November 4, 1993
THE HONORABLE CITY COUNCIL
P~lo Alto, California
.'
Agreement with Varian Associates -Amendment Nor 1
Members of the Council:
RePOrt in "rie!
3 •
This report recommends that the city Coun~il approve and
authorize the Mayor to execute the attaohed Amendment No. 1 to
the Agreement by and between the City of Palo Alto and varian
Associates., Inc~ The amendment allows Varian to convert sOlIe
additional 4~16JcV equipment to 12.47kV under 'the terms of the
aqreementl which will improve Varian and the City's electrical
systems. Tbe amendment also contains some clarifications to the
revenue aeterinq requirements and the service start date.
Background
On December 12, 1991, council approved an aqre~ent (CKR:549:91)
with Varian Associates which authorized the City to install
additional 12.47kV capacity at the Hansen way Substation. The new
capacity was intended to serve a new test faGility {Test Set),
that Varian was constructinq under It Department of Energy {DOE)
contract. Varian has reimbur&ed the city under the terms of the
agreement for all expenses to date for the installation. Varian
is currently 3waitinq reimbursement from the Electric Utility
under the agreement, which is based on the quantity of electric
energy consumed by the Test Set~
On March 22, 1993, Varian noti~ied staff that its DOE funding had
been delayed for the Test Set project and expressed concern that
CIIIU 5 64 • 93
o
Varian ftiqht not be able to obtain its entire reimburs~ment4
Varian requested that the City postpone the start date of the
reimbursement for two years, in an effort to quarantee that the
electric energy will be used as planned and a full reimburse.ent
would be pos&ible. Statf did not want to extend the contract
beyond the tive year interval since all accounting for the
reimburs~t formula is done manually. Staff also recognizes
the difficulty with the DOE funding and the need to work with
Varian to retain a valuable business.
For these reasons, staff began lookinq tor other ways to utilize
the spare 12.47kV capacity and requested Varian to consider
connecting additional electric loads to the new capacity. While
Varian has no new electric loads, it does have significant
existinq loads which are presently served frem the City's older
4.16kV system. Some of the City's old 4.16kV equipment, which
serves Varian, is quickly approaching the end of its QQsign lite
and needs to be retired. Staff realizes it would be in the best
interest of both t.~e City and Varian, if Varian would convert
some of its electric loads from the old system to the new l2.47kV
system. This would enable the City to reduce Its maintenance
costs and the inherent risk of failure of the old equipment, and
it would allow Varian some reimbursement on their investment of
new electrical equipment. To accomplish this~ varian must
convert some equipment to the new 12.47kV system at its own
expense. Staff is confident that Varian and staff can agree on
the conversion plans so as to maximi~e benefits to both parties.
Staff proposes to allow approved newly converted loads to be used
in the reimbursement formula, ~r.der th~ terms of the agreement.
Tbe attached amendment will expand the reimbursement formula to
allow this. The amendment also clarifies the start date and
.etering requirements for the reimbursement formula.
Funding
Varian ~ill fund all voltage conversion expenditures on their
site4 Tbe City will SUPPOlt the voltaqe conversion effort with
associated service cabling and connections. Fundin~ for
miscellaneous city work will be from the Capital Improvement
Program annual major project, Electric Meters and Service5.
Environmental
This project is an eXisting one under CEQA and therefore, is
categorically exempt from any requirements.
pezm-endation
Staff r~oommend& that the city Council approve and authorize the
Mayor to execute the attached Amendment No.1 to the Aqreement
between the City of Palo Alto and Varian Associates, Inc.
Respectfully submitted,
lWtJ\tu. \.j ,~J (I
MIC!I.~L D. BEAIlLAND
E~l~ct~~ering ~anaqer
E J. KRIZEK
Di ector of Utilities
~i'it,~/
BERIIARD M. STROJNY
Assistant City Manager
Related CMR: CMR:549:91 Aqr ... ent with Varian Associate.
Attacbaents: Aaendment No. 1
Aqreement
CI010564'U
. -
..
AKENDMENT NO. 1 TO AGREEMENT e E'TWEEU
CITY OF PALO ALTO AND VARIAN ASSOCIATES. IN'C.
This Arr.cndrnent No+ 1 to Agreement, dated
1993, is entered into by and bet'wro'ee.n the City of Palo Altc, a
chartered city and a municipal corporatiGn ("City") a:1d Varian
Associates, Inc., a Delaware corporation, witr-~ offices at 3100
Hansen Way. Palo Alto , Califo:rnia (-Varian").
WHEREAS, the parties have entered into an agreement,
dat~d January 16. 1992; and
WHEREAS. the parties wish to amend thi~ agreement as set
forth herein;
NOW. THEREFORE. in consideration of the covenants, terms.
and conditions set forth herein, the parties agree:
.5...ECTION 1. The partie.s hereby incorporate by reference
the letter of September 23. 1991 <attached hereto as ·Exhibit A"l.
under which City has agreed to use the meters of Varian to
determine electric usage credits under this Agreement under the
terms and conditions set forth in such letter~ and the letter of
Varian responding to the City's letter of September 23. 1991
{attached hereto as "Exhibt,t: B-). The two letters are intended to
modify the terms of the last sentence of Seccian 1{a). paragraph
two.
SECTION 2. The first sentence of Section 2(e) is hereby
modified to read as fallows:
follows:
"One year after said service begins and annually
thereafter, City shall pay to varian twenty percent (20t)
of the g:ross annual revenue received by City from the
sale of electric po~er for the new Test Set and/or othe~
electric power loads mutually agreed upon by the parties,
includir.g electric power loads resulting from the
shifting of power loads from varian'S 4 KV power system
to the new Test Set l2 KV system .•
SECTION 3. Section 4. (c) is hereby added to read as
-For the purposes of this Agreement, the tenn "date of
init.ial operation" and the date by which service is
deemed to begin shall be deemed to have conunenced on
January 1, 1993."
1
, ,;..
•
IN WITNESS WHEREOF, the parties have executed this
Amendment No. 1 to Agreemenr in Palo Alto on the dar,e first above stated.
Cit), Clerk
APPROVED AS TO FORM,
Senior ASs--e-:--city ]J.ttorney
c-c-::-:::--=--===---_ Director of Finance
Risk Manage r
AP PROVED AS TO CONTENT,
Director of Utilities
CITY OF PALO Jl.LTO
Mayo.!
Taxpayer Identification No.
94-23S9J45~ ________ _
2
· -
September 23, 1991
Mr. Ha~iano castillo
varian Associates
611 Hansen Way
P a BOX ICl250'
i'AL:J .... LiD. ("'Ulor.r,jA S',OOJ
Palo Alto, Ca. 94303-0883
Subject: Variants New Test set Load -Metering
Dear Mario,
During our meeting on september 17t.h, you nentioneci. that you did
not provide any metering space for the City to inst.all metering
equipment. As you knm,,', the City needs to measure energy
consu11lption .by the new Test Set in order to determine Variants
annual credit under the Agreement being finali~ed. We understand
that Varian would rather use the Varian watthour dem.>:lnd :meter
currently e.}(isting in the feeder break~r cotlpartment (to be
desiqrlated D33). We understand that the D3) feeder will be
dedicated to the ne~ Test Set.
We can allow the existing meter to be used if Varian agrees to the
following;
1. Before varian installs the new 12.47kV potential transformers
to replace the 4; .16kV units, please Iilake arrangeme:.ts to give
the new PT's to the City's metering department for testing.
The city reserves the ri9h~ to test and re-test any of the
associated metering transforlll.ers at any time. Any outages
required for testing 'Will only be done .... ith prior notification
of Varian.
2. Va.rian shall allow the City metering department to test,
calibrate, and seal Varian's t ..... a we.stir.~hc'...!~e '":.'"a-t.thOL<I derr.a..!"'ld
m~ters located in feeders D]2 2.nd DJ]. The City will aI:;o
install metering name tags like ~e do for our revenue ~eters.
At the end of the five year contract, the city will remove the
na~e tags and seals.
3. Varian shall pt"ovide key access to each of the meter locdtions
for periodic checking and meter rt'!adings. As an c.lternate,
Varian can install windows in the outer doors of feeders D32
and D33 to aIlo...,. the City to read the meters. 'The city .... ill
not reset the demand registers on Varian's meters •
.:.. Varian ""ill take month 1 '.!r readings of the t ... ,o meters (both peak
KW 2nd .KWH) and send :,le readings tc the City. The City ..... ill
cross check the Varian :meter readings ...:ith the city revenue
DictE"r readings for accuracy. Varian .. ,rill read the meters and
re.5~t the demand registers ,.dthin one day of the City!!:; meter
EXHIBIT A
reacHng of the City's meters. If th~ Varian metE>rs do not
check against the City l":1ete.c 'Within 2%, the city has the
option of ~stimCl.ti!lg the Test Set Load~ The City , ... ill annually
tata I the meter read i ngs for: the test set and compute the
dollar credit to Varian and issue such credit.
5. The City ..... ill have the right at any time to inst::-:l (at the
city rs expense) a !..oad Profile Record.er with remote phone date;
link to allow recording and analysis of the Test Load.
I trust this is satisfactory.
concerns, please contact :m~. If
p]edse notify us in writing 50
agreement in our file.
Regards l
~~-f~~
sam Zuccaro
Sr. Por,,'er Eng ineer
If you
Varian
.... e can
have any questions or
agrees 'With this plan l
retain a copy of your
ce. Mike Beanlanc, Electrical Engineering Manager
Donna Hilden l Sr. Power Engineer
Charles Randall, Metering supervisor
l,a!."ry LaRosa, Lead Utility Servicepel..·son
Tom Habashi, Sr. Power Engineer -Energy Planning
Saul Gold, varian
'" .... '-.
,
@
I,.·~!
&
1200A'~P
@\CW
A"C r t.>-'3~)
'~C,T."
(® . ~@(Cj~~ii)
15KVA CPT ,.7j\
\~'3
il
COMP'T,®
~ __ I
-/-"
L"'" 0~(mA
~ 'LAS
f -,
'~~,;I' ,-
(?
.. --><=,. .•.
FRONT fuvAT/~" '
_-1Jffr>'~Y~(T W!?lI!!/',('f'£'xJF J)",&-'?l
[) I C' " " fi:,
~
far ~C:C'u..r'(lt.e"
T L.,
mNER
C,1.5
. ;2CI'.1, PfIL.
1!'i~:VA
CPT
1
~
VA 1<iAl--\ ~ ~
"-6;0'~'1
.• 1-t':I-YI,.NNEL e..'
0"
A
®
PQ' .. ,ER r
,\1~",rf
./ -''{--I
'.-I' ;
..... 1 "T
L .....
'\11(, __ ' J . -t' ,,-x.., ,. "'~ :"'" 'f' ~;!'8 ( ,
--'
FOHER CI
IIlCl)M ,,~,
~)·7tr:j.!,::
"!i~'-"I' ,
/," .: ~
• '-\;~' d .,
',,,,";: :' ,,' '(C. ".' . ..,; ~~,!;>Jl. "', _'_ ->" ~';~Jt~ ~'l;' Ii,. ,J 'c" "\.:. ';
"' .. '~ ,
/
/ varian@
~~HISIT B
City of Palo Alto
Ut.ilities Department
P. o~ Box 10250
Palo Alto, California 94303
November 19, 1991
Subject: Varian's New Test Set
Metering at Existing "on Lineup
Att2nticn: Mr. Sam Zuccaro
Dear Sam,
The following is an item by item description of Varian's response to
your letter dated september 2], 1991.
Item 1. New 12.47kV·potential transformers should be forwarded to
CPA for testing.
ACTION: PT's have been forwarded to Ken Schwab of your Metering
Department and have been tested/calibrated~
Item ~. City reserves the right to retest any of the metering trans
formers at any time.
RESPONSE: We understand that varian will be given ample prior
notification in order to coordinate shut down of
equipment with the Building occupants.
Item 2. Existing Westinghouse watthour demand
calibration and installation of tags.
at the end of the five year contract.
meters require testir.g
Tags will be removed
RESPONSE: Meters will be removed at the completion of the 12kV
upgrade for the switchgear and ~il1 be "forwarded to you
for testing and calibration.
Item 3. Keyed access shall be provided to each meter location.
RESPONSE: switchgear pad is present.ly locked but does have a
se~arate access for CPA entry. Meters are now
accessible via switchgear doors ~hich are presently
unlocked. We will work yith the City to assure con
trolled access to the meters.
EXliIBIr 3
Vilro.aoA5s.o..o(':JI'''';,1I1e 3100 !-bn",c" WJ)' P,O eo_ 10800 Palo I\Jlo,C3h1orn;:J g~:;O"-{l68J li S A
.<lISP''':]:) 4000 T!l'h,'" :J.1-b47G
•
Item 4.
varian@
Monthly readings for the lva meters shall be read b)' Varian
and forwarded to the CitY4 Reading and resetting of meters
shall be coordinated 'With t.he city.
RESPONSE: Varian will read and reset the meters as requested.
Item 5. city may install a Load Profile Recorder vith remote phone
data link.
RESPONSE: Varian 'Will cooperate in any effort required .by the
city to install the Load Profile.
Please call me if you have any additional questions. Our plan is to
begin work on the s'Witchgear Thursday December 26 and to complete upgrade
of the switchgear no later than Sunday December 29, 1991. We look forward
to working with you in determining all of the interfacing required by the
City of Palo Alto an"a. ourselves to successfully complete this project.
cc: M. Johnson wa
M. McCoy va
s. Gold wa
RespecTfully Yours
~ ... ~ ... tf?~~
Mariano C. Castillo P.E.
V".l,lr'lA:l:k.ICi..'I,:s.I,1C 3:00 Han:;en W.:Jy P 0 OO~ 1000'J P .. I<,l AJIO.Calor"'I);,' 94JO.1 O{JtlJ U S 1\
'11514:)3-'000 T d •. :~ lo1-D<\ 7(;
December ~2, ~991
THE HO~ORABLE CITY COt~CIL
Palo Alto, CalifoLnia
AgreeIr'.gnt with Varian Associates
Members of the Council:
Report in Brief
6
This report recommends that Council approve and authorize the
Mayor to execute the attached agreement by and between the City
o~ Palo Alto and Varian Associates, Inc., allowing the City to
design and install n~w elect~ic substation e~~ipment for serving
power to a new Varian Associates electric load.
Discussion
In A~qust 1988, varian Associates met with Utilities staff to
request an increase in electric power capacity to serve a new 6
Meqawatt (6,000,000 wattJ test facility. At that time, Varian
wanted the new facility to be ready in late fall of 1990.
staff estimated the project cost at $750,000 to design and
install the necessary electric power distribution equipment to
serve Varian's new facilitY4 Staff determined that the energy
consumption of the new test facility was somewhat speculative;
and therefore, the project cost may not be economically
justified, as discussed under Uti~ity Rule and Regulation 17~
Varian agreed to reimburse the City for its expenses, provided
Varian could reco'\~er some of the cost depending on enerqy
consumption and subsequent associated revenue to oe received by
the City.
On August 3, 1989, Council approved a preliminary Reimbursement
Agreement vith varian Associates (ref. CMR:4CO:9) that allowed
staff to begin enqineering and purchasing lonq leadtime
electrical equipment. To date, staff has purchased and received
about $400,000 worth of equipment needed for this project. Varian
bas reimbursed the City in accoraance with the Preliminary
Agreement.
Since the preliminary Agreement was approved, staff bas been
negotiating the terms of the attached Agreement with Varian. Due
to the long negotiation process with varian (two years), staff
revised the estimated cost of the project to $820,OOQ~OO to
CKR,:549:91
. ..
o
AGREEME}II"T
This Ag=eement is made at Palo Alto, california, on the
day of 1991 by and bebleel"'. the CITY OF PALO ALro:-:i
municipal corporation~ hereinaft.er called nCity!1~ and VARIAN
ASSOCIATES. INC .• a Delaware corpor-ation, with offices at 3100
Hansen way, Palo Alto r California, hereinafter called ItVarian";
~ I T N E SSE T R,
WHEREAS, Varian desires an increase in t~e electrical power
provided to its business located at 3100 Hansen 'Nay, Palo Alto,
california~ and
WHEREAS, City's Electrical Engineering Manager has determined
that vari3.n r~quires additicnal transforZler capacity and that
Varia.n's requi::-ement is of sUfficiel"'.t :::=agnitllde that it would
impair the abil i ty of the present. sy:$t.e~ tc serve the nor:nal load
and that the requirements a!'".a of '.,ince!"tain permanency; and
~~EREAS, City has no assurance at the present time
requisite capital expenditure foe said transformer
increase vill provide an adequate return to City
investment: and
that the
capacity
on its
WHEREAS, varian is willing to advance to City the. Cityrs
actual cost incurred in providing additional transformer capacity
provided that Varian may recover o','er a period of years the
difference in cost advanced by i":. :;:; Ci::y and. the co,;t of the
standard installa.tion pursuant to Rule and Regulation 20 of city's
Utility Rules and Requlations, eifec":.ive July II, 1988, a copy of
.hic:h is attached hereto and incoryorated herein by "this reference
(gRu~e 20 a ); and
WHEREAS, the parties inLend that th~ cost of the improvements
to be made under this Agreer::ent -... ill not exceed Eight Hundred
T'",oienty Thousand Dollars ($82{) I 000) 'i.rithout prier nati Eicat ion to
Varian;
NOW, THEREFOPJg, in consideration of the mutual understandings
and covenants provided in this Agr~e~ent, the parties hereto agree
as follows:
a. G~neral. In order to serve the Varian Te3t Set Load to
be located in Varian Bui,ldinq 4 (referred to hereinafter as the
"Test Set"), City will add the new substation capacity at the
Hansen Way S~bstation as described below (referred to hereinafter
as the -Project-) ~ City presently does not have e:nough physical
space at the Hansen Way Substation to add this new capacity without
modifying the Substation layout~ To create space, City must first
remove transformers i{W-3 and HW-~ and associated equipment now
1
.-,,-
-~$<-~
d. varian rnstall.~...t....i,.91l_PeSOons_~.p.lJ_i tips. Varian -";ill
pr-ovide design and construct iO:1 senriceE for a:1y work needed on
Variants proper~YI as deemed necessary by City an~ Varian fer the
Project. varian ..... ill allolJ City to make the necessary power
interruptions to accompl is.h th~ Project but such inter=-uptions will
be coordinated as reasonably possible with Varian to avoid
disruption of 'l'~arianr:5 manufact:uring capa.bilit.ies~ -larian viII
make all changes on Varian's po' .... er dist!"ibl!tion system to allow the
Building 4 service to accept 12.47 kilovolts. All e:dstinq
electric load originally serll'ed from the 3'..lil·jing 4 service -will
remain on this service. All CO:1strucc:.ion by Var ian ..,-ill be subject
to approval by the City Building Department~ Varian will provide
cutouts in the i!".strument panel for Varian I s feeder breaker-serving
the new Test Set to allow City ~o i~stall its me~e~ing equipment~
Varian will furnish new rela~~ coordination curves and settings to
the City Utilities Department for approval.
a. Subject to the provlslons of S~c~ion 2.b. below, Varian
shall pay to City the total actual ::j'J5~alled c~s't:. fvr all 'Work
accomplished by City under the Prcject, as sumffi~rized in Sections
l.a~, b. and c. above.
b~ The estimated cost:.s -:~r -=.he -.... ork to be performed by City
under Section 2.a. a~ove is: Material--Four Hundred Ninety
Thousand Dollars ($490,000. GO); La.bcr--Three Hundred Thirty
Thousand Dollars ($330,000.00); T~tal--Eight Hundred Twenty
. Thousand Dollars ($8.20,000.00). NC::'·.,Iithstanclinq the foregoing,
prior written notification .. ill be provided by City to Varian's
Director of Facilities beforE: exceeding thi$ total arnount~
c. City 'IoIil! bill \tar-ian at pe~iodic interva.ls, no less than
on a quarterly basis, during the progress af -:he · .... ork for costs
actually incurred and paid by Ci~y under the Proje~~~ Evidence of
such payments by City shall be fUrnished .. ith invoices submitted.
payments to City · ... ill be made oy Va~ian on a net: basis -within
thirty (30) days following Var-ian I s receipt of invoices.
d~ City agrees to protact l indemnify~ d-Qfend and hold
ha~less Varian from and against that portion of an~l and all
claims, liabilities (including reasonable at~orneys' fees and legal
costs) or causes of action, of whatsoever nature including I 'Without
limitation l any mechanics lien claims asserted against Varian or
its employees caused by or resulting frem Cit-y's actions or
inactions in its performance of this Agre~~ent. varian agrees to
protect~ inde!r'.nify, defend and hold harmless City from and against
that portion of any and all claims, liabilities (including
reasonable attorneys' tees and legal costs) or causes of acticn l of
whatso~ver nature i~cluding, without limitation, any mechanics lien
claims asserted against city or its employees caused by or
resultinq from varian's acticns or inactions in its performance of
this Aqreement~ In the event of any conflict between the
previsions of this paragraph and Rule 20 1 attached hereto I the
prOVisions of Rule 20 shall govern.
J
91 I1 0.5 bck CXT.!ID51
o
city shall insure that no discrirr.ination shall be maae in the
employment or persons to perton ·,.,Ot:"k put'suant to t:his Aqree:uent
because of race, color, naticnal or-igin, ancestry, age, veteran
status or religior. of such persons. In connection 1o,'ith the Projact
city shall require its contractor and any subcontractor to meet all
requirements of the Palo Al to Munic ipal code pertaining to
nondiscrimination in employment and to complete and submit
TlCompliance Report-Nondiscriminat.ion Provisions of City of Palo
Alto Contracts n en a for.rn furnished by City.
s. TERMTNATrc.m.
Varian shall have the right to ter~inate i~s obligations to
make payments to City under thls Agreement on thirty PO} days
written notice to City; pravide-1, hcwever, that Varian shall
remain fully obligated tc pay City fer all reasonable expenses
incurred, com'l" . .ltted or encumbered by Cit"f to t.::-J.e date of such
notice and for all reasonable eXFJenses inctlrred, committed or
encumbered l"i City as a result cf such t€.r:ninat.icn. Such expenses
shall incll"je, bl.l': not. be limited to, t'"est.ot'"ation of t.he Hansen Way
Substation site and any related a.c:acen~ City p~oper~y to its fully
operational condition as determined by Ci~y"
9. rNTEGP~TIO~; AME~DMENT"
This docu~ent represents the e~ti=e and int.egrated ~~reement
between city and Varian and su~ersedes all prior negotiations,
representations and agreements, e1 :.he.:-...... r.l tten or oral. This
document may be amended only by wri~~en ins~rurne~t, signed by both
City and Varian~
10. GOVERNING LAW.
This Agreement shall be gover:1Ed by t:."::e 1 a" .. 's cf the St:ate of
California.
IN WITNESS THEREOF, the parties hereto have caused this
Agreement to be exeCLlted the day and year first above written.
ATTEST, CITY OF PALO ALTO:
City Clerk By : ~M"a"')"" o"r'--
Assistant City Attorney
VARIAN p,pSOCIA;lS-;x. INC. ~~
! ts: II'1l' VkE PresilBlt and Gerenl i'\lna!Er
APPROVED AS TO FORM:
Taxpayer ID No; 94-2JS9J45
5
•
j
t. SPECIAL POWER SERVICE REQUIRElIENTS:
1. General.
SPECIAL ELECTRIC UTILITY
REGULATIONS
RULE AND REGULATION 20
Where a customer desires vOltage control lJIIithin unusually close limits.
the City may requfre the C:Jstomer to provide at his own expense SUCft
spedal IJr additional equ;pme!lt as is required.
2. Nonstandard or [xcesshe C~.st~mer Requirernt!!'1ts:
Normal1y~ the City ..,ill insta11 'jine and/or transformer capa..::ity to
provide a reasonable marSiI1 for future grewt!'!. Howelr'er. if tne
customer r-equires a rIOnstandar-d voltaae. or ex;:o::ss line and/or trans
former capacity be-::ause o'f compara:lvely large loads of shOrt duration~
or unusually close voltage roegul-ltion. or .,is:h temperature liquid
filled transformers, or sc~arate transformers t3 serve Jow-r~venue
Joad~ slJch as X-raj mact'lines. we"id~f"'s. etc., the~ tne customer-shail
pay t.'le City an amount equal to tne difference in COSi: bet'Jrle~n tne
insta11ation reQuir-e{j by t.1e cwstomer a:'J!j t.'h.: standar:J installation.
If a customer's ~oad is cf sufficient magnituoe t!'lat it impairs the
ability of the sySi:!!lI to s~rvt normal load in the opinion of the o,ief
£iectr'icil Ellgine2r, tne cus~omer may be reQliire-d to impose h'fs peak:
loads aurin9 "afT-peak." hours of the City's e1:2ctri~.aT syst!:'"" or ta.it.e
servi ce from th~ Ci ty '5 60-ki1 ova it sy stem, or both.
B. PROTECTIVE DEVICES:
L It s,'1.a11 !le the applicant's r~spC)nsibi1ity 'to furnisn. instail, inspect
and k:e-ep in good and safe condition at his o~n risk and. e!(pense~ all
appropriat~ pret.ect!v! d!vices QT any kind or cnarac-:er .... M'fcil may be
reqt.iired to properly protect the applicant's facility. He IJtility
sMall net be responsitlie for any 'loss or damage occas:oned or caused by
the negl1gence. or II'rongful act of the appT icant or of any of I'd s
agent~~ empioye!s or ljc2~se~s in omittin;. inst!11jng. maintaining.
using, operating or interferiI19 witl'l any such protectiye devices.
2. It shall be the appnca1"lt's responsibility to lns .... al1 apprc'Yed protec
tive devices as may be necessary to coordinate proper1y "'ith the
Utility's protective devices to avoid e;c;posing ot.her cust.omers to
unnecessdry ser~ice interruptions.
a. Applicants who reot;lue-s .. primary voltage service sl'1al1 install circuit
breakers witn ~ver--:Ul"rent and ground fault reiays.
CITY. OF PALO ALTO UTILITIES
Issued by the City Cr .nc1 1
Supersedes Sheet No. J9a date-oj 7-j-83
Effect.ive 7·11-88
Sh •• t No.20-1
t'""'\ ~
SPECIAl ELECTRIC UTILITY
RE6UUTlQHS
RULE AND REGULATION 20 (Continued)
c.'" JNTERfERE~CE WITH S£RYICE: ,.
,. Genera 1
T'1e Util ity reser'l'es the right to refuse to serve r.ew loads or to
n.ntinue tD supply existing loads of a s;z.~ or character-that m!)I be
t ~"..rimental to !ne Utility's operation or to the service of its
customers. Any customer "'00 operates or plans to operate any equipment
such as, C.ut not 1 imited to pumps, WE'lders. saw mit 1 apparatus,
furnaces. compressors or other eQu;pmer:t ... here the use af e1ectncity
is intermittent. causes intolerable · .. oitage flJJctuations, or otltendSt:
causes intolentlie servi.:'! interference, must r'"C?:!Sonably jimit suei)
inter ferenee or re s!.ri c t the use 0 f sllch eQui ~mer:t upon reque 5t. ~y the
Utility. The customer is re~uired. either to provide and pay for
wh~t:!ver correct'fve ~asures aie necessary to 1 imit the 1nt~;fer;nce t'O
a le ... ~l established by tn! Utility as' reasonable. or avolo tne us.: of
such eq.uipment~ 'Wi'letr.er or not the equ1j:iment has prE-Vl0lJsTy cause'1
interference!.
2. ;-.armful Wave Form
Customers shal1 .,ot operat.e equi.;:ment :nat superimposes a current of
any f~eQuency or wave form upon the Util 1ty' s system. or draws curre!"lt
from the Utility's system of a harmfui 'Wa've form. which C3IJSeS
interference-with the Utility opentions. or the service to o:;her
customers, 01'" inductive Tn:erferencf' to communication raciiit:";es.
J. Customer's Resporlsibil ity
Any customer causi ng servic! interfeorenc!: to othe!"s must dil i gent1y
purs~e and taxe timely corrective action after being given notice and a
reasonab1e time to do so by tne Utility. If the cus-::omer does not ta~e
timely correct1ve action, or continues to operate tl'1e equ"ipmerlt ca.us1ng
the interference without restriction or limit. the Utility may. without
TiabiTity, af:er ~; .... in9 5 days written notice to customer, either
insta11 and activa.te c.ontrol devices on its facilitif!s that will
eln Of PAlO ALTll lITILlTlES
[s.s~ed by tile City Council
Supersedes Sheet No+ 41 dated ID-l-S4
Effe<:ti ~e 7-1-83
Sheet No. 20-3
.~.
)
~
Sl'ffiAL ELECTRIC UTIUT'r
REGULATIONS
RULE AND REGULATION 20 (Continued)
TABLE 1
NORMAl i'lAXIMIII AllOWABLE IWTOR STARTING ClJAAEIITS
ALTERIIA T1NG-tURREIIT MOTORS
Single-Phase Voltage
Rated HP
Gutput
Motor Rating (Service Voltace)
208v 1240.)
Thre-e-Phase VoTtage
Motor Rating {Service Voltaae
Z08v ~ 480,
2
3
5
46 amps 40 amps
69 60
115 100
69 amps
102
50 amps 30 amps
88 44
7 1/2
10
127 110 ll3
163
115 58
141 71
15 227 197 99
20 ··188 250 125
25 351 304 15Z
30 415 360 180
40 4J8 380 190
50 462 400 200
60 140
75 lOO
100 400
Over 100 -SEe Note 3.
iable 1 Notes:
L See Sect-ion C.4 f\1r detalls 011 tne use of this table.
2. Motor starting curr!nt is jefined as the st~ady state curre~t taken from the
supply lir.e with tne motor r~tor or rotors locKed, with a11 other power
consuming components. inel uding a current-reducing starter. j fused.
connec::ted in the starting position, and ...-ith rated vol tage and frequency
.ppl ied.
3. The applicant shall consult the Utility fOr" design criteria lrlTormation for
selecting suitable starting equipment for three-Dnase !-c motors not shown
on Table 1, and for motors that opera.te at higher vol tage ratings.
CITT OF PALO ALTO UTILITIES
Issued by the City Council
Supersedes Sheet No. 43 dated 10-1-54
Hfect7ve 7-1-83
Sheet No. 10-5
\
~CIAl ELECTRIC UTiliTY
RE6UUTlONS
RULE A~n R£GilLUiON 20 (Contin,.o)
2. Special facilities are; (a) fadlfties r~quested by an !pplic<!nt w!1icn
are in addition to or in substitut'ion for standard fa<:il1ties whicb the
Utiiity 'WOuld noneall), pro~iae for delivery of sen ice at one po;nt~
thrOLigh one l*eter. at one voltage class under its rat! sched~Tes. or
{b) a pro:; rata pOr"'tlon cf the f.!ci1ities requested by an appl ieant. fer
the sele use of sue" applicant, .,.nich would not normally be ailocated
for such soTe use. Unless otheno'ise pro .... ided by ttle UtlJity's rate
sc.';edules. special facilities wilT be installed. owned and maintained ~y
the Utility as an accorrrnodatior. to the appltcant only if acce~t1!cle for
operation by the l1tllity and tile reTiabflity of service to the Utility's
other customers is not impaire-j.
cln OF PAlO AI. TO UTILITIES
Jssued by the City Council
Effective 7-1-83
Driginal She~t Nc. 20-7
.:/ .~
.... C!L COMMUNICATIONS (Continued)
John Frances caruso, 101 El Ca.rmela Avenue, spoke regarding a
request to Council to review the negligence of the Palo Alto Police
Department. He was falsely arrested.
Edmund Po'Wer~ 2254 Dartmouth, spoke regarding civic responsi~ility.
Bazry Boulton, 535 Everett A'Ien'J.e, 4203, spOKe regarding support
fo~ a public meeting on the T2010 Transportation Plar..
Bob Moss, 4010 Orme Street, spoke regarding ~ th~nks to outgoing
council Members.
APPROVAL OF MI~~TES
septamber 9, 1991: Faz~ino/Kecovn, as submitted, MOTION PASSED
9-0.
CONSENT CALENDAR
Ilt1l.S will be VQfed OIl in one moliOJI UJr/~l lCllOo,Jed from '/rr calcrdar ,;.-'" a C)lIJlcir .~(e'mDt'r.
Mccown/Cobb -Approve COnsent Calendar J -9 and 11 -1J, with Item
10 removed by a Council Member to become lSA.
J. contract with Modern Office Machines tor Rental and Mainte
nance of Photocopiers
.t. RESOLUTION' 105J entitled IlRLSOLUTION OF THE COUNCIL OF THE
CITY OF PALO ALTO APPROVING AND AUTHORIZI/iG THE MAYOR TO
EXECUTE THE MEMORANDUM OF UNDERSTANDIIIG REGARDING URBAN WATER
CONSERVATIoN IN CALIFORNIA"
Memorandum of Understanding Regarding Urban Conservation in
California
5. RESOLUTION" 7054 entitled "RESOLUTION OF THE COUNCIL OF THE
CITY OF PALO ALTO DETERMINING PROPERTIES ELECTING TO ?;'Y COST
OVER A PERIOD OF YEARS, DETERMINING AND CLASSIFYI/iG GlfPArD
ASSESSMENTS, AND FUNDING LOANS TO PROPERTY OWNERS FROM THE
ELECTRIC SYSTEM IMPROVEMENT" RESERVE: UNDERGROU~D UTILITIES
CONVERSION UNDERGROUND UTILI~Y ASSESSMENT DISTRICT JJ
6. Agreement with Varian ~sociate5 re New Electric SUbstation
Equipment
7. Policy and Services committee recom.'llends to city Council
approval of consultant Agreement with uribe , Associates for
Assistance with Vehicle Service Facilities Pollution Preven
tion Program
Professional Engineering Consultant Services Agreement by and
between the city of Palo Alto and Uribe & Associates
2 12/16/91
o
CALENDAR {ContinoJ:ed~
8 ~ RESgJ,.;JTICN 7055 entitled IrRESOLUTION Of" THE CCUNCIL OF THE
CITY OF PALO ALTO APPROVING THE C1TY IS PARTICIPATIOU IN THE
SANTA cLAR.A COUNTY MORTGAGE CREDIT CERTIFICAT!: PROGRAM"
cooperative J~.greement 8et· .... epn county of Santa Clara and City
of Palo Alto
cspcsit Certificate Fo~
9. RESQf,JJTION 7056 entitled "FtESOLUTION OF THE COUNCIL OF THE
C!TY OF PALO ALTO EXPRESSnlG /l.PPR£CL~TION TO EUGENE ANTONE.
PROIET'l'1 UPON HIS RETIREMENT>!
~O. ORDIN~ ..... ~CE Of THE COUNCIL uF T:iE CIT! OF P.Il,.LO ALTO )._~ENDING 'tHE.
Bt]DG£:"T fOR F!SCAL YEAR 1991-92 TO ESTABLISH A NEW CAPITAL
IMPROVEMENT PROJECT N04 1921'2 IIBRYAN'T STREET BIC'lCU BOULEVARD
EXTENSION" IN THE' STREET IMP!iOVEMENT FUN~"
Item removed to become laA.
11. ORDBiA.J. ..... C; ______ 4.ruU entitled rtORDINANCE OF THE COl:/'lCIL or THE CITY
OF PALO ALTO AMENDING SECTION lR. {is. 040 OF THE PALO ALTO
MUNICIP_~L CODE (THE ZDNI.'~G ~..A?) BY A.MEN'DI~lG THE EXISTING
PUNNED COMMUNITY ZONING DESIGNATIC!'4 OF THE PROPERTY moWN AS
251 UNIVERSITY AVENUE TO DELETE: THE REQU:::REME:olT FOR GROUND
F.LOOR RETAIL USE" {1st Reading 12/02/91, Passe.d 9-0)
12. ~ma/East Meadow/East Charleston Intersection Improvements -
CIF 1907)
RESOLUTION' 7057 entitled "RESOLUTION OF THE COUNCIL OF THE
CI~,{ OF PALO ALTO APPROVING kND AUTHORIZING EXECL~ION OF AN
AGREEMENT BETWEEN THE CITY OF PAW ALTO AND THE COUNTY OF
Sl\l:TA CL.ARA. TRANSIt' DISTRICT FOR COST SHARING FOR THE AL'!A
~TREET BUS STOP DUCKOUT AT MEADOW DRIVE"
AJreement bet-"'een the City of Palo Alta and County of Santa
,lara Transit District for Cost Sharing for the Airea street
EJS Stop Duckout at Meadow Driv~
RESOLUTIO/l1 7058. entitled "RESOLUTION of THE COU}lCIL OF THE
CITY OF PALO ALTO AP'PROVING AND AUTHORIZING EXECUTION OF
PROGRAM SUPPLEMENT NOS. 00] AND 004 TO LOCAL AGENCY-STATE'
AGREEMENT FOR FEDEEL~L AID PROJECTS NO~ 04-5100"
Cal trans program Supplement No~ 00]
~altrans Program Supplement No. 004
13. Prop?sec study re Reflective Noise from Soundwalls
.oT~O. PASSE~ 9-0~
3 12/16/91
•