Cit), of Palo Alto
City Manag~r's_~epo~t
TO: HONORABLE CITY COUNCIL
FROM: CIT\' MANAGER. PEP ARThIE:'.: Public Works
AGENDA DATE: November 21, 1994 (~:5Oi:~
Calibration of Storm Dr:liD COOlputer Mood ' Amendment to
Consultant Agreement and ResclutJon or Rf1mtm-fSf'mcnt
REQUE5.T
This 1s a request fOj appro\'dJ of;ill arr:er.dme!H tn "it 2.~r.:r:m.:rlt WIll1 CB2.\[ Hili, In.: 1'(lT
calibration of the CDmputer TIl(xiel of the City'5 storm dr3in ,,>S!CrIl
RECD:>[MENDA TrONS
Staff recomml!!1ds that Council:
1. AppiOve and authorize the Mayor «) e~("(u!e Amendment 1 ..... 0 . .2 tn Con..:;ulum
Agreement No, C2020749 with CH2M HiH, loc .. in lilt' arT:our;\ of $44,500, for
calibration of the computer mood of we City',,) swnn drain s.y .... tt"m.
2, Adopt a Resolution of Reimbursement dC'daring the City's inten! 10 b< reimbursro (Of
funds advancoo for expenditures incurred prior 10 the .ute of issuance of boI>is.
POIJCY IMPLICATIONS
Approval or the amendment does not represent any cqe to existing policies.
EXECIrrIVE S! fMM"RY
In September 1991, COWlCil approved anag!telllent with CH2M Hm, Inc. for lhe preparation
of the Storm Dr.a.in Master Plan (CMR:407:91), Scaff presemed tn.:-results of !:he Master
Plan at a Council study session on March 7, 1994 (CMll.:l84:94) and at uu: Finance
Committee meeting on May 10, 1994 (CMR:263:94).
The Master Plan identifies the pipeline improvements needed to enable the O!':w:;s[ing storm
drainage syslem to convey nmoff from a len-ye.ar S.h .. fIT! Th' ~.lJ.ster ?~an's.
recommendations are based upon the proje(:[ioIL'" of a tbeoretiC21 computer mtxld w01ch
simula~ rainfall evenu;, flUlOff partems, and the perforrn.mc.e of t.P~ existing drainage
~t111l3
4
{"". ....
system. Input to the medel includes historical rainfall dat.1, land usc patterns, estimates of
impervious area, a-'Id the physical dWlIcteristios (diameter, slope, confLguration, etc.) of ~'1e
City's storm drain network.
The attached amendment provides ft.r calibration of the computer mode I so that proje<: ted
storm water flows to actual flows can be compared (0 Jl'ruai flows measured durlog s.J.onn
events. Calibration of tIle model wlil allow stllff to adjust the sc.ope of the recommerMd
drainage improvements, prior to design and conscruction of actual projects, Refmement of
project scope cIuring the planning stage will result in more cost-effecti"e usc of funds during
the design and construction stages, with project COSt savings poc.:ncially offsetting the costs
ineum<! for model calibration. Over !he ""xl severaJ months. staff will simultaneously
conduct public outreach to ctelermine the ievel of commlJruty interest m storm drain
improvements. Staff will utilize the knowledge gained from l~e model calibration. togetl,er
with the input received during the public outreach process. [0 formulate an L.:.pci21t'(j
recommendation for the future storm drain capltal impro~'ernent program for Ttview b) the
Finance Committee In Fall 1995.
Under the terms of the attached amendmellt. the COf'.SuJtant will me<is.ure raiJlJaJI and pipelirl\.'
flow rdtes during six separate stomts during !.he flfst quarter of 1995. The: rainfall rLIUi wiH
be input intI) the computeT model in ord('r to ge,rJeratc themetkal pipe-li'nc fl ... \l,l,' rc:!;tt2S TI":e
theoretical flows wHl then be compared to Ihe measured tlows:, and a.'1.y rtis~.:rcpan~ic-s. wit: !:'e
corrected by adjusting the model parai"neters. Following caliora1ion, Haff w!]J revie\.\ the
improvements recommended in the Master Plan and make any necessary ~djustrnents to their
scope a f work.
Staff intends to issue revenue booos in early .l995 to fmance stonn draiT' capital impron:m~1l!
projeets for fiscal years 1994·95 through 19%-97. Storm drain mood calibration is or", of
the projects to be timded with the bond ptoceeds. In acco,dance with federal taX law,
Council adoption of the attaChed Resolution of Reimburs<ment (Attachment 2) lS required,
in order to penni! the City to be reimbursed for expenditures related t:J stoml drnln model
calibration or other fiscal year 1994-95 storm drain cap ltal improvement pro j eets lncurred
prior. to issuance of the bonds. By adopting !his resolution, COIlocll is !JOt obligating the Cit)'
to complete any particulaI storm drain capital improvement projects oor to issue the bonds.
FISCAL IMPACT
Funds for stonn drain model calibration haw been budgeted in CIP 47702, Collection System
Improvements .
ENVIRONMENTAl, ASSESSMENT
Storm drain model calibration is not a project for pu;poses of the Californb En\'irnnmen~l
Quality Act.
AD'ACHMENIS
Ame:ndment to Agreement
Resolution of Reimbursement
PREPARED ilY: George Bagdon. Assistant Dlre<:t()r of Public Works
DEPARTMElIo"T HEAD REVIEW: =~~~~';;-;;Sr.fe:::;.:--,-~==.!O.::",,-,,~,,-. __ _
GLENN S. ROBERTS
Dire<:tor of Public Works
CiTY MANAGER APPROVAL ~~, ~m~,
BERNARD M. STROJloJ)
Assistant City ,'-'ianagcr
; .
_.'--.,.,
4.-W i M"Jn lifO. TWO TO COIiTR..ACT )l0. C2020749
.aBZWKDi CITY or PALO ALTO AND
CB2lC 1I1LL, Die .
T'dIS A.~"T to Contract No. C202(1?49 is made and
entered into this ___ . day af ___ • 1994, by and between
the CITY OF PALO Af .. ro, a rn.:.nicipal corporation of California,
he~einafter re!e~red to as "crTY,~ and Cn2M H!LL, INC. (Taxpayer
ldentHication N\tmb80r 59 ~ (918189) r a Florida corporation aut.horized
to do busiDe.s in California, with oftices at 1111 Broadway, Suite
1200, O~land, CA S4601-4d~6, fiereinafter ref~rred to as ~CONSUL
TA!rI" ;
;''':-tEREA.S, Contract No. C202D749 ''''·<is previously entered
into t~t .... "",:,.n c:ry ax:.~~ ('O!:SUL'rr..!'IT for the provi.sion of. engineering
s€!-':icr:-s "ur ~r;~ pre~aI";"!.ti-:Jn of a StOT1T1 Drain Master Plan and,
Elll:SE-.-~c:~'nt:l'j, a.-:--:~r.ded to f""xitfy the sc'-'pe of services and the
:~'-~'~::::':3Ct priz:e; 3.r.d
l;OW, r:.{EREFO.l,(S. in consideration of their mutual
ccv-ena.nts, the parties hen~to agree as follows:
SECTrCi::Ll_ Tn€' fj n:H: pa.ragraph of Section 6.1 is hereby
iii..rrl.er:ded to read a3 f("l110,,:5:
'In consideration for the full perfotl't'lance of the
Basic services described in Section ti.l of this Agree
ment, CIT':;;' agreeo to pay CONSUI.TANT a fee not to exceed
rOUT Jhmdred Niner,y Six Thousand Two Hundred Ninety-Three
Dcllars ($-496,233).·
SECTION 2. Th'! fiLst sentence of Section ./5 .1. 2 is hereby
amended to read as follows;
-1"01.-CONSULTANT's additional serllices, as described
in Section 4 of this _~9ree:nent, compensation sr.all be as
prescribed in Exhibit -S" but not to exr;eed Forty-Se-o.,..-erl
ThDusand Nine Hundred Twenty-Six Dollars ($47,926J.~
SRCTION 3. A new Tagk 1.6 is hEr~by added to Section r,
Task 1 of Exhibit -A· to provide for the calibration of the scorm
drain computer ~odel, as set forth in F~ibit ~An attached hereto
and incorporated herein by this reference.
SFCTICN i. A ne ...... Task -4.9 is hereby added to Section II,
Task: 4 of Ext'.ibit ·A" to provide for additional ser-.riceSi that rnay
be required tor calibration of the storm drain computer model, as
set fonh in Exhibit ·A~ attached hereto an.d illcorporated herE'.in by
t_ois ref'erence.
1
.,1
• i
..
SECTION S. A work. schedule for TasK. 1.6 is hereby added
to Section PI of E...'cJ"ibit 'A" as eet forth in Exhibit "BOO attached
h.ereto and incorporated herein by this ref~renc€'.
SiCTrON 6. A fee schedule ar-.ct rate schedule for Tasks
1.6 and 4.9 are hf:reby added to Exhiblt "3" as set forth in
Exhillit C· at.tached her-etG :md incol"p'.."lrated herein by this refer
ence.
~IQ!:L..1. Ex..~ibit 'C' i2 here.by a!!iend~d in its entirety
to read as shown in E~:ibit 'D" dttached hereto ~~d incorporated
herein by this reference.
SEClQr.; 8. F..xcep~ <'5 hereiD I:".o.::.';ified, all
orc·.risions ot and; ex.hibHs and a:~r:.:;i.",:,~r;ts tD said agr2€-:fl>?nt
remain in lull fo'::c-e aco e [fei~·t. .
other
shall
IN i'I"T!,,:";E·SS ?i":o-fE';:EOF, t~:'-' .r3.n.~<:'$ ;-.-=~.".~(J ~:'lve €xe~u::""d trJis
A..,;end.."n~!nt tr.e C3)" ar~,j Y';--:'.l':" ~!,!'st a!:.:::":,,, .. (!:it~~"n.
hT'TEST:
APPROVED AS 70 F0P .... Y.:
CH.2~ HILL, !NC.
APPRO ....... ED:
"Y;'Udfl-A=;q';.!.J, ~,
F --
Ita, II""'? e-->!'''-'''~:fCl __ Cit.y ~..an.ager
Director of Financ-e::-------Taxpayer Identification No.
59-091B189
Risk Manager
APPROVED 1'.5 TO CONTENT,
A.ttac:!:lmentli:
EXHIBIT 'A·: SCOPE OF JroRJ: (P.Y.E!i'DRD)
EXHI81T • B;: W'.)?K SCHEDUl.. ... E IA..ME1ITJRD)
EXHIBIT "D": CERTH'ICATE OF INSlJRAN'CE jAHENDED)
2
941101 ~'11 0IY!06l.5
1
I
STATE OF
C1mTIPI CATE OF ACKNOOILl!DGNl<>1T
(Civil Code § 1189)
COUNTY OF _.4<'==4......==-'-' ");",' ~"""'~ ___ _
end acknowledged "t:'6---I1',e that be/she/tbey---;;-;:-ec\lr:-;,~: th~ :5e_~·,e LJ'. his/
her/their alLthorized capacity(ies), and that bj hiB!her!Lh~ir
signature (51 on the l nstrwrant the persun (s), 0r the-ei'lt.il), '.1~:-':J11
behalf of .... hich the person \ s) actcd, .executed the inst n.J_i.~en:':'.
WITNESS my hend and official seal.
3
.. ,::. .
••
p ,
.,..:-.
,
! I '
I
EXHIBIT A
SCOPE OF WORK FOR CALIBRATION OF
STORM DRAlN COMPUTER MODEL
TASK l.6-STORM DRAIN COMPUTER MODEL CALIBRATION
The goa! of Model Calibration is 10 collect data nece.u&I')' to anal)'7.e the storm drain
model's perfoIllWlCe and make adjustments 10 ",odel parameters as Deedori to allow
the model 10 moxe closely simclate actual conditions. OWl collected will o>nSi.<t of
rainfall and pipeline flow data. This data will be used as model input to check ~
model', !O$p01lSe to actua1 storm cODditions, Model parameters will be adjusted to
adjust model response to mere dosely resemble field obsef"r'atior,s.
Rainfall shall be mcmitored at ooe-minute intervals. Pipeline flow dcpL1 and ve!oc!Ty
""ill be ma.rJualJy measured at preselected sites by a fleJd crew mobilil£d fa! ~p'cdfic
rainfall events, Preferably. the rainfall e ... ~nts to be moniwre.d will be small eyenls
which would be expet:ted to produce runoff, but T!ot overflow, from the stolm
drainage system, and which fc!l\lw shortly aiLer earlier rainfall t:.verlt>. Tne pre'.ious
rainfall events wouhl sen'e to sar-Ilfare, the stJU, thus produ~ing l~onsef' .. alive
antecedent soiJ moisture and related basin conditions, The S\oml drain mod~J has
been programmed 10 simulate thi'5 samrated condition,
TASK !.6.I-SITE SELECllON AND INVESTIGATION
CONSULTANT sb.all select potential siteS for flow mOnit'Jri...1.g, The s.ite'i ',"'ill be
selected with the 1..1.tenl of isolating homogeneous arez5 of land use in order to
facilitate evaluation of tbe mOOt} parameters for specific land uses. Cit)' suif will
provide input on preliminary sitos. Sites will be in vestigattd to evaluate theiJ
suitability as locations where discrete flow data can be collected. Site evaluations will
consi<!er chlinnel geom,UY, debris, and configuration at ~ manhole, pipe ,;ope if
available from tile existing STORMS database, traffic control requirements, .... of
velocity and depth measurements, and location relative to otller .<it<s. Up to 12 sites
will be investig!led, with ~ in,",,! of selecting 6 sites for flow measu.·"nlen[S, City
and CONSULTANT sllJIll >gree on tile fUlalsites to be monitored. CONSULTANT
.!b.oll furnish allla1lor and e<juipmeDl n=ssary for site investigation including traffIC
control on local City streets,
It is anticipattd that \his \ask will be petfOmle<l prior to the Erst meeting di>cussed Lo
MEET WITH CITY STAFF.
TASK l ... 2-.DEPLOY RAIN GAUGES
Rain gauges shall be placed at public facilities throughout tlie City. Potential sites
will be identiHed by CONSULTANT. City and CONSUL rANT shall agree on the
fmal site selection. 11 is anticipated that three (3) rain gauges will be needed for this
" ,
EXHIBIT A (Continued)
SCOPE OF WORK F'OR CALIDRATION OF
STORM DRAIN COMPl.iTER MODEL
wott. JWn glUlge5 shall be crmtinuously ~ording g,uges, ~ording rainfall in ,01
inch inaemmts II """ minute tim. inuorvals. CONSULTANT shall furnish, install,
and remove rain gauges, II is anticipated that tile rain gauges will be deployed for a
peri«! of 60 days,
TASK l.6.3-COLLECT FIELD DATA
CONS[TLTANT shall mobilize one field crew 10 collect discrete pipeline flow
monitoring data. Data shall consis1: of depth 3nd ve':loctry measurements, Sites as
5<lectuJ in SITE SELECTION AND INVESTIGATION shill be visited in an order
""proved by the crrY during e.>ch mobilizalioo, CONSULTANT shall provide all
e-.quipment, material, Jabor, and wety equipmenl necessary for the work, includLng
ln~.ffi('. ('0!llrol or. local C~I)' slIee\..S, It ~s e.stbnateO that the crew will be. able to Ylsit
"Pproximately 4 5ite.; per hour. The budge-ted CQsi for tills task is based on 6
rr: obiliz..; lions. CITY ,lnd CO!':SULTA'\TT s!,\,Dl agrc.e Qn which ;storms the Held crew
","iU b(o: mobilized, TIle em' contact for determining whether or not to mobilize for
a particular storm e ... ·rent shall toe Mr. Matt CosLigan Mr. Costigan shall be contacted
during normal business hours AI (415) 329·24~9 or alter ho'''' at (415) 326·5577.
H.SK 1.6.4-REDUCE FIELD DATA
Data coHected by the field crew shill be processed 10 produce flow quantities. The
discre~ pipeline flow data '\\ill be used to dovelop an estimated flow hydrograph for
eacb site for ea.:h stonn monitored.
TASK U,S-CALIBRATE MODEL PARAMETERS
Tbe model will be run using ~ storm rainfall data collected for eaoh storm event.
Model no ... hydrognph results cocre,sponding to 1M discrete now monitoring sites
will be compared with ~ field dala. Model parameters will be adjusted based on
,Utislical comparison of the simulated mOOel dat>. and the ["Id data. CITY staff and
CONSULTANT shall d.is..1JSS recommended 2djusunents and agree on new impervious
factors.
TASK l.6.~·PREPARE REPORT
The CONSULTANT will prepare a technical memorandum (1M) for this project.
The memorandum wil! include discussions of the methodology used for sHe selection.
d4la COllectiOIl, office data reduction. and model calibration. Recommended macel
parameter &djustments wiD be presente<l in the memorandum. Three copies of Ii draft
version of ~ TM will be submitted to cm' .<aCf prior to L~e third meeting included
L
, , ' , .
i
i ,I
I
I
EXHIB IT A (Cootinutd)
SCOPE OF WORK FOR C4LIBRAnON OF
STORM DRAIN COMPUrER. MODEL
in MEET'I\1TH CI1Y STAfF, The CONSlILTANT shall prepare the final TM
mer (be meeting and S<ibmjl fI"" ropi<o to <be ClTI.
TASK U.7-MEET \\1TB CITY STAFF
CONSIn. T ANT W&ll meet .nih CITY stiff fer. l;J,k-<>f! meeting, after L'>< third
fleld crew mobilization, and to p= tbe results of tbe r .. <lings.
The agendi for t.')e tIm a;ec-ting ,."ill t....clllO-! fLid£ngs c{ SITE SELECTION AND
~YESTIGATiO.";. D~.l.5..Sl{JU sh.a.JJ iTh:lud.r ~ceru fflr pipeline cleAnlng, site
~~-O:on re:»~rt:.c!d.!.~o!'..s, &!1d r;-,:-\I, rucciliuLiLln crite.fa and ~roce,ji.lf1'....s.
Tbe :;:ge.:,d& fef (:;e ~0nd r..r~li.1')~ "."llJ In,;ILJd~ rrelimtfl.!.f)' flndif1g_~ [rom the first
:.tree S!OrTIl e,""c::l~':', d:.:iC'J.:..iic>I'< uf rr;c-:hfyjr.g f!"!0:1ll(Hirlg pr(lo:;e-:hJJes, and di .... cu.s.sivu of
Crt;~' IT!:C,::rL:iu.I'~~,") \-:-::.=ri.:: a...'1j p[lo....eJ~rE5
Tc'! fuu1 ~.et(iiig ~a.ll L" .. ~\'.,!de di1.cu.s.s.i.orl of ~.he Ending.!> of the project and rt'.,,;',;w <)f
tt.e draf! 110L Cammert~ for ll".e fti,.eJ 1M: """W ~ c'Jlloct.ed at this m{"Jefing.
TASK 4,9-.4.DDmON4.L SER\1CES FOR STORM DRAlJ\ MODEL
CAl..IIIRo\, nON
It is t.!ltici~ If.al 3djitlonaJ ,sen'im · ... 'ould be needed if TASK 1.6.2··DEPLOY
R.<UN GAUGES ex~d.i be)'Ond 6(l day,. CO:;SVLTANT shall nol deploy the roin
~ for ioogtr th,ll1 60 (b)'! ","ithoot "TitleD lUthOrizatioc from the CITY.
...
EXHlBIT B
WORK SCHEVULE
em' OF PALO ALTO
eor.l'RACT AMENDMTh'T
STORM DRAIN M~lER nAN.
CAPITAL IMPROVEMENT PROJECTS. """"0
BARRON PARK DESIGN STANDA!<DS
TASK I •• Prepare ~laster Plan R'p'm
Du.ra~n
{caiendM ria:n;)
Ui<:ul.v r .....
(rom NOlk< '"
Proceed to
C('I!';",plet{ln
Task 1,j ---'---------------1 ll'oJ---j----](16----------.:
1:-. ..::.--'----------------------,.-------------.. --------------.. -----~---'
Task 12.1 I c.1 1 61 I
Ta...,tk-· \-.;~~-. ------------11--~(j r 76
t-------------.. -L. ------1---------£ I 45 I Task 1.3
Task 1.4. L1 I) I 213 1-------------+-----+-.. __ .----
Tm 1.4.1.2 )0 i 91 r=-"~"--------_t----'-C.·-·--+-----_1
Task 1.4.l.3·1.4.2 IS3 I 274
TasI: 1.4.3 3() 16S
Tas!; 1.4.4. 1 :0 304
Tas!; 1.4.4.2 3D 335
Task l.S l68 38l
TuI: L6 150 U13
TASK 1 -Capital ImpCOVomtJlU Pro]ect
" .. ----
'l'ask 2.1.1 45 45
TuI: 2. L2 3() 45
Task 2.1.3 76 91
T.,k 2.1.4 76 91
Task 2.U·2.1.6 213 243
Continued
I
I
'0
EXHIBIT B (Continued)
WORK SCHEDULE
CITY OF PALO ALTO
CONTRACT AMENDMENT
STORM DRAIN MASTER PLAN,
CAPITAL IMPROVEMENT PROJECTS, AND
BARRON PARK DESIGN STANDARDS
Ta~ Duration
(csloendar days)
CaJondar Da"
fr!)1ll Notice ro
PrC/\,."'e'e'd: to
Co rnpltti on
TASK 2 -Capital I.mprove~"-nt,-.,-Pr..;.o",je<:-,--,t5..;(,,C<l:cn,-b_·!i_u_ed..:.) __ --,-________ --{
hTc;!ISk __ 2_._1 __ .7_-_~_~===_.~~= ____ .L. __ I~O __ t-___ 2_1:_
• T"k 2.1.8 120 21"~ ~ "--1 T"';; 2.1.9 213 -274 I
Task 2.2.1 ; 55 SS I Task 2.2.2 45 100 ,
Task 2.2.3 45 I 145 ----
Task 2.2.4 68 213
Tm 2.3 280 560
TASK 3 -Prtpare Barron Porl< Design StandanIs
Task 3.1 30 30
Task 3.2 120 120
Task 3.3.1 15 45
Task 3.3.2 75 120
Task 3.3.3 75 120
Task 3.3.4 90 120'
Task 3.4 60 120 --.--
i'
I
D"H1B1TC
FEE SCHEDULE
CItt CI PMn AJlo
StMn OrUI ..... r Piar1
~ ModI.t c.It>r-.:Ion
'-""'.'"'iM.4 3M>Wl. ~.
t;~M -(;H~M!..ainr Hot.ltt !....DOOr E2 Eng MIl( ~ MIrIl-llp T_
T~ ~ ~~~~J)_-J!L~~_~
SASIC sEFhnCes
T!l.sk 1,8.1-Sfte SelectiOn DnQ 1nveat1gJdb'l
Tasl( 1.6.2-Dopic1¥ Ft.., Gauges
Task~.~AeklDlIla
;fIlIk l.6.4--Rda ~ Orta
,sm.l_$.~Mo6.I~
TEWt U.&-PnIpIIno Ropry,1
""'r~ 1.8,1-MH1 wMl at,. S1RrI
Taskl.G.~~
TOTAL. 8A.SIC SERVICES
ADDITIONAL SERVaS
Ta$l': 1II.9-Atk1IIJonaI SoMc:ElI tOl Slerm
Drlllo ModelcalltlfaUrJrT
TOTAL. AOCITIONAl SERIJICES
TOTALS, THIS "uENO~ENT
"'suny/lions:
flEVfSED CONTRACT TOTAl.s
o
o
o
c
o
2
o
• •
'" ,.
" o
8
•
" •
'" '"
$U123
"" 1<,2211
$2.097
0790
""'" S6.373
'"'"
... "
S2,007
",000
""'"
... .,.,
103'
tl~
.. 12 8 eo &4 $7.651 51."13 ",000 S2?"1
~ :i'. 11) 18 30 53.,*,,9 S«6 11 ,000 S\45
3 3 12 12 XI ~,9S4 S446 $400 ~
__ , ___ 0 ___ 0 __ ,_, __ ,_,_ ~ ___ 10_ ~_~
11 19 l~ 1:l:) lt12 $24.695 $13,ts54 M.t143 12,030
""" "1'80
"04MB
SA,,",
110.635 .. "'" .,-
~ 141"'"
__ 0 ___ 0 ___ ' __ ~ _' ___ ~ ___ 10 __ ...!2~ ~ .---E:.....72!...
o 0 0 l) G SO 50 12,0180 ~"B $2.726
11 " 102 ''''
~ ~ mil bo moI:Uilfld 6 ~
ToI8J 01 ~ ~u 10 b3 !t\CINh)owd
04 8ltIcJ ~ "-viIII(od!>/lt mt.".ItlIlIzlIlIQn
3rt11n~lObI~
TerrAL SASIe SE~VlCE:S
TOTltlAOOJTIONAl SIOA. ... ICE8
TOTAl ALL. SERVICES
= ~~.2:~ "3.654 SfIo,123 12,271) "'.9>0
.... ,.,
1-41,926
$S+4.21'
o
.' '
;'!",
-,' :
)
',....,-"
•
EXHIBIT C (Continued)
RATE SCHEDULE
CICM HILL!xxu1y labor !1l.es for Tub 1.6 4lld 4.9 shaIJ be &S follows:
j
~-
L.. t--
CH2M HIlL SAN FRA.NCISCO REGION
Bn.LlNG RATES'
Rate
Pers • .)ili"lel Gra~ ($ per Hour) --'----
E.0 _________ ~----.--:.:59..::.64'-'-----_I
68,76 ""-----f------------El
El 76.38
m 85.62
-----.--------r------------------~
E4 99,32 .-----
E5 1\8,76
E6 127.53
E7 155.37
n <\4,83
1'2 51.27
n 62.81
14 68,94
TS 90.64
Offi<:e 47.18
• These raJeS are subject to cbange as of December 25. 1994
•
EXHIlU'T C «,,,,,,dooed)
RA'IE SCHEDULE
Direct Et;pf'CYS a.re thmIe C"OSf..1 incmTed 00 or d:i.m:fJ)' (0:-t!'Ie proJect including, but not limj'tOd
10, .......,.ble ond ~ ~ cost, including curren! I'Ilt3 for CHlM HILL'.
1'eIDdes; meW snd ~; l&b<nlory ..... &lid lIlllysU: """'PlIler ..... ices: wold pr0cessin8
oemc.., tdqlI>ooe, pr_e, iept<>:luctioo~: III reasornble one! ~ cost3 associated
wilb 0iIlSide coosWta.:lts. subc\)nP'tuA'ts aDd other O!ltsitie !Imo-ices .aDd facilities; I.lJd oLher
similar eMU. R.eimbtlnemalt for Direr.."'t ~ will ~ Oil loY b&sis of a..~-lI..l' Ch1I~ when
~ by c()!tL-nert""AJ soun:es and oc the b&sis of current ra\..es ~'hetl fuJMhe.d by CH2M
H1LI... A $en1ce durge of 10 ~rct::.!'! .. i.li be i,d·j,."'l11O Diro:t F~pe:1se.s.
,' .... '"I~ .. Hl3GlNS OF COLOA.IoDO, INC.
11'1li STREET, SUITF. ,as.O
DENVER COLORADO 81)2(12
AnN: PATRICIA FRAHM
1511~-OO124 SFOlM
CH2M HILL, iNC.
'111 BROADWAY
SUITE 1200
OAKI.ANO, CA 94607404S
\ 5:P:P(~713;>
~:-:c';;;~c~"":;', I
! ~:.:~~ (CA, ~ I (A.!...L)
""''''' A 'Hm'
"""""" 8 ""'"
"""'-C 'Hmo
=-« D ""'"
~ E LE~
I r.>4'01,~
!Q.4";l',~
i
: L'-:',"J1,,9S i
! ().41O: ~:.
;.,::..,.: ".-, .o..;.:.-~ ~ .. "'"
;-:-~ .. :-::::::-....... ,::~ ' ... "
'Fl':' ":_ .. :..::,,.'~'":' " .. "", "
, ... :-0,,' h.? .-,,>
i,~-.... ";~
i
1~1lD-'~"';:
!
1",:;,,,.~~rr«!i
A:.!.. T"Hf rr.:.-~
'-
,
"IWJlCl ~. SF~~" ST!2K tlt.l.a \\UTU ;>L.-AJI, wn~ ii.It'.M~).--rS "~CHt:r J.c:
8WOII pAA'( HSIGIII Q)!D£L!ItlS. ~ A COJt:IJTJOII AS~SS»E"T TO lVAJ...UlTE HE ~SElIT a:::.HI'*I Of Till tifT'S nOD! f'rSf91 A.Iil Hl I
UaJeElI) lEIWJ1LIT~TJ,*. U;'''ll N6) iW'w::!;. CUHFtCA.TE itOLDfR iUoIE!l AS ADDIHOIIU.l. HIQ.tiI) ~ :"ur. lilH'f£ST *' ~ AS
Y OF" PALO A.LTO
I'\ITN JOE TERESiI
:250 HAMIL TON AVENUE
PAlO ALTO CA 94303
': ,i -.. , •. -....... .,~.,..... ,
L
SHO,JL{) AA'Y (.'1' ThE A.9OIE CJ£SC'\!8ED >V_-':;.;E';!:of C'O • ...,;lOi..l....':U BD'ORE "f"'K:o
(:XP:AADCN ""IT n,ER(OF. THE i;.sl.'I~jQ CO/tAPA.VI WIll -,x"iOz:ti>C¢<)' J
W.il... ~ OoI."I"SWROTc:k ~TlCE: TO lliE CE..cmFlCA1""[ ~ MM6) TO Tl1E
LEFT. ~JIfM.X"~>OC't~03C I _:~
I
I
~ <"4, ,
~j:L
Exhibit 0
;ACGM.&~~FICg,9F'!-NSURANCE::: "rl~O=:' j
I TliIIJ. eE.RnRCATE IS ISSUEO AS" ..... nER Of IHfOfWATlOH OM.Y AHO :
CONFEP.S NO fUQl-fn UPON ~E CERT'IFICATE HOl.D£ll nas CER'TlFfCAT'E
I
OOES NOT AMEHD. fXT"ar«) OR Al..TE.R THE C~Qf ~ 8V THE
poue~~ow~' ________________________________ -1
~_ A COMPANIES AFFORDING CCVERAGE~~~~~_~_~~ __
-PEHlNSUI.A exCESS INSURANCE BROKERS
j ~ DESIGN PRorESSIONAI.s INSURANCE CO. 1S114--0000S Sf'O -'-_-"'-cc __________ -j -= HIlL, "'"'-.-------------.------1~ ~ __ "" __ B __________ .
1~11 BROADWAY I ~ C l
~ "" 94601_6 ;;::-:-~-----------------====i
eH')' Of PALo ALTO
.." JOE Ti:RESI
l ....... HAMIlTON AVENUE
FIRST ftCXl<'<
PALO AI.. TO CA 94300
'L
'011: ClAIM PtiWfEll IOnl'.lll tIlE PetitT
i"!'; S -IOOLO ~ Of n1E ASO'.'t otSCAIBal POl.!C:Ifs BE CANCa:..£D 6EffiAE TH:E
EXPH\I\noN OAT"E THE:~Of. ~€ !S.3UL'tO COt.lPAA'1" \W...L ~
_.:i .. :' loW. ~'!.~.~TOi ~~I::HOt.DEfINAWE!)TOTKE ~ u;:FT, --,,-_1=-'111 Fwa '""' .... 2 GJ(B)!'a~ ~;: ~JS XWMTX7! 4)Q()I*-=XZvEik!UL' dOFY.
':~~ATM
K~ <f? W~
. '" "·._e<lOlPO ..... '_, ...
USOLlJ'rION NO.
ASSOLU'rION OF rEB COUNCIL OF
AL'rO DBCLARING INTENTION
UPDDXT't1RBS nOM 'J'R:a PROCBZDS
•• XSSUBD BY ~HB CITY AND
AC'rIONS
'rHE cay 01' PALO
TO RII I1IBURSE
OP O~LIgATIONS TO
DIRECTING CaRTA TN
The Council of the City of Palo Alto does RESOLVE as follows:
SECTION .L.. The Ci ty proposes to undertake the Project
referenced below. to issue debt for the Project and to use a
portion of the proceeds ot" such debt to reimburse expenditul:es
made for the Project prior to the issuance of the debt" .
SECTTQN 2 United States Income Tax Regulations section
1,150-2 provides generally that proceeds of C<>.x-exempt debt are
net deemed to be expended when such proceeds are used for
reir:-.bursE'_:r1ent c,f expendi t1.!r~s IT'.ade prior to the date of issuance
ot such debt. unless certain procedures e.:re followed, ene of ',"ihie;'
is a requirerr:ent that (' ... ·::.th certain ecxcept ions), prior to the
p3:.t;:',ent of any such exp,.:.r:diture, tbe issuer decliir~ an intention
t.o n;:~ir;..'::l\..:n::e such exp:endi t_UT.:'"
S~CTln'Ll.... It is in the-public interest and £01.' the
public benefit that the Clty decla:-e its official intent to
reirrtbu!"se the expenditures referencE?d herein"
SfT'T"'ION --L. The City intends to issue obligations (the
'Obfigations'} fer the purpose of paying the costs of itE> City of
Palo Alto Utility R~ven\le Bonc3 1994 Series A tinancinQ" of stOIl!'.
drainage iIT¥r-overnents, including costs of design, pipes, inlets,
PI..ml' station iliprovements and erosion controls (the • Project·) "
~E1~TI9N 5 The City hel-eby declar.es that it rea30nably
expects (i) to pay cert.ain cosls of the Project prior to the date
of issuance of the Obli~ations a.nd (ii) to use a portion of the
proceeds of tr~e Obligations for reimbursement of expenditures fOl"
the Proj ect that are paid before the date of issuance of the
Obligations.
SECTION 6.
obliga:te the
Obli(]ations"
The adoption of this resolution shall
City to complete the Project or issue
not
the
SECTION 7 The Ci ty Council finds that the action hereby
approved does not constitute a project under the California
E.nvirorur,ental Q'.Jali ty Act"
!II * .... 0-.... '* .... '*
o
AYES:
-C-i-,-,-'--C-lce--r~,-'-----------
A'?'i':";;,:)'::::..D .;;...<;: '~" F.~?\'~
.:,:::;'[::.; J-L_:!.':~ El:..l &. ', .. :::-n;F:,
;, rr-c~e3s"G,dl :..-~,,: (-'):--j:::,r-at i<:::-i
,..-, .
~ .... ----,------._--_.
Sr2~~~~ R. C~'~le;~ia.
B:'fld C'(.":ll-:.el
•
\
'-.~~------Ci t~-· ~~nag.~r
Dire~tor at Finance
"~---.,.,.---:--:---Senio~ Ass~stant City Attorney