S()BJECT: Approval of Draft Scope of ",0 rli. ror Citywide ScbGOl
Commllte Safety Study -Referral to Committee
REOUEST
Since the C'JIISIL1tan! cootrac! for Phase I of the School C«nmute Safely Study ~Jl exceed
$25,000, the City's procedures for selection cf a professional consultanl require that a
report be placed on the consent calendar transmitting the Request for Proposals and
recommending referral to a Council standing committee.
RECOMMENDATIONS
Staff recommends !hat Council refer the attached scope of work for the request for
proposals fOe the Citywide School Commute Safety Study to the Policy and Services
Commil!ee for their review and comment.
C-Ollncil may also consider the follo"ing optional courses of action: (a) rererral to the
Fmance Committee, (b) rellnl to the full Council for approval of the RFP scope of work,
or (e ) express 00 interest in re-'ewing the scope of work
POLICY IMPLICATIONS
The recommendation oflhis report is coosis!ent with Comprehensive Plan Transportation
Program 31; "Make improvements in pedestrian and bicycle safety to make it easier for
students to gel to school as travel patterns changes becanse of school closures."
EXECUflVE SUMMARY
On March 6, 1995, the City Council authorized staff to proceed with a two-phase
comprehensive Citywide School Commute Safety study and approved a Budget
Amendment Ordinance ofS4S,OOO for Phase I of the study, which will address school
C~2S809S J'a&e I DO
o
commute traffic issues in the northern area of Palo Alto, After Phase I is completed.
Council ",ill decide ",hether O£ not 10 proceed with Phase 2. If C<>UIICil decides 10
~"ith Phase 2, and subject 10 the City's satisfaction ,,~th the qualityof",ork and
cootinued suitability of the selected finn. the consultant selected lOc Phase I may be
il:vited to negotiate for Phase 2. Subsequently, a final contract for Phase 2, and
appropriate Budge! Amendment Ordinance wO'.!ld be forwarded 10 the City Council for
approval
AItacbed is the <bit scope of work to be il:cluded in the Request for Proposals to select
a rocsuItmt fer the Citywide Schoo! Commute Safety Study. The detalled scope of work
for Phase I has been divided into four traditional major Tasks: (1) Identification of
Issues. (2) Field Data Collection and Analysis, (3) Evaluation of Ahernative Solutions
and (4) Development of Recomlller.dations/F~"al Report. llowever, the woc!.: program
as OUTlined in the RFP will require the COllSIlltant 10 use a multi -disciplinary study
approach. integrating expertise in traditional traffic engineering and transportation
planning, bicycle and pedestrian facilities design, traffic safety education curriculum and
program planning, CC<IlIl1nte altemative<ransportation demand managelMDI, and
neigbborbood Iraflic management'traffic ca!mfug The tasks ror Phase 2 of the study bave
purposely been left less defined, pending completion of Phase I.
The Scope ofWorIc: has been reviewed by the CitylScbool Traffic Safety Committee a'ld
PAUSD Administration staf( and their comments iI:coq>oraled into this draft. If the
Scope of Services is approved by the Policy and Sen.~s Committee, staffwill proceed
with the Request for Proposals, evallllltion of the respondents, selection of a consultant
and negoliation of a con!ract The final agreement with the consultant WIll come befO£e
the full CouncillOc review and approval..
FISCAL IMPACT
By Council Action on Marclt 6, 1995, funding in the amount of $45,000 has beeD
provided in the FY 1994-95 Transportation Di,ision operating budget for Phase I of the
study.
ENVIRONMENTAL ASSESSMFJljT
AwrowI or a draft scope of work 10 retain a consultant is not considered a project m><ler
the California Enviromncntal Quality Act; therefore, DO environmental assessment is
required.
' . ..
. -,
;
\
,
AlTACHMENTS
I. Draft Scope of Wed:
Prepared By: Gayle Likens, Senior Planner
~HeadR~ ~rfst:/m£«i4r
D\re(;1Or of Planning
and Community Enwomnenl
L~
(:(;: City&bool Traffic Satety Committee
James Brown, Superintendent PAUSD
PTA PRsidefllS and Traffic· Safely Representatives
Palo Alto Bicycle Advisory Committee
'-.
..... 1.0
Cil} ... ide School Commute Safety Study
DRAFI Scope of Work
I.' GE.l'aRAL INFORMAnON
. -"
The City of Palo Alto Planning and Community Environment Department, TraIiSpO<Ution
Divisioo. is requestiDg proposals from quaIified ronsulting !inns 10 conduct I
ComprehensM Citywide Study of school commute corridors and commute safety for
students II1lveling 10 and from sc1l001s in Palo • .tJto and within the attendance area of the
Palo Alto Unified School Disbict The j.wpose of the study is to identify traffic safety
issues and concerns related 10 the safety of students !nveling 10 and from school and 10
develop recommendations 10 improve pedestrian, bicycle and vehicle safety. reduce
woflicts and accident potential, and traffic congestion along school commute routes.
These recommendations might include physical improvements on the public streets and
school properties, traffic sar"ty education programs, community aware"" •• programs.
enforc<mlCllt policies and any other programs or initiatives thai would increase the safety
and enviromnent for students commuting to school. The selected consultant or consultant
team sbould have, at minimum, expertise and experience in the fields of rransportation
~neering and planning. bicycle facility planning and design. pedestrian DlOeds and
circulalion, traffic safely education clllriculum and program planning. commute
a1ternalivesllransportation demand management and neighbOOlood traffic management
and traffic calming.
The study will be conducted in two Phases. The first ph"'" will focus on schools in the
.nocth part of Ibe City of Pal<> Alto and .djacenl Stanford University lands (nnincorporaled
Santi aara County). including five elemenwy schools, """ middle school and one high
school. The secood Phase would address traffic safety issues in the south area of Pal<>
Alto not heretofore eddr>!ssed by recent studies, and would include six clemenwy
schools, one middle school and ODe bigh school. The City Council has appropriated
fimdins ooIy for Phase r al this Ii=. Therefore. initially the City will contract for Phase
I, but the consultant >election process will evaluate the consultant'. ability 10 provide
services for the full study. If the City Council decides 10 proceed with Phase n. and
subject 10 the discretioo of the City', Project Monager "'garding the quality of wOO: &lid
suitability of the >e~d firm, the ~onsulta.'lt selected for Phase I may be invited 10
negotiate for & fee 10 perform the service. i.."lCluded in Ph"", IT.
DRAFT Scope oCWorl
1tme 7,1995
·-. . -. '.
"
'" ~\-: :---~ .
, ',,'
~':" -,. -
.' . " ~~~'fi2c~;;:~;:.:C :-,~< ..
o
Background
As a result of. COItIpIell set of factors including a series of school closures that resulted
in larger ..,hooI attendance areas, growing proportion of students woo attend scbools
within \he district odltt than !heir neigbborhood school, f"..du<:tioru in school !>using and
public Ir8lISit service .. in.:reased emphasis on driving students 10 school. pareD Ial
concerns about student safely and security, eIc., increasingly congested traffic conditions
exist during iIle periods inunediately before and aft...,. Ibe school hours which could
jeopardize !he safely of students traveling 10 and from school. C.onseqoently,:n recent
years, the City of Palo Al10 and Palo AM Unified School District have devoted increased
feSO=es and attention to improv'.ng the safety environment fot students in and around
school campuses and a1""8 school commute routes. The .. concerns have been identified
in the draft policies and programs for the updA!e of the Palo Alto Comprehenshe Plan,
including: (1) reduce dependence on single ocwpanl ""hicle .. (2) maintain or improve
!hi safery of streets and intersections fo.-pedestrians. bicycks and motor veruc 10 .. ODd (3)
continue 10 make safety the firsl priority of cil)"Wide tran.<jlO<tati<>n planning.
In 1991. the City Council authorized. focused study of the two primary commute
c:orricIors from the Barron Pall< neigbborhood I<> I. L Stanford Middle School
C'MeadoWICharle!llOD School Commute C<Krido< StOOy~). n,., study was completed in
Maret. 1993 and Council directed staff 10 pursue. ra.'l8e of improvements in.:luding •
new Iraff", signal at the Stanford Middle School driveway, signal timing and pha5ing
improvements at several intersections along State Route 82 (EI Camino Real), bike route
and pedestrian facilily improvements, additional adult crossing guMd installations, and
feasibility!l\Udy ofpedestriar>lbicycle grBde separations lillie railroad crossings.
Since the complefiQn of the Meadow!Charleston study, the City has conducted • localized
study of access to Gunn High School along Arastradero Road. This was a precurso.-10 •
fmther study of parking and on-site circulation "" the school campus by 111<: Palo Alto
Unified School District. Improvements implemented in response 10 these two studies
included signal timing changes al the Arastnodero Road/GUIlD Higb traffic signal and
redesign oflhe vehicle and bus drop off and parl<ing areas and IIIe bicycle circulation on
the campus.
In 1994, the PAUSD also conducted. rollsllllan! study of on-site pedestrian, bicycle and
vehicle circulation and parl<ing improvements fil four odltt schools, resulting in
improvem.Cilts that have been implemented to reduce pedestrian, bicycle and vehick
cooflicts on campus.
Lastly. during the past year, the Traffic Task Force. an ad hoc committee of the
CilylSchool Traffic Safely Conuniltee. cooducled a !I\Udy of school commute choices at
-, ~ -. L. >-,
,
•
·" ,-
~ '0F
PAUSD scbools, to provide baseline information 011 commute mode choi",s and to
identify tooIlIIute aItematives and ways 10 rew.e commute coogestion in and around
school m.:s.
,
.-,'
The City Coonci}'s mlen~ m approving the current study for whicll. this RFP is being
issued, is 10 address school commute issues and corridors that ha>e DOl herelofa<e
re<:eived focused attention, but 10 do so utilizing a comprehensive. systems approaclL It
is anlicipated that this sI\.>dy .",;n address issues and COllcerns commoo to IOOre than. one
school an.:ndance area, such as the overlap of e1emenlary school commute rootes wid! the
middle and high scbools, identify recommendations IIw can be applied 10 more than one
school CO<ridor 0< situation, or citywide. Tb.<: mien! is that this stud:! will build upon, but
DOl dup&ale the wcd of the preceding studies.
2.0 SCOPE OF WORK
Sc6pe of Strvkes -PHASE I
The Scope of Services fur ~ I will include the foHowing four major tasks:
TeA I: Identification of Issues
Task 2 Field Data CoIIecion and Analysis
Task 3 Evaluation of Altema.tivc Solutioos
TeA 4 Development ofR:wmmendationslReport
EadI of the major tasks will culminate in the development of I te<:hnicaI w<J<lW\g paper
for review by the City and the Study Advisory C<mmtittee (SAC). Tb.<: SAC .",;n coosist
of representotives from City stdi" P Al.;SD administration, and PT A representatives from
the participating schools and I liaison from the City'. bicycle advisory committee. The
consultant will be expected 10 meet v.itb the SAC to discuss the progress of the study and
eacll. woRing paperftecbnlcal report in each majo< phase of the s."Udy. Each of the tasks
and sub-tasks is discussed in more detail in the fonov.-ing scctioos.
Study Area
Tb.<: study area for Phase I encompasses the area of the city nonh of, and including, Page
Mill Road and Oregoo Expressway. This area includes the attendance areas of sevell
Palo Alto Unified School District (P AUSD) schools:
Addison EIewenlary School
Duvenecli: Elemenlary School
Walter IUys Elementary School
DRAFT Scope of Wool<
""'" " 1993
650 Addison Avenue, Palo Alto 9430)
705 Alesi", A venue, Pal" Alto 9430 I
) 525 Embarcadero Rood, Palo Alto 9430 I
,age 3
.... -.' .: -;;--.
•
, ---
'~ '.;'.
Escondido F.lement!l<)' School
Lucille N'lllon Elemenlllry ScbooI
Jordan Middle School
Palo .... !to High School
. . ;
'<
o
890 Escondido Avenue, Stanford 94305
1711 Stanfcrd A venue, Stanfo<d 94305
i.so N. Calif<Jrnia Avenue, ,Palo Alt" 94301
.so Embarcadero Road, Palo l\lto 94301
Sinu 1he attendance areas of the middle and rug)! school extend approximately Y, mile
.outh of Page MillIOregoo, it may be necessary 10 expand the study area 10 address
specific traffic safety and scbool commute issnes identified by the middle and bigh
schools in !his area during the Phase I study.
TASK I Identification oflssnes
This is a aitkal stage of the project which must be completed wi!hir. the last two weeks
of September and first week of Oclober 1995, i!I order for the consultant 10 identilY
needed resources foc, and conduct data coDeclioo and field obseIvations during the moo:h
of October, prior 10 the onse: of inclement weather and standard tiroe.
1.1 The representatives of the consultant team will meet with representatives of each
school within the study area 10 inform them of the study prace" and solicit input on
their specifie eoo<:erns and ""boo! commute issu< S, existing safety eduation
programs and .eIi vities in place at the school, and their expectations relative 10 the
study cu!put. The meeting should include, 115 • minimum, the Sebool. principal, PTA
president and traffic safety representatives, but could be • larger forum open 10 aD
parents, at the diS<re1ioo of the scbool administrator. City staff will assist in
azranging the time and place of1hese meetings, in order 10 expedite ~process of
infonna6on gathering, given the tight time line for Task I.
City staffbas solicited preliminary input from the schools regarding the issnes they
have identified to date. Attachment __ contains the C<XTespondence received from
some, but not aD of the schools. Since receipt of a.e.e klters, some of the issnes
have beeR resolved thr()ugh the recent studies undertaken by the City and PAUSD as
indicated in the Bacl.:ground section of this Request for Proposals. The consultant
should expect thai the schools, which previonsly submitted. Ii>! of isones, will need
to npdate their coocems, and those schools which declined 10 identify Coocerns
pre-.iousIy, will come forward will! issues 10 be studied.
1.2. The consultant will meet with PAUSD Administration officials 10 r""lew and
m..:11SS Districl pclicies relaled 10 school commute safety and 10 soocit mput "" the
district-wide perspective on issnes 10 be addressed through the study.
DRAFT S<opc ol Wock
June 7.1995
",,' ---,-"------,-----,----'. .
Pagc4
"') .
,
"
1.3 Consultant wil1 meet with the ?oIice Department, Fire Department and
T!BflSP'ldation Division 10 discuss and review City poI~s and programs related 10
pedestriImIbicycle safety and education, bikeway planning. police enforc~menl, and
1nffi<: management.
1.4 ConsuI!ant will summarize and define issue. idenlifu:d in Tasks 1.1 through 1.3, in •
woctiDg paper, and finalize • detailed wed pcogtam for the study.
I.S. ConsuI!ant wil1 meet with the Study Advisol)' Coounilte. to review p<OpOSed work
program.
TASK 2 Field Data Collection and Analysis
2.1. Accidents· The consultant will review and evaluate reponed accidents records
(pedestrian. bicycle and vehicular) and sonrcc documents 03 file with the Police
Department for the period from July I, 1992 to June 30, 1995.
2.2 FlCld DatafAnalysis: The consulraot will be expected 10 conduct field observations
and rollect traffic dara necessary to adequately .,· .. lUll!. the issues identified in the
final work program. II is expected that the Iypicai iypcs of data to be wIlected at
~Iected Iocati<>. ... woold include:
.. PedesIrian and bicycle counts
b. Vcblcular traffic counts including 24 hour ADT and morning and afternoon
I11minB movement counts
c. Speed surveys
d. On and otr-site parlting surveyYutilization analyru
., Pedestrian 8JIP studies and conflict analyses fo< selected locations
~ consultant will inYestigate and observe field conditions within the study area,
includ'mg but ,,"'limited to bicycle, pedestrian and vehicular behavior patterns,
VlOhicular violations, Inffic signal operations, roadway fe.ture .. patlring ingress and
egress pattems at school driveways, behaWlr of school safely patrols, adults
aossing guards, appropriateness of school zone speed limits, and effectiveness of
existin& traffic control devices, ele.
~ consultant', final work pcogtam will identify the exact tasks to be
accomplished.
I'age 5
o
2.3 Invent!!!)" fuistingSafety E4ucatioo!Community Outroa<:h PrO!!lJ,,'IlS. Based on
review of written materials. and interviews with City and School District staff.
ccnsollmlt will develop a wIleD SUI!lIlW)' of Ifu: existing bike/pedestrian/school.
commute safety curricula, education and enforcement pcograms, public: outreach
and community awareness efforts
2.4 Eya!uatjop of Existiruz Safety EducatiorllOutreach Programs. Consultant WIlI
"""'pare wrren! City/District pcograms with other known (standard or UIrique),
successful and effecli,~ school safety and community outreacll pcograms.
Consultant will identify and ckscn1>e CilylDistrict pco~ and identify
opportunities for improvement,
2.5 Systems VIeW of Stu4y Arel-The CQOsultant will develop. baseline symms
overview (mapping) of the physical area and issues being studied. Typically, this
mig&! show not only the physkal routes followed 10 and from each school. the
overlapping commute routes among the schools. an identification of pcedominao!
issues identified with physicallocalions, or, if behavioral 0< social, identified with
the schools.
2.6 The consultant will summ.nu findings and CODClusions in a wodcing paper and
present repor1lo the S . .\C.
City staff believes that approximately 35Y<r40"1o of the project budget will be required for
TASK 2.
TASK 3: Evalua60n ofAltemative Solutions
3.1 The consultant .... iIl identify and evWJm the effectiveness and feast1>i1ity of
poIenIiaI alternative solulion.s 10 Ifu: issues and pcoblems identified in rasks I and 2.
The consultant will consider short, medium and long term solutions, as appcopriate.
Short term impcovemenls are those tba! cooId be implemented with existing
resourCe., while mid-to-Iong range actions are those that would require funding in
future years througlo capiral improvement pcograrn (;JDding, grant acquisitions,
interngency agreentents, elc.
The .. oItemalives sIwuId encompass actions that cooId be implemented by the City
(signingfstriping changes, roadway improvement, intersection geometry changes,
IRfli<: managementTcalming features and stntegies, adult crossing protection, signal
impcovements, bikeway impcovements, oc by the School District (CD-sire
improvements, student eransportation policies, commute alternative programs tIC.)'
()[ jointly. including reco=ded elements of the Safety Education/Community
Awareness straregies discussed under Task 3.
DRAFT 5cq>e of Work
June 1, L995
-.---~---~.----.------.---..
•
Page'
',r.
3.2 The eansultant will prepare conceptuall'lans for any proposed physical
improvements.
3.3 Dcyelop Comprehensive Safely Education/Community Awareness Stnotell3':.
The Consultant shall recommend a comprehensive, integrated plan for educating and
inlonning students, parents and the community allarse regarding school commute
safety. The sttBtegie' .bonld include, but DOC be limited m, in-class bile/pedestrian
education program .. scbool-based ccmmute alternative programs. driver awareness
and public awareness campaigns, eII:. Ccnsultanl shaD identify spe.,-ifi;; SlnItegies
and meIhodoIogies m use .. ith specific target audiences. The consultant sbonld
consider and evaluate maiteting IeCbniques sueh IS direct mailings, neighbodtood
based programs, diSlnoution through cable tv public e=ss programming.
newspapen, driver edU<:ation coorses, service clubs, eII:.
3.,( Cost EstimateIFundin .. Qp!igns. C<msultlUlt will prepare estimated = for the
recommended alternative ronceptual plans and strategies, including personnel
requiremenIs and non-salary costs for each component 0( the education and
community awareness plan.
3.S Funding Resources. The coosultant will r"",arch and identify potentia! applicable
sources 0( federal. state, and grant funding IV3Jlable fo< the City andlor District fo<
elements 0(1he plan.
3.6 The consultant Will 5IlII1IWUize findings and conclusions in a working paper and
report 10 the SAC.
TASK " Develop Recommcn4afions/Repo<t
Task 4 involves the fomlaI development and documentation O(th. reccmmended action
plan 10 address and improve school commute safety within the City 0( Palo Alto.
The consultanI wiIl prep_ and submit <.......J copies 0( • dnft report documenting the
daIa an.aIysis, finding and recommendations and all other infonnation and steps of the
study proces$. The report sha1I be linaJizrd after incorporating review comments from
city staff and the project advisO<y committee. "f1Ie consultant will submit _ copies 0(
the IinaI report.
The collSllltanl will attend one meeting ... ~th the Project Advisory Committee and one
meetins with the City CoonciJ Policy and Services Committee and one meeting "'ith the
City C.oonciI. The consultant sball be asked m make an oral presentation at the Pol~
and Ser.~s Committee and City Cooncil meetings. including appcopriate visual aids.
DRAFT S<ope oCWorIc
lim< 7,1995
"/
•
" ,
· :'..-
o
Scope of Senices -PHASE II
Upon completion of Phase I. the City Coun..;I will decide whether 10 p<oceed with Phase
n. AI suclllime, and althe discretion ofth. City', Project Manager,the consultant
selected r.,.. Phase I wad< may be invited I<> negotiate for • fe. 10 perform service!
COIIlpM&b'el<> an 0< portions of Tasks 1,2. 3 and 4, descnl>ed in the preceding section, for
the Phase n swdy area.
Phase U Study Are. -The otudy area for Phase D is identified on Exhibit _' It covers the
area of Palo Abo south of Page Mill RMdiOregon Expr .. sway. The schools within the
study area include:
Fainneadow Elementary School
JUlU'.3 Briones Elementary Schoo!
Hoover Elementary School
EI Carmelo Elementary School
ObloJle Elementary Schoo!
Palo Verde Elementary Schoo!
J. L. Stanford Middle School
Owm High School
3.0 SCHEDULE AND RESOURCES
soo East Meadow Drive, Palo Alto 94303
C 100 OIIne, Palo Alto 94306
800 Barron A vellDe, Palo Alto 94306
3024 Biyanl Street. Palo Alto 94306
950 Amarillo Avenuc. Palo Alto, 94303
3450 Louis Road. Palo Alto 94303
480 East Meadow Drive, Palo Alto 94306
7g0 Anstradero Road. Palo Alto 94}06
Phase I is scheduled 10 start in mid-September 1995. Six months will be anowed for the
coosuItanIlo complete the study. 11 is very important thaI the selected consultant be
ready 10 mobilize promptly in September in order 10 s<:bedule tasks associated with data
collection in October. Proposals should cleM!y demonstrate bow wen the consultant can
meet this schedule. While the aclUal cost of performing the required services is 10 be
determined through the proposal selectioo and negotiation proces., the toW.mount of
the contract for Phase I is no( expected 10 exceed S45,OOO.
4.0 PROPOSAL REQL'IREMENTS
A suggested formal fur the consultant's r .. ponse 10 this RFP is indicated below. These
guidelines are intended 10 racilila.!e the Selection Advisay Comrnittee"s review of the
coosultant responses. Con,"Ultants are requested. Il()( required. to foOow these guidelines.
I. Proposer's Background. A brief statement of the Proposer', general background
and leclmical capabilities, and experieoce with systems studies of this nature and scale.
2. Project Statement. A brief; original sla!emem indi<:ating the consultant'. overan
lll1derstanding of the nature of the project and the services 10 be provided.
DRAr. Scop< oCWock
1unc 7,1995 Page I
!
•
3. Proposed Werlc Program. The Werlc Program should ideDtify the ",eric elements 10
be aOOertaken, the procedures the ~onsullAnt "ill empIDy 10 accomplish the werle, and
the ootpot or werlc products 10 be pro,ided.
4. Schedule. Prepare l werlc schedule indicatinglolal tiroe and staging for cadI work
IBsk and identify ley milestone dales.
5. Resourt:e SlIltIm31Y. Prestnt I sWllII1lII)' of the estimates of pe.-.oa-days and to!al
dollar costs for _It werlc element
6. Staffins . .Identify spe<:im iNividnaIs propose4 for this project, including: (a) their
project responsibilities, (b) their specific experien« related 10 the respOIIsibilities 011 this
project.1IId (eJ estimated level of effort (person days) and (d) personal resumes. This
shall incluck subconlnOcI!xs, if any. proposed as part of the project ream.
7. Refereoees. Identify three references (name, address. and phone) for recent, sinular
CQIlSll\ting werlc.
S.O PROPOSAL EVALUATION OITERIA
1lte criteria used by the Selection Adviso<y Coounitlee 10 evaluate responses to the REP
and 10 select coosuItants for on! interviews includes:
1. Completeness and general quality of the writtea proposal.
2. Composition and expenise of the consultant ream. including spe<:im
individuals who will perfonn the werle, and the time 10 be spent by eaclt.
3. Demonstrated recent experience reflecting type ofworlc, quality <Jl wo<l. and
ability 10 complete werlc within budget and scbedule.
4. Demonstrated experien<:e and skill in working with community group< and
special interest cooc:erns.
S. Estimate of required resources. including proposed fee relative 10 the ~es
10 be provided. and projected Palo Alto staff time in assisting cOllSultants. Professional
f«s are for budget and Rview Puq>OSeli. Actual fee is to be deterroined during
negotiations.
DRAFT Seq>< of woo.
1uae 1.199S
, ~.-<
.. :;:.
P"BC 9
@ G)
After die Proposa1s are reviewed, staff will notify aU Proposers of their status in writing.
IntcIvieW'& of selected coruml!llnls by • Selection Advisory Committee are tentative!-J
scbeduled foc the week of July 31, 1995. Key mcmben of .""b Proposer', project team
sbouId be pRsent foc the interview. City staff will Iltempl 10 schedule interview times
that ~ the consultants' existing time ~ommi=ls. A leila will be issued \0
eack interue..'CC indiuting the fonnal of the interview and discussion Iopic. aIoog widl
the firm's interview time.
The ScIectioa Advisofy Committee will rank the Proposers after the oral interviews. City
staff will "eg06.fclhe scope of worl< and 6nal1e11IlS of the agreement "ilh the selected
COIIStIIta!tt. Upon the romplction of the negotiatioos, the Agreement will be sent 10 die
City Cooncil foc Approval in eari'j September.
6.0 SUBMITTAL OF PROPOSAL
Ten (10) copics of!!>. completed proposal ore 10 be delivered to the Director ofCoo1r3Ct
Administration, 2SOHamiIton Avenue, PaloAlio, Califomi., 94JOI by --,1995
befote 3:00 p.m.
DRAFT Scope ofWod;
_',1995 Page IQ
:.--
,
I
•
0'}
"--"'
CITYWIDE SCHOOL COMMUTE SAFElY SlUDY
S11JDY AREAS
LEGEND
PAUS!) SCHOOLS
I Oweneck
2 AdcflSO!l
) Waller Hoy.
4 Jordan MIddle
S Ohlooe
11 Palo Alto High
1 Palo Verde
B EI carmelo
9
10
11
12
I)
14
15
Escondido
Fairmeadow
I. L SWlford
Nixon
Hoover
Juana Briones
Gunn High
--: .. ---,