HomeMy WebLinkAboutStaff Report 2603-6104CITY OF PALO ALTO CITY COUNCIL Special Meeting Monday, September 14, 2026 Council Chambers & Hybrid 5:30 PM     Agenda Item     4.Approval of Contract Number C27197641 with A3 Pipeline in the Amount Not-to-Exceed $2,466,255 for the Sewer Lateral Replacement Project (WC-99013) at various locations across the City; Authorization for the City Manager or Designee to Negotiate and Execute Related Change Orders Not-to-Exceed $246,626 for a Total Not-to-Exceed Amount of $2,712,881 for a Three-Year Term. CEQA Status: Exempt under CEQA Guidelines 15302 (Replacement or Reconstruction of Existing Facilities). 7 4 2 5 City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Utilities Meeting Date: September 14, 2026 Report #:2603-6104 TITLE Approval of Contract Number C27197641 with A3 Pipeline in the Amount Not-to-Exceed $2,466,255 for the Sewer Lateral Replacement Project (WC-99013) at various locations across the City; Authorization for the City Manager or Designee to Negotiate and Execute Related Change Orders Not-to-Exceed $246,626 for a Total Not-to-Exceed Amount of $2,712,881 for a Three-Year Term. CEQA Status: Exempt under CEQA Guidelines 15302 (Replacement or Reconstruction of Existing Facilities). RECOMMENDATION Staff recommends that the City Council: 1. Approve and authorize the City Manager or their designee to execute contract C27197641 with A3 Pipeline1 in an amount Not-to-Exceed $2,466,255 for the Sewer Lateral Replacement Project (WC-99013) at various locations across the City for a Three- Year Term; and 2. Authorize the City Manager or their designee to negotiate and execute one or more change orders to the contract with A3 Pipeline for related additional but unforeseen work, in an amount not-to-exceed $246,626 or 10% of the contract amount. The total authorized not-to-exceed amount is $2,712,881. EXECUTIVE SUMMARY The Sewer Lateral Replacement Project (WC-99013) is part of the City Council-approved Capital Improvement Program (CIP) intended to improve the reliability of the City's wastewater collection system, address known defects, reduce the risk of sanitary sewer overflows, and reduce recurring maintenance activities. 1 Contract C27197641 with A3 Pipeline https://www.paloalto.gov/files/assets/public/v/1/agendas-minutes- reports/agendas-minutes/city-council-agendas-minutes/2026/august/c27197641-sewer-lateral-final.pdf 7 4 2 5 The project focuses on replacing deteriorated public sewer laterals, which are the portions of the sewer laterals that extend from the public sewer main to the property line, and are referred to herein as the public sewer lateral. BACKGROUND 7 4 2 5 replacement in the first year of the program, with the remaining laterals planned for replacement in subsequent years. ANALYSIS Table 1: Summary of Invitation for Bids Project Bid Name/Number Sewer Lateral Replacement Project (IFB-197641) Proposed Length of Project 3-years Number of Bid Packages downloaded by Contractors 45 Total Days to Respond to Bid 44 Pre-Bid Meeting Yes (non-mandatory) Number of Company Attendees at Pre-Bid Meeting 7 7 4 2 5 Number of Bids Received:5 Public Link to Solicitation https://procurement.opengov.co m/portal/palo-alto- ca/projects/258907 Base Bid Engineers Estimate $2,870,000 Base Bid Price for 3 years (Basis for Bid Award) From a low of $2,466,255 to a high of $3,809,125 Base plus Supplementary Bid for 3 years (Basis for Bid Evaluation) From a low of $3,110,815 to a high of $5,070,625 Bids were received from five bidders, as listed in the attached Bid Summary (Attachment B) and were reviewed for responsiveness and responsibility in accordance with City procurement requirements. Staff determined that all bids were responsive and responsible. Staff recommends awarding the contract to A3 Pipeline as the lowest responsive and responsible bidder in the amount of $2,466,255. A contingency of $246,626 (10%) is included to allow for timely resolution of unforeseen conditions, such as subsurface conflicts and/or site constraints, to keep the project on schedule. Staff confirmed that A3 Pipeline holds an active license with the Contractor’s State License Board and is registered and in good standing with the Department of Industrial Relations (DIR). Staff also contacted the listed references for A3 Pipeline and found that they performed satisfactorily on past construction projects for other clients. FISCAL/RESOURCE IMPACT Funding for the first year of the contract is available in the FY 2027 Wastewater Collection Fund capital budget under CIP Sewer Lateral Replacement Project (WC-99013). Funding for subsequent years is subject to annual budget approvals by City Council and satisfactory performance by the Contractor. STAKEHOLDER ENGAGEMENT The project has been coordinated with internal City departments, including Public Works, Utilities Operations and Transportation, to align construction activities and minimize impacts to the public. Work locations have been reviewed to identify potential constraints such as school routes, arterial streets, and business areas. Property owners and residents within the project area will be notified in advance of construction activities. Notifications will be distributed prior to start of work and the Contractor will be responsible for providing project notices and coordinating access as needed. Additional communication may include updates through the City’s website and other communication channels. Construction activities will be scheduled to minimize disruptions to residents, businesses and traffic. The Contractor will be required to comply with all applicable traffic control 7 4 2 5 requirements, work hour restrictions and coordination with City staff throughout the duration of the project. ENVIRONMENTAL REVIEW ATTACHMENTS APPROVED BY: Attachment A Meeting Date: September 14, 2026 Staff Report #2603-6104 Contract C27197641 with A3 Pipeline In order to reduce paper consumption, Contract C27197641 with A3 Pipeline is available online at: https://www.paloalto.gov/files/assets/public/v/1/agendas-minutes-reports/agendas- minutes/city-council-agendas-minutes/2026/august/c27197641-sewer-lateral-final.pdf Total Base + Supplementary Bids Year 1-3 (Basis of Evaluation) Base Bid Year 1 Base Bid Year 2 Base Bid Year 3 Total Base Bid Year 1-3 (Basis for Award) Supplementary Bid Year 1 Supplementary Bid Year 2 Supplementary Bid Year 3 Total Supplementary Bid Year 1-3 $2,466,255.00 #2 Casey Construction, Inc.$3,576,375.00 $884,150.00 $908,557.00 $933,653.00 $2,726,360.00 $3,598,000.00 $3,590,675.00 $3,809,125.00 $2,402,063.13