Embarcadgro Road Pedestrian/Bike Bridge and Bike Path Extension
project. eIP 19310 -Budget Amendment Ordinance
Members of the Council!
RB1'OIl~ III BUD
On October 1:2, 1993, the City Council approved an agree:ment with
HKH, Incorporated, in the amour.t of $106,260 and authorized staff
to issue chanqe orders up to $15,000 for designing the Embarcadero
Road Pedestrian\BiJce Bridge and Bike Path Extension project. A
total 0:(' $50,000 has been appropriated for design in 1993-94,
leavinq a qap of $71,260~
rhi5 report requests that Council adopt the attached Budget
Amendment ordinance transferring a total of $71,260 from elP No.
19072 to C.lP No. 19310, in order to provide sufficient funds in
fiscal year 1993-94, to cover the design services agreement with
I00I, Inc.
BACItGROtnll)
On October 12, 1993 1 tha Council appz.-oved an agreement with HMH,
Inc~ in the amount of $106,260 to provide design engineering and
limited construction phase services, for the Embarcadero Road
Pedestrian/Bike Bridge and Bike Path Extension Project. In
addition, Council authorized staff to issue change orders up to
$15,000 (CMR:522:93J. A tot.l of $121,260 ($106,260 + $15,000) is
required to execute the agreement with HMH, Inc.
I'UNllIIiG
While a total of $550,000 is included for this project in the 1993-
94 Interim Budget document, only $50,000 is appropriated for design
in 1993-94; and the remaining $500.000 is included for construction
CKR:577:91
.~-------.
' •..
li··
"
", '. /
in 1994-95. There is a gap of $71,260 between the
1n 1993-94 ($50.000; and the total amount of
aqreeme~t ($121,260), includinq staft's authority
orders.
8l1PGH ~ ORDlJO.)ICII
funds available
the HMH, Inc.
to issue change
The American Society of Civil En9ineers reccmmends a fee range of
10 to 15 percer.t for design costs for projects of this magnitude.
Accordingly, at the time this project was submitted for the Interim
Budqet, staff anticipated a design fee of $50,000 (12 percent} and
included that alIIount for 19:513-94. However, as the consultant
selection process and negotiations unfolded, it became apparent
tbe.t a 10 to 15 percent design fee 1s sufficient to cover only
basic design fer simple projects and does not cover other services
and co~19x projects4
The consultant's fee of $106,260 includes $61,e~O for basic design
services and $38,.00 tor services which are considered above and
beyond basic design. Additional services that are p~rt of this
consultant agreement include limitp-d construction phase s~l-~ices;
alternative bridge designs; adoitional surveys; plats and descrip
tions for ease~ents; meetings with the Joint Powers Board,
Architectural Review Board and Council; and preparation of
environmental documents including a Natural Diversity study~ The
consultant's t\)t&l basic design f~e of $61,660 is 14 percent of the
estimated construction cost. Staff bel ieves that the total
consultant fee is reasonable, qiven the extra services and the
complex nature ot the project.
A Budget Amendment Ordinance in the a~ount of $71,260 is needed to
provide funding for the design services. Due to an oversight,
staff did not include this Budqet Amend~ent Ordinance earlier with
the HMH, Inc. aqree~ent.
The Minor Intersection Improvements Project (eLP No. 19702) was
recently completed, and staff has determined that a ~otal of
$91,SOS re~ains available in this CIP. These monies will not be
needed and could be used for the additional $71,260 required for
the design services agreemer.t~ Appro .... al of the attached Budget
Amend~ent Ordinance authorizing the transfer of $71,260 from elP
No. 19702 to CIP No. 19310 is recommended.
If Council approves the Budget Amendment Ordinance, $500,000 will
remain in the budget for FY 1998-95 to construct the project. The
project is approximately one mile in length a.nd includes the
following ma,or elements:
CKR:577:93 11/10/93
Page 2
(8) A bridge over Embarcadero Road
(b) A bike path (10 (eet wide
with 2-foot shoulders
(c) Fencing
(d) Lighting
(e) Other
Preliminary
Construction
Estimatf!
$ 190,000
140,000
80,000
40,000
__ 50.000
$ 500,000
The Joint Powers Board (CalTrain) has agreed, in prj nciple, to
allow the use of its right-of-way at no cost; subject to conditions
that staff believes can be met.
The Project involv2s the construction of an extension of the bike
route that currently exists running north/south i~ the area west of
the CalTr&.in tracks, and east of El Camino Real. The existing bike
route alignment follows segments of Wilkie Way, Park Boulevard,
Sou~~qate ~eighborhood streets, and El Camino Pa~k bike path. This
route is veIl used by commuter cyclists, students and others, as an
alternative to Alma street or El Camino Real. At the present time~
there is an existinq gap in the bikeway between Churchill Avenue
and University Avenue, adjacent to Palo Alto High School. Town and
Country Shoppirg Center, the Urban Lane area, and the Holiday Inn~
Tbe proposed Project will complete the missinq qap in the bikeway
and provide a continuous bike rO'.Jte from the south city limits with
Mountain View to the .north city limits with Menlo Park. In so
doinq, it will serve and facilitate bike travel to the Downtown and
California Avenue Business Districts, the two Palo Alto CalTrain
stations, the Palo Alto Transit center an1 stanford University as
well as Pale Alto High School, Town & Country Shopping Center, the
Urban Lane area, and El camino Park.
BNVIRONXENTAL IltPACT AS8ESSJllEH'l'
-A Budget Amendment Ordina~ce is not considered a project under the
California Enviro~ental Quality Act; therefore, no environmental
impact assessment is necessary.
IlBCOIOIEllDATION
staff recommends that Council adopt the attached Budget Amendment
Ordinan~e transferr~nq a total of $71,260 of CIP funds from project
No. 19072 to Project No. 19310, to provide sUfficient funds in
fiscal year 1993-94, to cover the design services agreement with
HMH., Inc.
CI'iR: 577! 93 11/10/93
Page 3
R.speetfully submitted,
ASBOK 1(. AGGARWAL
City Traffic Engineer
~~
City Manager
KENNETH R. SCHREIBER
Director of Planning and
community Environment
Attachment: Budget Amendment Ordinance
CI'IR: 577: OJ 11/10/93
Page 4
i
! 7
,
\
ORDINANCE NO.
ORDINANCE of THE CO~CIL OF THE C:TY OF PALO ALTO
AMENDING THE BUDGET FOR THE FISCAL YEAR 199)-94
TO TRANSFER FUNDS FROM
CAPITAL IMPROVEMENT PROG~~ PROJECT 190'2
(HIHOR INTERSECTION IMPROVEMENTS)
TO PROJECT 19310
(EKBARCAJ:E:RO PEDESTRIAN/BICYCLE BRIDGE AND BIKE EXTENSION)
WHEREAS~ pursuant to the provisions of Section 12 of Article
III of the Charter of the city of Palo Alto~ t.lote Council on .June
21~ 1993 did adopt a budget tor fiscal year 1993-94; and
WHEREAS, the city council of Palo Alto approved $50,000 for
the deslqn phase of Capital I:a:.prove::n.ent program {CIP} Project 19310
,Embarcadero Pedestrian/Bicycle B~idqe and Bike Extension) on June
21,. 1993; and
WHEREAS, an agreement with HMH. Incorporated {·HMH~}. in the
amount of $121,260 ($106 1 260 to provide ~esiqn engineering and
lililited construction phase se.r-vices and up to $15,000 in change
orders] for designing the Embarcadero Pedestrian Bike Bridge and
Bike Path Extension project was appz:-oved by council on October 12,
1993; and
WHEREAS, an additional $71~260 is required to implement the
agreement with lOOI; and
WHEREAS, CIP Project 19072 (Minor Intersection Improvements)
has been recently completed and has a balance of $91,809;
NOW~ THEREFORE, the council of the City of Palo Alto does
ORDAIN as follows:
SECTION 1. The sum of Seventy One Thousand Two Hundred sixty
Dollars {$71,260] is hereby transferred from CIP Project 19072 to
CIP Project 19310.
SECTION 2. This transaction will have no impact on Reserves.
SECTION 3. As specified in Section 2.28.08C(c) (1) of the Palo
Alto Municipal Code, a majority vote of the City council is
required to adopt this ordinance~
SECTION 4. The Council of the City of Palo Alto hereby finds
that the enactment of this ordinance is not a project under the
California Enviroruaent;e.l Quality Act and, therefor-e, no environmen
tal impact assessment is necessary.
SECTION s~
Municipal Code,
!!Idoption~
As provided in Section 2.04.375 of the Palo Alto
this ordinance shall become effective upon
INTRODUCED AND PASSED:
AYES:
NOES:
ABSTENTIONS:
ABSENt':
A'l"rEST:
C1ty Clerk
APPROVED ASrO FORK:
Sr~ Asst. C1ty Attorney
APPROVED:
City Manager
Director of F1nance
Director of Planning and
Community Environmen~