Loading...
HomeMy WebLinkAbout0467.093_01~' ... " , c:: '. September 2, 1993 BODorable city Couneil Palo Alto, California STATUS OF LIBRARY OQMPUA£R OPERATION Members of the Council: RtpORT IN pRIEl This is an informational report Division's computer hardware. report and: recommendation to replacement of this equipment. this time. HISTORY or LIBRARY'S AUTO¥~TION about the condition of the Library Staff plans to br ing a detailed Council later in the year for No action by Council is required at Tbe Palo Alto libraries were first automated ir. 1977 with a CLsr circulation system. The CLSI hardware and software were replaced in 1985 with Dynix software, operating on an Ultimate based Honey~ell mainframe. Th~ Oynix software now provides support for circulation, cataloging, acquisitions, magazine records, the public catalog [including dial-up access) and community resources services~ Until recently~ hardWare operating the software has been completely reliable. To cJ&te, citizens and the Library staff have enjoyed sliqhtly longer and greatly improved service from the Dynix system than from the CLSI system. It became clear, ho~ever. that the equipment was beginning to be superseded by nev technology and that the hardware cOI..!ld not accommodate new products and services becoming commonplace in the information marketplace. Therefore~ in 1991, starf establisbed a goal for the 1992-94 budget to prepare a report of Library automat.i.on development needs for the next ten years •. The r-eport was to include a long-term plan, as 'Well as an analysis of the life expectancy and cost effectiveness of the Ultimate/Honeywell system. A completion date of November 1, 1993 was set, so that the report's findings could serve as a basis for a proposal in the 1994-96 city budget~ in particular for inclusion in the City's capital improvement process. CKR:467:93 -~- CONSULTANT WORK AND DOWNTIME Oue to the ~apid developments in the library automation fi@ld and the highly technical nature of the issues to be incorporated into a plan, staff opted to hire a consultant to assist in the planning process. An RFP was issued and the consultan~, Joseph Ford and Associates., 'Was hired this sp!.-·ing. His first siT.e visit occurred in June, coinciaent with the Library's computer suffering a first­ ever, substantial and lengthy period of downtime, stretching over ten aays. Mr. Ford had firsthand experienc~ with what he called Rrecurring problems .•• symptomatic of elderly co~puting equipment.­ These included l} the lack of fresh spare parts (as the new par~s are now out of production). 2) no refurbishing capability for some solid-state parts, 3) dependence upon a decreasing number of qualified maintenance personnel, and 4) the advance~ age and design of the processor. As time goes by, we can expect increasing maintenance costs for less and less service. Furthermore. while a conditioned computer po~er circuit is installed at the Main Library where the co:!',pute:.c is located, the Ultimate system is particularly susceptilJle to relatively small changes in electrical current. The June downtime was extended as a result of power outages in Palo Alto near the Main Library. which might have been avoided if an Uninterruptiole Power Supply (UPS} bad been installed. In response to this precarious situatio~, Mr. Ford adapted his worK plan and prepared an interim report in July. The report recommended that the City proceed .... ith immediate purchase of replacement hardware to continue support of current operations instead of delaying a decision until the next fiscal year. Mr. Ford projects that the present computer is ope~atinq on borrowed time; that maintenance efforts. despite best efforts by staff and computer maintenance field staff, may not be able to restore reliable service after a prolonged do~~time period; and th~t public confidence in the reliability of Library recordkeeping would be at risk, should this scenario occur. Further. Mr. Ford has confirmed that there is no residual value in the equipment, i.e., the City has qot't.en all the value it C.2.n froD! this equipment. Hr. Ford's final repor',-, with a to the Ci~y by November 1; considered in the usual way. l!!:li!'..ItU1~ long-term plan, will be presented and its recommendations will be Given th~ fraqility of the Library computer har~ware mainframe d~d the fact that there is nothing ~hat can b~ done to prolong the life of the equipment, steps need to beqin immediately to procure l-eplacement equipment rather than waiting until the next bud9~t cycle, as originally planned. CMR:467:93 -3- In preparation for replacement, staff will: 1, Purchase a UPS to avoid repetition of the power cutage problem that occurred in June. Sufficient funds for this p'UXchase are available in an authorized Information Resources Department capital budget. 2J Prepare appropriate documents to request price quotes from a variety of vendors for replacement hardware. 3) Determine an appropriate funding source for thi~ purchase. When items 2 and 3 are completed, staff vill return to council with a report, including a elP request, and aq'2.ndize the matter fol" Finance committee discussion. Respectfully submitted l ~'~y--~ary J cI L<.vy Director of Libraries Thil t gen or of Community Services CMR:467:93