Loading...
HomeMy WebLinkAboutStaff Report 2601-5844CITY OF PALO ALTO CITY COUNCIL Special Meeting Monday, August 10, 2026 Council Chambers & Hybrid 5:30 PM     Agenda Item     11.Approval of Contract No. C27196740 with Blackhawk Painting Inc. in the Amount of $735,500 Over a Period of 18 Months for Electric Substations Equipment and Mechanical Structures Painting Services; Authorization for the City Manager or Their Designee to Execute Change Orders in an Amount Not-to-Exceed of $73,550, for a Total Not-to-Exceed Contract Amount of $809,050; and Approval of a Budget Amendment in the Electric Fund; CEQA Status: Categorically Exempt Under CEQA Guidelines Section 15301. City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Utilities Meeting Date: August 10, 2026 Report #:2601-5844 TITLE Approval of Contract No. C27196740 with Blackhawk Painting Inc. in the Amount of $735,500 Over a Period of 18 Months for Electric Substations Equipment and Mechanical Structures Painting Services; Authorization for the City Manager or Their Designee to Execute Change Orders in an Amount Not-to-Exceed of $73,550, for a Total Not-to-Exceed Contract Amount of $809,050; and Approval of a Budget Amendment in the Electric Fund; CEQA Status: Categorically Exempt Under CEQA Guidelines Section 15301. RECOMMENDATION Staff recommend that Council: 1. Approve and authorize the City Manager or their designee to execute contract No. C27196740 with Blackhawk Painting Inc.1 (Blackhawk) for surface preparation and painting of substation electric equipment and mechanical structures in an amount not to exceed $735,500; 2. Authorize the City Manager or their designee to negotiate and execute one or more change orders to the contract with Blackhawk for related but unforeseen work which may develop during the contract term, the total value of which shall not exceed $73,550 or 10% of the contract amount, for a total contract not-to-exceed amount of $809,050; and 3. Amend the Fiscal Year 2027 Budget Appropriation for the Electric Operating and Capital budgets (requires a two-thirds approval by the Council) by: a. Increasing the contract services operating budget in the Electric Fund by $809,050; and b. Decreasing capital improvement budget EL-89044 (Substation Facility Improvements) in the Electric Fund by $809,050. 1 Contract No. C27196740 with Blackhawk Painting Inc. https://www.paloalto.gov/files/assets/public/v/1/agendas- minutes-reports/agendas-minutes/city-council-agendas-minutes/2026/august/c27196740-electric-substation- painting-contract.pdf BACKGROUND Structural Integrity Loss: weakening of mechanical supports and lattice towers due to corrosion. Increased Outage Risk: Advanced rust can compromise the seals and dielectric integrity of energized equipment. Reduced Equipment Life: rust and corrosion can lead to early replacement of major equipment, causing increased operating costs and higher utility rates. ANALYSIS Pressure washing and mechanical cleaning of surfaces. Containment of debris in accordance with BAAQMD (Bay Area Air Quality Management District) requirements. Painting of Transformers, Switchgear Enclosures, and Lattice Structures. Work at various sites including the Colorado Power Station (COP) and several neighborhood distribution substations Bid Details Electric Substation Equipment & Mechanical Structures Painting Work (IFB-196740) Proposed Length of Project 18 Months Number of Bid Packages downloaded by Contractors 39 Total Days to Respond to Bid 27 Pre-Bid Meeting Yes Number of Company Attendees at Pre-Bid Meeting 5 Number of Bids Received:8 Public Link to Solicitation https://procurement.opengov.com/portal/palo- alto-ca/projects/253002 Bid Price Range $735,500 - $1,379,415 Staff have reviewed the bid provided by Blackhawk and found it be responsive to the bid requirements and as providing the lowest cost to the City. Staff are recommending Council approve awarding a contract to Blackhawk for the amount of $735,500 and authorize the City Manager to approve change orders up to 10% of the originally submitted bid amount. FISCAL/RESOURCE IMPACT Funding for the maintenance work is available in the FY 2027 Electric Fund budget. Staff recommends transferring $809,050 from Electric Fund CIP EL-89044, Substation Facility Improvements to the Electric Fund Operations budget and increasing the Electric Operations Contract Services budget by $809,050. This will reduce available funding for EL-89044 from $1,591,000 to $781,950. EL-89044 originally had anticipated funding the repainting of this equipment. However, the minor nature of work is more appropriately funded as a maintenance project rather than a capital improvement project. ENVIRONMENTAL REVIEW This project is Categorically Exempt from the California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15301(b) (Existing Facilities), as it involves the maintenance of existing utility facilities involving negligible or no expansion of use. POLICY IMPLICATIONS This recommendation is consistent with the City’s Utilities Strategic Plan to invest in infrastructure maintenance to ensure high levels of system reliability and safety. Link: Contract No. C27196740 with Blackhawk Painting APPROVED BY: Alan Kurotori, Director of Utilities Staff: Terry Crowley, Utilities Chief Operating Officer