 PM 5 13 6 0 2 0 0 0 0 0 0 0 0 26
1:00 PM 5 23 4 0 0 0 0 0 0 0 0 0 0 32
2:00 PM 16 32 1 0 0 0 0 0 0 0 0 0 0 49
3:00 PM 12 26 5 0 0 0 0 0 0 0 0 0 1 44
4:00 PM 8 26 3 0 0 0 0 0 0 0 0 0 0 37
5:00 PM 14 37 7 0 1 1 0 0 0 0 0 0 0 60
6:00 PM 6 27 4 0 0 0 0 0 0 0 0 0 0 37
7:00 PM 5 30 1 0 0 0 0 0 0 0 0 0 0 36
8:00 PM 2 15 1 0 0 0 0 0 0 0 0 0 0 18
9:00 PM 1 18 1 0 0 0 0 0 0 0 0 0 0 20
10:00 PM 0 9 1 0 0 0 0 0 0 0 0 0 0 10
11:00 PM 0 8 0 0 0 0 0 0 0 0 0 0 0 8
114 380 48 0 5 1 0 0 0 0 0 0 1
20.8% 69.2% 8.7% 0.0% 0.9% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.2%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 2 7 0 0 0 0 0 0 0 0 0 0 0 9
1:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 5
2:00 AM 0 5 1 0 0 0 0 0 0 0 0 0 0 6
3:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 5 1 0 0 0 0 0 0 0 0 0 0 6
5:00 AM 0 6 0 0 0 0 0 0 0 0 0 0 0 6
6:00 AM 1 16 2 0 0 0 0 0 0 0 0 0 0 19
7:00 AM 0 10 1 0 1 0 0 0 0 0 0 0 0 12
8:00 AM 5 36 3 0 0 0 0 0 0 0 0 0 0 44
9:00 AM 8 37 4 0 1 0 0 0 0 0 0 0 0 50
10:00 AM 12 62 4 0 0 0 0 0 0 0 0 0 0 78
11:00 AM 15 89 4 0 0 0 0 0 0 0 0 0 0 108
12:00 PM 15 126 11 0 0 0 0 0 0 0 0 0 0 152
1:00 PM 14 99 14 0 1 0 0 0 0 0 0 0 0 128
2:00 PM 17 107 10 0 0 1 0 0 0 0 0 0 0 135
3:00 PM 10 115 6 0 1 0 0 0 0 0 0 0 0 132
4:00 PM 8 121 10 0 0 1 0 0 0 0 0 0 0 140
5:00 PM 9 120 8 0 0 0 0 0 0 0 0 0 0 137
6:00 PM 2 108 5 0 0 0 0 0 0 0 0 0 0 115
7:00 PM 7 82 7 0 0 0 0 0 0 0 0 0 0 96
8:00 PM 1 65 5 0 0 0 0 0 0 0 0 0 0 71
9:00 PM 3 38 1 0 0 0 0 0 0 0 0 0 0 42
1,722
Friday, May 8, 2026
Total
Time FHWA Vehicle Classification
549
Saturday, May 9, 2026
Time FHWA Vehicle Classification
Total
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 225
10:00 PM 1 12 1 0 0 0 0 0 0 0 0 0 0 14
11:00 PM 0 10 2 0 0 0 0 0 0 0 0 0 0 12
130 1,284 100 0 4 2 0 0 0 0 0 0 0
8.6% 84.5% 6.6% 0.0% 0.3% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 1 0 0 0 1 0 0 0 0 0 0 0 0 2
4:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
7:00 AM 1 10 0 0 0 0 0 0 0 0 0 0 0 11
8:00 AM 9 20 0 0 0 0 0 0 0 0 0 0 0 29
9:00 AM 7 29 2 0 0 0 0 0 0 0 0 0 0 38
10:00 AM 11 17 2 0 0 0 0 0 0 0 0 0 0 30
11:00 AM 8 26 1 0 0 0 0 0 0 0 0 0 0 35
12:00 PM 8 23 1 0 1 0 0 0 0 0 0 0 0 33
1:00 PM 13 23 4 0 0 0 0 0 0 0 0 0 0 40
2:00 PM 20 32 0 0 0 0 0 0 0 0 0 0 0 52
3:00 PM 11 29 2 0 0 0 0 0 0 0 0 0 1 43
4:00 PM 11 21 2 0 0 0 0 0 0 0 0 0 0 34
5:00 PM 7 23 1 0 0 0 0 0 0 0 0 0 0 31
6:00 PM 4 32 4 0 0 0 0 0 0 0 0 0 0 40
7:00 PM 3 17 0 0 0 0 0 0 0 0 0 0 0 20
8:00 PM 1 15 0 0 0 1 0 0 0 0 0 0 0 17
9:00 PM 4 12 0 0 0 0 0 0 0 0 0 0 0 16
10:00 PM 1 4 0 0 0 0 0 0 0 0 0 0 0 5
11:00 PM 3 4 0 0 0 0 0 0 0 0 0 0 0 7
123 346 19 0 2 1 0 0 0 0 0 0 1
25.0% 70.3% 3.9% 0.0% 0.4% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.2%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 7 0 0 0 0 0 0 0 0 0 0 0 7
1:00 AM 1 5 1 0 0 0 0 0 0 0 0 0 0 7
2:00 AM 0 4 2 0 0 0 0 0 0 0 0 0 0 6
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 1 9 1 0 0 0 0 0 0 0 0 0 0 11
6:00 AM 1 14 1 0 0 0 0 0 0 0 0 0 0 16
7:00 AM 1 6 0 0 0 0 0 0 0 0 0 0 0 7
8:00 AM 3 21 2 0 0 0 0 0 0 0 0 0 0 26
9:00 AM 3 38 2 0 0 0 0 0 0 0 0 0 0 43
10:00 AM 8 53 7 0 0 0 0 0 0 0 0 0 0 68
11:00 AM 15 81 8 0 0 0 0 0 0 0 0 0 0 104
12:00 PM 9 96 3 0 1 0 0 0 0 0 0 0 0 109
1:00 PM 13 110 6 0 0 0 0 0 0 0 0 0 1 130
2:00 PM 12 121 8 1 0 0 0 0 0 0 0 0 0 142
3:00 PM 17 94 4 0 0 0 0 0 0 0 0 0 0 115
4:00 PM 7 103 7 0 1 0 0 0 0 0 0 0 0 118
5:00 PM 4 100 12 0 0 0 0 0 0 0 0 0 0 116
6:00 PM 8 109 7 1 0 0 0 0 0 0 0 0 0 125
7:00 PM 4 91 3 0 0 0 0 0 0 0 0 0 0 98
8:00 PM 3 35 2 0 0 0 0 0 0 0 0 0 0 40
9:00 PM 2 17 1 0 0 0 0 0 0 0 0 0 0 20
10:00 PM 0 9 2 0 0 0 0 0 0 0 0 0 0 11
Total 492
Sunday, May 10, 2026
Time FHWA Vehicle Classification
Total 1,520
Saturday, May 9, 2026
Time FHWA Vehicle Classification
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 226
11:00 PM 0 6 0 0 0 0 0 0 0 0 0 0 0 6
112 1,133 79 2 2 0 0 0 0 0 0 0 1
8.4% 85.3% 5.9% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 5 1 0 0 0 0 0 0 0 0 0 0 6
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 1 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 5
6:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
7:00 AM 1 3 1 0 0 0 0 0 0 0 0 0 0 5
8:00 AM 2 9 1 0 0 0 0 0 0 0 0 0 0 12
9:00 AM 7 12 0 0 0 0 0 0 0 0 0 0 0 19
10:00 AM 9 17 1 0 1 0 0 0 0 0 0 0 0 28
11:00 AM 8 31 3 0 0 0 0 0 0 0 0 0 0 42
12:00 PM 5 27 3 0 0 0 0 0 0 0 0 0 0 35
1:00 PM 9 24 0 0 0 0 0 0 0 0 0 0 0 33
2:00 PM 13 30 1 1 0 0 0 0 0 0 0 0 0 45
3:00 PM 17 19 5 0 0 1 0 0 0 0 0 0 0 42
4:00 PM 7 13 0 0 0 0 0 0 0 0 0 0 0 20
5:00 PM 5 23 0 0 0 0 0 0 0 0 0 0 0 28
6:00 PM 4 21 3 0 0 0 0 0 0 0 0 0 0 28
7:00 PM 7 19 3 0 0 0 0 0 0 0 0 0 0 29
8:00 PM 2 11 1 0 0 0 0 0 0 0 0 0 0 14
9:00 PM 0 5 0 0 0 0 0 0 0 0 0 0 0 5
10:00 PM 1 2 0 0 0 0 0 0 0 0 0 0 0 3
11:00 PM 1 0 0 0 0 0 0 0 0 0 0 0 0 1
99 279 23 1 1 1 0 0 0 0 0 0 0
24.5% 69.1% 5.7% 0.2% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 1 3 0 0 0 0 0 0 0 0 0 0 0 4
1:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 4 0 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 0 18 1 0 0 0 0 0 0 0 0 0 0 19
6:00 AM 0 21 4 0 0 1 0 0 0 0 0 0 0 26
7:00 AM 3 49 4 0 1 1 0 0 0 0 0 0 0 58
8:00 AM 9 59 7 0 0 0 0 0 0 0 0 0 0 75
9:00 AM 20 76 5 0 1 0 0 0 0 0 0 0 1 103
10:00 AM 11 53 9 1 0 2 0 0 0 0 0 0 0 76
11:00 AM 14 61 11 0 0 0 0 0 0 0 0 0 0 86
12:00 PM 6 74 13 0 1 0 0 0 0 0 0 0 0 94
1:00 PM 7 71 5 0 0 0 0 0 0 0 0 0 0 83
2:00 PM 15 75 11 0 0 1 0 0 0 0 0 0 0 102
3:00 PM 21 82 7 0 1 1 0 0 0 0 0 0 0 112
4:00 PM 11 92 9 0 0 0 0 0 0 0 0 0 0 112
5:00 PM 24 106 5 0 0 2 0 0 0 0 0 0 0 137
6:00 PM 9 100 2 0 0 0 0 0 0 0 0 0 0 111
7:00 PM 8 91 7 0 0 0 0 0 0 0 0 0 0 106
8:00 PM 4 66 3 0 0 0 0 0 0 0 0 0 0 73
9:00 PM 1 24 2 0 0 1 0 0 0 0 0 0 0 28
10:00 PM 0 18 3 0 0 0 0 0 0 0 0 0 0 21
11:00 PM 0 6 0 0 0 0 0 0 0 0 0 0 0 6
Total 1,329
Time FHWA Vehicle Classification
Total
Sunday, May 10, 2026
Time FHWA Vehicle Classification
404
Monday, May 11, 2026
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 227
164 1,154 108 1 4 9 0 0 0 0 0 0 1
11.4% 80.1% 7.5% 0.1% 0.3% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 1 3 0 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 6 14 0 0 0 1 0 0 0 0 0 0 0 21
8:00 AM 17 26 2 1 0 0 0 0 0 0 0 0 0 46
9:00 AM 7 20 4 0 0 0 0 0 0 0 0 0 0 31
10:00 AM 7 25 2 0 0 0 0 0 0 0 0 0 0 34
11:00 AM 4 24 5 0 0 0 0 0 0 0 0 0 0 33
12:00 PM 3 24 2 1 0 0 0 0 0 0 0 0 0 30
1:00 PM 9 14 6 0 0 0 0 0 0 0 0 0 0 29
2:00 PM 6 17 4 0 0 0 0 0 0 0 0 0 0 27
3:00 PM 18 26 2 0 0 0 0 0 0 0 0 0 0 46
4:00 PM 14 33 2 0 0 0 0 0 0 0 0 0 0 49
5:00 PM 12 23 0 0 0 0 0 0 0 0 0 0 0 35
6:00 PM 15 23 6 0 1 0 0 0 0 0 0 0 0 45
7:00 PM 3 15 0 0 0 0 0 0 0 0 0 0 0 18
8:00 PM 4 6 0 0 0 0 0 0 0 0 0 0 0 10
9:00 PM 2 7 0 0 0 0 0 0 0 0 0 0 0 9
10:00 PM 1 5 0 0 0 0 0 0 0 0 0 0 0 6
11:00 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
129 312 35 2 1 1 0 0 0 0 0 0 0
26.9% 65.0% 7.3% 0.4% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 1 2 0 0 0 0 0 0 0 0 0 0 0 3
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 13 0 0 0 0 0 0 0 0 0 0 0 13
5:00 AM 0 10 0 0 0 0 0 0 0 0 0 0 0 10
6:00 AM 0 28 5 0 0 0 0 0 0 0 0 0 0 33
7:00 AM 6 46 5 0 0 0 0 0 0 0 0 0 0 57
8:00 AM 10 72 10 0 2 0 0 0 0 0 0 0 0 94
9:00 AM 9 81 8 0 0 0 0 0 0 0 0 0 0 98
10:00 AM 14 80 8 0 2 1 0 0 0 0 0 0 0 105
11:00 AM 7 58 4 3 2 1 0 0 0 0 0 0 0 75
12:00 PM 12 65 6 0 1 1 0 0 0 0 0 0 0 85
1:00 PM 7 62 7 0 0 0 0 0 0 0 0 0 0 76
2:00 PM 6 88 13 0 1 0 0 0 0 0 0 0 0 108
3:00 PM 17 86 5 0 0 0 0 0 0 0 0 0 0 108
4:00 PM 11 84 13 0 0 1 0 0 0 0 0 0 0 109
5:00 PM 19 140 13 1 1 0 0 0 0 0 0 0 0 174
6:00 PM 14 129 10 0 0 0 0 0 0 0 0 0 0 153
7:00 PM 7 102 7 0 0 1 0 0 0 0 0 0 0 117
8:00 PM 3 82 7 0 0 0 0 0 0 0 0 0 0 92
9:00 PM 1 46 5 0 0 0 0 0 0 0 0 0 0 52
10:00 PM 1 14 1 0 0 0 0 0 0 0 0 0 0 16
11:00 PM 1 5 0 0 0 0 0 0 0 0 0 0 0 6
146 1,298 128 4 9 5 0 0 0 0 0 0 0 1,590
Total 480
Total 1,441
Monday, May 11, 2026
Time FHWA Vehicle Classification
Tuesday, May 12, 2026
Time FHWA Vehicle Classification
Total
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 228
9.2% 81.6% 8.1% 0.3% 0.6% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 1 1 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 3 9 0 0 0 0 0 0 0 0 0 0 0 12
7:00 AM 4 21 2 0 0 0 0 0 0 0 0 0 0 27
8:00 AM 14 30 4 0 0 0 0 0 0 0 0 0 0 48
9:00 AM 4 18 3 1 0 0 0 0 0 0 0 0 0 26
10:00 AM 7 13 6 0 0 0 0 0 0 0 0 0 0 26
11:00 AM 4 20 5 0 3 0 0 0 0 0 0 0 0 32
12:00 PM 3 26 7 0 0 0 0 0 0 0 0 0 0 36
1:00 PM 3 28 1 0 0 0 0 0 0 0 0 0 0 32
2:00 PM 11 31 2 0 3 0 0 0 0 0 0 0 0 47
3:00 PM 15 22 1 0 0 0 0 0 0 0 0 0 0 38
4:00 PM 10 48 5 0 0 0 0 0 0 0 0 0 0 63
5:00 PM 17 63 4 0 0 0 0 0 0 0 0 0 0 84
6:00 PM 13 27 2 0 0 0 0 0 0 0 0 0 0 42
7:00 PM 10 19 3 0 0 0 0 0 0 0 0 0 0 32
8:00 PM 3 21 2 0 0 0 0 0 0 0 0 0 0 26
9:00 PM 2 7 0 1 0 0 0 0 0 0 0 0 0 10
10:00 PM 3 5 1 0 0 0 0 0 0 0 0 0 0 9
11:00 PM 0 3 1 0 0 0 0 0 0 0 0 0 0 4
127 414 51 2 6 0 0 0 0 0 0 0 0
21.2% 69.0% 8.5% 0.3% 1.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 1 3 1 0 0 0 0 0 0 0 0 0 0 5
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 12 0 0 0 0 0 0 0 0 0 0 0 12
5:00 AM 0 15 0 0 0 0 0 0 0 0 0 0 0 15
6:00 AM 0 26 3 0 0 0 0 0 0 0 0 0 0 29
7:00 AM 3 52 2 0 0 0 0 0 0 0 0 0 0 57
8:00 AM 7 65 10 0 0 0 0 0 0 0 0 0 0 82
9:00 AM 11 75 8 0 2 0 0 0 0 0 0 0 0 96
10:00 AM 20 66 4 0 2 0 0 0 0 0 0 0 0 92
11:00 AM 13 61 5 0 1 0 0 0 0 0 0 0 0 80
12:00 PM 6 95 9 1 1 0 0 0 0 0 0 0 0 112
1:00 PM 5 76 14 0 1 1 0 0 0 0 0 0 0 97
2:00 PM 23 87 9 0 1 2 0 0 0 0 0 0 0 122
3:00 PM 11 81 5 0 1 0 0 0 0 0 0 0 0 98
4:00 PM 13 139 11 0 1 0 0 0 0 0 0 0 0 164
5:00 PM 16 160 26 2 0 0 0 0 0 0 0 0 1 205
6:00 PM 16 152 11 0 0 0 0 0 0 0 0 0 0 179
7:00 PM 4 100 10 0 0 0 0 0 0 0 0 0 0 114
8:00 PM 5 68 1 0 1 0 0 0 0 0 0 0 0 75
9:00 PM 0 36 4 0 1 0 0 0 0 0 0 0 0 41
10:00 PM 0 18 0 0 0 0 0 0 0 0 0 0 0 18
11:00 PM 0 6 2 0 0 0 0 0 0 0 0 0 0 8
154 1,398 135 3 12 3 0 0 0 0 0 0 1
9.0% 81.9% 7.9% 0.2% 0.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1%
1,590
FHWA Vehicle Classification
Total
Time FHWA Vehicle Classification
Total
Tuesday, May 12, 2026
600
Wednesday, May 13, 2026
Total 1,706
Time
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 229
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 1 3 0 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 5 15 2 0 0 0 0 0 0 0 0 0 0 22
8:00 AM 14 28 1 0 1 0 0 0 0 0 0 0 0 44
9:00 AM 14 18 1 0 0 0 0 0 0 0 0 0 0 33
10:00 AM 13 21 5 0 1 0 0 0 0 0 0 0 0 40
11:00 AM 6 24 3 0 0 0 0 0 0 0 0 0 0 33
12:00 PM 2 27 3 0 0 0 0 0 0 0 0 0 0 32
1:00 PM 7 25 1 1 0 0 0 0 0 0 0 0 0 34
2:00 PM 8 23 2 0 2 0 0 0 0 0 0 0 0 35
3:00 PM 15 23 3 0 1 0 0 0 1 0 0 0 0 43
4:00 PM 16 28 5 0 1 0 0 0 0 0 0 0 0 50
5:00 PM 10 27 3 1 0 0 0 0 0 0 0 0 0 41
6:00 PM 17 26 2 1 0 1 0 0 0 0 0 0 0 47
7:00 PM 2 16 3 0 0 0 0 0 0 0 0 0 0 21
8:00 PM 5 15 2 0 0 0 0 0 0 0 0 0 0 22
9:00 PM 4 12 0 0 1 0 0 0 0 0 0 0 0 17
10:00 PM 2 5 0 0 0 0 0 0 0 0 0 0 0 7
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
141 340 36 3 7 1 0 0 1 0 0 0 0
26.7% 64.3% 6.8% 0.6% 1.3% 0.2% 0.0% 0.0% 0.2% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
1:00 AM 0 6 0 0 0 0 0 0 0 0 0 0 0 6
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 12 1 0 0 0 0 0 0 0 0 0 0 13
5:00 AM 0 15 3 0 0 0 0 0 0 0 0 0 0 18
6:00 AM 1 20 3 1 0 0 0 0 0 0 0 0 0 25
7:00 AM 6 37 5 0 0 0 0 0 0 0 0 0 0 48
8:00 AM 16 85 7 0 0 0 0 0 0 0 0 0 0 108
9:00 AM 12 68 3 0 2 0 0 0 0 0 0 0 0 85
10:00 AM 22 69 10 0 2 0 0 0 0 0 0 0 0 103
11:00 AM 11 73 8 0 3 0 0 0 0 0 0 0 0 95
12:00 PM 10 70 7 1 0 0 0 0 0 0 0 0 0 88
1:00 PM 5 80 9 1 3 0 0 0 0 0 0 0 0 98
2:00 PM 9 73 10 0 1 0 0 0 0 0 0 0 0 93
3:00 PM 19 90 14 0 0 0 0 0 0 0 0 0 0 123
4:00 PM 19 124 6 1 0 0 0 0 0 0 0 0 0 150
5:00 PM 19 162 20 1 0 2 0 0 0 0 0 0 0 204
6:00 PM 15 137 3 0 1 0 0 0 0 0 0 0 0 156
7:00 PM 10 118 9 0 1 0 0 0 0 0 0 0 0 138
8:00 PM 5 62 3 0 0 0 0 0 0 0 0 0 0 70
9:00 PM 5 43 5 1 0 0 0 0 0 0 0 0 0 54
10:00 PM 0 14 0 0 0 0 0 0 0 0 0 0 0 14
11:00 PM 0 6 1 0 0 0 0 0 0 0 0 0 0 7
184 1,370 127 6 13 2 0 0 0 0 0 0 0
10.8% 80.5% 7.5% 0.4% 0.8% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Wednesday, May 13, 2026
Time FHWA Vehicle Classification
Total 529
Thursday, May 14, 2026
Time FHWA Vehicle Classification
Total 1,702
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 230
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 2 4 2 0 0 0 0 0 0 0 0 0 0 8
7:00 AM 8 16 1 0 0 0 0 0 0 0 0 0 0 25
8:00 AM 20 25 4 0 1 0 0 0 0 0 0 0 0 50
9:00 AM 20 19 2 0 0 0 0 0 0 0 0 0 0 41
10:00 AM 11 24 5 0 0 0 0 0 0 0 0 0 0 40
11:00 AM 5 25 4 0 0 0 0 0 0 0 0 0 0 34
12:00 PM 10 21 5 0 1 0 0 0 0 0 0 0 0 37
1:00 PM 8 21 2 0 1 0 0 0 0 0 0 0 0 32
2:00 PM 15 25 3 0 0 0 0 0 0 0 0 0 0 43
3:00 PM 12 30 4 0 0 0 0 0 0 0 0 0 0 46
4:00 PM 16 23 5 0 1 1 0 0 0 0 0 0 0 46
5:00 PM 20 18 1 0 0 0 0 0 0 0 0 0 0 39
6:00 PM 17 24 2 0 0 0 0 0 0 0 0 0 0 43
7:00 PM 12 17 0 0 0 0 0 0 0 0 0 0 0 29
8:00 PM 6 12 0 0 0 0 0 0 0 0 0 0 0 18
9:00 PM 3 14 2 0 0 0 0 0 0 0 0 0 0 19
10:00 PM 4 5 0 0 0 0 0 0 0 0 0 0 0 9
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
189 324 42 0 4 1 0 0 0 0 0 0 0
33.8% 57.9% 7.5% 0.0% 0.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Total Study Average
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 1 4 0 0 0 0 0 0 0 0 0 0 0 5
1:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
2:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 7 0 0 0 0 0 0 0 0 0 0 0 7
5:00 AM 0 13 1 0 0 0 0 0 0 0 0 0 0 14
6:00 AM 0 21 3 0 0 0 0 0 0 0 0 0 0 24
7:00 AM 3 33 3 0 0 0 0 0 0 0 0 0 0 39
8:00 AM 8 59 7 0 0 0 0 0 0 0 0 0 0 74
9:00 AM 10 64 6 0 1 0 0 0 0 0 0 0 0 81
10:00 AM 14 63 6 0 1 0 0 0 0 0 0 0 0 84
11:00 AM 12 69 6 0 1 0 0 0 0 0 0 0 0 88
12:00 PM 10 87 9 0 1 0 0 0 0 0 0 0 0 107
1:00 PM 9 83 9 0 1 0 0 0 0 0 0 0 0 102
2:00 PM 14 91 10 0 1 1 0 0 0 0 0 0 0 117
3:00 PM 16 92 9 0 1 0 0 0 0 0 0 0 0 118
4:00 PM 12 112 9 0 0 0 0 0 0 0 0 0 0 133
5:00 PM 15 130 13 1 0 1 0 0 0 0 0 0 0 160
6:00 PM 11 123 7 0 0 0 0 0 0 0 0 0 0 141
7:00 PM 7 106 8 0 0 0 0 0 0 0 0 0 0 121
8:00 PM 3 68 4 0 0 0 0 0 0 0 0 0 0 75
9:00 PM 2 37 3 0 0 0 0 0 0 0 0 0 0 42
10:00 PM 0 16 2 0 0 0 0 0 0 0 0 0 0 18
11:00 PM 0 8 1 0 0 0 0 0 0 0 0 0 0 9
147 1,293 117 1 7 2 0 0 0 0 0 0 0
9.4% 82.5% 7.5% 0.1% 0.4% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Note: Average only condsidered on days with 24-hours of data.
Thursday, May 14, 2026
Time FHWA Vehicle Classification
Total 560
Time FHWA Vehicle Classification
Total 1,567
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 231
Total Study Average
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 1 4 0 0 0 0 0 0 0 0 0 0 0 5
7:00 AM 4 13 1 0 0 0 0 0 0 0 0 0 0 18
8:00 AM 13 25 2 0 0 0 0 0 0 0 0 0 0 40
9:00 AM 9 19 2 0 0 0 0 0 0 0 0 0 0 30
10:00 AM 10 19 3 0 0 0 0 0 0 0 0 0 0 32
11:00 AM 6 26 4 0 0 0 0 0 0 0 0 0 0 36
12:00 PM 5 23 4 0 1 0 0 0 0 0 0 0 0 33
1:00 PM 8 23 3 0 0 0 0 0 0 0 0 0 0 34
2:00 PM 13 27 2 0 1 0 0 0 0 0 0 0 0 43
3:00 PM 14 25 3 0 0 0 0 0 0 0 0 0 0 42
4:00 PM 12 27 3 0 0 0 0 0 0 0 0 0 0 42
5:00 PM 12 31 2 0 0 0 0 0 0 0 0 0 0 45
6:00 PM 11 26 3 0 0 0 0 0 0 0 0 0 0 40
7:00 PM 6 19 1 0 0 0 0 0 0 0 0 0 0 26
8:00 PM 3 14 1 0 0 0 0 0 0 0 0 0 0 18
9:00 PM 2 11 0 0 0 0 0 0 0 0 0 0 0 13
10:00 PM 2 5 0 0 0 0 0 0 0 0 0 0 0 7
11:00 PM 1 2 0 0 0 0 0 0 0 0 0 0 0 3
132 344 34 0 2 0 0 0 0 0 0 0 0
25.8% 67.2% 6.6% 0.0% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Note: Average only condsidered on days with 24-hours of data.
3-Day (Tuesday - Thursday) Average
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 12 0 0 0 0 0 0 0 0 0 0 0 12
5:00 AM 0 13 1 0 0 0 0 0 0 0 0 0 0 14
6:00 AM 0 25 4 0 0 0 0 0 0 0 0 0 0 29
7:00 AM 5 45 4 0 0 0 0 0 0 0 0 0 0 54
8:00 AM 11 74 9 0 1 0 0 0 0 0 0 0 0 95
9:00 AM 11 75 6 0 1 0 0 0 0 0 0 0 0 93
10:00 AM 19 72 7 0 2 0 0 0 0 0 0 0 0 100
11:00 AM 10 64 6 1 2 0 0 0 0 0 0 0 0 83
12:00 PM 9 77 7 1 1 0 0 0 0 0 0 0 0 95
1:00 PM 6 73 10 0 1 0 0 0 0 0 0 0 0 90
2:00 PM 13 83 11 0 1 1 0 0 0 0 0 0 0 109
3:00 PM 16 86 8 0 0 0 0 0 0 0 0 0 0 110
4:00 PM 14 116 10 0 0 0 0 0 0 0 0 0 0 140
5:00 PM 18 154 20 1 0 1 0 0 0 0 0 0 0 194
6:00 PM 15 139 8 0 0 0 0 0 0 0 0 0 0 162
7:00 PM 7 107 9 0 0 0 0 0 0 0 0 0 0 123
8:00 PM 4 71 4 0 0 0 0 0 0 0 0 0 0 79
9:00 PM 2 42 5 0 0 0 0 0 0 0 0 0 0 49
10:00 PM 0 15 0 0 0 0 0 0 0 0 0 0 0 15
11:00 PM 0 6 1 0 0 0 0 0 0 0 0 0 0 7
160 1,357 130 3 9 2 0 0 0 0 0 0 0
9.7% 81.7% 7.8% 0.2% 0.5% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Time FHWA Vehicle Classification
Total 512
Time FHWA Vehicle Classification
Total 1,661
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 232
3-Day (Tuesday - Thursday) Average
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 2 5 1 0 0 0 0 0 0 0 0 0 0 8
7:00 AM 6 17 2 0 0 0 0 0 0 0 0 0 0 25
8:00 AM 16 28 3 0 1 0 0 0 0 0 0 0 0 48
9:00 AM 13 18 2 0 0 0 0 0 0 0 0 0 0 33
10:00 AM 10 19 5 0 0 0 0 0 0 0 0 0 0 34
11:00 AM 5 23 4 0 1 0 0 0 0 0 0 0 0 33
12:00 PM 5 25 5 0 0 0 0 0 0 0 0 0 0 35
1:00 PM 6 25 1 0 0 0 0 0 0 0 0 0 0 32
2:00 PM 11 26 2 0 2 0 0 0 0 0 0 0 0 41
3:00 PM 14 25 3 0 0 0 0 0 0 0 0 0 0 42
4:00 PM 14 33 5 0 1 0 0 0 0 0 0 0 0 53
5:00 PM 16 36 3 0 0 0 0 0 0 0 0 0 0 55
6:00 PM 16 26 2 0 0 0 0 0 0 0 0 0 0 44
7:00 PM 8 17 2 0 0 0 0 0 0 0 0 0 0 27
8:00 PM 5 16 1 0 0 0 0 0 0 0 0 0 0 22
9:00 PM 3 11 1 0 0 0 0 0 0 0 0 0 0 15
10:00 PM 3 5 0 0 0 0 0 0 0 0 0 0 0 8
11:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
153 359 42 0 5 0 0 0 0 0 0 0 0
27.4% 64.2% 7.5% 0.0% 0.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%Total 559
Time FHWA Vehicle Classification
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 233
Location: Bryant St Between Lincoln Ave and Kingsley Ave
Direction: Northbound / Southbound
Date Range: 5/8/2026 to 5/14/2026
Site Code: 01
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +
170 761 1,469 4,399 3,377 742 77 13 2 0 0 0 0 0 0 0 0
1.5%6.9%13.3%40.0%30.7%6.7%0.7%0.1%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
101 570 759 1,243 752 170 18 1 0 0 0 0 0 0 0 0 0
2.8%15.8%21.0%34.4%20.8%4.7%0.5%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
271 1,331 2,228 5,642 4,129 912 95 14 2 0 0 0 0 0 0 0 0
1.9%9.1%15.2%38.6%28.2%6.2%0.6%0.1%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
50th Percentile (Median) 23.8 mph Mean (Average) Speed 23.2 mph
28.1 mph 10 mph Pace 19.3 - 29.3 mph
31.0 mph Percent in Pace 71.2 %
50th Percentile (Median) 21.6 mph Mean (Average) Speed 21.0 mph
27.1 mph 10 mph Pace 18.3 - 28.3 mph
30.1 mph Percent in Pace 59.1 %
Location: Bryant St Between Lincoln Ave and Kingsley Ave
Date Range: 5/8/2026 to 5/14/2026
Site Code: 01
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 + Volume
12:00 AM 0 0 1 0 1 3 0 0 0 0 0 0 0 0 0 0 0 5
1:00 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 0 1 1 2 0 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 0 0 1 2 7 4 2 0 0 0 0 0 0 0 0 0 0 16
6:00 AM 0 0 0 8 12 2 0 0 1 0 0 0 0 0 0 0 0 23
7:00 AM 0 3 5 18 12 3 0 0 0 0 0 0 0 0 0 0 0 41
8:00 AM 0 3 12 40 31 7 0 0 0 0 0 0 0 0 0 0 0 93
9:00 AM 0 7 13 28 37 9 0 0 0 0 0 0 0 0 0 0 0 94
10:00 AM 0 4 8 25 31 5 1 0 0 0 0 0 0 0 0 0 0 74
11:00 AM 2 13 6 20 31 5 0 0 0 0 0 0 0 0 0 0 0 77
12:00 PM 3 8 6 43 39 10 1 0 0 0 0 0 0 0 0 0 0 110
1:00 PM 0 11 17 35 34 6 1 0 0 0 0 0 0 0 0 0 0 104
2:00 PM 4 6 15 45 34 8 1 0 0 0 0 0 0 0 0 0 0 113
3:00 PM 6 10 23 53 31 11 1 0 0 0 0 0 0 0 0 0 0 135
4:00 PM 0 19 21 47 43 10 1 0 0 0 0 0 0 0 0 0 0 141
5:00 PM 1 22 34 50 38 2 0 0 0 0 0 0 0 0 0 0 0 147
6:00 PM 2 6 22 69 42 9 0 0 0 0 0 0 0 0 0 0 0 150
7:00 PM 1 8 45 70 44 5 1 0 0 0 0 0 0 0 0 0 0 174
8:00 PM 0 3 19 53 30 2 1 0 0 0 0 0 0 0 0 0 0 108
9:00 PM 0 1 10 32 15 2 0 0 0 0 0 0 0 0 0 0 0 60
10:00 PM 0 0 4 14 12 1 1 0 0 0 0 0 0 0 0 0 0 32
11:00 PM 0 0 0 7 8 1 0 0 0 0 0 0 0 0 0 0 0 16
19 124 262 661 536 107 12 0 1 0 0 0 0 0 0 0 0
1.1% 7.2% 15.2% 38.4% 31.1% 6.2% 0.7% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Southbound 3,614
Total 14,624
Total Study Percentile Speed Summary Total Study Speed Statistics
Vehicle Speed Report Summary
Direction Speed Range (mph)Total
Volume
Northbound 11,010
85th Percentile
95th Percentile
Friday, May 8, 2026
Time Speed Range (mph)
Total
Northbound Northbound
85th Percentile
95th Percentile
Southbound Southbound
1,722
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 234
50th Percentile (Median) 23.8 mph Mean (Average) Speed 23.1 mph
85th Percentile 28.0 mph 10 mph Pace mph
95th Percentile 30.9 mph Percent in Pace 71.0 %
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 0 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 3
7:00 AM 1 1 2 5 5 2 0 0 0 0 0 0 0 0 0 0 0 16
8:00 AM 1 9 17 13 11 2 0 0 0 0 0 0 0 0 0 0 0 53
9:00 AM 0 5 3 11 7 0 0 0 0 0 0 0 0 0 0 0 0 26
10:00 AM 0 5 9 5 6 2 1 0 0 0 0 0 0 0 0 0 0 28
11:00 AM 0 2 8 20 6 4 2 0 0 0 0 0 0 0 0 0 0 42
12:00 PM 1 4 5 7 8 1 0 0 0 0 0 0 0 0 0 0 0 26
1:00 PM 1 3 11 11 6 0 0 0 0 0 0 0 0 0 0 0 0 32
2:00 PM 4 6 9 13 14 3 0 0 0 0 0 0 0 0 0 0 0 49
3:00 PM 1 8 9 14 11 1 0 0 0 0 0 0 0 0 0 0 0 44
4:00 PM 0 8 5 16 5 3 0 0 0 0 0 0 0 0 0 0 0 37
5:00 PM 2 10 9 29 9 1 0 0 0 0 0 0 0 0 0 0 0 60
6:00 PM 0 6 11 10 7 3 0 0 0 0 0 0 0 0 0 0 0 37
7:00 PM 2 5 5 11 13 0 0 0 0 0 0 0 0 0 0 0 0 36
8:00 PM 0 1 6 6 5 0 0 0 0 0 0 0 0 0 0 0 0 18
9:00 PM 0 1 5 7 6 1 0 0 0 0 0 0 0 0 0 0 0 20
10:00 PM 0 0 2 4 3 1 0 0 0 0 0 0 0 0 0 0 0 10
11:00 PM 0 0 2 1 2 2 1 0 0 0 0 0 0 0 0 0 0 8
13 74 120 185 126 27 4 0 0 0 0 0 0 0 0 0 0
2.4% 13.5% 21.9% 33.7% 23.0% 4.9% 0.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 21.9 mph Mean (Average) Speed 21.3 mph
85th Percentile 27.1 mph 10 mph Pace mph
95th Percentile 30.1 mph Percent in Pace 61.38 %
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 1 2 1 1 4 0 0 0 0 0 0 0 0 0 0 0 9
1:00 AM 0 0 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 5
2:00 AM 0 0 0 3 2 1 0 0 0 0 0 0 0 0 0 0 0 6
3:00 AM 0 0 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 0 1 1 1 2 1 0 0 0 0 0 0 0 0 0 0 6
5:00 AM 0 1 0 1 4 0 0 0 0 0 0 0 0 0 0 0 0 6
6:00 AM 1 0 1 7 8 1 1 0 0 0 0 0 0 0 0 0 0 19
7:00 AM 0 0 1 4 6 0 0 1 0 0 0 0 0 0 0 0 0 12
8:00 AM 0 3 4 16 15 4 2 0 0 0 0 0 0 0 0 0 0 44
9:00 AM 1 4 10 21 7 7 0 0 0 0 0 0 0 0 0 0 0 50
10:00 AM 1 6 14 24 25 8 0 0 0 0 0 0 0 0 0 0 0 78
11:00 AM 1 13 6 38 44 6 0 0 0 0 0 0 0 0 0 0 0 108
12:00 PM 3 8 15 56 60 10 0 0 0 0 0 0 0 0 0 0 0 152
1:00 PM 0 13 17 51 37 9 1 0 0 0 0 0 0 0 0 0 0 128
2:00 PM 6 4 18 53 42 10 1 1 0 0 0 0 0 0 0 0 0 135
3:00 PM 2 10 12 65 36 6 1 0 0 0 0 0 0 0 0 0 0 132
4:00 PM 1 7 18 61 41 12 0 0 0 0 0 0 0 0 0 0 0 140
5:00 PM 2 6 22 55 42 9 1 0 0 0 0 0 0 0 0 0 0 137
6:00 PM 0 5 13 64 24 8 1 0 0 0 0 0 0 0 0 0 0 115
7:00 PM 1 4 16 43 29 3 0 0 0 0 0 0 0 0 0 0 0 96
8:00 PM 1 2 15 34 16 3 0 0 0 0 0 0 0 0 0 0 0 71
9:00 PM 0 1 7 19 12 2 1 0 0 0 0 0 0 0 0 0 0 42
10:00 PM 0 0 0 7 5 2 0 0 0 0 0 0 0 0 0 0 0 14
11:00 PM 0 0 1 6 4 1 0 0 0 0 0 0 0 0 0 0 0 12
Total 549
Daily Percentile Speed Summary Speed Statistics
19.0 - 29.0
Saturday, May 9, 2026
Daily Percentile Speed Summary Speed Statistics
19.2 - 29.2
Friday, May 8, 2026
Time Speed Range (mph)
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 235
20 88 193 633 465 108 11 2 0 0 0 0 0 0 0 0 0
1.3% 5.8% 12.7% 41.6% 30.6% 7.1% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 23.8 mph Mean (Average) Speed 23.4 mph
85th Percentile 28.3 mph 10 mph Pace mph
95th Percentile 31.3 mph Percent in Pace 72.4 %
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
7:00 AM 0 0 1 6 4 0 0 0 0 0 0 0 0 0 0 0 0 11
8:00 AM 1 6 6 9 4 3 0 0 0 0 0 0 0 0 0 0 0 29
9:00 AM 0 7 6 16 7 1 1 0 0 0 0 0 0 0 0 0 0 38
10:00 AM 1 10 5 7 6 1 0 0 0 0 0 0 0 0 0 0 0 30
11:00 AM 1 6 6 9 10 3 0 0 0 0 0 0 0 0 0 0 0 35
12:00 PM 1 5 10 12 3 2 0 0 0 0 0 0 0 0 0 0 0 33
1:00 PM 2 8 6 7 11 6 0 0 0 0 0 0 0 0 0 0 0 40
2:00 PM 0 18 15 9 6 4 0 0 0 0 0 0 0 0 0 0 0 52
3:00 PM 4 8 6 16 7 2 0 0 0 0 0 0 0 0 0 0 0 43
4:00 PM 0 9 5 13 7 0 0 0 0 0 0 0 0 0 0 0 0 34
5:00 PM 2 2 8 11 6 2 0 0 0 0 0 0 0 0 0 0 0 31
6:00 PM 0 1 10 15 11 3 0 0 0 0 0 0 0 0 0 0 0 40
7:00 PM 0 3 8 6 3 0 0 0 0 0 0 0 0 0 0 0 0 20
8:00 PM 0 1 6 6 4 0 0 0 0 0 0 0 0 0 0 0 0 17
9:00 PM 0 3 3 4 3 3 0 0 0 0 0 0 0 0 0 0 0 16
10:00 PM 0 1 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 5
11:00 PM 0 1 4 0 2 0 0 0 0 0 0 0 0 0 0 0 0 7
12 89 109 152 98 31 1 0 0 0 0 0 0 0 0 0 0
2.4% 18.1% 22.2% 30.9% 19.9% 6.3% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 21.4 mph Mean (Average) Speed 20.9 mph
85th Percentile 27.6 mph 10 mph Pace mph
95th Percentile 30.7 mph Percent in Pace 54.67 %
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7
1:00 AM 0 1 0 4 1 1 0 0 0 0 0 0 0 0 0 0 0 7
2:00 AM 0 0 2 0 4 0 0 0 0 0 0 0 0 0 0 0 0 6
3:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 0 4 5 2 0 0 0 0 0 0 0 0 0 0 0 0 11
6:00 AM 2 1 0 6 3 4 0 0 0 0 0 0 0 0 0 0 0 16
7:00 AM 0 1 1 0 2 1 1 1 0 0 0 0 0 0 0 0 0 7
8:00 AM 0 0 4 9 8 4 1 0 0 0 0 0 0 0 0 0 0 26
9:00 AM 0 1 2 18 18 3 1 0 0 0 0 0 0 0 0 0 0 43
10:00 AM 0 4 10 20 25 8 1 0 0 0 0 0 0 0 0 0 0 68
11:00 AM 4 7 11 36 38 7 1 0 0 0 0 0 0 0 0 0 0 104
12:00 PM 3 9 10 38 40 8 1 0 0 0 0 0 0 0 0 0 0 109
1:00 PM 3 11 7 53 47 9 0 0 0 0 0 0 0 0 0 0 0 130
2:00 PM 1 17 20 65 32 5 2 0 0 0 0 0 0 0 0 0 0 142
3:00 PM 4 9 18 49 31 4 0 0 0 0 0 0 0 0 0 0 0 115
4:00 PM 3 6 21 46 33 8 1 0 0 0 0 0 0 0 0 0 0 118
5:00 PM 0 5 17 41 48 5 0 0 0 0 0 0 0 0 0 0 0 116
6:00 PM 5 3 21 48 38 9 1 0 0 0 0 0 0 0 0 0 0 125
7:00 PM 2 4 12 43 32 5 0 0 0 0 0 0 0 0 0 0 0 98
8:00 PM 1 2 7 17 11 2 0 0 0 0 0 0 0 0 0 0 0 40
19.3 - 29.3
Saturday, May 9, 2026
Time Speed Range (mph)
Total 492
Total 1,520
Daily Percentile Speed Summary Speed Statistics
Daily Percentile Speed Summary Speed Statistics
18.3 - 28.3
Sunday, May 10, 2026
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 236
9:00 PM 0 0 2 10 7 1 0 0 0 0 0 0 0 0 0 0 0 20
10:00 PM 0 0 3 3 2 3 0 0 0 0 0 0 0 0 0 0 0 11
11:00 PM 0 0 0 2 3 0 0 1 0 0 0 0 0 0 0 0 0 6
28 81 172 517 430 87 11 3 0 0 0 0 0 0 0 0 0
2.1% 6.1% 12.9% 38.9% 32.4% 6.5% 0.8% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 24.0 mph Mean (Average) Speed 23.4 mph
85th Percentile 28.2 mph 10 mph Pace mph
95th Percentile 31.0 mph Percent in Pace 71.9 %
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 1 2 2 0 1 0 0 0 0 0 0 0 0 0 0 0 6
1:00 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 5
6:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
7:00 AM 0 0 2 2 1 0 0 0 0 0 0 0 0 0 0 0 0 5
8:00 AM 0 1 4 5 2 0 0 0 0 0 0 0 0 0 0 0 0 12
9:00 AM 0 6 2 5 5 1 0 0 0 0 0 0 0 0 0 0 0 19
10:00 AM 1 6 3 11 7 0 0 0 0 0 0 0 0 0 0 0 0 28
11:00 AM 2 5 5 20 7 3 0 0 0 0 0 0 0 0 0 0 0 42
12:00 PM 1 6 3 15 7 2 1 0 0 0 0 0 0 0 0 0 0 35
1:00 PM 2 5 5 12 8 1 0 0 0 0 0 0 0 0 0 0 0 33
2:00 PM 3 11 14 9 8 0 0 0 0 0 0 0 0 0 0 0 0 45
3:00 PM 2 11 10 12 6 1 0 0 0 0 0 0 0 0 0 0 0 42
4:00 PM 1 2 5 9 3 0 0 0 0 0 0 0 0 0 0 0 0 20
5:00 PM 1 3 2 11 9 2 0 0 0 0 0 0 0 0 0 0 0 28
6:00 PM 4 3 5 7 8 1 0 0 0 0 0 0 0 0 0 0 0 28
7:00 PM 3 4 6 12 3 1 0 0 0 0 0 0 0 0 0 0 0 29
8:00 PM 0 2 2 5 3 2 0 0 0 0 0 0 0 0 0 0 0 14
9:00 PM 0 0 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 5
10:00 PM 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3
11:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
20 68 74 143 82 16 1 0 0 0 0 0 0 0 0 0 0
5.0% 16.8% 18.3% 35.4% 20.3% 4.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 21.7 mph Mean (Average) Speed 20.6 mph
85th Percentile 27.0 mph 10 mph Pace mph
95th Percentile 29.9 mph Percent in Pace 57.92 %
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4
1:00 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4
5:00 AM 0 0 1 4 9 5 0 0 0 0 0 0 0 0 0 0 0 19
6:00 AM 0 1 1 7 13 4 0 0 0 0 0 0 0 0 0 0 0 26
7:00 AM 4 6 10 21 12 4 1 0 0 0 0 0 0 0 0 0 0 58
8:00 AM 0 8 8 33 21 5 0 0 0 0 0 0 0 0 0 0 0 75
9:00 AM 1 17 15 36 26 8 0 0 0 0 0 0 0 0 0 0 0 103
10:00 AM 3 8 9 31 23 2 0 0 0 0 0 0 0 0 0 0 0 76
11:00 AM 4 11 5 26 33 7 0 0 0 0 0 0 0 0 0 0 0 86
12:00 PM 2 4 18 40 21 8 1 0 0 0 0 0 0 0 0 0 0 94
1:00 PM 3 5 4 29 36 5 1 0 0 0 0 0 0 0 0 0 0 83
2:00 PM 4 11 9 40 33 4 1 0 0 0 0 0 0 0 0 0 0 102
3:00 PM 2 13 11 56 22 7 0 1 0 0 0 0 0 0 0 0 0 112
4:00 PM 4 7 14 43 33 11 0 0 0 0 0 0 0 0 0 0 0 112
5:00 PM 2 15 15 78 22 4 1 0 0 0 0 0 0 0 0 0 0 137
Total 1,329
Daily Percentile Speed Summary Speed Statistics
19.0 - 29.0
Sunday, May 10, 2026
17.3 - 27.3
Monday, May 11, 2026
Time Speed Range (mph)
Time Speed Range (mph)
Total 404
Daily Percentile Speed Summary Speed Statistics
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 237
6:00 PM 0 5 25 54 24 2 1 0 0 0 0 0 0 0 0 0 0 111
7:00 PM 3 3 9 54 30 6 0 1 0 0 0 0 0 0 0 0 0 106
8:00 PM 1 1 8 39 20 4 0 0 0 0 0 0 0 0 0 0 0 73
9:00 PM 0 2 4 17 4 1 0 0 0 0 0 0 0 0 0 0 0 28
10:00 PM 0 0 1 9 7 4 0 0 0 0 0 0 0 0 0 0 0 21
11:00 PM 0 0 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6
33 117 168 626 397 92 6 2 0 0 0 0 0 0 0 0 0
2.3% 8.1% 11.7% 43.4% 27.6% 6.4% 0.4% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 23.5 mph Mean (Average) Speed 22.9 mph
85th Percentile 27.8 mph 10 mph Pace mph
95th Percentile 30.6 mph Percent in Pace 72.1 %
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 1 4 6 8 2 0 0 0 0 0 0 0 0 0 0 0 0 21
8:00 AM 1 5 14 14 9 3 0 0 0 0 0 0 0 0 0 0 0 46
9:00 AM 0 5 6 9 10 1 0 0 0 0 0 0 0 0 0 0 0 31
10:00 AM 4 6 3 7 12 2 0 0 0 0 0 0 0 0 0 0 0 34
11:00 AM 0 3 5 16 8 1 0 0 0 0 0 0 0 0 0 0 0 33
12:00 PM 0 2 4 13 6 5 0 0 0 0 0 0 0 0 0 0 0 30
1:00 PM 1 7 5 10 4 2 0 0 0 0 0 0 0 0 0 0 0 29
2:00 PM 1 4 3 10 8 1 0 0 0 0 0 0 0 0 0 0 0 27
3:00 PM 0 13 10 14 7 2 0 0 0 0 0 0 0 0 0 0 0 46
4:00 PM 1 6 11 19 10 1 1 0 0 0 0 0 0 0 0 0 0 49
5:00 PM 1 8 4 15 6 1 0 0 0 0 0 0 0 0 0 0 0 35
6:00 PM 1 6 11 16 9 1 1 0 0 0 0 0 0 0 0 0 0 45
7:00 PM 0 4 2 9 3 0 0 0 0 0 0 0 0 0 0 0 0 18
8:00 PM 1 1 2 6 0 0 0 0 0 0 0 0 0 0 0 0 0 10
9:00 PM 1 0 2 4 2 0 0 0 0 0 0 0 0 0 0 0 0 9
10:00 PM 0 1 1 0 4 0 0 0 0 0 0 0 0 0 0 0 0 6
11:00 PM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
13 75 90 175 104 20 3 0 0 0 0 0 0 0 0 0 0
2.7% 15.6% 18.8% 36.5% 21.7% 4.2% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 22.0 mph Mean (Average) Speed 21.2 mph
85th Percentile 27.1 mph 10 mph Pace mph
95th Percentile 30.0 mph Percent in Pace 63.75 %
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 3
1:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 0 2 0 6 3 1 1 0 0 0 0 0 0 0 0 0 13
5:00 AM 0 0 0 4 2 4 0 0 0 0 0 0 0 0 0 0 0 10
6:00 AM 1 1 5 11 11 4 0 0 0 0 0 0 0 0 0 0 0 33
7:00 AM 0 3 8 20 23 3 0 0 0 0 0 0 0 0 0 0 0 57
8:00 AM 4 5 20 41 22 2 0 0 0 0 0 0 0 0 0 0 0 94
9:00 AM 0 2 19 43 30 4 0 0 0 0 0 0 0 0 0 0 0 98
10:00 AM 1 12 21 41 25 3 2 0 0 0 0 0 0 0 0 0 0 105
11:00 AM 1 5 12 33 21 3 0 0 0 0 0 0 0 0 0 0 0 75
12:00 PM 3 7 9 31 26 8 1 0 0 0 0 0 0 0 0 0 0 85
1:00 PM 0 5 10 28 26 5 2 0 0 0 0 0 0 0 0 0 0 76
2:00 PM 0 8 10 48 30 11 1 0 0 0 0 0 0 0 0 0 0 108
Total 1,441
Total 480
Daily Percentile Speed Summary Speed Statistics
18.3 - 28.3
Tuesday, May 12, 2026
Daily Percentile Speed Summary Speed Statistics
19.6 - 29.6
Monday, May 11, 2026
Time Speed Range (mph)
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 238
3:00 PM 3 10 18 25 42 9 0 1 0 0 0 0 0 0 0 0 0 108
4:00 PM 0 8 12 47 37 5 0 0 0 0 0 0 0 0 0 0 0 109
5:00 PM 2 15 27 66 55 7 0 1 1 0 0 0 0 0 0 0 0 174
6:00 PM 1 8 31 68 37 7 1 0 0 0 0 0 0 0 0 0 0 153
7:00 PM 0 5 19 53 29 11 0 0 0 0 0 0 0 0 0 0 0 117
8:00 PM 0 3 15 48 22 4 0 0 0 0 0 0 0 0 0 0 0 92
9:00 PM 0 2 9 22 14 5 0 0 0 0 0 0 0 0 0 0 0 52
10:00 PM 0 1 1 8 6 0 0 0 0 0 0 0 0 0 0 0 0 16
11:00 PM 0 0 2 2 1 1 0 0 0 0 0 0 0 0 0 0 0 6
16 100 251 641 469 100 9 3 1 0 0 0 0 0 0 0 0
1.0% 6.3% 15.8% 40.3% 29.5% 6.3% 0.6% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 23.5 mph Mean (Average) Speed 23.1 mph
85th Percentile 27.7 mph 10 mph Pace mph
95th Percentile 30.7 mph Percent in Pace 72.8 %
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
6:00 AM 2 1 6 1 1 1 0 0 0 0 0 0 0 0 0 0 0 12
7:00 AM 0 2 4 13 8 0 0 0 0 0 0 0 0 0 0 0 0 27
8:00 AM 0 7 18 12 7 3 1 0 0 0 0 0 0 0 0 0 0 48
9:00 AM 1 2 6 10 6 1 0 0 0 0 0 0 0 0 0 0 0 26
10:00 AM 0 4 6 7 7 2 0 0 0 0 0 0 0 0 0 0 0 26
11:00 AM 1 4 5 10 9 3 0 0 0 0 0 0 0 0 0 0 0 32
12:00 PM 0 1 10 8 12 4 1 0 0 0 0 0 0 0 0 0 0 36
1:00 PM 1 4 3 19 3 2 0 0 0 0 0 0 0 0 0 0 0 32
2:00 PM 1 7 13 21 5 0 0 0 0 0 0 0 0 0 0 0 0 47
3:00 PM 1 10 8 11 6 2 0 0 0 0 0 0 0 0 0 0 0 38
4:00 PM 4 4 8 27 16 4 0 0 0 0 0 0 0 0 0 0 0 63
5:00 PM 2 12 14 34 19 2 1 0 0 0 0 0 0 0 0 0 0 84
6:00 PM 1 3 13 10 8 7 0 0 0 0 0 0 0 0 0 0 0 42
7:00 PM 1 7 5 11 6 2 0 0 0 0 0 0 0 0 0 0 0 32
8:00 PM 0 2 4 13 6 1 0 0 0 0 0 0 0 0 0 0 0 26
9:00 PM 1 3 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 10
10:00 PM 0 2 1 3 3 0 0 0 0 0 0 0 0 0 0 0 0 9
11:00 PM 0 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 4
16 75 129 216 127 34 3 0 0 0 0 0 0 0 0 0 0
2.7% 12.5% 21.5% 36.0% 21.2% 5.7% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 21.8 mph Mean (Average) Speed 21.4 mph
85th Percentile 27.3 mph 10 mph Pace mph
95th Percentile 31.0 mph Percent in Pace 62.33 %
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 2
1:00 AM 0 0 1 2 2 0 0 0 0 0 0 0 0 0 0 0 0 5
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 0 1 2 5 2 1 1 0 0 0 0 0 0 0 0 0 12
5:00 AM 1 0 3 2 2 6 1 0 0 0 0 0 0 0 0 0 0 15
6:00 AM 1 0 4 1 15 8 0 0 0 0 0 0 0 0 0 0 0 29
7:00 AM 0 2 3 19 28 4 1 0 0 0 0 0 0 0 0 0 0 57
8:00 AM 0 3 13 38 25 2 1 0 0 0 0 0 0 0 0 0 0 82
9:00 AM 0 7 12 31 40 6 0 0 0 0 0 0 0 0 0 0 0 96
10:00 AM 0 12 11 35 25 9 0 0 0 0 0 0 0 0 0 0 0 92
11:00 AM 2 9 8 28 22 10 1 0 0 0 0 0 0 0 0 0 0 80
18.1 - 28.1
Tuesday, May 12, 2026
Time Speed Range (mph)
Total 600
Total 1,590
Daily Percentile Speed Summary Speed Statistics
Daily Percentile Speed Summary Speed Statistics
17.0 - 27.0
Wednesday, May 13, 2026
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 239
12:00 PM 2 8 13 35 42 10 1 1 0 0 0 0 0 0 0 0 0 112
1:00 PM 1 5 11 29 35 14 2 0 0 0 0 0 0 0 0 0 0 97
2:00 PM 8 23 11 36 29 15 0 0 0 0 0 0 0 0 0 0 0 122
3:00 PM 4 5 4 38 41 6 0 0 0 0 0 0 0 0 0 0 0 98
4:00 PM 1 8 19 69 56 11 0 0 0 0 0 0 0 0 0 0 0 164
5:00 PM 2 12 31 90 67 2 1 0 0 0 0 0 0 0 0 0 0 205
6:00 PM 1 11 34 77 49 7 0 0 0 0 0 0 0 0 0 0 0 179
7:00 PM 1 3 14 51 42 3 0 0 0 0 0 0 0 0 0 0 0 114
8:00 PM 1 3 11 39 19 2 0 0 0 0 0 0 0 0 0 0 0 75
9:00 PM 0 0 3 25 11 1 1 0 0 0 0 0 0 0 0 0 0 41
10:00 PM 0 1 1 7 5 2 2 0 0 0 0 0 0 0 0 0 0 18
11:00 PM 0 0 0 0 5 3 0 0 0 0 0 0 0 0 0 0 0 8
25 112 209 654 566 126 12 2 0 0 0 0 0 0 0 0 0
1.5% 6.6% 12.3% 38.3% 33.2% 7.4% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 24.0 mph Mean (Average) Speed 23.5 mph
85th Percentile 28.4 mph 10 mph Pace mph
95th Percentile 31.2 mph Percent in Pace 72.2 %
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 0 4 3 10 4 1 0 0 0 0 0 0 0 0 0 0 0 22
8:00 AM 1 6 16 8 8 4 1 0 0 0 0 0 0 0 0 0 0 44
9:00 AM 0 7 7 7 9 3 0 0 0 0 0 0 0 0 0 0 0 33
10:00 AM 0 10 7 9 12 2 0 0 0 0 0 0 0 0 0 0 0 40
11:00 AM 0 5 4 11 11 2 0 0 0 0 0 0 0 0 0 0 0 33
12:00 PM 0 1 2 16 11 2 0 0 0 0 0 0 0 0 0 0 0 32
1:00 PM 0 4 7 11 9 2 1 0 0 0 0 0 0 0 0 0 0 34
2:00 PM 0 7 7 14 5 2 0 0 0 0 0 0 0 0 0 0 0 35
3:00 PM 2 11 8 10 11 1 0 0 0 0 0 0 0 0 0 0 0 43
4:00 PM 4 6 10 20 10 0 0 0 0 0 0 0 0 0 0 0 0 50
5:00 PM 1 1 12 19 7 1 0 0 0 0 0 0 0 0 0 0 0 41
6:00 PM 3 9 13 14 6 2 0 0 0 0 0 0 0 0 0 0 0 47
7:00 PM 0 2 4 11 3 0 1 0 0 0 0 0 0 0 0 0 0 21
8:00 PM 0 4 4 11 3 0 0 0 0 0 0 0 0 0 0 0 0 22
9:00 PM 2 2 4 7 1 1 0 0 0 0 0 0 0 0 0 0 0 17
10:00 PM 0 1 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 7
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13 81 111 186 112 23 3 0 0 0 0 0 0 0 0 0 0
2.5% 15.3% 21.0% 35.2% 21.2% 4.3% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 21.7 mph Mean (Average) Speed 21.1 mph
85th Percentile 26.9 mph 10 mph Pace mph
95th Percentile 30.0 mph Percent in Pace 62.57 %
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 3
1:00 AM 0 0 0 2 3 1 0 0 0 0 0 0 0 0 0 0 0 6
2:00 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 1 0 1 3 3 5 0 0 0 0 0 0 0 0 0 0 0 13
5:00 AM 1 0 0 5 7 4 1 0 0 0 0 0 0 0 0 0 0 18
6:00 AM 0 0 2 5 11 7 0 0 0 0 0 0 0 0 0 0 0 25
7:00 AM 0 2 7 12 19 5 3 0 0 0 0 0 0 0 0 0 0 48
8:00 AM 0 12 11 44 36 5 0 0 0 0 0 0 0 0 0 0 0 108
Total 1,706
Daily Percentile Speed Summary Speed Statistics
19.9 - 29.9
Wednesday, May 13, 2026
17.4 - 27.4
Thursday, May 14, 2026
Time Speed Range (mph)
Time Speed Range (mph)
Total 529
Daily Percentile Speed Summary Speed Statistics
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 240
9:00 AM 0 7 6 25 35 12 0 0 0 0 0 0 0 0 0 0 0 85
10:00 AM 4 16 13 28 30 11 1 0 0 0 0 0 0 0 0 0 0 103
11:00 AM 3 6 9 37 34 6 0 0 0 0 0 0 0 0 0 0 0 95
12:00 PM 0 10 6 35 28 7 1 1 0 0 0 0 0 0 0 0 0 88
1:00 PM 0 8 6 49 28 5 2 0 0 0 0 0 0 0 0 0 0 98
2:00 PM 3 8 9 26 36 8 3 0 0 0 0 0 0 0 0 0 0 93
3:00 PM 3 17 11 46 39 5 2 0 0 0 0 0 0 0 0 0 0 123
4:00 PM 4 11 28 57 42 8 0 0 0 0 0 0 0 0 0 0 0 150
5:00 PM 5 20 41 84 47 6 1 0 0 0 0 0 0 0 0 0 0 204
6:00 PM 1 11 19 72 41 12 0 0 0 0 0 0 0 0 0 0 0 156
7:00 PM 0 7 19 68 36 8 0 0 0 0 0 0 0 0 0 0 0 138
8:00 PM 2 2 14 32 19 1 0 0 0 0 0 0 0 0 0 0 0 70
9:00 PM 1 2 10 25 13 2 1 0 0 0 0 0 0 0 0 0 0 54
10:00 PM 1 0 2 6 2 3 0 0 0 0 0 0 0 0 0 0 0 14
11:00 PM 0 0 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7
29 139 214 667 514 122 16 1 0 0 0 0 0 0 0 0 0
1.7% 8.2% 12.6% 39.2% 30.2% 7.2% 0.9% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 23.8 mph Mean (Average) Speed 23.2 mph
85th Percentile 28.4 mph 10 mph Pace mph
95th Percentile 31.2 mph Percent in Pace 69.2 %
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 1 1 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 8
7:00 AM 0 3 6 8 7 1 0 0 0 0 0 0 0 0 0 0 0 25
8:00 AM 1 11 10 5 21 2 0 0 0 0 0 0 0 0 0 0 0 50
9:00 AM 0 9 11 11 8 2 0 0 0 0 0 0 0 0 0 0 0 41
10:00 AM 0 8 4 19 5 2 1 1 0 0 0 0 0 0 0 0 0 40
11:00 AM 1 3 5 14 8 3 0 0 0 0 0 0 0 0 0 0 0 34
12:00 PM 0 11 8 12 4 2 0 0 0 0 0 0 0 0 0 0 0 37
1:00 PM 1 6 7 11 6 1 0 0 0 0 0 0 0 0 0 0 0 32
2:00 PM 3 10 6 13 9 1 1 0 0 0 0 0 0 0 0 0 0 43
3:00 PM 0 9 11 13 10 3 0 0 0 0 0 0 0 0 0 0 0 46
4:00 PM 0 8 13 16 9 0 0 0 0 0 0 0 0 0 0 0 0 46
5:00 PM 1 7 12 13 4 1 1 0 0 0 0 0 0 0 0 0 0 39
6:00 PM 3 9 9 15 6 1 0 0 0 0 0 0 0 0 0 0 0 43
7:00 PM 2 9 5 11 2 0 0 0 0 0 0 0 0 0 0 0 0 29
8:00 PM 0 3 5 8 2 0 0 0 0 0 0 0 0 0 0 0 0 18
9:00 PM 0 0 8 10 1 0 0 0 0 0 0 0 0 0 0 0 0 19
10:00 PM 1 1 2 5 0 0 0 0 0 0 0 0 0 0 0 0 0 9
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14 108 126 186 103 19 3 1 0 0 0 0 0 0 0 0 0
2.5% 19.3% 22.5% 33.2% 18.4% 3.4% 0.5% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 21.1 mph Mean (Average) Speed 20.5 mph
85th Percentile 26.6 mph 10 mph Pace mph
95th Percentile 29.2 mph Percent in Pace 56.96 %
Northbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 1 1 2 1 0 0 0 0 0 0 0 0 0 0 0 5
1:00 AM 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4
2:00 AM 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 0 1 1 3 2 1 0 0 0 0 0 0 0 0 0 0 8
5:00 AM 0 0 1 3 5 3 1 0 0 0 0 0 0 0 0 0 0 13
Total 1,702
Total 560
Daily Percentile Speed Summary Speed Statistics
16.8 - 26.8
Total Study Average
Daily Percentile Speed Summary Speed Statistics
20.0 - 30.0
Thursday, May 14, 2026
Time Speed Range (mph)
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 241
6:00 AM 1 0 2 6 10 4 0 0 0 0 0 0 0 0 0 0 0 23
7:00 AM 1 2 5 13 15 3 1 0 0 0 0 0 0 0 0 0 0 40
8:00 AM 1 5 10 32 23 4 1 0 0 0 0 0 0 0 0 0 0 76
9:00 AM 0 6 11 29 28 7 0 0 0 0 0 0 0 0 0 0 0 81
10:00 AM 1 9 12 29 26 7 1 0 0 0 0 0 0 0 0 0 0 85
11:00 AM 2 9 8 31 32 6 0 0 0 0 0 0 0 0 0 0 0 88
12:00 PM 2 8 11 40 37 9 1 0 0 0 0 0 0 0 0 0 0 108
1:00 PM 1 8 10 39 35 8 1 0 0 0 0 0 0 0 0 0 0 102
2:00 PM 4 11 13 45 34 9 1 0 0 0 0 0 0 0 0 0 0 117
3:00 PM 3 11 14 47 35 7 1 0 0 0 0 0 0 0 0 0 0 118
4:00 PM 2 9 19 53 41 9 0 0 0 0 0 0 0 0 0 0 0 133
5:00 PM 2 14 27 66 46 5 1 0 0 0 0 0 0 0 0 0 0 161
6:00 PM 1 7 24 65 36 8 1 0 0 0 0 0 0 0 0 0 0 142
7:00 PM 1 5 19 55 35 6 0 0 0 0 0 0 0 0 0 0 0 121
8:00 PM 1 2 13 37 20 3 0 0 0 0 0 0 0 0 0 0 0 76
9:00 PM 0 1 6 21 11 2 0 0 0 0 0 0 0 0 0 0 0 41
10:00 PM 0 0 2 8 6 2 0 0 0 0 0 0 0 0 0 0 0 18
11:00 PM 0 0 0 4 4 1 0 0 0 0 0 0 0 0 0 0 0 9
23 107 209 628 488 107 11 0 0 0 0 0 0 0 0 0 0
1.5% 6.8% 13.3% 39.9% 31.0% 6.8% 0.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Note: Average only condsidered on days with 24-hours of data.
50th Percentile (Median) 23.8 mph Mean (Average) Speed 23.2 mph
85th Percentile 28.1 mph 10 mph Pace 19.3 - 29.3 mph
95th Percentile 31.0 mph Percent in Pace 71.2 %
Southbound
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
7:00 AM 0 2 3 7 4 1 0 0 0 0 0 0 0 0 0 0 0 17
8:00 AM 1 6 12 9 9 2 0 0 0 0 0 0 0 0 0 0 0 39
9:00 AM 0 6 6 10 7 1 0 0 0 0 0 0 0 0 0 0 0 30
10:00 AM 1 7 5 9 8 2 0 0 0 0 0 0 0 0 0 0 0 32
11:00 AM 1 4 5 14 8 3 0 0 0 0 0 0 0 0 0 0 0 35
12:00 PM 0 4 6 12 7 3 0 0 0 0 0 0 0 0 0 0 0 32
1:00 PM 1 5 6 12 7 2 0 0 0 0 0 0 0 0 0 0 0 33
2:00 PM 2 9 10 13 8 2 0 0 0 0 0 0 0 0 0 0 0 44
3:00 PM 1 10 9 13 8 2 0 0 0 0 0 0 0 0 0 0 0 43
4:00 PM 1 6 8 17 9 1 0 0 0 0 0 0 0 0 0 0 0 42
5:00 PM 1 6 9 19 9 1 0 0 0 0 0 0 0 0 0 0 0 45
6:00 PM 2 5 10 12 8 3 0 0 0 0 0 0 0 0 0 0 0 40
7:00 PM 1 5 5 10 5 0 0 0 0 0 0 0 0 0 0 0 0 26
8:00 PM 0 2 4 8 3 0 0 0 0 0 0 0 0 0 0 0 0 17
9:00 PM 1 1 4 5 2 1 0 0 0 0 0 0 0 0 0 0 0 14
10:00 PM 0 1 1 2 2 0 0 0 0 0 0 0 0 0 0 0 0 6
11:00 PM 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 3
13 80 106 176 106 24 0 0 0 0 0 0 0 0 0 0 0
2.6% 15.8% 21.0% 34.9% 21.0% 4.8% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Note: Average only condsidered on days with 24-hours of data.
50th Percentile (Median) 21.6 mph Mean (Average) Speed 21.0 mph
85th Percentile 27.1 mph 10 mph Pace 18.3 - 28.3 mph
95th Percentile 30.1 mph Percent in Pace 59.1 %
Total Study Average
Time Speed Range (mph)
Total 505
Total Study Percentile Speed Summary Total Study Speed Statistics
Total 1,573
Total Study Percentile Speed Summary Total Study Speed Statistics
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 242
Location:Bryant St Between Lincoln Ave and Kingsley Ave
Date Range: 5/8/2026 - 5/14/2026
Site Code: 01
Location: Bryant St Between Lincoln Ave and Kingsley Ave
Count Direction: Northbound / Southbound
Date Range: 5/8/2026 - 5/14/2026
NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total Site Code: 01
12:00 AM 5 1 6 9 1 10 7 6 13 4 2 6 3 2 5 2 1 3 3 0 3 3 1 4
1:00 AM 2 0 2 5 1 6 7 1 8 2 1 3 1 0 1 5 0 5 6 0 6 4 0 4
2:00 AM 2 0 2 6 0 6 6 0 6 2 0 2 3 1 4 0 0 0 1 0 1 1 0 2
3:00 AM 1 0 1 3 2 5 1 0 1 1 0 1 2 0 2 3 0 3 2 0 2 2 0 2
4:00 AM 4 1 5 6 3 9 3 1 4 4 2 6 13 1 14 12 3 15 13 0 13 13 1 14 NB SB Total
5:00 AM 16 2 18 6 2 8 11 5 16 19 0 19 10 2 12 15 0 15 18 1 19 14 1 15 Daily Average 1,573 516 2,089
6:00 AM 23 3 26 19 2 21 16 2 18 26 4 30 33 12 45 29 4 33 25 8 33 29 8 37 Mid-Week Average 1,666 563 2,229
7:00 AM 41 16 57 12 11 23 7 5 12 58 21 79 57 27 84 57 22 79 48 25 73 54 25 79 Mid-Week AM Peak Average95 47 142
8:00 AM 93 53 146 44 29 73 26 12 38 75 46 121 94 48 142 82 44 126 108 50 158 95 47 142 Mid-Week PM Peak Average194 55 249
9:00 AM 94 26 120 50 38 88 43 19 62 103 31 134 98 26 124 96 33 129 85 41 126 93 33 126
10:00 AM 74 28 102 78 30 108 68 28 96 76 34 110 105 26 131 92 40 132 103 40 143 100 35 135
11:00 AM 77 42 119 108 35 143 104 42 146 86 33 119 75 32 107 80 33 113 95 34 129 83 33 116
12:00 PM 110 26 136 152 33 185 109 35 144 94 30 124 85 36 121 112 32 144 88 37 125 95 35 130
1:00 PM 104 32 136 128 40 168 130 33 163 83 29 112 76 32 108 97 34 131 98 32 130 90 33 123
2:00 PM 113 49 162 135 52 187 142 45 187 102 27 129 108 47 155 122 35 157 93 43 136 108 42 149
3:00 PM 135 44 179 132 43 175 115 42 157 112 46 158 108 38 146 98 43 141 123 46 169 110 42 152
4:00 PM 141 37 178 140 34 174 118 20 138 112 49 161 109 63 172 164 50 214 150 46 196 141 53 194
5:00 PM 147 60 207 137 31 168 116 28 144 137 35 172 174 84 258 205 41 246 204 39 243 194 55 249
6:00 PM 150 37 187 115 40 155 125 28 153 111 45 156 153 42 195 179 47 226 156 43 199 163 44 207
7:00 PM 174 36 210 96 20 116 98 29 127 106 18 124 117 32 149 114 21 135 138 29 167 123 27 150
8:00 PM 108 18 126 71 17 88 40 14 54 73 10 83 92 26 118 75 22 97 70 18 88 79 22 101
9:00 PM 60 20 80 42 16 58 20 5 25 28 9 37 52 10 62 41 17 58 54 19 73 49 15 64
10:00 PM 32 10 42 14 5 19 11 3 14 21 6 27 16 9 25 18 7 25 14 9 23 16 8 24
11:00 PM 16 8 24 12 7 19 6 1 7 6 2 8 6 4 10 8 0 8 7 0 7 7 1 8
Total 1,722 549 2,271 1,520 492 2,012 1,329 404 1,733 1,441 480 1,921 1,590 600 2,190 1,706 529 2,235 1,702 560 2,262 1,666 563 2,229
Percent 76% 24% 76% 24% 77% 23% 75% 25% 73% 27% 76% 24% 75% 25% 75% 25%
AM Peak 09:00 08:00 08:00 11:00 09:00 11:00 11:00 11:00 11:00 09:00 08:00 09:00 10:00 08:00 08:00 09:00 08:00 10:00 08:00 08:00 08:00 10:00 08:00 08:00
Vol. 94 53 146 108 38 143 104 42 146 103 46 134 105 48 142 96 44 132 108 50 158 100 47 142
PM Peak 19:00 17:00 19:00 12:00 14:00 14:00 14:00 14:00 14:00 17:00 16:00 17:00 17:00 17:00 17:00 17:00 16:00 17:00 17:00 15:00 17:00 17:00 17:00 17:00
Vol. 174 60 210 152 52 187 142 45 187 137 49 172 174 84 258 205 50 246 204 46 243 194 55 249
1. Mid-week average includes data between Tuesday and Thursday.
Time
Friday Saturday Sunday Monday Tuesday Wednesday Thursday Mid-Week Average5/14/2026
Volume Report Summary
Volume Summary
5/8/2026 5/9/2026 5/10/2026 5/11/2026 5/12/2026 5/13/2026
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 243
Location:
Count Direction:
Date Range:
Site Code:
1 2 3 4 5 6 7 8 9 10 11 12 13
122 12,631 1,593 50 150 13 0 0 2 0 0 0 0
0.8% 86.7% 10.9% 0.3% 1.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
38 8,360 743 14 94 5 0 0 0 0 0 0 0
0.4% 90.3% 8.0% 0.2% 1.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
160 20,991 2,336 64 244 18 0 0 2 0 0 0 0
0.7% 88.1% 9.8% 0.3% 1.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
FHWA Vehicle Classification
Class 1 - Motorcycles Class 8 - Four or Fewer Axle Single-Trailer Trucks
Class 2 - Passenger Cars Class 9 - Five-Axle Single-Trailer Trucks
Class 3 - Other Two-Axle, Four-Tire Single Unit Vehicles Class 10 - Six or More Axle Single-Trailer Trucks
Class 4 - Buses Class 11 - Five or fewer Axle Multi-Trailer Trucks
Class 5 - Two-Axle, Six-Tire, Single-Unit Trucks Class 12 - Six-Axle Multi-Trailer Trucks
Class 6 - Three-Axle Single-Unit Trucks Class 13 - Seven or More Axle Multi-Trailer Trucks
Class 7 - Four or More Axle Single-Unit Trucks
Location: Waverley St, Between Lincoln Ave and Kingsley Ave
Date Range: 5/8/2026 to 5/14/2026
Site Code: 02
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 8 4 0 0 0 0 0 0 0 0 0 0 12
1:00 AM 0 9 1 0 0 0 0 0 0 0 0 0 0 10
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 5 1 0 0 0 0 0 0 0 0 0 0 6
5:00 AM 0 9 0 0 0 0 0 0 0 0 0 0 0 9
6:00 AM 0 21 5 0 1 0 0 0 0 0 0 0 0 27
7:00 AM 0 58 12 2 1 0 0 0 0 0 0 0 0 73
8:00 AM 1 111 28 0 1 0 0 0 0 0 0 0 0 141
9:00 AM 1 93 22 2 4 1 0 0 0 0 0 0 0 123
10:00 AM 1 108 19 1 2 0 0 0 0 0 0 0 0 131
11:00 AM 0 97 15 1 5 1 0 0 0 0 0 0 0 119
12:00 PM 0 111 25 1 4 0 0 0 0 0 0 0 0 141
1:00 PM 1 128 20 0 3 0 0 0 0 0 0 0 0 152
2:00 PM 1 123 17 1 3 0 0 0 0 0 0 0 0 145
3:00 PM 1 137 22 1 0 0 0 0 0 0 0 0 0 161
4:00 PM 3 163 17 0 3 0 0 0 0 0 0 0 0 186
5:00 PM 3 158 14 0 0 0 0 0 0 0 0 0 0 175
6:00 PM 0 134 14 1 2 0 0 0 0 0 0 0 0 151
7:00 PM 0 111 15 0 0 0 0 0 0 0 0 0 0 126
8:00 PM 1 107 17 0 0 0 0 0 0 0 0 0 0 125
Vehicle Classification Report Summary
Waverley St, Between Lincoln Ave and Kingsley Ave
Northbound / Southbound
5/8/2026 to 5/14/2026
02
Total
Volume
Northbound 14,561
Southbound 9,254
Total 23,815
Direction FHWA Vehicle Classification
Friday, May 8, 2026
Time FHWA Vehicle Classification
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 244
9:00 PM 0 103 11 0 0 0 0 0 0 0 0 0 0 114
10:00 PM 1 93 14 0 0 0 0 0 0 0 0 0 0 108
11:00 PM 0 35 7 0 0 0 0 0 0 0 0 0 0 42
14 1,924 300 10 29 2 0 0 0 0 0 0 0
0.6% 84.4% 13.2% 0.4% 1.3% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
1:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 2 1 0 1 0 0 0 0 0 0 0 0 4
5:00 AM 0 7 1 0 0 0 0 0 0 0 0 0 0 8
6:00 AM 0 16 1 0 1 0 0 0 0 0 0 0 0 18
7:00 AM 0 35 10 0 1 0 0 0 0 0 0 0 0 46
8:00 AM 0 79 9 0 1 0 0 0 0 0 0 0 0 89
9:00 AM 0 80 12 0 2 0 0 0 0 0 0 0 0 94
10:00 AM 1 75 9 0 2 0 0 0 0 0 0 0 0 87
11:00 AM 0 99 10 1 0 0 0 0 0 0 0 0 0 110
12:00 PM 0 94 12 1 0 0 0 0 0 0 0 0 0 107
1:00 PM 1 93 15 0 5 0 0 0 0 0 0 0 0 114
2:00 PM 1 86 9 0 3 0 0 0 0 0 0 0 0 99
3:00 PM 1 86 9 0 1 0 0 0 0 0 0 0 0 97
4:00 PM 1 99 7 0 0 0 0 0 0 0 0 0 0 107
5:00 PM 0 108 8 0 0 1 0 0 0 0 0 0 0 117
6:00 PM 0 110 6 0 1 0 0 0 0 0 0 0 0 117
7:00 PM 1 74 0 0 0 0 0 0 0 0 0 0 0 75
8:00 PM 0 57 2 0 0 0 0 0 0 0 0 0 0 59
9:00 PM 1 34 2 0 0 0 0 0 0 0 0 0 0 37
10:00 PM 0 29 1 0 0 0 0 0 0 0 0 0 0 30
11:00 PM 0 12 1 0 0 0 0 0 0 0 0 0 0 13
7 1,280 126 2 18 1 0 0 0 0 0 0 0
0.5% 89.3% 8.8% 0.1% 1.3% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 13 3 0 1 0 0 0 0 0 0 0 0 17
1:00 AM 0 12 3 0 0 0 0 0 0 0 0 0 0 15
2:00 AM 0 1 2 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 1 3 1 0 0 0 0 0 0 0 0 0 0 5
5:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 5
6:00 AM 0 13 2 0 0 0 0 0 0 0 0 0 0 15
7:00 AM 0 17 4 1 1 0 0 0 0 0 0 0 0 23
8:00 AM 0 52 5 0 0 0 0 0 0 0 0 0 0 57
9:00 AM 1 92 13 0 3 0 0 0 0 0 0 0 0 109
10:00 AM 5 108 8 0 2 0 0 0 0 0 0 0 0 123
11:00 AM 2 117 8 0 1 0 0 0 0 0 0 0 0 128
12:00 PM 3 93 11 0 1 0 0 0 0 0 0 0 0 108
1:00 PM 3 140 19 0 1 0 0 0 0 0 0 0 0 163
2:00 PM 2 133 15 1 0 0 0 0 0 0 0 0 0 151
3:00 PM 2 147 11 0 2 0 0 0 0 0 0 0 0 162
4:00 PM 0 102 4 0 3 0 0 0 0 0 0 0 0 109
5:00 PM 1 104 9 0 0 0 0 0 0 0 0 0 0 114
6:00 PM 0 120 9 0 0 0 0 0 0 0 0 0 0 129
7:00 PM 0 100 13 0 0 0 0 0 0 0 0 0 0 113
8:00 PM 0 92 6 0 0 0 0 0 0 0 0 0 0 98
9:00 PM 0 79 17 1 0 0 0 0 0 0 0 0 0 97
2,279
Friday, May 8, 2026
Total
Time FHWA Vehicle Classification
1,434
Saturday, May 9, 2026
Time FHWA Vehicle Classification
Total
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 245
10:00 PM 0 59 6 0 0 0 0 0 0 0 0 0 0 65
11:00 PM 0 34 4 0 0 0 0 0 0 0 0 0 0 38
20 1,637 173 3 15 0 0 0 0 0 0 0 0
1.1% 88.6% 9.4% 0.2% 0.8% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 5 2 0 0 0 0 0 0 0 0 0 0 7
1:00 AM 0 4 0 0 0 0 0 0 0 0 0 0 0 4
2:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 2 1 0 1 0 0 0 0 0 0 0 0 4
5:00 AM 0 3 1 0 0 0 0 0 0 0 0 0 0 4
6:00 AM 0 6 5 0 0 0 0 0 0 0 0 0 0 11
7:00 AM 0 17 3 0 0 0 0 0 0 0 0 0 0 20
8:00 AM 0 41 3 0 2 0 0 0 0 0 0 0 0 46
9:00 AM 0 64 2 0 0 0 0 0 0 0 0 0 0 66
10:00 AM 0 69 2 0 1 0 0 0 0 0 0 0 0 72
11:00 AM 0 83 7 0 1 0 0 0 0 0 0 0 0 91
12:00 PM 1 83 10 0 0 0 0 0 0 0 0 0 0 94
1:00 PM 0 101 5 0 0 0 0 0 0 0 0 0 0 106
2:00 PM 0 107 5 0 0 0 0 0 0 0 0 0 0 112
3:00 PM 1 84 5 0 1 0 0 0 0 0 0 0 0 91
4:00 PM 0 78 1 0 0 0 0 0 0 0 0 0 0 79
5:00 PM 0 92 5 0 0 0 0 0 0 0 0 0 0 97
6:00 PM 0 102 2 0 0 0 0 0 0 0 0 0 0 104
7:00 PM 2 74 4 0 1 0 0 0 0 0 0 0 0 81
8:00 PM 0 39 1 0 0 0 0 0 0 0 0 0 0 40
9:00 PM 0 36 1 0 0 0 0 0 0 0 0 0 0 37
10:00 PM 0 20 0 0 0 0 0 0 0 0 0 0 0 20
11:00 PM 0 7 0 0 0 0 0 0 0 0 0 0 0 7
4 1,120 67 0 7 0 0 0 0 0 0 0 0
0.3% 93.5% 5.6% 0.0% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 14 3 0 0 0 0 0 0 0 0 0 0 17
1:00 AM 0 8 3 0 0 0 0 0 0 0 0 0 0 11
2:00 AM 0 6 1 0 0 0 0 0 0 0 0 0 0 7
3:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 1 4 0 0 0 0 0 0 0 0 0 0 0 5
5:00 AM 0 6 0 0 1 0 0 0 0 0 0 0 0 7
6:00 AM 0 8 1 0 0 0 0 0 0 0 0 0 0 9
7:00 AM 0 21 4 0 0 0 0 0 0 0 0 0 0 25
8:00 AM 0 33 5 0 0 0 0 0 0 0 0 0 0 38
9:00 AM 1 72 8 0 0 0 0 0 0 0 0 0 0 81
10:00 AM 2 73 9 0 1 0 0 0 0 0 0 0 0 85
11:00 AM 2 95 8 0 0 0 0 0 0 0 0 0 0 105
12:00 PM 1 121 9 0 1 0 0 0 0 0 0 0 0 132
1:00 PM 2 140 10 0 0 0 0 0 0 0 0 0 0 152
2:00 PM 1 123 7 0 1 0 0 0 0 0 0 0 0 132
3:00 PM 2 107 6 0 0 0 0 0 0 0 0 0 0 115
4:00 PM 1 121 7 1 0 0 0 0 0 0 0 0 0 130
5:00 PM 2 103 6 0 1 0 0 0 0 0 0 0 0 112
6:00 PM 1 95 5 0 0 0 0 0 0 0 0 0 0 101
7:00 PM 0 87 12 0 1 0 0 0 0 0 0 0 0 100
8:00 PM 1 93 10 0 0 0 0 0 0 0 0 0 0 104
9:00 PM 0 56 10 0 0 0 0 0 0 0 0 0 0 66
10:00 PM 0 31 7 0 0 0 0 0 0 0 0 0 0 38
Total 1,198
Sunday, May 10, 2026
Time FHWA Vehicle Classification
Total 1,848
Saturday, May 9, 2026
Time FHWA Vehicle Classification
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 246
11:00 PM 0 14 0 0 0 0 0 0 0 0 0 0 0 14
17 1,432 132 1 6 0 0 0 0 0 0 0 0
1.1% 90.2% 8.3% 0.1% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 7 0 0 0 0 0 0 0 0 0 0 0 7
1:00 AM 0 8 1 0 0 0 0 0 0 0 0 0 0 9
2:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 5
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 4 0 0 0 0 0 0 0 0 0 0 0 4
6:00 AM 0 10 1 0 0 0 0 0 0 0 0 0 0 11
7:00 AM 0 21 1 0 0 0 0 0 0 0 0 0 0 22
8:00 AM 0 33 0 0 1 0 0 0 0 0 0 0 0 34
9:00 AM 0 40 4 0 0 0 0 0 0 0 0 0 0 44
10:00 AM 1 91 2 0 0 0 0 0 0 0 0 0 0 94
11:00 AM 0 123 9 0 1 0 0 0 0 0 0 0 0 133
12:00 PM 1 80 4 0 1 0 0 0 0 0 0 0 0 86
1:00 PM 0 96 6 0 0 0 0 0 0 0 0 0 0 102
2:00 PM 0 80 1 0 1 0 0 0 0 0 0 0 0 82
3:00 PM 0 90 5 0 0 0 0 0 0 0 0 0 0 95
4:00 PM 1 74 3 0 0 0 0 0 0 0 0 0 0 78
5:00 PM 2 74 1 0 0 0 0 0 0 0 0 0 0 77
6:00 PM 1 69 2 0 0 0 0 0 0 0 0 0 0 72
7:00 PM 1 61 1 0 0 0 0 0 0 0 0 0 0 63
8:00 PM 0 42 4 0 0 0 0 0 0 0 0 0 0 46
9:00 PM 0 13 2 0 0 0 0 0 0 0 0 0 0 15
10:00 PM 0 16 0 0 0 0 0 0 0 0 0 0 0 16
11:00 PM 0 7 0 0 0 0 0 0 0 0 0 0 0 7
7 1,046 48 0 4 0 0 0 0 0 0 0 0
0.6% 94.7% 4.3% 0.0% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 4 0 0 0 0 0 0 0 0 0 0 0 4
1:00 AM 0 4 1 0 0 0 0 0 0 0 0 0 0 5
2:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 6 0 0 0 0 0 0 0 0 0 0 0 6
5:00 AM 0 9 1 0 0 0 0 0 0 0 0 0 0 10
6:00 AM 0 24 6 0 0 0 0 0 1 0 0 0 0 31
7:00 AM 1 55 12 2 0 0 0 0 0 0 0 0 0 70
8:00 AM 0 122 15 0 2 0 0 0 0 0 0 0 0 139
9:00 AM 2 92 17 1 3 0 0 0 0 0 0 0 0 115
10:00 AM 3 115 11 0 4 0 0 0 0 0 0 0 0 133
11:00 AM 0 99 13 0 2 2 0 0 0 0 0 0 0 116
12:00 PM 2 106 19 0 1 1 0 0 0 0 0 0 0 129
1:00 PM 2 107 15 0 2 0 0 0 0 0 0 0 0 126
2:00 PM 1 112 12 0 0 0 0 0 0 0 0 0 0 125
3:00 PM 5 126 20 1 3 0 0 0 0 0 0 0 0 155
4:00 PM 1 167 15 0 2 1 0 0 0 0 0 0 0 186
5:00 PM 3 153 6 0 1 0 0 0 0 0 0 0 0 163
6:00 PM 3 112 10 0 2 0 0 0 0 0 0 0 0 127
7:00 PM 1 92 12 0 0 0 0 0 0 0 0 0 0 105
8:00 PM 0 93 13 0 2 0 0 0 0 0 0 0 0 108
9:00 PM 0 78 10 0 1 0 0 0 0 0 0 0 0 89
10:00 PM 0 29 5 0 0 0 0 0 0 0 0 0 0 34
11:00 PM 0 23 3 0 0 0 0 0 0 0 0 0 0 26
Total 1,588
Time FHWA Vehicle Classification
Total
Sunday, May 10, 2026
Time FHWA Vehicle Classification
1,105
Monday, May 11, 2026
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 247
24 1,734 216 4 25 4 0 0 1 0 0 0 0
1.2% 86.4% 10.8% 0.2% 1.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 5
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 3 0 0 1 0 0 0 0 0 0 0 0 4
5:00 AM 0 8 2 0 0 0 0 0 0 0 0 0 0 10
6:00 AM 0 11 5 0 0 0 0 0 0 0 0 0 0 16
7:00 AM 0 46 7 0 1 0 0 0 0 0 0 0 0 54
8:00 AM 0 96 12 0 1 0 0 0 0 0 0 0 0 109
9:00 AM 0 91 9 0 4 0 0 0 0 0 0 0 0 104
10:00 AM 0 87 8 0 1 1 0 0 0 0 0 0 0 97
11:00 AM 0 61 8 0 0 0 0 0 0 0 0 0 0 69
12:00 PM 1 55 8 0 4 0 0 0 0 0 0 0 0 68
1:00 PM 0 68 13 0 0 0 0 0 0 0 0 0 0 81
2:00 PM 1 77 7 0 2 1 0 0 0 0 0 0 0 88
3:00 PM 1 83 9 0 2 0 0 0 0 0 0 0 0 95
4:00 PM 0 97 6 0 1 0 0 0 0 0 0 0 0 104
5:00 PM 0 82 4 0 2 1 0 0 0 0 0 0 0 89
6:00 PM 1 64 3 0 0 0 0 0 0 0 0 0 0 68
7:00 PM 0 65 4 0 0 0 0 0 0 0 0 0 0 69
8:00 PM 0 30 1 0 0 0 0 0 0 0 0 0 0 31
9:00 PM 0 26 2 0 1 0 0 0 0 0 0 0 0 29
10:00 PM 0 17 0 0 0 0 0 0 0 0 0 0 0 17
11:00 PM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
4 1,078 108 0 20 3 0 0 0 0 0 0 0
0.3% 88.9% 8.9% 0.0% 1.6% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
1:00 AM 0 7 2 0 0 0 0 0 0 0 0 0 0 9
2:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 3 2 0 0 0 0 0 0 0 0 0 0 5
5:00 AM 0 15 2 0 1 0 0 0 0 0 0 0 0 18
6:00 AM 0 22 6 0 0 0 0 0 0 0 0 0 0 28
7:00 AM 0 53 8 1 0 0 0 0 0 0 0 0 0 62
8:00 AM 0 115 22 1 2 1 0 0 0 0 0 0 0 141
9:00 AM 1 89 24 1 4 0 0 0 0 0 0 0 0 119
10:00 AM 1 80 16 2 1 0 0 0 0 0 0 0 0 100
11:00 AM 0 113 15 0 4 0 0 0 0 0 0 0 0 132
12:00 PM 2 116 11 1 2 0 0 0 0 0 0 0 0 132
1:00 PM 1 110 16 1 2 0 0 0 0 0 0 0 0 130
2:00 PM 0 123 16 0 3 0 0 0 0 0 0 0 0 142
3:00 PM 2 136 21 2 1 0 0 0 0 0 0 0 0 162
4:00 PM 1 224 24 0 1 0 0 0 0 0 0 0 0 250
5:00 PM 3 268 22 0 2 1 0 0 0 0 0 0 0 296
6:00 PM 0 147 14 0 0 0 0 0 0 0 0 0 0 161
7:00 PM 2 129 5 0 1 0 0 0 0 0 0 0 0 137
8:00 PM 2 96 11 0 0 0 0 0 0 0 0 0 0 109
9:00 PM 0 81 12 0 0 0 0 0 0 0 0 0 0 93
10:00 PM 0 45 4 0 0 0 0 0 0 0 0 0 0 49
11:00 PM 0 15 2 0 0 0 0 0 0 0 0 0 0 17
15 1,993 256 9 24 2 0 0 0 0 0 0 0 2,299
Total 1,213
Total 2,008
Monday, May 11, 2026
Time FHWA Vehicle Classification
Tuesday, May 12, 2026
Time FHWA Vehicle Classification
Total
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 248
0.7% 86.7% 11.1% 0.4% 1.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 2
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 3
4:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 8 5 0 0 0 0 0 0 0 0 0 0 13
6:00 AM 0 15 3 2 1 0 0 0 0 0 0 0 0 21
7:00 AM 0 41 11 0 1 0 0 0 0 0 0 0 0 53
8:00 AM 0 97 14 0 2 0 0 0 0 0 0 0 0 113
9:00 AM 0 88 15 0 1 0 0 0 0 0 0 0 0 104
10:00 AM 1 72 10 0 2 0 0 0 0 0 0 0 0 85
11:00 AM 1 86 10 0 3 0 0 0 0 0 0 0 0 100
12:00 PM 1 76 7 1 1 0 0 0 0 0 0 0 0 86
1:00 PM 1 72 12 0 0 0 0 0 0 0 0 0 0 85
2:00 PM 1 97 6 1 1 0 0 0 0 0 0 0 0 106
3:00 PM 0 91 9 0 1 0 0 0 0 0 0 0 0 101
4:00 PM 0 113 8 0 1 0 0 0 0 0 0 0 0 122
5:00 PM 0 178 13 0 0 0 0 0 0 0 0 0 0 191
6:00 PM 0 116 9 0 0 0 0 0 0 0 0 0 0 125
7:00 PM 0 61 1 1 0 0 0 0 0 0 0 0 0 63
8:00 PM 1 47 2 1 0 0 0 0 0 0 0 0 0 51
9:00 PM 0 31 0 0 0 0 0 0 0 0 0 0 0 31
10:00 PM 0 10 1 0 0 0 0 0 0 0 0 0 0 11
11:00 PM 0 8 0 0 0 0 0 0 0 0 0 0 0 8
6 1,314 137 6 15 0 0 0 0 0 0 0 0
0.4% 88.9% 9.3% 0.4% 1.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 11 2 0 0 0 0 0 0 0 0 0 0 13
1:00 AM 0 4 0 0 0 0 0 0 0 0 0 0 0 4
2:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 9 1 0 0 0 0 0 0 0 0 0 0 10
6:00 AM 0 23 5 0 1 0 0 0 0 0 0 0 0 29
7:00 AM 0 60 15 1 3 0 0 0 0 0 0 0 0 79
8:00 AM 0 119 27 0 0 0 0 0 0 0 0 0 0 146
9:00 AM 0 104 15 1 3 1 0 0 0 0 0 0 0 124
10:00 AM 3 82 19 0 5 0 0 0 0 0 0 0 0 109
11:00 AM 1 123 13 0 4 0 0 0 0 0 0 0 0 141
12:00 PM 0 99 17 1 4 0 0 0 0 0 0 0 0 121
1:00 PM 0 100 15 0 1 0 0 0 0 0 0 0 0 116
2:00 PM 2 139 17 2 0 1 0 0 0 0 0 0 0 161
3:00 PM 2 167 17 0 2 0 0 0 0 0 0 0 0 188
4:00 PM 3 163 15 0 1 0 0 0 0 0 0 0 0 182
5:00 PM 1 178 15 2 1 0 0 0 0 0 0 0 0 197
6:00 PM 0 150 13 0 1 0 0 0 0 0 0 0 0 164
7:00 PM 0 110 11 1 1 0 0 0 0 0 0 0 0 123
8:00 PM 0 114 17 1 0 0 0 0 0 0 0 0 0 132
9:00 PM 0 90 9 0 0 0 0 0 0 0 0 0 0 99
10:00 PM 0 36 6 0 0 0 0 0 0 0 0 0 0 42
11:00 PM 0 24 2 0 0 0 0 0 0 0 0 0 0 26
12 1,909 252 9 27 2 0 0 0 0 0 0 0
0.5% 86.3% 11.4% 0.4% 1.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
2,299
FHWA Vehicle Classification
Total
Time FHWA Vehicle Classification
Total
Tuesday, May 12, 2026
1,478
Wednesday, May 13, 2026
Total 2,211
Time
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 249
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 6 0 0 0 0 0 0 0 0 0 0 0 6
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 7 1 0 0 0 0 0 0 0 0 0 0 8
6:00 AM 1 11 1 1 0 0 0 0 0 0 0 0 0 14
7:00 AM 0 42 6 1 1 0 0 0 0 0 0 0 0 50
8:00 AM 0 110 11 0 1 0 0 0 0 0 0 0 0 122
9:00 AM 0 74 11 0 1 0 0 0 0 0 0 0 0 86
10:00 AM 1 67 9 0 3 0 0 0 0 0 0 0 0 80
11:00 AM 0 67 13 1 3 0 0 0 0 0 0 0 0 84
12:00 PM 0 79 4 0 2 0 0 0 0 0 0 0 0 85
1:00 PM 0 91 7 0 0 0 0 0 0 0 0 0 0 98
2:00 PM 1 73 6 0 1 0 0 0 0 0 0 0 0 81
3:00 PM 2 84 8 0 1 0 0 0 0 0 0 0 0 95
4:00 PM 1 108 10 0 0 0 0 0 0 0 0 0 0 119
5:00 PM 0 163 6 0 0 0 0 0 0 0 0 0 0 169
6:00 PM 0 118 7 0 0 0 0 0 0 0 0 0 0 125
7:00 PM 0 64 5 0 1 0 0 0 0 0 0 0 0 70
8:00 PM 1 49 0 0 0 0 0 0 0 0 0 0 0 50
9:00 PM 0 35 0 0 0 0 0 0 0 0 0 0 0 35
10:00 PM 0 9 0 0 0 0 0 0 0 0 0 0 0 9
11:00 PM 0 6 0 0 0 0 0 0 0 0 0 0 0 6
7 1,267 106 3 14 0 0 0 0 0 0 0 0
0.5% 90.7% 7.6% 0.2% 1.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 11 2 0 0 0 0 0 0 0 0 0 0 13
1:00 AM 0 9 2 0 0 0 0 0 0 0 0 0 0 11
2:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 7 1 0 0 0 0 0 0 0 0 0 0 8
5:00 AM 0 14 1 0 0 1 0 0 0 0 0 0 0 16
6:00 AM 0 23 5 0 0 0 0 0 0 0 0 0 0 28
7:00 AM 0 60 13 1 1 0 0 0 0 0 0 0 0 75
8:00 AM 0 108 29 1 0 0 0 0 0 0 0 0 0 138
9:00 AM 1 124 23 0 1 0 0 0 0 0 0 0 0 149
10:00 AM 1 97 14 2 1 0 0 0 0 0 0 0 0 115
11:00 AM 2 106 12 2 7 1 0 0 0 0 0 0 0 130
12:00 PM 1 109 22 1 2 0 0 0 0 0 0 0 0 135
1:00 PM 2 133 14 0 2 1 0 0 0 0 0 0 0 152
2:00 PM 2 130 17 2 0 0 0 0 1 0 0 0 0 152
3:00 PM 5 142 26 3 2 0 0 0 0 0 0 0 0 178
4:00 PM 1 177 14 0 2 0 0 0 0 0 0 0 0 194
5:00 PM 0 190 17 1 1 0 0 0 0 0 0 0 0 209
6:00 PM 2 145 7 0 4 0 0 0 0 0 0 0 0 158
7:00 PM 2 128 11 1 0 0 0 0 0 0 0 0 0 142
8:00 PM 0 117 10 0 1 0 0 0 0 0 0 0 0 128
9:00 PM 1 115 16 0 0 0 0 0 0 0 0 0 0 132
10:00 PM 0 34 7 0 0 0 0 0 0 0 0 0 0 41
11:00 PM 0 20 1 0 0 0 0 0 0 0 0 0 0 21
20 2,002 264 14 24 3 0 0 1 0 0 0 0
0.9% 86.0% 11.3% 0.6% 1.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Wednesday, May 13, 2026
Time FHWA Vehicle Classification
Total 1,397
Thursday, May 14, 2026
Time FHWA Vehicle Classification
Total 2,328
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 250
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 1 6 0 0 1 0 0 0 0 0 0 0 0 8
1:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
5:00 AM 0 11 3 0 0 0 0 0 0 0 0 0 0 14
6:00 AM 0 15 4 0 1 0 0 0 0 0 0 0 0 20
7:00 AM 0 49 8 0 1 0 0 0 0 0 0 0 0 58
8:00 AM 0 108 18 0 2 0 0 0 0 0 0 0 0 128
9:00 AM 0 80 11 0 2 0 0 0 0 0 0 0 0 93
10:00 AM 0 67 16 0 1 0 0 0 0 0 0 0 0 84
11:00 AM 0 83 11 1 0 1 0 0 0 0 0 0 0 96
12:00 PM 1 86 14 0 0 0 0 0 0 0 0 0 0 101
1:00 PM 0 65 9 1 4 0 0 0 0 0 0 0 0 79
2:00 PM 0 65 5 0 1 0 0 0 0 0 0 0 0 71
3:00 PM 0 78 14 0 0 0 0 0 0 0 0 0 0 92
4:00 PM 0 88 11 0 1 0 0 0 0 0 0 0 0 100
5:00 PM 0 143 13 0 1 0 0 0 0 0 0 0 0 157
6:00 PM 0 125 8 1 0 0 0 0 0 0 0 0 0 134
7:00 PM 1 71 4 0 0 0 0 0 0 0 0 0 0 76
8:00 PM 0 50 0 0 0 0 0 0 0 0 0 0 0 50
9:00 PM 0 37 1 0 0 0 0 0 0 0 0 0 0 38
10:00 PM 0 16 0 0 0 0 0 0 0 0 0 0 0 16
11:00 PM 0 5 0 0 1 0 0 0 0 0 0 0 0 6
3 1,255 151 3 16 1 0 0 0 0 0 0 0
0.2% 87.8% 10.6% 0.2% 1.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Total Study Average
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 9 2 0 0 0 0 0 0 0 0 0 0 11
1:00 AM 0 8 2 0 0 0 0 0 0 0 0 0 0 10
2:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 3
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 4 1 0 0 0 0 0 0 0 0 0 0 5
5:00 AM 0 10 1 0 0 0 0 0 0 0 0 0 0 11
6:00 AM 0 19 4 0 0 0 0 0 0 0 0 0 0 23
7:00 AM 0 46 10 1 1 0 0 0 0 0 0 0 0 58
8:00 AM 0 94 19 0 1 0 0 0 0 0 0 0 0 114
9:00 AM 1 95 17 1 3 0 0 0 0 0 0 0 0 117
10:00 AM 2 95 14 1 2 0 0 0 0 0 0 0 0 114
11:00 AM 1 107 12 0 3 1 0 0 0 0 0 0 0 124
12:00 PM 1 108 16 1 2 0 0 0 0 0 0 0 0 128
1:00 PM 2 123 16 0 2 0 0 0 0 0 0 0 0 143
2:00 PM 1 126 14 1 1 0 0 0 0 0 0 0 0 143
3:00 PM 3 137 18 1 1 0 0 0 0 0 0 0 0 160
4:00 PM 1 160 14 0 2 0 0 0 0 0 0 0 0 177
5:00 PM 2 165 13 0 1 0 0 0 0 0 0 0 0 181
6:00 PM 1 129 10 0 1 0 0 0 0 0 0 0 0 141
7:00 PM 1 108 11 0 0 0 0 0 0 0 0 0 0 120
8:00 PM 1 102 12 0 0 0 0 0 0 0 0 0 0 115
9:00 PM 0 86 12 0 0 0 0 0 0 0 0 0 0 98
10:00 PM 0 47 7 0 0 0 0 0 0 0 0 0 0 54
11:00 PM 0 24 3 0 0 0 0 0 0 0 0 0 0 27
17 1,805 229 6 20 1 0 0 0 0 0 0 0
0.8% 86.9% 11.0% 0.3% 1.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Note: Average only condsidered on days with 24-hours of data.
Thursday, May 14, 2026
Time FHWA Vehicle Classification
Total 1,429
Time FHWA Vehicle Classification
Total 2,078
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 251
Total Study Average
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 5 0 0 0 0 0 0 0 0 0 0 0 5
1:00 AM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 7 2 0 0 0 0 0 0 0 0 0 0 9
6:00 AM 0 12 3 0 0 0 0 0 0 0 0 0 0 15
7:00 AM 0 36 7 0 1 0 0 0 0 0 0 0 0 44
8:00 AM 0 81 10 0 1 0 0 0 0 0 0 0 0 92
9:00 AM 0 74 9 0 1 0 0 0 0 0 0 0 0 84
10:00 AM 1 75 8 0 1 0 0 0 0 0 0 0 0 85
11:00 AM 0 86 10 0 1 0 0 0 0 0 0 0 0 97
12:00 PM 1 79 8 0 1 0 0 0 0 0 0 0 0 89
1:00 PM 0 84 10 0 1 0 0 0 0 0 0 0 0 95
2:00 PM 1 84 6 0 1 0 0 0 0 0 0 0 0 92
3:00 PM 1 85 8 0 1 0 0 0 0 0 0 0 0 95
4:00 PM 0 94 7 0 0 0 0 0 0 0 0 0 0 101
5:00 PM 0 120 7 0 0 0 0 0 0 0 0 0 0 127
6:00 PM 0 101 5 0 0 0 0 0 0 0 0 0 0 106
7:00 PM 1 67 3 0 0 0 0 0 0 0 0 0 0 71
8:00 PM 0 45 1 0 0 0 0 0 0 0 0 0 0 46
9:00 PM 0 30 1 0 0 0 0 0 0 0 0 0 0 31
10:00 PM 0 17 0 0 0 0 0 0 0 0 0 0 0 17
11:00 PM 0 7 0 0 0 0 0 0 0 0 0 0 0 7
5 1,196 106 0 9 0 0 0 0 0 0 0 0
0.4% 90.9% 8.1% 0.0% 0.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Note: Average only condsidered on days with 24-hours of data.
3-Day (Tuesday - Thursday) Average
Northbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 8 1 0 0 0 0 0 0 0 0 0 0 9
1:00 AM 0 7 1 0 0 0 0 0 0 0 0 0 0 8
2:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
3:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
4:00 AM 0 4 1 0 0 0 0 0 0 0 0 0 0 5
5:00 AM 0 13 1 0 0 0 0 0 0 0 0 0 0 14
6:00 AM 0 23 5 0 0 0 0 0 0 0 0 0 0 28
7:00 AM 0 58 12 1 1 0 0 0 0 0 0 0 0 72
8:00 AM 0 114 26 1 1 0 0 0 0 0 0 0 0 142
9:00 AM 1 106 21 1 3 0 0 0 0 0 0 0 0 132
10:00 AM 2 86 16 1 2 0 0 0 0 0 0 0 0 107
11:00 AM 1 114 13 1 5 0 0 0 0 0 0 0 0 134
12:00 PM 1 108 17 1 3 0 0 0 0 0 0 0 0 130
1:00 PM 1 114 15 0 2 0 0 0 0 0 0 0 0 132
2:00 PM 1 131 17 1 1 0 0 0 0 0 0 0 0 151
3:00 PM 3 148 21 2 2 0 0 0 0 0 0 0 0 176
4:00 PM 2 188 18 0 1 0 0 0 0 0 0 0 0 209
5:00 PM 1 212 18 1 1 0 0 0 0 0 0 0 0 233
6:00 PM 1 147 11 0 2 0 0 0 0 0 0 0 0 161
7:00 PM 1 122 9 1 1 0 0 0 0 0 0 0 0 134
8:00 PM 1 109 13 0 0 0 0 0 0 0 0 0 0 123
9:00 PM 0 95 12 0 0 0 0 0 0 0 0 0 0 107
10:00 PM 0 38 6 0 0 0 0 0 0 0 0 0 0 44
11:00 PM 0 20 2 0 0 0 0 0 0 0 0 0 0 22
16 1,967 257 11 25 0 0 0 0 0 0 0 0
0.7% 86.4% 11.3% 0.5% 1.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Time FHWA Vehicle Classification
Total 1,316
Time FHWA Vehicle Classification
Total 2,276
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 252
3-Day (Tuesday - Thursday) Average
Southbound
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 4 0 0 1 0 0 0 0 0 0 0 0 5
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
3:00 AM 0 1 1 0 0 0 0 0 0 0 0 0 0 2
4:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
5:00 AM 0 9 3 0 0 0 0 0 0 0 0 0 0 12
6:00 AM 0 14 3 1 1 0 0 0 0 0 0 0 0 19
7:00 AM 0 44 8 0 1 0 0 0 0 0 0 0 0 53
8:00 AM 0 105 14 0 2 0 0 0 0 0 0 0 0 121
9:00 AM 0 81 12 0 1 0 0 0 0 0 0 0 0 94
10:00 AM 1 69 12 0 2 0 0 0 0 0 0 0 0 84
11:00 AM 0 79 11 1 2 0 0 0 0 0 0 0 0 93
12:00 PM 1 80 8 0 1 0 0 0 0 0 0 0 0 90
1:00 PM 0 76 9 0 1 0 0 0 0 0 0 0 0 86
2:00 PM 1 78 6 0 1 0 0 0 0 0 0 0 0 86
3:00 PM 1 84 10 0 1 0 0 0 0 0 0 0 0 96
4:00 PM 0 103 10 0 1 0 0 0 0 0 0 0 0 114
5:00 PM 0 161 11 0 0 0 0 0 0 0 0 0 0 172
6:00 PM 0 120 8 0 0 0 0 0 0 0 0 0 0 128
7:00 PM 0 65 3 0 0 0 0 0 0 0 0 0 0 68
8:00 PM 1 49 1 0 0 0 0 0 0 0 0 0 0 51
9:00 PM 0 34 0 0 0 0 0 0 0 0 0 0 0 34
10:00 PM 0 12 0 0 0 0 0 0 0 0 0 0 0 12
11:00 PM 0 6 0 0 0 0 0 0 0 0 0 0 0 6
5 1,278 130 2 15 0 0 0 0 0 0 0 0
0.3% 89.4% 9.1% 0.1% 1.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%Total 1,430
Time FHWA Vehicle Classification
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 253
Location: Waverley St, Between Lincoln Ave and Kingsley Ave
Direction: Northbound / Southbound
Date Range: 5/8/2026 to 5/14/2026
Site Code: 02
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
30 137 639 3,780 7,047 2,513 359 43 12 1 0 0
0.2%0.9%4.4%26.0%48.4%17.3%2.5%0.3%0.1%0.0%0.0%0.0%
25 69 480 2,834 4,218 1,406 195 23 1 2 0 1
0.3%0.7%5.2%30.6%45.6%15.2%2.1%0.2%0.0%0.0%0.0%0.0%
55 206 1,119 6,614 11,265 3,919 554 66 13 3 0 1
0.2%0.9%4.7%27.8%47.3%16.5%2.3%0.3%0.1%0.0%0.0%0.0%
50th Percentile (Median) 26.8 mph Mean (Average) Speed 26.8 mph
30.9 mph 10 mph Pace 21.9 - 31.9 mph
33.7 mph Percent in Pace 78.7 %
50th Percentile (Median) 26.3 mph Mean (Average) Speed 26.3 mph
30.4 mph 10 mph Pace 21.3 - 31.3 mph
33.2 mph Percent in Pace 78.5 %
Location: Waverley St, Between Lincoln Ave and Kingsley Ave
Date Range: 5/8/2026 to 5/14/2026
Site Code: 02
Northbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 2 2 6 1 1 0 0 0 0
1:00 AM 0 0 0 1 4 1 2 2 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 1 0 1 0 0 0 0 0 0
4:00 AM 0 0 0 1 3 2 0 0 0 0 0 0
5:00 AM 0 0 0 2 3 2 2 0 0 0 0 0
6:00 AM 0 0 1 6 10 9 1 0 0 0 0 0
Southbound
Total
Total Study Percentile Speed Summary Total Study Speed Statistics
Vehicle Speed Report Summary
Direction Speed Range (mph)
Northbound
85th Percentile
95th Percentile
Friday, May 8, 2026
Time Speed Range (mph)
Northbound Northbound
85th Percentile
95th Percentile
Southbound Southbound
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 254
7:00 AM 0 1 1 19 39 10 3 0 0 0 0 0
8:00 AM 2 1 3 25 71 31 8 0 0 0 0 0
9:00 AM 0 2 9 35 50 23 4 0 0 0 0 0
10:00 AM 0 0 2 27 65 34 3 0 0 0 0 0
11:00 AM 0 0 8 39 53 18 1 0 0 0 0 0
12:00 PM 0 0 3 34 75 26 3 0 0 0 0 0
1:00 PM 0 2 2 41 75 32 0 0 0 0 0 0
2:00 PM 0 1 3 40 73 25 3 0 0 0 0 0
3:00 PM 0 0 10 46 69 32 3 1 0 0 0 0
4:00 PM 1 3 7 38 102 30 5 0 0 0 0 0
5:00 PM 1 3 8 23 106 30 4 0 0 0 0 0
6:00 PM 0 1 7 29 84 26 4 0 0 0 0 0
7:00 PM 0 2 6 25 64 23 6 0 0 0 0 0
8:00 PM 1 3 12 39 51 16 3 0 0 0 0 0
9:00 PM 0 0 2 27 57 22 5 1 0 0 0 0
10:00 PM 0 3 3 17 56 27 2 0 0 0 0 0
11:00 PM 0 0 0 5 24 11 2 0 0 0 0 0
5 22 87 522 1,136 437 65 5 0 0 0 0
0.2% 1.0% 3.8% 22.9% 49.8% 19.2% 2.9% 0.2% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 27.2 mph Mean (Average) Speed 27.1 mph
85th Percentile 31.2 mph 10 mph Pace mph
95th Percentile 34.0 mph Percent in Pace 78.0 %
Southbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 1 0 1 0 1 0 0 0 0 0
1:00 AM 0 0 0 0 2 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 1 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 1 3 0 0 0 0 0 0
5:00 AM 0 0 0 2 4 0 2 0 0 0 0 0
6:00 AM 0 1 0 5 8 1 2 1 0 0 0 0
7:00 AM 1 0 6 13 20 6 0 0 0 0 0 0
8:00 AM 0 1 4 34 41 8 1 0 0 0 0 0
9:00 AM 0 0 2 30 49 12 1 0 0 0 0 0
10:00 AM 0 2 3 28 38 11 5 0 0 0 0 0
11:00 AM 0 1 6 38 45 19 1 0 0 0 0 0
12:00 PM 0 0 2 25 61 18 1 0 0 0 0 0
1:00 PM 0 1 5 36 56 15 1 0 0 0 0 0
2:00 PM 0 0 6 27 50 12 4 0 0 0 0 0
3:00 PM 0 0 3 27 43 21 3 0 0 0 0 0
4:00 PM 0 0 5 31 60 11 0 0 0 0 0 0
5:00 PM 0 2 4 33 51 20 6 1 0 0 0 0
6:00 PM 1 1 4 35 58 18 0 0 0 0 0 0
7:00 PM 1 0 5 17 37 13 2 0 0 0 0 0
Total
Daily Percentile Speed Summary Speed Statistics
22.6 - 32.6
Friday, May 8, 2026
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 255
8:00 PM 0 2 3 14 28 11 1 0 0 0 0 0
9:00 PM 0 1 0 9 19 6 2 0 0 0 0 0
10:00 PM 0 0 0 7 13 8 2 0 0 0 0 0
11:00 PM 0 0 0 5 4 3 1 0 0 0 0 0
3 12 59 417 689 216 36 2 0 0 0 0
0.2% 0.8% 4.1% 29.1% 48.0% 15.1% 2.5% 0.1% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 26.7 mph Mean (Average) Speed 26.5 mph
85th Percentile 30.5 mph 10 mph Pace mph
95th Percentile 33.2 mph Percent in Pace 79.92 %
Northbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 3 9 4 1 0 0 0 0 0
1:00 AM 0 0 0 3 2 6 2 1 1 0 0 0
2:00 AM 0 0 0 0 2 1 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 1 0 0 0
4:00 AM 0 0 0 1 2 1 0 1 0 0 0 0
5:00 AM 0 0 1 1 1 1 1 0 0 0 0 0
6:00 AM 0 0 1 3 6 2 2 1 0 0 0 0
7:00 AM 0 1 0 4 11 4 3 0 0 0 0 0
8:00 AM 0 0 1 11 26 17 2 0 0 0 0 0
9:00 AM 0 0 1 23 63 17 5 0 0 0 0 0
10:00 AM 0 4 4 29 62 18 6 0 0 0 0 0
11:00 AM 1 1 10 37 55 22 2 0 0 0 0 0
12:00 PM 0 2 6 34 42 22 2 0 0 0 0 0
1:00 PM 1 2 8 43 85 23 1 0 0 0 0 0
2:00 PM 0 3 15 59 54 15 5 0 0 0 0 0
3:00 PM 0 1 13 51 73 23 0 1 0 0 0 0
4:00 PM 0 0 4 37 49 14 5 0 0 0 0 0
5:00 PM 0 1 4 30 54 23 2 0 0 0 0 0
6:00 PM 0 1 3 39 55 25 4 1 1 0 0 0
7:00 PM 0 1 1 30 59 18 3 1 0 0 0 0
8:00 PM 0 0 3 24 55 14 2 0 0 0 0 0
9:00 PM 0 0 6 29 45 13 4 0 0 0 0 0
10:00 PM 0 0 0 12 31 18 2 2 0 0 0 0
11:00 PM 0 0 0 6 17 14 1 0 0 0 0 0
2 17 81 509 858 315 55 8 3 0 0 0
0.1% 0.9% 4.4% 27.5% 46.4% 17.0% 3.0% 0.4% 0.2% 0.0% 0.0% 0.0%
50th Percentile (Median) 26.6 mph Mean (Average) Speed 26.7 mph
85th Percentile 31.0 mph 10 mph Pace mph
95th Percentile 34.1 mph Percent in Pace 77.8 %
Total
Daily Percentile Speed Summary Speed Statistics
22.0 - 32.0
Saturday, May 9, 2026
21.9 - 31.9
Saturday, May 9, 2026
Time Speed Range (mph)
Total
Daily Percentile Speed Summary Speed Statistics
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 256
Southbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 1 1 4 1 0 0 0 0 0 0
1:00 AM 0 0 0 1 1 1 0 1 0 0 0 0
2:00 AM 0 0 0 1 1 0 0 0 0 0 0 0
3:00 AM 0 0 0 1 2 0 0 0 0 0 0 0
4:00 AM 0 0 1 0 1 0 2 0 0 0 0 0
5:00 AM 0 0 1 0 2 1 0 0 0 0 0 0
6:00 AM 0 0 0 5 4 2 0 0 0 0 0 0
7:00 AM 0 0 1 5 8 5 1 0 0 0 0 0
8:00 AM 0 0 2 17 22 4 1 0 0 0 0 0
9:00 AM 0 0 1 18 39 8 0 0 0 0 0 0
10:00 AM 0 0 0 16 44 11 1 0 0 0 0 0
11:00 AM 0 2 6 17 48 16 2 0 0 0 0 0
12:00 PM 0 0 6 24 38 22 4 0 0 0 0 0
1:00 PM 0 1 2 21 53 25 4 0 0 0 0 0
2:00 PM 0 0 2 38 48 23 1 0 0 0 0 0
3:00 PM 1 0 7 27 38 16 1 0 0 0 0 1
4:00 PM 1 0 4 20 39 9 5 1 0 0 0 0
5:00 PM 0 2 8 23 41 17 6 0 0 0 0 0
6:00 PM 0 0 6 31 51 14 1 1 0 0 0 0
7:00 PM 0 1 2 27 32 18 1 0 0 0 0 0
8:00 PM 0 0 4 9 20 6 1 0 0 0 0 0
9:00 PM 0 0 0 14 20 2 1 0 0 0 0 0
10:00 PM 0 1 1 7 8 2 1 0 0 0 0 0
11:00 PM 0 0 0 4 3 0 0 0 0 0 0 0
2 7 55 327 567 203 33 3 0 0 0 1
0.2% 0.6% 4.6% 27.3% 47.3% 16.9% 2.8% 0.3% 0.0% 0.0% 0.0% 0.1%
50th Percentile (Median) 26.6 mph Mean (Average) Speed 26.7 mph
85th Percentile 30.8 mph 10 mph Pace mph
95th Percentile 33.6 mph Percent in Pace 79.05 %
Northbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 5 8 4 0 0 0 0 0 0
1:00 AM 0 0 1 0 5 2 1 2 0 0 0 0
2:00 AM 0 0 0 0 4 1 1 1 0 0 0 0
3:00 AM 0 0 0 0 0 0 1 1 0 0 0 0
4:00 AM 0 0 0 0 2 2 0 1 0 0 0 0
5:00 AM 0 0 0 2 3 0 1 1 0 0 0 0
6:00 AM 0 0 0 2 5 2 0 0 0 0 0 0
7:00 AM 0 1 1 4 12 7 0 0 0 0 0 0
8:00 AM 0 0 0 9 16 9 3 1 0 0 0 0
9:00 AM 0 0 2 17 40 20 2 0 0 0 0 0
Time Speed Range (mph)
Total
Daily Percentile Speed Summary Speed Statistics
22.0 - 32.0
Sunday, May 10, 2026
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 257
10:00 AM 0 1 2 31 36 14 1 0 0 0 0 0
11:00 AM 1 2 3 24 58 16 1 0 0 0 0 0
12:00 PM 0 3 7 40 64 17 1 0 0 0 0 0
1:00 PM 0 3 12 33 76 27 0 1 0 0 0 0
2:00 PM 0 2 8 49 59 13 1 0 0 0 0 0
3:00 PM 0 3 8 28 57 16 3 0 0 0 0 0
4:00 PM 0 0 9 34 66 16 4 0 1 0 0 0
5:00 PM 0 1 10 27 59 15 0 0 0 0 0 0
6:00 PM 0 0 4 29 53 14 1 0 0 0 0 0
7:00 PM 0 1 3 43 40 12 0 0 1 0 0 0
8:00 PM 0 1 6 33 48 14 2 0 0 0 0 0
9:00 PM 0 1 4 16 34 10 0 1 0 0 0 0
10:00 PM 0 0 1 7 23 7 0 0 0 0 0 0
11:00 PM 0 0 1 3 7 2 1 0 0 0 0 0
1 19 82 436 775 240 24 9 2 0 0 0
0.1% 1.2% 5.2% 27.5% 48.8% 15.1% 1.5% 0.6% 0.1% 0.0% 0.0% 0.0%
50th Percentile (Median) 26.5 mph Mean (Average) Speed 26.5 mph
85th Percentile 30.5 mph 10 mph Pace mph
95th Percentile 33.3 mph Percent in Pace 80.1 %
Southbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 4 2 1 0 0 0 0 0 0
1:00 AM 0 0 2 1 3 3 0 0 0 0 0 0
2:00 AM 0 0 0 0 1 3 0 1 0 0 0 0
3:00 AM 0 0 1 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 2 0 0 0 0 0
5:00 AM 0 0 0 1 2 1 0 0 0 0 0 0
6:00 AM 0 0 0 1 9 0 1 0 0 0 0 0
7:00 AM 0 0 2 5 10 5 0 0 0 0 0 0
8:00 AM 0 0 1 12 15 4 2 0 0 0 0 0
9:00 AM 0 0 4 16 20 4 0 0 0 0 0 0
10:00 AM 1 1 2 23 46 18 3 0 0 0 0 0
11:00 AM 0 1 3 34 72 21 2 0 0 0 0 0
12:00 PM 0 0 3 20 32 24 6 1 0 0 0 0
1:00 PM 0 0 1 19 49 31 2 0 0 0 0 0
2:00 PM 0 1 4 19 36 21 0 0 0 1 0 0
3:00 PM 0 3 7 24 41 18 2 0 0 0 0 0
4:00 PM 0 1 3 21 34 14 5 0 0 0 0 0
5:00 PM 0 1 7 17 33 17 2 0 0 0 0 0
6:00 PM 1 3 8 24 25 10 0 1 0 0 0 0
7:00 PM 0 0 3 26 17 15 2 0 0 0 0 0
8:00 PM 1 0 2 17 23 3 0 0 0 0 0 0
9:00 PM 0 0 3 2 6 4 0 0 0 0 0 0
10:00 PM 0 0 0 6 4 4 1 0 0 1 0 0
Total
Daily Percentile Speed Summary Speed Statistics
21.9 - 31.9
Sunday, May 10, 2026
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 258
11:00 PM 0 0 0 3 4 0 0 0 0 0 0 0
3 11 56 295 484 221 30 3 0 2 0 0
0.3% 1.0% 5.1% 26.7% 43.8% 20.0% 2.7% 0.3% 0.0% 0.2% 0.0% 0.0%
50th Percentile (Median) 26.8 mph Mean (Average) Speed 26.7 mph
85th Percentile 30.9 mph 10 mph Pace mph
95th Percentile 33.7 mph Percent in Pace 75.75 %
Northbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 0 3 0 1 0 0 0 0 0
1:00 AM 0 0 0 0 1 1 2 1 0 0 0 0
2:00 AM 0 0 0 1 2 0 0 0 0 0 0 0
3:00 AM 0 0 1 0 2 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 1 5 0 0 0 0 0 0
5:00 AM 0 0 1 0 4 5 0 0 0 0 0 0
6:00 AM 0 2 3 5 11 7 3 0 0 0 0 0
7:00 AM 0 2 3 16 33 8 5 2 1 0 0 0
8:00 AM 0 1 5 42 68 17 5 1 0 0 0 0
9:00 AM 1 1 5 35 45 25 3 0 0 0 0 0
10:00 AM 0 1 3 42 59 25 1 2 0 0 0 0
11:00 AM 0 0 4 36 53 21 2 0 0 0 0 0
12:00 PM 0 1 5 39 65 15 3 0 1 0 0 0
1:00 PM 0 2 4 40 55 25 0 0 0 0 0 0
2:00 PM 0 1 7 27 58 29 3 0 0 0 0 0
3:00 PM 0 5 15 34 71 24 6 0 0 0 0 0
4:00 PM 0 2 6 28 106 40 4 0 0 0 0 0
5:00 PM 0 4 4 25 79 43 8 0 0 0 0 0
6:00 PM 0 0 3 26 61 30 6 1 0 0 0 0
7:00 PM 0 1 8 26 43 24 2 1 0 0 0 0
8:00 PM 0 0 4 18 58 27 1 0 0 0 0 0
9:00 PM 0 0 0 22 47 15 5 0 0 0 0 0
10:00 PM 0 0 2 6 15 9 1 0 1 0 0 0
11:00 PM 0 0 0 8 10 4 3 0 1 0 0 0
1 23 83 476 950 399 64 8 4 0 0 0
0.0% 1.1% 4.1% 23.7% 47.3% 19.9% 3.2% 0.4% 0.2% 0.0% 0.0% 0.0%
50th Percentile (Median) 27.2 mph Mean (Average) Speed 27.1 mph
85th Percentile 31.3 mph 10 mph Pace mph
95th Percentile 34.4 mph Percent in Pace 77.3 %
Southbound
21.0 - 31.0
Monday, May 11, 2026
Time Speed Range (mph)
Total
Total
Daily Percentile Speed Summary Speed Statistics
Daily Percentile Speed Summary Speed Statistics
21.8 - 31.8
Monday, May 11, 2026
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 259
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 2 2 1 0 0 0 0 0 0
1:00 AM 0 0 0 0 1 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 1 0 0 0 0 0 0 0
3:00 AM 0 0 0 1 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 3 1 0 0 0 0 0 0
5:00 AM 0 0 0 2 5 1 2 0 0 0 0 0
6:00 AM 0 0 3 3 8 2 0 0 0 0 0 0
7:00 AM 1 1 4 14 22 12 0 0 0 0 0 0
8:00 AM 0 1 6 37 54 10 1 0 0 0 0 0
9:00 AM 0 0 1 36 51 14 2 0 0 0 0 0
10:00 AM 1 0 8 24 46 15 3 0 0 0 0 0
11:00 AM 0 1 5 25 34 3 1 0 0 0 0 0
12:00 PM 0 0 5 22 28 13 0 0 0 0 0 0
1:00 PM 1 0 7 29 29 14 1 0 0 0 0 0
2:00 PM 0 1 4 28 40 15 0 0 0 0 0 0
3:00 PM 0 0 6 34 33 19 2 1 0 0 0 0
4:00 PM 0 0 2 28 56 16 2 0 0 0 0 0
5:00 PM 0 0 5 34 35 14 1 0 0 0 0 0
6:00 PM 2 0 6 12 29 15 4 0 0 0 0 0
7:00 PM 2 0 2 22 32 6 2 3 0 0 0 0
8:00 PM 0 0 3 9 14 4 1 0 0 0 0 0
9:00 PM 0 0 2 10 10 6 0 1 0 0 0 0
10:00 PM 0 0 0 6 7 1 2 1 0 0 0 0
11:00 PM 0 0 0 2 0 0 1 0 0 0 0 0
7 4 69 380 540 182 25 6 0 0 0 0
0.6% 0.3% 5.7% 31.3% 44.5% 15.0% 2.1% 0.5% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 26.2 mph Mean (Average) Speed 26.2 mph
85th Percentile 30.5 mph 10 mph Pace mph
95th Percentile 33.4 mph Percent in Pace 78.57 %
Northbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 2 0 1 0 0 0 0 0 0
1:00 AM 0 0 0 1 3 3 1 1 0 0 0 0
2:00 AM 0 0 0 0 2 0 0 0 0 0 0 0
3:00 AM 0 0 0 1 0 0 1 0 0 0 0 0
4:00 AM 0 0 0 0 1 1 3 0 0 0 0 0
5:00 AM 0 0 2 4 5 6 1 0 0 0 0 0
6:00 AM 0 0 1 4 20 2 1 0 0 0 0 0
7:00 AM 1 0 5 7 33 11 4 1 0 0 0 0
8:00 AM 0 1 6 37 67 24 6 0 0 0 0 0
9:00 AM 0 1 5 35 62 15 1 0 0 0 0 0
10:00 AM 0 1 8 30 44 16 1 0 0 0 0 0
11:00 AM 0 0 9 25 64 30 4 0 0 0 0 0
Total
Daily Percentile Speed Summary Speed Statistics
21.4 - 31.4
Tuesday, May 12, 2026
Time
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 260
12:00 PM 1 1 8 24 87 10 1 0 0 0 0 0
1:00 PM 1 1 7 32 69 19 0 1 0 0 0 0
2:00 PM 1 1 9 32 70 25 4 0 0 0 0 0
3:00 PM 0 2 3 50 78 24 5 0 0 0 0 0
4:00 PM 0 1 17 90 114 23 5 0 0 0 0 0
5:00 PM 8 18 18 63 139 49 1 0 0 0 0 0
6:00 PM 0 1 1 31 91 28 9 0 0 0 0 0
7:00 PM 0 0 3 36 67 24 6 1 0 0 0 0
8:00 PM 0 0 5 30 46 28 0 0 0 0 0 0
9:00 PM 0 0 0 13 56 20 4 0 0 0 0 0
10:00 PM 0 0 1 9 22 14 2 1 0 0 0 0
11:00 PM 0 0 0 6 5 4 1 0 1 0 0 0
12 28 108 562 1,145 377 61 5 1 0 0 0
0.5% 1.2% 4.7% 24.4% 49.8% 16.4% 2.7% 0.2% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 27.0 mph Mean (Average) Speed 26.7 mph
85th Percentile 30.8 mph 10 mph Pace mph
95th Percentile 33.4 mph Percent in Pace 79.1 %
Southbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 1 0 1 0 0 0 0 0 0
1:00 AM 0 0 0 1 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 1 0 0 0 0 0 0 0
3:00 AM 0 0 1 0 1 0 1 0 0 0 0 0
4:00 AM 0 0 0 0 1 0 1 0 0 0 0 0
5:00 AM 0 0 1 3 1 7 1 0 0 0 0 0
6:00 AM 0 0 2 8 8 3 0 0 0 0 0 0
7:00 AM 0 0 6 16 23 7 1 0 0 0 0 0
8:00 AM 1 4 6 34 53 15 0 0 0 0 0 0
9:00 AM 1 1 6 37 42 15 1 1 0 0 0 0
10:00 AM 0 0 10 30 29 12 4 0 0 0 0 0
11:00 AM 0 1 5 33 51 9 1 0 0 0 0 0
12:00 PM 0 1 2 31 38 11 3 0 0 0 0 0
1:00 PM 0 1 3 36 32 12 1 0 0 0 0 0
2:00 PM 1 0 2 35 52 15 1 0 0 0 0 0
3:00 PM 1 0 4 40 44 10 2 0 0 0 0 0
4:00 PM 0 0 5 36 61 18 1 1 0 0 0 0
5:00 PM 0 0 4 60 91 33 2 1 0 0 0 0
6:00 PM 0 1 7 41 61 15 0 0 0 0 0 0
7:00 PM 2 2 8 11 26 10 3 1 0 0 0 0
8:00 PM 0 0 4 15 21 9 1 0 1 0 0 0
9:00 PM 0 0 1 14 11 3 2 0 0 0 0 0
10:00 PM 0 0 0 2 8 1 0 0 0 0 0 0
11:00 PM 0 0 0 1 5 1 0 1 0 0 0 0
6 11 77 485 660 207 26 5 1 0 0 0
22.1 - 32.1
Tuesday, May 12, 2026
Time Speed Range (mph)
Total
Total
Daily Percentile Speed Summary Speed Statistics
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 261
0.4% 0.7% 5.2% 32.8% 44.7% 14.0% 1.8% 0.3% 0.1% 0.0% 0.0% 0.0%
50th Percentile (Median) 26.2 mph Mean (Average) Speed 26.1 mph
85th Percentile 30.2 mph 10 mph Pace mph
95th Percentile 32.7 mph Percent in Pace 79.91 %
Northbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 1 6 3 3 0 0 0 0 0
1:00 AM 0 0 0 0 3 1 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 2 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 2 1 0 0 0 0 0 0
5:00 AM 0 0 2 0 4 3 1 0 0 0 0 0
6:00 AM 0 0 1 6 12 6 3 1 0 0 0 0
7:00 AM 1 0 0 10 40 24 4 0 0 0 0 0
8:00 AM 1 1 10 51 56 26 1 0 0 0 0 0
9:00 AM 0 0 4 39 56 24 1 0 0 0 0 0
10:00 AM 0 2 7 32 45 18 4 1 0 0 0 0
11:00 AM 0 0 4 40 72 25 0 0 0 0 0 0
12:00 PM 1 0 3 42 50 22 3 0 0 0 0 0
1:00 PM 0 2 11 32 57 12 2 0 0 0 0 0
2:00 PM 0 2 14 60 69 15 1 0 0 0 0 0
3:00 PM 0 0 12 60 90 22 2 0 1 1 0 0
4:00 PM 1 1 9 65 85 20 1 0 0 0 0 0
5:00 PM 0 0 5 59 100 27 6 0 0 0 0 0
6:00 PM 0 2 4 31 84 37 6 0 0 0 0 0
7:00 PM 0 0 1 36 59 23 3 1 0 0 0 0
8:00 PM 0 2 9 34 62 22 3 0 0 0 0 0
9:00 PM 0 0 3 21 54 18 3 0 0 0 0 0
10:00 PM 0 0 1 5 19 14 3 0 0 0 0 0
11:00 PM 0 0 0 3 14 6 1 1 1 0 0 0
4 12 100 627 1,039 369 51 6 2 1 0 0
0.2% 0.5% 4.5% 28.4% 47.0% 16.7% 2.3% 0.3% 0.1% 0.0% 0.0% 0.0%
50th Percentile (Median) 26.6 mph Mean (Average) Speed 26.6 mph
85th Percentile 30.6 mph 10 mph Pace mph
95th Percentile 33.3 mph Percent in Pace 79.1 %
Southbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 2 1 2 1 0 0 0 0 0 0
1:00 AM 0 0 0 1 0 0 0 0 0 0 0 0
Total
Total
Daily Percentile Speed Summary Speed Statistics
21.3 - 31.3
Wednesday, May 13, 2026
Daily Percentile Speed Summary Speed Statistics
21.4 - 31.4
Wednesday, May 13, 2026
Time Speed Range (mph)
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 262
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 1 1 0 0 0 0 0 0
4:00 AM 0 0 0 1 0 0 1 0 0 0 0 0
5:00 AM 0 0 0 3 3 1 1 0 0 0 0 0
6:00 AM 0 0 1 5 6 1 1 0 0 0 0 0
7:00 AM 0 0 1 9 29 9 2 0 0 0 0 0
8:00 AM 0 2 8 30 75 6 1 0 0 0 0 0
9:00 AM 0 0 3 24 36 23 0 0 0 0 0 0
10:00 AM 0 0 3 27 34 16 0 0 0 0 0 0
11:00 AM 0 0 4 33 37 7 3 0 0 0 0 0
12:00 PM 0 0 5 23 41 15 1 0 0 0 0 0
1:00 PM 0 1 7 29 55 5 1 0 0 0 0 0
2:00 PM 0 0 3 29 36 11 2 0 0 0 0 0
3:00 PM 2 2 4 29 44 13 1 0 0 0 0 0
4:00 PM 0 0 6 31 56 25 1 0 0 0 0 0
5:00 PM 0 2 10 71 68 15 2 1 0 0 0 0
6:00 PM 0 1 4 32 62 22 4 0 0 0 0 0
7:00 PM 0 1 8 20 28 12 1 0 0 0 0 0
8:00 PM 1 1 1 18 25 4 0 0 0 0 0 0
9:00 PM 0 0 3 11 17 3 1 0 0 0 0 0
10:00 PM 0 0 0 1 4 4 0 0 0 0 0 0
11:00 PM 0 0 0 1 3 2 0 0 0 0 0 0
3 10 73 429 662 196 23 1 0 0 0 0
0.2% 0.7% 5.2% 30.7% 47.4% 14.0% 1.6% 0.1% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 26.1 mph Mean (Average) Speed 26.1 mph
85th Percentile 30.1 mph 10 mph Pace mph
95th Percentile 32.5 mph Percent in Pace 79.24 %
Northbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 2 7 3 1 0 0 0 0 0
1:00 AM 0 0 0 3 3 4 1 0 0 0 0 0
2:00 AM 0 0 0 1 0 1 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 1 0 0 0 0 0 0
4:00 AM 0 0 0 2 3 3 0 0 0 0 0 0
5:00 AM 0 0 1 3 4 7 1 0 0 0 0 0
6:00 AM 0 0 2 4 13 6 2 1 0 0 0 0
7:00 AM 0 1 1 13 34 24 2 0 0 0 0 0
8:00 AM 0 0 3 20 69 41 5 0 0 0 0 0
9:00 AM 0 1 4 24 86 33 1 0 0 0 0 0
10:00 AM 0 1 4 43 50 16 1 0 0 0 0 0
11:00 AM 0 0 12 26 61 25 6 0 0 0 0 0
12:00 PM 0 0 6 42 63 23 1 0 0 0 0 0
1:00 PM 2 2 5 45 81 16 1 0 0 0 0 0
2:00 PM 1 1 7 45 81 15 2 0 0 0 0 0
20.6 - 30.6
Thursday, May 14, 2026
Time Speed Range (mph)
Total
Daily Percentile Speed Summary Speed Statistics
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 263
3:00 PM 1 4 11 66 73 23 0 0 0 0 0 0
4:00 PM 0 0 9 56 105 22 2 0 0 0 0 0
5:00 PM 0 2 6 51 116 33 1 0 0 0 0 0
6:00 PM 1 0 10 41 79 22 4 1 0 0 0 0
7:00 PM 0 2 4 63 59 13 1 0 0 0 0 0
8:00 PM 0 0 6 42 68 11 1 0 0 0 0 0
9:00 PM 0 1 7 39 60 24 1 0 0 0 0 0
10:00 PM 0 1 0 12 20 6 2 0 0 0 0 0
11:00 PM 0 0 0 5 9 4 3 0 0 0 0 0
5 16 98 648 1,144 376 39 2 0 0 0 0
0.2% 0.7% 4.2% 27.8% 49.1% 16.2% 1.7% 0.1% 0.0% 0.0% 0.0% 0.0%
50th Percentile (Median) 26.7 mph Mean (Average) Speed 26.6 mph
85th Percentile 30.5 mph 10 mph Pace mph
95th Percentile 33.1 mph Percent in Pace 80.5 %
Southbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 2 0 4 2 0 0 0 0 0 0
1:00 AM 0 0 1 0 1 0 0 0 0 0 0 0
2:00 AM 0 0 0 1 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 1 0 1 0 0 0 0 0 0
4:00 AM 0 0 0 1 0 1 0 1 0 0 0 0
5:00 AM 0 0 0 3 5 5 1 0 0 0 0 0
6:00 AM 0 0 1 8 6 5 0 0 0 0 0 0
7:00 AM 0 1 1 19 24 10 3 0 0 0 0 0
8:00 AM 0 2 4 52 55 13 2 0 0 0 0 0
9:00 AM 0 2 4 40 30 14 3 0 0 0 0 0
10:00 AM 0 0 9 35 30 9 1 0 0 0 0 0
11:00 AM 0 0 6 40 40 9 1 0 0 0 0 0
12:00 PM 0 2 9 30 47 12 1 0 0 0 0 0
1:00 PM 0 1 6 35 27 8 1 1 0 0 0 0
2:00 PM 0 0 7 27 27 10 0 0 0 0 0 0
3:00 PM 1 1 8 39 34 9 0 0 0 0 0 0
4:00 PM 0 1 4 30 43 19 3 0 0 0 0 0
5:00 PM 0 0 6 46 85 18 2 0 0 0 0 0
6:00 PM 0 3 12 48 57 12 2 0 0 0 0 0
7:00 PM 0 0 1 22 40 11 1 1 0 0 0 0
8:00 PM 0 0 4 13 24 8 1 0 0 0 0 0
9:00 PM 0 0 3 7 25 3 0 0 0 0 0 0
10:00 PM 0 0 3 1 10 2 0 0 0 0 0 0
11:00 PM 0 1 0 3 2 0 0 0 0 0 0 0
1 14 91 501 616 181 22 3 0 0 0 0
0.1% 1.0% 6.4% 35.1% 43.1% 12.7% 1.5% 0.2% 0.0% 0.0% 0.0% 0.0%
Total
Total
Daily Percentile Speed Summary Speed Statistics
Daily Percentile Speed Summary Speed Statistics
21.3 - 31.3
Thursday, May 14, 2026
Time Speed Range (mph)
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 264
50th Percentile (Median) 25.6 mph Mean (Average) Speed 25.8 mph
85th Percentile 30.0 mph 10 mph Pace mph
95th Percentile 33.1 mph Percent in Pace 78.87 %
Northbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 0 2 5 3 1 0 0 0 0 0
1:00 AM 0 0 0 1 3 3 1 1 0 0 0 0
2:00 AM 0 0 0 0 1 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 1 2 2 0 0 0 0 0 0
5:00 AM 0 0 1 2 3 3 1 0 0 0 0 0
6:00 AM 0 0 1 4 11 5 2 0 0 0 0 0
7:00 AM 0 1 2 10 29 13 3 0 0 0 0 0
8:00 AM 0 1 4 28 53 24 4 0 0 0 0 0
9:00 AM 0 1 4 30 57 22 2 0 0 0 0 0
10:00 AM 0 1 4 33 52 20 2 0 0 0 0 0
11:00 AM 0 0 7 32 59 22 2 0 0 0 0 0
12:00 PM 0 1 5 36 64 19 2 0 0 0 0 0
1:00 PM 1 2 7 38 71 22 1 0 0 0 0 0
2:00 PM 0 2 9 45 66 20 3 0 0 0 0 0
3:00 PM 0 2 10 48 73 23 3 0 0 0 0 0
4:00 PM 0 1 9 50 90 24 4 0 0 0 0 0
5:00 PM 1 4 8 40 93 31 3 0 0 0 0 0
6:00 PM 0 1 5 32 72 26 5 0 0 0 0 0
7:00 PM 0 1 4 37 56 20 3 1 0 0 0 0
8:00 PM 0 1 6 31 55 19 2 0 0 0 0 0
9:00 PM 0 0 3 24 50 17 3 0 0 0 0 0
10:00 PM 0 1 1 10 27 14 2 0 0 0 0 0
11:00 PM 0 0 0 5 12 6 2 0 0 0 0 0
2 20 90 539 1,004 358 51 2 0 0 0 0
0.1% 1.0% 4.4% 26.1% 48.6% 17.3% 2.5% 0.1% 0.0% 0.0% 0.0% 0.0%
Note: Average only condsidered on days with 24-hours of data.
50th Percentile (Median) 26.8 mph Mean (Average) Speed 26.8 mph
85th Percentile 30.9 mph 10 mph Pace 21.9 - 31.9 mph
95th Percentile 33.7 mph Percent in Pace 78.7 %
Southbound
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65
12:00 AM 0 0 1 1 2 1 0 0 0 0 0 0
1:00 AM 0 0 0 1 1 1 0 0 0 0 0 0
2:00 AM 0 0 0 0 1 0 0 0 0 0 0 0
3:00 AM 0 0 0 1 1 0 0 0 0 0 0 0
20.5 - 30.5
Total Study Average
Total Study Average
Time Speed Range (mph)
Time Speed Range (mph)
Total
Total Study Percentile Speed Summary Total Study Speed Statistics
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 265
4:00 AM 0 0 0 0 1 1 1 0 0 0 0 0
5:00 AM 0 0 0 2 3 2 1 0 0 0 0 0
6:00 AM 0 0 1 5 7 2 1 0 0 0 0 0
7:00 AM 0 0 3 12 19 8 1 0 0 0 0 0
8:00 AM 0 1 4 31 45 9 1 0 0 0 0 0
9:00 AM 0 0 3 29 38 13 1 0 0 0 0 0
10:00 AM 0 0 5 26 38 13 2 0 0 0 0 0
11:00 AM 0 1 5 31 47 12 2 0 0 0 0 0
12:00 PM 0 0 5 25 41 16 2 0 0 0 0 0
1:00 PM 0 1 4 29 43 16 2 0 0 0 0 0
2:00 PM 0 0 4 29 41 15 1 0 0 0 0 0
3:00 PM 1 1 6 31 40 15 2 0 0 0 0 0
4:00 PM 0 0 4 28 50 16 2 0 0 0 0 0
5:00 PM 0 1 6 41 58 19 3 0 0 0 0 0
6:00 PM 1 1 7 32 49 15 2 0 0 0 0 0
7:00 PM 1 1 4 21 30 12 2 1 0 0 0 0
8:00 PM 0 0 3 14 22 6 1 0 0 0 0 0
9:00 PM 0 0 2 10 15 4 1 0 0 0 0 0
10:00 PM 0 0 1 4 8 3 1 0 0 0 0 0
11:00 PM 0 0 0 3 3 1 0 0 0 0 0 0
3 7 68 406 603 200 29 1 0 0 0 0
0.2% 0.5% 5.2% 30.8% 45.8% 15.2% 2.2% 0.1% 0.0% 0.0% 0.0% 0.0%
Note: Average only condsidered on days with 24-hours of data.
50th Percentile (Median) 26.3 mph Mean (Average) Speed 26.3 mph
85th Percentile 30.4 mph 10 mph Pace 21.3 - 31.3 mph
95th Percentile 33.2 mph Percent in Pace 78.5 %
Total
Total Study Percentile Speed Summary Total Study Speed Statistics
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 266
Location:Waverley St, Between Lincoln Ave and Kingsley Ave
Date Range: 5/8/2026 - 5/14/2026
Site Code: 02
Location:Waverley St, Between Lincoln Ave and Kingsley Ave
Count Direction: Northbound / Southbound
Date Range: 5/8/2026 - 5/14/2026
NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total Site Code: 02
12:00 AM 12 3 15 17 7 24 17 7 24 4 5 9 3 2 5 13 6 19 13 8 21 10 5 15
1:00 AM 10 2 12 15 4 19 11 9 20 5 1 6 9 1 10 4 1 5 11 2 13 8 1 9
2:00 AM 0 0 0 3 2 5 7 5 12 3 1 4 2 1 3 2 0 2 2 1 3 2 1 3
3:00 AM 2 1 3 1 3 4 2 1 3 3 1 4 2 3 5 0 2 2 1 2 3 1 2 3
4:00 AM 6 4 10 5 4 9 5 2 7 6 4 10 5 2 7 3 2 5 8 3 11 5 2 8 NB SB Total
5:00 AM 9 8 17 5 4 9 7 4 11 10 10 20 18 13 31 10 8 18 16 14 30 15 12 26 Daily Average 2,080 1,322 3,402
6:00 AM 27 18 45 15 11 26 9 11 20 31 16 47 28 21 49 29 14 43 28 20 48 28 18 47 Mid-Week Average 2,279 1,435 3,714
7:00 AM 73 46 119 23 20 43 25 22 47 70 54 124 62 53 115 79 50 129 75 58 133 72 54 126 Mid-Week AM Peak Average 142 121 263
8:00 AM 141 89 230 57 46 103 38 34 72 139 109 248 141 113 254 146 122 268 138 128 266 142 121 263 Mid-Week PM Peak Average 234 172 406
9:00 AM 123 94 217 109 66 175 81 44 125 115 104 219 119 104 223 124 86 210 149 93 242 131 94 225
10:00 AM 131 87 218 123 72 195 85 94 179 133 97 230 100 85 185 109 80 189 115 84 199 108 83 191
11:00 AM 119 110 229 128 91 219 105 133 238 116 69 185 132 100 232 141 84 225 130 96 226 134 93 228
12:00 PM 141 107 248 108 94 202 132 86 218 129 68 197 132 86 218 121 85 206 135 101 236 129 91 220
1:00 PM 152 114 266 163 106 269 152 102 254 126 81 207 130 85 215 116 98 214 152 79 231 133 87 220
2:00 PM 145 99 244 151 112 263 132 82 214 125 88 213 142 106 248 161 81 242 152 71 223 152 86 238
3:00 PM 161 97 258 162 91 253 115 95 210 155 95 250 162 101 263 188 95 283 178 92 270 176 96 272
4:00 PM 186 107 293 109 79 188 130 78 208 186 104 290 250 122 372 182 119 301 194 100 294 209 114 322
5:00 PM 175 117 292 114 97 211 112 77 189 163 89 252 296 191 487 197 169 366 209 157 366 234 172 406
6:00 PM 151 117 268 129 104 233 101 72 173 127 68 195 161 125 286 164 125 289 158 134 292 161 128 289
7:00 PM 126 75 201 113 81 194 100 63 163 105 69 174 137 63 200 123 70 193 142 76 218 134 70 204
8:00 PM 125 59 184 98 40 138 104 46 150 108 31 139 109 51 160 132 50 182 128 50 178 123 50 173
9:00 PM 114 37 151 97 37 134 66 15 81 89 29 118 93 31 124 99 35 134 132 38 170 108 35 143
10:00 PM 108 30 138 65 20 85 38 16 54 34 17 51 49 11 60 42 9 51 41 16 57 44 12 56
11:00 PM 42 13 55 38 7 45 14 7 21 26 3 29 17 8 25 26 6 32 21 6 27 21 7 28
Total 2,279 1,434 3,713 1,848 1,198 3,046 1,588 1,105 2,693 2,008 1,213 3,221 2,299 1,478 3,777 2,211 1,397 3,608 2,328 1,429 3,757 2,279 1,435 3,714
Percent 61% 39% 61% 39% 59% 41% 62% 38% 61% 39% 61% 39% 62% 38% 61% 39%
AM Peak 08:00 11:00 08:00 11:00 11:00 11:00 11:00 11:00 11:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 09:00 08:00 08:00 08:00 08:00 08:00
Vol. 141 110 230 128 91 219 105 133 238 139 109 248 141 113 254 146 122 268 149 128 266 142 121 263
PM Peak 16:00 17:00 16:00 13:00 14:00 13:00 13:00 13:00 13:00 16:00 16:00 16:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00
Vol. 186 117 293 163 112 269 152 102 254 186 104 290 296 191 487 197 169 366 209 157 366 234 172 406
1. Mid-week average includes data between Tuesday and Thursday.
Time
Friday Saturday Sunday Monday Tuesday Wednesday Thursday Mid-Week Average5/14/2026
Volume Report Summary
Volume Summary
5/8/2026 5/9/2026 5/10/2026 5/11/2026 5/12/2026 5/13/2026
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 267
X
Appendix B: 2015 Palo Alto
Bicycle Boulevards Project
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 268
Palo Alto
Bicycle Boulevards Project
Community Workshop
April 30, 2015
Palo Alto City Hall
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 269
Agenda
•Introductions
•Ground Rules
•Goals
•Process and Project Overview
•Bicycle Boulevard Toolkit
•Break out for Detailed Discussion
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 270
Ground Rules
•Establish Ground Rules
–Listen actively
–All opinions are valid
–No yelling (volume control)
–Hold questions until the end
–Treat others as you want to be treated
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 271
Goals and Objectives
•Double the rate of cycling for local and total work
commutes by 2020 (to 15% and 5% respectively)
•Enhance school commute safety for K-12 students
•Safe routes for seniors
•Reduce barriers, improve connectivity
•Reduce transportation greenhouse gas emissions
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 272
Good for all ages and abilities
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 273
Planning Process
Proposed Concept Plan Line Approvals
•Planning & Transportation Committee hearing (Summer)
•City Council Presentation
Refine Alternatives
•Workshop 3 (tonight)
Information Gathering and Review
•Workshop 1 (June)
•Bike-Along Tours
•Farmer’s Markets / Event Tabling
•Data Collection
Develop Design Alternatives
•Workshop 2 (Oct & Dec)
2014 2015
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 274
2012 Bicycle & Pedestrian Master Plan Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 275
2014 Bike Plan Implementation ProjectsItem 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 276
Downtown Corridors Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 277
Bryant St, Nation’s First Bicycle Boulevard Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 278
What is a Bicycle Boulevard?
Characteristics
•Low-speed street
•Optimized for
bicycle traffic
•Discourage cut-
through vehicle
traffic
•Allow local
vehicle traffic
•Designed to give
priority to
bicyclists
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 279
Targeting the “Interested But Concerned”
Interested but concerned
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 280
Finding the sweet spot Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 281
Safe Routes to School Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 282
Low speeds = Survival
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 283
Data Analysis: Speeds and ADT
│16
Segment 85th Percentile
Speed
Vehicle ADT Bicyclist ADT
Bryant (Downtown North)24.6 MPH 1,313 479
Bryant (Downtown South)26.2 MPH 1,565 643
Bryant (Embarcadero - Oregon)19.7 MPH 525 1,146
Homer (at Kipling)27.3 MPH 3,649 153
Channing (at Kipling)29.5 MPH 3,666 131
High Street (at Homer) Not avail 2,638 Not avail
Existing conditions are optimal for Bike Boulevard (< 30 MPH or < 3,000 ADT)
Existing conditions are not optimal for Bike Boulevard (> 30 MPH or > 3,000 ADT)
Would need enhanced safety features to better accommodate bicyclists within
the narrow roadway
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 284
Downtown Circulation- Challenges
│17
–Homer Street Tunnel provides great access to
destinations west/south of Caltrain station
–Contraflow Bike Lane constructed with housing development is only one-block, forces users
southbound at High Street (one-way street) unless using Alma Street
–Challenges with converting High Street and/or
Homer Street to two-way
–Channing Ave is two-way enhanced bikeway east of Guinda Ave, but no connection into downtown
–On-street parking impacts a major concern
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 285
Wayfinding/Bike Network Identification Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 286
Pavement Markings
Goals
•Brand bicycle boulevard
network
•Educate all roadway users
•Promote predictable behavior
•Highlight conflict zones, cross-
movements, door zone
•Increase bicyclist visibility
•Teach children where to ride
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 287
Intersection Options (Typical)
All-way STOP Curb Extensions Center Chokers
Two-way STOP Traffic Circle Roundabout
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 288
Impact of STOP Signs Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 289
Curb Extensions
Benefits
•Reduces crossing distance
•Improved sight distance
•Opportunities for landscaping
Issues
•Loss of parking (minimal)
•Need to maintain drainage
Options
•All way stop (top)
•Two way stop (bottom)
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 290
Landscaped Median Islands
Benefits
•Visual/physical traffic calming
•Less costly than curb extensions
•Opportunities for landscaping
Issues
•Loss of parking (minimal)
Options
•All way stop (top)
•Two way stop (bottom)
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 291
Traffic Circle
Benefits
•Opportunities for landscaping
•Visual/physical traffic calming
•…free flow on one street
Issues
•Potential issues turning large vehicles
•Mountable apron
Options
•All way stop (top)
•Two way stop (bottom)
•All way yield (not shown)
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 292
Benefits Roundabouts and Circles
•Reduces conflict points for all users
•More continuous flow, reduced emissions
•Physically moderates speeds
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 293
Take a Closer Look Tonight
Bryant
•Bryant/Poe/Palo Alto
•Bryant/Addison
•Bryant/Kingsley
•Bryant/California
Homer-Channing
•Homer between High and Emerson
•Homer/Guinda
•Channing/Guinda/Boyce
High Street
•Two way conversion between Channing and Forest
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 294
More info:
www.CityofPaloAlto.org/bike
650-329-2100
Questions?
Break-out to Concept Plans
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 295
Questions
•What are the goals?
•How will drainage be addressed?
•Will public input be taken?
•Bryant St is crown jewel of bicycle infrastructure; 2 physical barriers and stops turned. Diversion is what makes Bryant what it is today. Homer was planned to be 2-way street; incremental improvements can be made at these intersections. Need to consider making Homer 2-way and diversion.
•Bryant is different than Homer. Commercial street with deliveries. Careful thought is needed.
•Danger isn’t speed on Bryant; it is rolling stops
•Can we do everything, nothing, or in between? How to prioritize?
•Comments from previous workshops. Were people heard? Bryant and Churchill: bicyclists don’t pay attention to stop signs and ride all over the road.
•California law say bikes need to go to the side and single file.
•Talk to Police Chief about rolling stops. Double parking is a major problem, especially trucks (on Bryant).
•Cross roads are a major problem along Bryant. Separating cars and bicycles would be ideal. Bryant is a problem even if it is the best around.
•Why don’t we have more road closures? Most people on Bryant aren’t locals.
•It is fabulous that kids are biking together 4 across. These are future bicyclists and may not be drivers. Bryant without cars? Let them do what they want to do.
•People bicycling wrong way on bike lane. How will they stop at 4-way stop. Lack of compliance.
•Separation of bikes from traffic? Cycle tracks like in Europe. Hierarchy.
•Stanford Police ticket bicyclists who misbehave. They need to go to class and this discourages repeat offenders.
•From Bryant to Churchill is a major issue in the morning with children going to school. Churchill and Alma and train
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 296
Pocket Slides
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 297
Bicycle Boulevards Map
30
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 298
Pavement Condition Map
31
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 299
Approach: Data Collection
│32
•Bicycle, pedestrian, and vehicle
counts
•Field and speed surveys
•Volunteer training
•Auto-counters from the City
-15-hour (6am-9pm) intersection video counts (typical weekday/weekend)
-7-day tube counts (for vehicle/bicycle volumes, speeds)
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 300
Spacious, light and airy 2-story contemporary
home in the heart of Old Palo Alto on bicycle
boulevard street.
Light-filled 3 Bedroom, 1 bath cottage nestled in
a garden setting on a tree-lined neighborhood
friendly street known as the first Bike Boulevard
in the nation
Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 301
Protection from Traffic Item 4
Attachment C - Data Collection
Summary Memo & Appendix A
Packet Pg. 302
X
Appendix C:
Collision History
Item 4
Attachment C - Data
Collection Summary Memo
& Appendix A
Packet Pg. 303
Bryant Street Collision History 2016-2024
East-West Street North-South Street Date Description Severity Source:
Homer Ave Bryant Street 3/25/2019 WBT veh on Homer collided with NB bicyclist on Bryant during rainy
conditions Injury (other visible)TIMS
Homer Ave-
Channing Ave Bryant Street 3/20/2019 Elderly driver heading NB on Bryant at unsafe speed ran off road and
collided with fixed object Injury (other visible)TIMS
Channing Ave Bryant Street 10/1/2016 SBL veh on Bryant operating at unsafe speed hit pedestrian Injury (complaint of pain)TIMS
Channing Ave Bryant Street 8/4/2016 SB veh on Bryant pulled into vehicle lane and hit bicyclist Injury (other visible)TIMS
Channing Ave Bryant Street 7/20/2021 NBT veh on Bryant collided with EBT bicyclist on Channing Injury (complaint of pain)TIMS
Addison Ave Bryant Street 4/9/2018 WB veh on Addison collided with SB veh on Bryant, caused by failure to
yield to vehicle ROW Injury (complaint of pain)TIMS
Lincoln Ave Bryant Street 5/22/2019 WB vehicle on Lincoln collided with NB vehicle on Bryant Injury (complaint of pain)TIMS
Lincoln Ave Bryant Street 1/27/2020 SBT veh on Bryant collided with SBL veh on Bryant Injury (complaint of pain)TIMS
Lincoln Ave Bryant Street 9/26/2024 EB veh on Lincoln failed to yield to NB veh on Bryant Unknown 2024 Neighborhood Petition
Lincoln Ave Bryant Street 10/7/2024 Involved a vehicle losing control, cause and circumstances unknown Unknown 2024 Neighborhood Petition
Item 4
Attachment C - Data Collection Summary Memo &
Appendix A
Packet Pg. 304
Attachment D:
Table of Initial Suggested Improvements by Street or Intersection
Location Proposed Improvement
Bryant St &
Kingsley Ave
Installation of a new mini-traffic circle featuring truck aprons,
splitter islands, and crosswalks.
Lincoln Ave &
Waverley St
Installation of a new mini-traffic circle featuring truck aprons,
splitter islands, and crosswalks.
Bryant St &
Lincoln Ave
Installation of a new mini-traffic circle featuring truck aprons,
splitter islands, and crosswalks.
Bryant St &
Addison Ave
Identical upgrades to the existing traffic circle to include truck
aprons, splitter islands, and crosswalks.
Bryant St &
Channing Ave
Permanent curb extensions to narrow the roadway and reduce
pedestrian crossing distances.
Bryant St &
Homer Ave
Temporary curb extensions to accommodate future bikeways
heading to the Homer Tunnel.
Corridor-Wide
Installation of high-visibility "BIKE BLVD" pavement legends and
the painting of curbs on crosswalk approaches to reduce or
remove red curb no longer necessary.
911 Bryant St Establishment of a new emergency vehicle-only parking zone
outside the Palo Alto Post-Acute Nursing Home.
Embarcadero Rd
& Bryant St
Pilot a temporary new restriction prohibiting left turns from
eastbound Embarcadero Road onto northbound Bryant Street to
eliminate a primary cut-through entry point and drop peak hour
vehicle volumes.
Item 4
Attachment D - Table of
Suggested Improvements by
Street or Intersection
Packet Pg. 305