Loading...
HomeMy WebLinkAboutStaff Report 4892 City of Palo Alto (ID # 4892) City Council Staff Report Report Type: Action Items Meeting Date: 9/22/2014 City of Palo Alto Page 1 Summary Title: Contract Approval and Other Street Sweeping Recommendations Title: Approval of Contract No. C15152971 in the Amount of $658,527.32 with Contract Sweeping Services for the First Year of a Five Year Term for Street Sweeping Services. Approval of Reduction in the Frequency of Street Sweeping in Residential/Light Commercial Areas from Weekly to Every Other Week Only During the Non -Leaf Season. Approval of Budget Amendment Ordinance with Impacts to Various Funds to Reflect Savings Due to Implementing the Efficiency and Cost Savings Plan. Approval of Amendments to the Table of Organization Reflective of the Proposed Elimination of Seven Positions Budgeted in FY 2015. Approval of Decrease in the Refuse Rate Street Sweeping Fixed Fee from $6.66 per Single Family Residence to $5.26 From: City Manager Lead Department: Public Works Recommendation Staff recommends that Council: 1) Approve and authorize the City Manager or his designee to execute the attached contract with Contract Sweeping Services (Attachment A) for an amount not to exceed $658,527 in the first year, including an initial base amount of $598,661 and an initial additional services amount of $59,866; 2) Direct the City Manager or his designee to maintain the contract for up to four additional years provided the contractor is responsive to the City’s needs and the quality of the contractor’s work is acceptable. The not to exceed amounts will be adjusted annually, and shall be tied to the Consumer Price Index for Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-San Jose area. Funding for each additional year is City of Palo Alto Page 2 contingent upon Council approval of that Fiscal Year’s budget; 3) Approve reducing the frequency of street sweeping in residential/light commercial areas from weekly to every other week only during the non- leaf season; 4) Approve the attached Budget Amendment Ordinance to reflect the impact of implementing the efficiency and cost savings plan (as described below), including a reduction of seven budgeted positions (1.0 Lead Heavy Equipment Operator, 1.0 Heavy Equipment Operator, and 5.0 Street Sweeper Operators); and resulting changes to the Table of Organization; and 5) Approve decreasing the Refuse Rate street sweeping monthly fixed fee from $6.66 per single family residence to $5.26 in order for residents to realize the cost savings from these Council actions. Executive Summary Staff is recommending implementing an efficiency and cost savings plan for street sweeping services that would save approximately $649,000 annually by outsourcing the street sweeping and material handling operation and changing the frequency of street sweeping in residential/light commercial areas to every other week during the non-leaf season. Leaf season is typically mid-October through mid-February and non-leaf season is comprised of the remaining eight months of the year. Staff issued a Request for Proposal (RFP), evaluated proposals and recommends award of a five year general services agreement to “Contract Sweeping Services” to perform the City’s street sweeping and debris management operation. The FY 2015 impact of this action differs from the annual savings due to the implementation date, one-time training and outreach costs, and a one-time transfer from the Vehicle Fund to the Refuse Fund. In FY 2015, net savings are anticipated to total $378,000. In addition, the Refuse Fund will benefit from a one-time transfer from the Vehicle Fund in the amount of $1,060,927, representing vehicle and equipment replacements that will no longer be required due to the proposed change in the service delivery model. The sweeping frequency would remain the same in the University and California Avenue areas (3 times per week), as well as El Camino (weekly), and would be City of Palo Alto Page 3 reduced from weekly to every-other-week in residential and light commercial areas during the non-leaf season. Contracting out this street sweeping and material management work would eliminate seven Full Time Equivalent positions (FTEs) and associated non-salary funding; and remove street sweeping equipment from the City fleet inventory. Additionally, savings will be realized in future years through reduced pension and healthcare costs. A monthly Refuse Fee reduction of $1.40 per customer would be passed on to the rate payers beginning October 1, 2014 to reflect the savings. To date, two employees out of the seven affected positions have been promoted or reassigned. Potentially displaced street sweeping personnel have been offered and are receiving cross-training that would help them qualify for open positions within the City. The City has spent approximately $5,000 on outside training based on the employee’s qualifications and career interest. The remaining $25,000 of training funds remains available in the event that affected staff members request training. Additionally, Contract Sweeping Services is amenable to interviewing and potentially hiring up to four of the displaced sweeping personnel. Background Currently, the City performs all of its street sweeping and sweeper debris handling operations with in-house staff and equipment. Residential/light commercial areas are swept weekly year-round and the University/California Avenue areas (i.e. the Parking District areas) are swept 3 times per week year-round. El Camino is swept weekly under an agreement with Caltrans. The estimated cost to conduct these operations is approximately $1.4 million per year. Most of these costs are funded within the Refuse Fund, with a portion funded from the University Avenue and California Avenue Parking Permit Funds. Based on 2012 survey results received by the City’s Administrative Services Department, Palo Alto sweeps its streets more frequently than any of the neighboring cities that were surveyed with most cities being swept every other week on average during the year with some exceptions for the large retail/commercial areas. On March 19, 2013, staff met with the Finance Committee to present options for reducing costs in the City’s street sweeping operation (Staff Report No. 3483). The Finance Committee directed staff to perform an every other week street City of Palo Alto Page 4 sweeping pilot program to test the feasibility of reducing the frequency of sweeping in residential/light commercial areas to every other week during the non-leaf season. On December 9, 2013, staff returned to the Finance Committee (Staff Report No. 4128) and presented an updated efficiency and cost savings plan and the results of the every other week sweeping pilot. The pilot results demonstrated that the City could reduce the frequency of sweeping in the residential/light commercial areas to every other week during non-leaf season without adverse impacts to the public or the environment. At the meeting on December 9, staff explained that the next steps in the efficiency and cost savings plan was to develop and issue an RFP for street sweeping and debris management services that could confirm the expected cost savings. The Finance Committee unanimously approved the efficiency and cost savings plan and directed staff to obtain Council approval for the issuance of the RFP. On February 3, 2014, staff received Council’s approval for the issuance of the sweeping RFP (Staff Report No. 4337). An RFP for Street Sweeping Services was distributed to qualified street sweeper contractors on February 4, 2014. Contractors had six weeks to review the RFP and submit proposals to the City. Proposals were received from two qualified contractors on March 18, 2014. A summary of their proposals is included below. Summary of Request for Proposals Process Proposal Name/Number RFP Number 152971 For General Services – Street Sweeping Total Days to Respond to RFP 42 Number of Firms at Pre-Proposal Meeting 7 Number of Proposals Received 2 Proposal Price Range *$598,661.20 – $1,231,238 *Note: Fee proposal before minor scope of work modifications, and adding 10% contingency. An evaluation committee consisting of three staff members from the Public Works Department, Public Services Division evaluated the proposals and of the two proposals received, staff unanimously selected Contract Sweeping Services as the preferred proposer due mainly to the large cost difference. A local company, Contract Sweeping Services currently sweeps many cities similar to Palo Alto. Some of their contracts include the cities of Cupertino, Foster City, San Carlos, City of Palo Alto Page 5 Saratoga, Menlo Park, and East Palo Alto. Staff has checked references that Contract Sweeping Services provided in their proposal. All of the references provided positive reviews for the services provided by Contract Sweeping Services. Both of the proposals that were submitted indicated that a five-year term would be the minimum term of the agreement that they would accept. Staff has found that a multi-year contract is advantageous to the City because it allows a contractor to amortize their major equipment purchases, and bid lower prices for the work to be performed. All of the cities that staff spoke with which had similar size and complexity of the proposed operation had contracts in place of at least five years. Staff returned to the Finance Committee on June 3, 2014 to present the results of the RFP (Staff Report 4539) as well as to present the plan’s next steps that include development of a contract with Contract Sweeping Services. The Finance Committee unanimously approved staff’s plan, and directed staff to develop a general services agreement and take the agreement to the Council for approval. The Finance Committee approved the following motions: 1. Reduce the street sweeping frequency for Residential and Light/Commercial areas to every other week during the non-leaf season; 2. In response to the City’s recent Request for Proposals, negotiate and develop an agreement with Contract Sweeping Services and return to the City Council for a contract award and a related Budget Amendment Ordinance; 3. That the savings from the switch to semi-weekly sweeping in non-leaf season be translated into the fixed charge to residents and businesses for street sweeping; 4. Staff make their best estimate of that savings at the time of the implementation of program and implemented at that time; 5. Authorize People Strategy and Operations Department to invest up to $30,000 in Focused Training for employees who otherwise may not qualify to be transferred to new positions, and that $30,000 would come out of the first year’s savings from this program. Discussion City of Palo Alto Page 6 Implementing an every other week sweeping program during the non-leaf season and approving the attached general services agreement with Contract Sweeping Services would allow the City to contract out most of its street sweeping and all debris management services, and save approximately $650,000 annually. Executing this agreement would result in the City reducing 7 full time equivalent budgeted positions and reduce the City’s fleet by 7 pieces of equipment. The City would retain staff and equipment to sweep parking lots, sidewalks, dead-ends, bike paths and respond to emergency response events such as water main breaks or traffic accidents. Some highlights of the efficiency and cost savings plan are: 1 Continue sweeping Downtown/California Avenue three (3) times per week. Contract for this work. 2 Continue weekly cleaning of parking lots, bike paths, dead-ends and downtown sidewalks. Continue using in-house staff and existing contracts to complete this work. 3 Reduce sweeping frequency to every other week during non-leaf season (except for Downtown/California Avenue areas and El Camino Real). 4 Contract for the main street sweeping operation (i.e. street sweeping performed by the large sweepers). 5 Contract for materials management (i.e. hauling leaf litter/debris to SMaRT). 6 Require the successful contractor to obtain an encroachment permit from Caltrans to continue sweeping El Camino Real weekly. 7 Manage emergency responses with both in-house and contractor resources (traffic accidents, water main leaks, large rain events etc.). Comparison - Staffing and Equipment Cost Savings Plan (Entire Public Services Sweeping and Cleaning Group) Lead Heavy Equipment Operator 1 0 -1 FTE City of Palo Alto Page 7 Heavy Equipment Operator 1 0 -1 FTE Street Sweeper Operators 7 2 -5 FTE Street Maintenance Assistants 2 2 0 Total Staff 11 4 -7 FTE Equipment Current Program Proposed Program Equipment Reduction Large Street Sweepers 7 2 -5 large sweepers Parking Lot Sweeper 1 1 0 Large Leaf Trucks (for picking up and hauling debris) 2 0 -2 large trucks Green Machines (small sweepers used to clean sidewalks and bike paths) 3 3 0 Small Dump Truck 1 1 0 Total Equipment 14 7 -7 Operational Changes The proposed plan calls for significant changes to the current operations that are currently being used. Current Operation Proposed Changes City of Palo Alto Page 8 Environmental Benefits There are environmental benefits with the reduced frequency every other week sweeping during the non-leaf season. The City would realize a 22% reduction of greenhouse gas emissions per year equaling approximately 37 metric tons CO2 emissions per year. Another potential benefit is the possible reduction of other air pollutants based on the fact that Contract Sweeping Services plans to use brand new PM10 compliant sweepers. These clean diesel sweepers are subject to stringent air quality regulations, and are tested to be up to three times cleaner than sweepers that comply with federal air quality standards. The contractor stated that they will not collect sweeper debris in piles on the street during the approximate 8 months of the non-leaf season. They will drive the sweepers directly to the Sunnyvale Materials Recovery and Transfer Station (SMaRT). This would be an improvement for the City in terms of wind-blown litter/loose debris reaching storm drains, creeks and the bay. Targeted Community Outreach Staff plans to conduct outreach for these changes using several methods. The outreach campaign will be a multi-month, phased-in effort to inform the community first about the new street sweeping contractor and then about the changes to their service frequency. The goals of the campaign are to: 1. First, inform the community about the new contractor starting in October. 2. Second, inform the community about the new every-other-week schedule (during the non-leaf season) that will not be implemented until early next year (i.e. February 2015). and 3. Third, assure residents in areas with trees that have leaf fall outside of leaf season that their neighborhoods will be swept more often as needed to keep their areas clean. The bulk of the outreach campaign will be implemented in January, February and March 2015, to raise awareness about the seasonal change from weekly to every- other-week sweeping service and assure residents in areas with non-deciduous City of Palo Alto Page 9 street trees that the City has planned for supplemental service in their area to account for their leaf fall issues. A variety of outreach mechanisms will be utilized to reach as much of the community as possible. It will include a bill insert, print ads for local papers and publications, Palo Alto Online ads, Facebook ads, and Pandora ads. It will also include a variety of unpaid outreach such as Facebook and NextDoor posts, emails to our contact list, and a press release. All outreach will direct readers to visit the Street Sweeping webpage or call Public Works for detailed information. Staffing Impact If street sweeping is contracted out as recommended by staff, then there are seven FTE positions that would be eliminated. Currently, five of those positions are filled, and two vacancies resulted from employees moving to other positions in the City. Staff has met with SEIU on seven occasions in 2014 (March 12, May 15, June 5, June 12, June 13, June 26, and August 4) to discuss the City’s street sweeping proposal, the training plan, and SEIU proposals to mitigate the effect on staff. In addition, Contract Sweeping Services has indicated a willingness to interview and potentially hire up to four affected members of the Street Sweeping crew at a wage that is comparable to their current salaries in Palo Alto. Any interviews with Contract Sweeping Services would not take place until after the contract has been executed. Training for Potentially Displaced Employees On March 12, 2014, in an effort to mitigate any negative effect outsourcing may have should the Council decide to move forward, staff proposed to offer training opportunities to potentially affected street sweeping staff members. Staff recommended beginning training as soon as possible, rather than waiting until the Council makes a final decision, to maximize the time that employees have to train as well as minimize operational impacts to the current operation by stretching the training time over a longer period. On June 3, 2014, the Finance Committee directed staff to allocate $30,000 of the savings (from implementing the efficiency and cost savings plan) towards training the affected employees in order to prevent any potential layoffs. Following the allocation of funding for training, affected employees have been and continue to be offered cross-training for current and expected open positions within the City as well as training in Departments without current vacancies. City of Palo Alto Page 10 In addition to the cross-training, the City is working with NOVA Workforce Services to provide career advice to the Street Sweeper crew. NOVA is a nonprofit, federally funded employment and training agency that provides customer-focused workforce development services. NOVA provides career advice, interview and resume counseling, and access to job postings. NOVA offers more than 20 workshops to assist job seekers in learning how to navigate the job- search process — including gaining a clear focus, writing a résumé, searching for the right job, interviewing, and negotiating a job offer. In addition to attending Nova training sessions, Street Sweeping crew members will each have the opportunity to meet with a NOVA career counselor for individual meetings and to devise a personalized career plan. In addition to the training employees will be receiving at the City and NOVA, employees may also request specialized training such as enrollment in a certification course, training on a specific piece of equipment, and/or training to refine certain skills. Some highlights of the proposed training program include:  Each Street Sweeping crew member will be allowed to train on City time with another workgroup in which they are interested and for which a training opportunity can be arranged.  Training requests submitted on or before August 28 were addressed and prioritized on a first-come-first-served-basis. The department managers will continue to work with PSOD to set up training opportunities. Directors and managers of all City departments have been made aware of this training effort and will try to accommodate all requests. Opportunities are, however, subject to operational needs and relevant requirements in both departments. As of August 31, 2014, affected employees have received training with the Administrative Services Department in the Stores Warehouse, with the Utilities Department on the Vac-Con Truck, training at the Regional Water Quality Control Plant, training with the Police Department’s Community Service Officers, training with the Public Works Department Street Maintenance Section and the Equipment Maintenance Section. Specialized training was also provided on backhoe operation during this time for potential opportunities in different departments that may arise. City of Palo Alto Page 11 In the event City Council approves outsourcing of the street sweeper operation, the City will consider adding training opportunities for employees who may be affected by bumping. At this time, the City’s goal and focus is to train the Street Sweeper crew so that they may be qualified and selected for other City positions or positions in other agencies. SEIU Proposals to City Staff The City has informed SEIU of and invited them to attend all Council and committee meetings on this topic since it began considering the issue in the spring of 2013. Staff provided SEIU with a copy of the RFP when it was released in February 2014 and provided the opportunity to submit any ideas, alternatives, responses, or other suggestions so that the City could consider SEIU’s input at the same time it is reviewing proposals from other entities. The City met with SEIU on six occasions to discuss the City’s and SEIU’s proposals, to discuss training for potentially displaced employees, and to answer any questions that they had regarding the current in-house operation. On June 26, 2014, SEIU Local 521 presented several proposals to staff with the goal of preventing potential layoffs while still offering cost savings to the City. SEIU’s proposed changes included reducing the number of budgeted FTE’s by three, rearranging the schedules of the remaining FTE’s, hiring temporary employees for four months of each year, and the elimination of three pieces of equipment which are used as spares in the event of a breakdown. Staff reviewed the SEIU proposals, and found that their proposals would undermine staff's ability to effectively meet the needs of Palo Alto’s residents, without providing the full costs savings included in staff’s efficiency and cost savings plan. Their proposal did not take into account the difficulties associated with hiring hourly employees, and the fact that staffing and equipment levels would be reduced to minimal levels. Should any unforeseen events occur such as employee illnesses or equipment breakdowns occur, the ability to effectively deliver service to Palo Alto residents would be compromised. After a final meeting between staff and SEIU an August 4, 2014, staff determined that impasse had been reached. This was conveyed to SEIU in a memo dated August 20, 2014. Resource Impact As described throughout this report, two significant changes are being proposed to the street sweeping program. First is a reduction in the frequency of street sweeping services to every other week during the non-leaf season in residential City of Palo Alto Page 12 and light/commercial areas. The pilot results demonstrated that the City could reduce the frequency of sweeping in the residential/light commercial areas to every other week during non-leaf season without adverse impacts to the public or the environment. Making this change alone while retaining City staff and equipment would result in anticipated savings of only approximately $87,000, and would not result in the elimination of positions. Because the City lacks the flexibility to effectively add or reduce the crew size before and after the leaf season, the crew would need to be fully staffed year round in order to accommodate that workload. The anticipated savings of $87,000 would be from the result of reduced fuel consumption, vehicle maintenance, and vehicle replacement charges. Partially offsetting the savings would be reduced parking citation revenue. The savings from changing the frequency of street sweeping, while using City staff and equipment, are outlined in the following table: Savings from reducing the frequency of street sweeping services provided by In-house City Staff and Equipment Category Projected Savings Total $87,000 The second change proposed is to contract out this service, at the reduced frequency described above. Outsourcing the regular street sweeping operations, in conjunction with the reduced frequncy of sweeping, would save approximately $649,000, across all funds, per year as shown in the following table. The cost of the street sweeping contract will be spread across the Refuse Fund, University Avenue Parking Permit Fund, and California Avenue Parking Permt Funds. The parking permit funds receive an enhanced level of street sweeping, and therefore will be charged for their proportional usage of the contract. It should be noted that the FY 2015 savings from the change would be reduced due to the project mid-year implementation date. Overall anticipated savings in FY 2015, included as part of the accompanying BAO, total $378,000. This amount is lower than the annual savings of $649,000 due to staff costs and vehicle maintenance, operations, and replacement charges incurred during the first three few months of the fiscal year under the current service model, as well as one-time outreach City of Palo Alto Page 13 and training costs. Before the end of the year, it is also anticipated that the Refuse Fund will further benefit as a result of this action through the sale of equipment no longer required due to the outsourcing (currently estimated at $400,000). This additional one-time revenue will be added to the Rate Stabilizaiton Reserve to gradually achieve a healthy fund reserve in accordance with the existing rate stabilization reserve guideline range (between $2.7 million, and $5.5 million). It should be noted, that consistent with previous Finance Committee direction, the savings resulting from the outsourcing will be passed on to customers in the form of reduced street sweeping charges. Due to the one-time nature of the transfer from the Vehicle Fund to the Refuse Fund, the $1,060,927 being returned to the Refuse Fund is recommended to augment the Refuse Fund Rate Stabilization Reserve. As indicated in the 2015 Adopted Operating Budget, the Refuse Fund Rate Stabilization Reserve currently has a negative $1.8 million balance, which is attributable to liabilities associated with maintaining the closed landfill, as mandated by the Public Resources Code and the California Code of Regulations. While the transfer will still leave the Rate Stabilization Reserve below the reserve guideline range (between $2.7 million, and $5.5 million), the return of these funds will aid in returning the Refuse Fund towards a position of financial stability. Annual Cost Estimates for the street sweeping operation with reduced frequency (Affected Staff and Equipment) City Equipment Costs Fuel $79,000 $4,000 ($75,000) Maintenance/Repair $164,000 $4,000 ($160,000) Vehicle Replacement $321,000 $57,000 ($264,000) Personnel Costs (with benefits) (1) Lead Heavy Equipment Operator $137,000 0 ($137,000) (1) Heavy Equipment Operator $128,000 0 ($128,000) (5) Street Sweeper Operators $566,000 0 ($566,000) City of Palo Alto Page 14 Associated Non-Salary Expenses (Uniforms, Supplies, etc.) $19,000 0 ($19,000) Subtotal $850,000 $0 ($850,000) Contractor Costs Sweeping fee - 17,272 curb miles @ $28.35 /mile. $490,000 $490,000 Debris management fee – 2,500 tons per year @ $28.00 per ton $70,000 $70,000 Unscheduled Service 500 hours @ $65.00 per hour $33,000 $33,000 Emergency Service (as requested) $10,000 $10,000 Contract Contingency @ 10% $60,000 $60,000 Subtotal $663,000 $663,000 Parking Citation Revenue $55,000 $18,000 $37,000 Total Annual Net Costs $1,359,000 $710,000 ($649,000) Other cost impacts which are not included in cost comparison above: 1) Existing equipment could be salvaged at auction. A preliminary estimate shows that the equipment would be sold for over $400,000. These one- time funds would be returned to the Refuse Enterprise Fund that ultimately has funded the purchase of this equipment. At this time, the budgeted revenue estimate is not recommended to be increased. 2) Some indirect allocated charges, such as General Fund cost allocation plan, which spreads the cost of the City’s administrative functions across the organization, could be reduced. These changes are difficult to quantify, however, as the annual charges are dependent upon many factors, such as the level of support provided to each fund/department, the overall budget for each department and fund, and the number of positions in each department and fund. As a result, these savings are not included in the anticipated ongoing savings amount of $649,000. 3) Long-term liabilities for pension and retiree health care would be reduced by the elimination of seven full time positions. These costs are not included in the savings amount, as it is difficult to predict with any level of certainty these cost avoidance figures. 4) Allocation of costs to various funds for the remaining Street Sweeper City of Palo Alto Page 15 Operators and Street Maintenance Assistants: as the new service delivery model is implemented and time estimates for remaining staff are refined, changes may be brought forward for City Council consideration at a later date. Notes 1) Fuel and Maintenance costs estimated using an average of costs per equipment from FY 2012, FY 2013 and FY 2014 (projected). 2) Vehicle replacement costs represent the estimated replacement charge necessary to replace equipment every seven years. 3) The City will retain two sweepers that are operated by the two Street Sweeper Operators for part time sweeping of permanently posted areas and use in problem areas as needed. As a result of the reduced utilization for the remaining sweepers, the annual replacement allocation will be reduced, as reflected in the table above. 4) Personnel costs are based on the 2014 approved pay increases, inclusive of benefit costs. 5) The University Avenue Parking Permit Fund and California Avenue Fund will be charged for the vehicle maintenance and replacement charges associated with the work performed in these areas. Modifying the Fixed Street Sweeping Fee As directed by the Finance Committee, the fixed fee for residential street sweeping services will be reduced by $1.40 per residence from the current amount of $6.66 to $5.26 beginning October 1, 2014 to reflect the FY 2015 savings of approximately $378,000. Proposition 218 noticing is not required if Council adopts a lower rate schedule. Environmental Review: Outsourcing the street sweeping operation and adoption of a Budget Amendment Ordinance are not projects under the California Environmental Quality Act (CEQA). In addition, the reduction of sweeping from weekly to every other week in residential/light commercial areas during the non-leaf season is exempt from CEQA under CEQA Guidelines section 15061(b)(3), because it can be seen with certainty that there is no possibility of a significant effect on the environment. Most neighboring cities sweep less frequently than Palo Alto and the Regional Water Quality Control Board has stated that residential areas are not a large City of Palo Alto Page 16 generator of litter. The City’s recent every other week pilot project showed no significant adverse affects to the environment. Finally, positive environmental impacts are expected such as:  Less impacts to roadway surfaces because of less frequent sweeping;  The contractor will not generate leaf piles throughout the City during the non-leaf season, thereby decreasing wind blown debris;  The contractor would utilize new sweeping equipment with lower air quality emissions; and  Less sweeping means less environmental impacts to noise, traffic congestion, vehicle emissions, etc. Attachments:  Attachment A - City of Palo Alto Contract #C15152971 for Street Sweeping Services (PDF)  Attachment B - BAO - Outsource Streetsweeping (DOC)  Attachment B, Exhibit 1 - Table_of_Organization_Modified_7-29-14 (PDF) DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 DocuSign Envelope ID: 781C389F-93FD-48E7-9A75-0EDF4B29A432 ORDINANCE NO. XXXX ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE BUDGET FOR FISCAL YEAR 2015 IN THE GENERAL FUND, REFUSE FUND, UNIVERSITY AVENUE PARKING PERMIT FUND, CALIFORNIA AVENUE PARKING PERMIT FUND, AND VEHICLE REPLACEMENT FUND AS A RESULT OF CHANGES TO THE SERVICE DELIVERY MODEL FOR THE STREET SWEEPING PROGRAM. The Council of the City of Palo Alto does ordain as follows: SECTION 1. The Council of the City of Palo Alto finds and determines as follows: A. Pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Council on June 16, 2014 did adopt a budget for Fiscal Year 2015; and B. At the time the 2015 Adopted Budget was being considered by the City Council, the Finance Committee had not yet completed their review of the Street Sweeping program service delivery change; and C. The service delivery change will reduce the frequency of street weeping in residential/light commercial areas to every other week during the non-leaf season. Sweeping frequencies would remain unchanged in the University Avenue and California Avenue areas (3 times per week), as well as El Camino (weekly). Further, street sweeping and material management work would be outsourced, resulting in the elimination of seven Full Time Equivalent positions (FTEs) and associated non-salary funding. Eliminated positions include 1.0 Lead Heavy Equipment Operator, 1.0 Heavy Equipment Operator, and 5.0 Street Sweeper Operators; and E. Bids were received from two qualified contractors on March 18, 2014, ranging from $598,661 to $1,231,238, before minor scope of work modifications and adding 10% contingency; and F. Staff recommends that the bid of $598,661 submitted by Contract Sweeping Services be declared the lowest responsible and responsive bid; and G. A contingency amount of $59,866, equal to ten percent of the total base bid contract amount, is requested for related, additional, but unforeseen work which may develop during the project. SECTION 2. A. The net sum of Two Hundred Ninety Four Thousand, One Hundred Seventy Three Dollars ($294,173) is hereby reduced from the Refuse Fund, offset by an increase to the Rate Stabilization Reserve. The Reduction in the Refuse Fund is split as follows: 1. Three Hundred Fifty Seven Thousand, Two Hundred Sixty Seven Dollars ($357,267) as reduced transfers to the Vehicle Replacement Fund; 2. Four Hundred Forty Nine Thousand, Eighty One Dollars ($449,081) from salaries and benefits as a result of the elimination of seven positions, effective October 23, 2014, partially offset by increased contract services expenditures of Five Hundred Twelve Thousand, One Hundred Seventy Five Dollars ($512,175) for the Refuse Fund portion of the street sweeping contract and training/outreach expenses. B. In the General Fund, the revenue estimate for citation revenue is hereby reduced by Twenty Seven Thousand, Seven Hundred Fifty Dollars ($27,750), offset by a corresponding decrease to the Budget Stabilization Reserve. C. In the University Avenue Parking Permit Fund, budgeted expenditures are hereby decreased by One Hundred Six Thousand, Eight Hundred Forty Three Dollars ($106,843), offset by a corresponding increase to the ending fund balance. This adjustment is attributable to decreased salary and benefit expenses of One Hundred Fifteen Thousand, Two Hundred Thirty Two Dollars ($115,232), partially offset by increased vehicle maintenance and replacement charges of Seven Hundred Fifty Three Dollars ($753) and the Fund’s proportional share of contract services expenses of Seven Thousand, Six Hundred Thirty Six Dollars ($7,636). D. In the California Avenue Parking Permit Fund, budgeted expenditures are hereby decreased by Four Thousand, Four Hundred Sixty Two Dollars ($4,462), offset by a corresponding decrease to the ending fund balance. This adjustment is attributable to reduced salary and benefit expenditures of Eighteen Thousand, One Hundred Twenty Seven Dollars ($18,127), partially offset by increased vehicle maintenance and replacement charges of One Thousand, Two Hundred Twenty Six Dollars ($1,226) and the Fund’s proportional share of contract services expenses of Twelve Thousand Four Hundred Thirty Nine Dollars ($12,439). E. In the Vehicle Fund, Transfers in from other funds will be reduced by Three Hundred Fifty Five Thousand, Two Hundred Eighty Eight Dollars ($355,288), offset by a reduction to the ending fund balance in the amount of One Hundred Eighty Seven Thousand, Nine Hundred Eighty Dollars ($187,980), and a reduction to contract expenses in the amount of One Hundred Sixty Seven Thousand, Three Hundred Eight Dollars ($167,308). F. The Vehicle Fund will transfer to the Refuse Fund the amount of One Million, Sixty Thousand, Nine Hundred Twenty Seven Dollars ($1,060,927). This adjustment will be offset by a decrease to the ending fund balance in the vehicle fund and an increase to the ending fund balance in the Refuse Fund, and is attributable to the return of funds originally transferred to the Vehicle Fund for vehicles and equipment that will no longer need to be replaced due to the proposed change in service delivery model. This transfer will be used to increase the Refuse Fund Rate Stabilization Reserve. G. Expenditure savings are to be passed on to customers in the form of a reduced street sweeping monthly fixed fee for street sweeping services. SECTION 4. The Table of Organization shall be modified as provided in Exhibit “1”. SECTION 5. As provided in Section 2.04.330 of the Palo Alto Municipal Code, this ordinance shall become effective upon adoption. // // SECTION 6. The Council of the City of Palo Alto hereby finds that adoption of this ordinance is not a project under the California Environmental Quality Act and, therefore, no environmental impact assessment is necessary. CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 427 Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % General Fund Administrative Services Account Specialist 7.00 7.00 5.95 5.95 5.95 0.00 0.00% Account Specialist-Lead 5.00 5.00 4.59 4.59 4.59 0.00 0.00% Accountant 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Administrative Assistant 0.93 1.00 1.00 1.00 1.00 0.00 0.00% Administrative Associate III 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Assistant Director Administrative Services 1.50 1.80 1.65 1.65 1.65 0.00 0.00% Buyer 1.95 1.95 2.00 2.00 2.00 0.00 0.00% Chief Procurement Officer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Contracts Administrator 1.40 1.40 1.70 1.70 1.70 0.00 0.00% Director Administrative Services/CFO 0.50 0.55 0.70 0.70 0.70 0.00 0.00% Director Office of Management and Budget 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Accounting 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Real Property 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Payroll Analyst 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Principal Management Analyst 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Accountant 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Senior Financial Analyst 4.81 6.10 5.90 0.00 0.00 -5.90 (100.00)% Senior Management Analyst 0.00 0.00 0.00 5.90 5.90 5.90 0.00% Storekeeper-Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Warehouse Supervisor 0.50 0.50 0.50 0.50 0.50 0.00 0.00% Total Administrative Services 37.69 39.30 37.99 37.99 37.99 0.00 0.00% City Attorney Assistant City Attorney 1.00 1.00 1.00 1.00 1.00 0.00 0.00% City Attorney 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Claims Investigator 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Legal Fellow 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Legal Services Administrator 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Secretary To City Attorney 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Assistant City Attorney 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Senior Deputy City Attorney 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Legal Secretary - Confidential 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Total City Attorney 9.00 9.00 9.00 10.00 10.00 1.00 11.11% 428 CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET City Auditor Administrative Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% City Auditor 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Performance Auditor 0.00 0.50 0.50 0.50 0.50 0.00 0.00% Senior Performance Auditor 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Total City Auditor 4.00 4.50 4.50 4.50 4.50 0.00 0.00% City Clerk Administrative Associate III 3.00 3.00 2.00 2.00 2.00 0.00 0.00% Assistant City Clerk 1.00 1.00 1.00 1.00 1.00 0.00 0.00% City Clerk 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Deputy City Clerk 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Hearing Officer 0.75 0.75 0.75 0.75 0.75 0.00 0.00% Total City Clerk 6.75 6.75 5.75 5.75 5.75 0.00 0.00% City Manager Administrative Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Administrative Associate I 0.50 0.00 0.00 0.00 0.00 0.00 0.00% Administrative Associate III 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Assistant City Manager 1.00 1.00 1.00 2.00 2.00 1.00 100.00% Assistant to the City Manager 1.55 1.05 1.00 0.00 0.00 -1.00 (100.00)% Chief Communications Officer 0.00 1.00 1.00 1.00 1.00 0.00 0.00% Chief Sustainability Officer 0.00 0.00 0.05 0.05 0.05 0.00 0.00% City Manager 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Deputy City Manager 0.50 0.50 0.00 0.00 0.00 0.00 0.00% Executive Assistant to the City Manager 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Management Analyst 0.50 0.00 0.00 0.00 0.00 0.00 0.00% Manager Communications 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Economic Development 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Total City Manager 10.05 9.55 9.05 9.05 9.05 0.00 0.00% Community Services Administrative Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Administrative Associate III 0.75 0.75 0.75 0.75 0.75 0.00 0.00% Assistant Director Community Services 1.00 1.00 2.00 2.00 2.00 0.00 0.00% Building Serviceperson 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Building Serviceperson-Lead 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Coordinator Recreation Programs 4.00 4.00 4.00 4.00 4.00 0.00 0.00% Director Community Services 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Division Manager Open Space, Parks & Golf 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 429 Division Manager, Recreations & Golf 1.00 1.00 0.00 0.00 0.00 0.00 0.00% Heavy Equipment Operator 0.00 0.00 0.07 0.07 0.07 0.00 0.00% Inspector, Field Services 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Junior Museum & Zoo Educator 2.25 2.25 2.25 2.75 2.75 0.50 22.22% Management Analyst 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Management Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Community Services 6.00 6.00 5.00 5.00 5.00 0.00 0.00% Manager Community Services Sr Prgm 3.00 3.00 4.00 5.00 5.00 1.00 25.00% Park Maintenance - Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Park Maintenance Person 6.00 6.00 6.00 6.00 6.00 0.00 0.00% Park Ranger 5.00 5.00 5.00 5.00 5.00 0.00 0.00% Parks/Golf Crew-Lead 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Producer Arts/Science Programs 12.00 11.75 11.75 11.75 11.75 0.00 0.00% Program Assistant I 7.50 7.50 6.75 6.75 6.75 0.00 0.00% Program Assistant II 3.00 3.00 4.00 4.00 4.00 0.00 0.00% Senior Management Analyst 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Sprinkler System Repairer 4.00 4.00 4.00 4.00 4.00 0.00 0.00% Superintendent Community Services 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Supervisor Recreation Programs 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Theater Specialist 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Volunteer Coordinator 0.50 0.50 0.75 0.75 0.75 0.00 0.00% Total Community Services 74.00 73.75 74.32 75.82 75.82 1.50 2.02% Development Services Administrative Assistant 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Administrative Associate II 0.00 0.00 0.00 3.02 3.02 3.02 0.00% Administrative Associate III 0.00 0.00 0.00 1.01 1.01 1.01 0.00% Assistant Director Public Works 0.00 0.00 0.00 0.02 0.02 0.02 0.00% Associate Engineer 0.00 0.00 0.00 0.16 0.16 0.16 0.00% Associate Planner 0.00 0.00 0.00 0.90 0.90 0.90 0.00% Building Inspector Specialist 0.00 0.00 0.00 3.00 3.00 3.00 0.00% Building/Planning Technician 0.00 0.00 0.00 1.80 1.80 1.80 0.00% Chief Building Official 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Chief Planning Official 0.00 0.00 0.00 0.20 0.20 0.20 0.00% Code Enforcement Officer 0.00 0.00 0.00 0.50 0.50 0.50 0.00% Deputy Chief/Fire Marshal 0.00 0.00 0.00 0.84 0.84 0.84 0.00% Development Project Coordinator II 0.00 0.00 0.00 2.00 2.00 2.00 0.00% Development Project Coordinator III 0.00 0.00 0.00 3.00 3.00 3.00 0.00% Development Services Director 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Engineer 0.00 0.00 0.00 0.62 0.62 0.62 0.00% Engineer Technician III 0.00 0.00 0.00 2.10 2.10 2.10 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % 430 CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET Fire Fighter 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Fire Inspector 0.00 0.00 0.00 4.00 4.00 4.00 0.00% Hazardous Materials Inspector 0.00 0.00 0.00 1.89 1.89 1.89 0.00% Industrial Waste Inspector 0.00 0.00 0.00 0.01 0.01 0.01 0.00% Industrial Waste Investigator 0.00 0.00 0.00 0.21 0.21 0.21 0.00% Inspector, Field Services 0.00 0.00 0.00 0.70 0.70 0.70 0.00% Management Analyst 0.00 0.00 0.00 0.01 0.01 0.01 0.00% Manager Development Center 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Manager Environmental Control Prgm 0.00 0.00 0.00 0.10 0.10 0.10 0.00% Manager Planning 0.00 0.00 0.00 1.80 1.80 1.80 0.00% Manager Urban Forestry 0.00 0.00 0.00 0.04 0.04 0.04 0.00% Manager Watershed Protection 0.00 0.00 0.00 0.05 0.05 0.05 0.00% Planner 0.00 0.00 0.00 0.80 0.80 0.80 0.00% Planning Arborist 0.00 0.00 0.00 0.25 0.25 0.25 0.00% Plans Check Engineer 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Project Engineer 0.00 0.00 0.00 0.15 0.15 0.15 0.00% Project Manager Trees 0.00 0.00 0.00 0.07 0.07 0.07 0.00% Senior Engineer 0.00 0.00 0.00 0.68 0.68 0.68 0.00% Senior Industrial Waste Investigator 0.00 0.00 0.00 0.01 0.01 0.01 0.00% Senior Management Analyst 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Senior Planner 0.00 0.00 0.00 0.40 0.40 0.40 0.00% Senior Technologist 0.00 0.00 0.00 0.50 0.50 0.50 0.00% Supervisor Inspection And Surveying 0.00 0.00 0.00 0.27 0.27 0.27 0.00% Surveyor, Public Works 0.00 0.00 0.00 0.47 0.47 0.47 0.00% Total Development Services 0.00 0.00 0.00 38.58 38.58 38.58 0.00% Library Administrative Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Assistant Director Library Services 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Business Analyst 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Coordinator Library Programs 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Director Libraries 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Division Head Library Services 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Librarian 5.00 5.00 5.00 6.70 6.70 1.70 34.00% Library Assistant 5.50 5.50 5.50 4.50 4.50 -1.00 (18.18)% Library Associate 4.00 5.00 5.00 7.00 7.00 2.00 40.00% Library Specialist 8.00 7.00 7.00 7.00 7.00 0.00 0.00% Management Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Library Services 4.00 4.00 4.00 4.00 4.00 0.00 0.00% Senior Librarian 7.75 8.25 8.25 8.50 8.50 0.25 3.03% Total Library 41.25 41.75 41.75 44.70 44.70 2.95 7.07% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 431 Office of Sustainability Assistant to the City Manager 0.00 0.50 0.00 0.00 0.00 0.00 0.00% Chief Sustainability Officer 0.00 0.00 0.50 0.50 0.50 0.00 0.00% Total Office of Sustainability 0.00 0.50 0.50 0.50 0.50 0.00 0.00% People Strategy and Operations Administrative Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Assistant Director Human Resources 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Director Human Resources/CPO 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Human Resources Assistant - Confidential 5.00 4.00 4.00 4.00 4.00 0.00 0.00% Human Resources Representative 2.00 3.00 2.00 2.00 2.00 0.00 0.00% Manager Employee Benefits 0.00 0.00 1.00 1.00 1.00 0.00 0.00% Manager Employee Relations 0.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Human Resources Administrator 5.00 4.00 4.00 4.00 4.00 0.00 0.00% Senior Management Analyst 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Total People Strategy and Operations 16.00 16.00 16.00 16.00 16.00 0.00 0.00% Planning and Community Environment Administrative Assistant 1.00 1.00 2.00 1.00 1.00 -1.00 (50.00)% Administrative Associate I 0.50 1.00 1.00 1.00 1.00 0.00 0.00% Administrative Associate II 3.80 3.80 3.80 1.00 1.00 -2.80 (73.68)% Administrative Associate III 1.00 1.00 2.00 2.00 2.00 0.00 0.00% Administrator Planning & Community Environment 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Assistant Building Official 1.00 1.00 0.00 0.00 0.00 0.00 0.00% Assistant Director Planning & Community Environment 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Associate Engineer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Associate Planner 0.00 0.00 1.00 0.10 0.10 -0.90 (90.00)% Building Inspector 4.00 4.00 0.00 0.00 0.00 0.00 0.00% Building Inspector Specialist 1.00 1.00 3.00 0.00 0.00 -3.00 (100.00)% Building/Planning Technician 2.00 2.00 2.00 0.20 0.20 -1.80 (90.00)% Business Analyst 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Chief Building Official 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Chief Planning Official 0.00 1.00 1.00 0.80 0.80 -0.20 (20.00)% Chief Transportation Official 1.00 1.00 0.90 0.50 0.50 -0.40 (44.44)% Code Enforcement Officer 2.00 2.00 2.00 1.50 1.50 -0.50 (25.00)% Coordinator Transportation System Management 0.50 0.50 0.50 0.90 0.90 0.40 80.00% Deputy City Manager 0.50 0.50 0.00 0.00 0.00 0.00 0.00% Development Project Coordinator II 0.00 0.00 2.00 0.00 0.00 -2.00 (100.00)% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % 432 CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET Development Project Coordinator III 0.00 3.00 3.00 0.00 0.00 -3.00 (100.00)% Development Services Director 0.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Director Planning/Community Environment 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Engineer 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Engineer Technician III 1.00 1.00 0.00 0.00 0.00 0.00 0.00% Management Analyst 0.00 0.50 0.40 0.40 0.40 0.00 0.00% Manager Development Center 0.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Manager Planning 2.00 1.00 2.00 1.20 1.20 -0.80 (40.00)% Planner 5.75 3.75 3.75 3.15 3.15 -0.60 (16.00)% Plans Check Engineer 2.00 2.00 1.00 0.00 0.00 -1.00 (100.00)% Plans Examiner 0.00 1.00 0.00 0.00 0.00 0.00 0.00% Project Engineer 1.00 1.00 1.00 1.65 1.65 0.65 65.00% Senior Management Analyst 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Senior Planner 5.00 7.00 7.00 7.60 7.60 0.60 8.57% Senior Project Engineer 0.00 0.00 1.00 0.20 0.20 -0.80 (80.00)% Supervisor Building Inspection 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Total Planning and Community Environment 43.05 49.05 49.35 28.20 28.20 -21.15 (42.86)% Public Safety 40-Hour Training Battalion Chief 0.00 0.00 0.00 1.00 1.00 1.00 0.00% 40-Hour Training Captain 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Administrative Assistant 1.00 1.00 2.00 2.00 2.00 0.00 0.00% Administrative Associate II 7.00 7.00 6.00 5.00 5.00 -1.00 (16.67)% Animal Control Officer 4.50 3.50 4.00 3.00 3.00 -1.00 (25.00)% Animal Control Officer - Lead 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Animal Services Specialist II 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Assistant Police Chief 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Battalion Chief 56-Hour Workweek 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Business Analyst 1.00 1.00 2.00 2.00 2.00 0.00 0.00% Code Enforcement Officer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Communications Technician 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Community Service Officer 8.50 8.50 8.50 8.50 8.50 0.00 0.00% Court Liaison Officer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Crime Analyst 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Deputy Chief/Fire Marshal 0.84 0.84 0.84 0.00 0.00 -0.84 (100.00)% Deputy Director Technical Services Division 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Deputy Fire Chief 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Director Office of Emergency Services 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 433 Emergency Medical Services Data Specialist 0.00 1.00 1.00 1.00 1.00 0.00 0.00% Emergency Medical Services Director 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Fire Apparatus Operator 30.00 30.00 30.00 30.00 30.00 0.00 0.00% Fire Captain 27.00 22.00 22.00 22.00 22.00 0.00 0.00% Fire Chief 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Fire Fighter 45.00 41.00 41.00 40.00 40.00 -1.00 (2.44)% Fire Inspector 3.00 4.00 4.00 0.00 0.00 -4.00 (100.00)% Geographic Information System Specialist 0.00 1.00 1.00 1.00 1.00 0.00 0.00% Hazardous Materials Inspector 1.90 1.90 1.90 0.01 0.01 -1.89 (99.47)% Office of Emergency Services Coordinator 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Police Agent 19.00 19.00 19.00 19.00 19.00 0.00 0.00% Police Captain 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Police Chief 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Police Lieutenant 5.00 5.00 5.00 5.00 5.00 0.00 0.00% Police Officer 49.00 49.00 50.00 50.00 50.00 0.00 0.00% Police Records Specialist - Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Police Records Specialist II 6.00 6.00 6.00 6.00 6.00 0.00 0.00% Police Sergeant 14.00 14.00 14.00 14.00 14.00 0.00 0.00% Program Assistant 0.00 1.00 1.00 1.00 1.00 0.00 0.00% Program Assistant II 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Property Evidence Technician 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Public Safety Dispatcher I 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Public Safety Dispatcher II 14.00 14.00 14.00 14.00 14.00 0.00 0.00% Public Safety Dispatcher-Lead 5.00 5.00 4.00 4.00 4.00 0.00 0.00% Public Safety Manager I 3.00 3.00 3.00 2.00 2.00 -1.00 (33.33)% Public Safety Manager II 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Senior Management Analyst 1.00 2.00 2.00 2.00 2.00 0.00 0.00% Superintendent Animal Services 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Supervisor Animal Services 1.00 0.00 0.00 0.00 0.00 0.00 0.00% Veterinarian 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Veterinarian Technician 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Volunteer Coordinator 0.50 0.50 0.00 0.00 0.00 0.00 0.00% Total Public Safety 278.24 272.24 273.24 264.51 264.51 -8.73 (3.19)% Public Works Account Specialist 0.04 0.00 0.00 0.00 0.00 0.00 0.00% Accountant 0.02 0.00 0.00 0.00 0.00 0.00 0.00% Administrative Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Administrative Associate I 0.70 0.50 0.60 0.60 0.60 0.00 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % 434 CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET Administrative Associate II 1.80 2.85 2.65 2.63 2.63 -0.02 (0.75)% Assistant Director Public Works 1.10 1.30 1.30 1.28 1.28 -0.02 (1.54)% Associate Engineer 0.10 0.10 0.30 0.30 0.30 0.00 0.00% Building Serviceperson 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Building Serviceperson-Lead 2.00 2.00 1.80 1.80 1.80 0.00 0.00% Director Public Works/City Engineer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Electrician 1.00 1.00 0.80 0.80 0.80 0.00 0.00% Engineer 0.30 0.30 0.30 0.30 0.30 0.00 0.00% Engineer Technician III 3.30 3.30 3.20 1.20 1.20 -2.00 (62.50)% Equipment Operator 3.46 3.46 3.46 3.46 3.46 0.00 0.00% Facilities Carpenter 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Facilities Maintenance-Lead 2.00 2.00 1.85 1.85 1.85 0.00 0.00% Facilities Mechanic 6.00 6.00 5.55 5.55 5.55 0.00 0.00% Facilities Painter 2.00 2.00 1.75 1.75 1.75 0.00 0.00% Heavy Equipment Operator 1.90 1.90 2.13 2.13 2.13 0.00 0.00% Heavy Equipment Operator-Lead 0.85 0.85 0.85 0.85 0.85 0.00 0.00% Inspector, Field Services 1.00 1.00 1.33 0.83 0.83 -0.50 (37.59)% Management Analyst 0.55 0.60 0.60 0.60 0.60 0.00 0.00% Manager Maintenance Operations 1.72 2.10 1.95 1.95 1.95 0.00 0.00% Manager Urban Forestry 1.00 1.00 1.00 0.96 0.96 -0.04 (4.00)% Planning Arborist 1.00 1.00 1.00 0.75 0.75 -0.25 (25.00)% Project Engineer 0.20 0.20 0.30 0.30 0.30 0.00 0.00% Project Manager 0.75 1.25 1.70 0.45 0.45 -1.25 (73.53)% Project Manager Trees 0.00 0.00 0.00 1.18 1.18 1.18 0.00% Senior Accountant 0.02 0.00 0.00 0.00 0.00 0.00 0.00% Senior Engineer 0.20 1.10 1.20 1.47 1.47 0.27 22.50% Senior Financial Analyst 0.16 0.16 0.16 0.00 0.00 -0.16 (100.00)% Senior Management Analyst 0.90 0.95 0.95 1.11 1.11 0.16 16.84% Senior Project Manager 1.00 0.10 0.10 0.10 0.10 0.00 0.00% Supervisor Inspection And Surveying 0.80 0.80 0.80 0.53 0.53 -0.27 (33.75)% Surveying Assistant 0.78 0.78 0.00 0.00 0.00 0.00 0.00% Surveyor, Public Works 0.78 0.78 0.78 0.31 0.31 -0.47 (60.26)% Traffic Control Maintainer I 1.94 1.94 1.94 1.94 1.94 0.00 0.00% Traffic Control Maintainer II 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Traffic Control Maintainer-Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Tree Maintenance Specialist 2.00 1.00 1.00 1.00 1.00 0.00 0.00% Tree Trim/Line Clear 7.00 7.00 7.00 7.00 7.00 0.00 0.00% Tree Trim/Line Clear - Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Total Public Works 56.37 57.32 56.35 52.98 52.98 -3.37 (5.98)% Total General Fund 576.40 579.71 577.80 588.58 588.58 10.78 1.87% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 435 Enterprise Funds Public Works Account Specialist 0.46 0.45 0.45 0.45 0.45 0.00 0.00% Accountant 0.23 0.40 0.40 0.40 0.40 0.00 0.00% Administrative Associate I 0.00 0.00 0.10 0.10 0.10 0.00 0.00% Administrative Associate II 3.20 2.15 2.15 2.15 2.15 0.00 0.00% Administrative Associate III 0.00 0.00 0.10 0.10 0.10 0.00 0.00% Administrator, Refuse 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Assistant Director Environmental Service 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Assistant Director Public Works 0.75 0.30 0.30 1.30 1.30 1.00 333.33% Assistant Manager WQCP 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Assistant to the City Manager 0.10 0.10 0.00 0.00 0.00 0.00 0.00% Associate Engineer 3.30 3.00 1.50 1.35 1.35 -0.15 (10.00)% Associate Planner 1.00 1.00 0.00 0.00 0.00 0.00 0.00% Business Analyst 0.13 0.13 0.13 0.13 0.13 0.00 0.00% Buyer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Chemist 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Chief Sustainability Officer 0.00 0.00 0.10 0.10 0.10 0.00 0.00% Coordinator Public Works Projects 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Coordinator Zero Waste 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Deputy Chief/Fire Marshal 0.08 0.08 0.08 0.08 0.08 0.00 0.00% Electrician 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Electrician - Lead 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Engineer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Engineer Technician III 1.40 1.30 0.30 0.20 0.20 -0.10 (33.33)% Environmental Specialist 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Equipment Operator 0.54 0.54 0.54 0.54 0.54 0.00 0.00% Hazardous Materials Inspector 0.04 0.04 0.04 0.04 0.04 0.00 0.00% Heavy Equipment Operator 5.90 1.90 1.61 1.61 0.61 -1.00 (62.11%) Heavy Equipment Operator-Lead 3.15 2.15 1.86 1.86 0.86 -1.00 (53.76%) Industrial Waste Inspector 2.00 2.00 3.00 2.99 2.99 -0.01 (0.33)% Industrial Waste Investigator 2.00 2.00 2.00 1.79 1.79 -0.21 (10.50)% Laboratory Technician WQC 2.50 2.50 2.50 3.00 3.00 0.50 20.00% Landfill Technician 0.00 1.00 1.00 1.00 1.00 0.00 0.00% Maintenance Mechanic 7.00 7.00 7.00 7.00 7.00 0.00 0.00% Management Analyst 1.20 1.20 1.30 2.30 2.30 1.00 76.92% Manager Airport 0.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Environmental Control Program 3.00 3.00 3.00 3.90 3.90 0.90 30.00% Manager Laboratory Services 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Maintenance Operations 1.38 1.00 0.96 0.96 0.96 0.00 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % 436 CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET Manager Solid Waste 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Water Quality Control Plant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Watershed Protection 1.00 1.00 1.00 0.95 0.95 -0.05 (5.00)% Program Assistant I 2.00 1.00 1.00 1.00 1.00 0.00 0.00% Program Assistant II 1.00 2.00 2.00 2.00 2.00 0.00 0.00% Project Engineer 2.00 2.00 1.85 1.81 1.81 -0.04 (2.16)% Project Manager 0.00 0.00 0.35 0.35 0.35 0.00 0.00% Refuse Disp Atten 4.00 0.00 0.00 0.00 0.00 0.00 0.00% Senior Accountant 0.23 0.30 0.30 0.30 0.30 0.00 0.00% Senior Chemist 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Engineer 2.25 1.90 1.80 1.76 1.76 -0.04 (2.22)% Senior Financial Analyst 0.16 0.16 0.16 0.00 0.00 -0.16 (100.00)% Senior Industrial Waste Investigator 0.00 0.00 1.00 0.99 0.99 -0.01 (1.00)% Senior Management Analyst 0.10 0.05 0.05 0.21 0.21 0.16 320.00% Senior Mechanic 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Operator WQC 6.00 6.00 6.00 6.00 6.00 0.00 0.00% Senior Technologist 1.13 1.13 1.13 1.13 1.13 0.00 0.00% Storekeeper 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Street Maintenance Assistant 2.00 2.00 0.00 0.00 0.00 0.00 0.00% Street Sweeper Operator 7.00 7.00 5.96 5.96 0.96 -5.00 (83.89%) Supervisor Public Works 1.00 0.00 0.00 0.00 0.00 0.00 0.00% Supervisor WQCP Operations 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Surveying Assistant 0.11 0.11 0.00 0.00 0.00 0.00 0.00% Surveyor, Public Works 0.11 0.11 0.11 0.11 0.11 0.00 0.00% Technologist 0.00 0.00 1.00 1.00 1.00 0.00 0.00% Traffic Control Maintainer I 0.06 0.06 0.06 0.06 0.06 0.00 0.00% WQC Plant Operator II 17.00 17.00 16.00 16.00 16.00 0.00 0.00% Total Public Works 114.51 104.06 99.19 99.98 92.98 -6.21 (6.26%) Utilities Account Specialist 2.50 2.55 2.55 2.55 2.55 0.00 0.00% Accountant 0.75 0.60 0.60 0.60 0.60 0.00 0.00% Administrative Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Administrative Associate I 2.00 2.00 1.00 0.00 0.00 -1.00 (100.00)% Administrative Associate II 7.00 7.00 6.00 6.00 6.00 0.00 0.00% Assistant Director Administrative Services 0.10 0.00 0.25 0.25 0.25 0.00 0.00% Assistant Director Utilities Customer Support Services 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Assistant Director Utilities Engineering 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Assistant Director Utilities Operations 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Assistant to the City Manager 0.35 0.35 0.00 0.00 0.00 0.00 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 437 Associate Engineer 0.00 0.00 0.50 0.50 0.50 0.00 0.00% Asst Director Utilities/Resource Management 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Business Analyst 4.87 5.87 5.87 5.87 5.87 0.00 0.00% Cathodic Protection Technician Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Cathodic Technician 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Cement Finisher 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Chief Sustainability Officer 0.00 0.00 0.35 0.35 0.35 0.00 0.00% Contracts Administrator 1.00 1.00 0.70 0.70 0.70 0.00 0.00% Coordinator Utility Projects 4.00 4.00 6.00 7.00 7.00 1.00 16.67% Coordinator Utility Safety & Security 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Customer Service Representative 5.00 5.00 6.00 6.00 6.00 0.00 0.00% Customer Service Specialist 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Customer Service Specialist-Lead 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Deputy Chief/Fire Marshal 0.08 0.08 0.08 0.08 0.08 0.00 0.00% Director Administrative Services/CFO 0.15 0.25 0.20 0.20 0.20 0.00 0.00% Director Utilities 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Electric Project Engineer 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Electric Underground Inspector 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Electric Underground Inspector-Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Electrician 14.00 14.00 14.00 0.00 0.00 -14.00 (100.00)% Electrician - Lead 6.00 6.00 6.00 0.00 0.00 -6.00 (100.00)% Electrician Assistant I 5.00 4.00 4.00 4.00 4.00 0.00 0.00% Engineer 4.00 4.00 4.00 4.00 4.00 0.00 0.00% Engineer Manager - Electric 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Engineer Manager - WGW 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Engineer Technician III 3.00 3.00 3.00 4.00 4.00 1.00 33.33% Equipment Operator 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Gas System Technician 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Gas System Technician II 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Hazardous Materials Inspector 0.06 0.06 0.06 0.06 0.06 0.00 0.00% Heavy Equipment Operator 9.00 8.00 8.70 8.70 8.70 0.00 0.00% Inspector, Field Services 4.00 5.00 4.00 4.00 4.00 0.00 0.00% Lineperson/Cable Spl 11.00 11.00 11.00 11.00 11.00 0.00 0.00% Lineperson/Cable Spl-Lead 4.00 4.00 4.00 4.00 4.00 0.00 0.00% Maintenance Mechanic-Welding 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Manager Communications 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Customer Service & Meter Reading 1.00 1.00 2.00 1.00 1.00 -1.00 (50.00)% Manager Electric Operations 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Utility Marketing Services 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % 438 CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET Manager Utility Operations WGW 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager Utility Telecommunication 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Manager, Utilities Credit & Collection 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Marketing Engineer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Meter Reader 6.00 6.00 6.00 6.00 6.00 0.00 0.00% Meter Reader-Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Metering Technician 0.00 0.00 0.00 3.00 3.00 3.00 0.00% Metering Technician - Lead 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Offset Equipment Operator 0.48 0.48 0.48 0.48 0.48 0.00 0.00% Overhead Underground Troubleman 0.00 2.00 2.00 2.00 2.00 0.00 0.00% Planner 0.30 0.30 0.30 0.30 0.30 0.00 0.00% Power Engineer 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Principal Management Analyst 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Program Assistant I 3.00 3.00 2.50 2.50 2.50 0.00 0.00% Project Engineer 5.00 5.00 5.00 5.00 5.00 0.00 0.00% Project Manager 0.00 0.75 0.75 0.00 0.00 -0.75 (100.00)% Project Manager Trees 0.00 0.00 0.00 0.75 0.75 0.75 0.00% Resource Planner 5.00 5.00 5.00 5.00 5.00 0.00 0.00% Restoration Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% SCADA Technologist 0.00 0.00 0.00 2.00 2.00 2.00 0.00% Senior Accountant 0.75 0.70 0.70 0.70 0.70 0.00 0.00% Senior Business Analyst 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Senior Deputy City Attorney 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Electrical Engineer 4.00 4.00 4.00 4.00 4.00 0.00 0.00% Senior Engineer 0.00 0.00 0.00 4.00 4.00 4.00 0.00% Senior Financial Analyst 1.60 1.40 1.40 0.00 0.00 -1.40 (100.00)% Senior Management Analyst 1.00 1.00 1.00 2.40 2.40 1.40 140.00% Senior Marketing Analyst 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Mechanic 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Performance Auditor 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Project Engineer 4.00 4.00 5.00 1.00 1.00 -4.00 (80.00)% Senior Resource Planner 7.00 7.00 6.00 6.00 6.00 0.00 0.00% Senior Technologist 0.87 0.87 0.87 0.87 0.87 0.00 0.00% Senior Utility Field Service Representative 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Senior Water System Operator 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Storekeeper 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Street Light, Traffic Signal and Fiber Apprentice 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Street Light, Traffic Signal and Fiber Technician 0.00 0.00 0.00 4.00 4.00 4.00 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 439 Street Light, Traffic Signal and Fiber- Lead 0.00 0.00 0.00 2.00 2.00 2.00 0.00% Substation Electrician 0.00 0.00 0.00 6.00 6.00 6.00 0.00% Substation Electrician-Lead 0.00 0.00 0.00 2.00 2.00 2.00 0.00% Supervising Electric Project Engineer 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Supervising Project Engineer 1.00 1.00 0.00 0.00 0.00 0.00 0.00% Supervisor Water Trans 1.00 0.00 0.00 0.00 0.00 0.00 0.00% Supervisor WGW 5.00 0.00 0.00 0.00 0.00 0.00 0.00% Supervisor, Inspection Services 0.00 0.00 1.00 1.00 1.00 0.00 0.00% Tree Maintenance Specialist 1.75 1.00 1.00 1.00 1.00 0.00 0.00% Utilities Compliance Manager 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Utilities Supervisor 5.00 11.00 11.00 11.00 11.00 0.00 0.00% Utility Account Representative 4.00 4.00 4.00 4.00 4.00 0.00 0.00% Utility Comp Tech 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Utility Comp Tech-Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Utility Credit/Collection Specialist 1.00 1.00 2.00 2.00 2.00 0.00 0.00% Utility Engineer Estimator 4.00 5.00 5.00 5.00 5.00 0.00 0.00% Utility Field Services Representative 5.00 5.00 5.00 5.00 5.00 0.00 0.00% Utility Install/Representative 12.00 12.00 12.00 12.00 12.00 0.00 0.00% Utility Install/Representative - Lead 5.00 5.00 5.00 5.00 5.00 0.00 0.00% Utility Install/Representative Assistant 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Utility Key Account Representative 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Utility Locator 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Utility Safety Officer 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Utility System Operator 5.00 5.00 5.00 5.00 5.00 0.00 0.00% Utility Install Repair Lead-Welding Cert 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Utility Install Repair-Welding Cert 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Warehouse Supervisor 0.50 0.50 0.50 0.50 0.50 0.00 0.00% Water Meter Cross Connection Technician 3.00 3.00 2.00 2.00 2.00 0.00 0.00% Water System Operator II 4.00 4.00 4.00 4.00 4.00 0.00 0.00% Total Utilities 251.11 253.76 255.36 258.36 258.36 3.00 1.17% Total Enterprise Funds 365.62 357.82 354.55 358.34 351.34 -3.21 (0.91%) Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % 440 CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET Other Funds Capital Administrative Associate I 0.80 1.00 0.80 0.80 0.80 0.00 0.00% Administrative Associate III 1.00 1.00 0.90 0.89 0.89 -0.01 (1.11)% Assistant Director Public Works 0.15 0.15 0.15 0.15 0.15 0.00 0.00% Associate Engineer 0.60 0.90 2.70 2.69 2.69 -0.01 (0.37)% Cement Finisher 3.00 3.00 3.00 3.00 3.00 0.00 0.00% Cement Finisher Lead 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Chief Transportation Official 0.00 0.00 0.00 0.50 0.50 0.50 0.00% Contracts Administrator 0.60 0.60 0.60 0.60 0.60 0.00 0.00% Coordinator Transportation System Management 0.00 0.00 0.00 0.10 0.10 0.10 0.00% Engineer 2.70 2.70 2.70 2.08 2.08 -0.62 (22.96)% Engineer Technician III 2.30 2.40 0.50 0.50 0.50 0.00 0.00% Heavy Equipment Operator 0.20 0.20 0.20 0.20 0.20 0.00 0.00% Inspector, Field Services 0.00 0.00 0.67 0.47 0.47 -0.20 (29.85)% Landscape Architect Park Planner 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Management Analyst 1.25 1.50 1.50 1.49 1.49 -0.01 (0.67)% Manager Maintenance Operations 0.90 0.90 0.90 0.90 0.90 0.00 0.00% Program Assistant I 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Project Engineer 3.80 3.80 4.85 5.09 5.09 0.24 4.95% Project Manager 0.50 1.00 1.20 1.20 1.20 0.00 0.00% Senior Engineer 2.55 2.00 2.00 1.09 1.09 -0.91 (45.50)% Senior Financial Analyst 0.60 0.60 0.60 0.00 0.00 -0.60 (100.00)% Senior Management Analyst 0.00 0.00 0.00 0.60 0.60 0.60 0.00% Senior Project Engineer 0.00 0.00 0.00 0.70 0.70 0.70 0.00% Senior Project Manager 0.00 0.90 0.90 0.90 0.90 0.00 0.00% Supervisor Inspection And Surveying 0.20 0.20 0.20 0.20 0.20 0.00 0.00% Surveying Assistant 0.11 0.11 0.00 0.00 0.00 0.00 0.00% Surveyor, Public Works 0.11 0.11 0.11 0.11 0.11 0.00 0.00% Total Capital 24.37 26.07 27.48 27.26 27.26 -0.22 (0.80)% Information Technology Administrative Assistant 1.07 1.00 1.00 1.00 1.00 0.00 0.00% Assistant Director Administrative Services 0.40 0.20 0.10 0.10 0.10 0.00 0.00% Business Analyst 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Desktop Technician 5.00 5.00 5.00 5.00 5.00 0.00 0.00% Director Administrative Services/CFO 0.35 0.20 0.10 0.10 0.10 0.00 0.00% Director Information Technology/CIO 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Management Analyst 0.50 1.00 1.00 1.00 1.00 0.00 0.00% Manager Information Technology 3.00 4.00 4.00 4.00 4.00 0.00 0.00% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 441 Manager Information Technology Security 0.00 1.00 1.00 1.00 1.00 0.00 0.00% Principal Management Analyst 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Senior Business Analyst 2.00 2.00 2.00 0.00 0.00 -2.00 (100.00)% Senior Financial Analyst 0.09 0.00 0.00 0.00 0.00 0.00 0.00% Senior Management Analyst 0.00 0.00 0.00 2.00 2.00 2.00 0.00% Senior Technologist 13.00 12.00 12.00 13.50 13.50 1.50 12.50% Technologist 3.00 3.00 4.00 2.00 2.00 -2.00 (50.00)% Total Information Technology 30.41 31.40 32.20 31.70 31.70 -0.50 (1.55)% Printing and Mailing Fund Buyer 0.05 0.05 0.00 0.00 0.00 0.00 0.00% Offset Equipment Operator 1.52 1.52 1.52 1.52 1.52 0.00 0.00% Senior Financial Analyst 0.00 0.10 0.10 0.00 0.00 -0.10 (100.00)% Senior Management Analyst 0.00 0.00 0.00 0.10 0.10 0.10 0.00% Total Printing and Mailing Fund 1.57 1.67 1.62 1.62 1.62 0.00 0.00% Special Revenue Funds Account Specialist 0.50 0.50 1.55 1.55 1.55 0.00 0.00% Account Specialist-Lead 0.00 0.00 0.41 0.41 0.41 0.00 0.00% Administrative Associate II 0.20 0.20 0.40 0.20 0.20 -0.20 (50.00)% Building Serviceperson-Lead 0.00 0.00 0.20 0.20 0.20 0.00 0.00% Chief Transportation Official 0.00 0.00 0.10 0.00 0.00 -0.10 (100.00)% Community Service Officer 0.50 0.50 0.50 0.50 0.50 0.00 0.00% Electrician 0.00 0.00 0.20 0.20 0.20 0.00 0.00% Facilities Maintenance-Lead 0.00 0.00 0.15 0.15 0.15 0.00 0.00% Facilities Mechanic 0.00 0.00 0.45 0.45 0.45 0.00 0.00% Facilities Painter 0.00 0.00 0.25 0.25 0.25 0.00 0.00% Heavy Equipment Operator 0.00 0.00 0.29 0.29 0.29 0.00 0.00% Heavy Equipment Operator-Lead 0.00 0.00 0.29 0.29 0.29 0.00 0.00% Manager Community Services Senior Program 0.00 0.00 0.00 1.00 1.00 1.00 100.00% Manager Maintenance Operations 0.00 0.00 0.19 0.19 0.19 0.00 0.00% Planner 0.95 0.95 0.95 0.75 0.75 -0.20 (21.05)% Senior Financial Analyst 0.00 0.00 0.20 0.00 0.00 -0.20 (100.00)% Senior Management Analyst 0.00 0.00 0.00 0.20 0.20 0.20 0.00% Senior Project Engineer 0.00 0.00 0.00 0.10 0.10 0.10 0.00% Street Maintenance Assistant 0.00 0.00 2.00 2.00 2.00 0.00 0.00% Street Sweeper Operator 0.00 0.00 1.04 1.04 1.04 0.00 0.00% Total Special Revenue Funds 2.15 2.15 9.17 9.77 9.77 0.60 6.45% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % 442 CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET Vehicle Replacement Fund Administrative Associate III 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Assistant Director Public Works 0.00 0.25 0.25 0.25 0.25 0.00 0.00% Assistant Fleet Manager 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Equipment Maintenance Service Per 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Fleet Services Coordinator 2.00 2.00 2.00 2.00 2.00 0.00 0.00% Management Analyst 0.00 0.20 0.20 0.20 0.20 0.00 0.00% Manager Fleet 1.00 1.00 1.00 1.00 1.00 0.00 0.00% Mobile Service Technician 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Motor Equipment Mechanic II 7.00 7.00 7.00 6.00 6.00 -1.00 (14.29)% Motor Equipment Mechanic-Lead 0.00 0.00 0.00 2.00 2.00 2.00 0.00% Project Manager 0.00 0.00 0.00 1.00 1.00 1.00 0.00% Senior Financial Analyst 0.08 0.08 0.08 0.00 0.00 -0.08 (100.00)% Senior Fleet Services Coordinator 1.00 1.00 1.00 0.00 0.00 -1.00 (100.00)% Senior Management Analyst 0.00 0.00 0.00 0.08 0.08 0.08 0.00% Total Vehicle Replacement Fund 16.08 16.53 16.53 16.53 16.53 0.00 0.00% Total Other 74.58 77.82 87.00 86.88 86.88 -0.12 (0.01)% Total Citywide Positions 1,016.60 1,015.35 1,019.35 1,033.80 1,026.80 7.45 0.73% Table of Organization FY 2012 Actuals FY 2013 Actuals FY 2014 Adopted Budget FY 2015 Adopted Budget FY 2015 Modified Budget FY 2015 Change FTE FY 2015 Change % CITY OF PALO ALTO FISCAL YEAR 2015 ADOPTED BUDGET 443