April 7, 1994
HONORABLE CITY COUNCIL
~alo Alto, California
Ventura N~J...ghbQrhQod~~ffic St\L(jy
Members of the Council:
o
This is an informational staff report summarlz1ng data collection
and staff findings for the Ventura Neighborhood Traffic Study. No
Council action is required.
REPORT IN BRI&P
In response to traffic concerns raised by Ventura neighbol.'hood
representatives, twenty-four hour traffic volumes, speed surveys
and a through traffic survey ''''ere conducted in the Ventura
!leighborhood in 1993. Staff's expressed intent was to collect and
analyze the data and only take further action, including bringing
the issue before council for forMal. discussion and direction if tho
data indicate,d an obvious problelTl. A comparison of traffic volumes
and speeds with volumes and ~peeds in other parts of ,Palo Alto
indicates that they are similar or lo, ... er than those generally found
in other neighborhoods I and the inrtount of through traffic is
minimal (actual figures shown in Table 2). Thus, staff is not
bringing this item to the council for consideration on a City
council agenda.
B~CP;GROt1ND
In-1992 Ms. Odile Disch-Bhadkamkar, a representative of the Ventura
Neigllborhood Association, cont~cted the: Transportation Division and
expressed her concern about traffic voh.lffies and speeds in the
Ventura neighborhood. Staff subsequently met with her and a group
of residents to disc'uss these concerns. At that time staff agreed
to collect some field data in this neighborhood to identify
potential problems and to help assess the extent to which problems
existed.
following the neighborhood meeting, and in cooperation with Hs.
Pisch-Bhadkamkar , the area of stUdy was defined as the area bounded
by Lambert Avenue, EI Camin'J Real, Meadow Drive and Park Boulevard
(Attachment 1), Staff also presented locations for the 24-hour
traffic volume counts j speed surveys, and the through traffic
CMR:221:94
\
surv&ys that we proposed to conduct. staff's expressed intent was
to collect and ~nalyzc the data and only take further action,
illcluding bringing the issue bp,fore Council for discus$ioh and
dir-ection .. if the data indicated a problem. Before staff" began
collecting datal and in response to a request by Ms. Disch-
8hadkarnkar , staff replaced the 24 inch stop signs with 30 inch stop
signs at all intersections within the study area, and posted 25 mph
e:peed limit signs on Matactero and Wil-ton Avenues.
P'~TA COLLECt'ION
Twenty-four ...l.f.2.uLTra f f S. c COJm1.i!
1'w()tlty-fo\.lr hour traffic volume counts were collected in March 1993
at ten locations as shown below and in Attachment 2. 'rhe volumes
ranged fron a low of 159 on Ash Street, to a high--of 1,347 on Park
Boulevard. All of the streets where traffic counts were collected,
ore clas:sified as local streets. Staff compared the traffic
volu~es froT.'l Ventura neighborhood streets with traf-fic volumes from
othsr local streets in P.fllo Alto (see Attachment 3), and found that
traffic volu~es in the ventura neighborhood are not unusually high.
Table I. 24~h(}ur Tr~ffic Volumes
24-hour Trame
SHeets and Segments Counlcd Counl -------~="=--====-==~~~-===~=-~~==~==~=-=:~!
Birch Street, between Lambert Avenue
and Chestnul Avenue 731 -----------;1----"'-'-----11
Ash Sireet, betwe,.en Lambert Avenue
and CneSliltl t A venue
Orinda Avenue, be--lweell Margarita A .... enue
and Maladero Avenue
Margarita A \fen ue. east of El Ca m ina Real
Willon Avenue, e.aS( of E! Camino Rf'AiI
wmon Ayenue, belween'.'!)rinda Avenue
and Park Boulevard
Park Boulevard, between Wilton Avenue
and Curtner Avenue
Park Boulevard, north of Me.adow Drive
Second Street, north of Mcadow Drive
CHR: 221,94
159
639
569
671
598
1,199
1,347
1,248
4/7/94
Page 2
..
l
o
In order to assess the levol ¢f through traffic in the
neighborhood, a 1 icense plato survey was conducted in May 1993.
',rnroug'h traffi" in. dGfincd as traffic with neither origin nor
destination -within th~ specific study area. The surveys were
conducted during the ~ornin9 and evening peak commute and travel
periods (1:3:0 a.~. to 9:30 a.al and ,4:30 p.m. to 6t.30 p.m.), when
conqestion occurs on the adjacent arterials. Tho extent of through
traffic at each ga.te during: the ~{"Irnin9 and evening two-hour pet'iod
is &ho'W'n below, o,J1d in A.ttachDont ~.
Table :2, Th{l,.lvgh 1'1 ~m~ Su r ... ·q Slim mary
'. "
(hIe: O~"!klf)) AM 1',-" (7;IT!:~ PM Pu, (4:30-{):JO p.m.) -------
Tt~.al Thru PII!(.;en\ Tnl~1 Thru Percent
-------~---..... -----------. nip" T.ip50 ____ "!!:~_ .. ___ Tri~:_ Trips Thru
Eir..:h Stnet O'It l.am~('f1 g9 I) 15 179 27 15
A.,,-e-m.l~~
A~h S((,-'"" e! Lamlxfl !\woue 10 0 0 ZS 8 32
Mugariu A'"tnut H Et 66 12 IS 'iO 13 26
C.!Jnil'~) RClI
Wilhm" An'ClLJe 31 FJ C;ainioo 8~ 1 1 100 4 4
Rt.ll
Park: »Oule-varo al Meadow 155 7 5 276 5 2
O,h-e .
S~"'-.~oo SHe.ei: at MU<kIw 218 10 5 194 7 4
O,h'e: L Willde Way al Memw Dri\-,t 19 • 5 58 4 7 -, . -
TOTAI.S 705 '8 7 912 78 8
Thes~ data indicate "that overall seven parcent of the traffic in
th~ l!l.ornLnq peak pa-rlod and eight perc£!i1t of the t~ .. affic in the
evening peak -pel."'iOt.i is through tr..eaffic. The greatest percentage of
throuCjJh traffic was registered on Margarita Avenue at El Camino
Roal in the lttorning and on Ash Street at Lambert Avenue in the
evening. The throuqh traffio in this neighborhood was compared to
other neiqhb(n:hood studies, such as Hamilton Avenue, Southgate, and
EVergreen Park, and the restllts are shown belo,"J:
Cml: 221 :94 4/7/94
Page :}
o
Location
Hamilton AVEnue
Southgate
Evergreen Park
L:ttton Avenue
Pcrcont
Through
:trALti.<L
!/
The abov~ data indicate that; throUl;th t"'aff ic within th is study area
is substantially lower than t.hat found in ,,",any othol." noiqllborhooos.
~SurveYf!
Speed surveys were dOll,.;!" in April 1~9) fit f( ur locations .... ithin tho
Btudy at'ea, as shown below:
.Hatadero Avenuo
Orinda Avenue
Wilton Avenue
Second Street
(200 bll;)
(3500 I>H;)
(200 b)~.l
8~th Percentile
§p~jHl$ ___ ~.
('6.8 nph
24. 8 ~ph
29.0 ~ph
31.1 ~ph
Surveys were done during the .... cekdC'l)·s. 'fhl('.sc survoys indic.lte th<'tt
traffic in the neighborhood tr~vels at preva,i) ing ~p(>c-ds in the
range of 24.S mph to ]1.1 mph, as conp;\red with the pdna racie
speed limit of 25 mph on resjdential stl:eet.tJ.. The cOl:'lparison bn 1 0\0,'
of Ventura neighborhood speeds with speeds in othel' parts of P~,lo
Alto indicates that these speeds are Im.'el' th.lll thos() qenerally
found in other neiqnborhoods:
Palo Alto Avenue between
Chaucer and Hale
Lytton Avenue between
Seneca and Guinda
Barron Avenue east of
Cass Way
LaOonna Avenue south
of Paul Avenue
Marion Avenue between
Middlefield and COwper
Lagun()_ Avenue north of
Barron Avenue
* Prior to measures being implerocnted
tu discourage through traffic.
CMR:221:94
8~th PercontilE'
.s:P._~.{tlj_~ __ . ___ .,
10 mph
J3 "ph
l3 mph
32 mph
31 l1Iph
4/7/94
Page 4
.. --," --, .'::'"(,,;",
.'.
:) o
Traffic Acc~
In addition to the above data, traffic accidents reported to the
Police Department from January 1988 to December 1991 wO"re reviowed .
. During the four year period, a total of 44 accidents .... ·ere roportod
in this' neighborhood (0 in 1988 1 13 in 1989, 12 in 1990 ilnd 9 in
1991), as shown in Attachment 5. Nost of the accidents were
related to people backing in or out of driv.eways or start.ing trol1l
a parked positicn~ Although Park Boulevard carries a moderate
amount' of bicycle traffic, there wero no reports of accidents 011
Park Boulevard involving bicycles. The accident history doos not
indicate any significant pattern of accidents related to throu!'jh"
traffic, or accidents of a type that co'uld be resolved by
engineering solutions.
OTHER CONCERNS
stop Siqoji
Staff reviewed the existing stop si9n installations within the
neighborhood, to evaluate whether additional stop signs should be
installed for visibility and safety l'easons. No Visibility
problems were observed, and the accident history does not indicate
any right-ot-way problems that could be cOr:t.'ected by installation
of additional stop signs. Attachment 6 shows the curJ:"ent stop
signs in the neighborhood. As is evident. from the -map. most
intersections within the core of this neighborhood have uAII way11
stops, except the intersections of Second Street at Hacl<me street
and Birch street at Chestnut Avenue. These intersection::! do not
Ineet the normal UGuard and Go" or caltrans criteria for installing
stop signs l and they l,ave no safety or visibiLity problems.
Bike safety on P~~~e~~r-g
The issue of bike safety on Park Bouleva.rd did not surface in
earlier staff discussion with naighborhood representatives.
However, staff was recently made aware that the neighborhood is
concerned about bike' safety on Park Boulevat'd.
Park Boulevard is a marked bike route north of Lambert Avenu~, anti,
the entire length of Park is identified on the P~lo Alto Dikeway
Master Plan. The route is used by many cyclists as an alternative
to EI camino Real or Alma Street. Park BouleVard already has
barriel's to vehicular traffic, therefore, it has many of the
characteristics of a "bicycle boulevard ll • Staff has discussed with
the Palo Alto Bicycle Advisory Commit~ee, adding this section of
Park Boulevard to the city's designated bike routes. Funding for
this 'project has been inCluded in the proposed 1994-95 CIP, as part
of the "Bikeway System Improvements" project. The type of
ht1provement anticipated includes adding signing. ,d thout making il:ny
other changes, and designating Park Boulevard as a bike route.
CMR:221:94
.. ,., .
4/7/94
Page 5
\
."
·~ .....
, :.'
'-,., •. >-.,' .,' ' .. :
()
",.
other options include addintJ bike lanes on t.he wider section of
Park {the width of the street varies from 30 to 40 feet), but would
necessitate restricting parking on one ~ide of the, street during
tile day~ 'lhe. 30 foot scction (frorll IVilton to Lambert) is too
narrow for bike lanas. Some minor modifications to th~ existing
barriers could be considered to provide better-access for bikes, as
well as restricting parking dire.ctly adjacent to the barrie.rs.
Staff has not yet discussed with the neighborhood what, if any,
changes would need to be made on Park to upgrade it to a bike route
(other than signing as contemplated by staff) " Staff intends to
address any specific neighborhood bike issue in the context of the
eIP project.
PINDINGS AND CONCLUSIONS
In Sult\mary, a review of the data collected indicates that:
1. The 24-hour traffic volumes within the neighborhood are not
unusually high;
:L Through traffic is low, and substantially lower than in many
other neigllborhoods;
3. The prevailing speeds are re('lsonable, and 10",'e1' than those
generally found in other neighborhoodsj
4. 'I'he accident history does not indicate any s,igni ficant
PQttern of accidents.
GiVen the moderate level of traffic volumes, low level of through
tt'affic intrusion and speeding, no additiomtJ traffic control
measureR are proposed for the V~ntura neighborhood, unless directed
otherwise by the City Council.
Respectfully submitted,
AS 1l0K AG GIIRI'1A L
City Traffic Engj ne'er
KENNf:1'1I R. SCIIRErBER
Director ot Planning
J~ and Community Environment
ci t.y Manager
Attachments: 1. Study Area M~p
2. Twenty-four Hour Traffic Volumes
3. 'I'raffie Volumes on other Palo Alto Streelts
4. Through Traffic Volumes
5. Area Accident History
6. stop Intersection Hap
cc: octile Disch-Bhadkamkar, Ventura Neighborhood ~ssociation
CMR,221,94
. ;".",',>.
, ,'J'
4/7/9'
Page' 6
. ,
I
·"
'.' .
• ,
STUDY AREA BOUNDARY
..
-\
LEGEND
8A.RRIER· PREVENTS SOUTHBOUND TRAFFIC
BARRIEA-PAEV~NTS NORnlBOUNO TRAFFIC A.N 0
REQUIRES S.BND. 3. ~.8NO. TRAFFIC 'TO TURN
NOT TO SCALE
c:to lUll I ~ III
I ,
"i'
';.-' '
H CAMINO RUt.
24 HOUR
TRAFFIC VOLUMES
;,
-~ U "(HJ,. TOUL rj .... ~'lc
NOT TO SCALE
---
---•. _. "-->~-. -'.,>7--""
.. '<-" ,-.
. "
o ATTACHMENT 3
HAImES OF TWO-WAY AVERAGE WEEKDAY DAILY TRAffIC VOlUHES. (ADIs)
MEASURED ON RESIDENTIAL LOCAL AND COLLECTOR StREEtS
Local Strents
AddiSon wi Emerson (1990)
Barron wi Whitsell (1986)
Bryant sl Channing (1990)
Edgewood 01 Rhodes (1989)
Bryant sl Oregon Exp (1989)
Chaucer nj Hamilton (1988)
College oj E1 Camino (1985)
Colorado el Naverley (1989)
Colorado el Cowpe~ (1989)
Cowper sl Colorado (1989)
Donald nl Arastradero (1985)
Greer at Haddux (1987)
La Donna n/ San Jude (1986)
lIncol" sl Hamilton (1988)
Harion el Cowper (1989)
Maybell wi Th. i n ~ay (1986)
IIewe11 sl Seale (1985)
Monroe at Monroe (1985)
Ramona sl Channing (1990)
Ross sl Ames (1990)
Talisman el Ross (1990)
lI.vodey at E. Meadow (1988)
Waverley slOregon Exp (1989)
Webster el Marion (1989)
Bryant sl Homer (J989)
lincoln wi lIaverley (1990)
/lawthorne wi M'fle1d (1988)
Everett wi M'fle1d (l988)
Co·.pe.· s/ Oregon Exp (l989)
'Not'li
IN PALO ALTO'
1565
1300
1390
330
1290
1200
1815
1010
2355
2240
470
1700
1445
1600
65~
2010
2090
690
600
2290
410
485
1135
280
2C40
920
1990
1900
2510
.willW:..llifili
f;m,r.nh s/ Cerell (1980! Z090
Wavedey nl ['Ilbarc (1990 4115
Waverl<'y sl Channfns (J988) 3130
Callfornh w/ Yale (1986) 7190
California el H'fl.ld(J985) 3000
Channing wi Center 119881 4815
Guinda oj lIa~l1ton J988 U20
Co"lwlle nl Mastr 1986) 1620
/I,r-I1ton el /I'fleld (1988) 3900
Lona Verde el Ross (IS901 2810
Loul s .1 Colo,.do (1989 4850
Louis sl CalifornIa (1985l 3320
Co10r.do ./ /I'fleld (1989 6525
l Robles "/ VII Vista (1989) 5585
Hatadero wI E1 C"lno (198&) 2300
Maybell wi Aoarant, (1986) 2905
lie.e 11 nl E~b"c aJoro (1988) 7680
/Iew.ll el Hamflton (1988) 2600
E. Headoll el AI .. (1989) 9310
E. Headow ./ H'fleld (1989) {890
Park Blvd el El C •• lno (1989) 810
Churchill '/EI C.mlno (1989lIO)]5
Churchill wi Waverley (1989 2250
1/. Cal if wi H'fleld (19891 1715
N. Calif 01 H'fie1d (1989 3510
La9U". nl San Jud. (1986) 1050
St.nford wI Bo~oln (1889) 8400
(J9x~) • year of measurement; sl, n/, el, wi, south of, etc.
Examples Include highest and lowest exIsting me.surements for eaCh categol'Y;
howaver, oth~r streets not measured could hava highet" or lower (ounts.
Though this list does include most residential collector streets In PalQ Alto,
.It does nQ1 include most loe,l streets. ADTs have not been measured on most
local streets. Many 10c.l streets not sholln on this list would be expected to
ha,. ADTs of less th.n 500.
CS
6/4/90 (Revised 11/20/90)
., '·'r."
\ '
!..EGEND
lUllIlUNG .' JlO'''' IIHIIY "'UflC O~lY O,U'I,"',
d:S(WOIIIIIIIU t MOVII T01.H II.U·',HI
CDl4(1
C~140
'\ I!YUIINO t HOll ... fOUL (4 3C·~ 101
trf~U'H. t IIOt.lll HUlY TfI""'IIC OIH~ 11,10-1,101_
·0 ...... r .. I ••• e,!-n .. I.d'it .. or , .... tl G ••••• ~tll ?I. , ..... , •• Iohlll.,-, e,'1 ... , ., .,. .. 1.,. -------.------------_.. ---
:. ,'-
MORNING AND EVENING
PEAK TWO HOUR THRU & TOTAL
TRAFFIC VOLUMES
N"
Nor ro SCAl.E
~-t: I t t:t r1~11-t--4-;1~f:;i~l-t f tot t:::t:::H:::t::t::f:::t_l_t t.f-I * • t t ~-~ t I ~-I t -t 1·1 t t II ~ 11-11: *1--;-1: -t J.-+~ 1 t * II t l II I .} II ll'l-'
'*"FF.f:-i:=*4---t4::t ~ *t:t-II t-r-t:1 t-!:::t: ~ i 11-t::t:i=14·t*t 1-*",1 + 1ft t t-, to t t-. Itt t -f II t t ITt-.:! I:..t:-t---t t::;4::l-1 l-'-I ; t 'll' ,
--'-----R-1~?~I"'-~-Y ""'~'~7"~"~' U ;;;, "'l'---~--lr".J.J· .. ~:.~ r
]
IIIIOM U _ "'" -I --I --~.'" I
it/e. -
["'''~J l
ITlI -------1 r-IEL CAMINO AI:AL
WIUON N
/
eUR"n" N
4/100
'l'rHIUU. ~J
L._
----~~-~
VEIIfY,,'" ~
W. wueow
-·--·---./-·-··~·"i-lcli.tl~·i)···w.v
""Z.: __ ._~-=-----------
,-".
,
c,' ,
\
',)
o ATTACHMENT 5
AREA ACCIDENT HISTORY
-,-=-==-
) ACCIDENT SUMMARY -
Street 1988 1989 1990 1991 --
r_·_Y·",_81'd-2 1 2 0
f----Birch St. , 0 1 --0 1"-----
Orinda St. 0 0 0 0 __ -------
Second $1. 0 0 0 0 --
:---__ ~~.~ Way_ 0 0 0 --_ __ 0_
_~ __ ~~bert A~._. --0 1 --~_3 0
Chl!5tnul Aile. 0 0 0 0
__ ~ndoA~~_ 1 0 I ..0-
Maroa rita Ave. --I --' 1 1 1-------
Matadero Ava. I 1 0 2
WIlton Ave. 2 0 0 '--------
Curtner Ave. 1 4 4 5 __ -
Vcntu/a Ave. 0 5 0 0
Ventu1a Ct. 0 0 0 0
M(lcLane Ave. 1 0 0 0
: ...
il
r ~··ST~P SION
I
• BARRIER-PREVENTS SOUrHBO!JND TRA.FFIC
, BA.RRIER-PAEVf:NTS NORTHBOUND 'TRAF"FIC AND
REQUIRes S.UND. 3; E.8ND. TRAFfiC TO '.IURN
IIOT TO SCALEi
G.
I
. , .. _;-.
;.
. ".