Loading...
HomeMy WebLinkAboutCMR- 471-02TO: City of PMo Alto City anager's Report 6 HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: POLICE DATE:DECEMBER 9, 2002 CMR:471:02 SUBJECT:CONCEPTUAL APPROVAL FOR CONTRACT WITH THE CITY OF SUNNYVALE TO PROVIDE ANIMAL SHELTERING AND ASSOCIATED SERVICES RECOMMENDATIONS Staff recommends that Council conceptually approve a contract with the City of Sunnyvale to provide animal sheltering and associated services. Staff believes that this partnership will create efficiencies and opportunities for improved services at lower overall costs to all users of the Palo Alto Animal Shelter (PAAS), as well as provide ongoing General Fund income. BACKGROUND Since 1993, the City of Palo Alto has provided regional animal control services to the cities of Mountain View, Los Altos, and Los Altos Hills. Under the agreements with the three cities, Palo Alto Animal Control Officers (ACOs) respond to all sick and injured, dead, aggessive and dangerous animal calls-for-service and transport the animals-to the PAAS where they are housed, and if necessary, receive medical attention. Recently, representatives from the City of Sunnyvale approached Palo Alto staff regarding the possibility of Palo Alto providing sheltering and associated services. Sunnyvale is currently a member of a Joint Powers Authority (JPA) with six other cities that was developed to form the Silicon Valley Animal Control Authority (SVACA), with the goal of providing animal control, shelter, and related services to the seven cities. Under the JPA, SVACA secured an a~eement with the Humane Society for sheltering services until such time a new SVACA shelter can be built. Unlike the other cities, Sunnyvale elected to retain its existing anima! control services that are administered by the Sunnyvale Department of Public Safety. After receiving information about significantly increased operational costs, together with its very large share for the construction of a new shelter, Sunnyvale requested a proposal from Palo Alto as a potential alternative. This report provides information related to a proposal provided to Smmyvale, CMR:471:02 Page 1 of 5 including cost/revenue estimates and Capital Improvement Program (CIP) cost projections. The City of Sunnyvale has requested a similar proposal from SVACA. Sunnyvale must determine which proposal to accept prior to December 31, 2002, so that it can notify SVACA of its decision. DISCUSSION Discussions with the City of Sunnyvale were initiated in September 2002. Staff from the Sunnyvale City Manager and City Attorney's Offices, and the Finance and Public Safety Deparm~ents met with representatives of the Palo Alto Police Deparmaent. The purpose of these meetings was to obtain specific information about services required by Sunnyvale and the potential of Palo Alto providing those services. Staff from Palo Alto's Administrative Services, Public Works, Planning, and Police Departments developed a proposal that was submitted to Sunnyvale on November 19, outlining the services Palo Alto would be able to provide for a minimum of 20 years. The proposal (Attachment 1)details the specific services Palo Alto would provide, estimated ongoing operational costs, and projected capital costs that would be needed in order to house Sunnyvale's animals, along with an estimated timeline for implementation. This business plan has been reviewed by the City Auditor, and the Auditor's memo is included in the Council packet. Currently, under the agreements with Los Altos, Los Altos Hills, and Mountain View, costs for services are based upon the actual number of animals handled for each city. A percentage is calculated by dividing the total number of animals handled by PAAS by the number of animals that originated from each city. Staff would use the same formula for charging Sunnyvale. However, because Sunnyvale would continue to provide its own animal control services and would only need sheltering and associated services, Sunnyvale would only be charged for those specific services. Staff has contacted the other partner cities and all are supportive of this proposal since all cities, including Pal0 Alto, would realize a reduction in ongoing operational costs. Because the three other cities' contracts expire in July 2003, staff has already had preliminary discussions with them regarding their agreements. While they are unable to make any commitments at this time, .they have indicated that they would be amenable to discussing possible longer-term agreements, especially with lower ongoing operational costs. Staff believes the residents of Palo Alto would benefit from this arrangement both through operational efficiencies, an expanded PAAS, and additional income to the General Fund. Staffing - The increase in the number of animals associated with Sunnyvale will require 1.5 additional FTEs for the Police Department. Specifically, a .5 Veterinary Technician, .5 Animal Attendant, and a .5 Animal Services Specialist would be needed. Under the proposal presented CMR:471:02 Page 2 of 5 to Sunnyvale, the first year salary and benefit costs for these staff would be the responsibility of Sunnyvale. In subsequent years, because Palo Alto and the other contract cities would receive the benefit of the additional staff, the salary and benefit costs would be shared by the five cities. Because of the addition of only 1.5 FTEs, staff believes that there will not be any impact to supervisory span .of control. Capital Improvements - Because Palo Alto has reached its capacity for kenneling and housing for dogs and cats, in order to provide services to Sunnyvale, additional kennel space, cat rooms, and veterinary treatment rooms would be required. Specifically, the cat rooms would have to be enlarged, eight new dog kennels with an adjoining storage area would have to be added, and additional space for a small animal room and veterinary receiving/treatment area would be required. The increased kennel space need is estimated to be about 2,448 square feet and the additional shelter space is estimated to be about 2,023 square feet. Planning staff has reviewed the proposed addition to the current PAAS to determine whether it is consistent with the Pa!o Alto Municipal Services Center (MSC) Master Plan (Attachment 2). Three components to the PAAS complex were included in the plan that was adopted by the City Council in 1987:500 square feet of additional office space, 2,000 square feet of wildlife administrative functions, and a wildlife rehabilitation area. While the wildlife rehabilitation area is not quantified in the narrative portion of the Master Plan, based upon the schematic portion of the plan, about 5,000 square feet was designated for that area. The original intent for the use of the rehabilitation area at the time the Plan was adopted was for the use by Wildlife Rescue, the organization that the City contracts with for handling live wildlife. In 1997, Wildlife Rescue initiated a capital campaig~ in efforts to raise money to help fund a wildlife facility adjacent to PAAS. However, it determined that it was not feasible to direct its resources for a new facility. Planning staff has concluded that the additional kennels needed for expansion are comparable to the cages, shelters and aviaries that would have been built if the wildlife facility had been located on the site. As a result, the 2,448 square feet needed for the new kennels would be consistent with the MSC Master Plan and is considerably less square footage than the 5,000 square feet planned for the wild life rehabilitation area. The 2,023 square feet needed for additional cat rooms, veterinary examination and small animal rooms results in a total expansion of PAAS of 2,483 square feet, which is less than the 5,000 square feet of additional office/administration space allowed by the MSC Master Plan. As a result, staff believes that the proposed expansion is consistent with the current MSC Master Plan. CMR:471:02 Page 3 of 5 Sunnyvale has indicated it would not have a challenge in meeting its share of capital costs. In Palo Alto's Infrastructure Management Plan (IMP), two major projects are scheduled to be completed at PAAS, one in 2004-05 and the other between 2008-2011. These projects would need to be completed regardless of providing services to Sunnyvale. Palo Alto and the three other contract cities would pay for the costs related to Americans with Disabilities Act (ADA) modifications, seismic upgrades, and other renovations. In order to expedite this project, Sunnyvale would be willing to work with the other contract cities to potentially front their share of the capital costs. Staff believes that the services can be provided to the City of Sunnyvale without any adverse impact to the residents of Palo Alto or the three current contract cities. Staff would return to Council with the finalized a~eement for approval. RESOURCE IMPACT The proposed agreement with Sunnyvale would be for a minimum of 20 years, with an option for an additional 10 years. Included in the attached proposal are operational cost breakdowns based upon 2001-2002 actual costs. Using 2002 dollars, Palo Alto's anticipated revenue with the addition of Sunnyvale would be approximately $80,000 for the first year of service. As stated earlier, because Palo Alto and the three other contract cities would begin paying a share for the additional 1.5 FTEs in the second and subsequent years, Palo Alto's net annual revenue would be approximately $40,000 in 2002 dollars from that point forward. Based upon the experience with the other contract cities, additional revenue may be expected for Palo Alto as Sunnyvale residents utilize the services of the SpayiNeuter, impound and vaccination fees, and retail sales. Staff anticipates that approximately $17,000 in additional annual revenue, all of which would belong to Palo Alto, would be expected. Staff has also had conversations with Sunnyvale regarding a potential annual surcharge or "host fee" in the mnount of $15,000 to $20,000 that Palo Alto would receive from Sunnyvale. The specific amount of this surcharge would be determined at the time of actual contract negotiations. Palo Alto's estimated share of expansion costs are about $480,000. As noted above, in the 10- year IMP approximately $526,000 had been identified for various physical improvements to the PAAS. They include CIP 10500 for mechanical and electrical renovations in the amount of $193,000 that had been proposed for 2004-2005 and $163,000 for a new roof, flooring and painting that would have been proposed within the next five to seven years. Approximately $10,000 is included in Public Works budget for ADA modifications for PAAS. Included in the 2002-03 Capital Improvement Plan (CIP) is a $160,000 project (10306) for isolation kennels. This project was identified as a safety issue and because it has no relationship to the possible CNIR:471:02 Page 4 of 5 provision of services for Sunnyvale, Sunnyvale would not be charged for this project. Attachment 3 reflects Palo Alto's estimated capital costs. POLICY IMPLICATIONS Approval of the a~eement is consistent with existing City policies. ENVIRONMENTAL ASSESSMENT An environmental review would be completed at the time of final desiro-n. The proposed PAAS facility expansion is consistent with the Baylands Master Plan. ATTACHMENTS Attachment 1" Attachment 2: Attachment 3: PREPARED BY: Animal Sheltering Services Proposal for the City of Sunnyvale Municipal Services Center Master Plan portion related to Animal Services Complex Matrix Reflecting Palo:~-',Alto's i / Assistant Police Chief DEPARTMENT HEAD: PATRICK Chief of Police CITY MANAGER APPROVAL: HARRISON Assistant City Manager CMR:471:02 Page 5 of 5 A~'ACHHENT City of Palo Alto Police Department Proposal To Provide the City of Sunn)wale Animal Sheltering and Associated Services Patrick D~9,er Chief of Police The City of Sumayvale has requested the City of Palo Alto to provide a proposal for sheltering and associated services for domestic animals belon~ng to residents for a minimum of twenty (20) years. This document includes a detailed list of the services to be provided, estimated ongoing costs, estimated capital improvement estimated costs, and a timeline for implementation. The City of Palo Alto believes that it can provide professional, cost-efficient, and effective sheltering and associated services to the City of Smm?~,ale without an?, adverse impact to the level of service provided to the residents of Palo Alto and the other contract cities. BackRround From 1934 to 1972, the Palo Alto's Animal Control Program consisted of Animal Control Officers who enforced the City's Municipal Code sections regarding the care and keeping of animals. The City of Palo Alto opened the Animal Services and Placement Center on East Bayshore Road in 1972. The Low-Cost Spay and Neuter Clinic opened approximately One year later in August 1973. h~ mid-1993, the City of Palo Alto entered into a~eements with the cities of Mountain View, Los Altos and Los Altos Hills for regional animal control services. The current contracts with these cities include emergency animal control services and sheltering and enforcement of State and local laws and dog licensing. Palo Alto Anima! Control Officers (ACOs) respond to all sick and injured, dead, ag~essive and dangerous animals. Aa<timals are transported to Pa!o Alto Animal Services (PAAS), where they are housed, and if necessary, receive medical treatment. Palo Alto employs a full-time veterinarian who provides required medical care. After hours, Palo Alto has a contract with South Peninsula Emergency Veterinary Clinic and several other local veterinarians to care for sheltered animals dm-ing times when the City veterinarian is not available. Attempts to reunite lost pets with their owners are a priority. Currently, PAAS return-to-owner rate for dogs is about 65 percent. Those animals that are not redeemed are evaluated to determine their adoptability. Of those dogs and cats that are put up for adoption, about 95 percent are successfully placed in new homes. PAAS staff members who are certified as euthanasia technicians humanely euthanize animals that are deemed unadoptable due to their medical condition or behavioral 275 Forest Avenue Palo Alto, CA 94301 650.32%2406 650.3292565 fax 650.617.3!20 Administration fax problems. Euthanasia is done by an injection of sodium pentobarbital. Animals that are approved for adoption are held for an indeterminate amount of time (average of two to four weeks) with the hopes of finding an appropriate new home. Palo Alto operates a Spay/Neuter Clinic and provides vaccination and microchipping services for animals. These services would be available to Sunnyvale residents. Because the costs to provide these services are not shared by contract cities, all revenue associated with them are retained by the City of Palo Alto. Disposal of dead animals is currently done by Koefran Industries. Koefran offers both communal and private cremation and the cost is charged to the animal owner. Proposed Services for the City of Smmwale Based upon Sunnyvale's 1,829 average total of dogs, cats and others, the City of Palo Alto offers the following services that would be the responsibility of Palo Alto staff: 1)General care of all animals arriving at PAAS including: daily feeding, sheltering, cleaning and required medical care. 2)Holding of all stray animals for seven days for owner redemption. 3)Attempts would be made to match lost animals with their owners. 4)Evaluation of al! animals for adoption. 5)Maintenance of records on each animal. 6)Perform spay/neuter surgeries and microchip all adoptable animals. 7)Humanely euthanize animals m~available for adoption because of health or behavior. 8) Disposal of all dead domestic and wild animals (except adult deer). 9) Provide intake services for any surrendered animal from residents of Sunnyvale. 10) Provide witness testimony as to the temperament of animals being sheltered at PAAS. ll)Provide training .to Sunn}~,ale's ACOs regarding PAAS policies and procedures. Surmyvale's ACOs would be required to become State certified euthanasia teclmicians. 12) License all unlicensed dogs. Sunnyvale ACOs would be responsible for the following tasks: 1) Transportation and delivery of animals to PAAS. 2) At the time of arrival at PAAS, complete the intake process for each animal, dead or alive, via the Chameleon software progam. 3) Initial kenneling of each animal and provide the animal with food, water and bedding. 4) Additional information on animals being housed at PAAS must be provided immediately upon discovery. 5)Vaccinate incoming dogs for canine distemper (DA2PP) and cats for feline distemper (FVRCP). 2 6)If an animal requires medical evaluation or treatment upon arrival at PAAS, veterinary staff must be notified. 7)Scan all arriving domestic animals, including dead animals, for a microchip prior to placement. 8) Euthanize unweaned animals, upon arrival to shelter, according to PAAS veterinarian' s criteria. 9) Monitor and release quarantined animals quarantined at PAAS Chameleon at the end of the quarantine period. 10)Decapitate and provide transportation to the County Health Department any suspect rabid animal. The Smmyvale Department of Public Safety would assume all responsibility for the investigation of anima! cruelty in the City of Sunnyvale and for conducting all the dangerous/vicious animal hearings as required by law, unless other arrangements are made. The costs for long-term housing and/or medical treatment for animals in these categories will be accrued and invoiced based on actua! costs and would be the responsibility of Sunnyvale. Hours of Operation: The PAAS is open to the public from 11:00 a.m. to 5:30 p.m., Monday through Saturday and is closed Sundays, holidays and every other Friday. Sunnyvale ACOs would be provided access to PAAS during nighttime and other off- hours. Feral cats: PAAS currently rents hun~ane traps to the residents of Palo Alto and the regional cities it services for the purpose of trapping feral cats. The City of Smmyvale has humane box traps available to its residents at no charge. PAAS will not duplicate this service unless other arrangements are made. Feral cats will be accepted from Sunnyvale residents either over the counter at PAAS or from Sunnyvale's field officers. Feral cats are held for a minimum of 72 hours. If PAAS staff ascertains a cat is truly feral, it will be euthanized. The Spay and Neuter Clinic participates in a number of progams designed to control the number of feral cats through a trap and release policy. Sunnyvale residents would be encouraged to participate in these pro~ams. WiIdlife: Live wildlife of any kind will not be sheltered at PAAS. Palo Alto currently contracts with Wildlife Rescue for the handling of live wildlife. It is our understanding that Sunnyvale contracts with Silicon Valley Wildlife Rescue for these services. Palo Alto will dispose of dead wildlife. Palo Alto contracts with a disposal services vendor who picks up the dead animals once a week. The dead animals are rendered at the vendor's site. ONGOING SERVICE COST ESTIMATES Formula for Annual Costs Palo Alto determines the costs for contract cities based upon the actual number of animals handled for each city. As an example, if 1,000 animals are processed at 3 PAAS during a year, they are broken down by the city of origin. A percentage is calculated by dividing the total number of animals handled by the number that came in from the specific city (e.g., if 500 of the 1,000 animals came from Palo Alto, then 50 percent of the total progrmn costs would be Palo Alto's responsibility. If 250 of the 1,000 came fi-om Sunnyvale, then Sunnyvale would be responsible for 25 percent of the total progan~ costs. Based on this calculation, costs may increase/decrease each year depending upon the actual number of animals handled and the associated percentages. The previous year's actual cost determines the estimated cost for the subsequent year. At the end of each fiscal year, an accounting is done to determine the actual number of animals handled and the associated costs of the program. At that time, the city is either billed or issued a refund depending upon its payments and the difference between the pa?mnents and actual cost. Re~onal contracts are billed on a quarterly basis. Surmyvale has requested only sheltering and associated services, therefore costs specific to field service operations and/or animal control would not be charged to the City of Sunnyvale and are not included in the cost estimates. All fees collected for the impounding and boarding of Sunnyvale animals and the licensing of Sunnyvale dogs will be refunded to the City of Sunnyvale on a quarterly basis, separate from contract payments. Fees will be determined by the City of Palo Alto and will be included in the City of Palo Alto Municipal Fee Schedule. Staffing Requirements PAAS would need to add 1.5 staff to accommodate the additional animals from Sunnyvale. Specifically, a .5 Animal Attendant, .5 Anima! Services Specialist, and a .5 Veterinary Technician would be added. For the first year of the contract, Sunnyvale would be responsible for the total cost of salary and benefits for the additional 1.5 positions. The second year and each year thereafter, the costs associated with that 1.5 FTE would be spread amongst the five cities. The staffing additions of 1.5 FTE are a direct result of the provision of services for Sunnyvale and are calculated based upon Smmyvale's ACOs performing all of the requirements listed above. If the City of Sunnyvale does not choose to have its perso~mel perform these tasks, additional staff over and above the 1.5 FTEs would be required and charged to Sunnyvale. Determination of specific staff additions would be calculated by the additional nmnber of tasks PAAS would have to undertake according to the ageement with Sunnyvale. Associated cost increases would be calculated during actual contract negotiations. Should an actual agreement be finalized with Sunnyvale, Palo Alto would anticipate converting the PAAS operation into an enterprise fund. Attachment I shows actual costs for Palo Alto and the three contract cities from July 1, 2001 through June 30, 2002. Attaclm?.ent 2 reflects the estimated costs for Palo Alto, the three contract cities and the City of Sunnyvale for the same time period. In addition to the costs reflected in these attachments, Palo Alto would want to reserve the right to charge a reasonable and appropriate surcharge or "host fee" that would be calculated during actual contract negotiations. CAPITAL IMPROVEMENTS The PAAS structure was built in 1971 and has a wood frame with stucco. The existing roof is tar and gavel. Radiant floor heaters heat the kennel house. The office, cat rooms and S/N clinic have two small HVAC units, as well as radiant floor heating in the office area. There is a separate isolation building with an independent HVAC unit. In late 1996, an infrastructure management study was completed for the City of Palo Alto. Several items were noted for replacement at PAAS in future years. PAAS is scheduled for three major capital improvements over the next two to ten years; including the up~ade of existing restrooms to ADA specifications; the installation of new heating units for the kennels, office area, cat rooms and Spay/Neuter Clinic; and the upgade of the electrical service. Other areas that were identified include new floors, exterior work, a new roof, and interim interior work such as painting and floors. Because this work would need to be included at the time of expansion instead of two to ten years from now, Smmyvale would be required to share in these costs. Because Palo Alto is currently at capacity for kennels, cat cages, and veterinary examination space, in order to accommodate Sunny¢lale's additional animals, some other capital improvements will be required at PAAS. The proposal for the capital. improvements is based upon Sunnyvale's estimated 1,600 live animals (out of the total 1,829 total animals). This includes an increase of approximately 96 percent cats, 30 percent dogs and 11 percent small/other animals. Additional kennels, cat rooms, lobby and administration areas, small animal room, and veterinary examination room would be added. Specifically, the following additions/changes would be made to PAAS: Cat Room Area - Cats are currently housed in three areas: the stray cat room, the available for adoption cat room, and the isolation area. With the anticipated number of cats from Smmyvale, the cat rooms will need to be be enlarged in order to accommodate thern. The available cat room and the stray cat room will each double in square footage to accormnodate 25 extra stray cat and 24 more adoption cages. The addition to the stray cat room will also act as feral cat housing. ~ Dog Kem~els - Eight new dog kennels will be required to house Smm?~*ale dogs. The new stray kennels will be separated from the protective custody/long- term hold kexmels by a common kenne! house. Veterinary ReceivinJTreatment Room - Additional space will be needed for veterinary receiving and treatment. The increase of live animals will require the creation of a small treatment room where the veterinary staff can perform exams and treat shelter animals as prescribed by State law. Small Animal Room - Small animals such as hamsters, parakeets, iguanas, etc. are appearing with regularity at PAAS. These animals have specific housing needs. Noise, activity and temperature must be controlled to ensure a safe and stress free envirormaent. Sunnyvale's small animal numbers represent an increase of 11 percent (avg. 167) of these assorted small pets. A specific room to house these animals is required. Costs associated with this addition wil! be shared by all involved cities. These additions, together with some limited remodeling would also require some ADA changes as required by law. The City of Pale Alto currently has a $160,000 C!P budgeted for the new protective custody kennels. Sunnyvale would not be expected to share these expenses. Additionally, portions of some of the remodeling costs would be shared by Pale Alto and the three other cities. However, that space that is being added as a direct result of the inclusion of Smmyvale's animals would be the responsibility of the City of Sunnyvale. It should be noted that based upon PAAS experience with other contract cities, once the residents of Sunnyvale become accustomed to the services provided by Pale Alto, it is probable that they will utilize the serv'ices of PAAS to a geater degee and as a result, the number of incoming animals may increase. It is Pale Alto's understanding that Sunnyvale would be able to cover its share of capital costs. Additionally, in order to expedite the project, Smmy~,ale would be willing to assist the three other contract cities with their share of capital improvement financing. Attachment 3 reflects the estimated CIP cost breakdowns for each city. Because of the relatively short time frame for the development of this proposal, the CIP costs are estimates only. The estimates are conservative and may be less after a more detailed design is completed. The estimate in 2002 dollars for Sunnyvale's portion is about $1,093,500. Attachment 4 provides an estimate of potential C~ costs that may be expected around 2015. These include exterior work such as painting and associated trim work as well as a new roof on the current kitchen!ke~mel building. Interior work such as floors, paint and ceiling work is also included in the plan. Using 1996 dollars, the estimated total costs associated with these improvements are approximately $81,000. These costs would be shared by all contracts. Timeline Pending approval by the City Councils of Pale Alto and Sunnyvale to proceed with actual contract negotiations, Pale Alto staff anticipates the following time would ensue prior to actual initiation of services: February 2003: February-October 2003: October-December 2003: Final a~eement presented to City Councils of Sum~yvale and Pale Alto for Approval Desig-n of facility, environmental assessment ARB and Plamaing Conn~aission Review 6 January-March 2004: April-November 2004: December 2004: Bid and contract award process Construction Initiation of Services Attachments Attact~nent 1 : Attachment 2: Attachment 3: Attachment 4: 2001-2002 actual costs for Palo Alto and three current contract cities through June 30, 2002 and estimated costs for services by contract city, including Sunnyvale, for FY 2001/2002 Estimated cost for services by contract city including Sumayvale for subsequent services Capital Improvement Cost Estimates Capital Ianprovement Cost Estinaates past 2015 7 ATTACHHENT 1 Animal Services Actual Costs - Fiscal Year 2001-02 Report Date: 9/16/02 Los Altos Palo Alto Mountain View Los Altos Hills Cost Share Percentage 58.5%23.2%13.3%5.0% Animal Admin $114,104 $45,252 $25,942 $9,753 Pet Recovery $106,158 $42,100 $24,135 $9,073 Animal Care $139,317 $55,250 $31,674 $11,907 !Animal Health $0 $0 $0 $0 i Regional Animal $66,353 $26,314 $15,085 $5,671 Volunteer Program $0 $0 $0 $0 Request for Service $104,913 $41,607 $23,852 $8,967 Cost Plan Spread $111,626 $44,269 $25,378 $9,541 Dept. Admin.$50,711 $24,077 $13,803 $5,189 TOTAL $703,182 $278,869 $159,869 $60,101 TOTAL 100% $195,050 $181,467 $238,148 Not Included $113,424 $0 $179,339 $190,813 $103,779 $1,202,020 YEAR 1: Estimate of Costs with the Inclusion of Sunnyvale ..... Additional non-salary costs spread across all contract cities Los Altos Palo Alto Mountain View Los Altos Hills Number of Animals 3,615 1,434 822 313 Cost Share Percentage 45.1%17.9%10.3%3.9% Animal Admin $95,223 $37,773 $21,652 $8,245 Pet Recovery $87,056 $34,534 $19,795 $7,538 Animal Care $121,771 $48,304 $27,689 $10,543 Animal Health $0 $0 $0 $0 Regional Animal $66,353 $26,314 $15,085 $5,671 Volunteer Program $0 $0 $0 $0 Request for Service $104,913 $41,607 $23,852 $8,967 Cost Plan Spread $96,064 $38,! 07 $21,844 $8,318 DepL Admin.$52,247 $20,725 $11,880 $4,524 TOTAL $623,628 $247,364 $141,798 $53,605 Plus Salary Expense Total Sunnyvale Sunnyvale 1,829 22.8% $48,178 $44,046 $61,610 $0 $0 $0 $0 $48,603 $26,434 $228,871 95,188 324,059 TOTAL 8,013 100% $211,072 $192,969 $269,917 Not Included $113,424 $0 $179,339 $212,935 $ 116,810 $1,295,466 FTE Sal Ben Total Expensel 0.5 44,449 16,002 0.5 46,924 16,893 31,908 0.5 48,609 17,499 33,054 95,18s Additional Salary and Benefit Costs Animal Attendant Animal Services Spec 1 Vet Tech (Total Salary and Benefit Costs @ 1.SFTE Sunnyvale Proposal (final 11-19-02)11/19/2002, 1:14 PM 1 A'FrACHHENT 2 YEARS 2+ : Estimate of Costs with the Inclusion of Sunnyvale Salary and non-salary costs spread across all contract cities Palo Alto Mountain View Number of Animals 3,615 1,434 Cost Share Percentage 45.1%17.9% Animal Admin $95,223 $37,773 Pet Recovery $87,056 $34,534 Animal Care $121,771 $48,304 Animal Health $0 $0 Regional Animal $66,353 $26,314 Volunteer Program $0 $0 Request for Service $104,913 $41,607 Cost Plan Spread $96,064 $38,107 Dept. Admin.,,~52,247 $20,725 ,, SUBTOTAL $623,628 $247,364 Plus Salary Expense 42,943 17,035 TOTAL $666,571 $264,399 Los Altos Los Altos Hills 822 313 10.3%3.9% $21,652 $8,245 $19,795 $7,538 $27,689 $10,543 $0 $0 $15,085 $5,671 $0 $0 $23,852 $8,967 $21,844 $8,318 $11 ~80 ,$4,524 $141,798 $53,805 9,765 3,718 $151,563 $57,523 Sunnyvale 1,829 22-8% $48,178 $44,046 $61,610 $o $o $o $48,603 $26,434 $228,871 21,727 $250,598 TOTAL 81013 $211,072 8192,969 $269,917 Not Included $113,424 $o $179,3,39 $212i935 $1,295~466 95,188 $.!.,390..,.664 Sunnyvale Proposal (final 11-19-02)11/19/2002, 1:14 PM 2 ATTACHmEnT 3 CITY OF PALO ALTO ANIMAL SHELTER EXPANSION PROJECTCOST ESTI ATE COSTS PER SQUARE FOOT CONSTRUCTION COSTS Cost per square foot (national average) Bay Area cost index SUBTOTAL Premium to keep existing facility open during construction Designtscope/sustainability contingency Construction contingency_ TOTAL PROJECT DEVELOPMENT COSTS Design Testing & inspection Environmental Permits and fees Project management TOTAL TOTAL COST PER SQUARE FOOT UNIT 150/sf 1.2 15% 15% 10% 40% 15% 1% 1% 2% 10% 29% COST PER SQUARE FOOT (Kennels) COST 15o.oo 30.00 $18o.oo 27.00 27.00 18.oo $252.00 37.80 2.52 2.52 5.04 25.20 $73.08 $325 $160 PROJECT COSTS Building Kennels Large Animal Housing Parking Io__~t expansion Landscape Sitework (drainage, paths, etc.) & utilities Renovations to existing building Allowance for seismic upgrades Fixtures, furniture & equipment Subtotal Escalation TOTAL SF 2,023 2,448 256 1,800 2,000 2,023 COST/SF $325 $160 $3O $2O $15 $30 5% TOTAL $657,475 $391,680 $7,680 $36,000 ~-- $30,000 $100,000 $400,000 $50,000 $60,690 $1,733,525 $86,676 ..........$1,820,20,1 S:MorriskAnimal Shelter\Cost estimates; Last updated 11/19/2002 ANIMAL SHELTER EXPANSION BREAKDOWN OF PROJECT COSTS BY CITY DESCRIPTION/SPACE PALO ALTO SUNNYVALE MT. VIEW t LOS ALTOS New vet exam room i $177,1251 New administration $19,006i $78,2601 $8,944 i $3,354 t New lobby $17,680!$72,800!$8,3201 $3,120{ New cat room #1 I $67,6001 I New cat room #2 i $83,2001 I New small animal room $19.338i $79,62.._____~5i. $9,100!$3,413t Subtotal interior spaces $56~024i $558,610!$26,3641 ....$9,887{ New dog kennels $160,000i $23!~680i ! New large animal housing !$7,6801 ! Shift parking lot 1 $36,0001 I New landscape I.$30,0001.!1 New site work & utility service I $100,0001 i Renovations to existing bldgs $224,000{I $!08,0001 $44,000{ Allowance for seismic upgrades $8,500t $35,0001 $4,000!$1 Fixtures, furniture & equipment $10,317t $42,4831 $4,855/$1,821 Escalation (5%)22.942{52 0731 7.161I 2,860t TOTAL $481,7831 $1,093,526i $150,3801 $60,068i __ROUNDED OFF $480,000t $1,100,000!$150,0001 $60,000] Note:i i I %'s for shared improvements 171 70!81 3{. LOS ALTOS HILLS $2,236 $2,080 $2,275 $6,591 $24,000 $1 ,ooo $1,214 1.640 $34,445 $35,000 TOTAL $177,125 $111,80O $104,000 $67,6OO $83,20O $113,750 $657,475 $391,680 $7,680 $36,000 $30,000 $100,000 $400,000 $50,000 $60,690 86.676 $1,820,20! $1,825,000 ............ ATTACHHENT 4 ATTACHHENT 2 2.MUNICIPAL S£RViCES CENTER SITE AND BUILDING DESCRIPTIOR The 15,6 acre* City of Palo Alto Municipal Services Center is located on the east side of East Bayshore Road, approximately one m~le south of Embarcadero Road, The site lies within the Palo Alto Baylands, directlyzb the south of the Matadero Creek, and is bounded to the east and south by preserved marsh land, Access into. the site,occurs along the East Bayshore Frontage Road. Due to the potential for periodic flooding within the Baylands, the Santa Clara Valley Water District has constructed a levee dlr~ctly to the north, east, and south of the site. This flood wall prevents flooding from the adjacent marsh and from Mata~ero Creek from entering the MSC site. The Municipal services Center functions primarily as an operational head-. quarters for Public Works Department and utility operations in the City, Approximately thirteen percent of. the site is utilized for uncovered storage** and ten percent of the site is designated autos truck, and equip- ment parking space, The Finance Department purchasing division provides warehousing for City operations, Police Department Communications repair activity also occurs at the site, but has only minimal impact on the day to day MSC functioning. Other facilities include interior hazardous waste storage, afuel station, and a proposed vehicle.wash facility. The existing MSC site has three main buildings: Building A, with 15,730 square feet;B, with-2~935 square feet; and C, with 32,720 square feet, The buildings are low, one and two story structures with preca~t concrete wall panels and some stucco. These buildings house the maintenance opera- tions for the City along with some support office space, There is also an~mal Shel~er~complex on thee MSC. site, consisting of five small buildings wit~o~3:~i,~e,~to The buildings are low, one .story structures w~th exte~Pio~-~ood siding, "~h~,se buildings house the animal services and care op6rations for the City al6~g with kennels and some suppor.t office space. Finally, there is a new UtilityControl Center (SCADA) with 5,415 ~quare .feet, This-building. is. a low,. single.story s~ruc- ture with a s~:ucco finish, and houses the monitors for the City's computer systems along with some sqpportoffice space. Refer to Existing Conditions plan, 15,6 acres includes, the area within the existing security fence and the area. of landscaping and parking between the fence and East Bayshore Road, *~Uncovered storage includes %he fenced purchasing yard, materials storage areas, and material bins. Hazardous waste ~torage is not included in this total, ~0 tO00000 'ON XV~ V~SION: Police Department, Animal Shelter A. Buildings This group is presently located at the Animal Shelter complex and has 5,950 ~quare feet. The group needs approximately 2,500 square f.ee%-In which to expand its o~~l~d]if~ administrative functions. The new of ce space s Ou e a ac ed i~o e'~~~6uil~"an~'n~~ the new wildlife administrative building should be in close proximity to the Animal Shelter complex, Site Storage and Exterior Work Area ..% Number of volunteers fluctuates. No l~e in~.c~.~9.anticipated. Access to MSC adequate~ Facility staffed from 4:~0 am to 9:00 pm. There is constant public access to the neuter cllni~, 4..,_~A"wil.d~i#e refuge" facili}y for th~e.,w_ildlife rescue progra~m is pro- Security lighting is needed, 6o Location sign is inadequate, The facility cannot be seen by public due to a l~rge hedge, Outdoor lunch facility, Parking EMPLOY~. PARKING CURRENT '- QUANTITY A'BD IT IONAL TOTAL 13 .....0 ..13 DEPARTMENT AUTO/VAN DEPARTMENT TRUCK VOLUNTEER AUTO PARKING 1 2 0 0 4 PUBLIC PARKING SHELTERAND ,,~ ..... BAYLANDS VISITOR 0 ~ 7~.i 7 I.A number of Baylands visitors presently park ~n~'6-~i~ ~helter parking lot, .i lO00000 'ON In the Animal Shelter complex, the additional area requirements can be met bY adding a new 5_O0~~area tothe existing office building, A new, se'F~e 2,000 square foot bu.ild~.n.~.,..t.o the A new 4,900 square foot building is needed on the MSC site for Parks and Open Space to accommodate the 3~080 square feet moved from Building C along with 1,800 square feet additional storage requested, A new 7,200 square foot canopy is needed to protect the various groups'. heavy equipment from the weather, k new 2,~50 square foot canopyis needed :o accommodate Light and Power's relocated storage and work space, Any new construction at the MSC site should respond to the existing buildings there, New buildi6g modules and fenestration patterns should relate to the existing buildings with an i~creased use of glass to bene- fit the users. The building entrances should be protected and well- defined, The buildings should have low profile roof structures with all roof equipment screened, The finish materials for new buildings at the main site should be concrete or stucco. The finish materials for new buildings of the Animal Shelter complex should be wood, The new roof canopies should be steel or concrete, with low profile roof structures, An .overall color scheme should be developed, setting guidelines for .r~pBinting and new construction. BUILDING IMPROVEMENTS Remodel ed Space New Space. Under Existing Roof 3,630 SF New ~nd Floor in,Existing Building 2,565 SF ADDITIONAL STRUCTURES New Addition to Existing Building New Buildings New Roof Canopies 550 SF 6,900 SF. 9~450 SF parking for certain specialize~ equipment and vehicles. Personnel parking needs to be increased to accommodate both present employee nu,m- bers and anticipated expansion, I~ is recommended that small vehicles: autos, vans, pickups, and smaller trucks continue to be located adjacent to. the division bu%Iding headquarters. Large trucks and specialized equipment should be located at a central parking.area, Th~ grouping of larger vehicles saves space and allows for the clustering of specialized trucks and equipment under .the proposed canopy, Expanded employee parking can be accommodated by reorganizing the present northern parkingarea in order to gain space and by expansion of the parking lot located between the animal shelter and the SCADA building, The 11 car visitor/employee parking area located at the entrance should be abandoned to facilitate a safer b~cycle trail, redistribution of employee parking to its proper location within thetwo expanded person- n~l parking lots~ a large landscaped buffer at the entrance and to simpli'fy vehicle circulation at the entry. Visitor and vendor parking spaces are proposed adjacent to each division building space, Visitors and vendors would be required to check in at the front gate where they would be directed to the appropriate divi- sional, office parking area., The.entry to the animal shelter should be move~ to the south to allow development of the ~outhern employee parking forand also to create a more identifiabie, and clearentry to the shelter, The animal shelter parking is expanded to accommodate public use and the occasional visi- tor to the baylands, Twelve. covered bicycle parking spaces are" propo,~ed adjacent to each of the two employee parking areas, The combined tBtal of 24 covered bicycle s~aces is co.nsidered adequate, based on current use and anticipated addit~.onal employee~. (See Build.ings, Parking,.and..Storage Plan.) Parking Summary: PARKING EXISTING PROPOSED ~mployee (Separate lots)194 224 +6 inside MSC Fleet Parking Within MSC Security Fence 'Visitor Parking Large Truck 0 22 33 "50 Light Truck 39 55 Cars, Vans, Pickups 69 84 Parking Summary, Continued~ PARKING .EXISTING PROPO~E~ Construction Equipment and Small Trailer 97 ....i00 Permit Parking 0 5 TOTAL 432 546 Notes Proposed covered parking will accommodate twelve (12) large truck~ or combination of larger trucks and smaller equip- ment, The above totals do not include the Animal Shel.ter. A~Imal -Shelter parking spaces increased from 18 to 30to accom- modate users, volunteers, and Baylands visitors. Proposed Z4 covered bicycle parking spaces located adjacent to employee parking lots. D.Site Expansion. ExpansiOn is recommended in order %0 permit maximum use of the site.~ This expansion.would allow for a more organized and manageable placement of materials, parking~ andadditional l.andscape buffering.Sufficient expansion can be achieved by accomplishing the following. Move theeastern fence approximately{of5 feet to the east., which locates it 30 feet from the toe of t~e adj~Fent flood wall. This allows for expansion of the material bins a~d ~mproved circulation around the proposed large truck parking zone. 2. 'M~ve £h~"f6#ce {long the souther.n property line to the south to a position 30 feet from the foot ofthe flood wall. This allows for. the development of expanded storage areas a.s well as .d.e, velopment of a wildlife rehabilitation area. The relocated entrance to l~lie animal" ~e~r also ?a--l~ ~Ythin this expanded area. 3,Approximately 30 feet should be left between the perimeter security fence and the toe of the flood wall to develop a significant. landscaped buffer between the Bay~ands and the project site, E. Circulation The present one way circulation system, with ~nor modification to ATTACHMENT 3 Estimated Palo Alto Capital Improvement Costs $160,000 193,000 163,000 10,000 $526,000 -480,000 $ 46,000 02-03 CIP 10306 IMP Proposed 04-02 CIP IMP Proposed CIP ADA Modifications (included in Public Works current budget) Palo Alto's Estimated Share Cost savings to Pa!o Alto