Loading...
HomeMy WebLinkAbout0289.094(I). • !. • • . '. ,'V ,,~~ ',- May 19, 1994 Tim HONORABLE CITY COUNCIL Palo Alto, California Regional Water Quality Control Plant1a Investigation Study -Consultant Selection Membel..'s of the Council: Report in .ari..e.! COrrosjon Control. This report provides the OPP01"tUllity for Council to refer consultant selection for the RWQCP's CQrrosion Control Investigation to Comrrdt.tee or to approve the selection of Kennedy/Jenks Consultants. Council. may leave this item on th~ consent calendar thereby approving Kennedy/Jenks as the consultant, or remove this item from consent and refer it to a Council Committe~. In either case, a negotiated consultant agreement will be submitted t.o Council at a 13uhsequent meeting for approval. The City's RWQCP must comply with stringent new liT-lits for copper and other heavy metals diRcharged to San Francisco Bay. Over one­ third of the copper discharged to the RWQCP comes from copper pipes, fixtures and industrial equipment. Therefore, the Corrosion Control Investigation Study has been initiated to develop strategies for reducing the amount of copper corrosion. This specific study was not envisioned at the time of budget preparation and aD a result, thp.refore neither the Finance Committee nor the Policy and Services Committee ..... as 'given the opportunity to be able to determine whether they wished to review consultant selection. Therefore, the Council is being asked to determine whether the consultant's selection should be reviewed at this time. The proposed approximate cost of the study is $130,000; and funds are available in the FY 1993-1994 operating budget, since studies of this genex~l' type were envisioned and pla:nned. Diacussloo Requests for Proposals (RFPs) were sent to eight consulting engineering firms with experience in engineering evaluations of corrosion control. Proposals were received from three firms: Kennedy/,Jenks. Montgomery-Watson, and the Bentley Company. The Bentley company proposal did llot address all of the components of the RFP and was eliminated from further consideration. Interviews were conducted with Kennedy/Jenks and Montgomery-Watson by three ; l.' .. ' , -1- \. 1 \ 3 . 'I. .:-: ' • o manilgere ftom the Public ~lork6 and Utilities Department.s. The Kennedy/Jenks Pt"oposal was selected, because their proposal and 1nter~/1.ew demonstrated a greater depth of knowledge concerning corrosion C'¢ntrol, ill the specific water supplieD tlsed in the RWQCP service area, and more developed recommendations for pursuing alternative construction materials to reduce corrosion wen~ provided. The proposed scope of worK. includes a series of components deAigned to l'efin{) the RWQCP's estimates of the amount of copper discharged through corrooion. to .tecommend apprcpriate water treatment clier,!.icals fo)," reducing corrosion, and to recommend appropriate restrictions on the, uae of copper containing const;ruction materials. 'the study 1a being carefully coordinated between the Public 'Works De:pal"tment and the Utilities Department because of the ifUPQ.ttant .relatlon8'hip between the water supply, which is managed by Utilities, and the copper discharge, which is managed by Public Works. The goal of the study is to minimize both the corrosion of copper fa. key concern for protection of the San Francisco Bay ('cosyntem} anrj the corrosion of lead (a key c·oncern for protection of h\;~t) health in the water supply). Staff recor.~'"':",ends that Council approve the selection of Kellnedy/Jenks COllsultants to perform the Corrosion ContX"ol Invc.atigation Study. Respectful.1y ollb-:nittcd, PIII!.IV DOUB[. Rnvironmental Compliance Division GLENN S.ROaERTS Oirector of ,Public Work.s ~~y Assistant City Manager ~ ;,' \ -2 -