HomeMy WebLinkAbout0317.095• ~-... -.. -.--.--- @ City of Palo Alto City Manager's Report TO: HONORABLE City COUNCIL FROM: CIty MANAGER DEPARTMENT: PLANNING AGL"IDA DATE: June 16, 1995 CMR:317:9S SUBJECT: Bry .. ntlAddisoll Traffic Circk (CIP 19212) -Construction Contract and Approval of. Budget Amendmellt Ordin."ce RWUEST Council bas previously directed staff to proceed with the installalioo of a pennanent traffic circle allhe Bryant! Addison internecIion. The design work bas been fully completed and bid procedures b-selecting a contractor to CODSIhict the circle bave been completed. The purpose of this report is I<> request that Cooncil approve the awarc! of the contract to construct the circle, and app«we additional funding of $34,800 thai is required 10 complete the project. RECQMMENDA nONS Staffrecommends that Cooncil: I. Approve the contract with B & B Concrete Construction Company, Inc., (A!Iachment 2) and authorize the Mayor 10 execute the contract, in the amoont of $64,800 lOr construction of the permanent traffic circle; 2. Authorize staff to negoIia!e and execute ODe or more cban.ge orders to the contract with B & B Concrete Constructioo Company, Inc.; the value of which shall not exceed $6,000; and 3. Adopt a Budget Amendment Ordinance (Attachment I) transferring a total of $34,800 from the City's Street lmprovement Fund to CIPNo. 19212, in order to provide sufficient funds to construct the permanent traffic circle. Pag. I a(ll • . ~'. ":'/" ",: .• - , '" +' , • POLICY IMPLICA~ONS 0 . Oxmcil has already approved the installation of a pennanent traffic circle at the Bryaot!A&ison in!Ine<:tioo. Traffic elides are one of several measures tllat are avaJ1able foe neigbbodlood traffic management This ""*"" like oIber similar traffic IIl3IlageI1le!l cJe,.'ices, raises several issues including: (a) the cootinued iocremen!al addition oI'regularly-requi.-ed maintenance, (b) the possible need roc maintenance services DOC available from existing City staff, and the (c ) lack 01' provision oftimding roc such maintenance, as weD as Cd) the likely future need to ",move and replace a portion of the project in order to repair or replace undergrOlDld utilities. EXEC1lJIVE SUMMARY Background In September 1994 (CMRA36:94), the City Council approved a staff rocOOlIDeodation 10 retain the temporary traffic circle at the Bryant! Addison intersection and directed staff to pnx:eed "ith the design and installalioo. 01' a permanent circle, with the understanding that it was to be done with the involvement 01' the neighbors and shOOld reflect the historic nature oI'the neighborhood. The traffic circle is ODe element of the Bryant Street B~cle Boulevard Extension Project. which was implemented in the ran 01' 1992. The design oI'the traffic circle bas OCCllfTed in two phases: the COllCeptuaI design phase and the fil1aI engineering design phase. For the initial conceptual design phase, the City cootrac:led \\ith an wban design ronsuItant, Greg Tung of Freedman, Tung and Bottomley, at a cost of $10,000, to cJe,. .. 1op the conceptual design for the permanent circle. This design received final Architectural Review Board approval OD April 20, 1995. On Ap1! 24,1995, Council approved a stalfrewmmeodatioo (CMR:224:9S) to provide an additiooal swn 01' $9,000 for the preparation 01' the final engineering design plans for the project Subsequently, the City cootraeted with a design fHIn, Tom Richman and Associates. to prepare the necessary engineering plans and specifications to bid and coos!ruct the project Proposed Project A plan showing the traffic circle project is shown in Attachment 3. The basic project includes: • Removal 01' temporary circle and existing pavement in the circle area; • Installation 01' masonry brick and custom cas! COIl<:rete elements over a base of poored coocrete; -" .;.' ----",-. -.,-.-.-----. , . , :~.~~~~ ., . ---,. .-". • • • Raising of personhoIes and wafer valve accesses to &eW grades ",thin the circle; and • JnstaDarjon of bndscaping and irrigation, including a soIar-powered C:OOlroller and rounec1ion 10 a City water line. In addition to the above basic components, the bid package included prov'.sioo for the possible in<:1usioo of two add alternates. One add alternate (I a) is for an anti-graffiti roating of the IIl3SOIl()' ~ The secood add alternate ( 1 b) is for gnmite street name panels in each of the four vertical piers. Inclusion of street name panels is an ARB cooditioo of awovaI. The design bas the support of the residents' wor1dng group, City departments, the Palo Alto Bicycle Advisory Coomtitree, the Historic Resources Board (HRB). the Architectural Review Board (ARB). and the City Council While the design process in<:1uded necessary trade-offs and compromises 10 address competing issues of cost, maintenance, traffic en~ aeslbelics, and othets, the final design is generaDy c:oosidered to be good, by mast involved parties. Bid Process A total of 12 bid packages was mailed tG prospective bidders on May 24, 1995. Two additional requests for bid packages were subsequently received and provided. Two aMenda coosisting of minor revisions 10 the plans and specifications were subsequently mailed to all prospective bidders. A pre-bid meeting was held 011 site OIl June 6, 1995, 10 discuss the project with prospective bidders. Bids were opened on June 13. Bids were received from two contractors, as shown 011 the Bid Suznnwy Sheet (Attachment 4). The lowest total bid is $64,800, and the other bid is $13.500. B&B Cpncrete $62.500 1.000 1.300 $64,800 CclJishaw $68,500 1,000 ~.OOO $13,500 base bid 10 construct circle added bid for add alternate I a (anti-graffitI) added bid fOr add alternate 1 b (s!reeI name panels) Total bid to construct circle The bid of $64,800 is 518,000 (38 percent) above the engineer's estimate of $46,800. Fran c:on'acts 1hat staff made with some COIlIl'act<l<S before and after the bid opening. the reasoos fOe the smaIllllllIlber of bids submitted relate to: (3) the full wed:: load that many '. , ". o cooIracton are currently experiencing, (b) the relatively small scale but complex {jature olthe project, and (c) Ihe relatively high proportion ofwori< thai: would have Ie go Ie sub­ COIIIradOf"S. The reasons Chat the low bid exceeds the engineer's estimate by a substantial amount (38 percent) aT: as foDows: (1) while the project is small, it is relatively complex, in terms of the many and varied elements involved. and (2) there is a significant degree of manual labor and W<Xkmanship involved. For example, the manual effort involved in preparing the forms file the concrete is high. compared to the smaIl amount of COIlCtete involved. The qIIlIlgy of material and wnrlonanship involved file the masonry worlc is considerable, and impoItaIIt to the visual appearance of the fin.aI proouct The number of different elements, for which the services ol different worlcers and/or contractors are required, is high fOr this small size of project. The engineer who prepared the engineer's estimate had also cautioned cay staff thai the bids could be highly variable for a project ol this nature. Staff recommends that the bid of $64,800. L'lCluding both add alternates, submitted by B &: B Coocrete Coos!ructioo Company. Inc. be detennined by the City to be the lowest responsible bid, and thai: the eontract be awarded accordingly. Council has the option of not including either one or both ol the two add alternates. and, thereby, reducing the amount ol the contract a Base bid + Anti-&aJli6 + Street Name Panels ~ $64,800 b, Base bid + Anti-Graflili ~ $63,500 c. Base bid +StreetName Panels ~ $63,800 d. Base bid ~ $62.500 Additjrnal FUDding The staffniport (CMR:224:9S) prepared fOr the Apn1 Cooncil meeting stated that the cost of the traffic circle at the conclusion of the CODCept>W design stage was estimated 10 be approximately $35,000, This was based 011 a limited amount of information al the conceptual stage and did nc! include any provision fOr contingencies. Subsequently, with the completion of the more detailed final engineering plans and specifications, the engineet'5 estimate prepared for this project placed the estimated cost at a to!aI of $46,800. The cbange in estimated cost between the conceptual design stage and the final engineering design stage ($11.800) is attribulable to more detailed and accurate information regarding !he specific cornpooenIS of!he project. The actual low bid for construction of the project, as presented in the previous section, is $64,800 . .~:' f.'";>:;",,"'."~ ; ';; --'"'"",-",,::-------- ...... 0111 .. .. . ',-, . .. ~ --= -.,.:.: . .r;'~-~. , - Cootingency funds are nonnaIly provided for ~. if needed, to cover unforeseen cooditioruJ tbat o.xur during the coostruc6oa pro~ wruch may require change orders. The cootingeooy funds for • project of this scope are an additiooal $6,000 and are esse<lIiaIlo Ihe cclc:rIy coosIrucIioo and ec<npldioo. ofdle project. Contingency funds are DOl part of the bid package. and are used only if necessary. If contingency funds are DOl made available, and • change «der is r~uired, slalfwoold have 10 return 10 Council for review and auIhorizatioo. This woold likely have a serious adverse impact on die scheduled progress and compIe6on ol the project. and cooId result in financial claims from the cootrac!or for costs related 10 SllCh delays. A S\lIIlIIl3t)' of the Iota! costs for this project, including design. construction, and contingencies, is as follows: CoocepIual Design Engineering Design Coostruction Contingencies Total SIO,OOO 8,000 64,000 $82,800 S 6,000 $88,800 A S\lIIlIIl3t)' of the funding required 10 construct this project is as ronov.·s: •. Cootractor's Low Bid b. Contingencies e. Total Funds Required Ii T oIaI Funds Remaining in CiP e. Required AdditiooaI Funds $64,800 wto contingencies $ 6,000 S70,800 (a + b) $36.000 $34.800 Cc· d) Staff recommends that Council adopt the attached Budget Amendment Ordinance (Attachmeni I) transferring a tolaI of $34.800 from the City's Street hnprovement Fund 10 CIP No. 19212, in order 10 provide sufficient funds 10 construct the permanent traf!ic circle. . F« infonnalioo, the fioaI engineering plans continue 10 include the infamous niche in the low wall. in order 10 accommodate' and avoid moving an existing storm drain hole. Similarly, the above DOled funds do DOl include any provision for removal of the niche. This Iopic received considecabte discussion at the April 24th Council meeting. l'qofaf!l ". :-.':" .~ .. >.---' o Slate IDA Funds Ju part of !he funding Eo: !he implementation of!he extension of the Bryant Street Bicycle Boulevard. Palo Alto applied for and received approval for a 1992·93 Transportation De\-elopmcDI Act (IDA) gran! il!he amount of $69,000. A to!al of S24.000 of!he grant funds had previously been txpendcd in 1993 (oc other aspects of the bicycle boulewrcl; leaving a balance of $45,000 available fer !he design and roostruction of a traffic circle or other posstble measures. The funds fum !he 1992·93 IDA gran! arc available until June 30, 1995. Thereafter,!he MetropcIitm Transportation Commission will reallocate Wlused funds to other projects. MTe does p<O\-lde an additiooa/60 day grace period Ie complete and submit aD De«sS&-y paperwod<. ()(!he $4S,OOOofIDA funds, SIO,OOO has now been spent for the conceptual design of the circle and SS,OOO has beea spent for the engineering design, which leaves a current balance of 527,000 of IDA funds available for construction of the cirole. The difference (S9,OOO) between the remaining funds available in !he CIP project (536,000) and the remaining IDA funds (S21,OOO) will COOle from Street Improvement Funds previously approved by Council. In order for the City 10 be eligible (oc this remaining amount of IDA funds. a COI\IraCt for coostructioo must be awarded by June 30th., and billi.'lg5 in that amount ($21,000) submitted 10 MTC by Angust 31st. IfQluncil awards !he coos!ruCIion conIact for !he circle 00 June 26th. these deadlines can be met. and the city will be eligible for !he $21,000. If these deadlines are 001 met. the city will 001 be eliglble foe the S21,OOO remainder of the 1992·93 IDA Grant funds. Alternatives The issues before !he Council at the present time are (a) wbe1het 10 award the coostruction contract, (b) what 10 include in the coostruction contract, and (c ) appro>al of a budget amendment ordinance 10 provide sufficient funding 10 comple!e the project The alternatives are as follows: Alternative I: Approve the staff recommendation to award the construction contract authorize change ()fliers. and provide additional !undin g foc the project SIaIf would then proceed with execution of the contract and coostructioo of the traffic circle. including the I"wO add alternates (Ia, Anti-<lraffiti and I b, Street Name Pa!lels). Provision for change orders ensures that the construcIioo w-JI be completed as expeditiously as practical . . . ' ---..;,;-:-----.-.-------- -.. ': .. • . -. --~-~=~ , .. -~.---.... , Alternative 2: Po no! include one or both of the two add alternates (I!!. An!i-Graffiti ~B @Sl 000 and lb. Street Name Panels @ 51 ~), and.~ reduce the amognt 0( the coolract accordingly. One or both items would be deleled from the contract and the project would be coostructed. as sc~ed, without inclusioo of ooe or both of the add ahemates. Staff believes that the anIi-gJaffiti proIectioo is an importanI feature and is likely to result in future cost savings that exceed the current incremental cost of $1.000.· Staff also be~ that the street name panels. which are an ARB c:ooditioa of approval, are a desirable, aJbeit no( necessary. and attractive feature of the circle, and worthy of the incremental cost 0(51 • .300. A!temative 3: Reject all bids. do no( aoorO'o'c the Budget Amendment Ordinance and proceed with some other option. such as the following: a. Lower-cost Circle Develop a substantially lower cost traffic circle design. A basic "off the shelf" design similar to those used in Portland and Seattle could be designed to the specific pbysir...al features of the Addisoo/Bryam intersection. Depending upon the level of design refinements resulting from Ihe design review process by the ARB, HRB and residents. the Iotal cost 10 design and construct such a circle is estimated to be $35,000 to $4S,OOO. In such a case, the timing is such tIw the Cily would not be able to proceed soon enough to avail itself of the remaining balance ($21,000) of stale IDA funding that bas been programmed for this project, and for which eligibility is about to expire. h. Street Closure Abandon the idea 0( a traffic circle at this location and develop a permanent street closure in substmIiaI cooformance with the original (pre­ circle) Ilial. The evaluation 0( the street closure Ilial concluded that it functioned wen with no significant increase in traffic vo!wnes, 00 subsIantial changes in speeds. and no acc.idents or major problems. Staff recommended that the closure be made pennanenl Due to coocerns that were expressed about safety and traffic diversion, Council concluded that the street closure should be replaced with another traffic management measure, and the six-month Ilial of the traffic circle ensued. CMlt:J17~ :>ace 7 allJ , 1. ,".-.. ,,:-. -'''.\ --.. --.. .. -' ~ ',' -,' . Based upon pas! experience with the construction of street closures, a basic street clos1Jre sinular 10 the ODe on Bryant at Lowen would cost about $1 S,OOO 10 design and construct. A somewhat lIKlfe suootantial closure, similar 10 some that exist in tbe Ever)ll"een Parle neighbornood, would cost aoo.. S2S,OOO to $40,000 to design and ronstruct Customized design refinements O£ enhancements would likely add additional costs. In such a ca.>e, the timing is such that the City would not be able 10 proceed soon enougb \0 avail itself of the remaining balance ($27,000) of state IDA funding that has boen programmed lOC this project, and lOC which eligibility is about 10 expire. c. Rt>ad Bumps Abandon the idea of a traffic circle at this location and install road bwnps aIoog Bryan! SIreet. 'M:len staff considered a replacement measure fur the trial street cIostre, a traffic circle and road bwnps were both ronsidered as viable options. The road bump option consisted of liIe installation of two road buJnp!; aJoog Bryant Street, one on either side of AddiSOll, about 50 feet from the intersection, along with associated signing and striping. The I/affi(: circle offered several impor1anI advantages over road bumps (0£ this particular application, in that. circle. (al does not have the poIential Iojar iqjured passengers d..'Stined Iix the Urgen! Care Center, (bJ improved aesthetics in a histOrlc neigbborbood. and (c ) creates the illusion Iix both Addison and Bryant drivers that the streets are closed. poIential!y discouraging some througb traffic and influencing driver behavior on both streets. Based upon past experience \With the installation of road bwnps in a portion of tile Midtown residential area, the COSIlOr installation of the two road bumps, aIoog with related signs and roadway markings is $10,000, if the installation were done in accordance with current city design. In such a case, the liming is such that the City would not be able 10 proceed soon enough to avail itself of the remaining balance ($27,000) of state IDA funding that has been programmedb this JrOject, and Iix which eliglbility is about 10 expire. d. No Traffic MlRlagemenl Measure Remove the temporary traffic circL: and do not pursue further consideration of a traffic circle or street closure in this area. N the time -"""!' • . . thaI the extension of !he bike boulevard was implemented, it was staff's conclusion that·DO traffic management me3Sllfe (i.e. trafIk ~ircle, street closure, road bumps) would be needed, and recommended an initial trial pc:riod wilhott any such measure. Due to coocerns expressed by residents, CouociI. directed staff to include the street closure as part of the first trial The cost of this option is minimal, limited to only the cost of removal of the temporary circle and related signs ($1,000). e. Slqp Sums Q>nclusiogs Remove the temporary trafIk circle and install two new ~op signs 00 Bryant Street at the Addison Street intersection. Prioc to the impIemenIatioo of the bicycle boulevard, !he Bryan!! Addison intersection . was a four-way stop cootrolled intetsectioo.. The remQ\'aI of slop signs 011 Bryant was, and remains, an essential part of the bicycle bouIe\'3l'd coocep(. to help facilitate bicycle travel and ellCOllrage bicycle use along the bicycle boolevard. The cost of Ibis option is also minimal, limited 10 only !he cost of removal of the temporary circle and relate signs, and installation of two stop signs on Addison ($1,400). The foUowing summarizes !he basic issues and options regarding the cWTent decision before the CooJllcil I. The f\mctionaIity of!he traffic circle, alibis Iocatioo, has been favorable, and the proposed design is a good one that will fit weD into the historic nature of the neighborhood. Unfortunately, it is quite costly. 2. The altematives of coming up with a lower cost circle (3a). or reverting back to a street closure (3b). <XlIlId likely end up requiring as much, or more, local funds than the iDaemental amount now needed to construct the proposed pl'oject. They will aJsc result in a visual appearance that is less likely 10 fit the historic nature of Ibis particular neif)lbodlood. 3. The alternative of using road bwnps (3c) is substantially Jess costly. The visual appearance would not fit well with the historic nature of Ibis particular neighborhood, and potential problems oou1d arise with respect to Bryant Street being an access route to the Urgent Care Center. CMIU1BS o 4. The alternatives of DO traffic management measures (3d), or ad:litional stop signs (3e). are a reversal of previous Council decisions 10 effectuate a delicate and elusive balance among a multiplicity of objectives and coocerns from individuals and groups. S. The past evaluation of!he si".-:>nIh trial of!he temporal)' circle induded a survey that was mailed 10 900 addresses. The approximately 2~ respondents indicated soli<! support (65%) fix making !he circle permanent Attacbment S provides a SIi!llIIIlIl)' of!he ~ results. 'Nhile sIaff is truly coocerned about spending this mooh money fix a project of this size and scope, given !he above considerations and the histOl)' and purpose of this proposed project. staffbelieves that !he traffic circle sbould be bmlt as proposed. Repaving of Addison Street In addition 10 the construction of the traffic circle. !he Public Works Department bas a street resurfacing project. long-awaited by residents, scheduled fix this summer tha! will result in !he repaving of Addison Street between Alma Street and Middlefield Road, including !he Addison'Bryanl intersection. Staff bas considered the trade.<>f!S regarding 5cbedu !jng, sequencing, public perceptions. and logistics fix lhese two projects. and has concluded !hat Ihe circle should be built Ii.,;t ReIDO'o'3I and replacement of asphalt around the circle for the repaving project will follow shortly thereafter. Next Steps If Council approves stafl's recommendation. ronstructioo of the pennanent traffic circle wil1commence mearly July, and will be completed by lale August, 1995. FISCAL IMPACT Approval of the attached Budget Amendment Ordinance and contract would transf'" $34J1OO fium the Street Improvement FUDd 10 this project The remainder of the contract would be paid from funds previously approved foe this elP project ENVIRONMENTAL ASSESSMEl'o'T An environmental assessment (91-EIA-28) was previoosly prepared for the Bicycle Boulevard Project. and Council apprO'Ved a Negative Declaration foe this project at its meeting of December 2. 1991. Additional environmental assessment foe funding and ronsIruction of!he circle is 00( required. hp >0"'11 . , . ,\TIACHMENTS I. Budget Amendment Ordinance 2. Constructioo Contract 3. Traffic eRie P1an 4. Bid Snmm:uy $Met S. Results of neigbborhood preference survey Prepared By: Carl Stoffel, Transportation Engineer Marvin L. Ovelway. Chief TranSportation Official Department Head Review: City Manager Approval: c:c: Neigbborbood Workiog Group ~'t'dX:&«4/ KENNETH R SCHREIBER Direcloc of Planning and Conununiry Environment ~~ Palo Alto Bicycle Advisory Committee CMR:11795 "-r """ 11 oC Il " . ~-j ATIACHMENT 1 ORn r!IANCE NO. ORnINA1'iCB OP THE COUNCIL OF THE CI1"( OF PALO ALTO AMENDING THE BUOOE'l' FOR THE FISCAL YEJ..R 1994-95 TO PRO'IIDE AJ1 AllOITIOSAL APPROPRIATION FOR CAPITAL II'IPROVEMENT PllOJECT NO. un:;, 'SRYA!<T STREET BICYCLE BOULEVARD EXTENSION' WHEREAS ... pursuant to the prov191ons of Section 12 of Article III of the Charter of tbe City of Palo Alto, the Council on June 20 1 199' did a~ a budget for fiscal year 1994-95; and WHEREAS. in Sep<e~~r, 1994 Council directed staff to proceed with the design and installation of a pervanent traffic circle at the in~E:reection of Bryant and Addison Streets; and W"rtEREAS,. on recommendation to preparation of the circle; and ~.pril :24. 1395... COf.mcil approv-ed a. staff provid~ additional fundins of $~,.OO'O for t.he final engineering design plans for the traffic WHEREAS.. the engineering plans and specification for the construction o~ the traffic circle have been completed; and WHEREAS... staff is requesting approva1 of a contract: to construct the traffic circle; and WHEREAS, based upon the lo~est responsible bid~ it is estimated that additional costs for construction ~ll be $34,800. NOW. THE.REFORE,. the Counci 1 of the Ci ty of Palo Al to does ORDAIN as follows: SECi'IQN 1. The sum of Thirty Four Thousand Eight lfundred Dollars {$:34,8·0'0) is hereby appropriated to CIP Project Number 19212... -Bryant Street Bicycle Boulevard Extension.· This appropriation increases Project 19212 from Seventy Eight Thousand Dollars ($18,Oo-O) to One Hundred Twelve Thousand Sight Hundred Dollars ($112, BOO). SBCTtQN 2. The sum of $3',800 is hereby transferred from the Street Improvement Fund to the Capital Improvement Fur~. >­-,: {~.o-- .,. SECT!QK 3. This t~ansacti~n vill red~~e the Street Improvement Fund balance from"S863.000 to $828,200. SECTION f. As specified in Section 2.28.0eOCa) of the Palo Alto Municipal Code., a two-thirds vote of tne City Council is required to adopt this oz:',::3inance. SECTION S_ The Council of the City of Palo Alto hereby finds that th~ enactment vf tbis ordinance is not a project under the california Environ.'uental Quality Act end, therefore,. no environmental impact assessment is necessary~ SECTION ti. Municipal COde, adoption. As provided in Section 2.04.375 of the Palo Alto this ordinance shall become effective upon INTROIJ(;CE!) AND PASSED, AYES. NOES. ABSTEN7IONS. ABSEN7, ATTEST. APPROVED. City Chr1c: Mayor APnavED AS TO FORN. Sr. Aliat. City Attorney • Ci t Y J.tanager Director of Finance Director of Planning and Community Environment ... ,,. -. -.----~ ---~---~~O"~ -~-~--~~--~-~--------. -~ ',- • ,-, o Z:, A1TACHMENT 2 CITY OF PALO ALTO CONTIIACT FORMAL CONTRACT This Contract" d.ted _______ is entered! into by.nd between the City of Palo 4tta •• mYnicfpal C01po1'tPorI of t:he Stat. of c.rrfornta rCity-... and B" I cpns;;Cf!!ft CQDSfngti9n 'amMO" toc;, • c:.rrforni' COt'POCJtion rcontractor ..... whose rl"PI!ver kfe .... tification M.tmbar i. 1+254 93'8 . fgr Ifd " c:on:tidemior'\ of the foAowWlg CO\Ienants. terms .00 conditions. City .nd Contractor ,-the partiel; -, ,. ram. nit ContrK1 .... 11 cornrnenc. on.. and be bfnding en the ,priQ 01\ the Oat. of &ecu1iotl of this Connct. ref .... IIXPh on" daw of reeon:f_tion of lh6 No'6<:l1 ;,f $ubsbintiel' Co~an.. Of. if no ~ no1k ... requhd ~ be fiJ.ecf. on 1hI cJr.:e tNt final payment is made ttareund'Of .. subject to 'ltle urfier _ of IIQ Controet. 2. r.enttnll Scopt or PIoictCt ,ad ~ Conb"KtOf sNn turrisf'! Jabof'. seNices, rT'.at8nITs .nd eQI,Jipmr.1t r. COr! ... 60<, with '!he eonstruction 01 Cf\8 Proj&Ct .nd Compfl't8 the Wort in ICcordar.c1 with the cover\ants, tel'11\l 8f'd c:onditions of 1hi:a ContrK110 the sat1sfacf"lOn of City_ The ProJect .nct WOf1t b: generafty de.sc:ribecJ as foTlow$: Title: Trame; Cjn;it! wand -8aarttfAdcfi;mn NO -171;34 Base Bid:' 82 50(} og Add Altemates iii any!: .? 1QO PO Tobil Bid t M AQO QQ 3. Pxrtntrt POSumI!'J'jJ.. This Contract: .",.,8 consist of 1he documents set fOfth btlfow ... hid! Ir. on file with 1tlI Citr CIeri: end' .... hereby 'h;orporated by reference_ For tt.e purpoMlS of c:~ing, tnterpretrng Ind' l.aoIving inconsfstenciet betwMl'l 1bt ptoviliortl ." IhiI Corrtr.et.. these c!ocumints and the pt'ovisions 121ereot ar. set fortfl in tfte fo1Iowing descending ordet of pre.;lMSence. I. This ContTart b. Invitation FCM' Bid. c. Project Specifications. tL Osawings. •. Ow>go 0nJ .... t. Bid. •• Supplemem.ory C<>nditions. h. General Cond'"rtioos_ i.. St.NlCf.r'Cf Of.wings.nd Spec:ffications U.992t. I. Certifiealt. of insurance. h~ Banc.f; .nd Performance Bond' l... Affirmative ActiorJ G_iidtrtnes and COmpliance Ropott. l 0d1er Specffictltianl. or pert thereof. not e~ssfy iocQrpoI1Ited in the Contract Specfficitfonli 0«' the Standlrd Drawings .nd Spec:ificatiOlll 11992). m. Ant other cJocument not expressly ..... n1ioned herein whictl is issued by Cfty or entered into b~ !he ponios. CITY of PALO J.l.TO: Contract -l12iS41 ~e1 or.., ~." .... ~~.\: "0 --'-. ,-_ .... ; ... o CITY Of PALO ALTO CONTMCT 4. ro."..,."..mn.. ., coo.s:iderw1ion of COl'1trRtOl"" .Performa~ of its obligations hereunder. City ahal pay to CQ:"ItrKtor 1he amourd set b'th ~ Contr.etor"s Sid in .aeeOfdance wim 1h. provisIons of this Cor.tr_c:t_net upon"'" recaipt Df written invoices ,I'd .n necessary ,JUfpOrtit'IQ oocurr.ontation wIthin !hi ~rne set font. in Ihe Connct Speeifieationl n "'" Stan"dard OfIwings.end SpecificatioN (19921. or .. iF no tilTl4l is SUited', within thirtv 1301 o.~s of !hi date of receipt Dr COntractOf~S irlvo~es, 5. lnll.!t'osa. On or before h o.ta of E'II.~ C~uect-:lf sN,1 ob-.a'\n and' memtatn the po!"lCie. of insurance 1:overege cJesenbod In the ....... itation For Bid on 11IIrJ'N and c:ond"rtions tnd in .mQt.JntI .s lNIY be required by the Rist MoIfla98I'-City tN. not be obr~ted to taKe out insurancl on Contractor's pel'$Ol\af property CIt the persollli property of _rty ~n performtng labor or MtVices Of' supplyir.g ma1erilll Of' .quTpment lJnd'er "'-PToIect. Contr6C1or.shaa flJmist\ City with the eertific6.tll. of ~r.roce and with. originaf ludorsements .tfecting covers,", required' urdu this Contract on or berore the Oat, of Execution.. the C$I db res end' It! doIsements for uch insur.ncl 1POrM::'t .shan be signed by .. WSOtl who is autjo,orized by tNt insurw tel 'bind tOY1i:ra~ in its bohalf. p,~ 01 in..sufanc. sflall be rr.ailed to the P,oiect M.nIIll8i '0 !he address se1 fOC1h in Section l5 of this Contract. 8. ~ Corrt:raetM agrees to protect. derend', InOernrLlo"fy and hold Cjty. its C'rty Council members.. of'fic:er1. trd employees hatrn1ess from ..-d .gainst any .nd aJf cfaTrns, demand's, ti6bTrties, iosses.. dll"Nlpes. costs" e:wpenses. fens. penahjes.. bts..or P:fgments. arising in whofe Of'in part.. dirK1!~ 01' inflFectfy •• t anW­ 'time fJom ar'Iy i"'iIY 10 tJ¥ cJu1tI of persons or darT'l&08 to property as I result of the willful 01" ~liliJl:nt .ct at on-iSIion of ~. or whk'P\ feSiJI'ts f10m eontr.ctor·s noncomptianc::e with Iny Law respecting 1he cond"rtion.. U51~ ocaJplltkln Of safety of 1tle Project site. Of .n~ part thereof .. Of' whic'h .rises from Contr.ctor". failure to cf.o anything rtquire<o1 under !hi.! Contr&et or ror doing-anything w""'Jch Contractor is requited not to do w'''der lhis Contract. 0( wl1ich ;arise.! from eOnOOct fOf' wflic:h any t.a ... imposes strfct IiabiIit)' on ~ in the performanea of Of' faiJoJre to perft)tl'n the terms and conW:tions of this Contract. \S)(cept .s mar .ri5e &om the sole willful' or negl'iijlenl .ct Of' omission of City or anv of itt City Council membIn.. officer3,. or tmPoyees. TIis ~ mil' extend to any Ind' aU claims,. demand's. 0( lieJ\l. made or filed Irt Rlason of ,oy wor\: poertarmed by Contr&etOf' unde.-'INs Contract &t any time cfurTng %he term of thiS Contr&et.. or arising 1heteaftef. 7. !m'rmtjpn of Bilk. Contractor agrees to lIofuntarilr assume any and all risk or lOss, damage. Of injury to ... pcper1:t of Cantrae1.a' wtic:tt may occur .... on. 01 about the PTol~ct sitB at any lime and in Iny manoer .. ~ adlloss.. ~. or damage .. mar be caused by .,.. .soTe willful' Of negligent &Ct C1' omi5Sion of City or any of its Cky Council members. officers, or Impl'oyees. 8, • _, Tho ~ of .... po",*" '" _'0 ... on ... " <he"'Qf, """. not __ .s 0 " ....... by City of itI .ights under this Contract. A waivlf by Citv of an ... breach of any part 0( provision of this Contract by Contractor wi not operate IS a w~· .. er Of continuing wa:'r8f' of any .subsequent bread! of me ..". 01" imy ether .Ptovtaion.. nor shalll Iny .custom Of' pr&ctjce w'hkfl may lrise bfiween the parties i'I the ~ of at'W" part or pfOvl.si'Of'l of tlli, Corttract be eonst:ued to waive or to lessen the right of City 10 hilt: upon Ihe performance of Contractor in .stria compr .. nce witJ\ the co,-,enants. terms .nd' eOfldition. of !his c.ntroet. 9_ ComgrI.lfGJl wjth I 'WI-ContreetO( shall comply with III L1ws now in force 0( w'hic'h may Mrufter be in forc. pertainir:g to '!he Prol&et and WOf'k .. rd 1ti. Contract. wilh the requirement of .loy bond 01" fire undef'Wfi'te.rt Of" otfIer simJl81 body now Of hereafter c:orlStituted, with anv discrationaty licer'\Sl or permit issued potJUant to Inv law of any public .~ or off'tC:TIIII u weD as with any proyi$ion of .11 recorded doc:uments Iffec:ting the Project site, insofar IS .ny It, required by reason of the ~se or occupancy of Ihe Proj6ct sb, end with 81 law.! pertsirWig to nondisc:rlmination and' affirmative action in emPo~nc and hazardoul mateflaTs.. CITY of ,ALO ALTO: Contr.act· 112194} Page I: cf '1 '-. ' . . , '. , .. -' CITY OF PALO ALTO CONTRACT 10. BmJdI. A:s. condftlon precer6sfll to City". obIigaticn to paY' cOl1'llMtf\S8~ to Contractor. and' 01\ ~ bator. 'Il\I Oatl of Execution. Contr .. c1or shell fumIstI to tN Project Manager the Bond's .. requi:;ed uncfM 1he _tion for a-6. 11~ Bog..., d 1I'1If'iqnt Ina w.nwi., ., 'IN suPPlY of any m8tadals and' eq..iipment and ~ ~.nd'eOng o.f labor ancr seMcU during .". c:outse and scope of hl'fojeet ancl Wort., Contntctor rlpresentl and warrants: a. Artt ~I. and' ar;r.Jipment which IhafI be "sad du~ the .eour.se and scope of the Pmj6Ct and WO<t. """I be"-"' Comrooto<: .... Ant material's ard equipment whid'I shal be I,lsed' 6uring tN c:our:te .nd seepe of the Protect: anc:J Work t1heI be ~ tnd fit to be used Jot the partic:uraf PurpClM to( wNc'h tfIe mite rial', are '*fJired; c. Ar:y labor' .-1d' Mt\'i"ees rendered ancJ mat.,; .... and' equipment used' or employed' during IN COt..Il'M It'd ICOpI of h ProIect ard W01k shd be free of defects n wO~J1.5hip for a period of one t,) ~ efter Ihe ~, of tNI NDtk:a of Suimantial' CornpJfJtion. cr. W no aJCh notice it: requiTed' to !>It fiTed. on the cfat.1hIt fir'" P'yment is rNld'e hereundat; d. Ant ~. warranty ~ by Contractor shall be obtarl'\ed Of shan be detarned' Obtained' by C_ f« .nd ., boNlf ~ CIty. e. Any fnfcwmatiOn lUbmitted by ContractOf priot to the award' of Contract. or thereafter. upon ~ W'he!tw or not IkJbrritted' un6er • continuing obRQI'6on by the terms-of Ihe Comrect to CIa .so, ill true _ncr COfTeet at 'the time IUCh inforTMtion fs ilJbrnitt~ Of' made oI".iTabfe 'IG N City: f. Comrac:tof-has r.ot colluded, conspired', or agreed'. direC11y Co' indirectly .. with jon-; person in regard to h terms and eon:frtions of Contractotl Bid.. 8.)(c:ept oil may be permittee! by the Invi\a1ion For Bid; .... Contrector he. 1he pow., and authority '10 entar Wrto this Contract with C'rty, 'IN1: 1tJe h:fMdual exeeutino 1tis ~ is ~ ~ UIo do 10 by Ippropriata resofuti01\. and 1f\at 'ltV .. Cont:ra<:l. slIaI be executed'. deIveted' and' perfOili.:l punua;1I to the 9Ow&I" oIncJ eU1tloriry com.rred' upon the person Of pet3ON; au1f\orinId It> bitd ContraC'lOl"< ... COn\JKtoc" has not made en .ttampt to exert undu. influence with 'lhe Puref\asi!'\Q Manage( or Project Mlir&agef Of '"1 ~'Cf'Ier pacson who flu directfy contributed' to C'rty'. d'ec:i~ to awlld' 'Ihe ~ntrac:t to Comrooto<: _ i. 1'Mre are no unresolved' claima: Q( d"~u betw&e11 Contractor and Cit; wtllcfl wcMd rnatftMlfy affect Contractor"'. abirrty to perform undor 1t.e CootrKt j. CotttrKtOl has, f\lmisfIed and wit furnish we and IC<:ur#t1t rtate~ recotd's~ ,.ports. res:otutions. ... tif' ..... ticn .. and'D1tlor written information I. mly be requested of Contr&c:tor by City from time '10 time c1uring !he term of tt-is Cont~ I:. ContrlCtor and' anr pel'3Or'l performing 'febor end services under thi' I'raject b duPy licensed' a, • contraCtOf" with the Stat. of c.rlfomi .. u required' fly Carlfomi. Bus'nfss a. Professions C* 5«tTon 702.8, U arnencfed; and CITY 01 PALO At TO: Contr,ct -II Zi94J Pag. 31 of '1 ;. o CITY OF PALO ALTO CONTRACT L ~ .... My...,-inod ..-.I __ cod.no Project "t •• nd "". M knowTodgo of ",. "" .... <01 C01Idmons of "'" Pro/oct ohe. '2. 6';' .i' ThiI Contract and the performance requirttd hefeunde£ l$ p&fSOn.t to Contractor. and it ...... not be assigned' by ContrKtor. Any att.mpllod' assignment wit be null lind void. 13. Oaim! gI Cpnnwjtq. AI dIlms ~ tr:I GXtrI: work.. edd"Jtjonaf eh.arges. or delol}',s witNn the CorrtAct TirrM Of other <isput .. ariling out of 'IN Contract INII be submitted by Contnctor to C~ in ",7itingo 'by eert:ifi4d or :-egisteted' mal ~ tan 11 01 Dey. after the claim arose Of within sue" other time as may be ,PetmittK 01' rtqJited' by raw •• ncr shall be descnbedl in suffICient detail to gfve ~ no~iI of the tubWInce of IfMI dIIim tD Crt)'. 14. "'!laitt "" pry, During the term of tnt. Contr2ct aruJ rOf"" period of nolieA than thrN (3l ~ellrl after tfle expiration or ear1itw termination r:1f this Cont'l'lact,. City wi ~ye 1he rJght to &oort ~. Proj"ec:t-feiated' aM Wm-re1.tBd wrffin{js w bvsiness rec<lrd's. .s sue" terms aN I1efined W1 C.rdllmifi EvidlSl'lCe Co6e Soc1i"oru: 250 .nd' 1271, Ii' amended. during t'f)e regut., business hourI of Contr&Cf:or~ Of .. • ContraetM Ms NJ such hours. during the ttlguT., busineS$ hour'! of C'1ty. 1 S. ~ AI aQll"Hlnents, appointment&, ewovals. ILrtholizetions, claims. demar.ds.. Change Orders. ~ ~ no1ic:es" offers., requests ltd stJItemEnts givt!n by either party to the other shal b4I i1 writing V!d wi be .Il.Ifflc!enrfy given and' .served' ~j)On the et'Ctler party if (' l pet'SOllIIfIr served, (2j :sent f:Iy N Uni\ed' Str..as mal. postage ptepa"id'. i~ sent by pcivatlt .~.,ss d,rlVer; service, or l4J ... 1M Ci'!:a of • fIIcsi,,",,-transmission. jf sent to the tef9phone FAX nr..;mber .set forth beJcw during reguTIt busil'\ess hoI.n ~ tf1e receiving partr and' foIowed' withirl two (21 Days by derlV8fY of • flarcf copy of th6 matetbr sent by fK&m1e 1JanSrT'is::sio in IC:COrdanc. with t 1). i21 Of (.31 lOove. Personal'.setVice shan incluIfe, wrthout limitation. service by 6e1ively .nd' se.."Vie, by fec:sirT\!l. transmission. To City. City of Palo Alto City Clerk 250 Hamilton AverllJe P.O. Sox 10250 Palo Alto. CA 94303 Copy to; City of Palo Alto Planning &. Community Enviro.-.ment Department 250 Hamilton Aver.ue P.O. So,. 10250 Palo Alto. CA 94303 An." Marvi~ Overway. Project Manager (415) 329-2578 . FAX; (415) 329-2299. CfTY of PALO AlTO: Contract· "2.194) Peg." of 1 . i· · . CITY OF PALO ALTO CONTRACT To CootrBCtor. B & 8 Cilos;rf:te Coostpx;jtoo CQmn.aOY lac 211 Ryland Avenue San ,fs>$8 CA 951 JO UQ8J 279·2277 FAX! (40S) 219-22U ATTN! __ ~8pb~~e~rt~A~~Bq~tubum~aur~t ____ ___ 1 e. Apqpgrirtiqn pf Qty FJnk T1"iI Contr.oct i:s ~ to "'" fiscal' pr~vlsiont of Article m. Section 12 or 'ChI Charta-of foe Oty of Palo Alto • .Mr ~s hereunder fot' labor, services" meteliars and' equipment may KCIUI or#Ij .rtIt aJCh sxpendi:uru have been ilpproved n r.dvtInce in writing in accordance w:th awr~abl. taws. Ttis ContraIct INI t:erminata without penePty (i1 et 1he end or .loy r.~ year r. tht 'Ylnt th.t fund. Me not appropriated fof the following fi'SCet VII ..... Of" tii! at Iny time within .. fiscal YIII'"in the e'/el1t that fundi are 'Cnty appropri.,ted b • portion of 'IfIe fi5CaI YMI' Ind' funds for this Contr1lct Ire no longer avaiJ.Itie. This Set;tion ,e-shall control in the everot of .. conflict .... ith aMy ot1ler provision of this Contract. ... Sehe Disclainw'. The .Pame.s undfIrrtand lind' agree tNt City does oot 9UfPOrt to be Contractor .... -. on.! City ... _ not _ for II1V "" __ "'",. ""...,nor property of C''''''aotcw. ,.. ConMnt ¥.1'enever in. this Contract the Ippt'ovaf or consent of .. party is feq.Jirecf. such approval' Of e.on.tent shaI be in writinsJ .,-d' wi be pecu:8I! by • person having !he elq'X'Us IkIthority to oranl sucf't 1Ij)p'0\I.r or ~1\IeI'1t. e. ControIliI'g t.aw~ The parties ItgrH Wt this Contract aha! be governed and c~ by end in ICCOfIIance with the taw.! of 1he Sute of Cartforri.a. 6. Definitions. The definitions and Urms set forth in Section. 1 of the Staooard Of.wings and Specffic:1'5Gns {' 99l! of this Contract '1'1 incOfPOtllted herein bv reference, e. ForC41 MIjeura. Neither party wil be dHmed Ia be in cJofault on KCoonl of olAV 4eIay CIt faiSuTe tg perform iU obI""tglltions under thiJ. Contnct ~ cfirec1ly re3Uh:. from ~ Act of God gr In act (;If. ILlperiaJ gQ'ViImmentJl .. uthorTry. f. ~ 'The 1*8178"" headings ... not • part of lfis Contract 81111 .shall ,""ve no effect upon Ihe eont'tr\K:tion CIt int~on of an., part of tN, CQntra~ I· 1nc000000oon of DocYments. AI documents constit-.. ting the Contract 600Jments dlt.5CnDed in Section 3 ~r6Ot aM all cJoc:umenu whit" may, from time 10 time .. be referred' to in any dl.dy executed' ameo6ment heret!) 01111 by sue'h toference incotpotatBd' in this Contract end' nil be cSeemod to be part of this Controct. CITY of PAI.C) At TO: <:0_. 112/94J Pagel of., ;~-. i~:. CITY OF PALO ALTO CONTRACT h. hteOIetXJr .. TN, ContrICt and any lme-nd'mentl hereto bt-tw ... n h .,.r!iu ~DnStjrut. the entire agreement t.tw.en "'-,plAties c:onclrning CW Project .ncr WOIk. and ther .. lirt no other ¢Of 0fJI 01 written .greemants between "... ~roas ~ .,e f'lOt incorpora1i&d in "'il CofltucL i Mod'lficl"tion 0# A~eement. This COr'ltf~ Ih8:I1 not be modified Of' te binding Uj)On the patties. uniess sue" modificlli"" it 8liJfeod to in writing and signad by L-"" paroes. J. ~ /4nv egreemen&. ~ condition. dwse. qualffieatio.!"\. reat(ic.tiof1" ~ticv.t. teml, Of other Itipufa1ion ." the Contr~ $hoi. crerlt\l or otherwise eonb'ol. nmbri.Sf\ 01 Gmit 'ChI ~ """""" Of........., '" 10 be ___ of 0< ""rm;tlod by ._ porty. AI p'o~ whet:f'lef co-..enantl Of cond'rtiana. INI be !fecITled' 'lD 'be bom covenants and' oond'ltions. k. Severability •• I court of c~tent jurisd+ctiOC'l finds or fUr .. thet ~ plovision or this Contract it vdc:f 01 unenf0tCe8bie~ She proYi.Pens of 1fks Contr..c1 001: 50 affected nil rel'Nin in fuI 'Olea and' effect.. L St81us of Con1rac1or. 1n 1h& exercise ~ rights .. nd obligations under tn. Conb act. Contractor acu a. an inc1epandent (:Qntrac'lOf 'tl" not as In .~nt or empTovee of City. Comtactot wI not be entitled UI any rightj and benefits accOf6ed Dr fCC,y:ing 10 the City Council membef$~ officers or emp1oyee5 cf City, IIt"Jd COf1t:r'8c1of" 8.lqnsslY waii'<l8S any and III crain'ls to suefl fiQfrts '00 benefits. m. $uc:CessorI .nd Asdgns. The provisions or Ihi.s COlIttact shall inur .. to 1he benefit of, and' hit IIppry to ,ncr bfnct 1he IUCC8.$$Of'S ."'011 luigns of &he P61ti ••. 'A. T1me of the &sente. rll'l'l8 is Df the .$:SInce of lhi.s Cootract and each of its ptovilions. '" the caJcuT .. tion of ti~ hefeuncJet. tf'Ie time .,. w*h en act is to be performed' wn be computed tlV ~ng 1he first Oay .nd "Wing the list. If the '6me in whic'h an act is to be performed fans on a Saturd'ay~ Suncr.y, Of any DillY obser\Ied IS. ~ horJday by City, 'IJN! time fO( petfOf"['(l.llOCe 'II\d be extendad to tNt fo8owtng 80'Sina" Oev- e. Venue. ... the event Nt: IUft iJ brought by e'fthet party tlereund' .... the partin Igree Ihitt: triaT of ad! IIC1ion IhII be wsted'...,.. ~ in 'Ihe stttlI courts Df C.rJfomia in the County of Santi Clal"ll in the City of s.,..Jose Of in the tJoited' Stcttes District CCl't.lrt for 1fle Northern [);.strk1: 01 c.rrfomr • ., 1I1e C-"Y of San Jose. p. ~ 01 eosta. The,prevlliling pa~ in at'IV ~ brought tel .morce the terms of this ContrICt or arfsj'ng out of chis Contract aNy reco~ its reasonable coSU. inc'fud'ino reasonable attorney's fees, incutrecf 01 e.pended in connection with IIUCh ~on 19ainst the non-prevlllirmg party_ crrv 0' PAlO ALTO: Contract ~ (12194) 1'0;. e of 7 f .-, -~ CITY OF PALO ALTO CONTRACT .. 'f\I1TNESS WHEREOF4 IN panSe.t 1\ave e)(8CUted ltis Contract on thlt d'ate ("list .bove ltated in Palo Afto. CaIiforrio. ATTE$T, arv 01' PAlO ALTO. CAUFOAMA By.~------------------------M'i!I'{Of Cor.1'RACTOR; -, __________ __ B~ _________________________ __ NI~: ______________________________ __ rotl," _______ , _______ _ Oiteetot of Planning .. Community Enw-onment T...,." .. 1.0. No, ____________________ _ DirK10r of Ad'miristrati ...... e Servic&-I Risk Manager 01 Maneger of ContrKt: Acfministnlllon APPROVfO "S TO FORM: C8fTIAC,I, T'E OF ACKNOWLBIOMENT CMlC«f,111S91 iSTATf Df, ____________ _ .cOUNTY'Df, ____________ , 0tI • btIr_ me.. • • Mta"y pubk .. ond' fat ....., County. P~ ...... .c P'lrto!\llly 'bIoWIi ltD lOll I« JlrvvaoJ to _ 011 Ifw bail of NtirillCtMy ..-AIf.1'lC*iJ III· btl h pe:aonW ... hoq 1WIfI'!e4.:J iI'.,. ~ til Che Mttin r..trwn. ..... • Ill"4 Kinowf.cfg!Od 'ID !nil dW: helllhlltMy IIQCMed «hi IoIme ill ......... 1!hW~ ~ err41t..r1:Py"""MW ~ DII 1fw"llWtrumm'o:l: IfII ptlPHfII-t. Of 1hI Mtity '4'0'1 befWII'I ~ whidl Ifw ~ .at-r. P-..tld 'IN irwtNr'nent. WTTNfSS my PIc1CI and o~ N4. END OF SECTION crry 1M PAlO ALTO:: Contraa· (12:I9.cj Plge' 0' J "-'" , -, .:'"'''. .. , ," , \, 1.~ .,.,', • /'., / r/ " : 'f' Typlcallnick • pies MJI4 1_ .. aIb CI-<Oery "HaJuImade" JItId( iJl SWIdard M04.u. Sla C3-!W' I). )( • 'loV," H. )( '·W J.) with ~ typ. ill_joint. vr _ for 16" X 16" traffk lip centered iJl flat face of br.ldt DIet. , Pace 01 CUtb ,. ~---..... {-' " "Water table" type brick until al bue of wNl---I-.... & I AII.male pier IIgn 1lI)'01ll: 16" X 16" trat& lip w/"'II" x 16" pl'flCUt *-' _lip panel below. • ,.----r-t ~ low wNl copI.ng 3" H. X 14" I). ® I Solar ItrlgaUon co_lIer (lop +24" above fin. grade, 20'-above .. .all) TopOlp~t~da1 cap 0110 .. wall CPhaIt CD I 22' ... "'''''' OWn"" t (11 COllt8el of bddc) ~ 'S u ~ I"l Bryant I Addison Traffic Circle .. Elevation ~ " ... Scale 11411 = 1'-011 March 23, 1995 " .:., , y :.' .,' ,,", ;'1 " ,0'; ..,.. ) , '; '. ,! , " ;';" I.' '" 'I ,', \. (, ' , " '/, , ' '" • • I , . ",,4 "'-;. " - \ \ "\ , , " , ,) , " ;",'1 1 " , , SoIu ......... _, U' H.. 6" I). I .... .. 12" ..... ...,...... p ........ oIlp "'_ of 1' ... . SpooWc p~ .......... J'U floW ~ of ,apply pI' _ ..... walor""" -.. ... 1>0_ ... 19' ______ ..... , 'II1II1 -." __ flellx ~', 50JI BnacbIa&" 0!a&JI0h loy!. l'\oaI.,......4I l" tI. cmlllaa\pJat stI<l<'..;..----7-;7c.,/~\ IbdoIfDg wat.. ......... 100 _ ...... ·.lovoJloft~ c of IIryonI St. b __ '" i .; .§ il t: 'lI !Il ,-W. :r r L. .. '1AI'~ tb1ck btldo,._ \~ lldekp ___ _ .. low waD. (!ondauou. arou4 dNIo (provido 2~ 010,. • .,.y irOib wall towoVdl tutb) \)\ ., Top of wall (lop oI"pl"II , • +17...,'" x..; Baddlow ,......101' ...... U- tI.. '10" r.. ....... U" dur bohlDd pier ..... oIJ3a wlcoator of plot. Spod/l< plot -1''' now __ of ,apply pIp... I t---4t0l Ad_a Ave. ... _ ...... , -tf6'.u. ct.ofdrde ,-ot(,nu.) .",.,,-. -__ .I _ , - I Typ.,--..,.. w-.. ooII<Il, 3" K.. W W. Wltfp,1·-..... 'JS1'. _ !ow woO 100'" '-~ lid... 0. __ oI_plw _1daIood lIIIO) r-t----Top of walle ,Ide _ AI _plu~ '1«1 .... ---2"'.01 ,_ (oN oopu. ..... wall lOIIW .' '-".........w , ... .., It,''>, 22'" 0.. X:w' w ... ~W' If. ~ (abowa "I_ 11M, doahod lIM ___ 1' .......... ) .~ ... :. Ml '_II 01_ """'" _ wall 01 _ 01_ ... 100 ___ ..... 1aIdo ~ -......;:::;::;",,,-041 .. P ......... wall, III Mft _ Nkho .... woO ... _m~;"\ .... ~M.H._ •• ~o mill. ole ... 011 ,Wn of M.H. """' "--SttoJpl..-. "Pln& .top ......... Iow ... 011-" '_I<OI'ID& caotlnp ...... Ibdo ...... __ M.H. ...... .. to be ra.l.atd to ...... ,l,v,don w. ""'" ___ ",old, bloduol .. required I« ...... tend .......... Bryant I Addison Traffic Circle ... Plan Scale ])4" = 1'-0" March 23, 1995 , " ',<' "',' "" " , .' ~;i ' , ,.,',.1 .. .1..<' '"' ,"lit, i , '.' " . '".' ',,'." ,; II;.... ,_', '" ,''.' . , ., . "",'1 '''',' ,'''''' " 'I. " ~,. "~,, ..... , , " , 'i_' , ',. \ .,' , \:, '. • I , , " . ·, .. .' /(' , " " ~ ,,," ;;', '>: Bid Jtem I I TraffIC Circle lsland ~ Bryant Addison (Bid No. 1m4) .m StiMMAR¥ SHEET Bid II"" Deocri~ lJnit ~.Il.um.l. ll&BCo.- C~Co .• ll>o, Ttallio Circle loltul(! LS $42,800 S62.m Buo Bid Total $42,81)(1 ~m L-, ----~-- Add AIt .... n.l .. J., Mli-j!r.lI'l\i op»l'<)a\iOlll LS ~,OOO SI,<IOO II>. St_~S\gn& LS S2,OOO $I,m Sue Bid .. Add Altel'llJll .. Total S46,SOO $64,800 -COliinw C~liw. m,m S6S.51)(1 .--~-----.-.-.- $1,<100 $4,000 m,$OO • • ® Q ~ > ('l $l ~ "'l .... \,--',:,' 'k .. ~, " ,",' ., ./~, '\ " f , , .' >" j '. , • ,j .. -' ~ '. ATI ACUMF.NT 5 JEIGHBORHOOD fREFERENCES REGARDI~Q ~IS~ITlO. or S~YAKT/ADCtSOM TEMPO~t TRAFFIC CIRCLE JlTJK9EJt OF ;R:E:SPONSES BY PUC! or JU:S lOEHeI Oil BtlS!iNESS ;ounn-m:E Oownteva. Prote .... E:ml;l6.t:-TOTAL ALL (Foe-•• t to .ooiUe .. c:.cS:ero to ..,..AS Lytt.OQ} SOut~ of Churchill For.lt. >. \"he tlmlpot"ary c ii'c1e .bO':lld. ~ m&d.·perm.n.n~4 20 112 ,. 150 (es .. 2. The lem~arf circle .ho~14 be r~Qved .n~ replaced ~tb • pe~nt clo.~re on Bryant ia it., fon>er locatioD Dear the Prqent Cart Center. • ,. , 2. llUl •• The temporar, ~ircl •• ~ould be' rettOved. l_ it. p!ace .. tbe follo~Dg mea.sure. ~r a.C"t.ione ebould be ltJtple:aented: .. Do tI~lli."9'_ • 14 1 19 tnl b. Add atop • .i.9ne DO Bryant at Addilon 2 l? 0 u (S') c. In.tall road bumps. 1 5 0 • (3') d. Better .fOlic. aufore_nt. -of tr.ff(c 0 • 0 l lit) laws . e. • i.cellaneou~ other C 1 0 3 la) ide •• ~~ n~ lure. '0 preference or response oot "l.e.ra • 1 1 • 0'1 TOTAL RESPONDS~TS l5 113 .. 231 "~ :---