Loading...
HomeMy WebLinkAboutStaff Report 2605-6359CITY OF PALO ALTO CITY COUNCIL Special Meeting Monday, August 10, 2026 Council Chambers & Hybrid 5:30 PM     Agenda Item     10.Approval of Contract C27197195 with High Point Power Systems in the Amount of $286,660 for the Repair and Refurbishment of a Load Tap Changer Located at Adobe Creek Substation; and Authorization for the City Manager or Their Designee to Execute Change Orders in an Amount Not-to-Exceed $28,666, for a Total Contract Not-to-Exceed Amount of $315,326. CEQA Status –Categorically Exempt Under CEQA Guidelines Sections 15301 and 51302. City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Utilities Meeting Date: August 10, 2026 Report #:2605-6359 TITLE Approval of Contract C27197195 with High Point Power Systems in the Amount of $286,660 for the Repair and Refurbishment of a Load Tap Changer Located at Adobe Creek Substation; and Authorization for the City Manager or Their Designee to Execute Change Orders in an Amount Not-to-Exceed $28,666, for a Total Contract Not-to-Exceed Amount of $315,326. CEQA Status – Categorically Exempt Under CEQA Guidelines Sections 15301 and 51302. RECOMMENDATION Staff recommends that the City Council: 1. Approve and authorize the City Manager or their designee to execute contract C271971951 with High Point Power Systems in the amount of $286,660 for the repair and refurbishment of a load tap changer at Adobe Creek Substation; and 2.Authorize the City Manager or their designee to negotiate and execute change orders for related, additional, and unforeseen work which may develop during the contract term, the total value of which shall not exceed $28,666 or 10% of total contract; for a total not-to-exceed contract amount of $315,326. BACKGROUND Adobe Creek Substation is vital to the City of Palo Alto Utilities’ (CPAU) electric distribution network. The subject transformer is currently off-line and unable to serve customers. This creates a reliability risk for customers served by the substation and those served by adjacent substations (Colorado & Maybell). ANALYSIS A 15MVA transformer has a long-lead item of 36-48 months for a new replacement. By performing these targeted repairs, CPAU defers a multi-million-dollar capital outlay of a new 1 Contract C27197195 with High Point Power Systems https://www.paloalto.gov/files/assets/public/v/2/agendas- minutes-reports/agendas-minutes/city-council-agendas-minutes/2026/august/c27197195-adobe-creek- transformer-final.pdf unit while addressing the failure modes. The repair specifically addresses “moisture ingress”, which shortens the life of the paper insulation contained inside the transformers. By re- gasketing the bushings and seals, we maintain the dielectric strength of the insulating oil, preserve the life of paper insulation and lower the risk of internal flashovers that could lead to extended power outages. Project Scope of Work Bid Details Adobe Creek Transformer-21; 15 MVA OLTC Refurbishment & Radiator Flange Repair/Re-gasket (IFB-197195) Proposed Length of Project 120 Days Number of Bid Packages downloaded by Contractors 27 Total Days to Respond to Bid 15 Pre-Bid Meeting No Number of Company Attendees at Pre-Bid Meeting N/A Number of Bids Received:4 Public Link to Solicitation https://procurement.opengov.com/portal/palo-alto- ca/projects/248855 Bid Price Range $234,165 to $456,116 FISCAL/RESOURCE IMPACT POLICY IMPLICATIONS infrastructure replacement program, based on planned replacement before failure to support reliability and resiliency.” STAKEHOLDER ENGAGEMENT ENVIRONMENTAL REVIEW CONTRACT LINK: Contract C27197195 with High Point Power Systems APPROVED BY: