Loading...
HomeMy WebLinkAbout0261.094..•. \ .~.: . ..:.~,,< •. _, ...• ', ;.",: (D .. , . • f • May 5, 1994 HONORABLE CITlr COUNCIL Palo Alto, California Attention: Finance committee MC!mbers of the Council: BUDGET 94-95 This is an inforroa;tional report and no council action is I1l!cessary. Each department. has prepared an overview of the activitias and programs which will be the focus of the efforts during tho 1994-95 budget year. Th~ overviews anticipate the Mission Driyen Budqetinq format, in that the:y are intended to provide a "big picture U summary of what the council is IlbuyingH with the resources; allocated during t.he budget process. Also-attached to Poach department overview is a summary of tull-time equivalent positions by program, to be usod in conjtlnction 'With the budget r(tview by the Finance committee. This inforl!lllltion is provided 1n a su.mmary table in the Budget appendix, as 'Woll. CMR:261:94 CIT\' ATTORNEY'S OFFICE 1994-95 BUDG"'. In 199(-95, the City Attorney" Office wW (ocus on three administrative and operational objectives, in addition to the usual advisory and litigation functions. The most notable change will be the addition of liability claims investigation. The department proPOS<'S taking this on as a full in-house function_ TIli, will rcpla« the City', on-going claims invesligation and adjusting service conlra<:l currently funded through the Human Resources Depar1ment. In 1992-93, liability claims dulies from the Risk Ma.'lagcr's office were divided and as.signed~ in part f 10 the City Attorney's Office, Since then, (he claims adminislralion process has been C<lllducted in-house. With th.e hiring of a Claims Inves1i,galor/Paralcga1, in Jury 1993, tile department began testing its ability to provide (ull in-house claims service. It was dClc-rmined to be feasible 10 provide full claims scrvice, provided lhe n«essary compuler tl~rdware and software to provide administrative support and management database reporting c.apabilil'le'i is available. The bl.',dget refle.cts a "trade" of the on· going contracl e~pcns.e for a one-time hardware and sofiware investment. It is c.stimatcd the T.;-!Urn 011 this investment \"'ould occur within one ),C'.a!. Tile initial hardware and software costs (S6S,C()() should more than oifset one year's savings i.n the outside claims service contract (.$75,OOO). Additionally, development of the Mission Driven Budget tMOll) will afso require significant auention. MDB requires detailed service analyses in order 10 aMSS and manage the time expense and value of \'anous regal activities. The Attorney's staff will be working with City depar1ments to study and reassess their service needs and altcmalive means of using staff al torney ti me. "inally, in-ho"", litigation role, will be monitored_ The budget include, a ,ubSiantial ($40,000) reduction in the outside counsel budget. While it is hoped this wiH not c,au5e service impacts, activities must be cautiously monitored during the: ye.ru to assure adC'.quatc: levels of service that are cOrlSistent with <:urrent staffing levels. ",," \ . , , I I ," .. STAFFING REPORT BY DIVISION, BY PROGRAM CITY ATTORl',EY'S OFFICE A«tmlllhl f .Uon and Cell c r.1 Ciry Anomer !.es.1 J\ssi$l:Mlt l<g.1 SwctII)··C«lli&nual PU81eg.1 hwe~;g'loc &nior Assi~a.nl ClI)' A"~' r«aI ProJgrL'll mrALDEPARTM£NT 1.00 1.00 2.00 1.00 l-lll 8.50 ~.50 .' . ':,' ' . " '. ';'-.c:;..;..;.,;..., ;_:,~. CIT\' AUDrrOR'S OFFlCll 1994-95 BUDGET The City Auditor', OWe< will continue to focus on operational aud;" in the. 1994-95 budget yeat. Thj5 approach is consistenl with a value-added approa,h Ie) atJdi{ing and seeks lo maximize the Office's ronlfibutiOll' to the Cit)'. Additionally, the Audito,', Office will emphasire oomplelion of follow·up audits to reports ;>suro In ro ... '<\l 1993·94 and will again proyille ",.i.lane< to the Cily', exttmaJ auditors. A detailed .udit plan will 00 presented to Coundl In Sep!emoo( 1994. During 1994-95, til< Auditor', orr"e "ill cootinue working towards improving the cfficicocy of audit. through the use of romputu·assilted audit techniques. This allows downl""ding of information from ,tfl.e Cilfs oomputer $)"s!cms and idffitHkation and sorting of d;:!ta in a meaningful way. tllus reducing the amount (If manual re,'1ew of reports and tnrormattorl~ while facilitating analys.is or data germane [0 eac-h audil. Finally. the Office: wiH comp!ele the risk analysis model in the 1994-95 budget year. This model assisls jn identirying are-35 of polenlial ('.\pos~Jre 10 the Cit)' and will be used in developing the audit plan. J, STAFFING REPORT BY DIVISION, BY PROGRAM CITY AUDITOR'S OFFICE IU!mrnllfraHon 'tid Gtnnal City Audjlor E. .... oculh'C Sccrttary ScniQr AlJd'ilor ToW Progrtm TOTALDEPARThI£NT 1.00 0.75 tOO ns 3.1S ., CITY CLERK'S OFFICE 1994·95 DOOGET " The fOCus for the City Clerk's Office in the 1994·95 bud~et year will be implementation of the Mis.ston Driven Budget (MDB), administering and monitoring the new Brow" Act provisions as appropriate for Council meetings, and full staffing of the City Clerk's Office in order to support the Council and provide public information services. The City Clerk's Omce will also foeus on Ihe Records Management Plan, In order 10 ensure the efficient retention and protection of official records~ there will be an audit of the ofT-sile microfilm records facility, rt<lucing the number ofrecords maintained in the office; providing for t)1e systematic transfer of inactive records from the office to warehouse storage; providing for the destruction of obsolete records; and maintaining an efficient filing system. Olher City Clerk's Office proje<ls in 1994·95 include; upd.le Ihe contliel of inlerest code and adminitlcr the campaign disclosure requi rements by developing a wmputeril£d Ir-acking system; and revise the election man:Jals and initiative, referendum and charter brochures. ,0" ... STAFFING REPORT BY DIVISION, BY PROGRAM CITY CLERK'S OFFICE Adm!nblraHoli and Gentral Iwist.ool Cily Ckrl; CilyCledo Deputy Ci<y Clm: E.x('C(Jli~ SwreIMY T 01111 Plop-am MN!inll j Min uCu an d Rorordl M ana,tmen I Assls!.ant Cily C lcik: CilyCledo Deputy Cicy elm: Ex~I~'t ~Yetary TOial PrQ81tm Eke-Uon& and ll,(jdoJvru A..<sistanl Ciry CI~Tk Cil)· Cterl; IRpuly City Ckd:: E .... ""wti I·e &q("~tJy Total Program TOTAL. DEPARTMENT O.lO O.SO 0.L5 Q.1.~ 1.70 OAD 0.20 0.25 UQ 265 0.30 0.30 O.LO !l.~ Ll5 CITY MANAm:R'S DEI'ARThIENT 1994-95 BUDG"-, .".' , The Cily Council's Ihrre priorit;"s for fts<.1 year 1994-9$ will be emph.,ized in the year's activilies ofille City Manag,,'s IXV-rtmcn!. 111= include evalualion of Ihe recommendations oflhe Hughes·Heiss organizational Re"icw Siudy a!1d planning for Ihe implementalion of those changes in !he Cily's organi'.3tion which art approvoo by the City Council: in support of the CounciPs IrHere.st in Palo Aho'~ EOOnomic Future, implementation of Ihe elements of the &:onomic Re-souT('{"S Plan approved by Covl1Cit; and con.tinuing 10 as.sist th.e Council in its coopellllil'e'planningaclhilics wilh EaSlI'a1o Alto and Ihe Olher participaling agencies, This }a..st Includes dirt(t im'Olvcment in liaison a~tiviHes. slimulaUng community involvement, SJ1d Msisting with economIc developmenl planning. The City Manager's Depar1men! will also overSt:t. several major programs underway in thr. City orgaoiulioo 10 assure suC«'-ss(ul progrtss: Ihe: Comprehensi .... e Plan upda(e, (he implementalion of MiMiorf Dnwn Budgeting, a!Y.l !he tvaluation of Ihe City's role ill new communications systems and lochllology. Addilionall),. Ihe Cily Manager's Departmef1t w~1I introduce an improved format for Cit)' Manages's, Reports. (CMRs) and win de\'clop, in conjunction wilh the City Cle.rk's Office, !n."OmnH!ndalions for enhancing Ihe Cil,Y'$ publk informationfcommullicalions function. The Cil)' Mana,ge.r's Dcparlmenl will aho as.sisl !he Council ill compiling and evalu31ing suggestions for tM poo,ili.s Ihat il will del;gnate (or 1M 1995-96 budge! cycle. STAFFING REPORT BY DIVISION, BY PROGRAM CITY MANAGt:R'S OffiCE Admlntllrat»n arid Gtntnl Ad.rnini~f,lli''t Srorl.&.i)'.Co.-uI6cnliai A~is(a.~ City MI.!'.IStt ~Inllo the Cil)' M Wgef CiIyM.lJl.Itt1" E.\:OMi~·e $c\.'frtll)·...("¢rJ'xScri(.jd OifKt Spcct,!l1I; T «Jl P«>p om CUyC<OlIlICU Adll',jnistr.'i~'C: s.xrc(uJ·(,O!i!'~it.l A"5.~st~ Cit} M""'6ff 1\.l$1 s.I$I"roIlO lh¢ tii)' M.m.I8« C'i!)'Mf!1lilg.."f R'\oc\ltiw Sco;mtl}'·Confldcpt;.1 OIrIOe Src'-'illid. T oIal Pro£7I\.,'TI Inlt'lo\'C'rm~nfll R.flllklrH /'.dmj"j wllli"e ~rt(tf)··Coru:dreti II A~si~!.p.~ Cil)' Mlmftt A.~is! ~L to the City MUlJgCf CityMlJ'ltger E.xC'CUli \"e S<Cftlll)'·('oof fti<nl ~ll Totsl ProgJlim E<-onom Ie n~ IOU~~ I PI. nnlA,I­ Mll)!g«.~R~Plmntt PlOQlrJl Assi!U.nl ToI.aI Progrt.rTl TOTAl-DEPARTMENT 'swrr.aM~.tu~Alfl'"..x4d«(Iw~kf-I),.4.u\1~c.(r.c..~";"-R~ ~1Ild~:..~'Cf,;,t'.M~¢.~R",""'-':~f1:N..i. ... ~ o.~ 01~ 02<) 0.45 0.12 OJ, 1.68 0.01 009 ().I~ (UO QJl 062 O.SO Q.liI 1.00 6.5<) COMMUNITY SERVICES DEPARTMENT 1994-95 llUDGET , \ ; The Communily Services D'pa"menl" primary focu, in Ihe 1994-95 budget )'ear will be to continue 10 provide high quality programs and servic", In addition, 'Ia((will be implemenling lheDepanmCllI's Mission Dri von Budge!, provid i ng i nform.lion for Ihe Cil y M ana.~<r" response to the Hughes Heiss Organizational Review, and m'ersccing 17 proposed capital impro\'CmCnl proJecls. Other Communily Service, Depanmenl a<ti"ilies will include; developing Phase n of Ihe Golf Course Masler Plan and implementing Ihe use of reclaimed waler at the golf collrse; i mpleme" ling Phase 1: of the Library Automa tiOil pran ~ conti nu 00 preparation of grant proJXJ~s 10 assist East Palo Alto; working with $pOns groups fo fund a reslroomfconcession Sialld al Cubberley; ",mpleling Phase II of Interprelive Cenler improven",nlS al Foolhills Par~ and the Baylands; making further landscape improvements in the downtown area; incrt'.asing se(vkcs for pooplc with Eoglish as: a second language; providing incre.Jsed advertisement ami prOrrlOliO'o'I {If Cubberley services and events; developing a facilities master plan for the Junior Mll.SeUm and 7.00; expanding City and community activities at Terman Cenler; working with PAUSD in planning for shared maintenance of athlelic facitilies; and aiSi~ling chifd care cenlers 10 aUain accred italian, :'; .... _. , ... -. " .1. . • .~ .. ~:,~~.t,~:r~~~ ..... -i:.. .. STAFFING REPORT BY DIVISION, BY PROGRAM COl\lMUNITY SERVIO;S DEPARTMENT COMMUNITV SERVICES ADMINISTRATION ActmlniJlrIIIUon and Gtneral Dir«lor of Social .00 CQrnmunity Sen.i~ Execu[j,'C Assistanl ToUl Ptogr.am Tot.' Conuml nli)' Stn'ku Adm [nh Iralloa HUM AN SE RVICES DIVISION AdltllnlJlrllllon ftn~ ernua' Administrator, Human Setvices swrs..:m"l' Managem«ll AssistlVll ToIsl ProgTo!.m Tolal Humin Sen.'lcel Dr"blon ARl'S AND CULTVRJo: DlVlSfON Admlnhlnttion nd Gtnentl Oi reCRV, Ms snd Culture Staff ~relaJ)' TOIal Program Vhuill Arte }',ec ili!ies A~~anl M!l1lager, Cultural ~lIter Office AssL~anl PrOO'.iC~r As-tsI$(,i~ Program Assi~ant Voltmlett Coocdinalor Tolal Progiam Children', Thnlre PfOduur ArtsISciences Program A.s$jstant S\JpcrviSOl. Theatre rWtTam." Theater Sp«-iali:>c Tole! Program COtllntl.! nil)' Thelll re S\Jpen'is:or, ThC<1lrC ProgrSFr.s 1ncaler Speci~'isl Total Program Tola! Arh and CutLure Dh'jslcln . . , 1.00 LllQ 2.00 2.00 1.00 1.00 IiSQ 2.50 2.59 1.00 1.00 2.00 G.50 1.00 1.00 2.25 1.00 Q.Lj 6.50 2.00 1.00 1.00 l.OO 5.00 100 1.00 2.00 1:5.50 j.: " : " .. ",.' STAFFING REPORT BY DIVISION, BY PROGRAM COMMUNITY SERVICES DEPARTMENT (continued) R£CREA TlON, OPEN SPACE A."'lD SClENCES DIVrSION AdUlI~hlnlk-n .Ild GC!lCtlll! Buildint, Stn,'h."'tpefron·Lead DiJ«~or, RCCfe1l\ion and Optn Spk~ Tot!1 p(~1Jn i1;ttr'ta~»rl AtthilU Offi« Spo.:i c 1i <;t P'rOgUffi A.ssis!ar:I Supe,-i;1!...oo...-rn (lr Rew-':alioo SUrmi50.."If, ~aJ Rwulioo T ()(aI hogram ScboolSitc B'~ihlkr,g Ser.iocplf:lt.'>n EXo!'o:ul iw AS$~staIll P{oganl Ass.i~Ill\ Supenisor, G~ral RlXn.'itioo TOial Program Srle-1l("U Oflkoe Sp .. xiati >1 PrOOl.~·. Arts,lSdtrx-.es SlIpl;'f\isor. Junior MU$(urn T((!I Pros:ram OptttSp.« Parl.:RMgC; P8J'k.<JOpcn Sp.K'e AS-$i$lanl Senior R8.Jl~tt Su~ Open Sp8IX: .. "XI &icr .... "'C Tocll Progum Tor.1 R«ruHon J 0pl"n Sllll't .."d SC'knC'ts Dirbkln -... 1.00 1.(IQ l.OO 3.25 1.00 1.00 8.00 1l2S 5.00 1.00 100 UlQ 800 0,$0 3.00 1m ,so 5.00 0.50 2.00 1.00 ·8.SO 36.2S STAFFING REPORT BY DIVISION, BY PROGRAM COMMUNITY SERVICES DEPAR'fMEN'r «ontlnued) Ll8RAR\'DIVISION Admm[Ur"Uotl .~d Gtntnl Di.re«or, U~, StMfS«:frt4i)' Totll P'''ifln'l Tmllk.1 Stn ku (~thMtC1". Lih'tfY Prop L'r,J. Librarian LibrlJ)' As-}.isti./\!: l.Jbwy "~Sixim libfU) Sp'",.h~ MVI~~,...-. MllQ tit..,-"} $<-t\X<:-$ Sci.x'( tit>fuit .. <l Supo-..i ~i.ng.I.i~LJi ~ C<o.."("JLna!CC'. Libt .. '), Circulil1X(') Toul PlOftW1 E"lcnJIo." Ston'i«. C(o.){Jin t"~. lit-rtl)" Pn-.pMU Lit-lUi.., LIN-IJ)' ~st&n! SmiOl'LiNuilrl Sup.:'f'\~siO\! lihll{iLfl T <)I.d Prl..'Ul,,... Total U~nr)' Dhbkrl'l 1.00 .l.llIl 2.00 1.00 1.00 100 100 550 100 5.00 200 J.oo 1050 100 6.50 1.00 5.00 too 15.50 38,00 ., \ . , STAFFING REPORT BY DIVISION, BY PROGRAM COMMUNITY SERVICES DtPARTMF.NT (conlin".d) PARKS AND GOLF COURSE DIVISION ColfCoLttH Operallon, DiJffior, 'Pms and GoU' COW'$(' Golf Equi,-.mrot MC\;fla.ruc Golf ('~ Me inlrnl.O\:(: Orem..okoeper Spr.nkkr S.rstcm Repair Per5(ofl SI.a!fScurtaJy Supcril1ll~,l of Golf C(.I(I{SC Total Program Gt-n.nal Park M &Inle n I nce Diroclc .... Perk'S Ut<J Go1(COOJ'S(: o IlI1g MO\\"Cf Me..:hmic Puks Crew·Uad Pm M,iTl~m3I"1Ce A~s.i$1&."11 Par\.; Maintenaoo: Pc(S<."'>n Pm.: MaUllm!loflO.'(: P(T:)('n·l...ea.! I'mslO,pen SpitCe A\S: slM! Spriflkl<r System Rtp.tir P~"Xl SIIp''l'inleoJenl of P.ark .. SlatT ~rct8Jy SUJX'fViSOf"('I( Pm!> Toc,,1 hOgl'll . .'n WorW .'or Ulitilwi Park M! inlt\:lance Pet'SOIl SIJper;nlen..:knl of Pcl;s SuperviS(l("(lfPari: .. Tool p(ogr.am Toral P~rkJ. and GclrCcutH Dhtlhn TOTALDEPARTMH{f all 1.00 '.00 100 100 OJi I.W 808 OM 100 l(() loo 11,9~ j,I.,'O OJ~ 200 09S 066 Q.9l 24.-42 o.os o.os OM O.IS ').1' FINANCE DEPARTMENT 1994-95 nUDGEr 11.e Finance Depanmeol's focus in Ihe 1994-95 budgel year will be on implementation of . Mission Driven Budgeling (MDB). MDB will r"luire Ihe developmenl of an enlirely new chart ofaccounts and reporting struclure, new cost a1localion melhodology, new labor reporting and position control systems, integtation of croSs departfllenl program and capj[aj projecl reporting into, the operating budget, development of impac( measure reporting, fe,vision of the Municipal Code, and departmental training on Ihe new finandal slruclur"". Templales for a new budget documenl formal must also be crealOO. The Budget Division wtlJ be wholly dOOieated 10 the projecl, supportOO by Ihe Accounllng and Adminislration Division management staff. Key financial systems will also be completoo in J994-95, including flxOO assets, stores jnvenlory, revenue collections automation, and the interface of the new p..'\yroll system 10 the acc.ounting system. The conversion of Ihe accounting system from Ihe HP 3000 !O Ihr. UNIX environment will also 00 undertaken. Other Finance Department projecl.i ~n 1994·95 include: lCJ.d responsihility for the Storm Drainage Fund debt financing; implementation of altcnddnt parki ng in (he Senior Cen!er rot and continued coordtnat[on wtth the Chamber ofCofllmerc~ on op!ions for dowlI!O\vn parking pefmit fees; review and proposal of revisions to the property transfer tax ordinance; and assistance with coordinating !he City Manager's response to the Hughes Heiss Organiz.a!ional Review. .. " i. I . ~,', '-, \ STAFFING REPORT BY DIVISION, BY PROGRAM F1NANCE DEPARTMENT ADM!NJSTRA TiON DIVIS ION Admlculrallon and Gtnnal DLT(Iro.,iOfofFiJl4J'loC.oo: 1.00 As:s:i$lanl tlrl!OOe Dir«Lor 1.00 B.'I(eo..~ti,'C S«retuy 1.00 Smiot Fin.arxi.1 Anslyit 1.00 Fin&nciaJ Systm\1 A11al)'$l Loo TOI.I PMgr6Jll 5.00 Toll' Admrrlillratlon l1I~'blo~ 5-00 ACCOIINTINGSERVIC£S DIVISION A(~unlinl! Strvkt. Conlrol A'XlOUn1 Spc>:f;lisl.tead 300 Control A«'OlJl1t Spoci"liS1 5.00 Dati Enuy Open lor 1.00 M!Slager, Aocoonting 1.00 Sci~i()f A~'ll'IU"J! 5.00 Staff A«(JIJ.r\lanl 2.00 SctlT ~"Telal)' 1.00 lJtilil1e:J AC"COOt1ti!'lg T eclu1ician .LOO ;.' T«ll Prog&!n 19.00 ., Tala I A«otln rfnl S~n'l«1 Dh'!lfon 19.00 TREASURY DIVISION J.ln_ner"t pr~nnlnr: Fill~jaJ AnI~'SI 1.00 S(aft"Sea-etaJy 0.50 Trusury MtI1ager Loo T 01&1 Program 2.50 Vlllily am Proouslns Cootrm A«()t!J11 Assistarlt 100 Total ProgrAm 1.00 Renl\lle CollcdtoM Control AOC'OOllI Specialist 5.00 Control Aocour:l Speci"liSl~Lc&d 2.00 Cootrol A'XOW11 Ass.is.t8.Ilt 1.00 Supen~sor. Reverme Colloclions 1.00 T 0181 Program 9.00 T(lI",1 Trtluury Dh'lJlon 12.50 " ., STAFFING REPORT BY DIVISION, BY PROGRAM FINANCE DEPARTMENT (cootillu.d) BUDGIiTDIVISION 8'lId ltl Smio;;( flnAn<:i.l Anal}'$( Staff ~((UJ)' Muut<'f.IJ!.>Ji-(( f~itJAM1)~ To(lt ~[0fJ&m TDld !ludIC' Dh hloll PURCUASING DIVISWN AtSmtnlt.l'lIl1~ nd Gentul ('(II(W...:ti A,:t--"lf1.I~~! .. '( ~'lff ('«,til'! AcCt..'Ul1 Sp..""Ci Ili~ Mml,set, Pwdl1s;ntt .rlJ COI'",uKj. $Micv n-"')ff Otnc¢ Spc.;i~ll~ TOIal Pro.g:lm Slor", Dtl"ti')" S!(\l't"~ WAl:oc.u..(;(: $upcniSOf A5,~i~'a.n1 ~0(("l:~'4" Tot.-.l Pr(>f1&m 'fo!aI Plim:hulng DhbJon R£A\.f-STATE DIVISION Altrntnhlnlllkm Ind Grrln.' ",b.iUtu. RC,II i'rop.."'fl}' fLllwililAnat}'St $1.,,-Sc-....,-<!tr)" SroK\( fa.n.mci_1 An~~r~ To!~t Pro-;Ilt!n Sc-bool SUe Luu' AdmlnbfrAIJon M8tI~~«. Re31 Prop.."I1)" rir.lJ:lo.;i~l An~l,st Sroi<.-( Fin.u'lo:i3.1.r\r131,.~ T<>Iel P'OiItm Tohl Rul Eslate Dh'I~lon 3.00 1.00 1.00 LOO 6.00 6.00 1.00 200 1.00 1.00 1.00 1.li 1.15 1.00 1.00 100 4.00 11.15 O.9\) 0.15 050 Q.9..1 l.iO 0.10 0.25 Q.Q, OAO 3.50 .-";:";;,," "-\" STAFFING REPORT BY DIVISION, BY PROGRAM FINANCE DEPARTlII ENT (continued) PRINTING AND MAILING SERVrCE.~ Prinlrng lind MaUlt, Srnkfl OD'Soe\ EquiJ~ Opera\('( Supenisor RcproiuctiO'.lV,d t.hiling Mailifl{!, SciVK(:s Sp.-..:i~li~ To«al Prlnll", .~d 1\hlllr.. ~n ku TOTAl-DEPARTMENT 3.00 1.00 1m ~oo 61.75 \ ,:,-.-:,-: '; ""'~''''~:'''' 1" .,,'" FIRE DEPARTMENT 1994-95 BUDG ET The Fire Departmenl's focus in lhe 1994-95 budget y<.ar will be updating the citywide emergency plan. This will require evaluation and revision or existing pla,.,s~ and ensuring the Emergency Operations Center (EOe) is in a stare of readiness 10 manage disasters the Cily may enrounter. In addition, the projf(:1 ~ill provide: updaled training 10 maJlagers who \-... ilI s.taff Il're EOC during a disaster. Oll1er Fire Departmenl projoc\S in 1994·95 include: preparing for implementation of Mission Driven Budgeting (MOB) within Ihe Fire Deparlmenl; responding to Ihe Comprehensive Plan projecl information needs; responding 10 the Hughes, Heiss Organizational Review; dc',reloping a ICOOrds retention program for Fire Ikpartment reoords 1Jsing optical imaging advan«'d technology, coordinating with Informallon Resources Depanment to purchase and iMtaJt necessary hardware and sofiware to implemenl 0plical imaging, 2nd dC"'elopiilg and implementing maintenance policies and procedures; implemenlation of the final phas.e or 3 year Computer Assisted Dispatching and Fire Records ManClge.menr Syslem projlXl; and rontinuing to evaluate the feasibility and alternative methods of regiol1aHl.3lion or consolldation or fire­ services with Menlo Park and Los Altos. .Ii,. STAFFING REPORT BY DIVISION, BY PROGRAM FIRE DEPARTMENT Adrl1ln~tf1llkm tnd Gtnera! a~.i. .. J~r FI~. Assistant FLre Chid 0.25 E.'~;:ewti\"e Socrt:(ary 1.00 FiN: Chid LOO Total Program 2.1S FI re Supp Nulon AssiSlanl FiN Chief D.1S Iht~lion Chid 2.00 C'ptain·PaumOO!c 1.00 I Fire Apparalll~ OPCf81or 2361 Fire Cllpl~~n·EMr 21.67 Fire Ff$hler·EMT 37.67 Fire Fi$hler·Paramo;fic-6.00 Operalor·Paumroi c: j~ Total Progr31l1 10126 J1rc PI"'t,'cntlon Cootrol Aoxoonl Sp.."'('i a I ist 1.00 Fire Insp.xlor·EMT 3.00 Fire Marshal 1.00 T«al Pro.p-am S.OO Resurch and 'frldnrng Baualioo Chief 1.00 T vial p({1gtcI.M 1.00 Paramedk Se rvfct. Fire Capl.i.,·EMT 1.00 Fire fighler·Paramedic 2.00 OptralOf·Palal'nooic UU TOIal Pmgram 4.S<l SLACflr-e Sen'let .. Bal lalion Ct,ic/ 1.00 Total Program 1.00 HaurJous Mater~ab Managrmenl Fire Appanllus OperatOf O.13 Fire Captain·EMT 0.33 Fire Fi~tcr·EMr OJ3 Fire rnspec!or.EMr 1.00 Hazardous Materials In\"csligliJor 1.00 H!l7.Mdous Meteri ~ Is SjX.'\~iGI ist 1.00 01lio:e SpCd31isi 1.00 Total Program 499 TOTAL DEPARTMENT 120.00 .:,-C, HUMAN RESOURCES DEPARTMENT 1994-95 BUDGET A major objecti,'a for the Human Resouroes Department during the 1994·95 budget year will be to support implementation plans for staffing changes associated with the Hughes·Heiss Organizational Review. This will include classification analysis, implementation time Jines; and mee~ and confer processes. A second major objecHve will be workJ'"ng with Informalton Resources and the Finance Department to implement a new PayrolllHuman Resource. Informalion System. Thi. new sys!em-will provide integrated payroll, position ,control, benefits and human re.sourre infonnation sySiem service •. It is also inlended to support the Mission Driven Budget (MOB). Anolhc"r atca or lnenlion by th.e Department include Public Emplo)'ees Retirement System (PllRS) heallh car. program issues including integration with National Health Care and possible addition of denLal be-nelit oovera,ge. Af leas! one Management Academy is planned and implemenlation of commu!e alternative programs will facilitate achievement of avemge yehicle ridership goals for Cit)' employee-s. In the Workers' Compensation area, a losHime cost analysis sysl~m v,;11 00 dC\'ttoped 10 provide. focus for 0051 rcduclton. The Department will be working wilh the Police Department to develop a more efficien! and timely hirine process. if , .-,.',,' "', .- STAFFING REPORT B\' J)[VJSION, BY PROGRAM HUMAN RESOURCES .AimlnhIDI~ .Eld Gt'R~U' O(ro:tor HunAA R¢5(IIJf\'('i i');o.;...ti,'t S««ieJ)'-C"''f1r~i JJ TQ(~r~om LtUC('OAlroI H'..I.'MnR~A'J.Sis!~ HI.mUi Res¢OS'C($ RC'r,(~Io'.i\~ Risk MU',jg<'f f«.1 P10Vlm :rMrlo~mtnl H~Wl Rcicour~A~'5.i$%Il"".t I Iu.'1\Ul R.es... ......... ,..:s R"»>f\·,;.;nWi\'ot M~'\lgC'f. Fll{':'Yi~l~~ Tc.~.t rn .... pfm £mllk),t-t S<-n tN-1 A dmlnlrll',..Uot'\ Du(\.-tco( HU.IlIM R~"($ E..x(\.ui,~ SNctAl}"-Coof1&."'lli 11 IIumIn Re~vts A~i~l!A: UUf"l\,Acl Rt"SOOf(oCS RtpfCSoeflts!i\'C Mwg«. Emplo)'«: Brncfi Is MUllS«, r~plo)'tt P.cl/.II~..s Mwtff. I tL.t'll2<1 R~wx.cl> Jkwk~ol TotAl J'"rop-un TOTALDtPARTMENT Q.SO Q.1(l 1.00 1.00 1.00 1.00 ).00 1.00 100 J.oo ).00 0.10 0.10 1.00 1.00 1.00 1.00 1.00 600 1).00 INFORMATION RESOURCES DEPARTMENT 1994-9S BUDGET The focus for the Inform.tion Resources Dep.1ftmenl in Ihe 1994-95 bll<1gtl yea, will be implementation of fOlJr major s),stems and continued \\'Ork on Ihroe projeo:U. The four new syslems are pa),{Oll1human resources, ~rrnil informalion tra(;-jng,. dass registration and facilities scheduling. and voice maiL The payroll/human re.$QUf\'C$ system software will be installed and mooW"d as ""lui roo. The oonvmion of lhe old payroll 'Yltem and interface with !he accounting syslem will <>xur in o.arly 1995. Ii is plMnod 10 be in pI",,,,, 10 support !he 1995-96 Mission Driven Budgel. Along with the new payrolllhllmal1 re..source.s 1),stem, the inform(tlion systems group will be working with a cily4wide team to sele<'t and implement ail aUlo.rnaled pe(mil informalif't1 tratking system. They will also assist Communil)' Service) in im,ptenlel1ting a aU!omal<Xi \Ioi6e area nelworkclass registration and facilities sctleduling sy:s('m; and will be implementing \'(tiC'<! mail citywide, while continuing to explore different l11e.dia for audio OUIPU! and romlllunicalioo~. jnduding audio te:<t. The Departmenl will continue work on the Utilily Dining S)'sttnl (UBS)~ Inume!. and 0plital imaging proj«:ts. The uas is in ils second ycar or a Ihrec )'c-ar de\'clvpm(>rli (:)'ck. During tM course of the year, slaf[ will install Jnternet ,.apabili;y for selcx'too ch)' starr 10 U~ Md evaluale. IRD wm continue to work with the ctly~\Vic1e inrormation network (C-\\~IN) oommilloe to define what information should be pul on the Inlernet and r('lum to Council next, spring with a nx:ommendation. Optical imaging will be e~pa!lded to include Fire Department needs and fax c.pabiIHy. A new fi,·o year plan and replacement schedule also neC<ls to be developC<! for all teleoommunicalions equipment. • STAFFING REPORT flY DIVISION, BY PROGRAM INFORllIATION RESOURCES DEPARTMENT Admlnlll r1l Uonlnd Gtnn.1 DiI~tcI!' lnfOOTllUon Rcsoo.rces E\:ectltil'C Sccrc:1aly Prognm Assisum TOI.I Progrtm Manlgrmtn I III romn.llon Rt,SOU~J Cotrtpo1er Operalor Mansger, Dtll PtC'«:SSing PI~Ilmn"Iel'/An.ly5L Seni04" PrOWammcr Anal}lol Supcr.isor,lJall Pr0CCS5wg TQl!&1 Pwgram Tek-phone St IYIC'u Telephor.e Tcc.Midan M&1l8ger, Datil. CommunKc!lioos ,\ TelephoN; 101al Program CompLllnS!.IJ'lI1ort: C,,"Ier Compu1er SUppoit Cent~r Tekphooc T ecMi~.n Manaser-. Com,P\ltU' Suppon Ce[ltcr TOIal Pro,rim TOTALD~PARTM[NT 1.00 1.00 O.ll 2.1S 1.00 1.00 200 200 2.00 800 1.00 l.W 2.00 1.00 1.00 J.OO ).00 n.7! PLANNING AND COMMUNITY ENVIRONMENT DEPARTMENT 1994-95 BUDGET The major focus of the DepaItment in 1994-95 will be to support the Comprehensive Plan Citi=. Advisory Committee and Ihe Comprehensive Plan update process. Milestones will include Ihecompletion of the Phase II Preliminary Policies and l'rograms document (late 1994), and illeAdministrative Dran Comprehensive Plan and Dran Environmental 1111 pact Report (EJR) in Phase II! (Summer 1995). The Planning Division, assisled by the Transportalion Division, will COnlinue application processing of, and completion of Ihe E1R documents for, the Stanford West and Sand Hill Road/SIMfoN Shopping Cenler project and Palo Alto Medical Foundalion/Urban l.ane project. The'Transportalion Division will C{)mplele construclion of the Embarcadero Bridge and Bike F-c1th Extension project) school commute safely improvements on El Camino Real at Los Roble.s A,'eflUe and AraSlIadero Road, and conduct feasibilily siudies for a new parking structure in the down!oWI'. Palo AHo and a new CaJifamia Avenue pedestrian/bicycle tlnderpas~. The department will pursue. development and implementation of improved technology and automated c.ommuoication services. including (he GIS hase nliip and public noticing c.apabilities J on·line permit information tracking system, and automatic inspection reque.st sys!em for the Building Inspection Division. Other departmenl activities wBl include coordL'nation wilh Ihe Palo Alto Housing Corporation regarding downtown housing at 753 Alma S!reel. with the Chamber of Commerce regarding implementation of the 12 Point Downlown Parking Plan, wilh Counly staff on implemelltation of the County Hazardous Waste Management Plan, and con1tnuing liaison to the Congestion Management Agency. .' ,-, .: ... ~ .. -" :.i STAFFING REPORT BY DIVISioN, BY PROGRAM PLANNING DEPARTMENT P~'NlNGDIVJSION Ad'minlJlraHolll and GClUul Ad:nipistnloc l..or-il1i: Auisl:~ f>1&!'lling om.;',1 ChitrPl~nt OITKi" IY..,«I<K. PI~.rJn3 and CttnmUtlity f~l1.\;rl)r1Jnrnl J::>."«'UU\'C $(.:-rrtuy Offioe At:sistent Oflioc S.t'«;lli.~ Muu$Cf. Dc,,"dopmcflt p..'kl(liIOOnl! m1 PlaMin:.8 Flojc«s Tot,ll'rop .. ms (.'o-MpuMnJht rhnnlnll A~is(~Jlll Pb.'l11.in;s: Oflki,1 ct.i(rp~e.'l...,.blt Ofti.;:i" Dlre...--toc, Plmroirlg MJ COffi,,;uni!)' EmiroOflx:tl1 Ex«ui\\.· S«-fctM)' OOi~ Sp..-...:i.li!'4 &llico( PI!Mtf T 01:41 PrQf:flms Dntlopmcnt Ind Monllorin& Administr.l{'lf l...:-.--,in@. A~"I(i'~e PllI\I')(; lluildir..g Plmni"g T~hnician Chid PI tftlling Omcid i>in'o.:lOf, P'lflnillg.l1'Id Com.l1l,m iI}' Em";rOOfT'\o('!lI E,.,t .. ;uttl'C Seq~&J)' orrl« AMi~U\1 Oflke~i.lis.l PJ.Il"W'X"f &of« Pla.nner M~fCT'. [h;.-rlopmcnt ... Iooi"..orir,j..oo Pt!Mil1g ProjC'ct.s T(l(\l ProgrtJl'u. S~~.dSludk1 . Administr.tor Zooil~, A"S.>i>lanl Plllnrling Omci,1 Built1in2. PIIPJling Ti.'d<f1i.iMl Oir«lor, Planning oIiI"ld Co,.nmunity Erll; rOM'K'f1I F...'-«QI i\:¢ ~H1 ~j)' Ofl~~i-!-tis.t Totalr~am:i , 1..\ 0.10 010 0.20 0.15 1.60 0.80 0.10 lUll >.15 O.SO o.so 0.05 0.05 O.4{J •. 00 3.50 0.15 O.SO 0.90 0.30 0.10 0.10 0.10 0040 2.00 1.00 IUQ 6.75 0.15 0040 0.10 0.25 0.15 Q.IQ 1.15 \ STAFFING REPORT BY DIVISION, BY PROGRAM PI.i\NNfNG DEPARTMENT (tonUnu,d) Houl!nr: E. ... :«utlvc ~uy Srok< PI"""," Mwg.:r, Dc:\'Clopmcol MooiloOt18 W rllMln,. r(tlj(...:<s To(al Prop uw Cotnmua~l fJC\'dopM-tM Bmk CUf:i1 {(,DBG) 00"1« Sf« i .1iS( Srn)..")" Ph.r .. .,u M.fl!~. Ikwkfomrot Mmj:.ri~s t.."'o! .'1 L".mrt$ f'{(~..xo (,DOO C(o.:'(d'irulN r('ll.J] Pro-pz."l'U Toht PllIlnlr., [}f\h~1I TRANS~(lRTAlION l)IVJSION AdmlnhluUon 'nd GtM~.1 D;r..xl('f. f'1~!v.in$ t.'"ld l\"M1u.. .. l.I~· [n\lrr.r-,fr,,(1)l ct~f llo!fl~l(1H."'\"Jn Off:Clll City r,lfrK! Ei1pn«r r::,·,~o.xr Srn~i' PIJNW( Sl.n'&>\,wAl)' Tl.ul rrt.'P4r1u Trllf'l'1( Opntlklr'll ell itr TfSmpO(I'!~'YI Olli(ilf Cily Tr~1C E"gill«( Eop= Scniof PJ,,1'IO<1" Iou! PCQplB"..s TNMpor1lIJon Pbnnlng Dittl..ior. PIAPJliog anJ, ('.om.m'.n"Iil)" J-':-m;lonroet •• ChidT~lioo OIlKLI' Cil)' Tll.m .. Engjl'l<'t1" Entin«f Scruor PJ!NY..'f Tol.!l p",t'JAmS Tolll TU1i:Ioporliljk>n Dh'hk-n 0.10. ".25 Q.2il 0.55 O.SO C.1S 0.20. UK! 245 n.~~ O.ID "30 010 O.LO 0.25 1.00 185 0.20. "60 100 ~JQ 2.10. 0..25 c. so "10. D9() Q.U 2<" 6')~ 1t. : i. STAFFING REPORT BY DIVISION, BY PROGRAM PLANNING DEPARTMENT (conlinu'd) INSPECTJON S ERV ICES DIVIS ION AdmlnbtntkJ.n ud Geller.' DirffiOl, PI wing and C~IW\.ity F./wironsnrnl As3istallt S .. i lding Ofiicill ChiefBuildin,g Offici 11 SalfSc«<wy Tot .. , Pn:-.p-4ll'\S Sulldln, Code E'~rolUmull ksi~a.n! BuilJing Offici.' Bui kling Jruprelor Super.isor BlJi~~i"81f\.."'JX'-lor 81l ikling Ir\Sr~!(I( SpNi!11 sI. Bu ikhng PiMiIli rig Ted\l1 iC~lIl Code Ecl'or«mml Oftim Office As:&ist~nl rlaru Check F.,ngitKU Tool ProgrW\S HOUlh,. JmJlN\'tmenl Building PI!Ming T«Mician TOial PfOiIMU '}'otlll Jnlp«II111l Do'idon ENVIROJ'lj'MENTAl. rROTECflON DIVISION CoordirulOl. En\'lrorunrola! Prot«lk., Tot.1 PrOf.l'eJ1\$ T0I81 Em'irOOf'OOlL~ PcOle<:lion Di\is.ion TOTAL DEPARTMENT (/ 0.10 Os<) 1.00 J.OQ )60 OS<) HO 1,((,; )00 I'" 100 1.00 H>Q nO!) 1.00 1.00 1.00 noo \ , .: .... ',:' ' ... ','c. o •• .: .... ~,.~:;;..;:..:,.."'."'".~.~: •• ~,..::;~;,£~;', POLICE DEPARTMENT 1994-95 BUDGET The Police Department's focus in the 1994·95 budget ye~r will be the ""nt1""00 emphasis on Ploblem Solving Polking. Problem Solving Policing resolves issues t~rough crc.a1ivc., non­ traditional means involving officers, residents, eommunily groups, and business owners. Over the next.year, the department will address youth crime problems; issues unique to the business districts, Barron Patk, and Ventura neighborhoods: and also implement the ('.amputer Aidoo Problem Solving (CAPS) program on a citywide basis. Techno!ogy continues to play an important role in providing quick, u~ble in [ormation 10 police officers. To this end, a mobile cor.iputing and a Computer Aided Dispatch (CAD) system will be ""mpleted in 1994·95. Acting as a prototype de%flment, the l'olice wilt ptay a s;gnifLcant role in (he development or Mtssi.on Driven Budgeting (MDB) with (he Finance Department. AdditionaHy. the Police Department wilt examine the organiU:tional struclure and consider changes as it relate·s to MDB and Icsulls from the Hughes, Heiss Organizational Review. I . ~ '. STAFFING REPORT BY DIVISION, BY PROGRAM POl.lCE DEPARTMENT POLICE DIVISION Admlah1raUon lind' Genud Iusi stlM Cnftr of Police Pol"" Chi<f E.'>;C'(uli\'e MiS.!.a.nl &«tJl.i\'e~' Total Progrtm SupP'JrtSen'ku PolK.eA~ PolK~ Rfi'Ofds: Spco:'i.lisL PrOJl'Ctiy Md Evidence Technid&Il M!Jlagef. Pplioe Compu!er S)'slcm~ Supcr.1SOf. Po1it(! & .... iON rohl P(og:r~m Fkld .Mf'ykn Poli('(A~t Potk.~ Cllpla~n Pol~-e LiC-U!CTIMI PoliceOffim Polke Sct~r,1 Staff S¢cnhuy TOiell'rogram Crime Prnenl ron COfItmunity Scr.iI:.e om~J Office Spocialist Pol K":: 1 ,ku!tn&lll V'Ohll!tctf Coordinator TOIa! PI"O'6TaJn Pef'*.Obnel and Training Pol ic-e UeUleflllll1 Prot1arT'l AssiSl'anl SlatTS«-felary Polkt-Onicer T 0131 Ptogram ,. ,". 1.00 1.00 1.00 LQQ '.00 1.00 ]0,00 2.00 1.00 LQQ 15m 11.00 1.00 3.00 39,1)(} 9J'O LQQ 66.00 2.00 O.SO LOO !U!! <.00 1.00 I.(() LOO 1.00 'J'I) '-', ' STAFFING REPORT BY DIVISION, BY PROGRAM POI,IO: DEPARTMENT «onllnutdj IllrUlllIllhtStn"ku Crime An.o~" om~'(: Sr«illist roll« 1\8--"1'.1: Potk>e C~.frl P~;.;oe Sci&<,~ St&JT ~"1thJ)' r~h:c OIrr.u let,} ProglI,) Tn1fk Lnfotc-emfllI Co,:k l::n(~,(~'(";:1I."Pl om-=« ('((1\1I"rllt\lty &'YI"K": om\.'ff "utir'F F..l'!,"'Cl.~L OfiK-(f PC>l1« AE:t'1.;J PoT:':.: L~~C\'\L"4 Pol~$;:-.r~("Ml St.'f So.:r.:Ur)' ~"",,·'n.i9.."« F'.~.KoC &n.l~~ P<:\lH,~Oili,,"'('f T 0111 Pwptm Tohl Pc~ Dh bl¢B ANIMA L snWIC[S DIVISION Ad"rr.fnhtrark.n Ind Grnual OIrfC<' Sj .... ""illll11. Suroirumdrot, IWrn.a1 Scr.;C('i SI.\<)('f'\'Jjl,V AniM,1 Sm;';.es Tot ... 1 Pn."W~ Anlolll Conltol An ina!. ("oou-o! OJTh."'<r TOialr(~em Anlnu.1 Cue Anim-,I A!lroj~ Vdcrin&rii" Tc .... :t",kil>rl YClcrinl>litn ToI:.'rw~!:n Spa)' Ind Nruh~t Clink VClmMtlan Tt..'h'lidafl V.c-;mi,,,,-;m T«,.r Pr~'VM1 T61I1T "nlmIIS~n'kcl nt~'hlon .' 1.00 lJ)!) 4.00 1.00 2.00 100 Mil 18.00 1.00 100 6.00 1.00 100 200 1.00 1.00 4.00 1800 U9.00 200 1.00 1.00 '.00 1.00 0.15 Q.% I J I 1.75 Ml 2,(,9 IMjO , , STAFFING RF.PORT BYDIV(SION, BY PROGRAM POLlCE DEPARTMENT (continu.d) COMMUN!CATIONS DIV!SION Ad'mlni'lrallQn and (it/ttut CO\.'IflJLru!or Commuruwiotu Smi(.(:J Toul J'rosr&,'T'i C(l.mm ~ nktl!(\nJ O ..... UllQls. Ch.id COfl"II'rrOOkttiooj Disp.alchcr Comrn LJl\k~!.km Disp3'!ther M w gt'f. (ornpul'tt Opo.-Uli<ns StaJTSecmIQ' Total Proi;Tam Communkalk-n, M.lnl(nAM('C' Chi"r C(loJn-'ll'.l!1k~{k'l\s D;spl~"~ CornmuniC""IKY'.$ T C\'hni( im Toral PlOgl:m!Tl T~l Comm'Jnica!i(ru DI',i!"l'-n TOTAJ.DEPAN.TM"ENT 1.QQ 100 soo 11.00 )00 l.oo H.t"O 1.00 1-00 )00 28 (),"l 161.~ PUBLIC WORKS DEPARTMENT 1994-95 BUDGET The 1994·95 flS<'1Il year will be one of <Xlnllnuing redennilion and improyemenl for the Public Works Department. Major funclional and slruclural changes will be pursued as a resull of Ihe Organizational Review I dc\'ctopmem of Ihe Misslon Driven budget, and Ihe Fleet Uliliz.allon Audil. State and Federal mandates in the are.., of solid waSie and waler qualily will drive increasing efforts in Ihe areas (If reeycling: and water reclamation. Major projects for FY 1994·95 will include the completion of the Cambridte Avenue Parking Garage and the Civic Center 81n floor/mezzanine truitd-out. The division will also provide 'ignific~t developmenl reviews including StinfordlSand Hill Road rei. led projcc/s and the Palo Allo Medical Cenler l'roje<:t. The Equipment MMagemenl budget includes tmplenlentat[o~ of a vehicle management :s.y.s.tem, a~ well as physical improvements to !he Garage I.) impro .... e productivily. Vehicle fleet reductions and budget reduc.tiol1s will be implemented as a follow-up 10 the Fleel Utilization Audit. Facilities Management's anlicipated projCC!S for FY 1994·95 will include continuation of the Cubberley School Site mas.ter plan improvements; completion oflhe Civic C('nlcr buildoul and remodel; Lucie Stem paltl\vay lighting. and roofing of Stations I & 4. The Operalions Division will be very busy tile first part of FY 1994·95 supporting Ihe finallwo games of WorM Cup Soccer; arv.llhc Tre,e Task Force Committee may reium with a City Tree Plan and request Council adoplion of <I prolC{:ted tree ordinance. There will be a Refuse Fund rate increase of approximately 18 percent for all customer categories; the full implementation of resource recovery al the SMaRT stalion will resull in an increase in the percw!age of solid waste recycted from Palo Alto's waste stream and the continued sale of compost manufactured in Palo Alto will all help to achieve source reduc.!ion and rex:yeling mandates from Ille Slate. A 31 % .torm drainate fee increase is being requesled to support a $9 million three year capital improvement program to/be financed through Ihe tssuance of utility revenue oonds. Major proj ects lncHlde pu mp station improvements, repair of deleriOr3led pi pel i n es th rough oul the City and new pipelines in Ihe Barron Park area and along Newell Road. At the Water Quality Con'tro] Planl, the primary focus in FY 1994·95 will be on development and jmplcmenlation of aggressive source control programs and water reclamation opponunitics in response to the very Sirict discharge permil conditions issued il1 Augus.t 1993 by Ihe Re&ional Water Quality Conlrol Board, which requires Palo Allo to explore all feasible methods of reducing ils copper discharge to San Francisco Bay. Tile RWQCP's pollulion prevenlion program is being expanded to include more and more commercial and residential sources. Auto shops, medical clinics, machine shops, laboratori('.$ and cooling water systems are being addrt%ed. Residents wm be asked to do iheir pari by changing practices. ).'. L j' ' I I I. I . I I I I I .. ·· i. , .. i " . It, -,;'. STAFFING REPORT BY DIVISION, BY PROGRAM PUBLIC WORKS ADMINISTRATION DIVISION Admlnrtlrallon &n~ Gunal Admini,r.1atot'. Puhlk: W()fb Director. Public WorhICily Unginett E. ... e¢tIli~'C Secmary rOloI Pro""", TQI.I P"blk' Workt Admlnbfr.Uoll D.~'b:io.n ENGINEERING DIVISION Admlnhtra(,~n ud GtntN.1 orl"K>e S~i~list SlaJT Se..'I«")' TOl!l Progrtlm EnglnHting A<;si->1anl EngilW\.'f A~ist8n!, DirMOf Public WOfJ.:.s En$,ill¢ef Engineering T ecMician Senioc-F..n&inccr TOIa! Propam rn$~1 fonlSon'tyfng SUpttviSOf, Iflpeclion and SUlny SW'\'e)'ing A..~SUJ)I Surveyor, Public W()fJ;s J1lSpCClor, PWI\VOW TOllll Plogr9m To!al En,lrotning Dh'ldoll ~., :; 1.00 1.00 100 3.00 ).00 1.00 1m 2.00 2.00 0.75 3.00 2.00 3m 10.75 100 1.00 100 100 4.00 16:1f, STAFFING REPORT BY DIVISION, BY PROGRAM PUBLIC WORKS DEPARTMENT «olllim«d) FACILTTlES MANAGEMEN7DNISION A'II'mtnil1"UOll Ind Central f",itili(;S EnSi!"lC'(:f SI.trS<mtuy To( .. lP~am Rt~.'r I'ld Con II rut1ton J-'~ilili~ Cupen!tt Ft:cili~cs EJ~i&ro fKililk$ Mainl<nfh,''I!'·L('.td Fb.":ltiliO"$ M~'~ m).c t'.-:i I i!K"5 P&intcf SUI''',"''n1s<..f. r&<'iTllies Mal1lgcmo.·i)t TOld Pn);pun BuilJif1B C¥llodhll 8'.;ilding s.c....icq .... r-s;on &ilding &("\1C(pcl~)n·lead Sup •. niS('(, Btl iWing. &"f'Ilres TQle' Plograrr"! radlilk. Rd~lblllt.l~ FlIFi~np: 'ftclonkian SU.I'"l'\i$O;, t"a<;ilil)' Projocls Tou.1 P((\~r~m Schoo'Sllr M.ln!tnance F.&o:ililiu MC\.-mnic OI1i~ spociatis:! Td:.IPI~lIm TOld )~,~Ililk. Manlgemenl Dil'ls:~n 1.00 1.00 2.00 1.00 1.00 2.00 '.00 2.00 1.00 10.00 5.00 200 1.00 •. 00 1.00 HI!l 2.00 2.00 1.00 3.00 15.00 '! ,"-• ..,.:.."",-.. -.~ ....... ..;.,.,._-> STAFFING REPORT BY DIVISION, BY PROGRAM PIJBLIC WORKS DEPARTMENT (,onlin"fd) OPERATIONS IHY/SiON Admllllil,.tion ud C.fllful Cootn'll Ac:«>lW; ${\."",i.1 i.~ ~ I~~"fj PW ~,(.'Uti...'ru D\t-~8 TcclYJ.citll S<ciot~ Superinh'rl<knt,· PW Opeuttor.t T ClUl Pro-tnm S1f"((t MdnltnlinN D..V·t)· l)~lXko(. fW ~"C1':a\;.cru i:q..;ipori':¢;lt Oprrl'~'C' Ht'qi)' E'f~r:T'IC'nl: OJ:o.:rl.:<< }kl~,.I-:q'...I;pmmt Or«.51(1(.I...t...-l &Jpc1'~ N':;~ WOf'b. S:.lJXriroi-tr.1mI. PW ~(~I.k"fjS Tru:k !)rjVN' T o"ll'f~'11.rn T,. .. Mr 0:>1'1 rol M IIln I r n .. n(~ ~·Dircct<'4'. J>W Or>Cf~ti...~u SUT~nisor f"uMic W('f~.i Surcrinlero-, .. "l. PW ~ntioo$ Trdlk CQfl{,o.ll M!ifllcnlt.~ Tr.rr~ Cooltol M .. imCfl~·l,('AJ 1'0(1:1 Pro,grtm Sidm.a:l.k M .In fc-n l~ CttOenl Fini!Mr C~ FLni~~·LtaJ t).t"U1)' OirIXIOf. PW Op«~kx\." Eq'Jiprr ... 'Oi. OpcI4:'" Svp¢n.;soc Publi¢ Wortc Supalntcod..-:nl. PW Or<rt>!~YtJ T()(/Jll'rogr.m O.OS 160 1.70 OSS OSO 010 iLal 6.6S O.OS OSO 010 2.6S 0.8.1 '.IS 1.10 O.8S O.OS 0.90 O.SO O.IQ 4.10 . , \ , -." .-. "..,..;""",;,,,,~~~;;;., . . STAFFING REPORT BY DlYiSION, BY PROGRAM PUBLIC WOR!(S DEPARTlIIENT (conlinut<l) Tttt Malnlrn.n rt Coordinl~",,". Public W .. \fls Dcpul)' Diroc:tC'f, PW Operollioo1 Equipmel1! O,pc-rfl!OC MUlSgU1g Armsl Supcrinlenden!. PW Ormlions Tree Mllolc:n&nce A~stMt TfC'e Mm\roance Person Tree Trimmin~tine Ckarin.s: Tree Trimming/tine Cltarirlg .A.ssis:!anl Tree Tri;ounin&,Uoo CIc.m'n8:.t~~d Toli] Program StonnDralnllt Cement Fmisher Cemenl Fi'l.isher·V:.ld; Depl.lty Diu)i::ICf. PW OptutiL'I,;:> E(juipmenIOi)(n:lOf Hr.a\)' E<luipmc~ll Op..'1'atOf Hea\)' Eql.lipmt'fll OPff!lO!.tew Supmisor Public WQI-Ks SUperinlender.I, PW Operlltioos TIIlffic Coolrol M.inlcnU/re Traftie ~trot Mllifilene.nce·l~<1d Trucl; Driw. T olel Program Work For Ulililltl Co.:ord;naIOf. Public WOfl:! M4J1~gin8 Albodst Too! Program Tc tal Opn.fron. Dhi~kln EQUlPMFNr M~ NAGEMENT DIVIS ION ,\'SSiS(&r)t FI('(I M&I1Ig<"f Aulo StniC'<"s M«he.nic Equipment P&r1$ T~hr.lcilll FtedManagrr Fled Stnices Coordinator Motor Equ ipmenl MochlL'~c; Sla~r~n:'ary Tootal Prograrn TOlal Iqulpffitflt ManaiCmtnf DhM(JrI TOTAL DEPARTMENT .'/ 0.2S OOS 1.00 OSO 010 LOO tOO H» S.OO LOO IHO o lO o IS O,OS 050 0.10 O.lS OSO OJO o lS O.IS O.IS ~'O OJ) O.SO LIS 38.00 1.00 200 LOO 1.00 1.00 800 1.00 IS.OO 15.00 ~n.15 , ,'i., ·.~,J~~';;'~~ot ... ~~~"._,,<_~~ _ .. _~:' _,_." .::~:...-:;;i:;.ii-~~.-";' ,,'~: liTAFFING REPORT BY DIVISION REFUSE FUND Ro1u .. eo.:.tdin8!«.l"l.Jbtic Weds . Engineering Tcclu1kill1 EnvironmenlaS Specialist Equipment Openlor Heavy Equipment Opci-ator Hca..,.. Equipmtlll OpttalOC"'Leacl MWgef. Environrnenlal Control Ptovam~ MlAAger. Solid Was(e OffK>C Spedalis! Progrnn ",,"S!AIl' Refuse Of spos.tl Atteod&nl Stoff S.",,,,)' Street Maf rltrn&OOe A';sis:hml Street Sweeper Opqat04" Stroo Sweqxr Opcralor-Lcad SUpuvl$Ol'" Public Works Supervi:s:oc Roo)'din$ P~or.ram Trud,Dri\'C'f TOIal Program TOTAL REFl'SE FUND RClu1.it FfE 1.00 1.00 1.00 2.00 3.00 1.00 1.00 \.00 1.00 2.00 4.00 1.00 1.00 600 1.00 2.00 1.00 LOO 31.00 31.00 . : II ~j)~~~~~~[:'t.,Y~~':~~~~~~~~.~,.:~~~~_~_.·"~'· -;: .~ STAFFING R.f<:PORT BY DIVISION STORM DRAINAGE FUN!) Storm Drahage A. ~i~Mt Dir\.'JClQf, Public Worb'As.s.i!illllt City Engineer Eng;nc., . Hen)' Equipmcrlt (}perill« }kt'"1' Equipmrol Opc-ralor-Lcad Indu..Wial Waste irup«lor Off;re Sp«iali~ Sc1l.io; ElIgiooer ToWl''''g"m TOTAL STORM DRAINACE FUND .-.:-:- ."'" ' 0.25 1.00 1.00 1.00 1.00 1.00 LQQ 6.25 6.25 STAFFING REPORT BY DIVISION IVASTEWATER t'UNO-TREATMENT Water QOIIII) COhlool Plu( AMiJt .. "" ~h."\3tcr. W.(<< Qullity A.ss¢ci .. le ~);g~ IJU),« Chtmi>l L·A>-.j;i.'l«rin@. TttMkilJ\ 1.n.~'lioo EI«1.Ii«&n 1 .... hc«1o."lf)' T ~hnKi III WWC MI ~")1cn.L~ ,.,~,.Wt.i<: WQC Ml.~. F .. /wln"Cll'l\Cr..tll ('()IT>J'lj.!.J'« ~hnl$Ct'. !..t'bon~ s..."f\-i«s "hl'lJ~. \\'b!ff Qu,tTif)' CootJoI 061::c Sr",'\,'ll' i$4 r.o.p;""'T\IT,,-"t ANl)1-/: Senior Cb.-mist St-ni<.'lf l~tiO('Cr Scr.~o( 'R.Wt~wrtl EhitKian Senior ~~},"'''i<' \""qc s..--ruc.-OpcTllN ,,\.(~ Sllrr S«te1:uy s!I!,rr &..'l"ctlJ)' Sl«"",~«f\"I' S~i~. Watu Qu,,'itr Cootrol WQCHlllIOp.."UltXll T (Iol,) P'rogr.tm J.:n\iNnrnt;,llI COfIlroJ A.~i:le fAlfi~r ChmUd lMw."ial WlS!:C In\'("${fg_~\(( L .. t:..."'($IOl)' T tthtU.:-~lO \VQC MW8ff.l::l\\ir~ Co:\tJ~ M~i«". E"vin:lMX'nlIl Corr.plia.n.:e Mwgtf. t.bof .. ,Of)' Sm;ces ProgJ.am AssidW f"ro-panvner Anat,.'St Stt.ff&"'"'f¢(II)' Supcoi5IX .IOO\lMt' WMtc t00!41 ~'OiJ'm rOTA 1. WAsn:'WATER FUND.TREATM E1'IT .... ' _ ~.!J~'.a~f!_~ .. 1.00 O.SO 1.00 l.OO 1.00 ).00 1.00 S.OO O.SO 0.90 1.00 1.00 090 1.00 1.00 1.00 1.00 4.00 1.00 0.50 1.00 ).00 IMQ 48.30 O.SO 1.00 3.00 1.00 1.00 O.SO 0.10 2.00 0.10 O.SO LOO 10.10 .59.00 UTILITIES DEPARTMENT 1994-95 BUDGET A key areas of con",otration for the Utilities D<partment In 1994·95 is continuation of tl1c a<c<leratoo Infrastructure Program in lho Waler and GilS Funds. Tho Wastewater Fund will begin tbe cooslruction ph.tle for projects currently being de,ignW. The Electric Fuml und~rground cort ... rersion program will (:On1inue as plan fled. ()c(urring in FY 1994-9S will be the final overhead·to-underground con"."ioos .<OJ cieanup of U,lderground District 34 (Downtown IVfChanning/Addi!OO), the construction of substructure and system inslallation in the SouthEatearea (District 35), and (be engineering and formMion of District 36, (he commer<ial ar", between San Antonio, Charl'''on and IlighwaylOi. The Departmenl will c,onllnue 10 W'Ofk to minimiu, Ihe C'05t of supply res.our('~s.. which reprc.st'nl almost 50 percenl of the total operating budget. This will require active panicip.3tion in [he \Vestem Area Power Administration's marketlng p!an for the CWlrnl Valley Projcci OUlput. makjng supplemental power purdas.es from the northwc~l. e'r'alualing the oplioos fOT a l.::mg-!erm gas supply. and disc-!.asing W2te{ pooling amngemcOIs with the Bay Area suburban cities. A long-term gas transporthtion ilgr~menl with the Mojave Comp.1JlY will be eXOCllted this year and !he design: of the Moja .... e connc{:lion s)'!'lem 10 the gas syslem will begin, Other Utilities Department projocls, involve g(C;'aier Cus.lomtt OUlf"eOKl'l and Nucational activities, markeling research. planned work \.',:ith city fadlities, 'tlnp1HUis on C'Wnomic de\'clopmen!. and support to the Puhlic WOf'ks. Department in rale analysii. (or lhe-Rtfuse and Storm Drainage Funds, r,.' II • t··.······.· I .-.-:' .. , . l .. STAFFING REPORT BY DIVISION UTILITIES A DlIlINIS TRA TION Ad'mlllht ... tlon Administralor. Utililies rnre.::tor, Ulilities Execullvc Sea-eu.ry M~.ger of Utili!)' RIles Utilities AOCOWl!ins: TcclIrt.ician T""I Progr&m AdmL"I1I1 raUre St rvk-e. A..c.-si~a.nt Dirc:«or. AdministraH\'C Senioes (..~omer Sernce Repr~'sti\'e Customer Service SpccillH~ E. ... OI::'Jlj\'(: Secretary Manager o(Ulili!)' Rates Meter Re&5tt Me:C'f Read«,Lc.~ Sen,ior ProgrtmlIJl(-f Al1lil}'st Supervisor, Uti I'ties Cu...qomer Scf\-iC'e S~,prtvi:sor, Utility ('.omputer SClyirei SupefVi'SOl", Ulility Mel<.'\' Re.adc:r and Fiek! ScnireJ: U,ilili('8 Field Ser.ioe Represenl!li\"e Utilities Sys.um Suppon UtiliI)' Credit/Co;!ocl io" Uli IiI)' Rale ANlyst T(){I11 PfO&Iam TOl"AL UTILITIES ADMINISTRA1JON 1.00 1.00 1.00 0.50 HIO. 4SO 1.00 3.00 J.OO 1.00 OSO 600 1.00 1.00 100 1.00 1.00 6.00 1.00 1.00 1.00 lRSO nO<) STAFFING REPORT BY DIVISION ELECTRIC FUND EIlIIr.etrl,,"COnl!Mlctto~ A..s:s1s.!Ml Dlredor of Operalioos-EI1gil1Ct1irls. Chic:fEIO;:lrlcal tIndcrg.roon...11nspc..:1CV­ Engineering M8J18gtr-E!ectriC Engiooering Teclmici 8!l POWCI" Engineer Senior EngiMef Scolo.x Power Ellgii"tW" Slaff~1)' UliHty En.gincerin,Es1im~!or T(ll!al Program 0.2$ 1.00 1.00 2.00 3.00 1.00 3.00 1.00 1.00 13,2$ . \'" STAFFING REPORT BY I>IVISION ELECTRIC FUND (,onlinued) Ruolu"('C' M an IIltMtn I lus.i$.1lnl Dirocto(, R¢SOIJlCoe M!Ilascmenl Associa!e POIlU" f,nglllter As.:so.:ial.! Re:5OUft>;! PJa.nner J)cpury .D~~IQ(. UciJitie1 MW8U, R<".iQWW CM..~alioo M.vu.ga. Res:ot.II'«' Pltnning om«: Speci.list rr",um COO«lina!04". Rest.\Ufcc Con..~ .... 'alloo R~~ Coo:serHtion Rcpres.enl.ui\'e Reso:xll'('< Coo!-m'alioo TechniCAl SpcdJli~ Re5I.XltOe PlolJ\li("( SeNor R($()QT~-e Pll\11J'Ief ~ lIT &o:tC1.1J)' TQh-l Program Op-tufkntl A.~stlflL Diroc,t("(' OfOpct~lillru.Eo~ir.eering E!«:~ S) fiC'fru: Djsp~~chcr Ek"cric l)~p"oond ll'l-<;p<.x:w EI««ki&Jl F1~.ciVl A~i:i4:11l1 J EktIficLIl1-Appl\'(l!KO:- Eh'trK-itn.I.e4d F~8if'lCffitl, TeclInici til Ikuy I!q~iprl~ Opcutrc- Jincpc(scnf'C.bl.: Splk« LioepenonlC.bk Spliccr+Apprco!ke lincpttSlYolC&Ne SpliCc' •• uad M\lll3g«. Eloctric Opcra!ior.s Sui[ Sc<re<uy Su~is...y Ekctric Optulioos Supcni$()f, ~ S}'slt'fl1'S Supcnisor. S)'sUm Opc:rlllicm To(al Progll.:n TOTAL IL£CTRIC fUND ~n:~_ 0,10 100 0.60 0.60 OAO 050 0.50 1.00 2.50 1.00 HO 1.20 LOO 14.00 0.25 6.00 1.00 13,00 LOO 4.00 ROO 1.00 3,00 9.00 UlO 5m 1.00 1.50 LOO 5.00 LQQ 61.75 STAFFING REPORT BY DIVISION GM FUND [nlln« tin~IC-9ruIl1J~C»n A»i""" Dffll« of Of>«.rirn'~~ £oVn«< BltjJx(rint MWFtf~WGW r:tl8\~ l~.itill\ rl\.~,pWM·OW Scnkvl-::.ngi;')C('( swr Sccrctuy Utill!y F..f\$:~'\TinS F..stinu!(lf" TN.! l'Il't'VO HUOUin: ~faru'tmt!';\ AAi~U11 [}if""-'1~-Y. R«;o~J((~ M l."";I~<tl<tru Al'R'>\:i~lC RCi«lr~ PhJ\ .. "'Cr D.-t~' Dirt'\{~. Uuhl.~ Mu-.otu. R<:'i(<.l,'\<:: (\v-... "'-"" ,"i~">O Mtnlf'('t, R(s.:.u'~-':: Pbr.r.J1.g PI "'1'.t:~ Cc.:~li'i:u:('(". R(,SlXil(~ (\.,9:1'0 ,I f.. ....... R(';. ... J1\"'(: c.:.'OSffio'.o.!icoa Fid(l ,"ip..7\'isli s.! RC'$>..'l;J(\,'C' COO!<'f'-"IKY\ FielJ Sp..~i..tj~ ResourC(" CC4'.;('n ,tio~o Rt'f'fC'S:'Otlli,,~ P.esouroc Consm"t: i,.:JO TC'l:l\nktl Sp«:itl itt Rt'XoUf(': Plt:'Il)tt Srok-f RC'!O'..t:cc PivvJ(f Saff&:.:rcl&!), To'...a' Progam OlJ'C'r.tltullJ A~'is!t1'tll.)irC'\iOl' of ep:..ltionS.Ell«il"'oh'l1.'" C.lh<:>J~ T<-.:hN¢iltl Chi.til'1~'xl{'f Y:OW Coor .. ~ r.tloc WOW Projt.."1 Equipmenl Opcr"IQr fl'CM ~x-e Pa$(1oC1 WOW Gt..\. SY!!<m Shop tJld Fidd Ref" irp<"fSoo..v, Ik".,. Equjpm<nl Of>«- MlIU.g.."'f. Uliltl)' OpculiooJ M-.-cl>an-ietl Unir RCf'J' "Ircr Still St-,'(Chl)" ~,,'is«, Sh¢p &nd f~d S«\'k"'>e"i WOW Suptnl",...,., WelcrlGa.vV:as!(\\,a:t, Ulililk;S [fI\(IIIc, Rtpaircr UlilitiesjflSUolkf Rtp.;rt''h~ss1 ~1lYl1 Uiil!IIC$lnst,.lkr R~atr~ .... l(6d Tot!.l P{'I.)gram TOTAL GAS FlIND ___ ~~'_I1_!~ __ r_~n; O.IS 2.00 0.3) 200 0.68 200 0.8) 0.60 8 S9 01> 0.25 020 040 (130 0$0 1.00 1.00 0.$0 0.'" 1SO OSO Q~S 1.SS o IS LOO 0.33 OSO 1.00 0.38 300 2H 0.32 O.~J OSO 0.48 1.66 8.10 0.90 1.S1 2)28 39 . ..11 STAFFING REPORT BY DIVISION WASTEWATER FUND.COLl.ECf!ON EnaineerlnzlCoJlllrl)ctio.u rusistatll Director or 0peraItons.En~n8 &gincer Engit)OeflnB MMlser. WOW &~Toc:M.~&fl tn..:;;,:.;:x~or. PWIWQW Seni('( F..llgineff Staff Scutt .. )' Utility EI'l~g E.,,qirnalor Tau] Program Opualionl AssLttam Dir\\:'~)( of (~:,(,fI!iQn5.Eng:jl"k."Crin8 Canml FUlIWr Chit·rJospc\."(c( WOW Coo.::dimlor WGW Projro Field SM."ire Pet'SO"I WOW He<I\y F....quipmflll Op.:rafOf MaMS-tr. Ulilit)i {Jvcrel.ioos Mecl!anic.1 Unit RepJir St~ S«-/rl&I)' SOpe .... isor. Shop aM field &nl~ WOW Sllperwis(or. W.tefiGc .. sl\¥astewaltf Utitilic:s in>tlllo.'1' Repail Uti I ities 1n.~111« Rep.1 irer ULililies IMlailer Repa;rer·As;,i s.l1lfl1 To(al Program TOTAL WAST£WATl:R FUND.COl,LECTWN .. ~~Jv~.r_ • .r~ 00$ 2.00 0)) 1.00 066 100 o lJ O.IQ 5.47 00) 100 O.H 020 0.12 ~06 0'6 0.l9 O)() on 160 1.00 4"0 1.00 D.M I~.II \ '.' -,,,: .. ; . .i: .. ,,,,,,:~~-:..:. STAFFING REPORT BY DIVISION WATER FUND EDglmeringlCon1tnrctioR Assisle.tlt Oil ector of()pcfatioru.EngiJKX"ting Engir.= En.gin«ring Manager. WG W Engb'tC'Cring Tedmkian In-<p<<tor, PW/WQW Senior Engir.cer SIafi'S«mary Utility EIlg,ilmring Estimulcr Toial PmgnITI R«OLlrt'e Manlgemtnl As.sisltJ\l Direttor, Rc:sou.rce Mamg.::mellt Ass-xisle Rt::5:QIJf(>e PI~..,ne[ IkpUly DiHctor, Utitilies Mall8ger. Res.xrrcc Coo ~T')8Ik'!1 Manager, Resource Planning Progrem COOfdinalOf. Rc:sctJrce ConscrYaliOfl Resource C'oosef"alioo Ro:prCSCJ113tive Resource Coo:::er.'61 ion T edlI1icaf Spc;:i~lisi Resource Planmr Senior Re!Ource Planner Siaff S«-ret!r)' T~al Program Opera11ont AsslstaIlt Dire.:::IOf of Op;.>r8!iOft,,·Engin<xring Chieflllspo:lor wow CQoruinlll(\( wow ProjOOl Fjeld Service Per$OO WGW Hell"), Equipr,)('f!1 Operator In.~nt8Iioo Ete>clfician Manager, Utitity Opcral~oos M-xhank.al Unil Rcpai r S!affSocrclary SupcrviSO£; SfK,p and FieW Setvices WOW SUpmti5Cof. Walel'" ~ktcr Cross Connection Supcr.'iOOl'. Waler Traflsmissioo Supen'lsor. Water/Gas/Wastewaler Truck Dri\'er Ulilil ies In$llliler Repairer Utililies Jrj'iolaller Rep~irer·AssislanL Utililies lns!illltr Rcpair<:r·Lead Waler Mete( Cross COI'\llt\:!ioo Tcc-hnici an Waler Tram:mis:siotl Operator Waler Transmission Op¢ralor·Lcad Total PrOgtam TOTA£., WATt.;R FUND ____ ~_~~I_a_~ __ ~~_ 0.05 1.00 0.31 2.00 0.66 1.00 0.84 Q..lJ! 6.19 0,15 {US 0.20 020 O,2(} 0.50 1.00 0.50 0.90 0.30 Q.U 4AS 0.05 OJ) 030 050 1.75 1.00 0.42 0.8& 0.50 029 1.00 1.00 0.14 1.00 1.80 o 10 1.16 2.00 2.00 1.00 11.82 28.46 .. '\ ,"