Loading...
HomeMy WebLinkAbout0577.093~ .... ' ~ November 10, 1.5193 HONORABLE CITY COL~CIL Palo Alto, California 9 Embarcadgro Road Pedestrian/Bike Bridge and Bike Path Extension project. eIP 19310 -Budget Amendment Ordinance Members of the Council! RB1'OIl~ III BUD On October 1:2, 1993, the City Council approved an agree:ment with HKH, Incorporated, in the amour.t of $106,260 and authorized staff to issue chanqe orders up to $15,000 for designing the Embarcadero Road Pedestrian\BiJce Bridge and Bike Path Extension project. A total 0:(' $50,000 has been appropriated for design in 1993-94, leavinq a qap of $71,260~ rhi5 report requests that Council adopt the attached Budget Amendment ordinance transferring a total of $71,260 from elP No. 19072 to C.lP No. 19310, in order to provide sufficient funds in fiscal year 1993-94, to cover the design services agreement with I00I, Inc. BACItGROtnll) On October 12, 1993 1 tha Council appz.-oved an agreement with HMH, Inc~ in the amount of $106,260 to provide design engineering and limited construction phase services, for the Embarcadero Road Pedestrian/Bike Bridge and Bike Path Extension Project. In addition, Council authorized staff to issue change orders up to $15,000 (CMR:522:93J. A tot.l of $121,260 ($106,260 + $15,000) is required to execute the agreement with HMH, Inc. I'UNllIIiG While a total of $550,000 is included for this project in the 1993- 94 Interim Budget document, only $50,000 is appropriated for design in 1993-94; and the remaining $500.000 is included for construction CKR:577:91 .~-------. ' •.. li·· " ", '. / in 1994-95. There is a gap of $71,260 between the 1n 1993-94 ($50.000; and the total amount of aqreeme~t ($121,260), includinq staft's authority orders. 8l1PGH ~ ORDlJO.)ICII funds available the HMH, Inc. to issue change The American Society of Civil En9ineers reccmmends a fee range of 10 to 15 percer.t for design costs for projects of this magnitude. Accordingly, at the time this project was submitted for the Interim Budqet, staff anticipated a design fee of $50,000 (12 percent} and included that alIIount for 19:513-94. However, as the consultant selection process and negotiations unfolded, it became apparent tbe.t a 10 to 15 percent design fee 1s sufficient to cover only basic design fer simple projects and does not cover other services and co~19x projects4 The consultant's fee of $106,260 includes $61,e~O for basic design services and $38,.00 tor services which are considered above and beyond basic design. Additional services that are p~rt of this consultant agreement include limitp-d construction phase s~l-~ices; alternative bridge designs; adoitional surveys; plats and descrip­ tions for ease~ents; meetings with the Joint Powers Board, Architectural Review Board and Council; and preparation of environmental documents including a Natural Diversity study~ The consultant's t\)t&l basic design f~e of $61,660 is 14 percent of the estimated construction cost. Staff bel ieves that the total consultant fee is reasonable, qiven the extra services and the complex nature ot the project. A Budget Amendment Ordinance in the a~ount of $71,260 is needed to provide funding for the design services. Due to an oversight, staff did not include this Budqet Amend~ent Ordinance earlier with the HMH, Inc. aqree~ent. The Minor Intersection Improvements Project (eLP No. 19702) was recently completed, and staff has determined that a ~otal of $91,SOS re~ains available in this CIP. These monies will not be needed and could be used for the additional $71,260 required for the design services agreemer.t~ Appro .... al of the attached Budget Amend~ent Ordinance authorizing the transfer of $71,260 from elP No. 19702 to CIP No. 19310 is recommended. If Council approves the Budget Amendment Ordinance, $500,000 will remain in the budget for FY 1998-95 to construct the project. The project is approximately one mile in length a.nd includes the following ma,or elements: CKR:577:93 11/10/93 Page 2 (8) A bridge over Embarcadero Road (b) A bike path (10 (eet wide with 2-foot shoulders (c) Fencing (d) Lighting (e) Other Preliminary Construction Estimatf! $ 190,000 140,000 80,000 40,000 __ 50.000 $ 500,000 The Joint Powers Board (CalTrain) has agreed, in prj nciple, to allow the use of its right-of-way at no cost; subject to conditions that staff believes can be met. The Project involv2s the construction of an extension of the bike route that currently exists running north/south i~ the area west of the CalTr&.in tracks, and east of El Camino Real. The existing bike route alignment follows segments of Wilkie Way, Park Boulevard, Sou~~qate ~eighborhood streets, and El Camino Pa~k bike path. This route is veIl used by commuter cyclists, students and others, as an alternative to Alma street or El Camino Real. At the present time~ there is an existinq gap in the bikeway between Churchill Avenue and University Avenue, adjacent to Palo Alto High School. Town and Country Shoppirg Center, the Urban Lane area, and the Holiday Inn~ Tbe proposed Project will complete the missinq qap in the bikeway and provide a continuous bike rO'.Jte from the south city limits with Mountain View to the .north city limits with Menlo Park. In so doinq, it will serve and facilitate bike travel to the Downtown and California Avenue Business Districts, the two Palo Alto CalTrain stations, the Palo Alto Transit center an1 stanford University as well as Pale Alto High School, Town & Country Shopping Center, the Urban Lane area, and El camino Park. BNVIRONXENTAL IltPACT AS8ESSJllEH'l' -A Budget Amendment Ordina~ce is not considered a project under the California Enviro~ental Quality Act; therefore, no environmental impact assessment is necessary. IlBCOIOIEllDATION staff recommends that Council adopt the attached Budget Amendment Ordinan~e transferr~nq a total of $71,260 of CIP funds from project No. 19072 to Project No. 19310, to provide sUfficient funds in fiscal year 1993-94, to cover the design services agreement with HMH., Inc. CI'iR: 577! 93 11/10/93 Page 3 R.speetfully submitted, ASBOK 1(. AGGARWAL City Traffic Engineer ~~ City Manager KENNETH R. SCHREIBER Director of Planning and community Environment Attachment: Budget Amendment Ordinance CI'IR: 577: OJ 11/10/93 Page 4 i ! 7 , \ ORDINANCE NO. ORDINANCE of THE CO~CIL OF THE C:TY OF PALO ALTO AMENDING THE BUDGET FOR THE FISCAL YEAR 199)-94 TO TRANSFER FUNDS FROM CAPITAL IMPROVEMENT PROG~~ PROJECT 190'2 (HIHOR INTERSECTION IMPROVEMENTS) TO PROJECT 19310 (EKBARCAJ:E:RO PEDESTRIAN/BICYCLE BRIDGE AND BIKE EXTENSION) WHEREAS~ pursuant to the provisions of Section 12 of Article III of the Charter of the city of Palo Alto~ t.lote Council on .June 21~ 1993 did adopt a budget tor fiscal year 1993-94; and WHEREAS, the city council of Palo Alto approved $50,000 for the deslqn phase of Capital I:a:.prove::n.ent program {CIP} Project 19310 ,Embarcadero Pedestrian/Bicycle B~idqe and Bike Extension) on June 21,. 1993; and WHEREAS, an agreement with HMH. Incorporated {·HMH~}. in the amount of $121,260 ($106 1 260 to provide ~esiqn engineering and lililited construction phase se.r-vices and up to $15,000 in change orders] for designing the Embarcadero Pedestrian Bike Bridge and Bike Path Extension project was appz:-oved by council on October 12, 1993; and WHEREAS, an additional $71~260 is required to implement the agreement with lOOI; and WHEREAS, CIP Project 19072 (Minor Intersection Improvements) has been recently completed and has a balance of $91,809; NOW~ THEREFORE, the council of the City of Palo Alto does ORDAIN as follows: SECTION 1. The sum of Seventy One Thousand Two Hundred sixty Dollars {$71,260] is hereby transferred from CIP Project 19072 to CIP Project 19310. SECTION 2. This transaction will have no impact on Reserves. SECTION 3. As specified in Section 2.28.08C(c) (1) of the Palo Alto Municipal Code, a majority vote of the City council is required to adopt this ordinance~ SECTION 4. The Council of the City of Palo Alto hereby finds that the enactment of this ordinance is not a project under the California Enviroruaent;e.l Quality Act and, therefor-e, no environmen­ tal impact assessment is necessary. SECTION s~ Municipal Code, !!Idoption~ As provided in Section 2.04.375 of the Palo Alto this ordinance shall become effective upon INTRODUCED AND PASSED: AYES: NOES: ABSTENTIONS: ABSENt': A'l"rEST: C1ty Clerk APPROVED ASrO FORK: Sr~ Asst. C1ty Attorney APPROVED: City Manager Director of F1nance Director of Planning and Community Environmen~ ~"t9 APPROVED: Mayor ,""