HomeMy WebLinkAbout0435.094.. City of Palo Alto City Manager's Report --------------------------- • TO: HONORABU: CITY COUNCIL DEPARTMENT: FROM: CITY MANAGER PL~NNrNG 9 AGENDA DATE: SEPTEMBER 19, 1994 CMR:435:94 SUBJECT: 400 EMERSON STREET REOUEST Cit)' Council ~s requested io approve the propossl fOT a Plarult"d C(lI'mnunity 7(lDe change at 400 Emerson Street and to accept payment of an in·lieu PJrking ft..: for addili,)T'.31 ?ar}r-Jng spaces requLred but not able io be (';omtructed on site, The propost.'\.' d~\ einrrrknl is a B,lOO square foot, t1lr~e story. mixed-use srmcture. including comll1erdal U,)i' (11\ tjl( lirst and second floon; and on.: r~s;denti31 unit on the third tloor. RECO~fMENDATlONS Planning Commission, the Architeclural Rtvic\\' 8oord, <'md staffrC',,:x111Imend that lhe ('ity Council approve: 1) 1be Conditions of Approval in the staff report to the Planlling Commiss.ion dated August 31, 1994 and amended as shO\\n ill AtB.ehmeni A to this repon, 2) The environmental assessment attached to the staff report dated August 31, 1994. recommending a negative declaration. 3) Tne attached ordinance amending Section 18,08,040 of the Palo Alto Municipal Code to chat1ge the Zoning Map designation for 400 Emerson Street from "CD­ C(PJ Do"mtown Commercial Pedestrian Combining" to "PC Planned Community," POUI;:Y IMPLICATIONS In-Lieu Parking regulations, when adopted, shaH apply to this project in downtown. EXECUTIVE SUiVI~lARY This staff report fon.nrds the Planning Commission and the ARB recommendations to approve the application for replacing all amortized automoth'e service repair buitding at the corner of Emerson Street and Lytton Avenue with a 8,l10 square foot mixed use structure that will contain 5,833 square feCi of conunercial space 8.nd one rental rcsidentiai unit. The property Dwncr, ~fr. Ed Storm, proposes to expand the comer lo! at 400 Emerson Street by removing the 1,500 square foot (12 feet x 125 feet) driv<w.y that CM1l:43S:94 Pagt lor.:f ./ \ separates the parcel from the adjoining lot at 412-412 Emerson Street. whkh he also owns. A total of 27 parking spaces are required !o accommodate the proposed commercial and residential uses, and to retain the two existing parking spaces at 412-414 Emerson. "Ibe proposal to build a thr ... story "uilding, providing less than half the required parking spaces on-site. and removing access 10 the adjacent parcel, creates the following parking pro,\-isi(ln and access issues. First. the project size generates a dl!mand fOT 27 parking spaces, ollly 12 of which ca."!; be accommodated on-site, I 'Ibe Planning Commission recommends that the applicant: (aJ pay an In-Lieu Parking fee for 13 of the additional parking spaces reguired; (b) substitute eight bicycle lookers off-site in place of another reqllired parking space, and CeJ be al1owe.d to share one parking space for residential and commercial users, The applicant must pro-vide at least t\\'O bicycle tockers on-site, and has accepted Planning Commission's recommendation to add a.<;. many bicycle racks as feasible near the commercial rcar entrance to reduct the demand for vehicle parking. The PlaIUling Commi.s.sion recommended agaim;t the applic.Jnl's request to ha\'e two {2} parking ~paces (required for the residential u.i1it) be shared with commercial users, 50 that h~ {'ould reduce the" number of spaces subject to payment of in-lieu fees. '1llC Commission rliscussed the i5sue at bDth public hearings, arJd recomm~ndcd that only one (I) residential space may he sha.red. For the applicant, the primary issul! is one of economic cost to d~velop the site. Some Planning Commission Members propos~d to delay psymrnt of the in-licu fees until just prior to occupancy. Ultimately, the Planning Commission approved a motion to modify Condition # 13, that specifics payment beforc issuanc';! of a building permit, at a rate of $23,000 per .spare, and 13 spaces subject to the fee. so that the recommended condition now reflect') the tinal provisions of the In-Lit!'u Parking Ordinanc~. ~ Se\:ond, acce35 to the rear of Fanny and Alexander's commercia! usc at 412-414 Emerson Street mmt be provided. The proposed corner lot expansion \"ill remove the driveway that currently provides access to the rear of the adjoining lot. The O~'l1er shalt provide J!;:cess across the parking lot at 400 Emerson Street to the rear of412-414 Emerson Street through the Certificate of Compliance procedure. A pennanent access agreement is propos.ed to be prepared and recorded prior to submittal for a building permit. The Planning Commission approved the plan conceptually at its July 13, 1994 public hearing, requesting that there be from one to fLvc residential units in t..he building and minor changes 10 the parking lot. The Architectura.l R~vie' .... BO(1!J approved the plan conceptually on July 21, 1994, accepting proposed changes to the parking lot and a single residential unit. The ARB requested that design changes including signage, lighting, 1 S;!e' chart titled "Parking Re'luired" in Staff Report dated August 31, 1994, page 4. 1 Planning Comrn..issi{)n reviewed the proposed In-Lieu Parking Ordinance at thE September l4. 1994 meeting. CMR:435:94 Pag~ 2 of 4 '_ .. ' . . . treatment of the north and south facades, the color pal ene, and roof material come back (0 them again for final review, (See the Jul)' 21 ARB minutes, attached,) The Planning Comm.l&sion ~ie\\-'ed the par:king issues at its second public hearing for the project 0!1 August 31, 1994. It ",as moved, and adopted, that pa)ment be made in ""C~ ·"ith the pTl)mions of the soon to-he-adopted In-Lieu Parking Ordinance (See Attachm<nt A. Condition #13). Attachment A lists tho modifications made by the P!a.nnL.T1g Commission to the Conditions of Approval on August 31, 1994. Full conditions of BppfovaJ are inciuded in the repon to the Planning C()mrnission dated August 3 i. ] 994. fISCAL IMPACT The proj~ct would not ha\ e a signifLcant fiscal impact upon the City. This application is 'it:~je....""1: to the full c·('."$1 reC{)YCfY fet" s::-hedule. E:!'>'~:um~.,~U;JHAL ASS!:SS;\1Ei'iT [1 i.~ n:~l'TT1!TlI.·n(kd thilt a NegJotiye DedardtiuD be adopted (attached te the Planning C(1i:1Qi~~ion ~l3ff rr:p.:>r1 <JC'Jed Augus.t 11. 1994). A l'arti"I [g)\DITlO;-"S OF APPROVAL. as modified by the Planning Commission on ~13Ii9-~ B. Draft Ordinanco C. Staff Repm1 to Planning Commission, July 8, ]994 D. L .... capt minutes of the Jui)' 13, 1994 Planning Commission 'Meeting F. StalTRepon to ARB, July 2i, 1994 F. S14tf Repon to Planning Commission, Augtl~t 3l, 1994, w/anachmcnts: I. Environmental impact Assessment 2. Ordinancc 3, Location Map 4, Exeapt ARB Minutes 7/20/94 5. Transportation D;"i,ion Memo date 8122/94 G. Plans (COImcil Members onl» PREPARED BY: JOYCE AUGUST, CONlT-ACT PROJECT PLANNER DEPARTMENT HEAD REVIEW: KEN],'ETIl R. SCHREIBER Director of Pla£lning and Community Enviror.menl • Page 3 of" \ \ CITY MANAGER APPROVAL\;lj~ , BERl.~m:') As..'iist3l'H City ~anag.er CC: P1aruring Commission Art:hi=tunl R", jew !3ca.<d Public Arts Commtssioo Mr. Tom Gilm.a..i, DES An"nitccts, 31.i9 Brddlard Str.:'et. ::300, Redwood City CA. q4~) ~fr. Ed S!Oml, 'I.om Ld.Ild C(,mp,:!.T'\:-, tL~ Park ('.:-T11("[ PI3..l..a... Sa.'1 ;os~ Ct\ 95113 ~1.r. i).:mi j'~1a~3is.e. P.O. BCI\. 5iN~. Red~il.-"".,"1 Cit) CA 9.WA.' Santa Clara Vc::I~e': 'l\;at~:r Distrin; 5")~U ,\trmdcn F\r~\:.~">-',jy. San JO'5C (,,\ 95118 Sandf3 F...alirl:', :~ i93 Gr~i' R.:d, F.tL) \it,) C\ 9-Ui"::1 H\)'usin~ Aclirln (\'~~iliC',~ .... -'(, S.ln:,;l CL,rJ. ('(:11'11: ~I1.i_1UL'.d'..ir;'!g Gro'Jp. 5201 (];':31 Amecl..;.,1 f'J.Tk\\.",.,, SUlk 421:-. S::.!11;l ('!H.I (',.\ 9."\05"; CMIN3!\.'94 I'll&< 4 014 ATTACHMENT A CONTI!TlONS OF APPRQV &. (Underlined text recommended by stan~ ba.\Cd on Plar'..nLng Commission conditions of approval, August 31, 1994). Prior to Submittal (or Building Permit 4. Twelve parking spaces (of the 27 requrre,j parli.ng 5paces) and 2 bicyck \ock~ shall be provided on-site. One residential parking space rna) be shared~ one equivalent parking space shall be in the ronn of 8 big·de lockers h.x:al::d otT-Sill"; and !J additional parklug spaces are subject to an in~lieu parking fC"l: TO h<-rmid IOlhe City. The applicant shall work with the Tran.~portaliQn Division l() r.rr·\ ide __ ~Q~itiowl bicycle racks (approximately ? to 8) at 400 EmC"~.Q..r.l ... 5.tJ:~.~.:. 7. The parking iot decorative wall shall be cCJn-struCit'd. lQ....ili.r:.. .. ~.j.(( rll_"ln:;. Ud..r.:,\ . .u.J.:.. . ..l.~.4::.i~11 t:: c to pennit \'isibility all the \'\"3)' il.l !ht: !3r \\a!L nh~r" l\",<;" <;()Uin '-.Elir"l',d! i~ ! .. '-... -::ted 8. Strike origina l tcx1: ~ eftt-li:! td"t 8iehe &Iitj-the-~~~-fl..:.-~tJt.;c:_: !i't-~ .. 1"t'tJ.~r.'l"tl.B: 9) tfie Ptt."lie lL""'t5 Ceffl1fllisJie8 (PAC), ana lflt j"h~ddlt' f(lr·+~ ... :'~t:t+1 (-.e. ~~ iu tfte tiftct! site tie. el ... rHflel'll rIsl'D .;~fllf'lineJ.-tfr·~he-"ARB-:--·tftfte-i:':ft-·~~,**-h·t-Tt;r­ ()"rHea fi:F" .... the 8A'ftef--AAatt--emef-.1 ~6hl hflffl11e:;:. fl~::e"'t'Rl 'I ia. eRe! C~7"' Replace with tex1. that follow.:.: .~rulr;ant shall ,onsuit ~ith th.: Public Arts Commission (PAC) ~fore sk'b!T}ju.iog final details of !he art niche and water fountain for ARB r~vi~_ anJ_L!;?r'.f9.\?l.L._...'~n PAC comments shall be submitte<l as part of the ti.nE1Lsite dC'Y~lQP.m.~t plans for ARB review. If the 811 objeet(s) is CjJY:Q\\lled gh.Jl:t~ ... 9\.\ner shall enter;] h0]d harmles..c. a greement with the Ci.t)::. Prior to Issuance of Building Permir 13. Applicant shall pay the City an in-li"u parking rce of S23.0(JO per 'pace. based on Ille number of parking spaces requITed... at a rate of I park.in~ space for each 250 ~uare feet of gross floor arca. Thc total fee is estimated to be $299.000 based On the I J spaces that carmot be provided on-site. ThiS amount may \"aT)' based on ii.nal constru\;tion measurements. In the ('Vl."flt lh..;-City adopts, ::',n ordinan-::c within !.)nc ~ ear after occupancy of the project, which l"swblishcs an in-lieu palkUlg ree li1Jt is highr-r than $23,000 per 'pace, the 0\\1Ier sh,1I pay the difference belw<'e11 513 .0(,,) per space . -->··.··~>lM. _______ ~ __ ·· • II UiJ; .• _---:.... __ o and the amount established by the ordinance. If the fee established by the ordinance is lower than $23,~'OO per 'pace, the City "ill refund the ditTerence between the $23,000 Wld the amount established by the ordinance" In the event that the In~Um...E.C.£_ oTdj!1...!Ilc~ hereafter adopt~JJ ___ .by the CiW CQWlcjl CQI)ff!ins provisions that-.£2P.f1ict with this con~llion. those ordinance l'ro\'isions~ ~ 2 "" . -- DATE: TO: PREPARED BY: .~ttachr;[ent C -~ ---._. ------ PLA1'INING COMMISSION July g, 1994 PALO ALTO PLANNING COMMISSJON Joyce August STAFF REPORT REPORT IN BRIEF: 400 Emmon Scree" ApplioatioD for a Planne<! Community (PC) woe chang" and reques' '" accep' payment of in-lieu parking fee 00 allow: L Demolition of a former automotive repair building; 2 ConsrructlOf) of an approl;imately 8,lO(lsquare foot 3-s!or:v mixed-use structure, inciuaiL.g i residential unit; 3. Provi.sion of 12-·14 parkJng sp<i::es. on-lit!:, including one shared space, aud paymenl of rrl-lieu parking fees for 11·13 ac!dltiona1 r.;quircd space,) off-site; and 4. A lot line adju:icment between 400 Emerson Streel and 414 Emerson Street to accommodate the proposed new building and parking. En\'ironm~tal Assessment: An Environmental Assessment rtrop.J.IDending a Mitigated Negative Decla.~tion l!I~ See 8/31/9'~ P1anning Coo;ni::sion staff report. ZQrx; D i:;.q:jc!: file Nos.: APPLICATION JNFORMATION Applicant: lG: I 9904 j a: \4OOemrsn CD-C(I') 94-ARB-52, 94-ElA-8, 94-ZC-9 DES Archi""lS & Engineers 399 Bradford Street, #300 Redwood City, CA 94063 Phone (415) 364-6453 7-g-94 Page I -------- , I Type of AppI,catlOtl: 0....: PI<I.IlDe<I Commuruty (PC) ZoD< Change Lot Line Adjustment Request to permit paymeot of in--lieu parking fee and ODC' shared parking space to rn eet requirements (or 27 parbng spaces, with 12·}4 spaces oD-site, A!>~IICa!Jo, rett,,,ed MWh 24 1994: R~" i$ed apphcatiOD received May 6 ]994: M.I.!ldarory action dearlliDe ~(legislative a..."tIoU) . ~ The Planoed Community Zone Cha:r:.ge pr-oces.s includes. .! preliminar)1 review by tlx' p~ Com..-"nisstoD. SbO' .. dd th~ CommtsSlcn act favorably at this initial review, the pmjec, plans ~e f')~"i!ded to t~~ ,~n:!iite.::ru;--.J ReYi~'i.\' B..'"l(I;d (ARB} for re~om1Jlendation, TOt' d~",eio?:T,-e::;; p:~n. a.s ap~r.:1\'/!j by th~ ARB. i:; lt~er.: r.eT1.!I~d to the Planning Corr..r:-,=s.s:o:\ t{l~ f.::;.1.l re','l::".' a::.:C rcco:'iliJ::'r:c..,w;);-] bt:fo~(: submittal ~o lbe City CounciJ for fl~ ~:'~HX, P;fO~ iL) r,L~ .. b~:; ~ fi~.·,,;l 2;'-;"1,,':"'-.11 rr':(IIT1m:'~:t.2lj(;!l :,) t)v: ('g) CCl!lnciJ. '1]( Pla .. ,"'mi:1g CJrn;:lisSiD:1 '::' req"ire.j :.> JL,~"e s.r~!f;c d~~e;mir..:J.ti[}m, rCbolrdilJg th~ pIojen in::luding a rmdm,g d pi;.!J:i; Lv.:i::-f~t rs..nd r.O o:.pr:orrwe an I:'nvlroj]ml:'nLa.1 cel..:rml.r...arjoo, development program Si.2.tem-eC:I, developmeol plan and de ... elopm~m ~hwu:k t.hal ..... iiJ become the bilSis ior the s.i!.t'-spe.(.iflc regl.!latl(l;.s [0 be applied within the PC zone di.srrict. An es'irr.oited tjmelL~ for pioct'..»ir:..~ the applicatIOn l.s as fDUO~-S (t~es.e date.i are tentative ~nding 5ubmissio~ oi re-~·i:s.e.d piaJ'l..5 !f1 res.po~ to CNnrr.ents. by the Plannmb Comrnls:.!on.and the ,ARB): Jvly D. 1m July 21. 1m AUO",,·31,1994 SITE INfORMATION Property Ov.'Mr: Jf.tllW ?i.anning Commission re\'i~w ARB re\'~' F irWil ?!a.'1ning CommlSSico review Cil), Council Review Ed StCom1 . Storm l...nd Company 104 Par, Cent<:r Pl= s.n Jose. CA 95113 ','-._-._--- 7-8-94 Page 2 Compreheosive Plan De,ignation: Existing Land U .. : Su.'Tolln<hng Land Us<: Par",,1 Size: PBOTI&JIHFORMATION Regiona.li'Cornmunll)' CommeI"cLal Nor'.b: F.asl: Scum' West: CommerciaJ Off~ct M unictpal Par~ inr, 1..0\ Res (2 u..'AIll B.ic);;:I~ Repair 5bop .12 acre Sa!;kgrpund: The site is D(riIrI" vacanl. F~r!y it \\0l.S occ""P~ by indepcooeo~ BMW, ~ autoJll()(j.,."f repair s.ervicc-usc, The: rtpalr servl'Ct \~led the prtr.:lS:!'S iJ1 svrruner 1993 in 2.C\."Ordance with a City luitiated oon-'"..onformi.r::g u.s.! a.mo~uulic~ $Ct;:d:..;le. In No\'et!'lber 1993, MI. Ed Storm of ttl:: StOim L:.od Comj)a.'i~· pwrctt!5-:-6 !..he p~C'?!rry. Site Deo:crip!lOrr The 400 Em:T.\.on Su-eet s.:~e is ,13 l-:'~l '" iC~ hy 1::5 k:: l"e~p . ..; .. 2:...':1",; ,;,CE:=~~'.("1;)' t, II S. squaJe foot cOllunelci:iJ bu~!dtr:g \l, [c.J.l tv. 0 \~h~r:, h:.·, t)nJ;~:":; ('~I [:-:--'~r:,'y, S:rec-i is prC-Sf',ntly en the 10:. rn~ c~rn!r pucel ~: 4((1 c!T.c-n·Q:-: ~s S.q.a.rcl~'::; iT·::'m tbe rc-~tJ12raEI 0!'J the adjoining 414 Erners'Cn Str~! PC"'!c~: w the '50'J[" h:. 3 1 ::'·f('l.~' CII', ~W.2y lh."l rTo' .. ;d~s. access to L'le interior of thaI pa;ctl. Or; lhe rea.: pro;--erry h,.,~ i~ l:':o: rear wail cd· [he CO;"',,:'ie[e block s.tructure Lh.a; hO'.lS:5 3 bicycle re~atr s.hop 0:1 Hi~h S:r~~1 Tbe applica111 proposes to d~m')itsh me e:tiSl!;lC, I. i 18 sq\J.J.!"t 100: st."'1Jcw.rc a.'Y.l coru.;;n.;c': an approxitmlteJ)' 8,100 square: foot tllR:C:·S!N} suuc:r.Jre. TIlt ne.",· b~ildiDg's f~rsl flcx")! will measure 2,594 square feel for commerl.':i.aj re!.liJ U!.C, a 3.239 s.q~'(: ({JQ{ second !lc.or for offICe use, and 2.277 square feet OD the third f1~ ;0 be: 3 s~:e residtc.[.i;aJ uniL Adjacent to the rear of the new building a 14 spa.:e pariir.g lot ~'ill be constr'U'..-""tal and eociosed ""'jtb a proposed IS-foot bigh decorative W311 ,,-ill! iii WTO'.Jgh! tjOrl galt frOD~ittg. on Lyr'.on Avenue. 'The blJilding afcbiteenlre is somewhat reminis.c.ent of the forma ~Toel building It 529 Bryant Street Mared.i.ls; include a. slOne ~. StaDe quo lm al the corner, plaster on Lht 2nd and 3rd floors. cast slOne accents, crrnaroc::u.taJ mew trim. and r::il~ion til~ roof. An art nicbe and drinking fOUI1laID are proposed alon~ ti';e Lytw:1 A' .. eo~e ',~.;.lj A!tbougr. thi50 comer is not sho,,",'TI to receivf' addit.'nn.aJ massing if} Lhe Urw .[:)esign Guide, tlus project is consisteDt with tht Urban Design Gukie in thai it orings retail and pedestrian activities to the corner, provides a corner focus for a designated WNrty node inlenection a:.nd adds to the activity and vibrancy on tIle side street tu~c.;ds. University A\o'enu:. JO ~ 19941 a:WOOemr-sn i i' ----~-~-~--.--~''''=--- ""' Tbe appiic.ant plans to s'. )It an application w subdi .... ide the PT~iY t() lCi.-.ea5t lhe SIU (J! 400 Erne",," Street by t3Xi,,& approximattly 2,396 square fe<1 n..11 the p",u:1 .. 414 Emerson Street Ttle subdivi.sion application will come before the Pla.!lrlin8 Commis.!.ion It the .second pubHc bearing OD this PC application. The shih in IOi area is proposed m order to accommodate the DeW build Lng under the existing dowcLOV.,' [l com.mercial zoning reg'~lation limits on floor area ratio (FAR), &lid to inctuse the flfSt floor footprint ADd Emerson Street !ramage. ?rpject Comparjson With Current Ord;narx:; ReuyjrCjments: PROPOSED ALLOWED' EXiSTING (Required) Floor Area ('G, ft,) Commerc.ial 6,139" (appro,_ ) J.j 18 Residential 2.277 (approx.) 7.700 FAR COmIDerc iaJ ,80 (6.139 s.f.)" 1.0 1 0 .21 f Residentiai .30 (2,277 s.f.) 1 10 ----+---'----'--+------+-\ -' ----.-. --- Maximum Approx. 47.5 fe~t I ,0 ftt'l ..... Height Park.ir~ I 400 Emerson 14 hl 414 Emerson 0 I , 14 to1ai 27 total ~~-'.~"' Ref., to CD·C -zorung PO!llllts regulatioM {anacherl.) Include.< ~~. proposed lot lin. adjustment 1'6 fee'_ I 6 2 8 lata) Al.!tomoLive Scr\' ice • •• ... Ccmmcrdal FAR includes 306 s.f. of coyered at·grade parJ:ing space . Th. maJlimum height ailowed in • PC district is SO feet. Except for the par-king requirement, the project <:o;lplies: with the provisions of the CD~C zone. 10 I 1994 la:\4OOcmnn • ------ 7-8-94 Pas,4 '--:-" .. The applicant proposes to commence constnlction this faU, complete the structure by spring 1995, and have tenants installed by summer 1995, The proposed construction schedule 15 attacl!od. ISSUES HazardQUS Materials The Santa Clara Water Quality District I isIS the removal of an underground fuel tank In 1986 as an opeD case. The owner indicates that he bas contacted the County agency and coordinated ~1th the Palo Alto Fire Departmect to resolve this issue. A closiIl,g Sl.3.tement will be oteded. prior to fu:ta.l izing the eDVtrOnmentaJ documentation. A protection plan and proposal for replacement or add;Iion of public rrees is required. ir. addition, staff recomo!tnds that further srudy be d:-!'le of the site and Ihe parking let to increase the landscaping with Lhe possibility of ino-oduciog additir:m.a.l {Tees. Th~ app!i-eant $bouJd consider adding trees in the proprJsed parking JOI similar to tbos-e b the parking lot a! tile re:u of 700 Emerson Street. These mooiflcaticms could be accomplished under t..bl! p ropo~ed PC zoning. Constn..:ction of the project is er.pected to begin in October 199'~. The length of cOIl5truction Ls estimated at B months, The COIl\tr\lction will impact the sidewalks. and parking adjacent to tL'1e site, although the proposed parking area at the rear or the site will be av .. ilab!e fC'r storage and staglng of materials during construction (s.ee attached st .. uement from the appiiC4Il') . The project construction may coincide wiLh redevelopment of the Stars Restaurant and the project 00 the former Peninsula Times-Tribune site (see attached timing chart). A uUiD.ber of issues related to construction activities and O'affic management during construction nud to be resolved. Careful planning, staging and coordination of the consO"Jction activities will be f""...quired: between the projects and the s',mounding neighbors. Parcel M.p 400 Emerson So-eel m~.sures 43 x 125 feet. for an exLst;.ng total area of 5,375 squlJ"e feet The owner proposes to expand Ihe IOta! area 10 apjlfoximatel, 7,710 square feel, by a c"rresponding rodue"on (approximately 2335 square feet) from 414 Emerson. The proposed lot Hoe adj LtSL"neDt would remove the r.xisting driveway and 2 parking spaces at 414 Emerson Street. The driveway i.s currently used to access the 2 parking spaces, me trash receptades, and. the patio al tllC rear of 414 Emerson Street. }Gll994I:1:\4OOcr.:um 7-8.94- PageS _ Hrlr:' "" \ • The prop"JSe.d pro;;erry ',-----. adjlJ..l.trnenl p,e:;enu a Dumbe ... of LSn:cciuding: (a) lack of Street JC;CeSl 10 t.~~ rea.-Portlon of 414 Emerson Streel for cmert'!'flC)' acctss and trash remov&.!; (b) reduction to UfO parking spaces for 414 Emerson; (-c:) the creation of all irrqular lot line: aod (d) a recluction in the opportunity for future developmem of 414 Em:noD Street. The :apphcant is proposing an easement across the new parking lot at ~ Emeno1l Strttt to ac<:<:lS tbt rear portion of 414 Ernerson. Staff does nOl gelltrally """"'" !lie """,non of irreguior 10' lines and ~ ""Deemed abou, fulUre problems that may CXXUT s.bould either property be sold to a separate owner. 1'be: use pennit for the commerclal us: at 414 Emerson Street will become subj~t to review aDd • DeW use permi' rnust be app I ied for due 10 lI>e CMOll' til access, parking and opemiooal dw>.!es for the tc!WllS .. 4i4 Emerson Streel. This appU .. 'ion rnust be made to :he City pOOr '" so::ood review by the Planning Commission, so they can be considered ~v , . PJrl;lGg and In=UelJ Fee A~ ct1!"T'"ently proposed. a to~l of 25 parkmg spaces would lX: required by code for the new C:('Immen:L~llrt$ld~n[iaJ hulldinE al 400 Emerwn Street The comblned comm!rciaJ space of 5,833 Sq"J.art fe:i at one space per 250 square feel of floor area equaJs 23 space.! plus two s-paoe-,S for tb~ resid-::nttal, to~s 25 spaces.. Howe','er, sr..aff recommends reducing lile parking requ,rem!D! for t.h~ l1l.i~e.d·I..LSt:; pro:tl:L ODe of the res:idemiaJ sp~es call be utilize.d for the C0:L>r-J~rcj.:U ~E.r~:.mg di.Hing; i1',~ day, b:cauy. in all likelihood the residemial tena..rlt wil1 001 '.!t'ci [',.>',~1 paJ~lr,; S~?,~..es. during G~': v.ork week. In addition, u~e dose proxlmil)' of mass U'a.tiS!! aro:.l s~r\,jce" will rej:.Ke dep!ndence on the amorr.obile. 11m reduces f . .''ie required pa.rk:1"l,g for th:::. 400 Emenon Street p.ucel to 25 Spil.ces. !be p~ Jot line cb.a.nge ehminates access to the two parking spaces on the adjacent parcel at 414 Emerson Street. The~ two spaces must be replae«l ar.d rn.ade available for the be-nt:fH and u-;e of L.1e adj.a.::.en1 tenant and buildi:ug. This brings. th~ Iota! required parking on lilt IW0 parcels Ie 26 spaces. The appl:icanl Prcpos.e'i to pro'/we 14 parking spaces on-site and request payment of aD io­ ltel! parkinj: fee co the City for ro05-tnlC1ion of additional spact in a public lot instead of providing all required sp.act's on the site tsee additionaJ discussion on the in-lieu parking fe(: in t..~ Ara!ysis section). ran: iQi Lot Des ign Planciog and Transporution have several w.ues (elated to the design and layout of the parling lot includmg: I. The I5-fOOl high waH tota, defLnes lI>e Lytton-Street side of the parking iot, crcates a dangerous blind .spot for drive~ who eXit at Lytton Street. \l,thich .is the only exit point $e,'en! 50Iutwru are available including widening of the gale .and the addition of a low barrier to prevent c:~iting autoroOOl1es from ntm'lng to close to the wall thus increa.:;ing visibiliry, or additional openings at driver eye-level in the proposed wall. ------- .""----~-., 7-8-94 Page 6 • r 2, Parhng ~?g...es r--.. r.~ IT; I'equ!r.:-{h"l ,-~h:c:k: l"(it.:Sl 1:-.<;(' 'it to n:t th-: rark1ng io~. --The: rumlll£: r:lcil __ is t.o<) narrow to pe:rrnil he<>doJI C)'II o;i,'H.GClUt 5~veral maneuvers., Turn arouDd v..wld be difflCUlt uoJess o:..ber sp.;sces in the lot are available. This can create "dd:tio~ wet)' o.':)::eIT15 at tb: gate. sid:l2I'alk and ~treet. 3. Bikt-r...-...b by W tr"JS.h CC'O~ln""..T$ j1.re inaccessIble. Bik~ racks mus' be relocated near the bulldmg emnro: 4. 1be a.pph-:.ant S:1~ thaI the parb~ 10: shall be &air.e-d. fix uafflC: x.fet)' reasons.. tile gate sb.a.!l be ope-:iIble electrOn.t.::.a!j~· from tb!" \·ebl::-le. ANAl YSI~ l.m I jnr; AdjU$tment The apphc3..D! had cr.ig:irnJl~· prO?osed tho:-fN II1l:e .1d.IUS~r.t In ord~: to ~eep the total FAR of the building be!01" I: i Md tD aJlo~ ic-t an i~cre~ buLldUlg footprint and srreet froDtage, How~~'er, Sln....~ t+'~ FAR Q; rt!1xt' .. i U-.-~ pr~.!e-c:s carL t,!, .::umul&IIYC', lh-= appllcanl could propos: .a riil..:.:h ~::l.a..ll~r ie-h~ ".:!,i·.1s~~:"'·. u'c.:.: ,\<-.;:1 :\1 cr('~;,r,:' <' lot of cl k.ast 6.13Si sqi.lue feel. whi..:::h tS ~:-~o:r~n:;!:..::-,-I f> ... .', a;~ Slaff rC"'...co!T1'r)~:,j~ tr'"i::1 if '" ;':::: ]i.!:-~ ,dji.!s:r,:r.'. r:: pursw:.,j [,';.;a: t1:~ ILl: ii(;e ';;'Jir~:::ld~ wilh !-be n'Ja.h\\·e~\ \l.,-:;,.:l "f it"te-t"!.l:>i'l1",,i. t-<'-,\:c'::~ (,~, t:"! ~i':' Err:~7Svn stgel pl.rccl iF; a ~"J:aiglll IIfje fro:-n the :ru:~: l~; tJ~e f~.: c,f u~~ ~'~(·.t:-s. I: <;(,'.:~,j '::';':; c;e.;,,'~ ~,5S f...).~< \ i25 (~"}Jtlo: al ~I}:J [mcno:l S'U.eet '" ;U\.Q :..::~; ~:,): ar~ c:" 6.S:~ sq'LJ.!( :'e~: Tr,,-, ~,,',JJid t;[e-a!~ a ,"ommercial rloor area ro.oo of .~. a::Dwlr.~ fo: u-:~ PiO;:X:I5-,;J i:!"·"'" b:Jildlr;b foorprir.t, and-pmvide .!: solid scree! wall V;J Em!:rson Street. Thh rccom_ . .-nended H·~'i:.\:(1'f'l would ;lcwl'T'.mod.a!.e tt:~ FfopoY...e.d b:.uldwg but .. ",..ouid require a redesign of tIll! parjjng jot II is !ikely :h.a! lWO ci lh~ ?Topos.ed parking 3races ","'ould have to tY.: elimLnat.eJ (spa.;t: #5 and ,tg), HO\l\ e\'l!i elirnnu.tion (If 11!~SC spa.c~s could res.olve Otb~f problems with th: park!!lg 10\ Jocludu:.g prov:dir.g dlre:-t.a.c.:.es.s to 4J~ Emerson Scree! for trash and delr .... .eries al &-.e location of Ul: propos.od p.a!k:C.l.g ipace #5, t..~e placem~n! of the [,"""''0 required parking $pa.ce1 for 41 .. E."Derson Screet on the 414 Emerson Street parcel (with an access easem~nl aaos.; the 400 Eme!>O_r'J street pa.rcel). and tbe addition of I:xrra SP.1C-f for sp..acc:s 19-#1~ that ~"OUld allow (or more ckan..ro,cc Ii !.he gJ.:e. A redesigned parking lot would ~m.moda1e only 12 ~king s:p3CCS and wO''':Jd. OOt res.olve the bacl:-up issu~ (0; patting spaces #6 and n. The reduct."" '" number of 'paces providtd .. 'ouJd resuil in an increase in the number of ~ 5.l:b~ to an m-h:.u parking fee -payment to 14. In-I jey Ere Prop-igl The appl!c.a.nt is. reque.illll.g a zoo:: cha.llgc: from C O-_C(p) 1.O PC. A PC process is nec(:ssary, because the applicant proposes to prov~ in-lieu parking fees for 12 of the required 26 parking spaces, rather than p!'o\,jdi~ aJl parking on-site:: or reduce the building floor area. PAMC Section 18A9.100 speaks to the abiilly of projects to pay an in-lieu parking fee ioste2!l of providing parkmg. HO·,4I:'."er. it is uncertain wh,ti:e: this projeci would mec! any of L1e five pro.,.isi"n_~ of th".! zoning senjon. 7·8·94 Page 7 l .. ·. r 1\" [ , ,. f The rra~porta!ion DivO is pr~panng the: irJ-ileu r.a.rk..l:!i fel'/.-· ...... \In.ar.~ l..tJ .. t ,5. npe.::td to come before the Commission in faJl 1994. Consequently, the c.tn:i.llatio:'l (or the in-lieu parking fee amOUDI bas DOt been estabH;;hed. An ioterim fLgure of $23,(0) per nee ~ .... space bas been established and was included in the Pia.n~ COrIlm.lss)oO ordin.mct (or tb~ receilt 531 Covwper Street project. The aIIlount does DOt include tbt: cost of ilit Land. If the Commission eon<:eprually Rl'PfQ\'e> the idea of an in-lieu paruog (ee fOf the parlur.;; spaces DOt provided, staff recommeDds that a fee of S13,Q"'() per uwrt"'dded p.ark'ir:..g ~ b! r~, or the amount fJ.D.a11y adopted in the upcoming ordinar~ whi:rrt:\'er :.s jo~er. PUBUCBENEW In compliance with the requiremen, fOf pr",'idiJl8 public ~oeflt lb: '!'Piicon1 stat<> lh>1 !he proposal is consistent with the Urban De5lgn Guide by providml: ped<3IrWl \'iabiJitj' to thz> CCR"l'ler and it will provide pubHcly "je9Pwle art a."1d a drinkmg i('un~iD. The apphC2.nt has ameMed the site plan \0 rt.lcca1e the drioking fmmta.in u.d the .... ·~\l,"lb!e a.ri. to iJ\ eJ;tenex nr..ne of the building, (In Lytton Street. Pedestrians wlll be able to use L~:" drlID:ing iC'un~in and view the an ruche from the .street. The fO!.Jn:2i!1 wllllx ~Y.J:i;2.~!t to &~ p<.;)L,:: 2.: k1L;H per d;,y. Staff cOflSlders the provi.stOCl of UJe re~ider,ll;;d UT!i! in;:; ..:rl :11"'!',:":.i 9:.:'.:,:,.:t :.i.'1 2;j!i ;':':2i public b!!.t1eflt. The Comprchensi\'e Flar; ar:J tll: Uibar: Dt.,l.ig~ G:J"Jt' ~':~~-:-,;r !"'i'"!!"r.td \J~=, which is difficult to achleve urdei e"LWng r'gular:c1n_, aif{! ;. 1-;::11 L' P:'C';'":X"~J. '" ~.'<' proposal. TtlLS precedent would heip ~lirTHi~21~ rr,lxe :-rme;d l.";-rr(?:,S-2.h The proposed public D,o;nefit is relatively mino;, howeyer. SLaff bel::,.,~ II 1(.' t>e 5'Jfii.::en; because the request for variation from the CD regutilriom IS YCr)" rmr..o'L Th-e p!tt!'.J.."')' r~Tl for a PC Zone il the payment of an approprlJlt' in-lieu p.1.c-).'ing iee ~Jj(n.""~ for o~f-s:~e constrUCt jon of the remaining required parking !.pi1.ces (k~"'TliOW~, Th~ applica.111 ~.A.' ~o: willing to wail until the City's initiated ordinanCt. mooiflc_in:!J!lS ..... .a,s process.ed tTl Qr,j~r !O proceed with th~ proje:;[ and i~ is uncertain whether LhlS projeci wQ\,;ld qu..aJifr si:1Ct lht ordL'IaIlCO is .till being ,,"died. CQMPBEHENSPfE PLAN COMf'UANCE The uses and site development regulations ~'ithi!l the ?C dis.crict must be determined to be coDSiscent wi.th the ComprehensIve Plan. Allbaugh onl)' one uru. L' propos«j the pro)eCt is consistent witb the follOViring objectives of the Comprehensive PlAn consKic1ed most pertlneni 10 this proposal; "Malntain at least the present nu!!'.~ .... of multiple-famLly rental unIts wh!le working 10 iocr-ease the overall supply of n:ntal housrng." H 31 2, ~ ·Support the mixing of residential uses in commerci.al and Progra."Il 3.3: offer i:ncentives and mitigate disincentives industrial areas.· H 52 3. EmplQymgDt policy 2 -Encourage the CODStrlJctiOD of more housing primanJy Oll or near iodustrial and commercial si~ ... 4, Environmental Re$OU[ccs Pol jcy 13 Program 41 "Mitigate impact of air quality problems due to stationaT)' and vehicular scurces. Implement programs to reduce totaJ transpOrtation re!ated emissions throug.h the development of additKmaJ housing close to employment centers. " RECOMMENDATION Staff recommend~ that thr: PlannIng Commhsioll conceptually appwve the pmposaJ with s:t.aff recommended revLsirln30 and rorn'ard L'fJe proposal to ARB for review, FINDINGS Findings and conditions will be prepared at tfle time of second Plannil1g Comrnissio:1 [('vie .... -, Attacllmen'ts: Location Map • \ ~),I~Q;:jmenwIJ.;u.pac.t..As.sei.smeru :-3€€ 8/31/94 Plannin.g C.);:clissicn stafi repDrt. CD·C Permitted & Conditional Uses Constr.Jction J mpact S tztement Construction Timing Schedule Plans (for Planning Commission only) !aO: Applicant Propen)' Owner 7·8·94 Page 9 ORDINANCB NO. ==""'='" ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMEND!NG SECTION 18.08.040 elF THE PALO ALTO MUNICIPAL CODE {THE ZONING ~-1AP) TO CHANGE THE CLASSIPICATION OF PROPERTY KNOWN AS 400 EMERSON STREET FROM CD-C{PJ TO PC WHEREAS, the Planning commission, after duly noticed public hearing held August 31, 1994, and the Architectural Review Board (-ARB-) , upon consideration at its meeting of July 21, 1994. have recomnended that. Section 18.08.040 [the Zoning Map] of the Palo Alto Municipal Code be amended as hereinafter se-.t forth; and W-dERE.~, the City Council, after due consideration of t.he recorrmendations. finc'!s that the proposed amendment is in the public inter.est and will promote the public health, safety and welfare. NOW, THEREFORE, the Council of the City of Palo Alto does ORD~IN as follows: ~ON 1. Sp.ction 18.08. 04{J of tbe Palo Al to Municipal Code, the ~Zoning ~..ap, It' is hereby amended by changing the zoning of ce:rtain propertj.' knO'i'nl as 400 8lT'.erson Stre:et, (the "subj ect property~) from PCO·C(P) Downtown Con~ercial Pedestrian COIT~ining~ to II!'PC PlaillJed Corrrnuoity.~ The subject property is shown on the map labeled Exhibit "A~. attached hereto and incorporated herein by reference. SECTION 2. The City Council hereby finds with respect to the subject property that: (a) The site is so situated and the uses proposed for the site are such that the application of general districts or combining districts will Dot provide sufficient flexibility to allow the proposed development. Neither the CO·C(P) district nor any ot.her district will provide the tlexibility to construct an S.llO~squ.are·foot mixed use building wit.h the required number of parking spaces (27) on site. {b) Development of the site under the Planned Community {PC) district results in public benefits not otherwise attainable by application of the regulations of general districts or combining districts. Public benefits that the applicant is providing include: (iJ ~I)" OO3H)I.5 One residential unit is provided i.n addition to the commercial use. The Comprehensive Plan and the Urban Design Guidelines support mixed use. This 1 precedent may sti.rmllate more mixed use proposals in downtown. {ii) A public drinking fountain and art niche, which are consistent with the Urban Design Guide-lines because they provide pedest.rian visibility to this corner, The owner ot the subject property will t:caint.ain and service a drinking fountain that will be a'l"ailable for use 24 hours per day. This is a ser~ice that the City 'Would not lik.ely be able to duplicat,e. (C) The uses pem.ie-ted, and t.he 9itf! development regulatiC'!1S applica.bl~ '.ithin the dietl-ict are consistent with the Pc:lo A]to C~rer;ensivE' Plan a,ad ;""ith exi9ting ar,,i ':!,llowable uses in a1joini~9 sites and ~{thin the general vicInity. The project is CC:;,,)..siBte!'~t~ ;.,'l'C.ll H8:lS-i.l~'J ~-O]icr I.i, Housing PoLLey 14, E!r:ployment PCllic-y 2, ar,-j Snvlrcr.:'""ental Resources Policy 13, program 43. ~s...7I(,;~; _}. 'rhos£' -c~rtai!l plans prep,.-:lrcd by DES Arch.itects !i.. ~r.;ineers, e:ltit~ej "'!.(;O f::~rs0n St.reet," dat~d 1,~;;;,t'ch 24, 199-1 ar.a revised hUg\1st 3, 19'H, arld apprOVed t·y the Architectural Review BoaLd on Ju})' 20, -~S94., a cOP'! of which plans is on file in the-?lan.."1inq Division office. and to which ~opy referencE! is hereby made concerning the. full particulars thereof, are hereby approved as the collective Developrn·:mt ?lan for the subject property, pursuant to S€'ction 18. 6E:l 120. Said Development Plan is approved to!' the fol':'owing uses, and 8lJt1ject to the follo .... ing conditions: (al f..e..t'n.l~t"'d TJsgs. The use shall be limited to one residential unit and a?prox~tely 5,S33 square ieee of commercial use8. 'I'he allcvable uses shall be those allowed in the CD-C (P) District. (b) Cgndit;iQMl Use", The allowable conditional uses shall be those conditional uses allowed in the CD-C(P) District. (c} lit.e DeveloDIIient Regulat.ions. The site development regulations sha1) be in accordance with ttl€?: Development Plan. {d) Parking .~._ Lqadino Reqyirem""nts. The loading Plar.. The Teq'.lirementB shall be a.s sho'iIl in the Development parking reT.liretteDts sr~ll be as followa: (i I A total 0f 12 on-site parking spaces shall be required, including one space specifically reserved fo!' the residential unit, one space to be shal.'ed between the residential and commercial uses on the 2 -.--.~- • \ subject property, and tvo spaces (., and "5), t{) be signed and spe'Cifically reserved for the exclu5 ive use-at all times by occupants of ~he adjacent property, knovn as 412~~1~ Emerson Street. Five of tr.e spaces lJ'dy be cOl'I:!pact spaces. The OWtler c-t the subject property st'..all grant to the real property at -'12·41-\ Emerson Street, in a ferm &atiefactory to the City Attorney. tl".e right of Access to, and the exclusive use of, tvo designated: pari'Cing spaC'es located on the s'..iliject property. {iii As part ':l'f U-,e par:'(ing requlre:~€nt for rhi. s ~l~Oj i?,::, the cwr.€!: of t be subj f::'ct r:n,-cF€rty s:aall prov:;';i.~· ten Class 1 bj,C"j'c}':: lc'::.=<:!2'!S, t.",o u~ ... hleb shall b~ locat~d en site a~j t~e others placed in liii) the as a~prc~rjare hy tt~ 1'ra~spo~raticrL Div.:ls:"c" Fi.r:,'il clesign C'f cr,·:> loc~"'.:-r'3 sl>.aL'L b., .::uo:-:-itt-ed fer-app.rov,;l.l by the TraDs.pOI"ldtion Division anj AE.B prior. to buiJ.d:,nq pern.it appllcat.iQ;--.. .~ctual provisic·r; of th-e 1 a c')c€:r-s shall be complete:i ?r~or t.o ccc::up::mcy of t~.e project. I~e owner shall 'Work with the Tl"aDBpon.atioo Division 1::0 provide additional bicycl~ racks (app~Qxima~ely 2 to S) on site. In accordance vith standard parking requirements of one parking space per 250 square teet of conmercial space in the dovutown area, two spaces for each residential unit, the r.orm31 required parking for the project, ba8~d on an es::,l.<'r.ated 'i, 833 square feet of cormercial gross flc::r area, WQuld be 25 spac(:s. \The t \li0 additional spaces for 11:;: -414 EmerBon are req'..Iired due to a lot line adjustment between the two properties.J The owner of the subject pro~~rty shall be .cl"edited with two parking s~ace9, as follc· ... s: one to:r tLe bicycle lockers and one for tj~e shared res ident ial/ corrur.ercial spaCE". For the re........aining required spaces, ",hich is estimated to be 13 spaces, based on the est.lm3.ted commercial ) • ~13lK 001101$ (H) til iJ _ d o access and parking rjghts to the rear of 400 Emerson Street. Prior to building ~rmit application, details of the DevElopment Plan herein approved shall be submitted to the ARB for final approval, inc} uding the following: noise reduc~ion plan, signage, lighting, north and sO'..lth wall facade changes, color palette, and Toof material. The parking lot decor-ative wall shall be constructed, to the e~ent structurally feasible, to pe~it visibility all the .... ay to the far wall, "lfihere the sOllth st.airwell is lccat",rt. The owner shall consult ... It.h trle Fublic ArtB C'::;II"!rdssion pl-ir;,y to i3u.b.~itling fir.3..1 detai18 of the a'-~ niche and ~at8! fountain foT. ARB r.('·lie .... · dl:,j approv,) i > All P}!I,(" COIT!f1,ents sr·..-tlt b-: sur}:T'itte:J J.S part of the final site d~velo~~ent r1aos for ARB review. Ii the art cbject (s) is City· owned art, the OWJ1.er ahall enter into an agr~ement with t tle Cit]' in accor.dance with subsection 2.26.050 [b) of the Palo Alto Municipal Code. (iv) Prior to building permit applicn.tion, a final landscape plan shall be 9ubrnit(~d for approval by the falloving: Utility Bnergy Services Division, Planning Division, Public works Department, and ARB. The planter at the parking lot east exit shall be installed to permit an unobstructed view for drivers exiting onto Lytton Avenue. The plan shall include a complete plant listing indicating ~~antity, locations. type and size of planr.s and trees, il"rigation schedule, fence locations and lattic~ details. Prior to submitting the plaL, a street tree plan shall have been submitted to and approved by the City Arborist. The plan shall include t=ees along Lytton Ayenue. [v) Prior to building permit. appl i.cation, a final grading and drainage plan shall be 5 square footage, the owner of the subject property shall be required to pay, pri~r to issuance of a building permit, an in­ lieu parking fee of $2.3,000 per apace, for a total of $299,000, This amount may vary based on final construction measurements. In the event the City adopts an ordinance within one year after occupancy ot tile proj ect, which establishes an in-lieu parking fee that is higher than $23,000 per space, the owner shall pay the difference between $23,000 per space and the amount estab­ lished by the ordinance~ If the fee established by the ordinance is lower than $23,000 pet' space, the City will refund the difference between the $23,000 per space and the amount established by the ordinance. In the ~vent that the In Lieu Fe~ ordinance herea!'ter adopted by th:8 City council contains provisicns that cc·nflict with this condit.i.on of approval, those ordinance provigions shall apply. {e) Special Requirements. 90i091316e 003101:5 (i) Prior to applyin.g for a building perrnit, the owner of the subject property shall apply to the Public WOTks Department for a Certificate of Compliance to evidence the proposed lot line adjustment between the subject property and the property at 412-414 Emerson Stl'eet. As a condition to the lot line adjuBtreent, the owner of the subject property shall grant to the real property at 412·414 Emerson Street, in a form satisfactory to the City Attorney. a right of access ~o and across the subject property for trash re..~oval, deliveries and emergency ac~eS:8 to the real property at 412~414 Emerson, as well as for the right to park.ing spaces, as set forth in subsection (d) (1) of t-his Section 3. As another condition to the lot line adjustment. the owner sp~ll apply for an amend."nent to the existing Use Permit for 412-414 Emerson Street, to address the following issues: change in property dimensions and the grant of 4 -. - _______ ~"':"' • .L~~'~ (vi) {vii) (vi] i) (ix) (x) (xi) () submitted for approval by '..:.he Public Wor~~ Department. Prior to issuance of building permit J utility load sheet~ shall be submitted for approval by the Water, Gas, Wastewater Engineering Division and the City's Cross connection Control Inspector, An Encroachment Permit and a Street Work Permit shall be obtained from the Public Works Department prior to any work in the public right·of-way. Prior to issuance of building pern'.ic., improv€j:lent plans for aJ.l utility ccnstru,-;tion shall be su.b:nitted for approval by the Utilities Department, Public Work!:! Department and the Inspect ion Se-r..rices Di ...... ision. The plans shal1 include a sp.parac.e water sCL';-ice and meter, a new gas ser .... ·i ce line and a separate sewer lateral to serve the residential unit. T1.e "'ater utility point of service shall be at the sidewalk. Backflo'W prevention into the public water supply shall be provided. The sewer lateral point of service shall be approved by the Public Works Department and the Inspection Services Division. Prior to occupancy, the parking lot entry gat€ shall be electronically operated, and equipped with a Knox Box to allow Fire ~~ Police services to a~ceBS both the subject property and the 412-414 Emerson Street property at any time. The parking lot entry gate shall remain open, at a rnini~. duriag normal business hours of B a.m. to 5 p.m. Prior to occupancy the owner shall install, maintain and service a drinking fountain that will be available for public use at all Limes, Prior to occupancy the owner shall show proof of the Santa Clara Valley Water 6 .----.--~-- District'g acceptance that the proposed development and construction will not affect any site remedia.tion for rezr,oval of an underground storage tank that occurred in 1986 and re..:noval of 2 oil­ assisted tydraulic hoists in the exiscing structure on the site. (fi Deve.l_~llL __ £cll~~. Construction of the project shall be ccmpleted on 0:' ~fore September 1. 1995. SRC1IQ~. The Council tinds that this project will not ha'\o"€. a siqnifica..nt environmental effect. ShcrIC:N =;. This ordinance shall be effective on the thircy·first day atter tte date sf its adoption. IN''I'RC[J';.1-::''h.0 : AYES: NOES: AESE.:!IT : 1..TTRST: City CleTIt APPROVED '-_=: TO FOR)!: Senior Asst. City Attorney MOIII!. b.;. 0(lJ IOU 7 A.PPROVh"D = =::::-------~~-~~~ Mayor City Manager Director of Planning and Community Environment . -:. • \ ."'.~.""""'>"' . ... , ... ~ , i:: ~ Nonil L ~. I .35'l ~? ~~;~ ........ Ii') .. ,,:::­?oh .... :t Ii: rR:OPOSED PROJECT ~~~~~~';;~WO EMERSON STREET ALTO, CA sOUTHERN· PACIFIC R.R. STATION '1" ZONING MAP \ , i --- --~--- ~\ r, ZONING USES CD-C CD·S A=>sory bQ1i1ics md .... 0USICIDaIily _10 pcnni!Ied ..... , Pemlito:<l ~ ~oflSce ..mcz ... limil<d by Secri= 18.~9.080(d) NotAIlowed - Amb."i!OCf suvice:s: Oooditiooal CoodiIic<W Anim>I em. bot exdpdir)g boanfuq: andlo:m>dt: Perm.itIed -AniIIW=, iI>:lOOing boaroing mdk=lels: Not Allow.d Cooditiooal ~00ve services;: Net Allo""e.j Cmlitioo.a.l .~obi1e se:¥ice -. subjet,1 to !lite and design rrn E:W in acc::c.n1aD% ~i!:h tr.e P"'";Wom of CllJp1er lii.82: Conditi"",1 Cm:Iitionai Busm.o. aul <lade o:bools, f-.mlltt<J PetmiOl:4 0r.Irc:hc0 and ~-: I'e!mitted -Cwuuacial RQt:aXa:t: Coroilioo:ol Oooditi_ C".cI:rvaltsa: f:IciliJ:ies: --Doycare_ ..... da, em bomes. omaIIdaycan:_ RId resid<mW care -!\:ImiliW Petmia.d Drive-in services or ~ :- _~ scrviocs, assod,,01 with p:nninPrl USI:5, so """ as drive-up 1883 lU9.OS0 USES -~ .... ~ rill oc::as .. pooSc$­ :ria 8111 bic)<:Iim. A ' oI .... JDd:I __ btpctCil· lOG _104.J-. (l J1XJ _III! e&clI "'" __ "" __ .5.7 --fl'O foe<)_ :.a:..a.:r. Eo!qlll!~ ~ ...... dri"f~ Ift1 tIU-«! teni::c::&: F&m'r.t'S' m.m:...""tt: ~!e..""\;~ e:.r..cep:: o..m·.i;o St:i'r~ Cmen! bcliroa:s """"'= Home q • --""""""" '" ~­""'" --_: -----"""......" --~ IIootIsbaill_ ~ 5. 19l1'. bIvIrc " __ 01 .,..,._iIII_ Li<plr """'" ~ --.-"$~,-''''.'''''''''''''''-- .. PALO ALTO MUNIClPAL CODE o CD·C CD·S 18S<! ------------" USES 0WI00r' ..... _ Rn"i:;es: PDiIlg os • prizxipol use: Per>cml >orvic= Pdv ... ~ lodl"S ,"lffmenu] o:p .. '~: Pli\'-a1e~ rfidb~ ~ ,"""""" madliocs ~= SiDgIe-tmm1y =. two famil)' ~ 1Ill;l multiple·!&mlly we>. T~bo=ymd .-:acc:i~ IaYice fIdIilico. wbc:n ope<..s- '" • J"DI'iII<d ....a oervic:e or II>oppiDj; ..... "","",­ lloc>f_oI_ -12>iny­_r"", ZONlh;G C!l·C f'eImilted ~ CIDIiIiorlOl ~ - ~~ Po:=:::.-,j Cra1i~oc;t.l P,,,,Jo:(j Pt..'!!:i.ZlO:i - Pcrnliot<l 'As _ by _ 11 . .f9.0t0:dl bclaw. "As limiI:d by _ 11.49.090(<1) _. -Exdndinlliquor SIt'Ca., wbidJ 1ft c:omma::w uses.. 11&5 CD·S I"tmi~ - C'rn!fticm! .. .·I ........ i ~ Pt=,1!ej Pt~~ G...'"'niici nJ ~rrr.iJ:d -No!~ Penn._ ,';" t!.4?05D F ALO ALTO MUNlClP AL CODE ,....., USES TOIIJIlC'3!Y JIIItinJ hdlit!es. pmvided 1Im __ .shaD rmwn DO more tbanJM:yt:m: Ti aaq:ottr:ic»:: -U1iIiI!es_ .......w~~ of II!iliIy ..m:... t.tt .... h'C!mg_ or:l!!>"lO' yartIs, mam. ' __ or oorporation yWs; 9-t .. ~1IOd CD·C <listrit.J!io:l: Not AlJo..-ol (Ord. 3751 f 1"1, 1987: oro. :l69611 (ptri), \986). - CD.S DES -~--~" .. -.-.----- F.? JJ; !1l'\:'-""~·~7'.tc; "~t"'d ".>" ,~, f" ":+~ hH~t i:; J~'.~';' Corurtnrrnoo PlM for 400 Emmon CCllSInIetioo of the projea w:ill be manaaed io tbrce basic Slages: delllolitioo, lIU\iar buiJdioB COlI.!mlCtiOD, and ,i_eli. During the initial demolitioD p~ of the wor'<. the .i!. will be fenced and tilt existing buiJdio • .00 paved pukiDg lot will be removed. This initir.l phase will take approximalel)" 1-2 w .. ks. TM SCt;ol'ld phast of [he wort will be t.~ major ba.ilding CO;\S[!\1":!..ion a:!d ,>\'ill include roofing and core slab wort. Nslc building frame Uld utility snterrLS, and final bci!.di.ri.g slli and fiahbes.. This ph.;:.se of the work will t.EJ:t' apprqximately six IDOl'1.tl::.s, The final p~ will iDdude the constrocti on Gf all she woI± and grolJDd lev.el fmi5h work. Thi~ will tai:.e aprrox..i.rrulTely thrce: w~k.". I>.mn~ the ';;On5ltUction of the pf(lject, we FJJt.i~ip .. tl' the need to fen.:-e (.:;.r.d utilize) the sidr.waik area aloug both the Emerson fronta8'e and Lh~ Litton Avenue trontf!.ge. During this ti.mc:, sidewalk.access alOllg Lytton will need to be protected lr. & sidewalk canopy aJOIl8 lbe Durer bat! of the •• dewalk of L),tton A venue, Tilil would occur along the Emerson: Streef fr~e. as w~ll, ex.cept wut::J"t; lm: u.u:: street tree occun:. At this JOCOttion, ti:e wa.fkway canopy will jl\$. cut ~ d arollDd the =, Existing par'-"\og elO!1$ Lytton lind Emet1Ol> will 001 be displaced .=PI whe ... abe ="l'Y j<>gs around the Emman Streel _, As .uoh, scaffoldiog tar abe ,,",,,,,,,,lion above will be DOlled, per Cil)' requiremenu. CODstnlct.LOO n:latcd trafIk wooJd """"'" tbc &ile vla Lytton Avenue. from either Alma Street or MilkIJefieId Roarl, As tbc ptejocI has no b ... meD~ we Ile nOl II!lticipale • signlficant off haul of material, .owing the majotJty o! the consl:.l'UCtiOI) of ilic: project. cUe ou~sj:e co.nstnJ~tio.!l offie< and the stagiIIg of material!; will occur on the we.;r.m half uf the site (the parking lot for the project). During the final 3 wteks, the project of ike will be moved ioto the buUding. and tbe parkin~ lot work wlU be completed, '.": Construction workers will be ellC-ouraged to pad; in the City owned parking lot, directly across the su-oe! • ., the comer of Emcrsoo and LyttOn. Every cart wi] l be taL:en to coordJnale COnstruCtiQIl methods and ~chedules. with other projc:ru within th~-~ Ie: "Moznl"f' project acro~~ Lytton, i:\nd (he "Shin" pn>jccL, UJle bl0Ck east O.u Lyuon. Pleas:: see auached proje<t schedule. \. ..~ • I ,:.I ~ , I /. l >\ ;,1 I I /1 ._------------- 400 EMERSON ST. PRQ.JECT ---'---, ~--~.-.-~ '* I 0-"." llHM~T 0'1, 19'!i5 OIr2 1~5 .41l..I!.EM!,!!~O~_.' 1_.L\A:.oilS.¥~~~ ....., .; '[1. --" ---.. ------"-~.--' IJ .... omfl 1 2 OEMOtiTION -.~.-.~.-,,-. -.-... ,---.-.-.-----.. ----~----.--.~-~-~---., 3 BUILDING COIofSTAUcTJOO -.~.--.-.. --~,-~--.----~.-~-.--.------.-,.-.-.-.- • I SITE CONS1RlICTKl~ , : r~~t1~~~~~~~~~=~~~~~= • I1oiTiM.~~iiii~~~~!~Q:i~~!::==::=: 11 DEMO .~ 1 ... EXCAVA,TlCm til GARAGE ....................................... -······ .. ·_······1 SKCNlBlOG COMPLETION ,..-.. --.. ~-,-,.~----.--.-.. -.. -,--.... --, .. -,-.--_._--- lNTfRIQR e?l _~' 7I111D!Il'~_"_ I • nc 7 QIr I, 1011 t ~ ... IilM I ~ So, 0<. I No.1 0.. J,o" '. '. ( \ l I' . J ,0,&,\ :,:'~~I' ,':::;,:" -'-" • EnvirorMental Docuoent, -City Of Palo Alto Project QescriptlocfTitle: , f n i £NY! RtM!ITA!. ASSESS!£NT f i ..... r lr f' . (c;.t r " h LoutimlMdress: 400 [mea"" Street Palo Alto C6.. ni+- Spcnsor-i IlS lIgeocy I ftW I i tant . CtPlJIoy pfS Architect$ ar.d Engineers tor Storm land Address and Telephone of ~l icant: 39S Bradford Strerr ~ C1ty CA 94063 ~3".~j l,..r.-..;, re ,'H",." Of tl"-e-~i"'F"..:t f 11 0:>'>. tr,f l,;:"j-e:'.'-lgned c··,:?c-..)er-' of H:f: Pl anni ng [}I:p~rt~nt ri3S c.'X,.::luded. -. 111 tteGU'i't't ®'iar~tir'r, The prO.,l€'"ct hdS no significant enl,'ircnme-ntal i"1)act, No En .... ",.,..TlIefH.al 1~C't R:e'Po~ is re-~".i1rej. The rE'a~o.'1S fer a Mitigated r-Jegat;ve Declaration ne: 1:1 The pro~~ Ny have a significant er1virOl'Tlelta1 it1)act, ,v, trlvirCf'Jhefital ! ~ct """"rt 0.111 be Prep.! red PJanrirng Oe\>.lr+...m Official: .jgKP .:\uqU5t PJannil1Cj Director: ~C~ TI'>€ project 1' .. , been <lefIied. Date: Date: file No.: 94-EIA-8 ----------1'.--...-, --- "-o \ " (NYIRtNl£HTAl OOCIJl1f1HS -P.oJ..O .oJ.. TO iNITIAL 5TUDr* u L Project iitle/hkJress. 400 ERrs"" Street. ?10 Alto. CA II. Project Description: The aP\llic.ant pro;>",es J) 2) defoolitiOfl of autcmnive r-ep.d~ r Dul1dl r;g _ and C('y'lstru:::t iOfl of O"l d~ro'(l!!t!:telj e,llO-square-foot structure Wlttl one reslderlt1ilF l,.j1nt and 14 on-SH€' paM:,lng spaces. adjust the lot lir're to expar"j ;:>-ar-cel !20-26·0~ by 2.798 feet by redu:ing parcel lZO-26-24 by the s~oe a~t 3) construct an appro;s::ilMtely B.IOO-sq.Jdre-fcl(jt rY:.";-.' st-0cture, CO"l~1SUr.q of the fall ow' e.g: 1he six (6) existing par~lr:,;; 5:-'3(e5 c' .... ~ tr',e :-,Hn p:::r(e'l c~:i t.....-c· U; .:; ... ~stH!~ 0;') the adjolning pai"Ce'l III"Oi)rcl b~' r:-,plnt~1ns1. ar,c Ul cCjlt~C·~31 ~-r:. park'r~; sp,~::es W'2>Jld ~ added. iiI. EnVlrol"ll'!'lefltal Set't'ir,g: Tne l2 dCTe s'te lS 4~' 5 fe-et ,.'1Coe by 12~ f~t deep. It is occc;:';))e-j by a 'i:ing're :;tGn' 1.11£ s~' .. arf f.:Y.lt I'd{:.ant autOl'i'iOtive rep':!i, tlL!ildmg Ci1 [.-~r::o~1 Street at l)'1:tOiI Strf't't. Tr:e pr~rty is cJrrently J{'cesslble thr'~:J,;t1 a dr1l;eo.tdj that l~ part of the adJacent parcel at 41~ £;",rsoo Street. T"" let", ,,,,rto property line 15 at the sid&aH 00 l)1.tco Street. A 3-stor_ .. c(Nl!('iciai cff,ce structure ;s located across the street on lytt01. To tt:-e e:JSt. on the southeast corner of Emerson at l)ttC1l is an ~t·9;ade 1TU"'1,c1p.al ~ri.H'''~ lot that serves the eX1st,ng retail disrnct. {)) trtf SC<JUI side IS the drlVeway of the ildjoinH19 parcel, TIllS parcel ha! a rtstaurant u;e and t·.., part.ing spaces in the rear. accesslble tnr"'-"lh the dr"eway 00 thls 1>1. Tne parcel is ,iso ~ by the ,wHca"t. West t>e/1ird the par-cel and adjoinin;; it is d c"""rete block bicycle rep." shop. The grade S iopes Jppro1.imately a to..lard t~ streoet 'rt;ere surface drainage takes the rur;off to Lyttof] Stre-Et .-.' p:ICONiPLANI!S-400E.JA 94-(JA-8 2 _ .. _----,-- • J IV. tn·,ri ro~tc 1 I rr,pa, tr.ecK'ri st [Exp 1 J nrl t i on of 'Y(:5 '/~-'\Swers 're '" 5ect ion y) l. .Em.b. Will the propo5al result in: ill ~.AYru: a. Unstable earth conditions or changes in geologic sllilstructure,' b. Disruptions. disp1ac~ts. c~c. tion or overeovering of the SOl _X_ e. Change in topography or ground surface re1ief features? d. The destruction. covering or modi· fication of any unique geologic or Physical features' e. Any increase in wind or water eroston of soils. sHher on or off t* ~lt€? f. Exposure of people or property to 1eo:~it; hazaras such as ~arthqt.Ja~e~, ands.idE'$, r,'!,J(jsl1des. ground failure or simi lor hazar'ds? L g. (flanges jrLSlltat)On. depo5it i orl, or erO$1Cn I>.tnch may rodify the ch]i1T1e: of d ri vei' or U!f:: bed of a bay Dr' inlet? * Adapted from Apper,dj;y, L California G~.ijdeiines for Implenentatlcn of C£QA, December 14, 1976 . .. Updated May 1982. Jon€ 1983 p: \CONTPLM'\ IS ·400L JA 1Q -L -L _1_ ....L -L 94-flA-8 3 • ·._-,;....---.... _---- 2. I"", 8ic. Will ~ proposal result in: a. Substantial dir en11SS10ns or de· terioration of alibient air quality? O. The creation of objectionable odors' c. Alteration of ajr movement. moisture terrperatuf'e. or any change in eli­ mate, either locally 0" regional? 3. ~. will the proposal result in: a. Changes in absorption rates, dralnage patterns, or the rate and amount of surface water r~~off? b. Alterations to the cc~rse or flow of flO0d waters? c. Discharge 1nto surface waters. or in any alteiation of surface watel' quality, including but not li';ted to temperature. dlssohed oxygen or turbidit)'? d. Alteration of tJl€ direction or rate of flo-,.,' of ground waters? e. Expo,ure of people or property to water reiateo hazards such as flOod· Ing or tidal ,ave? f. Change in the quantity of grol.md waters. el ther through di rect add1 tions or witr.df-lwals. or through Interceptions of an aqulfer by cuts or excavations? 4. plant Life. Wi 11 the proposal result in: a, Change in the di'ersity of species, or number of .ny species of plants (in­ cluding trees, shrubs, grass, crops, mlcroflora and .qtl.tlC plants)? b. Reouction of the numbers of any uniaue, rare or end~ngered specles of plants? ~~ c. Introduction of new specles of p:\CONTPLAN\[S-400E.JA _x_ _x_. _x_ _x_ 94·EJA-B -4 plants into dn drea, or in a barrier to the normal re?lenishTent of eXIsting species? d Reduct i 0f1 1 n acreage 01 limy agncultura 1 crop? 5" Anilllill LHe" Wlll the proposal result in: a" Chi!ngt' in t"" dlVerslty of species. or mll't>er of any sp::cles of animals (birds. land anj~ls including ~tiles. fish and shellfish. benthic organisms, insects or microfaUfla)? b, Re6uction of th€ rlurID€rs of any lCli~!J!? rarr:> or e:-:da!'1gei€,1 speCiE-'S of .:!nil"d1s? c. Ir"ltrC-:'J:tl C'1 of ne ... ' spe(~e$ ot .anl:"'~ls lnto an area. nr result in c. 0.:!rrier to the rligratiorl 0" 17<>.e· r:ren~ of drnr C ,jls? d [;..:?tericrctli/) lf~ existlri9 flSh or .. i ldl i fe r1abl t3t? 6. ~ h'lli the prop'Dsal result In: a. Increases lr. existing m)1<;e levels? L _x_ _x_ b. Expos'Jre of pe.c;.--le to seVE"rp nOiSE" levels? L 7 L~ant and Glare. ~ill the proposal proct.Jce new 11ght glare? _I_ S. Land Use. ~111 the propos.) result in a substantl~1 alteration of the present or planned land use of an area? -X- 9. Erertly/Natl,Jra' Re<:ources. wi 11 the proposal result 1n: a. Use of substantia 1 amounts of fuel or e:1erg)': b. Substantial increase in demand upon ex;st'ng sources of energy. or p:ICOHTPlANI1S-400E"JA ,."0" 94·EIA-8 5 10. req'J1 re the oe,,~lo>~nt Of ~ sources or e~rgy? c. increa'S~ in th€ rate of use of d:1y ~tural r~5ources? C!, $.ubstdntlai depietloo of '=1)' nYire­ !"\Ii!Wab 1 e rratl,;ra 1 res o;.:rc e? Ri sk of Upset, Coes the propJSd 1 . in't'ol"e-a r1sk of air e-1CP10!'10~. or tnt' reiease of r~lar00u5 slJtrstan::es: (H'p ciUf.l1no. txJt not 11S'lted to. ('.11. pestici1es. d'Ie!:I:lcals or ra,jlatlM) H1 the fVet1t of an a::Cldent C~ l..::,set 7 a \.i')\' ~r~ ~-.:~.'::'j} c:ter' :':" ic,::·~t1C·'1. rJl,,,,tr,t·:..:t\,~-,, C~~Sl~,)'. c~ ,;-,~.",:r. nt·:; c·f :r:'2" r~"",:r' ~·~'~>i12:' ",(i '~IT ~ .. ! ~~2'3 t c" 'rI'jll F~ ~~(·:-:-,~:.1 ~ff€:-: "~·.::·tlr:;: ~,:",J::lr:'J ',:,~ r(f".>' ,-,~-:;-; ... ~; f,,:­ c,j::i' t 1 c' '" 1 J _ ~ ';. '; )2, Trdr.~c-~:--t;jt ,r·,:,' 1",-;":"'" :':':': :"1 ~ 1 tr,.-, j::ro~sal resi...1t If"< a. G€n-erot1G~1 of sL.i~stantlei c~j,t:(.~al ... '-ehl("'.I1~r n:.'",'t-""rent't _:._._ b. [fffctS 0:1 €:o.'S.tl:-",:; pa''(:f,? f~c,1i· til'S. or deLand fCf ' ... p,,'tln,' L c. Alt~raticr.5 to ~resl:"nt C3tterm of circuldtlO'l or "'(WE"!'e'm iJ1 p·e0ple andfor goo:!s? . L d. Increase In trc::fflc hilzuds to rrotor vPhlcies. b1cyclists or po=d-estnans? _X_ 13. Publ;c *r,,~ces k'111 the prO¥~sal have an effect upoo. or result In a r::?~j for new or a-:terc:J g:',f~rr':-:'.::il se:-,;\ces lrL c:.y of the fol1~1ng are3S. ",- a. Fire prote-.:tion? p: IC<WTPLANIJS·400£. JA 94·EIA·8 6 • b. Police protection' c. Schools? d. Parks or other recreat i OOd 1 faci 1 ities' e. Maintenance of public facilities. inc 1uding rOods? f. Other goverm>e!1ta 1 seT> 1 ces' 14. Utilities. Will the pr~s'l result 1n a need for new systems, or substantlal .1teratiO!1s to the foll",";", utli!tles: a. Pawer' or natural gas? d. Se-Her or sePtic tlint'? f. Solid ...... 21ste and dlSP05.Jl'l 15. HL.man Health. ~i 1J th€ pro~csdl result in: a. Creat)ort 01 u~y health hazdrd or potenti.al health hazud (exclujirl'.;I mental health)? b. Exposure of people to potentlal he, 1 tn hazards? 16. Aesthetics. Will the proposal result in the obstruction of any SC~lC ¥1sta or view open to the pUIli1C. or .·ill the proposal result in the creatioo of an aesthetically offensi''1e Site open to public view? 17. Recreation. Will the pro;lCsal r.suH in an impact upon the Q=.Jal1ty or q1iafltity of exi sting recreati on.l opportumties' p:\CDNTPlAN\IS-400E.JA " " -~-. .L _,­ ....L 1 94·UA-8 7 i ~ eJU! 11. r C'I 0 ill MAY8E 18. 19. ~~l!~ri 1 R~~Qur~~s . a. Will the proposal result in the alteration of/or the destruction of a prehistoric or historic archaeological site' b. Will the proposal result 1n ad- yerse physical or aesthetic effects to a prehistor;,: or historic building. st.nKture; or object? c. Does the propesal haYe the potenti al to caus~ a physlcal change wIllCh .~uld affect unique cultural Yalues' d. Will the proposal restrictexlsting religious or sacred uses wlthln the potenti.l impact area? Man~:hJtQrv rinding~ Qf Slgnlflcon:::~. a. o.....""'eS the project have the ps-tential to dtgrade the qUdrlty of the .envir0:1!1"'2nt. subst.ntldlly reduce the habit.t 0f • fish or .,.;lldlife sp'2cies. couse a.fish or ...... ihifHe populatIOn to drop beJ~ ... self-sustaining levels. threaten to eliminate a plant Dr anlmal c;,..~uT1ity, reduce the number or restrlct the rarrge of a rare or -em:langered plant or animal or elimindte import~nt examples of the major periods of California: history or prehlstory' b. Does the project haYe the potential to ac::hleve short-term, to the di s­ advantage of long-term. ec'irrn>~"tal goals? {A short-term impact en the environment 1S one which occurs in a relatively brief. definltive period of time ~'hi1e long-tenn lmpacts will endure well into the futurel c. DO€s the project have i rnpacts Vlrhi c:h are individually limited, but cumulatiyely considerable' {A'pro­ jeet may impact Oil two or more separate resources where the impact p:\CQNTPLAN\IS-400E.JA !lQ L _X_ _x_ L • 94-EIA-8 8 d. • ______ ~ ________ '~_"6.~_-' __ _ ~ each resource is relatively smail, but where the effect of the total of those lmpacts on the environment is Significant.) Does the project have emi ronmenta 1 effects which will cause substantl.l ad',I.erse effects on human bel ngs. either di reetly or indi rectly? V, Explanation of "yes" answers ,n environmental checklist, \ 1, ilr1h, As part of this app1ication, the applicant proposes to reme',e one existi09 structure and parking area, and replace that wlth a new 8,]]0 square foot structure and rear park,ng lot, Construct10n of the project will.not increase the impervious surface on tile 51t€'. Tne demo11tlcn of the e.xlst1ng structure and front parking area '.-.I-in disrupt Site soils. and result 4n .')nly mH~lJr changes to site toplJgraph..\'. Site 5011 rrod11;cations are not expected to result in sigfl;f~cant adverse el1vironmental impacts. A final grading plan including a p1an to r'dintaln drainJge patterns from adjace~t propertles win be SuDject to re',llew by the De-partrr:ent of hr'D11C Wo:ks prlor to ls:;vilnce of any o;raai ng 01' bui ldll-:Jg perrmts, The sHe is 10·:.ated in a i'rcderate seismic r·is~. ared, subject to very strong gr'cJnd $ hak i ng 1 n the event of an ea rUlqui:tke. All new construct i on will be s0,bje,::t to the provisions of the ITtfJstcl}rrent Unifom B1Ji"lding Code (USc). portions of wnicn are direct~d at ~lnlmizlng seismic rls~ and preventing 10ss of life and property 1n the e~re:'1t of an earU'Ql.lake. '2. Air. ConstructiO!l of the project wnl temporarily result in an increase in dust €tTIi$SiOns over eX1sting ambient (ondilion$. The follOffilig dust control mitigation shan be reqlJired to redu.:::€ the unpact to an acceptable 1evel', To reduce dust levels during construction, it shall be required that e>q»sed earth surfdces be watered frequently. duriny the late morning and at the end of the day, with frequency of watering increasing on windy days, Spillage resulting from hauling operations along or across any public or private property shan be removed l!l1ll€diately and paid for by the contractor, Dust n~iSdrKes origlnating from the contractor's operations. either insid~ or oo..'tside of the Cl?ht·of-way, shall be controlled at the contractor's expense. 3. (el l!Utt, Ru1loff frOO' the site flo.'s to the San Francisco Bay with no treatment. Nonpoint source pollution is , serious prOblem for wildlife dependent on the waterways amj for people whD live ne.3r polh,ted streams. or bay)ands, Coostruction debris (soll, concrete. asphalt. sawcut slurry. paint. chemicals, etc,) are a source of th15 pollution. Th.~ontractor shall incorporate best management practices (aMP's) for stormwater pollution prevention into all construction operaticns, Typical BMp·s are outlined in a series of brochures published by the Santa Clara Valley Nonpoint Source Program and are available frm the City of Palo Alto Publ ic Works Engineering office, Implementation of typical BHP's wlll mlr:Jmiz€ impacts on water resources to an acceptable leveL 6. !!Qig, Constructlcn of the project ,.,11 result in temporary increases in ant>ient noise levels. All demoiition and construction acti'ities will be p:ICONTPLANIIS·400EJA 94·EIA·8 9 7. • subJoct to the P,lo Alto No"e Ordin.nce. Ch'pter 9.10 of the PAMC. Re51dents wll ~ be subJ€'Ct to no,se In;:Jacts froo downtown trafflc The project has been designed to .imlt11Ze r.OiS€ '~cts on the lnterior rooms ~iant Ina Gl.rt. The proposed three· story structure will produce additional igttt and glare ExterlOr light'ng shall be de$lgned for safety. and w111 avoid In!l''''Ojt)Cl,''Ig ~E'ssary 1 Jght and gldre. The prOJ.ect lS subject to rE-Vle'oo1 by the ArO\'tectural Re""" Board (A.'lBl. 'riinch .,11 '"rther min1mize any 111l"CtS. B. Land Use. Tnt:' applicc!'1t requests a zone crtar1gefor the entire site from the current CD·C(P) to PC. 10e CD·C(P) zomng pernl1ts the types of land use PN+'OS~. cc:.erCl81 r2ta,i. oHlce. and housh1g. ())e a&Jltlona,1 unH of housH19 ..ruld be proYlOed, tt:us increasing the City's housing stoc~ by that iMDITt. as no r-WSlI'19 presently ex.lsts on t.~e site. The PC zone change is ~ted in {]r~1" to dcccmr:.xiate the ~rr.lng as proposE'<:!. See the disCI.Jssion :..nder Tra.f'..spor-tc.t lei'; 300 Per\::. ing 12. (a.D.cd} iri!r<::N",~ati~ & ~.ar~J __ Qg. There ore 6 total of B par~ing spaces on t~ ccctnnf;.J p;c·~.:.s':?'.j .site. 6 pr~H~~ spaces at 400 E~rso!1 Street (APN 126·26- ( .... 4) ~~::J 2 toe;~l\:.j t".~ 3'.j]OlnH"/;J parc€l at 4l.:1 E~.t;;rsc-r: (APN 126-26.·24), All B p~r(1;:.;' sp:e-; arc V':·;::I:5e.~ C-2' r·;::l..air,{:j A total of 26 parking SP3C~$ are req'J}re--j f:c~ U:-eo VGJ2.::t. as calc-.,"iatej .here: 2)·?·: ·c·~ fr. j~~.~ v: f: :.,)j..' ~·1 ' L.. -16.4S -f 2 D~ l.s.t f1c~~ (C·T--=rcial .in·.i ~ Ie:':' :.:c-:-~'r':id 1 p3r~lr;<;r spaces resiC(;';lt ia 1 e~lstiilg spaces !_...u.o 26,0:2 • 25 r!3:r;~lr,;! spaces r€\~i.Jlred 04 provided} th;jer ttl€' pdrUr.-g re~1.Jl.at;ol1s of the Zoning Ordinance, removal of the spaces ;s not permltt~. ~Jt l~ $~bJect to a variance in the CD-C district and PC approval for t~,e pro,.,"Osed residential rezoning. The entire parcel 1S subject to the r€'Ql.llrerent::> of. the University Ayenue Parking Assessment D,str'~. Ur~r asse5s~nt d1strlct reguldtions. removal of the existing space~ 1~ legally perrnlsslble and results 1n an increase in the property QWr.er s assessment The applicant proposed to proVlde 12·14 p"ting spaces, Through the P],r;no(j u-mity 2""" process, ce pro:x>ses to pro,ide a fee to the AssesSJelt D1Strlct rii·heu of prml1dlng the addltional 12-14 spaces. The fei a:rount lS sllbJect to City CO:Jncl1 appro.'al. A fee in a sufficient a!t'O..D1t to. coyer th-e (ost of replaCin;· tJ~ .3ddltl0nal 12·14 spaces on another SitE'. ccm be mtigate tnls m.pact to an acceptable level. The fee is to be dete",ined b), the C, ty Counc1 !. based on t~~ best currently .,all.ble data. The Tr,nsportat1on D1"$100 has deten11ined that the Hlcreased floor drea " wi th1n the caps as set oy the City of Palo Alto's p \CCmTfLAA\ lS~~OJE .J;, 94· E1A·8 10 _.'\.. _~ .... '~'c.: •..... ~ 1986 Do.mtM"r Study and wl11 Mye rr.lnHMl li,pact on intersectiOOS. sueet and traffic in t~ area The increased Slle of t~ ",,"Cl"9 lot and the ,cci€<l traffle could lq>act . tile Mid·bloc' drea of lytton A',en"" ,rod the blxe pcths. Design of the driveway, revTe"'W by thE' Tr~r.sportatl0'1 DWislry") and approval by the ARB will minimize the potennal COOfi1Ct Bicycle racks will be prclo'lded N1 s~te Tt-;e slte 15 in the 'w'lcimty of retail goods am! se'Vlces. 10;.a1 y.:-:-s ana" th-e Uni;lers1t . .,... Public transit and other forms of transportat:m are a .... ailable for thOse .. 00 ..,11 use the servlces and i1ous1ll9 on-51te i)1e of the two parking spclCe:; r~ .... lf"e-j fo:"' H"R 5lngle resHiential (1"1.it may be shared with the cOW!Ierclai use. Tne reslCien~ial use c~lenents tne surT'(U)(ling dOwnt~ rete; 1 .tiY.l offIce wses. sir,:€ srr:;p,..""ers and off.1..:e users t'\a,)' r~ parr.lr>g d~"',n;" tr-,J2-C~:i ~r,:J r-esl~ts r:-2!i USof; the pan:1ng at night. During co."str~::tic" of tl~e ~:0,_~t-:-'-___ 2:::"'~::P-::~ 5tre-?~S ,J::j pa:-!::.lr,;, !n tl':€ are~ r"'.,)).' t'e aT1ectO::'j lr 2~::\:' -,.., cc,·,~::-'-~~tlC~ at 2.55 l_rttc-~' {Stars Restaurant)· anJ dt 2~:, l)'~:c, ,~u-,;, ;::.';--~r :='e:-,lr<':'.:la Ti -r:-~s. -TriD.i".e s,; te} rroay proouce cI.ro.Jl-5tl,'e tc-'~':;2I/ u ... ~st;...:::-tlCI l:-C,::1,:ts Tr,o: .a.pllOr:t :-.jst prf.-Pdrt? d (Clr,5tn~:-:tl«; r":s~r? i):,,;1 i:"l (C·-;~f'" ,."th :r,;;" iiti-~: t .... ') ~r"I')Io..~: prOJeccs in t~,~ aft-c_ Tt,:,:" ;,':,::-, ,,1"" t-? '';;',-):;':: w rE,'lf:"'l'l' a:-<:'I G~~~rU'.-al by fjre. Ped,c-e, F\.;blr( :"':~-~s., 2r,:l:-'.'r<'-tJUC, ~r,":; r'la:';Hr;o :.;.e.~!drti""!:?~-Its -,,:i"nch '''''ill ensure that cc-::stn ... .::1C-; l~':::'_s ere ~:tHBl€'d to an Clcu~>.~tat,)e 1 e,el . . 16_ AgSthetlCZ. CurremlY ~ $~,;ll :'-'e -':-:..-.\ :str~::tIJ~~ ar'j il "aCarit pri::.1F1g surface occupy th£> 10L H:f' C'''-r)~2s'?J J ::,tc"-/ 5tru.:tu~e .... , n C'OStr0Ct it.€, \fiN that is prE-sent-,), d\'':'11at'11e, t",~~','['r', tJ",'::: \'1~' 1$ fE'ldtiv('l)' limited. DeCJUSe (lone stc,;,;, cc.",:rr~? D;v:~ 5trtJ-::tt;re '!s situa'teo imeciiatel), to the-swt,~ c!rlG di·J~n~r i)r'r~-stor]' concrete block structure lies at the west property lln€ of trH? lot. 1he co:-ner rot "'1'111 contlnue to provlde a ."ista to tho30~ 10-:~H"]g bJth north dnd east frCl'!'i the property 1 ine. Future occupants of the second dnj thl rd f1 oors !lay, In fact. obt.ain iq>roved aesthetlc .... 1&'5 tMn are preserlt:y a','('!l1abie at gr"'CUld level_ Thfc ~roject is subject to re\llE.'W by the Arctllte-ctura 1 Review Board, wtnch sho,Jld ensure a deSlgn ttl at i$ ae5,th€tlca~ly pleaslng and cCllPc1tlble With its surroundH~~s. '. p; ICONTPlANI I S ·400E . JA 94-E1A-8 II At t ac hiJlfmtmmD Excerpt Planning ~ MiDnteo; or JuI, 13. 1994 AUENOA ITEM 2 4QO-414 EMERSQIj STBErT: (former Independ.,t BI'tII~uto sErvice): Preli.inary review of an application fo~ a Planned Coomunit,)' zont cna;nge to allow: (I) th~ demolition of a former aut~t}ve repair b~ilding and froot parking lot: (2) construction of an apprQxi~ately 8,lOQ·square-foot, thne-story ~ixed usp. building consisting of first floor (omrerc.ial retail space, secc~d floor corrmercial offic.e space, and a thir.j floor r;r,tal res1de~tia) unit: and (3) prOYiS10n of 12-14 on-site piirKlng spaces and pd),merlt of an in-li~(J f~e for the r~mai"ing 11·13 required parking spac@s. A lot lj~p iildjustnl!llt betwe2n 400 E,,'erson :,tr~et and ~!~ ~-',~rs(1:i Str€€t is "ls{) propos€d. Envir('lr,:'"u-r~al A(-:se~:;5"'~r,t; .; mitigate neg~t1ve declaration ~as Df~n prepared for this project. file Nos. 9~·fIA-8, 94-ARB-52, 94-ZC-9. Mr. Gilliland: I would like to ifitroduct' Joyce AlJglJst. th~ contract planner wno has. worked on this ';)"foject. Soth of us are-Q'Jailable to answer questions, Cnairpe..r:.~_on Schmidt: Are l,~ere qU€st ions for staff pri or to the publ i c: hei.ri ng? (None) 1 wi} J then open the pub 1 i c near; ng. WE' will hea r firs: t from the applicant or representath·2. Ed Storm. 399 Bradford Street. Redwood City: the project ~ing pro~os~d tonight is currently a vacent lot. r a~ sure you are aware of tn~ location_ As a matter of background, I do own the adjacent prop~rty which is occupied by Fanny and Alexander's. As an oveiview, the project is ~ very s~all one in terms of its footprint. It is only ab~ut 3,000 square feet, in round numbers. on the ground floor, so it ;s import~nt to keep in perspectl'J2" the size of the project. In looKing ,at drawings, it SOIIi!t':JleS takes on a larger ;~age than it really is. There are many fcur~bedrooa houses in town that are 3, COO square feet I so as a footpri nt, it j s not a big project. What I mean is big in scale. The d~sign and concept w~s a result of our putting in a lot of thought and review of the Downtown Urban Design Guidelines. I sat t~rou3h a ~umber of those ~etin9s and read through the output that came out of t~at, the 9~idelines, This project does finish Jff Eu~rson Street; it do~& present a nice visual completeness to the street. We ~re proposing to close off the existing drh'eway on EmETSOrf Street, thereby r::"king 1t man;­ pedestrian-friendly. We can get more into the detail, of that if you wish. but 1 think it does all of the things you would hope it would do to finish off this block. It also creates a transition that you are lo!ik.lng fer between Lytton Street and the reSidential area beyond in that it does 07/13/94 -4- --_._---- ':;i;: • pr~~lde a single residential unit. It at least insinuates some residentlals beglnnwg, and it also lets you know you are moving a\ltay fro~ i heav)' coamerc;al area into a different format. For the MOst part. I ~g~ee with the staff's comments. There are about six issues] would 1 i~e to bring up and see if we c.an resolve most (If them tonight. Th. first on. Is th.t st.ff has asked th,t we rna,. th. lot 11"e adjustment at the rear straight. That is something 1 have not run into with other developments in most c1 tles, where that is not a reqlii rement. ]f we were to do thatl W~ would lose two parking spaces. ....e would 1 ih to ",ave staff allow us to use both of the R-l spaces as s~ared spaces, nct just on. of th .. but both of them, to offset the 10.' of the two.spaces. Also, we wolJld 1 ike to drop the re'/iew of the use permi t for Fanny .and Ale~ander's. I cannot put them in jeopardy of 10sin9 any of their f;q~ts due to what I am d.o'ing next door. We do r10t think. ther! is any real reason to review the use permit for Fanny and Alexinder's in that nothing is really changing. Their parking is being maintained; their trash i$ being maintained; thEir use i.s. the same. The only real chang€ is that their access is now going to co~e off of Lytton A~enu~ versus ccming off of Emerson Street. $0 we think that is rlOt 11 ",-ell founded criterion or condition to this approval. We will re~iew our ~all design to provide better slght lines at the exiting of our parking lot. That is so~ethin9 we can work aut wltn staff wit~o~t ~ny problem. We will relocate the bike racks to an acceptable locatio~, beth fer ourselves and the staff. That should not be a problem. Staff h~d a question about Spales 6 and 7 in the site pla~ as to how t~ey are aligned in tMe parking lot. Tnat is best left for us to resolve with staff. lastly, 1 ",'ould like to discuss: .... ·ith staff and others a lHtlt! about the cost of the spaces_ I do not want to try and resolve that tonight, but when I ,orne back for you after ARB review, that will be olie of the issues. I know that would be precedent-setting. iMd I would like the chance to 100' at that and not commit to the 123,000 per spac. this evening. That concludes my cOr!Jl!ents. Ne>:t r 'Would like to have Tom Gil~an give you a brief ~verview of the project itself, both the site plan and the elevations. Tom Gilman. 399 8radford Street. Red~Qgd City: Just brieflYt I will give you a litt1e better sense of the project. You have probabiy had a chance to look at the site plan. but I will give you an oVfrview of the arrangement of thp. building. (Viewgraphs are shown) The building footprint at the first floor is in this area, with the Fanny and Alexander building to the south. The prop€rty line that Ed noted is the one that currently runs in this location, but we are relocattng it to the wall between the twc buildings. Current1y, the prop~rty line, as we have indicated it, jogs in and around the proposed parking spaces:. The realignment referred to in the staff report would just co~e straight down. In terms of the site plan itself, we do Ma'o'e a wall that Ed referred to which scr •• ns the parking lot from the street to give the building and the entire site a little bit mor€ of an urban quality and to prcvide a little stronger architectural edge along lytton Ayenue itself. Within that. there would be a gate tnat WGuld actually be motorlzed and would have , ' 07/13/94 -5- t t ". re.ote controls fer the various users ~f the building. There would be a deccrati~e iron gate. and another iron gate h~re that would typically lay open against this s~rface $0 that it might ha~e an arch1tect~ral motif that ""uld be c_.tibl. with the building. We are also showing the use of accent paving within this area, creating a little bit of i courtyard quallty as one enters the s;t~. The entire first flo-t)r ...,ill be retail space a little under 3.000 square feet or very close to that, with an elevator aCcesS that would carry up to the second .nd third floor$, Til<! basic concept of the building is that It is all retail on the first floor. The second f1o~r would be offlce use, and the third floor would be it residential lh1nQ unit. I wtluld like to go o\ler the elevations. This orawi~ is the tlevation on Emerson Street, showing the retail space on the first fJoor, office on th~ second floor and residential on the third flc\\r. T!"re building's motif is of Spanish character, with the use of d~corat've $~one ~aterlals on the first floor to give a little more texture to the b~ilding. ~ strong base, and really to use mare natural kir,ds of r,alt;"rials ilt gr-:!IJnd level n:!u pedestrians. The up~er p()rtions. of the tlLlilding lorii1l pl·obably be either a dry .... it or a plast~r ~jnd of fini~h with Spanish tile at the reof line. The drawing on th~ riQ~t is tne e1ey~tion as see~ fro~ Lytton A~enue. You can see how the b~ildin9 extend~ back, with th~ g~te into the courtyard area. There is ~n elevatc~ an1 the el~vator shaft is behind here. The wall extends t~ycnd th~ buildiog and just beyond the dri~eway. as ~ell. Ihls lS th€ area w~ere the Transportation Department had a concern for sight lines for someone sjtting in a car and pulling aut onto the street, not seeil"lg pedestrians. I see no difficulty at all in terms of redesig:,ing that area to pl'o\'jde that. visual access. Thi~ eJe'o'ation looks frorr. the parking lot toward the building. Here you Sl!'e th.tt if~ the lowest level. the buildIng steps out over iii couple of the spices t so the first level is actually a little smaller than the second f1!X1r. Then you see the third level above, whid wnl ha~e a 1 ittle bit of an outdoor area directly outside the living unit. That was a quick sketch to 13he a sense of the massing of the building. There is an entrance into the parking area just to the rear of the building. C~;$Sion!i"r Glazier: That, to me) looks like a four-story building. Does that mean that th~ resiJE!'nce is a two-story res',dence or: the top fl cor? Mr. iilmn: Ho. it is a single-floor residence. That fourth noor is si~ly an attic area. The residential unit is one floor. It might hava some yol~ ceilings, but the int~nt is tD oot have it ~re than one floor. The roof pHd its~lf is Simply an architectural statement to spall the "idth of the tJ,Jilding. In terms of the Might of the building. as .... "red by the zoning ordinance. I belie" it is 47-l/2 feet. CQ!I!!issiQner (ll1..U: I want you to explaln somethlng about the blcycle spi!.ces. Are these two spac.es a Class 1 or 2 or 3? P.re they bicycle racks 07(13/94 -6- .< 1 Dr are t~ey enclosed ccnt.i~ers? Mr. Gil .. n: I ~ not surp If the containers are ~ctual1y required in thls situitio(l. j de not believ~ l".t they are. r do not believe that the two bicycle ::s.polces are cont.-.inH types in this case. H,... Q\."pn.tln: If Carl Stoffel were Mere, ~e could answer tne question, but r di:i not ~ the inswr. (PMdssiqnfr illill: ! UI Hking h~ .,any bh:ycles does the applicant in!end to pirk in these plices] ",.., Gilav-: C.UrTe'f"Uy, 'ft shOlif two bic ..... ele sp.ices at that point to hold two biclcle~. I thi"~ th.it W.lS b.ased on the table. If Wi! nave rOO1!l, we COf.l:ld prob.lb~y )!ro~l.oe IIOre, if needed, as long isS they are not the contil iner tY:H". CO!!lBlgr,{"r Os.sti: Ir. ter~s of designir:g the ba::k of the property so t~lt Fanny ~nd Aie~I~~er'5 ~as ad€~~3te access for safety, etc .. h~d you thD~;ht of cc~~!n!~~ t~e t~J lots tc~etller for a cc-~j~ed PC? Wou}d that r~s\:h'~ t~-=-~·,cbl e-'? I":r,_M.L:.l!l: G-,t: of U:o:' l!""t.l.al I:'.::':-i~n (':r'C~;,t} "'"-S tv tr'l' 3r'1~ ~<Jint"in sep3r.at,=,,,,,. l~ ~hjs pir". In f.2.,:t~ .. e ',",:'.-1,::; ~'i' cr:~.:tlr.o a ..... 0111 to f(ln~~ a dj',;i5iv-, t.n'''"';?''':-I ~r:' 1)00': .c.;;>:;: .. T~;; b!:~i;: cc!".(eot )00'.3<; to not nix the two uso:s Tr,?y ':'..~I h"f.' ? ~.::.tio ~t tl"1e rei!(, as )'D~ ~r;o\ol'. ~--:l.is.)MtU.i __ ~ __ s_:a __ l: o.it thel' als(J n~e:j "ccess i~ for supplies arid equi~"tt irtd safet)' oar.j fire· e.xiU, etc. Mr. StCr.'1' Just to c1crlfy, ,,'15 H~ pro'r'idir1g the.":: .a po::r~anent easerccnt fr~ Lytton il'lto t~,eir propert)', 'So UH~Y do not havl: any change in ~ccess. lhit is prcbib1y i better iccess, becausE right ~ow. they have a very nirr~ .... dri't'ewiY and IW@' ire widening that te, .. et current codes. So they wil' hi¥e b€tter .cce~s for trash col)~ction ind d~liyeries. I do not Went to iU~.e the prope-rUes !H'l~, r.owe'l'er, for financing purposes. CQ!!isslgngr Qjikiin: c~nt. "The subject three· lnd four·stcr~ In t~e writeup we received fro,-:\ you, site is also in an ~rei that js be'ng buildings,~ From where do you deri'l'~ you mak~ the encourage-a for that? Mr. Stars:: Tnt!' Urban [}e.sign GlJidt>lines,. On pig-e 23, Figure 6 is _hat I used .15 i reference point. It 5.11011'1'5 the e:<isUng taller buildings: where they enroura;e t~0· a~d three-and four-story building$, It does not actuil1y sholl'l' this s.ite IS i p3rt of that en~elope, but it is in a pattern tnat shows where they i.re errcolJragiog H. It is basically transitional edges 110ng lytton, and thdt i~ where the taller buildings are, too. So we thought it w~s approprilte to use that ~s a refere~ce. Cl'1airy€rsQn S('I'~idt: I t!u~ so:one Qwest ions about thF; pHkirlg area at the rear. There is reference mad~ t~ a crlnki~g fourltain and s.o~e public .art. WlIere II'I'Duld tll~y be located? Mr. Gil~an: Right ~o~. tl'1e dra~jng shows those to be in this location. 07/13/94 -7 - \ ----- • __ ";' __ ~''''M'_~ .. ______ ~, .. _-_ 1n our discussions with staff, we ha ... '€' talked about relcc.a.ting that to etther sld~ of this opening. Chairperson Schmidt: So they would be on the street? Hr. Gilnyn: Yes. on the .str~et. This is the Lytton elelo'ation. One of these r.-;ches would be the ut niche arld H,e ot~,er "ould bE the drl1"!,Ung fount.ln nic~e •. right off the 'id .... n on lytton. ChairpersQn Schmidt: The parldng iTN, because it is qate-!l Cir.;:! there is. a person 9ate there also, wvuld net be available for pubiic us.e? Would it be only for peopl~ who wor~ or lt~e there? !r Storm: OUT preference is to ke~p it .are O~ le11 for the people using the building, but we would pr(l[}iibly lE'ilve it open dunr'tg the dn. If it becaJI3E 3 problem, we would prob.ably na ... '.;-to pol iCE-tnat. At r'lTg~t, 'oII'e want to hall! the-aJdlit,)' to close it off I:ecavse of ti;e res.ider:tial l.:.r.it upstairs. We do not want it to ~e a co11ector for cars ~l ni9ht, Chaj.r~_er'''QIL~.ctl:'T1idJ: T/"H! .,.;all, as sha""" j, 1:, r-u~t ;,igr-" l~'.' ~l,-2 talked about doinq 5(.l!r.et.i1ing to j-;,ro'.-" ~).,f Sl<;~.;; lj,,,s fDr ~'i:.',lcJ-=-S, 5.L:cn as making t~e ope~ipg larger. Mr, Gil.r.:an: 1 belie',e threl" ie~t ,,'~~ P,f~ :-~',:-._-l.h2t t~i' :r"'i"·~.H·t,~tl,~" Oepart~€nt recomended i n t1i~ an:'~ ,:1\ t"e s' i<:~t 11 r.2, :; 1 ~ t",'2 : t ::; J') area that extends back abollt s.ix f.cC't fr,:-t~2 E::!z;e 01 Pie tnffic "i!:~e-. So we would probably hJrldle tbis Hc l,itectloroi tr~ns.iti:":-l ~ 1:tt112 differently, steppillg it down farth~r in that la:.t six feet. !.';; ~jghl even incorporate a little landscapi~g there, as ~t!;. ChairpersQn Schmjdt: Would it ju~t h~ppen on ene sid~? ~i1~an: Yes, probably just on or,e s.ide. Ii·.' nicht 1(!ok ~t he;,., to complement that one rharacter on the oUre. s;ice of t'-~,€ dri"I? .. 'o.J'. Chairperson Schmidt: OtheNise, that stone .. ill C{l,1tlfWes olt l~ fed high? Hr. GilmarJ: y~s~ Tra.nsportat~or,'S conc.ern ..-u th.a.t .a persQn in a. c.a.r ilt Uris point is IKlre biocke-d Ulan her:: bt>cilPJse you do ha',if;-He othe-r drive lane to give visibility. ChairpErson Schmidt; How ~any feet r,jgh would the gate be? Mr. Gilman: It would be a transparent gate, probably irQri~~rk. 1t probably ~ould have some s~ape to it, and! see it ~ors in th~ @ight to ten foot range, It would not be H rligh as the wail. Commissioner Oiakian: Why don't you e.xplain just briefly some-ttlir.g at:out the residentia1 unit <-ho~ many bedrooms, ~tc, Mr. Gilman: The r~sidential unit ~ould probably h~~p two b2drco~s. It mlght have a den, and it would ~~~e a living area that would probably look onto this upp~r outdoor area. It ~il1 contain a kitchen and separate dining area. 07/13/94 ·8· .. __ .. _------- --' .. • o Crmm~sdj90tr Oiak1an: Will it b~ a renta1 unit? tit Gilman: Yes, Commissipner QiaKian: There 1~ mentlon mad~ in here about tre~~. Would you talk a little about the lindscaping7 Hr. GilMan: There are a couple of things. Currently. there are very fe-w street trees. r Delieve there is one tree existing, but r ~lieve it is just beyond the property ljn •. The thought would b. to .dd ,tre.t tree, along lytton Avenue. On Emerson Street, there is one street tree here, and we would probably be adding one additional street tree on Emerson Street. On the property, there was so~~ co~nt from staff regarding incorporating some phfltil'lg 'IIIithin. the pc.rldng area. itself. 1t1at h sOlM!thing that we intend taking a look at with staff. The Qf1e sensith·it.¥ that we had regarding landscaping in the parking area is an appropriate placem~nt 50 that W~ do not have a maintenance lssue with tars backing over or short cutti~g oyer a planting area. [orrrnissioner Casm: I .... ould 1 H:e to know how that w.an \ohere you shel'oW the tree and two people in the parking area, how does that w~11 transition into the other building on that side? Is it as tall as the other bu11d1ng, or is it taller? /iL-1!ilman: The willl is. about threE' feet lO'I"!\'"' th~;'1 the beigrit of the adjlcent buildir.g. CO!TlTljssioner Glazier: ",ould like to explore the building height .a little more. As far as I can see in the Urban Design Plan, it really does not specific~lly encourage three-and four-story buildings in that location. In areas somewhat close to it. there is some designation tc t~at effect, but in the specific part W~ are ta)king abo~t. as far as 1 Ciln se-e, it does not specifica1ly ercourage three-and four"stDry building •. In locking at this bui1ding , It does not seem that that fourth floor eyei reany.adds ail that much, arditectllrally speaking. To mf!, it looks fr~ the ene-drawing that the slope is pretty steep_ One ,ould argue ,that it would be better to have a 35-or <'0-foot bui lding in that area, {iiven that there are homes not too far distant. COUld you help me with wh,V. buildingwise or whatev~r, you really have to have a roof that goes that high, adding that much e~tra space, taklng it up to 47-1/2 feet? from what 1 can see, you could probably do a 40-foot building and !>till achieve the same effect in terms of residential Uving space. Mr, Gilman: I would like to point out a couple of ~xa~ple$ of ~imilal styles of architecture. A building that has same very similar characteristics to this is the building that ~e did a couple of years ago at 529 Bryant $tr€~t. It is the bu;ldlng between University A~enue and .f1amilton Avenue, the huilding that Digital Equipment is in. That building has a similar roof profile in terms of the pitch of the roof. In addition, 1 might poir.t out tl1e Plaza Rall!ona building at 250 Univers.ity l\yenlJ€.. It is d $(I(1',€-'foIh.a.t similar architectural sty1.e. I Ul1t\~ that having studied thet style of architecture a bit, I can j'Jst say tnat this pitch of roof is one that is common to that style of architecture. When the roof pitc~ is much flatter than this, it starts to give the building a 07/13/94 -9- '. ;~---,...:..-. • j \ -..• ---_ .. different kind of character. Another aspect, also; Is tnat with t~e roof pitch being lower, one visually loses the texture and the color that the roof can provid~ when the roof itself is up two or three floors aboye the pedestrian ground plan~ in a downtown area. ]n many cases, you cannot get back that far or hay! many vantage points where you can see the roof when it ;s flatter, CQlpigioner G1Jl;er: I am not sure! ",ould agret witt'. U\at entlrely .. As you look around tne downtown areal you see many Spantsh style buildings with var;o~s pitches to the roof. I could stand corrected, but it seems to .. that there are several ty~es of pitches, ,11 of which work. One thing 1 would corrtDent on, however, is that 529 Bryant Str€et and the other buildings that you mentioned are all right in the core of downtown 1 whereas this building really begins to get into ~nat ! would cal' the periphery of downtown. It begins to encroach an some of the resfdential areas. That is why I ~m somewhat sensitive to a 47-foot building there, especially since, from a functional perspec.tlve, it ;s; not char to me that it adds all that much. CommissiQner $chink: I wanted to ask staff, we ar~ referring this project to the. Architectural Re\'ie~ 8oard, and ... e ar.'.::! not aoing so. 'lo<ith any Kind of approval now on the architecture, etc., so we will haYe the benefit of their thinking, won't we? So if they say it i~ out of $c~le or doesn't work, when it comE'S bad to us, ..... e can agree with them at thal t il71e. ~G.il1.i.1.Arl.d.: Yes, i", tn':! process, this is the first review by the Planning Comrnissicn of the PC zOl""!e. H will go from here to the Architectural Review Board and come back to you. As with any PC, we strongly encourage you to make your coments abtJut the architecture ai'1d the design of th~ bui1ding 50 that the Architectura1 Review Board has th€ o€nefi t of that. CommiSSioner Srhink; Hr. Gilman, you naye only indicdteo one residential unit. Is there some reason why you are nat dividing up that space into more residential units? Mr. Storm: The space we wanted to create up there ~as one that would be a littl~ bit of a landmark in the downtown. We were not trying to creatf t.o or three small cubby holes. We wanted to credle a statement up there so that people, in my mind, could see what you could do with a downtown unit of 2,500 square feet, which 15 not a small space. It has an outside deck and is a very liveable space. That was our intent. It i~ II small project, and I wante-d to make a strong statement upstairs. With regard to the height of the ceiling, it is less expensive for us to build i 10wer scale ceiling, but we think that in terms of looking at Bryant Street, it ~as kind of the signature we looked at to t&Ke eff from. As! looked at dHferent buildings downtown, that seemed to have tne strongest fee1ing for me. That is why the roof pitch is where it is. We haye no ~ested interest in that, other than that it seemed architecturally correct and pleasing. It is a matter of taste. You may have a totally different taste, and the ARB may have still another kind of taste. With the residential unit, 1 wanted to do something up there that ~as a really strong statement, rather than building a bunch of small un; ts. I th ink. that has been done a 1 ct. I wanted to see if we could 07/13/94 -10· , f , ! f l ~. ---""-"' .... '--- o ,"-"1 de~l with a really hi9M quality unit dow~to~. Hr. Gilliland: let ~ respond to the bicycle parking question, now that hoa.'e hid I Chi nee to look .t n. As a single-family res1denti.ill unit, tl'!er.e is no iequire&ent for bicycle parking for the residential portion. The c~rcii.l/retilll has a total parking reQllirement of 23 spaces. The bicycle par~i~g is lC perce~t of that, or two bicycle parking spaces rt4Uired. ~p of those ~ust be a Class 1 space, which is the locker that ycu are thinking of. and the other Cin be a Class 3, Chlrperson 5cnejdt: Seeing no other speak.ers, I win clos.e the publi<: ~~rtion of the hearing and bring it back to the commission. Chairperspn Sc~idt: A~ there additional questions for staff? C._i )S'~M" Sen; ro.k: M1i)'be st .. ff <:oul d expan.d or. .,..tty it is a problem to "a,'e .J. cOuple of rigt1t 3.r1g1es. in a property line. I am not ver)' s~'thetic ~ith t~~t concern. ~r. G(1)ilan.J : 1 ... il1 not $-!Y t~.at it is. ar. overly 5tron~ concern on our part. ~e ~o I~in~ th~t in general, doi~g projects. WE find it better jf tl',us ~~ 3 s:tr-lig~t lot 1 ine. !n tryir.g t.O do futurf! devt>lcplfI,.:nt on th~ ~it~ i!rd f~Jt:_'r.: sahs d it. ·",e h?ve ~·,)und, over ti~e, and r"ost of the p1a[1rj\~9 dO':l·-.;:-]t ... ticr., 800ks, etc .• reC()""~,-2nd that if 'yOU h<l:',e ~ore of a ~tr~,~h[ lot 110E, it dQi\ ~Dr~ optter. But r would not say Ollf conc~rn 15 o~Erl) 5tro~g. ~i..ss.Jor}_~r tiLuier; I thol]uht tnat we had different parking rt:quif-:em;;;r-tt~ for Office .3nti fer retail. i1ere it says, one for every 250 SQu.are feet of space. Is my understanding incorrect? ~J. Gil1ilar~6: BeoLlst' it is in the dOll'nto .... n CO district, th~ CD has a bl~nded rate. ~nythi~g that y~w do dc~nto~n is one per 250 SQuare feet, exce-pt fOT res ident j a}. ComtiSSlO_n.ll Glazjer: If there is. going to be an iron gate blocking off t,~ par'kl~ nea., and ilssuming some part of this parking is dedicated to typi,cal rt'tiil use, peo~1e 'Will COMe in He middle of the day and will nte-.:l to lel\{e. Ho ... 101; 11 th3t ",ork with this gate? Wi 11 it remain open at ~11 t:8eS wt1ilt the retail establishment is open? Will there be some requirement for that? 1t is easy for the office use, but for the retail use, I 9~te is awkward, ~t best .. Mr ~tlliland: 1 think the apolicant indicated that it was their intention to leave it op~n durlng the daytirre. Certainly that is part of whit we W0ldd be looking toward ttle Planning C:mmission to address. 'Q!!issior.er Glazier: lastly, on these parking spaces 6C and 7C, do we have i substlnda.rd parking space ordinance requ1rement? ! can s~e how th,s cDuld be a disaster waltlng to happen with those two spaces. If it is full and people have to back out, ~nd scm~one is not looking, etc .• do we allo~ these kinds of ~paces? fir. Gillihpd; Tiley meet the ardir,ance. They do net meet some of the policy and transpartation-reiatE'd guidelines that we have. It does rtquire, thoug~, that those spaces, in order to meet our regulations, we 07/lJ/94 -11- \ would conside~ them as backing out across t~e sid~alk in order for them to be usea. They W(ltjld not tum around 'in t~e par','.ing lot its-elf. That would be difficult to do, alth:)ugn I .... , sute soet ~opl~ might try to do that. ~J..L(!ner Gl.a __ :z.J.~ __ r: C<IIn we qet cOllr'lS!l frOl!1 !l':Jr transportatio~ expert that that is potent i it! 11 ii s i g,;; I fi C OInt tn f fi c h<iza rd? Hr. Overwa ... : J think you nave riise-d .a p;)ir.t that reQuires so~ fvrther discuss ior. ill'ld design development. It is;: concern for us. W€' would nat perwit Uu.t in i }HJb'ic poiTlt;r~ lot. It ;also de~ends sCIQIIE! .. -tlat on the intended use. If it is tr.tend~ to be .a clos~ lot ~er! the S~ people ialre i..I~1r\g it iIIOre or less Ii$ reserved SpoIC-eS \!Inert> they ha~e iutomatic openers, ttt::., yey IrE' duling .ith l clientele U'!oIt i~ r./sed to using that. Tnat is dlffer~nt fro. ~at you would expect, co=ing to ~ retail k.ind of function. But overall, in the fHth:"r desi~r. of this., we wo:.Jld be l<lOKing it tr),inq to corre'Ct. scoe of Uut. ~sicr.Er Gluier: ;'s ,k:-, qjd. t~1s. j~ ;',,]t E"nhH~'~ .. '" Uf gOl1ig to taH;:"" ab:lut tonight, tJt It is. s·:-· ... ~ttllr i ",e )Oii!': \'~.'~ to tjl:;, a.bcClt tr_!: nEXt ti;o;:e it j:, t>efore-us. l"r. Gil1iJ._<!...f',.~: if:t \:i.! ,~lr i'_~'"'' ... ':t~, )'('0';.;. :.,':.; ... ~C'. r,\"",,",j to "ddre-5S, it ton;g~lt. ;'.S-st3ff s::--i'~ bed .?-,;j .... :Jr~,~ ~dU. tl"';:-,:r::5 2:S t~,:, ,;r,:-hjp:>(tural R~'Jie~' ?c·ard wClrh ""iF: the"', if ',he-:' i~ g"n,q t,) r~· ;; (C':'1't,fT,t'lon SI) H:21t th~ proj~ct cc~ld not be aDprG~~J, for exa-~~~. ~e nee-d to k~o~ that. CO:n"llssio'nt'r GLuier: frN°' r:) sti\,.,·j~oint. It is, :';0 r l'Ii11 lCJok forward to seeing th~t again. CO~iSS1Ni~r S.:t"ll'1k.: !f Hey ",,,rtr:-:) to r,o.vot: ((,;.0:. re~.i,:j",ntia~ unit:; on the top flcor, wou1J th~t incre~~~ the p~r~inq re~~ir~~~~:? Mr. Gillilan&: ,'i;S, it would. T'lto peT ur;it -,culd be roe.quirE'd. CQ!!!!issloner Oial<1.ln: ! ill'! 1301ng to sU;lpar-t .... hat (c.r:r.is.s.iJ::lner Glazier '""01<; saying earlier tha.t we do not want to get int·:) the bwslness of putting i~ parking spaces t~~t .He dysfu1"1ctio."iil1 I frar'!"'.v fr.Q1(fl on tnel'!! when I a~ invo1ved with theo in thf! city, itnd I hop!!' Hut when the ARB gets this, piddng up off of ~it is 901rl9 to CGofIe to thea froo. C'Jr mlnutes., th.ey will take a serious look ilt t~zt 1M try to COSl)!' up ",itn ;a design that a1lCh's for fi.mctionillity of ali of the p;ark.i,"';g spa.:!s. In tentS of the 350,000 square-foot b~ijdinq CG~ dO\i;'1'[o\Jj:l, I am assuming tholt beth the (etad 'ind cO:;:~Hci_G.l )jHt:. d tt-,i;: ~r."jj;:;.(t fall u!",der that. Is that corrEct? Mr. Gillilcnd: T~ilt is cor-reet. We are not iliilYilfhen close to reaching tho building cap. CQl!I'I!lssioner OjaUan: In ter~s. oi ~(JrHtr:.1ctioii im~a(ts, ! r.ctlce that one of the things you hav~ jn(l~ded in tne staff report i~ a chart highlighting two or three cf the main DTojects going en dQwnto~n. [have a question about construction, because ill '"Y t .... ·o years on tile PlaMlng COlm'isslon, we halle ne .... er .gotten into a d\SCLiSiion about .hether the Planning (omission has some control over construction time fl"'.HIles. Do W~ 0) /13/94 -12 - -, or do we not? Mr. 9j11111nd~ We wou1d not b~ ti1king so ~~ch ~t~~t canstruclion ti.e frames. What lite fio need is coordination of COi1stT(~ctjon, because there are three projects going on in the 1nned-tate area. I would uk. Ms.. Case regarding how illUcn authority you have to tontrol construction tl~ir'9· Ms. Cur: Construction ti~ has, In the past, bl!en di scussed in terns of environmental impact reports. In thi s instir,ce, st.1ff has proposed .. negath'e declaration thil.t does not show c.onst,.-uction as bejn9 a s'9l',ificant i.cti'Yity or causin9 significant ill?act'i. TMs ~s the ti. to IliKf! coaents an that, because of the tiai n9 imrolvecf. k2!!~jDner Qjak1an: So you are siYlng that wt hi¥£ some latitude iM r.mnentin-g on tnat. I am not nec.e.ssari1y sa.ying, fer the a~p.l iCl.rlt, tt1.iH I want to c~nt on their particular project. Ms. Case: The noise ordinance dces address tiriing of c.o'lstn.:ti')rr s"mewhat. l.t 1ei.st as far as. -..:hat days )'QU (",rI (li'\.j can["rJJt c;,ent.;., 'Io;ith certain hours. If )'OU are talJdng about tilif;'~S that are 5t'a~o:"1al 3d other types cf restrictions, those are not othtr~ls~ addre~5~j In t~p cit) cede. Corrrnission€r QiakiaQ: khat I a~' trying to fig'Jr<' G:""t 1<;' ju-st 02-';:.[:'(, r,:", much latitude we do have. Isn't it tru~ tbat b~sjde; t~e~e t~re~ projects on t~e chart. we have some other (onstruction [h~t does ~ot co~e t~fo;e the P1i!.fi!'\\r;g COl'M\lS$\Or. or City Ccune;,l b1;UIJSI? it is tl1o.o.;aole. .,iUd-:-1 the zoning. etc .• that is going on downt(.1lt(n? For instancE', there is SO"};;' renovation, in addition t.o the bUildir'!9. that i~ on Ui€, corr-H of E!t'>erson Street and University Avenue, the one that houses the c~ndy store, j~~elrl store ar.d s.ev.eral other 5~OpS. We f1a'le se'~eral c'.n1clr,gs. 1 \~,€ th-e building ~nere the Cottom,"orks is (J1l t~€ other er.d of U!11w'Hslt)' ':,'.e.,..:e that is also potentially under construct inn, So ,,'12 ~iave .se'~E'rai site.' that wi 1 1 be under construction dO\oll'1to .... n. Ms. Caa: There are same sites over tNnjch yOl.' Mavl!' r-c control whatsoever because they dQ not come to you, ~~arding sites that do C~ to you, the I}nly control you havi! over their construction s,t,E:dules are things you Cin address as part of thi! lS$es.sment of the lmpact~ of those projects, !\ther . ciJlflUlatively or individua11y. However, .VC'J Coilllnot deal \oiith Pist projects exc!pt in the furm of c~~ulative impacts. ! would urg~ you to not get into thOSE! isslJes Llnles5 you fino' that there wn1 ~ ~ ~)9nHiC.Jnt iapact on $ciiething that is c.o'Je'red under tnt ta.1ifornii Erl'-Jironmer.tai (llJll1t:i Act (C[QA) by the cumul.tlYe impacls; Certainly off tho "top of your head,· it is not a v!ry good idea to deal ~ith this. It is sc~~t~j~q th~t the staff can note and look at before the next time it 'Q~es before ;O~ to 5e~ whether they do need a reasses.s~nt of their e~~iron~entol l~~act report. Otherwise? you have a pretty limited scope to look at. C.o!!!Dissiorter Qjakian: Fran~ly, I am not s.ure I do .. ant to get into it. and 1 do not wilnt to get ~nto it in rehtior, to this. project. 5.0 1 do nc.t want the applicant to become concerned. [r~isEj the issue partly because I wondered why yall incl uded the chart in our p';i:~et? Mr. Gilliland: 8ecause as a part of the er~virof'lment41 assessmert that has to be prepared for the project, the construction i~pacts are an issue that 07/13/94 ; 13; • , ._--.;.,,- Mas to be addressed. The cumulative ir.;pacts of the th~'ee projects that we know of, plus the fourth that y~u mentioned, could be slgnificant in terms of a.ll Qf t~em. simultaneously being under construction. Tha.t chart, b J' the way, was prepared by the applicant at our request. Comm issiQner Q1akian: In and af itself, tMis particular project doe5 not pose a stgnificant effect in terms of construction impacts on the aOWlltown. In terms of putting in conditions on pes, Ls. it ac.ceptable to put in a condition that restricts the h~urs of business that a retail or commerci~l area could undertake? Could we put in defined ti~eSI saying the hours will be from X to 11 Ms. Case: Again, that wou1d be a condition that would have t.o relate very directly to impacts caused by the development that needed addresslnq. Just ~U't of some soc i a 1 concerns, you ",au 1 d not have t hat abil it 'I . . Mr. Gillila,..d: j might add that the use permit proce~s is sC't IJP, and many of the uses are sometimes controlled by time. particu13rly if it ;nyolves alcohol. If some us~ going in here created thet kind of a need to go tnrClugh the USE permit precess, it might be applied at that ti~e, do net know of any time tInt we tlave put a tir.:e r.on:;traint Or'1 a project ~s a part of a PC Ot, ally other zoning. Ms. CaL~: I would add that in this cas.e, W€ ar.e not creating ur1usual uses. We are basically suggesting that the uses be the same as would flormal1y be allowed in th€ zone as it 1S zoned for now. In that caSl3, there would be a heightened leyel of scrutiny on any kind of con.dition you would put in that yoOU would not put on an),one el se in th'e di strict. Commissioner Qjak;~n: So for example, in that co~er(ial sp~ce on the second floor of this project, I have been known to remain in He coll1'itercia1 building where I work until 7 p.m., 8 p.m .• maybe even 10 p.m. Are we saying in this partic~lar operation that someone could stay there until 3 a.m. if they felt like it? There is no conditioning that? Hs t Cue: That is probably correct. Of course, Uere is going to be a r!sidential unit there, and you r~n into the old airport problem. y~u have a duty not to create a nuiSance. I assume tnat since it is ,going to be a rental, not owner occupied, thai there will ~ same incentive for the owner to manage all the uses so that they are compatible ~ith each other. Corrmissioner Cassel ~ mitigate some of the ever been done'? I am trying to work out a way that we Cin perhaps parking with bicycle spaces. Has anything like that Mr. Gilliland: be 1 i e'ie you can space. Yes, the ordinanc~ specifically allows for that. I sub5titute eight bicycle parking spaces for one vehicle Comrn...ii,sien..,gr Ca$sel~ Can you tell me how that works? Hr. Gilln.nd: Not very well. Specifically, if the director. the person who can make that deCiSion, decides that additional bicycle parking spaces would be advantageous, you can substitute eight bicycle spaces for Of1€ 07/13/94 -14 - • o rtq'u-l red venltl e sprier:-. Ine only "instance I can think of where that was cktne re-cently ; s the Xercx bui ldi n9 in StanfOI"d Research Park., where they hive Ii 519"1 ricant number of people who cO:mlute .by bicycle. It does not do a lot in te~s of sa¥ing space, because eight lockers take up about the S~ ~unt of room as onE parking space. COIPjssjDnrr CiSH.]; But then would they not be required to put in the UJ,OOO in 1 ieu of that space? In other words, if they had 13 s:pac~.!. t~re instel!d of 14 spaces, you woula" not make them do an in-lieu space in zdditfon to that, would you? Mr, Gilliland: 1 think )leu wouid have to shtlw a need for that many bicycle parking spaces. CQ!!lssigngr Cassel: This is an office use downtown near the train station, and it is going to be a~ e~closed !rea where most of the use would be by people in the office and other place5. One of th~ problems in trying to bike to 'pjork 1s the need for safe bicycle storage wl1en ·you are at W'ork '50 U~at it is not out on the street all day, It I<o'Cri.lld be in the bac~ :o,rc. S.o~,e of tr>~s.e spaces may help out with s.Jcme of tllis ; .... ()..a.rdn;:>:ss they are havif"lg. ~:iL ____ O)-'i..ry~~_l:: On~ of tho;> t~jl1gs. ..... € have done in other places. is, rather tha~ p~t aight on tl,at particul;T property, to try ~nd locate somewhere else wh~re we tllOUght it might be a suitable use. In ~nother instance in reli3t~on to another development, SOr:le of ti1e U·r.acks. were put on University ~.Yenue "here they w!':!re f1eed~d. They were not ali needed at th~ partic\Jlar site where the project was being done. So if we were going to cOl'lsider that kind of thing, we might t;.'arlt to look beyond Hat particular ge':lgraphic lot to use some of those bicycle facilities. ~..QmiuJ..ruJ.g~lier: My understanding of the S2.1,OCO figure is that it is our current "best estimate~ of what W~ think the average cost to build an extri space, a combination of surface parking and u~derground parking, will be. That is why W~ are thinking about charging $23,000 per in·lieu space. ""r. Oven/ay: Es.sentially, that is true. It is a holding number that was estilblisnfd by what the city paid to lnother developer for sOllie spaces thit were ~Jilt in the downtown ar:l. We are in the precess of inalytica11y looking at refinement of that number. It is a good holding na..ber. COIRlssioner Glazier: Given ttjat that h our best estimate at this point, 1 ~uld ~ot see ~ny particular reason for us to negotlate with any p~lential developer on t~al figure. There is an independent procfss that is determining that. and is not SOlely driven by the Planning COlTI'nission. Given that r have said that, there might be some interestJng possibilities ind some flexihi1ity on my part if th~r~ were pe~haps so~e interest by the develo~r in rethinking the residential unit on top. Instead of one unit, which might be the nicest residential unit in all of downtown Pal~ Alto at 2.200 square feet, if perhaps there were some interest on the part of th~ app1iCGnt in exploring two or thre-e or more units, thHe mi9ht be some give on my part fer that. I do not know if tonight is the night to talk .about th.a.t, but; tis something I wanted to pl ant in the ear f'lf the applicant. We haye been taiking about mixed use for a long, long time, 07/13/94 . 15· ------- -' .. ' ,-~ f ~ .. / ._--...... -----,,_ .. .." ,1nd we have not seen ~a1'ly proposal $, for it. It is grut tn<lt WE' <lr-e s~ing this propo:;al, but one big, luxurious unit ~s prob.ibly o.)t _+\,)t we were thinl:.ing about when 'We t1avp. talked about .ixed lJse. 1 c,an undentimd why it Eight bs attract lye, but 1 think there .ight ~ ~re sociai ben~fit ~ith eore units. When we think about pes, we iIIlnys think about p'l.iblic benefit. Here I'llight bi! more publlc benefit if t}~re ~rf MOrt tha" ont unit. pernips three units targeted at a different fotol'tOllic s.t.at1JS for fO-lks wI'Io would '.unt to live dOwntOOffl. I ilPl no1 sure I ~ulj wtnt to s~nd S2,SOO per month to live next to a beer garden. Co.isslQMr Qi;tl;iar.: I ~uld lik.e to have staff respond to some of the (~nts .. de ear1ier by t~e lppli(a~t about char.gi~g the lot line to a(.::~at~ whIt stiff s~csted i!'1 th-e r-epcrt I about the R-l shari r.g of parking Sp iii CI!"S , .tb<lut dr<JPP \~ the use perr,; t rev; eo ... proce~s on the beer gareefl wh;c~ ~s bHO!!!:i~g infia~':J5 tor;jc;"t, about relocHiof, of the bike rack, redesi9"i~g af t~e wall for j~crovej visibility co~i~g out of the 9atP-d He~. j!:r"ld .!ls0 Sl}~i: (t~~"int O,r the C')S.t of H,e parking $paCE!S. ! do lr~. fr0~ _~~~ ~e dld t~e par~i~o lot in the C~lifornia ~yenue area t!ia.t H.e ((J.st~ ""Ere t~F.n esti::'.!ted at-abo:Jt $20,000 per space, and (c~~tir;, Sc t~~ r,.~-~~r t~i·C.' OJl tG~j9ht see~s pretty reasonable to ~e. Th~: i\ a 1ist oi sc-e Jf ~he thinJ5 th~/ ~rougllt up. Would you c~re tel ((-.-=-rit c,rl t:",E-? ~,.., GI ).ul.a.r"~: I ,10 "ot ha',e 2:r;i 'It:f'j specific cc:~ents, other Ulan in He :;t<lff n;.["·rt, '"~ ha ... e rer.cT€rtded t~at at l€a:;.t one of th~ R·} space) be cOi1sid.;,-ed tv t:-e shned. j thin~. "'~ \ltC'uld lo:J~( f(Jr your-Con'''1'1ents as to _heth~r you thin~ toth of the~ (ould be. r have ~pE'(Hic.iilly talked to 1\an..::y litle, t~e Zoning P.d~inistrator, about the use perr.:it. ~he ft'ers \'ery strc.:gly that it 1s 11 cnange ·rn Hie use-of the property. It ~culd be co~slstent with previous ~ctiops and that 1t wou1d requiT(, tl1J.t the use pe~it be re'l'is~.j or amended. It is not to say t~.lt it is " fe",'OCilio r , of t~'e i.B.e per.:llt. J do not want anyone to get O"t i~ression. it is just an 3~.er.dment to the USE permit, a review of it I and Nancy' h.t::: s.id t~3:t. Wr s;id in the st~ff report that SpacEs 6 and 7 aloe questiondble in the p.lrki~ lot, l!"ld w still 19ree with that. As far as the let lint ~djust~nl gQing thrDugh there, that is som~thing thit staff and the-ipplinnt need La review further. [ eel ie1'e I am h-earir;g frc,m you :;'0 far uc.t yOll na .... e a stronger concen ~~out Spaces 6 and 7 tnan !taff aid .n the staff report. TMat is what we lik.e to near-from you .-he .. j"JU feel about it. As for the bic)cl~ parking and €~its to th€ b~ilding. ordi~a~ce is clear on that space:!., they do r.€.ed to be closer We ~oid fairlj strongly to tl'1at. r cd r:t , to entrances The COimlissione-r Oja~iii'1; Ji~, it saunds like WE: are going to get some landscaping on the streetscape through the addition of street trees, at ieast. 1s there so,"ne rE~ason .. hy that did riOt get included as part of tnt' publ ic benefit? . , 07/JJ/94 . 16- ~,---. -, . Mr. Gilljlilnd~ That is sooettllng we would u-pccl of in)" pl·oject. COCII!Iissioner S.~hink: is it .ithin clJr power, in rE'vle1(ing this, to say to the applicant, in:s.tud of having only one unit, 'It.~ w,u:t j'<J~ to d;Yide )'our 2~ZOC sqQue feet into five urdts.? We feel ttu.t would be a r€;al benefit to the cOfIIIUnity, and we will not reqL;ire an)' .dditlOn.li p .. r~'ng? We think it is reas~nable tnit your 14 coaaerci.1 spac!s would be ide~uite to be shired with the residentta' sP~Ct~. !Sr, Ginjlil'ld~ Ye.!., you hive tne right to make tt',~t kind of ;( recosme~.t1on. {e~tatnly, if you ~re goi~ to 90 that fir, we ~uld ~ant to iddress it ~t the ~tiff le~el, beciuse th~r~ ~re ctn~r considerattons, plus the efff'c-t it vculd hHe Or1 other i1$SeS s.men,t di strict properties dQ'llffltown, Yell nee-d to be a.are of a let of On,!r i$sues thit revolve around thiit recO!IfI(!ndaUon.. )'cu can !lili(e Jt, ht if th~ .apoljca~t did not want to go along .. i HI ; t, ycur reccur-s'1 'IoI'olJld C>i' t~ c-t!cc""J!':e,d denial of t~B project. Then you ~culd h~ye to ~i(€ t~e ~~ri~~s finjj~~5 to do that. That is Of ... .a} ,;of s3:_.'ir~9 r ,,'::"uld u:.;~ici1 ~':."..2 <!\ r,i) k-... f.ar you would want to p;c!:~elj c-r. 5t.":i"1 ... rt'::C~€j"!'ja.~iC'~i. Com1ssioner __ jcnjr.'J;: Haw fu "O:.t'iQ y,:;'J t;C, 2$ far Ii", 5~.2F't:·j ,-n,t~g sp~ces? Would thr~e unit) be r~J~o~~)i~ treri! Nr. G:1lilillld: !It tf,i~ ti;-:".2, q~ff i;; ·"',.'r,. c:--f'ld2~·1,,· '~iU; u,~' ~:~.;_. sha.re-d parking spa.:~ for HE' re~ld~rlti~l <J~lt .. r.d r2t;;,:.rlr-i:':~ t.har. or,e remain. There is not a lot of ~tudy en that. j ca~n~t 9~~e jt~ a lot of basis for that, but our feelir.g i~ thet the r.;>s.i,ji'r1Ual ur.1t 1-s gOin<) to nave a car that will be p.rKej theU:' ,. .... Js.t c,f t~e tl"":-t'. Especia11), o~;e (}f thi$ size. yo~ might consider that one of the C~T~ ~i9~t go ~~~y dur1ng the day to so~ jcb, but the other c'"~e is. !Hely to be there. "lso, ! could argue the other ~ide pretty e~sily and Sl)" th~t "€ ~re next to mass. transit, ar.d retail servlces .are 'fer}, dose. Jt could bE" fer two people who do not nave cars at .. n. COI!!1$slQner Schink: That was .y next Q~estlon" '"ou Silld you need fc-ur units there, but only one is gOing to ha"tE par;;lr~g spiCes. Mr. Qyerway: Using the experience of Abitar~ o~er the Q gar.ge, it IS ~J understanding that each one of thos~ units has. parking spice, plus s~ shared overflow with tne pe~nent spots in the public portion. So they eac~ have on~, plus S~ sh~red use of e~(e~i spices. We do periodic.lly get calls from pp.ople who, 'in theory, IJndersti!'!.d that -..1l.ero thE-Y rent thO'se units, but they have two cars arid the), .",.ant to l(~'jW ..... nne th\?)' can pad:. their car. Our answer to th~~ is that tMere IS ~o Ql~:e for the~ to oark their car during the daytime. r do not lo:nnw now many .. nits are there~ bLAt it is evident to us that each ene of those units, on iver;ge. needs slightly ~re than ~ne parking place. Tne ether c~mment 1 w~uld .ake is that in ~orkin9 ~lth the parking cOFllnittee of the Chamber (Jf Co~er(J:·. th-ere is a s!ro,_~ CC:K_ern ar"j interest in gaining as ~any spaCES is they possiDly C2~ a~d in protect1ng a.S lIlany spaces as H~ey presently have. Hey ue He people 'who get (.~arged for building additional spaces. If there were going to be four residential u.nits, I think there would fla'ie t-o be a. filrl . .,,· strong, convincing argulil€nt that those four tenants .. r.uld, indHd, be gone durlng 07/13/9~ -17 - '~~~': . .,..f tn! day and their cars would not be there. If they .are g01ng to be there, tnat causes a spillover ripple that somebody i~ parkir.g in so~~ other spaces. That would be the concern that the other people downtc..m would have. tOMiss;oner Glujer: In my mi nd, I couid pretty easily make t~e ar9Lmertt that if you have someone 1,v'~9 ,n a 2,200·square·foot apartment, lt is liKely that it would be a couple or a famny or SOMoM: .blt tc afford two cars. If YDU had mu1tiple, SOO-sQuare-foot units, it would probably house $ingle peopl~, ~r couples just starting out in t~eir careers, who ~uld probably only have one car and would drive It to work. So the need for ~'t1ple parking spots during high Gse hours would be reduced. ts that a compelling argument? Mr. OvPrwiV: We do not have scient; f ic prMf of any of that. You certain1y are headed 1!'1 th.e right direction, but I cO'lld easi1y Soay that since they are close to the train station. the)' could co:r;;:..t.e to S.lr'r francisco d~riT1g the day ?nd leavE' th~ one car they have at ~,C':":~. $c\'C'e other one of those five tenants m~y have two cars, and so~e ~ay not h~,'e any car at all. Ch~.trD!!"sJtn Schmidt: Regarding ttle parking, o. lac:': t~ert:ci, th"t Joie ~ut in for the project in the alley on 8ryant StrEet, the By:tbee Hcuse, ~hich had several small unit$, there H'as no ~.ark1ng. fommissioner Ojayian: 1f J rer.:e~be ... right, we-put in six !Jlllts n.en. "rhe house itself was gojng to be divided into two unit~ and th?y ~er~ gOipg to put in a b~i)ding, which is currently under construction, that will have four other units. They averag-e 4QO or 500 sqLJare feet Nch, ar:'d it is true, ther~ is no parking for them. 1 felt that we m~de a sign'ficant exception there due partly to the histnric lnterest in that hause. Jt was a unique concept, a~d it will be interesting to see how that al1 plays out. We did raise a 10t of c.ono~rns abcut thE' park:\(1g "h'!:'n we confirmed that. We had addition.l interests 11'1 mif1d there, .. hid is. that the Byxbee Hause ~as been there a long time aM ~a:. s.o,""e historic 't'allJ!. Corrmissioner Glazier: It seems that behind the Fanny and Alexa~der property. there ~ight be some extra roo~ if we moyed it over 3,000 or 3,500 square feet. Jnstead of just moving the lot line oyer 2,2nO $q~are faet, it looKs liKe there \S room beh~nd th~t property. It says, wood fence a.nd dirt.. Ooes the c.:.urrent prop{)sa1 move it all the way OVf:r to a brick patiO which .seems to be behind part of this? Is. thert! iiny dirt or empty area not being utilized there that could be used for additional parking spaces? Hr. Storm: Right now, the proposed line takes it T19ht up to where they have a finished patiO. There is no longer any raw dirt there available. 1 should mention that I have to protect th~ir fight to cp~rate. I ca~~ot say for sure about the gate. Commiss:iQrler Grazier: Ye::., and we fully appreciate that.. ~bairperslln Schmidt: If that is tl1e r;:st qLlestion, we car. move into our comments. This is the preliminary re¥iew of this application. We are commenting on its conceptual stage and conceptl..lally appro\ling or 07/13/94 -18- o disappro\ling it, sending it on with conments to the Architector.al. ~e\liew Bo .... !. Commissioner Cassel; I would 11Ke to begin because r want to bring up the bicycle subject. The big issue here that is facing us her~, whether we iT9ue about tne apartment upstairs or n~t. is whether to appr~\le a prQj~ct tnat Mas too few parking spaces. Since it is only one space, I was h~ndering today if anyo~e is interested in offering the opportun,ty to negotiate one of those spaces in exchange for lOre bicycle parking spaces. Ob~lDus1YI we ~re not gOing to negotiate ill of the spate~. because it is not a one for one equal parking need for bicycles and tars It this time, but obviously, we are going in tnat direction in th~ f~ture, to more bicycles. One of the problems in using bicycles is having adequate, safe space when you ~o to work and remain there. People who are e~lcyed are ~re apt to use them, if they ha¥~ reasonable spaces. So I wondered how the rEst of you feel about that. Comissione-r Sc;binx: I would agree with ['rlyllis on that one issue. Also, I like this project, and I think it will be a good addit10n to downtown. I would like to see it work. Let me touch on a couple of pOints that J think are simple. r feel WF; should :;;mply allow the01 to make the 10t line adjustment, considering He nigh value of ~roperty liowntown. TMis is the sort of thing we would expect .. a few additional right angles here and there. But for the sinip'licity of paperwork, it 5~ems unreasor\,abh for us not to ailew ~,im to IT,Olle l"Iis lot line. $(1 I 'nculd \?l'\cowrage £'Ier),on-e to support the irregularly shaped lot line. I think the real public benefjt here is the residential unlt. 1 am almost 'Uncomfortab1e with the idea of the drinking ft:tH1tain and the art. 1 have not re,oncileo in my mind wheHler those should even be inclliced, because in some ways, they sl')rt of thu!':'1b their nose at the praceS!.. ! r.now we need to include public ban~fit, so maybe we are just jncl~din9 those and ca11in-g them pubnc benefit. Sut I $ef' tne rea'] benefit as being tne resident ill unit. I am strugglin9 mQr~ with how b'2f1dicial it is to have Just the one unit. I would prefer to see it as ;nore uni ts. I ctin approve the project Hoe way it is proposed, but I would be happier seeing it with four or fl~e units. ! would be so happy to see that that I wouid not rec:llJire them to provide park.in.g far those units, That is the direction in which I 'fIould"like to see us proceed. The package, wh~n c~mplete, will have a greater public benefit. If we ar~ going to take action as far as encouraging housing in our urban core areas, we are going to have to make parking concessions. That part of downtown Pll0 Alto could handle it. That 1S the d)r~ct10n would lik€ to see us go in. CQmissioner Glazier: I agree with almost el/erytnir,9 Jon has said. 1 like the mixed l.lS-2 concept. 1 like th~ mix of uses n.erf!, and I like the design, by ~nd large. But the whole issue of public benefit. as Jon says, is one that is easy to struggle ~ith. In the context of just one 2,2<lO-square-foot unit, 1 would say, I donJt like the parking problems; I don't 1 ike Spices 6 and 7; I am not sure 1 liKe a H~foot·tall building, But if it were to come back as a two or thr€e or four or five unit residential proposal, I think many of those concerns, weighed against the benefit of five units ~erSUi thos~ other issues, a decision would perhaps be ~n favor of the project, 07/13/94 ·19· { , , • .1 / ... ---......... ~ Sl~f wt ITt not ipprovtng anything specific tonight. just a 9~neral eonetpt, I would encourage the appllcant to work with staff to c~e bac~ wjth S~ creative Ippraacnes to this issue. ·Jon's proposal represents one &p~roIC~" il;M there a.re ?roba.bly cthf'.rs that Jim and s.ta.ff ca.n thifl~ of. Creati¥}ty is encouraged, but I would be glad to support a motion to i~prove thi 5 at a c{lnCeptui' level. ~: CQ!ni$stoner G]jz~~r: ! th~refore move th~t we appro~e conce~tually the request for a PC zone change, and along with that, a request to accept pay.ent of tn~lieu parking fees of 523,000 per space, consistent wit~ the report ,s presented to us by staff. ~: By Coaa1ssioner Schinx. 1 will second th~ motion if we can in,1ude th.t they be .11~d to ~a;nta1n the lot lines as shuwn in their oIppl ic:at ion. Chi!i)""c",sol"J~;:_:,;_t-'=i-ctt: Ms.. C~';e, the$t: are just caments. He motici'l \oPouid t'f fDr-clJr,':-eptr.:,al appr(,v2Il .,nth co~ents. ~$. _(<'lSI':: That is c(}n'"12Ct. The r:'JP will officially be in front of the ..:c.,~,jss.ion at t~e r,en hearing. Chiirper~on Sc~~idt: So tMere can be co~sellSUS or no consensuS on c~nts. ~~~; That is correct I and you are 9iving very goed direction to the stiff ind, I assu!Tlt', to the applicant. ("missioner Ojakia(1' t would concur \o:1U .... hat both Comissioners Schink and Glazier rfave-:Sajd i11 terms of lhe mi:c:a:J us.e concept. The-only thing I ~~ia Gdd to that , from a conceptual point cf Y;ew, that I like about this project 15 its lo,aticn. It is not .a. particularly attractive area of the downtown. so the fact that we have the potential for doing sOlile building there to enhance that c~ea is important to mention. T~ hit on i f~ of ihe ~tnar things that were brought uP. the key issue here that we S~ t~ be grappling with is the publiC benefit $l~e uf this PC. and included in that is looking at the whole parking issue. That is a difficult issue to me. I can hear where Jon is corning frDm, because W~ irt lookin£ for some added public benefit, and maybe that public benefit is ~kin9 svr.e sma 11ei u~its, so we would have Mare than one unit, a"d they ~ould be a little ~ore cost effective. It add~ something to the dO",,-ntOfffl. 1 would 11$0 hope that a part of looking at this is that w(! 10nk at the l.ndscaping and streetscape. not just in the area of the trees that they are pro'tidin5. but ant other things we can do to enhance that area. I .ou1d hope that the ARB would keep that in mind when they get this before thE~, along ~ith locking at the architelture of the project, making som~ recor.mend.tio11S on the lands.caping. I U'I grappling with tr,€ parking aspect of it. We bave gone through s~vera) discussions here, ower a period of time. Everyone knows there is 07/13/94 ·20· ~ ..... o ,J pillrkir:g prt'bl'l!'ll' dOWTltown, Staff!iolS 011 so c~r.ted on the f.lct that or ~OUTse, we hive ion iSSeSSI'oent oj stri ct, ilnd those peoplP who arE' i pi!rt of thlt usess.ent distrlct hav" concerns lIbout ~ pro';ect thilt goes in which does n~t ~i.ve s~ff,cjent pillrk1~. I ~ not sur~ wr.at the ~nS~er is. I suspect t~re is i. c~ln.ti~n .n~~r herE' tnillt SiYS, rot only is there a fee bvt thilt the i.pplicilnt hioS s~thi~ thlt gUlrant~es that they have parkirl9 sp~ces for-the OC:CUPIl'"its .of tl'1e bUliding so!:'",ewt1e-re dOWfltOwn. J am not quite sure ha-y~ would do thilt. ~j concern i~ tnat ~e do not nave enough parking, especiilly with ~o-e of th~ bui1ding we ha~e '~rr~nt1y 901"9 on ctowntcvn. Given tht: loc.a.Uon of tnis ~ilding, Sor.li' of thCiS.e ~ple will Plrt in the resi~ntil1 r.eigh~rhood because it lS con¥enient. It would not cost th~ .nyt~in9. ind it is ~ithin reasonable wil~lng d'~t.~e, So r hopp th,t wh.~ we 9ft t~is b,c(, we .re not just going to look at t~e fee end of it. f ~,ope trrolt ~ of1'set H~it '9a:inst :!'om.e guardntee that the occi..ipanu ~f this building h,He SO!!oP. p-H~i,.,g s.Q~.t;er'~. Cb"icU51y, sc·.":'-ethir.s ras to h ·,~,-',~.2 ' • .-i~~ ~;·~,:>:,s ~ ar:-j 7, cC'ca-..Ise (tjrre:;'tly, 1 CJ r:.:::t fi;;~ t~,1:'"" .a.::.::-;.t..:;,b1'E'_ j a-SL1r"t th~ M~8 i<;in c-o:-;r;l2nt on that. h'::;~';:>(wl iy, .... <: can d.] Si-. .f[~I;rS' ,,:-:o,_,!,. tc"n C.::fcre \o!'" (c-p7et.e this pro::€~:s. S~-,e P:C,p·l" cr::,T"Jrltej 0'1 I.~~ r,C'·..in of P'i' Q,;tin~ of tJlis ,H;,,~. t;"lin~ 'piE. )I"iJ~ld tao:.::-eo ur~f'..Jl 1C':-·~.:.t th<!t, -l~H\::~~~, I j:) r·ol ~:;r~t ~o se-t ~rlY t.1l'"~s. em tr.a.t r\g:"lt r.c", (,_,t H 51' .. .::.:10 t." ;s~eth\r.'9 f"'::3so~2.b~e $0 tt:ilt ,,)1 ot the-users of the 5.-,t~ Fe -!(~:::C~·c:!Clit€<~. H',[,s€ are i'r' !:'air; concerns. t do liks this proJ~ct in ~ lot of ~Jys. so hopefully. we' can work something out ~nd :;H it c.0'ICE to fruitiDn. i .'111 SUPDOTt tfle rrotion. {J~::m\ssir;..n!i'r (esse!; SHin]l)', j 11/:;? th~ proj€ct. ~hl$ is In a trar.sitio'l zone CC'lIo(nto,.f'l_ Ur:der tl1e UrbJ.l! DE~lgn G.uid~lln~s, a~)' indicate this ~rea as i pred~min~nt h£ight ~rea of t~o stories. 1 wc~ld rJot na'll'! beet! I.:r.nappy if n,h; tl,Jd C~ 1;1 ~s tilll'(! stories, but H has come in as three storie~1 ~nd th~y h~~e tne right to do th~t. It indicates that I phntit)g setbici:: alo:"li) lytton k"enue «light be iPtlropriate. That is: somet~in9 1 think one .ignt (o~s:ider. In ioo~in9 it the other buildings that ire going to be Ulree :Stories, 1 belle.'e Uoerr is sc.rr:e-setback from the streft on that. lht hti9ht is ther~, $0 this ~uld be the third building of .a:pproxla1lte-ly the SUl'i! hp.ight ",'S tva other bui ldi ngs 'currently on th.t corner. So that .igr.t be looked at, Interestingly enough, 1 hid th.t Sl.e ':<!Iic.ern tlu.t e'ier)'one else. did ibout the aputment on tM€, top floor, a~.d grappled filth that" I wer,t down and v~sited the site ye$terd~y ~fter~CC~J, ! ~ilked around. ViSlt~d th~ beer garden. went to the back and dl$CQ'.el'"(j no .... ~uc:h $pdCe h; bad. there-. Then I .ent back it 11 p.Rr_ to -"isit tile ~H garden, 'pjhich ... ·t!.s fu.n. I wanted to t"tear the sound, and they do, 1 ndel!'d have a bal1d, T1'1ey a1 so. h.av-e a lot of fun. and I would not .... a.nt to do a:nyth ing to jeopardize the fun at this site. At this Ulle. it no.-has lots of parking space arou'id it, so wher. you get OiJt of your or an-,j yet..! hear thE band, it feels good. If I were 1 )1'10g iT! U,at apartii:ent, r l~1 root sure-fie)'" gO.:l·:j it lrIould feel. r w.s thinking of Jon's (omQent ~nen ~e put in the ~ther six units in th~ i!.l1ey, and M1S cO:M"ients about H,e Mise at night. and thought, this is going to be Ij'jore nOise than that. So 1 ,"'.as a I ittl!? cOflcerr'led about a 07(13/S4 ~ 2 i - • , i f. ! I -. large, single unit up thrre for that reason. pr~sume it is a single story, although it Is a larg.e sizt, because H,er.e ire so~ a-.::cess proble-ss­ and some safety prol:lle.s in naYing two or three i.il'1its upstairs.. Yo ... have to get up and down the sUi rs and you IINst holve flre exits, so )'OIJ lose do 'ot of space in c\>irv:l that, l W'Juld presutte. But it is 4l~ int~··estin9 concept, and J am not for throwin9 it out, dnd I wa~ not thln~ing in terms of three or four-units. I am interest!d i~ explorir.~ the ,dea of excrlangTng sose of ttrE oarkir'19 for sorrte b\cyc 1 e spacE's. lit It; ght .a: t lea'S t ~e t S~ people perked, one way or another, that WiY. There lIIight be S~ cOflgensatl on . I do not see any reason for not iddir.g the public fountain as part of th~ p"bl;c bonefit. r a9ree with Jon about even one residential unlt being some pub11c beilefit. but I would rather have tw{l. ~aybe the Public Art Co~i!>sjor, might hil"le some ideas as to ho .... to handle th:!:t ~utll ic Ht sp.:-t. Ql.d.iroers.Q.L?_(h.JD.Lq!: I like th pr·)ject, ind ..l9rC:'e ... ·ith .! l'Jt Df t~? comments t1"lat hCl'/€ been madB!. One thinq of sigrllfJc.:;r,:.: HilL i d·:-. ~[.~ b-elie'lle has b~'&n rrentionC'd is. th.n this-is a r.roj-z·:_t th~t \5 l.~'''H·,;! n':;­ place of a piece of property that wJ$ a-~rti72j. Tr~ ~C(VP2~~ ltft ~~~ property ~bout a year Jgo, ~nd ! a-happy fo ~e~ t~~t ~c 3re ~e~1 I~O s.~-~ new) energetic projects I).ac~: en these propcrtit!$ th~t "'-::-h2.· • .:-"trc'J9ht to '~a!;.anc)' , It is gra~t to see projects that do support concepts of our recently adopted Urban Design Plin, WI,en I first lco~ed at the dra~in;s, t~e project by itself is an attractive project, but 1:'0 thinUfl9 iibou t• it ir1 context) lOOK1ng at elevations, it sE"eli,S li~e \t ~~gi"(t bl? a-. little:-t211. In driving around and ~31kin9 around the area, : do not th'nk th~~ 15 true. Ther~ are a lot of other two-a~d three-story bui!d!~;s In the vi<:inHy, even though the imlE-diately Idjacent building.s ire lO)rOt>r, Across Lytton Allenu!? there is ill large, t ... o-story building. Across Emerson Street and across the parking lot is t;,€ Unh-ersity NaUo"liill eilr11.:. wliich is at least a three-story building. There .are l!IuHiple story buildings acrosS Emerson Street, as .... ell, Htt?re will be ill ne"" multiple-story bui1/ling diagonally iterass Lyttcn A',enue. So I a.m not conct:!rne<l about the scale. and wou] c' agree wlth the iirchitect'.'l cOCIIJents that when you see it in perspecti¥e from the street, it looKs different than what you see on a paper ele .... alion. Indeed, you need to dCl SOGC thlngs like possibly make the roof slope steeper to l~ep the b~ilding looking good from the an91e at lthich most people yie.,. it. I .a:l~o .ou1d like to say th"t J will leave those-Kinds of cc~ents. (;i' to U;i' Architectural Review 80ard to disc.uss further. I like seeing some public benefits put in like the art and fountain_ Tnese are things suggested in the Urban Design Guidelines. r would like to see these public use features appear more in Palo Alto. These are the kinds of thlngs that occur in urban and suburban ~ettin9s in Europe and other large cities in the Unittd States. 1h~se ~r~ nicetie~ to h~~e in the downtown, and there aren1t many, if any, public dri~King fount~ins that 1 can think of downt<Jwn. 1t would be nlce to be Coble to get a drin'" of water some~here. 07/13/94 -12- o I agree that ttl! parking area neli!ds to be looked at. Staff and the Ipp~1cant can work out whatever' is appropriate, wheth~r the lot 1 ine beca.es straight or as propo~ell by tnt!' applicartt. Thn-e is 5ti i1 the necessity to nave access to the second property~ so something needs to be worked out there to allow that access, Lastly, I am verjl happy to see tha residenli.al use there. It wouid be n'lce to see DXlTe residential units, as many others have suggested. 1. toc, would be happy to .<c.pt littl. or no parking for additional units. We have donE that before w;t~ the Byxbee House project. Also. it is supportive af some of the things that are being reco~nded and discussed in the Compren!ns1ve P1an, that is, to reduce some of the parking requirements that we place on projects. These things can be dealt with. It is reasonable to try them cut in a small project. I will be happy to support co~ceptua' approval of this project. HOTTON PASSES: Chairperson S·:hmidt: Is there any further discussion on this motion? We "ave a motion b,Y COlT':!lissionu Ojakian, seconded by COl'!fJlissione-r" Glazier, to conceptually lIpprOV€ this project, ~enoin9 it (Hi to the Architectur-al R-eview Beard with a number of ccr:rnents, as foll{."s: consider e.x::.har.ging auto space for additioF)al blcycle parking; ';orrsidH 1~iv1ng the lot line as they ~re proposing; consider adding more residentic;l units to encourage hOtIsing, and tl"1l$ could bE! dorl': 101 it ho I..'l additional parking requirements; look at the landscaping and stn:.:tscaping; look at how the gating of the area "ill be ~:anc:ged; pD~sib"ly look at the height of the building; consider noise from ~ext door; consider doing something different with Sp~ces 6 and 7; the jn-lieu to be as suggested in the staff report of S2"3,OOO, stin to I::e furt.'"ler defined by the Transportatlon Department At a later date, but at the present time, S22.,OOO is the amount of an in-lieU" fee for parking spaces not provide-d. Al-I those in favor. say Aye? All opposed? That passes on i\ vote of 5-0 with CommiSSioners Clrrasco and Beecham absent. This item will next go forward to the ARB on July 21. retu~n to the Phnning Car.rnission on August 31st, .and go or; to the City Council on Sept",,""" 19th. t] i 2. ." INFORMATIONAL ~~RANDUM AACHITECTUAAL RE"tIEll aOAJU) July 21, li~4 400-414 !ler$~n St·· DES Archttects l Engln~ers 94·ARB·S2 94-EIA-S 94-Zr.-9 f!1anneti Coamunity zone change to allow: 1) the demolition of a fonmer autQlOtive repair buiiding and construction of an approximately B,lGll squire fODt 3-stor.¥ mixed use bullding, consisting of first floor commercial retail space, s!cQnd floor cOIIIIE!rcial office space, and a thtrd f1 oor rental residential unit; .and 2) pro'tision of 12-14 on-sHe parking spaces. D[SCRIPTION Please rd~r to the Plann-ing Commission staff report inc1ud€d in your packet for a description of the project: the issues and analysis. At th.;; rlanni.ng Corrrnisslon rT'ieeting of .July 13, the Planning Corm:isslon ex~ress€'d strong support for th€' project, particularly th~ mixed-use co~cept. They felt that this was a good project j~ a good location. Primary co~cerns includ~d parking ~nd the public benefit proposal. The COrTmission felt that residential in a mixed use project could be considered as pubic benefit, but was concerned as to the sufficiency of the water founhln and art. On. c. !' to 0 vote wHh Corrrnisslorters Carrasco and Beecham absent conceptui!lly approlled the pr-cject with the follOWing recommendations for the ARB and staff to consider: 1. Consider additional biKe par~ing. p~ss1bly in other locations in the downtown area, instud of proyidinS all the required parking spaces. 2. 3. 4. 5. 6. b: info-memo. 721 Allow the applicant to r,ursue a lot l;ne adjustment with irr!gular lot lines. Provide 1 to 4 additional dwelling units on-site with no additional par.king required. Prov'de additional street trees and on-site landscaping. further review of the parking entry gate design and the times at which the gate would be Closed. Rev; ew the height of the buil dlng with the intent of lowerlng tl1e overall he; ght if possibl e. ---.-''''~ .... --- Page 5 , o 7. Sf .illl.art!' of the nOl se issue from the adjacent commerci ii' t.!5r. plrt1cuhrly .ilt niQht, and review the project design to ,..fleet the ""t"ti.l CDnf1icts. 8. hrking sp~ce '6 100 '7 are nvt acceptable: due to the rt'Q4,,Ii;-e<! back-up to the street. 9. An in·ll~u fee of S23 1 000 for parking spaces not provided is iccept.1ble. AlW.YSIS TM pl iU'S included 1Fl your pld!t are UtE' Silmt! as those reviewed by the Pl~~ning coe.iss1on. The applicant has indicated that they w111 be rPV'Slng the plans in consideration of P1anning Commission c~nt5.. st;jlff r£>::'~i'1ds th.at th~ f~Q.8 cor.rnerlt. on thE' areas as indicated b,Y thE Ph~n\r,g f.~i$sicl'l and other o.re~s of concern to the ,a.RB~ and contlr.1.li' the proposai ~o the A,~gU5t 18, 1994 ME'eting to allow the i!.pphC~llt ~ddit ional ti~,e to prepare a re ..... iSed proposal and for staff h' r,;','le'" thl? rl2'ii~€d propo:;.a;I. b:inf_.121 Page G • ) ..... PLANNING COMMISSION STAFF REPORT .,-,~".;; .. -------------------------- PLANNING COMY.JSSION Palo Alto, California MEEn;';G DATE, August 31. 1994 ~ERSON STREET PL4,N~""ED COMMU~Tn' 20~F CHANGE REPORT IN DRIEF This repo-rt adJr':5~':" .3 rr"f' ~Jl ((,.r 2. P1Ji'J:cJ Cr.';!,;-;-;:!il!l., /._';~~ (.h .. u;,.:.-= :.:.~,j rt~'':':':~l tl) OlCJ:ep! pay/l!efl; of an Lf1·1'~u ~',l[Kin . .: fv; iL" J.t~,::, ... , th:.' fl'!\H:':",!!: 2) Constructiun of an appro'imalcly B.ll)) squm: ((,-0{ 3-'-ti_lry ml\t"d-'u.!'.oe ;,1rucrure, iocludUlg 1 residemial unil; 3) Provision of 12 on-site pani.ng SPA':/!$., iocl~ding 1\1,0 ~;t--lrcd spac.es f{)i the:: proposed residential unit. .substilct-Ion of 8 bic)'ck Jod.!!r5 (ex one pari:in, sp.1Ce. tOO parment of in­ lieu p3rkjng fees for 12 additional required ['W'king ~ DO! !'<"'\);,'ided; MId 4) A Certiflc.« uf Complim:< to >OJ'''' !hi: ,0< Ime be<w= 400 Emer><Jn S= and 412-414 Emcrwn Strtt, to accollllDOdJ" the p'op.-.sol DeW buil<Ilng and p>rkiDg. APPUCATION INFORMATION Applicant: Type of Application: CES ArclUt¢;tS & EngiDCCt"S 399 Br.tdfonl Sum. ,tJ300 .k.cdwood Cit)' > CA 94·063 (415) 364-6453 • P larmed Commu nil)' (PC) 7.0"" Change • SITE INFORMATION Property Ow!!'!r: Assessor's Parcel Nl1mber; Comprehensive Plan Des.igl18.tion: E.~isting Land uSC': Surrounding LaOO Use, Parcel Size: PreYious Planning Commission Action ..;-~~.-" ... --.- '- • Request to permil paymcn< of in lieu pa.~ f~ and one: sh.a."Cd ~ sp= 10 meet mpliretne<t<! for 27 parting ~. ~ith 12414 L"D-:;nc parking spaces. Applicalion received MaJcli 24 199:4; Revised IWlicatior. received May 6 1924'hWD& Lo! ~"jsed A1Jgys;~, Mandatory lCIioo deadline NQllL(legislAthe action). Ed Storm Storm Land ComFany 104 Park Center Plaza Sail Jose, CA 95113 120·26·04 and 120-:6·]·1 RegiQnalICornrr.unit)· Ccrnm-::-n:j,,1 North: Commercial Office East: MUnlcipal Parking Lot South: Restawanl West: Bicycle Repair Sbop .12 acre This application was conceptually approved by !be Planning Cot1IJtlisiion 00 • 542 yoce (Commissioners Carrasco and Bee<halll absent) on July 13, 1994. The majori!), position of !be PIaJ.ming Commission was to support the rrojcci based upon the publ~ benefits re--f-.ewed In ibc staff repon; namely the one residential unit, a public drinking fountain. and an a.rT n kOe. The Commission li.ccepled that the applicant provide 12 on-s.itc-parli...'1g 5p~S and :2 bicycle ~pa.ce<; (of !be 27 parking spaces required and lbe 2 bicycle spaces). The Commi>sico suggested that !be applicant pro"ide 8 additiorull Class I bicycle spaces (lockers) 1Il place of one: of !be remaining 13 required parking spaces; staff recommended me 8 additional lockers: be off-site in \ P:\PCSRW-OOE.SRJ.JA 8.131/94 Page 2 , I i I :1 1 I , • '\ --~-----.... the downtown area. Corrunission accepted the staff m:ommend.acit.n that the applicant pa)' an in-lieu parting fee of approximately $23,OCIO for each remaining parking space requittd. Aiso, the CQmmission recommended that the applicant considl!:f adding one to four units. of housing '0 the: proje<::t, without requiring additional parking for the residential units, (See the July 13 Planning Commission Minutes Ln packet.) Architectural Review Bo~nL Meeting On July 21, 1994, the Architectural Review Board (ARB) =mmended Planning Commission and City Coundl approval of the 400 Eml'rson Street plans, and the amendment to the Planned C01IlIl1W1lty rone, 'The ARB recommended that the project include Daly one res:idenrial unit, that some miner design changes he incorpcrated, and that the parking lot be redesigned. The design chatlges include signage, lighting, treatment of the north and SC'.lth facades. the color palette. and roof materiaL The ARB reviewed and accepted a revised parking lot design. but did 'lOt di.scuss the specific ali,gnmenl of the proposed new rot line, Tr.e architecl submin-cd a parking lot re--dcsign at ule ARB meeting, whii:h WJS appro"l"ed. Sl.lb.:;equC'n~ly. the applicant submitted the revi~J site plan dated S/3f94 that refllXlS the pJan approved by [he ARB on Ju:y 21, 1994. (See the July 21 ARB Mim.Hes attached.) ANALYSIS As e:\p:ained m the previous Planning Corrur..is~ion staff report and in the table below, this project generates a requirement for 27 parking spaces. Two spaces would be retained ae the rear of the subject site for use by the commercial facility at 412-414 Emerson Street. The appllcam piflpos:es to provide-8 bicycle ]o.:kers i.n~li('u of providing 1 of the 27 required parli'1g spaces. In the revised plan w.led 8/3194, the applicaru: added the 8 bicycle lockers or, the 4(X) Emerson Stree! site, for a total of 10 on-site lockers. Staff reconunends, and belie"l"cs that it was the intent of the Commission, that the 8 bicycle lockers be l{)Uoted downtown, preferably ae the Caltrain Station (see August 2200 memo from Transportation Division attached). The Transponalion Division has indicated tJ'I..at 8 off-site bicycle lockers can be disbursed in the downtown area. This would reduce the number of required parking spaces at 400 Emerson Street by one. Ilo addition to the 8 off-silt bicycle parking spaces. 2 on-site bicycle parking spaces <:ire required. The Planning Commiss.ion also discuss.ed reducing the o .... erall parking requirement by allowing 1 or both required rC5idemi;.1 parking spact!s to be shared with the commercial parking spaces because the need for ming the spa~e would occur at differeD( times.. Staff, however, recommends pennittiog onl.y 1 residential parking space to be shared with me commercial use. We believe-thai: th~ res.idential unit will require at least 1 space during the daytime hours. [f P:IJ'C$R\400E.SR3.;A 8/31194 Page 3 f / / • o only 1 parkl ~ gpace is cons idered a shared space for the residential use. then a total of 13 spaces mus< 1'< ,ovcreJ by the prupo>e<l in-lieu fee. 1 r2 parkinjj ,paces are considered shared ~. then the total number of spaces subject to an in-lieu fee would be 12. The Commission recommended approval of an in-lieu fee of approtirru;rely $23,000 per required parking space. Staff recc-rmmend..:;; that if the project is approved, language be tncluded in the coodirions of .appmvaJ [hat allows (or adjustment of the in~lieu fee based on subsequent adoption of. 4cwntown in-lieu parking ordi:n3.nce by Cit)' Council. In the event that the City adopts an ord.imDce within one: year after occupancy of the project, which establishes an in-lieu parting fee Ib&t i5 higber ~""n $23,000 per space, !he owner will be obliged to pay the difference ~ $2.~,OOO per ,'pace 1nd!be amount establisbcd by tIuIt ordi""""" If!be fee establi5bcd by <be ordillan<% is lower tIuIn $13,000 per space, the City would refund the difference between the $2.3,000 and the amount esublisbcd by the ordir-ance. The fmal antC'Wl! paid would depend em the uwnhtr of parking SPlC;:-S requi!ed and the in-lieu fee establiilied by oroina.I):(:, For 13 parlir~ sp.aces, t.l)e toUl in-lieu pa.rbng fee to be paid to the elty would equal approximately S:99.0C'(1 b.:({"R' the bu!lding permit for this project would be issued. PARKING REQUIRED '.-------I Staff's i PARKI1\G YARLIBLES ---r--Applicant's , Pro.,ooal I R€'Commeodation Tot.al Commercial S.F. 5.833·1 23 Re&id<DLiaISpac'" 2 per d.u. 2 1:.12-414 F.me"".'.~ I 2·" 2" ---------+--------- Suhtotal Rcquired 27 .--- mi."ULS shoud Te$idenJia/ -2 I mil'WS 8 bike ioeJ:.uJ -I Roquind Parking 24 lParldDg Oo-Site 12 TOTAL ItEMAINJJE R 12 • Parbllg reql.lirC'rne!u.~.l.H 1 p::tcl\jr • .;: ~-p:l.;:e per 250 sJ. commer.:i:!l spa.ce in Lht downto'ili'Tl a~ea .. Per l~m di~rict r~qOJiHr;,=;]H. 1 parl;.ing ~a.::cs mList he: maim.a.iroed for use by oo.--upanl3 of'lbc pr()pcn~' aI411-414 Emerson StroeL 23 2 2" 27 -I -1 25 12 13 \ P ;'cPCS.R"'400E. S RJ.! A 8131194 Page 4 • , -i"- '::~.i!,,' . < ;.,"- I I i ----_ ...... _---_.-, '-- TIle apphcam has re"i..s.ed the part.i~ ~ LayOO! &.nd show:) a rt' .... ised lot line to allow the 412- 414 Emerson S'ltt' p,,,,:<I.o rnainUm two porting ~ The proposed 101 lin< jogs east 35 feet 011 the 1a.S1 17 feet of the south property line to ilCWmmodate pad:iTl8 space tn. Since the additlooai iand are;, i~ rK~ re-qui:red for lot C0\-'erllgc: or t-AR cakuJations. staff recommends that the lOT line be ~jgtll lhrl"l\Jgh IDe middle of ~ sp.KC tfJ, Adju')tment of the lot line can be made-through the Certificate Df (ompJ LaD;(: procedure. wd iii pennanenl accus agreement prepared AnJ ["C(onkJ th.1t al1o'l1l'S Ki:-C"SS \0 "12----414 E.mersoXl: and the sh.a.ring of parking space 16. The CenjrlCJtc of Comp:i.aIlCe proc.e..<;:~ must he completed prior 10 submittal for a buiiding permit The-aprkant rTl .... r • .-,~~ n: '.'THile \C'h;~'lc r3rtin~ spsces Of the 12 spac-.es., j would be cemr;;''':-I, t,!.'h'?rc 1h:, ·_'t,1t1':~r.-:e .. Nl!.1 ,:rl!.~w 1~,.,Jy 2..c;c;: .. (If :l. s:ra..:e'S. \0 be <:ompact. Ir.l' C\lrNni:-:;i\',~ h~' '~J~,J ~h_ct \!-.-: -,p'k-:!1i \.<.'m~J;;:r poviding mort' hOIlS.lng units. at a 1::5-:-c: ~'-1u;::re It', '.;!.,~, 0:;. :, ,1\.',] if;,; ,-,:~,; L'r~'~ ',21,:[ r'r,_·{,.-.,;~,L n'L: Cumlnl:siOfl [Ioteii the need feT ~d,jii:kl!l.;d !1,.',:J'in.~ l.J~i", J.C'".J lr:.;,? !1l!1L,~J "jJe"j rar"lIlf: reqi..ltr.:mem. rr,~ / ... RB recommenCed thaI the: projeLl ill..:hiJt' l:r)c j .. ~~JcnliJI UIll: The ARB re>..-('IT"li'T1t!ooatit'n wa..;; based on Ir.e need to rco-de5ign (I.'mrr.~)n arC".1S (Hdtr',n:!ls 4.00 t ... Jlways) , the dt"~ire for up-scale units in the dO'o\n((l·"'[l lTca uJd (he ir~r~J...<.eJ defi:::t-en.:)' tfl p4T);ing !.i14! would accrue to added. residential Unlts. The app!ic:m! hj~ t':~;rtes.$¢d a slrt"ng dc~irc tl) have only one residential unit. Because of the in.:'rC'"3~J P..l";';;-Li! n·".:Fllro::mwt t.'1a1 Can~)l ~ mel if mort hOlls.ing un'B v,ere added, staff rec .. )mmo?oos !h;1l tl1e Pt\jt'(! In.:-NT"'Jr<lte (iDly (,ne resiJc-n!ia: unjt. The-puNk an ruche G. prop<..>5Cd !O dis:p1J.y a .... t ob}ec!.s. in conjunction with the Public Arts Commi~ion TIl(-3pp1i':;UH s.h.all ~bm;t <k4'..llls (}( t~ ruche. which s:hall be de-signed to provide secu;iry for the a..'1 obje-":I(s) Ji...::plil)'ed f{1f public ... ·le ... ' to the Publk At1s CQrnmlssioc and ARB for ~\'icw and 2pprm·.al" The re\"is.::d pl~~n in.:.h'::.ile, a planrcr or, e.ach sidr: of the p.2rking 1m entry to enhance on-site lAndscaping and pr~)\=Je an unobS.LructeJ ,'~ew for dri."ers. exiring onto Lytton Avenue at all times. TIle July 8, 1m s.tatf repon: remarked tN.! the proposa:J decorative wall between parking syact10 #1 and f/2 cL~IJ br.! a s..JfeiY prutll:fIl. bec.aLlS(: i! acts as a visual barrier. Staff 8/3Ii94 Page j • '0 recommends dmt the par'king lot decorative wall Ix ,.onstructed to permit Y~ibij[ty .all the ~~)' to t!.>e far wall, where the sooth stz.ir"Ne II is Ioc..ned. Pianning Commission and ARB also re\.!uc:s1ed that the: ilppl~m plant strut 1I-ee5 .Jc:mg: LJ'ttOn Averrue. As a condition of approval, a compkte laralsc.a.pc: p;W to; the ~it': .ll'}j fer 5U"Oet ~ 21cng Lytton A'\Ienl.le must be submitted before flmi appro,,&! by \he ARB ls gn.nteO Tht-1\mJ plan will return to the ARB to Tevi("w the app!~'s on--site I1ndscaping,wd street U't'!CS The applicant m1,.:st apply for :MI ameodruc:Cl 10 the: we permit for F.t.n.'1)' and Aleu...odcr's restaurant at 412--414 FmefS<2'n Street. Access i~ s.luil be re .. JC1I\>ed b) tbe Zon:ing Administnl£or. due 10 rht:-appl kant's proJect at 400 F.mt:'f"Y.In lbe new prl)jo:t \':h&r.ges thrt property dimensions a! 412· .. H4 Emers.JrJ Stret:t. crearing a I1eI!d fe·r 01 n£-ht (If .:KtC$.~ acfOS.'$ the rear of 400 Emerson Street f'.lT ;u.:cess (0 &..e rear of the 'Site. l;')(> 1 rari.:ing .;r.a..:.ei, U"ash ef1(;io~nm:., as well as police ?r;ti file eJl1.er~nlCy ;i;;-.;e~~ Prl{.lf!d i:,-:>uar~:~ of J B'.!i~JLr.~ Permit, the applicant will ~ required [0 arr.!"(tU tn.: CT,lstLr.g lr~ PCIT:lil fl~r ~ 12 ~ 14 Eni':~-"'Jn S:.ret'1 through <i ZCfl1ng t\<iministral;..\r h.;:;..r\r::,; ;l.~ijrc:,sm~ \-·r.\, t~ :l.1:--;>H \~~I":~~ The applicant proposes to cnmIr.er...::e c:)n5-tru..::~ioi1 this. Jail. cl1mpkt.:: rhe ~i:JI.i';::Urt: by 5"prirl~ 1995, and have tenants oc(,':upying the 'QIJilding DJ end cf st..:.n1lT\C'r 1~5. Demo1ilicil (,)[ lhe existing structure is scheduled co occur in Nmen1x-r [994, foUoy"eJ urur~j.a.td)" by building Construcilon lhrough mid-Mil)' 1995. Con.struction should be complete tl~· Sc-r~em'""cT 1, 199.5 1be detailed proposeC: c(mstructic:n ~hedu1e 'nilS submi1tcd with the July 13 Planr-.mg Commi~ion Mal'l repr.ln. Environmental As~_~,~m_c:!.iJJ Tbe attached environmental assess.m.-:nt prep.ared for mi.'\; projet'1 fjnds I...t:..il il will flO( rewh in any signiflCaDt impaClS. Staff recommends adcptkm of a rteglti'lt! dccta..""1IloG. FINDINGS Approval of tl"'.e requested Planned Commu..n.ity Z01le' change requlft:S that the following tindings be made. L Site. The site i~ so situated and the uses. prop<..lseJ. for the: _~iT_C are ~l..Ich tha, the application of the general and the combinmg disuict CD·C(P) (Corrune~ial Dov.1],[OYlon Community, \ P:\PCSR\4{.(JE .;") .. ..3 JA 8dli94 Page 6 .. -'~ r I ) --............... _,"' ... _ ........ _ ..... _ .. __ ... ~m_ Pedestrian 'Combining district) does not pro,,;de Ihe flexibility to comtruct an 8,110 square foot mixed use building wiL'l tlle required nu",be, of on-site parking spaces (27 ~s). 2. Public BeWit. Development of the site under the Planned Community district n:sW~ in pubtic benefits not ot.~rwise attainable. Public beoefLts that the applicant is pr"Oyidio,g include (1) one residential uDit on the third fioor, (2) 3 public drinking founLai.:J. a.nd (31 a secured public art nicbe. born on tlle Lytton Avenue facade. Below an: the sW'f recommended public benefit findings: a. One resIdential ur,-i( is provided in addition to the colIlIIrT't;ial 1J.SeS. Tb: Comprehensive Plan and <he Urban Design Guide support mixed use. This preccdenI may stimu:ale more mixed use proposals in che downtown area. b. The public drinking fountain and art nkhe aTe consistent with the Do\\'1"1J:OVt."T1 Urban Design Guidelines bOC:lUse the)' provide pedestrian viability to this ·:-OTTlf'f. 'The appiicanl will maintain and service a drinkillg foumain that will be available for lbe 24 hours per day, This is a service that City ~uff would not !u.:ely t'>l: able to du.plicate. 3. Comoreheo1'.ive Plan Qoals. The: site dei'elopment regulations applicable. iJ1(;~ucting office. retan, and residenti.al uses in a mLxed use structure ar~ CIlrLSlqerV wiLl) the f .. ,!lO·,:,'I.Eg Palo Alto Cornprerlcn:sive Plan gO<lh: "Maintain at lea:;! the present number of multiple-family reiltal un.its. \\!hije wor'bng to lJ'.crea.s.e the overall sUPJ')ly of rental housing." "Support the mixing of residential uses in commercial and indusulal 1lI>"..4S ... Pmgram 33: offer incentives and mitigate disincentives. c. EmptQymerit Policy 2 ~Encourage the construction of more housing primarily on OJ near UJdu..qri,a] and commercial sites.' P:\.PCSR\400E.SRlJA 8131194 Page 7 ........ o d. Em:.imnmcmal Re$OYrce~ Policy 13. Program 43 ~Mitig.ale impact of air quality problems due to stationary and vehicular sources. Implement programs to reduce total transportation related emissions through the development of add ieional housing close to employment centers. " Planning Commissjon Action Per the requ~ments of the Planned Conununlty district regulations, in making a retOlI1llleMa';OO to the City Coo",,;1 on the proposed Planned Communi!) designation, the P1a.nni:ni Commission is required to make specific. determinations regarding the project in suppon of the zone change an::! to revIeW: an environmental detl"nnmalion; a s~if:c-development program ~tat.emelJt; a development plan; and dl!velopmen! schedulc. Tnese documents along wllh '[he recommended conditions of approval form the tasi.s for the site­ ~pc-ciii\': n:gulations to be applied 'Y:ilhin the propo~d Planned Community zone district. Docun:ents th;at are incomr!ele are cited in illt,: COndiLklOS of approval. The environmental detennination is attached. The devdopmem ~hedu.le is alta'..:hcd to lhe July S staff report, RECOMMENDATION and CONDITIONS OF APPROVAL Staff n:c.oUlinends (hal the Planning Commission approve the approximately 8.100 square foot. 3·stof)' mixed use shucrure :>ubject to the fOliowing corxiitions: 1. A Cenlflcate of Compliance r;howing tt')e lot line adjustment shall be submitted for approval to the Public Works Deparunent. A condition to the lot line adjustment shall include language permilting pennanent access across 400 Emerson to the rear of 412-414 Emerson Street, that shall be submitted for approval to the Ci.y Attorney before the Certificate of Compliaoc.c is granted. The access .shall be granted to the parcel at 412-414 :E.menon Street to reach 2 parking spaces, permit deliveries and trash removal, and for emergency access. P:\PCSR\400LS R3.J A '- -~-"''''''---'''" ~ .... '".-. ~.------.. .,.....-.. ---- 2. TIll: apphcan: Wli apply for ~ amendment to fbe existing Use Pennit for 412-414 E..mersoll Stn!e1 tJuoogh iI Zoning Administrator hearing addressing the foliowing issues: ~ ill property di.nltrt'iioRS, pernunent access across the rear of 400 Emerson Street to reach tl),e rear (..It 412·4 14 Emerson, on-site parting spaces, trash enclosures. and to prov Kie police and n re emergency access. 3. Appb:.m: ,b.all ,!>ow proof of s..nr. Clara Valle)' Wale, Distric"s a=~ thaI !he proposed development aBd construction ",;1! not affect any :site remediation for removal of an underground storage tank. that oaurred in 1986 am will &.SSUIne feIIY.)val of 2 oil­ assisb:d hydtaul;C hoists. in the existing st:J'UCture on the sUe. •. T..-e1¥< paricing sr'''' (of tho 27 required parking spaces) and 2 t, :yele lockers sball be pro,r!ded on-slie. On:: residential p.arklng space may be shared; ODt; equivalent: parking ~.e wI! be if] [he form cf 8 bjC)'.:le lockers located off-site; and 13 additional parking ~c"e;'.:He 9.lh.ie-~llLI an in-iieu p.arl:.ing fee!O be paid to the City. ) AprJ1-:.a,,: _-1):;.11 ":I'<'r~iin,~!e ¥. ilh the City':; Tramp,)ft2tion Di\'15ioo to designate the location ,,'" g I,cf !f.t' ](I} r<c'~'~le l,"-=ker~ where appropiiatl! in ti'le downlO\Yn area, Fir.:a! design of the h..::",:k 1, ;'\:<':[, C:d: l--e ,utlm1,teJ fll[ approval by the Tmn .. <;;portatlon Division and the .\RB. 6, [)",[ai! .. ; ,'If de~tk'~ri1,'~r;t pl.;ms s~.211 t-e submin\!1J for approval by tbe Aim, i.ocll1ding the f~'l1o,,,, .. iTi~: rr0ix-reJu":-lir)n rl<tn. sign,age, ligh~ing, north and .south wail facade changes, co1cJr pak-nC', ;lod Hl<Jr material 7. The parking lot {i.;coralivt! 'o'\'ail s.r-.aJ1 be constructed to pennit vi:.;;joiliry all the way to the fa; -",,'::ill. \/where' Ihe south stair.\'el! i50 IOQted, S Detail!; (:1" the an nid\C and me proposed an shall be-SUbject to review and approval by the P-.ilili<: Arts Cummi:..siu[J (PAC), and the schedule for review shall be-included in the final ~ilc: dewiopme:11 plam .... ubmltted to the ARB. If Lbe art object(s) is Ciry-owned an, the Ollr-neT sr.all enLer 3 Ilo.kj harmless agreement with the City. 9, Appl i:car:I! stu; It pronde space on-sire fOT a padmount transformer fIrst verifying the location or the eleclTic ,'aull with the Utilities Department The flnal design shall be submitted to ARB for appro",':'!. 10. A fL'1.a1 l3lldsc:l~ pbn shall be submitted for approval l:Jy the Utility Energy Services Di\'lSiOTI. Pllr.j'1jn~ Division, Public Works Department aIXI ARB, a. TIle plant~f at the parking lot's east exit shall be inscalled to permit an uoobstructed ,,"'iew for drivers t.·:l;.iling onto Lytton Avenue at all tlmes. ____ ._,_,. ...... "'''''".'' ...... I_~_, ____ ,_ b. The frna"i lan<.1,\cape plan sh.all ia::ludc a c-omp!ttc PWlI Jls'ting indj,Q,ting qu.a:ntlty. location'i, type and size of plmts ilnd trees. l..ITit:I!.k..""'I(i ~hedule. fence loc.atlons. and ~ details. 1 L A streetscape plan showing i!tl proposed plamifliS., tree irriP.lOO. street lighting cha:nges, aod any other dlallges snail De s-ubmltted to ARB for 'Wro ... ·aJ a. 'The .streei tree 'PLan shall fl.ISl be su~ined tt) [he City :'rborist for ~ppm .. 'al. before the fiozi W!ds.capc: pliUl i'l. c:~ for CifY depl.rtmenu.1 rev~w m.:I ARB review and approval. b. Any ~ lighting: ctung.e-s ~l be submined to Vtilities. Public '\l.tooo, and tile Planning [)(panrm-nls. prior to ,WE l'\"yie'llo' 1M 'ppro'" ill_ 12. A fmal giddlng and drairupe rur: ¢.a!l he $"cIrmi[L.~ for arr['\1~-ar by the Public W~rks Der"mrnen< 13. Applie<.i1l ~r::o!! f'.l:. n--;.> c,;, .ir! :r·i·~:-:,i j'l!I-,Ji ,:.. k, '.':-~n.r))J i ... 'r ~f'a~c, based on t.hc nu.'11coer (If r\:Hkir,~ ~f',":'> rt.',.(.mt'~1. ';1 :! i';:C i,i I r'.,r':i~:.: ~r,k( f·)f ,:_:t . .:i1 25D :...l.LL-HC feet of gnJ~~ tl(.-xJf an:J.. ll;·:, leLi] fto: j" r:~i~m<itN \;lll\': SlW,())J r..>.s.eJ (~n (M 13 spaces IhJt cannot be pHl\:dc-J "jj-site. Tni~ am;.:,u,nt iTl.(. \'oHy t~"'fJ (In linal ccnHNCtlon mea5'..J.n:menl'i. !n th~' ~' .. cn! Lhi: Cit) aJ0pi.5 iIi ordiaaoc..r: "'lthin ODC'}CU after occupaoc)' of::he project. "'hich t:"S12bh<;t'.e,~ an il"J-i:ieu p.;.rk.i~ fee th.lt i_I, hi.~tleT than -S13,OC)(} per space, the owner sh:lll P3Y t~ diff:;,l't1');(' be!':.4ecn S23J),») F"!r spac-e and the amount established hy rhe ordll~:.n.:e If the ret r:sta~l!~hc'd t,.\' the ordin.loce is lower than .s:n,lXXl per spa!;;~, the CilY \;'ill rcfur.d Ihe differtnce be,ween the sn.OJJ ?oo lhe amount established by the ordil\auce. 14. A constr'Jction plan ~h311 be submitted for aJ-"rm'-a.l by tbc: P..Jblic Won.s I.)epartG:icnt and Transportation Dj~'isil)n tl"'.aI addresses the 100000tion of e.o-nsttu<.:UOn saging areas, tr.i\'el rootes fur constru.:rion vehicles, fencing of the ccns(J'ucL,<:-n site, Jl pJ.an for keeping t.be street·;; and sidewalk!> fret: (J f din a.'1d l~ cv~ioo debris as vreU 2.S all other iSSt.JeS deemed necessary by the Clry to provide: for tbr pubi~ s.a.f~)' and to rMace impaI:ts of construction on ll)e surrounding a.-ru. The plan sha.U ilXtude provisx>m to k.cep the streets open for yehie les a.")jj pedestrians., 15. UtiHty \0<1.0, ~l'li!(l~ ::.hal1 be ':-'Jbl.li~\terl fm appr;y,al by the I.'\lihtle~ Dep<\l"tl!Xnt's Water-Gas.­ WastewareI Engineerin£ OivLSion and the:: Cit)"~ Cross Connec(lon Comrol Inspector. P;\PCSRI4OOLS fU. J h 8131194 Page 10 I ! • , 16. An Encf();j~hIllo:nt PI..,---1l and Street Work PCilllit st-.. a.H IX o .. ~ from tho: t"'ubl~ Wori:.s Dep.artment prior to any work in the public right-Of.way. 17. lmprovemeoc plans for all utility conruuction shall be submit'~ fOT approVIl by the Utilities Depanmenl. Public Works Depanment and the Inspection Service Dn"""". The plans shall inc tude a separate water serv ice ;;.nd meter. a he"",' gas s.,.'"T'\'")c:e line and a separate s,e',ver lateral to serve the residential unit. 'The water utility poinr: of sen1ce shall be at the sidewalk. Backflow prevention into the public Vl7I1er supply shall be pro'\lKied. The sewer lateral poifli of service .\haH be ilppro\led by lhI: Publ'ic Woru Depanmenr and Insper.:1 ion Sert'ice Division. Dwing Co."lSlruction 18. Tn order to reduce dust level:\' during constru.;tion, e~posed e3rth surf~ mati be-wmred frequently. with reclaimed water. during the late morrung a.nd at the enj of tile dly. "'im frequency of watering Increasing on wi:ndy days. SpitJage resulting from hzu1in& open:tJ;crm aloug or ~cross any public iJT private prorem.' shall be remQ\'ed i:mmo:hl-te!Y.1t the expense of the OW!l(,'L Dust IIuisances originating from tlH: cnnsLlKticm or<-r.uieru. either mskk­ or out~jde ~)f Ihe rlghH):-WiiY shall he c,mi.Iolk-d at the d::-vel['fr-er",~ ':lpenr,(', T'h;o jn..~1 fC"!i Services Division ~ha!l monitor the d~ye!ore(s aUSI control opo;'fiiti,)~ '':'''ilr.'1 r0~( j0 ".,xl: on prlY'3tc propcrr,"; and &If Public Works Department sh2:l1 rn::n:!'Jr tJ""': r!~ ... ;:iC!rer'~ du..~ control operations wi\h ff:!:spect!O .,:,ork (tTl public prop<:rty. 19. The developer ~halt require il~ contractor 10 in;':Grp0nk be.-! rT:a.fL??t'mer.! rra~tk('s; {BMP's) for slormwaler polh.Hion pre,'emion in all constnJct!o!1 OpeTlt!Of.S, in ~~on.formanc..= with the Santa Clara Valley Nonpoin! Suun;t'· PolhHlon Concrol PrograITl. Tnt'In.spe.i.ion Services Division shall detel'ITline BMP's will) le .. ~-e.;1 to Ltx: dt:-,.doper's c.orlStJUCtion activities. on private property; a,n-j the Public Works Departrr'..:nt shall OetermirllC:' B~iP·s. wiLl respect w (he developer'; construction actjvities on puh!i::: pruperty. Priar to Occununc;y 20. The parking 101 entry gate shall be electrotlli;.al!y operated, and eq>.lipped with a Kno~ Key Switch to aHow Fire and Police services to access 00th 4OO.and 412--414 Emerson Street at any time. The parKing lot entry gate shall remain open durin8 oormai bwines! Oours of 8 a, m, to 5 p. m, Parking spaces 114 and #5 sha I) be signed and perm1llt!J1ly rn.aQe available at .11 hours of the day and nighl for use by the ocruparllS of 412 -414 Emcnot! Street. 21, Bike lockers shall be insfalled, wifh 2 on-site bicycle lockers and 8 off· site bicycle lockers, as de5igruHeO by the Transpcrtatilm Division, preferably .11 the CalL'"2.tn S(.aticn ~n Palo AllO. 22. The applicant shall provide clo~ure docu.mentation to the City from Santa Clara Vaney Wattr District related to the underground. storage: tauk. and removal of the '2 oiJ.-assi:sltri hydrautic hoisis.. P:\PCSR\400E.SR3 JA 8131/94 Page II ad 7 16. Arl Encroachment Pt.:")t and Street Work IJ1;rrnit slull be o'"~d in.HIl ll)e Public Works o......,anmenl prior to any work in the public nght-of-w·ay. 17. ImproVeJnelll plans for all utility construction shall be submitted for appro..,·al by the Utilities De::'3rtment, PublK: Works Department and the Inspection Service Division. The plans shall include a separate water service and meter, a new gas serJice line and a sepante sewer lateral to serve the residential unit. The water utility point of service shall be at the s.idew<ilk. Backt10w prevention into the put.lic water supply sball be: provided. The sewer laTeral point of service shall be approved by the Public Work..i1i Department and Inspection Service Division. l8. In order to reduce dusl levels during C()Ostnlction, exposed earth surfaces shaU be watered frequently, with reclaimed w:lter, during the late mor.Ung and al tile end of tile day. with freque ocy uf watering increasing 011 Yo'indy days. Spillage reSllitrng from hauling operations along .or acros~ any pubHc or private property shaH be removed irr.mediately at the expense of the owner. Dust nuisance!l originating from the construetioo operatioIlS, either ilL'iide or outside of the right·l)f~wa)' shali be controlled at the developer's r:-xpe:nse. 'Il1e Insp;:ctioD Services. Division shall monitor t"e developer's dust control opo.!nltions with rupeet to work on private property; ::nd the Public \Vorks Departrr:ent shall moniwr Lhe developer's dust control operations with respeet to work on public property. 19. The developer shall requile liS contractor to im:orJlorate best IT1.anagement practices (BMP's) tor 5tOrTn'A'ater pollution pre .... ention in all con.structlon operations, in conformance with the Santa Clam Valley Nonpoint Source Pollution Control Program. The Inspection Service$ Di','ision shall determine EMF's with respect to the developer'S construction activities on private property; and the Public Works Department shall detennine BMP's with respect lu tile d\!veluper's construction activities on pl.lblk property. Pn"or 10 Oc,'upa!JD.' 20, The parking lot entry gate ,hall be electronically operateO, and ~ipped with a Knox Key Switch LO allow Fire and Police services to access both 400 and 412-414 Emerson Street at any time. TI:c parking lot entry gate shan remain open during nomnal business bout'S of 8 a,m, to 5 p,m, Parking spa"'" 84 and #5 ,hall be signed and permanently nwle available at all hours of tile day and night for use by tile occ'Upants of 412-414 Emer<on S~!. 21. Bike lockers shall be installed, with 2 on-·site bicycle lockers aod 8 off-site bicycle lockers, as de.s.ignated by the Tran.sportatioll Division, preferably al the Calrrain Station i:n Palo Alto. 22. The a.pplicant shall provide closure documentation to the City from Santa Clara Valley Water DL..,[rict related to the underground storage tank and removal of the 2 oil-assisted hyJr.~'Jtic hOLSIS. P :\PCSR\400E.sID JA o 0 Report Prepam:! b,: Joyce August, Coutract Project Planner Divi<ioo Hood Appro".I: JIM GILLILAND, Assistant Planning Oflkial and LISA GROTE, 1..onlng Administrator for NANCY L VTLE, ewer Planning Official EnvLrumnenta.I Impact As . .r,essment Groinln<:e Loc&tioo Map Excerpt ARB Minutes 7120/94 Tramportatiotl D!\'"ision Memo date 8/22/94 Planning Commission Scaff Report date 7/8194 (Planning Commission members onty} Pi.ins (Plan. .... ing Commission members only) COURTESY COPIES: \ cc: Mr. Tem GilrnaiL U;-i.S Architects, 399 BnH:Jforu Sl"fft. #300, Re>dwood City CA 94063 ~k Ed Storm, Sturm Land Company, 104 Park Center Plaza, San loS( CA 95113 Mr. Doni Mal:~i~. P.U. B.:>x .~097, RedwO()(j City CA 94063 Sant~ Clara V,1Ik), Wt:i1i:'r Di~!rict. 5750 Almaden Expressway. San Jos~ CA 95118 Li~ Grote, CiLY of Palo Alto, J.!lanning Divis-ion Jim Harrington, City of Palo Alto., Public Work.s Engineering Dave Soemdage, City Amorist Marvin Q",er\l,'ay. City of Palo Alto, Transportation Divisio!l City cf Palo Alto, Utilities Water-Gas-Wastewatcr Division Fred Herman. City of Palo Alto, Inspection Service Divi&ion Dorh M<'oei:. City of ralo Alia, Fire Departmeol Ph]J Constantino. Cit)' of Palel Alto, FiR Department Public Arts Commission Arcruccctllra! Revi",\li Bcal"d P:\PCSR'.400E.SR3.JA 8131/94 Page 12 -----..... ". " • ORDIJl.\.."iCE NO .. ORDINANCE OF TKB COtJNCIIJ "O"F'"""THS='-Ci"TY OF PALO ALTO AMRNDING SBcrION 18 .DS .~, .. O Ot<' THE PALO ALTO MUNIer PAL CODE (TIig ZOlHro MAP) TO C"rtANGE THE CLASSIFICATION OF PROPERTY lrnOWN AS 400 EMERSON STRRA--r FR~ CD·C\P) TO PC WHEREAS, the Pla..n.ning CQM'ro.ise ion, after duly noticed public heoriog held August 31, 19~4, artd the Architectural Review Board (·ARB8), uoon consideration ~t its meeting of July 21, 1994. have rec~nded that Section 18.09.040 (the Zoning Map] of the Palo Alto Municipal Code be ~cded as hereinaft~r set forth; and W"tiERBAS, the City Council. after ,jue conside:t"ation of the rec::.Jll:::iendatl;Jl1s, finds that thE: prcpo:3e-d 3:.."'!'end"nent is in the public ilit~re5t_ o.;":.j ;.·i~l pr~_.:)te tl-.-e p ... bll.c r.ealth. safety and welfare. ~~~~W, ~:-:·:;'?E?~_H<'.~, th,~ CC"..lncil 0£ the City of 20.10 Alto does C}RDAI:'i ?,:;: t c'L~()' .. s: .S: __ ~_'';:::::.tC:_~i __ i. 8::-cticn 18.iJB.{J';(1 'Jf th.e Palo A!to ~'~unicipal Cc::," , ~~bE? '~:"2r,ir"3" :--~;a.p," .~~ r·eTE'~ly .?i_;"'endt::j by ch2!nging t}H·" zOIlin9 of Ce!-:",li.r, prq::c'fl), knc .. "'l ~s .;;uo 2r'"·e:rson StI·e.=-t, (the "subject prOp'Tty') f"fr)7"" aCD-C'(Pl .L.'c)"'7JtO"JI1.l C-c.::-;:ne:r-ciai Pedestrian Corrbin:i.ng" to ~FC f1an.p--e-d Co:z:-;-,..mity. ~ The subject property i9 sho-wn on the map labeled S'x..n:ibit ok-, at.tached h~reto and incorporated h=:reil1 by reference. SEC-rIi-:N.2, The Ciqr r:cllf\cil hereby !inds with respect to the subject property that: (a) The 9 ito: is so situated a..i;d tIle uses proposed tor the site are such tha.t: e-he application of general districts o!' ccmbining districts will not provide sufficient flexibility to allow the proposed d2velapment. Neither the CD-C(P) distL'ict nor any other district vill pr0"Vide the flexibility to construct an 8.lle-square-foot mixed use building wi~h the required number of parlting spaces (2'1l on site. (0) Developcnent of the site under the Planned COD"u:r.unity (PC) district l:esults in public benefits not otherwise attainable by ap.plication of t.he regulations of general districts or combining dis-crict~,. Publ :i.e b&nefits t.l~at the appl icant is providing include: (i) One residential unit is provided in add.ition to the cormnercial use. The CClI'ripreb.ensive plan and the Urban Design Guidelines support mixed use, 'J'his precedent rr.3ly sLimulate more mixed use prop~salB in do~~town, (ii) A public drinking fountain and art niche, ~hich are consistent ~ith the Urban 1 • \ --"~--"--,>~---... -----..,; .. ' ;:' o ------.-.. -.. Design Guide].. ines be<:ause they pro-vide pedestrian visibility to this corner. The owner of the subj eet property 'lti 11 maintain and service ~ dri~~ing fountain that vill be available for use 24 hours per day. Thj 9 ia a sen.-ice that tbe City would not li~ely ~ able to d~plica~e. (e) The uses permitted, and the site development regulations appli.cable withill the district are consi"t~nt ~ith the Palo Alto Comprehensive Plan and with existing and allo~ble uses in adjoining sites and within the general vIcinity. The project is consistent with Housing policy 6, Housi:cg Pol icy 14. s:cployment Policy 2, and Bnviron~~ntal Resources Policy 13, Progr~ 4!. SBC1ION.-.J.. Those certain plane prepared by DES krchite('t~ 51: Bng.iueers, entitled ~4QO RmersDn Str(,l'.'t,' date:'! "'.arch 21,;, U9t.. and revised Ao...:gUBl 3, 199~, :_H·~,j appro-..-e,j: by t~if: J._!"-:!iii_-2ctura_l Review Board on JU1:' 2(:, 199';', a. (,.:p)-, ot .. hich p~ans is c;~ filt~ _in the Planning Divi~ion office, and to which ccoy refer~i:c8 is here~y tnade concernir.g trle full parti:::'Jl:'l.cs rhen<.'f, oir--:? 'r:e:-<;'t.y arprO'.'€o as the collective Develcp:-'"'enl Pian fe'I-thE sub:;c:t [~:-'::~~':;,t-ty, pu:rsua~')t to Sect ir.)n 18.68 12,-). $·"id ['''-~vE'l,::!=,_-"",t r-'~.fIn i:::: ap;:;o'.'~ci for the-foli'Ow:i.r.S \lSeS, ana. s-ubj<:ct to t'r,,:' !1)_; __ L,:"",i';'J cc·,~1itic:,:-l.s: (a) PennittSc::i~. Th~ use sr.all be lir:,il.ed to on~ residential unit and approxil!!.ately 5,83-3 square feet of c~rciaJ uses. The allO\iable u.ses shall b.e these a~lowe,j in thE" C"D-C(:?, District. (b) .Q.Ql]Qitioual Uses. TI-,€ al1o'll'",ble CC:1dic.':");-laJ usec'J S'hall be those conditional UAe::; allo",ej in thE' CD-elf) Dist.:rict. {c) S.:it~ Df;velQ[)(!t!!nt Reg:~l~t.i..Qllil. The site develo~nt reg'..llatioDs shall be in ac.cordance -wiCh the De-v(:~lopm€nr Pla_fl. (d) Parking and Load1!19 fi;"'q-Ldrements, The load.ing Pla..a. Th2 requirements shall be as shown in the r>e...-elopment paT-king requirements shall be as follcW1!l: iil A total of 12 on-site parking spaces shall be recr.lired < including one space specifically reserved tor the residential unit, one space to be shared between the resident ial and Co~:n: .. ial uses on the subject property, and two spaces {.4 and '15). to be signeU and specifically reserved for the exclusive use at all times by occupants of th~ ~djacent property, known .;l.S 412 -0114 merson Street, Fi.ve of the spaces !Tal' oe COI!'~ct spaces. The vWIler of the subject property shall gra.nt to the :.:eal property at 412-41-4 Emerson Street, l.n a torr" satisfactory to the City Attorney, the 2 • (ii) (iii) .. ' .. j~'. right of access to, and che exclusive use of, two designated parkiog spaces located on the subject property. As part of the parking requirernent ~o:r­ thie pI."oject, the o-.mer of the subject property shall provide ten Class I bicycle lockers, two of whicb shall be located on-site and the 0therB placed in the downtown area, as determined appropriate by tne Tra .. 19portation Division. Final design of the lockers shall be submitted for approval by the Transportation Division and ARB prior to building permit application. AC'.tual provision of the lockers f;1hall b€ completed prior to occupancy I:)t the project. In accordance .... ith standaI.-d 'C"irkir.g requirements of one parking spac.;~ p€'r 251) square feet of co:m.erci.,l space .in t.hE­ dOW'Tltown area, two spaces fo:r '23..ch residenU.al unit. the noo:rral !.-equi "tej p~rking for chs pt"oject, base.::l on an estimated 5,833 square feet of commercial gross floor area, would be 2S spaces. {The two additional spaCE'S for 412-4.14 Emerson are required due to a lot line adjustment between the two propertiE's.) The owner of the subject property shall be cradited .... ith two parking spaces, as follows: one for the bicycle lockers and aIle for t,he shared residential/ccmmercial space. For the remaining required spaces, which is estimated to be 13 apaces, based on the estimated commercial square footage, the owner of the subject property shall be required to pay, prior to issuance of a building permit, an in­ lieu par.king fee of $23, COO per apace, for a total of $299 J 000. This amount may vary based on final const=uctian tr.easurements. In the event the ("j ty adopts an ordinance within one year after occupancy of the proj ect" which establishes an in-lieu parking fee that .is higher tha.n $23,000 per BpaC~. the owner shall pay the difference bet-ween $23,000 per space and the arr.o"J.nt estab­ liahed by the ordinance. If the tee established by the ordinance is lower than $23,000 per apace, the City will refund the diffel.-ence between the $23,OeO 3 o o per space and the amount established by t.he ordinance~ (e) Spec ia 1 Requi rement,B . ( ij (ii) (iii} (iv) Prior to applying for a building permit, the owner of the ~ubject property shall apply to the Public Works Department for a Certificate of Compliance to evidence the proposed lot line adjustment between the subject property and the property at 412-414 Rrnerson Street. Ao a condition to the lot line adjustment, the owner of the subject property shall grant to the real property at 412-414 Emergan Street, in a form satisfactory to the City Attorney. a right of access to and across the subject property for trash removal, deliveries and P,!Tlergency access to the real property at 412-414 EI1\erson, as well a8 for the right to parx:ing spaces, as set fo.t'th in subsection (I) \1) of this Section 3. A.3 another condit ion to the lot line adjustment, the owner shall apply for c,n amendment to the existing Uee Pennit for 412-414 Emenwn Street. to address the following iSBues: change in property dimensions and the grant of aCC~B8 and parking rightB to the rear of 400 EmerBon Street. Prior to building pennit application, details of the Develooment Plan herein approved shall be B~tted to the ARB for final approval, including the fOllowing: noise reduction plan, signage, lighting, north and south wall facade changes~ color palette. and roof material. The parking lot decorative wall shall be constructed to permit visibility all the way to the far wall, where the south stairwell is located. Details of the art niche and the proposed work of art shall be submItted for review and approval by the Public Arts Coamission prior to submittal of the Development Plan to the ARB for final approval. Prior to building permit application, a final landscape plan shall be submitted for approval by the following: Utility BDer~y S~rv1ces Division, Planning Division, Public Works Department, and 4 . :- .... , .' (v) (vi) {vii} (viii) lix) ARB. The planter at the parking lot east exiL shall be installed to permit an uocbstructed view for drivers exiting onto Lytton Avenue. The plan shall include a complete plant listing indicating quantity, locationa j type and size of plante and trees, irrigation schedule, fence locations and lattice details. Prior to subnUtting the plan, a street tree plan shall have been su.bm.i t ted to and approved by the Ci ty Arborist. The plan shall include trees along Lytton Avenue. Prior to building permit application, a fif'...al grading and drainage plan shall be submit~ed for approval by the Public Wor).:s DepartmeIlt. Frior to iSi:3uance of building permit, utility load sheets ,shall be submitted for approval by the Water, Gas, Wastewater Engineer lng Division and the Ci t.y' S Cross Conn.8ction Control Inspector. An Bncroact".Jl".ent Permit and a Street Work. Permit shall be obtained from the Public Works Department prior to any worJ.: in the public right·of-way. Frior to iasuance of building pern,it r improv~~nt plans for all utility construction shall be submitted for approval by the Utilities Department, ~~lic Works Department and the Inspection Services Division. The plans shall include d. separate water service and meter, a new gas service line and a separate sewer lateral to serve the residential unit. The wat.er utility point of sel.vice shall be at the sidewalk. Backflow prevention into the public water supply shall be provided. The sewer lateral point of sel~ice shall be approved by the Public Works Department and the Inspection Services Division. Prior to occupancy. the parking lot entry gate a!-..all be electronically operated, and equipped with a Knox Box to allow Fire and Police services to access both the subject property and the 412-414 Emerson Street property at any time. The 5 par~ing lot entry gate s~~ll remain open, at a uQnimum, duri~g normal business hr.>ura of 8 a.m. to 5 p.m. (XI Prior to occupancy the mmer ehall install" maintain an;:! service a drinking fountain that will be available for public use at all t~8. Ixi) Prior. t.o QCCl.lpi1::H:Y the owner shall show procf of the Santa Clara Valley Water Di8tric't.· 8 acce-pt.ance that the proposed deve1 opraent a.nd COD5!tructioll will not ~ffect any ~ite r~iation for removal ot an underground storage tank that oc(;urre:j in 2-9€6 and 'rerr'.Dval of :2 oil· a~sisted hydraulic hoists in th~ existing 1:lt.':1.Jct'.Jre :.;r. tr.e site. (f) ~.;;JQx;:eor ~(;I-;,;-~·jul"". Ccnstru,::tion ':of th.e project. sha.ll ce ccrr:pli':'tc,j ,m or bet()~.f· S'.:"'C::.e.""':::e': 1, 1995. s..EITllli_.':i. 7";":'2' C-')'~;-"c 11 f"ir:js t:[,at Ul is PFli ect ' .. 01 11 not have 3 .9-i;1nificant elYv':'.rc,_".:'.ent.31 ct[ect. s..A.C".cIQlL_~.. This crdina.r,ce s)-:~ll D'= effective on the thirty-first day a,t<:er the datto v! its .ldept-ion. INTRODUCED: PASSED: AYES; NOKS: A.BS'I'm.'TIONS : ABSBIIT: A'I"I'EST: City Clerk APPROVED AS TO FORM: senior Asst.. City Attorney APPROVED: City Mandger Director of Planning and comnrunity Er.vironIl'.enl · , \ '. ",.-',-. .. " Ue,'iew 1-1' r ~An:"itedlh III ~-i c.evnt- Hoard ,'U •• 'e. -----"", ,,----------------------------- MIHUTES A. BOll CAll Board Membtrs Present: JUlie Maser Cher,l Piha David Ross Shirley Wilson Thur,d." July 21, 1994 8:00 AM Council Conference Room 250 Hamilton Avenue P.lo Alto, California eoard Members Absent: Aino Vieira da Rosa staff Members PresEnt: Jim Gilliland Lisa Grote lorraim~ Weiss Joyce A~gust for Ite~ iI.2 B~b Schubert for Items II,J & 11.4 8, 6PPBCVAl OF ~U!IJTES OF JULY 01, )994 Approved )-0·2-0 is c.orrected, C. OMl Cot!!!UNICATlOHS: Hone. D. AiE!I!A ITEMS APPROVALS: The Architectur.l Review Board (ARB) decision on the design of the project is i recommen~at1on to the Director of Planning and Community Enyironment (t~e Dtrector), who makes t~e final decision. Unless otherwise statl!d by th! ARB or tht Director, project appro ... ·als ;ncorporatt', Projec.t Review CCllI!1ittee conditions. as mailed to the appl; c.ants and staff cond; tions as recorrmel1ded in the Infonnat ion Memorandums, CK>~GES: Any change to an approved des1gh plan must be resubmitted to the City for approval. Resubmittal of a project may be necessary if changes are mandated as a result of complying with other City department reqUirements, or any other applicable codes, or ordinance requ I rements or other regl.:1at()I·Y agencies, Page 1 ',,: -. • o '-'PPEALS: All major and mlr10r pro,jt!ct approval s are subject to an appeal period, wnich allows for the applicant or members of the public to file .n .pp •• 1 from the d.cl,lon of t ... Director on the project. The appeal period for ~ajor projects (deSignated with an asterisk .*") is el~ven {II} workiR9 days following the date of the ARB's recommendation on the prcjett. The appeal period for minor projects is seven (7) .orklng d~ys following the dat~ of the ARB's recommendation on the project. Appeals of .inor stte and design and lTIinor lone changes are subject to Chapter 18.93 of the Palo Alto ~Jn!cipal Code. If you wish to appeal any item on this agenda; contact the Planning DIvision (319-1441) ~.rdlng tlme and fe.. If you challenge this Jand use deci~ion in co~rt, you may be llmited to raising only those issues you or someone else raised at th~ pub1ic hearing d!scribed in this notice. or in lIlritteT1 t~rrl?SPQndfnte de1ivered to the City of Palo Alto ilt or prior to, the publ1c hearing. ENVI~ONMENTAl IMP.~CTS: All major projects oot ide"tified 01 an EIA file n~~ber follo~ing the proj~~t address have been determined to be Categl)ri<:ally E)'.empt from CEQA review. All minor projects have bee.., determined to be Categoric..:ally Exempt from CEQA l'eview. TIME LIi'lTT: Project appr.J'I-' a 1 is valid for o1:E'(l) year from the original date of approval. The ti~e period for a project may, upon application. be extendEd once by the Director for an additional year. EXPiRA1ION: in the event the buildlng permit for a project ;s not secu-red within the above specified time limits, the i!.pproval of the project will expire and be of no further force and effect. COIiSDIT ~EllDAR 1. lSOJUMINO !!fA!.. mo 94·ARB-1I6 Hordstrom;-,-.l.zc, ." install tEn new.,,30-f.-;:.ot high light fixturf,s·'to replace seven exlsting 11gM p~.es 10 the parking lot .. ,", front of Nordstrom t " ' SON!. ""--/' '"./' " ./ ARCHITECTURAl REVIEW BOARD ~TION~ppro'.d as submitted (4-0-1-0 ' Vieira dil ~osa absent). / "-",_, /// -'",- 2. ReV1~ed 94-ARB·15 531 C!lWPfR ST!!EET / California Pi~a/Kitcnen Re\'ised sic;pri,ge per previous ARB re'iiew for'Tlew restaurant . ./ This item w...s pulled for discussion by the Board. i S:\at1J\l'I'II.r21 Page 1 . . z. 4!Ijl =114 EZQSqI! ST· DrS Arc~lte<ts l ~~lneers 94·AR8-52 94·EI.A-8 94·ZC-9 P1anned c~1ty lone chinge to allow: !) the demolition of a for.er aut~t1ye repllr building and construction of an approxiaittly 8.100 square foot 3·story mixed use building, CQft5tsting of flr$t floor Co.sercll1 retljl space, second floor 'oa.erci~l office SPiCt, and i third floor r~ntal residential unit; a~ 2) provision of 12-14 on·~ite parking spaces. ~EtT REPR(SENTATI~ES: To. Gil_In. DES Architects and Engine~rs. projKt arc:hitet:t, l:tN!sl!'nt~ the proposoll. ~Bll( TES Tr POlY , None . . UCHlrECfUit.AJ. ~EVIE\f SOARD ACTIa..: David Res:'i abstained from this item. ~pprof~d 3·;)-1-1 (','ie-irA d<i Rosa ~'Dsent ar.d Ro::.s did not participate' ~jth cClndltions t~at the fol1c~in9 return to the Board: 1) ~ ! J I s i 9'1 .. gO? (:r-qra-; lit)hting plan: ehbora1:icn ot tieat!r:t::nt of art niclie and any ctl1er .suggested ilrt-.-or-Ks; 4) ~study the ~cut~ ~le¥ition bor-de~ing fanny & Alexander to provide Mre interest; S) recDnsid~ration lnd more definition of how the triple arch window on north fl~~~tio~ il desi9~ed and hew the break in the building \ljill1 is: de1ii'li:ctEd; 6) detail of t)'pic.:a1 wlndO'll' specifically to look at size of ,"irtdo,., c.pel'1ingi; lind 1) t'eC;)nsider co'ior palette olin<! roof moilterial. 3. T~e SQard felt thJt the revised parking layout as presented at ~t;ng WIS Icceptlble. 245 lJIION, 305·337 DQ$lW ST .• (Peninsula Tiaes Tribune) 94·ARB·121 94·EIA-10 Construction of three-stcrj, 54,90n square-foot, office buiiding And rtlated impro\le.rrents. The ARB heird the pres~ntiitions. ~sked questions and took public testimony far both Items II.3 & 4 p~jor to takin~ acttan on the pr-oje-cts. B:\L-tI\.IIIllI,n1 Pige 4 • • o PROJECT REPRESENTATlVES: ToO Korth, project .rc~it.ct: O',id G.tes, hndscape archHHt. arxl HHe-"i hon. pro.,lect delft!' 1oper. presented the propo .. ' , PUBLJC TESTI~V: Jie Godd~rd, 341 R~~i, co.pli.ented t~e archit~ct lnd de'lE'loper or. Ii project thit ,.'\11 t>P ;(f'. enh.af1~e!ftent. to the ne19"borhood, Hf exp~s5ed cvn~trn about thf alternzte proposal to hIVe t~e garAge exit em Ruont. 1Oo"Y Cilr-rHeo 'reQl..iestM that h15 ~~"t5 ~ added for th~ T@COrd. ~I~~~~ ~ilson ~ntion~ that TGny CUri5CO I!'ncourlge-d th.e ARB to consicl!r sore 'iuiet)' in the nts~d.nthl 6esl~ sptCific"i1,r ir. its. .rchHtctuul style .. nd lIIiSS. The &ird cOII!iIIIenteod is follows: JlJl ie Maser: S~e stated Hat t.hE! rE1Ii.s~d project is a Hst i!'t!pro"'e!Mnt o ... er t~e oriQlnal propos.al i:r1d tnat the re~derings \!tHe b€illutif'Jlly drawn. She was lH"!cO:"!foThble .jth th!:' il: .. :~:l'ii.r· "irdo .... fn;::"-i' lr.d jail de-tans; the S19rtol9E.' .tIS ,>hr.··om ~r; W too 1'119' .. r,d o',j not );C'rr. ''''ton with ttle building; tIle lcbbj ~i5 still t~o constricted· 12 was I@ss !han desired; and tile garage turrtHGl!r,.j pAS (,ka'., if t!',.eo s.par:.;:-s ri?'"'a\ne-d vacant til aIle· .... Cilirs t.') exH .. ~. siq:".el .at the-e~ltt-a'!"irE: h r-eeded to note wh~r'! the o)i!rage ;s h:l1. Sr-:e fe-H t~Ht p.,€, hi:-.iD;-;(.?l ;ef~r~r"l'.;e to Palo AltD'S lrist(lT"y If, t.he-lc:tt'l' ~':)\.!\O t,? ~~1iQHh.;\. Sh" ·';\.~\l1d lq.,<! to ~ee iccess from' th~ 9ard~n t~ the residentiil proj~ct. Th~ glass \fII'indows as pro~osed are fin-e, The 9,Hk.ing ir!g~e.,~/t';1f"(-'S.S. \o';1·Jld l1i'r'.e been better as two one-wa.y,> b\;t she could oefror the propos.l as. presented. Cheryl Piha st .. ted HIlt she hold r.et "lliHh a~p1icant prior to the T:'\eetirrg. She edoed Jlil101 I s c~nt~. She wO'Jld 1ike to s-e~ the Pub'~ic Arts. Coanissiort re\liN ~00'f propoHis if¥.! ideas; fer iii g .. rQt>n :>(ulpture. perl'laps carrying throll9t1 t~!" r'll~WSpiper theN, She was sorry tv see su.ch , n~rr~ lobby. S~@ WQuld s~pport the pl~c~"t ~f tne trin~fo~r lM tht glragE JlRd she would hue prefl'rrr--d .or~ IJs£,I.ble bil-co~jes, She supports flagstone surface on t~ public rlght-of-~.y, David RQss: He supported the flagstone in tht p~~lic r~ght-of'WiY. He s.tated th.at tote apprKhted the incorporation of SE<h-ilr,lcal penthol.lst's in the roof well, Ht WI5 disAppointed with t~e ~rD~~~ed S~pirated garige ramps which WQ~ld not iaprove 9,rige traffl~ flow Ind, therefore, did not belie~e that a cha~ WiS jU1tif;ed. He encD~rag~ i trell1s feature over the 9ara~ r~. ~s I res1dt~t of P!lo ~lto ar.d if he thought about being a resident of tni s project, hE 'JtO!Jld r,ot fI'.a.nt to see arl iiCCf!SS froo the garden to the residerlces. H~ ft:-lt that the transformer should be pLlced 1 n t~e 9ira.ge and thlt the 9hss .indows. weTe fine. Shirley Wilson: She stited that ~he aet with Oa.vid Gates ~rlor to the ARB meeting. She liked the building, although she expressed some concerns about the wir.do" fra.'T'i' :;.ash. She felt trtat the glass -""imiaws. B: \arl>VlU. nt Page 5 selecte<f were okay. She stated that two driveways wi 1 1 net s<llve interior circulation, so she sup~orts one driyeway, The Lytto~ Ave~u~ landscapin9 should con$ider foundation planters. She supported a trellis o~~r tne arch area over the glrage rimp, placement of the transfuner in ttle garage, flagstone, ir. the publ ic righl-of,wlIY .and a histor1c display in the bu11ding lobby. AROIITECTUIW. REVIEW lOAn!) Ae1l0ll: Appro'ed ~ith cc'nditions '-0-)-0 (~i:elra da Rosa absent). ihe ARB ga .... € strong support for t~e fcilo.ing and requested that staff follnw-up; 1) request that tne Transportation Oivislon seek out additional sites for parking to offset the loss of t~e temporory porking lots: 2) flogsotne in public right-of-wlj; 3) the transfcnmer location in garage; 4} encouraged the P~blic Arts Comr.is~ion involvem!nt for art in the garden; and S) the l')bby should niillve more tTansparency to the garden. 1 ) 2) 3) 4) 5) 8: \tor"bVChl. n, The following shall return to th~ Board for final reYle~ prior to issuance of building p~rnjt: A) re-study aJlrmirn .. 't.1 wi ncoI'!' fr3;'~,es. sho ... ing wir1ch:ni s(i:;."rl ~r;)iTIf' and material; 8} detail of wood balcony r~ils ~ith ~or~ substance; C) restudy location of sh~ii'1~; and 0) trellis design ove-r garage !:ntry ramp as. part of litrJdscav.= pl ar:. A five-foot, Six-inch .~treet dedication shall be pr!>'Jtded alor:g Ramona Stre~t. Prior to the applic_ation for a building pf!rt?lH, phns S'~i!ill be submi tted for and re'o'iew arId approval by the Tr&r.sporhtlcn Division and Phrm1ng Division dl!!mOnstrating Uu,t the ex,t rlf!tJ:' frPm the underground park1~9 provides adequ.te si9ht distance ~t the sidewa". Prior to the application for a building permit, detiils of t~e proposed ucurity gate shall b-e subt'1itted for N!\liew .nd appro\,-al tly the Transportation Dhision and Pli.nnirlig Oh'ision. jf the security gate is planned to be locat!d at th~ top of the r~. it Shill be of the wireless-controlled type of activation. If the gate i.s to be I;f the card·reader type ()f dcti ... atlcn, it shall be loc.ted .t the bottom of the ramp. Prior to the application for a ~jld;n9 permit, the proposed handicap van-accessible space in the undergr~und garage snall bE redesigned as a normal handicap space and th~ van-accessible space Shill be relocated to the satisfa~tjon of th~ Transportation Division and Planning Division. Page 6 '...::::.--------,-''"-~~------------. 6) 1) 8) ~) _ i ... o Prt or to thp appl; cat 1 on for a bui 1 d1 n9 penn) t ~ the proposed turnaround space in the underground parktng garage shall be revised to include a space perpendicuiar t~ the a1$le (e.g., one of the parking spaces) to the satisfaction ~f the Transportation Division and the Planning Division. The ~lans s~all be revised to snow the turna.round are& to be si9'nN 2nd/or striped accordingly. Tne applicint shall obtain an entroacnment permlt from the Public Works Engtneertng Oepartment for ~ed~str;an protection during construchon. All .ideo.l., bordering the project 'hall b. r~ved and replaced in c.-plianc. with ,t.ndard. apprc,ed by the Public Work. Engineering DepartMent. An constNlct1-on within the City right-af-way shan conform to standard specifications of the Public Works and Util1ti~s Depart...nt,_ 10) Tne corltra.ctor shall contact the Pi.Jbl1c Worr.s Inspector prior to any wljr~ performed in th~ public right·of·way, 11) ,.., ccnstruction log1st1cs plan sMall be subnitted for review arlo approva'i by the ?=Jblic Works Eng1r,e~ring OepartmErlt. All truc~ rout'!!i. s./'ia" con fO!fi1 with the City of Pa i 0 Alto J s True ks and Truck Route Ordinance, Chaptar ]0.48, and the route map which outnnes truck routes available throughout the Ciiy of Palo Alto, Construction of the project shall be toordinated with the proposed projects at 400 Emerson Street and 265 Lytton Avenue, to the $at1sfact1on of th~ Publ~c Works Engine~r1ng Depart~nt. At a minimum t~e plan shall address the fo11cwing: Park1~ for construction workers; rdentif;tat;~n of proposed constru,tion access points and truck routes and staging areas; -Site(s} fer st~rage of construction equipment and s~pp'ies~ Snoring fOT underground garage: Construction Qf teMporary waikways, barricades ~"d fenc~s; Provision of ped€strian and vehicular trlffic adjacent to the construction 51tt, Construct1on of t~rlry barricades ind fences; Restoration of City streets impatted by tonstruction activitiesi Replacement of Ctty sldewalks in adjacent to the site in accordance with City standards; and PubliC relations .plan direc.ted at resolving the concerns of adjacent residents and businesse'_ 12) A det.iled site-specific scil report shall be submitted .nich includes information on water·table and basement construction issues. Page 7 • ", 13 ) 14) 15) 16) 17) Ie) 191 Dettolished materials shall be recycled, as feulble. (Staff was glven UU! 'Opt"ion-to .. or~ with the applicint to revlse or delete tills <onOitl.n), Prior to 1S5UI.nce of any grading ilnd bullding pernits, the Ipp11e,nt shill s~bmit a preliminary gradlng and drainage plan to tht Public Works o.partment, including drainage pat~erns on site and from adjacp.nt praperties. The plan shall demonstrate that pre.existirt9 drainage pattems to and from adjacent prope-rties are no t a 1t ere<l To red~~e dust levels during construction, exposed tarth surfaces shall ~ watered freGue~tly. with reclaimed water, during the late sorning and at the end of the day, with frequency of watering increasing on _indy days. This requirement, may be modified when ilpprCyed in writing by the Public Works ~partment. Reclaimed water, in accortlanca w! th Pub 1 i c lrIorks Department pol icy I s ha 11 be used for this purpos~. Oust !1U1SaFlCes or-iginOl"Cing frol':1 the cDnstruction operations shall be controlled at th.e contractor's expense. The City of Pa.lo Alto Public \!larks Department shall ~Jnjtar th~ contrdctor's dust control operations. Splllag~ r-es.ulting frori1 haulif19 (l~lerations Jlong or .'lcross .any public-or Pl'jV.atc! property shall be rer;'1o'led irli'"'ediate'ry at the exper1S1a' of the developer. If rC.';1uired by the Public Works Oepart~fr1t. streets shall b~ cleaned on a daily Dr weekly basis. Overfilling of trucks by the Contractor shall be prohibited, TrUCKS shall be co-"ered dur;f19 the transportation of excavated and d~~lisnej m~ter;als from the sit~. The de'w'e1oper shall prepare a stormM'ater" Pollution Prevention Plan (SIiPPPj in;:orpor.,ting best management practices (BJIIIP's) for stor8Wat~r pollution pre~~ntion in all construction operations. The swppp ,h." be suboitted for review and approva' by tn. City of Palo Alto ~blic Wor~s Engineering Divislon. 20) An arborist's report shall be submltt~d to insure that th~ ~xlsting street trees on the offie! site are preser~ed durin9 constr-Jction witholJt d.aaagir.g the form of the trees, Hec~ndations to insure adequate root 'Iolume for sutcessful growth and developr.ent of the street trees adjacent to the proposed u~der9round parking garage shall be provided, If neCi'!5:sary. the wall fer the underground garage shall be mo-,red towird the interior of the site to insure adequate root ~olume for the street trees. 21) 6:\vb\lllllij.nl Prior to subm1ttal of final landscape plans, a tree protection plan, prepartd by a certified arborist, shall bf submitted for revie~ and approval by the Planr.ing Oepartment and implemented prior to demolition and thrQughout pr0ject construction. The plan Page 8 • -.------'.-~~-- ,,,",,, - shill intlude ider.tiflcltion of ill trees to be protected ~nd include ~is~res for their pr'te~tion during constructi~n. ill(:luding iI tetlpOru)' construction f~r,t:e to be err.~·cted around eat'h tree which is to be savta. It snl11 c~nsjst of portible cyc'o~e fen<: ir.g , or win! _sn SKul"'t!ly attachtd to ..etil posts driven into ~ qround or an 11ternat;~e fencing apprn¥ed jn writlng by tne Pll.Ml~ Departllfrlt. ThE ~HJr-pose of the fi!r1cin9 is to keep all cOfl3troctioF'l Icth1ty and stol"'age whiGe the drip] ine of the trees. It sh.ll be erected before Iny construction ~chinery enters t~ site, end shJII r.~t be ~ved until the final site l&ndsc~ 9rlding is c~leted. ~2) Prior to t~ 1SSUI~ce of iI building p~rmit. f;n~l landscape plans lind iM"~g.1t1tm phns wt1icl'l ~t thfo ~ulree1E"nts of t~e CHyis ll~sc,ape "".hr Effie; e~'y St.JrKhnhi IN required f(ll"" submittal fOT revih' ilnd app~ul by tP'le Ard1itecttJril Review Board, City Arbclrist, Iltilitif!s En~rgy ~~r"i\:i!$. D'''''ision arid Planning staff, Eac~ t~ to ~ ~yed ~ill he r~Quir~d as A condition of apprr,Ip'iI} of tht' re~iGe,.,tiill proji"d to ~ replitce-d .... ith ~t 1east tote i'1!"II tre-e~. TMe r.e;,; trees s:-'ould b.:.: !ocO-t.ed to SIHd.e pa"ir.g li",d to i~cflJc(> HIE" r.ee-o for .! j r cono it. 1 Ci r) j ng. ?3} l!,"H rr,:-,tectic·r; ~iE.a:;wre$, lnc-ll..Jding wrappir.g ':'1 ~il.jor limbs for C!'rote·:tlo:: of ~tr~~t t:--ees durin8 co!utruct ion, 3S detr;n"1ined by th~ City A:·borist .~d Plann;ng Division, shall b~ in place prior tc c~~n('€'!'J€;lt <Jf any constr"Uction .:!ctil!ities. 24) The deyeli:lper sMall (""4'1, _ito t~e requirl!,~nts of n~~ Palo Alto NQis~ Ordin.nee, CM~pter 9.10 ?~. 2S) I-tufflers uo.d ~;ol.l~il1gs sh~P bE: pro'Jide-d or. constructu:in .... enjc1es a.nd eGui pl'IE'nt. 26) Ene-rior 1ig-MiP.9 shal; ~ desig~ed for safety. and shall avoid 1ntroduc-ing UTlI\t-:!!'Hlr.v ligM anod glue. A dehile1J )1ghting phn sensitive to e)tstl~ I~jactnt l~~ U$e~ shall be submitted is part of thE final pl~ns to return to thE Architectural Review Board fer ~'i;ew ~nd ~pro~.l. 27) Ouring tht stlrt af ~onstruction on the off}c! project! the dtyeioper Shill keep &pproxj~tely ~alf of the teaporafY City p~rking let open to public park1R9 until after the Christm~s Sf"ilSO'" (Staff Wil~ 9H'"en the opt;on to work with the appl iClnt to ~'Win or delete-this condition,. 28) ~·street signage directing pedestrians to th! proper route around tne tellpDr.l.rlly dOSM sidl!lllilk.s shall be provided. 29) The dE~eloper sha11 i~l~nt a ~ubl'c outreach ptogr&~ to ~eep area. residents updated on the construction schedule and the use of tt'le adjicent stre~ts for constructior_ acce:c.s. ------_. ' .. 30) The dev.loper s,all l"",lement the foll""ln9 ... ,,"" a. Stlndlrd construction IT!. signs, subject to review ~nd approval of the Clty of Pale ~lto TransportJtion Divlsio". s~lll be posted Ilcn9 Lytton Avtn~e, ~r~cn Street. Ev~rett Street. RUIOn~ Stnet. ilM other stre-et~, 11> !1eCHsny. to warn the public of th'E! Iln-goirrq c-onstructio;, triffic. b. Contractor worker plrking shall confo~ wlth plans tpproved by tnt Tra1'isport,tiol'l Div1s.ion and Public "arks. DeiJilrtJllleJ1t. c. Storlg! of equipaent or .ater'als shall cor.forw with pl~s approved by the Trlnspcrtltion Deplrbrent and Publ1c WorKS Departftilt. d. E~rgency veh1cle access shal! bf ~lint.in~ .t al} ti~s. 3i) Prior to issua~ce of a bunding P-HT.lit. the olppliz.int sr,:.111 5ul:<"·it a It!tter fr"O(f1 ttle Santa. Clara Valley ... ·~teT' Oi~tjid l"1di(~tinq that the project will not interferp. ... itb all./' fut'.'re 'I"€""",,;:11 iI.'l - clean'up act1~itie5. (Staff was 9i~en th~ ~ptio~ to ~Jr~ ~1th the oipplic-ilnt to rayise 0,' df.:lete this (C~::nti.on). 32) The applicarit shal i i:'!'plFent the f0:1o",lnj: 33) 34 ) 8:\ub\JIllI,nl ~. There s~culd be Toutine. occ~sian~l T~,~valuation of agency records of .rndergrC'iind stora9€' link ~iIoHrd:nls-SUt.<;tii'1":;:;S rel~ases with!~ o~e·half 5ilE of the site jn ord~r to assess groundwater c.ontamir'lation thit (ould ;:Dp.!ft t'1e sHe. b. A ('ol1tinger:(y plan .hould be prepared In.;1 sublr:1tted to tt'1~ Fire Department to acc(!unt for conti!:1i"lolnts j.n the :;'011. jf any are encountered during e~cavition for the underground parking stl"'utture, Soil giS IICnitoril'l9 shOUld eta conducted to evaluate whether there ar~ ¥Idose l~n~ CQnt~;nl~ts. If groundwater lIIay be encountered, or if ~c indic.ated by the ~s~lts of Yldose lene ~nitoring: grou~lter testlng snould be conducted to aSless potential for groundwater cont.aJlinatiofl. (Staff was given the option to work with th~ .applicant to reyis~ or deletf this CGndition). A fire sprlnkl!r system shall be pro .. dde<l witliir; tl'le buildi!lg. to the saUsfactior, of the Fjrt=! Cepart'N!nL Th~ location of the required pad-MOunted transformer shall ~ SUbjfct to reviE!'lo' and approlr'al 1::, the Arc.hitectural Review BOi.rrl and the Utilities Otpartment. Page 10 .. \ ... Augus! 22. 1994 TO: Joyce A1..Igus.t FROM: Gayle Likens0_ / CITY OF PALO ALTO MEMORANDUM \, SUBJECT: 400 Emerson Str&Elt in-Lieu Bicvcle Parking Spaces ••• .. • ••••• • ............ ~ ••• .e ..... I-.I' •• O •••• This is in response to your JtJly 27th memo. J apoiogfze for not (espolldrng 'to you more promptly. Chapter 18.83 120 (8) 01 the Zoning Ordinance sHows for the substitution of 3 Class I bicycle parking spaces (bike lockers Of the equi\fa~ent) in addHior. to 1he minirn~lm bicycle requirement up Lo i:l maximum of 5% oi the '.,Iehic'~ stalls fl3=quireo, A1thOlJQh tn,s is a PC sut)!TIitt8I, staff would recommend that the same Class I bike pa!king br. appifed to any subSli1Ution of vehicle parking spaces for thjs project under the Planning Comm,sssion's plan. The hIghest need for long-term. high sec1'!'city bike lockers is at lhe Pa:c A\to Caltrain station. Calt/ain has a vacant sp~ce for bike lockers on a concrete pad in th8 pmk.jng lot .at AlmD and Lytton. Staff would recommend that if the P'an.ning Cornrn:ssjon wishes to pursue this off·site, in-Heu pian, that the developer be required to purchase and install a bike lockers (4 double lockers) and reach agreeement with CaiHain to have them in.'Stalied at the Caltrain statiOn for use by lrafn commuters. It is likely that it wili take time to work out the details with Caltrain. Sraff would be willing to facilitate the discussions, but the de .... eloper should taKe the lead (ole. The COSt of such bike lockers typically ranges from $650 to $1700 for each 2·bike unit, plus sales taxes, shipping and installMion costs. At a maximum of $2000 tor each double un.it, the total cost would be no more than .$8,000 compared to the .$23,000 in-lieu cost for one vehic:e parking space. if you have any questions, p~ease cali me at 329~2136. co; Carl Stoffel RECEIVED OEPAATh~~,\":·" 0, .... !.Ar>r..tl~ /!JriU CO:.':.;',\UNITY 02iEWPJaiT