HomeMy WebLinkAbout0590.093'November 18 r 1:'9'3 THE HONORABLE CITY COUNCIL Palo Alto, California l"Qs Trancos Improveme.nts Road and Page .Mill Road/Foothill Intersection CIP 1119'11 and 19D73, Consultant Agreement. Members of the Council: Report in Brief This report recomrtlends that Council approve the attached agreement (Attachment BJ with Nolte and Associates, In<: .• in the amount of $276,900 for consulting services to improve Los Trancos Road and the Page Mill Road/Foothill Expressway Intersec~ion. Funding is available in CIP 18670. Street Maintenance for Lo!'.> Trances Road and in CIP 19073, Major Intersections for the Page Mill Road/Foothill Expressway in~ersaction. Background Council approved funding in the f'Y 199,2-93 Capital Improvement Program b·.Jdget. for safety improvem-e.nts to the portion of Los Trancos Road within the City, includi~g possible street widening, pavement resurfacing. signs and striping. Council also approved funding in F"i 1993/94 for Page Mill Road/Foothill Expressway intersection improvements. including additional turning and bicycle lanes, and signal rephasing to reduce traffic congestion and improve air q'.J.ality. On July 8, lS93~ the Policy and Ser..rices Committee approved staff' 5 recommendation to negotiate an agreement with Nolte and Associates to design improvements to Los Trancos Road and the Page Mil.! Road/Foothill Expressway intersection (Attachment AJ. Discussion The attached agreement provides design services for improving Los '!.cancos Road and the Page Mill Road/Footr.ill Expressway as follows: Loe Trancos Road; Altnou9h the agreement includes conceptual design, preliminary de~ign and contract documents, sta.ff recommends awarding only the first phase of work. During tne cor~ceptual design, the consultant will prepare road alignmenc diagrams, determine right of ~ay requirements~ evaluate soil conditions, assess environmental impacts and develop construction costa. This information will determine whether road improvements are economically and environmental feasible before proceeding further with th.e project. If the project CMR:5~O:93 -1- 5 proves fea$ible~ staff will return to COUTlcil .... ith an agreement amendment for the preliminary design and contract document s. Page Mill :Road/Focthill Expressway !ntersection. The consultant will provide the following services: • Refine the City's existing conceptual design based upon discussions with Sa~ta Clara County perso~~el. • Assist staff in presenting the conceptual olans to local neighborhood groups and the City's Planning Commission. • Prepare an environmental assessment. • Prepare final plans and specific2tions for bidding. Staff has not in~luded construction stage services for the Page Mill Read Focthill Expressway intersf'ction because the scope of these services ~ill not be established until the d~sign phase has been completed. The construction stage services will be negotiated at the conclusion of the design phase. and staff will return to Council with an agreement amendment: at the time of construction award. Funding is available from the Street Maintenance C!P 18670. for Los Trancos Road and the Major IntersectiollS CIP 19073, f·~r the Page Mill Road/Foothill Expressway intersection Envircpg.eptal Assessment The consultant will perform an environmental review of the Los Trancos Road project under. the California Environmental Quality Act (CECA). including an examination of land use, traffic, geology. soils. vegetation. wild life. drainage and cultural resources issues. A negative declaration was adopted by Council for the Land Use and Transportation Study. which included the Page Mill Road!Focthill Expressway Intersection Improvements. As part of the consulta~t services. under the agreement, a project -specific environmental assessment under ~-OA will be pr~pared to address issues such as noise and air quality for the intersection improvements. Conflict of Interest Code Exemption Staff l with the concurrence of the City Attorney. has determined that Nolte and Associates, Inc. i£ not exempt from the requirement to execute form '30 and otherwise comply with the financial interest disclosure previsions of the City's Conflict of Interest Code. They are not exempt because the consultant's range of duties to be provided in the agreement are not limited in scope nor primarily ministerial in nature. -2 - t , • R~ccmmendatiQns Staff recommends that Council: 1. Approve and authorize the Mayor to exer:::ute the attached consultant agreement with Nelte and Associates, Inc:. in the amount of $276,900 fer desisn services for the Los Tranco9 Road and Page Mill Road/Foothill Intersection Froject, CIPs 18670 and 19073. 2. Authorize the City Manager or her designee to negotiate and execute amendments for services related to or incidental to the scope of 'Work or services, the total value of which amendments shall not exceed $25,000. Respectfully submitted, ~M~82 J HN CARLSON ior Engineer /~GDO~ Assistant Director o! Public Works Attachment.s: A -Policy & Services Committee Minutes B -Agreement CMR:S90;93 -3- ! , , ! I ~ , EXCERPT FROM THE POLICY ANDSERVlCES COMMITTEE MINUTES DATED JULY 7, 1993 3 ~ Consultant selection Approval for Agreement tor Improvina Lgs TrAncos Rgad ond page Mill Road Fogthill ExpresswAY Council Member automatically committee. HUber a.ked ","hether consultant selection approvals appeared before the policy and Services (P&S) Assistant to the City Manager Vieei Rudin said no. The Los Trancos Road and Paqe Kill Road Foothill Expressway Improvements co~tract (.Improvelaenta) was before the COlDli:littee because it expressed ar. interest in reviewing it ~s one of the consultant projects to be revieWed by the P.S committee at the start of the last fiscal year. Council Member Huber asked for the dollar figure for the Improvements and whether it related to how a selection was made. Public Works Senior Engineer John Car"lson asked whether council Meaber :tuber's question reterr-ed to the construction amount or consultant cost. council Member HUber said consultant cost. Hr. carlson said the cost for both projects was approximately $300,000. council Member Huber asked for the oriqinal estimate amount. Ms. Rudin said the P'S committee only requested the opportunity to review the Los 'l'rancos Road projecti however. the two projects were combined for the consultant's role. Mr. Carlson said the two prejects were approximately $125~OOO to $150,000 each. Chairperson Simitian refarred to the &itaff recommendation (CMR:377:9J) and asked if the P'S committee was ready for a motion • • OTI:O"': Council Mellber Huber moved, seconded by Fazzino, that Policy and servicEl:s Committee approve the staff reccItmendation (CMP.:377:9.J) fer direction to staff to 1) COIlUllence neqotiations. vtth the firm of Nolte , Associates for consulting services relating to the Los Trancos Road and Page Mlll Road/Foothill Expressway Intersection Improvements; 2) cOmlrlence negotiations with the firm of wilsey & Ham, if staff failed to reach an agreement with Nolte' Associates; or 3) commence neqotiations with the firm of HMH. Inc~, if staff failed to reach an agreEment with Nolte. 07/07/93 P&S: 2 AS.ociatea or Wilsey • Ham~ and 4} u9Qn successful completion ot neqotiations, return to coun~il tor approval. ~%~ 7ka8ZD 3-0, Kniss .bs~nt. 07/07/93 P,S. 3 I ArtAClDlDT I AGREEKENT for PROFESSIONAL ENGrNEERING CONSULTANT SERVICES BETWEEN THE CITY OP PALO ALTO AND NOLTE AND ASSOCIATES, INC. This Agreement is rnaa~ and entered into t.his _____ day of • 1993. by and betweer: the CITY OF PALO ALTO, a mtlf1.icipal corporation of California {"CITyn) and NOLTE AND ASSOCIATES, INC. (Taxpayer Identification No. 94-2706173), a California corporation; 'With offices at 60 Sc·uth Y..arket Str-eet, Suite 300. San Jose. CA 95113 (~CONStwTANT·;. W 1: T N E S S B T H: WHEREAS, CITY desires certain professional consultant. services hereinafter described; and WHEREAS, CITY desires to engage CONSULTANT to provide these services by reason of its qualifications and experiEDce for performing such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein; NOW, THEREFORE, in consideration of their IOl.ltual covenants I the parties hereto agreE as follows: SECTION 1 -DEFrNITIONS 1.1 ~ The term "CITY-means the City of palo ~tOI Califurnia. 1.2 CI~f MANAGER The term ~City Manager~ means the duly appointed City Manager of the City of Palo Alto. California. or his or her designated representative. The cerro nCity Clerk" n~eans the duly appointed City C"lerk of the City of Palo Alto, California, or his or her designated representative. 1.4 corrrRAMQR The term -Road Improvements Contractorl! or ·RI Contractor" means the general contractor hin,cl to construct the improvements in connection with the Los TrancQs Road Improvements Project. The term -Intersection Improvements Contractor -or -II Contractor" mea.ns the general contracto: hired to construct the 1 i:nprovements in connection wi-ch the Page r"iill Eoad at Foothill Expressway Intersection Improvements Project, 2..5 RISK MANAGER The term "Risk Manager ll sl"'.all r.:ean the duly appoin~ed Risk Manager of the City of tlal:= Alto. California~ or his or her designated representative, 1.6 PROJECT The tenn ItLos Trancos Road Improvements Project' ar ~RI Project-shall mean the services and imp~ovements, if any, described in Exhibit "A" entitled "Scope of Projects and Time Schedules, ~ attached hereto and made a part hereof by this reference. The term ·Page Mill Road at Foothill Expressway Intersection Improvements Project" or "II Project" shall mean the services and L~rov~~ents, if any. described in Exhibit "A". The tent! ·Projects" sball refer to thE RI Project and t.he II Project. SECTION 2 PROJECT CQQRDINATION 2.1 l:l.Il:: The City ~~ger ~ill be the representative of CITY for all purposes under this Agreement. JOHN A~ CARLSON hereby is designated as the Project Manager for the City Manager and he or she Bt~ll supervise the progress and ~xecution of this Agreemen~1 and shall be assisted by KRYSTYNA L. STADNIK, the Project Engineer. 2 .2 C9NSllIJANT CONSULTANT shall assign a Project Director to have overall respoDsibility for the progress a.Old execution of thJs Agreement for CONSULTk~. PAUL J. KRUPKA hereby is designated as the Project Director for CONSULTANT. BRYCE E. CARROLL shall be assigned as the Project. Coordinator for CONSULTANT and shall represent CONSULTANT during the day-tC·day 'Work on the Project. Should circumstances or conditions suhsequent to t~e execution of this Agreement require a substitute Project Director or project Coordinator for any reason, the Project Director or Project Coordinator designee shall be subject to the prior written approval of the Project Manager~ SECTION 3 -SCOPE OF PRQJECT~ The scope of the PI'ojects to be executed by CONSULTANT under the phases of the Basic Services described in Section 4: of this Agreement, and the time sched"..!les for the Projects. are described in Exhibit -A-, 2 CONSULTANT shall perfo:-m various design and construction management services for Crr{ in connection with Project and the II Project as more f'.;.lly de.scribed herein.. Other the RI 4.1 BASIC SE:RYLCES LOS TP.A.~\.~OS ROAD IMPROVEMENTS Phases of WorK. The Basic Services for the R! Project shall be furnished in the phase~ ot work as described belo~ and ~5 more particularly described in Exhibit ~AB. 4.1.1. {a) CONSULTANT shall prepare-a conceptual design 5tudy for the R! Project consistins of drawings and ot}-1.er documents illustratiDg the scale and relationship cf project components anc submit. five (5) copies thereof for approval by the Project Engineer. {b) CONS~~TANT shall submit to the Project Manager for review and apprO'V'al with the Concepr:ual Design Phase study an estimate in duplicate of probable construction cost based on current area, volume and other unit costs. ee) CONSULTAA"T shall attend two (2) meetings during this Phase. (d) Upon lrfI'itten approval by CITY for the Conceptual Design pr~se. CONSULTANT shall proceed to the preli~~oary Design Phase. 4.1.2 ~ina+y Design Phase The Prel~nary DeSign Phase sball consist of the following ph::lses of work and shall include. but not be li!nited to, the usual professional ser .... ices of ci'\ril and traffic engineering, emrironmental planning, and landscape archit!';!cture. as applicable. CO!1SU" ..... r:A.1QT· s specific respoc.sibilities are described belo~·. {a) CONSULTANT shall consult with CITY to ascertain the requirements of the RI p~oject and shall confirm such req~irements to the Project Engineer. (b) CONSULTANT shall prepare a maximum of three (3) preliminary design plans consisting of dra .... ings a:J.d othe:!" docwt:ents illustrating the scale and relationship of RI Project components and submit five (5) copies thereof for appI-oval by the Project Manager. (C) CONSULTANT shall prepare f':nviron.'Ttental assessments, in ac~oI:-d.ance with CITY gUidelines, applicable to the RI Project. 3 "'T--"~ •. ,,.,_ .. ___ _ ; /. (d) CONSULTANT shall sl.lbmit to t'he Proj ect Manager tor his revie\i," and ,:pp.toval with the Prel i:",: nary Design Phase plar..s, a sta.tement of p ')bable construction c , in duplicat€, hasoed on current area, vclume a~d oth€r unit CL~~S. te) :ONSULTM"T shall 'Work ..... ith C::-TY's staff to secure approvals of _:le Preliminary Design Phase by the City Council ana/or other appropriate boards, committees. and cO!!IITLissivns. If required by CITY, CONSu~TANT shall make persc~al presentations of the Preliminary Desig'n Phase to the City Coun: _1. any City Council ccmmitt.ee to which the RI Project is referred. CITY' 5 Plan.'1inq Co!ml1ission, any community advisory groups. and/or CITY's Archllectural Review Board+ C0NSULT~~ shall a~tend a maxim~ of three (3) meetings during this Phase. if) CONSULTANT shall subu~t to the Project Manager. two (2) copies of any and all cal.:::ulations, ske:.ches k dia.gra.r.'lS, cO!r:pllter print-outs rand oth€:r documentS prepare::: juring this phase of Basic Services. {g) At CITY's el~ctioll and at any time, CITY I!I.ay terminate the RI project, proceed forward with the RI Project under the original scope of work, or proceed forward with the RI Projecc. as modified. In the event that. CITY terminates the RI Project, CONSULTkNT will be re~ur6ed for ~ll reasonable expenses relating to the Preliminary Design Phase for the RI Project which are :r-easonably incurred before the date on which CITY gives notice of termination to CONSULTJ!..:::r. (h) Upon the written approval by CITY of the Preliminary Design Phase, CONSULTANT shall proceed to the Construction Documents Phase. 4.1. :; (a) CONStJ'"LTAN'I' shall prepare frcm the approved Preliminary Design Phase documeots, fer. approval by the Project Manager k d=a""ings, specifications. ana ot.her contract forms. setting forth. in detail. the requirements for the construction of the R! Proj ect k includ,ing the necessary environmental impact review. technical specifications, special conditio~s using special provisions and contract forms furnished by CITY. (b) Prior to the advertising for invitation for bids k CONSULTANT shall submit k in duplicate, to the Pro;ect Manaqer for his revie~w and approval a final detailed statenlent of probable construction cost. (c) CONSUL·TAN! shall attend meetings with CITY's staff at critical or~ses of the work and shall assiAt CITY in obtaining approval o~ regu:at.ory agencies when required by such agencies. In assisting CITY, CONSULTAN'I' shall be limir:ed to preparing anc providing exhibits as required by the meeting and presenting th~ ex.. ..... aibits and relat.ed materials aL:. the m-e-eting. 4 (d~ CONStTLTJ-.NT shall fur-nish plans at the SO percent, 95 percent, and 100 pe~cent stages of completion. Sub~ittals shall include RI Project drawings, specifications. estimates, and reports as more specificelly set forth in Exhibit "A." (e) Upon completion of the RI Project drawings, specifications. and other oGcumencs. CONSULTAIlT sl".all submit the originals to the Project Manager for signature. CONSULTANT shall !""eproduce one hundred fifty (~SO} copies of the RI Proj ect drawings and specifications. and the sarr~ shall be consider~d a reimbursable expense. CONSULTANT shall also provide the draw.!.ngs in AU'!'OCAD (R) format on 3-1/2 inch or 5-1j4 inch DOS (version S.C or later version) formatted diskettes. (f) All RI project drawings, specifications, and other inst.nunents of professional service furnished by CONSULTA.,,\IT at CITY's request on electronic ID:=dia, disk, tape, or cartridge a%'e record doclJIllents to be used for the sole purpose of Maintenance of ~he original facility for whicr. they were prepared, ~nd in no case shall they he used fer future construction, includi!lg but not limited to, renovations or additions to the ori9~nal facility. (g) CONSULTANT shall archive a copy of the electronic media trar~ferred to CITY~ the contents of which shall be deemed to contain the entire content of electronic media furnished by CONSULTANT to CITY _ Hard paper copies of the inforn.ation contained 00 the electronic media sr~ll be rrade available by CONSULTANT at the Project Manager's request _ Use: of che electronic media at CITY's election shall be at the sole risk of CITY and without liability or legal exposure to CCNSt~TANT. (h) CONSULT~VT shall submit to the Project Manager~ in duplicate, any revisions to the calculations, sketches, diagrams, computer printouts, and other doc~~ents that were initially submitted or required to be submitted by CONSULTANT during t!':.e Preliminary Design Phase~ (i) CONSULT~7 shall assist CITY's staff at and after the RI Proj ect pre-bid conferencE. if required, in obtaining and analyzing bids and awarding the contract _ CONSULTANT shall be available to answer inq •. .liries regarding the RI Project drawings and specifications by contractors and CITY duri!1g tbe pre-award bidding period~ (j) Upon awald by tl".e Cit.y Council of the RI Project construction contract. CCNSv~T.ANT shall proceed to c.he ConstructioD Phase. 4.1.4 Cpnst.ructlon Fhase --P-.drninistration of cons~ructipn contract (a) The Construction Phase will commence with the award of the RI Project construction contract and will ter.minate when final payment is m.:l.de by CITY to the RI Contractor or upon the 5 -------- I I , -" . cc"''''''"'''''-,,_c'"'--_____ ~ ______ ...... ,, _____ _ filing and recordation of th~ no~ice of completion. whichever occurs later. (b) CITY shall provide for the administra'Cion of the RI project construccion contrae,. (c) CONSULTk~ shall attend ere-construction and weekly cOllstruction meetings and ans .... er questions regarding the RI Project drawings and specifications prepared by CONSULTANT_ (d) CONSULTANT shall at all times h,ive acces~ to the work wher~ver it is in preparation or in prog:t'ess. (e) CONSULTA."IT's presence or. t1:e job-site fro~ time to time shall be required for the purpose of becoming g~nerally familiar with the progress of complet.ed canst ruCtlon and determining wheth€r, in general, the work is being performed in a manner -which indicates that the .... ork.. when completed, will be consistent with the objective intent of CONSULTANT's RI Proj ect drawings and specifications~ CONSULT~~ shall not be responsible for making exhaustive or continuous on-site inspections to check the quality or quantity of construction~ nor shall CONSt~TANT be responsible for the RI Contructor's failure to carry out the work in accordance with the RI Project const~~ction contract. On the basis of such on-si~e obse~v.ations in the capacity of a professional engineer. CONSULTA."IT shall endeavor to keep CITY informed as to the progress of the construction work. tf) The responsibility for consLruc~ion means, methods, techniques, sequenceB~ or procedures, or for safet-y precautions and programs in connection with the const.ruction of the RI Proj ect shall be placed upon the R:r Contractor under the RI Proj ect construction contract. CONSULTANT shall not exercise cOTItrcl over the RI Contractor, any SUbcontractors, officers, employees, or agents of any of them, or any other persons performing portions of the RI Proj ect constructioD. work. (9) CONSULTANT's obligation to obse~e the RI Project constructio::: work shall not create any duty on the part of CONSt.'LTAro.'T to CITY ~ the RI Contractor, or its subcontract.=-rs, officers~ employees, or agents of any of th~~. or any other ~hird party with regard to teropora~f shoring or braci4g. scaffolding, or partially completed construction. Any re~irement for submission of RI Project drawings, specifications, or other doc~~ntation for temporary shoring, bracing, or scaffolding as may he set fortb in the RI Project construction contract shall be for the sole purpose of verification by CITY that the RI Project dra~ings, specifica­ tions, and documentation have been prepared by a licensed engineer. {h) CONSULTANT shall review and take apprcpriate professiooal action on laboratory, shop and mill tests, reports of equiplr..ent performance, shop drawings, samples, and ot.her submissions of the contractor far confor.:nance 'With the design concept of the RI Project and for compliance with the construction contract documents. .. --'- · ,",,",.' (i) CONStTLTANT shall not be required to :review and shall not be rp.sponsible for any deviations from thE' Rl Project ccnscrcction cont.ract not cle-arly noted by the ::I:I Contractor, nor shall CONSULTllNT be required to review partial submissions or those for w~icr.. submissions for related items have not ~een received. Review of a specific item shall not indil:ate ar:ceptanc2 of eny assembly of which the item is a compor.ent. When the professional certification of perfo!lf".ance characteristics, or of mat.==rials, systems. or equipment is required by the RI project cc·nstrur:tion contract. CONSULTANT shall be entitled to rely upon. 5ljch certification as verification that the materia.l.s, systems., or equipment w~ll meet the performance crit~ria ~et forth in the RI Project con.struction contract. (j ) required in construction work: . CONSULTANT shall order to clarify contract dOC1.l.11.ents prepare supplementary or supplement the RI during the construction sket.ches PrGje~t Pnass of {k} CONStJLTANT shall review all requests for information and change orders for ccmpl~teness and validity. CONSULTANT shall recommend approprjate action fcr each r~quest. il) CONSULTANT shall conduct site visits, accotnpanied by a representative of CITY tc assist in the preparation of a punch list and determine the date of final completion. Further, CONSULTANT shall issue a written declaration that the RI Project is in conformance with the objective intent of Consultant· s RI Project drawings and sp~cifications. {mJ CONSULTANT shall attend meetings at least once each week throughout the Construction Phase with the RI Contrac~or and represEIltatives of CITY and shall submit to all parties the. minutes of the meetings attended by such pa=ties. {c) OONSULTANT~ at its expense. shall provide the Project Manager with one (1) copy of the RI P~oject drawings and specifications and a complete set of four mil minimum thick..."1ess, good quality transparent mylar drawings of record drawings after final completion. CONSULTANT shall also provide the record dl.·awings in AUTOCAD (R.) format on 3-1/2 inch or 5·1/4 inch DOS (version 5.0 or later version) forwetted disk~ttes. {OJ Upon substantial completion of construction, CONSULTANT shall obtain from the RI Contractor a marked-up set of RI Project drawings and specifications showing changes in the location and character of the -".ork ma.de by the RI Contractor during the construct.ion of the RI Project. CONSULTANT shall incorporate this information into a set of record documents which shall be delivered to CITY within a reasonable period after ::ubstantial completion. Payment of five percent {st) of the total c~~pensation payable to CONSULTANT for the Construction Phase Services shall be withheld until receipt of the record doc~~ents by CITY. 7 1 "! , '. I J ! ~ I I · 'i,' / (pl CONS'JLTANT rroay not be in a pasitior.. to eval<,;.;3,te or verify the accuracy or completeness ot any s .... ch l-ecord documents furnished by the R7 Contr~ctor< CONSULTANT shall not be responsible for ~~y inacc~racies, errors~ omissions, ambiguities, or conflicts which may be i!ltroduced into the re::ord d.ocu.rnents as a result of CONSULTANT' 5 reasonable and justi tiable relianc'2 or .. such information, except where such io.fo!'mation p::-ovided by the RI Contractor arose from reliance on CONSULTANT's deSign or ether work: performed hereunder~ (q) CONSULT~ry shall not be responsible fo~ d~~ges or injurie.s caused by the acts or omissions of the I! Contractor, or any subcontractor, or any agent or employee of the II Contractor or any subcontractor, or of any other persons perfo:rrr.ing any of the work. (r) CONSULT~~ shall not be responsible for the discovery, presence, handling, removal .. ::;r disposal cf or expos'.lre of per~ons to asbestos or hazardous or toxic substances in any form at the RI Project site. Professional services related to or in aoy way connected with the investigation~ detection, abatement~ replacement, use~ specification, or removal of products, materials, or processes containing asbestos or hazardous or toxic m3terials are beyond the scope of this Agreement4 (s) In the event that asbestos or hazardous or toxic materials is discovered at the RI Project job-site, CONSl~T~VT may .. at its option, suspend the perforrrance of services on 'the RI project, provided CITY first approves in 'Wri ting of such suspension of work, until such time as CITY may elect to or dete~~nes that it is necessar.f to retain a specialist consul tant or contractor to identify. classify~ abat~ and/or remove the asbestos and/or hazardous or toxic materials. (t) To the extent pennit;:ed by law, CONSULTANT shall not be liable for damages ariSing out of the presence of asbestos or hazardous or toxic substacces, products, materials or processes if such cla~. would in any way involve the i~vestigation, detection, abatern..:r.t j replacement, USer specification, 0= removal of prcducts~ mat.erials, or processes containing asbestos or hazardous or t.oxic substances. 4.2 BASIC SERVICES· PAGE MTLL ROAD 'FOOTHILL EXPRESSwAY lHTERSECIION IKPRQVZMEHTS Stages of' Work_ The Basic Services for the II project shall be furnished in the sta3e~ of work as described below and as more particularly described in EX.~iblt "AI. 8 .: ... "'::.' '.2.1 The Preliminary Design Stage shall consist af the following phases of 'WorK. and shall include, but [lot be limited to. the usual professional services of civi 1 and traffic engineering, en.vironmental planning. and landso::ape architectu::e, as applic3.ble. CONSULTANT's specific responsibilities a.t"e described below. (al CONSULTANT sJ1.all consult with CITY to ascert".ain the r~quirements of the II Project and shall confirm such re~~irement6 to the Project Engineer. (b) CONSULT~~ shall prepare one (1) Preliminary Design Phase plan consisting of II Project drawings and other docUtr,ents illustrating the scale and I'elationship of II Project corrqxments and submit ten (10) copies thereof fer approval by the Ploject. Manager. (c) CONSULTAI'IT shall prepare env-iro.nr.lental asseSSlnents, in accordance .... ith CITY guidelines, CEQA-. and NEPA, applicable to the II Project. (d) CONSULTANT shall sub~~t to the Prcject Manager for revie,.-and approval with the Preliminary Design Phase plan, a statement of probable constr~ction cost, in duplicate, based on current area~ volume and other unit costs. (e) CONSu~T~~ shall work with CITY~5 staff to secure approvals of the Preliminary DEsign Phase plan by the City Council and/or other appropriate boards, ccmnd.ttees, and cozr.mil5sions. If required by C!'TY. CONSULTA.."'IT shall :nake personal presentations of t.he Preliminary Design Phase plan to t.he City CounCil. any City Council cotm'littee to which the II Project is referred, CITY'IS Planning Commdssion, any community advisory groups, and/or CITY's Architectural Review Board~ CONSULTANT shall attend a maximum of three {3) meetings during t.his Phase. (f) Upon the 'W!."itten approval by CITY a:1d the County of Santa Clara ("TOUN'I'"':l"I:} for the PrelL"Tlinary Design Phase, CONSULTANT shall proceed to the Construction Documents Phase+ (g) CONSv~TANT sr~ll submit to the Project Manaaer, two (2) copies of any and all calculations, sketches, diagrams. computer print-outs, and other documents prepared during this phase of the Basic Services. 4.2.2 ConstructJoP DocUIt':ents Phase {ai CONSULTANT shaLl. prepare from the approved Preliminary Des::=ign Phase docU!!lents, for apprO"v"al by t.he proj ect Manager, II project drawings, speCifications, and other contract forms sett.ing forth, in detail, the requirements tor the construc'C-ion of the II Project, includins the necessar'/ environmental docurr~nts, ~ecr_~ical specifications, special 9 .. j ~ 1 I 1 ! ·- ,/ pro .... -isions and special condit-ions using con.:r,a.ct forms furnished by CITY. (bl Prior to the advertising for invitations for bids. CONSULTANT shall submit in duplicate to U:e Proj ect foI..anager for rEview and approval a final detailed statement of probable construction cost. Ie) CONSULTANT shall attend mee~ings with CITY's staff at critical phases of the work and shall assist CITY in obtaining approval of re~~latory agencies when required by such agencies. In assisting CITY. CONSULTANT !Jhall be limited to preparing and pro'.rid.ing exhibits as required by the :neeting and presenting the exhibits and related materials at the meeti~g. (d) CONSULTANT shall furnish plans at the 50 perCEnt, 95 percer:.t, and 1.00 per-:ent stages of c;ompleticm. Submittals shall include II Project drawings, speCifications, Esti~ates, and reports as more specifically set forth in Exhibit "A.- {e) upon completion of the II Project drawings, specifications, and other documents, CONSULTANT shall submit the originals to the Proj ect Manager for signature. CONSULTANT shall reproduce one hundred fifty (150) copies of the II Project draWings and specifications, and the same shall be consid6red a reimbu~sable expense. CONSULTANT shall alec provide the drawings in AUTOCAD (R} format on 3-1/2 inch or 5·1/4 inch DOS (version 5.0 or-later version} f.::>rmatted diskettes. (f) ~l II P~oject drawings, specifications, and other instruments of professional service furnished at CITY's request on electronic media, disk, tape, or cartridge are record docux;-;ents to be used for the sole purpose of maintenance of the original facility for ...;hich they ",ere prepared~ and in no case shall they be u~ed for future construction, including but not limited to renovations or additions to the original facility. (g) CONS'ULTANT shall archive a copy of the electronic media transferred to CITY. the contents of which shall be deemed to contain the entire content of electrcnic media furnished to CITY. Hard paper copies of the infcnro.atic·n contained on the ele,=tronic media shall be made available. and their use is recommended. Use of the electronic :media at CITY's election shall be at the sole risk of CITY and wi thout liability or legal e"'.-posure to CONSULTP.NT. (h) CONSULTANT shall submit to the Project Manager, in duplicate, any re ..... isions to ciSl.lculations. sketches. diagrams, computer printou~s and other documents that were i~itially submitted during the Preliminary Design Phase. (i) CONSULTANT s~~ll assist CITY's staff at and after the II Project pre-bid conference, if required, in obtaining and analyzing bids and awarding the contract. CONSU'LTM"T sl-...all be available to answer in~Jiries regarding the II Project drawings and specifications by contractors and CITY during the bidding pe~iod. 10 . I' "of'to {j) Upon a ..... ard by the City Council of the II Prc'ieee construction contract, CONSULTANT shall pL-oceed t.o t.he Construction Stage. 4..2.3. Const.ruct'; on phase ~ ·P..dministrat iot',, ____ QJ the construction contract (a) The Construction Phase will commence with the aware of the II project constl-ucticll contract and will termina.t,= when final payment is made by CITY to the 11 Contracror or upon the filing and recordation of the notice of completion, whichever oc:::urs late!:". (b1 CITY shall provide for the administration of the !T Project construction contract. (c) CONSULTANT shall attend pre~construction and weekly ::onstruction meeti~gs and answer questions regarding the II Prcj eet dra~iogs and specifications prepared by CONSULT~~. (dl CONSULTANT shall at all times have access to the work wherever it is in preparation or in progress. {aj CONSULTANTi s presence on the job-site from time to time l'lhall be required for the purpose of becoming generally familiar with the progress of completed conser-J.etion and deter.w~ning whether i in general i the work is being performed in a manner which indicaces that the work, when completed, will be consistent with. the obj ective intent of CONSULTANT's II Project drawings and specifications. CONSULTANT shall not be rEsponsible for making exhaustiv~ or continuous on-site inspections to check the ~~ality or quantity of constr~ction. nor shall CONSULTAb~ be responsible for the II Contractoris failure to carry out the work in accordance with the II project const~~ction contract_ On the basis of such on-site observations in the capacity of a professional engineer. CONSULTAN"r shall endeavor to i;:eep CITY ioformed as to the p~ogress of the construction ~ork. (f) The responsibiliqr for construction means, m~thods. techniques, sequences, or procedures, or for safety precautions and programs in connection with the cOllstruction of the II Project shall be placed upon the II Cont"t"actor under the II Proj ect construction contract. CONSULTANT shall not exercise control over the II Contractor, any subcont~·actors. Officers i employees, or agents of any of them, or any other persons performing po~tions of the construction work. (g) CCNSULTA.."IT's obligation to obsenre the II Project construction shall not create any duty on the part of CONSULTA..!Ifl' to CITY, the II Contra~tor, subcontrac~ors, officers i employees, or agents of any of them, or 2~y other third party with reg~rd to the temporary 5ho~ing or braCing. scaffolding, or partially comple~ed constnlction_ Any requirement for the submission of II Proj ect drawings i specifications, or other documentation for temporary shoring. bracing. or scaffolding as may be set forth i~ the II 11 ,'--'-- i Project construction contr'3.ct so:!"lall be tor the SQ:l~ p1.:rpose of verifica~ion by CITY that the II Proj eet dra ..... ·ings, specifications. and documentation have been prepa.t"ed by a licensed er!g-inesr-. ih) CONSL~TAN1 shall revie~ and take approp~i3t~ professional action on laboratory, shop a~d mill tests, reports of equipment performance, shop-drawings, samples, a:1d athe:::­ submissions of the contractct for cot'tforwa~ce with tr"e de,sign concept. of the project and for compliance with the cor.structio!"~ contract documents. (il CONSUL'l'A.,'lT shall not be I"equired to reviey and sha,ll not be responsible for any deviations from the II Project construction contract not clearly noted by the 1 I Contractor, nor shall CONSULTANT ,be required to review partial submissions or those fer which submissions for relatle,j items have not been :r-eceived. When the professional certifica.tion of perfcrmance chara::teristics, or of materials I systems. or equipment is required by the IT Project construction contract, CONSULTAltt shall be e ... titled to rely upon such cert.ification as yerification that the roatf3rials, systems, or equipment vill meet the performance criteria set fO!"t.h in the II project construction contract. (j ) required in construction work. CONSULTAliT 8ha 11 order to clarify contract documents prepare supplementary or supplement the II during the Construction sketches Project Phase of (k) CONSULTANT shall review alJ reques'ts fer inf:onnat.ion and change orders for completeness and validity. CONSOLTM"'T shall recommend appropriate a~tion for each request. (l} CONSULTANT shall observe the initial operation of the II Project, and of perfo~ance tests required by the II Project drawings and specifications. ,,,,I the start. -up, acceptance of If required by CITY, CONSUL'!ANT shall assist CITY in testing and operation of the equipment prior to the II Project by CITY. {n} CONSULTANT, at it.s expeI"'...se~ shall previde the Project Manager with one (l) copy Of the II project drawings and specifications and a complete set of four mil mini~~ thickness, good quality transparent myla= drawings of record drawings after final completion. CONSULT~~ shall also provide the record drawings in AUTOCAD {R~ format on 3-1/2 inch or 5-1./4 inch DOS {version 5.0 or later version) fonmatted diskettes. (o) Upen substant.ial completion of constro.1ct.ion, CONSULTANT shall obtain from the II Contractor a mar~ed-uo set of II Project drawin9s and specifica~ions showing significant· changes in the location and character of the work made by the II Contractor during the construction of the II Project. CONSULT.lUIT shall incorpo~ate this information into a set of record doc~~encs which shall be delivered to CITY within a reasonable period after 12 /-" . ~. . c"./:: substantial cocrpletion. l?ayme'r1.t o! an additional five percent i5%l Gf the c01":'\pensation to CONSULTANT for Cans~ruction Pha.se Services shall be 'Withheld until !:"ec~ipt: of th-e record documents by CITY. (p) CONSUl,TAlIT tray not be in a position to evaluate or voari!y t~.e accuracy ox: cotr..plete.nes!=i of any such record documEnts furnish~d by the II Contractor. CONSULTANT snaIl not be r~sP"o;'..sibloe for a.ny inaccuracies, errors, emissions, ambig-.:.ities, or conflicts which may be introduced inco the record docu.'l'l.ents as a result of CONSULTM'1"S relianc<e. on such information, except .."hel::e such information provided by the II Contractor arose from reliance en CONSULTAN~'s design or other work performed hereunder. (ql CONSULTANT shall not oe r€sponsit-.le for damages or injuries caused b} the acts or omissions of the II Contractor, or any subcontractor. or any ag€nt O~ employee of the II Contractor or any subcontractor, or of any Other persons performing any of the work. {~} CONS~~TANT shall net be r~spon5ible for the discovery~ presence, handling, removal, or disposal of or exposure of persons to asbestos or hazardous or toxic substances in any ferm at the II project site. Professiooal sen"ices related to or in any way connected 'With the investigation, detection, abatemen.t~ replacement, use l specifi.cation~ or removal of products r materials, or processes containing: asbestos or ha.zardous or toxic materials are beyond the scope of this Agre~~nt. (s) In the event that asbestos or hazardous or toxic materials is discovered at the II Proj€.ct job~site~ CONSULTA:oi"'I' tray. at its option l suspend the performance of senrices on the II Project, provided CITY first approves in writing of such suspension of services, until such time as CITY may elect to or determines that it is necessary to retain a specialist consultant or contraceor to identify, classify, abate and/or remove the asbestos and/or hazardous or toxic materials. <t) To the ext.ent pertr.itt.ed by law. CONSULTM""T shall not be liable for damages arising out of the presence of asbestos or toxic sUbstances, products, ~aterials or processes if such claim would in any way involve the invesc.igaticn, detection, abatement, replacement use, specification, or removal or products, materials~ or processes containing asbestos or hazardOUS or t.oxic Eubscances. 4.3 ADDITIONAL SERVICES CONSD~TANT shall perform or obtain any and all of the following additional ser..'ic€:s if so a\.lthoriz.ed in 'N.r-iting by CITY. and shall be paid as provided in Section 7 of this Agreemeut: 4.:;.2 Provide financial feas~bility or other special studies. 4.2..2 Provide planning s'urveys~ site evaluations r or comparative studies of prospective sites. 13 • 4.).:! Make measured c.ra ...... ings of exi sting construr:t iO:J wh~n required for planning additions or alterations thereto. 4.3.4 Revise previously approved drawings, speci! lea· tions or other docu..-nents to accOlTlplish cr..anges not initiated by CONSULTANT . 4.3" 5 Pro\,ide consul tat ion concerning replacement of any work damaged by fire or other ca ..... se during construction, an.d furnishing basic professional services of the typ~ set forth in this Agreement as may be required in con.~e-ctio~ with the replace­ ment of such work. 4.3.6 Provide professional sEz ...... rices made necessary by the default of the contractor in the performance of the II Project construction contract. 4.3.; Provide services, other than the completion of the Record drawi.ogs and the related Froject close-out, after final payment to the contractor. 4:.3. B Provide services connect.iOD lIlith any public hearing t proceeding of a court of record. as an expert witness arbitration proceeding, in or 4.3.9 Provide services for planning the lay-cut of tenant or rental spaces. 4.3.1.0 Provide services directly applicable to the preparation of environmeotal impact studies and reports. 4.3.11 Ma.ke detailed milL shop, and/or laboratory inspection of materials and equipment. 4.3.12 Furnish property~ boundary, rights-of-way~ topographiC and utility surveys I and related offic'E! computations and drafting and surveying in addition to similar services furnished under the BasiC Services. 4.3.13 ~~rnish special photography, models, printed reports and additional copies of RI Project and II Project construction contract:s drawings and docurr.ents above the number specified in Section 4 of this Agre~~ent. 4.3.14 Prepare applications and supporting documents for governmental grants or advances for p"..zblic works projects, and implementing such grants or advances. 4.3.15 Instruct plant employees in the operation and maintenance of newly installed equipment. 4.3.16 Incur travel and subsistence expenses for CONSULTANT and it.s staff beyond those normally required under Basic Services of this Agreement. 14 4.3.17 Prepare an operatiol'1s and maintenance manual. 4.3.16 Perform any other services tcat ~ay be aqreed upon by the parties subsequent to th~ execution of this Agreement" 4 . .3 .19 1f requested in writing by CITY, CONSULTANT shall provide one or more Projects representatives to assist the parties in observing, mo~itoring. and reporting on the progress of the RI Proj ~ct and II PI"oject construction contracts. (a) Such Projects representatives shall be selected, employed and directed by CONSULTAA'T or sub<:onsultants, and CITY agrees to pay to L"'ONSULTAN'T and/or s\.l.bconsul tants. for t.he services of the ProjEcts representatives, as defined in Se::tion 7 of this AgreeIllent. For the purposes of this provision. the Projects represent.atives· time spent traveling from CONSU".uTANT's and/or subconsultant's office to and fro~ the RI Project and II Project job-sites shall be calculat>ed as an additional service, as Ehall be the time spent on the job-site and preparing the r~ports required hereunder~ (b) Such Projects representatives shall visit the sites of construction as required by the needs of the R! Project or the II Proj ect .. or bottt, and a: least every other day over tne t.erm of construction~ provided there actually is vork in progress. The Projects representatives sp..all each file a written report with the Proje:-:t Manager setting forti'. the nature. scope, character and progress of the work performed at the two job-sites immediately after each visit to the sites. (c) CONSULTANT"S pre3ence on the two job-sites from time to time shall be fOol: the purpo.:5ie of he coming ge'J.erally familiar with the progress and quality of completed construction and detezmining whether~ in general. the two Projeo.cts· work are being performed in a manner which indicates that the tva Projects' wcrk~ when completed .. will be consistent with the objective intent of CONSULTAN!' s drawings and Projects specificati·:ms. CONSULTA.\,l' shall not be responsible for making exr4ustive or continuous on­ site inspections to check the ~uality or ~Ja-~tity of constr~ction; nor shall CONSULTANT be responsible for the RI Contractor'S or the II Contract.or· s failure to carry out the 'Work: in accordance with the RI Project constr'.JctioD contract or trle II Proj ect construction contract. On the basiS of such on-site observatio!ls in the capacity of a professional ensineer, CONSULTJL~~ shall endeavor to keep CITY informed as to the prcgress and quality of the const.ruction. {dl The respo~sibility for construction means, methods, techniques, sequences, or procedures~ or for safety precautions and programs in co~~ectioD with the construction of the two Projects shall be placed upon the RI Contractor or the II Contractor, as appropriate, under the respEctive RI Project and II Project construction contracts. CONSULTANT shall not exercise control over the RI Co~tractor or the II Contractor, any subcontractors, officers, employees, or agents of any of the.-n. or anr other persons 15 -___ " ... _____ Tt!_ ... ·_~-- ! , 1 ':.-. ";., performing portions of the RI Prcject or II Project construction 'Work. (e) CONSULTANT'S obligation to obeerve . he two P-')jects' construction shall not c:-eate any dutJj on the part 'f the CONSUL rANT to CITY, the Rl Contract':)r or the II COJ:.~ractor, subcontractors, ofticers~ err,ployees, or agents of ani' of them, or any other third party with regard to temporary shari:r..g or bracing, scaffolding, or partially completed const~~ction. ~'Y requirement for submission of the Project.s' drawin9s~ specifications, or other documentation for temporary shoring, bracing, or scaffolding as may be set forth in the respective two projects construction contracts shall be fOl tt;e sole pUI:pose of verification by CIT~ that the Projects' drawings, specificatior::s. and documentation hzve been prepared by a licensed engineer. 4.4 GENERA!. DUTIES OF CONSULTJ.,A"'T 4 .4.~ CONSULTANT represents that it has the exoertis€ a~d professional qualifications to furnish the services aescribed under-this Agreement. CONSULT~.NT further declares that one or more members or employees of itS firm and that of its subconsultants, if any, are licensed by the State of California to p~rform their services, if required, and that these services will be performed by them or under their sUDervision. CONSULTANT shall furnish to CITY for approval, "rior t: execution of this Agreement, a list of all firms or corp~~ations to be employed as subconsultaots. 4.4.:2 CONSULTANT states that it is aware of the requirements of the federal Americans with Disabilities Act of 1990. and the Government Cede and the Health and Safl!:!ty Code of the State of California. relating to access to public buildings and accommodations for disabled persons, and relating to facilities for disabled persons. COnSULTANT shall comply IW'itt'i or ensure by its advice that compliance with such provisions will be effected pursuant to the terms of this Agreement. 4.4.3 CITY reserves the right to retain the-services of a constr'J.ction cost consultant to prepare estimates of cost independent of those prepared by CONSULTANT during each phase of design. CONSULTANT shall meet with the construction cost consul· tant and CITY representatives to resolve major differences in their respective estimates. 4.4.4 CONSULTANT shall furnish CITY with every reasonable opportunity for CITY to ascertain that the services of CONSlJ""LTAN'I' art: being performed in accorda.!'lc "With the requirements and intentions of this Agreement. SECTION 5 • mITlES OF CITY S.l CITY shall provide full inf~rmation regarding its requirements for the Project. 16 .-; " I , .... ,,/'. :""""'{-"-.<." ;.: .. / .. > :}it;-c 5.2 C!TY shall examine documents s'.J.brnitt.ed by CONSULTANT and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CON,SULTA."'f!', E .... ork. s. J CITY shall furnish su-::b legal. accounting, insurance, and property research counseling services as ma.y be necessary for the Project r and such auditing se~ices as may be required to ascertain ho_ or for 'What purposes the contractor has used the moneys paid to it under the II Project construction contract. 5.4 The services, informa~ion, surveys and reports req-.Jired bv paragraphs 5.l and 5.3 shall be furnished at CITY'S expen:se~ and CONSULTANT shall be entitled to rely upon the completeness end accuracy thereof4 5.5 If CITY obse~~e5 or otherwis€ becomes aware of any fault or defect in the Project o~ nonconforrrance with the contract documents, CITY to the extent it is feasible to do so ~hall give prompt written notice thereof to CONSULTAA"'l" SEC"I'IQN 6 -STATEMElIT OF FROBABLE CONSTRUCTION COST CONSULTANT' 5 eval'tJations of CITY'S project budget and its statements of const~~ction costs as provided for herein will be made on the basis of CONSULTANT'IS experience and qualifications and will represent CONSULTANT's best judgment as a qualified design professional familiar with the construction industry" Because, however. CCNSULTAN'!' has no control over che cost of labor, materials, equipment, or services furnished by others, or Over the RI Contractor's and the II Contractor's methods of determining prices, or over the competitive bidding process or future market 'Conditions. CONSULTANT cannOL and does not guaro..nree or represent t~~t proposals. bids. negotiated prices, or actual construction costs will not vary from the statements of probable construction costs prepal."ed or agreed upon by CONSULTANT" SECTION 1 -PAYMENT Payment shall be made by CIT{ wit~in ~o days of the date of invoice, .only for sarvices rendered and within thirty (30) days of submission in triplicate of monthly progress payment re~~ests" Each invoice shall be itemized as to the type of payment described in this section. 7.1 CONSULTANT'S FEES 7.1.1 ~" (a) In consideration for the full performance of the Basic Services de~cribed in Sections 4 and 7 of this Agreement for the R! Project. CITY agrees to pay CONSULTANT a fee not to exceed forcy-one thousand nine hundred dollars !$41,900) for the Conceptual Design Phase. The fees for the Preliminary Design Phase 17 --.. " " and Construction Documents Phase and Construction Phase 'Will be negotiated after the Conceptual Desigr. Phase has been Lompleted. {b) In consideration for "the full performan.i:e of the Basic Services describEd in Sections 4 and 7 of this Agreement for the II project., CITY agrees to pay CONSULTANT a fee not to exceed one hundred eight thou.sand dollars ($lC8,OOCl for the Preli::ninary Design Phase, eigbty-two thQusa.'1d dollars ($82~OOO;' for the construction Oocu...,-.snts Design Phase. 'lhe fee for the Constr-..1ctio!; Phase will be negotiated after the Construction Documents has been completed. {el The amount of CONSULTANT's compensation shall be calculated as set forth in Exhibit ~B·, entitled 'Rate Schedule,­ att:.ac:bea hereto and l':\ade a part hereof by this referenr:E~ on lump S~. basis except as noted in E~~ibit wB~. up to the ~aximurn amount set forth in this paragraph 7.1. 7.1.2 Subcopsultants. Fees for subconsultants. hired directly by CONSL~T~~. shall be approved by CITY in advance of incurring such fees. 7 .. .1. 3 ~Additicn.al Senricps. For CONSULTANT's additional services, as described in Section 4 of this Agreement, compensation 6ha~1 be as prescribed in Exhibit. -S-but shall not exceed $25.000. An employee~s or subconsultant~e time shall be computed based on CONSULTANT' 6 Rate Schedule define:d in this section and Exhibit B. The rate schedules shall be -updated on July 1 of each year. 7.1.4 For Extra Work Qr Changes. Payment for extra work: or changes in the work not initiated by CONSULTANT and authorized in writing by the Project Manager shall be made wiehin thirty (30) days of submission by CONSULTANT of a statement in triplicate of itemized costs covering such woek. Prior to commencing such extra ~ork or changes, CONSULT~~ and CITY shall agree upon an E:sti:rr.ated not-t.o-exceed cost for such extra w-·:).:-k. In no event shall CONSULT~! be paid for deSign work or change order preparation which is necessary because of CONSULTA1"fT's errors or oversight.s. 7.1.5 ~eimhursabl. Expen€es. Reimbursable Expenses under t.he Ag'Ceulent shall not e.xcee-d $20 r 000. Reimbursable Expenses are in addition to the compensation for Basic and Additional Services and shall include act.ual expenditures, plus a mark-up of twelve percent (12%) made by CONSULTANT~ its employees, or its professional consultants in the interest of the Projects for expenses listed in the follo~ing paragraphs: (a) Expense in cor~~ction with the Projects for telephone calls and telegrams and fees paid for securing approval of authorities having jurisdiction over the Projects. (b) F~ense of reproduction, graphics, postage and ~.andlir.g of drawings aLd specifications, except for these required -;---.... !"" .............. -...... -.. ,~'~.----- to be furnished by CONSULTANT in Secti.on 4 and fer use in CONSULTANT'S office: (c) Expense Eor mileage to and from the Proj~cts j 00- sites and meetings re~~ested by CITY. (d) Only if authorized in advancE in writing by CITY. expense of overtime work requiring higher than regular rclte8. expense of renderings or models for CITY's use, and expense of computer time 'When used in connection 'With J.~,:jditional Services under Section 4. 7 • 2 PAYMENT S CI!EPtn.E 7.2.1 For Basic $e;vices. Payments for Basic Servi~es, excluding construction Phase-Administration of ~he Constr',J,ction Contracts. shall be Jri.Q.de monthly in progress payments­ in proportion to the services performed for each Phase. The fin~l progress payment for each project, excludirrg Co::;struction Phase­ Administration of the Construction Contracc for each project, shall be made by CITY after the bid opening for each project, but in no event: shall such final progress payrllent be made later than ninety (.90) days following acceptance of the applicable Construction Documents for each p~oject by the Project ~~nager. Work remaining after January 1995 shall be subject to ren~gotiation based on rate increases. Services for the Construction Phase for ~ach project shall be paid on a time and materials basis. based on ~~ibit Bl. 7.2.2 For Add~ t:iQr.-a1 ServicE'S. payments for Additional Services ot CQNSULTJuVT as defined in Section 4 shall be made as part of the monthly prog:.-ess payments for services rendered. 7.2.3 ~ Reimbursable Expenses. Re~ursable Expenses of CONSULTANT shall be made monthly progress payments for services rendered. Pay:nents for as part of the 7.2.4 DeducLion~. No deductions shall be made from CONStJLTAN'T's compensation on account of penalties, 1 iquidated da.,.ages, or other sums wi tt..beld from payments to ~.ontractors. 7.2.5 ~nt Upon Suspension or Abandonment of Projects. If the Projects are suspended for more than three months or abandoned, in whole or in part, CONSULT~~ shall be paid its compensation for serV'ices performed prior to receipt of \IiIritten notice frOCl CITY of such suspension or abar-..Qownent, together with additional and reimbursable expanses then due. If the Projects are resumed after being suspendea far more than nicety (90) days, a~y change in CONSULTANT's compensatio!'l shall be subj ect to renegotiat.ion and .. if necessary, approval by the Pa.lo Alto City Council (the "City Council-). If this Agreement. is suspended or terminated for fault of CONSl."LTANT, CITY shall be obligated to compensate CONSULTANT only for that portion of CONStJLTA."'IT' 5 services which a.re completEd at the date of termination. 19 ;-.,. , ~!QN 9 • PROGRESS AND ~)MPLETIQN S.l SCHJWUJ.,E CONSULTANT acknowledges the importance to CITY of t.he CITY' 6 Projects schedule and agrees to use its best effort:.s to per-form its s~:rvicetS under this Agreement in a manner consistent wit:.h that schedule. CITY understands, ho~ever, that CONSULTANT's perfo~nce must be governed by so~nd ecgineering practices. CONSULTANT shall not be responaible for delay caused by circuntstances beyond its reasonable control~ including, but not limited to delays by reason of. III strikes, lockouts, work slowdowns or stcppages, O~ accidents, (2) ac~s of God, (~) failure of CITY to turnish timely information or to approve or disapprove CONSULTANT's instrument of service promptly, and (4) faulty performance or non-performance by CITY, CITY'S independent consultants or contractors~ or governmental agencies. CONSULTANT shall Dot be liable for dw~ges arising out of any such delay, nor shall OONS~TANT be deemed to be in defa~lt oE this Agreement as a res'Ult thereof. T'.ne term of this Agreement shall conunence upon its execution by CITY. !t is understood and agreed that time is of the essence of this Agreement. The Conceptual Design Phase for the RI proj ect and Preliminary Design Phase for the II Project of the work shall start immediately upon. receipt by CONSULTANT of a notice to proce'2'd. Work on each successive phase of service as ~pecified in Section 4 of this Agreement shall proceed sequentially by stages and phases upon written notification and, until such notification, CONSULTANT shall not proceed ~i~h any subsequent item of service. e .2 TIME OF COMPLETION OF EACH PHASE CONSULTAh~ agrees to perform the phased services ~ithin thE; time li:nits set forth under t.he time schedule provided in Exhibit -A-, however~ that any change in the ECOP2 of services may require a revised time table. The Construction Phase, if ar.y. shall he dependant upon the lengt.h of the contrac:~ but in no evenc shall CONSLTLTANT submit record drawings later than thirty (30 l days after completion of construction work, as detertnined in writing by the project Manager. CITY agrees to exercise ordinary diligence in performing its tasks to implement: CONStr'"LTANT's time table provided under­ Exhi.bit -A-. 8 . ., CITY' S B WI EW ANP .;1'PROYAL Between each phase of 'Work there st.a.ll exist a re .... ~ie ..... and approval period by CITY. CrTY shall exercise o=dinary diligence to complete t-hese tasks; however. it is recognized that the inter- 20 c;,,,~,~j­ s:itJ;:;,;;;..;.;;. ... "O: .... -'-;i_.~~~~: ' !:<I?~~.'< related exchange of information among CITY's various departments makes it impossible to set a s?ecific time schedule. No.rm.:lly i CITY's estimated period of :review and approval will be furnished to CONSULTANT at the time of submission of each phase of the ~ork. 8.4 EXTENSION QF TIME OF COMPLETION In the event the services called for under this Agreement are not completed by CONStJLTANT within the time specifiE-d, CITY shall have the option to extend the till'.e 'Of completion. This paragraph does not preclude CITY's r~covery of d~ges for delay of CONSULTANT , SgCTION 9 . CSGL~GES IN WORK CITY may order maj or changes in seopld or character of work, either decreasing or increasing the amount of CONSUL7ANT's services. In the event that such changes are ordered. CONSULTft...NT shall be entitled to full compensation for the completion of all _ork performed prior to receipt of no~ice of change. Increased compensation for major changes shall be deter.mined in accordance 'With Section 7 of the AgreemeDt, but in no event shall CITY be liable for payment unless the ~~unt of such extra compen6a~ion shall first have been agreed to in writing by CITY~ In the event that major·changes are ordered Dursuant to this section; the schedule for progress and comple~ion~in Section e of this Agreement. and compensation under Section 7 of this Agreement, shall be adjusted by negotiation between CONSULTANT and CITY. subject to approval, if necessary, by the: City Council. SECTION 10 -TER.."""..INATIQN OR SUSrENsION OF AGREEMENT ~ D. 1 CANCELLATION BY CGNSVLTM'I CONSULTM'7 may terminate t.his Agreement or suspend 'II1oI'k cn the ~roject5 by providing 'thirty (30) days' '\IIri tten notice thereof to CITY~ but only in the event of a subst3.!ltial failu=e of performance by CITY or in the event CITY abandons or indefinite.ly postpones the Projects. 10.2 C~CELLATTQN BY CITY Withcut limitation to such rights or remedies as CITY shall otherwise bave by law, CITY ~~y terminate this Agreement or suspend work OD the Projects with or without cause, by providing fifteen (15) days· written notice thereof to CONSLTLTANT, or immediately after submission to CITY by CONSULTANT of any completed item of service specified in Section 4 of this Agreezr,enL CONSULTANT agrees to cease all work under this Agreement Llpon receipt of such wri~ten notice. --,..-------:--:-" 10.3 CQMPENSATION OF CQNSULTk~ TERMINATION OF THIS AGREElmNT IN TrlE EVE~! OF In the event of terrnina~ion of this Agreement or suspension of work on the Projects by either CITY or CONSUT~TANT as provided herein. CONSULTANT shall receive co."T!per:sation as f·o110,,",s: (a) For approved items of service under Set:tion 4 of this Agreement. compensation shall be in the amount outlin~d under Section 7 of this Agreement for the items of service fully performed by CONSULTANT. {b) For items of service on which a notice to proceed has been issued by CrTY, but which have J::ot been fully carr.pleted and approved, CONSULTANT shall be co:r.pensated for !.he items of service in an amount which bears the sarr,e ratio t.c the total. fee otherwise payable for the performance of the service as the service actually rendered bears t.o the total service necessary for the full performance of r.he item of service. (e) In no event shall the tctal compensation paid in the immediately preceding paragraphs Exceed the payment specified in Section 7 for the respective items of ~ervice to be furnished by CONSULTANT. (d) Notwithstanding anything in the preceding paragraphs. upon termination feZ" fault of CONSULTANT, CITY shall be obligated to pay for only that portioD of the service which can be incorporated in the respective Project or the Projects. ~O.4 DUTIES Q~ CITY AND CQN$ULT~7 Upon ter.mination o~ this Agreement or suspension 0: wo~k on the Projects by either CITY or CONSULTANT, aG provided herein, al.l. duties of CITY and CONSULTANT, as set forth in Sections 4 3.nn 5 hereinabove, shall terminatE. SEc:rIQN +1 • CONSULTA."'IT'S ACrOr::l'rI'lNG RE~ Records of the follolro'ing expenses pertaining to the Projects shall be kept by CONSUVI'ANT in accordance with generally accepted accounting principles and shall be made available to CITY at mutually convenient t~s during the term of this Agreement and for three (3) years following the termination of this Agreement: (a) Direct personnel expenses, including consultant expenses. {See Section? of this Agreement.) Cb) Reimbursable expenses. [See Section 7 of this Agreement;) . (c} Expenses pertaining to Additional Services. (See Section 7 of this Agreement.) 22 "' SBCTTON ~_: ..... 9~RSH!P OF DOCUMBNTS 12.1 OWNERSHIP QE. ORIGINAL poem-reNTS Subject to ~he provisions of Paragraph 12.2 belew. the original drawings, maps, plans, designs .. r~ccrds of 5'.lr.rey. wc,rk data, specifications, and any o~her docwr.ents prep:ared by CONSULTPJtT in the performance of this Agreement, although inst~­ mente of professional service, are and shall be the prop~=ty of CrTY whether the work for which thay axe made is performed cr r:ot. It is understood and agreed that the ?rojects' drawings and specifications prepared by CONSULT~~ under this Agreement are instruments of professional service iI1tended for one -time use 0::' the Projects only. It is further understood and agreed that, in the event CONSULTANT is precluded from completing a.ll services provided for hereunder, including all construction phase services~ and CITY elec~s to have the projects completed by others, there may be a significant risk of misinterpretation and misuse of CONSULTANT~s partially completed instruments of service, Nevertheless, a.ll such projec~s' drawings and specifications s~~11 become the property of CITY irl accordance with the t.erms and conditions o~ this Agreement. 12 ~ 2 TRANSFER TO CITY It is understood and agreed that the Projects' drawings and specifications prepared by CONSULTANT under this Agreement are instruments of professional senrice intended fpr oI!e-time use OIj, the .Proj ects only. upon ter:r-.i.oation under Section ~O of this Agreement and upon CITY's payment of the amount required to be paid uDder same section~ the originals and all drawir.gs, calculations, specifications and any similar dOCUI!"tents shall become the property of CIT'{. arul CONSULTANT shall transfe!' them to CITY, upon request, without additional compensation~ CITY shall have t.he right to utilize any completed. or 1.mcomplet-sd dra .... ings, esti.mates, specifications, and any other documents prepared hereunder by CONSULTANT. CITY~s election to use the plans and. specifications (1) for completion of the design of this project by others, (2) for the construction of this project 'Without participation by CONSULTANT, or (3} on any project other than th~ project which is the ~ubject of this Agreement, shall be at the sole risk of the ern', !,S",;;~CT,±,I~O~N~~1",3,-_~_~I,-,lIT,"·UE"R,"E"S2.' TL OF CONfiULTM."T; INDEPENP?IIT OF CITY CONSULTANT In accepting this Agreement, CONStJLTM"'T covenants that it presently has no inte~-est, and shall not acquire any int,=,rest, direct or indirect, financial or otherwise, which would conflict in any manner or degree ~ith the performance of the services hereunder. CONSULTANT further cove~ants that, in the oerfo~ance of this Agreement, no subcontractor or person having such an interest shall be employed. CONSULTANT certifies that no one 'Who 23 .. - / has or ...... ill have any financial interest '..!nder this Agreement is an officer or employ~e of CITi. It is expressly agreed that in the performance of the professional services required under this Agreement CONSULTANT, and &ny of its subco:lsultants or employees, sh.ill at all times be considered independent contractor3 and r.ot agents or employees of CITY. SECTION 14 -OlITSIPE CONSVLTANTS CONS\JLTM"T shall be responsible for employing all outside consultants (subconsultants) necessary to al-d CONSULTA.'IT in the performance of the services listed in Section 4 of this Agreementj provided, however; that all such subconsul tants shall receive prior approval of CITY in writing and shall remain acceptable to CITY during the term of this Ag,reement. SECTION 15 -INDEMNITY CONSt.TLTANT agrees to indemnify and hold harmless CITY. its Council members, officere.. and employees from any and all claims. demands or liability of any nature, including death or­ inju~f to any person, property damage or any loss, caused by or arising out of CONSULTANTis i its officers', agents', subconsultants' or employees' negligent acts. errors or omissions, or willf!.!l misconduct. cr conduct for whicil the law may impose strict liability on CONSULTJL~ in the performance of or failure to perform its obligations under this Ag~eement. CITY shall require Contractor to name CONSL'"l..TANT as additional insured. SBCTION 16 -INSURANCE 16 • 1 !NSURIu"JCE COVERAGE CONSULTANT, at its sale cost and expense, shall obtain and maintaiD i in full force and effect throughout the entire ter.m of this Agreement. the insurance coverage described in Exhibit wen to this Agreement, attached hereto and made a part hereof b}-r this reference, insuring not. only CONSULTANT and its subc.:ontractors. if any~ but also. ltfith the exception of 'Workers' compensation, employ£r's liability and professional liabiliey insurance, nawing as a.dditiona~ insureds CITY. its Council memP!;;I:s. officers. and employees, and each of them. concerning CONSU"LJTM"'I" s performance or failure to complete the perfcrrroance of the project under r.his Agreement~ Al~ insur~~ce coverage re~~ired hereu~der s~~ll be provided through carriers with an A. M. Best.& Company rating of A;X or higher that are admitted to do business in the State of California. Any and all subcontraccors of CONSULTArIT under this Agreement shall obtain and rl'"lainta~n, in full force and effect throughout the term of this Agreement, i!J5urance coverage as set 24 "- forth in Ex..~ibi t "e", ...,it-h CITY and CONSULTA!'tT named as addi ticnal insured under such policies as required abo~e. 16 .2 EVIDENCE OF COVERAGE Certificates of such insurance, preferably on the forms p!'"ovided by CITY, shall be tiled \oI'ith CITY ccncurrently with the execu~i,on of this Agre-crn.-ent. The ce!""tificates sh,all be subject to t.he approval of the R.isk Manager and shall contain an endorsement stating that the insurance is priIrary coverage and .... ·ill not be cancelled by the insurer without thirty (30) days' prior written notice to CITY of such cancellation, and that the City of Palo Alto is named as an additional insu~ed except in policies of workers' compensation, employer's liability. and professional liabillty insurance. Current certificates of such insurance shall be ke~t en tile at all times during the terIT. of this Agreement with the City Clerk:. 16.3 NO LIMIT OF LIABILITY The procuring of such required policy or policies of insurance shall Dot be construed to limit CONS~Tk~'s liability hereunder nor to flllfill t.l'"..te indemnification provision and requirements of t.his Agreement under Section 15 hereof. Notwithstanding sucb policy or policies of insurance. CONSULTANT shall be obligated for the full and total amount of any damage, injury, or los$ caused by the ne'31igeot performance of services performed under this Agreement, i~cludiog after the Agre~~nt has terminated or expired. SECTION -17 -WQRK~B$ ~ COl'+P;;NSATIQN CONSULTA,NT. by executing this Agreement. certifies that it is aware of the provisions of the Labor Code of the State of California which require every employer co be i:::t.sured against. liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code. and certifies that it -will comply with such provisions before cOrMlencing t.'r:!e performance of t:he 'M'ork u11der this Agreement.. GO " Any errors. otnissions, or ambiguities in the cor:t.ract docu:nents prepared by CONSULTANT lithich are discovered before the Projects are invited. for bid shall be corrected by CONSu!"TANT ..... i thout cost to. C!TY. CONSU!/rAA"T services required to make changes in construction resulting frcmerrcrs, omisSions. or ambiguities in the contract documents which a.re discO\."'er-ed after the construction contra.cts are awarded shall be perfo::tll.ed by CONSULTANT without cost to CITY only insofar as they result in unnecessary or non­ beneficial changes in construction. CONSULtANT services required to make changes in Coo5tTUction resulting from errors, omission8. or a.'''~.biallities in the cQ:1tract documents which are discovered after the construction contracts are awarded shall be performed by 25 ----------z 5,,: ""' CONStJLTANT and shall be pa id for by CITY only irtsofar as they add a benefit to the construction work. CONSULT.4NT agrees to permit CITY t:J audit. at any reasonable time during the term 0: this Agreement and for three D) years ~hereafter, CONSULTANT'~ re~o=ds pertaining to matters covered by this Agreement. CONSULTANT further agrees to maintain such records for at least three (3) years a,fter the termination of this Agreement. SSCTION 20 -AGRE~.J>.llilll.~ ~he terms, covenants. and conditions of ~his Agree~~nt shall apply to, and shall bind, the heirs; Sl,..iccesscrs, executo:rs. administrators, assigns, and subcontractors. as the case may be, of both parties. SECTION ,21 -NONASSIGNM!L!TY 21_1 PERSONAL SERVICE.C: Qf CON$ULTM7 Both parties heret~ recognize that t:his Agreement is for the personal services of CONSULTANT and cannot be transferred. assigned~ or subcontracted by CONSULTANT without the prior written cons ent. of CITY. 21~2 SERVICES OF SUECONSULT4~ Ab~ THEIR EMPLOYEES CONSULTANT shall be responsible for employing or engaging a~l persons necessary t-o perform. the services of CONSULTANT hereunder~ No subconsul~ant of CONS~~TANT will be recognized by CTn as such; rather ~ all subconsul tants are deemed to be employees of CONSULTM'1'f, and it agrees to be responsible for their performance. CONSULTA~ 5ha~1 give its personal attention to the fulfillment of the provisions of this Agreement by all of it:.s employees and subcor..sul tatlts. if any, and shall keep t.he work under its control. If any employee or subconsultant of CONS~~TANT fails or refuses to carry out the previsions of this Agreement or appears to be incompetent or to act in a disorderly or improper ~~~I.er, he or she shall be disc~arged i~ediately frem the work under this Agreement on demand of CITY. SECTION 22 CONSULTANT RELIANCE UPON PRQFESSIOJUU, SXILL OF CONSULTAl~ represents that its principals, officers, and employees are skilled in the professional calling necessary to perform the work agreed to be done hereunder and that CITY relies upon the skill of CONSULTANT, its principals, officers¥ and employees to do and perform th.e w.ork: in accord 'With usual and customary professional care, and CONSULTANT agrees that the work requir~d under this Agreement shall be performed in such monner. 21; The accept.ance of CONSULTAN!" s 'Work. by CITY shall not operat.e as d release of CONSULTANT from the obligation imposed he:r:-e'.lnder. No payment, partial payment, ~cceptance or partial accept.ance by CITY shall operate a5 a waiver en the pal-t of CITY of any of it.s rights under this Agreement. SECTION 2. -W/HYERS The waiver by either party of any breach or violation cf any term, covenar:.t. or condition ot this Agree"'nent or of any provisions of any ordinance or law shall not be deemed to be a waiver of such tenn, covenant. conditton, ordinance or law or of any subsequent breach or violation of the same or of any ':lther term, covenant, cO!ldition, ordinance or law. Tee subsequent acceptance by either party of any fee or otr ... er money which may become due hereunder shall not be de~T.ed to be a waiver of any preceding breach or violatior. by the other party of any term, covenant, oz:' condition of this Agreement or of any applicab~e law or ordinance. SBC'UQN :;;.c:. -COSTS AND A'ITORl,j-EYS' FEES The pre .... ailing party in any action brought to enforce ~he terms of this Agreement or arising out of this Agreement may recover from the other party its reasonable costs and attorneys' fees e:xpended in connection with such an action from the other party. SECTION 26 -NONPISCR1M.INATIONi PENALTY 26.1 DUTY OF CONSULTAb~ No discrimination shall be made in the employment of persons under this Agreement because of the age, race, color, national origin, ancestry, religion, disability, sexual preference, or sex ot such person. If the value of this Agreement is, or rray be. Five Thousand Dollars ($5.000} cr more, CONSULTANT agrees t,o meet all requirements of the Pale Alto Nunicipal Code pertaining to nondiscrimination in employm'!;!nt. including completing the "Compliance Report--Nondiscrirnination Provisions of City of Palo Alto Contracts· OIl the fo::m f-.:rnished by CITY and attached heret:o as Exhibit ~D" and made a part hereof by this reference. CONSULTANT agrees that each agreement for services from independent providers shall contain a pl-ovision substantially as follows: ·Provider shall provide CONSULTANT with a certificate stating that he (or sr.e) is currently in compliar.ce with Federal and State of Califor11ia la· ... s covering nondiscrimination in employment; that he (or she) will pursue an affirmatiVE course of action as 27 · ~-,-.. "/" .-'.<# required by the Affirmative Action Guidelines of the City of Palo Alto; and that he (or she) will r'ot discriminate in the e:mpl yrnel1t of an:" person under this contract because of the age, race, color. nacional origin. ancestry~ religion, disabllity. sexual prefecence or sex of such p~rson.~ 2£ . .2 prnAI,TY FOR DISCRIMINATION If CONSULTANT is round in vi:.:lation of the nondiscrimir~tion provisions of the State of California Fair Employment Practices Act or similar provisions of federal laW" cr executive order in the perfcnnance of this Agreeznent., i': shal thereby be found in material breach of this Agreement. Thereupon, CITY shall have the pow·:r to cancel or suspend this Agreement~ in whcle or in part~ or to deduct from the amou..'1.t payable to CONSULTANT the sam. of Twenty-five Dollars ($25; for each person for each calendar day during 'Which such person was discriminated against., as damages for breach of contract, or both. Only a finding of the State of California Fair En",plcyment Practices Commission or the equivalent federal agency or officer shall constitute evidence of a violation of contract under this section. "If CONSULTA.."'IT is fOUDd in viol at. ion of the oondiscrirr..:.nation prOVisions of this Agree..'T,ent or t.he applicable a:firmative action guidelines pertaining to this AgreemEnt~ CONSULTANT shal~ be found in material breach of this Agreement. Thereupon CI'I'Y shall have the power to cancel O'C suspend this Agreement~ in whole or in :;lart, or to deduct from. the amount payable to CONSULTANT t.he sum of Two Hll."'1dred Fifty Dollars ($250) for each calendar day during which CONSULTANT is found t.o have been in such noncompliance as damages for breach of corrtract, or bot.h. SECTION 27 -ARBITR.A1'ION Upon agreement of the parties any controversy or claim aris~ng out of or relating to t.r.is Agreement may be settled by arbitration in accordance with the Rules of t.he American Arbitrati~n Association, and judgment upon the aw~rd rendered by the arbitrators may be entered in any court havi~g jurisdiction thereof_ SECTION 28 -NqTICES All notices hereunder shall be given in .... -riting and mailed, postage prepaid, by certified mail, addressed as follows: To CITY: Office of the City Clerk City of Palo Alto Post Office Box 10250 ~alo Alto, California 94303 I I City of Palo ~~to Director of Public wcrks Post Office Box 10250 Palo ~to, California 94303 ATTN; Project ~anager. Los Trancos & Page Mill projects Attention of the Projec~ Director at the add=ess of CONS~DT~~ recited above ;;ECTIQN 29 -ALL COVENA.t"ITS ARE CONDITIONS All provi.Eioo.s of th~s Agreement a:=-e expressly ll'lade conditions. SECTION 30 AGREEMENT CONTAINS ALL IJNDERSTANPINGS + This document represents che entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiat ions. representa tions, and agreerr.ent6 i ei ther -wri t ten or oral. This document may be amended only by written instr~~nti signed by both ClTY and CONSULTANT~ SECTION 31 -GOVERNING LAW This Agreement shall be governed by the laws of the State of California. IN lrII'7TNB3S WHEREOF. CITY and CONSULTANT have executed this Agreement the day and year first above written. City Clerk APPROVED AS TO FORM, Senior Asst. City Attorney APPROVED, City Manager Director of Finance Director of Public Works 29 CITY OF PALO ALTO Mayor Taxpayer Identification No. 94-2706173 Risk Manager Attachments: EY.HIBIT "A": EXHIBIT ".8 ": EXHIBIT II C .. : EXHIBIT "D'"! SCOPE OF PROJECT « TIME SCHEDULE RATE SCHEDULB & PAYMENT SCHEDUL~ INSURANCE NONDISCRIMINATION COMFLIA.~CE FORM 30 !!XHII!IT A BASIC SERVICES Los TJODCOS Road and Page Mill!Foothill Expressway Inr=ectioo Improvements 1. LOS TRANCOS ROAD A. General Los Tranoos Road is 2l! existing 2 lane rural road having. traveled way widlh of approxi:n3tely 18 fee: running southerly from Alpine Road. The project area is a 0.7 mile portion along the easterly sit!e of LO£ Trancos Creek begir.ning approximately 0.4 mile soulherly of Alpine Road. The project limits are the Los Trancos Creek cros.si1lgs, which wi tl remain in their present condition, The primary objectiw~ of the project is to widea the road to a 28 feet traveled way inoluding two focI sh.>u1der. (IWO 12' lanes with 2' sIIoulders) in or<leT 10 increase ..rety. Consultant will perform only !bose services enumerated under' Conceptual Plan Phase" below. If authorized by the City of Palo A110 based upon • mulually a=p<able scope of ser.ices, schedule, and foe, Plans, Specifications an<! Estimates (PS&E) will be prepared by ConSilltant in confonnance wilh applicable City of Palo AIIO Standard Drawing' and Standard Specifications. Plans will be prepared in AulOCAD v=ion 12 usinE City of Palo A110 drafting criteria, and furnished in electronic media 10 document this project only, not for other use, as descnbed and qualified in Section 4 of the Agre.etn!llt. Text documents including specifications inputs wit! be prepared using Word Perfect 5.1, a. .... d furnished in reproducible and electronic media. The City will prepare all bid documents (excepl the PS&E), and adminisler the construction project, including bidding and management. Consultant will assist t'te City during Bidding and Construction Phases as detal1ed below. n\5.j\\ll19939O\Vt'p511.scope.r3 REVISION '3; NO'V~ S, 1993 . -".' Exhibit A Basic Servi= Page 2 2. YimU'erformed by CilJ! a. Permit application and processing. including property entry b. Public meeting schedules and mailers c. Advertising and award of construction contract d. Acquisition of rig~t-<>f-way and property e. Utility agreements, and construction permits f. Coordination and correspondena: with Stale and Federal Agencies regarding funding approvals 3. Information Sup!jlied by CilJ! 2. Copies of -as-btJi]t-drawings b. Existing Rillht-of-W.y maps c. Existing utility infonnatioo c. Bid documents and general provisions e. Standard Specifications f. Off-site hydrology information g. Existing survey data. i.,t1uding b<nchmarks within tile proj"-"t limits h. Title reporu i. Desip! Criteria j. City tille block in AutoCAD ._ 12 k. Example bid docu~ IS from similar City project 4. ExclusionS a. Hazardous waste investigations and remediations b. Permit application fees c. L-rigatioo design d. Utility poIholing e. Utility relocation design servi= for third party facilities f. Services in connection with any public bearing nO! specifically identified berein g. Scmces in connection with any arbitration or legal proceeding. except where the Ccnsultant is a party there!o h. Ally other services not O'.r,erwise specifically included in !his Agreement l!Iuj\OII99l90\wp5I\scope.rJ REVISION 6; November S. 1993 ...... Edubit A Bask Servt<:es Pagc3 B. Conceptual Plan Phase Consultant s!wI perflmn L~e following tasks. 1. Srope pf War) CQufirmafion rne Consulrant and staff will conduct a project initiation meeti.'g .Iter DOtice to proc=d. The objectives of this meeting will be to I), ~"" refine, and confirm the Scope of Work and sche<lule for the Conceptual Plan Phase; and 2) establish ba.>is for design criteria, deliver.!bles and format for same, conceptual oplnion of probable cost format, billing formal, and commurucation protoc01. Wriuen minu.tes of tlle meeting along with revised scope language will be prepared 10 document !be meeting, and disseminaled to all attendees. 2. Field Reyjrcw 'Thi! task will include a), field survey to define centerline profile, locate edges of po.vemen1 and adjacent grade breaks, locate significant trees (7" diameter or greater), and Iocall> uli!ities, .n ",ithin 5 feet of edges of po.vement; and set borizOo1lal control markers for !be aerial phOlogr.lph b), walle observatioru by Nolll> Project Mlmager and Project Engin=; and c), rectified aeriaI mylar hase sheels (plan/profile) at a scale of I" =40' done originally for this job (the fee for this product assu~ that the aeriaI photography for the Los Trancos Project and the Page MillfFoothill f'rojeet will be conducted during \be same flight operation). This work will t>e completed before th~ re:naining task..o;; commence. 3. Soys Tnvesti ration Temuech, Inc. will provioe geoteChnical inputs to the Conceptua.l Plan Phase as discussed below. a. Review available data on existing pavement section, existL'1g pavement perfonnance, and surface drainage conditions. b. Review pertinent in-house geologic maps and Iiler-.rure to belp identify local =rial characteristics, areas o! potential .rope u\sjIOll99190\wp5! \scopt:.r3 REV1SlON 13, November S. 1993 E>lnbil A Basi(: Services Page 4 instability, and other geologic hazards WI mighl affecl design of the: roadway widening znd improvements. c. RevieYw' preliminary plans for roadway widening: 10 identify where cut slopes. slopes steeper than 2:1, or retaining walls may be needed. d. Conduct field walk lour and ohserve ~ conditions 10 identify potential geologic constraints. e. Prepare prebmin.azy seils report to documenl general assessmenl conducted in tasks B.3.a. -B.3.d. above. 4. Enviroomental ASgtismenl a. David 1. Powers & Associates will conduct a conceptual environmental fatal flaw assessment that identifies the sensiti .... e areas al<>ng Los TIlII>COS Road. This fatal naw ••• esslll""t will identify potential impacts from roadway widening using !he City'S environmental checklist and !he base p"," prepared by Nolte a'ld Associates. The anticipated areas of cooc:ern include impacts !O me c=k bank along Los Trancos Croel<, adjacent drainage and wetland areas, large oak trees, and other significant Slands of "<gelation along the roadway alignment. No work by subconsultant specialists such as biologists is included in the Conceptual Plan l'!' ..... b. The results of this conceplual fatal flaw assessment will be provided to Nolte and Associates L~ ietter repon format for consideration in the development of the Alternative A roadway alignment plan in order to minimize environmental impacts. 5. Trame Engineering This task will include limited literature review regarding geometric criteria, resulting in a letter report defIning horizontal and vertical standards for use in conceptual planning. 11\sj\O 1 1 99390\'W'JIS1 \scope.r) REVJSION 13~ November S, 1993 Exhibit A Basic Services Page 5 6. Cqn~tual Alignment Plan for Alternative A lIa.!cd on the findings and products of tasks B. I through B.5 above, a COfI<eptlW alignment plan and profile will be developod using ink co mylar at a ,.;ale of I" ~20'. This will generally illustrate, for Alternative A (2-12' Lalles and 2-2' shoulders), the foUowing. •. Roadway alignment, both horizontally and vertically b. Siope Stabilization issue> and conceptual options c. Impact to exlsting trees d. Impact to the eovironmentally sensitive (creek, wetlands type) areas e. Impact to existing utilities. f. Private property conforms A !Otal of six (6) plan/prom. sheets and on. (1) Iypical cross-sections sheet will be prepared and ir.corpora!ed into the Conceptual Plan Repon discussed below. 7. CQWl!!!!!;'] Plan RJ:IlO!l A draft Conceptual Plan Report will be prepared in 5 copies for staff review I and will inc~ude the fono'W1ng items. a. Summary of the findings of !he above tasks. b. Alternative A planfprome =PL c. A planning-level cooceptual opinion of probable construction costs, prepared based on order-of-magnitude aggregate system costs for major ilems of work.. d. A refined Statement of scope and fee for Preliminary Design, Construction Documents, and Construction Phases. based on the text incorporated herein and estimated level of efforts for each major task. Written comments on the draft 'Will be incorporated into the final report and submitted in 10 copies for presentation to City approval bodies. This 1l\sjiOII99390iwpS l\scope.f) REVISiON 13; November-S, 1993 Exlubit A Basic Services Page 6 NOTE: report will provide the basis ror approval to move forward into the PIeliminary Design Phase. Back-ul' calculations, criteria, ,md findings relating to the basis of the Cooceprual Plan Phase will be prepared as an appendix to the ConceptUal Pl2n Report, and submitted in 3 copies. 8. Appmyal Meetings The ccnS'"ltant wiU prepare for and anend two (2) meetings 10 present the findings of the Conceptual Pian Phase. The rejective of l~is task is to give the City. presenmtion on the project so a decision regandlng moving on tv the Prelimina.-y Design pt. ..... can be made. The following tasks are included. a. Presentation Mater<-aJs: After confirming fOrmal requirements with City SlBff, the COJUUltant will prepare ooe (I) colored se1 of pian. for Alternative A ( .. "en (7) sheets), and ffil' charts with bullet summaries of l<oy findings (approximately 4 pages). b. Attend Meetings: The Consultant (witbo\;t subccnsulranu) will attend two approval meetings 10 make formal presentations of the findings of the Conceptual Pian Phase. THE CONSULTANT WIIL CONDUCT ONLY THE CONCEPTUAL PU.N PHASE AS DESCRIBED ABOVE. IF THE CITY DECIDES TO MOVE FORWARD INTO PREUMlNARY DESIGN AND CONSTRlJcnON DOCUMENTS, CONSULTANT ANDClTYWn.LRENEGOTIATESCOPEOF WORK, SCllEDULE AND FEE BASED UPON THE FINDINGS OF THE CONCEPTUAL PLAN PHASE INCLUDING APFROV AL MEETINGS. :c\.sj'Oll99390\wp:Sl \scope.r] REVISION 'J; November S. 1993 EJ:hibit A Basic SeJvices Page "i C. Preliminary Design Ph"'" Consultant shall perform tho following tasks. 1. Scope of WOO Coon rmatjpn The COIlSUltant and Slaff will C<lnOuct the proja:! initiation meciint after notice to proceed. The objectives of Ibis meeting will be to 1), revi .... , .. fine, and confirm the Scope of Work and sclIeduk: for the project; .,Id 2) ..tIblish basis for design criteria, phm format, spocilica60n fornw and bidding ba!is, opinion of probable cost format, billing fomw, ""0 communication protocol. Written minutes or the medina aIoni with revi5ed scope language will be preparod '" docIlment the meeting, and disseminated t:> all wendees. 2. Iow&!iij2hic and Boqpdary Surveys Based on a field survey, prepare a I" = 20' scale, I-foot con!oor map for planning and engineering Ibe new alignment of los Trancos Rood. Items included in survey: .. Cootrol line b. Significant -. "ith species and trunk and drip diamekrs c. Utilities d. Culverts e. Cross-sections at approximately 50' spacing 00 tangents f. Cross-secUOO5 at app:rox..imateI y 2S t spacIng on curves g. Existing property lines (based on record data and preliminary SUIVey). Cross-section limits will be 25 feel outside edge of pavement left and right. For the prelimina'Y submittal, the property lines will be sboWll "" an &eria1 pho!ograpll for .... of ~i5c"ssians with property owners. The phOlOgIaph will be a rectified aerial phO'.ograph at I' =40'scale (4 sheets) obtained by Consultant through a local aerial photographer (reimbursable item), n"-j\O I I 99390\v.opSl \scope, r3 REVISION #3; November S, 1993 Exhibit A Basic Services Page 8 •. David J. Powers &. Associace, will conduct a preliminary environmental constraints aJ1.a1ysis that identifies the sensitive areas aloog l<>s Tranoos Road. This conmaints analysis will identi fy potenti>.! impacts from roadway widening u,ing L~e CilJl'~ tnvironl'Il¢l1taI checklIst. The anticipated areas of concern include impacts to the rn:ck bank along Los Trances Creek, adjacent drainage ... ,d wetland areas, large oak trees, and other significant stand, of vegetation aloog the roadway aligmr.ent This prelimirnll)' analysis will also consider potential flooding hazards. b. ThE results of this preliminary conmaints ..,alysis including the environmental c!leek list will be pro.ided to Nolte ar.d Associates for consideratio:1 in the design of the roadway wideJIing in order to minimize environmental impacts. 4. Traffk Engjneerine The ttaffi<: engineering services, 10 be oonducted by Patte""" Associates, will CO!lSist of the following tasks. a. Data Gathering: Accident data, existing stlldies. and traffic counts will be gathered f'rnm the City. If required, Patt=cn Associates will conduct ttaffie counts for input into environmental assessments, whicb will be Cilruidered additional services. A summa..ry of the accirlent information will be used as information for a fie1d survey and eV31uation. b. Field Review: A fie!<! review will be conducted 10 determine mitigation measures for any accident problem, data which may hav~ been found. Sight distances at vertical and boriwntal curves will also be O\'aluated. Traffic operations at intersections with side = and driveways will also be observed. c. Review Improvement Plans: Based on L~e data gathered and field review, provide information or. uafflc design criteria incl uding design speed, horizontal and vertical curves, minimum sight nhjlO 1199390\wpSl \5a:Jpc.r3 JlEV1SION '3; N ovembu !!i. 1993 Exhibil A Basle Services Paae 9 distances, grades, road connections, shoulders, a.l'1d horiz.ontal clearanees. d. Traffic Engineering Report: The results of Tasks B.S .•. -B.S.c. wiU be documented in a brief report. 5. Preljminaz:v Analysis of POlfntial Flood Hazards The (onowing Wks .. ill be prepared 10 provide technical inputs for tIHo Environmental Assessment and prelimir.ary design. focusing on the potential flooding impUcations within the roadway right of way due to widening. a. Make field visi l b. Research available reports, maps, and other documentation on flood potential in the vicinity of the project site. c. Contacl appropriate City and County agencies to obtain available information on flood potential in the area. d. Review USGS mapping for the tributary walersbed. e. Make recommendations for further SlUdy/analysis (tf any), which will be additional services. f. Prepare letter report summarizing avanable information on flood PQ!entiai and any potential impacts to flooding due 10 prcposed widening. 6. PreIImjnary l)rs;gn Plans and Estimate -TWQ Desitn Altmgtiyes. ~ a. Base Alternative: Based 00 the topographic surveys, preliminary boundary information, environmental constraints, seils data. and a preliminary established design speed, prepare engioeering drawings (plan (.1 a scale of I· =20') and profile) which generally aUdine, for the base alternative (2-12' lanes and 2-2' shoulders, a\sj\01199J90\wpSl \scope.:) REV!SION 13; November S. 1993 ExhibiIA Basic Servi<:r.s Page 10 approximately symmetrical about the uoterline). the following. (1) Roadway ali6nmen~ both horilOnt.1lly and vertically (2) Right-of-way requirement.< (3) Re:aining wall/slope subilization and grading conform need, (4) Impact 10 existing trees and vegetation (5) Impact to !he environmen!a1ly sensitive (creek, wetlands type) = (6) Impact 10 •• isting utilities (7) Private property conforms (8) Drai.n3.ge culvert modifications and additions (9) Preliminary traffic signing and striping (10) Roadway confonns at !.ie limits of !he project. A total of six (6) plan/profile sheets and one (1) typic.al cross­ sections shoet wiD be ~ in 10 copies, and submitted 10 !he City for preliminary review, along with the Preliminary SoIls Repon (Task B.3), !he Environment.1l ... ssessmcnt (Task C.3), !he Traffic Engineering Repon (Task CA) and the Preliminary Analysis of Poten!iaI FIood Hazards (Task C.S). b_ Review Meeting: Approximately one week after submitW, a meeting will be held with COIlsuItanl (with subcOllsultants) and City representativ~ to r-eview the Base Alternative. The Consultant will jlrepaTe a colored print of tho submitW for the review meeting. The objective of this meeting is to review opportunities and constraints of the Base Alternative, and determine in concept, I), refinements ID Base Altemative, and 2), objectives and ooneeptUaI elements of two ether alternatives, for further deve;opment. e. Alternative: Based cn the results of the Review Meeting, the ae.;gn team would prepare an additional alternative thal widen. L'>e roadway where possible within the environmental and geo[eChnical constraints. The plans, prepaTCd at a =le of 1'=20', wil' generally depkt the following items: n\sj\OI L9'190\101pSl \scope.r3 REVISION 13; November 5, :~3 Exhibit A Basio Services Page 11 (I) Roadway align ment, both horizontally and vertically (2) Rigbt-of-way requirements (3) Slope stabilization and grading ooilfonn needs (4) Impact 10 existing tree> and vegetation (5) Impact 10 environmentally sensitive areas (creelc, wetlands !ype areas) (6) Impact to existing utilities (7) Private property conforms (8) Culven modifications and additions (9) PreIimIrwy tIaffic signing and striping (10) Roadway conforms at the limiQ of the pwject A toIal of six (6) plan/profile sheets and one (I) typical eros>­ sections sbeet will be prepared. d. Preliminary Opinion of Probable Construction Co,,: Order-of­ II12gnitude aggregate ')'Slem costs will be prepared for major item; of construction. along with a preliminary work breaJcrlowr, and nMewed with the City. A prelimirwy opinion of probable oonstruction cost will then be prepared based on the approved aggregate unit costs, for each alternative, for comparative purposes. 7. Community Liaison P..ardesty and Associates will schedule and attend four (4) meeting>, with the Consultant project manager or project engineer. to inform community members about tbe prelimina..ry project alternatives under consideration. and seek feedback. This will involve presen!2.tion of the exhibits prepared under Tasks B. 7.a and B. 7.c. above to the following agencies or groups .. Town of Portola Valley: Town Planner and Town Engineer (two meetings antieiP<Ued) b. Town of Por.ola Valley Planning Commission UO(Qffi)atjnnal meeting only) c. Santa Clara County (eiL"-r Parks and Recreation or Genem Services, 10 be determined). n\sj\O 11993901wp5l\scope.r3 REVlSION 13; No ... emba-S. 1993 Exhlbit A BaJie Servi= Page 12 A report will be prepared summarizing information and findings, and providing recorn mendations as appropriate. 8. Preljminall pes; en Rmoll A preliminary <ksign repor. summarizing t.~e findings of the above !asb, and enclosing the 10% P&'E, will be prepa."ed in S copies for staff review. Written comments Oil the draft will be incorporated into the final report aDd submitted in 10 copies fo< presentation 10 Cit}' approval bodies. This report will prc\.ide the basis for approva! 10 move fo!'Vt'3.Id into the Coostruction Documents Phase . .Back-up calculations, criteria, and findings relating Ie the basis of preliminary ~gn will be prepared as an appendix to !he Preliminaty Design Report, and submitted in 3 copies. 9. !\ppmyal Mec61W The coruuUant will prepare for and attend three (3) meetings to present tile fin::!ings of the Preliminary Design P~.ase. The objective of this !ask is 10 gain approval from the CilJl on a prefeJml alternative to carry fonwn:! to Coostructioo Documents Phase. The fonowing tasks are included. a. Presenialion Material" Afler confirming format '"'Iuifements with City staff, tI'.e eo.,sultant "'ill prepare one (lJ colored set of plans fo< each alternative (seven (7) sheets each), and flip <!tarts with bullet summaries of key findings (approltimately 10 pages), including a simple comparison of alternatives. b. Attend Meetings: The Consultant (with subcoosultants) will attend three form:;] approval meetings to make fO<mal presenralions of Preliminary Design Phase, D, Coostruction Documents Phase If City approval is granted to conducl the Construction Documents Phase, the following tasks will be perfa<med by the Consultant. nlsj\O 1199390\\l.p 1 \scope. r3 REVISION '3; Novembet-5, 1993 &JuDit A Basic Services Page :3 1. Scope pf Work Conf\11Iliti.Qn a. Review and Modi;y Scope: The Consultant will review the Sccpe and Fee for the Construction Documents Phase with respect 10 the definition of the preferred alignmont, to iden" fy any changes in design scope and f<e. Of particular concern in this regard is the scope and scale of poter\tial improvemefits, especially those relating In necessary mitigation p13."t;"gs. FOI" the .. items, the scope of work and levels of effort are app'.-oximately estimated anI:! must be reviewed fo< changes; f the scope of work is substantially changed. A written summary ;,f:;cope exceptions \/will be prepared -.ithin one wee};; of receipt of authorizati'On to prc;.c:.eed to Coostructlcn Documents, and submitted 10 the staff for review, A """,ting will be beld with City suff to review and agree on the scope eueptions, and the relative impact 10 fee (i.e., add or subtracl effort by major task). In advance, the Consultant will prepare revised scope language and fee changes, willl supporting justification, for review and approval by saff. b. Project Definition: After receiving written approval on scope and fee changes defined above, the Consultant will prepare a written description of the preferred alternati Ye, hereinafter called the "Project," along with a red-marked improvement plan to :rupplement the written de5Cription. This will be reviewed with the Consul:ant (with subconsliltants) and staff in • four-hour workshop. the results of which will be a consensus defll1itlOl'l of the Project. Minutes of the meeting will be prepared '0 document the Projecl definition and actions required. 2. Towgraphic and BOlmdarv SurveYs a. Boundary Sur;ey: Cond UCI boun;!;uy field survey of up to five parcels of land, sufficient to describe parcels to be acquired for the project (Le., the survey will locate fron lage and sides 10 limits of proposed righl-of-way line). &sed on the survey, establish tile boundary lines !hat will be necessary for the preparation of legal lJ\.sj\OI199390lwpSl \soope.r3 REV1SlON '3; November 5. 1993 Exhibit A Basic Services Page 14 descriptions for right-of-way acquisition. Boundary plots will be prepared, ."d the right-of-way lines will be added to base sheets. b. Plats and De5criptions: Based on preliminary rev;ew of rocord data and maps, it is C5timated thai five legal descriptions and plats will be required for right-of-way acquisition to conSlnlCt the proj",t. If other legal descriptions and plats are required for temporary oasement.s Of utility ~m<nts_ they will be treated as additional services. The product of L~is task win be five legaJ descriptions and plats, with L'>e acquisition areas shown on the plats. c. R=rd Map: Prepare a rccoro map showing the ... isting boundaries and right-of-way, and parcels to be acquin>:i. 3. Soils Inve£jgatio\l Tenatech, I"". will provide g"",,,,hnical inputs to the Constructioo Documents Phase as discussed below. a. Core through the pavement at approximate 500 foot intervals (eight IocatiOllS) 10 measure the existing pavement "",lion and to evaluate nweriaJs below the asphalt ~ sun""". Core bol .. 'Would be pat<:hed with asphalt COflcrete rold mix. b. Selectively sample anticipated pavement Stlbgrade material for R­ value te.sting. It is expe<ted that samples will be taker. at appro.; mate 5CQ. frot intervals depending on soil consistency ""d tho results from coring. c. Perfonn R-value testing on selected on-site soil samples. d. Design and ",,"mmend overlay thicknesses and alternate structtJraJ pavement sections based on T1affic Indices developed in cooperation with the City of Palo Alto. For fiU areas, provide pavement aItemative.'i for a soil subgradt: constructed u5ing native soil as well as for assumed R-val ... of import, as necessary. o\';\Ot J99390\wpS IIs<:o!>e. ,1 REvrS10N 13; November S, 1993 Exhibit A Buic Services Page IS t. Prepa.re geoleChnica1 recommendations rOT site preparation, grading and compactiOll of the ""vement subgrade. f. Perform field reconnaissance of existing slopes that .. ill be cut into significantly to allow road widening. Perform surface sampling or materials in proposed remining \.\'all locations. ~. Perform Atterberg Limits tests on surface soil samples, as appropriale. b. Evaluate field and laboratory data, and prepare =ommendatiOll. for maximum cut and fill slope steepness. i. Advise on retaining "alllslope stabilization option., and prepare m:ommended retaining .. allislope stabilization design parameter!. j. Prepare a wrinen report su mmarizing the findinE' and recommendations for altemate vehicle pavement sections? muimum .lope steepness and retaining ....nl slope stabilization design. If slope instabili ty is judged to be probable"" the basis of work performed above, it may be ne.:essary 10 perform additional services .uch as subsurface exploration with a backhoe or drill rig, IaboralOrJl testing, and analysis of specific ,lope areas. Finding' and recommendations for additional .. ",i<os woul~ be discussed with the Ci ty in term. of scope and fee, and wouid be performed only after receivL"g written. authorization. 4. Environmental A:w:ssment a. After design of the proposed roadway widening, Powers will prepare an Initial Study for the project. If the Initial Study indicates that the project impoets can be mitigated to • lIOIlsignificant level, a Mitigated Negative Declaration will be prepated. This Initial S:udylMitigated Negative Declaration will be formatted to moo: the requirements of the City of Palo Alto and the CEQA Guidelines. The document will include a project description. environmental cnecklist, description of the :c\sj\Oll99390\wpSl \sc.ope.rl REVISION ')~ November.1, 1993 E1Ihibit A Basic Services Page 16 etlvironmenlal setting, desmption of L~e potentially signiF.c2J1t impocts, and identification of proposed mitigation. The Ini tiaI Study/Mitigated Negative Declaration will be submitted to City of Palo Alto staff for review and comment. The areas of anticipated analysis and discussion in the Initial SiUdylMitigated Negative Declaration arc de.scnbed below. (i) Project Description: The proposed roadway widening will be descnbed based "JXl!l design infonnation provilkod by Nolte ar.d Associates. Proj..:t plan. will be presented. In addition, tho !"'Ojec!', objectives will be descnbed. (2) Land Use: Thi' section will address the Ian<! oS< impacts associated with righ'-of-way acquisition fran: privatt property owoers for the prop.>sed roadway widening. This section will alsc address the impactS of relocatin.g power li~ along the roadway alignmenL (3) Traffic, The Initial Study "'ill describe the !raffle cooditioru on Los Trances Road, based on the traffic SltKiy prepared by Patterson Associates. This sectioo will provide existing daily and peale hour ttaffx: voiumes for the subject portion of Los Trancos Road. No traffic L-npacU are anticipated since the proposed proj eel is required for safety purposes and would not increase road .... y capacity. (4) Geology/Soils: The geologic and soils conditions in the project area will be descn"bed, based upon inrormatioo provilkod by Temuech, Inc. Potential geologic impacts ;Jw may be associated with the project will be assessed, including slope instability. erosion, and seismic hazards. (5) VegewionIWtldlife: The Initial Study will describe the vegetation and wildlif. resources located within the project a.~. based upon • biological investigation condocted for the project by ",bcoo.u1tanc H.T. Harvey & Associates. The biological investigation will include a review of pertinent biotic documents (including the California Natural n\I>j'.OI199390\wpS 1\scopc:.r3 REVISION 13; NC>Vea>OO S. 1991 &hibil A Basic Services Page 17 Diversity Data Base) and • reconnaissance of the proje<1 site. The biotic an.aIysis will also provide a reconnalssance level debneation of wetland areas regulated by the U.S. Amy Corps of Engineers. as required. The vegetation and wildlife section will quantify the impacts to biotic resources resulting from the rood""''3y 9,'idening, incj·.u:Ilng estimates (}( vegetat!on rvnoval (mature trees, riparian vegetation, wetland vegelation) and impacts to wildlife (except special stilus animal species). Impacts 10 wetland habitats regulared by the U.S. Amy Corps of Engineers andlor the California Depar.menl of Fish & Game would be q1lll!!tified. Mitigation would be provided for po~tial impacts to biological resources, as well as monitoring tequiremena. (6) DrainagelFlooding: This section will adctress the existing drainage conditions within the project area and will address any drainage impacts from the roadway widening. based on hydrology information provided by Nolte and Associates. This section will address any flooding !wards to the project from the adjacent Los T rancos Creek. (7) CullWlil Resoora:s: A cultural resoun:es inv",tigatioo of the roadway WIdening area will be cooducted by subconsuJtant Holman & Associates. This investigation will include a literalure search and field survey of L~e project Stte. Impacts to potential archaeological resources will be assessed and appropriate miti.gation identified. b. The draft document will then be revised based upon written oomments and teSIlbmined to the City of Palo Alto for public circulation. Af"" completiOil of the 3O-day public ctmJlation period. Powers will prepare w..'ritten responses to any comments receive.:! on the !r.itial Study and submit them to Ole City. lI\sj\OI19939O\wpSl"'scope. r3 REVISION 113; Noy~,mber 5. 1993 Exhibit A &sic &rvi<:es Pagt i8 S. TraffiC; En~i!leerine The traffic engineering rervices, to be ccnduc!ed by Patterson Associates, will consist of the following tasks. .. Prepare Signing and Striping Plans: Signi.1g and striping plan. will be prtpare<l at I" = 40' seal.. The plans will show Caltran. S!3Jldard sign cedes and stripi.1g detail numbers. b. Traffic Control Plan, ~nni"e the strategy for construction of the widening project. Based on that !ttategy. propare • traffic control plan 10 direct traffic during construction. Appropriale delineators .",lIor temporary striping will be recommendal. The products pr<pared in "~is WI. will be integrated into the Construction DocuffiClts described below. 6. Flow Calcplations. for Storm Drainage Desiw The follOwing tasks will be conducted 10 delennin. stonn drainage modifications relating to eiliting culverts crossing the roadbed. a. Meet with CitylCounty to obtain cri tetia for design of storm drainage system. b. Review available plans.and calculations for existing adj3cent storm drainage racilities (supplied by o"".r;;) for evaJua.:ion of tie-in to existing system. c. Update calculatiO/lS to check fa< available capacity in e,,"sting adjacent sysrem(s) to receive additional runoff. d. Calculat. runoff from project area. e. Calculate size and grades of required storm drainage system. f. Prepare drainage report summarizing the criteria, assumptions, and calculated results. n\sj\Oll99390\wp.. .. 1 \scope.r3 REVISION 13; Nm'emha 5. 1993 hhi~it A Basic Services Page !9 7. Omwuc1ior Documents F'ma! ccnstru<:tion docu",ents will be pr~ ba.scd UJ'Ofl writu!n approval of the preliminary documents de;(;ribed, in three stlge5 of ccmpletion: 50%,95%, and tOO!ll. Construction docu!I1f:11ts ",m precisely depict: Roadway alignment Righl-of-way boundaries, existing and proposed Limits of improvements Typical road widths, p3vemfnt sectior.s and tra..nsitiMS Signing and #.pillg S torrn drainage Traffic contro! and construction phasing Mitigatioo or replacement planting Coostruction delan. Quantities • Special Previsions 10 !he Cily StMdard 'pecification •. .. 50% Pla.,., Specification., and Estimate (50% PS&E): The 50% documents are envisloned as iii compJete. unchecked version of final documents, and will include the following elements. (I) Plan. w'.JI be pnopared based on example plans supplied by the City, and will include the following: (a) Title Sheet (I sheet) (b) Geometric COIltrol (3 shee" @ I" =4(]') (c) Typical Sections (I sheet) (d) Improvemenl Plans (plan!ProfiJe) (6 sheets @ I" =20') (e) Con_ction Staging Plans (I sheel @ 1"= 100') (I) Signing and Stripll\g Plans (3 sbeets @ I" =40') (g) Quantities (2 sheets) (h) Mitigation Planting Plan. (6 sheets @ I" =20') (i) Abbreviations,Legend, Del>.i15and Notes (3 $beets) TOTAL (Estimated): 26 sheets. n\sj'OII99390\wp5 !\scope.r) REVISION 1f3; November S. i993 Exlubit A Basic Services Pa&e20 N",.e !hal item (b) .. as estimated assuming plantings fOl the fuU project limits, to mitigate impactS caUled by OOIl5IrUCtioo • (2) Specifications will consUl of technical special provisions for each bid hem, which ,,>iU reference and amend the City'S Standard Specifications, based on Cil)l provided examples of SjleCifitauoos and specW provisions from OIlIer rclevant job5. (3) Opinion of Probable Construction Cost will be prepared shewing, for each bid item, estimated quantil)l, unit cost, and extended cost. This will be a spreadsheet prepored using 1-otus 1-2-3. 6 sets of PS&E will be submitted to the Cil)l for disnibutioo and 11Me\\'. Back-up calcuWioos, criteria, and findings relating to the basis of preliminary design will be prq>ared and submitted ;" 3 copies. If, during Scope of Work Confirmation, additional plans or otber requitemenu are det=nined, such requirements will be COIlSidered additional serviCl!S. b. 95 % Plans, Specifications, and Estimate (95,. PS&E): The 95 !II docu ments are en.visioned as complete, checked documents for fir..aI review and approval by U,e City. Following receipt of a single, unified and cros.s-eheded set of written review comments and a single, unified set of red-marked PS&E from the City, the Consultlnt will review all comments and prepare written responses for resolutioo before proceedmg with revisions and production. (I) Plans will be revised and include the following: (al Title Sheet (I sheel) (O) Geometric Control (3 sheets@ 1"=40') (c) Typical Sections (I 'heet) .~\Oll99190\"¢ 1 ""'P." REVISION #); November S, 1993 Exbibit A Basic Services Page 21 (d) Improvement Plans (plan/Profile) (6 sheets @ I"Q20') (e) Construction Staging Plans (1 sheet @ 1"=100') (t) Signing and Striping Plans (3 sheets@ 1"=40') (g) Quantiti .. (1 shW.s) (h) Mitigation Planting Plans (6 sheets@ }"=20') (i) Abbreviations, l1gend, DouHs and Notes (3 sheets) TOTAL (Estimatoo): 26 sheets, Note that item (b) ""as estimated assuming plantings for the fun project limits, to mitigate impacts caused by construction . (2) Specifications will be revisOO'" reflect resol.oo comments, (3) OpirJoo of Probable Construction Cost will be revised to reflect resolved comments. (4) Preliminary bid documents, prepared by the City, will be combined with the specifications for publication as a whole. 6 sets of preliminary bid documents, including PS&E will be submitted to the City for dis~ribution and review. Back-up c.aleu14liOl1s, criteria, findings, inclUding construetioo Cf'OS!·sections at 5O-foot spacing, relating to the design will be prepared and submitted in 3 copies. If, during Scope of Work Confirmation, additional plans or OIher requirements aredetennined, such Rquirements will be considered additional services. c. 100% Plan" Specifications, and Estimate (100% PS&E): Follo¥oing receipt of a single, unified and: cross-checked :set of written review commen t.s and a single:. uni tied set of red-marked PS&E from the City. th~ Consultant will review all comments and nlsj I Oll99390\wp.5I\scopc.rl REViS!ON "3; Nover1'ber S, 1993 E1JIibit A Basic Services Page '22 prepare writWl responses for reso _tion before procee<ling with re\'isions and prOO:uction. (I) Plans will be rcvise<l and include the following' (a) Ti~e Sh<e! (I sheet) (1)) Geometri<: Control (3 sheets @ ." =40') (e) Typical Sections (l sbeel) (el) Improvement Plans (plan/Profile) (6 sheets @ I" =20') (e) Construction Staging Pians (I ,,~ee' @ I" = 100') (f) Signing and Striping Plans (3 sheets @ I" =40') (g) Quantiti .. (Z sheets) (h) Mitigatioo Planting PIans (6 sheets @ I" 520') (iJ Abbrevialion>, Legend, DwJls and Notes (3 sheets) TOTAL (Estimated): 26 sheets. NO/e tha, item (h) was estimateO assuming plantings for the full project limits, to mitigate iropac's caused by COI\SttUo...."'"tloo. (2J Specifications will be =ised to reflect resolved oommenu. (3) Op'.nioo of Probable Constructicn CoS! will be revised 10 reflect resolved commenlS. (4) Final bid document>, prepared by the City, will be combined \oVith the specifications for piolb[ication a5 a whole. 10 sets of bid documents. including PS&E, will be S'Jbmitted for approval by City staff. Following approval, ISO sets of plans, I camera·ready cop-j of SPttifications, and I copy of the opinion of probable coostruction COOl will be submitted to the City for dLs:noution. Back-Up calculations, cnt.ena, findings, iodudir.g rons.truction cross-sections at 5O-foot spacing, relating the de'ign will be ,;: . ll\sj\01199300\wpS 1\5copc.r3 REVISION 13; NQ\lembcc 5, ]5193 Exhibit A Basic Services Page 23 prepared and submined in 3 copies. If, during Scope of Work Ccmfinnation, additional plans or other requiremenrs are determined, such requirements would be con.id<red additiOl1al services. 8. Awroval Moetin" The consultant will prepare fOT and attend three (3) meetings to present the findings of Lie ('..<lOSlruction Documents Phase. The objective of this IaSI< i. to present and gain approval from City .. ",ff on the projecl The first meeting is eTJVisioned at the 50% level of completion, the second at 95~, and the third at 100%. when Council authorizes bids to be issued. Consmwu ""ill prepare exhibits from copies of project deliverables for these meetings (I.e., no new or special exhibits are reqL!ired. for these meetings). 9. Bidding Phil$!! Ser.rice.; During L"e bidding phase, the ConSllltanl will be avail2bl. to wist the City, at the request of the City, to clarify Lie intenl of the design documents. The budget for this p/lase is based OIl .. , estimat<d !lidding p/lase period of 16 weeks, from completioo of 100% documents to awan! of contract, and an allowance of 6 person·hours per week, plus 8 pel"liOl1- bours to prepa.--e for and at"~ one pre-bid meeting. The fonowing ilems will be conducled al the request of the City. When this phase commences, L~e scope of WOT' will be reviewed witi1 s:aff; it may be necessary to adju~ the time and expenses budget at that time. •. Respcnd to de$ign question, from the City through ielephone communication or wrinen addenda_ b. Prep<:re addenda '0 clarify or modify the design documents, at the request of the City_This ttsl< may require additional servi= depending on the nature of the design issue_ c. Attend one pre-bid meeting. n\sjIOll99390\wp5I\scope.,1 REVISION 13; November 5, 199.1 Exhibit A Page 24 I I E. Construction Phase During the Construction Phase, the Consultant will be available ", a.<sist !he City, at the ""lues! of the City, to Clarify the intent of the design documents according 10 L'>e provisi01lS of !he Agreement. The budget for this p~.ase was estimated baS«l on a row estimated cor.struotion phase periOO of 3Ii wet'ks, from award of coostruction 10 completion of construction, and an alloa'anCe of 8: person-hcurs per week. plus biweokly site person-visits, plus ~y proj~ site person­ meetings, ~ following items will be oond"cted, on a time aml expenses basis regardless of tbe schedule of construction. at the ""Iuest of the City. When this phase commences, the scope of work will be reviewed with staff; it mciy be oecessa..-y to adjust the time and expenses budget a: that Ii me. 1. Attend the pre-ronstruction m=eting. 2. Respond 10 design questions through telephOlle communi<ation oc written addenda. 3. Attend weekly project meetings at !he site to discuss outstanding issues. technical clarifications, and on-going work. 4. Prepare and di.<tnbute meeting minutes 10 all parties. 5. Review shop drawings and project submittals for specification and construction documenl compliance. 6. Review :requests for information and change ordm. 7. Prepare record drawlngs and subrrut in hard ,opy and electronic media &S qUoiHfied in this Agreement. n\.sj\OI199390\wpSl \scope.r3 REVISION #3; November S, 1993 .'-,' . ,",,," Exhrbit A Bas!c~ Page 25 U. PAGE MILL ROAD/FOOTHILL EXPRESSWA Y INTERSECTION A. GaleIal 1. PtoiCQ PcxriptiQO The objective of the project is to impro\le L'le intersection Level or Service (LOS) by increasing the number of left tum Ianes, adding ,",elusive right turn lanes, and modifying the signal and signal pllaSing. Specific imp",,-.ments to be as follows: Specifically for Page Mill Road: From the West: add a second left turn lane; • mod!fy the existing exclusive right turn lane by instituting • bicycle lane; From the East: add a second left tum lane: • add an exd LLSive right tum lane and bicycle lane; Specifically f'>f lWlipem Serra: modify the existing ex:clusive southbound rigbt turn lane and add. bicycle lane; Specifically fo< Foot!H!1 Expressway: • add a second jeft tum lane; modify the elisting right tum and add • bicycle lane; • lengthen the southbound acceleration Iar.e and add a bicycle lane. General: • remove 3 of the 4 traffic islands; relocate and upgrade traffic signals, modify and impro\le a\sjlO i 199390\v.rp51 ~t3 REVISION '3; November S, 1993 Exhibit A Basic S=1= Page 26 !he signal operation by changing pt ... ing from 6-phase to 8-po .... mooi fy =t lighti ng system at inte"rsectior •. Plans, Specif>eations and Estima:e, (PS&E) "'ill be prepared by Consultant in conformance with applicable City of Palo Alto, County of Santa CI.ua, and State of California Standzrd Plans and Standard Spec;ficatioos. Pia." will be prepared in AutoCAD version 12 llSioS City of Palo Alto drafting criteria, and filTnished in electronic media to <IDt:tlment this project only. not for otheT use, as descnbed and qualified in S«tion 4 of !he AgreernenL Text documents including specifications inputs wiil be prepared us:ng Word Perfect 5.1. and furnished in reproducible and electror';c media. The City will p~ >Ii bid documents. and administer !he =tion project. inciLiding bidding and management. Consultant wiJi:assist the City during Bidding and COIb'lrur.tion Phases as <Ielailed be]<>w_ 2, Wgri< PeU\luDI;d by Ci~ a. Permit application and processing. including p"";eny entry b. Public meeting scbedul .. and mailers c, Advertising and award of constnK:tion contract d. Acquisition of right-of-way and propeny e. Utility coordination, agreements, and construction permits f. Coordination and correspondence with State and Federal Agencies regarding funding approvals 3_ InfO!!!ljltion S"l!l!ljed by City 3. Copies of ·as~uilt" drawings b. Existing Right-of-Way maps c. Existing utility information d. Bid documents and general provlsi.:lns e. Standard Specifications {, Off-site bydrology information g. Existing survey data '\silO I 19939010.p3: 's,,,,,..,3 :RE\1SION 13; N-ovembeT 5. 1993 ExhIbit A Basic Services Page 27 h. Title repons i. Design Criteria. j. City titie block in AulOCAD •. 12 k. Example bid documents from s.imilar City projec~ -'. Exe1u.s]Qf)S a. Hazardoos waste and cultural investigations and remediations b. Penni£ application fees c. Landscaping and irrigation design d. Utility potboJing e. UtiliiY relocatioo desigil services for ihird part)' facilities f. Services in roMection with any p'Jbllc hearing not specifically identified her6n g. Services in connection with a.'y arbitration or !ega:! proceeding, except "'here the Con sultant is a party L~ereto h. Any otller services Dot otherwise specifically included in tl'Js Agreemenl B. Preliminary Design Pilase ConsuJlanl shall perform !he foUowing tasks. 1. ~ of Work Confirmation The Consultant and staff will conduct the project initiarion meeting after notice to proceed. The ob}ectives of this meeting will be 1), to revie~·. refine, and confrrm <he &ope of Work and schedule for the project; and 2) establish basis fOi design cri:eria, pian (onnat, spetificatioa format and bidding basis. opinion of probable cost fonnat. billing forntlt, and communication protocol. Wrinen minutes of the meeting: aloog with re\;sed scope language will be prepared to document the meeting. 2. TPPOfflphic and Boundary Surveys a. Confirm limits of survey. photogrammetric control requirements, and sel pholo control. "- • ll\.sj lO I I 99390\wpS I \scope. Tl REVISION "3; November S. 1993 . "; ., Exhibit A Basic Services PagelS b. Conduct field survey to supplement photogrammetry, and J'T1'P"fC • I" = 20' scale, I-foot contoor map for planning and engineering the ?RJiect improvements. The budget for supplemental Sll!Veying is approxiJl1lltely two day, of 2-pe""'" field crew and one day of senior designer (AutoCAD input). c. Boundary Survey: Conduct boundary fteld survey of up to six pan:els of land (estimated as 2 for Hetch-Hetenl' easements, and I for each quadrant of the intersection, with the understanding that S""'fard owns all lands adjacent except the Hetch-Hetchy f:!cility). Based on the survey, establish the boundary lines that will be necessary for the preparation of 1egal descriptions for right-<>f-way acquisition. Boundary plots will be prepared, and the rigbt-of-way lines will be added to base sheets. 3. Soils lnvesti ration To provide the design information required work for the proposed Page Mill Road/FootItill Expressway improvements wiD be as follows. a.. Review available data on existing pavement section. assess existing pavement perfontWlCC, and assess surface drainage conditions­ This task will be conducted using available as-built drawings from the County. b. Selectively sample anticipated pavement subgrade materla! for R­ value testing. It is e'Xpected that samples wili be taken at selected locations depending on soH consistency and the reslJlts from coring. c. Perform R~va1ue testing on selected on-site soil samples. d. Design and =ommend overlay thicknesses and alternate structural pavement sect.ion~ based on Traffic Inalccs esbbIished in oooperation with the County of Santa Clara. for fill areas, provide pavement alternatives for a soil subgrade: constructed using native soil as well as for assumed R-vaIues. of import. as necessary . • ~\o119939O\wpSJ\=p ... 3 REV1S10N I); November S. 199) Exhibit A Basic Services Page 29 c. ~ geotechnical recommendations for site prepanWon, grading and compaction or the pavemer.t subgrade. f. Prepare a wrinen report 5urnmarizjng findings and recommendatior.s fot alternate ","ehicie pavemen t se<:tions. 4. Environmental A$.#$Cssment a. The Environmental Assessment ",ill be prepared by David 1. Powers and Associate.s, and fonnatte.d [0 meet me r:quirements of NEPA and the City of Palo Alto, ;,nd ,,'iil include a project description, environmental che.:klist, brief description of the environmental setting, deseription c(potentiall y significantimpocts, and id""tification of proposecl mitigation. The Envirorunental Assessment will be .. bmi tted 10 the City of Palo Alto staff and Caltrans for review and comment The areas of anticipated anal ys.is a.'1d di SCUsslOD in the Environmental Assessmenl ate descn'bed below. (I) Project Descrip<ion: lb, proposed intersection improvements will be descn Oed based upon design information provided by Nolte and Associates. Project plans will be presented. In addition, the project objectives will be descn'bed. (2) Lar.d Use: This section will address the land use impocts 2.SSO\."iated with right-of·way acquisition from private property owners for the proposed roadway widening. This section will also address the impacts from reiocatioo of any utility lin ... (3) Traffic: The Environmental Assessment will descnl>e the traffic conditions oc Page Mill Road/foothill Expressway, based on • traffic study prepared by Patterson Asrociates. This section will provide existing daily and peak hour traffic volumes for tilt 5ubj~1 intersection. This project is proposed to reduce congestion during the PM peak hour; a\sJ\OI 1 99390\wp51 Uocope.d RE'r1SION 13; November S. 3993 ExhibifA Basic Services ~30 therclcre, no traffic impacts are anticipated. (4) Air Quali.y: Th. Environ menial Assessmen. would irIClude • project-level carbon monoxide (CO) analysis prepared by subconsultllll M O'C Physics Applied, as required under MTC Resolution 2270. This CO analysis woold quantify CO COI\Ce!lttatior.s at the Page Mill RoodIFooUtill Expressway inter>ection. [1. is possible thaI the project may be eligibie fer .. If-<:ertification umler 110.0 mc 2rlO guidelines. If it is delennined afrer consultation with MTe !hal the project would qualify for self-<:ertification, L~en the abo,. CO analysis would Dot be performed.] This "",tioo would also address the short·term air quaIily (dust) impacts resulting during collStrUCtion of L~e projec' and provide appropria~ mitigation. (5) Noise: The Environmenlal Assessment would include a noise analysis for the proposed intersection improvements, prepared by M O'C Physics Applied. This section would quantify the existing noise levels at nca1by sensitive recepro. ... (i.e. the residential uses at the northeast comer of Page MilUFoolhill). The noise analysis would project the ("lure oois< Jevels resuIting f.om i:nplemenlalion of the proposed intersection impfOYements and assess the potential noise impacts. Appropria~ mitigation would be i<lentified for any signi fiant noise impacts. (6) Cullura! Resources: A cuitucal resources in vestigaliOll will be performed by the City (per Addendum 12 to the RFP). (i) Geology/Seils: The geologic and seils conditions in the project area ... ill be descnl>ed, based on information provided by TerraleCh Inc. The potential geologic impacts associattd with the project will be assessed, including unusual soil conditions, erosion, and .seismic: hazards. b. The draft documen, will then be reYised based upon written comments and resubmitted 10 Caltrans for public circulation. After %)\sj'C I I 9939O\wpSl \scope.r3 REVlSION 13; Novembed, 1993 ExhiOit A Basic Setvices Page 31 completion of the 3O-day public circulation period, Powers will prepare written responses to any comments received 0.., the Environmental Assessmen[ and submi: them to the City. S. Traffic Engineering The design of the traffk: ggnal modifications and pavement markings will be preparre by Patterson and Associau:s, and will melod. the followL.g tasks. 3. Gather Data: The fol!ov.ing informauon will be gathered. (I) Design standznls and guidelines (2) Ao-b"ilt tr.<ffic sigoal plans (3) Pertinent I!afflC studies (4) Available traftk counts b. TraffIC Counts: PanersOD Associalei wLii conduct 24 hour machine OOlints (for four approaches). and peak hour (a.m. and p.m.) turning molJemerH counts. These counts will be used for mviromnentaI assessments. The: data needed for air quality calculations i:>elUile: (I) UI.'IeS per approach (2) Vehicles per lane per signal cycle (3) Vehicles delayed per Jane per signal cycle (4) Jdling time at the stop line (5) Cruise speed (6) Constrained volo me. (7) Estimated future (2010) volume" The Consuita.", will <ont.1ct the County to obtain existing model outputs for a.m. peaK hour and dlll1y traifie levels for year 2010 (1'2010 Coogestion Management Plan), or the Congestion Management Agency. to obtain pertinent exi sti og data on future forecasts. With this information, the Consuitant win estimate future (2010) v.be' for the above variables. If suitable future forec:aslS are not readily available, additional services will be nl.sjIOll99390\.,.,-pS l\scope.rl REVTSION 13; Nuv-mbcr S, 1993 Exhibit A l!asic Servi<:es Page 32 required tu develop such: data. This :scope assum~5 no formal lrafTlC fo=sting or modeling. c. Geometries and Alignment: OutHne pti'lject geometries, lane assig!1me~ts and alignment Proper ttadsitior. between existing lanes and new lane, ,.ill be primary focus of the review. WB-50 tn,ck turning templates will be used for all turnir.g r.u!ii, especially the radii of the dual left tu m lanes. Alignment of through Ianes and crosswalk, and curb ramp locations ~ili make sure that signal operations and pedest.-ian .. ,d vehicle trame will be handled efficiently and safely. d. Preliminary Design: A conceptual trnfIic signal plan will be produced. The plans will depict an 8 phase quad left turn trnfIic signal operation. Left rum signals will be .. ~own mounted OIl signal mast arms. Proposed striping will be ,hown, including the guide 5Iripes for the dual left rum movements ihrough the intersectiOil. 11-", placement of all lrafTl<: signal hea.1s for the dual l~ft turn movements through the int=tion will be included. The placement of all traffic signal poles as well as the locati<m of the cootroner and detector loops will be shov,,'D on this submittal. e. Traffic Engineering Report: The results Qf Tasks B.S.a. -B.s.c. will be dOCllmented in a report The design irems noted above will be incorporated into the Preliminary Design Documents discussed below. 6. Flow Calculations for Stenn Drainage Design The following tasks will be conducted to define drainage mOOifications required for the existing drainage system at the interSe .. "'tion. a. Review available plans and cakullltions for existing adjacent stann drWage facilities (supplied by others) for evaluation of tie-in 10 existing system. b. Update calculations to check for available capacity in existing ol.sj\O 1199)9Q\WJ'.51 \scope.r3 REVlSJCN #3; NO'IIcniber j. 199] Extibit A Basic Se:vices Page 33 adjacent system(s) to receive additiorW runoff. 1;. Calculate runoff from proj ect a..~. d. CaJcula Ie size and grade< of required stonn drainage system. e. Prepare drainage report summarizing the criteria, assumptions. and alculatod =115. 7. Pmljmjrtary Design Plans, SpeclfigtiQns and Estimate flQ% ~ Based upon the traffic study review. environ men tal assessme:Jt, topograph y and right-<>f-way swveys. Nolte and Associates will prepare a preliminary tle3ign pack3ge gcner-.Jly consisting of the following elements. a. PlaIls: (I) Improvement Plan: The 20-sca!e pia." will "SO an aerial planimetric as a ba.ve, and win show existlng toDditioos, new roadW2)' geometries and alignments, existing and proposed right-<>f-way acquisitions with a"Joi.~ing properties shown, and approximate new improvements including striping. (2) Sig,-w PlaIl: The 2O-scale traffic signal modification plan WIll generally show the new signal Layout on an aerial planimetric base. (3) Construction Staging Flail: A 40-scale plan for ",nstruction allowing c{)ntinuous traffIC and signal operations during the construction work. b. Specifications: OuUine special provisions, which will make appropriate references to the County of Sanla Clara and Caitr.lns tecfu-ucal spec;fica.tions. will be prepared along with a proposed format and numbering scheme. These will ultimately be combir.ed wirh the City of Palo Alto genera] provisions to create the Bid Documents. c\:sj\o l i 99390\<ovp5 l\scope.rl )tEVIS-ION 113'. Novemb« 5. 1993 Exhibit }. Basic Services Pa&e 34 c. Preliminary Opir.ion of Construction Cost Onler-oF-magnitU<le a"~ate system costs will be prepam! For major items of const.ruction, along with a prelimillary work breakdown~ and reviewed witll City ,taff. A preliminary opinion of probal>le con.str",tion cost will tllen be prepam! t.!se<I on tile approved aggregate unit C(b~. Back-up caiculations, criteria, and finding. relating to the basis of preliminary de,ign will be prepared and submiUed in 3 copies. 8. COmmynity JJaj!iOD Hardesty and Associates will ",hed"!. and attend ~~ree (3) meetings ",til the Cca.sultanl project manager or project engineer. 10 inform community members abcut the project, and seek f'!edb"k. This will involve pr""",uation of the exhIbits prepared ~, Task B. 7 .a. (I) above to the following agencies or groups, and will culminate in a brief summary report of findings. .. Stanford University Planning Department. b. Stanford Industrial Park. c. Frenchman's Hill Homeowners' Association. 9. Pre1jmjn;JTY Design Rmm A preliminary design repon summarizing tile finamg' of the above tasks, and enclOSing L~ 10% PS&E, will be prepared in 5 copies for SUlff review. Written comme:lts on the dr.JIt will be incorporat:'.d into the final rep<>rt and submitted in 10 copies foc presenlation to City appro,'a! t'Odies. 'l'1m report wiD provide the basis for approval 10 move fotwaro into L'>c Construction Documents PGase. 10. hpmPY!J Mretings The consultarlt (with subconsulta.,ts) will prepare ior and attend three (3) meetings 10 preselll the findings of the Preliminary Design Phase. The objective of this task is to gain approval from tile City to carry forward to Con.sttuction Do;:u.ments PhMe. The following tASks are induded. n\sj\Oll99390\wp51 \scope. r3 REVlS[ON 13; November 5. 1993 Exhibit A Basic Services Page 35 a. Presentation Materials: After confinning formal requirements with City staff, the cnnSllltanl will;>repore one (1) cnlort<l set of plans for '"" proje<:[ (six (6) sheelS), and flip <harts with bullet ,"mmaries of key project elem""ts (approximately 5 pages). b. Attend Meeting>: The co,,,,ltan, will attend three formal approval meetings ttl make formal presentations of Preliminary Design Phase. C. Constructiro Documents P~.ase After City approv,a] is granted to conduci the Construe tic., Documen ts Phase, tlIe following tasks will be performed by the Consultant. The Construction Documents ..-ill be prepamj in three .. .ages of completion; 50%, 95 %, and 100%, tv precisely lay OIIt th. construction necessary for the proje.."'t. Construction Documents will depict the following. • Roadway alignment • Right-<>f-.... y boundaries, existing and proposed I!etch-Heu:hy facilities • Eristing utilities • LimilS of improvtmenl$ • Typical road widths, pavement sections and trans.itioru • Signing and StriP'dlg Traffic signal modification, Street lighting modifications Stann drainage modifLcations Traffic contro[ and consttllction ph.i:uing Construction details • Quantities • Special Provisions to the City Standard specificatior.s. 1. 50% Plans Specificatjons and E:;rimate (50% PS&El 1k 50% documents are emisioned is a complete, unchecked versiol! of final documents, and will include the following elements. a. Plans will be prepart<l based an example pi,,", supplied by the n\sj\Oll99390\YvJlSll&:.ope.r3 REVISiON 113; Noven-w S, 19903 E><hibit A Basic Setvi= Poge 36 City, and will i..,clude the following: (I) Title Sheet (I !:heet) (2) Geometric Control (I sheet) (3) Typical Section s (l sheet) (4) Improvement Pla.1S (5 sheets @ 1"=20') (5) Construction Stagi"g Plans (2 sheets@ '"=40') (6) Signing .,,& Striping Plans (2 sbeets @ I" =40') (7) Quantities (2 shee-.s) (8) Traffic Signal Modification Plans (2 .. ieets; pi"" @ I" =20' a.,d soho.iules) (9) Street Lighting Modifications (I sheet @ 1:=40', I detail sheet) (10) Abbreviations. Legend, Details and NotfS (3 sbeets) TOTAL (Estimated): 20 sbeets. b. Specifications will coosiS! of technical special provisions for each bid item, which will reference and amend the City'S Standard Specifications. based on City provided • .ampl .. of specifications and special provisions from other relevant jobs. c. Opinion of Probable ConstrJCtioo Cost will be prepaml showlng. for each bid item, estimated quantity, unit COSl, and ",,/ended 005t. This will be a spreadsheet prepared using Lotus 1-2-3. 6 setS of PS&E will be submitted to :l>e City fur a,stnl>ution and review_ Back-up calculations, criteria, and findings relating to the basis of preliminary design will be prepored and submitted in 3 copies. if additional plans or other requirements or: idenrifio.i, such .. landscaping or earthen berms ~ such requirelmJlts will be considered additional services. 2. 95% plans Specifications., and Estimate (95% FS&E.) !be 95l! documents are envisioned as complete. checked documents for final review and approval by the City. Followlng receipt of a single, D\sj\01199390\wpSi l\scope.-rl REVISION i'); NO'iember 5, )993 Exlnbit A Basic~ Page 37 unifled and cross-<:hecked set of ",Tilten review comrr.ents and a single, unified set of red·matked PS&E from the City. the Cons.ulta..1t will review all comments and prepare written responses for 1'tsolution before proceeding with revi.sions and production. I. Plans will be revtsed and ioclude the following: (1) Title Sheet (1 sheet) (2) Geometric Control (I .heet) (3) Typical Sections (I sh",,) (4) Improvement Plans (S sheets@ I" =20'), including plo<ta:l profiles of new edges of pavement and lOpS of curb (5) ConstnJction Staging Pians (2 sheets @ !" =40') (6) Signing and Striping Plans (2 sh""ts @ I" =40') (7) Quantilie:i (2 sheets) (8) Tralnc Signal Modification Plans (2 sheets; plan @ I" = 20' and schedules) (9) Street Lishting Modifications (I shee!@ 1:=40', I detail sheet) (10) Abbreviations, Legend, Details and Notes (2 sheets) TOT At (Estimated), 20 sIt"'t •. b. Specifications will be revised to reflect resolved comments , ... Opinion of Probable Constru<:tion Cost will be revised [0 re: fleet resolved comments. d. Preliminary bid documents, pnepa."ed by the City, will be combined with the specifia.tions (or publication as •• ,hole, 6 sets of preliminary bid documents, including PS&E will be submitted to the City for distribution and review . .Back-up calculations, criteria. findings, including construction cross­ sections at 50-fOO! spacing, relating to the design will be prepaned and submitted ill 3 copies. n\sj\OL 199190, ..... pSI ~pe.rl REVISrON '3; November S, 1993 Exhihit A Basic Services Page 38 If additional plans or other requirements are identified. such requirements will be considered odditional !e1'Vices. 3. 1005 Plans SwcifkatiQDs and Estimate (]OO% PS&E) Following receipt of • single, unified and c"",-cheeked set of written review comments an<l • single, unif.ed set of reJ-nw-ked PS&E from the City, the Consultant will ",,,ie,,' all comments and prepare written mpon"" for resolution hefme P!lXeeding with revisions and production. a. Plans Vt.~ll be revised a:::Q include the following: (I) Title Sheet (I ,_) (2) Geometric Contro1 (I slleet) (3) Typical Sections (I sheet) (4) Improvement FIan, (5 sheets @ 1'~20'), includingplctted prom .. oj .ew edges of pavement and top, of CUJb (5) Constructioo Staging Pia. .. (2 ,hee'.s @ I" =40') (6) Signing and Stripm, Plans (2 sheets @ l' =40') (7) Quantities (2 ,heets) (8) Tra.'TIc Signal Modification Plan, (2 sheetS; plan @ 1" ~2C' and schedules) (9) Street Ughting Modification, (I sheet @ I: =40'. I cIeWl sheeI) (10) Abbreviations, Legend, Delans and Notes (2 sheets) TOTAL (futi n1ated): 20 sh""ts. b. Specifications will be revised to reflect re.sol\'ed comments . c. Opinion of Probable Con,truction Cost will he revised to reflect resolved comments . d. Final bid documents, Prepa1ed by ~~e City, will be combined with the specifications for pUblication as a whole. 10 sets. of bid documents, inciuding PS&E. will be submitted for approval by City staff. FollOwing approval, 150 sets of plan" 1 camera-l103dy copy 1l~I.C: iY9390\""P5 I \scope. r3 REVISiON 13; November 5, 1993 Exlnbit A Basic Selvices Page 39 of speciflCal'OIlS, and 1 copy of the opinion of pro;able oonstrbction cost will be submitted to the City for distno lltion. Back·up calculations, criteria, finding§" including constr.;ctioo cros.s­ sec:ti<XIS at 5O-foot spac1ng. relating 10 the design will be prepared and ,mbmltte<! in 3 copies. If additional pla."15 or other requirements are identified, such requirements will be cot,sjdered additional servic<:s. 4. Awrqya1 Meetings Tho consultant (with subconsultants) w~l prepare for and attend three (3) meetings to present the findings of the: Construe tior. Documents Phase. Too objective of this task is to present and gain approval from City staff on the projecl The first meeting is envislor.ed at the 500;;; level of completion, the =ood at 95~, and tlu: third at 100%. wilen Council authorizes bids to be issued. Consultant will prepare exhibits from oopies of project deliverobles f", these meetings (i. e., no new or special exlubits are required for these meelings). 5. Bj¥jng Pha::,e Seryjg;$ During the bidding phase, tbe Coosuitanl will be available 10 assist the City, at the request of the City. to clarify th< intent af the design documents. Tho budget for !hi, phase is based on an estimated bidding phase period of 16 weeks, from completion of 100% documents to award of contr:!ct, and an allowance or 6 person-hours per week, plus a person­ hours to prepaie for a..'ld attend one pre-bid meeting. The fonowing ite..?t1s w'J1 be conducted oX the requeS! of the City. When this phase commences, the scope of work will be reviewed with staff; it may be "=saT)' to ad] uSI the time and expenses budget at that time. a. Respond 10 design questions from the City through telephone communication or written addenda. b. Prepare addenda to c1a.oify or modify the design documents, at the requeSl of the eil)!. This task may require addirional services: n'l_'.J .... ,OI199390\wp5I\scope.r3 REV1SION '3; Novemba" 5, 1993 Exhibit A Basic Se:vices Page 40 depending on the nature of the design issue. c. Attend one pre-bid m~ting. D. Construction Phase During the Construction Phase, the Consultant will be available to assist the City, at the request of the City, to clarify the intent of the design documents according 10 the provisions of tile Agreement. The budget for this p~ase " .. as estimau.l based on • total estimated construction phase period of 36 weeks, from award of construction to completion of construction, and an aJlowance of 8 person hours per week, pillS biweeldy site person-visits, plus weeldy project site PO""" meetings. The fonowing items will be rood u..::ted. on a ti me and expenses basis n:gardless of the schedule of ronstruction, at the re<juesl of the City. When this phase com""",=, the srope of won. will be r .... iewed with staff; it may be n<a:ssary to adjuS! the time and eJlpenses budget at that time. 1. Attend dle pre-constmction meeting. 2. Respond to design questions through telephone cornrnllnication or \1tr-ntten addenda. 3. Attend wceldy proj«:t meetings at the sil. 10 discuss cutstanding issues, IeClmical clarifications, and on-going work. 4_ Prqme and distribute meeting minutes to all parties. 5. Review shop drawings and project submittals for s.pecification: and construction document compliance. 6. Review requests fGr information and change orders. 7. Prepare record dfii..wings and submit in bard copy and electronic media as qualified in this Agreement. nlsj'.Oll99390\v.rpSl \scope.r3 REVISION 13; Novembu S, 1993 HXHIBff A-I PRomcr SCHEDUU! 1m Trancos Rood and Poge MillIPoodtiO E!Jtpt\:4SWlly Inlersoclion Impmvement.s I. LOS TRANCOS ROAD A. Conceplual Plan Phase I. Scope of Work Confinnalion 2. Pield Review 3. Soils Jnvestigatioo 4. EnvitOllmental Assessment ~. Traffic Engineering 6. Concept"al Align",ent Plan for Altemalive A 7. Conceplual Plan Report Review 8. Approval Meeting. SCHEDULB IN CALBNDAR WBBKS ruKr ElW.sH WTRATION CUMU!.ATIyR o I I I I 4 4 4 4 8 4 8 4 8 4 8 4 8 4 8 8 12 4 12 \0 12 2 12 12 14 2 14 14 18 4 18 B. Preliminary Design Phase I. Scope of Work Confirmatiol'l 2. Topographic and Boundary Surveys 3, Environmenral Assessment TO BE SCHEDULED ~~f !fI/!ti, ;!;: ,t;:::'-;~..;:,· . .' \Ji:... Jl' .II • ;r:. 10.$, .~ • ~ y!i;~~ ~ I' k:.,xt" , '. IT~~}""l\ ~fi.ln'\>.IL(l~ J. 4. Tramc Engineering 5. Preliminary Analysis of Polential Plood Hazard. 6, Preliminary Dc:sign Plans and Eoitimate ~ Two Oesign Allernatives (10% P&E) 7. Preliminary Design Report Review 8. Approval Meeting. n\!!j\OII9939O\wp51\!K'McLrJ REVISION 112 Nmemher:i. 1993 Exhibil A-I Project Schedule Page 2 C. D. Construction Documents Phase 1. Scope of Work Confirmation Review 2. Topographic and Boundary Surveys 3. Soils Investigation 4. Environmental ASSC55ment 5. Traffic Engineering 6. Flow Calculalions for Storm Dntinage Design 7. Construction Documents 8. 9. a. 50\\\ PS&E Rcvit.w b. 95\\\ PS&E Review c. 100\\\ PS&E Review Approval Meering~ Bidding Ph3~ Services Construction Phase SCHf!OULI! IN CALl!NDAlI WIlBKS IiTABl flliWI DlIRATION CUMULAll'lE TO BE SCHEDULED TO llll ~CHEDULED TO IlE SCHEDULED n'~\OI 199]90\..,,, l\a:hrd.rJ kEVISJON n November 5, 199) , E.hibit A·I Project Schedule Page 3 SCHEDULE iN CALBNDAR Wlll!KS STldIT 1'lNWI!WRA'DON CUMl".ATIYB I. PAGE MILt ROADIFOOTlULL EXPRESSWAY INTERSECTION A. Preliminary Design Ph.", I. Soope of Work Confinnatiou 2. Topographic and Jl()undary Survey. 3. Soils llwe!ltigation 4. Environmental Assc!(!)ment S. Traffic Engineering 6. Plow Calculations fOf StOl'1l'I Drainage Dt.sign 7. Preliminary PS&E (\0" \'S&I!) S. Community Uaison 9. PrelinlinBry De.~icn Rcpon Review 10. Approval Meeting, B. Construction Documents phase 1. 50% p5&E Review 2. 95% rS&1l Review 3. 100% PS&1l 4. Approval Mer-lings 5. Bidding Phase Services C. Con5lruct\on Pha!.e 0 I 1 1 4 3 4 1 4 3 4 1 ? 6 7 1 4 3 7 1 4 3 7 4 ., 3 ., 4 7 3 7 4 ., 3 "I ., 9 2 9 9 13 4 13 9 11 4 \3 13 16 3 16 IS 20 5 20 20 26 6 26 26 28 2 28 28 32 4 :\1 TO BE SCHEDULED TO BE SCHEDULED l\\ .. j\01 \99J9O'."tIl'Sl\idled.fJ REVISION n __ S. 1')'13 EXHIBlTB FEE SCHEDULE Lao Tr.mcos Road and Page Mill!F<>OIhiIl Expressway inlenectioo ImprovernelllJ I. LOS TRANCOS ROAD A. Conceptual Plan Phase I. Scope of Work Confilmation 2. Field Review 3. Soils Investigation 4. EnviroDmen:al Assessment S. Traffic Engineering 6. Conoep!Ual Alignment Plan far Allemative A 7. Conceptual Plan Report 8. Approv.iI Meetings (Time and Expenses Allowance) LOS TRANCOS ROAD TOTAL CONTRACT AMOUNT U. PAGE MILL ROADIFOOTIULL EXPRESSWAY INTERSECTION A. Preliminary Design Phase 1. Scope of Wor~ Confirmation 2. T<JPOSI3PI!ic ard Boundary Surveys 3. Soils Investigation 4. Environmen:al Assessment 5. Traffic Engineering 6. Flew Calculations for Storm Drainage Design 7. Preliminary Design Plans, Specifications and Estimate PS&E) 8. Community Uajson (Time and EApenses Allowance) 9. Preliminary Design Report 10. Approval Meetings (Time and Expenses Allo\\-.ru:e) SUBTOTAL A $ 1,500 12,000 $2,800 4,500 1,100 10,000 7,000 ~ $41,900 $ 3,000 33,000 2,500 19,000 9.000 2,500 (10% 16,000 6,000 5,000 ...lUlQQ $108.000 n\sj\DI 199390\"'PS I \f«:sched.r3 REVISION 112 November S, 1993 Exhibit B Fee Schedule Page 2 B. ConstructioIl Documents Phase 1. 50% Plans, Specification., and E:;ti"",re (50% PS&E) 2. 9S% Plans, Specifications, and E:;timate (9S% PS&E) 3. 100\!\> Plans, Specifications, and Estimate (100% ?S&E) 4. ApprovaJ Meetings (Time and Expenses A1low.m:e) 5. Bidding Plwe s.r,i",s (Time and Expenses Allowance) SUBTOTAL B PAGE Mll.L ROADlFOOTIULL EXPRESSWA Y TOTAL CONTRACT AMOUNT m. ADDmONAL SERVICES IV. RElMBURSABLES GRAND TOTAL CONTRACT AMOUNT S 26,000 26,000 8,000 12,000 IO.QOO $ 82,000 $190,000 S 25,000 $276,900 ...... "IllI!~I~,d REVISJON 6'1 ~ S, 19P1 f , i i ! EXHIBIT B-1 NOLTE and ASSOCIATES CHARGE EArn SCHEDl!l.E PUo A!to Los Trmeos Road and: Pafe MilllFOOlhiU Exprt6!>"'4'lY lDtersec:lioa Impro .... ements OFFICI!: DBSIGN AND DJlAfTING De.ign Supervisor SeWor Deaiguer o..;pez -... Dnf"J'C"O' Dmtspenoo Juoi<n-DnfupctIoo PROf'ESSlONAL ~ s-J&,m= M""""" Salior &giDoo<1P1Iomer AaIo6ate &giDeerfPlam.e:' __ Eu~,'Plmo<o Jurii« EDgiMe:rfPlamltr EzI~ioecrinS Ajde,lPbmni.rIg AJdc CONSTRucnoN MANAGEMENT Constructio!:l M~ Raidoot Earl- A.ssislaa1 Res.ideut Eo,iDoer SU1lVEYJN(l ClmfofS"""'l' 3-~ Survey Cnew 2-Penot1 S\tf'\"ey CR'W ApproaIic:e Survcya< SERVICES AND EXPENSES, .Administrative T ecbn:icim Te::haiaJ Typist C<>mputer1CAl>D S)'SIemS PlOUinJ cd !D-bow< l<'P~OQ s..boi-.e Other E:l;pemcs-Indudin£ Sub-Coni1llta;Dts .ad .Pun=hued :$crvices lhrouJb SlObcontrxts Mikage • Outside local lmI S 92.0C' /boot S 77 . 00 /bou!" S iLCO rbcw S 66.00 Ibour S 53.00 Iltour S 47.00 .'hor.lr S 11 6 ,00 Ibour S 1i6.00 Ihoa:r S 103.00 Ibocu- 5 93,00 /boar S 85.00 1boI...,. S 7 i.OO ./bom" S 58.00 Ibour S 34.00 !bour S 103.00 JbooJl S 84,00_ S 74.00 /boW' 5 91,00 Iboar 5 201,00_ S 1~,OO_ S 38.00 Ibour 5 5<1.00_ S 35,00_ 5 30.00 Ibour 1.121 Cos: 1.12" ~ 1.12 l Cost 5 O.32lnule Billing rues iDcJudt O'IIerhcad. eqWpmeaI, space. ~1a1. etc. These bil.li.fJg rzk:s Il1't SlJbj~ to Ux:teMe in July of CKb year c!ae to salary iDcP..ues. Principal', time on projects is d.&rfeable c $158.00 per hour, Litiption AlppOI1 will be billed .at $235.00 per hour. A la!e paymr,nt FINANCE \,. .'-IARGE will. be computed a« the maximum rate aflowed by law aDd ,"ill be-applled 10 my IUlpaid balatlce c.omrnem'mg 26 days afier the da~ of thf: oritinaI i:l."oi~. AD~ .... enacted by lUIy govemmeo! lx.>dy will be added 10 the Ilxwe na:5. ~ Effective 7 110192 GDICRSNOCALPJK ...,.-!:I .... ~ ... • . .:!" ~.'~" . . ,' .J-':< -- NOLTE & ASSOCIA TE5 ~I~ . . -'->-' -- Certificate of Insurance IS !SSUECl ,11,$ ... "" ... TT'ER ~ INFOIitMATlON CONFV:S NO RIGHTS UPOIIj n-tf CDmfOIC;A n THIS CEATlFICA n:: 00155 Nor AMENt!, EXTVotl) OR Companies AtforG.lI'I'iI 1750 c. •• I<slcI. a.... Driv<I. Sullo 250 Company A -ZURlCH INSURANCE CO MPANY Como.ny B -AM!IIICAN HOME ASSURANCE unit! IADW ~w _ ~ TD 'l'H.f --...m IIjMOIID -..oYI' • , ~~ 1IIti'f'~.""" CNI ~ Ol' Nff ~OII ~oor;:t.vetT _..".~ Tl:11III!«:it no ~1"l"""'" AIII$I.II!I 011 ~ """_.1'IoII-..wJeII~""'-'rMI..auou~l'I8QII\'lIItr..l1t.11CT"II~~r~ .. p.c::.~IiMO~OI'tv04~ co. """ 01' POUCY """'"' >OUCV m .. ",\lIWf<:O Nl. ...... 9R't:, ~n: £.."UI'9\. !)ATf. \WI .... 1 00 CB<a\Al LlAItUtY I G_ ...... .... "' 2,DO\1.0Q0 C.ommI. G-. Li.t>Wty JJJoduCUI-C<IPIIO • • z.ooo,r.oo I I Cillima Made ~_~"'!I. .... eN. ini.l!y' ___ !.Looo.ooo A JX1 Qcc::utatoC:I d"0611H"'GiS 03"5193 031115184 !.c:h Oce'J~' t: 1.000.000 I J 0 .... _', • Conv-e!o,", ~~O ." ~.,. .1,000.000 rrl)t~M • AUTO UU!IJTY I C~ SintJl;l Urrit i [Xl Arrf .. ~. "' t,OQe.OOO t r l Ali ~wn.td ""U:I aoaav Lr:jurv ,.., pera>Ol'l • l I Sc.M(\H4-.rto. • Ul'5.1. 7",,7.oe 03JU;'/S3 Oll,SJS4, • I Hired.au1Ol Bo@v I"'}VIY ~r ~,. ] Noft-G..,I*IS MltJW, • J G.,...,. IiGiity ~C.-n.g. EXCBS WUIILJN f.ad! Occ:u ... roec • -""'" A.QOiIIf'I9IIte • om.. m..n limb .... FOtm -...s' I 5 t.atutflE'l u....wu:: • .,.,..,..,....n"", WCU17G64 05101183 ...",.. ffth ItC!;KI'!'lI .1.000,000 AND atPLOYEM' ~oIic:vL..ilrli1: • ',1»0,000 lJARJTY Ci,..u .. ~~ ... '0 __ I • 1.000.00(1 C fl'R;ORSSJONAl. COIOOt:l I 19Qo11 04115133 ..".-·t· ... g"~ul.-• 1.000,000 UA8IUTY • Description of O\l.ra:tiO~tionsN"hic1es.if\e$tri~on.sJSpe.eiat item-$: An Qpe~.ticns of the namedJ;ns.ur.d. ~.~ra: LJ.abirrty CI!'tly: The CitV'cf Palo AAo. its officers, .~ents and emp"'VeM are named as add"rtiOllilI inMed$ but onIiI!~ respects ~abirrty arising out of the n.amed insureds op.eratiOtlS for los Tranco:a ~ hge Mill Road.'fO(rthit\ [xprus.way !fU.erseeticn Impravemenu, Project" 19-93- 90: !h~ por~ is primary 8$ rUpects any inS.,.H~nce carned by the additionaJ inslJl't!!ds with respec:t to work perform'ed by the named inlUflld; this ;K»icy cOntains a sev.rabip'"ty -of interest ctauu, • Wrrtten at .; re at~ limns of fiabifrrv n01 less than a:mounr· u,own. : Cartiftcare Haidet: CITY OF P""l.O Al. TO Civic Center F"lTI.t Floor 250 Hamilton AVE'nue P.Io Alto, CA 94303 John Carlson I ~ '~it: I"NJT 'S ~! '-ro'!'",-~~Cl ... v~ _ ~I !'fIUBr""!f.l I wm.... ,..u ~ ~ AU eP!IUI~:S 01' ~f......,. CAJlC:t:a.LA nON: IhIl<..Ul ~ O • .,.... 40\>1 Q~.-ouCIH IU C:-e1!.UD IIII'CIIIW 110;101 ...... 1'I00I r!).AT! 1'JtM~'~,'TKI: .~"""'Q; C;~. 1T.s ~ 0lIl .......... -r .. lTVI:, ~ ,_ ao~"'I'::I ,..'N!. :.0 o .. ;.,,· ..... l"I'"Dt M'ICJTIC:t TO TIlt eam_ ..... 'n: -.-J;IUII H.\NUIIl0 I ~e I.DT ,,,"-1" , .. u • ..l-TC ...... ~ HOner DI.-u ~~ 110 U>OfIIIIUTY ~ '*-IGAoT\DIII Zurich Insurance Company l'OHcy N_ Cl'OSI19S66-06 Droam Dw: 08123/93 Policy plngt Epcfonemcpt COMMaC!AL GENERAL UAIIIL!TY ADDmONAL INSURED 2 .• 1be IIdditioual iD.sared ~:u below~ wids 'TeSpeCl1o COViJ.AGE A. SODa y INJURy AND PROPERTY DAMAG£ UABILITY CGlY ..... ooIy " _ ""'" ~ by. for '" 011 bdooif of iii< --. ADy odie< --. .. _ by iii< oddilioaal _..-~ whioll......wI DfherWe opply '" .." .. zcac:t· ccww:nd ~ this policy man be CCIGIideRd CJ:~ md. DOII.-coDCnllutioa with tbe ~ __ by dU poIiey. City ofhio Alto, its Gftieers. ~ aDd cmpJC')'ee& for Los Trueos aGd p,qe Mill Road;'FO<Kb.CI ~y !J>"""";" hopro, ........ Prnj<d II 19-93-90 Totol ... _ "'-Wm: At Audit