City Manager's Report
wi~h
TO:HONORABLE CITY COUNCIL
FROM:CITY MANAGER DEPARTMENT: PLANNING AND
COMMUNITY ENVIRONMENT
DATE:
SUBJECT:
DECEMBER 17, 2001 CMR:461:01
250-270 HOMER AVENUE/819 RAMONA STREET: APPEAL OF THE
DIRECTOR OF PLANNING AND COMMUNITY ENVIRONMENT'S
APPROVAL, AFTER REVIEW AND RECOMMENDATION BY THE
ARCHITECTURAL REVIEW BOARD/HISTORIC RESOURCES BOARD,
OF AN APPLICATION BY PREMIER PROPERTIES TO ALLOW
CONSTRUCTION OF A 37,798-SQUARE-FOOT, MIXED-USE PROJECT
AND THE REHABILITATION OF THE HISTORIC FRENCH LAUNDRY
BUILDING TO PROVIDE FOR OFFICE AND RESIDENTIAL USES AND
RELATED SITE IMPROVEMENTS ON APPROXIMATELY 0.58 ACRES
AT 250 HOMER AVENUE AND THE PROPOSED REHABILITATION
OF THE HISTORIC AME ZION CHURCH AND A NEW TWO-STORY
ANNEX TO PROVIDE APPROXIMATELY 5,300 SQUARE FEET OF
OFFICE DEVELOPMENT AND RELATED SITE IMPROVEMENTS ON
APPROXIMATELY 0.12 ACRES AT 819 RAMONA STREET. ZONE
DISTRICT: MUO/AMF. FILE NUMBER 00-ARB-175
RECOMMENDATION
Staff recommends that the City Council:
1) Deny the appeal and uphold the Director of Planning and Community
Environment's approval of the proposed project, and;
2)Amend condition No. lc of the Conditions of Approval to specify a procedure for
the possible release of excess parking spaces for the affordable housing project
and condition No. 49 to require explicitly that the developer to provide public
parking for weekday evenings and weekends for at least sixty parking spaces in
the project's parking structure.
CMR:461:01 Page 1 of 12
PROJECT DESCRIPTION
The applicant is proposing to construct a new three-story, 45-foot maximum height (30-
foot nonresidential height) mixed use building including two residential units (7,968
square feet), 28,000 square feet of office space with 2,000 square feet of amenities,
preservation/rehabilitation of the historic French Laundry building, an underground
parking garage providing 140 spaces and related site improvements at 250/270 Homer
A~enue; and preservation/renovation of the historic AME Zion Church building,
including a new two-story addition comprising 2,900 square feet of new office space and
related site improvements at 819 Ramona Street. The project would be located on the
northern half of Block C of the property formerly owned by the Palo Alto Medical
Foundation (PAMF).
Including the French Laundry and AME Zion Church, the entire project would yield a
total of 42,510 square feet of habitable floor area on a 30,935 square foot site. The project
would result in a total FAR of 1.37:1, with an overall residential density of 2.8 units per
acre (0.26 FAR) and an office Floor Area Ratio (FAR) of 1.12, including new and
existing floor area. The project described as 250/270 Homer Avenue would have an FAR
of less than 1.5:1.
The site consists of six existing parcels that will be merged into a single parcel on Block
C of the former PAMF properties. The site is located on the northern half of the block
bounded by Ramona and Bryant Streets, Homer and Channing Avenues (see Attachment
A: Location Map). The proposed building footprint (19,472 square feet) results in 63
percent lot coverage. The proposed building setbacks on the three floors would range
from zero to 64 feet (an average of 35 feet) along Homer Avenue, four to 40 feet along
Ramona Street, 15 to 17 feet along Bryant Street, and 12 to 43 feet from the rear property
line.
The revised plans (dated October 22, 2001) provide 140 parking spaces (72 spaces on
Level 2 and 68 spaces on Level 1). The Development Agreement requires that 20 of these
spaces be reserved for the affordable housing site and at least 60 spaces of the parking
garage be made available to the public for evening and weekend use. Four spaces would
be reserved for the two residential units. Vehicular access to the site would be provided
from a single, two-way entry ramp on Ramona Street that would service both the subject
site and the City's proposed affordable housing site to the south. The shared ramp will be
constructed by the developer and located on the affordable housing site. The developer
has prepared a Transportation Management Program (TDM) plan that will be
implemented with the development.
The architecture is contemporary with building elements that are compatible with historic
structures in the area and consistent with the Secretary of the Interior's Standards for
Rehabilitation. The project does not require any exceptions to the Mixed-Use
Overlay/Attached Multi-Family (MUO/AMF) Development Standards contained in the
South of Forest Area Coordinated Area Plan (SOFA CAP). The project, as approved, is
C!vIR:461:01 Page 2 of 12
consistent with the Development Agreement between the City of Palo Alto and the Palo
Alto Medical Foundation that was approved by the Council on April 10, 2000.
BOARD/COMMISSION REVIEW AND RECOMMENDATIONS
The proposed project has been reviewed by the South of ~Forest Area (SOFA)
Architectural Review Board/Historic Resources Board (ARB/HRB) at seven public
hearings (July 12, August 3, September 7 and November 9, 2000, and March 8, March 22
and April 26, 2001) and a study session on February 22, 2001. On July 12, 2000, the
applicant provided an overview and history of the project as well as the three SummerHill
projects on Blocks A and B. The ARB/HRB conducted a preliminary review of the
project on August 3, September 7 and November 9, 2000 and detailed review of the site
planning, architecture and landscape components of the project on March 8, March 22
and April 26, 2001. During preliminary review of the project, the Board generally
" supported the direction of the site planning, pedestrian amenities, public plaza, landscape
components and design of the project. The Board supported the relocation/rehabilitation
of the French Laundry, and the design of 270 Homer Avenue. However, while the ARB
members endorsed the design of 250 Homer Avenue, the HRB members expressed
concerns about its compatibility within the area.
The ARB/HRB, at its study session held on February 22, 2001, addressed the issues of
the proposed shared ramp for both the proposed project and the affordable housing
project that will be developed on Block C. The main purpose of the study session was to
allow the Board to fully explore the feasibility of the urban design for the entire block
and specifically whether the furore affordable housing site would be better served by a
dedicated ramp vs. a shared ramp. Four alternative ramp locations were presented
addressing the viability of a shared ramp or a dedicated ramp for both projects. The
ARB/HRB, in its subsequent project review hearings, supported the shared ramp at the
proposed location.
At the March 8, 2001 meeting, the Board discussed and provided direction to staff on
three main issues relating to the proposed project: (1) the project's design quality,
including considerations of style, articulation, materials, historic building rehabilitation
and construction, and urban design for the SOFA area; (2) the project's compatibility and
conformance to policies and standards of the SOFA CAP; and (3) the project's ability,
through site improvements, to support and benefit the future affordable housing project.
At the March 8 meeting, staff provided a staff report and presentation, that addressed the
substantive issue of compatibility. Staff emphasized that the standards of review for new
development should be based on compatibility which is achieved when the apparent scale
and mass of new buildings is consistent with that existing in the neighborhood; as well as
when new construction shares general characteristics and establishes design linkages with
surrounding existing buildings so that the visual unity of the street is maintained. Staff
also presented to the Board the specific "Standards of Review" required for this project
CMR:461:O1 Page 3 of 12
by the SOFA CAP, which included substantial conformance to the Secretary of the
Interior's Standards for Rehabilitation (A~hment C).
The Board respcrded to the staff pres~- ~ion with comments and direction at that
meeting, and id~~ ~ed two additional i~ .,rtant issues that staff was asked to address
prior to final rec: ~endation by the Board.
First, a peer review is needed of the finding made by Page & Turnbull that the 250/270
Homer Avenue proiect was c ~atible with tb.e French. Laundry and, therefore, in
substantial conf.n~; ~ce with Secretary's i~;~dards ~or Rehabilitation. The City
subsequently cc ~.d with the nistorical consulting firm of Carey & Co. to provide the
Board with an inaependent review of the project for conformance with the Secretary's
Standards. This is addressed in Section One of the staff report dated March 22, 2001. The
peer review by Carey & Co. determined that the proposed development was in substantia!.
conformance with the Secretary's Standards except for certain fenestration issues that
were finally resolved to the Board's satisfaction.
Second was the ::.tent to which the ARB/HRB's review and ecomme afion was
constrained by the developer's entitlement under the Develop: ent Agr .::-nent to a
maximum 30,970-gross-square-foot building. This issue is discus~:~:d in Section Two of
the staff report dated March 22, 2001, which clarifies that the maximum allowable square
footage would be permitted only if the resulting building conformed with the Secretary's
Standards for compatibility with the French Laundry. The Board found that the proposed
development was consistent with the Development Agreement, the SOFA CAP, the
MUO/AMF development standards (including FAR), ,:~d the Secretary's Standards and
therefore was not required to reduce its size.
On March 22, 2001, the ARB/HRB recommended 6-0 that the Director of Planning and
Community Envirc:~_ment approve the project at 250-270 Homer Avenue with the
conditions contained in the March 22, 2001 staff report. On April 26, 2001, the
ARB/HRB recommended 5-0 (with one absent) that the Director of Planning and
Community Environment approve the project at 819 Ramona Street with the conditions
contained in the March 22, 2001 staff report. The Board appointed a sub-commit': of
one member each from the ARB and the HRB to work with staff, the applicant a e
historic consultants to resolve design issues related to the size of six window ope~ ~ngs
(fenestration) at 250 Homer Avenue as they related to conformance with the Secretary's
Standards.
Since April 2~i, the applicant has c)mbined the plans for both projects and incorporated
the major design revisions required by the ARB/HRB. The applicant also has been
working with the developer of the affordable housing site at 825-827 Ramona Street to
fi~alize detai!s of the shared ramp and driveway serving the two projects. The final
revisions to ::~ project are contained in the plans and submittal materials dated October
22, 2001. The Director of Planning and Community Environment approved the project on
CMR:461:01 Page 4 of 12
November 27, 2001 with the conditions recommended by the ARB/HRB, in addition to
several conditions requ.ired by the Director relating to the_~s.hared ramp (condition 1 c) and
parking spaces (conditi~on lc).
Public testimony regarding the ipxoject @as also taken at each meeting. The concerns
expressed by the public focused mainly,on the contemporary design of ~the building and
its compatibility with existing buildings in the area. A detailed summary of the project as
well as a discussion of compatibility issues is contained in the ARB/HRB staff reports
dated March 8, March 22 and April 26, 2001 (Attachment D, E and F). Verbatim
minutes from these meetings are also attached to this report (Attachments G, H and I).
DISCUSSION _ :.
On December 6, 20ffl, the Director's approval was appealed by a resident in the area
(Attachment B). The appellant's areas of concern are summarized below, with staff.
responses. The numbering of the concerns and responses corresponds to the organization
of the appellant' s letter. .::
Appellant Concern: The SOFA CAP policy framework was disregarded in the
ARB/HRB review of the project. The Development Agreement conflicted with the
Council policy determinations and left the ARB/HRB to review only very minor
compatibility issues such as details regarding building window size, placement,
and decoration.
Staff Response: The SOFA CAP policy framework was adopted by the City
Council on September 27, 1997 to provide direction to staff in preparing the
SOFA CAP document. It is not specific to project development. The SOFA CAP
is consistent with the policy framework and the project conforms to the goals and
policies of the SOFA CAP. The Development Agreement was in turn adopted by
the Council to implement the SOFA CAP.
The Development Agreement was approved by the Council to implement the
SOFA CAP. The ARB/HRB review was essentially based on the SOFA CAP,
MUO/AMF zoning requirements and the Secretary's Standards. There was
extensive preliminary and major design review by the Board for this project. The
ARB/HRB played a significant role in the design of the project with respect to
major design elements, historic preservation and compatibility with Homer
Avenue. The ARB/HRB provided the primary guidance to the applicant and staff
for the many significant elements of the project, including the public plaza,
massing and scale, setbacks, historic rehabilitation, and important details of
fenestration, materials and landscaping.
The ARB/HRB made findings that the project is consistent with the SOFA CAP,
based on staff's findings of consistency as presented in the attached staff reports
(Attachments D, E and F) and Conformance to Plans and Policies (Attachment C).
CMR:461:01 Page 5 of 12
Furthermore, the project does not require any exceptions to the MUO/AMF
Development Standards contained in the SOFA CAP.
Appellant Concern: ¯ ~:e placement of the shared parking ramp on the adjacent
affordable housing site decreases the opportunities.for affordable housing. This
also constrains the number of housing units for the affordable housing project.
Staff Response: This is not the case. The affordable housing project would require
a parking ramp of similar size and configuration as that proposed for shared use by
the two projects. The shared ramp is an efficient use of the entire city block as
well as providing direct access to the 20 parking spaces on the mixed-use site
which are to be dedicated to the affordable housing project. The number of units
for the housing project is constrained by the required parking spaces and height
limits, not by the small loss of surface area involved in the dual-use ramp. The
project approved by the ARB/HRB for the affordable housing site locates a trash
and recycling enclosure and laundry room adjacent to the shared ramp. The
housing developer has also stated that a dedicated ramp would have been located
in the same place as proposed for the shared ramp with the 250/270 Homer
Avenue project.
The City Council's direction to staff in April 2000 was to determine if it was
feasible to combine the two ramps on Block C into one ramp located on Ramona
Street south of the AME Zion Church. The ARB/HRB and staff determined that
this could be achieved and that it would provide for improved urban design and
planning for the entire block. All parking spaces for both projects could be
adequately accessed by a single ramp, therby reducing curb cuts and total area
devoted to cars.
This design successfully achieved Council direction and provided good planning
solutions for the two developments. The logistics and engineering for the shared
ramp proved to be a challenge for the two projects. The most difficult issue
involved is not the location of the ramp but the timing of the two projects. During
the earlier stages of the 250/270 Homer design review, an affordable housing
developer and a project design were not in place to respond to the shared ramp
design. To address this, the Director of Planning and Community Environment
determined that the SOFA development permit for 250/270 Homer would not be
issued until the ARB/HRB had completed its review and recommendation on the
affordable housing project. This allowed the two projects to have concurrent
conditions of approval that addressed the development and use of the shared ramp.
Appellant Concern: The project should pay the City a reasonable, continuing fee
for an easement for the shared ramp on the affordable housing site.
CMR:461:01 Page 6 of 12
Staff Response: The mixed use project will pay for the easement over the
affordable housing site in three ways: (1) by paying for construction of the ramp,
(2) by making a cash payment making up any difference between the reasonable
cost of the ramp and the fair market value of the easement, and (3) by maintaining
the ramp. Staff believes that a single payment for the easement minimizes
administrative costs compared with the system of annual payments Mr. Bubenik
advocates. (The fair market value of the easement is the present value of a series
of future payments for the easement.) These requirements are in contained in
Condition 1 b. The developer of 250/270 Homer is also required to deliver a long-
term access and maintenance agreement securing the right of the below market
rate project to the twenty spaces and the City right to after-hours use of sixty
spaces.
Staff believes that this formula provides compensation to the City while providing
credit to the developer of 250-270 Homer Avenue for actual construction costs
that would otherwise be borne by the affordable housing project. Finally, under
no circumstances will the City or the affordable housing developer subsidize or
compensate the mixed-use developer for the ramp and easement.
Appellant Concern: The project conditions provide an alternative to provision of
the 20 parking spaces (for use by the affordable housing project) called for in the
Development Agreement. The developer may vacate his obligation with the in-lieu
fee of $35,000 per space for the 20 dedicated parking spaces.
Staff Response: The Development Agreement requires the mixed-use development
to provide twenty parking spaces for the benefit of the affordable housing project.
To date, the housing developer has stated that all of the 20 spaces are needed.
However, because the project involves shared parking, the affordable housing
project can ask that its parking requirement be reduced by up to 20 percent (Palo
Alto Municipal Code Section 18.83.070.) If the Director grants that request, and
the Council upholds the Director's decision in the event of an appeal, the project
may not need all of the twenty spaces. In that event, the conditions of approval
require the mixed-use project to make a payment to the City of $35,000 for each
space released, up to a maximum of $700,000. Because the parking spaces were
required to support affordable housing, these payments would be treated as
commercial in-lieu housing fees. The decision to ask for reduced parking must be
made prior to construction of the affordable housing project.
Staff recommends that the text of condtion lc be revised as follows to make the
circumstances under which parking may be released clearer:
1 c. The developer of the 250/270 Homer Project will provide 20
dedicated underground parking spaces in the parking garage on the
site for the use of the affordable housing project. The 20 dedicated
CMR:461:01 Page 7 of 12
spaces shall be located in the 250/270 Homer parking structure,
generally along the Ramona/Homer street-side and accessible to the
affordable housing residents, as determined by the Director of
Planning and Community Environment. Prior to the issuance c~f a
building permit for the 250/270 Homer Project, there shall be
recorded an Access and Parking Easement Agreement for the benefit
of the affordable housing project in a form acceptable to the City. If,
pursuant to Palo Alto Municipal Code Section 18.83.070 or the
provisions of the SOFA Community Area Plan, the City determines,
with the agreement of the developer of the affordable housing
project, that one or more of the twenty spaces is not needed by that
project, the developer of the 250/270 Homer Project will make a
payment to the City of $35,000 for each space released. The
decision to release spaces must be made prior to commencement of
construction The payment shall be made prior to the granting of any
certificate of occupancy for 250/270 Homer Avenue or 819 Ramona
Avenue.
Appellant Concern: The project conditions imply that the residential units need
only be habitable while tacitly permitting their use as offices, contrary to the
provisions in the Development Agreement. Instead, the condition should ensure
that the residential units be maintained "in" rather than "for" residential use.
Staff Response: Project condition 1.e provides for annual inspection of the
residential units to ensure that they are maintained for residential use. The intent is
to guarantee that the two units are built and occupied for residential uses for the
life of the building. Staff believes the condition is clear in meeting that intent.
Further, project condition 1.q requires that the applicant comply with all the
conditions contained in the Development Agreement, particularly those specified
in Exhibits D-1 and D-2 (Attachment K). The condition referred to by the
appellant is condition I in Exhibit D-1 and is, therefore, a condition of the project
approval dated November 27, 2001. The project would require a subdivision map
for the residential units. The Council also has the authority to change the project
conditions of approval to read "...in residential use ...". The annual condition
monitoring would not change.
Appellant Concern: A preliminary review of its plans indicates that the project,
which is required to provide 140 parking spaces, 20 of which are dedicated to the
neighboring affordable housing project, has fewer spaces than that.
Staff Response: The development agreement calls for 140 spaces to be located on
the 250-270 Homer site, including 20 spaces to be dedicated for use by the
affordable housing project. The approved project and plans submitted on October
CMR:461:01 Page 8 of 12
7.
22, 2001 provides 140 spaces on-site. The SOFA CAP requires that only 114
parking spaces would be required for the project.
The Development Agreement requirement that the project provide 60 spaces for
public use on weekday evenings and__weekends is addressed in condition of
approval, No. 49. However, the condition does not explicitly call for 60 spaces.
Staff recommends that the Council amend this condition to require the "applicant
to execute an Easement and Maintenance Agreement with the City providing
public access to at least sixty parking spaces in the underground parking garage
between the hours of 6:00 PM and 10:00 PM on weekdays, and between 8:00 AM
and 10:00 P~ on weeken .~: ~.
Appellant Concern: The project does not provide pedestrian entrances at intervals
of 25 to 50 feet as required by Section 4.2 of the SOFA CAP AMF Design
Guidelines.
Staff Response: Guideline 4.2 does n0~.apply to this district. It applies to the AMF
(residential) district. The MUO/AMF has separate Desi__gn__ Guidelines contained in
Section 3.3(g). The MUO/AMF guidelines state "Building mass or faqade
composition on parcels greater than 100 feet in width should be articulated in
modules and massing variations to reflect the historic development pattern of the
area. Techniques for creating this massing or faqade module may include but are
not limited to the following: roofline variations and projections or recessed wall
surfaces."
The Development Agreement (Exhibit D-l, condition E) requires that "the new
buildings shall be treated architecturally as more than one building. They shall
have at least three distinct architectural characters." The plans clearly show three
distinct architectural styles: 270 Homer Avenue, a contemporary building with
historic architectural elements; the French Laundry, an historic building
rehabilitated according to the Secretary of the Interior's Standards; and 250 Homer
Avenue, a contemporary building designed to be compatible with typical building
elements in the area such as modestly-scaled window operfings and multi-pane
fenestration. The resulting project design provides a collection of buildings that
are pedestrian-oriented with high quality materials, building articulation, varied
setbacks and extensive landscaping.
o Appellant Concern: The ARB/HRB Subcommittee lacked proper process. Near the
end of its 250/270 project review, the joint SOFA ARB/HRB panel chair created a
subgroup to resolve differing opinions on fenestration issues between
architectural consultants hired by the 250/270 developer and the City.
Staff Response: The ARB/HRB's recommendation for the project included a
subcommittee with a board member each from the ARB and HRB. It is standard
CMR:461:01 Page 9 of 12
practice for City boards and commissions to form subcommittees for the purpose
of reviewing specific items as directed by their respective boards/commissions.
This had been done consistently by the ARB and the HRB. Recent examples
include the historic renovations for the Apple store (historic building) on
University Avenue, and the Stanford West Senior Housing projects, which
included issues of fenestration, detail and design compatibility.
For the 250/270 Homer Avenue project, the subcommittee consisted of one
member of the ARB with expertise in architectural design and one member of the
HRB with expertise in historic resources. The charge of the ARB/HRB to the
subcommittee was to review the size and pattern of six modified windows on the
250 Homer Avenue building for conformance with the Secretary's Standards and
to make a recommendation to the Director of Planning and Community
Environment. The size and placement of the windows was considered in relation
to the pattern and size of other fenestration openings on Homer Avenue. Metal
mullions and spandrels were added to the project windows to reduce their apparent
size. The Board subcommittee determined that these modifications satisfied the
Secretary's Standards. The ARB/HRB determined that these changes were not
sufficiently significant to warrant a full Board review.
Appellant Concern: An ARB representative participated in the ARB/HRB beyond
the expiration of his term on the ARB
Staff Response: Robert Peterson volunteered to serve on the ARB/HRB at its
inception and agreed to continue serving on the ARB/HRB following his
retirement from the ARB. Mr. Peterson was appointed by the Director of Planning
and Community Environment as Chairman of the ARB/HRB prior to the meeting
on July 12, 2000. The Director accepted Mr. Peterson's offer to continue his role
on the ARB/HRB after September 2000 to ensure consistency through completion
of the PAMF/SOFA projects. As with previous appeals for SummerHill, the City
Attorney's Office has determined that this was consistent with the SOFA CAP
review process.
10.Appellant Concern: The conditions of project approval do not include the full set
of City Council conditions.
Staff Response: Staff does not concur with the appellant's contention. The
conditions of project approval (dated November 27, 2001) incorporate by
reference all the conditions included by the City Council in the Development
Agreement. Project condition 1.q requires that the applicant comply with all the
conditions contained in the Development Agreement, particularly those specified
in Exhibits D-1 and D-2 (Attachment K). Any regulations included in the SOFA
CAP, the Palo Alto Municipal Code and other City ordinances apply, whether or
not referenced.
ClVIR:461:01 Page 10 of 12
11.
The conditions contained in the Development Agreement continue to be in full
force and effect. Staff as well as the ARB/HRB reviewed the project under the
policies of the Comprehensive Plan, the standards and guidelines of the SOFA
CAP, and the Secretary of the Interior's Standards and made extensive findings of
consistency, as described in Attachment C. Additionally, when the Council
adopted the SOFA CAP (Ordinance 4626), htrther conditions of approval were
included for development (Attachment C).
Appellant Concern: Does the Chief Building Official have valid signature
authority for a Planning Division document?
Staff Response: Yes, the Chief Building Official was given authority to act on
behalf of the Director of the Department of Planning and Community
Environment.
ENVIRONMENTAL REVIEW
The project is subject to environmental review under provisions of the California
Environmental Quality Act (CEQA). An environmental impact report (EIR) was prepared
for the SOFA CAP including the project. The EIR was reviewed and certified by the City
Council on March 27, 2000. The project, as currently proposed, has been reviewed in
comparison with the project that was evaluated in the EIR. Staff has determined that the
current project is consistent with that evaluated in the EIR and, therefore, no subsequent
environmental analysis is required. Copies of the EIR and the findings made by the City
Council pursuant to CEQA (Resolution No. 7950) are available for public review in the
Planning Department on the Fifth Floor of City Hall.
ATTACHMENTS
A. Location Map
B. Appellant's Letter of Appeal, dated December 6, 2001
C. Conformance with Plans and Policies (Comprehensive Plan, SOFA CAP,
AMF/MUO, Secretary's Standards, Urban Design Guidelines, DA excerpts from
April 26, 2001 ARB/HRB Staff Report), Standards for Review, Ordinance 4626.
D. ARB/HRB Staff Report dated March 8, 2001 (including attachments)
E ARB/HRB Staff Report dated March 22, 2001 (including attachments)
F. ARB/HRB Staff Report dated April 26, 2001 (including attachments)
G. Excerpts of the ARB/HRB minutes of March 8, 2001 (Council Members only)
H. Excerpts of the ARB/HRB minutes of March 22, 2001 (Council Members only)
I.Excerpts of the ARB/HRB minutes of April 26, 2001 (Council Members only)
J.Approval Letter and project conditions, dated November 27, 2001
K. Development Agreement Exhibits D-1 and D-2
L. Plans and Updated Final submittal dated October 22, 2001 (Council Members only)
CMR:461:01 Page 11 of 12
PREPARED BY:
Current Planning Manager/i~
DEPARTMENT HEAD REVIEW: ..... ~
Interim Director
Planning_ and Commum~y Environment
CITY MANAGER APPROVAL:
EMIL?~ARRISON
Assistant City Manager
cc:David M. Bubenik, 420 Homer Avenue, Paio Alto, CA 94301
Jim Baer, Premier Properties, 172 University Avenue, Palo Alto, CA 94301
Rick Holstrom, Menlo Equities, 490 California Avenue, 4th Floor, Palo Alto, CA
94306
Tom Gilman, DES Architects, 399 Bradford Street, Redwood City, CA 94063
Elaine Voulgares Breeze, SummerHill Homes, 777 California Avenue, Palo Alto, CA
94304
CMR:461:01 Page 12 of 12