Loading...
HomeMy WebLinkAbout2026-04-28 Parks and Recreation Commission Summary Minutes1 MINUTES 2 PARKS & RECREATION COMMISSION 3 Regular meeting 4 April 28, 2026 5 In-Person & Virtual Conference 6 Palo Alto, California 7 8 Commissioners Present In-Person: Chair Nellis Freeman; Vice Chair Bing Wei; Commissioners 9 Vadim Axelrod, Amanda Brown, Yudy Deng (arrived 7:25 p.m.), 10 Shani Kleinhaus (arrived 7:35, left at 8:44 p.m.), and Roger 11 Smith 12 Commissioners Absent: None 13 Staff Present: Sarah Robustelli, Ben Heinstein, Adam Howard, Michael 14 Warner, Megha Bansal 15 CALL TO ORDER AND ROLL CALL 16 Meeting was called to order at 7:00 p.m. 17 The clerk called the roll and announced a quorum. 18 PUBLIC COMMENT 19 1. Curt K. spoke about the potential conversion of tennis courts at Mitchell Park into pickleball 20 courts, noting that no one is against pickleball but some fear that Mitchell Park will become 21 mostly pickleball when it was designed as a multi-use facility for the community to engage in all 22 sorts of recreation. Curt K. stated that the expansion of 15 to 23 pickleball courts will make it the 23 center for pickleball, which is not bad in itself but limits other citizens of Palo Alto from using it 24 as a general recreation center. 25 2. Juanita Salisbury described how 10 years ago, with the City's permission and countless 26 volunteers, the Primrose Way Pollinator Garden was created. Since then, 6 more gardens have 27 been added and a habitat corridor along Embarcadero Road is being created. Juanita Salisbury 28 emphasized that this is part of a larger vision to transform Palo Alto into a city within a park by 29 bridging a gap between Baylands and Foothills Nature Preserves. Juanita Salisbury stated this 30 vision needs permanent expert stewardship in the form of a habitat manager position equipped 31 with dedicated staff and budget. Juanita Salisbury said this is the way to turn volunteer passion 32 into permanent green infrastructure and make Palo Alto the model for the rest of California. 33 3. Harriet S. has been organizing programs for the past 4 years for Magical Bridge, which was 34 founded 16 years ago to provide a place of sanctuary and joy for people with disabilities in a 35 corner of Mitchell Park. Harriet S. stated she did not imagine next door would become a regional 36 center for racket sports and noted that as pickleball has increased at Mitchell Park, there has 37 been a decrease in visitors to the playground. Harriet S. said it is difficult to park, much less park 38 close, which discourages disabled people from using the playground, and people with sensory 39 sensitivities can be triggered by the repetitive pop of the pickleball hitting the racket. Harriet S. 40 pointed out that the noise is such that when working with scouts on their disability sensitivity 41 merit badges last week, she could not hear their presentations at the community stage. 42 4. Mark Weiss stated he organizes a series of concerts at Lytton Plaza and events at Mitchell Park 43 and several indoor facilities. Mark Weiss noticed a change at Lytton Plaza, the installation of 44 new green metal tables and fixed seating, which obstruct where they normally set up the band 45 facing the fountain. At a recent event, they had to move the stage about 50 feet south and tilt it 46 back toward the fountain. Mark Weiss said he was not at the meeting when this was deliberated 47 and wondered if the benches could be moved 50 feet to the north. 48 5. Thomas shared that he recently retired and is getting back into tennis. Thomas noticed there are 49 only 4 active tennis courts left at Mitchell Park and voiced concerns about them being converted 50 into pickleball courts. Thomas asked that the tennis courts be retained because there are plenty 51 of pickleball courts and only 4 tennis courts. 52 6. Leslyn L. stated she plays tennis and pickleball regularly at Mitchell Park and that Mitchell Park's 53 unique waterspout feature for the kids was a big appeal when moving to Palo Alto. Leslyn L. 54 stated that park users who have been silent and need to be considered are families who use the 55 picnic tables, summer events and concerts, children who use the play structures and open 56 space, the Magical Playground, seniors doing tai chi and early morning walks, and residents who 57 want green open space for contemplation and quiet. Leslyn L. said the goal is for all groups to be 58 accommodated and the City needs to consider how to provide more pickleball courts while 59 ensuring the many other uses of the park are maintained. 60 AGENDA CHANGES, ADDITIONS, AND DELETIONS 61 None. 62 APPROVAL OF MINUTES 63 1. Approval of Minutes from February 24, 2026. 64 MOTION: Commissioner Smith moved, seconded by Commissioner Brown, to approve the Parks and 65 Recreation Commission meeting draft summary minutes of February 24, 2026. 66 MOTION CARRIED: 5-2 (Commissioners Kleinhaus and Deng absent) 67 2. Approval of Minutes from March 24, 2026. 68 MOTION: Commissioner Axelrod moved, seconded by Commissioner Smith, to approve the Parks and 69 Recreation Commission meeting draft summary minutes of March 24, 2026. 70 MOTION CARRIED: 4-2-1 (Commissioner Brown abstained, Commissioners Kleinhaus and Deng absent) 71 CITY OFFICIAL REPORTS 72 1. Department Report 73 Sarah Robustelli, Division Manager for Open Space, Parks, and Golf, highlighted the Earth Day 74 Festival at the Art Center, which took place Sunday, April 19, and had about 400 attendees. 75 Ms. Robustelli announced upcoming events. May Fete will take place in Heritage Park on Saturday, 76 May 2, from 10 a.m. to 1 p.m. and the theme is "Not All Heroes Wear Capes". The 2026 Movie 77 Nights will be held at Mitchell Park athletic fields with seating starting at 7 p.m. and the movie 78 starting at sunset. The first movie is scheduled for May 5 and all the dates are available on the City 79 website. Twelve teams have signed up for the Chili Cookoff happening on July 4. Commissioners 80 have been invited to judge the competition. 81 Anyone who wants to sign up for Cubberley updates can do so at the project webpage, 82 paloalto.gov/cubberleyproject. 83 Palo Alto has been working with a native plant expert, Juanita Salisbury, who spoke during public 84 comments. She has developed a native planting palette that will support the City's ecological goals 85 and maintain clear visibility throughout the park. Community Services staff will have a team building 86 planting work party there next week. 87 Ms. Robustelli celebrated recent volunteer efforts in the City, including volunteers from Rivian 88 weeding at Eleanor Pardee Park Community Garden, prospective Eagle Scouts building raised beds 89 at Ventura Community Garden, and Kiwanis Club painting site amenities and building a split-rail 90 fence at Briones Park. 91 Recent Hopkins Park improvements include removal of overgrown vegetation and replacement of a 92 fence. The courts there will be resurfaced in upcoming months. 93 Ms. Robustelli provided an update on the Heritage Park site amenities project, including a new sign 94 and 3-sort receptacle being added in response to community feedback. 95 Chair Freeman thanked Ms. Robustelli for the presentation and opened the floor for commissioner 96 comments and questions. 97 Commissioner Smith noted there is a new gate at Heritage Park from the playground to the new 98 bathroom at the museum, which he stated is a wonderful addition for moms, children, and elders. 99 Vice Chair Wei expressed thanks for the presentation and great work. 100 Chair Freeman was glad to hear about the 12 teams for the Chili Cookoff and asked how many 101 teams participated last year and whether there is a cap for how many teams may sign up. 102 Ms. Robustelli confirmed that 10 teams participated last year, 20 is the maximum number of teams, 103 and the sign-up cutoff is 3 weeks before the competition in early June. 104 Chair Freeman applauded the volunteer teams who contributed to the community garden projects. 105 Chair Freeman stated he lives near Heritage Park and has noticed the improvements. Chair Freeman 106 said it is a very active park and the extension of it out to the museum is great. 107 To a question from Chair Freeman, Ms. Robustelli clarified there are no new updates on Cubberley 108 at this time and recommended signing up for email updates on the Cubberly project website. 109 Chair Freeman asked about the Movie Nights and Ms. Robustelli replied that this is the sixth year of 110 Palo Alto's Movie Nights and the first movie will be held on June 5. 111 Commissioner Brown highlighted the public comment about benches and tables and asked Ms. 112 Robustelli to speak to the process around improvements like that and how the community and parks 113 users are engaged for feedback. 114 Ms. Robustelli responded that the community engagement process is site-specific. If doing an in- 115 kind replacement, very little outreach is done because it is more of a maintenance-based item and 116 stays at the staff level. When it is a capital improvement project (CIP), there is a robust community 117 engagement process that involves stakeholder meetings, open public meetings, and updates to 118 commissions. For Lytton Plaza specifically, they worked with nearby buildings owners, the City 119 Manager's Office, and Recreation to make sure items were placed in ways conducive to 120 stakeholders. 121 Commissioner Axelrod shared that he had the pleasure of attending Earth Day. Commissioner 122 Axelrod noted there was heavy traffic when it closed down; it seemed like people wanted the event 123 to last longer and he wondered if that was possible. 124 Ms. Robustelli expressed thanks for the feedback and offered to bring it to the staff debrief the 125 following day. 126 3. Ad Hoc Committees and Liaison Updates 127 Commissioner Axelrod shared that the final version of the Cubberley Master Plan and CEQA will go 128 to Council on May 18. Poll Number 4 is completed but the results are not summarized and will be 129 available through staff on May 7. For Open Space, there is a presentation with Commissioner 130 Smith's daughter about the interpretive center. It is in the early stages but designs look good and 131 they are starting to move forward with fundraising and financing. 132 For Nature Connectivity, Vice Chair Wei shared that she and Commissioner Kleinhaus are looking 133 into the scope of it and will engage staff for discussion when ready. 134 Chair Freeman stated that for the park dedication at Ventura, they should be hearing back from 135 Planning this week on next steps. The Memorial Site Concept for Ventura was brought to the PRC at 136 their retreat and related public comments were received by email. 137 Chair Freeman added an update on wetlands work at the golf course. Remedial wetland work 138 completed last fall focused on test plots with a variety of plant species and now the City's ecologist 139 is evaluating how those test plots are performing. Based on those results and consistent with the 140 original plan, the City will be expanding planting in the additional wetland areas this fall. It will 141 continue to be monitored and adjusted as needed to ensure it meets the desired ecological 142 outcomes. 143 Chair Freeman shared that the City issued a Request For Proposal (RFP) for formal ongoing wetland 144 monitoring and reporting and a consultant has been selected. That monitoring is expected to begin 145 later this year, pending City approval of the contract, which is scheduled for May 4. 146 For Park Group updates, Chair Freeman said there have been several conversations regarding the 147 Skate Park Renovation Project and not much is happening with it but there should be more 148 information at the next PRC meeting. Chair Freeman said there is nothing new from Safe Routes. 149 Chair Freeman applauded Eric for the fine job he and community garden liaisons have been doing to 150 reduce the waitlist for various community gardens, which has gone from 100+ to 10 or less in some 151 areas. Chair Freeman shared that community garden policy updates are being reviewed internally by 152 Eric and staff, who will meet with community garden liaisons and then bring that to PRC for 153 approval. 154 BUSINESS ITEMS 155 4. Informational Update on the Foothills Nature Preserve Improvements Project (PE-21000) 156 Megha Bansal, Senior Project Manager, provided a slideshow presentation update on the Foothills 157 Improvement Project's background, outreach efforts, plan development, timeline, and next steps. 158 Foothills Nature Preserve opened to the general public in 2020 and significant increase in visitation 159 led to the need for improvements to pedestrian access, safety, and parking. At the PRC meeting in 160 October 2025, staff presented a reduced scope for the project, which PRC supported. PRC's 161 feedback was to add back the gravel parking lot across Boronda Lake, including accessible parking, 162 and further discuss parking and traffic control. Proposed improvements in this plan include 163 designated pedestrian pathways, asphalt curb and borders as safety barriers between pedestrian 164 and vehicular traffic, delineating and reconfiguring most existing parking, and removing the parallel 165 gravel parking at the entrance road and in the Boronda Lake area. In the Boronda Lake parking lot, 166 staff proposes converting 2 spaces to accessible parking and 2 other spaces into a turnaround zone. 167 The plan includes traffic control features such as crosswalks, speed humps, speed tables, and 168 signage to improve safety. A new dirt island with asphalt curb will be added at the south intersection 169 of Vista Hill to enforce 1-way traffic; this was chosen over the previously proposed tiger teeth spikes. 170 This plan will return to PRC in May for recommendation of Park Improvement Ordinance (PIO) to 171 City Council. Final project documents and Council adoption will take place in summer 2026, with 172 bidding and construction to begin in Fall/Winter 2026. 173 Chair Freeman expressed thanks for the presentation and the materials provided and reminded the 174 Commission that this session is informational only and the project will return to PRC for a motion in 175 May. 176 Commissioner Kleinhaus asked if this project would require retaining walls. 177 Ms. Bansal confirmed there are no retaining walls as part of this project. 178 Vice Chair Wei said this is one of her favorite parks in Palo Alto and asked if parking is the main 179 concern or challenge addressed by this project. 180 Mike Warner, Open Space Manager, responded that the park has enough parking for the amount of 181 vehicles allowed by ordinance, which is a cap of 250 based on previous formulas used by the City. 182 The Commission and City Council capped total visitation per day at 600. Current general parking is 183 about 292 spaces within the preserve. The plan removes 9 parallel parking stalls, which leaves about 184 40 parking spaces in excess of the vehicle cap of 250. 185 Vice Chair Wei replied that since parking is not the primary issue being addressed, the project must 186 be more focused on natural preservation. 187 Mr. Warner explained that the project's goals are multi-faceted: aesthetics of the park, fire fuel 188 reduction by reducing interaction between vehicles and vegetation, and making it an efficient and 189 easier-to-use space by correcting how parking is done. 190 Commissioner Axelrod stated this is an amazing park and one of Palo Alto's best and expressed 191 excitement for the project to move forward. Commissioner Axelrod asked what success looks like 192 for this project and how that will be measured. 193 Mr. Warner responded that on the park operation side, success means reduction in speed issues; 194 reduction in collisions between vehicles and wildlife, people, and objects in the park; and improving 195 pedestrian safety. 196 Ms. Bansal added that the pedestrian pathways will be made of quarry fines and existing asphalt 197 curbs and borders will be used as much as possible as a safety barrier between pedestrian and 198 vehicular traffic. 199 Chair Freeman asked what was removed from the original scope. 200 Ms. Bansal stated that the original plan presented in the October meeting was to have pedestrian 201 pathways all along the preserve road all the way to the interpretive center. Based on Council 202 direction in September of last year, the project scope reduced pedestrian pathways to the higher- 203 use areas of Boronda Lake and Vista Hill. The original plan's split-rail fencing and bus parking have 204 been eliminated. 205 Mr. Warner added that 1,200 feet of split-rail fencing was asked to be put in to protect the 206 grasslands to the southwest of Vista Hill but usage after the pandemic leveled out and increased 207 education and signs posted by staff persuaded most visitors to stay off the grassland and protect it. 208 The boulders along the road on that section also serve to encourage staying off the grassland. 209 Chair Freeman asked how confident staff are that the new layout will improve traffic flow, especially 210 on busy weekends. 211 Mr. Warner responded that the addition of the speed humps to slow traffic through the preserve 212 will protect wildlife and other users and improve the visual aesthetic when entering the park by 213 opening up the view of the lake. 214 Chair Freeman asked why Tiger Teeth are no longer planned. 215 Mr. Warner noted the Tiger Teeth suggestion came from someone who no longer works for the City. 216 They were discussed with Transportation and determined inappropriate for this location. The 217 consultant suggested adding the natural barrier of the dirt island to direct traffic and make it 218 difficult to drive the wrong direction down the one-way. 219 Commissioner Kleinhaus asked how often all parking spots are taken. 220 Mr. Warner responded that the last time the park reached full capacity was Christmas weekend in 221 2020 with a few times after that coming close. Easter Saturday 2026 had 215 vehicles. The $6 entry 222 fee has helped slow visitation. 223 Commissioner Kleinhaus opined there may be an oversupply of parking, which can be discussed 224 later. Commissioner Kleinhaus highlighted public questions that asked about the appearance of the 225 crossings, speed bumps, and signs, and asked whether they are designed for nature preserves or a 226 downtown area. 227 Ms. Bansal replied that the crosswalks and speed tables will follow standard City design per 228 discussions with Transportation. Some signs will be on wooden posts to help align their appearance 229 with the nature preserve. Excess asphalt in the Vista Hills area is being removed to maintain a 230 natural look. 231 Commissioner Kleinhaus asked for good visuals to be included in the next packet so commissioners 232 and the public can see what they safety features will look like and how many will be included. 233 Commissioner Kleinhaus expressed concerns that the nature preserve may start to look like an 234 urban street. Commissioner Kleinhaus pointed out that, while the project is called a minor 235 improvement and exempt from CEQA, it is not minor and should still follow CEQA best practices. 236 Ms. Bansal responded that the plan went through minor ARB/staff-level review and received 237 approval. 238 Commissioner Kleinhaus asserted that minor ARB review is not right for a nature preserve project 239 and recommended that CEQA standards and best practices should still be followed, such as 240 completing a bird nesting survey before doing construction. Commissioner Kleinhaus expressed a 241 need for more overall information and transparency related to mitigations. 242 PUBLIC COMMENTS: 243 1. Karen H. thanked the PRC for their work and expressed pride in the City's parks and nature 244 preserves. Karen H. serves on the Midpeninsula Regional Open Space District Board but spoke as 245 an individual this evening. Karen H. commented that she is used to seeing proposal maps with N 246 for new and E for existing but this project's map does not have those marks, so it is unclear what 247 is new, existing, or reconfigured. Karen H. asserted that there is a real responsibility to maintain 248 the character of the preserves and noted that striping and urban signage and colors degrade the 249 experience. Karen H. recommended following the Yosemite Design Guidelines, a beautiful 250 document about roadways, designs, and compatibility in a natural setting. Regarding CEQA, 251 Karen H. expressed concern about the project being exempt because it is unclear if new parking 252 is going in disturbed or undisturbed areas. Karen H. noted roadways are narrow and curvy, so 253 human pathways require expanding the roadway into undisturbed areas and vegetation/habitat 254 and may require a retaining wall for steep areas around the lake. 255 2. Jon Foster, Palo Alto resident, thanked everyone for their work on this. Jon Foster 256 recommended retaining the parking near the entrance because it is the only place to park when 257 accessing the beginning of the trail that starts at the entrance gate. 258 Ms. Bansal clarified that the 10-minute parking at the entrance is not proposed for removal but the 259 parallel gravel parking is proposed for removal because of safety concerns. 260 Mr. Warner stated that the public speaker was addressing the parallel parking under the tree at the 261 entrance. Mr. Warner said removal of that parking is not only related to aesthetics but some parking 262 issues on weekends in that specific spot. Mr. Warner added that staff has discussed allowing parking 263 in the 10-minute zone on weekdays. 264 Commissioner Axelrod expressed excitement for accessible parking being added and wondered why 265 staff chose to remove parking at the lake level and add it to a more elevated parking area. 266 Mr. Warner said that additional parking further back is a more natural spot. Parallel parking along 267 the lake area has had parking issues in the last 5 years, especially on busy days and evenings 268 because the lake is popular. Vehicles encroach on the roadway, making it a narrow spot and making 269 it difficult for cyclists and vehicles to pass both ways. The current parking plan improves that and 270 makes it possible to see the lake versus a row of cars the whole way. It also aims to reduce vehicles 271 trying to park close to the rocks, which pierce vehicle oil tanks, which staff have to clean up. 272 Commissioner Axelrod encouraged staff to make sure a wheelchair can easily get from the new 273 accessible spots to the lake. 274 Vice Chair Wei recognized staff's efforts to balance the increased visitation since 2020 and the need 275 for safety. Vice Chair Wei echoed Commissioner Kleinhaus and public comments about the park's 276 identity as a preserve being first priority and its function as a park being secondary. Vice Chair Wei 277 stated the preserve-first framework is reflected in the plan. 278 Sarah Robustelli, Division Manager for Open Space, Parks, and Golf, asked for clarity from the PRC, 279 noting that the gravel parking lot was not in the plan presented at the October meeting, the PRC 280 asked for it to be added back to the plan, and tonight's discussion is voicing concerns about too 281 much parking and disturbing natural areas. Ms. Robustelli clarified that the parking lot was originally 282 asphalt and was converted to gravel per PRC feedback. 283 Commissioner Kleinhaus stated the plan is much better than where it started and appreciated the 284 work that went into it. Commissioner Kleinhaus noted the initial visual of coming down into the 285 lower part of the preserve is a gravel parking lot, which is better than asphalt, but with the trail on 286 the other side, it becomes a large area that is not natural. Commissioner Kleinhaus stated the lot is 287 not the highest priority in terms of nature conservation but is a visual place and a lot of birds forage 288 there, so it is good to not touch it much. Commissioner Kleinhaus was unsure about changing the 289 whole visual feel of the park for the few days each year that are at capacity. Commissioner 290 Kleinhaus said gravel is better than asphalt but none is even better and suggested keeping that lot 291 for overflow use on high visitation days. In terms of curbs, Commissioner Kleinhaus felt it was better 292 for staff to use natural materials like tree trunks, logs, and rocks versus asphalt as much as possible. 293 Commissioner Kleinhaus was unsure why pedestrian and vehicle use need to be separated on this 294 road, noting that Ross Road has cars, bikes, and pedestrians all together. Commissioner Kleinhaus 295 asserted that the beauty of this park is critical and if improvements make it less beautiful, that is 296 important to consider. Commissioner Kleinhaus shared that several people reached out about 297 keeping the top parking lot open. Commissioner Kleinhaus was not sure that a path could be put by 298 the road without shrinking the road or building a retaining wall. 299 Ms. Bansal pointed out that the existing shoulder is planned for conversion to the pedestrian path. 300 In certain areas, the path may have to be reduced to 3 feet but it can be mostly maintained at 3 to 4 301 feet with a gap wherever there is a conflict with existing trees since no trees are being removed. 302 Commissioner Kleinhaus asked how paths can be protected from erosion without a retaining wall. 303 Ms. Bansal said there is enough space for a 3 to 4-foot trail and there will be no retaining wall. 304 Commissioner Deng noted the gravel parking lot across Boronda Lake and the pedestrian road and 305 asked what materials are used. 306 Ms. Bansal shared that the material used for all of the pedestrian pathways is quarry fines, which is 307 a byproduct of quarry operation. This material is installed at Arastradero Preserve and staff have no 308 concerns about it. It has better maintenance than DG pathways, which is why it was selected. 309 Vice Chair Wei hoped that the goal was to get more efficiency rather than adding more parking, 310 reconfiguring and formalizing spaces to eliminate ambiguity for visitors, improve flow, and clearly 311 designate parking areas. Vice Chair Wei supported removing parking configurations that create 312 safety issues and ecological damage and reclaiming existing space where informal parking has 313 expanded beyond intended limits. 314 Chair Freeman hoped for a continued balance of safety improvements while preserving the natural 315 character of the preserve and asked what PRC can do before this comes back. 316 Ms. Bansal asked PRC for clear direction on whether they want the gravel lot across Boronda Lake, 317 which was added back to the plan per PRC's direction in October. 318 Chair Freeman wanted to make sure there was room to park while not distracting from the park's 319 beauty. 320 Commissioner Kleinhaus asked if it was possible for staff to have a grassy area instead of parking, 321 which could be used as overflow parking on peak days only. 322 Ben Heistein, Assistant Director of Open Space, explained that there is currently a lot of unofficial 323 parallel parking that is causing issues, so if they create an unofficial grassland area for parking, they 324 may run into the same level of safety issues being experienced now because it would be hard to 325 police and regulate. 326 Mr. Warner agreed with Mr. Heistein's statements and added that infrequent park visitors will not 327 understand that that area is overflow parking only and will want to park there all the time. Mr. 328 Warner expressed concerns that encouraging visitors to park on vegetation in one area can confuse 329 them about whether they can park on vegetation throughout the park. Mr. Warner stated he has 330 encountered visitors who think parking rules at other places like Mitchell Park should apply in the 331 preserve. Mr. Warner gave the example of occasional people sneaking a mini van between the 332 boulders to park on vegetation. 333 Commissioner Kleinhaus supported removing parking along the lake and wondered if more parking 334 is needed given the visitation is not as high as it was right after COVID. 335 Mr. Warner noted the visitation limit is decided by PRC and Council. The 600-person cap is based on 336 calculations around visitation for the last 20 to 30 years but the municipal code allows up to 1,000 337 visitors per day and the cap could change based on who is seated on PRC and Council. Mr. Warner 338 recalled the explosion in park visitation after COVID and asserted that things can change overnight, 339 so built-in contingency is a good thing but it must be done mindfully. 340 Chair Freeman asked if staff have enough feedback and information to create their ordinance for 341 approval at the next PRC meeting. 342 Ms. Robustelli stated guidance was still fuzzy on the gravel parking lot, which PRC recommended at 343 the October meeting but is now opposed by 2 commissioners. Ms. Robustelli asked for a better 344 sense of PRC's recommendation on the current plan and scope moving forward. 345 Chair Freeman recalled a lengthy discussion around the gravel parking at the October meeting and 346 expressed surprise that it has now become an issue. Chair Freeman stated a need for a consensus on 347 whether to keep or remove that parking. 348 Commissioner Smith spoke in favor of keeping the gravel parking lot and cautioned against some 349 parking being overflow on specific days only because it takes staff time to communicate and 350 enforce. 351 Commissioner Brown supported keeping the gravel parking lot to accommodate high-traffic days 352 and prevent damage to habitat and more work for the rangers. 353 Commissioner Deng agreed about keeping the gravel parking lot because it will make up for the 354 parallel parking being removed. 355 Chair Freeman noted that people parking where they want to has been an issue that rangers and 356 others have observed and keeping the gravel parking lot in the plan will help address that. Chair 357 Freeman noted it can always be re-evaluated in the future. 358 Commissioner Axelrod said that if there is sufficient parking without the gravel lot, it may be easier 359 to do work on the other parking and then see if more is needed. 360 5. Middle School Athletics Program: Future Management Model and Program Direction 361 Adam Howard, Community Services Department, provided a slide presentation update on the 362 Middle School Athletics (MSA) Program and requested feedback from PRC on the preferred 363 management model. 364 The City of Palo Alto took full responsibility for MSA in 2009/2010. In October 2024, the City Council 365 asked PRC to review the program and align it with universal student access and applicable state laws 366 and explore the feasibility of outsourcing program operations to local nonprofit organizations. Mr. 367 Howard provided an overview of the current MSA program, fees, offerings by season, related City 368 staffing, participation levels, compliance with state law, participation and expenses, and program 369 accessibility and capacity. 370 At the PRC meeting on July 22, 2025, alternative models that were discussed included a tiered fee 371 structure, nonprofit partnerships, and partial or full program management outsourcing. Staff and 372 the ad hoc committee sought solutions that do not increase registration costs or City subsidy and/or 373 do increase program capacity. Staff and the ad hoc recommended against a tiered fee structure and 374 the partial program management outsourcing because it raises the cost to remaining sports and 375 creates concerns around equitable experience from sport to sport. Staff and the ad hoc 376 recommended continuing to strengthen the partnership with the Palo Alto Recreation Foundation 377 (PARF) and completing a Request For Proposal (RFP) to fully vet the full program management 378 outsourcing option. 379 Chair Freeman thanked staff and the ad hoc committee for their efforts and asked whether the ad 380 hoc members had anything to add. 381 Commissioner Brown spoke for the ad hoc committee, noting this item was a request by Council in 382 the PRC's previous work plan. Commissioner Brown expressed appreciation for staff's work on it. 383 To a question from Vice Chair Wei, Mr. Howard clarified the MSA sports offerings are listed in the 384 fall Enjoy! catalog with all the registration dates listed but it is not listed each season. 385 Vice Chair Wei asked about tennis court maintenance and Mr. Howard confirmed the school 386 operates their tennis courts and fields and that does not impact the MSA because it is separate. 387 Commissioner Axelrod asked if total participation time per sport is roughly equal, which Mr. Howard 388 confirmed. 389 Commissioner Smith asked about the Palo Alto Recreation Foundation (PARF). 390 Mr. Howard explained that PARF is a nonprofit organization whose sole mission is to support the 391 Recreation division. They help support the Rec Department and supply funding for a lot of special 392 events to help continue or expand them. 393 To a question from Commissioner Smith, Mr. Howard clarified that PARF's $10,000 equals about 60 394 scholarships, which pay half the registration fee for 60 participants. 395 Commissioner Smith wondered what other similar funding might be available. 396 Mr. Howard believed other similar funds are out there and noted that PARF running Thursday night 397 events at Cal Ave and coming back to the forefront should help them gather more donations and 398 fundraise. 399 Commissioner Smith stated athletics are so important for getting kids off their devices, teaching 400 them how to compete, and having someone besides their parents telling them what to do. 401 Chair Freeman asked how staff is communicating the availability of sports fee scholarships. 402 Mr. Howard stated this is something new and they will advertise to bring it to the forefront. Mr. 403 Howard noted there is an information gap around which families cannot afford to participate even 404 with a 50 percent scholarship because they rarely reach out. Mr. Howard felt that adding the option 405 to apply for a scholarship covering 100 percent of the fee will help staff understand the level of need 406 in the community. 407 Chair Freeman noted there are 1,200 registrations with 60 waitlisted and asked whether that 408 number is trending up or remaining stable. 409 Mr. Howard replied that the waitlist number remains stable and MSA tries to keep it as small as 410 possible. If someone was invited to participate in another sport and turned that down, they are not 411 included in the waitlist number. 412 To a question from Chair Freeman, Mr. Howard explained that basketball and girls volleyball drive 413 the waitlist the most. They have to have the right amount of coaches and team sizes come into play 414 because of the limit to how many people can be on the court. There are also space limits because 415 basketball is a winter sport, so there are no options to put things outside because there would be 416 weather delays. 417 In response to a question by Chair Freeman, Mr. Howard clarified that staff recommends continuing 418 to investigate full outsourcing. Staff recommends against partial because if they outsource 1 or 2 419 sports, the remaining sports have to increase in cost to cover the fees. The only way to avoid this is 420 if all sports are able to be individually contracted out. Even if that is possible, the question is 421 whether all sports are getting equal attention from 8 different organizations and how to manage all 422 those contracts. Staff concludes that individual contracting out does more harm than good and 423 recommends fully investigating the potential for full outsourcing, though it is unclear whether the 424 right group can be found to manage it. 425 Chair Freeman commented that the previous RFP did not get much response and asked what staff 426 will change, whether the RFP itself or reaching out to other communities to find out what worked 427 for them. 428 Mr. Howard clarified that the first request was a Request For Information (RFI), which is more 429 informal and vague. Mr. Howard stated that some organizations perhaps did not want to provide 430 information or take the time to do it because it is informal. An RFP is more formal, will be very 431 specific to full contract management, and can go from an RFP to taking ownership of the program. 432 Mr. Howard said the results may not be different but they need to try and find out for sure. 433 To a question by Chair Freeman, Mr. Howard further explained that using the RFP to fully test the 434 market is the best solution. The City can weigh any RFPs submitted and can still choose to keep MSA 435 in house. 436 Commissioner Smith asked what time these sports activities take place. 437 Mr. Howard explained that the activities start within an hour of school getting out. Practice is 438 typically an hour, Monday through Friday. The game schedule fluctuates but some games go as late 439 as 7, though they try to avoid that as much as possible. 440 Commissioner Smith wondered if these activities are considered childcare assistance. 441 Mr. Howard thought MSA may act as childcare for some but stated that the importance of sports, 442 especially at middle school level, is that is provides one of the last opportunities where kids can 443 participate in a team sport where skill is not the main driver. Once at the high school level, skill 444 becomes a more prominent focus. 445 Commissioner Deng commented about the program's promotion via PAUSD and City email channels 446 and wondered if there is any on-site promotion or introductory session during the middle school 447 visit to make parents aware and help them plan their kids' afterschool programs in advance. 448 Mr. Howard stated it is easier to reach seventh and eights graders. The incoming sixth graders are 449 hardest to reach, so they are working with elementary schools to see if they can send out MSA 450 information to incoming sixth graders at the end of fifth grade. 451 PUBLIC COMMENTS: 452 1. Tom Haxton stated he came prepared to argue for the RFP and was happy to hear about the 453 adjustments and recommendation for the RFP. Tom Haxton shared that he founded the Palo 454 Alto Middle School Athletics Community Organization (PAMSACO), which is a nonprofit whose 455 advocacy led to the City Council vote. Tom Haxton highlighted the motivation for evaluating 456 partnering with nonprofits was to increase the level of service for middle school sports. Tom 457 Haxton started off as a volunteer coach for cross country and track and field at JLS Middle 458 School and found the student experience is determined by the quality of coach, which can vary. 459 Tom Haxton stated the biggest thing to do to improve the program is to support the coaches 460 more and pay more to be reasonable compensation for time in the Bay Area. Tom Haxton noted 461 most of the registration fee goes to administrative overhead, not the coaches, and encouraged 462 staff to put the RFP out there as soon as possible. 463 2. DC, parent to a seventh grader at JLS, thanked the PRC for their service and time. DC shared that 464 he and his wife did a lot of sports growing up and stated that middle school is a crucial time to 465 learn a new sport. DC highlighted nonprofits in Palo Alto and noted the experience with middle 466 school sports has been poor by comparison because there is no organization or consistency 467 among the sports. Sometimes they lack able coaches or there are too many participants for the 468 coaches to manage. DC shared that in flag football, a coach was unable to stop unregistered 469 players and complaints to the City about it received no response. DC noted he sent written 470 comments earlier and hoped his eighth grader would have a better experience next year. 471 Vice Chair Wei stated MSA is doing great work and hoped they can get more funding, perhaps from 472 corporations in Palo Alto. 473 Commissioner Brown asked if the staff who administer the MSA program are 100 percent dedicated 474 to MSA or if they perform other functions. Commissioner Brown wondered if contracting out MSA 475 entirely would eliminate these positions and remove that administrative overhead. 476 Mr. Howard confirmed that MSA staff perform other functions, including adult sports, summer 477 camp contracts, and special events. Should MSA be contracted out, there would be a discussion 478 around whether full-time positions could be kept. 479 Commissioner Brown emphasized the importance of remembering that those employee positions 480 would not be entirely eliminated because they are not 100 percent dedicated to MSA. Eliminating 481 them means service impacts to the department while not eliminating them means less cost savings 482 related to outsourcing the program. 483 Commissioner Brown highlighted that they are looking at MSA not only to address the service and 484 improve the quality of the experience but also to make it more equitable in terms of access and 485 address changing needs. The research done showed the in-house delivery service model offers the 486 most flexibility in terms of being responsive to new sports being requested, though that could be 487 baked into a contract in some way. Since this conversation started, some considerations like 488 increasing the subsidy became less realistic given the reality of the current budget conditions. 489 Commissioner Brown expressed support for the staff recommendation. Commissioner Brown noted 490 it is very low cost and low effort to fully vet the outsourcing option and it will get the PRC the 491 answers it needs moving forward. 492 Commissioner Axelrod advocated for reconsidering partial program management across all sports 493 because it would enable them to find vendors who are best-of-breed and have a mission and 494 passion about each individual sport rather than looking for an umbrella organization. Commissioner 495 Axelrod stated it is hard to find a group that loves and offers great programs for the full range of 496 sports. Commissioner Axelrod recommended RFPs for individual and/or groups of sports. 497 Commissioner Freeman stated the goal is to grow and refine the MSA program and some of the 498 biggest constraints are facilities, staffing, and funding. Commissioner Freeman asked what processes 499 have been tried to address constraints, such as advertising and raising awareness. 500 Mr. Howard stated that websites like Indeed are used to increase the number of coaches available. 501 There are difficulties finding people available from 3 to 6, Monday through Friday, and it is not a 502 large chunk of time or pay. Mr. Howard stated they continue to reach out and use the current 503 coaches to promote to other people. Mr. Howard noted the economy and number of people looking 504 for work plays a role. Mr. Howard shared that high school students get out a little later, so the 505 schedule has been adjusted to allow them to coach because that is a good pull. It is about as much 506 communication as possible and being flexible with scheduling based on coach availability. 507 Commissioner Freeman recalled that when his kids were younger and in sports, the City had 508 programs for coaching and referee workshops. 509 Mr. Howard responded that the City is trying to find a coach certification program to offer through 510 the Enjoy! catalog, which could increase the potential coach pool. 511 Vice Chair Wei stated that is a great idea and asked if there are any resources from Stanford 512 students or their sports department. 513 Mr. Howard shared that they advertise the need for coaches through Stanford Athletics and other 514 junior colleges in the area, anything to promote to anyone available and interested in coaching. 515 Commissioner Smith asked if coach pay is competitive to neighboring towns. 516 Mr. Howard stated coach pay is competitive to neighboring cities but not private clubs because they 517 are able to pay more. Palo Alto pays coaches a range depending on coach level, starting at $20.91 518 per hour for Rec 1. 519 Commissioner Brown moved to accept the staff recommendation of an RFP contracting out the full 520 program. 521 Chair Freeman moved an addition that staff should return to the PRC with a comparative analysis 522 between the final decision, seconded by Commissioner Deng. 523 SUBSTITUTE MOTION: Commissioner Axelrod moved adding an RFP for partial program management 524 across all sports in addition to the staff's recommendation of an RFP for full program management, 525 seconded by Commissioner Smith. SUBSTITUTE MOTION FAILED: 3-3-1 (Brown, Deng, Freeman no, Kleinhaus absent) MOTION: Commissioner Brown moved to accept the staff recommendation of an RFP for the full 533 program, seconded by Commissioner Deng. MOTION PASSED: 5-1-1 (Axelrod no, Kleinhaus absent) 6. Review and Confirm the Revised Parks and Recreation Commission Fiscal Year 2027 Work 537 Plan PUBLIC COMMENT: Dan Garblik spoke on behalf of Rinconada Park parents and community members 560 who are proposing a small, nonprofit-operated café at Rinconada Park. Dan Garblik stated that Palo Alto 561 has an approved model for this, Ada's Café, which has successfully served Mitchell Park for years. The 562 same is wanted for Rinconada Park, which has a lot of foot traffic but no food or beverage options 563 within a 25-minute walk. The café would be operated by the nonprofit and local high school students, 564 giving them real entrepreneurial and leadership experience in their community. Supporters of the café 565 have a full presentation ready, are talking with City Planning, and are looking for guidance on the path 566 forward, specifically about the official park design process and how the proposal would fit into it. COMMISSIONER/BOARD MEMBER QUESTIONS, COMMENTS, ANNOUNCEMENTS OR FUTURE AGENDA 568 ITEMS ADJOURNMENT