September 21, 1995 CMR:427:9S
Encroachment Permit for San Francisquito Creek Bank Restoration
Project
This is an infOODationa! repon on an encroachment permit 10 be issued 10 Watershed Science
10 perform bank restoration on City-<lwned land in San francisquito C«ek near Abna Street
POIJCY lMPYCAIlOlSS
The proposed bank restoration project is consisteDl with prior Council direction regarding
appropriate erosion controlleChniques for Sao Francisquito Creek (CMR: 166:95).
EXECUTIVE SUMMARY
Over the past several years, bank erOOon has occwred at the sharp bend in Sao fraocisquito
Creek downstream oCthe railroad bridge near Alma Street (see site map, Attachment I). Due
10 the .. OOve forces of the creek on the outer edge of the bend, the rear portion of three
properties CHI East Creek Place in Menlo Park has been wasbed away. further property losses
are likely unless the bank is stabilized and protected.
The property owners initially retained ao engineer who proposed the construction of a concrete
retaining wall. This proposal was not pursued doe 10 its substantial cost and significant
environmental impacts. During the past year, the property owners have participated in the
ODgoing Coordinated Resource Management and Planning {CRMP) process, in an attempt 10
identify an effec1lve and enviromnentally-compah1>le solution 10 this .rOOon problem. Wrtb
the input of CRMP participants, an a1temalive plan was devised based upon biotechnical
restoration techniques. The plan utilizes natural materials inclucfmg bouiders, logs and tree
plan6ngs \0 stabilize the creek bank. This plan will cost much less than the concrete wall and
have Iong-tenn environmental benefits. In lale 1994. the City issued a letter of support fo< •
State of Califamja Urban Streams Restoration Grant appUc.tion, submit!ed by the City of
Menlo Park and the Peninsula Conservation Center Foundation (representing CRMP), 10 fund
Pa&e 1.13
, .
" ;
this proje<:t (Attachment 2). The State did no! award I grant for this project, but the three
property owners have agreed to fund the w('(k OD their 0"'11.
Although most of the bank res!orstioo wcd< will take place on the Menlo Park side of the creek,
Waiersbed Science has applied 10 the CIIy for an encroachment permit 10 allow work within El
Palo Alto Park on the Pal" Alto side. The ",.or!< in Palo Aha consists of removing a gravel
deposit along the inner edge of the bend, placing boulden 10 protect the toe of the slope and
planting trees 10 srabilize the bank and create shade. All wor!< will be performed from the creek
bed, and 00 "mers or equipment will be allowed 10 enter the poctWn of the park al the lop of
the bank. The project is located approximately 200 fee! downstream from El Palo Alto and ",ill
DO( affect the bealth Of stability of the historic tree. The encroachment penn.~ will require the
contractor 10 nolify residents along Palo Alto Avenue of the p<oject, control dust during
construction a.od conform 10 the City's Noise O"rtn8.DCe. In additien, the applicant is awaiting
f"mal approval from the Army Corps of Engineers, State Fish and Game, Santa Clara Valley
Water District, Regional Water Quality Control Beard, and the City of Meulo Park for the
p<oposed bank restoration.
Although a p<>rtion of the proposed bank restoratien is within a dedicated park, the City
Attorney's Office has issued an opinion that a Park Imp<ovement Ordinance is no( required,
since the wor!< will no( constitute a substantial a1teraticn of the physical cbaracteristks of the
creek. Stl!ffbelieves!hat the City's interests can be adequately proI<C1ed through the conditicns
placed on the encroachment pennit Unless otherwise directed by Council, sIaff intends 10 issue
the encroacbment permillO Watershed Science on September 21,1995.
nSCAL IMPACT
The applicant will pay the City an encroacbment permit fee to cover the cost of City
administraticn and inspection.
EN\JRONM ENTAL ASSEMMD(I
The City of Menlo Park is the lead agency for the San Francisquito Creek Bank Restoration
Projecl for purposes of the California Environmental Quality Act (CEQA). Menlo Park staff
regard this project as I miner land altera!ioo and have detennined ilto be categorically exempt
in accordance with Sec60n 153<)4 of the CEQA guidelines.
ATIACHM1KTS
I-Site Map
2 -Letler of Suppo<1
PREPARED BY: George Bagdon, Assistant Director of Public Worlts
..... lol3
•
DEPARTMENTHEADREVlEW, £1. ~~
GLENN S. ROBERTS
0ire<:1Or of Public Wods
CITY MANAGER APPROVAL: ~!'\~
Assistant City Manager
cc, Rube" Nino, City of Menlo Pat!<
Kay Whitlock, Santa Clara Valley Water Dislrict
Debbie Myte!s, Peninsula Conservation Center foundation
Robert Hemmes. Friends of San Francisquilo Creek
Steve Zembsch, Watershed Science
Bill Van<livere, Clearwater Hydrology
Mr. and Mrs. Lloyd Divine
Ms. Sue Cbung
Mr. and Mrs. Maurice Jolmson
Paee J oU
•
I •
•
ATTACHMENT 2 n .
Mr. Earle Cummings
Urban Streams Reli!oration Program
Division of Local Assistance
. Department 0{ Water Resources
State 0{ California
P.O. Box 942835
Sacramento. CA 94236-0001
Dear Mr. Cummings:
pty~rp.:1l0 Alto
OffreoflheCityMm.7g",
December 30. 19<;4
I am writing 10 endorse the grant application to yoor agency from the City 0( Menlo
Park and the Peninsula Olnservation Cenler Foundation foe funds t~ support a.
stream bank stabilization project on San Francisquito Creele.
As one of tile ageucies with an active interest in San Francisquita Creek, the City
of Palo Aho bas been participating in tbe Coordinated Resource Managemenl and
Planning {CRMP) process for the creek. In November 1994. the CRMP Steering
Committee voted ~ seek funding for a project to prevent fiJ.rt.l)er erosion at a site
<>pp<>Site and slightly east of the El Palo Alto tree histoocal landmarlL
To stabilize the creek bank. the proposed project will utJlize an innovative terracing
method that is sensitive to the natura! environment. Volunteers \!Iill be recruited
and trained 10 plan! native veger"tion along the reconfigured bar.k'to further
stabilize it against erosion.. The property .owners conrur with tlJe deslga concept:
and bave agreed to proceed witll the project. which should prevent further loss 0{
their land and ,,';at of neigbbors downstream. In .d<lition. the are. has high public
visibility and will provide an e"eITent demonstration opportu"ity for future stream
banIc stabilization projects.
The proposed San Francisquilo Creek stream bank Slablli2.atiou project is consistent
with the City 0{ PaiD Alto'. desire !O preserve the natural .alues 0( San
Francisquito Creek. On behalf of the Ci..>y. I endorse the project and ask that you
approve the Urban Streams Restoratiro Program application for funding.