HomeMy WebLinkAboutCMR- 459-01City of Palo Alto City Manager's Report TO: ATTENTION: HONORABLE CITY COUNCIL FINANCE COMMITTEE FROM:CITY MANAGER DEPARTMENT:ADMINISTRATIVE SERVICES DATE:DECEMBER 18, 2001 CMR:459:01 SUBJECT:ORDINANCE CLOSING THE 2000-01 FISCAL YEAR, INCLUDING REAPPROPRIATION REQUESTS, COMPLETED CAPITAL IMPROVEMENT PROJECTS, AND THE YEAR-END PERFORMANCE HIGHLIGHTS REPORT RECOMMENDATION Staff recommends that the Finance Committee review and forward the attached ordinance and associated exhibits to the City Council for its approval to: close the 2000-01 Budget and authorize to re-appropriation of 2000-01 funds into the 2001-02 Budget ~xhibit A); close completed capital improvement projects (Exhibit B); and transfer remaining balances to the appropriate reserves (Exhibits C & D for General Fund and Exhibits E & F for Enterprise Funds). BACKGROUND Exhibit C and Exhibit E of the budget-closing ordinance summarize financial results for fiscal year 2000-01 for the General Fund and Enterprise Funds respectively. They provide an analysis of the performance of these funds in comparison to the budget as adopted and adjusted by Council throughout the fiscal year. The result of net operations is explained in terms of changes to the various fund reserves authorized by Council. Last year staff prepared the Performance Highlights report to discuss economic trends and fmancial performance analysis. The report was well received for its ease of reading and understanding, and it is once again included as a supplement to the Comprehensive Annual Financial Report, which is attached as Exhibit G. DISCUSSION At the closing of the fiscal year, the City's financial position remained healthy with the General Fund reporting a net operating surplus of $4.6 million. This performance is primarily due once again to revenues exceeding budget. Funds that were not committed CMR:459:01 Page 1 of 3 by year-end but are needed to complete projects are included in the reappropriation list (Exhibit A). The Rate Stabilization Reserves (RSRs) for all Enterprise Funds combined increased by net of $24.3 million. Most of the increase is attributed to the Electric-Fund. The results for the General Fund, while still positive, show a declining rate of growth from prior years and reflect a continuing leveling off of the economic expansion previously experienced. In fact, current fiscal year financial information strongly demonstrates that General Fund revenues will be short of the revenues recorded in 2000- 01. Staff has taken steps to carefully review and prioritize expenditures including making budget adjustments where necessary to meet goals of funding the Infrastructure Management Plan for capital spending, and also to continue providing high level of services to the community. The Enterprise Funds are also making necessary adjustments in light of the uncertainty of commodity prices and their accelerated capital spending. RESOURCE IMPACT Adoption of the attached budget-closing ordinance allows for reappropriation and carryover of funding from the 2000-01 budget for the completion of specific operating budget programs or projects in the current fiscal year. In addition, the closing of completed capital improvement project balances (Exhibit B) to the Budget Stabilization Reserve (BSR) releases unspent monies for further appropriation. Exhibit D reflects the allocation to major reserves as follows: ¯The General Fund BSR has been capped in accordance with the prior year Council policy of 20 percent of budgeted expenditures and carries a closing balance of $24.5 million, an increase of $4.4 million. ¯The Reserve for Emergencies was funded to its Council-approved target of 10 percent of salaries and benefits and has a closing balance of $6.8 million, an increase of $.4 million. ¯The remaining surplus of $4.9 million was utilized to fund the Infrastructure Reserve, which has a closing balance of $18.8 million. It is important to note that Council approved staff's recommendation to close the Reserve for Emergencies and moved the balance to the Infrastructure Reserve during the 2001-03 Budget Adoption. Therefore, the reserves for Infrastructure closed at a total of $25.6 million. The transfer of funds will take place at the close of fiscal year 2001-02. Exhibit F provides the balance changes for all reserve categories for the Enterprise Funds. The change was a net increase of $20.3 million for all funds. POLICY IMPLICATIONS This recommendation is consistent with existing policies. CMR:459:01 Page 2 of 3 ENVIRONMENTAL REVIEW The action recommended is not Environmental Quality Act. a project for the purposes of the ATTACHMENT Attachment A: Budget Closing Ordinance body text Exhibit A - 2000-01 Re-Appropriation Requests Exhibit B -Capital Improvement Projects Closed in 2000-01 Exhibit C - General Fund Summary Exhibit D - General Fund Reserve Summary Exhibit E - Enterprise Summaries Exhibit F - Enterprise Reserve Summary Exhibit G - Performance Highlights Report California PREPARED BY: Assistant Director, Administrative Services DEPARTMENT HEAD APPROVAL: CITY MANAGER APPROVAL: ~C~~~ATS - Director', Administrative Services ]~MILY HARRIS ON Assistant City Manager CMR:459:01 Page 3 of 3 ATTACHMENT A ORDINANCE NO. ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AUTHORIZING CLOSING OF THE BUDGET FOR FISCAL YEAR 2000-01 WHEREAS, pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto and as set forth in Section 2.28.070 of the Palo Alto Municipal Code, the Counci! on June 19, 2000 did adopt a budget for fiscal year 2000-01; and WHEREAS, fiscal year 2000-01 has ended and the financial results, although subject to post-audit adjustment, are now available and are herewith reported in summarized financial Exhibits ~A" and ~B" and ~C" and ~D" and ~E" and ~F" prepared by the Director, Administrative Services, which are attached hereto, and by reference made a part hereof; and WHEREAS, pursuant to Section 2.28.080 of the Pa!o Alto Municipal Code, the City Manager did amend the budgetary accounts of the City of Palo Alto to reflect: (A) Additional appropriations authorized by ordinance of the City Counci!. (B) Amendments to employee compensation plans adopted by the City Council. (C) Transfers of appropriations from the contingent account as authorized by the City Manager. (D) Redistribution of appropriations between functional areas major activities, and objects within various departments as authorized by the City Manager. (E) Fiscal year 2000-01 appropriations which on July i, 2001 were encumbered by properly executed-, but uncompleted, purchase orders or contracts; and WHEREAS, fiscal year 2000-01 appropriations in certain departments and categories as shown on the attached Exhibit "A", while not encumbered by purchase order or contract, at year end are nevertheless recommended for reappropriation in the fiscal year 2001-02 budget. NOW, THEREFORE, the Council of the City of Palo Alto does ORDAIN as follows: SECTION I. The fiscal year 2000-01 encumbered balances for the departments and categories shown on Exhibit ~C" shal! be carried forward and reappropriated to those departments and categories in the fiscal year 2001-02 budget. SECTION 2. The City Manager is further authorized directed: and (A) To close the fiscal year 2000-01 budget accounts in all funds and departments and, as required by the Charter of the City of Palo Alto, to make such interdepartmental transfers in the 2000- 01 budget as adopted or amended by ordinance of the Council. (B) To close various completed Capital Improvement Projects as shown in Exhibit ~B" and move the balances into the respective reserve funds indicated in Exhibit ~B". (C) To establish reserves as shown in Exhibits "D" and ~E" and ~F" for all Funds as necessary to provide for: (i) A reserve for encumbrances and reappropriations in the various funds, the purpose of which is to carry forward and continue in effect the unexpended balance of appropriations for: (a) Fiscal year 2000-01 departmental expenditures which were authorized to be carried forward pursuant to Section 1 above. (2) Reserves for Advances to Other Funds and for Stores Inventory in accordance with ordinance and policy guidelines. (3) A reserve for general contingencies of such amount that the City Council has approved. (4) Reserves for utilities plant replacement, rate stabilization, and other reserves in accordance with Charter and policy guidelines. (D) To fund the Budget Stabilization Reserve in accordance with the General Fund Reserves Policy adopted by the City Council. SECTION 3.The sum of One Hundred Nineteen Thousand Seven Hundred Five Dollars ($119,705) is hereby transferred from the Printing and Mailing Retained Earnings to the Printing and Mailing Fund. This transfer will reduce the balance in the Printing and Mailing Retained Earnings to $159,000. SECTION 4. Th@ sum of Two Hundred Eighty Thousand Three Hundred Fifty Two Dollars ($280,352) is hereby transferred from the General Fund Budget Stabilization Reserve to the Storm Drainage Rate Stabilization Reserve. This transfer will reduce the balance in the General Fund Budget Stabilization Reserve to $24,490,000. SECTION 5. Upon completion of the independent audit, detailed financial statements reflecting the changes made by Sections I, 2, and 3 of this ordinance, shall be published as part of the annual financial report of the City as required by Article III, Section 16, of the Charter of the City of Palo Alto and in accordance with generally accepted accounting principles. SECTION 6. As specified in Section 2.28.080(a) of the Palo Alto Municipal Code, a two-thirds vote of the City Council is required to adopt this ordinance. SECTION 7. The Council of the City of Palo Alto hereby finds that the enactment of this ordinance is not a projectunder the California Environmental Quality Act and, therefore, no environmental impact assessment is necessary. SECTION 8.As provided in Section 2.04.350 of the Palo Alto Municipal Code, this ordinance shall become effective upon adoption. INTRODUCED AND PASSED: AYES: NOES: ABSTENTIONS: ABSENT: ATTEST:APPROVED: City Clerk Mayor APPROVED AS TO FORM:City Manager Senior Asst. City Attorney Director Services of Administrative Exhibit A 2000-01 REAPPROPRIATION REQUESTS Total Recommended $ 600,766 $3,186,327 $870,000 $540~471 $5,197,564 $40,000 $54,000 Fund a comprehensive review of the City's fee and rate structure Development Impact Fee Study - Phase II This project has been delayed due to staff shortages. This project could not be performed in 2000-01 because it is a follow-up to the preliminary Development Impact Fee Study, which will be completed in early 2001-02. $50,000 $50,000 Art Center - Main Library Building Feasibility Study Mitchell Park Library Community Center Site Feasibility Study These dollars were scheduled to be encumbered through a contract in 2000-01 with the Art Center Foundation. However, Purchasing determined that in order to contract with a non-profit organization we must first secure Council approval. A CMR cannot be developed until July 2001. This requires the funds to be reappropriated. These dollars were scheduled to be encumbered through a contract in 2000-01 with the Friends of the Library. However, Purchasing determined that in order to contract with a non-profit organization we must first secure Council approval. A CMR cannot be developed until July 2001. This requires the funds to be reappropriated. The $50,000 of State gants funding exists in the Library budget and has been designated by Council for the Mitchell Park project. $10,000 $20,000 Relocation Expense Reimbursement Comprehensive Compensation Benchmarking Study of positions in SEIU and Management To pay for relocation costs associated with move of City Manager who recently purchased a home and to cover other relocation expenses that have yet to be turned in. Study was just recently completed and billing invoice is not expected to be received in July 2001. $60,000 $50,000 $50,000 $46,494 School Commute Safety Study, Phase II Development Review - Mayfield Computer Traffic Model Traffic Safety Campaign Second phase of the Citywide School Commute Safety Study will focus on the schools in south Palo Alto: Gunn, JLS, Ohlone, Hoover, Palo Alto, Juana Briones, E1 Carmelo and Barron Park, and prospectively Terman Middle School. It will complete the work begun in the first phase, which focused on the schools located north of Oregon Expressway. This project furthers the City Council's Priority on Traffic Calming and Alternative Transportation. It is anticipated that this study will result in recommendations within the following areas: physical improvements and/or traffic calming on the public streets, traffic safety education and transportation demand management programs, community awareness programs, enforcement policies, and other initiatives that would increase safety of students commuting to school. Analysis of a potential community center at the Mayfield site will continue into FY 2001-02. Reappropriation of funds for this project is critical to providing City Council and the community with information related to the impact of a community center at this site. This project furthers the City Council's priority on Joint Master Planning of City School facilities and services. Progress on this project has been greatly impaired due to staff changes. The Traffic Safety Campaign has been greatly enhanced by donated services, including marketin#advertising, graphic design and advertising space. Reappropriation of the unexpended funds will enable the campaign to continue into next fiscal year and will allow staff to reinforce the campaign's safety themes through the beginning of the school year and into fall. $33,000 Zoning Ordinance Update The 2-year Zoning Ordinance Update work plan was not presented for approval by City Council until November 2000. Since that time staff has been assigned to support the project, 2 contract planners have been selected, and research has begun per the work plan. $21,200 $35,072 $47,000 Video cameras for patrol vehicles Technology grant for County wide radio interoperability and GIS projects OTS grants for traffic safety devices This is part of a multi-year state CLEEP technology grant. Video camera order was delayed in Purchasing. These are multi-year grants, $100,000 for technology and $10,000 for CI-IP. This is a multi-year state grant. The department attempted to order the equipment, but experienced difficulties in finding and selecting vendors. $34,000 Funding to clear brush that is encroaching onto the roadway on Page Mill Road. An RFP for this project was sent out in March 2001'. At that time no contractors bid on the project. This project is in response to Traffic and Fire Safety issues. $3,084,827 $101,500 Commercial Advantage Program Rebate Accelerated Energy Efficiency Program San Francisquito Creek Levee Restoration Project and Stabilization and Revegetation Study Customer and City electric efficiency projects were initiated on an emergency basis during the second quarter of 2001. Program design parameters, construction timetables, and inspection deadlines will not allow completion in FY 2000-01. The two projects are under the direction of the San Francisquito Creek Joint Powers Authority. They are activities of regional benefit, and Palo Alto's continued participation is critical to their success. The implementation schedule has slipped beyond the original due dates as a result of the complexities of coordination amongst multiple JPA member agencies. It is anticipated that the work will be completed in FY 2001-02. $420,000 Purchase and install utility bodies and interiors for 24 City-owned tracks and vans. Equipment Management has had a higher than normal vehicle replacement workload for the last several years. This has caused a backlog of projects. The chassis for these replacement vehicles have already been purchased and they all must be outfitted with utility bodies. $450,000 Funding for desktop replacement The bid responses have not been accepted/approved to date. Information Technology is evaluating new cutting-edge technology that differs from the City standard. Hardware demo items were required for on- site evaluation. As a result of the evaluation it appears that the preferred vendor differs from the low bidder. $180,000 Telephone System Replacement (ASD 10021) The project was delayed pending completion of other prerequisite projects. $50,062 $278,409 $32,000 Rebuild the fueling facility at Foothills Park (PW 19205) Americans with Disabilities Act Compliance (PW 19309) Arts Center Plumbing Replacement Project (PW 10007) Equipment Management has had a higher than normal workload for the last several years. This has caused a backlog of projects. The existing fueling facility at Foothills Park is out of compliance with local environmental regulations and has been shut down. Since this fueling facility supports Fire Station Eight and Foothills Park operations, it is critical that the facility be rebuilt as soon as possible. This project provides funding to make City facilities, programs, and services accessible to persons with disabilities in order to comply with federal laws and regulations. Due to workload scheduling, no ADA improvements were scheduled for the last two years. Now that infrastructure staffing is now on board, two restroom renovation projects are scheduled for completion in FY 2001-02. The sink and plumbing need to be upgraded to accommodate the environmental and safety requirements related to the use, cleanup, and disposal of art materials at the center. This project is currently in the design phase and will be completed this calendar year. ***Note to General Fund Reappropriations: The Comprehensive Annual Financial Report shows $749,000 in General Fund reappropriations. The $148,000 difference from the $601,000 shown here is a capital project carryforward for the Community Center that does not require Council action. Exhibit B City of pJo A to CAPITALIMPROVEMENT PROGRAM PROJECTS Cmnpleted and Closed in 2000-01 PROJECT NUMBER PROJECT PROJECT TITLE BALANCE GeneralFund 10011 10013 10016 19012 19602 19605 19620 19701 19710 19809 19902 19908 19912 19917 Financial Applications Users Access Impr.20,604 Year 2000 Contingency 4,101 Diesel Exhaust Removal 25,723 Payroll Personnel System 2,759 Civic Center Chiller Replacement 492 Foothill Park Water Management 36,617 Civic Center LAN Upgrade 9,825 Library Lighting Improvements 5,071 Revenue Collection Software 59,969 Work Station Operating System and Email 4,900 Parks Facility Lighting 37,821 Diesel Exhaust Removal System 45,658 Oracle Database Enterprise 2,001 Office Automation Suite 29,350 Total $ 284,891 Electric Fund 8945 * 0001 ** Automatic Mapping 41/2 kV Conversion of Maybell 1 and 2 13,765 800,000 Total $ 813,765 Refuse Fund 0107 Landfill Phase II B Closure 446,089 Total $ 446,089 Storm Drainage Fund 9508 * 0014 Arastradero Creek Erosion Repairs Instrumentation Van Total 110,508 5,210 $ 115,718 * Projects are closed. No expenditures were incurred. ** Project was cancelled. No expenditures were incurred. Exhibit C Property Taxes Sales Taxes Utility Users Tax Transient Occupancy Tax Other taxes, fines & penalties Service fees and permits Charges to Other Funds Rental Income Other Revenues Total Revenues Add: Operating Transfers In Prior Year Encum & Reapprop Total Source of Funds Expenditures : Administrative Departments Community Services Fire Planning Police Public Works Non-Departmental School Site Operations Total Expenditures Add: Operating Trans Out Total Use of Funds Net Surplus/(Deficit) 2000-01 Adjusted Budget $11,335 24,200 6,163 9,400 8,272 11,191 9,568 10,355 12,871 103,355 14,042 12,288 129,685 $21,468 23,386 16,944 8,210 20,013 13,168 7,317 7,!93 117,699 9,868 127,567 2,118 2000-01 CAFR Basis Rev/Exp 2000-01 Allocated Charges 2000-01 Encum+ Reapprop 2000-01 Budgetary Rev/Exp $12,110 $0 n/a 25,786 n/a 6,895 n/a 9,359 n/a 8,887 n/a 12,743 n/a 818 7,590 n/a 10,270 n]a 15,793 n/a 102,661 ....7,590 .....n/a 14,157 n/a -12,288 n/a 116,818 I 19,878 n/a $12,110 25,786 6,895 9,359 8,887 12,743 8,408 10,270 15,793 110,251 14,157 t2,288 136,696 $18,557 $617 $1,862 $21,036 18,469 2,526 1,067 22,062 15,973 864 107 16,944 6,652 301 1,148 8,101 18,306 1,163 450 !9,919 9,522 2,683 621 12,826 7,186 (600)126 6,712 7,301 7,301 101,966 7,554 5,381 114,901 10,221 10,221 112,187 7,554 5381 125,122 4,631 12,324 (5,381)11,574 2000-01 Variance $775 1,586 732 (41) 615 1,553 (1,160) (85) 2,922 6,898 116 7,014 $432 1,324 0 109 94 342 605 (108) 2,798 (353~ 2,445 9,459 CAFR Reconciliation:Current year encumbrance/reappropriations Prior year encumbrance/reappropriations Current year stores adjustment Prior year stores adjustment CAFR Net imcome 5,381 (12,288) 52 (88) 4,631 Exhibit D Balance @ 06/30/00 Net From Operations Balance @ 06/30/01 CAFR Fund Balance Less: Encumbrances Reappropriations Adjustment for Stores Operations Budgetaw Fund Balance Allocate To Reserves: Budget Stabilization Reserve Reserve For Infrastructure Improvements Notes Receivable Reserve Stores Inventory Reserve Unrealized Investment Gain/Loss Reserve Reserve For Streets & Sidewalks Reserve For Emergencies Adjustment for Stores Operations Budgetary Fund Balance Adjustment for Stores Inventory Encumbrance Adjustment for Stores Operations Total Adjustments $55,765 (12,045) (612) 281 43,389 $20,029 13,898 649 2,144 0 0 6,388 281 43,389 $4,631 7,129 (137) (229) 11,394 $4,462 4,890 491 82 1,309 0 389 (229) 11,394 136 (84) 52 $60,396 (4,916) (749) 52 54,783 $24,490 18,788 1,140 2,226 1,309 0 6,777 52 54,783 Exhibit E REVENUE Water sales Other revenues Reappropriations /Enc 1999-00 Act/Enc/ Reapprop 14,551 1,163 1,021 EXPENSES Purchases Other Expenses TOTAL OPERATING EXPENSES Capital Expenses 5,711 7,402 13,113 3,640 2000-01 Act/EncJ $ Variance Adjusted Reapprop Favorable Budget ActuaUEnc (Unfavor,) 14,883 15,441 1,201 1,726 1,625 1,625 558 525 5,970 5,969 1 8,340 9,051 (711 ) 14,310 15,020 (710) 7,033 6,228 805 REVENUE Electric retail sales Electric wholesale sales Other revenues Reappropriations /Enc EXPENSES Purchases NCPA & TANC Debt Svc Other Expenses TOTAL OPERATING EXPENSES Capital Expenses 1999-00 Act/EncJ Reapprop 56,769 4,582 10,844 6,546 18,261 11,026 27,928 57,215 18,603 200001 ActJEncJ $ Variance Adjusted Reapprop Favorable Budget ActualJEnc (Unfavor.) 55,381 53,093 (2,288) 3,620 4,064 444 23,256 94,052 70,796 11,271 11,271 27,967 57,763 (29,796) 11,564 9,999 1,565 45,702 44,612 1,090 85,233 112,374 (27,141) 23,157 20,030 3,127 REVENUE Gas retail sales Gas wholesale sales Other revenues Reappropriations / Enc EXPENSES Purchases Other Expenses TOTAL OPERATING EXPENSES Capital Expenses 1999-00 Act/EncJ Reapprop 16,443 1,372 993 2000-01 AcUEncJ $ Variance Adjusted Reapprop Favorable Budget Actual/Enc (Unfavor.) 21,547 9,264 (12,283) 13,255 13,255 11,595 8,542 20,137 3,904 7,306 7,808 502 1,254 1,254 20,772 20,627 145 14,590 14,249 341 35,362 34,876 486 4,026 6,142 (2,116) REVENUE Revenues Reappropdations /Enc EXPENSES Sewer Treatment Exp. Operating Expenses TOTAL OPERATING EXPENSES Capital Expenses Principal Payments 1999-00 Act/EncJ Reapprop 11,307 8,262 4,390 2,340 6,730 13,569 47 2000-01 AcUEnc/$ Variance Adjusted Reapprop Favorable Budget Actual/Enc (Unfavor.) 11,196 11,420 224 7,460 7,460 5,020 4,974 46 3,220 6,570 (3,350) 8,240 11,544 (3,304) 12,594 9,230 3,364 1999-00 Act/EncJ Reapprop REVENUE Revenues 23,041 Reappropdations / Enc 2,263 EXPENSES Payments to PASCO 6,957 Other Expenses 14,754 TOTAL OPERATING EXPENSES 21,711 Capital Expenses 1,979 2000-01 Adjusted Budget AcUEncJ Reapprop ActuaUEnc $ Variance Favorable (Unfavor.) 23,638 2,182 23,630 2,182 (8) 7,699 16,364 24,063 3,576 7,699 13,581 21,280 2,967 2,783 2,783 609 REVENUE Operating Revenues Restricted Bond Proceeds Reappropriations / Enc Bonded Reappro/Encum EXPENSES Operating Expenses TOTAL OPERATING EXPENSES Capital Expenses Principal Payments 1999-00 ActJEncJ Reapprop 12,650 2,246 6,883 11,570 11,570 9,997 298 2000-01 Act/EncJ $ Variance Adjusted Reapprop Favorable Budget Actual/Enc (Unfavor.) 12,571 13,278 (707) 12,571 13,278 (707) 5,037 6,307 (1,270) 262 262 - 14,051 14,735 684 1,815 1,815 - 2,451 2,451 - 3,710 3,710 - REVENUE Revenues Reappropriations /Enc Bonded Reappro/Encum Restricted Bond Proceeds EXPENSES Operating Expenses TOTAL OPERATING EXPENSES Capital Expenses Principal Payments 1999-00 Act/End Reapprop 2000-01 Adjusted Budget Act/End Reapprop Actual/Enc 3,197 423 426 935 2,527 3,078 275 423 1,327 426 944 935 1,954 1,954 2,148 1,998 200 250 2,560 2,326 2,560 2,326 $ Variance Favorable (Unfavor.) 119 2,834 215 234 234 (836) 35 Exhibit F FISCAL YEAR 2000-01 Beginning Reserves To (From) Reserves Water Electric Gas WWC WWT Refuse Storm $10,385 $105,500 $12,569 $9,103 $4,214 $10,127 $728 (2,456) 30,076 (9,437)(1,894)2,864 1,565 (394) Budgeted Reserves 6,719 135,722 1,126 6,894 4,660 8,308 % of Reserves 118% 100% 278% 105% 152% 141% Total $152,626 20,324 163,429 106% FISCAL YEAR 2000-01 Water Refuse Storm Total Rate Stabilization General RSR Supply RSR Distribution RSR Total RSR Emergency Plant Replace Calaveras Underground Loan conservation loan Water Resources board Shasta rewind loan Central Valley Project Public benefit program $7,025 $6,759 $5,623 $11,102 $334 56,645 510 8,326 1,805 7,025 64,971 2,315 6,759 5,623 904 2,252 783 450 1,455 64,780 623 64 7O4 2,182 34 11,102 334 590 $30,843 57,155 10,131 98,129 5,844 64,780 623 34 590 64 704 2,182 FISCAL YEAR 2000-01 Gas Refuse Storm Total ...... Beginning RSR $9,506 $31,382 $11,187 $8,683 $2,847 $9,537 $728 To(from) RSR (2,481)33,589 (8,872)(1,924)2,776 1,565 (394) RSR Maximum 8,988 22,853 7,886 5,368 4,064 3,725 N/A RSR % of Maximum 78%284%29%126%138%298%N/A $73,870 24,259 52,884 186%