City of Palo Alto
City Manager's Report
TO: HONORABLE CITY COUNCIL
FROM: CITY MANAGER DEPARTMK'>'T: PLANNING
AGENDA DA IT: April 24, 1995 CJlfR:224:95
SUBJECT: BryantlAdd'"lSOll Traflk arcle (C[p 1 Slll} -Budget Arnendmo. t Ordin. DC~
REQUEST
Council has previously directed staff!o proceed with the design and construction cf a
permanent traffic dICIe at the Bryant! Addison intersection. lbe design work has
progressed through the conceptual design .tage. AI this point in time, it is evident that
additional funds ($9,000) are needed 10 prepare the final engineering plans aad
specifications and construct the project The PUl]Xl5e cf this report is to request thaI
Council approve a transfer cffunds ($9,000) from the Street Improvement Fund to the
Iraffic circle CapitallmprovemeDI Program ( ClP No. 1921 2).
RECO~ENDATIONS
Staff recommends that CouIlCiI adopt the &ttached Budget Amendment Ordinance
(Altacbmenl: 1) transferring a \OOlI of $9,000 froID the City's Street Improvement Fund to
aP No. 19212. in order to provide sufficient funds to prepare the fmal engineerillg plans
and specifications for the Bryant/Addison Traffic Circle.
POLIcy IMPLlCA nONS
Council has already approved the installation of a permanent traffi<: circle at the
BryantlAddisoo intersection. Traffic circles are one of several measures that are avaIlable
roc neighbo<'bood traffic management
The Public Works Department has expressed !he legitimate concern that !his proje<t, like
other similar traffic management de>ices, cootinues 10 incrementally a<'..d to the regularly
required need for maintenan~e without any concomitant budget adjustmeot for
maintenance and landscaping. In additioo, maintenance of the circle may require services
that are not included with current staff (e.g. !rick mason) or for which funding is not
aVailable in the Publics Works Budget.
CMR:224:9S
,
., ... , ... ~.
h&elofS
•
..-.
o
The installation of!he traffic circle is on lop ofa "umber of underground utilities. 'WI)J1e
provision is being made for noanal ser.;';e ""cess, there will likely Wille a time when 2
po<tioo of the drde would have to be removed &-.d replaced, in order to accomplish the
needed wode. The most likely identifiable need is the storm dcain S)'stem. which may be
replaad within the ne'" five to ten year time period,
EXECUTIVE SUMMARY
Backeroond
InSep!ernber 1994 (CMR:436~4; Sept=ber 19, J994),the City Council approved a staff
recommendalion to retain the teI11jXlfary traffic circle at the Bryantl Addison intersection
and directed staff 10 proceed "ith the design and illstallation of a pennanent traffic circle,
with the understanding that it was to be done with the involvement of the neighbors and
should reflect the bistorK nature 0{ ibe neighbo.-hood. The traffic circle is one element
«the Bryant Street Bicycle Bouleva,-d Extension Project which W2S implemented in the
fall 0{ 1992.
The September 1994 staffrepon indicated tint a conceptual-level cos! estimate for an
irrigated. landscaped circle is approximately $25,000 to S30,OOO. A design that is
compatible with thehis10rK nafure oflhe neighborh<><Xi coold result in a cost S"'1'assing
$30,000. The staff report noted loat the City bad access 10 a remaining balance 0{
$45,000 0{ State Transportation De\'elcpmenr Act (IDA) funds that could be used for the
project. subject to certain deadlines: (oj cO!lS!ruction contraol approval by June 30, 1995
lind (b) construction completion by September 199 S. Otherwise, the Metropolitan
Transportation Commission will allocate UDuy-d funds to OIher projects.
St.afi's original intent was 10 try 10 eSlablish a "oI>.:n!eer working group of residents,
induding design prof""iona\s, 10 actuaTIy develop the design of the cirde, \hereby
ensuring that the design wO',w be acceptable to the neighborhood and saving the cost of
!he design work. As illumed out. res'.dent5 ar.d design professionals were willing 10, and
did, in fact, wntribme substantial time and effort 10 the conceptual design development
efJOrt. However, they were no( ahle 10 S<Jb:,iitute fur the need to hire consultant expertise
to do the actual conceptual design work: a me final engineering design work:.
Therefore, an urban design consultant -Greg Turg of Freedman, Tung and Bott<>mJey -
was hired, at a COS! of$1 O,OOt\ to develop the CO!lC<>ptual design for the permanent circle
that would echance and complement the historic aspect of the neighborhood. A
neighborhood working group was assembled 10 work: wiib W,/'. Tung in developmg flfS!
a preliminary conceptual design and, subsequently, a fmal coocept design. Members of
PaJ,e-2 ofS
•
•
;
..• ~,-...
, ~;
-,-"
"
o
the worlcing group include residents living on !Pree of the corners of the Bryant! Addisoo
intersection, three design professionals living near the circle, and a staff representative
from the City's TranSjlOltation Di,'sioo.
Concept Plan
The coooepruat design devel<lpment work h .. proceeded through several iterations of
al~.ernatives and variations and included the involvement of the neighborhood working
group as wen as an opportunity for broader neighborhood input; review by l:>oth the
Historic Resources Board (HRB) and the Ardlitechtual Re"';ew Board (ARB); and re"';ew
by affected City departments
The initial concept plan (estimated 1<> cost $50,(00) was subsequently modified to
address. to the extent possible, specific feat'JJe5 that raised concerns duri.'1g the review
process, as wen as 10 reduce the overall cost. The final coneept plan, as de><:nbed and
iIIustraled in Attachment 2, addresses !he concerns raised during the review process and
is currently estimated to cost approximately $35,000.
The next R'qUired step is the preparation of engineering design plans and specif",atioo thaI
can be nsed 10 proceed with the solicitation of bids and tV.e construction of the circle. The
estimated cost of sL>ch semees is $9,000. Startlng with the original sum of $45.000,
utilizing $10,000 for the concept design work and estimating a need for 535,000 for
coostructioo, leaves 00 remaining funds for the engineering design work. Therein lies the
genesis of the need for the subject Budget Amen<!ment Ordinance to pro,ide an additional
$9,000 to fund the cost of the engineering design worlc
Al!ernatiyes
The issue before Council at the present time is whelher !o approve a Budget Amendment
Ordinance that would provide an additional $9,000· for the completion of the
Bryant/Addison traffk circle. The alternatives are as foLIo\.\·sc
Alternative I:
Al!em.live 2:
CMR:224.:.9S
Aooreve the staff recommendation and,,~ the_~na,hed Budget
A,nendment Ordinance. Staff would then proceed with the
engineering design "ork which is required 10 bid and construe I the
project as now prQ9OSl'd.
Do not aweve the attached Budget Amendment Ordin~""ee and
!li!:ect staff to reduce Ihe estimated C05t 10 construct the circle, by an
amounI sufficient 10 cover any remaining engineerin..gdesign work.
for example, if the cost 10 construct the c irele could be reduced 10
i'age J Df S
•
Conclusions
-.. "~ .
o
$26.000, there would be $9,000 aVOIlable fOf required design work.
II is staff, con"idered opinion that any such further reduction would
significantly aher the basic design COIlCept and would necessitate
starting over cr going 10 ail "ofi"tlJe s.lJelf' design. In either case, Ibe
decision rogarding a new de sign would return 10 the neighborhood
worlcing grOllp.
Staff believes that the proposed circle design is a good one and has Ibe supp<>rt of the
residents. including design professionals, who live in the inuneiliate "'.emily. It bas been
reviewed by the HRB and the A.~B and is generally acceptable to the City departments
Ibat will be affected by its installation and need foc maintenance. To start over with
aoodler design eoo<:ep!. at this point in time, would be unwise and inefficie!lt utJ1ization
of resources. It would also most certainly result in L':te 10< s of State TDA funds that are
now avrulable 10 Ibe City foc this project
NcXlSteos
If Council approves the attached Budge! Amendmer.t Ordirumce. slaff will proceed ·with
Ibe hlHowing steps:
a Cootract witb a consultant 10 prepare the necessary engineering plans and
specificaiioo.
b. Proceed with bid procedures 10 select a coolraclor 10 construel the circle.
e. Return to Couocil. prior 10 June 30, 1995, for award of a construction contract
d. Construction of the circle will need to fulJow expeditiously. with completion by
September 1995.
F1SCAL L"IPACT
Appro\'3I ('(the attached Budget Amendment Ordinance ",ould transfer $9,000 from the
Street Improvement Fund 10 this project
El\'\'lRONME·NTAL ASSESSMENT
An environmental assessment (91-ElA-2S) was pceviously pcepared for the Bicycle
Boulevard Project. and Council approved a Negative Declardtion for this project at its
. meeting 0{ December 2, 1991. AMrtional ~nviro"mental as""s smenl for funding the
engineering design of the traffic circle is not required under CEQA
, .-. "--.... -.
. -." ~'.;:':'",,_ ... ~i"<'
...... ',i:
. / r'
A If ACHMEI't.'TS
1. Budget Amendmenl Ordinance
2. TIlIffic Circle C.oo..~pt Desig:a Plan
Prepared By: Marvin L. Overw.)'. ChiefTransport.ti<.a Official
Department !-lead Rrnew:
City Manager Approval:
00: Neighborhood WorlcingGroop
Historic Resources Board
ArcllitectoraJ Review Board
y~ S-.!.MJ~
KB.'NETH R. SCHREIBER
Director of Planning
ar.d Community Environment
II.! FLanNG
City anager .
Page S orS
'~-, '-~ --:" ..-' , .. . .
•
ATTACHMENT 1
ORDINA1',CE NO.
ORDINANCE OF THE COONCIL OF THE CIT! OF PJU¢ ALTO
J\MENPING TIiE BUOGET FOR THE FISCAL YEAR 1]194-95
TO P5tOVIIlE AN AOOITICNAL APPROPl!.Il'.TICN FO!t CAE!T1>.L IMPROVEMENT
PROJECT NO. 19212, "BRYANT STREET BICYCLE I!OULEVAAD EXTENSION'
WHEREAS .. p.,.lrsu4Dt to th'! provisions of Section 12 of Article
III of the Charter of the City of Palo Alto .. the C~il on June
20~ 1594 did adope a buOget for fiscal year 1934-95; and
WHEREAS.. last fall Council directed staff to proceed with the
design and ir,stcallatioc. of a permanent traffic circle at the
int.ersection of Bryant and Addieon Streets; and
W".riE.UAS .. with inpu·t frOlll. r~ei9't.bors in the Bryant/Addison area,.
a design tor the traffic ciL'cle .that preserves the historic nature
of the neighborhood has been identified; and
~ .. staff bas detel~ined that additional design work and
expense is required; and
WHEREAS .. it is estimated that additional costs for design work
will be $9, 000 •
NOW .. THEREFORE, the CO.lIlCil of the City of Palo Alto does ORDAIN as
(ollows,
SECTION 1 _ The sum of Nine Thousa.'1d Dollars ($9. 0'00 ~ is
hereby ~pprcpriated to CI~ Proj~ct Numb~r 19212. -Bryant Street
Bicycle BotJ.levard Extension.· This appropriation increases Project
19212 from Sixt.y Nine Th<:;ol.Jsand Dollars ($69,00'0) to seventy Eight
Thousand Dollars {$1S .. CD'C}_
SECTIQN a. The sum of $9,GGO is hereby transferred f~om the
Street Improvement Fund to the Capital Improvement Fund.
Sf!"7JOfi 1. Thie transaction ..,ill red.uce the Street
ImprO"-i"emeIlt Fund balance from $B72~ 0'0'0 to $863.000.
-.
-.
'.-
SECTION '. As specified in section l.2S.0BO(a) of the Palo
Alto MUnicipal Code.. a two-thirds vote of the City Coun.cil Is
required to adopt this ordinance.
S2C'J'1.ON S. 'The 'Council of the Cit..y of Palo Alto hereby finds
~hat the enactment of this crdi~~ce is not a project under the
California Environmental Q.,lalitY Act al:!d~ therefore, no
environmental impact assessment is necessa.ry.
S.sf'T1ON 6.
Municipal Code,
adoption.
NOES,
ABSE:NT,
City Clerk
As provided in Section 2.04.375 of the P~lo Alto
this ordinance ~hall beoome effective upon
MPRWED,
)la.yor
APPROVED AS TO FORM,
Sr. ~~st. City Attorney
APPROI/ED,
City Manager
Oirector of Finan~e
Director of PlarJling and
Community Environment
o
"c--ATTACHMENT 2
BRYANT/ADDISON TR.AFf1C aRCLE DESCRIPTION
DesIp o!>IectIve of th. lraffk dlde: Th. ~ IIilffic circle Is. new Ir.iIlIc control feature
/or L'Us type oIotreetlnleructlon and n.!ghbo<hood '" Palo Alto. During ~ cleslgn proc ....
CIIy Stalf and 1IdgIIbo<hoocI resId.nts examlnecl b"offic c!rcle prototypts lpprt'\'ecI.ncI
constnK1e<Iln rosIdendal nelgl",borhoods In the Seattl .. WA Inc! Portlancl. OR ""'b"opOIiIaa "' ....
WhlIe IIIese ""-YO _ pioneering eHoos In nelghborl-.ooc!-scaI! traflic planning, ... lcIents telt
_ tIIe5e clesigno II.>d • uW;iarlo. appoarollC! thai detIacteclfrom. resid .. dal r.elghborloood
ch.uacIer. TlIereloro. ~ main obJectIve of the IIryanV Acldison 1nffic cL-cIe deslga was 10
cIevelop. vfsIa! cIwach!r to comp1=>enl and enIIance the historic character 01 the Professorville
~ wlUle meeting tho hmc:IlonaI requlrements.
_, sUe Clmltmnla: ExIstIng uncIergrouncI utWtles {;:nootIy storm and sanIlaly sewer En..,
\mdemeatll boIlIlkyant and A<ldlson Stre.ts fod>a:!. any ciesIgn proposalS InroMnJ plor.ls willi
deep rooIS, or constructioD mrur..s with deep footings. partku!ulYI, the geometric center olthe _
drde. In 1<IdItkm. Oldsting manhoI! and wale, valve covers within the c!rcle'sllldlus must be
_ 10 oet.t ""'" elevations .booe the Oldsting road pa Vem.!nllocatlons. OM ollhe wore:
vaive COYe1S Is CIlrn!nlly Jocalecl where the <wb would falt if the cIrde"s c~l.r was ser exactly 00
the crossing of street =f.,1ines. n..r.~ the circle's cenlerlineo should be penr.ilted 10
IIodzontally 0_ slig!ltlyln plan (61ncl" ... maxfmUlI\l from the street centerlil1es to
accommoclale tlIese m..d waler valv. and ma.""olE rover b:aHoll!,1n oroer 10 allow L~em to
(enlei.withIn and lvokIlnterlering willi ~ 22' diameter <".lib 01 th. island; subject 10 IIilffic
engineering requirements. SucIo an QIfsef will net be pe=lvable In the Inlorsedlon sp><' !!selL
Mal __ DaIp~.c The objectionable "uIilitula." tra£fic c!rcle designs were
vIsu.aIIy_ted by powe<I-in--pIace c:onaele Inc! odd sl<>plng wps. W. ,,"-YO ~
mad. the foDowIng =oendatlons for materWs and forms:
Bdd<: Our study of the 5UJ1OWIC!lng nelgI>bomood coolexf 01 rna!er!als le4 us 10
conchI<I. that reel brick would be the IMSt .ppropr' .... pertr.anent building lI1PI.eriallO
cIwoc!er'..7A! the ard\Irecture of the IIilffic circle. W. obsavecl that reel br!cIt was used In
waII:wiIyand planter strip paYIng. entry stairs, and building bases of manylIOIJIe5
tlIrougIIout the neighborhood. In response to residents' COI"oC<nI$ about. non-<naclUnecl
1ppeam!C. and CiIy Staff concerns over future replaceab!lily, we have sped£ed • b<Ick
prodlltt for pien and walls from the Glen-Gery Corpor.otloo (a prominent ""Ilona]
manufacturv 0( manll ..... sWldlng. wlUcl supplies lo0oi clisIrlb<1torr.l al!ecI the
"HancImI<1. BrIck" (.stanclacl modular sIu) These bricks have an irTeguIu texturecI
oppeill1iJla due to ac:tuaI manufacture from lIzndmad. molds, .. """"""" 10 meclIanial
IooIdng wire cut brIcb. BrIcks IOuCIling 1M horlzontal paver surface at 1M bases of walls
and piers will be a quaner-an: "waler table" type wpo On the GIeD-Gery W12-1t modeD.
10 ronna visible base. They will be 0_ In. variegated mix of3 cIooeIy reIa!ecI colors
10 _ fu.Iwe repolrs or repla<eznents.1f any. win be abl. to b!en41n easlIy. BrIcks for th.
paYIng area will be the GIeD-GeJy Corporation "molded dIamkrecI" pavlngb<lck In
matcIIlng colors (this b<Ick Is englneerecl rue vehlcular loading).
Preculco_ W. ""-YO sdecIed pnast concme components from Dwa Art Slone In
Newarlr,. CA 10 cop the vertical br!cIt .lements \rustcm!but similar to atabgJ preaS!
pier cape and catalog p<eciSI wall copL-.~ or..! serve as an ICcent molmal (precasI
COD<:me sip panels wit. _leltering. If seIect2<D. ThIs combination 01 reel brick
---.-~ -"" '----"'~~ ..
"'\.-" _.''';
". -~"~' '~
I
I
..
' .... --: .. -"" '.~~-~
J"
o
walls and IighI worm gray ,tone-lik caps and ornamenfs Is. rypm 01 traditio"'"
an1rll<ctun and la.~1'" gardeD elemonls from the Iunl 01111. centul)' and ... -Iler.
Combined 1Oit!l • geometric arrangement L'" circle design Is lnten<!ed 10 ha "both • dvlc
!o«!erly and~" IJ1d res!dattial (hWNIn-scale and bandcraAedl character.
Edge al14 "Jollovel.kirt"l The trafficdJcle Island ""'1( has an ovenol! diaJnete< ol twenl)'-two
(ZZ) foe!. 115 ~ edge wID be •• " hlp. 6"wfde concrele cwb.l>ehInd whlcll wID be All
.ppnixlma12!y rr deep ring band ofGlen.Qrybdck pove" Ctnolded cha!nfered typol.llush v.ith
Ihe lOp 01 cwb and grouted In pIaa alDp 0 reinforced ronaote sub-base. ThIs edge flotronn Is
N!CtSSIU)' IS. "_vor sldn" lor vehicles v.ith 1argo Iumlng radii {>uclo as delivery lNd:s) that
"'"7 __ 111 roll over lb. cwb in order 10 mab Ihe left turning "",vemenl on:nmd the
c:In:le. a... wafer nlve awer and one storm draIn manhole cover will be raised 10 the new ... "
~.Ilan &lid loated wllhin the brI.:k pover us. The sldn sl>ould be !loped away from the low
W>II base and towards the cwb v.ith • 2" slope !o provlde positive dralnag"
Lew Wall: A 1~711r Cappro>C.) high (measured from the brick paver ,kilt), 12" thid<. appro><. 17-
rr d!a~ dreuIar brick waD forms. raised platform for the center 01 lb. c:In:le. k will lIave ••
Inl.-<On! 010 reinfurted poured-In-plaa concme retalnIng _lI.COV&ed by lUI curer skin of
I>ricb iL'Id capped by.,. O\·er!langi.~g 14" ,.;"e,3" IMel: precast concrete coping by Dura Art
Slone {type WC5}. The roping wID overhang Ille wan by I" on oiL"" okl .. The Int<r!or Ii>cA! 01 Ill.
ccmcele retalning waD will be coated w'.tlI1 wa!e1prWllng membrane !o prevent ef!lorescence
on !be brick swfo<e. There wID be 4 bOCk ~"lnterruptlng tile wall. oriented lowards oadl
approocl>'"-g Slreet (see "PIer" secoon immedia lely Io!lowing). The wa 11 ,,;n 1n!!!S<!<:t the p!er(s)
In sud: • Wll15 10 appear centered on Ibe .lde of the pier (thls relationship .... Ille radius ol til.
wa! and its precast roping).
The ""'1I wID have. "nkIIe" In plan to acoommodare Ibe one storm drain manhole alyer at the
... " el ... llon. The niche will have stralgh.t walled sides and. curve wall rear, ",at. the rear
CUfYlfure-, radius 10 be set the same as the overall curvature In order to use the same mold foe
!be precasI coping. The niche', size ,.;n be set 10 mainWn a minimum S" clearance away from the
DWlh~ cover.
PIem: Four 211" deep. 24"1Oide. 36" hIgh (+40" height from _ asplWi to lOp of precast apt
fapprox) re<!angularbrid: piers .,..loo1led on tenfer wlth eaclIapproaching ,tree'. v.ith the
ru!>ide brick face set Ippro>dmalely 27" behind tho t.c. of cwb. EacIo. has an overnanging
precast concreIi! op 1Oi!h.1ow pymnkIai slIape lop {the ap "".,.!lani' the btiel: pier Eace by 2"
on all sides). The outw3rd face of eaclI pier con13ins II/¥' deep recess!o accommodale 116" •
16" CiIJ "WOVed tn.ffic 5ip panel wlth the In!emanonill traffic symbol lor a """'Y, to direct
ODalIJIlAgmoIorisIs on how 10 Irovelaround tho circle. The rea!S5wi11 have no less !han"""
brick enc:I'. wIdtII to eIthu sid .. In order to appear arthilKturolly Integrated ,.,;u, the pier. It Is •
SIrong concera ollhe r.e!gbl>orl>ood residents to integrate traffic signs.required by the
TransporIaIlan Oivioion Into the a!cltitecture oIlhe cin:!e.. and therebyayoid !reesIanding sigo
pasfs ~ undesirable by them.
"" opt!onaI cons!de..,tior. Cshould the budget pe=o't and final cons!ructioo de!ailing &how
...:apt>bLe proportions and Jeglbilily ol wordsl FOUld be the inclusion of. precast c:oncme street
Mme sIga panel set flush ",itllthe brick S'~ and below uclo traffic sign .Indlcatlng tile JWne
ol the aosoln3 _ \0 oocoming vehicles. This would be. panel 4-71ft' high! C! bricb ~ one
mortar joint JUg1\) .16" IengtlI (10 molcll the lIaflic 5ip .bovd. A Roma~ rype rypeface would be
~r::::'FT;--------
.~*-
. ~,--~------------.-~
, .---~
.",' .
",
" ,
used. wItIo 1-3111' MIght leIterS. It would be separ.!ed 1>, one brick from ld'jiICOIlllUms (t.'Io
InlIicl5lp abov .. the edgt of the pia" 10 1M sides, atld Ih.l>ricll pa .... "r.fa« below).
lnsdoaplDa: llehind and wIlhIn Ihe low wall will be. planting area. The ft."lIsh son ~ will
be $eI at .14-Vl' above exlsting <!reel pavement. A low malnlenan<e ground cover plan!
malerial" lied ... H<lbc 'l-Wm's s..lf-branchlr's' (EngDsIllV)' -. medium leo! overgr_1vyl will be
planl<d ill. triangular sri<! on 1.f' c."ters. A drip lnlgation system will provide water fct-the
plant marerW. kl expooec! bod<fdlW prevenler .. lve (opproox. 111' helghl • 10" 1engtl1) will be
_10 be cenWed l>ehlnd on. <ol 1M pius.oo ",itlo a mInImum 12" ~ from Ille pier
CwhIcII pier II> be 5decIed wm be per fIcld water supply location). A solar operal<d lnlgotion
COhlroller mUl "ppm", :W" !lelght • 6" depdl-unl1: _los. parl:lng meter) wilIb< loafed
..... teredl>eh!nd...-pier (whlcll pier lise 10 be se1ected will be pel f!eld water sum .
IocaJ5on). Bodt the bacl:Jlow prevenfer valve and Ille solar inigotion conlrO! mUl will be hfdd ...
from _-on YIew by tI>eI< adjacent pier; they ""'1be somewhat vWb~ from Ihe side. They
will be ouppI!ed CC painled In aD undItrus!-ve coIor!o blend In. An area <InJn w-:n be provI<Ie4lo
.sn ... elf e>cceS5 taln or Itrlgotion ..... tot. kl existing sanlWy sewer man!Iole cover and In
<O<lsIing .... ter nlv. cover _ tlIls planting ..... will bo!h be nIsed 10 a n .... +16"
~ etevalioD abov. existing pavemer.~ and plant "",ferial will be set !>ad from 1M
coyer frameS ll«<lt'dlng 10 public woe .. requirements.
~ W. rECOlIlmOll<! thai a clear .ntl-gralfitl coo.ling sue). .. "Porous Plus" (MJnde
S •• I.,lIs .. Abrasives Co.) be applied 10 exterio< brick and masonry sun.ces. Please note that
dimensions dtod Ire IpproxI:r .... and ""y require min« ad'JUS!m<nI during Bnal ccnsttuctlon
c!etallIng.
. ,-"-"
'.,. ,
, '
l'ypbl btIdc • pI ... and.
low w.u. Glen-eery
"l{NUIm&c1e" '8~ In
Sflll\l1al:d, MoCluiar Size
(3.5/11" D. ~ 0 "'""." H. x
'MIll" W with 3J8" !)'p.
Il\OtW 'olnt.
1/1" rec_ for 16" X 16"
trolffc .ign amlerll!d In
flat face of brick pier.--------\
Fa"" oE curb' b_~
"Water table" type brick
WlII8 .t billie 01 Wall __ ..j..-.,~
60112" I'IecaaI ~""'r---~
~ / ~ c=
19"ll'l."
(11 (0_ oE bl'kkl I
&
---~~~~~~-
,.-------AlIemJIe pier lip
layOUl: ~6" X 16" traffic
• w/WJII" x 16"
p_*-I_ •• 1p
plll\el. ~O'W.
-----l'ftcast COlIC. low waIl
coping )" H. X 14" D. e
I • Solar IrrIptiol\ cOl\ttolIcr
(lop .. 24" .l>oYe tin..
grade, 2(11f." above wall)
Top of 11_1 pyrmtioW
cap
of low waIl C;I
~
~ Z~' ·0" Island 'Diameter ---J ~ U
Bryant I Addison Traffic Circle ~ Elevation
Scale 114" = l' ~ 0" March 23, 1995' , ,-.
'"
,-,'
, "
"
'."
"
, ';'.
" .'
~" .. ,; .':
'. l~~ ':'
"
,
, . I
,-. >