HomeMy WebLinkAbout0260.094May 5, 1994 HONORABLE CITY COUNCIL Palo hlt,o, California Attention: }'inance Co'"":.1i ttp.e Members of th~ council: 'I'his is an informational report and no Council action is necessary. At the April 19 Special council Heeting on General Fund Budget Issues, Council Merr,ber simitian asked staff to compa};"e General Fund capital expenditures in the Proposed 1994-95 Capital Improvement Program, as a percent of the operating budget, with historical information on capital spending levels. l\ve~~Q.j....n9.....Q!l Q!lQ...i,tal ~XQ.enditures ~~Operi!t.i!lg Budget. 1981.-82 thr...QJ!gh 19§~e_~ 6.4% ~~QRosed 1994-95 Spending as ~LQPJlli~.ting Budget 6.3% General Fund capital spending ill the Proposed 1994-95 Budget, as a percent of the operating budget, is approxil11ately equivalent today to the average in 1981-82 through 1985-86. (The time frame for 1986-1993 is not used for comparison, because extensive budget CMR:260:94 ~fE~ :-~ ," "';' . :::~.,.~~/~:f::,~ \ .. :;.:~-,: ":..' ;.:.::;1':", ,"." ' .. ; . , ,/; ;, • , , . I I ",'": 1/ .• 0 •• reductions during that time frame distort the numbers.) This fact further substantiates .an earlier staff report dated September :1.9, 1993, titled "Capital Improvement Program (CIP) Infrastructure Budget from 1,)81~92 through 1993-94 11 (attached). That report conoluded that "overall budget doll.lrs devoted to public infrastructure projocts have kept pace ~ith inflation and have not declined over time.1I This conclusion lTlay ba sorne~lhat counter intuitive, in that it contradicts our belief that funding for infr.astructure has decreased over time. However, keep in mind that the City added utility user t~x dollars in 1986-87 to fUnd additional street and sidewalk improvements. That increase helped to offset the effect of inflation over time. In addition, because the city shifted storm drainage and vehicle replacement capital dollat"s to other fundin9 sources, namely, the Stor~ Drainage utility and the Vehicle Replacment Internal Service Fund, two benefits have a:r:isen. First j the capital budget is now able to accommodate more projects than would have occurred if storm drains alld vehicle replacement were sti 11 funded in the General FUlld capital budget. In other v.'ords, the $4.2 million proposed for the Genera l Fund CJP in 1994-95 can be "stretched furtheL'" than .... ·ould h<lvO been the case if that $4.2 million had to fund st.orm drainago and vehicle replacement. Second, as a utility funded through rates, potentially more dollars can be spent on storm drainage improvements than Would likely have occured if storm dt'ains were still a General Fund re.sponsibility. Having said this, the City now has more infrastructure to maintain and n~placc. Since 1981-82', the city has taken over the operation of the Cubberley School Site; has added Johnson Park, Byxbee Park and acroage at Creer Park; and has upgraded the former Harbor site. Currently, discussions arv underway to participate 1n maintaining the palo'Alto Unifl~d School District's playing fields. Additional infrastructure will require additional capital (and maintenance) dollars over time. FinallYr it is also worth noting that the real valuation of capital spending is the condition of our infrastructure. The General Fund does not have a comprellensive inventory of its infrastructure, nor of its relative condition, nor a long-term plan to address anticipated infrastructure obsolescence. Having a fixed asset system will begin to address these concerns. A co~prehensive capital plan, including actual conditions of assets, CQuld be addressed only ""ith the focused application of additional resources j in order to develop a specific Infrastructure Management System. Such a system has been discussed by staff ot! a preliminary basis as a potential future priority for development. Due to existillq staff commitments, however, it cannot proceed until after complet ion of the Hission Driven Budget and the CHR:260:94 2 L /l \ .. f I . i i \ . ....• \. \ \1: "'.: ~ ... :."'.' •. ' -.-->':;J . -.. ~ . . - '> '> "';. •••• -r •• \ . . ';,; .. Organizational RQvlcw. Tha earliest possible date at which such a proqra", could b. considered for initial funding would be in the preparation of the 1995-97 budgot. with actual implementation requiring a multi-year sch.dule. Respectfully Gub~ittad, 9tt-I~~h (!JH STEELE Budget H~nClger -~.~£) o rector 0 nance Attachmant: CMR:489:93 CHR:260:94 3 ,,';. '" _ ._~ ..... ,",,,_ • .," ,, __ ._~_,. ,~~,~ ,,'" ~~.~~.;:;~:"o,;";::::;i::';',>=-,,~_~ ~{"-;::~~~;;;:;~~.!.".,1;~"~~"_~ :­ , September 16, 1993 HONORABLE CITY COUNCIL city of Palo Alto Attention: Finance committee Members of the Council. This is an inforrn~tion81 report ~nd no Council action is nec{Jssary. lUlpo;t in 'Briee In an effort to address questions about the City's long-term commi trnent to its capital infrastructure, staff has Analyzed tha past thirteen years of capital bud90tS. Bud90ted capital expendi­ tures have been oategorized to provide 10night into the levels anc\ trends for infrastructure and non-infrastructure spending. Comparisons of real dollar capital budqets OV9r the p~st decade reveal that public infrastructure projects as a ~holo have kept pac~ with inflation. This is chiefiy a result of tho dedication of utility users ta~ monics [04 htre~t8 ~nd aidewalko ~nd shl~tinq storm drain projects to enterprise fundin9. OthGr infr8struqturo categories, such as public bulldinqs and p.nrks facilities improvo­ ments, that are dependent upon the General fund, havo eithor not kept pace with inflation or experienced :inconsistent levels of funding over the years~ Backgro.l.l.M During recent budget hearings, as veIl as in reviewinq the Economic Future Study I Ceuncil has expressed concern about long-term funding for the City's infrastructure. "One of the: principal questions frequently asked is whet.her the city, over timo, has devoted f()'wer CMR: 489:93 ,~~7"[~ _. . .... ; ,-~-(:::; l~~', -:-;~:'~~.:" \\ :~'~_'..;~ ~~It}~" ! I, I I 1 i I 1-" , ;,'., 'I I J I I ! • ": , . ,,",' Capital Improvement program (CIP) dollars in this area. This question leads to a mora comple~ one. Staff interprets council's concern as not simply being over the ~bsolute level of the capital infrastructure budget, but whether there is a backlog of infra­ struoture improvements and whether that backlog is increasin9 or decreasing over time: in other words, what is tho condition of our bul1dingo, ro~ds, sidewalKs and parks? Is the cityls ~sic infrastructure deteriorating, improving or being roaintained, and at what level? Categories of C§p,ita1 Expenditures As'a first step in addressing council's questions on tho health of the City's infraBtructure, staff examined budgeted capital expendi­ tures over the last 13 years. Projects were divided into three oategories: Public Infrastructure: The tern lIinfrast:ructure ll has several definitions. A project is defined as infrastructure in this analysis if it is ct'lpital intensive (hi9h cost), has a long public facility (geraerally 10 years or longer), and generates a public service. This definition has been refined further to include the acquisition, construction, and extension of the life of a physical entity. Thus, this category includes public buildings, facilities ~nd building systems; streets and sidewalks; intersection, traffic and biks lane improvements; parks, qol! and open space improvo­ ments; and st.orm drains. Storm drains, noW' an enterprise fund item, have been included in this analysis because they wero part of the General Fund CIP in past years. Examples of CIP projects included in this categOt'Y and other categories are 11!Ited on pages J through 5 of the attachad worksheet. Budget~d dollars displayed on the attached worKsheet exclude rei~bursements from the Utilities. Note t.hat some budqeted projeots for buildings, an infrastructure category, may bo for reasons other than extending the useful life of the capital aBSQt~ Such expenditures are not included in this cateqory. An example would be 'proje,cts related to making fa"cili­ ties accessible to citizens with disabilities. The purpose of these projects is to p~~moto public access¥ not to extend the life of the modified structures. NOn-Iftfrastruature: This category includes projects for such items as environ~ental and access improvements I communication and informational systems, and miscellaneoUS projects. Examples of these projects are provided on pages 4 through 5 of the attached 'WorKsheet. CMR'489,93 2 ·t'·· , , , .~ , I " \ . . \ I , \: ' ',. \" . 'V ""l' . BxtraQr4inarY/one~~ima CIP projeots: This category includes one­ time projacts fully funded by non-G~no:ra.l Fund sources. These are, arguably, exceptional-projects that might skew the leval and trend of budgoted capital expenc;tituros incl\ldad in the Public Infrastruc­ ture categ~ry. Thirt'tn-YlAr CAplSal frogram Tr~~ The worksheet on pages 1 through 2 of the attachment shows the capital budget for the last 13 years, orqanized into the three categories discussed above. It is important to note that funding by category can vary considerably year to year, depending upon the size ot one or more projects. Therofore, in addition to comparing a "basa yearn to curre.nt year funding, it is instructive to track fundinq over the 13~year period. In the right-hand colurnns of page 2 of the attachment, budgeted capital eHpenditures in 1981-82 are compared to budgeted capital expenditures in 1992-93. Adjusting for inflation, the following tentative conclusions appear: o The overall total public infrastructure budget has increased by 109 percent in real dollars from 1981-32 through 1992-93. o o o o o o CMR'489'93 Public capital dollars Buildings, Facilities and Building projects have decreased by 73 percen~ from 1981··82 throuqh 1992-93. Systems in real Streets and Sidewal~ CIP capital budgets have increased hy 140 percent in real dollars from 1981-82 through 1991- 93. Intersection, Traffic and Bike Lana Improvements capital budgets have increased ~y 454 percent In real dollars from 1983-84 through 1992-93 (this category did not have a budget until 1933-84). storm DrainagE'. capital budgets have increased by over 4000 percent in real dolldrs from 1982-83 through 1992- 93. (This category did not have a budget until 1982-83.) Parks, Golf, Open Space and School Site Improvements capital budgets have increased by 12 percent. in real dollars fl"om 1981-82 throuqh 1992-93. The City's non-infrastructure CIP project budgets have increased" by 595 percent in real dollars from 1981-82 through 1992-91. 3 \ " i', . I' r , I I I I ! ... -n . . {j. -." .~ .. I Overall, the city has been able to keep pace with inflation for its total infrastructure budget. This has basn accomplished through 'dedicat,ion of the utility users tax monies to fund street and Bldewalk proj~ots, by shift.ing stQrrn drc'lina98 projects t.o enter­ prise funding', and by the a'pplication of gas tax funds, federal funds and traffic =itiqation fees for intersection l traffic and bi~e lane improve~ont~. fllbUS! Byilding, fuMing for {"proysI'ents to public buildings, facilities, and building syste.s ha:s decreased, when adjusted for inflation, since 1981-82. The t¥pe of projects In this category include roof repail'B~ seismic improvo1!'lonta, major remodeling of huildings, building system i~provo~entsl dam repairs, and building new t~oillties. In the llIe.in l these p:cojects are supported by the General FUnd. The public and council havo expresslld concerns regarding the leval of CIP fJ.mding for the City's parks and playgrounds. Within the ctltsqor)' "Park.s, Golf I Open Space and School Sites, II fundillg detail is provided fot" p~rk facility improvements over time. Funding for J.nt.l"o!Iatructure improve7l:!~nts Buch as playqround equipment, park dJilenitios such 8S benches And fences, and irrigation rcpair.s has boen inconsistent !Since 1981-82. The 1993-94 park facIlity budqet of $344,500 represent$ the highest level of funding for infrastruc­ ture improvements over tho 13-year period. Prom 1981 through 1992- 93 the city has spant an average of $84,000 per year (adjusted for inflation) on p~rk infrastructure improvements. The 1993-94 fundil'\9 of $344,500 for parks facility improvements reflects the level of annual fundln9 n~cossary to implo~ent ~ajor components of Community Services' Parks Master Plan (scheduled for the next five years). As with pUblic builcHng projects, park projects have been <tepondont upon-tho level of General Funds available for elP p<ojects. Non-totr&,truotuxa projeota The City's non*'inh"astructure elP budget has increased significant­ ly since 1981-82. This is a result of federal mandates, such as the A.~9rlcans with Disabilities Act and environmental mandates, such as underground tank removals. Projects such as' Police al1d Fire communication systems have been added to the CIP budget. The City has increased funding for management information systems, such as Geographic Inform.ati,on Systems, Information Systems Development, and Computer Aided Happing. There has also been an increase in a variety of miscellaneous, non-infrastructure project.s, such as Art CKR:489,93 L _~ __ 'ln;."~; I ,. .1 in Public Places, Printing Services. equipment up<Jradeg, Service Center security i~prove~QntG, and fire station nodifications. COlJclusiOll Hunicipol dormitory overall, capital budqet dolIAt'S. devot~d to public infrastructure projec..:ts 'have kept pace with inflation and he-ve not decl in,lld over ti~B. This is' a consequence, howevor, of dedication of the utility ulSere tax: monies to fund atreet and sido'Walk projects and the shifting or etom drain. projects to enterpri.e (undlnej. other project categories, .. ore delX'ndent upon th .. ovallobillty or Canarol FUnd financinq, such as laprovoments to public buildlngo ~nd park infrastruoture, have experienced declines in real dollar terns or inconsistent funding ~ver tl~Q. Non-i~rrastructute projects have experienced, stoady qrovth baG-ad on, r.egullltory changes, enhanced public safety systeulfJJ and tha el'!lorgcnce of new COJl\putor technoloqy to increase productivity and satisfy tho denan~ for ~Qrc infor~a­ tIon. Respoctfully submitted, \J\. t .... "J·.\.-, .... JO'E SACCIO senior Financi~l Analyst ~J? . ----~ ltLLL'-O E r,y HARJU so '~-----~i ;:: 0[/ lryfnce J FLEI! IG ~ C Y Hanager f/ CHR:489:9J 5 /1 I I <: .. , . Co~fliQ,\ 01 CiP .."" K~~t I~I I,\>..., I "'-.1~. ,.$.t .... ~'o~15 I, f'IJIUC IIffMSTRUCfVftE Il~OOET 18:Q:J:U J.i.OU,! US..'!.." lU.t~ ll.l!Ull. I!FU"1. lUl-lQ lUf.f1 J_~ M>h O~, $tr~ •• f.ctit., fluS#J.;I $yt~ 1,»8,000 1.125.000 1,4111.000 U$,OOO "".000 ',''2.00(1 "11,'00 417.~) 435,000 6''"tJIOd SJoH.wllC'!J -UUl TUI 01 co-rtl rloOd lllfJ I~.OO() 2,OJ:/.,'00 2,()lt,00<> -&,"1 ~\'tmtI'It rund~" T.~) 500.000 1>00,000 ""''''''' 100,('000\) 100.<X>O ..... 00 )OO,<:oXt 661pX'! ... - SutI10ttl S",.K aM 6I6t"''', 600,000 000,_ WO,,,,,", '0¢,.OCo) J;)').c.¢O 1.o1e..ooo "H:!Op60' ~ • .cQJ.('Iw)() J,1"...ooo 1n'$1~loo. T(.!'flc.m M., l_ ~O\'t(Mna Nr) >0_ \4$.(01) ",00<) In''''I-&("Hon. T,.dr.'(: ....,., 93:" l .. -.e !mptcvlmeou ton (UOlCS) "'.000 "0.000 II'!I,OOO 1J4,00.."<) .a6-,~ &8-',('00 M10Iall-n!e'uc:tiol'l, Tl.fflQ IVId 8i1l. l.4nt ~0¥_"'1e ... «» rilO.()')O "",000 Hv.(loX) n~,ooo JI5,O'""" UUi('o() Ston-n Dr.lhs .a.eMf" (lJno:l "0,000 00,000 3~S.("') lOO.OO) lSS_<X'IO t<o,.")b:>') -5IComl 0 .. .., Sl.tlrU"'ld .115·,000 S>Jbkl" Scow", Or.,," 41),(100 9(),OOO 39$.1)('() l{»);000> J:!S.OOO ""'/)00 4115,r;.oo Parle F"K5t.,. 'IOf'Iol'$n>3r'lI' 15.000 10.('OJ lolS,QIX) ".000 3-87,(1().) riNk I)II~~ w-,-,s-on &O!;l Grotl Pri.l 10,000 J':i,OOJo ~~,OOO 4S-O,OQO 1)).000 0 e-s-o,OOO ~'CQ.urn 80,000 1 Je,()I)O lSO,(OO IOO.OCoO 10,('1(]() 10.('0()() Olh'ft SpK., '1'...:111 Halbo-r. S..., flao-=hQUito Ct-.. lI: 1305,000 .. 0.000 l5-0,C-OO :l;lO.Qo..')() 400.000- s.;:~ Si'!e AtqU$1t1M.l M'd lmpto\'otrNnU l-4IJ.OOO )'15.000 l.t15,OO) lIO.OOO e.SS,-('('IO SuI:l10U4 Parke, Ootl. O~4" ~ .. ~ ~tJ le5.000 315,000 118,000 1,4'0.(1().") 1~,(lXl 2ro.C<xl H>5,OOO t,l H,.QCoO 1,Ur,('OOO To~ I'\IMc fI1fltUlveM. B~t UXll.OOO I."O.~ Z,UI.OOO ,),1U,(\.,'\G J.ne.wo '.~u..O¢O ,u .. ,s~ ..... '('10,'00 1,2»,000 1981·tt2 8.&u VI.., I",f\!o!f-d b,. C?'I 2,O:t~,Ol(l; 2.102',OJ6 ~.)I1,~U l.UI .• ll 2 • .ur.l,' .J.U.',20$ .2.U'.2HII Z ... '4.6M ~hlll\oC4l ... (" .. n ~1 1M hole Yin rnflalid In,Ole) nuf.4 t,Ul,:JU II,'" .U4.1tt tllP,lOtl 1,.'1.1.4 '.fU ........ II. N~ 8rRVCTUflE ell> 8!JOOlr ffl\'iror.nenhl ~""m!'rll. "$).000 19:5.000 liel.ooo A<x:lIou ImpfcverJ'lert[1 " Amw\:.lM wl1h Di~"""~. Ac. >5.00> "o,000 CotM-,unJcolt>:on~ 28,000 61.000 IU.OOO 211,000 ",QOO !U.ooo 4',3010 Mtn~~ am I'uW<: II1lounalJon S) I"ml 65,000 ..,.= 45$.000 3SlJO;» U5.000 joU.600 "''-UII.OOO New \fINe-Ie. 81,«(10 6UOO .,-L.o;htll9lnlllrr-9f"~'...-n.MI' 90.000 .&0,000 "'t(~A-l)/otct. 00.000 J 11,QtX1 ,~,OOO SV.QOO 15.0C'¢ U1.-SOO IM.,OOO l-3I.ooo .. e1,(!(jo() Te'lelHon-fnfl ... ttI,;or<,,iIe ~IP 8....".1 1og,1)OO 3J.3,OOO 145,000 ~$'.ooo I,3J MOO $1l!1,eoo nuoo 611.$10 !.Ul1.900 III, EX1I'lIOfdbrylOl'It-Tm. CIP F'ro.ltC1' .... .eqo.bitlQ,l 01 Ke',I1OM 101 l&x-.d ~1rJbJtud, 1,:.\.16,(100)0 <0_ • Srnct Itt EM (Star.ford Ro!lrroburudJ 000,000 ITT Marsh fllMr-oQo1rn6M (C6IJI~ Con .. rv. R.Ombo..IJ.-.II c ... roml-l Aonnu. P.fIfr;Irog ~ruelo .. 1f8 t&-x\d &ImbuJMdI M.Jfor trsI .... ".c;t~ «'T1pJovllMnl,.p.tgt M<f 'fotellbft .. ,oJtn.ttyAA1t:rn,. (;j P "'*)Io-\t 1.32-5.000 00.000 000_ GUM To'" ~f"I'lIUcM" Hon--lrll, •.• blrDoOld "'o,",ctt 2.\12,000 2 ,,'JIM,OOO 3,138.000 4,0431.000 3.M!!;,OOO 6,185.~ UM,oOC<I 5.010,~'O 1,038,600 I. "'I"(:'nt.~. .... 1'II11o,»M}xI...-l'" P~l'Of6 I InF~1roiI CtI~nr~ t. Pl.J6UC fl'lFRASTftUCTlJf.t: 8UOOET Ht9i!_jj. li$.l,".Sl lUH.3. illHL I~Ql·_&lloJJlU.1!_~ JQUH.lUii.Z.:U .~ ~ Bu.1JIngt. S~M", F .. eIItl4l. 811~ S\,*l.nw 845,00.) J 10.000 1,100,000 ~O.OOO ·13,~" -72'.$0" SIIHIII ~ tkl"III.a!h ·\JUT Ttl( Ot" OeOlf" fl,lt\$ {Of} 1,000,000 1,000..000 1,000,000 '.000.000 .stIN' ~r.Y"~1 ru1<l ~tI lu; 6(15,000 300.000 1~5.000 800."'" :$Wlo!:.tl611Mt. 1M Sldt •• l. 1.~1J5.000 1.300,000 1,165,000 1.eoo,OOO 269.00" 1.39.60" 1.rIl.r"<:t~. T'll("1I: 11M ~a-l_ l'r'9«~""m4Inlt tofl 40,000 l'nt.rH<:!O)n, TnWc .... 1 9.\:4 Lin" Imp!()vemenll (Gil fund) , to.ooo 5<10 .... 315.000 3l4,00<1 Sublollo1 rM"'-;I01~. TIII~ ~ flA, LI~ J,~, .... menu 120,000 500,000 415,000 -3t4.ooo 730.00':11. 4U,11" lIil8:!<-e..l<U4 n t>f~ r". O·«ml)rw., -<lC!04I1~ fuo1 -$INm 01""" Sutllund 1,79{).0()0) 935.000 2.8-10,000 1.245,000 ~!olel6Iorm [)p~'k1 1,J9Q,OOO 935,000 2.e.40,OOO 1,24'i,()C:() 6~,OO!li fi:)O),OF" 19S1-S) ".+-1 fl ~I., .... !I!I Park F..::litr '~!l\,<!m'!nl' 181.000 40,1')00 120,000 :J.C4,5<IO P.rIt Dotve~M f...I:*ns.on -."I<J GI&.e~ Parh) 390,000 GtXf COUll'" 50,OC~ Open ~k&. Y.t(:I" H;wb:x, SM fr~~u!,"''1(> Quit 1'130,000 2'6,000 158,000 Scho¢.! $,.'1~ Aeqo.i$lIiom .M'Id ~OI'''rTl6I)('' 150.000 Svblole19.,h, 001'1, O.i>'rl~;)OI .Q SMo-oI SH •• 1,25',000 385.000 276,000 3U,500 61.21" 11 611% TOltl PvbJ,:, InI,nlrutlur, 8~ t ~,7n,(lOO 3,iHO,OOO 8.2'IIlI,lXlO 4,.63,600 213.'~" Iljl'.:n", 1991-,92 Batt VUI I"rtal~d by Cpj 2.'08.2&.2 2,114,193 3,002,446 3,On,6'O DIfI.rettOe Ihl"""" 8~te111M au. VI.ulIl1'b1H 2,868,718 U8,004 S.29',~U I ,46<1,U 0 II. ,"ON '''''AASTftUCllJR! tiP BUD<lU [,,"';'~n.t" 'mplCl~·elTlenl. 105,000 ... -keen ImpfOI'ClMnl'& An'le-llcwn w~h OIu.!:.le. Act '0.000 3~,OOO lSO.ooo 343,810 C~allon. 84,050 28:9.250 344.600 681,950 ""~emt~ VId f'I.obk rnlIXrPUolloo s-,o,l.m, 69(1,600 231,600 314,600 290,400 ,"W Ve!.lcl .. t:1 I ,0(1) 32,OOG It,OOO 76,000 LeMlcoGopr.g IIT'If<"O\'8m.!1f1U 30.000 M'~C8~~ Pr"""etl 198',000 376.000 215,OC<l 6 16,&00 TOIa! NoM'rof, .. lll.Iclu,. C1P 8iidg,t 1,354,55<) 1,028,%0 l,I36,100 1,922,410 942,28~ 69l;i..34% In. [rtt.a.ohth.t.¥rIOn.,l"" ell' Pto}lct, "I,cq' .... dlionof XeVllor.. LollBood R\l1rrlbuNe41 $.-wl' tA fiR 4Sl.-nl«c:I RHnbvtwdJ ITT ,.~.." Eoh¥ocemtflol (C"'$la( Com&rv. RHr'lbtnM) 843.000 Ceiloml .. "I,Y8~ P.w1o;Iog SJ:rucIIK. r800d nln-o~ .. d) 1,&00,000 MI!I}Gf 1<'l1"'H<'t~ 1mp.'()~"""'l\ll·PIlllO M.t 1,000,000 Tow h;lr~~IO .... ·n-r. C-'P Pr<>jfcb lU3.ooo l,fJOO.ooo 11>00,000 o"nd Te-tel '''fr .. Il'~II'''., HM.J"rro, Ii E~lt.orcf, Pt<l}lC(' 8,014,650 4,8M,e!\.O 9,OU,~OO 1,4J1),t1O 32:1.18% 164,98" page 3 of 5 Bxampl •• of projeots in Eaob CIP category 'p'Ublio Buildlnqs, Struc~~_t:AQ..UJ.t..ies and ~D'§ • Foothill and Arastradero Dam Repairs • Children's and Community Theatre and cultural Center Building and Auditorium Improvementa • CorrQc~ structural Deficiencies in Lucie Stern Buildlnq • Architectural and structural Investigation of Public Assembly Buildings • Kain Library Building Remodeling and Structural Deficiency corroction • Roof Repairs and Replacements at city Facilities Q Public Build~n9s: Structural Improvements • Foothills Fire }'acility • Civic Conter Fire Sprinkler System • Lucie stern Mechanic~l System Improvements • HVM Energy conservation Retrofit • Civic Center Energy Hlmagement System • Rillconada Pool Renovation and Improvements .. Civic Center Air Intake Nodification • Heating end Ventilation systems at Lucie stern • Cubberley Roof Repa.lrs • California Avenue Underpass Improvements • • • • • • • • • Renovation of Mitchell Park Tot Lot Downtown Park North Greer Park Develop~ant Tennis and Basketball Court Resurfacings RenoVation of Irrigatioh Systems and Installation of Backflow Devices Playground Furniture and Equipment Replacement Baylands Reclaimed Water system Parks Facilities Improvement3 and Repairs Baylanrts Athletic center Circuit Replacement • Maintenance Building Improvements • Sorvice Yard and Storage pad Improvements • Golf Cart Path Improvements • Golf CourSQ Perimeter Fence and Driving Range Fence Installation and Repair • Water Reclamation .. \ \ I. • Page 4 of 5 • Er'Osion Control on SAn Franclsquito Creek • Ya.cht H~ibor-Restoration and Improvements • Saylands Duck ~onQ Filtration system • 8oronda-Lake Public Dock Replacement • Foothills Park Picnio F~oility Replacement Scb~~l sit_~quisit19n and InproVamants • Ter~an School Site Development • Surplus School site Purchase • School Site Inprove~ents H-a~al'dous H:a.terials storage • • • • • Hazardous Haterials Underground Tank Removal Airport 'J.'lInk Renoval and Cleanup Tel"',:;: Investigation and Removal Fuol storage Tank Upgrades • Police Mobile Radio System U~Jrade • Dispatch Console Roplacement • Telephone system Heplacement • HicrowavQ Radio system • Police and Fire conmunications Computer • P8X Software and lIa.rdwat'a IJpgrade • VoiCE! P.t'oc:essing system system • Info:t.~r!l:ation systems Davelopment • LIbrary Computet'i~ation • FInancial Data Base Upgrade • Co~p"ter Aided Mapping • Ge09raphic lntormation Systems ~ Wide Area Net~orking • Warehouse Inventory Control System • Personal Co~putor Upgrades • Payroll/Personnel system Miscellaneo~_~~J& • Clty Facilities Carpet Replacement and Painting • Art in Public Places • Facilities Haint.enance , Replacement of Reproduction Equipment • Garage Hoiso and Equipmont Overhaul • Vehicular Washing Facility \ 1 '· .. : I' I I Page 5 of 5 • Communications Contor Re~odel • Hearing I~p.ired Systoms • civic center Conservation Lighting Improvements • Fire Ste.tion Ovel'~\ead Do-or Modification • Fira StatiQn" Dormitory Modifications • Sign Replacement in Do~ntown Parkinq Lots • Recorda K~naqement • Evidence storage Expansion • Computer Room and Finance Vault Remod~l • Fire Appa~atu8 Hear.in9 Protoct.ion • Ca~le T~levio1on Equipmont • Printing Services Equipment UP9r~d&