Loading...
HomeMy WebLinkAbout0524.094TO: City of Palo Alto City Manager's Report HONORARLE CIIT COUNCIL FROM: em' MAN.-\GER DEPARTMENT: PLA1"NING 8 .~GENDA DATE: No'ember 28, 1994 CMR: 524:94 SUBJECT: OrdinailCf" Estlllb'ishing an Tn-Lieu Parking Fee for the Uni\lersity Aveoue P3rKing Assessment District R.EOlTST TIl:: Cit: CDun~tl ;~ a~~;;:J It) r'.~, .. te\\ th~~ n;;Xil~ ,Iudy :ina ~:O~l anaiysis for the in-lieu parking 7-'~,e, and 10 ;3.,jupl Ir,i;' of(JinJr,.:.'.? (-5(.i\bii.shirlg the fl."~ and th~ procedures for its collection and RJOcmL\lE,,'n,\ 110.YS Staff fcc(:mmel1ds. (hat Couilci! (0.) approve Ih:: allach!!d Negative Declaration; and (b) adopt tnt artachcd draft ordinar1ce providing for Ihe coliecl!orJ of an in-lieu parking fee of $19,(XX) lind estab!ishlng th>! prcx:edures feT its. COlleclion and management, including coileclion of lht: f~ at r~e tiTTle of huilding )'ermil i~,s.jJan,;;e. The Planning Commission recommend~ that the In-Ii::u fee be established at S17,300, ~nd (hat it be collected 3t or prior to building occupar1cy. The Planning Commis.5iol1 fllr1h~r recommends that Cuuncil direct staff to Geye!op iln in-lieu parkin~ fee for res;identiaJ development within [he assr:ssment district. ~fPLICATlO:-;S When tm: new downlown commercLal (CD) zOrling regulations were adopte-d by Council in 1986, the in-lieu parking pro\'ision was emtisioned as primarily, if not excJusivrJy, for use \\.idl development of sites where no on~site parking eouid be physic.ally provided. The proposed in-lieu fee aJlows thai regulation Co be implemented. Please refer to the attached P1.&nning Commission report for further details. EXECJmYE SmL\L~RY This staff report forwards both the staff and Planning Commission recommendations to approve an in-lieu parking fee and the proce.dures for its collection and management. Tht Planning Commiss.ion's recommendations differ fTom 5taff's in three areas. First, the CommiSSion unanimo'Jsly rt!commerds (with Conlmlssioner Glazier abseIlt) that the fee. be e~tlj;bJished al $17,300 per required st.~Jj. ratn!( tnan staffs recommendation of $19,000. P:l.~ lo{4 .. / l 'The Commission beli.t'ves thllt the" \"(J'${ of building a parking Splice should be ~parate from the cost of financing it. and :-ecommends Ihal the bond i!.!'uancc:: cost not be included in the fee. Staff's recommendation iiOCl~s a proportional s.hare of the up--front (10 percent) cost of financing a puking project through the sale of bonds (Ie""".! the 'bond issuance cost'). while the Planrun~ Commission"s recommer",';ation does. nD! incl'Jde this component. Staff's rationale for includlng the btlnd issuance cost is that the fees are-e~pected to come in slol,1.'ly enough that • parking projec1 <(WId no! b.o b"Lit so!dy with ioe,_ It is .. pe('!ed that a parking $lnJcrure wOtJld h.ave 10 be finan.c('.d ..... ilh bonds. with a Srll!lI increment contributed by fees tlrt"~y coUect«!. or later with reimburs.em~n! from f~s:, Thus, bond issuance: costs would be incurred. and lhe in--Jiel1 f~ should ioclude its share of thaf cosL Two members of the dc::"'elopment communit)" p~senl at the Commission meetillg supported A fee of 517,300 and not inC'hJdin~ an.",' propcrt:onll $hare of up-frar.l financing co~tS. The second poir.! of diffen:n:~ ~t\l,C~fl lht'" C(:r11mi,,~i(1f1 ~qJj s:3if,. n.·':'.:;mm:;':l1datiorlS is the time when Ihe fel! is r~quired to h:-p:-tid Sl,!lf r~,>lllimcr.js 1~121 (he: tec be pod at tile: time of bL1i!din$ permit iss.u.1n.:.:: ri,i, 15. tliC p,,',inl in H;~i.· \\ h~n t[l;:-Cit:-has. the mO.q le ... ·erage 0v,er an .l)lpiicant. tu t"n~ur" lh.lt Ir;: t;;'",: f~ piJ jn ~~ lir;~d) ~q'ln~r:-,. wilh the least expendi!ure or st.-lIl-r,;'·~·'):Jr .. ·C:5 10 ..:o]):;,..:t tl;;:-fc::, r-rl,'ll1 J f~"""'rH!J1J:, 11;,I>."tPlng payer. Th:::r¢ lends to be Q. ~r"CI! d~al :1"..'.1('.' CflC!fi. "n~'·t:: .. J,:J illl;:.' :jr',,j ~I ~I'n:'::'i\ h,-:'l L'~~ lil--.dy col~eclion uf the fee. \I,'her. it is rWI (::quird III ti-t" ff.lid until lh" tim,' f'( F'(l1>;,;-! 0~·(.up;;n~)'. Furtht:r. !.Wte law f,oYemit1g !he co!l-: .. '~:u:-: \If d-:\"ekpCf fns r'~qlllrn til.!! kes (or hou5in,g projects nO! he collected u~til O'::U..lp.['.cy, but a110 .... ~ uli~~ l,', ;""011.;-.:1 fees for commercial projects prior to issuance of a bui Idillg rlCrm i L R{'pr~!-("nlat! \ cs. of the dC'.'.e"iop l11ent Cl.)m mu nity slated that the fce should not be colie.:-;t.'d until o,clIf!anc.\ (If Ihe projeci. \l..hidl is '\>\'h("n the p;lTking demand is ger-.er-iied, To do nt~·.:r" i::.-:;-\\ e;Jid subje .. 'l a dt' .... c-lop:'r to an unnecessary fin:mcial burden (roughly 51500 per )('.H pn slaH W fiI1QIl~'e th;;-p~)menl of the fee al an interest rale of ei~!'H percent) The:" COlllrrli~siun emere.j inw ce:m.iderOlble discus-sinn with staff on this i~uc. and felt Ihal staff should np!orc whetha some disin.:;entive could be established (slIch as.a late charg~ or r-.:fusal 10 !urn on utiElies), so thllt the Cit)' might be reasonably wre of coJiecling the-kc a! or before building occupancy_ The Commission unanimously recommended (with Comm~!;.!.ioJlt'r Glali~r abs.enO that the fee be paid at, or prior 10, the time of buiidLOg occupancy. Currently, L~e Cit), coHects 3.!mi!ar fees for both housing and transportation. FIfty percent of the in-lieu housing fee is payable at the time of building permit is.slJance; the remaining 50 percent is payable !>eforc o:::cupan,:.y. The traJls~xma:jon imp:tct fe\! is. payable in full at the. time of building permit issuance. Staff behe .. 'es that, disincentives notwithstanding, the best time to collect an)' fr.::e l!. at the lIme of issuance of the building permit. Nevertheless, if CooneiJ detennincs that all or a portion of the feo should b.: paid in connection with building occupancy, the appropria!e time would be prior to -final buildin.g inspection approval". Occupan-::y perlllit~ are not tf3C~t!d 1:1 the-City'S perml! tracking system, nor are they necessarily issued for all d;::velopmenl proj-eClS. CMR:57.4:94 ~ge Z 01'4 • ( i • • Thirdly, the Commission feels thai the in-lieu f .. should also apply 10 residential buildings or additions within thl! pa.rking assessment district, and unanimously recommends (with Commissioner G!szier absent) that Council direct staff to consider deyeloping suC'-h 1I1 ordina~. Staff believes thai this recommendation is beyond the scope of the :nexw study and the propose<l ordinance, Applying the f~ to hou,ing might be possible and/or beneficial. However, it would require R complete analysis of the existing do~ntown regulations and supportive environmental documentalion. 115 weI! loS the asse~ment district, to detennlne whether such a proposal would cause any financiaJ or en\'irorunentz.l impacts. Such an analysis probably could be dOll< by staff in consultation , .. ith bond couns<l. However, s.taff cannot estimate the cost of such a study at this rim~. If the Council wi.shes to explore the possibility of applyint; the in-beu fee 10 housing, or to otherwise broaden the scope of the fee, which currently applies only under th(' c:\isting downtown regulations, staff' recommends t~at the, ordinaf!ce, as propt)sed, be adopted now, arld thaI su-ff br.-directed !o study the-option of applying itle fee to hou--sing. flSCAL IMPACT There is no fls..;al impact to tile CIt, ,0\ the ~.\'&ff r(cl)mm~r:,j~\!or,;.. If, as )h~ Ci..Wnmi,.;ion re.commend'3, the fee does not include a proponional 5r..ar~' of ~.r.e Up·frll~1t CG:.I "I' f1f1an,'ing. such CO$.is will be borne by property OWr!N5, nOI the City. at 'SoUl'll t!rr:~ th31 (1n [.5s('"~s.iTlcnl dis.trict is formeu, If, as the Commiss.iQrI ro::commcnJs., (h::-ke i<. J~s.igrl;,~,d l.(l be-::-(;Oll.~-:te-d at project occupam;y, the-Cit)' might incur addiljoll~1 cos.ts. tu (:011('(! Ihe ftc. if a raytr were unwilling or recalcitrant. .EOO:rnONlIfEN[AL_ASSESSMEN'r An Envircnmental Asse5.sment rer~on1mending, a Neg41ive Dt:claration h3S been (,("lmpie-ted and is attached to the Planning Commiss.ion siaff re-pr)l1. A ITACfiMEl'\'TS 1. Environmental AssessmentfNe:galive Declaraiion 2, Revised In-lieu Parking Fee Ordinance 3, Planning Commission Staff Repen dated September 14, 1994 (induding the Nexus and Ccst Basis Study In-lieu Parking Fee) 4. Minutes of Planning Commission Meeting of Septtmber 14, 1994 CMR:524:94 Page 3 of-4 • i'repered By: Carl Stoffel. Tl'3nsportation Engineer -&f{ X:~k4 a< NNETH !C SCHREIBER ~ Department Head Review: City Manager Approval: <Xc Palo Alto Medical Fo"ndation (Jay Tho!"Waldson) Chamber of Commerce (Susan Frank) Chop Ke"nan Jim Baer John Bser Ed Storm Rex)' Rapp Warren Thoits CMR:S24:94 Page 4 of 4 ATI'ACHMENT 1 Er:vlrtHwp.ntal DcclJ=ents -Cit, of Pe:lo Altc 'NVIRONMENTAl ASSESSMENT Project Oescription/T1tle: Ordinance to Establisb In-lieu Parking fee loci.tion/Address: Uni¥ersity Avenue Parking A!:sessment District S~nsorin9 Agency/Applicant: City of Palo AltQ/Transportat1Qn PiVision Address a~ Telephone of Applicant: City Hall. 250 Hamilton Ayenye. Palo ~JtQ. CA {(lSi 329-2~________ " App 1 i Ci:t i 0., for: A.'ll'endfilE'nts to...£Q.. Regulat ; ons (PAM( ~jl apte~~l ______________ _ (e.g., loning c~ange. subdivision af property, architectural re¥iew, use pe~1t} Zoning at Proj:!ct Lecation: __ ~R._. ______ _ Fee Rf!'cejpt No .. r!~LJ~!L ~wnu: OF Of TERM INA liON 8as€d upon review 0f the project files, ttle undersigned mr~ber of the Planning (lcp ~rtmen t hCi scone 1 u,:led: IXI Mjtig~led Negative Declaration: No EnvirDn~enlal Impact Report is required. The reasons for a Mitigated Negative O€claration are: ! n y i mp a c t-,~_~c-'J.r1 ____ p_~-, __ mJ JJ9.~l~_g_~t..Q ___ ~_llj __ {tScJqO_tftc:._.? __ I1! ____ J.~y_?J ____ c. __ ~., .~_~§_~x_t9_~_5t ____ U:L __ 1b __ ~ attacheo Project O~scrlptLon and analysis. A record of proiect actipn is availjble for review in the Palo Alto Transportation Diyj~ion. Sixth Flgor. City Hall 250 Hamilton Avenue. 8 AM . 12 noon and 1 PM - 5 ElL Mond3)' . FridilY. [I The project !flay have a significant environmental impact. An Environmental Iapact Report will be prepared. \ Phnning Depart..,,,t Official: ~ dh/P.I .;)vry¢~ C~ Phnning Director. ~115ii:.lt-t!f~I!'J:-Oat.: h5,/2'i/1!L_ The proJect has been approved, DalE': iht! project has beer! denied. [IANOO 94-EIA-23 .~-- > > , EII'I11!CIIIEN1' AI. OOGJI£~ T S • PAL n ALl 0 INlllAl STUQY' •• I. Proj.ct Tttle/Address: Qrd;OiDce to Establish in-Lieu parking Eer in t~ l'nivrr:sih Ay.nMf Puking Ass!ssMnt [}, strill.-. ___ _ II. hojKt Oeschption: Tl'!e City of Pilo ~JtQ is proPQslng tR adopt in grdin,"cr tn,t would isl~.e exi sting CO dj strict Pltkjng regulation> that prpy!de the oOPQrtunity for elJ9jblg PPW deyt]Qpmeot to pAy i ftc In lit y of providing ictu.l Pirkjng spaces tnat would nOn8a11y lit ["NjirJQ. 1ft. Enrirct'Mnhl Setting~ Urban downtgwo <-entnl Q4,aintis dj.ctrict. gi'ied tpJQs, urnn dmrotqwr; tqffir-rtQjse. ___ _ lV. E":'iiro~ntil I~ .. ct C!<'ecklist {L'(~Ji!lin1tj,,~n of all ·ye:;"' answers are in Ser.:tio!'1 VJ I. UL:..n. ',/il1 the propo~aJ re~:.J1t in: ,,," Ur:5.t~Yle ~ar(h cCJr1;Jjtic'1s or (,~~r.ge'S in ;eJlo~,c ~ub5t,r0(tures? b. [JiSTuptiC'n'S, djs.pl2.c.e~ents, CC:-pil(' llGn or o¥~rcoyerj~g of the sCll C. U'liilnge i" tap~raphy o. gr{'iund surface relief fe~tures? d. The drstro[tton, covering or mcdl· f\(at~{jn of i.f'l)' ~ji\iqu,= g~o.lcg\c ex Physitiill feat~res? £' . .An,.,. increase in wind or _ater erasion of ~oils. eith~r on or off the site? f. Exposure of peop'~ or property to geo1091C hazirds such as earthquakes, laridsltd'E!s, IlUdslides, gfo'Jr.d failure Qr si.11lT hizards? g. Chl.rtges in siltaticn, deposit1on, or erosion whic~ ~y ~dify t~e channel of a ri ... ·e-r or the bed of a bay or if) 1 et? '* Adilpted frOCl Ap~Mi.x I, Cl1 ifornia Suidelines for Implementation of CEQA, ~~r 14, 1976 . •• Updated MiiY J982, ,Iuroe 1983 E IACKl 94·EJA·23 1 .L 2. Air. Will the propO~ll result in: a. S~b5tintlil lir eafs~1ons or de· teriorltlon of &abient iir quality? b. The cUi.tion -::f cbjection.able odon? c. A 1 teriil;t i on of air lIC~eeent. II) j store teaperature, or any change in eli­ ~te, eit~er lo~ally or ~ionll? 3. 1J.t.tr, Will tt'tfo propos.~l result 1n: i. Chinges in absorption rites, dri;nige patterns. or the rate dod Ulow,t of surface .ater runnff? b. Alt€raticn~ to the coyr~~ or flow of fl cod 'lfaters? c. Ois.":~ilrge intl'l su..-fu12 ",'a(.on, ur ,~: ~ny alterat10n of surface _Jler q'..;alit),. inclt.:cilng bt not 1p .... ,it,j t€~per3L~re, dissolvej o~yscn Qr turbiditi? d. Alteration of ttl€' diro2'o:tl0i1 or rate of fl c-,.. of ground \o!'a.ten? e. Exposure of people or property to water related hdz~rds ~uch as flood­ ing or tidi!l )(aye? f. Chafi9(!' in the GI.l<ll'ltHy of gr()und witers, either H1ro'.Jgh dlrect addit'ons or w'thdr~wal~. or thro~~~ inter,~ption$ of an iquifer by cuts or exciI\lations? 4. ~1ant I ifg. Will tne propos.;i r!sult 'in; a. C~ange in tne di¥ersity of species, or nUDber of ~r.y sp~<ies of p\int5 (,n­ cllld"ing trees, s.hrubs, grass, crop~, micrt:lflora. and aquat;"': plant~)? b. Red~cticn of the nuabers of a~y un'que, rarp. or erdar:g~r~ species of plants? c. Introduction of ~ew spe(ies of flACKl 94·EIA·2J 2 ..1 __ ..L . .L ..L plants into an area, ~r in a barrier to the "ormal repienlsh~nt of existing species? d. Reduction in acrea9~ of any a9ri~ultural crop? S. Anj,aJ Life. ~i1l the proposal re~ult in: a. Change In the diversity of ~pec1es, or af any spec1ts of .ni.als (birds, land an1~als including reptilts, fish and shellfish, be-nUde orgardsIII5, insects or Microfaun~)? D. Reduct ion of ti'1-e nlJrnb~rs of any llnique, rare or e~d~ng€red species 'Jf animal~? c. Introduction of new species of anirn~ls into an area, or re~ult In a barrier to the migr~ljon or move­ ment of animal s7 d. Deterioration in E'xisting fjsh or wildlife habitat? 6. No;~_~. Will the proposal result in: 7. 8. a. Increases in ~xjstir.g noise levels? h. Exposure of peopl~ to S!Vere noise levels? Light and Glare. Will tn€ proposal produce new light glare? Land Use. Will tI1e proposal result in a substantial alteration of tne present or planned land use Qf an area? 9. E.ner.9.'U..Natural Resources. Will the proposal result in: a. Use of substantia'i amounts of fuel or energy: D. Substantial increase in demand upon ex i s t i fig SVU rces of er.ergy, or ill [JACKl ~4-[lA.23 3 -)- _1_ ElACKl require the development of new sourtes or energy? c. Inclease in the rate of use of any natural reso~rc~s? d. Substantlal depletion of any nonre­ newable natural resource? 10. Risk of Upset. Does the proposal lnvolve a risk of an explcsion or the release of hazardous substancES {tn· eluding, but not limited to, oil, pesticides. them1cals or radiation) in the even t of an acc i den t or upset? II • PODU 1 at j on/HolJ~5_n9:. c. Will the proposal alter the location, distribution. density, or growth rate of the hUman population of an area? b. Will till.? prof'osal effect existing housing. or create a de-mand for artditional housing? 12. Trarull.9rtat.tQ.n/Ci reu1 at ion. ,h 11 thp. proposal result in: a. Generation of sUbstllntial additional ill vet! j cu i ar movement? _1 __ b. Effects on eXl£ting parking facili 4 ties, or demand for new parking? -X- c. Alterations to present patterns of circu(ation or mo~ement of people and/or goods? -X- d. Increase in traffic hazards to motor _L x ¥enicles, bicyclists or pedestrians? ~ 13. public Ser-yices. Wlll the proposal have an effect upon. or result in a need for new or altered go~ernmental Sirv;ces in any of tne following areas: i. Fire protect icm? 94-ElA-23 4 (IACKl b. Po11c~ protection? Co Schools? d. Parks or ather recreational heil tt1es? e. ~1ntenince Qf p~blic facilities, inc' !.I4ing roads? 1. Other govern.e~tal services? 14. Vt1litip5. 'Will the propo:.ai result in a rlt;'l!d for no:?\Ii systellls., or substantial alterations to ttl€' following 'Utilities: ~. p~W~( or natural gas? c. J(ater? d. Se~er or septic tank? e. Store!'! water drainage? f. Sol id waste and dispos~l? 15. H~~an Health. Will the proposal result in; i. Creition cf any health hazard or potential h~altn ~azard (excludir.g IiEnt.l healtn)? b. fxposure of ~·eC'ph to potential heal th hazards? 16. A,sthetics. Will the proposal result in the obstructiQn Qf any scenic vista i)!'" view apen to the publ ie, or will tne proposal result in the creation of an ii~sth€!t"icaJl'y cffc-:nsi .... e site open to p\.lbl it vi!li? }7. Recreation. Will the pro~osa' result in an ilDpac.t upon the qual ity or quantity of existing recreational opportunities? ill 94·EIA·23 5 _1- .:: ......... ~--::....-------"-- 18. Cultyral Resou~. i:. Win tnt prDpo~.ii rE'suH in the iltfrat}~n of/c~ t~e destruction of a pr~i st,,"r-i, or ~i storle lrthleologio:.al site? b. ~; 11 tht prop.ou 1 ruu It in ild ~ ~erle physic~l or ~p.sth~tlc effects to A prehistoric ar historic Ix:ndi"9', structu~; O'r obje-ct"' c. oo.c-s t~f' pr~lX!sal tuve the poter.tj .. l to ciI'Jse 1 ~r~)'slc'l ching!! which Irould affect "1"Iiq,,e (J.ilt1Jral "'dlue~;? d. i'i"11 O''1>? ~rG'~.»~l r£-otri-::t ['):;Qirg r.e': ;(]ic~~ or s~.:-re'.~ IJS~5 ',,;H'1ifl th;; pvtent !.:i ~~paC't are,;;? ill ii. Cees the 'p1'OJ~ct hate thE' ~.;Jtellti<il t,) de9ra~e th~ q~ill it)' of Un: en,,·iror""'~nt. sub~tarlt:.a.1 ly rej;.Jo: ttw Mabitat of a tis.h or .. ildlife spec 1 f.'i. , c .. use a fish .;)r 'Wi jcl if~ popu1 iitl(j.,"", ~o dr0l' belo .... splf-~w5t~in1n9 level5, threate" to ~limi!'1;!:tc a r-]ent or anir'la·~ cO:-r'-.J!"Jit)" reduce th! nu~be( or restrict the ringe of ~ rare or €J1d~ngered plint or ini~~l or 21;~inite i~ort3nt examples of the aijc. periods of Ciljto~nli his.tory or prehistory? b_ Oof'S the project hi¥E' the potential to acnle~e sh~rt-t~r., to the dis- 1~~lntI9E ~f lo~-tena, enviro~nt~l goals? (A sho~t-terD i~act on the M\I; rOilllel'lt is; <me whic!'! ~ccurs in a rel.tively hrtef, definiti~e p~riod of ti~ ~ile lon9~term i~acts wii1 endure · .... ell intu the future.) c. Does the project ha\'e ilapacts which ~rr in<li¥ld.ual1y 1 iP.t'iteci. but cUlM.ihti¥ely cOrlsiderable? (A pro­ je-ct ..:&.)1 iapact Of. two or JI(lre separ~te resources ~here the impact EIACK1 94-EIA-2J 6 _x_ on each resource is rel,tively ... 11, but where tne effect 0/ t~. tata1 of those i~icts Of! t~e envlronaent 1s slgntftclnt.; d. Does the project ha .. e en .. · t ro~n:t.l1 effects which ~111 cause 5~~stintill adverse efftcts on h~~ beings, either dlre<tly or hdlrectly? ill V. Explanation of ·yes· answers in e"Y;ro~ntil checklist. See-att~ched. [IACKI , 9~-flA-ll 7 .' Ordinanoe eatablishinq an In-Lieu ParkiD9 ••• tor th. U~iv.rl~tf AVenua Parkiuq ~ ••••••• Dt District Proieet J)§seript,i2:Il The city of Palo Alto is proposing to adopt an ordinance that 'Would implutent the existing CO dis'trict par-king regulations (Palo Alto Municipal Code Section lS.49.100) that provid~ the opportunity for eligible new non-residential development in the University Avenue parking Assessment District t.;) pay a fee in 1 ieu of providing actual parking s.paces that would normally be required. The fee for each requir-ecl parking space. would equal the incremental cost to the ·City of providinq a net new public parking space in the Assessment District. When the City proceeds with a ne~ parking project in the downtovn, the accumulate~ fees would be used to construct all or p3rt of that project. A specific proje~t is not being proposed ~t thif; time. An er.vironmf!ntal a:s:sezsr:1ent .. .-ill be prepared prior to approval of any parking project. On July 14, 1986, the City Council certified the Final EIR for the Downtown study, and approved the project described in the Stlldy. With respect to parking, the council amended th\i! Co'"-prehcnsive Plan as folloW's: 1. Imposed a cap on developlf1ent so as not to increase the par}r.inq deficit beyond 1600 spaces; 2, Agreed to re-evaluate parking exceptions wh,=n such exceptions result in an unmet p~rkin9 demand of 225 spacesj J. Encouraged Planned Community zoning for par~ing structures; and 4. Implemented the 12-point parking program. The city Council also mad~ the following zoning changes relatecl to par~ing as a result of the Downtown Study: required all new non­ residential development in the doynto .... r:; area to provide one parking space for each 250 square teet of flovr area, ~ith some exc~ptionsl and allowed the provis ion of off-site parking and in-lieu fee payment in certain appropriate situations. The propos~d neW ordinance that is the subject of this Environmental Assessment would add provisions ~equired by state la~ to implement the in-lieu fee adopted by the City Council as part of the. Downtown Study actions in 1986. No new regulations are '. , . propoB.~ that ~ould affect par~in9~ Further, ths current parking deficit of 1490 spaces Cas of September 1993) is less th~n the 1~86 deficit of 1600 spaces. Therefore, the 'Environlflental Assessment tor the proposed o~dinanee is based on the 1986 Downtown Study ErR, in addition to the followinq dJSCU9Sion explaininq items from tha Initial Study prApared for this project. Explanation of Checklist Item§ 12(~~~U)~. ___ T~r~aDD~s~p~o~r"t~a~t~!~·2~nLUL W.culatioD TWo potential impacts from the above amendments have been . identified: 1. L9catio(l_ and Use of .lll::Lieu st...~. J:.. neW' public parking project that is financed all or in part by in-lieu fee~ ~ould not. n-ecessarily be located in the vicinity of the ne ..... developments that paid the fees. In some: cases.. several de'r'elcp~ents :;.cattered throughout t.he .!I.ssessment District. £!light pay i n-lieu .f€~s th3t. are aggregated to paj' for a single parki~g project. AS more specifically di:;.cussed in the staff report (September 14 r 1994 REC'port to thS! Planrlinq CO!!llQission, Qrdinance Establishing an In-Lieu fee for the UniversitY-AYenue Parking Assessment District}, the new parking projects most liKely to be implemented I:.'ill tend to be located ...-here the existing parking deficit is the rdqhest. Thus, a nelo! parking project will most likely provide new parKing supply where th~ need is greatest. This aggreqative benefit would tend to offset the smaller disagqregative parking deficits created by new developments paying the in-lieu fees ar,d not constructinq their own ne~ individual parking facilities. This will also tend to keep t.o a :minimum any additional traffic caused by drivers circul~tin9 to find parking. The. stalls c-onstructed with the in-lieu fees will not be ~eserved for use by the new developments that paid the fees; rather, they will De av~ilable to customers and employees of all Assessment District. businesses. Public u5age of these stalls is a net' benefit to the Assessment District, as it 94,"'SIA-23 Auqust 25, 1994 ", -.~--.'- Page 2 • \ would usually :result in i:lore intensive use of these stalls (I.e., qr.a.t._r 'tut'noven than if they vere reserved for a ~rtieu18r business. In summary, the location and usage of in-lieu stalls, compared to that of private stalls dedicated to a 3pecific business, does not create a slqnificant n~gative i_pact. 2. Tf!!ppqrory laCCillltilotion o( Unccn.tructed ...In..-Li6U Stalls, As .ore specifically discuss-ed in the Septellber 14, 1994 Staff Report. the .adoption of the 1986 Downtown Study included .itigation .e~sure5 to address the long-term deficit of parking spaces in the do...-ntovn area. Inherent in the in-lieu parx.i119 progr..!t!l is the c!"E-ation of a tel':'lporary deficit of paL~:ing spaces t>~ca1..lse ot t.he t.~~e lapse Defore in-lieu fees cC'-lld ar:tu~li:r· r.-€ -:;:(In'.en::02d into ne',.,.' pari;in,) stalls. Ho .... 'ever, b-c:c~u.s-E:' thE'. p'.!q:ose of tilo::! in-l ieu progr,:m is to construct the .i.n-lieu st.ails dS soon as a pilrkir-,g project is feasible, ,"'h(ltl';'"v€l. acc'.)..-::c.:lat.ion b'..lj las up ... ·auld be t:.emnora;:-y and short­ ter,·, 'The City bas the option. of \lot ",'aitir:.g for in-lieu fe.es to aCCll~ulace to a large enough ~~ount to build ~ new parking faciliry financed entirely by those fees, Instead, the City could bui 10 Cor b~y into a parking project that is only partially funded t:ly in-lieu f-'!es, Within the next J to 5 Y6ars, it: is es:timated tha.t IJP to 50 unbuilt parking stalls could accumulate te~porarily fro~ the in-l,ieu proYisioll" It is likely t.hat these SO stalls .... c-uld be incQ!:"porated irl one or !lore new parking tacilities that could be completed in the next five years. In the long term, it is estimated that up to an addit.ional SO unbuilt in-lieu stalls could accumulate temporaril:y". Thus, in. the .. orst case, 3.s.:;uming that no new parking facilities ... ere built in the near future, there could be a ~dxi.um teaporary accumulation of 100 unbuilt spaces due to the in-lieu program. The impact of the temporary shortfall created by the in-lieu proqra:r: is not siqnific~nt, for the: following reasons: 94-:EIJ..-:n August 2S, 1994 Page J ,a) The shortfall is ta.pora~y and short-tera. The purpose of the in-lieu prQ9ra.::II is to fund t.hll! I"luaber of r'l;ew parking spaces equal to the teaporary 5ho~fall. (b) The City h~s creaced ap?toxizately 10C ne~ pub1ic parkinq spaces dOwrltoVl'l sinc~ 1980 {without in-lieu fees). The city and down~own p~ope~ty ovner8 continue to seek vay. to increJller.tally jncr~a8e thP.' supply ot p-oJblic spaces, .uGh as ~y restripinq suitable ~xistinq parking areD8, and temporarily uSing availabl. private lots tor public parking. In addition; a f.~8ibility study is nOW beginning tor a n~~ public ~rking facility on an existing do;.mto'w1"l. public lot, 'Which cO:Jld lead to con$tructicn of ~uch d pro)ect within t~~ next three to five Y€01rs. (c) If the 100 cpac~s is C'o:=bined '."ith the-c,,)tT{>-nt deficit of 1490 spiH;:es, lhe tot'll is 3till l~s.::. th"-n th~ ;rax1.!!.\..l:; deficit of 1600 spaces ,J::.Jc,pted in the [;:::,mto\o;'n Study policif's. The 100 spac:,'s I:> c,~·nc~i.·jf,("abl'l belc ... · Ute trigger of 225 u;~cuilt sp.:lces I?st"_ablish-ed (lj' t.t-.e Dow~tc\o{n stud)' as a point dt .. ;hicn re-l"valuation of th~ City'!: parking exception pOlicies .auld tre undettakt!."r., In or.del" to =.ir,ir.!iz@ the potential ter.t:'orar-y cu::ul~t.ive i~ract of unbullt stalls resulting fro:i:l the in-·Jle-;J progra'!ll, the e:ds:ting ~onitoring pr-cgr'drn .... 'ou)d ~ expanded to include a count of unbuilt in-lieu sya~es. 'Ihe nu~t.€.r of unbuilt in-lieu stalls would t.hus. be inch.:.ded in the total of unbuilt stalls ~hich counts towacd the 225 trigger point for the: city's reva.l:Jation of p.!IIrxin9 regulations and/or for planning for a ne~ p~rking !a~ility. 94-1:lA-23 AUgU9t 25, 1994 P~ge 4 \ ·'~ -' A 'IT ACHMEl'IT 2 ORDlliANCE NO. ORDINANCE OF THE COUNCIL OF THE CIT\' OF PALO ALTO AMKNDING SECTION 18.49.100 ICD PARnr«; REGULATIONS] AND ADDIRG C!!Al'TER 16.57 ro ESTABLISH A Fl!E ON C~CIAL DEVELOPMENT WITHIN THE UNrVEl!SIT'f AVENUE PARJ(ING ASS E SS!'reNT 0 I S I"R rCT AS A.>; ALTl!RNATIVB IN-LIEU OF FULLY SATISFYING PAP.UNG REQUIREMRlITS The council of the City of Palo A.lto does ORDAIN as folloW'S: SECTION 1. Background, Intent and Purpose. A. The Downtown Study Environmental Impact Report I tr.e "ErR") was prepared pursuant to the California Environ.rr,E;mtal Quality Act to fully identify aDd analyze potent:ally signif~ca.nt envirol'..I'('.ental i.rr,pacts of propoeed change-s to ':ity re5'lJldtion~~ affect.ing traffic, parking and lend use in do,-rntm .. 'D P~lo Alt.o The Council certified the adequacy and cOi1'.plet.el'l~ss ci :::he 21S: ar .. j approved the Downtown Study 00 July 14, 1986. S, The EIR de-mon8tratps-that E'xistil'"'/f f'a.::kir:::3' facilities funded by the University Avenue Parking As s€-sSI:',em_ District (the-"Assessment Di8trict~) do not have suffici€i1l capacity to meet current demand or to absorb the additional parking demand projected tc result from future development vithin the boundaries of the Asseestt'.ent District. According to the ErR, available parking in the Assessment District was t'u! ly occupied as of 1994, vith a deficiency of 1,220 parking spaces in downt.o-.m Palo Alto 'Which spills over into nearby residential areas. The erR projected that new development in the Assessment. District to be pe~tted by the new Commercial Downtown (-CO-) zoning regulations through ~995 would pr~~uce demand for an additional 2,~60 spaces. The BIR proposed as a mitigation measure tr~t new nonresidential development in che Assessment District be required to provide 100 percent of its parking needs or. under limited circumstances, to be allo~ed to pay an in-lieu parking fe~. c. on August 28, 1986, the City Council enacted new regulations for the CD zoning district. With ce~tain exceptions. those regulations require nonresidential development 'Within the boundaries of the Assessment District to provide one pa~~ing space per 250 square feet of gress floor area within a dey~lo'DlZient project. (PAMC, § 18.49.100.) However, recognizing that-this requirement could be unduly r-estrict.ive with respect to sorn:e sites, the regulations pennit paymeot. of an in· lieu parking fee to finance the provision of publ.ic pa.rking spaces in off rsite locaticos. (PA."IC, § lB.49.100Idl.) D. The October 22, 1993, ~Conm.ercial Downto-wn (CD} Monitoring Report-identified a parking deficiency in th~ do~town area of 1,490 spaces as of AuguBt 31, 1993. 1 !H1Il1L...00310I!l • -__ • __ n. _____ .' 1" •• .:..--"' ...... ----...~--,,-,----". E. The City Council haE' determined that construction of additional parr-ing or payment of a fee in lieu thereof iB needed in order to ensure that new development. in the downtown area of Palo Alto does not exacerbate the existing parking shortage. The: purpose of the in-lieu parking fee established by this ordinance is to establish a mechani&~ for funding the provision of parking to serve nev, nonresidential developments which are not able to meet the parking requiremenL Bet forth in Section 18.4g.100. F. In-lieu feee collected pursuant to this ordinance will be used to finance the construction of llew parking facilities to meet the inC'%:'eased parking demand caused by ne .. nonresidential develC"pments which do not provide the required park:'nq. The amount of such fees will equal the full coat of providing the required number of parKing spaces. Pee revenue& will not be used to mitigate the existing park.:Lng shortfall. G. The City Council determines that there is a reasonablE: relationship betwesn new nonresidential development within the boundarie~ of the Assessment D18trict and the resulting need for additional parking faci 1 it ies. The Cit.y Council turther dete:rntinea that there is a Teasonaole relathmship bf.!t· ... '2eo new non­ reSidenti~l developrru;;nt and the use of in-lieu teE' n?Venues to finance construction of 61..lch additional parking facii.ities _ l-.s mOI.-e fully set forth in the document entitled ~Nex\le and Cost Basis Study -In-Lieu Park.ing Fee," prepared by the City of Palo Alto Transportation DIvision, dated Septet!'..ber 1994. and in the scaff report (CMR: ___ ), cost estimates supporting the fees levied pursuant to this ordinance are reasonable estima.tes of the-cost of providing the necessary parking facilities, and the feeB to be generated by new development wi.ll not exceed the total costs of providing parking to selrVe the parking demand created by sud~ ne"" de'Velap.r..ent. R. The scarcity and high va.lue of land within the assessment dist.rict make it most likely that additional public pa:tking will be provided by the construction of a multi-level parking structure on an existing public parking lot; although a sinsle elevated cleek. above an existing public parking lot, an underground garage beneath an existing public park-ing lot, or incorporation of public parking into a private development are also feasible potential projects. The factors considered in selecting the actual locat.ions for parking facilities will include the amount of localized parking deficiencies and the potent.ial for future nonr~sidential development. SECTION 2. section 18.49.100 of the Palo Alto Municipal Code is hereby amended to read as follows: 18.49.100 Parking r~gulation8. The provisions of Chapter 10.83 regarding loading requirements, bicycle facility requirements, parking requirements for residem:.ial uses, and parking requirements for nonresidential uses outside a parking assessmeDt district, formed and assessed under Bond Plan G financing pursuant to Title 13, shall apply in the CD district. 2 'HJH71K OOJIOl9 \ (' H~r. with respect to on-site and off-site parking space requirements for nonresidential uses within an assessment district wherein properties are assessed under a Bond Plan G financing pursua.."lt to Title 13. th-2' following requirements shall apply in the CO district in lieu of the requirements of Chapter 18.83: (ai on-Site Par-kiog. Any new development, any addition OT e.nla.rs~nt of existing develo~nt, or any use of any floor a.rea that has never been .assessed under any Bond Plan G financing pursuant to Title 13, shall provide one parking apace for each two hundred fifty gross square feet of floor area, except as may be exempt from such requirement by the provisions of subsection (b) ot this sectioo. The purpose of this subsection is to regulate the o~r of park.ing spaces req-.Jired> Requirements for th"e size and other design criteria for parking spaces ehall continue to be governed by the prry?isions of Ct~pter 19.83, (b) EXceptiofl.9, Dr:~rviced in 8ub::::ect i on (a) io}lawi~9 inst~nces: The requirerr,ent for on· ~ite parking of thia section shall not apply ;i.n the (1) Sq-uar~ foot:age for: [i) Handlc?~ppe.:l. acce8a which 'does not. incr:~as€, th~ usable floo"C area. as determined pursua.nt to Secti,-;:;n 18.~9,06'J(t.l (1): conjunction with 18.49.060 IbJ 12); iii) seietr.ic An increase in l-ehabilitatior.., sq\1are pursuant footage in to Se-ct ion \ iii) Historic structures in Cacegories: 1 and 2. Bach historic structure in Categories 1 and 2 may take ~dvant3.ge of the following exceptions during thE' life of the building; (A) An increase in square footage of a h.istoric building in categcl-iea l and 2, pursuant to section lB.49.060(!Jl (3), and (8) A conversion to commercial use of a historic building in Categories 1 and 2 that .is fifty feet or leS9 in height and that has most recently been in residential use, if such conversion is done in conjunction wit.h exterior historic r~:t>.a.bilitation approved by the director of planning and community environment upon the recOIImlendation af the architectural review boaJ:'d in consultation with the historic resources board. Such conversic,n must Dot eliminate any existing on-site parking. (tv} A miJJor increase of two hundred :squa,re feet or less, pursuant tD Section 18.49.060Cb) (4); included in the 904L1I71ac OOJIOl9 (v) At or above FAR calculations. as 3 grade parking. set forth in though Section '--1Il /. , '. • 19.49.060(a;. shall oot be subject to the on-site parking regulations of subeeclion (a) of this section. (2) vacant parcels s !-..a 11 be exempt frOO'. the requirements of !nJ.bsection (al of this ~ection at the time when develop:nent occurs as p:::-ovided herein. Such development shall be e.xempt to the extent of park.ing spaces for everyone thousand square feet of aite area, provided that such parcels were at some time assessed for parking under a Bond Plan R f ina-acing pursuant to Chapter 13.16 or were subject to other ad valcre:r. assessments for parking. (3) No new parking spaces will be requi red for a site in conjunction vi th the developtr:-E.-nt or replacement of the amol..UJt of floor area used for nonresidential use equal. (,0 the amount of adju:3~ f!d ~qu.a_re fc-o::.age fc:r-the 8i te shown OD tbe engineer's report for fiscal yea~ 1985-87 fQ~ Lhe latest Bond Plan :::; financing tor parkir.::3' ilCq'..lisition {n-.l:-::pro·,·e"em:s in that certain are-3. of tho?_ city c.elin-?'3.te~ ell '-he :'"dp of th02 tJrdver:9i.ty Aven\le parkinG a.sseSS;T·e-n~ d istl-in. 0T.r. it l.e·.j, "t>:O}:-08f'C g(..li"nljaries of University Aven\.!e Off Stl-'2J:,-::' ?'-ir\:~ .. r:·:J },-"'reject $:1"15-·63 MSeSSmei1:: Distric(, City of Pc;~o ?'.,. __ ~t·.-), CC'.nt>' c,t S_:mt.a ClciLEj'j St3.te oC CdlLfonJia,' darc:-d ~~nr_'\t't'r JO . .3.9~'a, al~cl 0,1 rUe:> ....,ith the cir.y (;1 erk. i:G .... e~-el:, squ:.".re l: o,Jr"~.:.ag€ · ... hi.dl ... ·J.~l devclnped for nenres) dent ial fY..lrp.:.ses or ""':11 ch has 'h::!2D US2·j far nonresidentia.l purposes but". ",,-hich is not "Used for such pllq.<)SeS dU.e t,,· vacano:y at the tiG'.-e ':It the enginee=-' s re:p-:lr-t shall be ir.cluded in the aI/10'"mt of tloor area qualifying tor this eXE-J"r.ption_ No exempticil from perking :>:equire:::r£:DtB shall be aval.la.ble "ItIh-el'e a residential use changes to a Tlcores:iderlt ial use, e;:(.::-ept pursuant lo subdivision (1) (iii) of this fH;.bE.ectioD.. te) Off-Site Pilrking_ Parlting reql.!in!:d b}' this chaptel­ may be prO"'.rided b:( off -.site parking, provided that such off· site parking is within ~ reasonable distance of the site using iL or, if the .5ite i8 within an aasess:ne:ot district, within a reasonable distance of the assees:oent district bo'..:.ndary and approved in writing by the director of planning and com:mmity ~nvironme!lt. The director shall assure that sufficient covenants and guarantees are provided to en&UI-e use and ma.intenance of such par);:ing facilities, including an enforceable agreement that any development occurring on the aite where parking is provided shall oot result in a net reduction of parking spaces p~ovidpd. considering bath the parking previously provided and the parkins; requir'ed by the proposed ~lse. (d) In-Lil2u parkicg Provisions. rn connection with an ..... expansion of the fiupply of public parking spaces within the cD coamercial downto'W!l district, the city shall allocate a number of spaces for use as ~in·lieu parking~ spaces to allo",-development to occur on aites which would otherwise be precluded from development .::lue to pe.rking ccnsr.:.-aints imposed by r.tJis chdpter _ Off-site parking cn SLlCl"l. Gites may be provided by paYP1ent of an iu-lieu monetary contribution to the city to defray the ccst of providing such parking. Contributions for each required parking space shall equal the incremental cost of providing a net new parking space in • • -'#-- / an assessment district project plus cost for the adoi~i6tration of the. J'rCSram, all. a. determined purtI\>IIJtt to Cbapter :1.1,,57 of Ti,U" .-~,'~:":~,~. ,pade, by the director of pla..o.ning and cCftmJnity enVironment, whose decision shall be final. Only sites satisfying one or more of the follo",ing crite~ia. as detp:rnd::ed by the director of planning and coann1nity environment, st~ll t~ eligible to participate in the in~lieu parking program: (Ij Construction of nacessitate destruction or substantial historic Btructure; on-site par~in3 vould d~~liLiQn of a deBigr~ted (2) The site area i8 : ee' eM!9 ten thousand square feet ~:~ and it would not be phY9ically feasible to p'!"O'.~ide t_he required on-site parking; 0) The site is greater than u,n tJlO'J!.Hn-j -sq'...!.3.z.-e feet, but of such .an unusual confi('H.l1:at.io'1 ths.t :;'t 'IIf':''..Jld not :Ce phys:ically feasible to pI-ovid"" the re,ru",no.j ,x;·site p;aY,:':i::3; (4) The sit·:; L"i located in an .;tce3 • .. ·here =:1(>' policy precludes c\!rb cutn 01:." ot'ner",is!:-p:revl::.~t~~ llSr:: Df tr.e 3ite for on-site p~rking; (52 The site ~aB other pnysical COllstr3ints, ~uch as a high groundwater tablf:, -.,.,hic'n prec:-lune pt"ovisio!1 of on 5i(€ parking without l'e~l!laf' :P~l-ng-~ .. i;l19_sil ,~tL. 19]!' --~f' extrac")rdinary expense. {e) Underg-round ParkiDg. Und.erground parXing oeeper- than two levels below grade sr-.all be prohibited unless 3 SOil8 report or engineering analysis derwnstrates tha~ regular plJ.mPing of subsurface water will not be required. ~QlL...l. ChaptE:r 16.57 is hereby ajde:i to Tit le 16 (Building Regulations} of the Palo Alto MuniCipal Cod~ to read as follows: CIIAP'I'IiIt 16. 5 7 Dlct.n!O' P),'KUIG l'KB RlIt JIlIN ~lDIIMT1:AL ~ ,llit THB CCJiMDMM, liC&iltAi (Q)} ztIIimlGi!UTI!lCT ~ .. 'S'1 ... 020 n.dinitiOl1.8~ For ~ purposes of thiE chapter, ~"f~~ ... d4tinitions SMU apply; l .. > ...... s_t district' means ell<! llni"" .... itl' Avmwe fli$~~lIj,~ . District . 5 'Nllj71K OOJI019 .(I»~C1ty' _ the .C1ty of Palo Alto. len .•...••• If,I'It •. -theDownt;own Study Bnvir=-ental ~ ~{:~i;C~19llS,and .r=:t.ified by the City coun.:ll "" ~:';"'3.&".' . 1<11 ..~._ apa)'lMnt in 1ieu of the provision Df ~""""~·apilCH· ' .. 1 •. ·.1"wId·1IIe/UIIi the !1niversiey Avenue Parlting IW It !:ti$t;:riict In'lieu Par!ting Pund. {f) *l;r""" floor are .. -shan be defined as set forth in eeet~ ~.04.930of this Code. (g} -:set new park.ing space" means a public parkir..g space that is constructed at. a particular location in the assessment district. in excess of any ~~istiog public parking spaces lost or removed from that a..ame location. (hl '-po..mlic parking space· IDf:!anE a parking space C1(l~ arA ope~ted by or on behalf of the assessment district, 1O.57.G3() (a) The fee fOl" each 250 square f.eet of gros9 floor area in a de~lopznent: ahall. equal the sum of the construction, land acquisition, "if 8.¥)y" and administrative costs attributable to the provision of .. """ ne>rparkin9 space, ... established by the City council ""the basi" of calculaticr.8 made by the chief transporbtt iw. officiaL TIl" fee s,"",11 be $ 19 • 000 per 250 square .f .... tofgross:tloor area. This fee shall be adjusted annually by t:hechiaft~ation official, by an amount equal to ~be change in ·ebe·.·.· cOlUltrUetiOll. <:OIIJt index f or the preceding year, as Cl«e~ for th<e Ban Frallciaco Bay Area by the • Bngineerin!1 5<> .... 1lJ>eo.rd. ··tbe.~"lUllCo.ostruction Weekly. 16 .5' • 040 '.I':1al.Aq of .paylleCt. ~.~ll>fi· paid .10 full to the city building tMpectioa ISivisioU·'::piiQ,,· tiC> issuance of a building penoit for the i1e\Ie~t;' ereation.ot 6,peoial ~. ~·r.tll.::~ ..... t4l>li.l;ed ll.IIpeCial !1nivereity Avenue ~~ ..... t.I . .}i·~#et1i). •• Ueu Parl<ing!IUM (the 'fund'), into ~etiir",t:\':f~,..JaiIi;Il!UI'Y interest t:ilereoJl, shall be depoaited. The ~,~::,~."'jnt .. :lileIl:ae.a·..."arate capital. facUiti .... account in· • .........,r.X'O.avind any eomrnillgling of tbe fees witb other re~a~ :t:und,s',or accounts,.of the'ci.ty. Upon receipt and entry to the ..... eeoUXlt',l..t\g .rltcord& . forth" fund, sue!> monies abal.l be ~l,~~tted to.the uses prescribed in Section l.G.57.D60. 9411111.K 00310111 L +,:-:. :;~~,,~ - 1~.S7.~ 11 .. of f_. DoaWClld.'"' iathe tuIId ?lIa11 be eligible far expenditure ~ <~>"~.~<publiepatid;"!f. epacea If1thin the . '7. <'c~iClttQ Mrve _ l>I'rl<ing needs of the district ........ lIr~,~Utllat. pa.j.dr:.he t ....... a. det~ by _.~ ".. 111!F ~ ;)%Udal, subject to.1:he approval. of the ettt.,..,. Pitt' 'U rtle'iHtiee a"" <CC1lBt'rUJ'te<S pdor eo .,.,poalt of ",rum . < t . -.u_ into the tuIId, then fees may be used to .... lJoburae tIMl~~. spenUturee_.ill ~<:e of. receipt of f_. In _......,....u-=t ... in the fWllS .be used for regular 1IIa1nt"",,",ce Cf,.'t.:tac:U!t.ie8 0<' ~ Gy'.pII%ltiDg facilit~"'" not avaUable to._a.,.. .. __ -.. of bwJ~ :Located "" the ... ,,""""""'t ~. '1'IIe priorities for expendltlll'1>8 of meniea in the fund as ......... varl.OWI types iUId locations of parking facilities _11 be as det~ by the City Council r a..fter c0U9idering the recqmmendati~n of the ~hief transportation cfficial~ 10.51.070 The -uses P:l.\:.."POsed for expendit.ure of the monies in the fund shall b-e reviewed annually by the CJ ty Council along with its review of the <:1 ti~' s capital i....'T!proYe!ri&lt prograJ.'1l, and the :r.o:;;,ies from the fund shall b4! appropriated for such €!~nditl.lre in the ~r provided by the Palo Alto Cit.y Charter and Munic1.pal Code for adoption of t.!:!.e a.w:ual budget. on an azwual basis following the enactment of til:!" ordinance f the chief trar..sponation Official shall review the estimated cost of the described parking. the continued need for t.hat parkiIig' and the reasonable relat.iooehip between such DEled and the l.JDpacta of pending or anticipated nonresidential development wit.hin the a8Be!1sment district. The chief transportation official shall report: Jlia or ber f indillge to the Ci ty Council at a noticed public liearing and re,,~ any adjustmer.t to these requirements as may be needed. if .ertY prov;;don' of t/liill <lbapeer or the applicability therect t¢ anypersop or entity ie L'eJ.d to be invalid by a court of ~ ju.r.1!o&et1cm,. eu:cll illvaJ.i4i ty sball lIot aftect lUly other provisiOl1·oft:his chapter which can<be 9iven effect withoUt the invalid proviaiono or application; and to this end tne Provisions of .~" ."haPl:sr are declared to be severable. SECTIQ~t. This ordinance was ad~pted at a duly noticed public hearing. All supporting studies, :t'eports and data were made available to the general public for a pe~icd of at least 10 days prior to the publJc hearing. SECTION 5. The City Council cert.ified t.he Final EIR for the Do~t.own Study and approved the project d~scribed in the Study on July 14, 1985. One of the provisions adopted in that action was to aut.horize payment of an in~lieu fee for parking. This ordinance 7 ~J1I7IKOO3iCil" L '-'-, .... ,,"--.. i.IIIplements the fee. No new regulations have been adopted that would affect parking. Further, the ClJrrent parking det:icit of 1,.90 wpace8 (as of September 1993) is less than the 1986 deficit. Therefore, the Council finds that the Downtown Study SIR may adequately eerve as the basis for the environmental assessment and negative decl&ra~icu {I94-SIA-23) prepared for this project. Accordingly, the Council finds that thi9 project will not have a significant effect on the eovironment. SRCTION 0, 'I1l1a ordinance shall be effective on the thitty-firet date aft.er thE date of ita adoption; provided., hO'W'eV'er , tbat. ia ac:corda.uce with Government Code section 66017, the ~ee hereby adopted ahall be effective 60 days after adoption of this ordinAnce. INTRODUCED: P;,..sSED: AYES: l.ITRST: Clty Clerk APPRO\1BD AS TO FORM: Sen:lor Asst. City Attorney ,..1117"0I»10l9 8 APPROVED: ~4yvr------------------------- City Manager Director of Finance Director of Planning and Comcah~1ty Environment Chief Transportation Official I ATTACHMENT 3 PLANNING COMA-fISSION SUMMARY STAFF REPORT £!!.9 ; n ,1[!~,~.L.E.s..I1: h : i s.b.in';m.~.n I.D __ : __ Li·~.'.J... P..-: : ;... i:1'; F e~' J c' r mG.: -:. ___ U.Di~~(" rs it), A \'e I:LbLC: Paxki.D.Z-__ t\j~:; ~:s rr;~ nJ. Oi.~:lr; ~!, REQUEST: The Planning Commission is .lsked to re'.'i.ew llie I~.\US :;wdy arid co~: analysis for the in-lieu parking fee; and to ret..'cmmend 10 COUilCii ~dc,pifon of the fe-e and fhe procedure:; for its COIl,:,ciion and marlJ.gernent. RECOMMENDA nONS: Staff recommends that the Commi~ion recomme,~ thal Council {a) appro .... e tile attached Negative Declaration; and (b) .wop< the atl.ached draft ordinanc~, providing for th~. collection or III in-lieu parking fee of S!9,OOO. and establi!>hing tix procedures fClr its collection and management. !'OLlCY IMPLICAT!QNS: The policy impllc.ations of in·lieu parking were -considered by Council Jil 1986 when amendments to the Comprehensive Plan and new developffie;nt regulations for the. Downtown, including the in-lieu provisions of the commerciaj CD regulations (pAMe Section 18.49.100), were adopted. When the CD regulations were adopted in J986, the in-lieu parking provision W~..5 envisioned as primarily, if not exclusively. for use. wit11 development of sites where 110 OfHj[~ p3rkiJ1g (ould t>--.: physicall)' pro\'ided. Tile -------------_._----_ .... _---- c---~---.--.-.-..... - -' =----_.,._._ ........... . proposed in-lieu fee is nnticipated to be also used in situations where some, bUI not alI, of the required parking can be accommodated on site, In lny event, new development in the Downtown will continue to be limited by the project specific and the overall square foolSge limits eslOblished by the sdopled Downtown Study policies and ~gul.tioos. EXECUllVE SUMMA!Y This report briefly discusses the background of the in·lieu puking provision tlw was established by Council in 1986, as part of new CD District regulations, and summari= the cost onalysis contained in the attached cost basis study, The next .. and cost basis srudy (Attachme.tl)est&blishes the required onus belW«O the r.e and new development proje<1s and provides the basis upon which L"e cost of providing parking in the downtown area can be established, The 'tudy concludes that the in-lieu fee should be S 19,00) per requirt-d parking: staJl, based 0<1 the cosl per adde:d parking stall for a multilevel sL.'"lJcWre. This repcli recummends adoption of thai fee, as. well as Ihe pnx.·edure~ neccssarr to collect and manage (ht! fe.e. nSCAL IMPACT There is no tiscal impa(:1 to the Cit)' of the staff rccomm<;nOa!iOll or tb,-·. altc,"llallvt's. ArTy fiscal impacts accrue: to the downtown prDpert)' and b,"L~ine.s$ owners. If the in·iteu fee is set at a rate that turns oul to be tess thall the co~1 of net new space:. in a future City parking project, [he unfurKIed amount wC'uld be passed on to .11: downlOwn property owners as an incre-ase in the assessment fer the projecL . E."IVJRONMENrAL ASSESSMEl\T An Environmental Ass.essment recommending a Negative Declaration has been comple~ and is included as'Attachment 3, PREPARED BY: Carl Stoffel DEPARTMENT HEAD APPROVAL: )f~:;'{;<J,~':..=-__ Kenneth R. Schreiber, Director of Plan"; ng and Com m uni t)' Environment SUBJECf: Ordinance EMabljst\ing ao In-Lieu Parkin, Fee fur tbe t1njyen;ity A)'t~nae Parldn& Assessment DjsDict RECOMMENDATIONS SWf recommends thaI the Commission recommend thaI Council (a) approve the allJicbed Negmive Decl ..... tion; and (b) adapt the attached dnft ordinance, provi~ing for the collection of at1 in-lieu parking fee of S19,OOO, and establishillg the procedures for its collection and management. BACKGROUl\'D Palo Alto Municipal Cod," (PAMC) Chapter J 8.49 se l , f(lfth regulations governing development in the CD Commercial Downtown Disrrict, which were iriSlltuled iii 1986 as a result of the City of Palo Alto Downtown Study. The CD area lS shown ill the map of Figure I. Section 18.49.100 sets forth parkt'lg regulations for the CD district. Generally, this section requires thai any new de.vdopmenl, addition. enlargement, or use of ,my pre.vious.ly tmass.e-sliied flO<Jr area in Ihc CD districi mUM plOvide. park..ing at the rate of one space per 2-,,"0 gross square feet. For CD district properties located within the Assessment District, Section 18.49.100{d) provides that the Cil)' may receive an Ln~iieu monetary contributioIl (i.e.) "in-lieu parking fee") from eligible new development in th.e­ Assessment District that is unable to meet the 'Parking requirement of Section 1 R.49.100. To be eJigible to participate in the in-lieu parking program, sites mu.st satisfy one or more . of the following criteria liste.d in Section J 8.49.1 OO(d) ~ (l) Construction of on-site parking would necessitate destructlon or substantial lkmolition of;a licsignated historic structure; (2) (3) The sile area is less than 10,000 square feet and il wouid not be physically feasible 10 provide the required on-sile parking; The sile is grealer than 10,000 square feet, bUi of such an unusual configuration Ihat it would not be physically feasible to provide the required on-site parking; (4) The site is located in an area where city pel icy precludes curb cuts or ot.\terwise prevents use of the siw for on-site parking; (5) The si Ie has ather physical constrai"ts, such as a high groundwater table, which preclude provision of on-site parking without regular pumping of subsoil water or other extraordinary expense. \ i I I FIGURE 1: MAP OF CD DISTRICT Boundary line ___________ _ Staff believe; that criterion (2) should not be in~'1' ... ted so a> l<> preclode reasonable development thai othcrwi.se meets the site de'w'eI"Pment regulations. and the in-lieu fee should be available as an option where some. but not all. of Ille required parking could be C:01Utructed on sl\e$ that meet one !:If mo~ of the fi,,-c criteria. Thus, it is not the intent of this criterion to require Ihal buildi:1g sizes be limited orli)' 10 those sizes for whiclJ porlrin8 can be prov;do:I with"". U$C of the in-lieu payment. As. funher point of clvification regarding criterion (5). pumping of subsoil water is not permitted. so the last phrase of criterion (5) will be amended In the attached ordinance to read:" .whicl1 prttlud< provision of on-site porlcing without e.lrlIoniinary expen..te .• The p-roposed arnero1'ifeniS Iv 'he CD [;,jsl.ri<:t reguhltcru., which are the, subject of th~!s staff re-pc',rt, ~t fonh (il u~ iegaH) require-d re-i3.1i0f"l5hips. betwun the ir.-liw fee and )l~W d("\,.elOj'1mCfll. {Ji) lh:e am ("' .. m! ,)1 ~he kt.'" .7:iHJ the procedure foik,''\'~J 10 eSlablish that ~H·n0tli'll. ~nd (iii! tht_ m,~i:n~J \11 .... h.:h \h·~ Cii.~ \,\111 coll['C1 :mc\ maflaf{'" the fee. The policy imrlica,ion~ 0f ii1-Il~u parlln.1;; \-lieu: .. ;)~sid.:"red by CCIH1cil in 1986 when amendmer,Ls io the Compr-ehem,\"e Pl-an aM new devdoprnC'ilt regulatiuns for the Downtown. including lhe in-Ilcu pio\'isiono; of th:! commerci&l CD regulations (PAMC Se{:ticn l SA9, lOC)), were. <;do~ed, The flJndam~fltaJ purpose of the in-lieu provision was. to pw\-ide 3. mecharus.m W ~lhr ... ' tie\'dopment to l)CC"ur on a ~ma\l lmmber of ~ites that were undeveloped and un.zblc 10 have on-sjte r.arking (pnrnarily because of small sire, unusuaJ conflgunrion arxjfor a 1,")C!tion which effeclj..,'C'ly precluded a curb cut or other access to on·s.ite. parkl0g). it Wa!. 21SI,) r-ecognired that there would be ot.ier unusual circumstances whc:re on-site parking ~'3..S eilher oot phys.icalJ)' feasjbl~ or not desirable (primarily becau.s.t uf pos.sible conflicts between new parking and oth,,:-,r policies, including the desire 1'.) avoid curb cuts and parking; in prime pedestrian-oriented retail areas)_ These considenulom. led To the fl\le criteria for use of the in·!ieu f~ that are identified. in the p<eViOO5 "BACKGROUND" section. While the establishment of the amoonl of the in-lieu fee is a further definition of existing pclicy. conditions ha""t changcJ be!w~n 1986 and 1994, and the recommended in-lieu fee is anticipated H.> be availab~e for sltuatiofls where some, but not all, of the parking ""juiremenl can be mel on site. An «amp!e is the proposed redevelopment oflhe parcel at the comer of Emerson Streel .and Lytton Avenue (recornmel1dea fOT approval by the Ptanning Commission on Augwt 24, }9(4) where some of the required parking spaces are available on site and L': remaining p;,rking rcq~jrement ',\'ill be met through the haeS or, ---_ .... $r ....... >_ .. > ___ I~------ " \ >--- payment of an in-lieu fee. Howe .. r, IS i, the case with the Emernln Street project, application of the recommende<! fee would stili involve meeting one or more of the previously identified five criteria listed in Section 18.49.100. Staff does not anticipate subSiantia.! use of the in~liev fee" for de .... elopmcnt con$i$t~nl ",1.th the CD zone's 1: 1 floor area ratio. Thi, conclusion is reached ptimarily becaus.: • large number of sites are already developed at or close to • !: 1 floor are.! .-.tio. and Building Code provisions prohibit, except in unusual circumst&rk%s, windo\lr"s on property lines where an odjacem building could be =tructed. Comer properties are far mere likely to be redeveloped because upper floor.; can illCO<pOrate Ole ",ind",,', ='sary to oblain office rent. .. sufficient to warrant the redeyelopmenl costs, '!'1lere are much greater policy impliC'3Ii('n5 of t. ... c use or .an in-lieu fee-if the fC'-commended criteria for application of the fe.: were to be r<:'~'isi\cJ. A~ "'ill::!',] ah,?\'e, the 1986 downtown regulations. govern !h.e pres.ent f1rl'r~::1~J.!, ) l": {his mC're limitro application may not aJiow the fi~:r.ibi1iI)" i0 work witb the aT"!(!t:ip<,.!c-d dlOlLig~,,-, :n r~ta;1 alxl c·ffice environment", tn the dUW!'1W\!"fl in ~he 19SI{..Is. Staff iM'!nds. II' identIC-:-' th!\:..: p\',ll~'Y implic.ations ill Ll. sl.!b~eq'}er.t Tepon 10 the: Ctl~' CU'JIi'.:il. DlSCUSSIQIS The development ofth~ recommendation:. in th;s report are-dO,l.elf rdaled to the in,lie-~._~ concepl deveioped in 1986, as pal; of the Downtown SluJy. Srot:cificaUy. staff t"nvisior.s use of the fee in the following situatior.s: • New de"'clopment on parcels thaI meet one or more of the Tl,,-e criteria identifie<i earlier in this report and contAined in Section 18.49.100(d) of tile zoning "'gularia!\-', and where proposed development can have some or IlOfle of,~ required puking. • New Planned Communit, zone de¥e!opments that meet the 1'&=1 size and configuratjon crileria in 18.49, 1 {)()(d). pro\'ide substantial public beneftlS necessary 10 q'Jruify flJr a PC ZOrle, !Hld s.!tjsfy ot..p.er City planning and design objectives ., identified in the Comprehensive Plan and otllcr related documents (e.g., Downtown Urban Design Guide). Use of the in-lieu fee beyond the aDove two situations should ~nta!l consideration 0f broader poJicy issues. ---;"'~'---''''''''----''''"' - • If the fee is Ol!opted, the City should carefully modlor use of tl1e f~ to determine whether the usc is appropriate, or whether the .pplk.ability of the fee should be constricted or expanded. New PUblic parking Projects and Their Cost PAMe Section !8.49.IOO(d) requires that the in-lieu fee be based on Ihe in=mental cost of providing. net ",".W public parking space in the Assessment District. The nexus and cost basis stlUJy (Attachment I) presents information regarding L~e location and type of new public parking projects, and the cost per net now (added) parking .tall to construct such projects. The study dL~usses st\leral feasible scenarios fOT puhlic parking in the University A .,'enuc Parking Aosessmenl District (please refer to Table I in the attached study). These s~nmos are narrowed down to the fom most approprizJe fer implementation. Aftl!r a review of private parcels and public parkl:1,g lots where a parking project might he constructed. nine potential public parking projects are identifie,d (Table 3 in the atl.ache.d ~tudy). From these, it LS conc1uded that a multilevel structure on Lots. SIL, R, or RiP is the most Ekely. The co.st per added parking stall for a mullile.,.,,1 struciurf, is. calcUlated to be $19,000. RecQ..ITUllend:ltjQI) for Amo\lot of In-lieu F('{: The recommended amount for the in-tie_u parking fee is S19,(X)(), ba!;ed on the cost per added paridng stall for a multileyel .• !ruc!ure. The fee would be adjusted annually on July I of each year based on the Construction Cost Index for the San Francisco area, B3$ing u-,e fee on the m\Jltilevel structure has some advantage~: (a) it is unlikely that a pro~r1y owner would be overcharged for any parking project; and (b) provision of in-lieu stalls is encouraged by a lower fee, and public usage of in-lieu stalls benefits the downtown. as such usage usually results in more intensive use of these stalls (i.e., greater turnover) than if they were reserved for a particular business. The disadvantage of selecting the fee for a multilevel structure is tlJal a more e"-perlsive parking projec1 would be underfunded. Howeyer, U,e financiaJ consequence 10 the Assessment District of underfunding can be relatively small. Draft Qrdinance Implemelllior the In-lieu }>alkine Fee Attachment 2 is the draft ordinance implementing the in-lieu parking fee, including the mechanism by which it is to be collected and managed. The existing authority is found in the CD Regulations of Title 18 (Zoning), in Seetian 18.49.100. This section has been amended Co refer to the new provisions implementing the fee v~'hich, for cunsis!en.:y with other development fees, will be locatod in a nowly-adopted Chapter 16.57, in Title 16 (Boilding Regulations). . Pq:. 7 of' /' .i i , i The new regulations have been draftOO to comply with Government Code sections 66000 et seq., which govern the collootion of City-imposed development fees. They include tertlIin findings reg.roing the relationship of the fee to the development that i~ require! to po.y the fee, as well as the relationship of the purpose for the fee (i.e., parlcins ,paces) to the development that pays the fee. The finding', and the amount of the fee, are supported by the Ne,.' and Cost Basis Siudy prepared by the TransportAtion Division. Specific provisions include: • Pa)'ment of the fee is re<juired prior to issuance of. building permil. • The amount of the fee is indexe<J for inflation. • An annual review is required to cOlltil1uatly justify the. fee. • Th.e fet is placed in a separately accounted fOT fund, which can ~ used orJy for constrm-:tion of new parkjng tc, serve non-residential development in the UI11versit), Avenue Parking District. ALTER~A TIVES Tabie A·3 in the appendix of the cost bi'l.sis study identifies alternatives for the amount of the in-lieu fee, 2. The tee can be set at the average cost of nine parking project'"; ide:ntified. in Ihe study, which is $29,200 per adde<J parking siali. On an average basis, this fee would fund construction Qflhe number of spaces for which the fee was collected for allY of nille parking project~. As with any average, howe\lcr. there is th~ problibilicy of a mismatch between the average and the actual. With the higher fee, there is a smaller lil<elihood of underfunding the in-lieu stalis. The disadvantages are (a) potential discouragement of the types of cleveiopment fostere<J by the in-lieu fee provision; and (b) possibility of overfoooing the in· lieu stalls if a multilevel parking structure were built. The fee can be sel at the highesl cost of the nine likely parking prcjects identifie<J in the ,rudy, which is $38,100 per added parking stall. If the ir.­ lieu f~ were established at thi s level, no parking project envisioned in the study would be underfun:le<J. However, it could be unfair to an individual property owner who wishes to develop a downtown property aM, if the owner were nOi abie to provide the required parking. would have to pay a fee that mighl be higher til.n nee<Je<J. • i' , USCA!. IMPACT 1bere is no fuca! impact 10 the City 01 the ,WI recommendotion or the oltematives. Any fucal impoclS accrue to the downtown property and business owners. If the in-lieu fee is set at I r&le that turns out to. he ~ess fhan the cost of net new Spi:tces in a future City parking project. the unfunded amount woold be pASSed on to all downtown business ownen as ." i1K"l"'e&.$t in the a.ssessment for the project An Eovin-..unental As=sment recommending a Negative Declaration has been C<Jrnpleted ;md is iochx!cd ~ Artachmenl 3. On.;c tr.e ordinan;:t is l\pprov~d adopling \~e in~!ieu fee and the collection and m::t;1J.gC'm~nt sySlc"ITl, 110 fUrlha Coun .... il :!Clion is required before toe fees nln be coib.:-te.d 1llC Fi,l1IiC,e Der,ar1ment ,I,'ili $,:-1 up lr.e me,::h,mhm rt':quiTw fordepos.it of the fees ;if,d lLc intL'it'_q coil,~~i{'·i t~,(,J~on. On 3fl 3rHiual b,~~is, as part of its review of the C.:p;tal lmpro,'t'nlt'ni Program. Coun..:i! is rt"'luir<.o to review the: uses. propos-ed for eA~~ndiwre of the mcn.ii!"$ in nle' in-lieu fund, ATIAcmm,,,'TS: I. Ne.~u'S and CoSl B:;.si" Study 2 Draft Ordinance '3. Environmental Ass.e!smenl Prepared by: Car; Stoffel DivisiooJlXpar.mem Head Approva~: cc: Palo Alta Medical Foundation (Jay Thorwaldson) Chamber of Cammer", (Susan Frnnkj Ch"" Keenan Jim Baer lohn Baer Ed Stann Roxy Rapp W arren Thoit~ • NEXUS AND COST BASIS STUDY IN-LIEU PARKING FEE City of Palo Alto Transportation Oiv,s;on September 1994 • NEXUB AND-COB~ BASIS STUDY IN-LIEU PAREIMG FEE 'the purpos.e of this study is (a.) to present an ana lysis. of the le~ally-required relationships between the in-lieu p~rking tee~ the parking project it is intended to fund, and the developaent projects to whi~h it is applicable; and (bj to select and justify the aJIIount of the in-lieu feo, based on the lIIost p['obable futul:"e parking project in the Univ~r5ity Avenue Assessm~nt District. SU!OW!T section I of this study discusses the or igi,r and purpose of the in­ lieu parking :fee. Als::o discussed are the 1."e:latior.stlips bet ..... een the corn~ercia 1 develo?li'ent to whic:, the fee appl ies, the parking np€"::i g~nerated by that d~velopment. and the cast of that parking. Section II of the study identifies the nost likely public Pdr~ing project that could be inpler:,entel..l in ttH: University ~.venm, AS$essn~nt District--the cultilevel structure. lts cost ~G developed based on ex~mp!es of projects that-have actually been constructed. The report concludes and recom~ends that the in-li~u fee be establisned at $19 1 000, adjlJst.ed a.nnually on July 1 based on the Construction Cost Inde>.: for the San fr<!.'icisco area. The appendix continues the cost analysis to other scenarios for public parkinq fad lities in the Assessment District. an,1 discusses alternatives for the amount of the in-li~u fee. SECTION I: N!IOB ANALYSIS section 66001'a) of the Government Code requires the City to (i) identify the purpose and use of a development ftei (il) determine how there is a reasonable relationship betYeen the us~ of the fee ana the type of development project on ~hich th~ fee is imposed; and (iii) determi~e how there is a reasonable rel~tionship bctyeen the need for the facility for which the fee is to be used and the type of development on yhich the fee is i.posed. PI DOmVW" aWD! The 1984-86 Downtown Study ~as in~tiated by the City Council to address the increas~ng parkinq and traffic problems in the Qowntown area. Incre.8sed parking deficiencies and traffic cr;)ngestion hacl resulted, at least partially, trom a surge in downto-.m office building construction since 1981. In 3uly 1986, the City Council approved the Downtown Study, certified the tinal EIR, and adopted Page 1 • nu~erous measures affecting the downtown area. measures affecting parking are the following: The primary .. A limit was established of 350 1 000 square feet of 'neli developaent beyond that e~isting in 1986. • A blended parking rate of one space per 250 square feet of floor area lias established. Exceptions are allowed for handicapped access, seis1!lic or historic renabilitation, and additions of less than 200 square feet. • Parking can he provided ~ff site under certain circumstances. • Fees can be p~id in lieu of providing: ne .. parking spaces on or off site, under certain circumstances. • The 1986 parking deficit of 1600 spaces should not be exceeded by ne'W development. Re-evaluat ion of park 1..Ilg pol icies ... ·ill take place ""hen the unrn(?t park ing demand createct PJ' the above exceptitms e)!ceeds 22::' spaces. 1\ v;c>rii tor ini:;f program .... as estilblj shed to monl tor thes'l? numbers. e Staff was directed to undertake a f~asibility study to evaluate an additiona.l pUblic parking structure do .... nto ..... n. • Underground parking was limited to tlro'O levels P€loW' ground unless regular pumping of subsurface water will not be necessary. Q A twelve-point parkinq program was adopted, addressing t.he use and design of the existing dO\llntown parking facilities. The Downtown Study established that, as of 1986, available parking in the Assessment District was fully occu~ied, with a deficit of 1600 spaces (Oowntown Rep9rt, A Summary, January 1988, page ~C). The additional growth of J50,OOO 6quare teet of non-residential development approved by city council for t}-.e dOW7ltown area, ttJough very limited, would nevertheless increase the parkinq deficit:. Thus, the Downtown study proposed, ana the city·Council adoptpd, mitigations and regulations that require commercial development in the ~sseS5ment District to provide 100 percent of its own parXing. However, tne study also recognized that certain parcels would be unaole to provide their own parking on site, due to site and/or zoning constraints 1 so it established two possible alternatives: (1) the development could provide new permanent parking supply off site, but nearby; and (2) eel'tain qualified developments could pay the City an in-lieu parking fee equal to the cost that the City ~ould pay to provide a net ne~ public parking stall as part of an Assessment District parking project. The second alternative has been included in the. CD district regulations as £lAMe section Page ;;: • I I '1 , • ·----- 18.'9.100(d). While provision for an in-lieu parkin~ fee cur~ently Qxists in seotion 18.49.100(d" the fee itself was not established and is the subject of this study. The te"C1ll$ "Assessment District", "public!! , and "Cityll are used interchanqeably in thi6 study to refer to parking lots, projects, and facilities which are paid for by :neans of assessments on p6rcels located in the University Avenue Parking Assessment District. These facilities are owned and managed by the City. PVlPOI' AlP 08. 01 rHIL'ROPOS,P lEI 'l1le ~ and. .YG of the proposed fee is to provide funds for the City to construct or purch~se new publj~ parking stalls as substitutes for stalls that are not provided by certain new comaorcial developments in the University Avenue As~essment District specified in section 18.49.100(d). Under the curr!;'!r'\t ptoposr'li j the city · ... ould accu!I1ulate money (["om in-lieu fees until it had enough ~o finance a n~w puhlic parking pro)ec-t. In practice, howev€'~, th~ fees may not accumulate quickly eno~gh. A more likely scenario is that the city would proceed with a ne~ public parki~g project based on other needs in addition to th~ need 'to build in-lieu spaces. The in-lieu fees .tha.t had accul:;ula't.E-d at that tipe ""'0\110 be used to pay for the number of spaces tor ~hich the in-lieu fees had been collected, and the City ,",Quld issue bo~ds thl:Ol.igh an assessment district pr:acess, 01' by other means j to pay fo[, the cost ot the renlainder of the spaces included in the project, ~he new parkinq st«lls provided by the ir.-JieIJ fe.es are nC'lt intended for-the exclusive use of the specifiC develcpments that paid the tees. Rather/ the parkIng stalls would be designated P.ither a.s per'll1it parking (available to any Assessment District employee), or time-limited public pa.rkinq (availa.ble 1.:0 anyone), in the same manner as all other public parxing spaces in dovntown City parKing facilities. The primary .advantage of the in-lieu fee is that it permits developsent In the Assessment District under the CD district r-equlations, albeit under quite restrictive circumstances, that otherwise would be precluded due to the CD district requirement that ~ll develop~ent provide its o~n parking. For example, there are a number of sites where/ becallsf! of size and/or location, provision of anyon-site parking is no~ possible. AlSO, an existing business that m.eets the eligibility r-ecr<Jirement£: ~stablished in PAMC s~ction 18.49.100(d}/ and does not now have its o·.,.rn parkiTlg, or rOO1!L for any, could expand in size/ and pay t.he in­ lieu fee to cover it.s parking requirement fo~ the increased square­ footage. Otherwise, the business wOllld not be able to expand, unless it could find nearby permanent off-site parking/ which is usually difficult to find. There ~ill also be si~uations where a development can provide some of its required parking on siter \.lith part of the parking reguire~ant satisfied through the in-lieu fee. Another advantage at the In-lieu progralfl is that" the in-lieu spaces are available to any employee or customer in the downto~n area, Page 3 just as are the other public spaces downtown. public usage of the in-lie.u stalls benefits th@ dOlflltOvt'\, as such usage usually results in &ore int~nsivE use of thes~ stalls (i.e., greater turnover) than if they vere. res@rved for a particular business. 1'he primary disadvantaqe ot the in-lieu fee, as it i:e;; current.ly proposed/ is that 80~ d-evelop=ent may ~ccur .... ithout an immediate corresponding provision of parking, The~~ may be a delay of some ti~e before in­ lieu f.4!8 coul.;;i actually be conv~rted into ne.' parking stalls. Hovever. this delay vas ~ccounted for in the Dovnto~ study ErR and in the Negative Decl~ration for this project. It was found to be accept.a.ble 55 long .... 5 the temporary det leit caused by parking exceptions and ~y collection ot the in-lieu fees remained below 225 Gtal18~ and the total deficit did not exceed 1600 stalls. 'IUTlQUIlL.'nnp PSI Of nil It"! MP TaE lIlE 0' Pnx.LOPM...~ 'ro gt.Q-DI. __ .l:IE IS APPLICNILE The lllJ,n of dc .... e !op~en'[ to "'r. lch the in'-l ieu fee is dpplicable is that port:::'on of ;ce',,! cc""";€>rclOl.l de\!81op;:-,~~nt in thB Assess-ment District th~t is un~hle to pro\'ide 100 percent of its own required par~;ing, as. ,c;.'t tor-th in P./._"':C Section lE:.~9.100(d). That deveJop~ent generat~£ ne~ parki~q de~a~d that ~ould increase the ?ar~ing de:(icit. i.f r,a;.-):i.n'~ s\..~lls. -",c.t"e. not_ provid€d in £.o';:\e otho;.r ~~nn~r. The usg o( the fee is to provide those stdlls which that d~velop~enc does not pro\rid~. ~_1tf.t.An9.~5R!P en-nEts NEttO fOR PUJ.l1ig _______ STMl.S ANO TEl: TYPB OF ~!;YnQfHprr ON 11'1'1 I CH THE FEE _l~ __ :n~.Pg~.t_p. The ~ for pal'~ir.q :stall:;;. do·.mto· .• :rJ is docuI"enteti in the Do .... ntown . Study (discussed abo",e.) and Ute annual do·.mtowH r'.oniloring: reports. Til€-Octobi!'r 22, 1993 IICQ!"'merci31 Do· ... nto·.m (CD) Monitor~ng Reportt1 identities a deficit of 1490 sp~ces as of August 31, 1993. This continuinq deficit indicates that e~isting parking facilities are insufficient to handle existing, demand, dnd therefore results in a continual .... ait-list fot" existing parking facilities in the Assessaent District, \orhich has o!I negative impact on the employees and custoaers of exi~tinq co~ercial development. The deficit also negatively iapacts the surrounding residential areas by causing dovntown eaployees and CllstOJl)f!["S t.o park in these areas (!L0\fDtovn ~:tudy, pratt EAR, City of Palo Alto, December-19S5, p. VLJ.13j also "1990 On-Street Parking Survey", City at" Palo Alto Transportation Division). 'rh~ ~~ of development on .... hich the fee is irnposed--ne ... · comme.rcial development in the do.nto\.in Assessment District that is perthitted to exercise this option according to the criteria of p~~c 18.49.100{d)--qenerate$ new parking demand that ~ould increase the parking deficit, if parking stalls were not provided in some other manner. Th~ funds generated through the in-lieu fee allow the construction of nev packing facilitiEs to s~tisfy the additional parking dei!land t:hat is not r:".et through the provision of parking by the new development. Page 4 • !,r.ATXQIIBIl BrnrJR! TlILMOIDrr_-.9LTBI nt-LIEU FEE NlD tHE CQ§..LQZ It. UU;:t1lQ ltALL Section 66001 (b) of the Goverrment Code requires that the C.i ty determine thol'lt there is a :reasonable relationship betwe.en tl'Ie specific ~unt of & aavelopment tee and the cost of the portion of the public facility that is attributO!lble to (i''lecessitatf':d by) the development project. City regulations specify that all non-r~sidpnti~l development in the Assessment Dist't'"ict provi·-j.e on-sitl! (or approved otf-$ite) parkinq spaces at the rate of one spaca per 250 gross square teet of developl!illent. This req.,lirement is. baited on studies that cnoa.'l on an 4veraqe basis throughout the Assessment District., non­ residential dev~lopaent gen~rates the need fer parKing at this ra~e {oovntOlrlD P419 Alto Farisi!'t9 stru;tur~JU.Qilit:y .l:naly?i~, Volu.e .t, Wilbur Saith and "''3sociates~ April 11, 198;£, pp 26-28,. also City Manager's Report Offi:623:3, Decem:l~~!" 9, 19B3, City of Palo Alto)" Based upon eliqibilit.j' requirer'1cnts establ,shed in PAMC 19.49.10{}(d~, t.he ir.-l).e\\ te.e-nay bg ~ccep"~..-:.d b): t.he-cit"l for part. or all of the spaces requi~:ed by Cit]-' regulatior,5 for a ne ..... developJr,enti and that fBe Glust equa.,i the tuJ 1 incrc:--en.t;:o:l cost of providtng a net ne .. parkirl'~ 5p3ce in a ne'",' ,;"'5es~r:ent Dist.rict parking ~rcjectJ including tne cost of ad~injsttation of the in­ li~u program. It is, ther~fore, reasonable to lZVj the ful2 cost. cf i=1r.::>viding n~ ... parkin'-:l facil i tJes on C! per-requi! ed $l)-dCf; b.'isi s on nf:~"" non­ xesidential de\l'elop1!\ent. in the )..sseS~r,€Tlt Dist.rict for the rlU'I:l.ber of parking spaces th<!lt such develop1':1€"nt is un.:lble to provide, bec.:1use such developu:ent gene["dt~5 J 00 percer-It 01 the 1'1E'1oo' park. inS' demand for which the in-lieu fee is bt:~ir.g l~vied. Tht"' develaper pays only tor the ~pecific nu~her of spaces t!=~t the developer's project is unable to pr"vide on site or ~t-.:'IpprQ..,ed off-site location:E;'. The full cost of new pa.rking st<!olls is established in Section"II of this study. SEC'!'lOlC "II: fJETZRliI)f1\,TI014 or Ili-LIeu 'FE'! FOR A NEW PUBLIC PAaXI"G PROJZ~ IN TUE UXXV%RSITY AVENUE P~lNG AS8~S8MEHT O:STRI~ The c;:)st analysis proceeds accordinq to the fol1mdog steps. 1. Identif}' the fea.si.ble scenarios tor public pl!llr~:ing facilities in the Assessment. Distr~ct. 2. From ~hosel identity the ~ost appropriate scenarios for implementation. J. Id~ntify the-pot.ential ll.Jcation-s for future parking projects, based .on consideration at the develop!:l:ent potential and unl!let parking demand at thQse l~caticns, and identify tne parking projects appropriate for those sit~s. Select the most likely site and associated parking project. Page 5 • .. ". 4. Determine the cost to construct a parking stall in the most likely parking project. 5. Recommend th~ amount for the in-lieu fee, based on the cost per added stall in the ~ost likely parki~g p~oject. STiP 1. FJaBZBILITY or PARKING r~CILITIEs. The first column o~ Table 1 lists four types of public parKii"l.g facilities that exist now, or could ~ construct~d in the future, in the University Avenue Assessment District. These facilities could be constructed on the sites of existing City p3lrking lots (coluan 2 of Table 1)( or ir. conjunction with private developments 'such as tne 250 University/Ramona Plaza project (columns J and 4). TAB1.,E 1 FEABIBILI~Y OF PARY.!NO F~CILIrrES IN THE l~rVERSITY ~VgNU2 PARKING ~SS:ESS.HEN1' DISTRIC'j' r np, OF ''''';I~;;--~! IJIJILT ON!liNDER 1 Br)!~~~-~~~ f';'~,.'",u --_. ·--1 aUJL'l C'1' f'k.lVFlrc: I Fr.CILITY II EXlS1'JNO C~T':i L~rrD {fOR :::kLE L,,,"';::' (D? s.~ r. ~ j PARY.1NC> Lor ~ Cn'i' TO CIn NDr L";-, f INCLUDltiG LAND CLUDtNG LiU;D ! CO~!) con i Surfaefi! F-I!riting Lot (') (2) Il) Already e,..ists Would nc,+_ '''' \oiould not b. De~. (4) built built Si,u>lle Elevatp.:d (~} (' ) I' Feui::'la Would r.ot b. ,,'ould Il'-'t. l~ b,.ti.1 t-_ t.I..iUt iH.ult.i..lliilvliIl st.r .. cturo ef) (0) I (' ) ,NY inc;lude Feasible Wl..tt! 0< Fe,u • .i.ble Fea.sible b ... enMrnt bvel) without first floo.t" t"et&i.l Two-lAveL (0) (ll) (12) Underground GUilge--I'tluible with 0< f'easitlle Pf!-lIeibl-e \,Ioder 8xi8ting Cit;y wit;hout II ir parking lot or under pri~ate building ci~htil I The numbered cells of Table 1 identify 12 scenarios that cover the range of I'easonable possibilities for public parking projects in the ABsess~ent District in the Ioreseeable future. Tha 12 scenarios a~e described below. SurfOC~ Parking Lot_1§cenarios 1-3) The surface lot is the most common existing parking facility. HOlrJever, it is unlikely that the city or a private lando""ner 'o.Iould build new surface parking lot:;,;, other tharl for 'temporary purposes, beca.use of the high value of land in the dovnt,o-.m ateCi.. Th·.ls, surface par~in9 lots were not included for additional analysis. Page 6 t .. '1"'_"'_~--·----' 1 • ,! ___ ~'; ____ ~ __ ~l.~,·.'~ ____ '_ ....... _. ~._." Single peck over Existing (@t (scenarios 4-6) DUe to the high value of land downtown, it was assumed that. it Would be financially impractical for a landowner to build. an elevated decx on a privately owned site, so Scenarios 5 and 6 were MC)t included for further consideration. similarl}~, it 'Was assumed that the Clty would not purchase a new site on which to constnlct a decK j or any new parxing facility, as the City already owns several parking lots spread throughout the: Assessment District that could be utilized. A sin~le e.levfttad deck oller an existing City parking lot is considered to be a possibllity--one that ia typified by the parkinq deck on Lot 5 on Ca~bridge Avenue and the recently­ co.pleted parking deCK on Lot J on cambridge Avenue, both in the California Avenue Parking Assessment District. HYltilevel parking structure (sceDariQ~~ This type of facility is typif led by th.e 'r>lebster-cowper Garage, ..... hich now has seven levels of parking, tncluding one basement lev~l, an at-grade level, and five above-grade levels, il1cluding the roof. Stanford University parking structllres I, II, and III, and the downto',m Moun-cain View, Santa Cruz, and Redwood City structures also typify this type of facility. Such a facility could have one or t' ... o hasement levels, on€ gl'oumi l~vel, and \.lp to five above-grade levels, to stay within Palo Alto's existing height limitation. Underground parking deeper than t'Wo levels below grade is prohibited by the Palo Alto Municipal Code Section 18.4~.100(e) I .... nless regUlar pU!Ilping of sub-surface water would not be required. The entire structure ..... ould normally be devoted to parking. One variat.ion of a multi level struct·ure w"uld be to have retail portions on the ground floor, with parkin9 above and below. Other varia.tions involving use of air-rights for other uses above parking are discussed in the appendix. A multilevel parking structure could be built on the site of an existing City parking lot (Scenario 7) I or a private developer could build a structure on private land and offer all, or a portion of t.he parking tor sale to the City through an assessment. district process; with or ~ithout including the cost of land (Scenarios 8 and 9). TwO-Level Underqroun~ Garage (Scenarios 10-111 One or two levels of underground parking could be constructed under an existing City par}:ing lot, with parking maintained. on the surface level {scenario 10) I as suggested in the October 1993 Downtown Urban Design Guidelines. ~yen though it would be less costly to build an above-grade structure, there ar~ reasons why it miqht be preferable to construct undergrol.md parking: unenclosed surface parkin91 which seems to be preferred by business district customers, could be preserved; future options for a surface and/or air rights project could be pre,servedi there :n~y be windo'ois , doors, private parking areas l or other aspects of buildings adjacent to the parking lot that would preclude or be impacted by above-grade Page 7 ="'-="'---------_._, .. ,-." \ • constructionj and, a concern for aesthetics -might not favor an elevated structure. Scenario 10 includes the possibility of .urf~ce a.nd air right.~ development in ccnjul".e-ticn 'Wit.h undergound public par~ing( as discussed in the appendix. Mother scen.,do (or underground parking is for a private developer­ to construct a cOl:l.iDercial building with underground parking on priv~te land. If the d~veloper ~ere able to provide more parkin9 than required br City regulations, the deyeloper could offer the excess parking for sale ~o the City through an assess~ent district p~oc~ ••• with or without inclu~ing the cost of land (Scenarios 11 and 12). scenario 11 is typified by the favorable arrangement fQr additLonal parking in conjunction vith the 250 universitY/R~mona Plaz .. project. Ti'!ble 1 and Step 1 descril:ed 12 par-king facility scenario.,,> for publJ.c parking pro5e.::t~ in 'the Assessment J)istrict. .From tile above dl!,C\,.lssic.r., c,f,ly J of t.hE::c' 12 sC€i!3r-ios 6!"e considered "to be fei'i:~ il:>le Ln-fu(.u.re projects. In Step :2, these sever. are further n"'n-c· .. ·ec de ... ';--: to 'the fO"Jr r.,,:)~:t a~ipropT iate, or "developable ll • As eXplalnGd in Step 1, neither the City nor a private property o.me.r ... ·ould be lik-E'ly to build rr.:ore perrr,ancnt surface parking lots, nor .. ould a private property o' ... ner • ... ho owns :3 surface parking lot be likely 'to build dn elevated deck on such d lot (Scenarios 21 3 1 5, and 6-in Table 11. N~lr 'o.,'Ou1d a private property owner be lik'91y to build a );;"Jltilevel parKing structure on priv3te land, because there 'lo'Quld be l§inimal, if any, leasable hui lding space included (Scenarios s and ~). Downtown land is too valuable to be used just for parking. even multiple levels of parking. '.litt'. minimal lease inca.eo to th~ owner. In Scenarios 11 and 12, it is more lHCE=ly that .!; property owner woul.d offer parking for sale to the City wi thout including land costs. recause the owuer would probably des.ire to provide a publ ic benefit in order to gain cert.ain develop.lIIent right.s. Thus, Scenario 121 whictl does not include lend costs, is considered to be more appropriate than Scenario 11, which include$ tand costs+ pq",....,~ Scpw ..... TI, l~ Page 8 Most APPropriate Scenarios The reaaininq four scenarios tr,at are t.h@ :'!lost appropr iate fer i.ll.p18lJe1lt"tjon in the Assessment District i!!lre SCEnarios 4. 7, 10, and 12, shovn by the shaded cel)s i~ T~ble 2. T"'-Bl..£ 2. MOST APPROPRIATE PARKING SC"El"ARIOS FOR THt UNIVE...lffirrY AVENUE ASSESSMDrl' DISTRICT n'PW QF PAAA~"" sun.i OH/UlfOER I atTn.T 0frI f'RIV"n: 8UI:L'! Of< PRIVATa P1'.Cll..lrt ~:usnltC CITY 1..Jo,)ffi lroJl!; 5M.~ ! TO Ci'7Y uoro P'''' • .u "AA.U~ em-ro CITY NOT ,.- I"CU.i~I~ LA."CD CLUDING r~t,jfo i L"'" cost) - Surf&c@-PlI!.r'n.r,g !.Dt. I (\.) I "~ (J, i. },~r~",':ii ~~~s ... ·8'.; 1 d r~t t~ ~o~!j 1'1~, 0., I C'.J i ~ t. b..J l.it . --... -...• :Hngle l:l.','ate:i Df'c\:: ~ { .. ) I (5 ) I {6> } ..... j..bl .. ..,~"" ~ rJ r,;:' " I "";:J' . .!lc' n,,:-t'. , ~.. -------,!jL-------+-"'" --+-"-'~"----' I; )o\'Jlt.ileyel ;<it:'JI;:LIJ(O: (1~ ! (13) I en ~ ~ (i'!' ..... y 1.Il.:1.:r!e T ... &,,~bl. Io'io:.r. c ... ~ f~I'!'ibl" F'(>.H·i.bi~ ~ oa.sC'me'"lt leve 1 ) _-i_-~.~t~t>¢"'-'~t~t~L~'~·~'_'_·_i_ '_'''' -------t-------,--~ ,. floor :-.t.~il. _ "I'-..'O-z.e.'IIe-l (10, OIl (H) Under.g:rO'.Jr'ld Gara9~--"' •. nibl. "tltb or I r .. ,,'Ii l.bl(;l' T .... ibl. under e,Xi.t.Ln9 Cit,· -..;1.t.}-.out .. ir p4rki~9 lot cr un~.r ~~9h~S priv.t. building 81'P 3. IQQTIlIClt.TIOPil OF POT.P-lIAL LOCATIONS F01LlU'!'ORJ ASSUSgn DISRICT PARl:IlfGmD.C;ILITIIS After identifying above the tour most tI~propriate pa:t:kinq scenarios for tlle Assessaent District, it is nece.ssary 't.o identify the specific locations ..,here these scenarios could be blplemented. Private parcels and City parking lets in the Assessment [1~st.rict were revie",,"ed tor this purpose I as discussed bela"'-, Redevelopment Potential of Private Parcels Private parcels in the Assessl:'lent. Distrlct were examined for the likelihood of redevelopment in a for~ that ~iqht include new public parking, only one parcel .... '3.S identified as having a reasonable such lil<elihoCid. This is thA 325 Lytton property, in combination with City Lot K, which h~s been considered by a local developer as an cpportunit;y to build a ne .... building j.n conjunction with added pq~." ~1.1~ Page 9 \ -.. -----_ .. _-- pUblic parking underground. Thr:ee other parcels and qroups of parcels were identified as potential for such re.develop.entr but are considered to be too uncertain to il'lClude in this analysis (500-526 UniversitYr 400-420 University/51S Waverley, ana 663 Alma). The PlAnning arid Tr.t\nsportation Division staff uEed. the following factors in assessinq the redevelopment potential of private parcels: • size of parcel. • Physical condition of structures. • Physical and economic constraints. • Viability of current business. • Intensity of current develop!l1~nt or '.lSi?, .. 1ndication:s from the C'wner, or other ::>0urr.e J o~ner's redevelopment plans or d~5position redevelopment with the city, r-eqa.["dlr:~l tht! tm.'ard joint &m§Y~.rulL..Pot e nt i aL.Q.L. _.f~;.~"t: .1JJ.9. .~E'i~.{).~ j l}g-LrLt._~ .. _ ... f.QL. .. ): -e "*" Patkinq Faci.U.!...i~~ Existing City parking lots were examined for t~le possibility of redev~lopment according to one of the f0ur p""l:"k:i.ng facility scenarios listed above. The process used by the It clnsportatioil Division staff was based on the follo~ing factors dnd intor~ation sources: • Pt,ysical constraint.s of the p~rcel, lnciud I ng size, access li:nitations: from the streEt. and access needs of adjacent private buildings, including doors, windo~s, and private parKing areas. • Phi'sical location of the lot 01:: parcel in tt,c block, including its relationship to the el~vations of adjacent buildings. • Data froIll efficiency multilevel a li=ited 1989 City of convertinq surface parking {Transportation analysis examin~n9 ~he parking in City lots to Di'olisl..on. May 24, 1989}. • Conceptual designs produced in 1992 by the watry Design Group for Lots DI 0, and S/L. • Guidelines from the Downtown Urban Design handbool<.. October 1993. • Possihl~ sale oy leas~ of surface and/or air rights C~ a city lot (included consideration of Iactors swch as lot 3lze and location) . • Complexity of redevelopment., such as closure of a publ ic Page 10 • I .~ street or alley, abandonment of a public riqht-of-way, encroachment on or under puplic property. • City of Palo Alto 1994-95 Capital l~provement project {elP) No. 19530, 'lDowntol,ffl Parking structure Feasibility Study." • Relative unmet p~rkinq demand, as determined below. E"tiMtioD of Unmet Parking pemand. 'rhe likelihooO of iJllpln.entation of a public parking project is affected not only by the av.ilability of an appropriate developable location~ but also on the unmet need for parking in that area. For example$ if there wet'e high dellland for parking near a Clty par}:ing lot that had potential tor redevelopment as a new or expanded parking facility, the City might be more 'inclined to consider that redevelopment. Likewise, a private property owner' who is considering redevelopment of a site in an area with high parking demand might De more inclined to construct extra parking as an added public benefit~ or enter into a joint developrnent project with the City. Thuz., the~e is a need to establish a measure of ~nmet parki~g demand at each location in the Assessment District. 'l'he method sple(:ted was to divide the ,lI"sseSSjT,ent District into blocks as def ined bj.· the major cross streets, then into ~e(.:tors, as defJ,ned by the conjul1ctiof', of tOil!' bloCKS, Fer ~ach blecK, the nUj~bet' of pubJic off-street parki ng stalls was OeteP,\ined. Thi So constituted a measure ot" the parking supply on a block-by-·block basis. 'The.n l using tl"1e 1994 Assessnent Di~trict engineer's report and t:ol1, a tally was made fot' each privat..e parcel of the parking required, less the parking pI'ovided on site. This constit"uted. a measure of t.he parking demand on a block-by-block bi!llsis. -The supplr was subtracted fro1!1 the derr,and, yielding a relative deficit in each block in the 1..ssessr.\ent District. Fin':l.lly, the dp..fi<:it calCUlation ..... as translated into a deficit index for each block (highest deficit = 1), as shown in rigllre 1. This index should be considered as a 6urroq~te representation of the actual deficit. Waat is most important i.e the use of a m.ethod tha.t produces a. reasonable representation of the deficit and that is consistently applied throughout the aI"ea, enabling the relative intensity of the deficit to be compared on a block-by-blocy. basis. Ur..met parking demand, as measured by this deficit index! was considered in the review of existing City parking lots for redevelopm.ent potential. For example, Lot D h~s significant physical constraints relating to circulation and the need to access adj~cent properties that make it a difficult lot to redevelop, However, these physical difficulties are offset to some degree b'l its location in an area of high unroet parkinq demand. Thus, Lot 0 has besn included as a potential future parking project, albeit of less likelihood of implementation cOMpared to other locations. Ba.sed on the criteria listed above, seven City parking lots that are considered to he reasonable possibil i ties for inplementation of specific new parKing projects were identified. Figure:2 and Table :) Show the identified projects. Parking projects are listed in approxim~te decreasing order of likelihood of imple~entation. Page 11 - I I I -'1 ,j I . 0.25 Jlunl 0.08 0.51 0.43 BloCk Deficit Index Iblock bounded by major streets or block bounded by major streets and, Assessment Dislrict. boundaryl Sector Dtlficir fndex (ayerage of deficit indices of b~ock.s adjoining at intersection) Scale: 0.68· 1.00 high deficil I 0.34·0,67 medium deficil 0.00· 0,33 low deficit ~.....,.... __ -=,~ ! , I /i,:e Ill, '1t:~:11 ["":@:""il'l E ,~ ... -'~ .~ 1= ~fai 1;'1 JL 1 r o~: 1 I 4 eZ\'·\\T 0.65 : r'i..!CCC~ __ ....., 'l~["" 0&1 1111 ,@@ 1~1',"',-,-?"@1~LJ ~ ~ = ccc~~~~_===~ -, ?35 ~.87 II JI IQii-l ~ ~ ". ~L--.J ---=".......::;.54l~ d 6 ' " I ~ll '"'"""J ~l~1 I 0.33 l\Ot~~ J r 0.61 l!1 I,io\ , 74 L--.J~I I <----;'=~ .. ,.bd'1~h!"JI'IIIIIIIf1IIt1UrllllllnuulllruIIIIIIIUIIJ FIGURE 1; DEFICIT INDICES FIGURE L LOCA nONS OF POTENTIAL PUBLIC PARKING PROJECTS THAT COULD BE IMPLEMENTED IN THE UNIVERSITY AVENUE ASSESSMENT DISTRICT ,._- \ ~\ '" I \ TABLE :. POTEllTIAL PUBLIC PARKING PROJECTS THAT COULD BE lKPL.D1E:;TED H' THE UNIVERSITY AVENUE ASSESSHEN'I' DISTRIC'T <lIS SIL Lot R with or "",itho~1 L":H P L.(;I Po ",.:, :In (1( ~it.lK'ul L".I! P IL", D :1 ~Ll): V 1- u..110 TYPE OF F ACIUTl' -=G~!-' i-le-':<:-' -~r-_~"-:'~-i_~-~-.. ---------; ~2 I-:,' .. I~ 1]" kr.!,''r''~':tCj "",n ~'"(. i-\i: '.':~ "~Il.,":: , --------------{ Lot 0 ~ it'v~i~ u;.Jergr,';,;nJ ~iLh r.!r\;t'.~ (,;'1 -",g(.!~r Lm K a.n.1 325 t'>r'1\'31c t'1Ll'IIJlng mer:t I:::.eh urXkft;f'''J:<J r-'~~I~'\) L)norl (',cm('l;n~ ';;(1mhineJ Ii.,;th llr r!!;h,.' ~~\er L'I!.!-~_. ~_~_J Projects on Lots D/ 0, dnd the Lot K/325 Lytton combination are considereo to be less likely than the other proj€cts because of the greater physical constraints of Lots D and 0 related to internal circulation and access needs of adjoining properti~s, and the vagaries of the real estate market. associated \r{ith 325 Lytton. parking structures on Lots SIL, P, and R are considered to be .ore likely than underground parking with or ~ithout ~ir riqhts dev~lapmentf because a structure is less co~plicated and less expensive {refer to cost analysis in appendix) than an underqrQund or air rights project. FurtheOllOt"e, a structure has been identified more frequently than other typ~s-ot pcnk:ing facilities tor those locations, as evidenced by the Urban Design Guidelines and the Cit~,js elP project. The elP pI'oject will study the feasibility of building a parxing structure on a downtown City parking lat, which could lead to construction of a structure within che n~xt three to five years. The study is expected to focus on a Wepstec-Cowper type of structure (i.e., an al:>Ove-grade structurE: :..n conjunctio:"l \o'ith one or ~ore underground levels) on Lots S/L, R, or RIP. Page l' ..... •. !"'~ , , ./ n • -, , i 1--, ! , i ; ,I I rl i I city lots not included in Table 3 are not considered to be likely candidates for redevelopment primarily because of small size l location, and/or physical constraints such as the access and circulation issues mentioned above. Analysis of conceptual plans produced by the Watry Design Group fC'r Lots 0 c,md 0, and the cost analysis presented in th~ appendix, indicates that cos~ per add~ stall for a sin~le elevated deck vould be too high to be included as a like11 project for the locations listed in Table J. Also, a single deck does not reflect current public and city thinking tor these sites. Existing City garages (Webster-cowper I Civic c~nter, B, and Q) were not considered in this analysis because significant alteration is neither needed nor reason5bly feasible. The parking projects in Table J constitute the cu~rent best assessment of potential new public parking projects that could be implemented in the University Av-e.nue Parking Assesst!\ent: District in the foreseeable future, ..... ith the mult i level structure being the most likely type of parking facility. The two Most likely locations for a multilevel structur~ are Lots S/L and Lot R vith or 'Without Lot P. In the future, the c.!t~' or dncth€r proper-ti' owner may determine 'that a different parkil1g facility is ~ore appropriate for a particular location than the onas identifed, or that one nat listed ~ay turn out to be a potential project loc~tion. Notwithstanding these in2vitablc uncertainties, 3 rnultil~/el structure ~n Lots S/L or RIP serves as a redsonable, rational basis for future planning for a public pa~king preject in the Assessment District, and as ~he basis for the in-lieu f~e. ~Tf!P 1. DERlYATION at' COS1' PER STAt.t. ___ FO~L)I(tJ'LTrLEVE'L PJ\RJJ.:ING S:TRUCTUR~ Genera] AssumptiQ~ What the Cost Calculatiop Includes. The c:ost per parking sta 11 pres anted belo~ includes all hard and soft costs, from PTOj~ct conception to completion--roaterial .. labor, design, arChitectural and engineering services l testing, inspection, fees, any special conditions such as hazardous materials removal and utilities relocation, and administrative costs associated with development and construction of the project. Costs of bond issuance ~ill be added to the above cost in S~ep S. Interest cl ... arges for bemel debt service should not be included in the in-lieu fee, and thus are not included in this cost calcula­ tion. Whatever amount of in-lieu funding e:..:ists. at t.he time of project financing l will be used to pay do ..... n the total amount 'to be financed. For example, it the next parking structure were to cost $5.0 million, and $500,000 had accumulated in in-lieu fees (including earnad interest) r the amount to be financed through an assessment district precess ..... ould be $5.0 million, less $500,000, or $4.5 million, plus appropriate financing related costs. Page 15 ~ - (' :1 Cost per Added Stall. The in-lieu provisions of PAMC le~49.100(Q) require that the in-lieu fee be based on the incre­ .ental cost of a net new, or added, parking stall in an As·sess­ lIent Oist.rict p3rk:inq project (the terms "added n I'\nd II net new fl are used interchangeably in this stud~·). For any project built on an existing parkinq lot, onl)' the added ~talls (i ,e., the additional stalls above and b2yond those already existing on the projec~ site) represent an increase in the parkinq supply. Typically, the primary purpose of a parking project is to create .ore parking stalls tnan what already exist at the project location. Thus, the real cost of that project is determinea by dividing the project cost by the nunber of those edditional, or added stalls oreated by the project. The number of added stalls is equal to the total number of stalls in the new parking project '!!linus the mmber of stalls that existed prior to the project. This effectively raises thE; cost per stall for a project built on an existing parking loti compared to one built where no parking previously existed, ThB stalls in e>!isting city su:ctace lots have alreCidy been paid for by d.::,wnta .... n businesse$. Removing ttlese stalls and :r.;,>building t"t1.em in .a ne .... paJ;."king facility repl'esents a new cost that results solely fron the construction of that ne'.! facility. 'I'h.:! cost of that re~oval and repJace~ent be~o~es ~n illseparable el~~ent of the cost of the new project, Thus, the difference be~ween the cost per stal~ (based on ttle total number of stalls in ~he project) and Ul€ cast per added stall e3sentially re:presents the cost to replace exi~tinq stalls, This difference is greatest for a facility with onl}' two lev~ls, as the cost to replace existing stalls is spread over only one level of new parking. The differ­ ence decreases with an increasing number of levels in the facili­ ty. 'l'he cost differential between t.he cost per stall a".d cost per added st.all can also be viewed as a surrogate for thr: per-­ stell cost of new land if the City had to buy vacCint land to construct a parking project, instead of constructing it on an existing City-owned parking lot. Replacement: Ratio. In most parking facility designs i.nvolving multiple levels built on an existing City parking lot, fewer surface parr.ing stalls would he able to be replaced on thQ surface, and fewer constructed on each of the above-and belo~­ grade levels, than "Were eXisting on the surface prior to the new project. This is because ramps, columns I and other structural elements usurp some of the space avail~ble for parking. The "repL .. c-ement rl1tio" (r) is used in this study as a measure of these losse.s in moving from surface-only parking to parking on two or more levels. Besides the structural elements, other factors influence ~he replacement ratio, including the design of the circulation system, the size and shape of the site, and structure setback restrictions. Another fuctor is the latest parking dimension req~irements (e.g., an increased percentage of compact stalls in the new design can increase the replace~ent ratio, while new requirements for parking for the disabled can decrease the replaoement ratio). The replacement ratio is the Page 16 ,j ----.-.---,--.---~-.--'- average number of parking stalls per level in the new project divid~ by the number of parking stalls in the existing surface lot. The lower this ratio, the higher the cost per ~dded parking stall. It is n~cessary to select a representative replac€~ent ratio to be used in the cost calculation. Yollo"_ing is a list of replaee­ aent ratios that have been calculateo tor several existing and conceptual parking f~cility d.es.igns for Palo Alto surface parking lots. CUlbridq. Iov. Lot 5 Structur. (old) (!. SO C~ri~ ~V~ ~~ ; struetare (ne~l 1.03 ''It.rtl .. t: ...... d.aiql"l #2 f<;n V..lt 3 {Kilb<Jr-Sl'!lith) 0.96 ,\!t_rr. .. :.i",. d,,:siqr, I~ fo~ L<:It .3 (lo'Ubur-SmiU1) 0.88 A"d~·t'"I9E' af t ivE' desl.gr;" ter ShEnT,1J;11 j\,se Lot! lWiltllH"-Sr;1itrl) O. ~l ... ·~!lollt~r-CO"ip.H G.a.(.!ge O.!iD G&~.~e Q 0.93 cc~.ce;:tL:~l d"!."li·.Fl for :.oct ("\ 5tn .. ..-;vJre Ih·.itf)",) O.5G CO,"F'''pt'-<ill de-algor; !<:1r I..-ot (1 deck (I· .. ~t")'J 0.61 cc.;:-'~Qp"t',.al de~1..9n fer t-:·t.·~ Sjl.. stn.l\:.'t.\lt2 \W::.t.r'il 0.82 The r~cently-co~pjet€rl Ca11bridge Avenue LD~ ) structure,.with r = 1.03, is ~nu~ua]ly sucessful in not losing (but actu~lly gaining) st~lls on a per-floor basis, despite the space requirements of the ra~ps and colu~ns associated ~ith a Rtructure. A contribut­ ing factor js that the st~ucture ~~s built up to the property lines of the site (i.e., no setbacKs), At the other extrf"l!Ie is t.he Webster-Cowper Carage. .... :ith r = O.~, due prir.'!arily to the \.muS\lall~' large set.hacK of the g:.rage from the propel::""t.y line5 to !l',ake l"00.n [Col' extensive landscaping, lighting and ventilation for the "maerground level r o.nd tbe ?erimeter public walKways. The ""eighted av£:!"aqe rep!aceILent ratio for the above examples is r a. SO. 'Which has been chose.n as the tII.cst appropriate to he used. in the cost calculations included in this study. ~tlt;.Yil..tiQn of Cost per stal.Lfor Multi level parking stru~~ 'the only exa.ple of a standalone multilevel park.ing structure in Palo Alto is the webster-Co~er Garage. When originally built in 1986. it was ~ 41B-stall five-leVel structure, including a base.ent and parking on the roof, and was built en existing city l~t J which had 157 existing stalls. Since then, developer Jim Baer added t ... o addition."ll fl001"S that; are restricted to private use only. Th~ cost of the original facility is used as the basis for the parking stall cost calculation. cost Per_.~.l..l.. T .... le cost to build the Webster-Cowper Garage l exclusive of financing costs, is $5.4 million, expressed itl mid- 1994 dollars r or ~lJ,OOO per st~ll. based on 418 total stalls {~arch 30, 1989 !!lemorandum, Public Harks Department, lIeast Comparison, 250 University Versus J.lar}nng Lot Jill. Table A-4 in the appendix lists a number of local multilevel parKing projects, Page 17 :; "~X_ *;: with and 'Without basemerts, .ith costs per stall r~nging from epproximately $10,000 tor the Gover~ment Center Structu~e in Redwood City and Stanford Structures I and III, to $16,800 far the downtown Santa Cruz structure (the DeAnz~ structur~, at $3,200 per-:'Itl!tll, i. n.ot incll,lded in this comparison because it i;;o so auch largp-r than any project th.et would be ,,",uilt: downtown). Wgbster-Co~r stands approxi~ately at th~ ~idpoint of this range and/ Mingo a. proje.ct constructed in dovnto,;n Palo Alto, is selected as the best project tor .. hich to calculate a cost per stall figure. Cost per added Stall. ~djusting the ccs~ of the ~ebster-CQ~er project for the r~plftcement of 167 existing space~, and using the represent-atj ve r4!'p~ aceltent rat io of D. 8, a cost per added stall of $17,300 i~ cal..::ulated l .as sho1fl'l be 1 0 ..... , r .. C.B .. a\'-g of 1);,6 li'::lt!cS ~r tlC',:.r/i6 1 e)(i~ti.r.1l !!!tall,..; R~Fr~lgntat~ve proJect t',~"" w~~ld ~~~E S ~e;.ls x 13J.6 ~~2 t,;;t41 '!jt:l.lll'i: "l!Is.:..-. .lnq a. ccr;p_::-",~t~'2'-, c:::st Gt :i.!.J,O)J./s~d;ll f~.;.',,-~,_-t--.:i!t! ,,,.(''t,. :o:t'il"l'icc"'"F~r pCC"'l~:-'_, to,:-",l F~,{.O-'"'Ct. CClst ~ )~ e' ..-.l.~~'JI'l; ir,IJ;, ("C)!;t f<;1J.· "~'0",.:J E>t.J.l~ 0 ~,8 .. t_E· ,-ll1jC'---,i:~'-5'~-="11 s.!7,JO;) As point~d out at the conclusiGn ot Step J, the aro\~nt of the in­ lieu tee should be ba~;~d on the cost F{'r added PQr1~iny stall for a ~ultilevel parkiny structure, or $17,JOO per st~ll other~ise required to be ~rQvidej b~ develop~ent projects that meet one or more of thp in-lieu criteria_ One addjtiona' adjllstment !'ecc~,~ended fo~ inclusion in th~ in- 1 i~\l fee {';onCeTf"I'::o -f in3nc .Lng cost~~. ',nlE-'n 2i ne.' parKing st.ructure is built in the do .... ntown ~["ea, the project .... .i 11 be financed through the fcrmation ot an aSS~SS~2nt district comprised of two basic cCl'lIponents: (a) initi3l, upfront bond is~uance costs (legal fees, under·.,-:-iter fees, etc.). and to} en-going, annual pond payments (principa l and interest) throughout the bond issue period. Since h-Ona issuance co:s.ts (appro::OCltlately 10 pe:rcent ot the amount. of the bond issue) are ".,:ptront costs and a necessary pre.'Curs.or to proceeding ,.ith a f\e .. parking stn~ctu'["er the in-lieu fee should include an appropriate sh~re of such cost. Therefore, the recommended in-lieu fee 15 $19,000 per added stall j inclusive of d proportional sha~e of the bond issuance costs ($17,300 plus 10 percent fol:'" bond issuance ccsts), ".:his. fee i.ncludes the full incremental cost of providing a net ne:· .. · publ ic pa!"king sta.ll in the Assessment Distrio:;t, as required b~' PAMe SE:!ction 18.49.100 (d). The fee should be adjusted annu~lly on July l~ based on the construction Cost Inde~ tor the San Francisco area, A typical multilevel structu.re for Lots 5/L CQuld have a total of six levels (including base~entl, about 550 total stalls, and ..... ould be expected to cost approximate) y $-" J, 5 mi 11 ion ($13.000 x 550). Such a structure could be cor.str~cted within the next 3 to page 18 t ! 5 yearlf" during which til!le it is Gliltiaated that up to 50 unbUilt parking stalls could accumulate fro~ the in-lieu provision. That nuaber of stalls (or whatc~er the actual nuaber is at that future tiae) would be designated for funding by the in-lieu fees that had aCCU8ulated. At $19,000 per required stall, that eaount would be $930,000, plus interest. As shown in the appendix to this IiItUQy, the .u!tilevel structure h~B the lowest cost per added stall of all the racilities 8nA­ lyzed. Basing the fee on the ~ultileyel structure has so:e ad~antage8: {a) it is unlikely that a property owner yould be overcharged for any parkinq project; and {b) provision of in-lieu stalls is encouraged by ~ lover fee, and pyblic usage of in-lieu stalls benefits the downtown, as such usage usuallj' rt'sults in .ore intensive use of these stalls (i.e., greater ~urnover) than if they were reserved for a particu.l~r business. The dlsl!Idvan­ taqe of selecting the fee for a. ml.llt:.ile-vel structl.l!.-e i.s that a -mQre e.xpensive pa:rkinq project '.,:auld be underfl1nded, As desci't,).ed in the appendix, however, tne finClflcial cons~guenC'.e-to t.he Assessment Dist~ict of underfundinq c~n be r~latiyel)' s~~ll. \ : <. APPENDIX COST BASIS STUDY FOR OTHER TYPES OF PARKING FACILITIES THAT COULD BE IMPLEMENTED !N THE UNIVERSITY AVENUE" ASSESSMENT DISTRICT • APPENllIX con IIMIS 9=Y FOR 01'IIJ:lt 'rYl'IB OF l'AIUIING FACILITIES 'l'lIAT COULD BZ IXnllllPTED III i'III! OlttVERBl'rY AV1:1.'UE J\SSESSKJ:IIT IlISTaIC'!' This appendix appliss the cost analysis of this study to the other parking scenarios in Table 1 that are considered reasible in th~ University ~venue Assess~~nt District--Scenarios 4, 8, 9 1 10, 11, and 12. DA;ry,MIOlI! or cos'!' PER STAl.L lO! OTR'IIR §.Q~jL The fol1oW'inq costs inolude all developlllE'!nt and construction­ related costs described in Step 4 of the study. Costs of bond issuance ar'!' added to these costs in Table A-3. As explained in step 4, interest charges for bond debt service ~re not included in these cost calculations. 7he most curren"t exampJe of a single park.ing decl<'o on a Cit-}' parking let is the recently-completed project on Lot 3, in the California ;'.vlil-j,ue Busin.ess District. The cost ot this project ,is used as the basi~ of the cost calculation ot Scenario 4. Cost Per Stal~. Th£ October 1933 Final Engineer's Estimate fer the Lot. 3 project , a rer::ord of aU cost;s associated with t-.his project, indica.tes a total. pI'oject cost of $1.87 million, exclusive. of financing costs. Based on t;'le total of 186 stalls provided in this structure, the cost par stall is $10 1000. Table A-4 sutunarize.s cost and other da,ta for the Cambridge structlJre ~nd other local parking projects. cost per Ad~ ___ St~U. subtract ing out the 90 previously existing stalls on Lot J, and adjusting for the representative replacement ratio of 0.80 results in a cost per added stall of $26,700 for a representative single deck project (Scenario 4), a~ shown below. r • O.B • avg of 72 stalls per floor/90 e~i.ting surface .~&l18; F:epreM:lt4ti-",e project thus wolJJd have 2 JI: 12 ." 144 tot-al ataU8; Aa.~in~ a conBtruction coat of $lO,OUO/stall from act~al ~ J proj8c~, tot-al pr~ject ~o6t • $1.44 ~ill~on; Thus, coat per add~d etaLL ~ $1.44 milllon/(144-90) ~ 526.100. Mu 1 til eye 1 ParkJ..D..Q.. __ S trJ4,g!;.yt:g As determined in Step ~, the cost per stall (bascd on total stalls) ot' a Ilultilevel structure is $13, OOO~ This is applicable tv scenario 9 in Table 1, where. the structure does not replace existing public park:lng. and land costs are not inclucled. Land Cost. design and structure~ Scenar-io S includes the cost of land added to the construction costs ot the scenario 9 multilevel parking Lana cost was assumed to be $100 per square foot, based on t.""e City's purchase of t.hE' Board ot Re~ltors building. This cost was then distributed. oyer five lp.vels of p,:lrking ~s follows: 418 Bt.llB over ~ l~~lB • eJ.~ .tellBjlevel, $lOO/Bt ove~ .50 I.Tele .. PO/d on. .ach lev.}, 'arkinq 6t .. ll • )55 .r t~r w.nBt.r/cowper !other e'&mpleBl 370-)15 .f t,:>c 150 lJniv.r~ity .. nd Kour.tain 'Ii ...... gar&ge,.); ~nd co.t • 2o.J7S-$1,s.OO/.tall. Thus, land cost contributes an additional cost per s~al1 ~f $7,500, for.a total cost o! $13,000 + $7,500 '" $20,500 per stall for Scenario. 8. Undergxgy'id Garage (l);g r.eY!g:ls) The aost rece~t und~rqround parking project in d~wntown Palo Alto is t:.he 250 lirliver:5.it)'IRa~ona Plaza project, cOn1pleted in lJ91 by d,e.· ... eloper .}i.!';'I Elder. The project. cOl1sists of a four-story office building oye::--a t .... o-level uncf!r-gro\tnd parY.ing g<lTC');ge, located on priv~te lanj. The cust of this facility is used as tIle basis of the Pdrki~g stall C0St ca}cula~ion3 of Scenarios 10-12. ~0s:L_12.~ .. c_St~U, ,;s part of the nego~ ia t ions for ci ty approval of his prciec~, Mr. ~~~r offered to c0ns~ruct arid sell to the City one lc\'cl of Pdt·:'~r":J P€),c'nd ' •• hr'.t .... ·21s r-.e~ded 1'0r the p!'oje-ct.. TtH:~ City accept~d ~h~ otter at an d9re~J-upcn pr~ce of $2),000 per stall, negoti~ted prior to cons~cuction ($24,800, expressed in mid-1994 dollars}. This turned O';Jt to be! actually lo .... er than the as-built cc.st per st.all, as explained bela·",', This type of development proiect could occur at other do~nto""n locatiuns in the future, bec;use .many proFert}" O'\oo'noers $UPpoct havin·1 more public pB,rking do.alto .... 'D, and a prc,per-ty O'.d1er ~dy need to considpr offering a. p·J.blic h~netit in tht~ torn of public parking in exchange for cert~in develop~ent opportuniti~s. It is also a.n effective way to provide sealler-incr~ments ot public parking at locations spr~ad throughout the do .... nto .... n area, rather than a larger incI'ernent at one location. l'1r. Baer provided details about the individual cost components of the project. With that informatjon, it was then determined which as~cts of the construction of 250 Univer5ity woulo be likely to be re.peatecl in a typical dO'.'"1ltown development site, and which 'Would be considered to be special acco:nJ!!odations to the specifics o:f the 250 University project. From that analysis, a "model project cost scenario· .as developed, representing the construction cost of a 250 University type of project in a generic do .... ntown location. The total as-built cost for the 250 University project i~ $28,400 per parking stall, expressed in mid-1994 dollars (not including land cost)1 a.nd the estimated 250 University 1!model" cost is $28,000 per par-xing stall expressed in mid-1994 dollars (not including land cost). The details of this analysis are contained in an october JO r 1991 !l'.emoranduro from Jim Harrington to M.fI_I'vin Oven-lay, ItModel Cost Esti.ttates Per Car St2.11H; and a SepteDber 6, 1994 memorandum fro: Gary Weinreich to Carl stoffel, sa~e title. page A-2 L otJ'Ier examples of totally underground par);inq projects are listed iii Table "'-4 , but none of these are conside~ed to be directly co.parable to 250 r)ni .... ersity. The Paseo Padre Project in dovnto"lin San Jose (one level of parking beneath ~ four-story housing project) has a cost per stall of $26,600. Tht'_ l1easurll!'x p,\rk in/) garage in Cupertino (J~ levels be~eath an oft ice bui lding) has a cost per stall of $28,900. Neither casoe involved cor.;:st,rictcd construction ne)l.'t to o@'_y.isting buildings, or any other unusual conditions. In neither case is th~ COSL d~ta as detailed as that obtained for 2'50 University. Nevertheless, these t\lO exaaples serve to illustrate the costs associated .i~~ this type of ~rkinq faeility. The costs for the 250 University project appear to be-typical and reasonable tor' that type of proj€'.ct. The project repr-esents one built according co Palo .lI.,lt.o's con!':tr-u.:tion prac,_h::es and ~€ets Palo Altc"s requir",!,J;'Ient;:. for parJ:lr:q stall M,d circuldti()f, layouts. oetailed cost d3ta was available fro~ ~;le dev~lop~r 50 th~t each cost component-coulc: be anai.y::;p.d [or irs rC,:'!5C'i"bl(>n'!O':S-5 in the specific ~50 Universit:j-' project, ·nd ),; ~ts applic.;:ticn in the rocd_-el applicable to a g€iir~r-ic d,y .. 'nto·"n loc:>otl;:)r). T'nE 2~,(l Unive~sity model, thU5, serves ~s th~ best C03~ ~~sis fc~ S~e~~rics 10"1::::. The cost (Ii S':;:enilrio ':.'2, thus, is. S.::,s,C'ClO :J2r' <::"311, bJ:Sfo"d c;n 'tot.al st.alls. Land Cost. Scenal:"io 11 includes UIE c:ust ot li,nd added to the design '!nd construction costs of d,', undergro;.:.nd par)dng tacility. As for Scenario 8, lalld cost was assured to be $100 p~r squar~ foot. This was djstcibuted ov('!" t,.'0 ~eyoel,:, of p~-rking and four levels of building (due: to the ('H)"s SO-fe,et h-:iSoht ll"'!lit, tJ Cl.aximuJ:l of f01.:r storie'S was a5s-u.-",,1 for a building), as fol}o ... ·s: 131 IjItAlls o'o'er ;-l~"ela .. 6-~,5 st_ .. ll.ejl .... ·el; SlOOjsf 'Jver 6 l.vell .. S16.iO/s! O~ l!'.!c)'-, l.e;'el; P .. d:int'~ st-all '" 370 !of tor 2~O Gr,i."'; Land cost -16.70 x j7Q ~ Sf.20v/~~all. Thus, land cost ,:ontributoe.s an additional CGst per stall o( $-5,200, for a total cost per stall at $34,200 per stall (S28,OOO + $6 ,200) for scenario 11. Cost per Stall and pEr Added Stall for....r'!'.9~-~_l_JlIldergroyDd GQrage Under an Existing City ParKing Lot, In order to develop the cost f~r Scenario 10--a two-l~vel underground garage under an existin~ City parking lot, w~th parkil19 on the surface {ground level)--twD adjustments were made to the base cost of $28/000 r~~ st31l from the 250 University model. First, parking on the surface requires more structural support for that level than 'Was provided for the 250 university project, ~here only the static load of a building needed to be supported on :nost of the grcund level. To approximate this increased cost, the cost of structural ele~~nts for one slab ot the gara.ge ... ·as doubled and this added CCo3t ..,.·a,S distributed over three levels of parking. The second adjustmen~ ... .:'JIS to convert the page A-3 ;' . i OJ ti " ~ ~. : -- -.-...;.----~~ cost per stall to a cost per added stall assuming a replaceDBnt ratio of O.80~ The result is a cost of $34,600 per added stall tor Scenario 10, as shown below. Iner •• .-of 25~ in total .tructur~l costa ~c.~ •• or doubli~9 or COlt of .tructural el~ntM !pr Qne alab to handle p4xkinq or. tl'le ~.<rt.lC.: $29)lt: G&r~9. total eoat • 29JK ~ (2eK x 131) • 3.90M; UIln9 the _1z. of 250 Univlc.tty aa a apecific .x~l., aa.~ 5~ nulCber of .taUa on 9roLlfld 1.vel all or, oth.r lev.la (9cOo'.md l~v.l h.. .iail.~ loat apace due to ramp. •• do thv Un4eX­ gc;:,u.nd llvel_) r thu.a resulting in l.9~ tct.l IIt.ll... '::101 J lavela, .nd coat/.tell ~ 3.96H/195 • S~: eal~l.t. co.t ~r Idded .tall with r • O.S: Exi.ting ataUs· ~1'i6.f3il.8. 81.1, J.96K/(196 -81.7) ~ ~ Surface and.....AJ.J::. Rights Development on ctty-.fE_rldng L9t.~ Scenario 10 represents tiie cost of ,::onstructinq addi.Cl..cnal parr:ing und.er an e,.;isting City p<\r).-.ing lot ... 'hiJe !T1dintaining parking 10m the grolJrld level .• 11., variacion of Scenario 10 .... ·ould .be the construction of le.,sable building space on and/or ubove the existing p<'lrking lot. Such a project could be constructed by a pdvate deveLoper if the City w.re ~o ~ell or le~se it~ surface and ~i~ rights. If a build.ing were constr'lJcted on t.n~ lot, ;:.11 parKin., ... ·o'..lld i:1!'.'''~ to ce placed underground--existing/ additicna! public parking, and that required for the ne~ use. rt would be reasona~le to expect that, with judicious use of space, additional ne' .. public p,;.ry.il~g could ~ included in such a development l as it .... as :in the 1983 Lot Q/hbitarE' project. AnothcI" variation of scenario 10 .... ,::mld be for the leaaable building space to begin on the second or higher floors, 'Witt. park.ing occ-upyinq the lo· ... er levels {such as the single. room occupancy project that was disc .... ssed irl conjunction 'o.Iith Lot R). If neither the surface nor above-grade levels were used for par-Jcinq, the .cost of placing all existing surte.ce parking under­ ground would substantially increase the estimat.ed. $:)4 (600 per added s~all tor Scenario 10. However, it would be expected that the cost of replacing existing parking, and some portion of the cost of constructing any new public parking, would be borne hy the surface or' air riqhts development. It would not be reasonable for the City to pay more :for new public parking associated ..,ith a building development on its own p~ry.ing lot, than it would pay without such a development. It llIiqht even be feasible for the cost of public parking to be subsidized by 't.he air rights developer, thus lowering the $34,600 estimat~. Not~ithstandin9 these variables. it ~ill be assumed in this study that the cost of scenario 10, proviQing new public parking stalls under an existing city lot, is $34,600 per added stall, whether or not there is an associa~ed s~rface or air rights development. To summarize the above cost analysis, Table 1 is repeated be 1 0"" showing the cost par stall for each feasible scenario. Page A-4 : ... -'-":" J 'j' 1'.i: -. ·. TABLE 1\-1 S~y O~ C08~ or FEASIBLE PAR~ING SCENARIOS IN THE OWrVERSITY AVENUE PARaING ASSESSMENT DIS~I~' TYPI 01" PMXINC FACILI'n Surface P.r~inq Lot Single £levatad Deck Xult-ile'/liiIl Structure (may includ~ base­ ~l1t J.R'/el) " T ... o-L!!vel Undec- !'r ground Garage--l.ll-,der I existing City park-.I i.n,] l'.)t or under jl ~,rivat.~ b\!ild.in~ .".------------------- BUILT ONIUND£~ E~~ ISTING CITY PARXING LOT , II Already exl.t. (4) $26,1COja46ed .tA~l 1$10, OJ}V _tall (7) S17~300/&dd.d Btall rSU(<!OOJ~t.al1 (10) :5:34 .• 6,."'O! i!dded at.-11 <$:;!O,200/ncll} eUILT ON PRI­ VATE LAND {FOR SUE TO CITr I NCLfJDING LM."O COST} P) Would not be built (5 ) Would not be built. (' ) S2{J, ~'OO/5tall (ll) $.3.4,200jatall BUILT ON P:RI~ VIITE LAND (J"O'R SA.I..E 1'0 CITY NOT IN'CLtJDIKG IAJIfD COST) '>1 Would not ". bui.lt (' ) IfOlll~ not be b-uiLt (9) 513,OOOj8t;.1l1 (U) I $2a, ao~/ kt~l1 I 1. CoetJ~tall i8 bae6d on the total n~rnber of stalls i~ the facility. 1 st~ cell. itldJ.cate 1 "108:' &pprcp.£'la~e 1JC9- nRrlo~.~. ________________ ~ 'I'able 1-.-2 is a sU!"$\a:ry of cost per stall for the fout: scef'oa.rios. determined in Step 2 of this study tt:' be most appropriate for implementation in the Asses~ment District. TABLE ;a.-2 roup. :MOST APPROPRIATE PARJ(ING SCENARIOS IN THE UNIVERSITY AVENUE 1!.SSESSMEJ:T DrSTiUC'l' AND THEIR COSTS SCENARIO H~E (NUMBER) SinQle Elevated Deck on City Lot (4) Multilevel Str~ctur. on City Lot (~ith or without 1st floor retail 1 Two-lavel Und.rground Garag& Under Private tsu.ildin ( 12) Two-level Undergt"our.d Garage lI'ncJer City Lot (~~~king on ~urface and/or ~ith air right9) (10) COST I ACDED STALL S25,700 S11,3M S:tB,COO $34,600 page 1\-5 • ;. i _.--- , '1 I I [ , • ------------- ~I'CV8SIOI pr ALTI8K&TXV£ lEE OptIO¥S The proj~cts in Table A-2 cover a cost range of $17,300 to $34 1 600 per added parking stalL Based on Table J of the stud.y and Table­ A-2, several alternatives [or the ~lDount for the in-lieu fee, are prpsentad and discussed hE h'",' , A£ d~9cussed in Step 5 of the :study, a. 10 percent bOnd issuance coot should be included in the in-lieu !'ee. <. TABLE 1\-3 ~LTERNATIVES FOR ~~Ol~ OF IN-LIEU FEE F~ Bas~d on ~~Bt cost Froject ~ee 8a~ed on Hiqh~~t ~o,t Project r~e S;!!!l:ed O~ .... ·.'.erage COl!l of tHne ?oj~:t~ in 7aLle J fP."e '3o\~£-j on CC'!Jt of I-!'Jltilevoii!l Stf"!,]ct;.!!'f> $1"),300 SH,5DO ~1t"SOO $]7,300 ~19,OOD $J~, 1'.)1) $29,.200 $)9,000 Ju"___ fee aaseq_O_1l J,.9',.,est. Cost Proie_~ __ 1;=-":' __ ~_12........QQ..Q, This is the recQl"lmendeo 2'.!~ount for the in-lieu fee, Only the lowest cost project tl!l;llltilevel structure) could be funded ',d thout 1,Indertundinq che spE'cii ied nu:nber of spaces, l...L ___ ...f~ __ Jt~ .. SE#d gn Highest __ C:::_Q~_t_project--S38,100. If th~ in-lieu fee ... ere est.ablished at this level. no parKing project envisioned in this s't.udy 'W'ould be underfunded. HC'toleVeI-, it could he unfaic to an individual prope:-ty o-.ner ",ho .... ishes to de'/elop a do.ntown property and, if the a.Tier .... ere not able t.o pr-o .... ide the required parking, wOlJld ha ..... e to pay a tee that :might be higher than needad. 3. fee Based on Ay@roge c.ost of N)ne Projects in Table 3--$29~, On an average basis, this fee .,..ould fund construction of the number af 5paces for which the fee was collected, without underfunaing. As vith any average I however, there is the pr-oba:bility of a aisBatch bet~een the average ana the actual. .!...._ Fee Based on Cost.-2I ~ultilevel structu.n.--$19, 000. This is the reco~~ended amount for the in-lieU fee. Only the multilevel structure could be fundea without underiundiog the specified number o~ spaces. This option differs in principle from option 1 in that option 4 is based on the cost of a multilevel structure I which happens to also be the lowest cost project, Page 1\-6 WltCT' Qr tlIDlRl'UJIDII!G UP ovan!lfDIlfG " PM~ PRQJECT undutynd.ino The rollo~inq example proYlde~ 90~ insight into the consequences of establishinq the in-liE"'J. t~e at an lllllount that turns out/ after ~~. fact, to be lESS than the cost to build ~n in-lieu stall. In-l.l. ..... f .. iJi •• t .. blh~ .at SlCj,OOO pt:r r.­ q\I';"~ "t .. U--tl-neod 01' the e.tim!ltltd co.t pee a~ at .. u. to conatruC't " ..... ltil.v.l park.ir.=f! .t n"I ct, u re. 2. OYer tl'-.. n.,.;I; Hv. Y.,J,=.~ irl-11 ...... r ..... r. 001- l.ct~ teo. dav.l~~~t proj.~~. tor 50 Btall_ ~t $19,OC'),Iatall, !t,.'r II t.o:al at $9~O,OOO (for ~~llcity" ••• ~~ t~.t ~o i~tpr •• t i, •• rn~f. 3" J\. ~S\)-tl~,I'.l 5-". 1\1"'8 l .t:n. • .;:t.ur~ )... bu,lt fivfo ,'''!!'U"lI f.~ f.:'>'><, at '" tctliL C[~'·. of $7.2 Il'_d!i.on, or $l6,CC'ej per IElt .. ll. 5'J or t~t"8-e ",tal! ... ~t'@ <:!~~ig­ -.u 1i!::I 'to c... r.;t.'!~d b,.· thll! Lr;-l ~e-."' flli''C''' collp.cted h'r ..... ) '~.~l. IS":'·:',CI.:>C!I. .... ,",,," ex ~~.~ ~r.) .lot <:::-:: lo':Hcr. tt; .. stn.ct'Jre i,;: built ~;~~ U"~ r.l. ... l:.s·. '6':'> e~':-;-' adde::! 9t~11 CObts ~1.2 r"l.tlk:. ({".·')-il("1 $:2!.l(·J, _'nln, is ~2,:ncl ~t" ::;'./I,ll ~~r'! tt . .J." t."c <l:-~" ... r,t ""';·.<'!t'!i5-r:e(: for ti-1e ~'<'-ll"""; ~~e, The fctJ.o ..... ·l.~q tilble-sr::' .... s U.f:! ~;:p!lln on l\.'U·IIi''!Io!l-fro;o,,(;. District fE-ea tc.r the ,!,oo·.-e (;.U'~: 1\~--pr'O)(~~.'-ltr ,ll,r>r"\uol 1tmount to tao. Paid by ;a. I L F-ro~tty own~ Oi!'r. 'j'r'(,D~c;ih ill N~' Park},rlQ A •• ~ •• ~nt District io. the S~ $t~~~~wr. I •• au~a 25 y •• r bond, 7.~\ intetest, 10\ coat or i •• u.n~. and r ••• rv~l A. AG ... ~nt ot f~ll proJect $O.J)4/s~~.re foot ~~nt; no ~r.-1iu~ ~.e. ~~llect.d-- $.1 ,200,000 S. Aa ...... nt of full P~O}~t SO.190Jaqvar. tOOt ~~t 1 ••• in-li~ t ... collected .t $l',OOO/.tall (S9~O,OOOJ-- $6,250,000 c. As ••• ..ent of t'UL\ proje-.-:-t. ~o. 2e3/iiql.:arl!! !t>-.::t A:.IIIC>\.lflt l$s. l..n-li4lu feel' that Iofo>lld r-'&Y8 b4-er. collected i( fre Mild ~ol:!n ~&l to coat ~c &dd~ B~all ,~~ x $21,200· Sl,060,OOO)--$6,140,OOO This example shm,,'s that the inadvertent shorttall of $2,200 per required stall for the in-lieu tee, ~hen applied to the construc­ tion of 50 in-lieu stalls in a parking structure, is passed on to all dovntown property o~ers as an increased assessment of $0.005 Page A-7 \ ! : • per square foot. {$O~1.90 -$0. 2as.}. Exis.t.ing aS$£.ss'IM!nta total approxiJllately $0.10 per square foot. The incr't.entilliJ. financial consequence of collecting an in-l ieu tee t.nat turns out to be insufficient, "'hen spread out o .... er: the full .assesslt.ent district and. tinaneingi period, is relativel:.' small. In return for this saall increased aa~es .. ~nt which, quite possibly, =ay not actually JBaterialize l the businesses 1 property c"ners and qe:nera.l publ ic realize the follo~in9 ben~fits from provision of in-li8u PArking spaces: (a) pUDlic usage of the in-lieu stalls usually results in ~re intensive use of th~se stalls (i.e., qreater turnover) th3n if they were reserved tor a particular business; (b} a lover In-lia~ fee helps encourage some beneficial development or chahge. in use that developers might otherwise feel is not econo.ic~lly feasible. rt the in-lieu fee collected per requif'~d stall turns out, after the fact, to be !.'!Q..t.,g than th~ coc>t ot" an .i.n-!ie>.J st2!ll jn the parking project described in the above e:..:C'!:.ple, "the exces:;:: "'-o':JJd be d~ducted f~om the cost of the re~~inder of th~ pdl-}.ing project n0Y financec! by in-lieLi fees. The .).sse5s:;;ent to bl? paid e J' ~ll property owners for this project 10iculd rherefo;re ~ in'';-.n;t!i~nta 11y ..l2ltu. Py an a'roount siillilar to the ano ..... e f>:.:aJ:ple, than i':. ,"'ould otherwiSE ha1lt been A$SE=.scd i£ it · .. eren't: tor the e-xcessive in­ lieu fee. In this manner, the entire assess~ent distrjc~, rather . than the individual propert.y ow'\"'\t!rs · ... IV:::· paid ~Ol:" th'£! ii--,-lieu spaces, receives the "refund" from the overfun~in~ of the in-lieu spaces. It has been concluded that a refund proc~dure tor the in­ lieu payers would be too cumbersome to administrate etficien~ly. This would be especi&lly true if the refunded a5sess~ents were made several years after their payment " and/or" property ovner :saking the original payment no longer owned the property. Page A-B """"-----_ •... _' --_._-- .' , ~ .. '.' .... " "" . '-8:. " ~ ' .. '.,' 'J~(. ~,WI+""'''''.fJ'ea::;u .HQ.};:I\'r-R~q"5t4" ,;; .'i!f",.'''trr'I''"'~· T:\ble A--4 COST OF PARKING STAl.lS AND OTIlER INI'ORMATION -~-==-.. -=="'= - I COSTJINFO JiEM PR,OJf:CT ~O UniversilY Web~ietIC"'wper 0:nuge Lot Q Gat'.~ Duwntown StNcrum, , P.to AI!o Pili,,) Allo Palo Alto iSmta C.,u. I rot,.l Cosi/Stai! (1) ($/tblll, JidjtJ'5tcd 28,400 )3,000 12.900 16,20() bued on 440 10 mid-I994 pri(~) (26.300 ill '90 x.l ,08) (10.000 in '85 :11_29) '''''''' Obr.l Cost (I) $3.72t.1 S's.4M S'l,38M $4.6M in '8/ ~L,&) $1.1M in '92 x ).04 Number ()f St<lll~. AvS/FIOI.lr 131. .vg 65.S ~12. lIovg 8 .... 138 411 .r.h1Il (Number P,~vlously f:xi!it:ng) (l6i) r(4 ) ~O it no comm') ~lUIq (165) , :5. 111(;1 one CIIclos.':ld Number of uvell! 2 bdow l'tnldc. enc1/J500 • Ine! open hBSCl1l('.Jl< 14 h.I~-lt",t:h. below ,!{~e. end haoemenl. -. - Parking l}R top deck? no "' no ,.'" -'fy~ of Conll!r\u:lion reinfotcoo «merele 1>tmCluttl! ~t~'"l" cDn(r<:l~ .. kck. "WIll 1\ simple tit if'l plllCe. postT w/~"'''u~1 """' ,"'dk 2 "',, fie'''.' I len!lioood -< Com;\rm:tion Conditions Diffio:uit.Tshoring, 1.IIiht.e_~ N(lthr:lg unu~u .. 1 'Nc>{ much kllown shoring n.:::u to relo.::. hnrnat huildi!1ji:!!. 165 pilell f,;;rr fotmdttion, uti] rdO\;- i 1l1'011. dewlI.terin,. --t983± - vib""ion IIII{'Inilorina: Datt" of Cllmpic1lon ~rnber 1990 jI9R6.S" Nov 1991- I -+ Slall Fw(p~jnl (3) .-". j:'" """,, "... ]: 300·]10,;( avg 370sf Mill( lIl.!I~_"___ .55: d a\'g purL Other Foolpnnt; 2:5.:5 iFOf'!prm'';: ,uf,>: JIm HarriAitQn full bnck fxade .. JI K,f W.~l/w"U. JOK"f Ie-Illion",. 7 1<Jr;( InfD: ],m H!t.N"ingIOl1 I.,">, ""IP",O ''''dmd ',"d,,"I'<). cmlD!:'rc;JlI IIpIlIee <m Is j4<>,_SK:-f, Inlo: J~~'::~:::~:,,..,.,.. ~ nOor. Info: Mat! f'.~ll -, ole!>: (Ii eml md1.ldCfl flW.t~ri.l. laoor, al'{:hik':CIUtt' '" t:nii~rinll', d("'E'), te~linll:, irl~f1c.;:han, let:'~, ('i.;, S ~ C'C; from ENR WK'li 10 COmpult' Inl1.11lion (Kior, (2) Fitumcr: CO!It~ and land , .. "llI a~ nol incJOOt4 in l(.olal co,,!. (]) AVf/: i:-. footprint ~1 ,""'erl'<BI; nllmbcr of .tAlI'!: rocr !e'"d (i,t:., ... ~IJllt ... I"I~(']'1l. M~)1. 1" foolpnn! pn nl.lnlNr of 1I<lalhl 00 ..... 1111 WIth "'*). nu~r {lr "ulli. J .... " ... ,,' .. , ... ,~,." .. ''''' .. " -. .... 1 , .';.- I r ti , .~ ,: • .., ... ;;i(,;" " ~'-I , rl'~' ~ ¥ " '/ , I ( 1 ! .. _,::.....-'-.-..:'.-:::1;:..-.:.:."::..--':"""""'V',._!:i_R!!_?itL:~..f"'. _ ._._;:;::.~li!!t~t...:...:..."tL_ 'f;tble'! A-4 (COntr~ul'd) --,.,;.. ... ~-----. COST OF PARKING STALLS AND ')H1ER iNFORMATION COSTflNFO IiI!M PR.OJECT DeAnza College Pks $truclwo:-r --,:::------ Pt., SttUclUII:) III RedWlJQd. Cily --I[k, Shu"",,, II Structu~ Stanionl (f',)[<;ythc) (Ho~W) City Cmtef St.t.nI0,d Slauronf Sl1'lll:ture 0"'1 CO'iIfStall (I) ($j~~II. adJUIltcd 8.1:00 9,900 il' "00 10,800 Il.(lIj() to nud·I994 plice~) C L" To~1 Cost (I) 12.IM $10,7 i9.12M $B.J6M ,U6M (11.3M in '90 x 1.08) 1(9.04M ill '~(j xl. III) !(l:S.IJ6M in "1)9 {R.OtlM In '92 Il.04 ~~ of Sull!>, Avg/Floof I F 1469 10&4 i'50 BOo .so (Number Pr'!\,iousJy EU<ling) Numt.er of Lev!']", "'1.1.1. inc! psnilll --~~. ------t-(no bQemenl) $, inc! 'II t...~~,-,t ~. wd '::'>1C J, ind ~ b"~l'I'iC'nt. Dpefl bl1"-Crtkrd. 0[= hL'lemt1lt ~[ Parking On top deck? yO'< yc~ yf:' y~, Y'" Type of ConsttuCliolt --pre,MI concrete, f>;.lst-!,·n~i"flcd Pile JUPVOr!ed ifu(;tiJc de,i£1I OfL1IJuttJOO. Moment rmistin, ductitt'> frame. Con~tructiOl'l CondltiC'n~ Dothin, UnllS\1lil jllolhHlf, um.:~u..al IIQlhin, unwwal SurrOtlnckd by I huiklinss, haz mal. I utiliriM. boj 1'981 culvert. Date:. Qf Complelioll DeCember 1990 Spnng 89 ON: 1993 No .. ember '993- Siall Fvotprint (3) 460 sf ilvi 400 ~f .9.vg I " --r- Oth .... 1 footprint = 150K~(.±. son} W«lrj de!!:!g:1. Nat ~'-Oin-! fioul'l; ~I~pped Witty de.. .. ip. Not Info: Jroff Lynch e floors lite-prod back d<!~lgn-build. IrJo: ba<;k .:k.sip~build. Info: Jotm Murphy f,xurrl1'\!: SO. 3K.~f. lohn Mhrpby. jlnfo: Ju1uI. Frernc.n. jand JC>hn M!)rphy ~ --- (I) Cosi includts ItIat..,rjal. 13bor, In:hitecNre dE. erlginOl':'ring, dujrn. le!itmg. m~-pecIIOT'i. r~~ . ..,t.;:. Sf eel fmln ENR med to computt jftflation f.:lor. (2) FinaJ"oc-e CO!lU and lutd cost» In not includftt in total cost. (3) Avg is foorprint ~r .veJ1l~ number of aull!! p:r level (i.e., I1:htll~J'kvehf). Mu is footprint per m:tn~f of stall_ on (evc1 with mu. number of ItIJls, pk,\moIla.2 lev Serterllbc:." 1994 16,15 2 ~ ~ ~t " f '. "1"_',,", N;;' ._"'" +,",,",O.~~,,,, _ ,~~,,«, T~ble .. \--l (~onrIl1U,,<1) ________ ....;Cr'O;;S:.:T:..;;O~F_P;..A,,;.R;.;.;;K:.:IN~G STAU~~ AND OTHER INFORMATION ~ CQSTIINFO ITEM I _. --_.K~'h" r\FJ;B?'T·"--~'-----------------1' '~.1 C(>~IIStill (1) ($l:cu.ll, .dJ~ 10 nud·1 ~)94 pf'lcrll) >----~-- ITol~l em! <I; Ikiwnlv,n StrHCIUt-t M('IV~,.jn VI ... "" '.(,200 -~-'-------.. $) k .... i"" "JI(,l<:y I~'~"M-,.tt,-~ PJII"f'O p.d, .. Pt"Jc<_:' CUrW'~llf~'-' I 7.~,t(lJ 1,,:'1(·')((1 I{J\w'; C~loN 'ilrt,il"t\jf\l Rflodw<wld Ch), 110,000 ,..o,)I)M ,!'J IHM (f,,;\:M 1n "):,i~',.J.l'l d ltL"vl ,,) '11K.1 S9M 'alhbridl" Lot ) D«' ,.1<> Alto !S IO,(),)) SUI7M f:--~-'---------- _-_=e.;'(S<'" '" '~~~~'~ ___ i' ~~~~n j Numhn of StJIIlh, Avg/Fl/l'" ]0'} (J{,<' i: 'i,) f}()(l 111116, hi 93 (Num~r Prt"joliNly E;l;l'!mr.) '. (90) Number of Ltvdll 4, Il() hll\oCmtn-, --I, h,,~",,", ',"J",. *,:~;;;':;;':;;J r.. In" o"e" t. "., ..... "",,! ',I"(lt~ h(>U~lo~ r" hill:'Mmr.nl Palbnj[ on lOr d«k? ,e. ,flO ~---~!n~ Y" Y" n I I ----4-----------t----i IliyPf' 0f Cunslnl(;lion p\'t1<'-t~n~loncd ... lab j.:,,-.I ;~ pJ""r ':'l11c:n·tr. M(Jmenl rea,~tml -. .-,,-11.' -,,,,UIU rl1"~ d\>Clile (,.me -----HCon~;;-~<':'!{t~ Cc.on(.hhOno; Inothm i unu,\UJI 1!'lIJ' nr.1l1 to ,JI"<::r ~-l·Jr.~i""1 II!':';!'! ." ,,~~,u flO' ~1:I.rdOC nniN.' 1~::'!'JH'r .. n";/IIT1g No IUfTO\mdln, Ibu,ldinp. flu m.t remQvld I +::lJ~U~j ~DIII(' uf-Compldi£m IM;;.:=r990 1()()4-('-J-~----I' iV.-.9-~-------+90-C%:-'-orllfllel~ .~~4------ 8/94. Will open llf<;l4 II--I ----. . I 39),,( 1"'8 'I'J(l5 ,,1 'Ivg ~l97 .1 ~-..... , I:ns ~f max "ull.' , U --1---. ~-+-:-~-,.,~ . ..,..----+----,- i01h('r Iconlinuou~ rllml". I'll foolpTlm -111.5 iC,-)< 'l1!llll~~j hy ~6 for In(o: Jito Fltl;'IIl Engineer'K sun Fl)()lpnnt (JJ UVAC. sprinJdcred, K~f. Co',1 tnGlllcd hy i'oot! C<hl~ !kr Jim St)w"'rbrower Estilllll.le, )0;93. no rest f(X)rn~, J.-Jb fOr sofl CO~I:; JX'f j'-hfnnf. . .lor, from &011 Wahl. m.1lint~Sf,5K/yr: JIm Hllfrlngtoo Inc! fea., ~rudy 8t footprint '= JO]5~f sr.ff ti~ . i ~__ ~_~~~~~=,o,=, ,~=~'!"' ____ ...I._~ __ -.Ji (I) Co..~t indude.~ material, laoot, architecture & rngi~l'i(}g, f.l<!<;igrt. testing, inlopct:lifOn, fccl>. N_-=:' Sf'.Jl Fn4fJ.:I:lC'.o eel from e.NR UllM ioo;CoInputj~ inflation fllctl:!r. (2) FiJ'l/Ulce costs and land 00.;1<; lire not included in totll co:<:t. (3) Avg i~ foolpr-lnt rer aven_st' numbtt of :ltalls per levd (I C" #:-;!all~/"'leveh). Mall i·~ r-Y.)tprint per nu,nh<:,-o( ,.,qlll oa level with max number or lUlls. J ".,_".2 ~. s.,I<mb<,'. ,,., "" 3 I ~ ~ " ,~;-~" , • '. J '1 • !:c ________ .. __ . __ ATTACHMENT4·"; Wednes.dlY. Septp.llber 14. 1994 R~U\lr Meeting P I ann i n 9 Com m.~i~s~s i-..:.o_n..:..., _~C_ity~o_f _P_a_l_o _A_'_t 0--, APPROVAL OF MlkU}ES I. Approvill of July 27, lS9-4 Phr,n1:"1g CoeoiS5ion ~in~tes.. Mi IC HEARINGS 1. 2.4 S l fTI~ AI( HillE E_!~P _____ ~_.Q_~_~) __ J_L_E~.~,~ ~_O;'Ljl R [E J (P~_,~~ n:, IJ 1 ~ 1.i..t~ .. 1.:1rJ_R_uJJJL~_~.J tl1tr._gj: A~';;1 H:~t ,Q~l to rUIJ~t; ~ pDrt ior'1 of thO! property frc~' ~~l..l .. 3!)t CD-C(P} CI,,;j FC )I]J t:1 " F'Jannt>d Corn .. lrlity (f"C) D\$trict 1:'"1 c,r;}er to cC'n50tl,~'~t 17 sir,gle-fa:-:-dly J.Jnits ani fO'.ir $,'(c.:-.-:: i,;r·l~5., :;1s.0 .a c..!i"H,gE' to t~e Co:t,;·rtd:,::.n:;.ive PI"" {j(;$ig~,at\cn ('r!.: ~:Irti(':; c,f tr.E. :;.ite froe'] P.:E>~)(l~Jl COrrr:":Jnity ({'TE'rci~l to 1~.IlUple f';:':',il) Residential. Setb.:'lck vari.ar:ns a~d a t-'2r,t.atin> $"t;..jnision Il.a.p ilre .1s.o requE'ste-d. E~'Hjrof1~")f!nul AEess~nL A negative declara~iol'l I'1i!S beert ~f'e?art"d for this pr(\j~ct. file No,. 94·1e·7, 9t·[P·l, S4SUel. 94·[)I·)D. 3. Q~E ESTABlISHJ.jG.AN IN-LIEU PAR(~l.RfliR THE UNl¥ERSITY AVfNU~ PAR~ING A~SESSH[NT DISTRI(T: This ordioince would al1-:lw eligible t'lt'W aeHlo~nt in ine University Avenue parlc'in9 asses.Sllent district to pay" f£le in lieu of pro~iding actwal parklo9 spices that ~uld noma11y be re~l!ired. [n\l1:"cra'loe'nt.1 A:>.s.e!>~l!IIenl: A negative d!chration has t.>een prep-ir~d for tl'l;:;. project. Fil. No. 94-EJA-ll. REPORTS fRQlj QFflC lA, , 4. 5. Ca.pr!~ensiye Pl.n Adyis~ry Coemittee. Midtown Study Sroup J. Slocum 09/14/94 .) . 2 1 ) 41 45 --........ .,..--""-- case, lOre housing. What we hive before ~s is a motion to adopt the attlched ordini~ce amending tht Planned Ccnmun1ty z~ne in order to rezone ~ne pr~p~rty f~ RM-30 1 CO-C(P) and PC 3111 to i Pl inned ConDtln1ty Distri<:t in order to const~Jct 17 single-family units and four ~econd units. That .oticn was Mjde by Cocm1ss1oner Beecham and seconded by Chalrmln Sc~i~t, HOTIQH PA$SfS: ChaipPin Qjakian: All those in favor, say A~e? All o~po!ed? That passes on a vote of 3·1, with C~iss1oners Se~cha.. Ojaltan and Schftidt w~t;ng aye, opposed is CQ8Mlssioner Cassel, CoaIlssioners Carrasco and Schink n~t participating and Ca..issio~er 'luler absent. The next item we hive before us is ! recommendat'on to Ipprove t~e setbick v,arianctls with the ittached findings, if1cluded in our packet 'WerE the variance findin':js., the three Uilt are required, ~: Commis.sioner Scnmidt: and the attached findings, .llim!P: By CorrrnissiClner Beech~m, rTIO'{e approval of the setI:Jac~. ~'lilfiar1ce:; MQI.l.ruL PASSES: t,t1.llimar. ,P.i~kigD: l~ t.here ar,), fwrt~~~r diHUS-:io!i 0;1 Hli~ rrf'Jtion? What we nave befer€; us is RecQ~en;j"tio{~ .!4 fro~ Pi!~e J of tho: staff report approvjng t~~ setback variances ~ith the attalhed findin9s is found ~n Page 16 of the varianc€' finding:;, 1 ... ill say that h;J.~ing roohJ o .... er each of these findin9s.. I find them acceptable lind COf1si:.tent 'JI'itn SOft of the re/i;s.oni ng we have u s.ed in the pas t. Ant hOH in f.vor. 5;:)' l'·ye? Al' tlpposed? That passes on iii vl)te of 4-0, 'JI'Hh Comjs~joners Carrascc and Schink not ,participatirlg and Comissio~E'r Glazi..:-r ibsent. Thilt luY€l5 ilppro',lal of the tenhti.,.'e !Oubdivision lIIap wHt; the-lttlc.hed f1ndinss and conditions, as pro~ided to us in Pages 17 through 22 dated Si!pt~ber 14, 1994. Is there any disCLission or i: fiCtion? ~: CO!Ji!jS$iOfler Schmidt: 1 ItOve appro\lai of the staff Recommend~tion 15, the tentative subdivision ~ap with the Jttach~d findings and conditions. ~: By Comaissioner Beecham_ ~~; Cha;rmjn Qjakian: Is there any further discussion on this DOtio~? All thos~ ;~ favor. say Aye? All opposed? Tnlt p.sses on a \lott ~f 4-0, with Commissioners Carrasco and Scnink not partiCipating and Commissioner Glazier absent. That covers all of the topics we had to .... <It! or. tonight. Hds itee will be forwarded on to the City Council on October 17, 1994. AGENDA ITEM 3 • s In the Unl\lers;ty Aven~e parking assessment district to pay a fee in lieu of providing actual parKing space~ that would 09/14/94 ·17· i I , I , ~<,"" -''-..,..-. ~,,,,,,, ----_ ...• , .. nOnail1y be required. En~ironmental Assessment: .1t1gated ne9ati~~ deciarat10n has been prepared project. F1le Ho. 94-EIA-13. A for this Hr. Oyerway: 1 wDcld like to go through some overhead projections ~ith tne commissicn to give some background on this whole process. The first point I would like to ~ake is that when the downtown study was done i~ 1986, several options wer~ pro¥tded for people to provide downtown parking. The overriding 0", was that first and foremost, .11 n •• development MIS SUPp05~ to provide parking en site. That was the prj mary regulation, and th.t st111 1s 1n effect tod.y. There were soo< .xc.ptions .ade to that for t~e reis~ns indicited an the screen. The handicap access seismic rehab of historlt structures and ~1nor increases dtd net have to ~et that requtreEent. There was also a provision that deveiopers could provide offsite parklng, subject to the approval of the Director of Planning aM COlMIunity Environment. There was a fourth provIsion that an in·lieu parking fee could be paid to meet all or a portion of the parking requlrements for the development. Tho$e were the choices that people had. Thi! in~lieu fee is one of those c;,oices, and that is what Wt! arf.! discussing tQnight. The discussion in the ordinance t~at already exists talks about an in-lieu fee to bE' Ht e\:juill to th~ iflcrement.al c.ost of pro~'idjr'1g l1et new parking. r will go into ~hat ~net new p~rkjngW is in just a f~w minutes. It specifiEs that the fee will be that. It does not QO on to ta1k about what the actual fee is. It also gives SQ~e criteria for the use of that in-lieu fee. The USf of it has to meet certain criteria. It hiS to be an historic structure; the site area has to be l~ss th~n 10,000 square feet; if greater thin lO,OOO square feet, it has to be physically cr financially infeasible. H lIay be a situation where the city is. limiting curb cuts, 1$ on Univ'ersity AvemJE'. where the cit), would ~ot want the parking to be pro\l"ided~ even if it co .... ld be, or where there are tliher site constrajnts. So the applic.ation of thE; in·lieu fee, as worded in the ~~isti;,;g iiu..micipal code, ;5 conditioned with these requlremeonts. In theory, it ;s only applicable for developments that meet these requirements. Tne ordinance does not establish what the a~ount of the fee should be. and it ~as never been established since 1986. The reco~r.dation to you does not talk about what the fee should be or what the criteria far applying it should be. It strictly de.1s olth the dollar amount of the fee and how it is collfcted and how it is used, etc. The issues that are important are the amount Qf the fee. There is an important legal ne~U$ that has to be ~hown, and part of the reason for the report attached to the staff report is due to the need to sho~ the legal linkage between the fee belng collected and what you are going to do wlth it and the whys and the wherefores of that relationshlp, Tnat is important from a legai standpoint. Ms. Case can speak to t~at, i5 well. The proposed ordinance al,o ta1's about the collection of the fe. and the retention af it and uses of it. Then it talks abo~t adjustments thit can be made to the fee aver time. In trying to und.rstand how much of • fee would be proper, ; f we had a structur. presently designed and ready to be built,' it would be very clear. We would take whatever it cost to buil~ that structure and divide by the number of spac.es, adjust It, and that wOu'ld be it. The problem is 09/14/94 -l8- -- , I I· I I , < ! 1 I i r t~at at tnis point in ti.e, we do net know of a structure that Is gOing to ~ built. Howeyer, we art i~leMenting • Capital lmpro¥ement Project wtlich the cound 1 his .pprov~. in October", we will initiate a fu .. 'S.tbility study ~ic" wi" look at building another structure in the downtown area. The focus ~f t~at study, at the present time, tends to be t~rds Lots L i~d S or P ~nd R, in those general areas. Llck;~ thit k1nd of spec!fic1ty, we took the next best approach and asked ourselves what «1nds of prDj~cts could be built in the downto~n area. We idei1ttfied four of the!B. O:1e 15 a surface lot like we haYe today. Another " • slngl., elevated deck 11k. they .re pre •• ntly building on C~rldge Avenue. One is I ~lti-level structurt; the Webster-Cowper ~rlge would be an ex~l~ of that. Another ant would ~ a two-level, underg~nd structure. Tne one under Plaza R~na would ~ an exa~le of that. Thtt is a pr1vat! garige, byt in the urban deSign plan, there is SO>;ae sl!ggest1on of Hilt Sitr.'lE' kind of thing being done under city l(lts, wit~ park1n9 bE-ing repla-:ed at the surf3c~ level, So you might t1,Po'2 two le'fels of ur:derground parking wHh SOIll€ use of the air rights. above it for develoj:'iN'nt, or yCli might have twc le-vels. of pHUng undergr<nmd with pad:ir:g npla.ced lit the :SrJrface. That particular cattl!gory is meant to be represented by thts l~st one. We a150 lookEd at it from tht sense of ~hether we might do it on s city lot or in co~junction ~ith a. pl'ivate deyelop~ellt. Again, the exa~ple of pri i'ate d\:ye1op~('nt here WOlil d be the Ramona Pl aza. When that project was built, o~e le~el was built for the project, and t~e city bought a second level ud fOr.:le~ an ass;ess.lt~nt dist.rict to pay for it. In the-ory, that could be done "ga1n in oil limHe'Cl number of cases, Wh~n ~ started looking at this r.ind of matrix, we quickly determi~ed that se~eril of these were not particularly appliclb)e. The value of land in the downtcwn un is too important to build a surface parking lot. Wher: ~~ lOOKed at the single, elev~ted deck, we said yes, it could happen on a city lot, but it is not very likely to happen on anyone's private prop~rty, Jt would not be cost-effEctive to do so. Then we started est~blishin9 costs, I"tluded in the r~port 15 a host of examples of the costs of thEse different kinds of structures, 9~sically, the cost to build iii Single, elevated d-2ck over in existing parking lot nas. been established at 510,000 per stal1. That is whit it costs to do the ane on Ca&Oridg~ AvenuE. There are other examples thlt we hive included that win reinforce that Y~lue. We looked at the multi-1e .. 'el deck. and concluded that, bas.ed on our experience with the W~bster·Cowper Garage and reinforced by examples dcne in Redwood City and Mountain Vie\l{, Sl3,OOO was the amount per stall. These CO$t$ inci~de all of the design and construction costs. I will get i"to the financing costs later on, but everything relat~ to design and construction t including the public works inspe,tors , labor and ~ater;als, fees, etc .• are intendEd to be incl4Jded in thes.e! cos.ts, When we looked at the underground (beca~se g01ng underground is more expensive), 520,000 ~as the number. .,..hat "e needed to do was to con .. 'ert those costs per space to what we s~e as the (cst per net new space or cost per added ~pac~, The difference is that when we bUl1 d a parking structure on a city parking lot, we are displacing existing parking. There are two terms here, On& is ~cost per space n and the other i~ "c~st L 09/14/94 . -19- ;" --,-' ---.. -~., .. ~~- per added or net new spice." The .. ·ord " .. dded-or "net new" is intende<l to pel" t~ s£ae thing. The cost of the p~oject is the same under both of those ,cennlos. In trot first C:oIse, I would be t.aki n9 the total cost of the project ind divi6i~ by the n~r of spaces th.at tr.e project Is pM)vldi~. In the second CaSE, I would t.lke the total (Clost and divide by t~ diff~rence bet~n tne nu.ber of space~ t~at Is be1~g prnvtded minus whit ~I~ there before. fOT exa~'e. wlth a .ult)-level structure, iSs~i"9 it is iI 500-stilll Qilragf si.i1.r to "ebstI!T-(.c·\tw'"Per, there were )00 spaers on t~2 lot er1gi~aj}y. It cost S~ ~i'lion to build. S~ .i11iDn over tne 5~ spaces c~s to SJ2,OQO per space to build this typtCI' ~x~le of I stru,ture. ~ver. if I take that same $tTuctur~ l~ subtr4ct cut the 100 spaces th.t we~ there bef~re, the cost per net new 5P1C~ or per added ~pac~ is 515.000. So it cost Sl2,COO to ~ul1d it. ~t th-e cost ptr het flew sp.ace ls considerably higher. iM !~act (If that rl!'phceeent of existing p~rkir1g is basic.a.lly the difference bet~en cost per $p~ce a~d ccst per net ~e~ spac~. and it SEr\lP:;; oilS iii )~rrvglt€ {Jr right-of-Io'aj' c-o)ts. If a: penon \lten~ ~oing to go out ~nd b~y ~ ~ot, you ~ould flrtor in a right-of-way cost. The replac-e.,*"nt of the C');Htl!'",Cj ,PHJ:.ing, U":€ first JOO spaces. that arE' built, tl"l€' .e~5fss~nt distrlct is ne! ~Din9 to 9.dn a.nything, Hey .arc.going tD ha~e to replace thO£f f,rst 100 space~ ~t SJ2,(~~ rrr space before 'they :!>tart to goilL; so;o:-ething. So J SoH jt ,as a ~urrc,;,-ate for right·of·Iol'o!Y cost;:;_ ~'het'i YOLI ~o to a ~arKir.g d~~''', til.:, differen.ce becz:;~:> swbs.ta.ntiaJlya.cCC''lt,"2:tt''d. YaLl M.a','," fp .. 'H spCices to 5~,re'ld it 0"''''(. Irlsteold cf cui}cirtg i 500"SLa11 gang .. , )/;"l's sa:{ 100<' \If':j1.l1d buihi ~ 200-stJl;11 deck, l€'t'~ ol5SU;:I{' th<1t H.e cost per !-pacc is Sotill the s.ame, but .hen you ~ubtr~ct out the existi~g 5t~11~, the cost per net new space giltS up si9!1iiicantly, because )'OlJ ire all.ocatin9 Hu~E' JOO spaces over He TeJII.olIining IOC ir,51ead of o'w'er tlli-remaining 400. Getting b~ck to this t~ble t~at is projected, that is ~hy, in this pHticuhr instinct' of .. single, e-lev.ilted declo:.. the cos.! gDes: from 510,000 t>t!r space to $26,OC-0 per net ne;.-space. TIi .. t is .hy, in H1~ flVJlti·level, yo~ go f~ 513,000 per sp~ce to 117,300 Pfr net new space. That continues on. The ordiMince thit we ha¥! says t~at the fee will be based ~pon whit is shawn here in red 011 the cost per net new spac~. As an uUlple, if you lOOk it the cC',st of buildin9 a structure ~n priVate l~nd, tne~ is n~ re~son why it should cost th~ any r.ore or less than it would cost the c1ty to do it on a plrk+~ lot. This particular column does not include i~Y land vilue. Wh~t we n.¥! done in this column is to add the vll~e of land (at 5100 per squIre f~t). prorated it ever the nu.ber of floors ir. the building. and 1110cated the "umber of spaces you could put ir. thE-reo So tl'1e rt;s!Jaant cos.t per space is S20.S00 I>!Ihen the actual cost, ~~thout the ri9~t·of·waYt !s SI3 j DOO. T~is one is loaded with r1ght·of-Wi) costs; this one is loaded with replacement of exist1~g parking costs. Again t t~ese c~sts are costs to c~nstruct. There are design costs .and there are construction costs. Now I ~ill get to fininc.ing costs. T~is d1agra~ illustrates w~at is included in th~ financing costs. In the first Cite-gory, [}esign and Constnlction. all of theSE costs are included in t~e nUilbers I showed previously,. They did not inClude any of what we c.all fin.ancing cost. We have di¥id~d financing cost int(l tloo'O parts, far Illustrative purposes. One is the up·front financing costs that occur, L ~:_w, · .. w._~ . ~ I I some of which are a percentage of the loan ~no sO£e of ~hich are fix~6. Hke c10siflg c.osts on a house. There is ;t "'uiety of c:l1n9<?s Inri services that 90 into $ett1r~ up an ~ssessmeot district and selling bcnjs, etc. In addition, you flavt the o"9'(\1ng .bond p.y;zents, which are principal and interest, wnich go on for 2S or 30 ye~rs, h~vfr 'D~ they are sold for. The rec~ndit1on 1n the staff report inciude$ a shilr~ of this ~orl1on of Ute up-front financing COltS. It does not include ~."y S!'\ilr!' Qf tMe otr.er' on·going portio." I win iliustrate the i~lCt of 1"CfOOing thl.t wiU! this ntxt projectlon_ I thin. it f.irly cl •• r th.t .11 of the,. deS19" and construction costs sh~uld ~ included. There ire ~rg~nts thlt ,,In be ~de to include or not to include the ~p-front fin'-ncl~ costs. I hlV~ never heard anybody argue th~t it sh~uld includt iny rort1~n of tht on-going, annual bo~ paywents, so j think th~ ~~scuS$ion ;s probabl) about whether this p~rtton (up-front rina~ci~ c~~tsj 9~ts incl~ed or not. The lSSlJ't is ...nether or not people paY,in in-liNI fH, ...n;cn includes i prGP~rtt~nll shar~ of thls yp-f~nt fjna~~ing (05t. The i~act of thi.lt i.s. s.hown ht}re. Jr\ selecti~9 th~ bll,SIS fo';'" ':5t~bii!'hi!"1":: th~ fee, we lool:;Bd e:t H'Isonl J:;;lnds of options.. I rril'fe 'ircle~ t~e O~~ that the staff report reco:rli;;l;nds. Before )'{)lJ l~:)" it tr,o~e o~ti"'j), however, these t~o columns are j~~nrtant. Tl:e~e ~re th~ rD~t p~r ilcd~d space, taksn from tMat t3ble J jus.t show~d iOU, d~~e~dj~g upo~ the scenario we are tah.ing ahout. j(1 tr,e fint c.::~~, .! 5har~ of t~.OH l1p-front financing costs has not Of'Eil arjje,:). In the '3e(O~ij (25e, t~''":'I' have been added in. For insl~n(e, the e~i~p)e Of th~ Webster·Co~~er . Garage that can be bui~t for 513,000 per sp~ce, bJt costs S17,300 per 1,Ct ne~ spac~. is increased to 519,000, abc~t a 10 pertP~t jn~rel,e b~cau~~ of the ir:clus1on of up-front financin-g co~ts. We laDled at t~€ lowest ccst as a basis for e~tablisning tn~ f~~ w~ looked at the highest CO$t as a basis. We look~d ~t lveraging t~r~e different types of s trilct ures > the: oed., the :. t r"jjC tu re OHiO the underground. WOe looked it nii1€ <11ffe-rent ~~tiOM in the dDOI'!"1towr, are.!. a.ssessing somellihat Sl.fbj!cti'Yely whit kinds of stT,,",ctIJr€'s !t.ight ~ t:lJiH on wnat lots. We caae up with nine of them. but the iverlge ~t~tn the nint and the three is so tlose that it was not worth argu'n~-.bcwt the diff~rences. The ant ttat Wf! selected th.f:t we feel is th-e IIOst appropriate is th~ .ulti-level parking 9~r.ge, w~icn is $17,l~j without the finanCing cost portion, and Sl9,OvO with the finlncing PQrtlon. The basis for pic.ing the In-11.u fe. i' • ~.bst.r-Cowp.r type of facility, and the fee we-Ire recoatendins is S19,C(.lO. It ~s Nse<.I U~XHI and Includes i share of the bo~ iS$ua"c~ f1nanctng cost. Th~t 1s pr~(Hcated on the assUtlPtion that the next parking structure will be ~ multi-level structure si~ilar to the Web$ter-C~er Garlge .od ~il1 probably be built on lots I and $, or Lot R, or some combination of lots P an·d R or some combination Gf lots land 5 and P and R, ir, ott"ler words, those t:.fO ge:neral locatlDn~. That 1S further reinforce<! by the Urba;"l Deslgn SUidelines whlch identifie~ those two sites is suitable s~tes for parkin9 structures. In our a.nalysis of t~e existinq parking deficit in the dr.wntoWTl area, thfse tW{) areas a,'e a.lso important, rather t.hin the area by the Webster-(owper Garage. fie have sufficient pilrkir.g ill that area. The provision also provides for an annual review of the basis for this 09/14/94 -2l - fe1!. rich year, W~ ~i11 go through and detennine whether or not we still feel that the multi-level parking structure is the best basis for establishing this fee. For Instance, after we do this planning and feasibility study. we will know i l~t more about w~at the next project is going to b!. When we kn~ whit that is, the fee will be adjusted to rrflect the particular project that we are headed towards. Each yur, H will be adjusted to reflect tne ictual knowledge: at th~t point in time , regarding the next future project. We cannot 9~ back and changE the v~n~y we have collected, ~ut it wo~ld change any future money that is paid fro~ that point on. So there Is a huilt-in annual review. There is also a built-in annual cost; fide)( adjustment, even if we do I"IOt change anything_ The cost will b< adjusted by a construction index that reflects inflation and the increased east of doing business. Also, as part of t~e d~.ntown study, there is in innual mon1toring of the parking deficit that goes on in the downtown arei!;. That MillS gone (1n each year since 1986\ and I bellave a cop:.; of that is given to yo .. each year, .e wnl bE-g~n to include> in Hat report an acc.ount1ng of the in-lieu fee spaces that nav.a been paid for so you will k.now whE'!tr-ler thi:. number is getting very large or nllt. We do not tt'.lnk H is goif19 to bE' a very lijrge number, but the monitorjng process will pick that U~" The consequences of collecting i~sufficient funds i~ relatiVEly sm~11, 1.f~ indeed, we r.ol1ect $19,00D an-:1 the n~xt structure tUTI1S out to be $20,000 or $21,000 Dr $22,000 pel" space, we w!ll ha~e underco11ectetl for ~hate~er number of Sp.C2S we have. The burder~ of th~t f~11s te t~e assess~~nt district. Whatevel' money we collect fro~ the jfl·li~u fee ~il1 be deducted from the tot~l project cost, and the rpst of it ~il1 be financed. Somebody ha~ to pay the bill, By tradition. in the City of Palo Alto, that has always gone to an assessment district. l'le city is not 90ing t~ pick up that difference from its own funds, Wr,en we looked at the c.onSl?quences of being two or three thousand dollars short, spread (I\lEr the-fun asseBment district, it is a very small amount of money. I think. 'We have somE' numbers in the repDrt, and they are Ij'e-ry s~ali on a per· foot basis. First of all, we do not feel we will be s~ort. is we are Siiltisfied with the numbers we have collecte-d, but if we are, the assess;ent district. not the in-lieu developer, wl11 !nd up pickin9 up that difference. HO~\ler, there is $~~ benefit t~ the assessment district also. jf a developer builds his' own parking, he controls. thit park; ng. It is not available to tne general public. It is a~ailable on thf terms that he chooses to set up. If it 1s in-l ieu parkir,g. it is going to go into the public realm, and it will ~ available to more people ~ore of th! time, and is actually gotn9 t~ be better utilized just because it is going to b~ available more times and is going to be used more often during the day. It 1~ going to be available evenings, nights and weekends, so t~ere is a benefit to everyone of .a slightly greater use of the public parking spices that the in~lieu prov;s;ors are making possible. That concludes my pres-entatfon. Com;ssion~r Sr.hink: F:egarding the bond financing costs, arc: thcs~ a fixed pril;e for the bond I or are those a percentage of the amDunt of r.1oney that is being raised? 09/14/94 -22- tis. Case: Typically. it can be ,alctJlate-d as a percentilge of the amount of the tlands, C.intDner Sc;blnk: rf half of the money nei!ded to build the park.lng structure waS funded with in-lieu fees. then you would only have hal' the bond costs. They would be reduc!d proportl0n~tely. Hr. Qyeooy: J think that is truf to a significant extent. Some of the fees are f1xed~ but the majer1 ty of them are based on the amount of the , Oi!n. tommission,r Senink: Then what is the rationale for requiring the payment of the ir.-lieu fee It the time of the permit. as opposed to tne time wnen the d~nd is cr~ated to use the parking spaces? Mr. Q\lg""2V~ The topic: has been discussed, and Hlere are argtrments on both sides. The argument for Mt includiii9 it i~ that if enough in~'i.eu fees. were collected to build a parking strJ.Jctur~, there would be no bond finar:cing costs at all. We ~ould just go out and build it al1'J pay for it. That is the arguiT.ent for not doing it. Tile reality is, nt:lWeVH, that at the rate at which "~ p.xpect these in·lieu fees to come in, there never will be sufficient mon~y to do th~l, so th, city i5 90ing to have to build a parking structur~ in the downtown area an)'I'!<';Y. In order for the in-lieu feE'> to \o!ork and tak.c ad.'iwtage of tfrat, they need.! stru.::ture to be built, therefore, part of the cos.t oCi.n.d rLe~6 for tMat structure to be bulit is He front-end finandng cost. An E;(arr.ple of that is that if you wanted to build a reom onto my house, you cannot do that unl~ss I first build the house and pay the front-end casts to do that. There would not be anythin9 there for yo.; to work wit-h, 1 can stin go ahead and pay my share of the pri.nclpal and interest, but I have to pay a1) of th! front~elld costs. On that basis, you are beins; a sked to share some of tna t, in proport 1 Orl to the i. n -1 i eu fee, the num~er of spaces that yau ire being assessed. Coropj$SiQnEr Carra~cQ: ! hay~ a 1and use question whieh I will addres~ to Honey. It seems tnat the Co=prenenslve Plan Advisory (omrnittee, the Planning C~!ssion and I r~ctnt projett that Ed Storm brought on the corner ~f [Mrson Street and Lytton Avenue went in the direction of doing a fot space~ or res!dential above commercial, which is s~methin9 we ha¥e encouraged throughout the last Comprehensive Plan. 1t seems like the present Coaprehensive Plan is also going In that direction. Given that that is true. can you co~nt on why you would not consider 1n-iieu fees for residential de~elopaent as well as for commercia1? Why would we not ha'ie the same .kind of benefit fer resioenthl development, rather than cnly for tommercia1? Ms Lytlt: I think that if th! current Cornprfhens1ve Plan wants to encourage an expins;on of this kind of prcgrim, that would be a perfectly lpprDpriate move for them to make in terms of encouraging that residt:nUal development. This staff assignment was based upon the current Comprehensive Plan policy and ordinance that literally was drafted under that document, with some holes in it. So we did not take any turrent policies beyond our Comprehensive Plan in this assignment. But if that is a direction that it ,appears as 'j f it is bei ng recorrmended to be reinforced in this update effort, certainly Hat is a recommendation you could make, L 09/14i94 ·23· • ----- that 15~ tc have that (ollowed up with additiofial benefits or abilities for resident~al d~velo~"t to ap~'Y for thi5. COI'issjQncr CarrtscQ: ATe you sU9gesting that we reco~nd to council that they 1nelude this in i re:!.ldenthl component. or do ~e modify this to say, residenti.) ~"d non-res1dentiil? Ml.. Lytle: O:Jr reco.eitdation .ould be tftat you allow the Comprehen~he Plan to takt place Iccord;ng to the c~rrent time li~e. If that is one of t~ poll~' directions that you want to recommend, you would do so within t~~t ti.e line, T~refore. In ordinance revision here would come at th~ c~lus;on of the Co.prehensive Plan process as i followup assignment, or a~ '~'~nt2tjon pr09r~ of thit document. this ordinance bef{lrl!" you is an extension ar.d i followvp orf the existing Co.pnher.th"e Phn. It is a 1 ittle late in getting done. but we are stl1l opoer~tii"9 for He next year under that docUTI'IEnt, so the time has not run olJL We Ire i!':'.pl~nting tnt' old ~o'i'ies. ~.s. ill.£: I ... o~ld li~e to dda that this is bas~d ~fI th~ "Ny COr1pl icated and tech~i(~l pro~isjon5 for the as~ess~ent district downtown. ~f at some point, W~ ~~re to add in 3 cc~ponent with re9ard to residential, it would rot b~ ~i~ple. Legally, j w~uld adYlse ag~inst that right now, If you ln~ist~d ~pDn gGi~g ahe;d ~1th it, it would 5~t thj~ project back 5t!c,stal"~tiall)', tl~~7!1'i$~, .Q,.sir""l'l'1an OidUan: Hy under-stcirldlng is that tonight, we isre not nec~ssarily lonkj~~ at who this is applicable to, jS that has already been set. 'lrftat '"e ne leokir,g it is tr-oe JIlethod of calculation for the fee, how that might be adjusted over some period of time, and the collection ~thod. Th:J~e $eelr: to O~ the key components. We are not talking abou~ .adding to thf e)(ceptions: or subtncting fro,", them. !'Is, Cjue: T~ill is our recvmendatlon. The reas.on why we are re~o~~oing thAt ~ 90 forward "liHh it based on the current ordinance prD'I'lS10ns lS t~lt u~er stlte ~~w, we h~ve S~ ~try strict requirements to follow when W! Ire en~cting fee req~ireoents for developments. Also 1 th~se provisions elSe o~t of that envircnmentll asse~s.ent, We would not want to go too far Jfield frC'!!! that, or W'! IIi9ht be getting outside of the boundaries of what our enYiror~ntal ~SSeiS5ent can handle. Ch.Ir"Nr, PhXi,n: The way I rud this, Wi! should not e'ien go anywhere near thlt. Wh~t you Ire saying, Ms. Case, is that the possibility exists tonight, lnd we hilve to be very cilreful about how Wi! have to do tha.t, Ms. Case: That is correct. For 111star.ce, if you had H in mind that you w~nt~ to allow just about enyone who so d€~ired to pey fees, as oppo~ed to ~q~;ring th~ to pro~ide parking , that ~ould really upset the environmentill ap~lle cart at this point. (bairnn QjJkian: I am net su.ggesting tha.t, but I "anted to clarify that. l1L (ag:: Right, and Hat is an ir;-:portant thing to chrify. CD!'!!issioner farrago: I hav~ another question r,ohi'ch is much simpler. On Pilge 5 of the zoning ordinance, it talkS about those projects that are L----- 09/l4/94 -14- i • "'"--'+~-' 1neluded ~nd t~ose which ~re not 1neluded. There s~e~~ to be • hol~ at JO,ooo squire feet. 1 wou1d sU99~st tn~t Wf chlr.gt tne wording on Pagt 5 It .. (2), to ny, on. site or .. is ill !.M.l!uru! lliif..J: fill 2! llll, .nd a WQuld not be physical1y feasible to provide the required on,s He parting,-Most of thOSf properties ire 10,000 ~Quare feet, Ms.. Case: I iulized WE: wculd hHi' difficulty collecting 'Ijything fr()(!1 anyone who had exactly a 10,000 s~uart·foot site. CbtirazD 01at..1...i.[l,: I wi 11 now ope-n tht" public ~elring. Boxy RIDR. 773 Vnjycraj!y Avgnur. Palo Alto: ~rvin. th~t was a great presentation. J1. Batr will be p~stnt1ng our graphicl later. 1 hive two key pof"ts I would like to bro,rtg up. One i:S. Hut wtJen the fn-litu fee 1$ pa.1d, it ;5 re.lly 9ci~ to tN! for s.all d~Hlo~nts. ~cau.s.e of the cost of illCney, it really ... kes sense for i; de...-eloper to piily H,e i:1·1ieu fee upon occupincy or w~e-n t.he electricity is turned en. That j~ 'l<ih-E'Ti it is going to implct pi!;r~:ing, and Mt befcr.e lid nut C:.Jring the st~gl~ of dtvelo~nt. So I W0uld 1 i,,€ to. enco>Jngc .... L~IJ 1.C! ccr,5oi,j;;r t.f1i1t the H1~lieu fee be p.lid .. he:l the {j<'vel(,;,"t;j,t 150 (;J-~lEt£j, (ic·t .at the: til"',,; of the building pe/'"!"H is'S~n.l',[e. 1he other itett H12't I ·"':HIla 11~:~ .IOU to 'Ic":',~ dt:e~'I)' jnto is. the bOI~d expen.se b2ing adrj~,::J lr.t('> th:· i(~-lie!.! (e-E'. i ft:f?1 H!at SIF:(:E' roC Jr~ p""tting t,;p the osh to pa,' n.;-il'i·li,:;::.J ia, yc:.; \Io%·lci (jot r,en;", the b"n:j expense. In re~l it)', if this encci\.ira9b E'rln;~~i ce'''i.dl.~,p~nt, there l~ the possibility that you ~o~)1 not n.~1 in 15~@ss~2nt to paj for the next p~r~.ing lot. So! W'Ovld lir.e )'o:J tC" )oo~ .It tht yery cl.osely. One other Com!"Ient is that the rea5or)r'\ th~t t~ef'€' ~l'l'e not beeon ar"IY il1-!ieu fees paid is that J f~el th~t t~e city, ~nd e~en the de~elopers ~Jve felt that WE are all th;r.~ing of too high iii dol1ilr ilrtrOUrtt. lt was irl the S20\COa to 524,000 r.lng~ \o'her. 'We t.H;~J to the Clty pre'o'iousl)'. It just does not work with. the nwtbers. r Just did i de .... t!lClP~nt in 1'4ounUln View, ind their in·lieu pi.rklng f~ was SI3,OOO pn-sp.ice. I nive t{1 ask, ,".y do IrrI'I! do an 1n·lle-!J fee? It is. t,) I?nc.ourige de\lelop..ent. It is tv ~rovide .ore pirk1ng and to 5ike thr downtown ~re ~itll. Thank you. CQ!I!Iissioner Be-eeba_. YOll ltenlioned ilrlcthPr lo'"tion that had a fee of S)3,000. [5 thlt on th~ Si5e cost basis iilS we h~o prestnted here, or have ttJ.ey nat Inc:lude-d certain lspects that we hid in ol,Jr presentati on? Mr Rapp: let De read fr~ a letter fro. the City of Mountain ~)ew to lie. ·T~e parking il'l·Heu fee is 113,000 per space. This is based upon the cost of our Bryant Strt:'ct strI.Jctu-re itno reflects the actual cQnstruction cost~, d~slg~ fees, and ctty overheid. If we wtre lQ include tne val~e of the lind and the 10$5 of space that exist!d previously. tn~ cast would be closer to S18,OOO per spa~e. However, since tne downtown parking district is like a homeowner~ a~s?ciiltjcn. all revenues C~ from downtown husinesses and property owners, not the general fund. The cHy does not believe it is fair to add the lind and los~ of space to the co~t of the parking i~-lipu fe~. After all. cur intent is to encourage priy~te i nilestment in the downt.owTI." Co~is$ioner Betcha~: What does loss of sp~ce mean in this appllcation? 09/14/94 -25- Mr. R.pp: I be11eve it is the same as MaT,,;n referTtd to. Mr. Oyerway: They are reftrring to the nor.·1nclus;on of tnose existing spaces. Our equi~a1ent n~ber, 90in9 to actual constructlon cost, is S13?!)OO. When we go to the loss' of space calculi!tion. it goes tJP to $17,300, and when we go up to th~ bond issulnce cost, it goes ~p to $13,000. They do not include either one 1)f those ~nr;rements ; n ,""aunta irl Vi .... Hr Bapg: One other thing is that one of tne benefits for an in·lieu fee is that It l~rs t~e assessment .. ~st leases written today are what ire called triple net leas!!5. So a~y iilssessment ; 5 passed on to the llerch.znt or retailer. Therefore, h~ ~as to pay a ~igher re~t. If ~ ~re able to lower the assessment by plying in-lieu fees. it ~ans tnat these asseSS!M=nts wi 11 Mt be passf!d along to the .. rc:l'lant, ind it rcakes: 1 t IIO'I! viable for hi:a to hi! s'JccessflJl in busineH ir. doW'ntoWll Pillo Alto. CQ:1T.115sioner Beecham: Would that i!"".ply that the in-l iel1 fees shol,;lct br high~r 50 that t~e assessment fees He low",r? Mr, Rapp: The ti,inking of that is wrong bec~u~! what ~il1 happen is. we won't de an in-lieu fee and projects will not ~e built. The nu~ber~ just don't wor~ out. We ha'l"e to eN!'!!; tI:.l a h&ppy /"",,:-dhr", ar,\1 tha:t is. ",~at Marvin has worked so hard on. I re~lly appreciate ~11 te has do~e fOT us. We have ~ad M~etings ~;th Mdrwt~, thep Keenan, Wal-[(:l ThoiLs, Jl~ Beer, Jtlhn Baer and myself, aho E.o StOrTI, a.nd ! think jo,';? Ht; 9l2ttin~ clos.. . CO~.jisioner Beecham: Ir. your experience, ~hat doer, it (ost t<:l inrlude parktn9 on-site at a typical site versus paying the in·lieu fee? Mr. Raop: I will let Jlm Baer respond to t.hat. ChalrmanJ2.iiLkian: Mr. Beer lS our final spNker from the public-. Jim 9aer. 532 (nanning Avenue. Palo Alto; The tr~nsportition division has reilly done a remarkable job under a very complex set of Ij,ateriils, afld not only with a (o~lex set of .aterials but a1so wlt~ an audience that ;s not easy to bring together. The audience that Mar ... ;'n has IDE't with o'o'er the past s~veral weeks is Chop Keenan, Warren Thoits, Roxy Rapp. Ed Sto~, John Baer and myself. You have i ~ide set of interests in that group. Roxy is anticipating a project for which in applicati~n has been filed, is has Ed Storm. They are in the final stages of the process ind ~~ seeking the lowest possible in-lieu fee that they can. They are g01n9 to be the fi rst ones to be subject to an i n-1 ieu fee. Chop I(eenan probabl.v has tt'1e best parked buildings in th-e downtown, so his attitude is, ~Jlhen 1 built flY Duildings, I ~ad to pay for expel'lsi"I'e parking on s.ite, so 1 want a hefty fee, oth!rwise, yo~ are going to pass your burden on to me," Warren Tho1ts probably has the most underparked buildings 1 ~'iuse of an older in~entory, He has the most underparked square focta9f, so a future larg€ assessment hurts him core. He would rather pass on a bigger fee. My brother and 1 are right in trr~ middle, because we are trying to be helpfl.!1 to Roxy and Ed, and """E: wind up being in a similar position to Chop arid Wi!rr.an in that assessments will fall heavily on lJS. We have some numh€r of buHdings underparked.· Gl'llen that set of tr'tJ-ij' strong finan.cial diff~rences and very stron9 philosophical differences, with Chop and 09/l4/94 -26- , ! ~ I I ' ... i I I I I .. Warren forcing lie Oil the one side, and ~d and R1)xy on thE! other side, everybody came Qut of the first me~t1n9 with the ffiateri.ls Marvin presented, lInlch Carl Steffel worked on, as well, saying we could not have imagined 1 bttter, clearer presentation. What you $a~ today Is so persLlas1ve in its qual Hy that ~e a11 felt __ e had some range Iofhere we would find agreeMnt. It was an extraordinary bit of material. At the last lIleeting we attended, it WiS my understanding that we had agreed that $)1,300 would be the fee. That is also wnat appears on your agenda. We d1d pot get to ~he techn1ca' level at our meet,ng re9araing tne bood financing fee, but here would be the aC9urnont not to include the bond financing fee. The factors are the hard cost of construction, tne flnancing fee, and a thir<i factor, ..,lcn Is tn.t if It Is, 10 percent interest rate, nc o~e is going to vote for i bond fund. If it is a 5 pe-rcent rate, you ..,ill hear people say, let's .. go and incur that bond issuance in order to get i low rat~. When 250 University Avenue came along. lot J was rewritten as a bond, because at th~t time, we were at an historic-ally low bond rate. The assesSm€nt district said, this is i! good deal t{l incur those ul1dertJrit.ing costs. That factor that t"e ilssessment, as a whole, will deternine whether they take on thp und€rwritj"g costs is gOing to be based on the availability of i(!tere~t rate financirLQ 'at th~t ti~. TI'lSit filctor that the i!Ssessm~nt, 1.1$ c. .... ~ole. will determine ... 'helher they tah on the underwriting costs is going to be t'H2d 011 the intere~t ratt financing at that ti~e. Therefore, we tho~ght that the bond financing should not b~ included. The second f~ctQr is that right now, ~hen fees are p~id for 8HR units, when an office building of O~fr 25,000 square feet is built, it ~~S ~ housing ~itlgation fee. That fee is paid half at building permit is~uance and half at occupancy. It is my Uf1dfrst~ndin9 that the BMR in·1 ie-u fe-p. is paid at occupancy. "ere in a comercial proj~ct., a d2velaper may draw a bullding permit and not break ground, but you'v~ QOt. one year automatic-any before you ha ... e to break ground, ana you can get an automatic one-year extension. So it is not uncOlTnon to pull a building permit s~ you have vested your code compl1ance rights. and not start digging yet. A lot of dev~'opers of smaller parcels may finar.ce tne front end ",r their prDjects out of cash, so I would support Roxy's st.atell"lent in arg'Uirlg that th2 model s would more suggest that it come-prior to occu.pancy rattH!r than prior to the buiiding permit. It is a pretty bi9 burden to impOSe at th~ front end of a project before the parking impact has hit the assessment district. To respond to Commissioner Carrasco's questton about a reSidential ffe, this is spec; fic t'.) the lssessment district. Ed Storm' s in~ 1 ieu space applies just as much to the residential as it ~oes to the commercial. It does not discriminate as to .... hether it 1s for cOlfl'llercial or residentia1 sp~ce within the assessment district. The argu~~nt that I would make against extending this to residential, Tony. is that part of why the in-lieu can work in ihe downtown is the iarnediate availability of alternate spaces owned by the assessment district. So a 20~unit subdtvision on El Camino ~ea' bordering on Barron Park cannot say. let's pay an in-lieu fee and park them in the downtown. It does not mitigate the burden that the housing created .-parking in that neighborhood. Here the built·in solution is that we do have the ability to develop the)e structures to mitigate. 09/14/94 -27- ... So .~ think this ;s ~ great presentation and we feel it is time to move it on to the City Council. It is likely that there will be another two or thNi! projects in the JO,OOO-square-foot or under rarlge that wO:Jld need to tlke advantage of this . I will oil so answer t"'e question of the c.ost to build on-s; te rather' than off-s1te, H you will grant ~ the additlcnal t1m'. (Granted) Part of ~kinq 10,000 square feft or under as a Dreaking point. if it is not a corner plrcel, Is th.t it Is virtually iapo"ible to build a lO,OOO-square-foot parcel at any econom1cs 1n developing it, by the time yCY d~ r~ing, which r.~s to be wide enough for entry and exit, and to do i drhe line 1rx1 have an e1 evator coming out of that. It would not b!' iiln eXlgqerltion to say that they would be 530,000 or $40,000 per spate, be<iUS! so IUch square footage is dedic.ted to non-parking uses. That is pirtic~lir)y exacerbated if yau do not h~ve an entrance cr exit so that y~ could park on either side, If JOU had to loop around 1 you can see that you ~uld not get many spaces, T~at is why th~re was wisdom in the original ordinance draft in saying that 1010~a is an arbitrary cuttIng off pOirlt. If you look at th~ number of lO,OOQ·squHe-foot parcels downtown, Here are not 'o'er), many, There are not many that are 1 arger than iO,OOO square fset, and thosp cught to be looked at and say, leoliard Ely's parcel is just under lO,OOO square feet on Waverley and lytton. If it is 10,DOC! or more, ne "nuld ha .... e to preve that the configuration was. I"iOt feasible. If It i~ under 10,000, it is pr~sumed to be infeasible. At 250 0niversity Ave~ue, W~ had very expe~sive spaces in two ievels b"eCi!I..I'i€ we ned SOi'll€ shoring up of sio'r-buildings iln.n some relocation of utilities. lhose wound up btlng S23,000 per st~ll, 69 per level. Our pi~cel ~as 19,000 square feet, but we we~e able to 90 out ~nder sidewalks, SD probably t~e full extent of our parcel was closer to 24,000 square feet and $23,DOO per ,t.ll. lh.y probably could hav. b •• n don •• t S20,aOO plr stall if it were nnt fDr shoring and underpi~nin9 neighboring properties and the utility relocation. ! think $20,000 '5 about as well as you ~ill do. ~ssjQner Carrasco: I understood Ms. Case's thougnts on not c~l;ciltin9 this ordinance, and that it was the (ouncil's directiYe to stick with the nonre-sident ial zone. However, if a resid~ntial prrlject were built in tne assessment district, it has the same design constraints Gnd the S~ physical prob1eas that a co~rclal project would. If we are going to encDurlg! residential developaent in the assess~nt district, which is Ule direction in which CPAC seems to be going, as we'll as our existing CODprehenS1~e Plan suggests, I do not understand why you $ay it would not be a good idea. j understand why it is not a good idea. to include it in this ordinance, but 1t ",,·ould be a study that staff would undertaKe with i different process in ·mind. Mr Safr: I think 1 am E1ssing something. As to the assessment district, it is my understanding that this ordinance would apply to G residential project as well as i nonresidential project. M"'. O"erway: Tne {lrdinance says it is. for nonresidential. Mr. Baer: have mi sunderstood, C.onmissioner Carrasco: So would you support the idea of including 09/14/94 . -28- • L _.-- I 'I I residtntial, not in this ordinance, but at SQaIe other time? Jtr Bur: Abst)iutely. I defer to stoaff en that. Again! the i'lailabilitjl Df sites 01'1 ~lr:h thr parkjng could be provided jn the assessment district would apply e~ul'ly vel) to residentill IS tc co~rc;al. in my optnion. '~101jc:[ B;ei=CPII: At 'your 2S0 University A'oIenue bui1ding, as 1 ~nderlt&nd it, yeu hAve BOrf or less the equlval!nt of 24.000 square feet """" you .""and undor the sid ..... l.s. Is that <orreet? (lesJ Aod the cost the~ was lbout S23,OOO per parking spaCE, s1nce yo~ had to shorp. ~p adjolnir.g buildings. ot~erwise it would ha¥~ C~ to &bout $20,000? ,Yes) Aceordt"9 to t~ ~y this ;s written, I would i$SI~ that that sfte would ~ot fit any of the flV! txe.ptton c.tegories here 1 so you WDu1d not be ,able ttl t~ In-li.~ fHS , in II'1Y case. ~ilfr: That is Lorrect" CC!!I!l?uiQl"ftr B«cr'i-1't: if 'it had t,t'~n ~'ia;hble, wou1d :1'01.i hll .. e 'Hinted to do this? !iL..-~il_U: Thllt is ~ ier)' 9"o(l Quo:-sticn. (Ht~;r.i)' HIe CclJtiOfl that ought to 90 t(l the C i t.J (c"..'"c 11 is. thai. .a I! of t~:e (l";'''~;S agre~d that 'rIe did not ~ant to do a~Jlhin? to creat€ a dis.incE~tfye to ~ake t~e best park\ng use of CIJr" Sltt!!;" 1he tw:') thir.')s thdf an? ;n~Uerlt in Hi~ in-lieu proposa1 is that if tr.P.,! r:-e~c-e publ ic s~':ce~, tile), Ui' r:ot captl't"ed for our pri'.·at~ use. So ~~ would s~lend a few t~0usard ~ore to capture private use. A second factor ~D~ld b~ if y~u are re~ote. Right nD~, on lot J, if th~y .re near in ~nderutiljled structvre, it ~o~ld ~ilke sense not to build the most expensl .. "e spaces on your sHe If yeu could poly an inrllEu fe~. even if t~ose in-lieu f~t$ were u;ed .. ~re remotely. So th~t is another factor. How closf! ue you to i'l'aihb1e park"ing? That will be one of t~e issues when the fuslbility study is cone re9ardir1~ wl1ere the next pad .. ing sfri,Jctur,. lItil} be built. 'rOll '10/\11 have owneiS ,;;'yaluat;~g ... hit are the aHernative iI\laihbilitie!:.. I want to idd two other i~~ortint thoughts, which I hope will be Clrrt~ frOli the .pla~n.ing COIIlisSio!\ to the Ctt)' COI,lncil" 'There is a hugely under" use<! p.uldl"\g resour'Ct in City Hill. We ire urban enough that for employee plrting, if you vilet·?irK~ ! floor-~~-a-half, you would increase by about 400 spolces for 01 relithely low cost. Ir. filet, the increased permit fees on the approJt~te 400 sp.ces would cover your v.let employee. We think that the resistlnc! to thlt is somtthins that wcu1d be overcame, in t;.e. Two yrlrs liter, we would not reaeeber that ~eople used td fuss abcut hnln9 to lu¥t t~tir keys. You CQu)d ha\lf SOllIE' ,classes of permit parking that was valet and some that were nolo ihe cost of these spaces is n!>body'5 ilJiaglllatio:1. "'e all hope they (an be built for 519,000, but none <If us .ilri! confident that they can be. ~e ha'ie honestly said to Tnnsporht i 0;'1 thilit tnese ire expens i \Ie !Jropos it; on s on smalls ites . So t~,t is one idea we hop€ the city will reilly lOGk at as a way of creating a lot of ease of parking in the downto~, The ether jS. think about what this applies to. ~ou will still ha~e pes, Ed Storn had a PC for one reason only. He did not park. Roxy l$. going to come along ~ith a PC where he is adding so~ extra square foetage and needs your permission anyway. The in-liell fee is an element of that. But at 250 Unh'eT'sity ~:.,Ienue, if we c.~me in and ~aid> illfe .ant 10,000 more L 09/14/94 ·29- square feet. and by thf way. we dQ not ~int to park. if ~ ir~ txce~ing a one to one fl{)or uu ratio. plus tht allO'1tE'o b(l!'luses for the district, In1 new square footlge btl~ added outside of t~e 111o~~d zone h~s to ,~ forward' ftlr your pe'-'!$s1on in a PC, At that t1ae. you cowld say, forge-t it, we ire not giv1n9 you SQuire footage ind let you PlY l19,Oon to park to do In in.lleu .-hen it only ~~sts you .522,000 to parJ:: em YOl.'r owY'1 sHe. So tnat protection is tnt bigger one tMat gets to tne ,oncern j btlip~e yo~ are raising, Bern. CQRllfuiongr kechi!!: If 1 can dr.!1lI a conc.1us ior: frOCl Vllat you ha'J'e said, based on the value of having private parki~g a~ the locaticn ~ln9 at your site. you would consider Ilaying 20 ~ercent IIOr~ t/'tal'1 the in·1i!'J fee to have those two feltur~s? Mr. Bur: Yes, and Ch<lp Keenan argues that IIOrt e~i='ert 1y ..mer. he Siys tnlt there is $~ cents per foot that you Cipture if yOlO an! parking it threi! stills per thous.ilnd ino if you H~ pHkir,g at less than thre.e stal1s per thollsand prh·at~l.v. whether t~3t is lOt or 2S~ per foot, it is 'in that range, Yo~ irE' really ~Qt a space lJ!'1les~ yi"1U na,.·!:' F,.'r 0.11 f·a:r~.ing. Cowper ,",as 2\'01 .... eo becausE' of tha.t Nr:t:irg l1it. t,,-,t it 1',,1::, (.·:.t b'::f":'"J J factor, But the W;Jlgre€f; building i:-r:o~ a s~'ac,:. {';;'f d var}et'( of reasons. One is. that it Cl.1E'S [lot. ~!a'~E' \';'.'ei1at,111ty ~f Pf]',ate p~r;;ir:g cr it:J,"Hii<!te1y adjacent parUii9. SO .YOU ,"'·;:.uld ~.r(:,·,'ide )c·,.:r C ... ;1 ~~rJ,lr'9 for d small difference. ~ll"!'lIissjoner Beedram: ~":-i.l1d yul! .a1s:j edlJ(ilte i;': Dn kn.jr; " bit r·:,r,,·. make tne analog)' to thE' ber:d of taKing" !':.ort9?l9e" i,lU! or] ~i ~.·n:s(, N nna~"cjng my car, and the adyant.ige to IT\<; of fir;a!;cir!g as oppose,} to pay; ng out of pocket, 1f the cit)' builds;) structurE' for the aSSEHf':'..;;nt di Urict and tne rates lire high, therefore He ESE>ssr"'.er,t di stri ct Hys they will not do a bond. How do they Pili)' for it? "Jr. Baer: Well, they lioT'1't. I am reall), saying t!'1lt the t;rr,;ng ir, SQ>1'>€ rear wind{l\ls, you lIIould have ilissessment district wnH<; 5.oI;)'ing )o'a:it iii iii n<Jte , we ate at the pea.~ of a publ ic finance ~arket, and we 5.ee we .care a ye-.ar away from a national g.eneral e1ecti.cn. let's. h'ait arod see .... hat hapj)l:'ns. You can Sfi! thil in very consol t-d~led o-.mers.hip, pubi i( assesslllents for things like freewiY iJl':)lro .... ements in Trilc)' ",,~ere t'""O <)wners were resp~nsible for the whale payment. Th~y will debate abuut the time. It is not iii very good example I have used as ipplying to I 200~o.~er B5sess.ent distrtct. CDfIII!i$sioner Beec"a,: So in ilr.-ost e'lery Ca.Sf, doi n9 il bond i:'i not iln option, You would hil~e to d{l a bond if there is no ether way of finilncing it. Me Baer: One important factor that ~ar'o'in has made informatior. aVillable to us a~ut (and perhaps the Planning Commission should know ibout) i~ that our bond rate for parking in the downtown is 3.2¢ a ~nth, 32c a yeir per fool. Comissiongr Beecham: What is a b'Jnd rate? Mr. Bur: We own a buildir";g of 10,000 square feet. What we po}' tr, parking bond fees as part of our property taK bill is 32( per year en that ID,OOO squa~ feet, so that is $3,200. If our rents are at S3.00 per --__ ~< .,.,~ .. , J' .. ;.." 09/14/94 -30- squar! foot in the downtown. we ire paying 1 percent of our facility cost toward parking, That 1s pretty extr~ordin~r11y low. Part of wnat the ownership, col'!ct1v!ly. is s~y1ng is that a~ our rents have gone from $1.50 ot the tl .. let J .is funded to S3.00 In this er., we often say w. are und.rfunded. P.r~!ng Is a blgg.r problem th.n fInancing. It is tl .. to doub1eo that ,lsseuMnt, ~r ever. .orE. WE' won't Mear scream~ from retailers about thlt the way we .1gMt have when it was a bigger percentige of their total r.nt. CR"1ss1oner Beecha~: In ter.s of 1ncludir.g the c~st of the ~ond In the nusber which takes it up by 10 percent, what 1s your rationale ({lr not Including the tost of the bond? Mr. Bur: I would Ix!' inventing one IIOtE' important than tMe rnl issue, which Is th,t I theught .e had .gr ...... t. wh.n-the 9roup of us .. t, thit it was at S17,300. 1 am not sure ~ether ~e would not ha¥e ~re people speaking if we had debated H at Sl9",{lOO. 'We might have naa Ed Stonn and his buddies and a fe~ others here saying. wait a second, or leonard fly, who may be an applicarlt in the future for this sa.ying, ... ait ~ sec(I;;d, we thought ..... e 'Were in alignment .at Sli',300. So 1 unnerst~no the H'.asoning. My bi.gge.~t argu~e-nt would be Hat 1 thougt;t 'We I1o.d agreed lJpor, S11,300. CQrmllssjcl'1er Beecham: I understand t~ilt th~t j ~ I>Ih.at happened at the meeting. As we ha¥e it now, does jt ma~e sense to include the bond or not? 1 ~m working to find out what was the reason for not in,luding it. Jf either of you can help us. to. understand th:at, ! 'fiCli.Jld apprHii!:t€ H. Mr. Baer: 1 will create a couple of scenarios. 1 think th~se are t~in9s we have th{:lu'9ht about before. One of those \IIiould be exactly .... hat you talked about .. putting a IIlOrtgage on your !101M!. l;n't it ~etter to finance than to pay cash? One of the things that is happening with the tn·lieu fee is. wouldn1t 1t be gre~t if they could sa}" h:t ~ finance more than my pr~·rata share of the parking bend? let me pay ~j S15,000 per stall 1r, bOl'rowing at S percent interest. rather t~an funding H at bank rates of 9 percent interest. It would n~t be an issue. It is th~ fact-that the in-lieu payor is paying in hard, difficu't·to·fin~nce dollars. Th~ second is that in the list of ad.antages and ~isadvJntages thlt Marvin laid ~ut about whether we were picking a rate that 1s too low, and whit is the danger and exposure of that, as of picking one thlt is too high, 1s that over a $5 millien to $7 oillion .ss.ss ... t Dond, which i, the kind of range we anticipate toming up, ~e Ire really tilk1"9 about soaething that ~ay have a .agn1tud~ at the outsld~ of i quarter of I .ll110n dollirs being undf!rfunded. I may be ;I 1 ittle sloppy wHt1 th.t figurE', but the o;mcept is not off. If we are it 250 spaCES l.iI'lderfunded. thit is a hlJge number. There is no way we are going to na~e 250 in·)i!u SPiCfS, so it $1,700 per space, or.e hundred is a pretty day dre~ bl9 n~r to me. At $1.700 times 100 spaces, is 5170,000 out (If kHhr Gn i 57 .nlion bond? Commissioner Beecham: What is the tenm of a bon~? Mr t Baer: tllink lot J is 15 years. ,Mr, Qverwav: lot J was folded into Plaza Ra.mona, ind I bel ie'lle th~t one is at 15 years. Sometimes they are for ZO yean, sOCDetiae.5. is long is 25 09/14/94 -31- -_ .................. _--.--- )'urs. Mr. Bier: ~Qthtr piece of information is that we do not park in office ilying, to distinguish It frOft retail bec~use retai' is so hard to 8ei5Ure, we do not park In our office at anywhere near to four per thousand, We hive do~ three or four of our bUildings, WhlCh are n~t our hrger bulldings, $u,h as 250 Unhierslty Avenue. The l{lwer level is for 30 9 000 squire feet used by Oi91ta1 EquiP=ent. There are 69 spaces there with 15 unused spices. Di;ilhl happens to be a low-intensity user. At wells fargo SI"k, there are probably 40 or SO unused stalls In the underground glTlgr there. The law firm does not happen to park at a four per tho. SInd ritl •. At 525 University Ayt~ue. they ~!Vt relsons for advocating their fl9ures, but they would argue that theirs 1s st'tRWhere ~tweer. 2.B and 3.1. Our' ~xperience would be t~at .e ~re ;n the 2.8 to 3.2 rangE, depending upon the type of office user. lilt-lis Farg<J tank is pretty hard to meClsure. If you go there at lvnc~ Ind there ire Z~ peoplf ~tandin9 in liMe, It is ~ard to get a count of t'!I'.plcye~s or at 11 (ornaio, For owr office users, J think ~taff would agrff t~at ~e h~ye a se~Sf th3t we art well under 3.5 and prab,"-bly c1oQs~r to 3.2 il1 thl' do'!(!')to\lffl, ~o aMther argument ,"ould be, We gTe not 'H)'1l'!9 let's go do .. ~d'Jtoric ~~ tf1i!it would change ten years from n~w, so _e are clOSfr to four, rh~ parti,ulir type of users we h3ve h;d in the l~st ten years do not park at fOL!r per thousand. Chaim3Jl._.9j.~.J<.ian: Seeing no other SP~.iI~(!rs" J will dose the public portion of the nuriil9 and bring it back to the c:orrmissior.. Are thHe any questions for staff? Corrrnis:;igoer Schmidt: A couple of p'eeks-ago when w.e l()cked at the project en [;renon Street and lytton A"-linue "irl regard to in-lieu fees, the t{)pic ca~ up ab-out paying the fee at a diffEr~nt time, which has been ~ntioned sf.'IIeral times this e't'ening. I believE ~s, Case said that it is easier to collect it at the beginning than, at Ule end. We have again hurd tonlght frOG the public that thit iiming bf! changed. Would you spfak some ~re about that? Is it pos.sible to dQ any $ort-of phi-sed fee collection? Soaethir.g at the beginning and so~tning at the end, as occurs with some other types of fe~ collection. Ms. Cas!: I would like to have Nancy respond to the administrati'lle burden is!Uf, i:H.lt with res~c:t to the timin9, t~e cnly requlre.ent that we are ur~er with respect to legal requirements is, if we were taiking ab~ut hGusi~g. we are required, und~r state law, not to collEct it until occupancy. But with respect to non·r!sidenti~l, ~e ha~e the ability to collect It earlier. So legallYl it could be colll?cted earlier or later. Ms. Lytlt: Thp. administrative issue is whether or not you ha~e a willing payee. If you have I willing payee, It is not a ~atter of staff being particularly lazy and unwilling to spend their tim€ on this iMherent problem. It is a matter of how much resource 9Qes 1nt.o the c:ollection of the fee. At building permit time, people pay up_ There is no issue. They are trying to ... est a right tnat they are go1019 to lose. There reany is not much time, effort, energy, or city ey.p~nditure that goes into the collection of that fee. There tends to be a great d€al more effort, energy and ti.e and a less likely coll.ction of the fe. at occupancy. The reason for that is that one is under a great deal of pressure at occupancy 09/14/94 -32- .ti"- ---- I I , ,- i I I hiVing to de with oth~r fitt~rs. Perhaps the mayor has scheduled a ribbon c'J"tting ceremony for the store opentng that weekend. That is sOfJ"I'E'thjng thlt the newsPGP~rs hive written about; peopie have plann~d a big party t"'~re. Pollticil press!..ll"'t! is on us to a11ow 1 in some way. occU'pancyof t~e butldin9' Tnen we are in the position of having given aCCUpinC) wit~t ~a~nt. That cln t~ke time and resourtes out of the public ~gency. perhaps leiding to tM€ hiring of a collection agency. etc. after the occupancy is granted. We do not hay~ as strong a club at the later ti~. It is not i~5s1bl~. legaliy, we ~ave the right to do it at eHtM!r i!~. It 1 s a matter of ho.; ~ch pu't'>lic expenditure you ire will !ng to put into collecting that fee. You art going to nave tne likelihood of .ore publ}, expenditure at on! point than you would at the other. cwtujoou Schlljdt: And thit irgument would apply to ilIrlY sort of phased collection, ,f you co1i~cted hi1f ~t the beginning and half at the end. Ms. Lytle; You fa.'Ou16 have the assurance of getting it with less resource expenditure, partially. and ~ore resource eKpenditure p~rtially. This is not i rulf; it is ~ tenden~y. CQ!'T"i,siO!"l~ __ r ____ ~_~gco;_b_~_~: J D€1ieve Ujil;t ilt our h:>t meetlr"1g, when His is'SLlf n~ l1P, staff said the)' wowld (.i:""-:' bad ""'ith arr assesslT'ent ar:li provide us 'lriith !:'lC're inf(ll"1":'.atior> o:~ the ir:f)-.lct of r'[1ving poricy fro."'! one ttl the­ other. I m~y have ~is~ed it in th: st~ff reprrt, but do you h;YB ~ny more ,r,fcr:--at'vn fc,r us. on tMe ·ir-pac.t of da,\i9"\r,9 the poi icy from (',I',~ dh'ect~cn to Ule oUi'r? ~s lktle: Nothing, othEr tha~ ~hat ~a~ been covered repert. That is the level ~f analysis thlt was do~e. olc:!.dreS!.ed il'\ the re~ort .. a~ I IJroderst.wct \to in the staff It was just C-omiss!oner Eucha}}l: 1 apparent1,)' ~iss-ed jr! Hie staff report that. issue belng addrl!!Hed. I apologize for tf'lat. 't!IlIere in the r.eport is It ~ddresse-;j? !!s. little: What .. as decided was that they would respond vfrbaily to trl& isSLlE" rather than irrclu<1ing it in the staff r.eport • .as I am learning here at ttH! table. T~ere was no analysis in the staff report. The issue ~f ~1ch f~s we collect ind where, we are clear on now. That WlS recownt~d 'n the testi.ony earlier, that the transportation mitigation fees ire currently collected up fr~nt; the housing BMR 1s split; and housing co..erciai fee is at the time of ~ccupancy. COMlujQntf" (.rruco; Regarding Mticing, the agenda tonight says that t~e st.ff rec~nds th.t the fee be $17,300. The staff report says 119,000. Does that have to be renoticed if you go with S19,OOO? Ns, e,se: Ho. the staff report is not controlling. in case you are referring t~ a Brawn Act issue. The agenda is what is controlling. ChilM!in Ojakian: The agenda says S17,300. ,",s. Case: It does not ,'lave to go back. The amount of the fee is not 5ubstantlvf, as. far as the Brown Act issue is. concerned. lliirman Ohkhn: It appears that we ha .... e several items before us. We- 09/14/94 -33- " " I have to look at wnethtr .-e-.,ill apprO've the negiltive dechr .. 'Uon on this itHi. Also, we hnt! the adoption of th-e drift ordinanr.e. If J a!l'> fath(lal1ng ..tilt people hil~e bun Siying tor.ight or. the secor'ld H.$u(-, 1t looks like d1scuss1or, could centtr ilrou~d three ar~a$. One is the ~thod of calcul.tlon, {Ind ; did not h~ilr toe .any p~ple cosment against net new spIces being us~ u r.1rt of the fCl"Wll a) I and iII.!.)'be S~ r.:omi5sioners 'all"t to CO'ISICnt Otl that, i!jlj/or how yC'u c .. ~ up lliith the figure of S17.300 or S19,OOO based on S~ different types of struct~res ilnd kow you bl~tded that tQgether to co.e ~p with that n~r. A1SG ~r the .ethod ~f C;lCU}iltiD~, there is. of ~ourse, this whole 1ss~ ~f what fin~nce c~lrges s~ould or should not be lncluded in there. If that is ~1nt fl, t~ .eth~ of cllculiltion. then Point 12 would be 1OQki~ at t~ -.ethods of adjust.ent.-Und~r thAt. there Wi~ ~~ ca.ent in the report .tbc-ut tyirl9 this to indu1~9. In essence, irld hlv1rr9 an annual r-e~ie. of SOlIe sort to t!\lil IJi\te. Th~ Hird thing that see:':'ls. to (C~-€ LJ~ i!> tlH:ii:'9 abo-..rt colledion. Is it done .at u;(' tj~ of t~e pef'l:"it or is. it d~i:f' ~t the t;1""f' (if occupanry Dr sc~>';' '1Hjatlor. ti1ereof. Hr:-,sr: :;i"'e~· to .~O' t~(· 'I:e .. ' thirgs that ~,c-,:,pie hOi'o'!,; been ge~tl~g it. If we co~~r t~os~ t~Q 2r~3S ar~ unj~r t~e se~on~ on~, get lnto $O~ of these Issue:::, ~'e .odil /',=' .... ; ,j,:i1~ ~ pr€"tt)' 90':;Jd j~,l:l of addressing this. ~C:"ni..Jl_tQ_r'_~L ___ I; __ Ci: __ ~ __ ~_E;'J: Lit pssibl", (L> (e,lled thH fe-e at d point in the begloi1ing or middle of cCh::.tI'JJctic:l, or do "'~ hJve n:;> c'~r!tl'o) Q,'er than Ol"tce we i:ssue a oliildlng per.:'it. ca~1 ::c.':lstrw;:tior. begin <It iLn.,. ti~? iihat 'We are beirtg told is Ulit we is.s.\.l~ iI b~ildifl9 ptJn1it, and the pruject !rI,ay not be built for a yeH cr !lore, nilt s.e!c'l:1s. 1 ikE'! ~n 1Jnreasor.able .3r.lount of ti.-e. It cowld be built tQ::'oOrTc .... 81Jt d0CS tl1e city actlJ.:lll, has no contio' over ..-hen canstn:ctioi"l start:.: 15. tI'.~re no ti!l:-i> in t_~e middle? M..i~: Thilt 1 s true. 1ne constn;(t lOr. c.ar. ti~e pl ace as long as the penait is ilctive. We do not have-contro1 o~'er when. CnajY71an Ojakhn: That ciJuld be iI dcublt·eoged sword. On the Cril! side. if JOU collect it it pe~it tiNe a~d it is not constructed fer a·_hne. that is t~ Dur ad\la.ntige in some ways t~ the city. ~aybe it is an incentive to bul1d the thing Quider. Or. H!e other side of the c{lin, if you do no! collect it at that point in time. ob~iously ~~body Cin hold off on con~trtlct1o!'l for a.lthil~ becaus.~ they hnf not paid the money. aut fro. whit you said ~fore, there iTe !oee other aechanis~s that could ~ used, et,'en it the tilM! of Cl>nstruc.tioo, to help gUilrantee Hit pa,YJtlent. One might be that you ~tt"ch S~ ::;ort of a late charg~ if it is ~ot paid 2t the point of occupancy. It could b~ another 5 p~rcer.t. There arf lllethoos out there, and I Olin sure we cOlJld COM' liP witrl something. I nave neard both arguments tonight, a~d you could S4ke an arg~ment either way. We could go with the l~tter and still put In some disincentive for not paying on time. (umissioTi€; Beecham: Fro,,; staff, 1 ... auld like hi s.tory of the di ffi cuHy and eXp€flst> of tryif19 builder at point of occupancy permit is~uance. to pay at that point. and because the mayor has we do. in fact issue th~ occupancy pe~it, what L 09/14/94 -34 - lO f1nJ o-ut !nor;: on the to (ol1e.:-t funds from Q If a builder is reluctant a grand cpening~ etc., and avenues are available to -- the city to collect the funds? Ms. Lyt1t: T~!y ITe t~~ same Ivenues th;t are available to Iny ,gency. W. would first go through normAl channels of ootlf)'ln!) tn.." We then hire a co1lection IgencYt we take th~ to c{)urt, i.e .• the SltJ\E' cl'1iln!'ltl:s th,t anyone else has. ~1s$loner Beechtm: When the city does that, ~hit percent~g~ of loss do we take from that collection? Ms. (lse7 ]f we turn it over to a (Ql1ection agEncy, it is generally SO percent. Lately, tke City Attorney's office has been doing those. We recently got. f •• fr .. a rec.lcltra.t dev.loper who hos .,tu.l1y boon In t~ city for quite. few yeors, He paid part of the fee, then did oot p.y the relli1nder. The city t~e,., agreed to eT1ter intc. an igreeeent w'rth that develoger which allowed him to pay the fee a little lIter. Then they either did fil~ or thr~atened to file bankruptcy insteid. Tha city did finally get all or most of the money, but there \."a$ quite a bit of 1 itigation in .... olved. in w!lich 'He, .... e did nol ha.'E' to gin the r'"c,ne-j' ~o anyone else, bl!t thHe is a fair a~(lunt of ti~e ~:<per;d2d. Cqmis"ionr,r Beecharr;: Ho\o\l ~an)' '(i::o;es h~s. that happ-:-I"d:d il1 th.,; last fi .. e years, would yeu say? Ms. Case: I can think of (lr1€ inst;.HlcF; thi!:L ~3~, qO:1€ to tt!~t €~hr,t, "r,,:; one other that has ceme to OUf offie!. I d~ not·~nc~ ~O~ often this -occurs. I ilSSIJmE' there at'~ SO,T:e that get resoh:ed before-beirro SH,t to our ~ffice. I do not know about t~cse th~t went to collectjon-age~(je5 before ~ started doing our o~n litigation. Ms. Lytle: I know of about four lnstilnce~ "'hue 'WE" tHIl'P hi:d to in\iolve sOO'~ ~nforcement collection agency, but keep ',I", r:o.ind Hat WF, no-w iilyoid collecting at that phase. Our gOi!l is to try and get fee~ c:)llfCt.ed in an earl ier phase. Most times when Ife nil ..... ! an i!ll~act !rtitigHion fee, we tillD€' It to the bulldiog per.lt issuance, COllll1l.ssioner Beecham: Are thosl! fOIJr in addition to the two thit ~L C~~e referred to? Ms. Lytlg: Yes, t~ey did not Mile it to the att~rney's office in te~s of enforcement. Commissioner Beecham: O¥er ~hat period of t;~ did th~y tak~ pi ace? M~, LVtl§: That has been during the six years I have been here. CQrnni:><:jgner Beecham: How many people need to pay ;none.)! at the time of occupancy peMm1t? That Is four or six out of how many cases? Ms. lytle: Hundreds, COlmlissiQner Beecham: It is a ~ha;ne ;1 t;l! city loses mcney, but eLl a percentage baSiS, it is not very high. Ms. lytJe~ \lie do not now collect many fees at that time. That is the only qualifier I could say, The hundreds are all fees that are col'ected 09/14/94 ·35· , - earlier or later, dlfflcult to de an • ltlg.tlen f ••• we We have not done an ana1ysis , very time hive collected over analysis. and tt would be very tansum1ng. of all the different I peri~d of time . Commissioner Beecham: Of the four you are aware of, do you know how much .aney we lost on those, approximately? ~tll~ No, because we have not traditionally traced our t~~, as city staff, and CDnsid~red it a ~net~ry issue, eo..iss1nner Begcbam~ WerE they not goin9 out to collection agencies at t,l.t tl ... ? ~: Before that happens, there is internal staff tiae. Th~n it goes to the finance dep~rtment. Th!y are the ones who have cooperated with us in getting collection agencies, Commissiqner Beecham: In those (ase~, had we iss~~d the cccupa~(y permit and were still owed money? fu----b:£1J..t~ That is correct, ,0mi$siDnerJll.th£!:J: Why did we is:;ue the oCtup.anlY perr.dt jf the)' o"ed us mcn2Y? Ms. Lytle: We were pressured to do that, for a number of r~ason~, We .... .ere prtssl,ir~d to allow <lccu;>a.'II;:Y, and th~ fee was. fOTgi \'en Clr a story was accepted that it would b~ forthcoming, That is. not an unusual occurrence. There is a lot {If fone that comes to bear at that stage in a building's con~tructiGn. COl'ill'lissjQr~r Beecham: ! am sure we wowld $;11 J ike to s~e flexib,l it),. 1n any case. Ms. LytlE: Yu, and our gent-ral attitude is to be customer· service oriented, givin9 people the benefit of tn~ doubt, Cgmmissioner Schink: Nancy. you could just have a hard and fast rule that stated that the occupancy pennH would nDt b~ issued withot.!t the payment of tnE fee, regardless, or if it WEre in the ordinance, wouldn't that be 1 i.iting? Ms. Lytle: You could have it. I don't know t"at it would work. but yes, you could nave it. IT, my experience, it is not l;~ely to hold. It is law now. in tne ordinance. So the rule is. there, It is just one that is a v€ry tough one to stand tall on. Cnrnmlssioner Sch1nk: Once the occupancy permit is issued, can it be revoKed? Ms. L yt 1 e : 1 ilSSUml.:! it can. CommissiQner Carrasco: You also have control through the uti);ti~s departm~nt to not supply power. Secondly. I am net sure if Palo Alto has an occupancy permit. Maybe the building perrnH is admlnisteral, You might have to gi~e final inspection if all of the administrative.issues 09/14/94 ·36· ; "-,- i L I I I' ! , Irt reaedied and everything is in there. Perhaps that is what you are spea~;~ ~f. But if there Is a lot of pressure, I do not see that as a good reason. If there 1s pressure, that means t1iat sorr:--eone really want.~ to occupy the bul1dir19, and that is iii great ~ay to extract more than the fee, If you wanted to. ~: CC4l!!i ss iqnrr Sc:hink: move approval of He EIA and approval of t~ ~raft ord1nlnce, with two revisions. The first ;s that the fee be $17,300 .nd thot the in-lieu fee should be paid at the time or issuance of the occup.anty permit or prior to occuplncy of the building. The question of to. $17,300 i. pretty straightforward. That Is the cost of the parking spice, excl~;n9 bond origination fees. Wnat was described to us was the cost of or'ginating a bond, costs only incurred for financing purposes. SP it Is pretty cut and dried. Tney are separate issues, and that fee should be kept .ep.rat •. nit! second point is, ..... hy should we wait six months or a year into the process for ccl1ect1ng those fees? It is becaus~ there !s interest involved in the a;cney. 8y P':.y rOlJgr. c.ilculations, WI! are ta.lking .. bout close to a thous3nd dol13f$, If a project went along, right from the st~rt, within six ~onths, using an 8 pErcent interest rate ~ith t~e ~sual loa~ origination fees, t~at i~ 1n extra thousand dollars ~e are asking the builder lc pay if he PdYS up front, as oPPDsed to the time h~ is placi~g the demand ~n t~e p~rkinQ spaces. So 1 feel 1t j~ reJsonable that we as~ that j t tit' pa'rrl at HI~ t1rTie of t1CCUparj()'. s£co~o: 8y Commissioner Carrasco. Cbll; rm~~ill: The mot ion that we have bE'for,p us i 5 to accept the staff recolir.endation en Page 1 of the st.:aff repoi"t: Staff recomends that th~ c~issi~n recommend that countil (a} approve the attached negati~e C'ec-1oil.rationj and (b} adopt tt1e attact1~d draft ordinance, pro~idir-9 for the collection of an in-lieu parking fee of 519,000, and est!bltshing the procedures for Hs collection and management. TMre Hi;> two re .... isions. One Is to set the parkir,g fe. at 517,300, .nd th.t it be collected .t the ti~ of occupancy as oPPoled to issuanc~ of the building p~rmit. 'Q9Missicner~rri$cg; The re~son why I second~d it ;s that it is cleaT that the real tost of the parking space ;s 117,300. There i$ no bond finilncing it tha.t pOint, so there shoJJld not be a charge for the bend at th.t point. It should be the re.l co.t of the parking space. The second reason for seconding It th.t I like the Ide. of paying the fee at the point of occupancy. as that is. where the real problem is (',reated. That is when people are otcupying the building and ,.,111 need parking. Therefore, tnat is. the appropriate time. There is another issue relating to hardship, which Jim Saer spoke to. That up· front money is really e~pensive money. 1t is not financed and is out ~f pocket, developer money, which is ~ard to come by. It is much more expens1v! to do it then tha r , later, J wO:Jld add a friendly amendment, which is that we :5trongly recommend tc council that we add a different process for non·residentia.l construct ion, to be in place her~ to direct staff to come up with a separate ordinance that allows residential construction to use the same benefits. 09/14/94 . -37· i' I i I I I Ii-_.~ ____ .. , .-----. ----- PI$. Cue: would suggest thilt 11,')1..' do that IS I sepHate Mt jon. ~1,:s.i?ne~ ClfrISCO; A11 right. CbJjrlfn OJ.ki.n: Any othEr ea..ents on the eotion ~f~re us? CQllissioQrr BtfcbJ!: the lPPlic~nt does not cost in constructing a This is " qlJ'2.5.tion to the lu'Ker of the IOOtion. Pi.Y the bond cost, bot in het , there is il bond f~cility, who does pay the bond cost? If C9"11S1oncr $chink: The bond costs ar~ for the bond. It is a percentage of tl\t: eMGUnt of -aMy thlt netds to be rilis~. You are redl.lcing tMf ..ount of .aoey that needs to be T~ised by the in-lieu fte, so that ~as my ~"e"stion tulier about percenhgu. That !>ond fec is ]0 percent. It is a 1~ crisin~tior. f~, essentially, .r.d sin~e y~ ire not having to borrow thtt .,ch -.on!!!)' beciluse you hi'{e H,e in-l ;eu fee, the res.t of the people wn{l AN iJsir;g the p,.rki ng spaces ...,hc. He paying in the asses:;:m-ent di strict are p~ying for it. Cf'4r'1~siQ1'q:r 8t;!echa~.: So assiJ~ing t.hat Hoe in·lieu f~e is p.dd before Ue stn<t'Jre is built ar:d the ~Oi:.j f1et''ds, to be issued. is it at the city's o~1ic'!'1 on ;.I",etr,er Dr not UI€Y a.chajl, apply the in-lie'.! fu tQ fE'QUCt' HIE bond reqlJ I red? (9':T',j~_L"-'J': __ I: ____ ~;J_hJI!.t: '1'1250, .ar~,::! He tri;-ky ques.t i011 .... 'ol!ld beco'l\e', in tnt! flJtur~: ;::fter yo'-l iS$.ue (! t,ord, if you are s.til1 charging in-lieu feE'S, ar~ you guing to us~ t\1C)~e in~11eu fees to reduce your nand indeb-tednen? If net, lnd yo~ continlJe to k~ep the~ and accrue them, then jg~in, JOu sr.ouio Tlot c:hU'9E the bend fees, If you start US\r.g in·lieu fees t.Ct re-dLicE your b\JM 1noeoU'dn-e-ss, Hen "it is justified to charge that bond tost, COI!!!riS:;;iQ(1"r B~j'£ta'!!:: Perh.lps :'ihff can t"lel? ITo:: to understand tt"lis. In tne pArking ~ss2ssment struct~res we have allocated, dQ _e normally build th~.in adv.n'~ of g~tt;ng f~es or after getti~g ffe~? Do ~e anticipate a need, a~ build it, or do ~ Wilt until there is. a ne~ out there and we have c;llected fees, lnd tnen build it? HI". Qy@T'ltlay; We hiVE never co 11 ected fees in advance. A 11 of the structures that hay~ been done in .y ten years, and 1 am $ur€ even preceding thlt, hai ~n through ,sse$~senl districts. A project is identified, wnetker it is i surf~ce lot or a structure. ~nd an ass!ssment district is fon.ea, bonds ~rf sold ~nd property DWners are assessed to pay th.t off, Ms ('Sf: let me idd tnat tnl> fee l~ set up so that it tar. be utilized i~ two w~lS. Jt tin either be collected before a structure is built or a structure could be built and j ,ertain n~r of spaces reserved for r!iBburs~nt by liter fees that are paid. So it is set up to acccmrnodatf ~ither scenario, or both. Cc~lliiQner 8eecham: My confused concllJsion is that 1:-1 terms of including the band cost and the in~)i~u fee, 1 ~ould sa)' not to do it, b1sed on two ways of looking ~t it. Jf the in-lieu fee is paid before the struct~re is build, then theoretica11y tne bond can be reduc~d by that ~unt. If the structure is built first, and some years later, 09/l4/94 -38- i '--~ developaent occurs il;,.d an in-lie'Ll fef! is. p.id for spa(es ,,!lee-ated It the tiDe of cons.truction for the iSte~s.er.t district: then one ~an say th.t the city his ger.er.al use of these spices that ire not being lJsed by Inyone. T~e ~ity essp.ntiilly has the free u~e of it. They ;re paYlng the interest on it, but otherwise. the ctty has total ~se of those SpiC~S. So I am not sure 1t aakes a big difference. but It is enough of I difffrtnce in eitJ'Ier direction Uut 1 voul{j fe-el coefortilble ln saJ'ir,g tl'lilt the bond cost .hould not be Included ir, t' ... costs. CQlW1$siQner Sd'l!jdt; I u in support of lne 517 .30t. figlH"e for tnt vlrious rei sons that nlve been ~ut fort~. 1 ~ still so.ewhat puzzled about the apPNlpriot. tlolng of fees. I do not I ike piyill9 t,eo ,11 up front, but ... 1so • little hesitant to .. k. th ... 11 .t the 000. W. did a~k if there I~ Iny other possible trigger points during c~nst:uttior. to saYt this 15 t.he 1)01"t of ftf p;yaerot. And cOIJld stop c~n$tr'..!~tion if the fees were not plid. If 'We do not hl'¥e-in)' better till1;ng s\Jggesticns irrd col1ect10n IDethc-d. I ",o~'d support the (ollecticn at Ut fro,;! r.a.t!ier tn4in at thf b.e9inning. If t!'lue is s.~ other crei!t;vt' thir.;. tc a"..:,>, t -"ol.lld support it. Saslc.all)" 1 a!"1 in agree':"!€nt Piit~; tb"~ ·".:.tion. ~C1lM":is1ton~L~~u.tl: l .. r. in 'S'J~r"rt of the S17,3D~ f".,. 1."'1 comfortable \lll'ith cnargil"19 Ule '~hoh' Hs.e~~I""t:nt district !'..:rr t~,E" coit Qf the bond. I im cD~fortable with the fart that alth~L,~h t~e r.~b~r of o'rlners 'fino gath~red to dls,:uso;; this and r.::-co to ~ C'c'~~rc"i S~ J.ia.~ J rehti\'.ely 5~illl grot:p OlJt of t~'f t.0L:1 nu-'_b=r cd 0'''''10'(,:' 1r> the <::~5.td(t, that figure has. S.C'fle' agreeJ:'>€nt e .... CJr~g the,:. Hie)' i!:i'€' C-C-;ll"c:";)sir'J ,a~!j::g ~ variety of vje~oints, which J fj~d relpf~l. Like Kathy, I .... ·ould lik~ to h,,'t':2 .$~thing in Hlt~ r1idJ1e of th~ process, which J was lOOKing for ur1ier .... ith r" .q~estion. [."; n,t'rE' SON' otl':er trigger p~int that work~? ~hat I a~ being told )s that th~re is none. 1 a'so have ~ixed feelings. After all, this is the ri1y, and ~e ne~d cur IItOney. and we .... int it up front. At the sa~ tim:>, we want thE' de.,~lopment to happen, so I HI torn on this lssue, I 111,11 support Hoe DOt ion at ttl; s ti!l'e, but if stiff an tome up "an SOCDe interilll S.til:ge. 1t4ybE thlt can be 100ked at in th! meantime. Chairman Oi.akian: First of ill, I w.nt to thank the stiff. 1t is r:ot something thit typica,lly c~s before the c.o."1IllSS ion, ilr>d )'ou halie done in excellent job of liying it out for us to digest .mat is .going on. Obviously, we h~ye done that by tne deg~e of dtbite we arf havir.g over some of the finer points. From hearing the motion and the com.ents of other c~issior.ers. 1t sounds like we have tacitly accepted the prinCiple of net new spaces inc tt"te formulas you have ~se-<l to arrive at the figure of -517,300. I need to !'lote that. Also, it sounds like for the ~~djustjng ~thods." t~!re is a need to nave in ar.nual review to keep ev~luatlng where this number is set It, and lDoking at tne indexing factors as they relate to it lre acceptlbl~ to people here. It (0BE5 down to a couple of issuts around wheth~r we shoul~ or stHHIld not include Ue bond amount as. pi!.rt of the cost of the in·1ieu fee and the point of collection. I basically '9". with the motion before "' .nd tr,<' figu,. of HI,300, realizing that we .,ill look -at this p':fiodiCilly and see if the number remains valid. The second isslJe on tne point of collection is one we are 09/14/94 -39· r , i i I , \!' groping with. 1 think C~1ssiGner Cassel's comnent is probably the right one. So.ewhere between this ~et;ng and tht council's considerftlon of the it~", the shff should rea"llze that sinct we are groping Jltith that, they may want to address that a little further, looking for some other apprGiches. Maybe some of that can come from the developmEnt c~un1ty. T~ bottom line is that ~ want to collect the IOney. That plays into SOlIe of th~Sf oUter numbers ~orking out. J always try to avoid the negative, .so wtlen I deal wtth business lIatters, I try to h'Ke the approach thlt .... one ,. 90'"9 to provide us ~ith what .... nt. Th •• if that does not happen, .aybe you haye .... things that ire factored in th<re. ",ybe you want to look It th~s I"d say oxay, a f1rst-ti3e offender, Issu.ing that someone ~ight want to build again, 1f t~ey do not provide the feel aaybe we .ould pr<ly1de ._ .ort or penalty .g.lnst th.... Or .ttach i penalty at the t1 .. of collection th.t 1f 1t is not paid, ther, Is soaeth1og t~it happens to ~ke that n~t as palatable to do. Those aT! my tDRlnents • Commissigner C3rras!;,Q.: Will you chiinge that wording of "10,000 sQI.J~re feet or less'? !:!.l., .. Ja~.,g: We will do that. "'~ 'Will asswii"~ thlt it is a part of the mot ion. M01l9_ti..PA~J~: Chairman Qiak,an: The motion is. to approve the s.t,",ff ·reco~;rnendii.tion a~ found on Page I of tile staff report of Spptf~be'r 14: St~ff reconT1l+:!l1ds that the corrmission recO,''!r.'cnd th<lt COL;riCil (il) a.~-PNV€: the a.ttached negatille declarition; and (b) adopt the atti!che6 draft ordinance. providing for the collection of an In-lieu p~rking fee of $19 1 000, and establishing the procedures for its collectiQn and rnana9~!Tlent. with the following rell;sions. ).ie recolT'rTIend th~ in-lieu parking fee to be S17.300, and to require collection of He fee,at th'E: pOint of oCf,upaney, not at the point of issuance of the building penr;it. All those in fa'.'cr, ny Aye? All opposed? That passe> on a vote of 6·0, with Commissioner Glazier ab~ent. HQIlQH: Commjssjoner CarraSCQ: I ~ve that the Planning Commi)sion strongly recommend to the City Coun~11 that we look at a diff~rent ordinance and/or direct staff to look at developing in ordinance_thit would anow residential projects to enjoy the UIM! prillileges~ given that they have the same constraints as the non .. reslde~tial proj~cts for which we ha~e developed an ordin.nce. ~, By C~issicn.r Ojakian. We have a motion befor~ us requiring an in-lieu parking fee of residantial buildings or add1tior.s wit~in the CD zone par~ing is~essment district of the downtown areQ, Is there any further discussion on this motion? Commissjoner Beecham: As moved, what does staff see as a direct result. that is, will ~taff prepare a report, or Simply forward it on to the council? What comes next if ttds passes t<lni9ht? Ms. lvtle: ThH motion would co on to ,our.,n with the report tnat transmits this ordinance. CO!l!'!!issiQn~r Beecham: Then it will be council's decislon on whether or 09/14/94 -40- i' -----------.. """" ... _-. not to direct staff to furth'r dev.lop the idea. M.s. lytle: That i, correct. c2"t$s~Qner Beecham: To the ~ker of the motion, ~y assumption in housing is that it almost a necessity, downtown, to be in an ;ssessment district. ~ ~ssumes that people whD live there would be w:lltng to park the~r cars in a downtown lot ind walk to their corda, ett. I wonder how ,ucces,fu1 do you think that will be? C?"tssioner Carrascg: I think the marktt wfll filter out how devflopers .re going to r.act to this. You n.ed the v.hi,l. to allow th .. that option, gi.en that th.r, .re small lots and • dense, urban patt.rr of developaent downto~, sl~~iar to co.nerci.l de¥el~pment. I suspect that people lre 90i"9 to put in , .... _unt of parkinS on the lot. for the ~~nt of parking thty cannot get ~n the lot, they will use commercial spaces d~rin9 the e~enings, just as Abitare and other residential projects downtown do. We ar! leoking at lower parking rate~ for those kinds of projects, and develop.ers are going to be pro .... idir,g som~ parking on the site, and people will park {Iutside, juo;t as F.!\lErY0rli? does: in do,,'ntm'l'n nijrt~ (lr SOFA. CQm'!issjQ!'1!r Srhin..~: One of tnt! most important aspects of the in-lieu fee WiiS the Ra.~ in which it helped prctect s.mall buildings frGiT! being torn down when sorn~one .".anted to add s{)me Sq:JHf' footage, rl'Eviously, the lnc.enti'lE was to tear down iil.ll tt1.e sfIlill1 bl1ildinas and ass€lTible the parcels so you can build a big parking garage. ihe idea was for the city to C~ up with thi~ in-lieu fee to protect the small par~els, and owners could add on small aJIlounts of square footage. Tf,e most l09ica1 wa.y to a.dd ~n square footage is to add S~ space on the third floor and ml~e them residential units. That is ~hy this motion would be an especi~11y ..elningful addition to the ordinance. ConmiS$ioner Schmidt: That is certainly done in bi99cr r.:Hies liKe San Francisco, where you ha~e off-site parking for residential units:. MOTlaH PASS<S: Cha!rman QJakian: I will support the motion, because .hat we are trying to achieve is the abi11ty to pay for parking in the downtown to co~er the deficit we could have. I d~ not s~e thit it matters whether it Is caused by residential versus comnercial. There is still 90ln9 te be I deficit and still be a tcst to overcome it. Is there any fortner discussion on this ~tion? Ail those 'n favor, say Ayf? All opposed? That passes Dn a vote of 6·0, with Commissioner Glazier absent. REpoRTS FROM OFfiCIALS AGENDA ITEM -4 Comprehenslve Phn Ach:iscry Corrrnittee. CQ!!issioner Schmidt: At toe joint meeting with the City Council las\ week~ Vice Mayor Simit1an raised the question, how were we going to make th~$ a usable document? .... hat happens from the paint where it is now, c.onsisting of nearly a thousand poric.ies and p~ograms, four Urnes the number in the ctlrrent Comprehensi\le Plan, to its e~entual finCil version? How does it evolve from wha.t it it now to a final document? We w€re re~u~sted to come to the m~eting ne~t week with an answer to that. I 09/14/94 -41-