City of Palo Alto
City Manager's Report
-------
HONORABLE CITY COUNCIL
CITY JllANAGER DEPARTMENT: Plallning ODd
CommuDity E.viroument
AGENDA DATE: extober!6, 1995 CMR:447:95
SUBJECr: Appeal of Zoning Administrator Approval or Us. Permit
No. 9S-UP-17 for. Fi.oncial I.stitullo. at 375 Arboretum Road
RooITEST
This report addresses an appeal 0(. Zoning Administrator decision which approved. Use
Penni!, with conditions, for • financial instirution (bank) in • neighborhood commercial
zoning district at the comer 0( Arboretum and Quarry Roads.
An interested citizen. Hem Borock, appealed the decision based m his concern that the Use
Permit approval had nOl been COD<fttior.ally linked 10 the ArchltCClm'al Review Board (ARB)
approval and thai he did nOl believe he had been properly notified of the project 2JlPIOvaL
The appeDanI did 001 raise substantive issues with the use of the site as a financial institution.
!!ECQMMENDATIONS
Staff and the Planning Commissioo recommend that the City Council deny the appeallli1d
nphoJd the Zoning Administrator's approval o(the Use Permit. The Planning Commission
further recommends that woofing be added 10 Condition I-h I giving the Zoning
AdminiSlral<lr the authority 10 administratively approve millO< amendments 10 the
landscaping, sidewalt. cum and driveway plans 10 implement any future City Ccuncil
approved improvements 10 Quarry R~ and minor changes 10 the wonfmg of Conditions
~ 2 and 310 allow greater fleXIbility in the boors of operation for the banl and the A 1M
(see Attachment I -Revised Use Permit condition wor<fmg).
POLICY IMPI,ICAIIQNS
The proposed financial nse is cOflSistent with the Neighborhood Commercial land use
designation of the Comprehensive Plan. The inlent of the Neighborhood Commercial
CMR..:447:9S Pag<: I of4
' .. '
..
"--."
o
de,ignatioo is 10 provide service commercial uses which serve nearby neighOO<b<>ods and
employttlCllt centeno No polkies in !he existing ComprehenSive Plan specifically address the
use of this site.
EXECIITIVE SUMMARY
The applicant applied for • ConditiooBI Use Permit 00 May 9, 199, to allow a 4,400 square
foot bank "" It.e flat, 2Q,OOO+ square foot site at the corner of Arboretum and Quarry Roads.
The applicamt submitted. concurrent ARB ap;>licatioo.
Both the ARB and the Zoning Administrator's approval were appealed. The substantive
issues in the appeal relate 10 the ... n approval and are addressed in CMR:412 :95, which
was included in the SepIAmlber IB, 1995 City Council packet and is .nached 10 this report
as Attachment I(d). The City CmmciI continued action on the ARB appeal until October 16.
1995, so that both appeals could be ".osidered IDgeilier.
The appellant appealed the Use Permit approval, based 011 the fact thal the Use Permit was
001 conditiooaJly linked 10 the ARB approval and that he had no( been properly notifie<l of
the ARB dedsion. The Palo Aho Municipal Code (P AMC) does no! require Use Permit
approval", be frued 10 ARB "I'provaI or any other ats.."reIionary approvals. The Use Permit
is. separate action with iIs own public bearing. Se<tioo I ".90,06() "fthe P AMC .U\horizes
the Zoning Administrator 10 approve. Use Permit if specif.'C fincftngs can be made, The
appeUanl requested and received. copy of the Use Permit decision. There is no record of
his request to receive a copy of the A!m dec isioo. ARB decisioos are GOt aU10ffiatically
mailed to speakers at ARB hearings. In the absence of a special request 10 be notified of this
ARB decision, the awellann laS 001 sent .copy_
Both or these isSlJOS are addressed 00 page 4 of the attached Planning Commission staff
report dated September 27. 1m.
The Planning Coounissioo beard the appeal of this item on September 27,1995. Meeting
minutes are included in the City Council packet of October 12, 1995, for Cky Council
inlllrmation. The appellant had requested. eoolinWlnC<: of the item because he had 10 be oot
ofloWn 00 September 27, 1995. The Plartning Commission decided 10 consider the item in
the appellant's absen<;e, because he had submitted a very detailed <ppeolletter that clearly
presented his conceros. In addition, the appellant ,,'ould have the opportunil)' 10 speak to the
City CoIJnc.] in o.;tobcr and could present his case at that time, These circumstances,
combined with the fact that the appeOani did not raise substantive issues about the use of the
site as a bank and a conlinuam:e would delay the City Council appeal hearing for
CMlb"7095 Pageld4
" -~.
•
approximately ooe month, led me PIa.'lJIing Cmnmission to hear the Use Penni! appeal on
the schedule<lliighl
The Planning Commission fucused its discus.wlt on the issues related 10 the Use Pennit,
which t'lClucled the _ of the site as a bank, 1hc ~ firnfmgs required to approve a Use
Pennil 8IId improvements 10 be made in the public rlght-<>f-.. ay along Quarry Road (see
Planning Commission minutes dated September 27, 1995). The Planning Commission
discussed 1he right-<>f-,,'aY improvements in detail and stated lhat it is impo<tant lhat the
Zoning Administrator be allowed 10 admlnistratively approve minor changes to the approved
project sire plan, !O aocommodatc future City Cooncil approved improvements along Quarry
Road.
The Planning Commission recommended additional wDromg !O Condition No. I ""d IIlin<lr
wording changes 10 Condition Nos. 2 and 3 10 allow flexibility with regard !O minor site plan
changes 8IId hoors of cperation for the bank and Ibe A 1M. They did oot want the applicant
to bave 10 apply for an amended Use Permit !O eiIher lengtheo or shorten hours of operation.
FlSC\I·IMfM:I
There is no fiscal i:npact 10 the City ofPaIc Alto from any "fthe "",sible actions •
. EIIIYIRQNMEN1AJ, "SSy,ssMENI
A Negative Declaralioll was preparerl by staff 8IId recommended for appn",allo lite Director
of Planning and Community Environment by the ARB 00 July 20, 1995. The Director
approved the Negative De<:laration 00 July 25, 1995.
"UACBMENTS
I. Revised Use Permit C.onditions as recomm<:nded by the Planning Commission
2. Planning Commission staffrepor1, daled September 27, 1995, with eight attachments:
.) Letter of Application. dated May 9, 1995
b} Use PennitDccision (Up-95-17), dated July 26,1995
. c) Lener of AypeaI, dated August 4, 1995
d) CMR:412:95, dated September U, 1995 (will> .ttachm<mlS A-F)
e) Zoning Administrator Hearing minutes. dated July 20, 1995
f) Porcel Map
g} ZooeMap
h) ProJect Schedule
3. Plans (City Council Members only)
CMRA4109S Page 3 of4
•
. :-::""
PREP~ BY: Lisa Grote, Zoning Administrator
DEPARTMENT HEAD REViEW: 1i:::&dzf. ~y
TH R. SCHREIBER
Dire<tor of Planning and
Community Environment
CITY MANAGERAPPROVAL;~£~?2~~~~2-_
xriiNY
.~~ager
cc: William Phillips, Stanford Managemenl Company, 2770 Sand Hill Road, Menlo Park
CA 94025
Red> 80r0<:k, 2731 B) ron Street, Palo Altc>, CA
ReVised Wonflllg fa< Use Permit Coodi!loru
as recommended by the J'IatIning Coolmiss."n
CONDl11ONS
I. The project slr.1tlIbe ""nstructod in substantial compliance will> pIall< dated May
S, 1995. on flk in the Planning Division office. lb. ZcmIng Ac!mioistrlItoc may
admInIstrath-tly appcuv. mInar changts (0 the approftd landscaping.
ddewslk, <UliI ",,01 driveway plaDs (0 enab~ Imp/emo1tWloo Dl City ComIcil
approved improvements II> Quarry Road.
2.' The prop0se4 boors of nperotioo are: Monday • 'i'hundoy 9:00 a.m. I<> 6:00
. p.m.; Friday 9:00 a.m. 10 7:00 p.m.; Sanmlay 9:00 .. tIL 10 2:00 p.m. A»
aJIIelldme>d t4 Chis Use hnnit is no( ""l1llted II> apand the hours of
..,.,-atfon up to IJJ<Ise 0( the oventll sIIoppbJi; _leT.
3. The A 1M may be in operation up II> 24 boon per day, e.eryday 0( tbe week.
'J5UPl1.1g
tsO~A'ISlUIJ'
PD. b}(U.5()
rdbA..'tl,CA,.~
4-1S,Jlc:I.2441
oU5.:£.'9.22«JF~
August 1, 1995
Page 1
,
PLANNING COMMISSION
STAFF REPORT
TO: PLANNING COMMISSION
FROM: Lisa Grot<, Zoning Administrator DEPARTMENT: Planning
AGENDA DATE: September 27, 1995
SUBJECI': 375 Arboreruin Road -Appeal 0( Zoning Administrator approval of a Use
Permit for. financial institution (95-UP-17).
BF£OMMENDADQN •
SIaff reoommeDds dial PI>-IlIling Commission recommend 10 City Council that they deny
the appeal and upbold the Zoning AdminisrralO< approval 0( • Conditional Use Permit
(CUP} 10 allow COIlStrIKtion 0(. new 4,400 square foot financial service buildmg (bank),
with 22 parking spaces and related site improvemeots ill • Neigbborhood Commercial
(eN) zone.
BACKGROUND
The aWlicanl applied for a Coo<fttiooaJ Use Permi! (CUP) on May 9, 1995 10 aDow •
4,400 square foot bank on the fIal, 10,000 square foot !Ortner gas station site located at the
corner of Arboretum and Quarry Roads (see Attachmem I, Letter 0( App!lcation).
The aWlicanl submitted au Archite<:tural Review Board (ARB) application coocurreotly
with the CUP application. The ARB approval has also beeo appealed and was scheduled
for consideration by City Council co September 18, 1995.
'." ::
•
Table 1 summarizes the pertinent information regarolDg the site.
TBh1c J; Site Informatioa
Appellant:
Owuer:
Comprebensiye Plan
Designation:
Existing Land Use:
SurrounOlDg Land Uses:
Parcel Siu:
Project Hjslo[y
Zoning Administrator Approval:
Stanford Managemelll. Company
2710 Sand Hill Road
Menlo Park CA 9401S
Herb Bocock
The Board of Trustees of the Leland Stanford
Junioc University
c/o Stanford Management Coo!pany
2710 Sand Hill Road
Menlo Park CA 9402S
Regional/Coolrounity Commerci.al
CN -Commercial Neigbborbood
StoragelServlce Area
North:
East:
Sooth:
West:
vacanl land
vacant land
arterial :and commercial oses
rellil commerci.al
10,000 square feel or .n aeres
The Zoning Administrator approved the CUP, with Ihr..., conditions. on 1uJy 25. 1995 (see
Atw:hmeDl2. ZA decision foe 95-UP-17, dated 1uJy 26, 1995).
9-27-95
Page 2
ARB Approval:
The ARB recommended approval 0( !he site design and architecture of the project on
July 20, 1995 and the Director of Planning and Community Envlroomenl signed the ARB
approval on July 25, 1995.
Appeal of Zoning Administrator and ARB Approvals:
Both the Zoning Administrator approval and !he ARB approval were appealed 00
August 4, 1995 (see Attachment 3, appeal kller from Herb Borock, dated 814195). The
majorily 0( !he coocems rajsed in the appealletler rel.1e 10 design issues and the ARB
approval. The staff re8JlOIlSe 10 the ARB relaled issues is included in the attached City
Manager', R.eport (see Attachment <4, CMR:412:9S, daled 9iI8l9S}.
The appellant does not Fa ise roncerns about the proposed use 0( the site as a financial
institution. He does lake issoe with the fact wt the approval of !he Use Permit was not
~tiooaIly linked 10 !be ARB approval o(!he project and. Wt because .it was not linked,
be was required 10 pay two appeal fees. He also raises conrerns about bow he was notified
of project approval (see pages 8-100( Attachment 3). These concerns are discussed in
detail in the Issuesi Analysis section 0( this report-
Process for Appeal Hearings:
Chapter 16.48, ArchileCtllral Review, of the Palo Alto Municipal Code (fAMe) requires
ARB appeals 10 be wosidered by Ibe Cily Cooncil within 31 working days 0( !he appeal
date. Sections 18.92.040 and 060 Ibe PAMC require appeals 0( Zouing Administrator
decisions 10 be beard by !he Planning Commission within three mootbs 0( the date of the
appeal and by !he Cily Cooncil within 30 days 0( the dale <Jf!he Planning Commission
action.
The ARB appeal of this item is scheduled for the September 18, 1995 Cily Council
meeting. SI3ff has recommended continuance 0( !he ARB appeal until the Planning
Commission can review !he appeal of !he Zoning Administrator's decision and both
appeals can be beard simoJuneously by !he CiIy Council. k is possible, bowever, that !he
City Council will cboose 10 take action on the ARB appeal at the September 1B, 1995
meeting. The appeal o(!he Zoning Administrator'. decision is 1e000tlvely scheduled for the
October 16, 1995 Cily Council meeting.
9·27·9$
Page 3
, .
roue)' IMPIJCATJQNS
' .
. ,
,,-,,""'"',--,' __ ~~w .. ,," .... · ... ·.;.' ..:.
The proposed finmlcial use is coosistenl with the Neighborhood Commercial land lL<e
designation and the Slanfool Univen;iIy Lands section of the Comprehensiv~ Plan. The
imen! of the Neighborbood Commercial designation is 10 provide service commercial uses
which woold serve neorby neighborhoods and employment centers. No policies in the
existing Comprehensive Plan specificaDy address the use of this site.
!sSJCS and Awlysis
The appeUanI does DO( raise concerns about the use of the site as a financial institution.
The substantive issues the appeDant raises are in relation 10 the site design and public
improvements. Staff response 10 these issues is addressed in the attached CMR (see
Attachment 4, dated September 18, 1m).
The appellanl does stale that because the Use Permit approval was no< cooditionany !inl<ed
10 ARB approval, be was obliged 10 pay two appea1 fees and !hat the two fees are onerous
10 him. Section 18.90,060 of the Palo Alto Ml1nicipal Code {p AMe) authorizes the Zoning
AdJIlinistrator,1o approve Conditional Use Permits if specific flndings can be made. The
Code docs not require Use Permit approvals 10 be conditionally linked 10 ARB or any other
cIiscreIiooaIy opprovals. In this particuJar case, the Use Pennit findings reference the ARB
decision regarding landscaping and conditionally links the Use Permit approval 10 the
project plans dated May S, 1m, which are the plans approved by the ARB. The use of
this site for financial purposes was found 10 be appropriate, and was correctly linked 10
specific plans, If other discretionary aclions change the approved plans substantially. an
amendment 10 the Use Permit would be reqcued.
The appellanl also raises questions about the notification process for !be z"ning
Administrator and ARB dec isioos. The appeIlant requested and received a copy of the
Zoning Administrator's decision. There is no recool of his requesting a copy of the ARB
approval. ARB approvals are not automaticaIly maIled 10 speakers at ARB hearings. A
special request must be made 10 receive a copy of the decision. In !be absence of such •
request, notification of the ARB decision was DOl mailed 10 the appellant.
9-27-95
Page 4
):.:.:.,<
" ... > .'
~" :-" ').
Pub)j!; Participation
At !he Zoning Administrator hearing on July 20. 1995, !he appellan! spoke about !he
project. The appellanl discussed landscaping, parldng space length, overbangs into !he ()Q
site ~r landscape area, !be plan!er strip betweee the sidewalk and Quarry RGa<l and
removing existing equipment from the sitJo prior 10 COIlStructing the new builalllg (see
Attachment S, Zoning Administrator meeting minutJoS, dated 7120195).
AJ,n;BNATIYES
1) Rewmmeod 10 !he City C<Juncil that !he appeal be denied and that the Zoning
Administrator's approval be upheld with modifications; or
2) Recommeod 10 the City Council that the appeal be granted.
USC!I. IMPACT
There is no fiscal impact 10 the City of Palo Aho from any of the possible actions.
ENYlBMMENTAL t.SSESSMfNT
A negative declar..tion was prepared by staff and recommended for approval 10 !he
Director of Planning and Cooununity EnviromneDl by Ibe ArchitJoctural Rev;ew Board on
July 20,1995. The DireclO< approved the Negative Declaratioo on July 25,1995.
STEPS fOllOWING ACTION
The Planning Commission recommendation will be ~dcd 10 !be City Council for final
action.
\UACHMfNTSiEXHIBITS!
I. Leaer of Application, dated May 9, 1995
2. Use Permit De<:ision (U?-95-17), dated July 26.1995
3. Letter of Appeal, dated August 4. 1995
4. CMRAI2:9S dated September 18. 1995 (with attachments A-F)
S. Zoning Administrat« bearing minute<. dated July 20. 1995
6. Parcel Map
7. ZoIIe Map
8. Project Schedule
9. PUns [Commission members only]
9-27·95
Page 5
"":.~ ." .. -.
; ~'
W!RTESY corlES:
William Phillips, SIanford Management Company, 2110 Sand Hill Road,
Menlo hri:: CA 9402$
Hero l\oroI;k, 2131 Byroo Street, Palo Allo CA
Prepared by:
Lisa Grote, Zoning Administrator
9-27-95
Page 6
May 9,1995
CITY OF P AU) AI. TO
DEJ>AltThIENT OF PI.ANNINo
ANI> COMMUNITY ENvIRONMENT
250 H=ilton Avenue
Palo Alto, a.tifumia 9430 I
Attn: C-"Y'. Zoning Administratoc
Re: C<>nditionallise Pennit Submittal
fur 315 Nboretum Rgad Palo AM CatjWmja 94;.Q.c;
To Whom This May Conc,m:
Stanford Management Company hereby requests I Cocditionallise Permit for • nov'.
440() square foot. <>ne-stor)! Bank of America branch bank buMing and related sit<
improvements '" be located at tile corner of Quany Road and Arboretum Road. The
existing building is • vacant BP service .... tion. (See anached Project Description.)
The proposed use wiI1 not be detrimental or injurious ICI property or impro\"emeI"ts in the
vicinity,!l()( willlh. proposed use he d<trimentallO the public be'ltb, safety, general
welfare. or coo,ren!ence. The ~d use .. ill be Joc.ated' and conducted in a manner in
accord wit1> Ill. Palo Alto Coroprehensive Plan and !he purposes of!he Zoning
Ordinance,
Should you have any questions, please feel rr...1o call me at (41S} 9:" '()21!,
Sincerely_
wmiam T. Phillips
Managing Directo< Real E .... te
WTP:dl1
ends.
Gty&Pa1oAlto
Deptmer:i rf['1Jrminga"d
Q"",,,,,,,ily tnwOllment
",pp!lcaoon No. 95-UP-l1: 315 AIboIetum R<>ad
Use Permit 95-UP-11 is approved for !be construction of. new 4.400 square (00(
f;-nanciaJ ~ buiI<flIlil (banI:), with 22 parkins spaces and rejale<! sUe improV=cnt5.
IS per atta<:hed plans. 1I37S Arborell!m Road, CN Zone District, Palo Alto, CaIifornLt.
Project approval is based on !be fo!Jowing findIngs and is subject 10 !be conditions listed
below.
1. The proposed use at !be proposed location will llO< be detrimental or
injurious 10 property O£ improvements in !be Vicinity, and will not be
detrimental 10 !be pub!lc health, safety. geaerallllelfare oc converuena:,
in Ih.at surrounding streets have !be capacity 10 carry veh.lele trips
generated by ::-te facility aN!. there is suffic:ieDi parking on the site 10
accommodate employees and QlStome". The vehicle ingress/egress and
parking areas were redesigned after revIcw of !be origuw propo<al 10
improve on-site circula6on. The use "'ill provide I needed and convenient
service 10 !be immecfUlte area consisting of predominately retail and
med"1Ca! uses. .
2. The proposed use ,"'iD be located and conducted in • manner in accord
with !be Palo Alto Comprehensive Plan and Ibe p;uposes of Title 18 of !be
Palo Alto Municipal Code. in lila! !be proposed land usc: is conslstenl.llIul.
!be rurrouoomg land uses and is I conditionaDy permitted DSe in the
zoning dIstrict. Parti,,/! and setback requiremeD15 and Arcllliectul"a!
Review Board (ARB) standards have bee. met by the project. The
majority of Iands.oape requiremcDlS have also bee. met with • minoc
exception to !be regulation requiring one tree for every IeR parking staUs.
The ARB review<d !be landscape plan and found Ii!JIt adding one tree 10
meet the landscape requiremenl would adversely impact !be visual appeal
of the buiIlflng. The ARB approved !be landsca.pe plan without !be
aMItiona! tree.
95UPI7.1g
SlHamJIlonA Y611.le
PD,blO2.5C
FaJoAho,CA9OD
4l5.:c9.244l
415,~.z:l4llFCill.
July 26, 1995
Page I
--.. " ..
< •
.• "4-_ . --:--'," ... ,,:~ ,
'" ,-.... -~::-:-'
CONDiTIONS
I.· Tho project WIJ be constructed in substantial compliance with plans elated May
5, 1995, CD file in Il>c: Planning Divisior: offICe.
2. Tho houri of operation WIJ be: Monday· Thunday 9:00 I.m. to 6:00 p.m.;
Friday 9:00 I.m. 10 7:00 p.m.; Saturd.;y 9:00 •. m. I<> 2:00 p.1lL
3. Tho ATM WIJ be in operalion 24 boors per day, .. eryaa, of !be week.
UsAGROre
z,oning Admlnistrator
July 26, 1995
This decision letter does not constitute final action CD !be app!icaoon Co< • Ccodilional
Use Permit. Any pe""., {"Hm, 0< cocpocation aggrieved or affected by Il>c: decision may
file. written appeal with !he Planning Division on or before August 7, 1995. The appeal
will be forwarded for ccnsideIation by Il>c: PIannlng Commission and City Council. If no
.ppeal if. filed by Il>c: .bove-mentioned dale. I fmal action letter will be mailed to yon
and should be presenl<!d I<> tl1e Building Division along with your building permit
applicatlon.
ce: William P!ull;p., Slanford Management Company, 2710 Sand Hill RoaJ, Menlo
PaIk, CA 94025
The Board of Trustees <Jf !be uJand Stanford Junior University, clo Stanford
Management CompanY. 2710 Sand Hill Road, Menlo Pork, CA 94025
Herb Boroek, 2731 Byron Street. Palo Aho, CA
9SUP17.1g July 26, 1995
Page 2:
...
. i [.
CiTY Ofl'f-l n ~ no. t Ac
CfT't OF PALijj.liQ.V.';';; em,:,
ATTACHMENT
APPEAl. FROII THE ~~J;: ~~ ~ f>uII&Na
AND COMIIlINITY EIMIIOHMalT IARQllTECTUFIA!. REVIew APPlJCA~S)
To be fled h duplk;al.
Receipt No.. ____ _
Phone (4fs"j 3;>6 -.;l3tg
.4H.o 4<.-70 CA:
CI!y' &
The 4edsioo or I!le Director -01 PIamlng and Community frMrOMlfrHated ~ lrf..'1 ~ S,
'9 '\$ ""." .. bythoappl"teallonor WIIA,,,-To '?lIlA.,!, S~ __ ""''''4-IY
(o'lgTnS approcan/l
lor arol1ftecl\lral ""'ew .... _,:A..-=:"fM~"';-~::;,,.-__ ~. 'is "reby appeaTed lor I!lereasoos slaled'
laPJlfOY€dJden;ecJ)
RECEIVED
1Il1!le atlllcl1ed Teller (m cupTta\e).
_0iIt_._2>_t'+_'_9_S __ -_S_igna_tu_r_e_or_~ __ nl~~~~~~=~:::::::::::~[;,:~;~.~;;;,~'~;:,;_"::~;~;~
Da1. _____ ~_ Approved __ _ Oenlod ___ _
SUBMITTAl REQUIREMENTS SATISFIED:
t. Plans B~ __________ __
:t labels
1 Appeal ApprocarlOO forms
4-lener
S. Fee
By:
By e.. ... R Pi .:.........fr, :~~~
9S"-M$-81 / 9s~GrA-~13
· ' .
..... -" j.:.~('~~-~".
~ .'.
G
£'11 Cr P~,l~ ~no.a ~:,y ClEr<'\'S ~fflCE
"5 tIll; -~ P~. '-, 11 31> .4AB'C>~I17UM
~S AIft!YtL. t.417~ (ft-n-1K*I>t ~ to Mf.~ Fo,tqn) ,
Z. .tl-M Af1t!l4--Ll~ -rf.W; M#.wrrL. c{)--r~ #B
R~~~~7"x>tJ A>.e. -r~ f'OUJ><.Jl~ 1l...~.s<lrJr:
f. 10 ~~IJIU" '"1lk;i'" NfUCA,r( 'To Ck>t1R>~"'-To
'T~ C(-rv csP II/-<..c 4<-~'s SrIWDr>.A.~ c.,.",OIT'Q ... .s c-p
Mfh>oJJ.{.. tP! CuRS fu.rrCE9... S~lt'. 4-JP SID~ _ t . __ , ___ , ___ '. _________ , .,' __
So -r7M:"1 Tlf{; f'iSu c:. ~~if-T ~-W.4"tIS. ~AlnrrliE'f'J7: WJ7'o/
I1M' ~ l'i'N ~-m.~t> $1J."oH'N<.. <:S;"":".~ .. ~tl .. ~ .'
f<.Mr SoJ~/'W7"T~ G'{ -rJ,ft 5A->l6 WIC-:'-/*"'t, T. P/flt...l..J.,S.
wl6 ~) 7~ AI,t.fv,..rr Fr>( 7WS .... J t ttffl..{e./F7wl ~
7e. ~"""LfSH. --n-/-IS I,T OJ({...t... i<€ ~C<..'lJ'M.~ ~
iU' FI'''L{~ -r-" 'Y\!:)\urfif #f ~rvI7t .. ~ S ~ WI1\i'
lf1'rSf£W\<O-r1' 70 '16{£ Cl7'( 14.p, fir.r~uc. ~'lff --cY-Wrt'1
~ ~ FP..oI'<T~ ar 6(~1 ~J N W'J~t~>"'9
/'1'.-0£($ fVu-'1 jlJ Tll-6 ~ Mt}'( -;;lSI 19 9S' I
m1;-Mt>~tfll\ Frt,o ..... G,(....oeN Wf.WJ<,.:"1uf '"To L.oMMNk-w(;riSS.
@eN7l~~ cr;C f'~~ ~)
,~~----.~-~~~~
'0';'
,: .-
--~------------------.----------------_. -------------
~S-Mi-i(J1>~-13
3?S"~~~
{»~~ IcnY'~L
~L-~~1)~1J
~. tFU"',IJ+r .. JC 1.<E)£:$fW 7114 f'1fI{K.!.JCt (.+Y""'" 7........ lil •
rJ-t6 4(.s-t.VJ~ ~.....,~ ~~ ~/~ ~
l.-<&ft",wr. $..N\1:AAt-~KIAfC, S7".4-f...W', 45 ~~
/Ir.oL£:" An.\..'1 : ... -r~ ~ ;2-'*4~ 1ll'J-'1 :VIJ 19'fS/
A1~~ ~ <.4.(.!..-S7'c-PMn.. ?t> ~N~ ~rr.
3. If> e.,N~ -z:a S''7'''''''~~9 flft.J!.lAlG. Lfl7 l./.I.J'PY<A<".s;
~~<.!NTS (Nu,mlff,. 7ifG pO.c:<e;rJT'r41!: ar-.
{Jo{7'~}OR. WJ>5c,.y~ I 7/fft ~1iN7 cp:. P1!t« Kr"'~ ...s74<-~
o,,~~ IN T~ {A,JJ)SG<Ti'£ (3uffTd, Ao-;" 7#if
-I-~r;.rr ~ ~ -ClOd" F;:.j( 6tk~ 7"e;1'J m.e.K;~
S"I'~ ,,,, A-(2.., "".
Lt. fo MSl-r€ ,M i(J/ux~ -ro ~PU.rH 711<£
oS~71-m S-rM<Z!> IN fl.1!Jlrj~ (fJ I OJ" /j,.fp U)
A#'l~.
>. /<:> (IUY.fl'D(F t'(.4,JS 7N<4-7 f)br(oN"N~ 7HN7 7f!r;
~"J;!VT WI!.\'" A-tM>w ~ ylf(r ArT<.I.t:€ t,JIMwJ4"l; 0{:
6?lftrUy (/.~ 4J9 1Jlt~~\J"1 .f..~ Af 'Pre.fC,(/$-L-,? IfI.,eM
~u..>1 J,J 71¥ M*'1 ;;!.~ Jf'1J; ff4H~'L ;1{fZM~V'n1
~<:;;
:. -,
®
qS-AJ..1S -Z/ 9S"-e:.M-IJ
j'1> ~~ol..a"'"
~Ot...<:.~/ % ~!..
Mi~~Nj
--:0
.. "
ss A~ -\ PH ~: 11
6. 10 ~~\lutE ir,Hlr( 4-Gt...J01'T/O,.!. Bc:o A-77~ 7<>
T~ MP~ 10 "'~ -r1kE C¢Nf)l7J<>"' • .(~~,..~
fJ.'1 -rlt'C< Fi~ P~7"'~ 'tb R.'bIt~ "'1~M-,{
~ rfk; CA.J~ Yr~c=:1 S"ro!"K€ ~~ ~
"(If€" ~A,Lp S*,N"JG-~ M Pa"«L&.D ~
/ M.su. 'i M"7lf<5 A.(£ D ~71Jt ~J' Ce,., "'-rn' <nJ 71fG
lu-u."'t"'~ MP(,{~I.r/ (9S" MIS!.fbl Frlt.. 'lffj M~<=7
~~ 'JOiZl, I'IJ~ ~.ffa:> :3 /lo/9S.
? To 5-(",,, -rw V~\..A>'T, .. ..J <rF-"llhr G+f...Ir~~ ..
~\~.-J"",TdT4t-<l(\f~<'( 1'rc--7 G~) ors'~ 6'1 Ilftit . . 'J~~ tJ'Irr<J~ ~ ~J AN>U<!I71".J. I7.t.~_~_.
VloLkr'-' fP UoQ~ A.lt> \, 15 f'/~~""" "'To P.'1~"c
A.f"j)Io."VO--~ l} p.,~Tv>N <rl'-7It€ ~'+r~-U"" ~
QI1~ ~ -r~7 CotC1~\CTj -t'!I-if 1'~"!Ojl£) f}e:JrW ~
.<!!IpOIiOIo~ fl..~ IN -rf.f€ S ......... if Jflli...lt;w-l!r J'v/.hu'7'74-L
f,,-'l.. 57¥fl>4 JHoIPIIf"C C0-'TID... J/fIf,te..vbkeN1 lu,..rrA!'
9~S~I~ III t.~ON wI 4-l0.,r~. -:t-7 ~ * YV-><A--1'"toN
(fY U!liA--~ i"l't.r /t€Ce:otG4LlJ.J6j /0 ~~ 71f'C
flJfulff (iJlDbff~ ,p. ~.mu'i t<~ AdI) M-gr;(L~~"<4i>
kJ 0 6 J'cP.It~ /I'l f.e:t'¥D N iP ;;l /L.&~ .
9S'-~-U/9>I?4-B
3l'J5' Ji.(!S'~t1..I!7V""
(1.:. ~ .. ctc:./ <17', ~<J>.! CIL.
/tIf1.£4f.... P"~NJ
-', '-~"
,-' .-..
-------
~L 10 ()t.~1;<'r1' 7~ f(~f-4-t... ~~"11£"17 oF
-rj.t<:l' A'9:r>Ki.!:r<7 ((:~<:101~CA"" ~~ ANP 70
~uw£ 71£+7 -nt-€ A#~~ <S'P 11ft.J ''<<:01Z"l:7'
6~ G:,..r'1'1/0N~o.-J "'11+if t.¥€" <YP 71/rc ~.:a.;7~"'''
~ JAtJp ON "TJ.I.E' ~l'>"" 4rJp vre-cr-
((IT-S~ VNllI"&-!Ul7'/ P~NG ~/u-ry>' ~
-rD ~ 71f!;# )'rhu(4W7 t ;). -iJ1rf.e P'('IIf1'.rc.7 .
r)~<.f....,p-[(DN .=taz:7~ 7Q 7'IH, U ... i77~. "Xc IS'
A-Vl.::.U·· .. "[cc# <S'P-a...~4-MP '{~~,..,c; 70
Nft;::Jltr T~ P~<£VT VX7#1-~ P/{<>PQf<n>
A<A(ii.J",,~ CP A-p~JC.(-rJ1..'+J ~/:f ~y <J,.}
~ S/~t..f-7'I~ P~l'lII~ ~ 71+1ilf' ~,<&..~"
I~ 4-Jo ~ ..wC<J<A-<7'I~ 07/(~~~N ~
/.tr~« .51.fMJJP f.h//vHJl7-j ~ NK;«.rry.
f1../1J' .YrrG Ate»-is(> TIM" l.l¢f~ tf/'U:>IU~ IS'
01-JL Y 'J.:2'f _ ~ T is 0"; I-~ --rJj-€ 1.-0 CA-71 o" MJ)
/¥lffJhtM c-P -rJl-tff ~e-r1A.11d iJA:111-7'1-M-7 «t:;rut-7J
\fJ ~ A<--¥w~ fA-tU!f"'~ LoT 44> tA<:¢. <SV fMK/~
WI I.A-JPXM::.t .. ·~~~·~ __ ~.A~~~.~<>~N~=~~,
",,',. :. '
. . ", ;. '-' :-' .
. '\ ' ...
' .. -
®
'S-.¥B.8'!9S-lfVr -11
3 r"}s-MSOR.15!1J1Ij
~'R.oct!/ Crr'f CoIJ~(L
~rlf:I;~-. g~.tJs
-~ • -<
l~r&:. Avr£.
.'. .. ,.' \' ....
.. -."-. ' . .. .
,·-,::i.<; ~ ,;. _', -:''; ..
,'.-. .-,-
~-..
" ; ,.
ss A lIS -~ PH ~, 11
~'l:~~wt~9~~~:: ~-:::;.;;~ P'P ... A.. ,' •.•.•.
~,.Vsr ft.4-~ --ntre AHu(1frJ7 ~ IJE-twr;;
._ Mt"Er ~ ~<!'!?.f~~.T~ Ihprrt£>~~~. f:.-~.
~.tl'-~ ~ Wi4'1.~ .~ A-..Y;wJJM-P
CA)M, . j~ s 7"(. If J PvJp ..n{)r:}~.
.. .
r~ .Afl.'-4~. PI,IZTti!:N,Df .. 711t:t _~~....t<;. .. ~7's'
.p-• .t:'R,M-¥!. f1'f.~ .. ~ e~"!,5,,-~ lMiH~~.bf~_lJ:cA
[I$!.!~. h~'<>.':"3l.fofi/._~_9'f'i £J'7M.1l~! ~€17'O~f •...
7:~. ftI.fI.J/!t<~LIJ.h~II5 .. ~. P11,J~ Yov •...
"71f'€ f~. 0f<:£1lf1!<<$<::fl.. {P;tJI]fW l~ l; . .4-.~
.~.Y(~ ~. "'7M ... t!JMt;J!""ti .. f..:rr ~P. IY.J~~V!~
<51"'-. A:LJ.,. fM-~Lq~JFIkJ .. e'~ 7i~ .C(7y(r
(Z ~ fJ/:r ...,.p • e.n'.>1 •.
----.
. ~ ~Ol-r(¢!{ /rl-<.-(JJfLtCJ!.Ul.f?i.if 6-'fIAt ~o ~t&JtICrz
It P{MTfd.. S.-r!.11 eN .. !Zf&>r!2.r&:T .>r'le/if Il1Ar
61"'-~ .sr-~A4 C-otJPt7?o,lt ~ Alll..oVA-I-.
,
o
9>-Mt-'$t/'N""~/I'rIJ
3 '1.<" #$<>xtortv""
6t>;".t.V./c.at ~L.
A'f f./.'4'.. I.~'" }
o
my ~r rAt~ A"Ta. CA
:!IY (~F)\'S CFflf£
9HUC -~ flH: t1
f..N£c If ~ NIl..l~!.r ~""1i"'f4 M ~ocn'<!;> AU • .,."
7lf1E>.~ /rnlklfe p ~~ P~lnl."'.
® ~U if A-S1~fkT''Il! t"( FJ7"~ V7lu'M-71oN ~
k SIftt{l.4 ()N\~Ii1 f1Y-1CJ~ ~'U T)f q 7lf;f'{ ~'bJP.P
<>d lit-P/~~U.rtf Vk..t.+1I c r! ~ e:...~.4-.
..
(]) ((TiM" Sl.e t2C4vJ IJ p~NJp iN If.e:s fe.JJS'iO 70.4
PICj"tPt' oF rr~ <0 IWo:'M~~ Pr V/I$W A.M.l,.,,/\,
ft.:i' ~d-tR.fA..1 (l47H "11f+t 4~ 1lf.& 4MM. oF
..AA.SQwr~ ~b Q~"1 t<.~ 'J -to -rHiC S/l!U:IU7'l>$;'
QWr,.t.(),%'b¥1 PI!.T<At6l1P /IV @ AS .. ~.
<§) l/Jt>& gv~t~~ 5t7l..r<i .4J~ Q€JlGoJ i<:t.t:.sf<;;,rJ~ 7 ..
7M ~ hrt..;-Ave l/I$N&we'1 b;!:S"<:R.tta Mov~:'
<W 7~ 5aG' f(A.J r ll{>tT If' liffq eN 7lfc$
~U'\f(W:f' f)G-V~'IIJ~.,.J .#;fA<.Q!:W"f 1~cn:L(S)
{JI-~ -r1fG f'p.rr;;/z"?;r Ff<o"," M.,.vI{)i'.J~ 7!f-<;Z
S'-r/r1'1 tll;flJ} PJ ~ ff oF (,J It'{.
(catcr~ eN fl~ ') )
.. "
•
<.'
.' .
~------------...•• -•. ~-
e
9f-At(~-8119J-~-r1
3'?J M80UNfI1
g<Tf<I>.~( CVl'y Ce<,PJaL
AN~a,.~ ...
® .. lHof Ar~.fM7. f".IS!.e.>J Pf 7'JH:rr.. t~7H:l,..fJ!'~~; '.'
/+ .Ff(" ~ ~P.[~7'j!~.~~~'-ifi 7¥.
.>()~~ t=I,~.""1lf§ A f!!' -.. • '-. -~ .!J'rc!1; .. 'T.!ti¥
HV~ Fc-!r:t. ~J~~\OI: .. IS &y _.'f?SfP!~m Cl>J . __
I't<'-~ . f~7 ~ ~ p~,.MP, :7,..~!$~~ .T..<Y.~
<Sp. 7A-€ f?:t.'Vf~ ._~. ~~ . W~ N.&: _~.~
c:N:.~ .M~.e~ _tSf: .. -r.~ A~~~~ I.M,~~_.
7~ AI1u~![_£g:l~r·~/':!!i:..J;5>...s:!!~"!j;'.::itl·wt:;;.~,,,-r~~._
~~qT~~.f~~ ... 6.._ <rI'=-7~ __ ·JYf,.-'1.~ ~ J'l '!§ '-_ _
J7~ (J.r£R9_tn'. 7,,_ .. -rtff;. MCGk.~"'Ml...J!..<;,'\A~_?~~ ...
-. . -. «. . .. ' c··-® 5!'7I~ .fIIF"--rn-e .. ~ .. S'Hl.--9 t N1l .1t:7-4-{)JAqo~t..
. ~WT1 fAJ S~_fW<.-.t~ S--~14:t-~·-j 71f-47 ~.V.ltYZ __
~\(W~AJW:~UV~1Nl) fi,({ 1&'rt~~.0().., ~}a_"''''f_ •.
• ~-7tf.C .4I'!A~ Ool-rqtJi''(;{ 'e. ~O"'(~IC Si71N"$ ~
. il-f6 gtJrUCN"l; ¥ ft%so>.)'
" .
'. ---/.
9)-~-'8'/9r.-F1A--IJ
1 tt(" Al-i oP...~"1l-t
!oA.~Q7'f ~1L
/'rtI'4t. t..~N.s
~; -' '-, -
"", ,. ----.-;:'
'. --; -,
9SAUG-~ PM~' 17
'L e.~ \J t:r-T 7t-+IH y~ v () PtfJ:>LI;> I/I-r$ A-fi?l£'4L. ~p
CJ\fG<L -r1./'tW I1I-G 'i)eTtfl()N OF 7~ <J)/~&!7~ or
PIAJIJI IJf. A>sl> ~ MN ~ t:!:>.JVII< oN-'%! 7r.rT, A-rJf> 71M-7
'/00 fl.~q~ c-v,,,~ G-Jv1(/J:".JNJeN74-<-/2-.\£.Vl<£W OF
~ U~W' ",,= -r'/f£ PI<C>7Jarr">} A:r ljIeFr,.lJ.o elf w"\'4-.
L:. A-u'o /l.J£!.JioJfl7 7tM-r 't<:N ~NPI-T'''''' +''1 p.(.rj~
~e..""1k-.so 7!~7 IT Ii1>D~7~ 1fj"<J(.."-M-IJI.Dp
(,.I ~ -#-( 7M~1f .p. 8 ~_"'~'
A-Sr£1'A/.IIrt~ W-~ f~<7 At'P~'<?:I--L 6'1 ~ &wl~
A9~(.rIfYM7"oR. If A-4-o /6.J9{,./f A'( 7J.ItJ' /7e</;)7}rz;c:::r.
].J ~ 1Mr, ~ ~ IMvr£ g~ 6~ • i\$(
AM.4-1" ($G" 1~'1 AI~4~/b";.r, ~ 7Wi) Nl'l!.wM...[ ~.r (?el9J LtI'Jil.1!!J> ()'{ flIlt'?fN6; OA.f~ <Y-' 7l(-(..~ _
It c.s,l'JD{71,,,,j of: Mlfl.,:,v/I-!-Fs-L ~ ~.
(CcN?cN'<Ji<!ip "'" p/}\e-<))
; T_ • ---:--___ , ........ ,_, __
: . ,:-: "'-
4 -_-
~ .', ~
. '" ~ '," ,-
---:.~ ~ '//~:·i'J,~~><.-:. -
-:., ::: ,--:~-:-~-.....
, '
-"'.;:"":~ -' , --?~-,.=-0 ,',' '-_'.{ .:, .. ~ ..
"~" ," ~'.:: : " , , '
"-.... '. --... -.:
®
qr-#&~81 !9,r: &lk .t3
3?f ~~J)j
9 o/to el( I Ci-ry CoIJl-fCIL
Nt~ ~1'lS
f~~ Nl,..,t~
, "
-..... '," ;~
"
·:""-':c_-'-·, .
ii>!-lS?:A»!fu; s(;..x~ A-()/'l&"' fCf!.w!!,1' ~J\I~'1
~c£f1SN9J o/J A-11+LltC~ (Ju(I-PIN(. ~4f~ r TJI.e'
. ,OJ,s 1l£l'L .... YT US<J7IA..<"'1 tW 4-' U:.,.J1)(7iO..r 7l#r-r
/A,J!t.; -(lit:!' ft#A.fN/rL CS"P-~ lUre i'~ 70
~ Mp({,~ oF"--Tit€" AAS M~ l.«.+7u:w.
T~ o,"'f.Ri ~1fI{.JI.J7~! ItII,(;:J./AC OF -rlfrf:" oSe:;'
f4~l'" ,IS, 4l-19t71o-J~ 0f.I(.'l ~>N' 7tfr;;:" fJGIftfl, R>I{, 7lflI' _
Pl~ Ikr~ ~ 6~N6: ~AfOI7(c""~ (JAJ 7/N
",AI-S 4(11,!(kn~ iJ&I~AlI~ ..
-:-fIN,,:/'" MTtf%,~ Aun fA-'1 cl-AI~ ,
~1 '70, A<44 AffldrL 7r!-r£ (jr~ 1-<-~'7 If//flj.v/R-,
, '"lO <:>8-qw.t 7U'~' Jim> € l!..<avL-r -z:-W{JUU;> )M.vtr
~(;fJ JfIl-y, -rr~ Pt.~~ C-6N "11(0.-.1 Jbfi INQ,vo t..~
,.0 (.oNP(71ooJ (lft5" (frQ; l~l7 ON" 7if£ #g AlI'/P/A<..
j:'rMr -tlHJ DO(Itt.e ~ ONG(?,ol/S MP A-(Jt<en<JI)[Cf"'<
M~t' ~ '9ifcR..~/.A',
~rJ~(:JJ ~Af fTKc 10)
9J-Mf.-Z'; ~-M£ -13
37{' At~UJ,31V>11
~Iv> O£./ <..t?1 Co,yJe.1.
1tN~~,..tr
,-
---~ , ,; ,
o
-x tt~VIS\) {if -n~ ~l---4-c.:.r'1 o-r-'7/14
'?:pNW(i, A9~,(..tr~!F O%' p~~ pe::UJ'lot!} 'CcJ7
~ ltJ"l:f tJ'crf SC;!N7 A-~P'f o-C---nt-G' ~'" IN 'i
QI~~ MCj.f{'t'~J~ ~~ ~~ f)o:cc'SCW.
7~ U.r~ P~'<'T Mf~ ~Lt"-'<r If iIt~ 71h+N
~ ~6 t:tPf~ ~W~. ~ 7-!.5<-Ir$;> ON
-r&.1-.6 eN'L.'1 (.fi$fr~ -z: {I...$c=..-o-p 7---WOVLS> !h4-~
/lli1Jf1,W -r~ 'll~u~ ~ 7!~ At.t /'tf1c!:1tL,
c.,.,(~ . 7J ~ f'~ l T • csr-7tH:: P(A-,JN/I·.r'i Pl~~(r
~, Atpl.»oJA1.,. ~ Y.o-t1 "ll:> Ir.rr~= hrbTtW
~~ !-w.~lA>tJsflRcA-"7lo,.J At 7f~ MB !1C!PtN/i.
At~(:Q'!1l
8.4JIL <3"V 1f..':eR.1~ fNr.Jt!:L-7 ~~ll7/o'" (J2 ,,*tt;Y)
1\IIA't ]S, 1111' M~~'''''' [,.lW~,,;t-% !JI~SY (, 'f~)
M~ J.1.ft 11~.{ II!l'lot.~g" ...... ST",F1-H.-7C WY/f (;t 1'.f(E!J)
frl.<E Fr£f7; c.,..,.,. ... &.nJ,''''~IJ';.~ 3/t",j'if',;I:;i1.9J Mt<.«(, (t I'EK'&)
l~; 'If II"
. . ~ ,
'-'-.
/"
·llANK OF A.\1ERlCA
PROneI' DESCRIPTION
my C:' FAlO ALTO.£A
CIiY ClE};'S !JFflC~
95 AL'G -~ PH 1" 11
The p'0j~ is • one-stacy braooh bank of approxima!ely 4.400 square feet. fl will conlaln •
public lobby area,. !OIl .. !in.:, oili<:ets' podium, I vault. employ~ work an::as.lDd re..'lrooms.
Cons!ruoIloo will be high'<jUllity commercial, utili2ing maIl:rials and syst=s such as reinf"rced
eoncreII; s10De masonry. stool frtmlng. wi glJs! sIoIdronts. On lhe intaio<,1hm will be an
.b~ of caseworl< and _ fixtmes, AuIom8tic!Ol!or m""b;"", and sophisti~
colllp<l!et equlpment.,. s!lmdml and os=tia! !ix!ures.
THE SITE
Tho .ite is I one.!Jalf 0Cle par<d 111111> nortlleastuu eorner of Arlloretum and Quarr1 Road,
which pmsently iDeoJponIco • stongeIsenice ..... fOr StacfO<d Shopping ~ maintenance.
It -. previously occupied ~y • gas station. !b= are some I!IAture oak = along !be !lOrthem
and eastern bordott of1be~.
SITEl'LAN
The site pl&ll is dev<loped ill response 10 • desire on !h< part of StanCO<d \0 incorpor>le • view
corridor and pedestrian path Chat !ink !h< comer of Arberetum and ~ Road 10 !h< interior of
1111> "I<ctangle" and!h< AdxneIum IIIeA (foe future utiitzatiao of. sJ,.ored University parlcing
facility).
Tho cllIgonal path and view".me divide !be bank pa,od into two equal parts. The portion nearest
Quany Road is planned for !be Jequircd 22 parlcing space.< The half fronting Arboretum is
occupIed by the building. Wbea lh. 2O-foot setback is app5ed \0 111. Arboretum frontage, the
resulting =a is tbe aVailable building footprint
The existing eorb liM along Qua.'tJ' Road is eight feet from !be property line. The Project', site
plan mps 1his width lOr • now sidewalk wbich Includes tree pockets with new Oak frees as I
landscape buffer against !be road <OIldition. A!so there is. five mt land..<eaped IIIeA separating
the sidewalk from the Projm', paOOng area. W. feel this is. better. more urnan. solution than
the suggestion by 1he Cily of. five mt wide plai>ting lrip along !be curb with • five lOot
sidewalk 11 !be lnside.
L.QIDSCAl'E CONCEPT
The landscipe concept plan aims to pr=v.!be existing chara<ter of the surrounding area. and
10 defioe circulation and use.,.... A o!<>uble 10\1/ of flowering pea treesstroogly defines the
primary pedestrian clrculatiod leading from !be inler.iection at Arboretum Drive and Qu3l1)'
Road In the futur .. 1be promenade Is inteuded 10 extend 1D the nO<cheast Along !be promenade.
bicycle parklng Is provided on the southwest side of !be buaamg. T. the northeast side, • oervke
court is enclosed by I. vioe covered fence..
The main entry or parking coW1 CD the north side is enclosed by a continuous hedge. At the
bwld'ing entry, • pedestrian plaza is speciaDy pa .... ed, and eldcnds into the parking court. Flush
eoo.crete bands d'~fine (he parking stalls in fr.r,.)rJ. ofl:he Bank... ~eel stops jlrovide separation
between .... ehicles and pec!estrian cUurIation. .
•
I Q
? 'BANK Of All{ERICA
Poled DeiCrlpoOD
Fagel
......
. ~ ..
o
t.:fil' N' P~L.?}~LJf(lI·~J~ iJi'f t.tE.~.~\ ~ \,.;\ -'-
SSMJ(;-4 PK!,' n
The _ trees pm"ted along Quany Road are to mOlch ~ existing oak 1m>. An infonnal
grove of Calil'omia Live OW along Alboretum Drive .nhzn<:es \be native clwadcr .fthe
~ The oak> are elusl:n!d at \he eost end and open on Ibe W<St to provide view> of \be
&ok building. Along AIboretum Drive, a curvllinear bikefpedesttion path CO!1!!tCtS die existing
pOIh to the in!e<=tion and promenade. Majo< existing trees at the north edge are preserved as
mucli L5 pOss1olo.
BUILDING CONCEPT
The bwlding.!iko most branch banb, is • one-story p.vilioolhat houses i public hanking lobby
separ.!Ied by '. teller fine !rom *k-of·boU$e !imctions and. "aull Thi& design responds 10 the
diagaoal path and viewIine, desa:!Oed .ha· .... and '" til. lates! Bank of Alnerica prototype fur
branch bank in!erlars. Thi& prolOlypO call. fur. circular pubGc 'P"'" bordered by • semicircular
tenor linc. The exterior form extends this «neep! by ~""ing ... mic~"C\!Jar shape for \be main
part of the bullding, inlertw'.ned with \he rectangular rorm of <he null and employee fimotions.
A metal canopy comple~ the exterior, providing shelter at the eotraooo and • place fur the Bank
of America sign.
The exterior materials .. ." $\00. on lb. vaull structure and the wall. adjocen\ 10 the pa!\l. ""d
metal panels and glass.n the semicircular portion. The colors ofth. stone and metal .. ill be in
the beige and acllze toneslhat are asso<:iated with the Stanford campus.,
SAFETY AND COMPATIBILITY
The prapo<ed lISe w-JI not be d.~ta1 to the pubGc health, safety, general weIJiu<. 0<
convenience;. and it will not be detrimental or injurious to proyerty or improvements in the
vicinity. The Bank of Alnerica b<anch facility will be Jocated and caoducted in. maoner in
accord with the Palo Alto CompreheDsive Plan and <he ~urpo ... of the mnins ordinance.
".
~ , ...... "';-.'
. J"' Co--'._-<
, ,
_., -,
.---.
rtf"{ err P!'L~ AllO·CA
C! WolIeLWoili ~Pirtment
55 AL~~~ p;vision
MEMORANDUM
"' '"
. V", lS, 1995
T,,:
GaryW'inre~~J
Engineer f/w
Snbject: 375 ArborelIlIn -Pubilc Works Special Conditions
PuI:soan! to our meeting an Miy 25, 1995 !he Pub1ic Worn Enginemng special condirlons on this prcject
should be changed as foDows;
1. Slandard OlllditiOIlS -certain Standard Conditions Of Approval awly t<> the project and ... ere
!nnsmittod previ<Jus!y.
2. Property !inc -II 'Ppean tIlaIlhe pub1ic rignH,r·WlIY ea..<ement aloeg Quarry Ro.d is oely 5' wide
wbeD.measured!'rom faceofcurb_ The City ,t."d.,,1 fur!bis type o(deveJopmellt iDclade .. 6' wide curb,
• "-6' ",ide planler str~ along !he Curb and • 5' wide sidewall: along !lie rear 0( Ihe right-of-way
easement. This is also shoWJl OIl the draft 1994 Stmford Shopping Center Improvement Plans whiel!.
includes 1hls type of planJl:r strip and sidewall: improv.m<nt on both sides of !be rerouted QuarT)' Read
ftomA,bomum Drive to Fl Camino Rm
•
To facilil>tr: <IDs goal it wll! be =sar)" for !he a,;pflCa!ll to de<f.:ate I!l a:!<!itiooa\ S· wide easement 10' ( .'
tile City fur putGc rig!lt-<>f-~"y along !he frontage of Quarry Road. Sa"", of !be new sidewalk will be
OOlSide Ihe City CO<pOriIIe limits. Stanfocl will need to enter into I mainteo= agreement with tbe Ci!y
0( Palo Alta for these improvements_ The revised pubfic right-<>f-way should be sIlown on tile prajec1 ;
plans. .
,. Streellmprove."mts -Remove existing sidewall: at edge of curb along Quarry Ro,d. Provide.
otaDdard curblgut!<C wid! planler and sidewall: as descriIled above. Copies of !be appficable City Standard
Drawings 1120, 1141 and 1201 are at!ll<:bed and sboold appear <>n !lie improvement plttns.
4_ Special Pavlng--1be".,cial paving·shall be coofin<d to private property. Spec!3.r paving.ban no!
be inshlIed in !be pubilc right-of:way.
GLWlbn
Attachments
"": PWE Land Development filef1375 Arboretum
"'" .
M E M 0 RAN 0 l)'lM~ Pit~: J B
May24,l99S
FROM:
Lorrain<> WeisslPlanning Division
Carl Stcff~ ransportation DiVision
SUBJECI': Project Review Comments fur 375 Arhorerum Road
1. ~ applicant must demoostrate that the plans will allow for the future widening
ofQuany Road in connection with the Sand Hill Rnad Projects. It is no! clear
from the plans !hAt such provision has been made .
. 2. The: applicant must demonstrate tlIat the plans will aDow for the future widening
of Alborotum Road in compliance with Ibe mitigation measure, adopted fo< the
Quarry Road Ge=aI PIaIi Amen<lment EIR.. 'OI!= such ... ic!eoins is triggered.
It is DOt clear !hat such provision has beeo made.
3. Bicycle parlcing as proposed is una=pfable, as it is no! located as conveniently
10 the building entrances as the most convenient auto parldng (as required by
p AMC 18.83~ Thus, the locI=, and especially the racks, must be located
closer 10 the building entraI>ce. Manufacturer', specifications for the bike
racb and locker must be submitted to the Transportation Division for approval
(Gayle Likens, 329-2136).
.4. There are several parking sbI1Is that require awkward movements for entering 0<
exiting, thus producing a poor clrcuIation plan lOr the paIlcing lot: The two. e.<lern-.
most sIalIs and the two westem-most ,tails (and possible three) are easy to enter,
but driven would have 10 back out nearly across (he entire parking lot 10 exIt the
driveway. The two staI1s adjacent to the. right side of the <lriveway upon enieting
are awkward 10 mter in llOrward direction (requiring V-turns). If drivers were to
back in 10 them. exiting would be difficult These deficiences shoold be corrected
with a revised parking lot layoot.
. ",,","'''7;-. ,.,
--' -
.. -" . ' . . ,
I (;.)
375 Arboretum
May24,l995
Page 2
ClTi' OF Fl,l ~ ALTO, p,
ein' Ci.ERi\'S Cff:Co
S. The project is expcclod 10 generate 77 PM peak hour trips, which .is below !he
cs
. 1hrcshoIcl1ix. Sanla Clara County CMP traffic impact anclysis, This project WI$
nO! ii:.cludod in the commercial. uses approved in the Citywide Land Use and
Transpo<talion Study" Thus, & brief analysis was ~ 10 determine !he
impact of Ibe project during !he PM peak hour on the adjacent and nearby
inlersectioos of Quarry( Arboretum and Palmi AlWretum. The 1993 entering PM
peale how entering volume at Quanyf Arboretum is 2350 trips. [f all 77 projerA
, trips wen: to pas.s tbrough Ibis inI=ectioo.lf1e new IoIaI (based on !he 1993 coopt)
would be 2421 hips, which is substantia!ly less than the S 175 trips approved 1ix
this inI~ in the Citywide Study. Silmlarly, at Palmi Arbore!ruD, the 1993
entering PM peale hour entering volume is 3545. E""n if all 77 project trips were
to pass through tbii in!mec!ioo, !he total would be 3622 (based on the 1991
count). substantially Ie .. !han the 4221 trips approved for this intersection in the
Citywide Study. Thus, there will not be • signitieant traffic impact from this
projett.
TO:
FROM:
.... -.. "
"-'.
,
'.'.,
, "-;:
City of Palo Alto
City Manager's Summary Report
HONORABLE CITY COUNCIL
CITY 1>lANAGER DEPARTMENT: Planning and
CommunilJ En-.iromneut
AGENDA DATE: September 18, 1m CMR;412:9S
S()BJECT:
RfOlJFST
375 Arboretum Road -Appeal 0( ArcllitecturaJ Reriew Board
Approval; File Nos. 95-J.RB.lIl, 95-EIA·13.
This report addresses an appeal of the ArchitecturaJ Review Board's {ARB} approval 10
allow <:OOSttUCtioo of .. 4 ,400 ~ foot wmmerdal building bousing a fmancial semce
(bank). 22 parking spaCes and related site improvements.
Rf&OMMENPAll0NS
The appeal o(!he Architectural Review Board ~ision must be placed on a Cily Counce
agenda within 31 working days after receipt of all appeaJ Of, in \his case, !he m=ting of
Seplembet 1&, 1 m. Staff rec<lIJlJDeIlds !hat the Cily Council continue !he appeal tmtiI
after the Planning Commission has reviewed the related appeal of the Zoning
AdminiW1ltor approval of the CooditioaaI Use Permit for the project, so !hat boll! the ARB
and Zoning Administrator appeals may be reviewed by the Cily Council simultaneously.
The CoodltiooaI Use Permit was approved OIl July 20, I m by the Zoning Administratoc.
An appeal of the Coodition.aI Use Permit was filed 00 August 4, 1995 and is scheduled for
the Planning Commission public bearing 011 September 27. 1 m and Cily Council 011
October 16. 1 m.
POUCY IMPLICATIONS
The proposed project cOmplies will! the Palo Aha Comprehensive Plan. Zoning Ordinance,
Sign Ordinance, and the Architectural Review Board Ordinance.
CMJI>412:f5 ,..,. I <II "
~. ~~
o
Comprehensive Plan:
The folJ<Jwing Compr~beDSive Plan policies and programs apply 10 this project
I." Urban Design Elemem. Objective, page 42: Promote the orderly and bannDnious
development of the City (paraphrased). The new development is !lesignated for
RegionallCommunity Commercial use in the Comprehensive Plan, which provides
foe services including banks, and the site is adjacent 10 compatible laud uses.
2. Urban Design Element, Objective, page 42: Promote vi.ua1 envirorun<:nts which
arc of high aesthetic quality and variety, and considerate of each other. This
proposal add, a wen..sesigned and attraclive wntemporary buil<fmg, whkh utilizes
high quality materials, compatible 10 other buildings on the Stlmford lands.
3. Urban Design, Program 4: Discourage garish signs through sign regula,;"ns o.nd
design standards and e!lCOW""ge signs !hat blend with the site and the area. The new
signs consist of individual illuminated pan chanr.el leiters and logo whlcb have clean
lines and are easy to read.
4. Urban Design, Policy 3: PrOrDOle visual aesthetics throu)lh tree planfu!g,
landscaped ar."" and removal of visuaily disruptive element; 00 major City streets.
The projecl includes landscaping, which adds 10 a p2rcel which cumnUy has none.
Architectural Review Ordinance:
The proposed project meets the goals, purposes. and Standards for Architectural Review
in the following ,nanner: The building is • clear investm<Ont 10 the City as the design and
;elated improvements provide a development wlllcb is sited well on the parcel and fits wen
within the context ()( the streetscape. The proposed strucPlre provides a contemporary
buil<fmg with archilectural enhancement visible 10 pedestrians .nd motorists. The
development is \lisually pleasing, and makes use oi: quality materials \() creale ,. more
desirable presence at this corner than presently exists.
The design and architecture of the new building comply with the Standards to<
Architectural Rev',ew in the following IDail!lCr: The design is compatible with the
immediate environmeDl of the site (sundard 2). as the site is in the vicini.'Y of the Stanford
Sbopping Center and the Med'1CaI Center, and contrilMes 10 the lively overaU environmer.t
of this major intersection. The stone masonry entranee element with roor feet of additional
height over the main portion of the building and the painted steci canopy above tile
entrance stand out as .0 entry statement, which enhances the building and directs the
pedestrian 10 the main building entrance and promotes a sense of order, and provides a
"-" .-,
.--, .' -
~.; " . :'
'" :..-
. -.
desirable environment for occupants and visitors 10 the site (standard 7). The windcw
W3lls, alumillillIl storefront entrance franllng and stainless steel entrance canopy, and
proposed colors are an appropriate expression for this building style (standard 12l.
Zoning Ordinance:
The project complies with the provisions cf the Zoning Ordinance, specifically with
Chap!ers 18.41, (eN) Neighborbood Commercial Distrk"l Regulations, and Chapter ,8.64,
Additional Site Development and Design Regulations for Commercial and Industrial
Districts of the Palo Alto Municipal Code.
EXFClmvE SJIMMARY
The applicant has raised seven basic issues with this application. an of wbleb ate addressed
in detail in \he Discussion section <>f the attached In· Deplh staff report (»ages 10 10 15).
FISC"I. IMPACT
There is no fiscal impact 10 !be Cily of Palo Alto from any of tile possible actions.
Ji.NVlRONMJi:NTAI. ASSESSMFNT
A negative declaration was prepa;ed and recommended to the DireclO< <>f Planning and
Community Environment for approval by !be Architecrural Review Board on JuJy 20,
1995. The DireclOr approved the Negative Declaration on June 28, 1995.
PREPARED BY, Lorraine Weiss, Planner
DEPARTME.'U HEAD REVIEW,
CITY MA."IAGER APPROVAL,
~bv;~
KENNETH R. SCHREIBER
Dirocto< of Planning and
Community Environment
r .. cl at u
o
OIlt:4U:9S
"'."..
o
SUBJECT: 375 Arboretum Road -Appeal or ArclIltectura1 Review Board
Approval; File Nos. 95-ARB-81, 95-ElA-13.
RECOMMF.NDr\TION
The "1"".=1 0( the Architectural Review Board decision must be placed on a City Council
agenda wilhin 31 working days after receip! of an appeal or. in this =. the meeting of
September IS. 1995. Staff recommends ihat the City Council molinue the appeal until
after the Planning Commission has reviewed the related appeal of the Zocing
Administrator approval 0( the Conditional Use Permit for the proje«. so ihat both the ARB
and Zoning Administrator appeals may be reviewed by the City Council simultaneously.
The Conditional Use Permit was approved on July 20. 1995 by the Zoning Administrator.
An appeal of the Conditional Use Permit was filed on AUgust 4. 1995 and is scheduled for
the P\arullng Commission public bearing on September 27. 1995 and City Council on
October 16, 1995_
BACKGRffiIND
project pesrrlptjon
Original Application:
The applicant applied on May S, 1995 lOr an Architectural Review Board (ARB) approval
10 construct • one-s1Ofy 4,400-square-fOOl commercial building and related site
improvemerus in. CN lODe. The building is proposed 10 include a financial service, Bank
of America, requiring I cooditiooal use permit. The new structure would be 21 feet high
with entrance elemeoo on the Quarry Road elevation and north ek,,'ation at 25 reet high.
The new building was specifically designed 10 incorporate a view corridor at the corner
of Arboretum and Quarry Road 10 the interior of the adjacent vacant parcel and the
Arborerum area. To accommodate this view corridor, the build'mg ocrupies about half the
site adjacent 10 Arborerum Road behind • 2Q-fOO( landscape setback, and parking is
provided on the north side 0( the sile and adjacellllO Quarry Road.
The proposal includes landscaped setbacks on three sides of the parcel, and landscaped
pedestrian circulation leading 10 the buMmg entrances with • double row of tIo""'ering pear
trees and special surface treatment and outdoor beocbes. Additional street trees are added
CMit:412:95
" -'-/'--",."
10 the Quarry Road frontage (on private property) ;0 m.tch me .<isting oak trees in tlIe
area.
Exterior building IIllIterials include reinforced coocrete. stone on the ,·.ult structure and
the wal1sadjacent 10 the paths. and metal aluminum p.nels and glaSs on 1M semicircular
pcnion. The window ... ·alls. aluminum st",efiOlll entrance framing and staicless steel
entral!re canopy will be painted (see Attachment A -letter from applicant for furtlJer
deta.iI).
Table I below =izes pertinent information regarding the site.
Table 1; ~rte InCormation
.' .
Applicant:
Appellant:
Owner:
Stanford ManagemeO! 0:>Glpa ny
2770 Sand Hill Road
Menlo Park. CA 94025
Herb Borock
The Board or Trustees of L'le Leland Stanford
Junior University
efo Stanford Management COmpany
2110 Sand Hill Road
Menlo Park, CA 94025
Comprebeosive Plan Designation: Re gionallC{){nrrlUoity Commercial
Zoning District: CN -Commercial Neighborbood
Existing Land Use: Storage!service area
Surrounding Land Uses: North: vacaruland
East: vacant land
South: arterial and commercial uses
West: retail commercia!
Parcel Size: 10,001 square feel (){ .23 acres
7qe' or 15
-
.'
".'
" '.-
,-",
.''--
. -
ARB Approval:
The ARB reviewed and commented 011 !he eooc<:ptuaI design of !be proje..-! at a prelilllinary
review on April 6, 1995. Generally, the Board was very positive about !be project, but
made SOIm comments about parking lay-<>ut and the location of !be vehicle enUy,,'ay off
QuanyRoad.
TIl<> ARB appro,ed !be firulI design of !he ooe-s!ofy, 4,400 square-foot bank wilding and
related site improvements at irs meeting of July 20, 1995 (see Attachmen! B -ARB
decision for 95-ARB-81 dated July 20, 1995). The entrance off Quarry Road had bee"
Improved and the parking Jot design bad been modified.
Appeal:
An appeal was filed on August 4, 1995 (see Attachmelll C -Lener 0{ Appeal from Her~
Bocock dated August 4, 1995). The appeal is based on !be assertions that: I) the
proposed project does not conform to the Draft 1994 Stanford Shopping Center
ImprovemeOl Plan for right"f·way improvements such as ~url>, planter strip; and
sidewalk; 2) the parking lot should be redesigned !O eliminale ,,,'kward maneuvering to
and from parking s\aIls; 3) the parking lot should be landscaped !o meet the landscape
requirements of the Off-Stree! Par1cing Ordinance; 4) tile plans should demonstrate !hat
tbe jl£ojec! will alklw for future widening of Quarry Road and Arboretum Road; 5) a
COO<liUon should be added 10 the project apjl£ovaJ, which confIrllls Fire DepartmeOl
commelltS and requires removal of the existing slorageTservice area on the project site;
6) apjl£oving this jl£Ojeet is • violation of the CaJifDrnla Environmental Qualilji Ae.
(CEQA) because it is piecernealing !he Stanfo<d Shopping Center Master Plan by allowing
tills site 10 be developed prior 10 !he review and approval of other an<icipated jl£ojeolS m
the area and prior 10 future ",iderJng of Quarry Road and Arboretum Road; and 7)
approval of this project is • violation 0( CEQA because the project include. a pedestrian
path and cOIlSiders colllinuation 0( the path on the adjaceru "rectangle' parcel when that
site is developed in !he future (see Attachment C, letter frorn Herb Bocock for furtber
detail).
These issues are OJ5Cussed in detail in the Issues! Analysis section of this report.
POlley IMPLICATIONS
The prop<>oed jl£Oject complies with the Palo AltO Comprehensive Plan, Zoning Ordinance,
Sign Ordinance, and the Architectural Review Board Ordinance.
..
-... -~.
, ... -, .'
,." ,
Comprehensive Plan:
The following Comprehensive Plan policies and programs .pply 10 this project:
1. Urban Design ElemenJ.. Objective. page 42: Promole the orderly and harmonious
development of the City and the at!2inmenl of the most desirable land use and
improvemeots wough the r.-;jew of new development. The new development is
de>;ignated foe RegionallCol1ilDunity Commercial use in the Comprehensive Plan,
which pro\ides foe services including bar.ks. The site is adjacent 10 the Stanford
SJxwing Conte<. a regional shopping eenter. and near medical facilities. which are
wmpatible land uses with the """'. bank.
2. Urban Design Element, Objective. page 42: Promote visual environments which
are of high aes!lletie qualily and variety, and considerate of each other. This
proposal adds. well-designed and attractive coolempo<ary wilding. wl:kh utilizes
high qua!i(y malerials, 10 the Stanford lands. Tl-.e site is adjacent 10 modern
buMmgs in the Slanfonl Shopping Cenler 10 tile northwest and the MecflCal Center
SOOIh ohho site. The project would replace tl-.e existing unsightly vaant gas station
and would add • buildL"g which complements the surrounding buildings and
environment.
3. Urban Design, Program 4: Dis<:ourage garish sign througb sign regulations and
deslgn standards and encourage signs that blend with the site and the aTea. The new
. signs coosist 0( individual iIlumlnaled pan ehannelletters and logo which have clean
lines and are easy 10 read.
4. Urban Design, Polley 3: PromOle visual aestheties through tree planting,
landscaped areas. and removal of visually disruptive elements on major City streets.
The project includes planting thirty-seven new trees. and planting a land.<c2pe buffer
on the private property fronting Quarry Road and the removal and replacement of
two streel trees in poor condition, for a con..is\em landscape scheme.
ArchitecturaJ Review Ordinance:
The proposed project meets the goals, purposes, and Standards foe Architectural Review
in the following manner: The building is • clear investment 10 the City as me design and
related irnrfovements pro.".de a deve10pment which is sited wen on the pa'<el and rots well
within the context of the streetscape. The proposed structure provides • contempo<ary
building with :m:bitectural enhancement "'.sible 10 pedestrians aDd motocists. The
development is visually pleasing, and makes use 0( quality materials 10 create a more
desirable presence II this romer than presenUy exists.
-""_:::<""-'""', ' . ...,.'":" -.. --'--' --c
,"> '
. '
I •
" '
.'
-'\
-:" i-; !'t". < C' ,-:~"",;;a.;;';'f!
The desigI1 and architecture of the new building comply with the Standards for
Architectural Re,·iew in the following manner: The design is compatible with the
immedia!e eI1vlromnen! of the site (standard 2), as the site is in the vicinity of the Stanford
Shopping Center and the Medical Center. and contributes 10 the lively, overall environment
of this major intersecOOo. The stone masonry entrance element with foo, fuet of additional
height over the main portion of the building and the paL~ted steel canopy above the
entrance stand OUI as an entry statement, which enhances the building and directs the
pedestrian 10 the IDain building enttance and promotes a sense of order. and provkles a
desirable euviroomelll for occupants and visitors 10 the site (standard 7). The window
walls, aluminum store froul entranee framing and stainless steel entrance canopy, and
proposed colors are an appropriate expression for this building style (standard 12).
Zoning Ordinance:
The project complies with the provisions of the Zoning Ordinance. specifICafiy with
OIap!eTS 18.41. (eN) Neighborhood Commercial District Regulations, and Cbapter 18.64,
Addi!ion.al Sice Developrnent and Design Regulations for O>mmercial and Industrial
Di>tricts of the Palo Alto Municipal Code.
Table 2 below summarizes the proposed project compared 10 the zoning requirements,
Table 2~ Pr<ljed Comparison "itb Current Qrdinance Reqgirements
REGUL.4.TION PROPOSED PROJECT REQUIRED (ClIi Zone)
Floor Area (sq. fl..) 4,400 8,000 sq. ft. malL
Flooc Area Ratio .22:1 .4:1
MaxImum Height 25 feet 25 feet
I.()( Coverage 22% 50%
Front Yard (Arboretum 20 feet 10 reet
Road)
Rear Yard 10 feet DO requirement
Street Side Yard 50 fee! 20 feet
Parldng 22 spaces 22 <paces
CMR:41HS
--"-_....-... .. _-
o
mSCllliSlQN
J:;sres and Analysis
Seven basic issues have been raised "'ith this appeal application. Each of the issues is
summarized and discussed below.
I} ~ proposed projecr doe. not conform 10 lhL Draft /994 Slan/ord Shopping Qlller
Master [mpro"onelll l'tan for righ1-of-way improvemenls S.cil as cur/>, plalller
strip. and sidewalk.
The Draft 1994 Stanford St.opping Center Master Improvement Plan bas DO[ been
approved by the City of Palo Alto. The dr3ft plan was subrillned 10 the City iI) November
1994 and is currently undergoing revisions by Stanford in response to City comments.
Although the revis<:<! Master Pian has no( yet been fOrmally awoved by the City, Slanford
Managemenl Company has provided prefIminary copies of the revised strett improvemeIll
plan for Coone\! review in relation \() the subject .wlicatioa (see Atta<:hment f). The
revised plan shows five·feet of rigbt-of· .. 'ay that would be available immediately for use
as sidewall< along the Quarry Road frontage of this site. plus five feet of additional right
of·way 10 be made available at the time street improvements are implemented. Four and
one-balf feet of the new right-of-way would be used for Iree planting and one·half a i0oi
woold accommodate the new curb.
Until the Master Plan is approved and the street improvemenls are implemenled, staff
recommended. and \he ARB approved, an iI'.teri.m solution for providing tree canopy along
the site', Quarry Road frootage. Five feet of right-of·way that currently edsts will
become sidewalk; and frve oak trees, consistent ... ith «isting street tree> in the area, ",ill
be planted on-site along the northern property line, adjacent \Q Quarry Road. The trees
will provide canopy over the sidewalk, until street trees are planted in what will become
the newlandscape strip between the realigned roadway and the sidewalk.
Tile inlerim landscape solution will provide attractive landscaping along Quarry Road and
will imjll'ove the existing siruation.· Tile aw1icant has demonstrated that fumT.
implementation of the re,ised draft Improvement Plans can result in traditiooal City
standards being met.· The present project in DO way impedes f"p.rre street iinjll'OVement
wod< which may be required in connection with odler Stanford project<. 11,e revised
landscape plans are tentatively sc!Je<luled 10 be reviev.'ed by !.'le ARB on a preliminary
basis on September 21, 1995.
.....IG0I1'
, '
.' -'. -~~".;.' , ..; , ....
"
. -~.
"," -. "
--.
--
o
Roquiting the street imprOV.meDlS as pan of the subject application would add unnecessary
disruption I\) the ,enel"2.1 public, by <equiring major road construction as part of !he
dtvelopmellt of this site and then again when the rest of the road improvement.; are
implemeille<l. Further,the traffic which will be generated by the new commercial use at
this site does DO( justify imposition of street improvement ccnditioru;.
2) The parking lot should be ,edesigned I<> efimj1lilte awkward T1Iilneuvering to and
from parking stalls.
The site hilS beell specifically designed 10 afuw fo< a view corridor and pedestrian path !O
link the corner of Arboretum and Quarry Roads with the interior of the adjacent vacant
Stanford land and the arborerum area. Additionalljl, the banJc:'s programmatic requirements
dictate that all the required parking be provided 00 site. Th.y do oot want I\) apply for a
parldng variance, nor is there anything unusual abotr. the site that would warrant approval
of a vllriance.
In ord.r 10 accommodate tlJe view cO<ridor and parldng objectives, the building i> sited at
• diagonal and occupies approximately a quarter of the site adjacent to Arbor.tum Road
behind a twen<)' fool landscape setback; parldng is pro"ided on tlJe Quarry Road portion
of tlJe site. Siting the buikfmg in this manner and providing !he required parldng {22
spaces) results in some awkward maneuv.ring in and out of some parking stalls.
Specifically. the two eastern-lIKJSI stalls and the two western-lIKJSI stans are easy 10 enter,
but drivers would bav. 10 back out across a large portion 0( Ihe parking lot \0 exit the sile.
The two stans adjacent to the rigru side of the driv .... ay, when emoring the sit., ace
dU'ficult 10 access in • forward direction; and drivers would essentiany be required '" make
U-rums '" enlr.r !he spaces head-on. While some of the movements are awkward, Ihe
Transportation Division considers the circulation adequate and sare.
The preliminary praposaI for tllis project used the same builJing and s'te configuration,
but had a different parking layout which also had some difficult spaces to .ccess. After
preliminary review .. iLl, the ARB, the .pplicant revised the parking lot eesign .nd
relocated the vehicle enttance off Quarry Road, so tlJat it would be furlber away frO!Tl the
corner. The redesign improved the fuoctionality of the parking lot and decreased the
awkwardness of same of the movements, but aid DOl. completely eliminate al1 difficulties.
Siting the building at a diagonal and providing all required parking on-site will result in
unusual circulation ro matter which parldng lot design is usea.
When reviewing a deve!opmeOl proposal, iI: is important 10 consider an of the architectural
~ f<x review and bal= them against one anotlJer. Maintaining the view <o<lido<
helps the project meet standard number 2, which states that the desigll of tho project should
hi-11 01 16
. -
.',~ .
o o
be compatible wifu Il1e immediate environment 0( the sire. Providi.'8 visual access through
the subject site and into adjacent sites helps create I cohesive appearance 10 the entire ao-ea.
Creating the visual connection betwe<On sites in the immediate area empllasizes the
compatibility between the subject project and fr.e res! 0( the area.
Creating this view corridor does no( preveOlIhe project from meeting standard number 10,
which states that access 10 the property and circulation thereon should be safe and
convenient for pedestrians • .:ye1lsls and vehicles. Althougb there are some awkward
movements required 10 earer and exit a few of the parking stalls, the on-site circulation and
parldng is still safe and convenient. When evaluating the pr<'ject as a whole, the frade-<>ff
between provi<fmg • safe, convenient, traditionally-<lesigned site and parking area that does
no( provide a visual connection 10 other sites in the area, and provilEng a safe. com·ement.
creatively designed sire and parking area with a few awkward movemenls that provide a
visual coonection betw.een sites and streng.thens the consisteocy and compatib!lity in the
area~ is a reasonable one.
:» Ttu pariOng lot should be landscape.! 10 mut the landscape require::""'Is oj lhe Off
Sueer Parking Ora.lUlnCt.
The design for the project compl;"" with the Off-Street Parking Onfmance. Sec60n
18.83.100 O(the Palo Alto Municipal Code. As required by code, the plans provide for
the required perimeter and irlrerio< landscape. Table 3 below summarizes the proposed
landscape 10 the landscape requiremenls of Cbapte' I g. 8; 0( the Zoning Ordinance.
Tab,,]." ProJ>osed J ,andgBpe Compared to Ordjnapce Requirements
REGULATION PROPOSEDL~~~APE REQUIRED
LANDSCAPE
Perimeter Ian!lseape • S'-wide strip along Arboretum S' -wide perimeter
Section JB.8J..lOO(a) • 5' -wide strip along Quarry Rd. still'
• S' -wide strip along rear
boundary
Interior landscape 1089 square feet S% oflOlal
Section 18.83.100(b) parking facility
(368 SQUare feet)
CMIUIl,95 Page 12 or Ii
·---'~·····!. .. ·t£if ?i"
"" -:. .~;""-. ,
< .. '
:... ..
"' . -:~:;';
.
.'-
REGULATION
ParkIng landscape
Islands
SecOOn
IS.83.100'J>XiJ)
Parldng Jot ~
Section
IS.83.1OO'J>)(tiJ)
:,,>,
.. --' ..
PROPOSED LANDSCAPE
• single row of parking is disrupted
by eDlry feature and no islands
provided
• !WO sets of double rowed trees
along pedestrian paths in from of
parking and entry = 22 tree,
REQUIRED
LANDSCAPE
one island for
every 10 parking
space, in a single
row
one tree for every
6 parking stalls or
4 trees for Ihis
application
Section 18,83.100(h) allows for vetJcle overhang for Ihe innermost two feet of ea<:1i
parking space when a permanent curb, bumper or wheel slOp is IDsta.!Jed; a.ld Secticn
18.83.090, Table 5B -P-.rking Lot LayOUt Dimensions for Um-Gass Parking Stalls for
Various Stan Widths, allows. 9O-degree parking stan 10 be 11.5-feet inchlding two-feet
of overhang and _5-feet Qf curb_ The plans stAlW half • fool for Llle curb and two feet
""erhang inIo Ihe landscape area and 15-feet of addilional stall lenglll for IOIal stan lengtb
of 11.5 feet. Section IS.83.1<X\'b)(ri) of the code requires tba! one tree be planted every
Iellrh parking space in • row, Planning staff determined, and the ARB concurred, !hal tbe
building emry in Ihe subjec! proposal clearly disrupts tbe row of parking in front of Ihe
buikfUig and stands out &S • separale element both in surface treatment and uulization of
an enuy feature (canopy)_ Thus, lher" are not 10 parking spaces in a row lhal need 10 be
broken up by a tree. The double row of trees 00 eilher side of Ihe entranCe also provides
landscape adJacent 10 Ihe parlOng row near Ihe blJiJding entrance_ 'W1ule Ihe ARB .1 its
meeting of July 20, 1995, discussed Ihe possibility of adding a tree in Ihe eooyway, Ihe
Board overall did not make tbis 2 Teljllirement (see Attachment D -Minutes from tbe July
20. 1995 ARB Meeting).
4) To resile the bui/djng 10 GCcomplish the objeaives slmed ill reQS.OlU I. 2, and 3
above,
See responses to items J, 2, and 3 abov •.
S) The plans should aemonstrate ,hal the projec! "if! allow for jutwe widening if
Quarry RIxuf and Arboretum Road.
Page 1.1 of 16
--;:::::~---
"
~-,. ~
The response 10 this comment is largely answered in 1\ of !his section. One additional
piece 0( information related 10 !his comment is that the fu~J.:e wIDening 0( Arborerum Road
would no( occur along the subject property frontage, and is planned ~cross Arborerum
Road in front 0( the Psy~hi.atric Offtce/Outpatieru Building. The right-of-way expansioo
bas already been provided for in !he siling 0( !he facility, as the right turn lane. alignment
0( !he comer, and remaining sidewalk along Arboretum Road can all be accomplished on
tbe Psychiatric OffJCelOJtpatient Building side 0( the road.
6) A condition should u added to 1M project approval by I~ rUt Department whiclt.
requires nmovol of 1M aisring storage:strvict area on 1M project sit~.
The Fire Departmelll in their review 0( tile preliminary project provided romment, dated
Marcil 10, 1995. that the materials in the storagelservke area on sile nsed by the Stanford
Shopping Center sball be removed. For practical reasons, the emting storagelservke area
and its contentS willllave !O be demolished and removed prior 10 any construction of !he
ne .... building and sile improvements. The approved project plans do no( include tlle
storagefsenice area. O>nstru<:tion of a new building cannot physk.ny occur prior to
demolition and removal 0( all emling structures and equipment. Staff concludes WI there
is 00 need for a separate condition addressing this issue.
7) Approving this project is a violalion of 1M California Emlironmell1al QwJ'1ly Act
(CEQA) becaust is is pitce1tU!aIing the Stanford Shopping Celtttr Master Pitm by
allowing this sire to be developed prior 10 !M future widening of QwJrry Road and
Arboretum RfXJd.
As .Iated in response 10 comment II. the Stanford Shopping Center Master Improvement
Plan is a draft plan and flO( yet approved by the City. The plan ",ill. be aroeuded in the
near future 10 accommodate ootruuding isSlles 0( the expansio!l 0( the Shopping Center,
Stanford West and Sand Hill Road Corridor projects. The development project at 375
Arboretum Road is DOt plecemealing an. overall master improvement plan because the plan
h.1, flO( been approved. V,ihile the property owners are the same, tlle projects remain
independent 0( each other. The Bank of America facility is allowed under tlle current
O>mprehensive Plan and Zone District designations witll • O;uditional Use Permil. It
does DOt require land use zone changes and further analysis for possible policy impacts aod
cbanges. as would major projects ,",cll as the Stanford West projects.
The appenant believes Wt the subject project implements a portion of tlle righH)f-v .. ay
improvements but is incon.isteru with ov,rall plans for widening Arboretum Road and
Quarry Road. The desigH 0( the project would 001 prevent implementation 0( any right
of-way improvements since the ",idening 0( Arboretwn Road would OC<..'Ur on LOe
CMJt;411"5
------~,;::.-. ---.--'--,.".~----.-,-_.---.
" .
,--.-.;~
. ~.. ,
,.
H.· .-'~
-," ..
_."" /. :2...
Psychiatric Offlce/Outpatient Building side oi the public right-of-way, as mentioned
previoos!y in response 10 comment IS; and the design for the building allows ample room
10 provide a bicycle Jane. The approved 375 AIboretum Road project does oo! prevent any
nectssary widening of Quarry Road, as stated in respODs. 10 comment II, since there is
adequate room to add necessary public right-<>f-way fo< a landscape strip as indicated by
the Stanford Management Company and will be reflected in an amended plan 10 be
submitted 10 the City for ARB review in September 1995, prelinllnary copies of whicll are
in the Council's packeL
8) Approval of tlris project is Il violalion of CEQA because the project <'leludes a
peikstTimr. path and considers contiJwalioo of the path on the a<{iacellt vacant parcel
whe" the site is dlNeloped ill the future.
The approved Bank of America development includes a pedestrian path for circulation on
site which may also be used in the future 10 continue on 10 the adjacenl vacant parcel, if
developed. However, the pedestrian path may be used solely for this site as internal
circulation 10 the building.
PIarullng a path for the development of the site under the approved project application or
f« consideration for future planning of an _dj_cont parcel is 001. a violation of CEQA.
Ra!her, this foresight results in good planning for the future.
Public participation
At the July 20, 1995 ArchitecruraJ Review Board bearing, only one person offered public
!eStlmony in opposition 10 the application. The issues expressed in the pnblic testimony
are the same as provided in the appellant'S Jener (see Attachment C -Leuer of Appeal}
and are addressed in the previous clSCUssion section of this report.
ALTERNATIVES
If the City Council does 001. conlinue the item, it can:
I) Deny the appeal and uphold the Architectural Review Boord's approval;
2) Deny the appe.1 and uphold the Architectural Review Board's approval ",·ith
modifications; or
3) Gran! the appeal.
.... ---~
..,..: .-:
,
, -~-
o
FISCAL IMPACf
Tllere is no fiscaJ impact to the Cily of Palo Alto from any of the possible actions.
ENVIRONMENTAL AS5F.SSMENT
A negative declaration was prepared and recommended to the Director of Planning and
Community EnviroDmeIll for approval by Ille Architectural Review Board on July 20.
1m. The Director approved Ille Negative Declaraticn on July 25.1995.
STEPS [OJ J QWJNG ACTION
I) If appeal is granted Illere are no next steps.
2) If appeal is denied Ille next step would be for Ille applicaIll to apply for a building
permit and comply will! conditions of approval.
ATTACHMENTS
A. Application Jetter from Stanford Managemen! Company dated May 8, 1995
B. Architectural Review Board Decision dated July 20, 1995
C. Letler of appeal from Herb Borock, dated August 4, 1995
D. Minutes from Ille July 20, 1995 Architecrural Review Board Meeting
E. ARB Staff Report July 20, 1995
F. R.."Vised Stanford Showing Center Master Plan August n, 1995
G. Plans (Cily Cooxil Members only)
COURTESY COPIES,
Herb Boroek, 2731 Byron Street, Palo Alto, CA
WiUiam Pbillips. Stanford Management Company. 2770 Saoo Hill Road, Menlo Park,
CA 94025
Pq< 16 or U
"'"' "" _Q o(,.?
" .
. "':' -:--.
... ~ '. ".!
.', '_." _,. _r .
"""-~-'
:-:.-~:-A
-:= "
.'--.
{) Attachment A
BANK OF AMERICA
PROJECT DESCRIPTION
The project" • O""-story brancb bank of approximately 4.400 square feel It will contain a
publk lobby area. !enor ~ offi<:ers' podiwn, • vaul~ employee work areas, and restrooms.
Conslroction will be blgh-quality commercial, utilizing materials and systems such as reinforced
=to, stone nwoory, steel framing. and glass storefronts. On:he inIerio<, iliere ",-ill be an
abundanc< 0( easewort and oustom futures. Automatk tenet maclllnes and sophis!ieated
CO!Ilputu equipment are standard and essential fixtures.
THESlTE
The site is • one·half acre par<:.llll the oortl,o.."m com", 0( Arboretum and Quarry Road,
which presently incorporat.es a storage!sen~ce area for Sta."lford Shopping Center maintenance:.
It was previously (X:cupied by " gas. station. There are some mat'.ue oak trees along the. northern
and eastern borders of tile property.
SITE PLAN
The site pIan is developed m respons.e to .a desire on the part of Stanfocd in incorporate a ,,-jew
ccrridor and pedestrian pall>. 1hat link the cornO! of Arboretum and Quarry Road'" Ille ir.teno. 0(
Ill. "rec-.angle" and the Arboretum are>. (for fuMe u@zation of a shared Unn'ersity parking
facility),
The diagonal p3th and view!me cfivide che bank parcel inl0 tv.'o equal pa.""tS. The portion nearest
QuarT) Road is pla."lIled for tile required n parking spac"'. The half frooting Arborer"", is
occupied by the builarng. When the 2O-foo< setbaok is .ppfied 10 Ille Arboretum frontage, me
resu!ting area is the !lvatlab!e building footprint
The .existing curb fine along Quarry Road is eight.feet from the property line. The Project's site
plan leeps this width for • new sidewallr. willen indud<S tree pockets with cew Oak tr.es as a
Iandst;ape buffer against ilie road condition. Also t."':Iere is a five fOO{ 1andscar-ed area separating
the sidewaIk from the Project's parking area. We feellllis is • bener, more urban. solution than
the suggesrlon by the City of a five foot ~ide planting trip along the curb 'Q,"ith a five foot
sidewalk 01 tbe inside.
LANDSCAPE CONCEPT
The Ian~ concept plan aims 10 preser ... e the existing characrer of the sWTounding area,. and
10 define tirculatkm .and use areas. A double row of flowering pear trees strongly defmes tne
priffiary pedestrian circulation lucfU",~ from the intersection III Arborenun Drive and Quarry
Road. ~n the futur::. the promenade is intended 10 exteod to Ill, northeast Along the promenade,
bkyclc parting is provided on the SOlJthwest sid.e of tile: building. To the nonheast side. a service
court is encJcsed by a vine covered fe~ce.
The main entry or parking court Oil the nonh side :s enclosed by a continuous hedge. ~J the
builalDg entry, a pedestrian pt.aza:s specially paved, and extends iDiO the parking COI.l.i"1.. Flush
concrete bands define the parking stalls in fronl of the Bank. ~llee1 stops pro,,;&: 5eJlar.ltiot1
betweell vehicles and pedestrian. drcuIadon.
'. ,. -"
-'
BA-NK or AMERICA
'0)<<1 Desaipooa
Fo,el
:~ r
<>.,'". -:-:. ,-
The _ !roeS pl8I1led along Quarry Road an: to matcb the existing oak trees. AI; infonnal
gro\-C o(CaIifomla Live Oaks along Arborerum Drive .nh .. ""es the native cllaracler of the
surtOIlDdilIg .. The oab II< ~!usteted at the east end and opeo 00 the ... "st 10 provide views 0( the
Bank building. AIoog AlborelUm Drive, a curvilinear bike/pedestrian path cooneru the existing
path to the ~n and prom<nade. Major existing trees at the north edge are preserved as
much as possible.
BUILDING CONCEPT
The building, like most b<a!lcb banks. is • one·stoty pavilion that 00=5 • public banking lobby
separa!ed by 1 IeOOl line from back~f·h""", functions and I v.ulL This design responds 10 Ill.
diagonal pad! and viewline, described above, and to froe latest Bank 0( America prototype for
branch be.ot inu:riot:s.. ThIs prototype Ca.1ls for I. circular public Sp:I!Ce., bordered by a senticircufar
teller Ene.. The exterior fOrm extends this COOCCpl 'by ha .... iP.g a 5errJcircuiar shape for the main
part of the building, in.ertwined ",th the rectangular form of Loe vault and employee functioo.s.
A melal canopy completes the exterior, provi<frng sbel.er at til. eo=e and a place for the Bank
of America sign.'
The exterior ma:erials are stooe 00 me vault structUre and the ", .. 3..115 adjacent 10 th:: path. and
melal panels and glass on Ihe semkircu1ar port1on. The colors of the stC'm: and metal v.ili be in
!he beige and ochre tones iliat are associated ",fro the Stanford campus.
SAFETY AND COMPA TIB!UTY
The proposed use wm not be detrimental 10 the pubflc heal!h, safety, general welfare, '"
convenience; and it \Wilt nOC be detrim~nta! Of injtLr1oU5 Kl property or improv.ements in Ll:Ic
vicinity. The Bank of America branch facility v,.ill be k-..caled! and conducted in a m.mner in
accord with the Palo Abo Comprehensive Plan and the PIJ11lOS'" of the zoning ordinance.
,
My 21. 1995
Me. William T. l'Iilllip
t,,>,~
;'-\~;; --"
;-;;;i~~~''''~'·-~:, ~; r
uland StanfOfd 1uDio< Uru •• r.;ity
cfo S<anford Management Compony 1m San<! Hill road -
Menlo P:irlc. CA 94025
Dw Mr. PhllliJ>:
.-. -. -
The Direc\oI: of I'lannir-.g and Community Environ:nent, ul"ln recomrn"ndatlOn of <be
Archfu,c1Ulal Review Board at its meeting of July 20. 1995 his approved, wilh
conditions, <be "Dowing appfltation P"'" the plans submitted fur review:
175 A..boretum Road.
Bank of Ameril:.
9S·A!Ul-81
95-ElA·B
95-UP-11
C-{)nstruct. new 4 ... 400 square-foot cormnercizl bullding with I fma.ncia1 senrice use
(bank). 2.2 parking spaces li:nd related site: il'nprovements.
The building materials and sign colors are fine,
CONDITIONS
I'RlOR TO ISSUANCE OF DEMOLITION PERMIT
I. The Permittee shall be responsible foe identitkation >r.d locatiro of all
utilities. l>OIh pub1lc and private. within !he wc.d area. Prioc to any
excavafien work at me Site. !be Permittee shall contact Undergraund
Service Ned@(&00)642.2444.atleast48 boors prior to beginning ... ·od",
P"blk Wgrl!:t QperaOO!1
2, The fuflo",fug tree I"otection meas=s shan be prepared by • <etifled
arboris! and approved by !he City ArWl5l and included in
constructionidemo!Jfion contracts and be implemented during demoTifuln
and eonstrucfion .ttl viti" unless <>1h<:rwis< a!>Proved. The fuUowing tree
250~A\'EnlJe
Po.bl~<;Q
roJe Mln.CA '4)J3
""'<»244l
415 ~.1240Fu
.' ,
• ,
'-" ',,' -,-... ~:
o
proleclioo measures .hall apply: PA.\1C Sec. 8-04-070. Any modifications 10
th= requirements mt.Sl be approved, in .. ,nting. by the City Arborist.
IL An trees 10 be preserved.ba11 be I'rotecl<d with six-foot-high chain fink
fences. Fen<:es are 10 be mounted on two-inch diameter galvanized iron
posts, driven into the ground to • depth of.t leiL" 2-feel at DO more than 10-
Coo( spaeing. The fences .haU.nclose the entire area !IIlder the dripline of
Ille Ire<s_ The fences shall be erecled before conslructioo. begins and remain
in pta.:e uotil final inspection of the buMing permit, except for "'ort
specifically required in the approved plans 10 be c!ooe UDder the trees 10 be
proItcIed. (See Public Worb Departrnem'. standard specification detail
'505).
b. No storage of material, topsoil, ve~Jcles or equipment shall be pennitted
within the tree enclosure a;ea.
e. The ground around the tree canopy area shall no! be altered.
d. Trees 10 be retained ,),all be mgaled, aerated and maintained as necessary
10 ensure survival.
The certified arboris! shall inspect the tree protection and certifY Ibat the tree
pro!ection measures ha,'e been instatled properly_
PRIOR TO ISSUANCE OF BUILDING PER.\'!IT
Unlifie§ Departmegt (Ekdrid
3_ This project requires a padmount transformer. The location of the
padmounl transfocmer shall be shown on the site rlan and .pp<oved by the
UtIlities Department and the Arc~jtecturaJ Review Board. tJTjlities RnJe So
Regulations # 1-3(B)(3). #11-A2(4).
4_ All new electric servke must be underg:-oUDd Utilities RnJe &: Regulation
f19~1}.
5_ Only one electric servke lateral is permitted per parcel Utilities Rule &:
Regulation'19-0(2).
6. Location of electric panel swilchbcard shan be shown on site plan and
approved by Architectural Review Board and Utilities Department.
~-'
>. ", . .;.-.~--:
7. Allclectrlcal subs',;ucWres required from the service point {a new primary
pull box) 10 Ibe switchgear shan he ir,staUe<l by the customer 10 City
slandm:ds. Utilities Rule &; Regulation' 17 -A(2).
hhM Works Earjneednc DepartmeDf
8. The applicant sl-.all submit. fin.aJ grading an<! drainage plan 10 Pubuc
Wocb Engineering, indud"mg drainage patterns on site !IIld from adjacent
properties. The plan shall demonstrate thai pre-existing drainage patlerns 10
lind from adjacent properties are not altered. Sec. 16.28.210.
9. The appIiC&D! shall obtain • Permit for ConsL'llCtion in • Public Street from
Public Works engineaing lOr consIIUction proposed in the City right-of
way.
I(}. AIlllnderlying 101 nne exists on the pr~. The developerJapplicant is
required 10 apply foe. Certificate of Compliance to rernev. the underl)ing
lot line from lIlis parcel.
BgUdinr IBspectioR Divisiog
II. The proposed de-;elopment ... iU result in • cbange in the imr.ervk>us area of
the properly. The applicant shalI provide calculations shO'o>ing the adjusted
impervious aua with the building permit application. A storm drainage fee
a<!justmenl will take place m fr.e month following lhe final approval of the
construction by the Building Inspection Division.
12. Color chlps Ie match thecolors specified in the builcfmg pennit d,... wings
shan he attached Ie the cover shut of the bwlding permit dra win g sel by the
appliGant
i 3. Permittee must obtain • gracfmg pemllt from the City of Palo A110 Building
Inspection Division if excavation .,",.eds 100 cubic yards.
II. A constru<:tion logistics plan shall be provided, addressing at mini mum
parking. truck routes and staging, materials storage, and the pcovision of
pedestrian and vehlcular traffic adjacent to the eo",;1ruction slte. An !ruck
rootes shaH COlI fOrm ",ith the City of Palo Alto's Trucks and Truck Route
Orcfrnance, Otapler 10.43, and the attached roo!e map which outlines truck
«'utes avw1ab!e througbout the City of Palo Alto.
"->---: •
lWuJjnl DMsjon
15. A portioo of the proposed work is within the Stat. ofCaliforni. or Count)'
ofSanla Clara right-of·way. A permit must be <btained from the appli~able
agency. Evidence of permit approval shaD be submitted 10 the P!amUng
Department
16. The approved bmlding malerials and eoIor scheme shall be shown on
building penni! drawings fOr an bu~<fmgs, patios, fences, utilitarian
enclosures and other landscape features.
11. S ignage shall relum'" cbe ARB prior 10 issuance of building permit The
Board shaJl review illunlinaDon and. reduced entry (approximatel)' 20%).
) 8. Dewled landscape and irrigation plans encompassing on-and off-site
plantab!e areas out 10 the curb must be submitted 10 and approved by
Planning Staff and Ibe Resource Conservation Divisioo prior to issuance of
bmlolIlg pennil The pI an snall include:
a. All existing trees identified both 10 be retained and removed
incluomg street trees.
b, Complete plant Jist indicating tree and plant species, quantity, size,
and locations.
c. Irrigation schedule and plan, ,.'!!er use c~lations and. statement
of d<sign in!ent
d. feace locations.
e. A detailed lighting plan .. 'lib pbotomctr'.c dal .. The lighting mllSt be
orr~tional and !be source of light must Il<l! be directly visible. The
tight must not extend beyond die site and be sensith .. c to existtng
adjacent land uses.
f. Tree. 10 be retained shall be irrigated, a<rated and maintained as
necessary to ensure survival.
19. The applicant shall subrnillo Planning Staff for review and approval b)' the
Transpoc!ation DivisioD mar,ufacturec·. specifications for the bicycle racks
and lockers and • site plan sbol>ing revised locations fOr Lie bicycle racles
-___ r'-
· . " ~ ..
and lockers.
20. All unlity meters. lines, !ransr~ backflow provenlors, and any other
required utilities, shan be shown 00 the landscape and irrigation plans and
shaH show that no <on..'lict will occur between 1M utiEties and landscape
materials a."d shall be screened in • manner w~jc:b respects the btrilclIIg
design and setback requirements_ &c.16.48.120 (aXil) and Co). Sec.
l6.B2.060 (0)
Ubljtje, Departmegt
21. The apjlrle81lt shall submit. completed W A TER-GAS-WASTEWA TER
SERVICE CONNECTION APPLICA nON -LOAD SHEET for Cit)' of
Palo Aha UtHities. The applicant must provide an lIle infonnation
requested for utility service demands (waler in G.P M .• gas in B.T .U.P R,
and sewer in G.P D.).
22. The ,woc'il'l shall submit improvement plans for utility construction. The
plans must show the size and location of all underground utilities "'ithln the
development and the puNic righl ofway inclucing meters, backflo\v
preventers~ flre service requirements, sewer cleanouts, and' any oilier
required utitities.
23. A separlile water meter shall be installed to irrigate the approved landscape
platL This meter shan be designated as an irrigation account and DO other
w.ter service will be billed on the account.
24. The existing wa1er meter is in conflict with the proposed drlvcv.'ay. The
water meter must be relocated to either side of the drl ...... -eway by l'1Stan:ng
new service and abandoning the existing service althe main.
25. A new water service nne insf.cllation fur domestic usage is required to
furnish customer. demand specified in the load sheet presented wit1l this
project. For serv'.<:. connections of (·inch through a-inch sizes, the
applkanCs cootractor must provide and install • concrete vault with meter
reading lid covers for water mete[ and <>!her required control equipment in
accordance with the Utilities Standard Detrul.
26. A new water service line instaITation ror irrigation usage is re'l.uired!o
furnish customel's demand specified in the load sheet presented with this
project.
,-.-' -:
o
21. A new water service line bstallaoon for Iir. system usage is required to
furnish customer's demand specified in uie load sheet presented witb t.llis
project.
2B. An approved Reduce I'ressure Principal Assembly (Bacldlow Preventor
Device) sbaIl be installed fur an existing and new water connections from
Palo Aha UtilitiC3 10 comply with requirements of California
Administtatlve Code, rJ!le 11, Sections .5&3 through 7605 inclusive. The
Reduce Pressure Principle A.!sembly shall be installed on the owner's
property and directly behind the water meter. Inspection by the tJtHiti",
Cross Connection Inspector is required fOr the supply pipe betw~n the
meter and the assembly.
DURING CONSTRUCTION
BoDding Ij"spectiQD OivisiQQ
29. To reduce dust levels, it shall be required that exposed earth surface, be
watered as necessary. Spillage resulting from bouling operations along or
acrc& any public or private properl)' shali be removed immediatel), and
paid for by the contraclO<. Dust Duisan<:es originating from the COOtTactor's
operaoons, either inside or outside of the right-of·way sban Oecontml1ed at
me contrac~s expense.
3~. A 2, I !ree replacement ratio sr.an be required for any trees damaged or
removed during demolition and toI'stru<:tion activities.
Public: Work, Epcjneering
3 L The Contractor must contact the CPA Public Works rnspecloc at (4 15) 496·
6929 prior 10 any workperfocmed in tile public right-of·way. Sec.
12.08.060.
32. No storage of construc"Jon materials is permitted in the street or on the
sidewalk withoot prior approval of Public Works EngiIv-.ering.
33. The develDper .hall require its contractor to incorporate best management
practices (BMP's) foe: stocmwater pollution pr",·ention in all construction
operations, in cooform.oce with the Santa Clara Valley Nonpaln! Sauro<
Pollution Control Program. The Inspection Services Division shan monl1or
BMP'J with respe<:t f.O the <!eveIoper"5 construction activities Oil private
.. -~
property; and !he Public Works Department shall monitor BMP's with
fesgect 10 !he developer's coostructlon activities on publi<: property. It is
unIa","ful to ~harge my coostruction debris (SQil. asphalt, sawcut slurry,
pain~ cbcm.icaIs. el<:.) or other waste maierials into gutters or storm drains.
(fedetal Clean Water Act)
PRlOR TOFINALlZATION
Prang ill Diymmt
34. The landscape archltecl shan certlfy ill writing and submit to Planning
Division. and can ~ inspection, that the Ia."dscaping has bee. L'1S!alIed in
aecordance with oil aspects of!he approved landscape plans. thai tl:!e
inigaOOn has been installed and that inigation has been tested lOr timing
and function. and all plants including street trees are healthy_
PJlbljc; Works Endneerip,
35_ All sidewalks bordering the project shan be repaired arulIor removed and
replaced in compliance w;th Public Works approved standards. Sec.
12.08.0 W.
3<i. The \II1used driveway located on Arboretum Drive shall be removed and
replated wlth curb and gutter. Sec. 12.08.090.
37. The Public WOfks InspeclO< shall sign offtbe buMmg permit prio< to the
finaflUOon of this penni!. All off-site improvements sboll be finished prior
to !his sign-off.
38. A curb ramp lOr the "lSabred .,>111 be required at the corner of Quarry Road
and AIboretum Road. Curb ramps ~ the GIS.bled will also be required 21
the driveway entrance in Quarry Road.
Sllould you have any questioDS regarding this ARB action. please do DO( besitate 10 caD the
Planning DepartmeDl II (415) 329-2546.
Lorraine Weiss
ARB Saff Liaison
Planner
... -.
-.-..
r, -_ ..
ATTACHMENT
WNJNG ADMn<lSTR.UOR'S MEETING
JUt Y 2Q, 1995
375 Arbordum BOld
MINUTES
Usa GTole: We'll In"'" on 10 the oecond item ...rue. is 315 Ar\>oretum Road, an 'ppfication for
• oonditional use permit 10 construct a D'!W 4,400 square-foot financial service building. .. meh is
• bank, and 22 pmIcing spaces. This is belO,.. us becaus< banks in the CN district, which is a
neighborbood commercial cfLstrict, require I conditional = permit So. is the applic4llI her. to
give us a briefpresenta60n?
Bill Phillip": Would you like ""y ."hibits?
Lisa Gro": W. can put on. up. I should note tnat this went to the Architectural Review Board
this morning. which I attended, so I have seen these drav.ings. We'll put ooe up fur any
members of the a'Jdienc.e who have not seen them:
Bill PIIillips: What we .... doing heR: is providing a new. much more appropriate, site for \he
Bank of America,. which is.a tenant of the shopping ccnter .DOW on the north side of the San
Francisquito Creek. Thai leganl has been in the shopping center since virtually its beginning. Its
in • premises .and location TNhlda is vcr)' suitable fOr o..1ke space. Its of a size that is very
suitable for ofI'ke space and in fact represents the way banking once ..... done moo. like an
office operation ~'ith 'lhCtSC peopk "¥tim wanted \0 use services coming to the office in order \0
avail Ihemse~ of those services. Banking. as I think anyone can see the .. days, is basically
now a vCl)' competitive relaIl operation with customer servia as a prim"')' criterion. And that is
why we: are moving the bank in the al.J"e'Ctioc of the old petroleum site or SP gas statioc site
because at this point they are .ble to use • new state of \he ar', higb tecb building and
improvements on a site "'it"hich is extremely accesSlok esp«lally from the bank"s two primary
_. customer bases of the medica! center and the shoppmg center. They llave excellent identity aJld
they have the parlcing and surrounding amecities of. retail facility basically aligned .. ith their
primar)I ~ so they can have the ATM outside. They can have the appropriate IiEhting and
can service their fac-J1ity in a .,.'ay t.ha.r: is appropriate 10 • banking operation. The ZDniI'lg in this
particular alea was CC at one tim. which was basic all) just like the regional shopping cent"""
zoning and I guess that would have permitted what "","re talking about here automatically. The
fact that it g<Y. re20ned '" neigllbnrnood commercial and I think lbc fact that basicall)' financial
services are still considered as not quite retaIl use and therefore deserving. specie! review .. ]
think is probably something lba! won't last lDue~ long .... but be that as it may. that', wbere we
are new ana r am bapp~ SO ~'e.r any specific questions on the siting. on the bul1ding
improvements 0< operations. "'0 do have ",m us today, Cathy Zalatoras, who is "'ith \he Sank
of America and is responsible for mue' of their construction in this half of California and sbe' 5
-,.,-~.-.. -' ..
" . '.:
~': . ~ . ,
"./
o
been the proje'Ct manager for Bank 0( Amerka Since 'We started biking abOl .. rt this change.
Usa Gro"': OK, Th>nk you. I bav. just • couple, fe ... questions about the hou. .. ,of operation.
Wbal are yoa ",,-pecting the bank Ie be open.
Bill Pllillip.: Ilhink r II bave 10 ask Calhy what she thinks.
Carby Zalato .... : I am Cathy Zalatoras, I am .. ith Bank of America, c<><p<>rat. real es'-ate
division and the hours of operation will remain the same a'S t.~ are now in the shopping <:enter.
They are open from Monday througb Thursday from 9:00 AM \0 6:00 PM, Fridays from 9:00
AM to 7:00 I'M and aD Saturda-J' from 9:00 AM to 2:00 PM.
Lisa Grote: OK and '\\'ould YeP'; have any objections if [ 'W1ote that into your conditions of
approval?
Cathy Zalator .. : No.
Lisa Grote: OK great. How about IDt 1M .At. TM\. An! )IOU expecting wem 10 be open 24 hours?
Cathy Zalat.ras: Yes,. 24 hours.
Lisa Grote: Thanks. Is there anyone who would like lO spe21 on this ISsue. I should also
mention lhat if you want to :m:eive I copy of my dedsion, lOll should fill out a ""tite card and
give lIlO me before yon leav.. OK.
Herb Borll<k: I attended the Architectural Revie .. · Boa:-d bearing this morning on this item. As
a result ofpart oftbe di~ussio[J in t..'t.at flearing.1 bave a new concent that I'd tike: to raise here
regarding landscaping ~uirements for the pa!-king 10<. Section 18. n I 00 of the Palo Alto
Municipal Code and I also bl<e to "raise "" issue that I don 'I believe .. ·as .ddress<d !!>-'It I had
raised at the ARB meeting and there were two questions aOO-.Jt Quarry Road that I'm not sure
that I got an an..<wer 10 bcth of them so I'll go through eacll of them. First, on the par\:ing lot,
there is. required five foot landscape perirne1er and it appem from the plans that i just Md an
opportunirj 10 look at that they seem to overlap the parking 'l'3Ce required length. [believe tOere
may be 2n option k.< the bumper overl!ar.g by 2 feet but it seems to be ""'''' \han Ihal 2 feet. I
didn "t have a scale 10 measure it but the five tOot seems 10 be indi~ated and ] could point it out on
the plans for you \0 see if I "' ... reading it correctly_ Is tJ-.ere another plan that bas QllDensions?
Here is • five 100t landscape setback shown on T guess ",,'hat would be the north side and it seems
Ie soo'" t!lat from !he property fine into the parking space there is I 3-foal ovemang. [guess the
most that you can have is 2 feet so I have a concern there. The ~ond l5 that a minimum part of
the required parking lot landscoping bas '" be interior landscaping. [believe the size oft!>< lot is
the ml'nimum of5 percent and I am not sure that perimeteI doesn"t count.. the perimeter1s the
exterior. The inte...ior is J guess "'bat these little triangles are for. Its nOC dear that it meets that 5
percent. and finaTIy whee. thele is a J()I;{ of parking. 2: tree must be providt:d fOe e'<f'ery 10 spaces
in .. single row and the row in frocr of the building is more tltan 10 spaces. In the middie of ia: is
the handi<:.p spot and the drop off point. So I have I concern that those landscaping
::--.. ----~----~------~
".'
-.~-,
~ --~"
---
requirements for the parnng lot have not been met and 1 believe blJ! &; Il ~l recal\, that this is
going back 10 the ARB for landscaping. This is • concern of bow 10 get and what needs 10 be
dooe 10 gctll>ose parldng requ\rements oft11e code roc'_ One of the issues I raised this morning I
c!oo't believe .... addressed and 1his was l1Iised during • .wI revicw of the prelimlnazy
appIicatioo &s 10 """.ether or Dol there were any vehicle holst or other related' material. thalexis!
under curn:nI Stanford Shoppin@ ~tet vehicl< maintenance area 10 the rear of the property.
Because ift11ere are, they nee\l1o be removed per Fire Dep(. Regul.ti<>ns with • permit and tWt
was DOl sometl-.ing that was noted on the Environmenr.J Review and I c!oo't know wbat the
siruati<>n ill then:. It was just somelhing thai was DOl '"'POnded 10 this morning. On me question
of Q\Iarr)' Road, then: were two issue.. One had 10 do with the futule widening connection with
the Sand Hill Road p«>jects and it wasn" cl<ar 10 Ill< what thal answer was tbis morning and the
",.her had 10 with Public Work. requirement of standard conditions of dedicating an additionaL I
believe,. flve feet so thal to pro>-ide DcmnaI planter strip sidewalk area_ The standard is 6-incb
wide curb, r"", fool six-inch wide planter strip along the curb and I five-foo! wide side ... ~
along the rear of right..,!-""ay .... ment and it indicated in the comments from Public Works
Engineering on May 25, 1995 !hat this is shown on the submittal for the 1994 sbopping center
improvement plans which includes such specilkations of both side. of the rerouted Quarry Road
between Asboretwn and EJ Camino and as I understand it, !be way this opplication has bees
submitted, it doesn't have that and Pubflc Works Engineering said !hat to facilitate this@oal, it
may be neceasazy 10 dedicate an additioruo! 5-foot wide .... ment 10 the City for pubtic right-of
way along the frontage of Quarry Road. So L"ere ",any are two different issues on Quarry Road.
There is • publlc dedic.rt"Km. Ther.e is also the question of :bow it fltS in ~-ith the rerouting of the
street itself. And it seems 10 be k:! gel the proper conditions to address the (:oocerr.s that they
Ilave. Tha:nk you..
Us. Grote: Thank you. Is there anyone else who would like so comm.ent on this application?
OK. Just as _ ronow up '" Mr. &rock's questions-, the appIicant could address the issue of the
,-ehicle lloist. I am DOl familiar .. ith that. Is there anything on the property thal needs 10 be
removed or win be removed?
Bm Phillips: I think th--re is probably a process of demorlSbing the existing SP bmlding. There
may still be • hoist in !her< although I am not sure ... 'hether they are in both bays that <xlsted Of
"nether ',",le are just talking about one bay. The confusing (hing for me was the refereoce to the
shopping center mainlenance area which is really the area on the edge and 1 don't bcliC\"e there is
any ,,'ehlde hoist in there. I think that" 5 an tempoon)' stuff and basicaTIy mal.""1tenance eCl.ui.pment
and a hoJding area for flowers and other garden improvements.
Lisa Grofe: But it would be )lour intention k1 take anything currently on the .site offthc site prior
10 construction?
Bill Phillips: Yes, thaI's correct
Lis. Grote: And then as J understood yOll kl comment this mornIng on the v.idening of Quarry
Road, in the future the road could be rr.oved over .a couple of reet without affecting the afign.'Dent
(Appllcant: that·s correct) and that could leave at some point two 10 three feel of potential
"' .... -."
landscape are! which could be implementej whe. 0-", ",aster plan is implemented for the entire
aru.
Bill PhnJips. Right N. far as the s..oo Hin Road project app5catior, I think we'N be .l>o .. 1og.
slightly c!iII=nt alignment for Quarry Road on that and I think !here' d be minor adjuS!ments 10
some 0( the other ~ systf'rns that arc shov.'n on that as we mO\iC througn that process and as 9\.'e
gel m= inl'onnation from not onlJ 1he City of Palo Alto b'Jt CalIl'anS ond o\her";. Wbat we hove
sbo ..... is that we tan, in the vicinity <>fthe site. move Quarry Road IOwards the mall portion of
1he sbopping center by up 10 2 feet from v.l!ere tb< present edge of Quarry Road is. SQ in
essen<e. if we move it any furtbet than lhat" we end up with alignment geometry problems at the
inlersectioa with Arbore:um and Quarry. &> we eould provide another 2 led We can', previde
aoo!her S feet" which is wbat would be the ;deal, because then tb>t would requir< IlS 10 dedicate
1hal addltiooa! ~ and also hav, the S foot planter 5t!lp betw ... ~'>e sidov.'allc and the ",ad.
Lis. Grole: OK tb.anIcs. Then regarding Ille 2·[00( overrumg of cars, I Illink that can be easily
rectified by moving the adge of your landscaping strip Ioward Ille Dew bank builclIlg ., you bave
a 2·foot overhang raIher than. 3·fOOl ovemang. Would !bat be acceptable \0 yO"'
8m Phillips: Yes, yes, [don", see any problem with that J 'WaSD~1 sure where th2.1 o·.erhang "''as
occuning and wbe.a '\\1: taJ'ked about north I was thinking lOr 2 moment that it ""as on the QuarT)'
side wbicb I know %'e had carefuIly observed but "if it exIsts along there. thaI is something 'io'e
would need '" adjust.
Lis. Groie: OK. Wen tltat concludes my comments a."ld questions unless someone else bas
anything to add. OK., 1"'111 close the pubric bearing and issue a 'iIrorir~n determina60n \\-rth.in lcJ
working days. Thank )"OU very mUCH.
PF lItA\..
> ...... ~. ..' .. .... '.-
cc
LJ~~~.-] l ~
Site Location
1 fC 376 ArPoretum Road
\
375 Arborewm R04d
..
•
'.
.-. \
J
. --
-Stanford Shopping Cenler
375 Arboretum Road
371) Arboretum RoaJ
•• --
STEP
I
2
3·
4
S
6
1
8
9
ZONING ADMINISTRATOR APPlICATION sca.ru.E
CONDITIONAL USE PERMIT, VARIANCE, AND PARCEL MAP (without exceptiOns)
June 1995 through September 1995
Of
}"oPt.! 001011 D£A!X. INf'
with Environment.l Assessment 416 41?O 5111 !>I 25 6/8 6122 7113
... rout En,ironmenta1 Assessment ~IIJ 4/27 5118 6/1 61lS 6/29 1120
Department Routing 10 day 10 day 10 day 10 day 10 day 10 day 1Q day
pffiod pc..-iod period period • .eriod period period
Completeness Review/Plan Chect Witt,;n Withi n Withi n Within Within Withjn \/it~in
Environmental Assessment 30 days 30 days 3D days 3D days 30 days 30 days 30 days
Advertise {nvlronmental 5110 5/24 6/14 6128 7/12 1/26 8/16
Assessment/Available Same Day
(orl! if required)
Advertis.e Agenda 5111 5/25 6/15 6/29 7113 7127 an1
Notice Hearing !>Ill 5/.11 6/21 76 ]119 e12 8123
Zo.~ING ADIUNISTRATOR HEARING' 6/1 6115 11& Ina 8/3 8111 917
6:15 6/29 712'J ail SIll 8/31 9121
61
Withjn
30 days
8/30
8131
9/6
9/21
10/!>
Please Note:
These dates will not aPell if additional erNiror,!)ental stlJ{hes are required. If the applicatiOfl is determined
incomplete. the dates will be adjusted to the time when acldltional materials are soomitted. .
1 The ~lfcauon f1Hng deitdline fOf' applications which do not rcqulre En'ilronmental AsseSSIDef1t lS two wt'€.4:.s later tflM
the eadline fOf' applications wtJich do requlre It'lis rC'iliew. .
f"!c.cting: dates are subject to reschetful in0 dllr to holld,ly'; (if" h'l1lJth of agenda5.
C: ICAlENOOS'I'CI..JfIVARPM.CAt
MWB