Loading...
HomeMy WebLinkAbout0467.095TO: FROM: City of Palo Alto City Manager's Report HONORABLE CITY COUNCiL CITY MA.l'iAGER DEPARTMENT: PLA..~ING AGE."'lADATE: October 30.1995 CMR:467:95 SUBJECT: ResolutioB Approving I Caltrans Program Supplement Agreemf'n. between the City of PlIo Alto ".d Caltrans, ror the TraffIC Signal Timing and Controller Replacement PrGjecl REOIlf,ST The attached Program Supplement Agreement, with the Slate of California, covers financial reimbursement fur funding the Traffic Signal Timing and Controller Replacement Project. in the City of Palo Alto. The major source of funding fur this peojecl is federal funds. which are administered b)' Caltrans, 00 behalf of tho federal governmellt. 1llls agreemenl serves as a mechanism whereby the state formally agrees to provide peo]ecl funding. The pu<pOSe of this report is to request Council adoption of the resolution appI'O\ing the Program Supplement Agreement with Caltrans. RECOMMENDATIDNS Staff ceCOltll1leoos that Council adopt the attached resolution (Attachment 1) approving the Program Supplement Agreement, ber. ... een the City of Palo Aho and Caltrans. POLICY IMPLICATION The recommendation of this report is consistent with e,osting Comprehensive Plan Transportation Program I S: Make eJfecUve lise of the traffic carryil'lg ability of Palo Alta's netwr>rTc of majOf' streets. EXECJmVE SUMMARY Palo A1lo's traffic signal control system is comprised of Wee primaI)' components: (I) traffic signal equipcuent and cootroller k-,cated at each signalized inters"<,Oon, (2) a central computer control located at the Municipal Service Center and linked to individual intersections via comal cable and electronic wiring, arK! (3) signal timing plans used to ~rate ea<:h traffic signal_ CMR;461:95 J>age!of1 . -~t '-'--", .. --:. o While the current system continues to operate in an acceptable manner, various components are becoming ou!dated and are in need of replacement or upgrade. Foe­ example, some of the individual intersection controllers are no longer manufactured or serviceable, the central computer is over ten years old, the traffic signal timing plans are based upon traffic cooditions !hat existed in 1986, ami the ability to ad<! new features such as emergency pie-em;>tion and traffic data collection is severely limited. Therefore, Palo Aho has a need to improve and upgrade its traffic signal system infrastructure. As a means to facilitate the improvement and upgrade of the traffic signal system infrastruct.ne, sIaff investigated poIeutial sources of funding, and identified an applicable program administered by the Metropolitan Transportation C.ornmission (MTC). The name of Ihe program is "Regiooal Traffic Signal Operations Program (RTSO!')" and the purpose is 10 provide funding for traffic signal timing and equipment upgrades. The oojective of RTSOP is to reduce congestion and improve air quality, through improved traffk flow, by replacinglupdating traffic signal equipment and timing plans. Subsequently, an application was submitted 10 MTe lOr $460,000 of Federal CMAQlSTP funds, to replace ooe-<jOOrtef of the existing traffic signal controllers, and to establish new signal timing plans based upon currenl conditions. The Palo Alto application, ranked fi<st in Santa CI ara Coonty and fIfth out of 92 projecls in the nine counties comprising MTC, was included in the 1995 Transpof1alion ~ Program (TIP). Notification of stale and federal approval was receive<l in Augnst 1995_ Si~ the proje.,,,! involves tbe use of federal fi.mds, Palo Aho is required 10 r .. fI, '\\ procedures and standards established by the federal government and adminislcrc-d. "n II> behalf, by Caltrans. These include review and approval of right-of-way. en,·ir,,,u1),·nl~1 docur:uents. selection of consultants and cootraclors, and C.ouncil adoption of a rN ~"b '" approving a Program Supplement Agreement Program Supplement Agreements are Ilsed by Caltrans ,,, cover fInaru:ial reimbursement and cooditions that are specific to the project The agreemenl serves as a supplemern 10 a Local Agency State Agreement foc Federal Aid, enlered into between the City and the Stale on April 4, 1978. I'ISCAL IMl'ACI ApprO\'8l of the Program Supplement Agreement ,\>1] an"w the City lei be reimbursed by federal and stale TSM match flmds up 10 88.5 percent of the actual project cost, for a Iota! CMR:467:95 "ase 2 of) ~-----.--.,.-.---..... --" ",,-'--,.,...-'- .. .--.~ ;' . - , - • ""'~ ", :-. '.-,:, .-. r ',:"_:, r_ '.,,""' ,'_~. " reimbiJrsemen! of $459,845 ($407.100 federal funds and $52,745 State rs.M funds). Based on $459,845 in federal and slate reimbursement, the City \\111 need to pro\OOe $60,000 as a local malclt. Staff will include funOmg fOr this project in the 1996-97 Capital bnprovemenl Program (Electric Utility funds). ENYIRQNMEl\TAI. ASSFSMIFNT Execution of the Program Supplement Agreement does not constitute a project for pwposes of the California Environmental Quality Act (CEQA). The traffic signal timing and replacement project is exempt from CEQA pursuant to Sections 153{)1 (existing facilities) and 15302 (Replacement (){ Recoostructiooj, of the CEQA guidelines. AlTACHMENTS I , Resolution autOOrizing execution of the Program Supplement Agreement 2, Program Supplemer.t Agreement Prepared By: Ashok Aggarwal, City Traffic Engineer Department Head Review: £vrnt !hill~' Director of Planning and Community Environment Cily Manager Appcoval: cc: Robert Wu, Caitrans ~~ ____ •• r ... ~~ __ ~~ __ ~ __ __ '" \-:><, .. -~" ," ,-< , , · , , ........ RESOLUTION NO. " ' .. "BSc-UniON OF TIm COUNCIL OF THE CITY OF PALO ALTO ADOPTING AND AUTHORIZING EXt."CU'fION OF PROGRAM SUPPLEM&N'r NO. C07 TO TRE AGREEMENT BE'IWEEN THE CITY OF pAU) ALTO AND CALTRANS FOR FEDERAL·AID PROJECTS, RELATING TO TI!E PROPOS&o TJ<AFFIC SIGNAL TrMING AND CONTI:OLLER REPLACEMENT PROJECT WHEREAS~ ~he City of Palo ~to ~ the Californi~ Department of Transportation PCaltrans') have entered into ail agreement entitled 'Local Agency-State Agreement for Federal-Aid Projects .. ' No. 04·510,0. dated April 1.0. 1978 (the 'Master Agreement·); and ~. the Master Agreement sets forth the general ter.ms and conditions under which all federal aid projects shall be performed, but provides that terms and conditions for each specific federal aid proj eet shall be set out in a 'SUpple..TTlsntal Local Agen-cy-State Agreement, • a.lso referred to as a 'program supplemen·t.· which is adopted by t.he City and approved by cal trans ; and WHEREAS. the City bas requested federal funds to finan~e preliminary engineering. constru'ct:ion engineering and construction fo~ the proposed Traffic Signal Timing and Controller Replacement Project (the ~project·i. Which requires the City Council to adopt a program supplement (No. 0-07J, {or the project; and. WHEREAS. the City Coun~il desires that necessary work be done relative to the project. and to a~ Program Supplement No. 0,07. NOV# THEREFORB# the Council of the City of Palo Alto does RESOLVE as follows! SECTION 1. The City Council hereby adopt-s Program Supplement No. O~7 to the Master Agreement between the City and Cal trans. and autborizes ~he Mayor to execute said Program Supplerrent for and on behalf of the City of Palo AJto. SECTION 2. Adoption of tbe Program Supplement does JlOt constitute a p,roject for purposes of the California Env-ironmental Quality Act (~CEQA·)~ Further, the proposed traffic Signal 1 95100" 11K 6011217 . ..-.. -;. ·.1.,... . .. ' timing a.nd rep.lacement proj ect is exempt. from CEQA pursuant to Sections 15301 (Existing Facilities) and lS302 {.Replacement or Reconstruction} of t~e CEQA Guidelines. INTRODUCEr> AND PASS ED: AYES: NOES: ABSENT: ABSTENTIONS : ATTEST: City Clerk APPROVEI> AS TO FORM: Senior Asst. City Attorney 2 APPROVED: Mayor City !I'.anager Depu~y City Manager Administrative Services Director of Planning and Community Environment Chief Transportation Official , 1'ROCJRAX • OPPL£IIIOIrl' ~ 007 to ~ LOCAL AGBSCY-8TATB AGRBEMEN7 lOR PE~BaAL-AID PROJECTS 50. 04-51~ :,--" ". -, . -:. -. Cat.: August 29~ 1995 Loca~·JII 04-SCL-O-PA Project ~~rl CKL-51~O(~03) B.~. BUmber. 04-927603 This Proqr~ Supplement is hereby incorporated into the Local Agency-state Agreement tor Federal Aid Which was entered into between th~ Local Agency and the state on 04/10}78 and is subject ~o 811 ~~e te~& and conditions thereof. This Program Supplement Is adopted in accordance with Par~9raph 2 of Article 11 of the aforem~ntioned Master A9ree~ent under author tty of Jlesolutlo-n No. , approved by the. Local Agency on (see copy attached). The Local Agency further stipulates that as a condition to payment of funds Obliqated to this p~oject# it accepts and will comply with the covenants or re:arks set!o~th on the follo~inq pages. l'ROJlIC'l 'I'BRIlUI. VAitlOOS LOCATIONS IN DOWIITOWN PALO ALTO ~B 01 VOU, COO SIGNALS LENGTH. 0.1 (NILES) PROJEC'I' CLASSIFICA7IOB OR PHASSIS) 01'.021 [X) Preliminary Enqineering [J Right-of-Way (J [Xl Construct ton Enqineerinq lX) Construction Estimated Cost.1 City of Palo Alto By Date Ped;eral J'unds $ $ Attest __________________________ __ Title Hatching Fund .. ITS}( KATCH I o $ 52745 $ OTHER 8~TB OP CALIPORNIA Depart.ant of ~r.D.port.tloD By Ch i~e"f;-.-'D"ir.s;:;t"'r=ic=t--'L-'i-:a"1-:son="B"r~a=Cn<;=h" Office of Local Programs Date t lIereby ~tlfJ '4""1 ~ persoNll ~tedte" tt1.-t; "Do..dget"ed f:.rdIJ .re avaHa!ll\e for 'tbl". ~."'u: AccountiI>9 Offi" Date [.;;lJj. $IS $ 459845.00 o o.QPtH'l $taM") It_ Pr-ogr. III< I f<.rd So.Irce ''''J,n "" " .. ~-\2S-OQ 95·" 3(l) '995 2t'J,&j-101-!90 95·06 "" ,995 266C-125 • 042 " ... CO.le.1OO. aoo c 20.30. lIHI. azo < ZO.30.t'D.!2' < 26Z'042 04l-r 26200l 0892-1 25&020 ~1 '.OG '1)7100.00 SZ74S.DO paqe 1 of 2 ". · - ' .. ~ '. OC-SCL-O-PA Ei) CML-5100 (OOl) DATE: 08/29/9S SPECIAL CQVENA.VTS OR FEMARI<5 1. All maintenance, involving the physical condition and the operation of the improvement5~ referred to in Article VI MAINTENANCE of the arorementioned Master Agreement will be performed by the Local Aqer~y at reqular intervals or as require~ for efficient operation of the complated improvements. 2. The Local Agency agrees the payment of Federal funds viII be It.lted to the amounts approved by the Federal Hiqh~ay Administration in the Federal-Aid Project Agreement (PR-2)JDetail Estimate, or its modification (PR-2A) or the FNM-76, and accepts any increases in Local Agency Funds as shown on the Finance or Bid Letter or its modification as prepared by the Office ot Local Programs. 3. state Traffic system Man~gement (rSK) funds are being made available to matcb only those federal funds eligible in accordance with Section 182.4 of the Streets and Highways Code ar~ as per5itted by Article XIX of the state Constitution~ 4. Federal funds eligible for TSM match will be proportional to the total federal participating amount established at contract ayard as indicated on the Finance or aid Letter or its modification. 5. In executing this program Supplemental Agreement, Local Aqency hereby reaffirms the ·Nondiscri.ination Assurances· contained in the aforementioned Master Agreement for Federal-Aid Program. 6. Whenever the local aqency uses a consultant on a cost plus basis, the local aqency is required to submit a post a1ldit report cover­ ing ~ allowability of cost payments tor each individual consul­ tant or su~contractor incurring over $2S,~OO on the project. The audit report must state the applicable cost principles utili­ zed by the auditor in deteraininq allowable costs as referenced in CF.R 49, part 18 1 subpart C -22, Allowable Costs~ Page 2 of 2 ---.;;,--- , - f