~ . City of Palo Alto ~ ____________ C~I_'~~~ __ an_a~g~e_r_'s_R __ ep~~rt_
TO: HONORABLE CITY COUNCIL
FROM:
AGEND,>\ DATE: Jaa....,. 23, 1'" CMR:lll:95
SUBJECI': Revi!ioa .r CoII~ey FluId for Demolitioa "rtll. Buildiag al
141 AbIIII SCree! ad 1JIs(a!41km of F.aces
This report requests CouociI to approve increasing !be contingency fund 8VlIllable in the
City's coa1rIa wilh Forma CorponIIioD fix the demolition of the building at 841 Alma
SIroet Ilom $11,250 to $26,250.
RECOMMENDATIONS
SiBtf recommends IbaI Council:
I) Alllhorize the City Mmlagcr tt be. designee to negotiate and execute one oc """
cloange orden to !he con!ra<:t to cover additiooal reWed but unf<>r= work wbi<:h
has developed during !he project The vaJoJe of these change orders shall no( cxccod
$26,250.
POLICY WPUCATIONS
Thil; '"""Inc! does not reproscn! any clwIge to existing' policies. '
UWITJYE SUMMARY
00 October 11, 1994, Council approved !he con~ wi1h Forma C<xporation in the
amount of $74,901 foe the demolition of!he building at 841 Alma S!rect and authorized
change orders to the contract in an IIIIlOWIl no! to exceed SII,25O (CMR:~:94). The
~ work for !he demolition of.the building was started <in January 3. 1995. The
. zemovaI of the roof and !he walls 00 !he wcsl, north and east sides has been <:O!I1pleted.
CMR:IZI:t5 ,.... •• u
"
. -,~-
5
-'--"',..;
UnfOft:S<>eD circumstances bave prevented tbe removal of die sooth wall adjacent '" 153
Alma Street.
Durir.g demolition it was mscovmd thai tbe till'., l>uiIding walls an: lied Iogethft with
inedutnicaI eoo:mectors at tbe parapet kv.t Nails were used '" tic and S1IpI!Oft tbe
reiDfon:ing rods in tbe 1141 Alma wall to the 853 Alma building ,.-all. In additioa, it bas
become apparetI! thai no WIling or expansion mal<:r'.aIs w .... used between the two walls
when conc:n:Ic was poured b the 841 Alma sooth waD. The conaete wlin of 841 Alma
was poured directly against the wan of 853 Alma.
In crdcr to avoid any damages 10 the building at gS3 Alma Street, changes aru=/uired
'" the demolition procedure specified in the contract. The recommended method for
. demolishing tbe remaining south wall is by uslng'haDd tools. To Ivoid excessive noise
at 853 AIma. this wort will have to be performecI on weekends. The estimated cost is
$22,OOS.
fiSCAL IMPACT
Fuods for this project are included in the FY 1994-95 E1ecIric Fund, Capital Improvement Progtam. .
ENVIRONMENTAL ASSESSMENT
The enviromnenlal assessment remains the same as descn1>ed in CMR:456:94.
ATIACHMENTS .
CMR:466:94
PREPARED BY: Thomas IN, Patrick VoIatb :d~~~ a<>d
DEPARTMEN. HEAD REVIEW: _ f,J,~~~~:±-:---
EDW J. K
Director of Utilities
CITY MANAGER APPROVAl: £U.!.1lM 1\\ .~ BERNARDMS~
Assistant City ~
L
1'11&.2 or 2
. ~ .;
-.. -
(1)"
• •
• ""i. ~, .
City of Palo Alto
City Manager's Report
TO: HONORABLE'CITY COUNCIL ·2
FROM: CITY MAl'liAGER DEPARTMENT: UTILITIES
AG!.NDA DAreOdober 11.1994 CMR:466:114
SUBJECT: Demoliooll of the BaiJdla" 81 sn Alm. Street .Dd IasWlalioll of
rences
JqQUEST
This report requests that Council approve and authorize 1he Mayor 10 execute 'contra.."1
with Fenna Colporation in 1he az:IOUIlt of 574,9Q1 10 demolish the Cily-owned bw1<frng
al84l Alma Stree! and 10 insWI fences et the ~ and rear of the property. This includes
a IemponI:y solid wood fence b an Architectural Review Board (ARB) approved mw-al
aloog Ibc Alma StrW frOOlAge.
RF£QMMENIlADONS
Staff recommends !hat Council:
I. Au1hori2e 1he Mayor 10 ~ the attached contract with F erma C<xporation in the
amow>I O(S74,9Q1. b the demolition of the building and fence wcd: at 841 Alma
and
2. Authorize the City Manager or ber designee 10 negotiate and ue<:ute one or more
change orders 10 the COblract 10 cover additiooal related but unforeseen wo<l, which
may develop during the project. The value 0( these change orders .baIl 00( exceed
$11,250.
POLICY IMPLICATIONS
This contract does 00( represent any change 10 exlsting policies.
EXECUTIVE SUMMARY
In I %5. !he City purcbased the property L"><i builamg at 641 Alma Str~t 10 facilitate the
upgrade and expansion 0( the substation, to meet increasing demand fur eleclrical power .
.... .
'.-c.'
:
----~~ .
... , '."
J '-',~
The sile COO1ains .""",,1 ~,15Q squ=-foot automOO,. service bIIildIng aM foot parmg
spaces in 1bc rear.
01 Febcuary II. 1993, Council approved an amendment to the Palo Alto ~ Map
(eMIt: 161:93) to chang< tht zoning of !he C'1ly-<>wned parcel at M I Alma Street from
~S(P) (Commercial Downtown Service SllbdiSirict with a Pede.otrian. Overlay) 10 PF
(Public Facilities). This chang< permits use of tile site tor expansioo of the ""!>station..
Cooncil also directed the ARB to require a solid fence design for the temporary fe"". to
be COIISIruC:Ied along the SOIIlhem portion of!be site's Alma StrccI frootag<. The S<ilid
fence design. ~ approved by the ARB on Oc!ober 26, 1993. A&r completic!l of the
wOO< by Fenna Corporation. • local artist will install • mural aJOIlg the Alma Street
frooIage.
Utilities staff plans to replace the aging 4KV equipment with new 12KV equipment m the
substation. This plan was approved by !be Coancil in the i 992-1997 Capital Improvement
Program budgrt The project will also include coosttuction of a permanent fence to
rep!ace the temporary solid wood fence. The design of the permanent fence will follow
the guidelines in !be Downt<>Wn Urban. PIaD and will be submitted 10 ARB fb£ approval.
Bid reques!S w .... mailed _10 len conttacton and three builder', exchanges. Three bids
w .... r=ived on October 4, 1994 (Bid Summary Sheet Exh.ibit "B" is attached). Based
upon !be lowest RSpOIISible bid. rek-.'lIIlt wort experience and • review of refcren<:es in
three previous contracts. staff recooimends the conlract be awarded to Ferma Coq>oration..
FISCAL IMPACT
FIlDds ror this project __ included in the IT 1994-95 EIectr:ic Fund. Capital Improvement
Program. .
ENYIRONMENI,4.I. ASSfAAMENf
"I) The related "Environment Assessment 92-ElA-45 was attacbed to the staff report
(CMR;161:93) 1indc:r the heading of "34 1 Alma sireet, Zooe Map Amendment from
CD-s(p) 10 l'F" and !he Negative Deela;ation was adopted by the CooIl<:i1 OIl
FebrJa%)' II, 1993. "
2) Asbestos: The City blrod KELLCO, • registered asbesIos consultant. 10 conda<:! •
survey anc! provide a ciearance report on the removal of regu13!ed asbesto5
containing maJeriaf in the M I Alma Building. The two reports prepared by
KEU.co. dated June 1, 1994 and August 16. 1994. are included in tne project
specifications.
"3) Lead; KELLCO conducted a 1ead-conraining-rnaterial inspection. Ihei< final report
with findings and reccmmendations are also included in the project specifications.
CMR:456:94
----·r----~
?
< , 4) P~cum Oil: The· two abandoocd hoists" aIoog with die petroleum oil
cooramirvtted soil in !he _ side 0( the paliiDg area behiIId !he builcfmg. b&ve
been mnovcd. A report by Wahler Associates, • RUST Environment &:
~ Company. elated July 3. 1994. is on fi!. in !he City's rm Department.
The Fire Depa!1Inent has accepted the closure 0( this case IJId the Santa C1ata
Valley W_ DisIrict is ~ 10 as wen.
ATIACBMENTS
Exhibit '1\.', Cootract
Exhibi! "S", Bid Summary
PREPARED BY, Thomas La and Michael ~
DEPARlMENT HEAD ... .PPROVAL:
" ~ '. -.
:; ~.
§
I
I
" -....'. ~:~~" -.~: . -..
'-
"; .... to
-~-. {
1
\ ,
co
C! co g
ri --
g
.:; g
'" N -
'c>
'" ~
g
g
~. -
Ii II .'
1
i • , •
i
, -------------_:.-:-"
'", '\
;
.~.
,
PART •• FORMAL CONTRACT SECTION 00500
CONTRACT
1'1'Q Contract. d.-ted is tntered intO b~ aM between the Crty of
P .. lo Alta ... munIc:ipIIf ~n of'lhe s.tate of c.rrfomi .. rCity, .• nd Fern CprDOntiQn
_____ -'-_______ .. ~ntract01" roContnlctM-i, who_
T.~., I<f __ IS __ .:9,,4c: .... 15"'qz~!J28,,4 ___ . ________ _
agt1l$.!
1. l:aaIL T'hiI" tenuaet thall' corTWne:rIC4I Dt" .. _nell be bincfll'".g an 1M porties or\. IN Dati or e.:eeutiora (\f tt-J.
Contract. and "",II' POke en the daa of rKOI'l1.tion of 1M NO'6(:. cf SiJbNrrtiaJ CompJalion. or, I no IUcl!
noCiC't: it re~ed' to be fi1ed~ 01"0 tn. date that flN'! DIIymeot is rrwde hereundef". AlbIect to"" e~lU
~n of this Contr.~
2. (',eM •• ! Scope of !roieC' aryS Wrylr Contr~or shall fl.t!n;sfI !lboi-.. selYic .... mateNls and eovjpmerd: in
C1)f\ftIIwon whh 'the: tC~Qn ef 'She Pro}ect 100 ca.mP<fte the Won. i::"li .ceorcS.enee wi1h 'It .. f:ovenants.
Unn. n-c:cni!ionI fIf 'I\is Contract to the 5allisfaetion or City. The Project 111d! Wori. iI eel'\el'8lfy described .. -
T"stle: DfMOIITVW· 84 ' AI Ita SIBEfI N!! DlNG NO'
\~Bd:.~Z~'~go~t~O~QL-_____________________ _
',\¢ .... _ .. Iff.nyl: .' ________________ _
T .... ' Bid. 14.901.00
3. {: 7 'bnomerzte 1'tis eomr.et lheJ,con:sisI g( 'Ihe documents set fon;, ~Qw. whid' .rll' on fie ..... ith the
City Om\. rd .... hIrefJr ~ bt ... -r.rence. foI the purpose..s of t:OftSUUing. il"lt..l:rpfetitlv and resoMno
h;o di:rta .. c1Q betwl'" Ihe provisions of eNs CclTtf~ the.se documentS .tId the ,CIfO"is;ianl :hereof ate set
forth in ..,. foaowing 4lescsnding onfet of p>eeed"ence.
•. This ContrKt.
~. _ InYitfug Fonnol Bid •.
c. Project Speciflcations.
d. Drlwil'\QS.
e. 0u1"lgt Ord1ln.
f. Bid.
~. Su.ppl£~..., Co~rtiQn$.
~ Ge~ Conditions..
L STAfldao;I ~wT"QS aM Spe:c.if~.tions (199~.
j. Certifica1: .. of It!svranc:e. Performanc:1I!' Bond", labOf &. Materals iPilyment) Bond.
I:.. Affirmative-~Jon Guidelines and Compliance. Report.
l.. Other Sgecifir::ati:llu,. or part therecl'. n:x e;qH"l".ssfw incOI'J)'"AtEd in 'thre Contract Specifications-or the
Stllnd"ilrd Orawi,..gs ,nd Specific-ations {1992). .
m. Any ot11er dO~lJment nOI exptu"sfy menfior-.e" herein which is is~d b., City 0( entered. inm bv the
parties..
SECT.ION oo500-:Ii 1Jf 8
. -.----.~.-.-'
~ ..... <
PA!l1' • -FORMAl. CONTRACT
CERTiFICATE OF ACKNOWLEDGMENT
(CM Coda I 1189)
STATE OF _________ l
CO'JNT'( OF _______ -'
. Sf('TION 00500
on , before me,. .. 21
no!ar}' PlJi:>fic in end for said County. personany sppeared -:-___ .-:-..:. ___ =-:-~-~
. . .'. • personsny known to me I« proved to me on the basIs of
satisfactory evidencel to be the per.or'(s1 wMse name[.l Isfare subSCl"ibed to 11" ... wfthln fn.trum.nt, ______ ~ ______________________________________ . ____________ __
. • and 8cl<ncw!e~d to me tNt I1elslleftlley
executed t.'" same" Nsll>erJtheit authoriZed capacityf .... ). and that by l1islt.e'ftheir signature!s}
on the Instrument the person{s}, or the e!">lity vpon behalf <>f which tile p8..so<l{S) acted.
exec".,,,, the instrumer1l.
WITNESS my bend and officiaf seat
END OF SfCTION
SECTION 00500~ 0' ~