HomeMy WebLinkAboutStaff Report 2607-6535CITY OF PALO ALTO
CITY COUNCIL
Special Meeting
Monday, August 10, 2026
Council Chambers & Hybrid
5:30 PM
Agenda Item
14.Approval of Contract Amendment No. 1 to Contract No. C25191297 with Kittelson &
Associates to Extend the Term through September 9, 2028, and Update the Scope of
Services and Schedule of Rates for the South Palo Alto Bike/Ped Connectivity Project
(Southern Palo Alto Bicycle and Pedestrian Railroad Crossing Study), with No Increase to
the Previously Approved Not-to-Exceed Compensation; CEQA Status – Categorically
Exempt
City Council
Staff Report
From: City Manager
Report Type: CONSENT CALENDAR
Lead Department: Transportation
Meeting Date: August 10, 2026
Report #:2607-6535
TITLE
Approval of Contract Amendment No. 1 to Contract No. C25191297 with Kittelson & Associates
to Extend the Term through September 9, 2028, and Update the Scope of Services and Schedule
of Rates for the South Palo Alto Bike/Ped Connectivity Project (Southern Palo Alto Bicycle and
Pedestrian Railroad Crossing Study), with No Increase to the Previously Approved Not-to-
Exceed Compensation; CEQA Status – Categorically Exempt
RECOMMENDATION
Staff recommends that the City Council approve and authorize the City Manager or their
designee to execute Amendment No. 1 to Contract No. C25191297 with Kittelson & Associates
for professional consultant services for the South Palo Alto Bike/Ped Connectivity Project
(project) to extend the contract term through September 9, 2028, update the Scope of Services,
Schedule of Performance, Schedule of Rates, and Compensation schedule to align with the
current project work plan, and make these updates with no increase to the previously approved
not-to-exceed compensation amount.
EXECUTIVE SUMMARY
The City entered into Contract No. C25191297 with Kittelson & Associates on September 9,
2024, for transportation planning and engineering services in support of the Southern Palo Alto
Bicycle and Pedestrian Railroad Crossing Study, also referred to as the South Palo Alto Bike/Ped
Connectivity Project. The consultant team is assisting the City with community outreach and
engagement, existing conditions analysis, development and evaluation of crossing alternatives,
preparation of a report, implementation planning, and grant application support.
Staff recommends approval of Amendment No. 1 to extend the contract term two years
through September 9, 2028, and to update the scope of services so that the contract
documents accurately reflect the remaining work needed to complete the project. The
amendment is needed in response to community input requesting additional engagement and
to align the project schedule with preferred community engagement periods in the spring and
fall and scheduled Rail Committee and City Council meetings. The updated scope also aligns the
contract with the proposed work plan based on what staff, the consultant team, and the
community have learned through the project to date.
BACKGROUND
1
2 Alternative A
involves two variants:
Alternative A1 with a signalized crossing of Alma Street at El Dorado Avenue.
Alternative A2 with a tunnel under both Alma Street and the Caltrain tracks in the
vicinity of El Dorado Avenue.
1 City Council, September 9, 2024; Consent Calendar Item #7;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=6496&dbid=0&repo=PaloAlto&searchid=5ceb3b7e-
41e9-4bf1-9ad4-fb0749407a24
2 City Council, December 1, 2025: Action Item #18;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=83952&dbid=0&repo=PaloAlto&searchid=d9f09a55
-fa77-4887-8005-bb508af17995
To reflect these developments, staff is bringing forward Amendment No. 1 to update the
contract term, scope, and schedule so the contract accurately matches the remaining work
necessary to complete the project.
ANALYSIS
additional and more clearly sequenced community engagement;
continued coordination with advisory bodies, including the Rail Committee and the City
Council at key milestones;
refinements to evaluation criteria and alternatives analysis based on input received
during the project;
updated reporting and documentation deliverables, including public draft and final
study materials and responses to public comments; and
continued implementation and grant support to position the City for future project
delivery.
This amendment does not request any increase to the previously approved not-to-exceed
compensation amount. The amendment updates the compensation schedule and schedule of
rates to align with the revised scope and timing of work.
FISCAL/RESOURCE IMPACT
STAKEHOLDER ENGAGEMENT
Special Joint Meeting with Palo Alto Pedestrian and Bicycle Advisory Committee and
Mountain View Bicycle/Pedestrian Advisory Committee: August 28, 2024
City Council Meeting: September 9, 2024 (Contract Authorization, Consent Calendar
Item 7)5
Small Group Discussions: November 2024 to December 2024
Online Survey: April 1, 2025, to May 22, 20256
Transportation Planning Workshop: April 2, 2025
California Ave Third Thursday Pop-Up Event: April 17, 2025
Earth Day Festival Pop-Up Event: April 27, 2025
Pedestrian and Bicycle Advisory Committee Meeting: May 6, 20257
5 City Council, September 9, 2024; Consent Calendar Item #7;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=6496&dbid=0&repo=PaloAlto&searchid=5ceb3b7e-
41e9-4bf1-9ad4-fb0749407a24
6 South Palo Alto Bike/Ped Connectivity Survey;
https://communityfeedback.opengov.com/portals/paloalto/Issue_14352
7 Pedestrian and Bicycle Advisory Committee, May 6, 2025; Discussion Item #7.a.;
https://www.paloalto.gov/PABAC
Planning and Transportation Commission Meeting: May 14, 202511
Bike to Work Day Pop-Up Event: May 15, 2025
Rail Committee Meeting: May 20, 202512
City/School Transportation Safety Committee Meeting: May 22, 2025
Parks and Recreation Commission Meeting: May 27, 202513
Phase 2 Community Engagement: Feedback on Alternatives (Fall 2025) – Completed
Online Survey: August 15, 2025, to October 12, 202514
Bike/Ped Rail Crossings Workshop: September 9, 2025
Planning and Transportation Commission Meeting: September 10, 202515
Bike Palo Alto Pop-Up Event: October 5, 2025
California Ave Third Thursday Pop-Up Event: October 16, 2025
City/School Transportation Safety Committee Meeting: October 23, 2025
Pedestrian and Bicycle Advisory Committee (PABAC) Meeting: November 4, 202516
Rail Committee Meeting: November 18, 202517
City Council Meeting: December 1, 202518
A third round of engagement will occur in fall 2026 and will allow the community to review and
provide feedback on the two shortlisted grade-separated bicycle and pedestrian rail crossings
documented in the Public Draft Report. A Final Report will be shared in spring 2027 in Phase 4
for community review and potential adoption by the City Council.
11 Planning and Transportation Commission, May 14, 2025; Study Session Item #4;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7648&dbid=0&repo=PaloAlto&searchid=953eac3d-
214a-4cea-a77b-5cfa3921c24f
12 Rail Committee, May 20, 2025; Study Session Item #2;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=9269&dbid=0&repo=PaloAlto&searchid=d661c2c2-
51aa-4f56-bdc3-9882fb61d4e3
13 Parks and Recreation Commission, May 27, 2025; Business Items Item #5;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7060&dbid=0&repo=PaloAlto&searchid=b91d0517-
cedc-4099-8940-84b874c6ccd0
14 South Palo Alto Bike/Ped Connectivity Preliminary Design Concept Survey;
https://communityfeedback.opengov.com/portals/paloalto/Issue_14594
15 Planning and Transportation Commission, September 10, 2025; Study Session Item #4;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=7671&dbid=0&repo=PaloAlto&searchid=cc55f36b-
8916-4c57-a84c-1aa231dab86e
16 Pedestrian and Bicycle Advisory Committee, November 4, 2025; https://www.paloalto.gov/PABAC
17 Rail Committee, November 18, 2025; Action Item #1;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=83878&dbid=0&repo=PaloAlto&searchid=e5ce0fb7
-ff7e-4ddf-aa36-356d39a32b5b
18 City Council, December 1, 2025: Action Item #18;
https://recordsportal.paloalto.gov/WebLink/DocView.aspx?id=83952&dbid=0&repo=PaloAlto&searchid=d9f09a55
-fa77-4887-8005-bb508af17995
Because the project is intended to identify feasible bicycle and pedestrian grade-separated
crossings of the rail corridor in a complex and sensitive area, public input is critical to
understanding community priorities, concerns, and desired outcomes. Input received to date
has indicated a desire for additional opportunities for community engagement and review
before key project decisions are brought forward.
ENVIRONMENTAL REVIEW
ATTACHMENTS
APPROVED BY:
Vers.: Aug. 5, 2019
Page 1 of 24
AMENDMENT NO. 1 TO CONTRACT NO. C25191297
BETWEEN THE CITY OF PALO ALTO AND
KITTELSON & ASSOCIATES
This Amendment No. 1 (this “Amendment”) to Contract No. C25191297 (the “Contract”
as defined below) is entered into as of August 10, 2026, by and between the CITY OF PALO ALTO, a
California chartered municipal corporation (“CITY”), and KITTELSON & ASSOCIATES, a
California corporation, located at 155 Grand Ave, Suite 505, Oakland, CA 94612 (“CONSULTANT”).
CITY and CONSULTANT are referred to collectively as the “Parties” in this Amendment.
R E C I T A L S
A. The Contract (as defined below) was entered into by and between the Parties
hereto for the provision of transportation planning and engineering services in support of the
Southern Palo Alto Bicycle and Pedestrian Railroad Crossing Study, as detailed therein.
B. The Parties now wish to amend the Contract in order to extend the contract term
through September 9, 2028, update the Scope of Services, update Schedule of Rates and update
compensation schedule with no increase to the Not To Exceed compensation.
NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions
of this Amendment, the Parties agree:
SECTION 1. Definitions. The following definitions shall apply to this Amendment:
a.Contract. The term “Contract” shall mean Contract No. C25191297
between CONSULTANT and CITY, dated September 9, 2024.
Other Terms. Capitalized terms used and not defined in this Amendment shall have the meanings
assigned to such terms in the Contract.
SECTION 2. Section 2. TERM of the Contract is hereby amended to read as follows:
The term of this Agreement shall be from the date of its full execution through
September 9, 2028, unless terminated earlier pursuant to Section 19
(Termination) of this Agreement.
SECTION 3. Section 4. NOT TO EXCEED COMPENSATION. COMPENSATION of the Contract
is hereby amended to read as follows:
“The compensation to be paid to CONSULTANT for performance of the Services shall be based
Vers.: Aug. 5, 2019
Page 2 of 24
on the compensation structure detailed in Exhibit C, entitled “COMPENSATION,” including any
reimbursable expenses specified therein, and the maximum total compensation shall not
exceed Four Hundred Eighty-Seven Thousand, Ninety-Four Dollars ($487,094.00). The hourly
schedule of rates, if applicable, is set out in Exhibit C-1, entitled “SCHEDULE OF RATES.” Any
work performed or expenses incurred for which payment would result in a total exceeding the
maximum compensation set forth in this Section 4 shall be at no cost to the CITY.”
Optional Additional Services Provision (This provision applies only if checked and a
not-to-exceed compensation amount for Additional Services is allocated below under this
Section 4.)
In addition to the not-to-exceed compensation specified above, CITY has set aside the
not-to-exceed compensation amount of Twelve Thousand Three Hundred Ninety-Six
Dollars and Twenty cents($12,396.20) for the performance of Additional Services (as
defined below). The total compensation for performance of the Services, Additional
Services and any reimbursable expenses specified in Exhibit C, shall not exceed Four
Hundred Ninety-Nine Thousand, Four Hundred Ninety Dollars, and Twenty Cents
($499,490.20), as detailed in Exhibit C.
“Additional Services” means any work that is determined by CITY to be necessary for the
proper completion of the Project, but which is not included within the Scope of Services
described at Exhibit A. CITY may elect to, but is not required to, authorize Additional
Services up to the maximum amount of compensation set forth for Additional Services in
this Section 4. CONSULTANT shall provide Additional Services only by advanced, written
authorization from CITY as detailed in this Section. Additional Services, if any, shall be
authorized by CITY with a Task Order assigned and authorized by CITY’s Project Manager,
as identified in Section 13 (Project Management). Each Task Order shall be in substantially
the same form as Exhibit A-1, entitled “PROFESSIONAL SERVICES TASK ORDER”. Each Task
Order shall contain a specific scope of services, schedule of performance and maximum
compensation amount, in accordance with the provisions of this Agreement.
Compensation for Additional Services shall be specified by CITY in the Task Order, based
on whichever is lowest: the compensation structure set forth in Exhibit C, the hourly rates
set forth in Exhibit C-1, or a negotiated lump sum.
To accept a Task Order, CONSULTANT shall sign the Task Order and return it to CITY’s
Project Manager within the time specified by the Project Manager, and upon
authorization by CITY (defined as counter-signature by the CITY Project Manager), the
fully executed Task Order shall become part of this Agreement. The cumulative total
compensation to CONSULTANT for all Task Orders authorized under this Agreement
shall not exceed the amount of compensation set forth for Additional Services in this
Vers.: Aug. 5, 2019
Page 3 of 24
Section 4. CONSULTANT shall only be compensated for Additional Services performed
under an authorized Task Order and only up to the maximum amount of
compensation set forth for Additional Services in this Section 4. Performance of and
payment for any Additional Services are subject to all requirements and restrictions
in this Agreement.
SECTION 3. The following exhibit(s) to the Contract is/are hereby amended or added, as
indicated below, to read as set forth in the attachment(s) to this Amendment, which is/are
hereby incorporated in full into this Amendment and into the Contract by this reference:
a. Exhibit “A” entitled “SCOPE OF SERVICES, AMENDMENT NO. 1”,
AMENDED, REPLACES PREVIOUS.
b. Exhibit “A-1” entitled “PROFESSIONAL SERVICES TASK ORDER,
AMENDMENT NO. 1”, ADDED.
c. Exhibit “B” entitled “SCHEDULE OF PERFORMANCE, AMENDMENT NO. 1”,
AMENDED, REPLACES PREVIOUS.
d. Exhibit “C” entitled “NOT TO EXCEED COMPENSATON, AMENDMENT NO.
1, AMENDED, REPLACES PREVIOUS.
e. Exhibit “C-1” entitled “SCHEDULE OF RATES, AMENDMENT NO. 1”,
AMENDED, REPLACES PREVIOUS.
SECTION 4. Legal Effect. Except as modified by this Amendment, all other provisions of
the Contract, including any exhibits thereto, shall remain in full force and effect.
SECTION 5. Incorporation of Recitals. The recitals set forth above are terms of this
Amendment and are fully incorporated herein by this reference.
(SIGNATURE BLOCK FOLLOWS ON THE NEXT PAGE.)
Vers.: Aug. 5, 2019
Page 4 of 24
SIGNATURES OF THE PARTIES
IN WITNESS WHEREOF, the Parties have by their duly authorized representatives
executed this Amendment effective as of the date first above written.
CITY OF PALO ALTO
City Manager
APPROVED AS TO FORM:
City Attorney or designee
KITTELSON & ASSOCIATES
Officer 1
By:
Name:
Title:
Officer 2
By:
Name:
Title:
Attachments:
Exhibit A “SCOPE OF SERVICES, AMENDMENT NO. 1”, AMENDED, REPLACES PREVIOUS.
Exhibit B “SCHEDULE OF PERFORMANCE, AMENDMENT NO. 1”, AMENDED, REPLACES
PREVIOUS.
Exhibit A-1 “PROFESSIONAL SERVICES TASK ORDER, AMENDMENT NO. 1”, ADDED.
Exhibit C “NOT TO EXCEED COMPENSATON, AMENDMENT NO. 1”, AMENDED, REPLACES
PREVIOUS.
Exhibit C -1“SCHEDULE OF RATES, AMENDMENT NO. 1”, AMENDED, REPLACES PREVIOUS.
Vers.: Aug. 5, 2019
Page 5 of 24
EXHIBIT A
SCOPE OF SERVICES, AMENDMENT NO. 1
(AMENDED, REPLACES PREVIOUS)
CONSULTANT shall provide the Services detailed in this Exhibit A, entitled “SCOPE OF
SERVICES”. Notwithstanding any provision herein to the contrary, CONSULTANT’s duties
and services described in this Scope of Services shall not include preparing or assisting CITY
with any portion of CITY’s preparation of a request for proposals, request for qualifications, or
any other solicitation regarding a subsequent or additional contract with CITY. CITY shall at all
times retain responsibility for public contracting, including with respect to any subsequent phase
of this project. CONSULTANT’s participation in the planning, discussions, or drawing of
project plans or specifications shall be limited to conceptual, preliminary, or initial plans or
specifications. CONSULTANT shall cooperate with CITY to ensure that all bidders for a
subsequent contract on any subsequent phase of this project have access to the same information,
including all conceptual, preliminary, or initial plans or specifications prepared by
CONSULTANT pursuant to this Scope of Services.
Task 1. Project Management and Coordination
Throughout the study duration, Kittelson’s project manager and members of the consultant team will be
available for conference calls and in-person meetings with the City. Based on the proposed scope of
work, we anticipate the schedule would be about 32 months. We assume one 1.5-hour in-person kick-off
meeting plus a total of 75 30-minute check-in calls and 10 additional 1-hour work sessions to prepare for
engagement activities or to review analysis findings at key project milestones. Kittelson’s project
manager will prepare a detailed project schedule in coordination with City staff showing key
milestones by subtask. This schedule is included as Appendix A. Kittelson’s project manager will prepare
meeting materials for distribution prior to the meeting and provide a list of action items and status after
each meeting. Meeting materials before each meeting and action items/status after each meeting will be
distributed via email. Notes will be recorded and shared through OneNote or a similar collaborative
method.
Task 1 Deliverables:
- Kick off meeting
- Project schedule (included as Appendix A)
- Coordination meetings/calls and materials
- Monthly invoices, progress, reports
Task 2. Community Outreach and Engagement
Task 2.1. Community Outreach and Engagement Plan
The Kittelson team will develop a Community Outreach and Engagement Plan that identifies target
audiences, includes messaging that are designed to explain the project purpose and need in layperson-
friendly language, as well as tailored messaging that is customized to resonate with specific target
audiences. This includes the identification of disadvantaged groups and organizations that serve them as
Vers.: Aug. 5, 2019
Page 6 of 24
well as communications methods and forums for reaching them, such as pop-up events, outreach at
local schools, community and senior centers, food pantries, health-care centers, job and unemployment
centers, and other venues.
The Kittelson team will also prepare a detailed implementation plan, which aligns with key project
milestones and serves as an actional distillation of the Community Outreach and Engagement Plan. This
will include target audiences, messages & communications mechanisms for engaging and informing
them, timelines, roles & responsibilities and desired outcomes for each phase and touchpoint of
engagement, as well as a process for recording who we reached out to.
The Community Outreach and Engagement Plan will also further define the City’s Goals & Objectives for
Community Outreach and Engagement, including desired outcomes. The Goals & Objectives will help to
inform qualitative and quantitative metrics that will be used at key intervals of the Study to determine
the effectiveness of Outreach and Engagement activities.
The Community Outreach and Engagement Plan will undergo a max of two consolidated rounds of
revisions.
Task 2.2. Implementation of Community Outreach and Engagement Plan
Community outreach and engagement will be conducted in four phases:
Phase 1. Establish design priorities
Phase 2. Feedback on Alternatives
Phase 3. Review public draft report
Phase 4. Council adopt final report
Engagement will be conducted using the methods and mechanisms described in detail in the
Community Outreach and Engagement Plan. Specific details on implementation will be determined as
part of Task 2.1 and are expected to include the following subtasks.
2.2.1 Project webpage. We will support the City-hosted project website, which will serve as a public-
friendly repository for the Study, including a Project Timeline and Opportunities for Public
Engagement, Public Notification and Informational Materials, and Project Documents.
We will work closely with the City to develop content based on the City’s web and design
templates and ensure that all materials are ADA-compliant and accessible.
- Our support may include the development of a webpage mockup, if needed, and simple
graphic designs to illustrate project information, including a timeline graphic, and funding
graphic and one or two other simple graphics.
- The webpage will also feature up to two online public surveys, which will be linked to the
City’s OpenGov platform, which provides automated methods for tallying and graphically
displaying survey results.
Vers.: Aug. 5, 2019
Page 7 of 24
2.2.2 Social media content.We will work with the City’s Communications Team to develop social
media content for the City’s social media platforms. We will provide web content in plain text
(non-html) for posting by the City’s web manager and up to three updates at key intervals of the
Study: Project Initiation; Draft Alternatives; Draft Study. To facilitate coordination with the
communications team, we will prepare an editorial calendar with content for up to three rounds
of social media via Facebook, Twitter, Instagram and Medium/Next Door. Concept renderings
and technical analysis from subsequent tasks will be incorporated and up to three additional jpeg
graphics will be prepared for social media.
2.2.3 Community Workshops. The Kittelson team will plan, coordinate and implement up to three
community workshops at key intervals of the study. Our services will include detailed annotated
meeting agendas that further define desired meeting outcomes and formats; logistical
coordination with vendors, including translation, interpretation and meeting materials; and
consensus-focused meeting facilitation, as needed. We will also provide written summaries (up to
five pages each) of each community meeting highlighting key topics and questions. Language
interpretation will be provided in Mandarin and Spanish as needed. Public notification materials
will include verbiage requiring 72-hour notice to accommodate language interpretation needs.
These workshops are anticipated to occur during Phase 1, Phase 2, and Phase 3.
2.2.4 Community Surveys. We will host up to two online public surveys. The online surveys will be
hosted on OpenGov, or a similar tool, which provides automated methods for tallying and
graphically displaying survey results and will be mobile-friendly. Each online survey will include
between 5-7 questions, or less, not including demographic questions and will be promoted via
emails created by the Kittelson team and distributed by the City in Task 2.2. We assume one
round of consolidated revisions per survey. These surveys are anticipated to be conducted during
Phase 1 and Phase 2.
2.2.5 Advisory Committee Meetings. Kittelson’s project manager will work with the City’s PM to co-
create materials for each of the four phases of engagement, including draft presentation and
staff report content.. Meeting materials will be developed once for each phase and reused, with
minor updates to tailor content to the specific audiences based oninformation that is most
relevant and requests for feedback that are concrete and actionable. Kittelson’s project manager
and BKF’s engineering lead will provide virtual support for up to 15 advisory committee meetings
over the course of the project. These meetings supported by consultant staff are expected to
include:
Phase 1. Planning and Transportation Commission, Rail Committee
Phase 2. Pedestrian and Bicycle Advisory Committee, Planning and Transportation
Commission, Rail Committee, City Council
Phase 3. Planning and Transportation Commission, Rail Committee (two meetings), City
Council (two meetings)
Phase 4. Rail Committee, City Council
Vers.: Aug. 5, 2019
Page 8 of 24
The cost for Kittelson team virtual support at two additional meetings is included in Task 2.2.5 as
an optional task.
2.2.6 Reaching Disadvantaged Groups. We will work closely with the City to identify disadvantaged
organizations and groups in the community and to identify the most effective communications
methods and forums to reach them “where they are.” These groups may include youth, senior
citizens, the unhoused or recently unhoused, non-English speaking communities, transit-
dependent and paratransit riders, as well as households with limited mobility, and essential
workers and day laborers. This task will be executed in sync with Task 2.1 Community Outreach
and Engagement Plan.
2.2.7 Local Business Engagement. We will coordinate with the City to conduct one-on-one and small
group outreach to business owners to further define their specific interests and needs related to
grade separation. We assume up to three meetings with key business owners via Palo Alto’s
Chamber of Commerce and the local business district. We assume that the City will distribute all
flyers and doorhangers to local businesses, and implement the tracking process outlined in the
Community Outreach and Engagement Plan to record who has received outreach materials.
2.2.8 Informational Materials & Pop-up Events. Specific informational materials and pop-up events
will be further defined in the Community Outreach and Engagement Plan. Materials include a
Study Fact sheet for each phase of engagement and Flyer which may be updated for the second
and third phases of outreach. The Kittelson team will also prepare informational boards and
handouts to support public workshops and tabling at events during each phase of outreach. Pop-
up events would be staffed by the City.
2.2.1 Documentation. Kittelson team will develop a summary of community engagement
activities completed for each phase and prepare a summary report for the first two phases
of engagement. The Kittelson team will update the draft summaries with one round of
consolidated comments and prepare final summary reports for Phase 1 and Phase 2. The
Kittelson team will then prepare a draft report section outline compiling findings from Phase
1 and Phase 2 with Phases 3 and 4. The Kittelson team will update the draft section of the
report with one round of consolidated comments, and finalize the draft report section after a
second set of consolidated comments.
Task 2 Deliverables
- Draft and final community outreach and engagement plan
- Webpage mockup and draft/final content for three updates
- Up to three social media or website graphics
- Social media content
Vers.: Aug. 5, 2019
Page 9 of 24
-Community workshops (2), including meeting annotated meeting agendas, meeting logistical
plans, dry runs of 60 minutes, vendor coordination, including room and equipment, meeting
facilitation, meeting summaries
- Online surveys (2), draft and final survey tool and survey findings memo
- Advisory Committee Meetings (15), including draft and final presentation and meeting
materials/staff reports, virtual participation at meeting, meeting notes, and follow-ups
- Draft and final target audience engagement plan, including coordination with community based
organizations and school groups
- Local business engagement, including development of a contact list and support with targeted
outreach through specific to business owners and supporting informational materials, such as
doorhangers or flyers for reaching local businesses
- Draft and final Phase 1 engagement summary report
- Draft and final Phase 2 engagement summary report
-Draft and final engagement summary section for inclusion in study report (Task 6)
Task 3. Data Collection and Analysis of Existing Conditions
Task 3.1. Review of Existing Plans, Policies, and Projects
Kittelson will review the documents identified to develop an understanding of the planning context and
prior efforts completed within the study area. We will supplement this review with the review conducted
for the BPTP Update, which included a review of 53 documents, including those identified by the Rail
Corridor Study Task Force and most of those identified in the RFP.
In addition to gathering relevant information from these documents, we will conduct up to eight one-on-
one or small group interviews with select staff, committee members, and community members to learn
their perspectives firsthand and get input in real time at the onset of the project. We will work with the
City to identify appropriate interview participants. These interviews will support a holistic quantitative
and qualitative analysis that reflects viewpoints and needs of those most knowledgeable about and most
affected by the project.
Task 3.2. Technical Data Collection and Analysis
Kittelson will compile and review qualitative and quantitative data inputs from prior tasks and combine
these with data Kittelson has gathered for BPTP Update, including multimodal intersection turning
movement and ADT speed and volume counts collected in June 2024 and existing and proposed bicycle
and pedestrian infrastructure.
Kittelson will conduct a large-scale desktop review of existing conditions within the study area,
considering things like bicycle facility width, pavement condition, sidewalk presence, ADA treatments,
driveway presence, curb radii, and other elements which may affect the experience of people walking
and biking throughout the area. As we collect and review satellite imagery data, we will identify items to
field verify on a site visit. As part of this task, we will conduct a field visit with up to three staff from the
consultant team. Kittelson will coordinate with City staff to select a day and time period that would be
most informative for the analysis and understanding of existing conditions (e.g., morning school
commute period). According to the initial project schedule, the field visit would be conducted in October
Vers.: Aug. 5, 2019
Page 10 of 24
when school is in session and the weather and daylight conditions continue to be conducive to walking
and biking.
Kittelson will use these inputs to complete the analysis of baseline conditions, which may include
information related to demographics of residents within the study area, commuting and travel to school
characteristics, vehicle, bicycle, and pedestrian counts, access to transit stations, walk and roll routes to
school, comfort, safety, and network connectivity, characteristics of existing railroad crossings and future
potential alignments.
Considering the analysis approach and methodology for the evaluation criteria identified in Task 4 to
analyze and compare alternatives, the Kittelson team will identify gaps in current data that may hinder
comprehensive understanding of the study area or prevent the ability to design or analyze the
alternatives using the proposed evaluation criteria. After identifying data gaps and needs, Kittelson will
work with the city to formulate a plan to overcome these challenges, e.g., collect additional counts,
conduct field observations, purchase data, hold additional interviews, select an alternative performance
measure.
Task 3.3. Existing Conditions Report
Kittelson will prepare a draft, revised draft, and final technical report summarizing input from the
community needs assessment (Task 2), findings from the literature review (Task 3.1), and the technical
data and analysis (Task 3.2). In an effort to keep the document succinct and to the point, the topics
covered in the memorandum will be chosen for their relevance and usefulness in supporting selection of
preferred alternatives. Kittelson will prepare a report outline and collaborate with the City on the topics
and level of detail to be conducted for the analyses. The memorandum will be visual, relying on maps
and graphics more than narrative to convey concepts and information. Supporting materials (e.g.,
historic traffic volumes, collision records) will be provided in a technical appendix. We will respond to one
consolidated set of comments on the draft technical report and prepare a revised draft technical report
for City review. We will respond to one consolidated set of comments on the revised draft technical
report and prepare a final report for publication. This document will serve as the baseline against which
the alternatives are evaluated and compared in Task 5, using the evaluation framework and criteria
developed in Task 4.
Task 3 Deliverables:
- Draft Existing Conditions Report Outline
- Final Existing Conditions Report and Appendix
- Interview Guide and Notes from up to eight interviews with staff, committee members, and
community members
Vers.: Aug. 5, 2019
Page 11 of 24
Task 4. Goals and Evaluation Criteria
Task 4.1. Goals and Priorities
Using inputs from prior tasks (e.g., literature review, interviews) and information shared by City staff and
heard from community members, Kittelson will draft goals and identify an initial list of project priorities
to inform the development of the alignment and subsequent concept design options, which may include:
Sustainability: Expand transportation options and access to critical destinations and limit
impacts on the environment
Connectivity: Strengthen active transportation linkages in Southern Palo Alto
Safety and Health: Enhance safety and comfort of people walking and biking to school
Constructability: Minimize potential for disruption during construction
Funding and Implementation: Leverage partnerships between the City, Caltrain, and other
project partners to position the project for implementation
These goals and priorities will be co-created with community members in the first round of outreach.
The resulting goals and objectives will directly inform the criteria against which the alternatives will be
evaluated.
Task 4.2. Evaluation Framework and Criteria
Kittelson proposes a two-stage evaluation to streamline the evaluation process and first filter concepts
(preliminary evaluation criteria) that don’t meet established criteria and then evaluate and compare
concepts (secondary evaluation criteria) that show more promise. As part of this task, Kittelson will work
with the City and relevant stakeholders to determine the appropriate evaluation criteria to include at
each stage of the analysis based on available data, keeping in mind the level of information needed to
support decision making. The evaluation criteria would be determined based on the goals established in
Task 4.1 and would include quantitative and qualitative metrics that could be scored individually and
compared in a scoring matrix. Potential criteria will consider challenges and opportunities, which may
include those listed in the RFP:
Walking and biking connectivity to destinations
Safety for people walking, biking, driving, and taking transit
Distance to key destinations and existing/planned bicycle and pedestrian facilities
Travel patterns and potential for traffic diversion
Right-of-way acquisitions and easements
Environmental impacts, including aesthetic and visual impacts
Community benefits and opportunity sites
Construction phasing and impacts during construction
Construction and maintenance costs
Task 4.3. Goals and Evaluation Criteria Memorandum
Kittelson will prepare a draft and final technical memorandum presenting the project goals and priorities
(Task 4.1), and the evaluation framework and criteria (Task 4.2). The document will provide clear and
transparent description of the performance measures and documentation and use plain language and
Vers.: Aug. 5, 2019
Page 12 of 24
graphics as well as straightforward narrative illustrating how the evaluation criteria will be analyzed and
scored.
We will respond to one consolidated set of comments from the City on the draft technical memorandum
and prepare a final memorandum. We will respond to one additional consolidated set of comments from
advisory committee members and prepare an Updated Design Priorities and Evaluation Criteria
Memorandum that will be the basis for the alternatives analysis conducted in Task 5.
Task 4 Deliverables:
- Project goals and priorities
- Evaluation Framework and Criteria
- Draft Design Priorities and Evaluation Criteria Memorandum
- Final Design Priorities and Evaluation Criteria Memorandum
- Updated Design Priorities and Evaluation Criteria Memorandum
Task 5. Alternatives Development and Selection of Preferred Alternatives
Task 5.1. Identify Crossing Locations and Develop Design Concepts
Working with City staff and community members, the Kittelson team will develop alignment alternatives
with the primary aim of improving pedestrian/bicycle connectivity over the railroad in Palo Alto south of
Oregon Expressway. Guided by the project’s goals and priorities, the team will apply a two-stage
evaluation process to determine up to two preferred alignments and their concept design features. The
process consists of:
- Identify the full range of alignments and potential design options
o The team will consider alignments considered as part of prior plans and supplement this
list with additional alignments based on baseline conditions analysis, public input, and
feedback from City staff
- Evaluate the alignment alternatives with a set of preliminary evaluation criteria
o This qualitative “scorecard” exercise will narrow the initial universe of options to a
handful of promising alternatives. This initial step enables subsequent concept design
work to focus on the most viable alignments.
- Develop concept design options for a subset of up to eight promising alignment alternatives
o Concepts will be developed at a sketch level with sufficient detail to establish
preliminary cross-sections, landing/touchdown points, on-street treatments and
intersection modifications, and key design elements of the alignment (e.g., underpass,
overcrossing, structural elements)
o Up to eight graphics (e.g., cross sections, plan views, renderings) will be prepared to
illustrate the alignment options
The selected alignment alternatives will be evaluated with a set of secondary evaluation criteria as part
of Task 5.2.
Kittelson will prepare a Draft Initial Screening Memorandum documenting the work completed in this
task. We will respond to one consolidated set of comments on the draft technical memorandum and
prepare a revised draft memorandum. We will respond to one consolidated set of comments on the
Vers.: Aug. 5, 2019
Page 13 of 24
revised draft memorandum and prepare a final memorandum.
Task 5.2. Alternatives Analysis
The Kittelson team will analyze up to eight alignment alternatives against the set of secondary evaluation
criteria established in Task 4, which are based on the project goals and priorities developed under Task 3.
The criteria will be a mix of quantitative and qualitative measurements or assessments depending on the
criterion under focus and availability of information to support the evaluation. Evaluation of each
alternative will be in relation to other alternatives, rather than against an absolute scale. All criteria will
be weighted equally for the purposes of the evaluation. Kittelson will prepare a draft, revised draft, and
final analysis summary matrix for use in public engagement and the Alternatives Analysis Report.
Information will be presented in a summary matrix with supporting narrative. Materials prepared for
this task will be public-facing for use in community engagement. Kittelson will prepare a draft, revised
draft, and final analysis summary matrix for use in public engagement and the Alternatives Analysis
Report.
The Kittelson team will prepare graphics to visualize the alternatives in plan view with annotated call
outs to describe key features. Illustrative sections and example renderings may also be provided to
illustrate specific features. We will prepare graphics for eight alternatives. We will respond to one
consolidated set of comments on the draft and prepare a revised draft. We will respond to one
consolidated set of comments on the revised draft and prepare a final set of graphics for public
engagement and use in the Alternatives Analysis Report.
Kittelson will prepare a Draft Alternatives Analysis Outline for City review. Kittelson will respond to one
consolidated set of comments on the draft outline and prepare a Draft Alternatives Analysis Report
documenting the work completed in this task. We will respond to one consolidated set of comments on
the draft report and prepare a revised draft report. We will respond to one consolidated set of
comments on the revised draft report and prepare a final report.
Up to two alternatives will be carried forward from this task for refinement as part of Task 5.3.
Task 5.3. Preferred Alternatives
This task includes:
Refinement of one alternative (Alternative A1) based on feedback from community engagement
efforts conducted in Phase 1 and Phase 2
Development of a new alternative (Alternative A2) at a conceptual level, similar to that prepared
for the eight alternatives analyzed in Task 5.2
Preparation of a traffic study to evaluate neighborhood circulation impacts and support
development of accompanying transportation network enhancements
Preparation of concept level exhibits (plan view and cross-section) to illustrate accompanying
bicycle and pedestrian network enhancements
Revisions to the two concept alternatives 15 percent design plan and profile drawings to
Vers.: Aug. 5, 2019
Page 14 of 24
incorporate Phase 3 feedback
Revisions to the recommended network enhancements conceptual plan view graphics to
incorporate Phase 3 feedback
The Kittelson team will prepare draft and final graphics illustrating the refinements to Alternative A1 and
new Alternative A2 and recommended network enhancements. These four graphics will be prepared at a
conceptual level, similar to that prepared for the eight alternatives analyzed in Task 5.2 and will be used
during engagement activities during Phase 3. The Kittelson team will use feedback gathered during
Phase 3 to inform refinements to Alternatives A1 and A2 and network enhancements. Incorporating this
feedback, the team will prepare a draft, revised draft, and final plan view and profile at the 15 percent
concept design level. The team will also prepare a final concept-level exhibit (plan view and cross-
section) illustrating the recommended network enhancements accompanying the crossing for each
alternative. Improvements along side streets and parallel routes will be considered to account for
potential traffic diversion.
The Kittelson team will evaluate the two preferred concept alternatives against a subset of the
evaluation criteria established in Task 4: cost, personal security, property impacts, and neighborhood
traffic impacts. The Kittelson team will prepare rough order of magnitude cost estimates and an
accompanying traffic study to evaluate the alternatives. The results will be presented alongside a
narrative documenting the inputs and assumptions and methodology used in the analyses and an
assessment of the potential benefits, challenges, and recommendations to minimize traffic impacts,
minimize property impacts, maximize safety and personal security, and improve conditions for all users.
The analysis and findings will be documented in the report prepared as part of Task 6.
Kittelson will coordinate with the City to define the traffic study area and count locations, focusing on
streets, intersections, and parallel routes near the crossing with potential circulation impacts. The
Kittelson team will develop a simplified, off-model analysis methodology appropriate for a planning-level
assessment of vehicular, bicyclist, and pedestrian diversion under future year conditions. The Kittelson
team will use the off-model tool to calculate and summarize redistribution of trips and assess
neighborhood and circulation impacts to support identification of accompanying transportation network
enhancements. Work completed in this task will be completed keeping in mind the project
implementation process and requirements outlined in the Caltrain Corridor Crossings Delivery Guide, as
well as future funding sources, such as competitiveness for grant applications. The narrative and exhibits
prepared will speak to evaluation criteria from relevant grant programs and be readily transferrable to
grant applications, including ATP, ATIIP, RCN, and HSIP. The preferred alternative and selection process
will be documented in the report prepared as part of Task 6.
Task 5.4. Implementation Plan
The Kittelson team will prepare an implementation plan consistent with the project implementation
process and requirements outlined in the Caltrain Corridor Crossings Delivery Guide, including the next
steps needed to complete the Preliminary (15%) Design Submittal Checklist. The document will provide
clear and transparent description of the project timeline, including estimated costs and funding
opportunities for each phase of project delivery. The plan will also identify key considerations for
implementation, along with recommendations for environmental documentation and preparation of the
Vers.: Aug. 5, 2019
Page 15 of 24
required analyses to support CEQA/NEPA clearance. The implementation plan will be documented in the
report prepared as part of Task 6.
Task 5 Deliverables:
- Draft, Revised Draft, and Final Initial Screening Memorandum
- Eight concept alternatives (description and graphics - plan view, section, and/or renderings)
- Draft, Revised Draft, and Final Alternatives Analysis Methodology Memo
- Draft, Revised Draft, Final Alternatives Analysis Matrix
- Draft Alternatives Analysis Report Outline
- Draft, Revised Draft, and Final Alternatives Analysis Report
- Draft, Revised Draft, and Final 5% and 15% Design Exhibits (Plan View, Profile) for two
Alternatives
- Draft, Revised Draft, and Final Concept Exhibits (Plan View, Cross Section) for Accompanying
Network Enhancements
Task 6. Southern Palo Alto Bicycle and Pedestrian Railroad Crossing Study
Report
Task 6.1. Administrative Draft Study Report
Kittelson will prepare an outline of the draft study report for City and Caltrain review. The report will
document selection of the preferred alternative and next steps toward implementation based on work
completed in Task 5.3 and Task 5.4. Kittelson will incorporate one set of consolidated comments on the
outline and prepare an administrative draft study report. The document will be formatted as an ADA
accessible and interactive pdf for posting on the project website.
Task 6.2. Public Draft Study Report
Kittelson will address one set of consolidated comments from the City on the administrative draft study
report and prepare a public draft study report for posting on the project website.
Task 6.3. Final Study Report
Kittelson will compile and summarize public comments received on the public draft study report.
Kittelson will address and incorporate comments received into the final study report and prepare a
comment response matrix to share back with the public indicating how the comments were
incorporated and addressed.
Task 6 Deliverables:
- Draft Report Outline
- Administrative Draft Study Report
- Public Draft Study Report
- Response to public comments
- Final Study Report
Vers.: Aug. 5, 2019
Page 16 of 24
Task 7. Grant Application Support
Kittelson will work with the city to advance implementation of the preferred alternative(s) by identifying
relevant grants and funding opportunities and supporting the development of grant applications and
other requests for funding. Kittelson will leverage extensive experience preparing successful grant
applications to set the city up for success with implementation. As part of this task, Kittelson will prepare
and maintain a grant tracker that identifies relevant grant and funding opportunities, and highlights key
elements of the application process, including, for example: schedule, project eligibility requirements,
application criteria, and funding amounts. Kittelson will also support the City preparing materials for
grant applications, including maps, graphics, and narrative.
Task 7 Deliverables:
- Preparing and maintaining grant tracker
- Support preparing grant applications
Vers.: Aug. 5, 2019
Page 17 of 24
EXHIBIT A-1
PROFESSIONAL SERVICES TASK ORDER, AMENDMENT NO. 1
(ADDED)
CONSULTANT shall perform the Services detailed below in accordance with all the terms and conditions of the
Agreement referenced in Item 1A below. All exhibits referenced in Item 8 are incorporated into this Task Order by
this reference. CONSULTANT shall furnish the necessary facilities, professional, technical and supporting personnel
required by this Task Order as described below.
CONTRACT NO.
OR PURCHASE ORDER REQUISITION NO. (AS APPLICABLE)
1A. MASTER AGREEMENT NO. (MAY BE SAME AS CONTRACT / P.O. NO. ABOVE):
1B. TASK ORDER NO.:
2. CONSULTANT NAME:
3. PERIOD OF PERFORMANCE: START: COMPLETION:
4 TOTAL TASK ORDER PRICE: $__________________
BALANCE REMAINING IN MASTER AGREEMENT/CONTRACT $_______________
5. BUDGET CODE_______________
COST CENTER________________
COST ELEMENT______________
WBS/CIP__________
PHASE__________
6. CITY PROJECT MANAGER’S NAME & DEPARTMENT:_____________________________________
7. DESCRIPTION OF SCOPE OF SERVICES (Attachment A)
MUST INCLUDE:
SERVICES AND DELIVERABLES TO BE PROVIDED
SCHEDULE OF PERFORMANCE
MAXIMUM COMPENSATION AMOUNT AND RATE SCHEDULE (as applicable)
REIMBURSABLE EXPENSES, if any (with “not to exceed” amount)
8. ATTACHMENTS: A: Task Order Scope of Services B (if any): _____________________________
I hereby authorize the performance of the
work described in this Task Order.
APPROVED:
CITY OF PALO ALTO
BY:____________________________________
Name __________________________________
Title___________________________________
Date ___________________________________
I hereby acknowledge receipt and acceptance of
this Task Order and warrant that I have authority
to sign on behalf of Consultant.
APPROVED:
COMPANY NAME: ______________________
BY:____________________________________
Name __________________________________
Title___________________________________
Date ___________________________________
Vers.: Aug. 5, 2019
Page 18 of 24
EXHIBIT B
SCHEDULE OF PERFORMANCE. AMENDMENT NO. 1
(AMENDED, REPLACES PREVIOUS)
CONSULTANT shall perform the Services so as to complete each milestone within the number of
days/weeks specified below. The time to complete each milestone may be increased or
decreased by mutual written agreement of the Project Managers for CONSULTANT and CITY so
long as all work is completed within the term of the Agreement. CONSULTANT shall provide a
detailed schedule of work consistent with the schedule below within 2 weeks of receipt of the
notice to proceed (“NTP”) from the CITY.
Milestones
Completion
Number of Days/Weeks (as specified below)
from NTP
1. Task 1. Project Management and
Coordination
Projected 775 working days, or to be
determined by CONSULTANT and CITY’S
Project Manager within terms of Agreement.
2. Task 2. Community Outreach and
Engagement
Projected 775 working days, or to be
determined by CONSULTANT and CITY’S
Project Manager within terms of Agreement.
3. Task 3. Data Collection and Analysis of
Existing Conditions
Projected 140 working days or to be
determined by CONSULTANT and CITY’S
Project Manager within terms of Agreement.
4. Task 4. Goals and Evaluation Criteria Projected 85 working days or to be determined
by CONSULTANT and CITY’S Project
Manager within terms of Agreement.
5. Task 5. Alternatives Development and
Selection of Preferred Alternatives
Projected 390 working days or to be
determined by CONSULTANT and CITY’S
Project Manager within terms of Agreement.
6. Task 6. Southern Palo Alto Bicycle and
Pedestrian Railroad Crossing Study Report
Projected 330 working days or to be
determined by CONSULTANT and CITY’S
Project Manager within terms of Agreement.
7. Task 7. Grant Application Support Projected 400 working days or to be
determined by CONSULTANT and CITY’S
Project Manager within terms of Agreement.
Optional Schedule of Performance Provision for On-Call or Additional Services Agreements.
(This provision only applies if checked and only applies to on-call agreements per Section 1 or
agreements with Additional Services per Section 4.)
The schedule of performance shall be as provided in the approved Task Order, as detailed in
Vers.: Aug. 5, 2019
Page 19 of 24
Section 1 (Scope of Services) in the case of on-call Services, or as detailed in Section 4 in the case
of Additional Services, provided in all cases that the schedule of performance shall fall within the
term as provided in Section 2 (Term) of this Agreement.
Vers.: Aug. 5, 2019
Page 20 of 24
EXHIBIT C
COMPENSATION, AMENDMENT NO. 1
(AMENDED, REPLACES PREVIOUS)
CITY agrees to compensate CONSULTANT for Services performed in accordance with the terms
and conditions of this Agreement, and as set forth in the budget schedule below. Compensation
shall be calculated based on the rate schedule attached as Exhibit C-1 up to the not to exceed
budget amount for each task set forth below.
CITY’s Project Manager may approve in writing the transfer of budget amounts between any of
the tasks or categories listed below, provided that the total compensation for the Services,
including any specified reimbursable expenses, and the total compensation for Additional
Services (if any, per Section 4 of the Agreement) do not exceed the amounts set forth in Section
4 of this Agreement.
CONSULTANT agrees to complete all Services, any specified reimbursable expenses, and
Additional Services (if any, per Section 4), within this/these amount(s). Any work performed or
expenses incurred for which payment would result in a total exceeding the maximum amount of
compensation set forth in this Agreement shall be at no cost to the CITY.
BUDGET SCHEDULE
TASK NOT TO EXCEED AMOUNT
Task 1
(Project Management & Coordination)
$37,950.88
Task 2
(Community Outreach)
$130,172.99
Task 3
(Existing Conditions)
$69,782.50
Task 4
(Goals and Priorities)
$37,072.00
Task 5
(Alternatives Development and Analysis )
$163,860.75
Task 6
(Study Report)
$22,000
Task 7
(Grant Application Support)
$11,600
Vers.: Aug. 5, 2019
Page 21 of 24
Sub-total for Services $472,439.12
Reimbursable Expenses (if any)$14,654.88
Total for Services and Reimbursable Expenses $487,094.00
Additional Services (if any, per Section 4) $12,396.20
Maximum Total Compensation $499,490.20
REIMBURSABLE EXPENSES
CONSULTANT’S ordinary business expenses, such as administrative, overhead, administrative
support time/overtime, information systems, software and hardware, photocopying,
telecommunications (telephone, internet), in-house printing, insurance and other ordinary
business expenses, are included within the scope of payment for Services and are not
reimbursable expenses hereunder.
Reimbursable expenses, if any are specified as reimbursable under this section, will be
reimbursed at actual cost. The expenses (by type, e.g. travel) for which CONSULTANT will be
reimbursed are: up to the not-to-exceed amount of:$14,654.88.
A. Travel outside the San Francisco Bay Area, including transportation and meals, if specified
as reimbursable, will be reimbursed at actual cost subject to the City of Palo Alto’s policy for
reimbursement of travel and meal expenses.
B. Long-distance telephone service charges, cellular phone service charges, facsimile
transmission and postage charges, if specified as reimbursable, will be reimbursed at actual
cost.
All requests for reimbursement of expenses, if any are specified as reimbursable under this
section, shall be accompanied by appropriate backup documentation and information.
Vers.: Aug. 5, 2019
Page 22 of 24
EXHIBIT C-1
SCHEDULE OF RATES, AMENDMENT NO. 1
(AMENDED, REPLACES PREVIOUS)
CONSULTANT’s schedule of rates is as follows, subject to the terms and conditions of
Exhibit C regarding Reimbursable Expenses:
Vers.: Aug. 5, 2019
Page 23 of 24
KITTELSON & ASSOCIATES, INC.
BILLING RATE SCHEDULE
Effective July 1, 2026
The current billing rates for Kittelson & Associates, Inc., staff are as follows and are subject to change:
Staff Billing Rate
Senior Principal Engineer/Planner $348
Principal Engineer/Planner $313
Associate Engineer/Planner $265
Senior Engineer/Planner $238
Engineer/Planner $203
Transportation Analyst $183
Principal Data Scientist/Developer $283
Senior Data Scientist/Developer $263
Data Scientist/Developer $243
Data Analyst/Software Developer $188
Software Technician $133
Associate Technician $213
Senior Technician $193
Technician II $168
Technician I $143
Office Support $123
Service & Other Direct Costs Billing Rate
Mileage Current IRS mileage rate
Travel & Other Direct Costs Actual Costs
Subconsultants Actual Costs
Vers.: Aug. 5, 2019
Page 24 of 24