City Council Summer Recess Report
RECOMMENDATION
Informational Report Only.
EXECUTIVE SUMMARY
This informational report provides a brief update on notable activities and work throughout the
City Council’s July 2026 recess.
BACKGROUND
The annual Summer Recess Report share updates, organized by department, on activities
accomplished during the City Council recess. This report is not an exhaustive list of staff work.
The updates are to inform the City Council and public about items completed since the last City
Council meeting of the fiscal year and other efforts underway.
ANALYSIS
Administrative Service Department
End of Fiscal Year and New Fiscal Year Activities
Staff focused on transitioning into the next fiscal year. Closing FY 2026 is underway. The annual
inventory of both warehouses, the Municipal Services Center and Regional Water Quality
Control Plant, are complete.
Revenue Collection
Staff assisted permit customers with the transition to the new residential Parking Permit
Program that launched in mid-June.
Office of Management and Budget
Staff kicked off the budget system upgrade project and worked towards publications in August
of the FY 2027 Municipal Fee Schedule and both the FY 2027 Adopted Operating and Capital
Budget books.
Procurement
Staff closed year-end purchase orders and began encumbrances for FY27. Staff continued
efforts to update the Palo Alto Municipal Code, as recommended by the Policy and Services
Committee, to increase the thresholds for solicitation of goods and services, increase contract
approval and settlement authority and to make other technical changes. This will be considered
by Council in August.
Staff continued the inter-departmental partnership to advance the Cubberley Community
Campus Project.
In accordance with Council direction on November 17, 2025, Staff completed the acquisition of
a 3.25-acre parcel from the Sobrato Organization by grant deed recorded on June 17. The site
is adjacent to Matadero Creek, near the former Fry's building.
Staff worked towards finalizing the Regional Water Quality Control Plant line of credit and
refunding of the 2009 Water revenue bonds. Staff advocated to the State on behalf of the City
for SB 762 to increase the sales tax cap by 0.5% or half-cent. Staff advocated to the State on
behalf of the City to protect the parcel transfer tax revenues.
Staff met with the Palo Alto Museum ("Museum") in June to continue addressing the water
intrusion in the Roth Building. In addition, City staff collaborated with the Museum staff to
review parameters that guide the planned basement repair work and address water flow from
Heritage Park. Plans are being developed by the Museum for this work and the City will review
plans once received.
Staff made the $20 million disbursement from the Section 115 Trust to CalPERS for the pension
ADP (additional discretionary payment), per Council FY 2027 Adopted Budget, which will reduce
the City’s unfunded pension liability.
Staff anticipate transmitting the June 30, 2025, CalPERS valuations of the City's pension plans to
the Finance Committee this fall, along with a review of the Retiree Benefit Funding Policy.
CalPERS completes valuations using member data two years in arrears and issues annual
reporting each August. As of July 2026, CalPERS provided the following preliminary investment
returns as compared to a 6.8% target:
14.8% for the period ending June 30, 2026 (impact in FY 2029)
11.6% for the period ending June 30, 2025 (impact in FY 2028)
9.3% for the period ending June 30, 2024 (impact in FY 2027)
Consistent with past practice, staff will incorporate these results in financial planning, including
the Long-Range Financial Forecast (LRFF) and annual budget development. Additionally, staff
continue to use a lower discount rate than the 6.8% used by CalPERS to calculate the
employer's normal cost and transmit the difference as an additional contribution to the City's
Pension Trust. As part of the FY 2027 Adopted Budget, the City Council approved continuing to
use a discount rate of 5.3% in FY 2027.
City Manager’s Office
Palo Alto Homekey Progress
Palo Alto Homekey reached an important operational milestone with staff and clients
completing the move from the Sunnyvale hotel bridge program to the Palo Alto site over a four-
day period in late June/early July. Families are settling into the new location, and children are
participating in summer camp activities, helping provide structure, stability and a positive
transition during the summer months.
LifeMoves shared that the move was meaningful for many families, and described the site as
offering a renewed sense of peace and safety. Additionally, Homekey clients shared with
LifeMoves that the setting provides peace of mind as they continue to seek permanent housing,
with nearby nature and open space contributing to a therapeutic environment. LifeMoves staff
observed a growing sense of community and rapport unfolding with shared meals and 4th of
July celebrations together.
Oversized Vehicles Discussion Planned for Council in August
Staff continue regular street sweeping, enforcement and responding to constituent concerns
regarding oversized vehicles. A City Council discussion is anticipated on August 24, presenting
two pilot programs intended to address ongoing neighborhood, business, public health and
safety impacts associated with OSVs used for habitation while balancing and providing a more
structured and humane response for individuals living in those vehicles.
Human Services
Human Services staff continued supporting community needs this summer through the FY 2026
Emerging Needs Fund and direct service coordination. The City received 11 Emerging Needs
Fund applications and made 8 awards totaling $50,000, fully allocating the available funding.
Awards supported vision and health services, food assistance, senior nutrition, equipment
needs, youth mental health programming, outreach and referral coordination, community
event support, seasonal operating costs and early intervention services for students. Staff also
supported a resource fair for unhoused residents, attended by approximately 32 unhoused
neighbors and 16 service providers and community partners, creating opportunities for direct
service connections, meals, resource sharing and continued coordination among local
organizations.
Nobu License Agreement
Thursday Live/Entertainment Zone
FIFA World Cup
Destination Marketing
Annual Community Survey
Community Services Department
Summer Camps
This summer, Community Services offered 320 camps with $1,846,301 in total revenue
generated as of July 21, 2026. A total of 3,747 campers enrolled with 2,108 on waitlists.
Summer Camp 2026 season ends August 8. The highest demand camps this year include Zoo
Camp, Woodworking Camp, Two-Week Theatre Academy, Jurassic Camp, Camp Kinetic and
Camp Palo Alto.
Recreation Special Events
This year’s Family Movie Night series has been a great success, with each movie night
welcoming 300–400 attendees. The summer series ends on August 14 with “The Super Mario
Galaxy Movie.” The continued success and strong attendance highlight the community’s
support of family-oriented events throughout the summer.
Eleven teams competed in this year’s 4th of July Chili Cook Off & Summer Festival, including four
returning and seven new teams. Chili teams vied for several prizes including People’s Choice,
Best Vegetarian Chili, Best Decorations and Most Spirit. First place went to Veterinary
Emergency Group (VEG) E.R. for Pets and the Klemens Family won the People’s Choice award.
Attendance was estimated at around 3,000.
Aquatics
Rinconada Aquatics continues to provide opportunities for residents of all ages to learn how to
swim, stay active, enjoy recreational swimming and pursue employment through lifeguard
certification. Throughout the summer, the facility welcomed numerous families and offered day
camps. From June through mid-July, aquatic camps hosted 502 campers, a 25% increase over
the same period last year. Staff have certified 109 lifeguards year-to-date, helping support both
facility operations and the broader aquatics community. Summer certification activity has been
particularly strong, with 57 certifications completed June through mid-July, a 63% increase
compared to the same period in 2025.
Public Art Program
The Public Art Program hosted nine ArtLift events activating Downtown, California Avenue and
Cubberley, engaging over 200 residents and visitors. The Public Art Commission approved the
final design for a temporary artwork at the Sherman Avenue Garage, which is planned for
installation in August.
Cubberley Artist Studio Program
Four of the artists from the Cubberley Artist Studio Program (CASP) held free workshops and
events at the Cubberley campus engaging dozens of residents of all ages in art making.
Palo Alto Art Center
The Art Center sold 772 summer camp sessions, generating $262,732 in revenue with 95 teens
participating in as either our Counselor in Training or Ceramics Apprentice teen leadership
programs, with a revenue increase of 21% over last year. There were 89 teens who supported
summer camps as Counselors in Training (CIT) and Lead CITs, serving almost 1,600 hours.
Members of the Art Center Teen Leadership group are planning the Open Call Teen Art
Exhibition, which will take place in September, showcasing local teen artwork.
A new glaze washing station was installed in the adult ceramics studio to reduce the volume of
Rinsate produced by keeping clay waste and glaze waste separate. Using funds from the
Ceramics Program CIP, a down payment was made on a custom kiln, which is currently being
fabricated with installation scheduled for summer 2027. Summer quarter is usually the quietest
season for Adult Studios, but there are currently 339 people enrolled in classes and workshops,
generating $79,294 in revenue, an 11% increase over last year.
The year-long series “Centering: Clay and Community” celebrating the Art Center’s role as a
resource for ceramic art and education, concluded.
The Art Center hosted over 7,500 people at the annual Clay and Glass festival on July 11 and 12.
This summer the Children’s Theatre welcomed 246 campers, generating $151,000 in revenue.
Assisted by 14 interns, the camps were at capacity with 344 waitlisted.
The Children Theatre produced the annual Summer Hot Dog Season, featuring “Tales of the
Arabian Nights” and “Wheels on the Bus.” Performed before sold out audiences, the
productions were seen by more than 6,000 community members and included Magical Series
Spectrum Friendly and ASL-Interpreted performances.
This summer, the theatre launched a new audio play series, featuring a June 2026 summer
intensive class that recorded The Wizard of Oz (an original Children’s Theatre adaptation for
young actors), and in July, the theatre took up residence at Cubberley Theatre for two weeks to
record an audio book of their upcoming publication of Monologues for Young Actors.
The Teen Arts Council closed out the school year with WaveFest, an outdoor music and art
festival for teens. This year’s festival included teen bands, dance companies, student vendors
and clubs, local community groups, plus Palo Alto’s Teen Library Advisory Board (TLAB) and Art
Center Teen Leadership.
The Twilight Concert Series kicked off in June, with the first three concerts attracting more than
3,000 community members. The lineup included “Heartless,” “Summer Night City” and
“Fleetwood Mask.” The concert series concluded on August 8 with blues band “Legally Blue.”
Palo Alto Junior Museum & Zoo (JMZ)
The Palo Alto Junior Museum & Zoo hosted 937 campers in nine science camps. Thanks to
donations from the Friends of the Palo Alto Junior Museum & Zoo, 43 campers received a full
scholarship to cover the cost of participation. Forty-two (42) middle and high school interns
supported JMZ summer camps through the JMZ Science Camp Assistant Program. The search
for the next Executive Director began in June, attracting a highly competitive pool of
candidates. The City is in the final stages of the recruitment process.
A new flamingo chick was born on June 22 to parents Ruby and Sal. Remarkably, the chick
hatched on the same date as Rio, the Zoo's flamingo chick born in 2025. The new arrival brings
the flamingo flock to 8 birds. Producing chicks in consecutive years is a significant achievement
for a flock of this size and reflects the exceptional care provided by the animal care team, as
well as the health and well-being of the colony. The JMZ also introduced two new public
programs this summer: a Teen Night and a World Snake Day celebration.
Staff established a new partnership with the Stanford Autism Center to support future inclusive
community events, including a "Meet the First Responder" event for individuals with disabilities
and their families planned for late August. In preparation for summer camp season, camp staff
across CSD received specialized training on supporting campers with disabilities. Staff provided
accommodations for 13 summer camp/class participants, helping ensure inclusive access across
CSD programs.
In June, we hosted a Downtown Hangout for young adults with disabilities. Additional fall
offerings are planned for all ages including cooking classes, gym time and family socials.
Accessibility continued expanding with the addition of a sensory tent at the Fourth of July Chili
Cook-Off.
Rangers have increased their frequency of patrols in the Baylands Nature Preserve following
the attack and robbery in the Baylands on July 23. Midpeninsula Regional Open Space District
has also increased patrols of the section of the Bay Trail in Ravenswood Preserve.
The Pearson-Arastradero Preserve Gateway exhibits were refreshed for the first time in nearly
20 years, including interpretive panels, updated exhibit elements, new display models, and
enhancements to the visitor center experience.
The Rangers have been performing annual fire fuel mitigation work totaling over 400 acres of
fuel breaks and ignition prevention mowing and maintaining clearance on 25 miles of fire roads
and trails.
Staff presented the financial feasibility study to the Parks and Recreation Commission and are
evaluating their input and determining appropriate next steps.
Greer Park Skate Bowl Maintenance
Park Sign Replacement
Parks Asset Management
Community Gardens Workdays
Cubberley Community Center Project
Fire Department
Vegetation Fire Response
Palo Alto experienced three significant vegetation fires this summer at Pearson-Arastradero
Preserve (~3.5 acres) on June 22, Coyote Hill/Page Mill (~6.7 acres) on July 1, and Byxbee Park
(~ 3 acres) on July 11. All are suspected to have been caused by illegal fireworks.
Fleet Update
Fire Station 8 Activation & Wildfire Prevention and Wildland-Urban Interface (WUI) Inspections
Human Resources Department
Library Department
Summer Reading Program
The Library hosted its annual Summer Reading Program June 1 – August 1. The theme, Oceans
of Possibilities, invited participants to dive into new adventures and explore the depths of their
imagination by reading and/or listening daily, whether it’s books, articles, audiobooks or
storytimes. All-ages events took place all summer long, and participants tracked their reading
online or on a paper log. Prize pickups will be at Children’s, Mitchell Park, and Rinconada
Libraries through August 31, while supplies last. The Library thanks the Friends of the Palo Alto
Library and all other donors.
The Library hosted a series of Pride events in June and July, including an exciting performance
by the SF Pride Band and a karaoke night; a new Tech Class series for basic computing needs
and interests; and a Juneteenth storytime and craft. Staff tabled at the unhoused resource fair
at the Opportunity Center and issued library cards and promoted library services.
During summer recess, the Vintage Media Lab (VML) – which provides community access to
tools that help residents preserve, digitize and share personal and family history – booked a
total of 194 hours at Mitchell Park and Rinconada Libraries in 97 appointments.
The Mitchell Park Library wall repair project began in July and is scheduled for completion by
fall 2026. The Library and Public Works Department are working closely together to oversee the
repairs. During this time, the Teen Space will remain closed for safety. Library staff are
coordinating limited access to Teen Collection materials upon request when it is safe to access
the area.
Starting July 20, the Library closed the Children’s Library on Mondays as part of the impacts of
the FY27 reductions to Library’s budget and the loss of 4.0 FTE positions.
Office of Emergency Services
Staff conducted numerous trainings for City staff, community members and Emergency Services
Volunteer (ESV) program participants.
OES continued participating in regional emergency planning, particularly around the FIFA soccer
matches in our area.
The City lead a multi-agency coordination and deployment for the 4th of July to facilitate rapid
response in the event of a wildfire, terrorist event or other threat to safety. Some partners
included the Midpeninsula Regional Open Space District, CAL FIRE, CHP, San Mateo County,
Santa Clara County, Valley Water and other allied agencies. OES also deployed Emergency
Services Volunteers at various locations to spot fires and other potentially unsafe conditions.
Office of Transportation
East Bayshore Repaving, Bike Facilities & Transportation Funds for Clean Air
TFCA Grant for Citywide Bike Parking
One Bay Area Grant Cycle 4 (OBAG 4) Application
Railroad Safety and Quiet Zones
enforcement and evaluate additional design options to encourage drivers to refrain from
illegally stopping on the tracks in advance of FRA issuing the Notice of Establishment. The City
has implemented additional Police enforcement, and continues to work closely with Caltrain,
the CPUC, and the FRA to address these requests and advance implementation of the Quiet
Zone at this crossing. These additional reviews and evaluations have extended the
implementation timeline for the Quiet Zone while the City works collaboratively with the
regulatory agencies to address the requested safety enhancements.
Automated Parking Guidance System (APGS) Installation and Testing
Embarcadero Road Improvements
Churchill Avenue Enhanced Bikeways
Planning & Development Services Department
Accessory Dwelling Unit (ADU) Plans Gallery
Automated Permitting System Federal Grant
In July, Planning and Development Services applied for a U.S. Department of Housing and Urban
Development (HUD) funding opportunity supporting jurisdictions to evaluate and deploy
automated permitting technology. If awarded, the $620,000 grant would fund a 12- to 18-
month subscription to AI plan review software to assess its effectiveness. The 36-month project
would proceed in stages: software proposal solicitation, selection, prototyping and
implementation. The evaluation would measure the technology's impact on consistency in
applying codes and standards, plan review timelines and reliance on outside contractors and
consultants. HUD will notify applicants of awards by August 31, 2026.
Senate Bill (SB) 79 Applications Received
SB 330 Pre-Applications Received July 1-15, 2026
PLN Address Units Floor Area
(Sq Ft)
Zoning
District
Ground Floor
Commercial
Proposed
Community Development Block Grant (CDBG) Annual Action Plan
Local Housing Trust Fund (LHTF) Report
and 3001 El Camino Real projects to support the development of affordable multi-family
housing.
Recent Housing Development Application Resubmittals
Transit Oriented Communities (TOC) Policy Compliance
Certified Local Government (CLG) Grant
Police Department
Recruitment
National Night Out
Another Rivian Patrol Vehicle
The Police Department added a second all-electric Rivian patrol vehicle, which will be driven by
field supervisors, to its fleet.
Public Works Services Department
Even though the Newell Road Bridge work started three weeks late due to nesting birds, the
contractor made great progress on the bridge work including demolition of the old bridge and
installation of the new bridge piles and abutments. The project remains on target to complete
the work in the creek by October 15.
Fire Station #4 construction continues with the completion of structural steel, relocated
temporary power and ongoing installation of the exterior metal studs. This project remains on
schedule with completion anticipated in June 2027.
Work started on Embarcadero Road Improvement Project – Phase 1 on June 8. Grading and
storm drain work was completed, widened sidewalk work is underway. Work is anticipated to
be completed prior to school starting on August 13.
The staff team welcomed a record seven interns, and is excited to provide them with
meaningful, hands-on experiences. Staff hopes they will carry their positive experiences into
their careers and help strengthen the wastewater industry.
Staff completed several major plant shutdowns to accommodate the two largest construction
projects currently underway at the plant, the Secondary Treatment Upgrades and Local
Advanced Water Purification System projects, both of which are on track for 2028 completion.
The work completed without any major compliance issues.
The plant continued providing public and private tours, and received positive feedback from
attendees.
Staff safely managed an unusual sea foam event during King Tides in early July, which did not
result in any major compliance concerns. Sea foam began billowing out of the final effluent
box—the structure where treated water leaves the plant and flows to the Bay. Staff believes
seawater carried organic material into the effluent box during a period of low plant flow in the
middle of the night. A subsequent high tide from the Bay, combined with increased flow from
the plant mixing within the relatively small area of the effluent box, appears to have created
the sea foam.
A new project to build a local workforce pipeline by creating awareness and generating
enthusiasm for career pathways in the wastewater industry began this summer. Work
completed by this year’s summer intern includes a new careers webpage with employee
interviews, development of a Wastewater Treatment Plant Careers Tour for teens and research
on existing programs to inform a 3-year workplan.
Zero Waste City Facility Audit
Household Hazardous Waste Station Outreach and Video
Youth Climate Advisory Board (YCAB) and E-Bike Training
Utilities Department
Fiber-to-the-Premises (FTTP) and Palo Alto Fiber
installation processes, service activation, customer service workflows and network support.
Staff will return to the Utilities Advisory Commission and Council with pilot data, financials and
customer metrics by the end of 2026.
Gas Main Replacement Project Summer Progress
Foothills Wildfire Mitigation Project
Annual Water Quality Report
California Renewables Portfolio Standard Program
FISCAL/RESOURCE IMPACT
STAKEHOLDER ENGAGEMENT
Foundation: Community Postvention Conversation (August 11) and It’s OK to Say Suicide
(August 12). The annual State of the City address is scheduled for Wednesday, August 19 at the
Palo Alto High School Performing Arts Theater. Later in August, there are two community
meetings on the grade separation project (August 24 and 25) and one on the South Palo Alto
Bike / Ped Connectivity project (August 26).
Website Statistics for January – July 27, 2026
o Home page
o Careers
o Content search landing page
o MyCPAU Account Login
o Utilities Department
o Meeting Agendas and Minutes
o Register for Activities & Classes
o Palo Alto Children’s Theatre
o Creek Monitor & Camera
o Palo Alto Art Center
ENVIRONMENTAL REVIEW
ATTACHMENTS
APPROVED BY: