Loading...
HomeMy WebLinkAbout0586.093November 15, lS93 THE HONORABLE CITY COUNCIL Palo Alto, California Rllbherir:ed Railroad Crossings AgreemenLt'or _the Alma/Meadow an~ Alma/Charlestoc InterBections Members of the Council: Report in Brief This is an informational report on the installation of rubberized railroad crossings adjacent to the Alma Street/East Meado .... Road and Alma Street/East Charleston Read intersections. No council action is required. Bgckground In 1991 and 1992~ the City installed street and traffic improvements for the Alma Street/West Meadow Road and Alma Street/8ast Charleston Road i1'ltersections {CMRs:467:91 and 320:92). In conjunction with these improvements, the City and Cal crans entered into agreements for che Joint Powers Board (JPB) to construct vehicle gateB~ pedestrian gates. a siynal warning system and rubberized railroad crossings adjacent to each intersection (CMRe:56B:91 and 181:92i. The JPB has completed all improvements~ except the rubberized rail~oae crossings~ Disc)1§e.ion The JPB 'Will be installing rubberized railroad crossings a.t the ~~4/West Meado~ and Alma/Charleston intersections from December 1.993 through February 1994. Work requiring clo6ur~ of the railroad crossing to vehicular. bike and pedestrian t'I'affi.c has been scheduled on Saturdays to minimize the impact on commute train and vehicle travel. as indicated on the attached schedule (Attachment A). The work will take place between the hours of 8:00 a.m. and 9:00 p.m. with most of the noise generating activitias occurring before S: 00 p.m. The timing has been coordinated with City. Stanford and world Cup accivities. The schedule may need to be adjusted. if the JPB work crews are needed to respond to emergencies at other railroad locations or if there i6 inclement weather. CMR:586:93 -1- ~------" The school District and reside-nces adjac-ent to these crossing locations will be notified of the scheduled wc·rk beforehand. Also, traffic control signage and barricades \liill be set up p:::"'C'r to e",-:h closure and a City representati vef:: \l{ill be onsite during the closure. Respectfully submitted. ~o0_:_~ ~Engineer .~~ GEORGE: BAGDON Assistant Director of P"\Jblic Works Project schedl.lles cc: Palo Al~o School District Jim Mathiott City/School Traffic Safety Committee Joy Addison. Principal J.L. Stanford Middle School Christopher Rich, Principal Gu~n High school Gary PrehrJ~ Principal Juana. Briones School Kay Vanderberg, Principal Hoover S~hool William Gratsy, Principal Fairmeadow School will Beckett, Barron Park Association CMR,S86,93 -2- ATTACHMENT A RUBBERJZED RAILROAD CROSSINGS ALMA GTAEETIEAST ME"DOW FlO"D ALMA STREETI EAST CHARLESTON AOAD TENTA TlVE STREET CLOSURE SCHEDULE East Meadow Road @ Railroad Crossing adjacent to Alma Streot December 4, 1 993 December ", 1 993 January 8, 1994 January 15, 1994 East Charleston Road @ Aailroad Crossing adjacent to Alma Street January 29, 1994 February 5, 1994 February 19. 1994 February 26. 1994 Work HoiKs: a:oo AM TO 9:00 PM