Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2026-08-06 Architectural Review Board Agenda Packet
ARCHITECTURAL REVIEW BOARD Regular Meeting Thursday, August 06, 2026 Council Chambers & Hybrid 8:30 AM Architectural Review Board meetings will be held as “hybrid” meetings with the option to attend by teleconference/video conference or in person. To maximize public safety while still maintaining transparency and public access, members of the public can choose to participate from home or attend in person. Information on how the public may observe and participate in the meeting is located at the end of the agenda. Masks are strongly encouraged if attending in person. The meeting will be broadcast on Cable TV Channel 76, live on YouTube https://www.youtube.com/c/cityofpaloalto, and streamed to Midpen Media Center https://midpenmedia.org. Visit https://bit.ly/PApendingprojects to view project plans and details. Board member names, biographies, and archived agendas and reports are available at https://bit.ly/paloaltoARB. VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/96561891491) Meeting ID: 965 6189 1491 Phone: 1(669)900-6833 PUBLIC COMMENTS General Public Comment for items not on the agenda will be accepted for up to three minutes or an amount of time determined by the Chair. In-person comments will be heard at the beginning of the agenda and remote comments will be heard at the end of the agenda. All requests to speak will be taken until 5 minutes after the staff’s presentation. Written public comments can be submitted in advance to arb@PaloAlto.gov and will be provided to the Board and available for inspection on the City’s website three days before the meeting. Please clearly indicate which agenda item you are referencing in your subject line. Spokespersons that are representing a group of five or more people who are identified as present at the meeting at the time of the spokesperson's presentation will be allowed up to fifteen (15) minutes at the discretion of the Chair, provided that the non-speaking members agree not to speak individually. The Chair may limit Public Comments to thirty (30) minutes for all combined speakers. The Chair may reduce the allowed time to speak for Study Sessions and Action Items to two (2) minutes or less to accommodate a larger number of speakers. PowerPoints, videos, or other media to be presented during public comment are accepted only by email to arb@PaloAlto.gov at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB’s or other physical electronic storage devices are not accepted. Signs and symbolic materials less than 2 feet by 3 feet are permitted provided that: (1) sticks, posts, poles or similar/other type of handle objects are strictly prohibited; (2) the items do not create a facility, fire, or safety hazard; and (3) persons with such items remain seated when displaying them and must not raise the items above shoulder level, obstruct the view or passage of other attendees, or otherwise disturb the business of the meeting. CALL TO ORDER/ ROLL CALL AGENDA CHANGES, ADDITIONS AND DELETIONS The Chair or Board majority may modify the agenda order to improve meeting management. IN-PERSON PUBLIC COMMENT Members of the public may speak to any item NOT on the agenda. 1-3 minutes depending on number of speakers. In-person comments will be heard at the beginning of the agenda and remote comments will be heard at the end of the agenda. CITY OFFICIAL REPORTS 1.Director's Report, Meeting Schedule, and Upcoming Agenda Items ACTION ITEMS Public Comment is Permitted. Applicants/Appellant Teams: Ten (10) minutes, plus ten (10) minutes rebuttal. All others: Three (3) minutes per speaker. 2.Recommendation on Process and Design Standards for Tier 2 and Tier 3 Wireless Communication Facilities in the Public Right-of-Way. CEQA Status: Not a Project BOARD MEMBER QUESTIONS, COMMENTS, ANNOUNCEMENTS OR FUTURE MEETINGS AND AGENDAS Members of the public may not speak to the item(s). VIRTUAL PUBLIC COMMENT Members of the public may speak to any item NOT on the agenda. 1-3 minutes depending on number of speakers. In-person comments will be heard at the beginning of the agenda and remote comments will be heard at the end of the agenda. ADJOURNMENT INFORMATIONAL REPORT The materials below are provided for informational purposes, not for action or discussion during this meeting’s agenda. Written public comments may be submitted in advance and will be provided to the Commission and available for public inspection on the City’s website three days before the meeting. A.Public Comments PUBLIC COMMENT INSTRUCTIONS Members of the Public may provide public comments to teleconference meetings via email, teleconference, or by phone. 1.Written public comments may be submitted by email to arb@PaloAlto.gov. 2.Spoken public comments using a computer will be accepted through the teleconference meeting. To address the Board, click on the link below to access a Zoom-based meeting. Please read the following instructions carefully. ◦You may download the Zoom client or connect to the meeting in- browser. If using your browser, make sure you are using a current, up-to-date browser: Chrome 30, Firefox 27, Microsoft Edge 12, Safari 7. Certain functionality may be disabled in older browsers including Internet Explorer. ◦You may be asked to enter an email address and name. We request that you identify yourself by name as this will be visible online and will be used to notify you that it is your turn to speak. ◦When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will activate and unmute speakers in turn. Speakers will be notified shortly before they are called to speak. ◦When called, please limit your remarks to the time limit allotted. A timer will be shown on the computer to help keep track of your comments. 3.Spoken public comments using a smart phone will be accepted through the teleconference meeting. To address the Board, download the Zoom application onto your phone from the Apple App Store or Google Play Store and enter the Meeting ID below. Please follow the instructions above. 4.Spoken public comments using a phone use the telephone number listed below. When you wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will be asked to provide your first and last name before addressing the Board. You will be advised how long you have to speak. When called please limit your remarks to the agenda item and time limit allotted. CLICK HERE TO JOIN Meeting ID: 965 6189 1491 Phone: 1-669-900-6833 Americans with Disability Act (ADA) It is the policy of the City of Palo Alto to offer its public programs, services and meetings in a manner that is readily accessible to all. Persons with disabilities who require materials in an appropriate alternative format or who require auxiliary aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at (650) 329-2550 (voice) or by emailing ada@PaloAlto.gov. Requests for assistance or accommodations must be submitted at least 24 hours in advance of the meeting, program, or service. Item No. 1. Page 1 of 2 Architectural Review Board Staff Report From: Planning and Development Services Director Lead Department: Planning and Development Services Meeting Date: August 6, 2026 Report #: 2607-6577 TITLE Director's Report, Meeting Schedule, and Upcoming Agenda Items RECOMMENDATION Staff recommends the Architectural Review Board (ARB) review and comment as appropriate. BACKGROUND This document includes the following items: ARB meeting schedule Upcoming ARB agenda items Recently submitted and pending projects subject to ARB review Board members are encouraged to contact Samuel Tavera (Samuel.Tavera@PaloAlto.gov) to notify staff of any planned absences one month in advance, if possible, to ensure the availability of an ARB quorum. Approved projects can be found on the City’s Building Eye webpage at https://paloalto.buildingeye.com/planning. Any party, including the applicant, may request a hearing by the ARB on the proposed director’s decision(s) within the 10-day or 14-day appeal period by filing a written request with the planning division. There shall be no fee required for requesting such a hearing. However, there is a fee for appeals. Pursuant to 18.77.070(b)(5) any project relating to the installation of cabinets containing communications service equipment or facilities, pursuant to any service subject to Palo Alto Municipal Code Chapter 2.11, Chapter 12.04, Chapter 12.08, Chapter 12.09, Chapter 12.10, or Chapter 12.13 is not eligible for a request for hearing by any party, including the applicant. No action is required by the ARB for this item. Item 1 Item 1 Staff Report Packet Pg. 4 Item No. 1. Page 2 of 2 UPCOMING ARB AGENDA ITEMS The following items are tentative and subject to change: Meeting Date Topics August 20, 2026 1185 Skyline Boulevard: Preliminary review for skyline field office for Midpeninsula Regional Open Space District 3997 Fabian Way: Early review for Streamlined Housing Development (273 units) RECENTLY SUBMITTED PROJECTS The following new ARB project was submitted: Address & Record #Project Description 4103 Old Trace Road 26PLN-00198 Major AR and Tentative Map to subdivide one vacant 1.02-acre lot into 13 residential lots and one common area lot for a private road, access and utility easements. Project consists of sixteen (16) total units. 180 El Camino Real 26PLN-00186 Minor AR to allow exterior improvements including refinishing facade and new signage for proposed 'Victoria's Secret' in the existing 'Peloton' Store. ATTACHMENTS Attachment A: 2026 Meeting Schedule & Assignments AUTHOR/TITLE: ARB Liaison1 & Contact Information Steven Switzer, Senior Historic Planner (650) 329-2321 Steven.Switzer@PaloAlto.gov 1 Emails can be sent directly to the ARB at the following email: ARB@PaloAlto.gov Item 1 Item 1 Staff Report Packet Pg. 5 Architectural Review Board 2026 Meeting Schedule & Assignments 1 2 0 6 5 2026 Meeting Schedule Meeting Dates Time Location Status Planned Absences 1/1/2026 8:30 AM Hybrid Cancelled 1/15/2026 8:30 AM Hybrid Regular Adcock, Hirsch 2/5/2026 8:30 AM Hybrid Cancelled 2/19/2026 8:30 AM Hybrid Cancelled 3/5/2026 8:30 AM Hybrid Regular 3/19/2026 8:30 AM Hybrid Regular 4/2/2026 8:30 AM Hybrid Cancelled Rosenberg 4/16/2026 8:30 AM Hybrid Regular 5/7/2026 8:30 AM Hybrid Regular Jojarth 5/21/2026 8:30 AM Hybrid Regular 6/4/2026 8:30 AM Hybrid Regular Chen 6/18/2026 8:30 AM Hybrid Cancelled Adcock, Chen, Rosenberg 7/2/2026 8:30 AM Hybrid Cancelled Adcock 7/16/2026 8:30 AM Hybrid Regular 8/6/2026 8:30 AM Hybrid Regular 8/20/2026 8:30 AM Hybrid Regular 9/3/2026 8:30 AM Hybrid Regular 9/17/2026 8:30 AM Hybrid Regular 10/1/2026 8:30 AM Hybrid Regular 10/15/2026 8:30 AM Hybrid Regular 11/5/2026 8:30 AM Hybrid Regular 11/19/2026 8:30 AM Hybrid Regular 12/3/2026 8:30 AM Hybrid Regular 12/17/2026 8:30 AM Hybrid Regular Assignments will be made by the ARB Chair January February March April May June July August September October November December Item 1 Attachment A - 2026 Meeting Schedule & Assignments Packet Pg. 6 Item No. 2. Page 1 of 2 Architectural Review Board Staff Report From: Planning and Development Services Director Lead Department: Planning and Development Services Meeting Date: August 6, 2026 Report #: 2607-6574 TITLE Recommendation on Process and Design Standards for Tier 2 and Tier 3 Wireless Communication Facilities in the Public Right-of-Way. CEQA Status: Not a Project RECOMMENDATION Staff recommends the Architectural Review Board (ARB): 1. Develop new review criteria and process to support more efficient review of future Tier 2 and Tier 3 Wireless Communication Facilities (WCFs) in the public right-of-way (ROW), using the previous Objective Design Standards1 as a foundation; and 2. Recommend adoption of the proposed review criteria and process by the City Council. BACKGROUND The ARB considered this item at a study session on July 16, 2026.2 During the study session, the ARB requested that staff share architectural drawings for previously approved Tier 2 and Tier 3 WCFs located in the public ROW for Ad Hoc Committee review. Since the item was previously presented as a study session, no formal recommendation was made at that time. The item is now returning to the ARB for a formal recommendation on the proposed revised review process and review criteria for Tier 2 and Tier 3 WCFs in the public ROW. DISCUSSION Staff shared architectural drawings for previously approved Tier 2 and 3 WCFs in public ROW to the Ad Hoc Committee via email (Attachment B). The ARB Ad Hoc Committee, consisting of 1 Resolution No. 9873 Wireless Objective Design Standards is available online at: https://www.paloalto.gov/files/assets/public/v/1/city-manager/communications-office/wireless-communication- facilities/city-council-reso-9873-signed-121619-wcf-standards-update.pdf 2 The July 16, 2026, ARB meeting video is available online at: https://cityofpaloalto.primegov.com/Portal/Meeting?meetingTemplateId=19506 Item 2 Item 2 Staff Report Packet Pg. 7 Item No. 2. Page 2 of 2 Chair Adcock and Board Member Hirsch, reviewed the Objective Standards on July 21, 2026, and provided a redlined document to staff (Attachment A). Furthermore, Chair Adcock requested the following items be discussed by staff at the ARB hearing: WCF Siting Standards – Historic Districts, Sites and Structures. [WCF Design Standards – Underground Design (Preferred Option)]. WCF Design Standards, WCF Antenna and Shroud Design (Diameter / Height)]. WCF Design Standards, WCF Antenna and Shroud Design (Diameter / Height)]. WCF Design Standards, WCF Equipment Adjustment for Wood Utility Poles. STAKEHOLDER ENGAGEMENT ATTACHMENTS Report Author & Contact Information ARB5 Liaison & Contact Information 5 Emails can be sent directly to the ARB using the following address: arb@paloalto.gov Item 2 Item 2 Staff Report Packet Pg. 8 1 Resolution No. 9873 Resolution of the Council of the City of Palo Alto Amending Objective Aesthetic, Noise, and Related Standards for Wireless Communication Facilities in the Public Rights of Way The Council of the City of Palo Alto RESOLVES as follows: SECTION 1. Findings and Declarations. a.On April 15, 2019, the City Council adopted Resolution 9825, establishing objective aesthetic, noise, and related standards for Wireless Communication Facilities (WCFs) on Streetlight and Wood Utility Poles in the Public Rights-of-Way. b.On June 17, 2019, the City Council adopted Resolution 9847, amending the standards to delete inadvertently added language, clarify existing standards, and adopt an interim setback from public schools. c.On August 12, 2019, the City Council adopted Resolution 9855, amending the standards to address a conflict with other City standards and to clarify the allowable height for WCFs on Streetlights and Wood Utility Poles. d.The City Council wishes to consolidate the existing objective standards previously described in Resolution 9855 for clarity and update the objective standards in order to address Council specified location, design, and other preferences in the City for WCF on Streetlight Poles and Wood Utility Poles. SECTION 2. Objective Standards for WCFs on Streetlight Poles and Wood Utility Poles in the Public Rights-of-Way Amended. The City Council hereby adopts the objective standards in Exhibit 1, attached to and incorporated into this resolution, for Wireless Communication Facilities in the Public Rights of Way on Streetlight Poles and Wood Utility Poles. The City Council hereby adopts Exhibit 2 that illustrates the Residential Zone of Exclusion and Exhibit 3 that illustrates the City of Palo Alto roadway network and locations of special setbacks relative to generalized zoning designations for the sole purpose of supplementing the objective standards in Exhibit 1. SECTION 3. If any section, subsection, clause or phrase of this resolution or the attached standards is for any reason held to be invalid, such decision shall not affect the validity of the remaining portion or sections of the resolution and exhibits. The Council hereby declares that it should have DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 34 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 9 2 adopted the resolution and exhibits, and each section, subsection, sentence, clause or phrase thereof irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared invalid. SECTION 4. Environmental Review. The Council finds that this resolution is exempt from the provisions of the California Environmental Quality Act (“CEQA”), pursuant to Section 15061 of the CEQA Guidelines, because it does not authorize the construction of Wireless Communication Facilities in any locations where such facilities are not already permitted; therefore it can be seen with certainty that there is no possibility that the ordinance will have a significant effect on the environment. The resolution is further exempt under CEQA Guidelines sections 15301, 15302, 15303 and 15305 because it represents part of a comprehensive regulatory scheme governing minor alterations to existing facilities or small structures. INTRODUCED AND PASSED: December 16, 2019 AYES: CORMACK, DUBOIS, FILSETH, KNISS, KOU, TANAKA NOES: FINE ABSENT: ABSTENTIONS: ATTEST: City Clerk Mayor APPROVED AS TO FORM: APPROVED: Deputy City Attorney City Manager Director of Planning and Development Services DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 35 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 10 3 Exhibit 1 Objective Standards for Wireless Communication Facilities in the Public Rights of Way on Streetlight Poles and Wood Utility Poles A Wireless Communication Facility (WCF) proposed for the public right of way must comply with the applicable provisions of the City’s Municipal Code and all of the following objective standards. In each instance where a proposed facility is unable to comply with the City’s objective standards, a WCF Exception may be requested and evaluated in accordance with this resolution and PAMC Section 18.42.110(k).1The following standards apply to both streetlight poles and wood utility poles, unless otherwise noted. WCF SITING STANDARDS Permitted Zoning Districts WCF placement is permitted in non-residential zoning districts. Public School Boundary A WCF shall not be placed within 600 feet of a parcel containing a public school. No WCF Exception shall be granted allowing a WCF to be placed closer than 300 feet to a parcel containing a public school. Residential Zone of Exclusion (this standard applies to WCF Exception requests to locate in residential districts) No WCF shall be placed within the public right of way in the area between the street centerline and the central fifty percent (50%) of the immediately adjacent parcel’s front lot line. The central fifty percent standard shall be based on the parcel’s lot width2. For corner lots, the central fifty percent standard along the street lot line3 shall be based on the parcel’s lot depth4. Exhibit 2 illustrates this requirement. Residential Roadways (this standard applies to WCF Exception requests to locate in residential districts) Any request for a WCF Exception involving placement of a WCF within a residential zoning district shall prioritize WCF placement on the following roadway types (See Exhibit 3): Expressways Arterials Residential Arterials Roadways identified with a Special Setback (including collector and local streets). 1 The City may hire an independent consultant to evaluate WCF Exceptions at applicant’s expense. 2 Palo Alto Municipal Code Section 18.04.030(a)(93) 3 Palo Alto Municipal Code Section 18.04.030(a)(91)(E) 4 Palo Alto Municipal Code Section 18.04.030(a)(87) DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 36 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 11 4 In each instance above, the priority shall be for placement of a WCF most distant from residential property. An additional WCF Exception request must be made to place a WCF on a collector or a local roadway that does not have an identified special setback. Building or Structure Setback A WCF shall not be placed closer than 20 feet from any building used for occupancy in any zoning district. Distance Between WCFs A WCF shall not be placed less than 600 feet away from another WCF. This requirement does not preclude WCFs collocating on the same structure where otherwise allowed. Intersection Corners5 A WCF shall not be placed less than 20 feet away from any roadway intersection. An intersection is measured from the start of the curb radius. Scenic Routes6 A WCF shall not be placed along an identified scenic route. Historic Districts, Sites, and Structures A WCF shall not be placed within a listed historic district, nor immediately adjacent to a parcel with an historic structure, nor immediately adjacent to an historic site, as those terms are defined by PAMC Section 16.49.020. A WCF shall not be placed in a potential historic district, or immediately adjacent to a potential historic structure or site, where the application for historic designation was filed with the City prior to the filing of a WCF application, until a final decision has been made regarding that pending historic designation. WCF DESIGN STANDARDS Underground Design (Preferred Option) Radio equipment shall be placed in an underground vault. The associated antenna(s) shall be placed in a shroud at the top of a nearby pole. Underground vaults shall be the minimum volume necessary to house WCF equipment and include information detailing why the proposed dimensions are required. Maximum vault size shall not exceed 5 feet 8-inches x 8 feet 2-inches x 5 feet 7-inches or 260 cubic feet, excluding space required for ventilation or sump pump equipment. 5 Gateway intersections are identified on Map L-4 in the Comprehensive Plan. 6 Scenic routes are identified in Policy L-9.1 in the Comprehensive Plan. DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 37 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 12 5 Top-Mounted Design (Secondary Option) Radio equipment and the associated antenna(s) shall be enclosed within a shroud at the top of the pole. Minimal Sunshield Design Use of this design requires a WCF Exception Radio equipment shall be enclosed within one or two sunshields not exceeding 8 inches wide nor 0.75 cubic feet in volume each, mounted directly to the side of the pole. The associated antenna(s) shall be placed in a shroud at the top of the pole. Sunshields shall be attached at least 12 feet above ground level and, when located on wood utility poles, shall not interfere with the identified communication space. Existing Signage Design Use of this design requires a WCF Exception Radio equipment shall be attached to a pole behind existing signage under the following conditions: i) Radio equipment shall be placed within a shroud that does not exceed the dimensions of the sign in height and width, nor 4 inches in depth, including any required mounting bracket. ii) In no event shall WCF equipment obscure or interfere with the visibility or functioning of the signage. The associated antenna(s) shall be placed in a shroud at the top of the pole. WCF Antenna and Shroud Dimensions (Diameter / Height) Antennas shall have the smallest size possible to achieve the coverage objective. The diameter of the antenna and shroud shall not exceed 15 inches at their widest. For Streetlight Poles: The maximum WCF height shall not exceed 3 feet (or 5.5 feet for top-mounted designs) from the top of the streetlight pole that meets the City standards for the proposed location. The associated “antenna skirt” shall taper to meet the pole above the mast arm. For Wood Utility Poles: In no circumstance shall the total height of a pole and all WCF equipment exceed 55 feet. For wood utility poles carrying power lines, replacement poles shall be the minimum height necessary to provide GO 95 mandated clearance between WC equipment and power lines. For wood utility poles without power lines, any WCF equipment shall not increase the height of the pole by 5.5 feet when compared with the height of the existing pole. DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 38 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 13 6 The associated “antenna skirt” shall taper to meet the top of the pole if wider than the pole. WCF Design Quality Antennas and/or equipment at the top of the pole shall be covered by a single integrated shroud and “antenna skirt” designed without gaps between materials or sky visible between component surfaces and between the shroud or skirt and the top of the pole. All components external to the pole shall have an integral color or shall be painted to match the color and/or materials of the pole. Equipment shall be oriented to face in either of the directions of travel in the right of way and shall not face or extend toward private property or the curb line. WCF Equipment Adjustment For Streetlight Poles: Equipment that cannot propagate an adequate signal within the shrouding required by the standard designs shall be attached to a streetlight pole at a height of 2 feet below the light mast or higher. Each instance of such equipment shall not exceed 0.85 cubic feet, nor shall the total volume of such equipment and any shrouding exceed 2.6 cubic feet per streetlight pole. For Wood Utility Poles: Equipment that cannot propagate an adequate signal within the shrouding required by the standard designs shall be attached to the top of the pole or on a cross arm or brace protruding from the pole the minimum extent necessary to comply with safety standards, including GO 95. Such cross arm shall be placed as high on the pole as technically feasible. Each instance of such equipment shall not exceed 0.85 cubic feet nor shall the total volume of such equipment exceed 2.6 cubic feet per wood utility pole. Curb Clearances Any WCF attachments placed below 16 feet above ground level shall not be placed closer than 18 inches to the curb, nor shall they extend over the sidewalk (Caltrans Highway Design Manual Section 309). All WCF equipment shall maintain at least 3 feet from any curb cut. WCF Wires and Cabling For Streetlight Poles: All wires and cabling shall be routed entirely underground and within the pole and any attached shroud. For Wood Utility Poles: All wires and cabling to equipment shall be within the shroud or shall be within conduit. All conduit shall be mounted flush to the pole. DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 39 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 14 7 Safety Signs Safety signs shall be the smallest size possible to accomplish its purpose. Power Disconnects For Streetlight Poles: Power disconnects shall be labeled and placed in a vault near the base of the pole. For Wood Utility Poles: Power disconnects shall be labeled and placed on the wood pole or in a vault near the base of the pole. Ground Mounted Equipment Except as provided in these standards, no equipment cabinets may be placed at grade. Existing Pole Locations A WCF shall utilize an existing streetlight pole or wood utility pole location. Any new pole locations are prohibited unless approved through a City Public Works/Utilities pole placement application. WCF PERFORMANCE STANDARDS Pole Replacement For Streetlight Poles: An existing streetlight pole proposed for a WCF installation shall be replaced with a new pole.7 For Wood Utility Poles: An existing wood utility pole proposed for a WCF installation shall be replaced with a new pole.8 Landscaping Replacement Any existing landscaping removed or damaged by installation shall be replaced in kind. Landscape Screening A WCF shall be placed where existing street tree foliage or new street tree or amenity tree foliage within 35 feet of the WCF provides interruption of direct views of the WCF. 7 Replacement streetlight poles must meet the currently applicable City standards for the pole, including foundation and bolt designs, conduit separation, aluminum material, color, width, height, light mast characteristics (examples: orientation, design, height, color temperature and photometrics), and the presence/absence of decorative features. Replacement poles will conform to Public Works Department (PWD) style guidelines and Utilities-Electrical (CPAU) standards where the City has adopted standards and will match the pole being replaced where no standards exist. Standard specifications for streetlight poles in the City can be obtained from the Utilities-Electrical (CPAU) and Public Works (PWD) Departments. 8 Replacement wood utility poles must meet the currently applicable City standards for the pole, including width, height, color, material, structural capacity, and GO 95 compliance. Replacement poles shall be no greater in diameter or other cross-sectional dimension than is necessary for the proper functioning of the pole with all attachments. Existing pole functionality shall be maintained, such as in regard to electrical lines, climbing space, light masts (examples: orientation, design, height, color temperature and photometrics), and provision of communication space, unless existing functionality, such as transformers, can be relocated with the approval of the Utilities-Electrical Department (CPAU). Standard specifications for pole replacement in the City can be obtained from CPAU. For wood utility poles carrying power lines, replacement poles shall be the minimum height necessary to provide GO-95 mandated clearance between WCF equipment and power lines. DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 40 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 15 8 Noise9 Noise from a WCF shall comply with PAMC Chapter 9.10 and shall be consistent with noise-related Comprehensive Plan goals and policies. City Marketing Banners WCF installations shall not require any changes in the City’s existing banner marketing program. WCF EXCEPTIONS A WCF applicant may file an application(s) containing a request for one or more WCF Exceptions to the objective standards set forth in this resolution or any other provision of PAMC Section 18.42.110. The request for a WCF Exception(s) does not exempt a WCF from complying with other objective wireless administrative standards adopted by City Council resolution or any other provision of PAMC Section 18.42.110. Each WCF Exception request must be made at the time an application is submitted and must include both the specific provision(s) from which the exception is sought and the basis of the request, including all supporting evidence on which the applicant relies. The applicant has the burden of proving that federal law, state law, or both, compel the decision-making authority to grant the requested exception(s). The WCF Exception must satisfy the requirements of PAMC Section 18.42.110(k) and demonstrate why the standard is infeasible. Failure to identify all required WCF Exceptions upon application submittal may result in application denial. No WCF Exception may be granted that allows a WCF to be placed: 1) within 300 feet of a parcel containing a public school, 2) within 20 feet of a habitable residential building in a residential zoning district, 3) on wood utility poles within the Residential Zone of Exclusion described in this resolution, or 4) in an alley within a residential zoning district. 9 In residential areas with an average 24-hour noise level (Ldn) at or below 60 decibels (dB), noise generated by WCF equipment shall not cause the Ldn to exceed 60dB or to increase by 5.0 dB or more, even if the resulting Ldn would remain below 60 dB. In residential areas with a Ldn above 60 dB, noise generated by WCF equipment shall not cause the average to increase by 3.0 dB or more. DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 41 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 16 144.2' 100.1' 70.0' 144.2' 60.0' 100.1' 30.0' 100.1' 60.0' 160.0' 139.1' 160.0' ' 64.9' 100.0' 100.0' 64.9' 100.0' This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend 0'53' Ex h i b i t 2 WC F RZO E D I A G R A M CITYOF PALOALTO I NC O R P O R A TE D CALI FORNIA P a l o A l t oT h e C i t y o f APRI L 1 6 189 4 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto rrivera, 2019-11-25 17:25:35 (\\cc-maps\Encompass\Admin\Personal\rrivera.mdb) ROAD CENTERLINE RZOE - central 50% of parcel's lot width 50% of 139.1 lot width = 69.55 ft RZOE - central 50% of parcel's lot width RZOE - central 50% of parcel's lot width RZOE - central 50% of parcel's lot depth 35 f t 50% of 70 ft lot width = 35 ft ROAD CENTERLINE CURB LIP PARCEL/PROPERTY LINE 30 f t 30.0' 30 f t 30 f t RZO E - c e n t r a l 50 % o f pa r c e l ' s l o t wi d t h RZO E - c e n t r a l 50 % o f pa r c e l ' s l o t wi d t h RZO E - c e n t r a l 50 % o f pa r c e l ' s l o t wi d t h RO A D CE N T E R L I N E RZO E - c e n t r a l 50 % o f pa r c e l ' s l o t wi d t h Residential Zone of Exclusion (RZOE) (this standard applies to WCF Exception requests to locate in residential districts) No WCF shall be placed within the public right of way in the area between the street centerline and the central fifty percent (50%) of the immediately adjacent parcel’s front lot line. The central fifty percent standard shall be based on the parcel’s lot width. For corner lots, the central fifty percent standard along the street lot line shall be based on the parcel’s lot depth. Fr o n t S e t b a c k L i n e 139.1'100.1' 60 . 0 ' 60 . 0 ' 60 . 0 ' 70.0' 64.9'64.9' 30 . 2 4 f t 32.44 ft 50.05 ft32.45 ft 30 . 2 4 f t 35 . 0 7 f t 69.38 ft 30 . 2 4 f t 50.39 ft32.44 ft 32.45 ft 69.55 ft DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2.Attachment B - ResolutionNo. 9873 Wireless ObjectiveDesign Standards(Repealed) Packet Pg. 42 Item 2Attachment A - ARB Ad HocNotes on Wireless ObjectiveStandards Packet Pg. 17 24 24 24 24 2424 24 24 2424 24 24 24 24 24 24 24 2424 24 24 24 24 24 2424 24 2424 24 24 15 24 24 101010 10 10 24 20 10 1515 15 15 15 10 10 10 1524 15 15 15 15 15 24 24 24 24 20 2424 50 30 30 50 50 24 24 25 25 25 25 25 25 25 25 50 24 24 24 50 24 50 50 50 50 30 50 50 50 25 25 25 25 25 25 25 25 25 25 24 24 50 50 5050 50 50 50 50 50 242424 24 24 24 24 25 25 25 25 25 24 24 24 24 24 30 25 50 24 24 24 24 24 7777 6 6 6 77 77 77 7 7 77 77 77 24 25 6 24 24 24 24 2424 24 2424 24 24 24 2424 2424 24 24 24 24 24 24 24 24 24 2424 3535 351010 24 10 53 204 418 20 10351035 24 24 24 24 24 24 24 24 24 24 24 24 24 24 2424 24 24 24 30 7 7 7 17 24 30 24 24 24 30 177 7 17 7 17 30 24 2424 24 24 24 24 24 30 24 24 24 24 24 24 40 40 24 24 24 24 24 24 40 40 40 24 24 24 24 24 24 40 40 40 40 40 40 40 40 40 40 40 40 2424 24 24 24 24 24 24 2424242424 24 24 24 24 24 60 60 60 30 30 40 30 24 24 24 24 24 24 30 6060 60 60 50 50 40 40 24 24 24 24 242424 24 24 24 24 30 24 24 24 24 24 24 24 24 30 24 24 24 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 2424 24 2430 30 24 24 16 8 24 16 8 16 24 24 24 24 24 24 24 24 15 30 24 20 25 24 24 24 24 2424 24 24 24 24 24 24 24 30 24 24 20 20 24 25 25 25 25 2525 252020 2525 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 2424 24 24 24 24 24 24 24 24 24 24 24 24 2424 24 24 24 24 24 24 24 24 24 24 2424 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 50 50 50 50 24 24 Special ConditionsSpecial C onditions Special Condit ions ACK_FOR_MIXED d e l a s Pu l gas d H i l l R o ad J u n i pe r o Serra B o u l evard Page M i l l R o ad Ar as t rade ro Road E l C a m i n o R e a l S a n An t o n i o A v e n u e Cha r l e s t on Roa d Or e gon Exp r e s swa y Mid d lef ie ld Road University Avenue e w a y 1 0 1 A l ma S t r e e t El Camino Real A l p i n e R o a d F o o t h i ll E x p r e s s w a y H i g h Hillview East Bayshore West Bayshore Fabian Central Expressway Sand Hill Road Embarcadero Road Fa b i a n W a y Newell Rd California St Latham St C Pu Middle Ave Welch Coyot e H i l l Rd Hansen Way Matadero Ave Loma Verde Ave Colorado Ave Park Blvd Birch N. California Ave Amaranta El Ca mino Way Lytton Ave Hamilton Ave Homer Ave Channing Ave Channing Ave Guinda Stanford Av e Waverley St. Churchill Ave tPeer C outts Serra S t Arbore tum G a l v ez Park B lvd Amph i t h e a t r e P k w y Charleston RdAlma St Los A ltos A ve Hillview Ave Old Page M i l l Rd o l d e nantes R d This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend Residential Zone Districts Non- Residential Zone Districts Public Facilities/Open Space Zone Districts Special Setback Frontages Local Collector Residential Arterial Arterial Expressway City Jurisdictional Limits 0'2670' Ex h i b i t 3 Ro a d N e t w o r k a n d S p e c i a l S e t b a c k s wi t h R e s i d e n t i a l , C o m m e r c i a l , an d Pu b l i c F a c i l i t i e s Z o n i n g D i s t r i c t s v. 2 0 1 9 1 1 2 5 CITYOF PALOALTO I NC O R P O R A TE D CALI FORNIA P a l o A l t oT h e C i t y o f APRI L 1 6 189 4 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto rrivera, 2019-11-25 13:00:40 (\\cc-maps\Encompass\Admin\Personal\rrivera.mdb) DocuSign Envelope ID: ECCACC0E-18AC-4D5E-9AEE-0C930810BD0A Item 2.Attachment B - Resolution No. 9873Wireless Objective Design Standards(Repealed) Packet Pg. 43 Item 2Attachment A - ARB Ad Hoc Notes onWireless Objective Standards Packet Pg. 18 Certificate Of Completion Envelope Id: ECCACC0E18AC4D5E9AEE0C930810BD0A Status: Completed Subject: Please DocuSign: RESO 9873 WCF Resolution with Exhibit 1.docx, RESO 9872 Exhibit 2.pdf, RESO 98... Source Envelope: Document Pages: 10 Signatures: 5 Envelope Originator: Certificate Pages: 2 Initials: 0 Kim Lunt AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 250 Hamilton Ave Palo Alto , CA 94301 kimberly.lunt@cityofpaloalto.org IP Address: 199.33.32.254 Record Tracking Status: Original 1/7/2020 1:32:22 PM Holder: Kim Lunt kimberly.lunt@cityofpaloalto.org Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: City of Palo Alto Location: DocuSign Signer Events Signature Timestamp Aylin Bilir Aylin.Bilir@CityofPaloAlto.org Deputy City Attorney Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 1/7/2020 1:36:35 PM Viewed: 1/7/2020 1:40:55 PM Signed: 1/7/2020 4:08:48 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Jonathan Lait Jonathan.Lait@CityofPaloAlto.org Interim Director Planning and Community Environment City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 199.33.32.254 Sent: 1/7/2020 4:08:51 PM Resent: 1/13/2020 8:54:57 AM Resent: 1/15/2020 8:58:56 AM Resent: 1/16/2020 11:39:30 AM Viewed: 1/16/2020 12:31:49 PM Signed: 1/16/2020 12:32:05 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ed Shikada ed.shikada@cityofpaloalto.org Ed Shikada, City Manager City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 1/16/2020 12:32:09 PM Viewed: 1/16/2020 5:51:30 PM Signed: 1/16/2020 5:51:37 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Eric Filseth eric.filseth@cityofpaloalto.org Mayor Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 108.169.4.229 Sent: 1/16/2020 5:51:41 PM Viewed: 1/16/2020 11:04:09 PM Signed: 1/16/2020 11:04:20 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 44 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 19 Signer Events Signature Timestamp Beth Minor Beth.Minor@CityofPaloAlto.org City Clerk City of Palo Alto Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 199.33.32.254 Sent: 1/16/2020 11:04:23 PM Viewed: 1/17/2020 7:52:37 AM Signed: 1/17/2020 7:52:54 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 1/16/2020 11:04:23 PM Certified Delivered Security Checked 1/17/2020 7:52:37 AM Signing Complete Security Checked 1/17/2020 7:52:54 AM Completed Security Checked 1/17/2020 7:52:54 AM Payment Events Status Timestamps Item 2. Attachment B - Resolution No. 9873 Wireless Objective Design Standards (Repealed) Packet Pg. 45 Item 2 Attachment A - ARB Ad Hoc Notes on Wireless Objective Standards Packet Pg. 20 Attachment B Example Plans If you would like a copy of Example Plans, please contact Associate Planner, Nishita Kandikuppa at Nishita.Kandikuppa@paloalto.gov or (650) 838-2806. Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 21 From:Kandikuppa, Nishita To:Architectural Review Board Cc:Switzer, Steven; Tavera, Samuel; Raybould, Claire Subject:Follow-Up: ARB Wireless Study Session 07-16-26 - Pole+Wireless Facilities Examples Date:Tuesday, July 21, 2026 2:39:24 PM Attachments:Metal Streetlight Pole in Downtown Example 1 - 1221 Middlefield Road.pdf Wood Utility Pole Example - 2802 Louis Road.pdf Metal Streetlight Pole in Downtown Example 2 - 135 University Avenue copy.pdf Outlook-jcqg4shq.png Outlook-jk0ebsxh.png Hello Board Members, This email is a follow-up to the wireless study session held on Thursday, July 16, during which staff presented examples of pole and wireless infrastructure designs to the ARB. At the study session, the Board requested an opportunity to review the plans in preparation for a future ad hoc committee item to discuss potential recommendations for new objective standards for Tier 2 and Tier 3 wireless facilities in the public right-of-way. Attached are three plan PDFs for your review: One example of a wood utility pole design Two examples of Downtown streetlight pole designs, as designed for Verizon and AT&T wireless facilities Please review the attached plans and let staff know if you would like any additional materials or information. Thank you, Nishita Nishita Kandikuppa Associate Planner Planning and Development Services Department (650) 838-2806 | nishita.kandikuppa@paloalto.gov www.paloalto.gov Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 22 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 23 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 24 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 25 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 26 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 27 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 28 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 29 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 30 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 31 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 32 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 33 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 34 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 35 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 36 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 37 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 38 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 39 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 40 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 41 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 42 TITLE SHEET REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 T-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS STARTING FROM AT&T OFFICE: 5001 EXECUTIVE PARKWAY, SAN RAMON, CA 94583 : FA NUMBER: 14800993 USID #: 180556 CASPR NUMBER: 3701A099NY PROJECT: SMALL CELL SITE TYPE: SINGLE STREET LIGHT POLE SITE ADDRESS: 135 UNIVERSITY AVE PALO ALTO, CA 94301 SITE NAME: CRAN_RSFR_SJWE0_024A 1. GET ON I-680 S FROM BOLLINGER CANYON RD (0.7 MI) 2. TAKE I-580 W, I-880 S AND CA-84 W TO WILLOW RD IN MENLO PARK (35.2 MI) 3. CONTINUE ON WILLOW RD. TAKE EVERETT AVE TO HIGH ST IN PALO ALTO (3.1 MI) ARRIVED AT 135 UNIVERSITY AVE, PALO ALTO, CA 94301, USA SITE SITE · · · · · · · · Jul 07, 2021 APPROVED PLANS 19PLN-00191 PLANS RECEIVED 7-13-21 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 43 Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 44 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 G-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS GENERAL NOTES 19. WHEN ROOF TOP OR TOP FLOOR DECK TEMPORARY STAGING IS REQUIRED, MATERIALS SHALL BE EVENLY DISTRIBUTED OVER ROUGH FRAMED FLOORS OR ROOFS SO AS NOT TO EXCEED THE DESIGNED LIVE LOADS FOR THE STRUCTURE. TEMPORARY SHORING AND/OR BRACING IS TO BE PROVIDED WHERE THE STRUCTURE DOESN'T HAVE THE DESIGN STRENGTH FOR ADDITIONAL LOADING. 20. SEAL ALL PENETRATIONS WITHIN FIRE-RATED AREAS WITH U.L. LISTED OR FIRE MARSHALL APPROVED MATERIALS IF APPLICABLE TO THE SUBJECT FACILITY AND OR PROJECT SITE. 21. BUILDING INSPECTORS AND/OR OTHER BUILDING OFFICIALS ARE TO BE NOTIFIED PRIOR TO ANY GROUND DISTURBANCE, CONSTRUCTION, AND ANY OTHER PROJECT EFFORT AS MANDATED BY THE GOVERNING AGENCY. 22. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF PROJECT AREA DURING CONSTRUCTION. 23. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING IMPROVEMENTS, EASEMENTS, PAVING, CURBING, DURING CONSTRUCTION. UPON COMPLETION OF WORK, CONTRACTOR SHALL REPAIR ANY DAMAGE THAT MAY HAVE OCCURRED DUE TO CONSTRUCTION ON OR ADJACENT TO THE PROPERTY. 24. CONTRACTOR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD FREE DURING CONSTRUCTION DISPOSING OF ALL DIRT, DEBRIS, AND RUBBISH. CONTRACTOR SHALL REMOVE EQUIPMENT NOT SPECIFIED AS REMAINING ON THE PROPERTY OR PREMISES. SITE SHALL BE LEFT IN CLEAN CONDITION AND FREE FROM PAINT SPOTS, DUST, OR SMUDGES OF ANY NATURE. 25. PROPOSED CONSTRUCTION INSTALLED ADJACENT EXISTING BUILDINGS OR CONSTRUCTION SHALL ARCHITECTURALLY MATCH THE EXISTING IN TERMS OF COLOR, TEXTURE, FINISH MATERIALS, ETC., EXCEPT AS NOTED IN THE PLANS AND SPECIFICATIONS. 26. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BACKING, BLOCKING, AND/OR OTHER ANCHORAGE DEVICES REQUIRED FOR THE INSTALLATION OF FIXTURES, MECHANICAL EQUIPMENT, PLUMBING, HARDWARE, AND FINISH ITEMS TO INSURE A PROPER AND CODE COMPLIANT INSTALLATION. 27. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING INSTALLATIONS THAT ARE CONSTRUCTED LEVEL, ERECT, EVENLY ALIGNED, PLUMB AND TRUE BASED ON THE CONSTRUCTION DRAWINGS. THE CONTRACTOR SHALL COMPARE EXISTING CONDITIONS WITH THE PROPOSED DESIGN PRIOR TO CONSTRUCTION AND REPORT ANY DISCREPANCIES OR INCONSISTENCIES TO THE NETWORK CARRIER'S REPRESENTATIVE AND FURTHER TO THE A&E SUCH THAT THE PROPOSED INSTALLATION WILL LIKEWISE BE LEVEL, ERECT, EVENLY ALIGNED, PLUMB AND TRUE. ARCHITECT AND NETWORK CARRIER SHALL BE NOTIFIED OF ANY ERRORS, OMISSIONS, OR INCONSISTENCIES PRIOR TO ANY CONSTRUCTION. 28. THE CONTRACTOR IS TO PROVIDE PROTECTION FOR ADJOINING PROPERTIES FROM PHYSICAL HARM, NOISE, DUST, DIRT, AND FIRE AS REQUIRED BY THE GOVERNING AGENCIES. 29. WHERE SPECIFIED, MATERIALS TESTING SHALL BE TO THE LATEST STANDARDS AND/OR REVISIONS AVAILABLE AS REQUIRED BY THE GOVERNING AGENCY RESPONSIBLE FOR RECORDING THE RESULTS. 30. THE CONTRACTOR IS RESPONSIBLE FOR THE STORAGE OF ALL MATERIALS AND SHALL NOT STORE OR STAGE MATERIALS ON PUBLIC PROPERTY WITHOUT A PERMIT TO DO SO FROM THE GOVERNING AGENCIES FOR THIS PURPOSE. 31. GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM REQUIREMENTS TO BE USED IN ALL CONDITIONS UNLESS ILLUSTRATED AND NOTED OTHERWISE. 32. TRADES INVOLVED IN THE PROJECT SHALL BE RESPONSIBLE FOR THEIR OWN CUTTING, FITTING, PATCHING, ETC., SO AS TO BE PREPARED PROPERLY BY THE WORK OF OTHER TRADES. 33. ALL DEBRIS AND REFUSE SHALL BE REMOVED FROM THE PROJECT PREMISES AND LEFT IN A CLEAN SWEPT CONDITION AT ALL TIMES BY EACH TRADE AS THEY PERFORM THEIR OWN PORTION OF THE WORK. 34. NETWORK CARRIER DOES NOT GUARANTEE ANY PRODUCTS, FIXTURES, AND/OR ANY EQUIPMENT NAMED BY A TRADE OR MANUFACTURER. GUARANTEE OR WARRANTY THAT MAY BE IN EFFECT IS DONE THROUGH THE COMPANY OR MANUFACTURER PROVIDING THE PRODUCT, FIXTURE, AND/OR EQUIPMENT UNLESS SPECIFIC RESPONSIBILITY IS ALSO PROVIDED BY THE CONTRACTOR/SUBCONTRACTOR IN WRITTEN FORM. 35. CAUTION! CALL BEFORE YOU DIG! BURIED UTILITIES EXIST IN THE AREA AND UTILITY INFORMATION SHOWN MAY NOT BE COMPLETE. CONTACT THE ONE-CALL UTILITY LOCATE SERVICE A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION. 36. WHEN APPLICABLE, CONTRACTOR IS RESPONSIBLE TO CALL, COORDINATE AND MAKE ARRANGEMENTS FOR R.O.W. AND/OR PRIVATE PROPERTY LOCATES BASED ON SPECIFIC SITE REQUIREMENTS. 37. SEE CIVIL DRAWINGS FOR ADDITIONAL SITE INFORMATION AS APPLICABLE 38. CONTRACTORS TO DOCUMENT ALL WORK PERFORMED WITH PHOTOGRAPHS AND SUBMIT TO NETWORK CARRIER'S REPRESENTATIVE ALONG WITH REDLINED CONSTRUCTION SET. 39. CONTRACTOR SHALL DOCUMENT ALL CHANGES MADE IN THE FIELD BY MARKING UP (REDLINING) THE APPROVED CONSTRUCTION SET AND SUBMITTING THE REDLINED ALONG WITH PHOTOGRAPHS PER NETWORK CARRIER REQUIREMENTS. 40. CONTRACTOR SHALL COORDINATE AND SEEK APPROVAL OF ALL POWER DRAW, INSTALLATION AND/OR MODIFICATIONS WITH POWER COMPANY, OWNER AND JURISDICTION AS REQUIRED. CONTRACTOR SHALL REPORT POWER INSTALLATION SOLUTION(S) TO NETWORK CARRIER REPRESENTATIVE, PROJECT CONSTRUCTION MANAGER AND ARCHITECT. 41. ANY SUBSTITUTIONS OF MATERIALS AND/OR EQUIPMENT, MUST BE APPROVED BY NETWORK CARRIER CONSTRUCTION MANAGER. 42. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL REMEDY ALL FAULTY, INFERIOR, AND/OR IMPROPER MATERIALS, DAMAGED GOODS, AND/OR FAULTY WORKMANSHIP FOR ONE (1) YEAR AFTER THE PROJECT IS COMPLETE ACCEPTING UNDER THIS CONTRACT BETWEEN THE OWNER AND THE CONTRACTOR. EXCEPTION: THE ROOFING SUBCONTRACTOR SHALL FURNISH A MAINTENANCE AGREEMENT FOR ALL WORK DONE, COSIGNED BY THE CONTRACTOR, TO MAINTAIN THE ROOFING IN A WATERTIGHT CONDITION FOR A PERIOD OF TWO (2) YEARS STARTING AFTER THE DATE OF SUBSTANTIAL COMPLETION OF THE PROJECT, UNLESS OTHERWISE WRITTEN IN THE CONTRACT BETWEEN THE OWNER AND THE CONTRACTOR. 1. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND NETWORK CARRIER OF ANY ERRORS, OMISSIONS, OR INCONSISTENCIES AS THEY MAY BE DISCOVERED IN PLANS, DOCUMENTS, NOTES, OR SPECIFICATIONS, PRIOR TO STARTING CONSTRUCTION INCLUDING, BUT NOT LIMITED BY, DEMOLITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY ERROR, OMISSION, OR INCONSISTENCY AFTER THE START OF CONSTRUCTION WHICH HAS NOT BEEN BROUGHT TO THE ATTENTION OF ARCHITECT AND NETWORK CARRIER CONSTRUCTION PROJECT MANAGER AND SHALL INCUR ANY EXPENSES TO RECTIFY THE SITUATION. THE MEANS OF CORRECTING ANY ERROR SHALL FIRST BE APPROVED BY ARCHITECT AND NETWORK CARRIER CONSTRUCTION PROJECT MANAGER. 2. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALL VISIT THE JOB SITE TO FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT. CONTRACTORS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND THE CONTRACTOR HAVING BEEN AWARDED THIS PROJECT SHALL VISIT THE CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT DOCUMENTS TO VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE ACCOMPLISHED AS SHOWN. PRIOR TO PROCEEDING WITH CONSTRUCTION, ANY ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECTOPENGINEER VERBALLY AND IN WRITING. 3. THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN THE CONSTRUCTION AND CONTRACT DOCUMENTS THE COMPLETE SCOPE OF WORK. CONTRACTORS BIDDING THE JOB ARE NEVERTHELESS CAUTIONED THAT MINOR OMISSIONS OR ERRORS IN THE DRAWINGS AND OR SPECIFICATIONS SHALL NOT EXCUSE SAID CONTRACTOR FROM COMPLETING THE PROJECT AND IMPROVEMENTS IN ACCORDANCE WITH THE NETWORK CARRIER PROJECT SCOPE AND THE INTENT OF THESE DOCUMENTS. THE BIDDER SHALL BEAR THE RESPONSIBILITY OF NOTIFYING (IN WRITING) THE ARCHITECTOPENGINEER OF ANY CONFLICTS, ERRORS, OR OMISSIONS PRIOR TO SUBMISSION OF CONTRACTOR'S PROPOSAL. IN THE EVENT OF DISCREPANCIES THE CONTRACTOR SHALL PRICE THE MORE COSTLY OR EXTENSIVE WORK, UNLESS DIRECTED OTHERWISE. 4. 11X17 COPIES OF DRAWINGS ARE NOT TO BE SCALED DUE TO DISTORTIONS RESULTING FROM MULTIPLE REPROGRAPHIC COPIES. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALES SHOWN ON PLANS. 5. OWNER, CONTRACTOR, AND NETWORK CARRIER REPRESENTATIVE SHALL REVIEW AND CONFIRM THAT PROJECT SCOPE, DESIGN INTENT AND UTILITY COORDINATION ITEMS ARE INCLUDED IN THE DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. 6. THE CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION FROM NETWORK CARRIER REPRESENTATIVE TO PROCEED WITH CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS. 7. THE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED HOURS TO AVOID DISTURBING NORMAL BUSINESS OR TENANTS. 8. THE CONTRACTOR SHALL PROVIDE NETWORK CARRIER PROPER INSURANCE CERTIFICATES NAMING NETWORK CARRIER AS ADDITIONAL INSURED, AND PROVIDE NETWORK CARRIER PROOF OF LICENSE(S) INCLUDING PE & PD INSURANCE. 9. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. 10. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE PRECEDENCE. 11. ALL WORK PERFORMED ON THE PROJECT ALONG WITH ALL MATERIALS INSTALLED, SHALL COMPLY IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCES. CONTRACTOR SHALL LIKEWISE ISSUE NOTICE TO ALL SUB-CONTRACTORS THAT THEY SHALL COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY, MUNICIPALITY, UTILITY COMPANY AND LOCAL/STATE JURISDICTIONAL CODES BEARING ON THE PERFORMANCE OF THE WORK. 12. A COPY OF THE GOVERNING AGENCY ISSUED AND APPROVED PLANS SHALL BE KEPT IN A PLACE SPECIFIED BY THE GOVERNING AGENCY, AND BY LAW, SHALL BE AVAILABLE AT THE JOB SITE FOR INSPECTION AT ALL TIMES. THE ORIGINAL PERMIT SET PLANS ARE NOT TO BE USED BY THE WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT THE SAME INFORMATION AS GOVERNING AGENCY APPROVED PLANS. THE CONTRACTOR SHALL ALSO MAINTAIN ONE SET OF PLANS, IN GOOD CONDITION, COMPLETE WITH ALL REVISIONS, ADDENDA, AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES UNDER THE DIRECT CARE OF THE SUPERINTENDENT. THE CONTRACTOR SHALL SUPPLY THE NETWORK CARRIER CONSTRUCTION PROJECT MANAGER WITH A COPY OF ALL REVISIONS, ADDENDA, AND/OR CHANGE ORDERS AT THE CONCLUSION OF THE WORK AS A PART OF THE AS-BUILT DRAWING RECORDS. 13. THE STRUCTURAL COMPONENTS OF ADJACENT CONSTRUCTION OR FACILITIES ARE NOT TO BE ALTERED BY THIS CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE. 14. THE CONTRACTOR SHALL STUDY THE STRUCTURAL, ELECTRICAL, MECHANICAL, AND PLUMBING PLANS AND CROSS CHECK THEIR DETAILS, NOTES, DIMENSIONS, AND ALL REQUIREMENTS PRIOR TO THE START OF ANY WORK. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE JOB SITE WHILE WORK IS IN PROGRESS UNTIL THE JOB IS COMPLETE. 16. THE CONTRACTOR HAS THE RESPONSIBILITY OF LOCATING ALL EXISTING UTILITIES SHOWN OR NOT SHOWN ON THE PLANS, ALONG WITH PROTECTING THEM FROM DAMAGE. THE CONTRACTOR AND SUBCONTRACTOR SHALL BEAR THE EXPENSES OF REPAIR AND/OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGE RESULTING FROM OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK. 17. ALL EXISTING CONSTRUCTION, EQUIPMENT, AND FINISHES NOTED TO BE REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL BE REMOVED FROM THE SITE WITH THE FOLLOWING EXCEPTIONS: 17.1. PROPERTY NOTED TO BE RETURNED TO THE OWNER. 17.2. PROPERTY NOTED TO BE REMOVED BY THE OWNER. 18. THE GOVERNING AGENCIES, CODE AUTHORITIES, AND BUILDING INSPECTORS SHALL PROVIDE MINIMUM STANDARDS FOR CONSTRUCTION TECHNIQUES, MATERIALS, AND FINISHES USED THROUGHOUT THE PROJECT. TRADE STANDARDS AND/OR PUBLISHED MANUFACTURERS SPECIFICATIONS MEETING OR EXCEEDING DESIGN REQUIREMENTS SHALL BE USED FOR INSTALLATION. 43. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR THE SAFETY OF THE OWNER'S EMPLOYEES, WORKMEN, AND ALL TIMES DURING THE CONSTRUCTION OF THE PROJECT. 44. THE CONTRACTOR SHALL BE REQUIRED TO PAY FOR ALL NECESSARY PERMITS AND/OR FEES WITH RESPECT TO THE WORK TO COMPLETE THE PROJECT. BUILDING PERMIT APPLICATIONS SHALL BE FILED BY THE OWNER OR HIS REPRESENTATIVE. CONTRACTOR SHALL OBTAIN PERMIT (UNLESS OTHER ARRANGEMENTS HAVE BEEN MADE) AND MAKE FINAL PAYMENT FOR SAID DOCUMENT(S). 45. NETWORK CARRIER'S REPRESENTATIVE SHALL REVIEW AND APPROVE SHOP DRAWINGS AND SAMPLES FOR CONFORMANCE WITH DESIGN CONCEPT. NETWORK CARRIER'S REPRESENTATIVE PROJECT APPROVAL OF A SEPARATE ITEM SHALL NOT INCLUDE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS. 46. ALL ANTENNAS MOUNTED ON ROOF SUPPORT FRAMES TO BE PROVIDED BY NETWORK CARRIER. 47. CONTRACTOR SHALL PROVIDE HEAVY STEEL PLATES AT OPEN TRENCHES FOR SAFETY AND TO PROTECT EXISTING GROUND SURFACES FROM HEAVY EQUIPMENT UTILIZED DURING CONSTRUCTION. 48. CONTRACTOR SHALL PATCH AND REPAIR ALL GROUND SURFACES WITHIN THE CONSTRUCTION AREA AS NECESSARY TO PROVIDE A UNIFORM SURFACE AND MAINTAIN EXISTING SURFACE DRAINAGE SLOPES. 49. CONTRACTOR SHALL REPLACE EXISTING LANDSCAPE VEGETATION DAMAGED DUE TO CONSTRUCTION ACTIVITIES, AND REPAIR, RESTORE AND MODIFY EXISTING IRRIGATION LINES IF NECESSARY TO OPERATING CONDITION, PROVIDING FULL COVERAGE TO IMPACTED AREAS. 50. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES WHERE PENETRATION OF EXISTING ROOFING MATERIALS OCCUR, CONTRACTOR SHALL COORDINATE WITH BUILDING OWNER TO OBTAIN CONTACT INFORMATION AND UTILIZE THE EXISTING ROOFING CONTRACTOR OF RECORD FOR INSTALLATION, PATCH, REPAIR OR ANY AUGMENTATION TO THE ROOF, AND HAVING THE WORK GUARANTEED UNDER THE ROOFING CONTRACTOR'S EXISTING WARRANTY ENSURING 100% MOISTURE PROTECTION. 51. IN THE CASE OF ROOFTOP SOLUTIONS WITH THE INSTALLATION OF ANTENNAS WITHIN CONCEALED (SHROUDED) SUPPORT FRAMES OR TRIPODS, CONTRACTOR SHALL COORDINATE WITH THE FRP DESIGNER/FABRICATOR TO ENSURE THAT THE FINAL FRP SHROUD IS SIMULATING (IN APPEARANCE) EXISTING EXTERIOR BUILDING FACADE MATERIALS, TEXTURES, AND COLORS. THE CONTRACTOR SHALL FURTHERMORE ENSURE THE USE OF COUNTERSUNK OR FLATHEAD FASTENERS IN ALL FRP CONSTRUCTION. WHEN PHOTOSIMULATIONS ARE PROVIDED, THE CONTRACTOR SHALL ENSURE THAT FINAL CONSTRUCTION REPRESENTS WHAT IS INDICATED IN PHOTOSIMULATION. SHOP DRAWINGS SHALL BE PROVIDED TO THE CONTRACTOR, CONSTRUCTION COORDINATOR, AND ARCHITECT PRIOR TO FABRICATION AND CONSTRUCTION. 52. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES WHERE ANCHORING TO AN EXISTING CONCRETE ROOF SLAB IS REQUIRED, CONTRACTORS SHALL CONFIRM (PRIOR TO SUBMITTING BID) WITH CONSULTING CONSTRUCTION COORDINATOR AND ARCHITECT THE PRESENCE OF POST TENSION TENDONS WITHIN THE ROOF SLAB RESULTING FROM AN UNDOCUMENTED DESIGN CHANGE IN THE EXISTING BUILDING "AS-BUILT DRAWING SET" HAVING INDICATED AN ORIGINAL DESIGN SOLUTION OF REINFORCED CONCRETE W/ EMBEDDED STEEL REBAR. IN THE EVENT POST TENSION SLAB SOLUTION IS PRESENT, CONTRACTOR SHALL INCLUDE PROVISIONS FOR X-RAY PROCEDURES (INCLUDED IN BID) FOR ALL PENETRATION AREAS WHERE ANCHORING OCCURS. 53. CONTRACTOR SHALL USE STAINLESS STEEL METAL LOCKING TIES FOR ALL CABLING TIE DOWNS AND ALL OTHER GENERAL TIE DOWNS (WHERE APPLICABLE). PLASTIC ZIP TIES SHALL NOT BE PERMITTED FOR USE ON TOWER NETWORK CARRIER PROJECTS. RECOMMENDED MANUFACTURE SHALL BE: PANDUIT CORP. METAL LOCKING TIES MODEL NO. MLT4S-CP UNDER SERIES-304 (OR EQUAL). PANDUIT PRODUCT DISTRIBUTED BY TRIARC. 54. CONTRACTOR SHALL OBTAIN, REVIEW AND EXECUTE ALL NETWORK CARRIER CONSTRUCTION STANDARDS (MOST RECENT REVISION) AS A PART OF THIS BID AND CONSTRUCTION PROJECT. 55. CONTRACTOR SHALL BE RESPONSIBLE TO SET ELECTRONIC TILTS FOR PROPOSEDLY INSTALLED ANTENNAS UNDER THE CONDITION THAT THE CONTRACTOR OBTAIN THE MOST RECENT COPY OF THE RF TILT INFORMATION SUCH THAT THE ACCURATE CONTROLLER CAN BE ORDERED AND INSTALLED. 56. A STRUCTURAL ANALYSIS SHALL BE COMPLETED AND SUBMITTED TO THE NETWORK CARRIER REPRESENTATIVE AND CONTRACTOR DEMONSTRATING CAPACITY AT THE EXACT LOCATION OF EXISTING CONDITIONS TO SUSTAIN ADDITIONAL HEAVY BATTERY CABINETS OR OTHER OUT OF SCOPE EQUIPMENT. 57. THE CONTRACTOR SHALL PROVIDE MATERIALS LIST (BOM) TO THE NETWORK CARRIER REPRESENTATIVE PRIOR TO CONSTRUCTION. GENERAL NOTES: ‐ ELECTRICAL NOTES: 1. THE APPLICANT SHALL BE RESPONSIBLE FOR IDENTIFICATION AND LOCATION OF ALL UTILITIES, BOTH PUBLIC AND PRIVATE, WITHIN THE WORK AREA. PRIOR TO ANY EXCAVATION WORK AT THE SITE, THE APPLICANT SHALL CONTACT UNDERGROUND SERVICES ALERT (USA) AT 1-800-227-2600, AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. 2. THE APPLICANT SHALL SUBMIT A REQUEST TO DISCONNECT ALL EXISTING UTILITY SERVICES AND/OR METERS INCLUDING A SIGNED AFFIDAVIT OF VACANCY, ON THE FORM PROVIDED BY THE BUILDING INSPECTION DIVISION.UTILITIES WILL BE DISCONNECTED OR REMOVED WITHIN 10 WORKING DAYS AFTER RECIEPT OF REQUEST. THE DEMOLITION PERMIT WILL BE ISSUED AFTER ALL UTILITY SERVICES AND/OR METERS HAVE BEEN DISCONNECTED AND REMOVED. 3. DURING CONSTRUCTION a. CONTRACTORS AND DEVELOPERS SHALL OBTAIN PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS BEFORE DIGGING IN THE STREET RIGHT-OF-WAY. THIS INCLUDES SIDEWALKS, DRIVEWAYS, AND PLANTER STRIPS. b. AT LEAST 48 HOURS PRIOR TO STARTING ANY EXCAVATION, THE CUSTOMER MUST CALL UNDERGROUND SERVICE ALERT (USA) AT 1-800-227-2600 TO HAVE EXISTING UNDERGROUND UTILITIES LOCATED AND MARKED. THE AREAS TO BE CHECK BY USA SHALL BE DELINEATED WITH WHITE PAINT. ALL USA MARKINGS SHALL BE REMOVED BY THE CUSTOMER OR CONTRACTOR WHEN CONSTRUCTION IS COMPLETE. c. THE CUSTOMER IS RESPONSIBLE FOR INSTALLING ALL ON-SITE SUBSTRUCTURES (CONDUITS, BOXES AND PADS) REQUIRED FOR THE ELECTRIC SERVICE. NO MORE THAN 270 DEGREES OF BENDS ARE ALLOWED IN A SECONDARY CONDUIT RUN. ALL CONDUITS MUST BE SIZED ACCORDING TO NATIONAL ELECTRIC CODE REQUIREMENTS AND NO 1/2-INCH SIZE CONDUITS ARE PERMITTED. ALL OFF-SITE SUBSTRUCTURE WORK WILL BE CONSTRUCTED BY THE CITY AT THE CUSTOMER'S EXPENSE. WHERE MUTUALLY AGREED UPON BY THE CITY AND THE APPLICANT, ALL OR PART OF THE OFF-SITE SUBSTRUCTURE WORK MAT BE CONSTRUCTED BY THE APPLICANT. d.ALL PRIMARY ELECTRIC CONDUITS SHALL BE CONCRETE ENCASED WITH THE TOP OF THE ENCASEMENT AT THE DEPTH OF 30 INCHES. NO MORE THAN 180 DEGREES OF BENDS ARE ALLOWED IN A PRIMARY CONDUIT RUN. CONDUIT RUNS OVER 500 FEET IN LENGTH REQUIRE ADDITIONAL PULL BOXES. e. ALL NEW UNDERGROUND CONDUITS AND SUBSTRUCTURES SHALL BE INSTALLED PER CITY STANDARDS AND SHALL BE INSPECTED BY THE ELECTRICAL UNDERGROUND INSPECTOR BEFORE BACKFILLING. f. THE CUSTOMER IS RESPONSIBLE FOR INSTALLING ALL UNDERGROUND ELECTRIC SERVICE CONDUCTORS, BUS DUCT, TRANSITION CABINETS, AND OTHER REQUIRED EQUIPMENT. THE INSTALLATION SHALL MEET THE NATIONAL ELECTRIC CODE AND CITY STANDARDS. g.METER AND SWITCHBOARD REQUIREMENTS SHALL BE IN ACCORDANCE WITH ELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS COMMITTEE (EUSERC) DRAWINGS ACCEPTED BY UTILITY AND CPA STANDARDS FOR METER INSTALLATIONS. h.SHOP/FACTORY DRAWINGS FOR SWITCHBOARDS (400A AND GREATER) AND ASSOCIATED HARDWARE MUST BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO INSTALLING THE SWITCHGEAR TO: GOPAL JAGANNATH, P.E. SUPERVISING ELECTRIC PROJECT ENGINEER UTILITIES ENGINEERING (ELECTRICAL) 1007 ELWELL COURT PALO ALTO, CA 94303 i. CATALOG CUT SHEETS MAY NOT BE SUBSTITUTED FOR FACTORY DRAWING SUBMITTAL. j. ALL NEW UNDERGROUND ELECTRIC SERVICES SHALL BE INSPECTED AND APPROVED BY BOTH THE BUILDING INSPECTION DIVISION AND THE ELECTRICAL UNDERGROUND INSPECTOR BEFORE ENERGIZING. 4. AFTER CONSTRUCTION & PRIOR TO FINALIZATION ·THE CUSTOMER SHALL PROVIDE AS-BUILT DRAWINGS SHOWING THE LOCATION OF ALL SWITCHBOARDS, CONDUITS (NUMBER AND SIZE), CONDUCTORS (NUMBER AND SIZE), SPLICE BOXES, VAULTS AND SWITCH/TRANSFORMER PADS. , Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 45 GENERAL NOTES REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 G-2 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS ELECTRICAL NOTES: GENERAL 1. THE APPLICANT SHALL COMPLY WITH ALL THE ELECTRIC UTILITY ENGINEERING DEPARTMENT SERVICE REQUIREMENTS NOTED DURING PLAN REVIEW. 2. THE APPLICANT SHALL BE RESPONSIBLE FOR IDENTIFICATION AND LOCATION OF ALL UTILITIES, BOTH PUBLIC AND PRIVATE, WITHIN THE WORK AREA. PRIOR TO ANY EXCAVATION WORK AT THE SITE, THE APPLICANT SHALL CONTACT UNDERGROUND SERVICE ALERT (USA) AT 1-800-227-2600, AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. 3. THE APPLICANT SHALL SUBMIT A REQUEST TO DISCONNECT ALL EXISTING UTILITY SERVICES AND/OR METERS INCLUDING A SIGNED AFFIDAVIT OF VACANCY, ON THE FORM PROVIDED BY THE BUILDING INSPECTION DIVISION. UTILITIES WILL BE DISCONNECTED OR REMOVED WITHIN 10 WORKING DAYS AFTER RECEIPT OF REQUEST. THE DEMOLITION PERMIT WILL BE ISSUED AFTER ALL UTILITY SERVICES AND/OR METERS HAVE BEEN DISCONNECTED AND REMOVED. EXISTING SL'S THAT NEED TO BE REMOVED SHALL BE SALVAGED BY CPA. CONTACT CPA IF ANY STREETLIGHT CIRCUIT NEEDS TO BE DISCONNECTED TO DO ANY TYPE OF SUBSTRUCTURE WORK. 4. PER MLA SECTION 14.0, SURESITE MAY BE REQUIRED TO PROVIDE A PERFORMANCE BOND OR LETTER OF CREDIT. 5. ALL SITES SHALL INCLUDE POLE LOADING CALCULATIONS. THE FOLLOWING SHALL BE INCORPORATED IN SUBMITTALS FOR ELECTRIC SERVICE 1. A COMPLETED ELECTRIC LOAD SHEET AND A FULL SET OF PLANS MUST BE INCLUDED WITH ALL APPLICATIONS INVOLVING ELECTRICAL WORK. THE LOAD SHEET MUST BE INCLUDED WITH THE PRELIMINARY SUBMITTAL. 2. INDUSTRIAL AND LARGE COMMERCIAL CUSTOMERS MUST ALLOW SUFFICIENT LEAD-TIME FOR ELECTRIC UTILITY ENGINEERING AND OPERATIONS (TYPICALLY 8-12 WEEKS AFTER ADVANCE ENGINEERING FEES HAVE BEEN PAID) TO DESIGN AND CONSTRUCT THE ELECTRIC SERVICE REQUESTED. 3. ONLY ONE ELECTRIC SERVICE LATERAL IS PERMITTED PER PARCEL. UTILITIES RULE & REGULATION #18. 4. IF THIS PROJECT REQUIRES PADMOUNT TRANSFORMERS, THE LOCATION OF THE TRANSFORMERS SHALL BE SHOWN ON THE SITE PLAN AND APPROVED BY THE UTILITIES DEPARTMENT AND THE ARCHITECTURAL REVIEW BOARD. UTILITIES RULE & REGULATIONS #3 & #16 (SEE DETAIL COMMENTS BELOW). 5. THE DEVELOPER/OWNER SHALL PROVIDE SPACE FOR INSTALLING PADMOUNT EQUIPMENT (I.E. TRANSFORMERS, SWITCHES, AND INTERRUPTERS) AND ASSOCIATED SUBSTRUCTURE AS REQUIRED BY THE CITY. 6. THE CUSTOMER SHALL INSTALL ALL ELECTRICAL SUBSTRUCTURES (CONDUITS, BOXES AND PADS) REQUIRED FROM THE SERVICE POINT TO THE CUSTOMER'S SWITCHGEAR. THE DESIGN AND INSTALLATION SHALL BE ACCORDING TO THE CITY STANDARDS AND SHOWN ON PLANS. UTILITIES RULE & REGULATIONS #16 & #18. 7. LOCATION OF THE ELECTRIC PANEL/SWITCHBOARD SHALL BE SHOWN ON THE SITE PLAN AND APPROVED BY THE ARCHITECTURAL REVIEW BOARD AND UTILITIES DEPARTMENT. 8. ALL UTILITY METERS, LINES, TRANSFORMERS, BACKFLOW PREVENTERS, AND ANY OTHER REQUIRED EQUIPMENT SHALL BE SHOWN ON THE LANDSCAPE AND IRRIGATION PLANS AND SHALL SHOW THAT NO CONFLICT WILL OCCUR BETWEEN THE UTILITIES AND LANDSCAPE MATERIALS. IN ADDITION, ALL ABOVEGROUND EQUIPMENT SHALL BE SCREENED IN A MANNER THAT IS CONSISTENT WITH THE BUILDING DESIGN AND SETBACK REQUIREMENTS. 9. FOR SERVICES LARGER THAN 1600 AMPS, THE CUSTOMER WILL BE REQUIRED TO PROVIDE A TRANSITION CABINET AS THE INTERCONNECTION POINT BETWEEN THE UTILITY'S PADMOUNT TRANSFORMER AND THE CUSTOMER'S MAIN SWITCHGEAR. THE CABINET DESIGN DRAWINGS MUST BE SUBMITTED TO THE ELECTRIC UTILITY ENGINEERING DEPARTMENT FOR REVIEW AND APPROVAL. 10. FOR UNDERGROUND SERVICES, NO MORE THAN FOUR (4) 750 MCM CONDUCTORS PER PHASE CAN BE CONNECTED TO THE TRANSFORMER SECONDARY TERMINALS; OTHERWISE, BUS DUCT MUST BE USED FOR CONNECTIONS TO PADMOUNT TRANSFORMERS. IF CUSTOMER INSTALLS A BUS DUCT DIRECTLY BETWEEN THE TRANSFORMER SECONDARY TERMINALS AND THE MAIN SWITCHGEAR, THE INSTALLATION OF A TRANSITION CABINET WILL NOT BE REQUIRED. 11. THE CUSTOMER IS RESPONSIBLE FOR SIZING THE SERVICE CONDUCTORS AND OTHER REQUIRED EQUIPMENT ACCORDING TO THE NATIONAL ELECTRIC CODE REQUIREMENTS AND THE CITY STANDARDS. UTILITIES RULE & REGULATION #18. 12. IF THE CUSTOMER'S TOTAL LOAD EXCEEDS 2500 KVA, SERVICE SHALL BE PROVIDED AT THE PRIMARY VOLTAGE OF 12,470 VOLTS AND THE CUSTOMER SHALL PROVIDE THE HIGH VOLTAGE SWITCHGEAR AND TRANSFORMERS. 13. FOR PRIMARY SERVICES, THE STANDARD SERVICE PROTECTION IS A PADMOUNT FAULT INTERRUPTER OWNED AN MAINTAINED BY THE CITY, INSTALLED AT THE CUSTOMER'S EXPENSE. THE CUSTOMER MUST PROVIDE AND INSTALL THE PAD AND ASSOCIATED SUBSTRUCTURE REQUIRED FOR THE FAULT INTERRUPTER. 14. ANY ADDITIONAL FACILITIES AND SERVICES REQUESTED BY THE APPLICANT THAT ARE BEYOND WHAT THE UTILITY DEEMS STANDARD FACILITIES WILL BE SUBJECT TO SPECIAL FACILITIES CHARGES. THE SPECIAL FACILITIES CHARGES INCLUDE THE COST OF INSTALLING THE ADDITIONAL FACILITIES AS WELL AS THE COST OF OWNERSHIP. ENGINEERING AND OPERATIONS (TYPICALLY 8-12 WEEKS AFTER ADVANCE ENGINEERING FEES HAVE BEEN PAID) TO DESIGN AND CONSTRUCT THE ELECTRIC SERVICE REQUESTED. UTILITIES RULE & REGULATION #20. 15. PROJECTS THAT REQUIRE THE EXTENSION OF HIGH VOLTAGE PRIMARY DISTRIBUTION LINES OR REINFORCEMENT OF OFFSITE ELECTRIC FACILITIES WILL BE AT THE CUSTOMER'S EXPENSE AND MUST BE COORDINATED WITH THE ELECTRIC UTILITY. DURING CONSTRUCTION 1. CONTRACTORS AND DEVELOPERS SHALL OBTAIN PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS BEFORE DIGGING IN THE STREET RIGHT-OF-WAY. THIS INCLUDES SIDEWALKS, DRIVEWAYS AND PLANTER STRIPS. 2. AT LEAST 48 HOURS PRIOR TO STARTING ANY EXCAVATION, THE CUSTOMER MUST CALL UNDERGROUND SERVICE ALERT (USA) AT 1-800-227-2600 TO HAVE EXISTING UNDERGROUND UTILITIES LOCATED AND MARKED. THE AREAS TO BE CHECK BY USA SHALL BE DELINEATED WITH WHITE PAINT. ALL USA MARKINGS SHALL BE REMOVED BY THE CUSTOMER OR CONTRACTOR WHEN CONSTRUCTION IS COMPLETE. 3. THE CUSTOMER IS RESPONSIBLE FOR INSTALLING ALL ON-SITE SUBSTRUCTURES (CONDUITS, BOXES AND PADS) REQUIRED FOR THE ELECTRIC SERVICE. NO MORE THAN 270 DEGREES OF BENDS ARE ALLOWED IN A SECONDARY CONDUIT RUN. ALL CONDUITS MUST BE SIZED ACCORDING TO NATIONAL ELECTRIC CODE REQUIREMENTS AND NO 1/2 - INCH SIZE CONDUITS ARE PERMITTED. ALL OFF-SITE SUBSTRUCTURE WORK WILL BE CONSTRUCTED BY THE CITY AT THE CUSTOMER'S EXPENSE. WHERE MUTUALLY AGREED UPON BY THE CITY AND THE APPLICANT, ALL OR PART OF THE OFF-SITE SUBSTRUCTURE WORK MAY BE CONSTRUCTED BY THE APPLICANT. -CONTRACTOR MUST SET NEW POLE -CONTRACTOR MUST TRANSFER OVER OLD SL HEAD AND RE-WIRE NEW SL PER CITY SPEC. -CITY TO MAKE SL ELECTRICAL CONNECTIONS @ SECONDARY SOURCE ONLY. 4. ALL PRIMARY ELECTRIC CONDUITS SHALL BE CONCRETE ENCASED WITH THE TOP OF THE ENCASEMENT AT THE DEPTH OF 30 INCHES. NO MORE THAN 180 DEGREES OF BENDS ARE ALLOWED IN A PRIMARY CONDUIT RUN. CONDUIT RUNS OVER 500 FEET IN LENGTH REQUIRE ADDITIONAL PULL BOXES. 5. ALL NEW UNDERGROUND CONDUITS AND SUBSTRUCTURES SHALL BE INSTALLED PER CITY STANDARDS AND SHALL BE INSPECTED BY THE ELECTRICAL UNDERGROUND INSPECTOR BEFORE BACKFILLING. 6. THE CUSTOMER IS RESPONSIBLE FOR INSTALLING ALL UNDERGROUND ELECTRIC SERVICE CONDUCTORS, BUS DUCT, TRANSITION CABINETS, AND OTHER REQUIRED EQUIPMENT. THE INSTALLATION SHALL MEET THE NATIONAL ELECTRIC CODE AND THE CITY STANDARDS. 7. METER AND SWITCHBOARD REQUIREMENTS SHALL BE IN ACCORDANCE WITH ELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS COMMITTEE (EUSERC) DRAWINGS ACCEPTED BY UTILITY AND CPA STANDARDS FOR METER INSTALLATIONS. 8. CATALOG CUT SHEETS MAY NOT BE SUBSTITUTED FOR FACTORY DRAWING SUBMITTAL. 9. ALL NEW UNDERGROUND ELECTRIC SERVICES SHALL BE INSPECTED AND APPROVED BY BOTH THE BUILDING INSPECTION DIVISION AND THE ELECTRICAL UNDERGROUND INSPECTOR BEFORE ENERGIZING. AFTER CONSTRUCTION & PRIOR TO FINALIZATION 1. THE CUSTOMER SHALL PROVIDE AS-BUILT DRAWINGS SHOWING THE LOCATION OF ALL SWITCHBOARDS, CONDUITS (NUMBER AND SIZE), CONDUCTORS (NUMBER AND SIZE), SPLICE BOXES, VAULTS AND SWITCH/TRANSFORMER PADS. ELECTRICAL NOTES CON'T: PRIOR TO ISSUANCE OF BUILDING OCCUPANCY PERMIT1. THE APPLICANT SHALL SECURE A PUBLIC UTILITIES EASEMENT FOR FACILITIES INSTALLED ON PRIVATE PROPERTY FOR CITY USE.2. ALL REQUIRED INSPECTIONS HAVE BEEN COMPLETED AND APPROVED BY BOTH THE BUILDING INSPECTION DIVISION AND THE ELECTRICAL UNDERGROUND INSPECTOR.3. ALL FEES MUST BE PAID. 4. ALL SPECIAL FACILITIES CONTRACTS OR OTHER AGREEMENTS NEED TO BE SIGNED BY THE CITY AND APPLICANT. MASTER LICENSE AGREEMENT. EACH SMALL CELL NODE WILL COMPLY AT ALL TIMES WITH THE TERMS AND CONDITIONS IN THE MASTER LICENSE AGREEMENT FOR USE OF CITY-CONTROLLED SPACE ON UTILITY POLES AND STREETLIGHT POLES AND IN CONDUITS (“MLA”) BETWEEN THE CITY OF PALO ALTO AND NEW CINGULAR WIRELESS, PCS, LLC, DBA AT&T MOBILITY, EXECUTED ON APRIL 9, 2012 (CONTRACT NO. C11145721). A SECURITY INSTRUMENT, SUCH AS A PERFORMANCE BOND OR LETTER OF CREDIT, SHALL BE PROVIDED IN ACCORDANCE WITH SECTION 14.0 OF THE MLA PRIOR TO PERMIT ISSUANCE. PUBLIC WORKS 1. SPECIAL STREET LIGHTING: DOWNTOWN UNIVERSITY AVE DISTRICT. IT IS RECOMMENDED THAT ROADWAY LIGHTING US DECORATIVE LUMINARIES, SIMILAR TO EXISTING LUMINARIES WITHIN THE UNIVERSITY AVE UNDERPASS AND ALONG PORTIONS OF ALMA STREET. A STYLE PLACEMENT GUIDE SHEET IS AVAILABLE FROM PUBLIC WORKS AT THE DEVELOPMENT CENTER. THIS APPLIES TO ALL LOCATIONS THAT ARE WITHIN THE DOWNTOWN BOUNDARY. 2. EASEMENT: ALL EXISTING EASEMENTS SHALL BE INDICATED ON PLAN SUBMITTAL TO PUBLIC WORKS FOR NECESSARY PERMITS. ANY PROPOSED ITEMS IN EXISTING PUBLIC UTILITY EASEMENT AREAS SHALL BE APPROVED BY CPA UTILITIES AND PUBLIC WORKS ENGINEERING. 3. DEMOLITION PLAN: PLACE THE FOLLOWING NOTE ADJACENT TO AN AFFECTED TREE ON THE SITE PLAN AND DEMOLITION PLAN: “EXCAVATION ACTIVITIES ASSOCIATED WITH THE PROPOSED SCOPE OF WORK SHALL OCCUR NO CLOSER THAN 10-FEET FROM THE EXISTING STREET TREE, OR AS APPROVED BY THE URBAN FORESTRY DIVISION CONTACT 650-496-5953. ANY CHANGES SHALL BE APPROVED BY THE SAME”. 4. WORK IN THE RIGHT-OF-WAY: THE PLANS MUST CLEARLY INDICATE ANY WORK THAT IS PROPOSED IN THE PUBLIC RIGHT-OF-WAY, SUCH AS SIDEWALK REPLACEMENT, DRIVEWAY APPROACH, OR UTILITY LATERALS. THE PLANS MUST INCLUDE NOTES THAT THE WORK MUST BE DONE PER CITY STANDARDS AND THAT THE CONTRACTOR PERFORMING THIS WORK MUST FIRST OBTAIN A STREET WORK PERMIT FROM PUBLIC WORKS AT THE DEVELOPMENT CENTER. IF A NEW DRIVEWAY IS IN A DIFFERENT LOCATION THAN THE EXISTING DRIVEWAY, THEN THE SIDEWALK ASSOCIATED WITH THE NEW DRIVEWAY MUST BE REPLACED WITH A THICKENED (6” THICK INSTEAD OF THE STANDARD 4” THICK) SECTION. ADDITIONALLY, CURB CUTS AND DRIVEWAY APPROACHES FOR ABANDONED DRIVEWAYS MUST BE REPLACED WITH NEW CURB, GUTTER AND PLANTER STRIP. 5. ALL PROPOSED PEDESTAL, TRASH AND UTILITY EQUIPMENT SHALL MAINTAIN ADHERE TO ADA ACCESSIBILITY CLEARANCES PER CHAPTER 11A/B OF THE CALIFORNIA BUILDING CODE. THE CLEARANCE SHALL BE MEASURED FROM THE EDGE OF THE EQUIPMENT TO THE NEAREST OBSTRUCTION AND/OR PROPERTY LINE. INCLUDE A DIMENSION FOR EACH LOCATION THAT HAS ABOVE GROUND EQUIPMENT THAT WILL BE MOUNTED ON A SIDEWALK. THE DIMENSION SHALL BE DEPICTED FORM THE EDGE OF THE EQUIPMENT AS OPPOSED TO THE CENTER. 6. A PERMANENT ENCROACHMENT PERMIT WILL BE REQUIRED FOR ALL EQUIPMENT THAT IS TO BE INSTALLED IN THE PUBLIC RIGHT-OF-WAY. 7. PUBLIC WORKS SHALL DETERMINE THE NUMBER OF ENCROACHMENT PERMITS AND ASSOCIATED STREET WORK PERMITS, IF ANY, THAT CAN BE PROCESSED IN A BATCH. THE APPLICANT WILL BE REQUIRED TO APPLY FOR ALL NECESSARY PERMITS INCLUDING: STREET WORK AND ENCROACHMENT PERMIT APPLICATIONS. ALL REQUIRED APPLICATIONS SHALL BE IN THE SUBMITTAL PACKAGE FOR PUBLIC WORKS. ANY NECESSARY TRAFFIC CONTROL PLANS WILL ALSO BE SUBMITTED IN THE PERMIT APPLICATION PACKET. ANY SUBMITTED TRAFFIC CONTROL PLANS SHALL BE ROUTED TO TRANSPORTATION DIVISION UNDER PLANNING & COMMUNITY ENVIRONMENT FOR REVIEW. THESE NECESSARY PERMIT APPLICATIONS AND REQUIREMENTS ARE AVAILABLE FROM PUBLIC WORKS ON OUR WEBSITE: HTTPS://WWW.CITYOFPALOALTO.ORG/GOV/DEPTS/PWD/FORMS_AND_PERMITS/DEFAULT.ASP 8. THE LOCATION OF PROPOSED PULL BOXES WILL BE REVIEWED AND DETERMINED ON A LOCATION BASIS. 9. SIDEWALK, CURB & GUTTER. IN THE EVENT EXISTING SIDEWALKS, CURBS, GUTTERS, DRIVEWAY APPROACHES, OR STREET AREAS IN THE PUBLIC RIGHT-OF-WAY ARE DISTURBED AS PART OF THIS PROJECT, THE APPLICANT SHALL REPAIR OR REPLACE THOSE SIDEWALKS, CURBS, GUTTERS, DRIVEWAY APPROACHES, OR STREET AREAS AS DIRECTED BY AND TO THE SATISFACTION OF THE CITY ENGINEER. CONTACT PUBLIC WORKS' INSPECTOR AT 650-496-6929 TO ARRANGE A SITE VISIT SO THAT THE INSPECTOR CAN DISCUSS THE EXTENT OF REPLACEMENT WORK ALONG THE PUBLIC ROAD. THE SITE PLAN SUBMITTED WITH THE BUILDING/STREETWORK/ENCROACHMENT PERMIT PLAN SET MUST SHOW THE EXTENT OF THE REPLACEMENT WORK. THE PLAN MUST NOTE THAT ANY WORK IN THE RIGHT-OF-WAY MUST BE DONE PER PUBLIC WORKS' STANDARDS BY A LICENSED CONTRACTOR WHO MUST FIRST OBTAIN A STREET WORK PERMIT FROM PUBLIC WORKS AT THE DEVELOPMENT CENTER. 10. ALL TRENCH WORK AND PLACEMENT OF FIBER OPTIC CONDUIT SHALL ADHERE TO CITY OF PALO ALTO PUBLIC WORKS SPECIFICATIONS. REFER TO CITY OF PALO ALTO PUBLIC WORKS CONDUIT LOCATION DETAIL TELECOMMUNICATIONS DRAWING NO. 402. THIS DETAIL WILL PROVIDE SPECIFICS FOR PLACEMENT OF CONDUIT IN BOTH RESIDENTIAL AND COMMERCIAL AREAS. ANY DEVIATION FROM CITY STANDARDS AND REGULATIONS MUST BE APPROVED BY PUBLIC WORKS AND ALL OTHER APPLICABLE DEPARTMENTS. 11. STORM WATER POLLUTION PREVENTION: THE CITY'S FULL-SIZED "POLLUTION PREVENTION - IT'S PART OF THE PLAN" SHEET MUST BE INCLUDED IN THE PLAN SET. COPIES ARE AVAILABLE FROM PUBLIC WORKS ON OUR WEBSITE HTTP://WWW.CITYOFPALOALTO.ORG/CIVICAX/FILEBANK/DOCUMENTS/2732 12. PROVIDE THE FOLLOWING AS A NOTE ON THE SITE PLAN: “THE CONTRACTOR MAY BE REQUIRED TO SUBMIT A LOGISTICS PLAN TO THE PUBLIC WORKS DEPARTMENT PRIOR TO COMMENCING WORK THAT ADDRESSES ALL IMPACTS TO THE CITY'S RIGHT-OF-WAY, INCLUDING, BUT NOT LIMITED TO: PEDESTRIAN CONTROL, TRAFFIC CONTROL, TRUCK ROUTES, MATERIAL DELIVERIES, CONTRACTOR'S PARKING, CONCRETE POURS, CRANE LIFTS, WORK HOURS, NOISE CONTROL, DUST CONTROL, STORM WATER POLLUTION PREVENTION, CONTRACTOR'S CONTACT, NOTICING OF AFFECTED SURROUNDING PROPERTIES , AND SCHEDULE OF WORK. THE REQUIREMENT TO SUBMIT A LOGISTICS PLAN WILL BE DEPENDENT ON THE NUMBER OF APPLICATIONS PUBLIC WORKS ENGINEERING RECEIVES WITHIN CLOSE PROXIMITY TO HELP MITIGATE AND CONTROL THE IMPACT TO THE PUBLIC-RIGHT-OF-W AY. IF NECESSARY, PUBLIC WORKS MAY REQUIRE A LOGISTICS PLAN DURING CONSTRUCTION.” 13. CALTRANS: CALTRANS RIGHT-OF-WAY ACROSS EL CAMINO REAL EXTENDS FROM BACK-OF-WALK TO BACK-OF WALK. THE CITY HAS A MAINTENANCE AGREEMENT WITH CALTRANS THAT REQUIRES THE CITY TO MAINTAIN THE SIDEWALK AND TO ISSUE STREET WORK PERMITS FOR WORK DONE ON THE SIDEWALKS BY PRIVATE CONTRACTORS. CALTRANS HAS RETAINED THE RIGHT TO REVIEW AND PERMIT NEW INGRESS/EGRESS DRIVEWAYS OFF EL CAMINO REAL AS WELL AS THE INSTALLATION OF TRAFFIC CONTROL DEVICES AS PART OF THIS PROJECT. THE APPLICANT WILL PROVIDE A COPY OF APPROVED CALTRANS PERMIT PRIOR TO ISSUANCE OF ANY STREET-WORK AND ENCROACHMENT PERMITS. 14. CALTRAIN: ANY WORK WITHIN CALTRAIN ROW SHALL HAVE NECESSARY APPROVAL ALONG WITH ANY SERVICE AND LICENSE AGREEMENTS 15. EXTENT OF ANY EXISTING EXTENDING SUB-SIDEWALK BASEMENTS SHALL BE IDENTIFIED IN FIELD PRIOR TO START OF WORK; IF THE LOCATION OF THE BASEMENT IS A DIFFERENT LOCATION FROM LOCATION IDENTIFIED ON PLANS AND IN TRENCH/BORE/EXCAVATION AREA, UPDATED PLANS SHALL BE PROVIDED TO PUBLIC WORKS ENGINEERING (TO INDICATE HOW PROPOSED Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 46 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 G-3 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS GENERAL NOTES WGW UTILITY ENGINEERING CONDITIONS: 1. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (800) 227-2600 ONE WEEK IN ADVANCE OF STARTING EXCAVATION TO PROVIDE FOR MARKING OF UNDERGROUND UTILITIES. 2. THE CONTRACTOR SHALL PROVIDE POTHOLING AND VERIFY THE EXACT LOCATION OF EXISTING AND ABANDONED UTILITIES, INVERTS, DEPTH AND ELEVATIONS TO CONFIRM THE HORIZONTAL AND VERTICAL ALIGNMENT OF THE NEW PIPES CROSSING THE STREETS. THE PROJECT ENGINEER MUST REPORT TO UTILITIES ENGINEERING ANY PROPOSED UNDERGROUND WORK IS CONFLIT WITH EXISTING WGW UTILITY SERVICES/MAINS. 3. THE APPLICANT SHALL PROVIDE A CROSS SECTION OR PROFILE SHOWING THE PROPOSED VERTICAL ALIGNMENT FOR THE (N) CONDUITS AND THE CROSSING OF EXISTING UNDERGROUND UTILITIES. THE PROFILE MUST BE DRAWN TO SCALE WITH APPROXIMATE DEPTHS OF (E) PIPES. 4. THE APPLICANT SHALL PROVIDE PROTECTION FOR UTILITY LINES SUBJECT TO DAMAGE. UTILITY LINES WITHIN A PIT OR TRENCH SHALL BE ADEQUATELY SUPPORTED. ALL EXPOSED WATER, GAS, AND SEWER LINES SHALL BE INSPECTED BY THE WGW UTILITIES INSPECTOR PRIOR TO BACKFILLING. 5. WHEN TRENCHING: FOR CROSSING UTILITIES THE CONTRACTOR SHALL MAINTAIN 12" CLEAR, ABOVE AND BELOW, FROM THE EXISTING UTILITIES TO NEW UNDERGROUND FACILITIES. FOR PARALLEL UTILITIES MAINTAIN MINIMUM 3' CLEAR HORIZONTAL (NOT DIAGONAL) SEPARATION. 6. WHEN BORING NEW PIPES OR CONDUITS: THE PILOT BORE HOLE SHALL BE 24" CLEAR FROM ANY CROSSING EXISTING WGW UTILITY PIPES AND ALL EXISTING UTILITY CROSSINGS SHALL BE POTHOLED PRIOR TO STARTING WORK. FOR PARALLEL UTILITIES MAINTAIN MINIMUM 5’ CLEAR HORIZONTAL (NOT DIAGONAL) SEPARATION. 7. UTILITY VAULTS, TRANSFORMERS, UTILITY CABINETS, CONCRETE BASES, OR OTHER STRUCTURES CAN NOT BE PLACED OVER EXISTING WATER, GAS OR WASTEWATER MAINS/SERVICES. MAINTAIN 1’ HORIZONTAL CLEAR SEPARATION FROM THE VAULT/CABINET/CONCRETE BASE TO EXISTING UTILITIES AS FOUND IN THE FIELD. IF THERE IS A CONFLICT WITH EXISTING UTILITIES, CABINETS/VAULTS/BASES SHALL BE RELOCATED FROM THE PLAN LOCATION AS NEEDED TO MEET FIELD CONDITIONS. 8. ALL UTILITY WORK/INSTALLATIONS SHALL BE IN ACCORDANCE WITH THE CITY OF PALO ALTO UTILITY STANDARDS FOR WATER, GAS & WASTEWATER. 9. FOR ANY UTILITY WORK IN CALTRANS RIGHT-OF-WAY, THE APPLICANT SHALL OBTAIN AN ENCROACHMENT PERMIT FROM CALTRANS FOR ALL UTILITY WORK IN THE EL CAMINO REAL RIGHT-OF-WAY. THE APPLICANT MUST PROVIDE A COPY OF THE PERMIT TO THE WGW ENGINEERING SECTION. 10. FOR ANY UTILITY WORK IN A COUNTY RIGHT-OF-WAY, THE APPLICANT SHALL OBTAIN AN ENCROACHMENT PERMIT FROM SANTA CLARA COUNTY DEPARTMENT OF TRANSPORTATION FOR ALL UTILITY WORK IN THE COUNTY ROAD RIGHT-OF-WAY. THE APPLICANT MUST PROVIDE A COPY OF THE PERMIT TO THE WGW ENGINEERING SECTION. 11. FOR ANY UTILITY WORK IN OR NEAR SCVWD RIGHT-OF-WAY, THE APPLICANT SHALL OBTAIN A CONSTRUCTION PERMIT FROM SANTA CLARA VALLEY WATER DISTRICT FOR THE UTILITY WORK BY THE CITY OF PALO ALTO UTILITIES. 12. ALL WGW UTILITY WORK SHALL BE INSPECTED AND APPROVED BY THE WGW UTILITIES INSPECTOR. INSPECTION COSTS SHALL BE PAID BY THE APPLICANT'S CONTRACTOR PRIOR TO STARTING WORK. SCHEDULE WGW UTILITIES INSPECTIONS AT 650/566-4504 FIVE WORKING DAYS BEFORE START OF CONSTRUCTIONS. 13. THE APPLICANT'S CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITIES DEPARTMENT (650) 496-6982 OR 650/329-2413 IF THE EXISTING WATER, WASTEWATER OR GAS MAINS ARE DISTURBED OR DAMAGED. 14. NO WATER OR GAS VALVES OR OTHER FACILITIES OWNED BY UTILITIES DEPARTMENT SHALL BE OPERATED FOR ANY PURPOSE BY THE APPLICANT'S CONTRACTOR. ALL REQUIRED OPERATION WILL ONLY BE PERFORMED BY AUTHORIZED UTILITIES DEPARTMENT PERSONNEL. THE APPLICANT'S CONTRACTOR SHALL NOTIFY THE UTILITIES DEPARTMENT NOT LESS THAN FORTY-EIGHT (48) HOURS IN ADVANCE OF THE TIME THAT SUCH OPERATION IS REQUIRED. 15. THE CONTRACTOR SHALL NOT DISCONNECT ANY PART OF THE EXISTING WATER, GAS, OR WASTEWATER MAINS EXCEPT BY EXPRESSED PERMISSION OF THE WGW UTILITIES INSPECTOR AND SHALL SUBMIT A SCHEDULE OF THE ESTIMATED SHUTDOWN TIME TO OBTAIN SAID PERMISSION. 16. ONLY CITY FORCES CAN WORK ON THE CITY GAS DISTRIBUTION SYSTEM. EMERGENCY SERVICES: ALL AREA CODES ARE (650) UNLESS OTHERWISE NOTED CITY COMMUNICATION CENTER (FOR POLICE OR FIRE 24 HOURS) 329-2413 CITY WATER-GAS-WASTEWATER OPERATIONS 496-6982 CITY WATER-GAS-WASTEWATER INSPECTOR 566-4553 UNDERGROUND SERVICE ALERT (USA) (800) 227-2600 CITY ELECTRIC/FIELD OPERATIONS 496-6914 CITY ELECTRIC/TRAFFIC SIGNALS 496-6991 CITY CHIEF ELECTRIC UNDERGROUND INSPECTOR 496-6965 Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 47 POLLUTION PREVENTION REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 G-4 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS 1POLLUTION PREVENTION Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 48 PUBLIC WORKS CONDITIONS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 G-5 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS 1PUBLIC WORKS CONDITIONS Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 49 SITE PLAN REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS 1SITE PLAN N HIGH S T (E) CPA COMM. HANDHOLE (E) CATU HANDHOLE (E) SEWER CLEANOUT (E) BUILDING APN: 12026037 (E) BUILDING APN: 12026039 (E) BUILDING APN: 12026031 (E) PARKING AREA (E) PARKING AREA (E) TREE (TYP) (E) TREE (TYP) (E) TREE (TYP) (E) STORM DRAIN (TYP) (E) TRAFFIC SIGN (TYP) (E) CURB (TYP) (E) R O A D S I D E P A R K I N G (E) R O A D S I D E P A R K I N G APN: 12026102 (E) BUILDING (E) BUILDING (E) FIRE HYDRANT (TYP) (E) LIGHT POLE (TYP) (E) TREE (TYP) (E) UTILITY LINE (TYP) (E) UTILITY WATER SERVICE CONNECTION. SEE NOTES 4-8, SHEET G-2 (E) CPA VAULT/POC. REMOVE AND REPLACE TYPE AND SIZE TO BE DETERMINED BY UTILITY (E) MANHOLE (TYP.) (E) WATER VAULT APPLICANT SHALL PROVIDE PROTECTION FOR EXISTING WATER METER VAULT AND SERVICE LINE SUBJECT TO DAMAGE (E) WATER SERVICE ACCESS (E) ABANDONED TREE WELL (E) CRAPE MYRTLE TREE TO BE WRAPPED IN TYPE-III TREE PROTECTION PER ARBORIST REPORT DATED 10-16-2020. WORK TO BE SUPERVISED BY PROJECT ARBORIST (E) PAC BELL VAULT (E) CATV VAULT (N) 4" PVC CONDUIT FOR UNDERGROUND POWER DIRECTIONALLY BORED UNDER EXISTING UTILITIES PER CPU STD. DWG. #402 WITH (2) 1/0 COPPER WIRES. (E) CRAPE MYRTLE TO BE REMOVED AND REPLACED WITH A NEW 24" BOXED CREPE MYRTLE UPON COMPLETION OF WORK. (E) ELECTRIC MANHOLE DEPTH 105" (TYP. FOR 3) (E) STREET LIGHT POLE (#46) TO BE REPLACED WITH (N). (E) POLE TO BE SALVAGED (E) CRAPE MYRTLE TREE TO BE WRAPPED IN TYPE-III TREE PROTECTION PER ARBORIST REPORT DATED 10-16-2020 . WORK TO BE SUPERVISED BY PROJECT ARBORIST. 1. THESE NOTES SHALL BE CONSIDERED A PART OF THE WRITTEN SPECIFICATIONS, CONTRACT AND CONSTRUCTION DOCUMENTS. 2. THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT, APPURTENANCES, AND LOBOR NECESSARY TO COMPLETE ALL INSTALLATIONS AS INDICATED ON THE PLANS AND IN THE CONTRACT DOCUMENTS. 3. PRIOR TO THE SUBMISSION OF BIDS, THE CONTRACTOR(S) SHALL VISIT THE JOB SITE(S) AND BE RESPONSIBLE FOR ALL CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS, AND CONFIRM THE WORK MAY BE ACCOMPLISHED PER THE CONTRACT DOCUMENTS. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE IMPLEMENTATION ENGINEER AND ARCHITECT/ENGINEER PRIOR TO BID SUBMITTAL. 4. THE CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED ON ANY WORK NOT CLEARLY DEFINED OR IDENTIFIED IN THE CONTRACT AND CONSTRUCTION DOCUMENTS BEFORE STARTING ANY WORK. 5. ALL WORK PERFORMED AND MATERIALS INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCE, INCLUDING APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS. 6. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. IF THE RECOMMENDATIONS ARE IN CONFLICT WITH THE CONTRACT AND CONSTRUCTION DOCUMENTS AND/OR APPLICABLE CODES OR REGULATIONS, REVIEW AND RESOLVE THE CONFLICT WITH DIRECTION FROM THE IMPLEMENTATION ENGINEER AND ARCHITECT/ENGINEER PRIOR TO PROCEEDING. 7. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATION OF ALL PORTIONS OF THE WORK UNDER THE CONTRACT INCLUDING CONTACT AND COORDINATION WITH THE IMPLEMENTATION ENGINEER AND WITH THE AUTHORIZED REPRESENTATIVE OF ANY OUTSIDE POLE OR PROPERLY OWNER. 8. THE CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO PAVING, CURBS, VEGETATION, GALVANIZED SURFACE OR OTHER EXISTING ELEMENTS AND UPON COMPLETION OF THE WORK, REPAIR AND DAMAGE THAT OCCURRED DURING CONSTRUCTION TO THE SATISFACTION OF AT&T MOBILITY. 9. CONTRACTOR IS TO KEEP THE GENERAL AREA CLEAN, HAZARD FREE, AND DISPOSE OF ALL DIRT, DEBRIS, RUBBISH, AND REMOVE EQUIPMENTS NOT SPECIFIED AS REMAINING ON THE PROPERTY. LEAVE PREMISES IN CLEAN CONDITION DAILY. 10. PLANS ARE INTENDED TO BE DIAGRAMMATIC ONLY AND SHOULD NOT BE SCALED UNLESS OTHERWISE NOTED. RELY ONLY ON ANNOTATED DIMENSIONS AND REQUEST INFORMATION IF ADDITIONAL DIMENSIONS ARE REQUIRED. 11. THE EXISTENCE AND LOCATION OF UTILITIES AND OTHER AGENCY'S FACILITY WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. OTHER FACILITIES MAY EXIST. CONTRACTOR SHALL VERIFY LOCATIONS PRIOR TO START OF CONSTRUCTION AND USE EXTREME CARE AND PROTECTIVE MEASURES TO PREVENT DAMAGE TO THE FACILITIES. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF UTILITIES OR OTHER AGENCY'S FACILITIES WITHIN THE LIMITS OF THE WORK, WHETHER THEY ARE IDENTIFIED IN THE CONTRACT DOCUMENTS OR NOT. 12. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (800) 227-2600, AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY EXCAVATION. 13. THE CONTRACTOR MAY BE REQUIRED TO SUBMIT A LOGISTICS PLAN TO THE PUBLIC WORKS DEPARTMENT PRIOR TO COMMENCING WORK THAT ADDRESSES ALL IMPACTS TO THE CITY'S RIGHT-OF-WAY, INCLUDING, BUT NOT LIMITED TO: PEDESTRIAN CONTROL, TRAFFIC CONTROL, TRUCK ROUTES, MATERIAL DELIVERIES, CONTRACTOR'S PARKING, CONCRETE POURS, CRANE LIFTS, WORK HOURS, NOISE CONTROL, DUST CONTROL, STORM WATER POLLUTION PREVENTION, CONTRACTOR'S CONTACT, NOTICING OF AFFECTED SURROUNDING PROPERTIES, AND SCHEDULE OF WORK. 14. EXCAVATION ACTIVITIES ASSOCIATED WITH THE PROPOSED SCOPE OF WORK SHALL OCCUR NO CLOSER THAT 10 FEET FROM THE EXISTING STREET TREE, OR AS APPROVED BY THE URBAN FORESTRY DIVISION. CONTACT: (650) 496-5953. ANY CHANGES SHALL BE APPROVED BY THE SAME. GENERAL NOTES: 1. "TYPICAL" OR "TYP" MEANS THAT THIS ITEM IS SUBSTANTIALLY THE SAME ACROSS SIMILAR CONDITIONS. "TYP." SHALL BE UNDERSTOOD TO MEAN "TYPICAL WHERE OCCURS" AND SHALL NOT BE CONSIDERED AS WITHOUT EXCEPTION OR CONSIDERATION OF SPECIFIC CONDITIONS. 2. "SIMILAR" MEANS COMPARABLE TO CHARACTERISTICS FOR THE CONDITION NOTED. VERIFY DIMENSIONS AND ORIENTATION ON PLAN. 3. "AS REQUIRED" MEANS AS REQUIRED BY REGULATORY REQUIREMENTS, BY REFERENCED STANDARDS, BY EXISTING CONDITIONS, BY GENERALLY ACCEPTED CONSTRUCTION PRACTICE, OR BY THE CONTRACT DOCUMENTS. 4. "ALIGN" MEANS ACCURATELY LOCATE FINISH FACES OF MATERIALS IN THE SAME PLAN. 5. THE TERM "VERIFY" OR "V.I.F." SHALL BE UNDERSTOOD TO MEAN "VERIFY IN FIELD WITH ENGINEER" AND REQUIRES THAT THE CONTRACTOR CONFIRM INTENTION REGARDING NOTED CONDITION AND PROCEED ONLY AFTER RECEIVING DIRECTION. 6. WHERE THE WORDS "OR EQUAL" OR WORDS OF SIMILAR INTENT FOLLOW A MATERIAL SPECIFICATION, THEY SHALL BE UNDERSTOOD TO REQUIRE SIGNED APPROVAL OF ANY DEVIATION TO SAID SPECIFICATION PRIOR TO CONTRACTOR'S ORDERING OR INSTALLATION OF SUCH PROPOSED EQUAL PRODUCT. 7. FURNISH : SUPPLY ONLY, OTHERS TO INSTALL. INSTALL : INSTALL ITEMS FURNISHED BY OTHERS. PROVIDE : FURNISH AND INSTALL DEFINITIONS: ALL EQUIPMENT WILL BE PAINTED TO MATCH NEW POLE. THE PAINT COLOR TO BE USED SHALL CONSIST OF ONE OF THE FOLLOWING: 1. CITY OF PALO ALTO MUNSELL RAL5.5GY2.76/2.1. PAINT NOTES: (E) CALLERY PEAR TREE TO BE WRAPPED IN TYPE-III TREE PROTECTION PER ARBORIST REPORT DATED 10-16-2020 . WORK TO BE SUPERVISED BY PROJECT ARBORIST. (E) PROPERTY LINE (TYP.) Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 50 ENLARGED SITE PLAN AND ANTENNA PLAN REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-2 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS 1 N PROPOSED ANTENNA PLAN2ENLARGED SITE PLAN N (E) CURB (E) R O A D S I D E P A R K I N G (E) R O A D S I D E P A R K I N G (E) R O A D S I D E P A R K I N G (E) TREE (TYP) (E) TREE (TYP) (E) TREE (TYP) (E) BUILDING APN: 12026037 HIGH S T HIGH S T (E) UTILITY LINE (TYP) (E) UTILITY WATER SERVICE CONNECTION. SEE NOTES 4-8, SHEET G-2 (E) UNDERGROUND GAS LINE (E)TREE WELL AROUND TREE TRUNK (E) CREPE MYRTLE TO BE REMOVED AND REPLACED WITH A NEW 24" BOXED CREPE MYRTLE UPON COMPLETION OF WORK. (E) CREPE MYRTLE TO BE PROTECTED WITH TYPE III TREE PROTECTION PER ARBORISTS REPORT DATED 10-16-2020, AND AS DIRECTED BY CITY ARBORIST. EXISTING SIDEWALK EXISTING SIDEWALK (E) CREPE MYRTLE TO BE REMOVED AND REPLACED WITH A NEW 24" BOXED CREPE MYRTLE UPON COMPLETION OF WORK. (E) CPA VAULT/POC. REMOVE AND REPLACE TYPE AND SIZE TO BE DETERMINED BY UTILITY EXISTING UNDERGROUND ELECTRICAL VAULT AND ACCESS (E) WATER VAULT (E) WATER SERVICE ACCESS (E) ABANDONED TREE WELL (E) UTILITY WATER SERVICE CONNECTION. SEE NOTES 4-8, SHEET G-2 (E) PAC BELL VAULT (E) CATV VAULT (E) STREET LIGHT POWER VAULT (E) UNDERGROUND WATER LINE (N) 4" PVC CONDUIT FOR UNDERGROUND POWER DIRECTIONALLY BORED UNDER EXISTING UTILITIES PER CPU STD. DWG. #402 WITH (2) 1/0 COPPER WIRES. (E) WATER SERVICE ACCESS NOTE: (N) FIBER PER UTILITY (BY OTHERS UNDER SEPARATE PERMIT) SIDEWALK GENERAL NOTES:LEGEND AT&T LINE FIBER LINE GAS LINE SANITARY SEWER LINE STREET LIGHT LINE TELCO LINE WATER LINE AT&T FIBER GAS S S/L T W W SUBGRADE SHALL BE COMPACTED TO AT LEAST 95% RELATIVE COMPACTION. WHERE UNSUITABLE SUBGRADE MATERIAL IS ENCOUNTERED, REMEDIAL WORK SHALL BE DONE UNDER THE DIRECTION OF THE CITY ENGINEER, INCLUDES BUT IS NOT LIMITED TO, REMOVING UNSUITABLE MATERIAL AND PLACING A LAYER OF CLASS II AGGREGATE BASE UNDER THE INSTALLATION. UNDERCUT SUBGRADE FOR GUTTER OR SIDEWALK SHALL BE FILLED WITH APPROVED GRANULAR MATERIAL. EXISTING CONCRETE SHALL BE REMOVED AT EXPANSION OR WEAKENED PLANE JOINTS OR AT SAWCUTS. SAWCUTS MUST BE FULL DEPTH. NO UTILITY BOXES, POLES, POSTS OR ANY OTHER FACILITIES OR DEVICES WILL BE PERMITTED IN THE SIDEWALK AREA WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER. NEW WORK SHALL MATCH EXISTING SCORE AND COLOR. SUBGRADE SHALL BE THOROUGHLY WETTED IMMEDIATELY PRIOR TO PLACING CONCRETE. CONCRETE SHALL BE CLASS B-5 SACK MIX WITH 34 INCH MAXIMUM AGGREGATE. CONCRETE SHALL HAVE A SLUMP OF NOT MORE THAN 4 INCHES. NO ADMIXTURES SHALL BE USED WITHOUT THE PERMISSION OF THE CITY ENGINEER. 12" THICK EXPANSION JOINTS SHALL BE PLACED ON BOTH SIDES OF DRIVEWAY APPROACHES, CURB, GUTTER, AND SIDEWALK RETURN POINTS AND AT 20' ON CENTER. WEAKENED PLANE JOINTS AT LEAST 112" DEEP SHALL BE PLACED AT THE CENTER OF DRIVEWAYS AND 20' ON CENTER. 14" DEEP SCORE MARKS SHALL BE PLACED AS DESCRIBED IN THE STANDARD SPECIFICATIONS OR AS DIRECTED BY CITY ENGINEER. NO CONCRETE SHALL BE PLACED UNTIL THE CITY ENGINEER OR HIS AUTHORIZED REPRESENTATIVE HAS INSPECTED AND APPROVED FORMS OF SUBGRADE. ALL EXPOSED EDGES SHALL BE ROUNDED WITH 12" RADIUS TOOL. ALL SURFACES SHALL BE BROOM FINISHED UNLESS OTHERWISE NOTED. CURBS, SIDEWALKS AND DRIVEWAY APPROACHES SHALL BE BACKFIELD WITHIN 7 DAYS AFTER PLACING CONCRETE. THIS SHALL INCLUDE ANY REQUIRED AC PATCHWORK. FORM FACES SHALL NOT VARY FROM THE DIMENSIONS SHOWN BY MORE THAN O2 FEET. FORMS SHALL MEET GRADE. UNLESS OTHERWISE SPECIFIED ON THE APPROVED PLANS, CONCRETE SHALL BE CURED BY MEANS OF THE IMPERVIOUS MEMBRANE METHOD. ALL SIDEWALK CONSTRUCTION ADJACENT TO CURBS SHALL BE POURED MONOLITHIC WITH CURB UNLESS OTHERWISE APPROVED BY ENGINEER. ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE COMPLETE NO LATER THAN 5 DAYS AFTER INSTALLATION OF UTILITY. A MINIMUM OF 6" OF ASPHALT SHALL BE REMOVED ALONG THE GUTTER LIP FOR THE INSTALLATION OF FORMS. FOR CURB AND GUTTER INSTALLATIONS AC SHALL BE BROUGHT TO FINISH GRADE OF FORMS AND TRANSITIONED AS REQUIRED BY THE CITY ENGINEER. ALL FACE ANGLE INSTALLATIONS IN RETURNS SHALL MATCH EXISTING RADIUS OF CURB. SIDEWALK GENERAL NOTES:(E) STREET LIGHT POLE (#46) TO BE REPLACED WITH (N). (E) POLE TO BE SALVAGED (N) 12"x24" N16 ELECTRICAL SERVICE VAULT W/ (N) GROUND BAR (N) LIGHT POLE FOUNDATION. (E) FOUNDATION TO BE REMOVED IN ITS ENTIRETY AND DISPOSED OF BY CONTRACTOR (N) ALUMINUM STREET LIGHT POLE (#46) (E) POLE TO BE SALVAGED (N) 4G FIBERGLASS ANTENNA SHROUD (N) 4G ANTENNA (N) 5G ANTENNA AND RADIO ENCLOSURE WITH (2) HORIZONTAL ACCESS PORTS (N) 2" PVC CONDUIT WITH (N) 3 FO AT&T JUMPERS, (8)#12 THW AT&T POWER AND (4)#12 AT&T GROUND IN A 1.5" - 2 CELL MAXCELL FLEXIBLE INNERDUCT IN (N) ±2' TRENCH (SEPARATE 2" CONDUIT FOR CITY POWER AND FIBER) (N) 4" PVC CONDUIT FOR UNDERGROUND POWER DIRECTIONALLY BORED UNDER EXISTING UTILITIES PER CPU STD. DWG. #402 WITH (2) 1/0 COPPER WIRES. (E) CREPE MYRTLE TO BE PROTECTED WITH TYPE III TREE PROTECTION PER ARBORISTS REPORT DATED 10-16-2020, AND AS DIRECTED BY CITY ARBORIST. (E) CALLERY PEAR TREE TO BE WRAPPED IN TYPE-III TREE PROTECTION PER ARBORIST REPORT DATED 10-16-20. WORK TO BE SUPERVISED BY PROJECT ARBORIST. FOR THE REMOVAL OF TREE #2 LAGERSTROEMIA INDICA, THE APPLICANT IS REPONSIBLE FOR REPLACING THIS TREE WITH (3) 24" BOX TREES ONE OF WHICH WILL BE PLANTED AND THE REMAING TWO TO BE PAID INTO THE URBAN FORESTRY FUND VIA A TREE REMOVAL PERMIT IN THE AMOUNT OF $650 PER TREE TOTALING $1,300 Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 51 PHOTO SIMULATION REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-3 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-3 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS EXISTING VIEW PROPOSED VIEW Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 52 ELEVATIONS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-4 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS PROPOSED ELEVATION - SIDE 1EXISTING ELEVATION - SIDE 2 GROUND LEVEL @ 0'-0" AGL TOP OF (E) LIGHT POLE @ 23'-7" AGL HIGH ST (E) LUMINAIRE & LIGHT SENSOR TOP OF (E) TRAFFIC SIGN @ 8'-11" AGL @ 7'-3" AGL BOTTOM OF (E) TRAFFIC SIGN (E) TRAFFIC SIGN TO BE RELOCATED TO (N) POLE @ 24'-10" AGL (V.I.F.) TOP OF LUMINAIRE & SENSOR @ 7'-4" AGL BOTTOM OF PARKING SIGN @ 8'-11" AGL TOP OF PARKING SIGN @ 0'-0" AGL GROUND LEVEL (E) RELOCATED TRAFFIC SIGN (E) BUILDING (E) BUILDING @ 30'-2" AGL TOP OF (N) ANTENNA @ 29'-3" AGL RAD CENTER OF (N) ANTENNA @ 27'-1" AGL BOTTOM OF (N) RADIO @ 27'-9" AGL TOP OF (N) RADIO (N) EQUIPMENT TO BE GROUNDED & BONDED TO (N) BONDING LUG AT ACCESS OPENING AT BASE OF (N) POLE (BEYOND) HAND HOLE ACCESS UNDER CLAMBSHELL @ 30'-5" AGL TOP OF (N) CANISTER @ 28'-1" AGL BOTTOM OF (N) ANTENNA @ 25'-0" AGL TOP OF (N) LIGHT POLE @ 25'-2" AGL (V.I.F) TOP OF LUMINAIRE & SENSOR @ 22'-6" AGL (V.I.F) ℄ OF MAST ARM ATTACHEMENT @ 21'-4" AGL (V.I.F) BOTTOM OF LUMINAIRE (E) STREET LIGHT POLE TO BE REMOVED AND REPLACED. (E) LIGHT POLE TO BE SALVAGED (E) LIGHT POLE FOUNDATION TO BE REMOVED IN ITS ENTIRETY AND DISPOSED OF BY CONTRACTOR (N) 5G ANTENNA AND RADIO ENCLOSURE WITH (2) HORIZONTAL ACCESS PORTS (N) LIGHT POLE FOUNDATION (N) ALUMINUM LIGHT POLE (#46) (N) FRP ANTENNA SHROUD (N) ANTENNA (N) FCC NOTICE SIGNAGE (N) 14" TAPERED SHROUD SKIRT (2) (N) 2203 AND (1) (N) 2205 RADIOS @ 22'-2" AGL TOP OF (N) 5G ANTENNA @ 20'-7" AGL BOTTOM OF (N) 5G ANTENNA @ 21'-6" AGL RAD CENTER OF (N) 5G ANTENNA NOTE: THE POLE AND LUMINAIRE SHALL BE PAINTED MUNSELL RAL5.5GY2.76/2.1 (E) CREPE MYRTLE TO BE REMOVED AND REPLACED WITH A NEW 24" BOXED CREPE MYRTLE UPON COMPLETION OF WORK. (E) CREPE MYRTLE TO BE REMOVED AND REPLACED WITH A NEW 24" BOXED CREPE MYRTLE UPON COMPLETION OF WORK. @ 10'-0" AGL RF SIGNAGE DECAL (N) FCC NOTICE SIGNAGE Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 53 (E) STREET LIGHT POLE TO BE REMOVED AND REPLACED. (E) LIGHT POLE TO BE SALVAGED (N) ALUMINUM LIGHT POLE (#46) ELEVATIONS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-5 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS PROPOSED ELEVATION - STREET SIDE 1EXISTING ELEVATION - STREET SIDE 2 GROUND LEVEL @ 0'-0" AGL TOP OF (E) LIGHT POLE @ 23'-7" AGL (E) LUMINAIRE & LIGHT SENSOR TOP OF (E) TRAFFIC SIGN @ 8'-11" AGL @ 7'-3" AGL BOTTOM OF (E) TRAFFIC SIGN (E) TRAFFIC SIGN TO BE RELOCATED TO (N) POLE @ 24'-10" AGL (V.I.F.) TOP OF LUMINAIRE & SENSOR @ 0'-0" AGL GROUND LEVEL (E) TREE TO BE REMOVED AND REPLACED (E) BUILDING (E) BUILDING (N) 24" BOXED TREE. SEE ARBORISTS REPORT DATED 08/26/2020 @ 25'-2" AGL (V.I.F) TOP OF LUMINAIRE & SENSOR @ 22'-6" AGL (V.I.F) ℄ OF MAST ARM ATTACHEMENT @ 21'-4" AGL (V.I.F) BOTTOM OF LUMINAIRE @ 22'-2" AGL TOP OF (N) 5G ANTENNA @ 20'-7" AGL BOTTOM OF (N) 5G ANTENNA @ 21'-6" AGL RAD CENTER OF (N) 5G ANTENNA @ 7'-4" AGL BOTTOM OF PARKING SIGN @ 8'-11" AGL TOP OF PARKING SIGN (E) RELOCATED TRAFFIC SIGN @ 10'-0" AGL RF SIGNAGE DECAL (N) EQUIPMENT TO BE GROUNDED & BONDED TO (N) BONDING LUG AT ACCESS OPENING AT BASE OF (N) POLE (BEYOND) HAND HOLE ACCESS UNDER CLAMBSHELL (N) LIGHT POLE FOUNDATION (N) 5G ANTENNA AND RADIO ENCLOSURE WITH (2) HORIZONTAL ACCESS PORTS @ 30'-2" AGL TOP OF (N) ANTENNA @ 29'-3" AGL RAD CENTER OF (N) ANTENNA @ 27'-1" AGL BOTTOM OF (N) RADIO @ 27'-9" AGL TOP OF (N) RADIO @ 30'-5" AGL TOP OF (N) CANISTER @ 28'-1" AGL BOTTOM OF (N) ANTENNA @ 25'-0" AGL TOP OF (N) LIGHT POLE (N) FRP ANTENNA SHROUD (N) ANTENNA (N) FCC NOTICE SIGNAGE (N) 14" TAPERED SHROUD SKIRT (2) (N) 2203 AND (1) (N) 2205 RADIOS NOTE: THE POLE AND LUMINAIRE SHALL BE PAINTED MUNSELL RAL5.5GY2.76/2.1 (N) FCC NOTICE SIGNAGE Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 54 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-6 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS DETAILS 5 4 3 1 6 2 CABLE PORTS (TYP.) SEE MANUFACTURER INSTALLATION INSTRUCTIONS 1"-14 BOLT SITE ID :________________ RF ENERGY EMITTED BY THIS DEVICE MAY EXCEED THE FCC'S GENERAL PUBLIC EXPOSURE LIMITS. STAY AT LEAST 2 FOOT AWAY FROM THIS DEVICE FROM 27'6" TO 30'6". CALL 800-638-2822 FOR HELP IF YOU NEED ACCESS WITHIN 2 FEET. USID:__________________ Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 55 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-7 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS DETAILS WELDING GENERAL NOTES: 1. REMOVE ALL EXISTING CONDUCTORS AND GROUND WIRES FROM POLE PRIOR TO WELDING AND INSTALL NEW AFTER WELDING IS COMPLETE IN ACCORDANCE WITH STANDARD SPECIFICATION 86-2.04(B) WELDING TO BE PERFORMED BY AN AWS CERTIFIED WELDER FOR THE TYPE OF AND POSITION INDICATED. ALL WORK MUST BE IN CONFORMANCE WITH LATEST EDITION OF AISC & AWS D1.1. GRIND SURFACES TO BE WELDED WITH A SILICON CARBIDE WHEEL PRIOR TO WELDING TO REMOVED ALL GALVANIZING WHICH MAY OTHERWISE BE CONSUMED IN THE WELD METAL. APPLY ANTI-SPATTER COMPOUND AFTER GRINDING. WELDING TECHNIQUE MUST MINIMIZE TEMPERATURE RISE ON THE INSIDE SURFACE OF THE LIGHT POLE AND ALSO VOLATIZE ANY REMAINING ZINC WITHIN THE BASE METAL WITH MINIMUM SPATTER. USE AN E70 (LOW HYDROGEN) ELECTRODE. USE LARGEST DIAMETER ELECTRODE COMPATIBLE WITH WELDING POSITION AND MATERIAL THICKNESS. STRICTLY FOLLOW ALL MANUFACTURER'S INSTRUCTIONS FOR STORAGE AND USE OF ELECTRODES. AVOID REMOVING ELECTRODES FROM MANUFACTURER'S PACKAGING UNTIL READY FOR IMMEDIATE USE. WELDING MAY PRODUCE TOXIC FUMES. REFER TO ANSI STANDARD Z49.1 "SAFETY IN WELDING AND CUTTING" FOR PROPER PRECAUTIONS. UPON COMPLETION OF WELDING, APPLY GALV-A-STICK ZINC COATING TO ALL UNPROTECTED SURFACES. APPLY A SECOND LAYER OF COLD GALVANIZING SPRAY COMPOUND CONTAINING A MINIMUM ZINC CONTENT OF 95%. APPLY A FINAL COAT OF COMPATIBLE PAINT TO MATCH SURROUNDING SURFACES. 5 4 1 6 4 23 Utility Box No. N40 BOX 268 lbs. Composite Lid ·Etched polypropylene face ·Face anchored in concrete ·Ultra-violet inhibitor ·Exceeds ASTM-D1693 Standards for Environmental Stress Cracking Resistance Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 56 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-8 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS FOUNDATION DETAILS 1 SIDEWALK GENERAL NOTES: 1. SUBGRADE SHALL BE COMPACTED TO AT LEAST 95% RELATIVE COMPACTION. 2. WHERE UNSUITABLE SUBGRADE MATERIAL IS ENCOUNTERED, REMEDIAL WORK SHALL BE DONE UNDER THE DIRECTION OF THE CITY ENGINEER, INCLUDES BUT IS NOT LIMITED TO, REMOVING UNSUITABLE MATERIAL AND PLACING A LAYER OF CLASS II AGGREGATE BASE UNDER THE INSTALLATION. 3. UNDERCUT SUBGRADE FOR GUTTER OR SIDEWALK SHALL BE FILLED WITH APPROVED GRANULAR MATERIAL. 4. EXISTING CONCRETE SHALL BE REMOVED AT EXPANSION OR WEAKENED PLANE JOINTS OR AT SAWCUTS. 5. SAWCUTS MUST BE FULL DEPTH. 6. NO UTILITY BOXES, POLES, POSTS OR ANY OTHER FACILITIES OR DEVICES WILL BE PERMITTED IN THE SIDEWALK AREA WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER. 7. NEW WORK SHALL MATCH EXISTING SCORE AND COLOR. 8. SUBGRADE SHALL BE THOROUGHLY WETTED IMMEDIATELY PRIOR TO PLACING CONCRETE. 9. CONCRETE SHALL BE CLASS B-5 SACK MIX WITH 3 4 INCH MAXIMUM AGGREGATE.10. CONCRETE SHALL HAVE A SLUMP OF NOT MORE THAN 4 INCHES. 11. NO ADMIXTURES SHALL BE USED WITHOUT THE PERMISSION OF THE CITY ENGINEER. 12.12" THICK EXPANSION JOINTS SHALL BE PLACED ON BOTH SIDES OF DRIVEWAY APPROACHES, CURB,GUTTER, AND SIDEWALK RETURN POINTS AND AT 20' ON CENTER. 13. WEAKENED PLANE JOINTS AT LEAST 1 12" DEEP SHALL BE PLACED AT THE CENTER OF DRIVEWAYS AND 20' ON CENTER. 14.14' DEEP SCORE MARKS SHALL BE PLACED AS DESCRIBED IN THE STANDARD SPECIFICATIONS OR AS DIRECTED BY CITY ENGINEER. 15. NO CONCRETE SHALL BE PLACED UNTIL THE CITY ENGINEER OR HIS AUTHORIZED REPRESENTATIVE HAS INSPECTED AND APPROVED FORMS OF SUBGRADE. 16. ALL EXPOSED EDGES SHALL BE ROUNDED WITH 12" RADIUS TOOL. 17. ALL SURFACES SHALL BE BROOM FINISHED UNLESS OTHERWISE NOTED. 18. CURBS, SIDEWALKS AND DRIVEWAY APPROACHES SHALL BE BACKFILLED WITHIN 7 DAYS AFTER PLACING CONCRETE. THIS SHALL INCLUDE ANT REQUIRED AC PATCHWORK. 19. FORM FACES SHALL NOT VARY FROM THE DIMENSIONS SHOWN BY MORE THAN .02 FEET. FORMS SHALL MEET GRADE. 20. UNLESS OTHERWISE SPECIFIED ON THE APPROVED PLANS, CONCRETE SHALL BE CURED BY MEANS OF THE IMPERVIOUS MEMBRANE METHOD. 21. ALL SIDEWALK CONSTRUCTION ADJACENT TO CURB SHALL BE POURED MONOLITHIC WITH CURB UNLESS OTHERWISE APPROVED BY ENGINEER. 22. ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE COMPLETED NO LATER THAN 5 DAYS AFTER INSTALLATION OF UTILITY. 23. A MINIMUM OF 6" OF ASPHALT SHALL BE REMOVED ALONG THE GUTTER LIP FOR THE INSTALLATION OF FORMS. FOR CURB AND GUTTER INSTALLATIONS AC SHALL BE BROUGHT TO FINISH GRADE OF FORMS AND TRANSITIONED AS REQUIRED BY THE CITY ENGINEER. 24. ALL FACE ANGLE INSTALLATIONS IN RETURNS SHALL MATCH EXISTING RADIUS OF CURB. FOUNDATION NOTES: 1. STOP FOUNDATION POUR 3 12" BELOW GRADE. PLACE FINISH CAP AFTER STANDARD IS SET ANDPLUMBED. BUILD UP GROUT UNDER STANDARD BASE ON LOW SIDE (TYP.). 2. SURFACE OF FINISH CAP TO BE AT GRADE AND SLOPED TO MATCH EXISTING OR FUTURE SIDEWALK (TYP.). 3. ANCHOR BOLT SIZE AND LENGTH AS INDICATED (TYP.). 4. STANDARDS TO BE SET AT 1'-9" TO CENTER FROM BACK OF CURB UNLESS SHOWN OTHERWISE. 5. NEW FOUNDATIONS SHALL BE PLACED IN FIRM UNDISTURBED SOIL 6. WHERE WITHIN (2) TWO FEET OF THE FOUNDATION, SURFACE SOIL SHALL BE COMPACTED TO A MINIMUM OF 90% WITHIN 2% OF THE OPTIMUM MOISTURE CONTENT ACCORDING TO THE ASTMD 1557 TEST METHOD. CONCRETE NOTES: 1. ALL CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-14. 2. CONTRACTOR SHALL VERIFY SITE CONDITIONS & ALL DIMENSIONS PRIOR TO STARTING WORK. NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES. 3. CEMENT SHALL CONFORM TO ASTM C150, TYPE II. 4. CONCRETE AGGREGATES SHALL CONFORM TO ASTM C33. 5. ALL CONCRETE SHALL BE A MINIMUM COMPRESSIVE STRENGTH OF f’c = 4,500 PSI MIN. AT 28 DAYS. 6. ALL REINFORCING STEEL SHALL BE GRADE 60 AND CONFORM TO ASTM A615 UNLESS OTHERWISE NOTED. SEE PLAN FOR SIZE AND PLACEMENT. 7. MINIMUM LAP SPLICE SHALL BE 42 BAR DIAMETERS UNLESS OTHERWISE NOTED. 8. MINIMUM BEND DIAMETER SHALL BE 6 BAR DIAMETERS UNLESS OTHERWISE NOTED. 9. MINIMUM REINFORCING COVERAGE IS 3" UNLESS OTHERWISE NOTED. 10. CONCRETE SHALL BE PLACED AGAINST FIRM UNDISTURBED SOIL AT DEPTH SHOWN. 11. BOTTOM OF ALL FOOTING TRENCHES SHALL BE CLEAN AND LEVEL. 12. ALL ANCHOR BOLTS & THREADED ROD SHALL BE ASTM F1554 GRADE 36 MINIMUM. NEW: & WITHOUT SIGNIFICANT RUST. TOP 2 FEET & HARDWARE TO BE GALVANIZED PER ASTM A123. 13. A 12" CHAMFER SHALL BE PROVIDED AT ALL EXPOSED EDGES OF CONCRETE UNLESS OTHERWISE NOTED.14. REINFORCING, DOWELS, BOLTS, ANCHORS, SLEEVES, ETC TO BE EMBEDDED IN CONCRETE SHALL BE SECURELY POSITIONED BEFORE PLACING CONCRETE. 15. ALL CONCRETE SHALL BE THOROUGHLY CONSOLIDATED BY MOTORIZED VIBRATORY MEANS AND THOROUGHLY WORKED AROUND REINFORCEMENT, EMBEDDED ITEMS AND INTO CORNERS OF FORMS. 2 3 5 BASIS OF DESIGN: 1. UNCONSTRAINED CONDITION 2. ASD METHOD 3. MAXIMUM BASE MOMENT = 14.61 K-FT 4. MAXIMUM AXIAL LOAD = 600 LBS 5. MAXIMUM BASE SHEAR = 912 LBS OCTAFLUTED LIGHTING STANDARD 10B HANDHOLE COVER VANDAL RESISTANT SCREW 11.5"X11.5"X1.25" BASEPLATE 11"Ø BOLT CIRCLE 24"Ø CAISSON GROUNDING PROVISION NUT RETAINER WELDED OPPOSITE HANDHOLE ON POLE WALL W/1/2"-13NC SS SQ NUT & 3/4" LG SS HEX BOLT SAW CUT SIDEWALK (IF APPLICABLE) TO FLAG LINES UL LISTED GROUND CLAMP SUITABLE FOR CONCRETE ENCASEMENT OR DIRECT BURIAL INSTALL CLAMPS ON ALL ANCHOR BOLTS (TYP.) 1" NON-SHRINK GROUT, MIN. 4" X 6-1/2" OVAL HANDHOLD REINFORCED FRAME & COVER W/ ALLEN SET SCREW ON LOCKING DEVICE (4) 1"Ø ANCHOR BOLTS (4) TOTAL (18" MIN. EMBEDMENT) F1554 GRADE 36 (6) #6 VERTICAL REINFORCEMENT EQUALLY SPACED #4 TIES @ 12" O.C. W/ (3) IN TOP 5" 4500 PSI CONCRETE FINISH TO MATCH CURB & SIDEWALK (IF APPLICABLE) (2) GALV HEX NUTS & (2) GALV FLAT WASHERS PER BOLT OCTAFLUTED LIGHTING STANDARD 10B GROUNDING PROVISION NUT RETAINER WELDED OPPOSITE HANDHOLD ON POLE WALL W/ 1-2"-13NC SS SQ NUT & 3/4" LG SS HEX BOLT (3) 2" CONDUIT NOTE: DECORATIVE BASE NOT SHOWN FOR CLARITY Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 57 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-9 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS TRENCHING DETAILS Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 58 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-10 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS TRENCHING DETAILS Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 59 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 A-11 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS LUMINAIRE DETAILS Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 60 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 61 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 62 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 63 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 S-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS LIGHT POLE DETAILS Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 64 REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 E-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS WIRING & FIBER DIAGRAMS (N) 2" CONDUIT FOR AT&T POWER (N) 2" CONDUIT FOR CITY POWER (N) 4" CONDUIT FROM MAIN POWER SOURCE Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 65 STRUCTURAL ANALYSIS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 SA-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 SA-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS NOTE: REFER TO FULL STRUCTURAL SUBMITTAL FOR ADDITIONAL INFORMATION Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 66 TREE PROTECTION PLAN REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 TP-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 TP-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 67 TREE PLAN & DISCLOSURE REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 TP-2 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 TP-2 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 68 EME REPORT REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 EME-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 REVISE 5G ANTENNA HEIGHT LEL06/19/2019 PLAN CHECK COMMENTS CSH02/25/2020 LEL03/16/2020 1 0 EME-1 2 3 RC100% CD'S06/04/2019 REVISED PER NEW POWER ROUTE CLIENT COMMENTS CSH03/04/20202 CH06/11/20204 PLAN CHECK COMMENTS JAF07/08/20205 CITY COMMENTS JAF08/27/20206 NEW BORING PLAN RGL/JAF11/20/20207 CITY COMMENTS CH06/22/20218 CITY COMMENTS Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 69 TRAFFIC PLAN 1TRAFFIC PLAN N (P) WORK AREA HIGH S T (E) BUILDING APN: 12026037 (E) BUILDING APN: 12026039 (E) PARKING AREA (E) PARKING AREA (E) TREE (TYP) (E) R O A D S I D E P A R K I N G (E) R O A D S I D E P A R K I N G APN: 12026102 (E) BUILDING (E) TREE (TYP) (N) STREET LIGHT POLE (#46) W/(N) ANTENNA (E) MANHOLE (TYP.) (P) CHANNELING DEVICES, TYP. (E) BUILDING APN: 12026031 SHOULDER CLOSED AHEAD ROAD WORK AHEAD SHARE THE ROAD END ROAD WORK LYT T O N A V E 25 25 25 25 PROJECT SCOPE TRAFFIC STAGING ·CLOSE PAVED SHOULDER ON SOUTHWEST BOUND HIGH STREET. ·DETOUR HIGH STREET ENTRANCE TO ADJACENT PARKING LOT TRAFFIC CONTROL NOTES: ·8'-9"FT LANE WIDTH TO BE MAINTAINED ·POSTED SPEED LIMIT ON ALL STREETS IS 25mph 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN, AS WELL AS ANY ADDITIONAL TRAFFIC CONTROL DEVICES THAT MAY BE REQUIRED TO INSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE WORK AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS. 2. ALL DELINEATORS SHALL BE EQUIPPED WITH REFLECTORS AT NIGHT TIME. 3. THE CONTRACTOR SHALL NOTIFY THE CITY/COUNTY OF RECORD AND CALTRANS PERMIT INSPECTOR AT LEAST FIVE WORKING DAYS IN ADVANCE OF IMPLEMENTING ANY CONSTRUCTION DETOUR 4. ALL SIGNS, DELINEATORS, BARRICADES, ETC. AND THEIR INSTALLATION SHALL CONFIRM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION) AND THE MUTCD CALIFORNIA SUPPLEMENT, STATE OF CALIFORNIA STANDARD SPECIFICATION, SPECIAL PROVISIONS, AND STAMPED PLANS. 5. THE CITY/COUNTY OF RECORDS AND CALTRANS RESERVE THE RIGHT TO OBSERVE THESE TRAFFIC CONTROL PLANS IN USE AND TO MAKE ANY NECESSARY CHANGES AS FIELD CONDITIONS WARRANT. ANY CHANGES SHALL SUPERSEDE THESE PLANS. EXACT LOCATION OF ALL EQUIPMENT AND TRAFFIC CONTROL DEVICES SHALL BE DETERMINED BY THE ENGINEER. 6. ALL TRAFFIC CONTROL DEVICES, STRIPES, MARKINGS, LEGENDS AND RAISED PAVEMENT MARKERS SHALL CONFIRM TO THE MUTCD AND THE CALIFORNIA SUPPLEMENT (LATEST EDITION), THE STATE OF CALIFORNIA STANDARD SPECIFICATION (LATEST EDITION), SPECIAL PROVISIONS, AND STAMPED PLANS. 7. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION AT ALL TIMES AND SHALL BE REPAIRED, REPLACED OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 8. ALL TRAFFIC LANES SHALL HAVE A MINIMUM OF 5 FEET CLEARANCE FROM OPEN EXCAVATION AND A MINIMUM OF 2 FEET FROM VERTICAL OBSTRUCTIONS. 9. CONTRACTOR SHALL PROVIDE FLAGGERS AS DEEMED NECESSARY BY THE CITY/COUNTY INSPECTOR OR CALTRANS PERMIT INSPECTOR. 10. ALL ADVANCE WARNING SIGNS SHALL BE EQUIPPED WITH FLAGS. 11. TRAFFIC SIGNALS SHALL REMAIN IN OPERATION AT ALL TIMES. SIGNAL OPERATION DURING EACH CONSTRUCTION PHASE SHALL BE COORDINATED WITH AND APPROVED BY THE CITY/COUNTY OF RECORD AND/OR CALTRANS INSPECTOR. 12. PLACE ADDITIONAL "LANE CLOSED", (C30) SIGNS ON TYPE II BARRICADES AT 100 FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE THAT IS CLOSED. INSTALL "OPEN TRENCH" (C27) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY. 13. ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE REMOVED FOLLOWING COMPLETION OF EACH CONSTRUCTION STAGE AND THE PERMANENT TRAFFIC CONTROL DEVICES SHALL BE RESTORED BY THE CONTRACTOR UPON COMPLETION OF PROJECT. 14. CONTRACTOR SHALL REPLACE/REPAIR ALL DAMAGED STRIPING AT THE END OF EACH WORKING DAY. 15. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE AMERICAN DISABILITY ACT AS RELATED TO PEDESTRIAN ACCESS AND SHALL MAINTAIN PEDESTRIAN ACCESS AT ALL TIMES PER ADA REQUIREMENTS. SIDEWALK CLOSURE/DETOUR SHALL COMPLY WITH THE WATCH STANDARDS AND MUST OBTAIN APPROVAL FROM THE CITY/COUNTY OF RECORD. 16. CONTRACTOR SHALL COVER OR REMOVE ALL CONFLICTING SIGNS. 17. CONTRACTOR SHALL POST "SYMBOL" UNEVEN LANES, "STEEL PLATES AHEAD" OR "BUMP" SIGNS FOR PAVEMENT SURFACE DISRUPTIONS OF 12" OR GREATER. PAVEMENT DISRUPTIONS FOR 1" OR GREATER SHALL HAVE A BEVELED EDGE OF FOUR (4) HORIZONTAL TO ONE (1) VERTICAL. 18. CONTRACTOR SHALL INSTALL "CAUTION STEEL PLATES AHEAD" AND/OR "ROUGH ROAD" SIGNS IN ADVANCE OF STEEL PLATE BRIDGING. 19. RESIDENTS TO BE NOTIFIED OF DATES & TIMES OF CONSTRUCTIONS (2) WEEKS PRIOR TO THE START OF WORK. 20. A 5'-0" MIN. PEDESTRIAN CLEARANCE TO BE MAINTAINED AT EXISTING SIDEWALKS. ·REMOVE AND REPLACE EXISTING STREET LIGHT POLE WITH A NEW STREET LIGHT POLE AND FOUNDATION. INSTALL NEW SMALL CELL FACILITY ON NEW LIGHT POLE ·UNDERGROUND BORING TO BRING POWER TO SITE NOTES SHOULDER CLOSED AHEAD END ROAD WORK SHARE THE ROAD STAY IN YOUR LANELEFT LANE CLOSED AHEAD ROAD WORK AHEAD TRAFFIC CONE TRAFFIC SIGN LANE DIRECTION "ROAD WORK AHEAD" SIGN WORK AREA "END ROAD WORK" SIGN TRAFFIC SYMBOL LEGEND "SHARE THE ROAD" SIGN "ARROW BOARD" SIGN "STAY IN YOUR LANE" SIGN "LEFT LANE CLOSED AHEAD" SIGN FLAGGER POSITION "SHOULDER CLOSED AHEAD" SIGN ENTRANCE CLOSED DETOUR USE EMERSON ST. ENTRANCE "DETOUR" SIGNS REV DESCRIPTIONDATE UNLESS THEY ARE ACTING UNDER THE DIRECTION IT IS A VIOLATION OF LAW FOR ANY PERSON, OF THE ARCHITECT OF RECORD, TO ALTER THIS DOCUMENT. BY ERICSSON FA 14800993 CRAN_RSFR_ SJWE0_024A 135 UNIVERSITY AVE PALO ALTO, CA 94301 1 0 TRAFFIC CONTROL PLAN RC02/26/2019 TR-1 04/29/2020 UPDATED PER JX COMMENTS LEL 2 06/05/20 PER BORING PLAN LEL 3 08/13/20 PER REVISED BORING PLAN JAF 4 11/03/20 CITY COMMENTS RGL NOPARKING TOW AWAYZONE "NO PARKING/TOW AWAY ZONE" SIGN NOPARKING TOW AWAYZONE CONTRACTOR TO PLACE 'NO PARKING TOW AWAY' SIGNS AT EACH AFFECTED PARKING SPACE 72 HRS IN ADVANCE (TYP.) STREET # OF SIGNS TOTAL # OF NO PARKING SIGNS HIGH ST 5 5 Jul 07, 2021 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 70 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 71 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 72 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 73 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 74 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 75 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 76 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 77 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 78 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 79 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 80 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 81 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 82 STOP STOP STOP STOP STOP STOP ST O P ST O P LOUIS RD(25MPH) BR U C E D R SY C A M O R E D R SY C A M O R E D R CO L O R A D O A V E AM A R I L L O A V E BIKE LANE BIKE LANE BIKE LANE BIKE LANE BIKE LANESIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK 2802 DOWNSTREAM TAPER: 20’ ROAD WORK AHEAD W20- 1 ROAD WORK AHEAD W20- 1 ROAD WORK AHEAD W20- 1 SHOULDER CLOSED C30A ( C A ) END ROAD WORK G20-2 END ROAD WORK G20-2 W11-1W16-1 R9-11A SIDEWALK CLOSED CROSS HERE 100’ BUFFER:155’TAPER: 42’ ROAD WORK AHEAD W20- 1 R9-9 SIDEWALK CLOSED R9-11 SIDEWALK CLOSEDAHEAD CROSS HERE MU T C D T A B L E 6 C - 1 MEANING OF LETTER CODES ON TYPICAL APPLICATION DIAGRAMS Rural Expressway / Freeway 500 ft 1,000 ft 500 ft 1,500 ft Urban (Low Speed) - 25 mph or less 100 ft 100 ft 100 ft 500 ft 2,640 ft ROAD TYPE A B C DISTANCE BETWEEN SIGNS Urban (Low Speed) + 25 to 40 mph 250 ft 250 ft 250 ft Urban (High Speed) + 40 mph 350 ft 350 ft 350 ft REQUEST BY: JOB# PM# LOCATION:COMPASS:SCALE: REVISE# DATE COMP:4-17-17 NOT TO SCALE 2802 LOUIS RD PALO ALTO CINDY HOLBROOK VINCULUMS SERVICES INC 209-627-8412 CHOLBROOK@VINCULUMS.COM LEGEND: CHANNELIZING DEVICE SIGN WORK ZONE DIRECTION OF TRAFFIC TYPE 3 BARRICADE TYPE 3 BARRICADE W/SIGN CERTIFIED FLAGGER CRASH BARRELS MESSAGE BOARD (PCMS) FLASHING ARROWBOARD TEMP NO PARKING SIGNS FLASHING BEACON WWW.BATSTRAFFICSOLUTIONS.COM B.A.T.S. TRAFFIC SOLUTIONS Drawn By: Raul Vera, Jr. CSLB# 917034 Office: 510-657-2543 Fax: 510-657-2544 AFTER HOURS EMERGENCY 510-299-5666 44800 Industrial Drive Fremont, CA 94538 - Traffic control shall conform with MUTCD and/or Caltrans Standards section 6 dated 2014. - One lane of traffic in each direction and all high volume turning lanes shall be maintained at all times on all streets at a minimum lane width of 10 feet. - Contractor shall notify local authorities once signs are posted. - All advanced warning signs shall be equipped with 2 (18” orange flags) - Certified Traffic Control Workers shall have Type II vests, work shoes, and hard hats. - Temporary no parking signs shall be placed a min of 72 hrs prior of work. - Driveways shall be monitored and maintained at all times during work hours. - Distance between sign and work area will be determined on speed limit. - Roadway shall not be opened until safe for public use. All open trenches must be plated or backfilled prior to public usage. - All Devices shall be removed when no longer required.N O T E S 28” cone, spacing of cones 25ft. PAGE #1/1 SF PALO ALTO130 425234 POST TEMPORARY NO PARKING SIGN ON TYPE II BARRICADE 72 HRS IN ADVANCED. ****NOTE: IF BATS IS RESPONSIBLE OF PLACING TEMP NO PARKING SIGNS, PLEASE NOTIFY BATS TRAFFIC SOLUTIONS PRIOR TO 72 HOURS ADVANCED**** ***FLAGGERS MAY BE REQUIRED.***ADDITIONAL NOTES: 1.ALLOW RESIDENCE AT IN/OUT ACCES WITHIN SHOULDER CLOSURE TAPER/BUFFE AREA IF POSSIBLE. NOTIFY RESIDENCE TO PARK AWAY AWAY FROM WORK AREA IF NO IN/OUT ACCESS IS AVAILABLE. Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 83 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 84 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 85 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 86 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 87 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 88 Item 2 Attachment B - Example Plans for Previously Approved WCFs in Public ROW Packet Pg. 89