HomeMy WebLinkAbout0454.093I ~, • • "" , . .'." ~ , Aug-Jst S, 1393 THE HONORABLE CITY COL~CIL Palo Alto~ California 10 Storm Drain F!lmp Station and Pipeline Rehabilitatic"n PI-gject.. CIP 47702 -consultant Agreempnt Members of the Council: ~t in Brief This report recommends that Council approve and authorize the Mayor to execute the attached (Attachment A) consultant agreement with Brown and Caldwell in the amcunt of $483,7QS for design services for the Storm Drain Pu.np Station and Pipeline Rehabilitation project. Funds have been appropriated in CIP 47702. Collection System Improvements. Background This consultant agreement will provide for three separate but related services. Firet, the Capital Impro ..... ement Program included funding in FY 1993-94 to retain a consultant: to design a project to replace or repair damaged sections of the existing storm drain system, as identified in the Storm Drainage condition Assessment report. Second, funding i& also included for a consultant to design storm drain pump station improvements. Thirdly, in 1992, the £tate of California Office of Em~rgency Services requested that the Cit.y prepare a. flood inundation map to identify areas that would be flooded in the event of the failure of the Foothills Park Dam. In order to expedite the implementation of these necessary improvements, staff has consolidated these tasks into a single consultunt agreement. Discussipn of Consultant Selection A Request for Proposals was issued to twelve e~1gineering firms that appeared qualified to perform the required storm drain deaign work and that had expressed interest in providing services to the City. Four firms responded with proposals on June 29, 1993. A selection advisory committee consisting of staff from the Engineering and Operations Divisions of the ~~lic Works Department reviewed the proposals and invited three firms to participate in an oral interview on July 12~ 1993. Based on the quality of the written proposals and the oral presentations, Brown and Caldwell was selected by the committee because of the depth and quality of thei.r experience on projects of a similar nature, the strength of their proposed consultant team. and their well-defined approach to the project design. CMR,454 ,93 -1- In July :1-993, the Finance Committee and the Policy and Services Committee reviewed all consultant agreements to be awarded in FY 1393-94, in order to determine if they wanted to review staff's consultant selection prior to Co~ncil award of an agreement. The Storm Drain pump Station and Pipel ine-Rehabil i tation Proj ect consultant agreement was not selected by either Committee for review, Discussion of Agreement: The attached agreement with Brown and Caldwell is for the following scope of work! • Storm Drain Pump Station Rehabilitation The consultant will identify options for the replacement of the Airport Purep Station, which has inadequate pumping capacity and is in poor operating condition. Issues to be res':llved include the location. of the pump station and its discharge point~ the possible use of a stormwater detention basin on the Palo Alto Golf Course to reduce peak flows, and coordination witb proposed paving and drainage improvements at the Palo Alto Airpcrt+ The consultant will perform an environmental assessment of the project and assist staff in obtaining project approvals, including Site and Design Review appr~val and regulatory agency permits. The consultant will also visit and evaluate seV'"en other pv.:rtp stations throughout the City and recorr.mend operational and safet.y improvemen.ts. The evaluat.ion ,.,il1 include pumps, structures, wiring~ instrumentation, lighting, security, safety devices, and other related items. The consultant will prepare a single construction documents package (plans, specifications, and estimate) for the work at all of the pump stations. The agreement also includes a provision fer adding constn.lction administration and i~spection services to the scope of work at a later date. • Storm Drain Pipeline Rehabilitation The consultant will prepare a second construction documents package (plans, specifications, and estimate) for the repair or replacement of 19 damaged storm drain pipeline segments as identified in the Storm Drainage Condition Assessment report. The consultant will review the existing video tapes of the interior of the pipelines and recommend replacement or a specific rehabilitation technique for ea~h segment based upon the pipeline condition and the above-ground constraints (traffic~ accessibility, hydraulic capacity, etc.). • Foothills Park Dam Flood Inundation Map The consultant will prepare a rr~p identifying areas that would be flooded in the event of the failure of the Foothills Park CMR,454,93 -2- '.-; ' •... , '.- .@ "P Dam. The map wi 11 be submitted to the State of California Office of 2mergency Services for their revi€'!w and approval and will be modified, as necessar/, to meet their req~irements. EnyironIDf:Ilt' a1 Assessment As part of the 1992-97 elP Program, staff indicated that improvements to the storm d:tainag-e system might require further e~vironmental assessment prier to implementation. A formal evaluation of the environmental il:lpacts of the reconstruction of the Airport Pump Station is included in the scope of this agreement. Recommendations Staff recommends that Council: 1. Approve and aut.horize the Mayor to execute the attached consultant agreement with Brown and Caldwell in the arr.OU:1t of $483,70~ for design services for the Storm Drain Pump Station/Pipeline Rehabilitation Project, CIP 47702. 2. Authorize the City Manager ~r he~ designee to negotiate and execute amendments for services related to or incidental to the scope of work: or services. the total value of which amendments shall not exceed $70,000. Respectfully submitted l ~~ GEORGE BAGDON Assistant Director of Public Works GLENN S. ROBERTS Director of Public Works ~ City Manager Attachment: Agreement CMR:454:93 -3- o ~'-. A G ILJLB M B N T VOR P1Of'BSSIONAL ZIIGDlERRING CONSULTANT SE!!.VICES BBIWlmlQ TBB CITY OF PALO ALTO AND BROWN AND CALDWELL POR STORM DltAIN PUXP STATION AND PIPELINE REHABILITATION PROJECT TH!S AGRERMBNT is made and entered into this ___ day of , 1993 1 by and. between the CITY OF P.~ ALTO, a =='=i'"'c=-,'-"pa='l-c=o"rpo= ration of California, hereinafter referred to as ~CITY~· and BROWN AND CALDWELL (Taxp~yer Identificaticn No. 94-144i5346i ~ a California corporation, with offices at 3480 Buskirk Avenue~ Pleaaa.TJ.t Hill, CA 94523~ hereinafter referred to as • CONSULTANT· • 'If 1: T NBS SL_~~= -'II'lHERF.AS~ CITY' desires certain professional consultant services hereinafter described; and WHZREAS, CITY desires tc engage CONSULTANT to provide these services by reason of its qualifications and experience for performing such services. and CONSULTANT has offered to provide the required servicas on the terms and in the manner set forth heTein; NOH~ THEREFORE, in consideration of their mutual covenants~ the parties hereto agree as fellows: SECTION 1 -DBFINJTIONS 1.1 l::llX The term "City" shall mean the City of Palo Alto, California. 1. • :2 CITY MANAGER. The term "City Manager!! shall mean the duly appointed City Manager of the City of Palo ~to, california, or his or her deBi9nat~d repreB~ntative. 1.3 CITY CLRBK The term aCi~y Clerk" shall mean the duly appointed City Clerk of the City of Palo Alto, California, or his or her designated representative. 1.4 RI$K MANAGER The term ·Risk Manager" shall mean the duly appointed Risk Manager of the City of Palo Alto, California, or his or her deSignated representative. 1 ""'- C~·Shcn RO'>'. lilly lS, 1993 · ",.' -_-d __ 1.5 PROJECT The term ·Project· shall mean the senrices a.nd improvements, if any, described in Exhibit nAIII entitled ~Scopc of Pr.oject and Time Schedule, III &ttached hereto and made a part hereof by this reference. SECTION 2 -PRQJECT CooRDINATTON 2.1 CITY The City Manager shall be representative of CITY for all purposes under this Agreement. JOE TERESI is designated as the Project. .Manager for the City Manager, and he or she shall superv-ise the progress and execution of this Agreement. and shall be assisted by MATT OOSTIGAS, the Project Engineer. CONSULTAl.r:r shall assign a single Proje.ct Director to have overall responsibility fer the progress a,1d execution of this Agreement for CONSULTANT. ROBBRT GRACE hereby is designated as the project. Director for CONSULTANT _ ROBERT OWENS shall be assigned as Proj ect Coordinator for CONSULTANT and shall reprE"sent CONSULTANT during the day-to-day work on t.he Proj ect. Should circumstances or conditions subsequent to the execution of th:1.s Agreement require a substitute Project Director or Project Cccrdinator for any reason the Project Director or Proj ect Coordinator designee shall be subject to the prior written approval of the Project Manager. ~Q!i 3 -SCOPE OF PRQJEC"'1" The scope of the Project t.o be executed by CONSULTANT under this Agreement, and the time schedule for the Project, are describ.ed in Exhibi t • A' . DUTIES OF CQNSULTANT 4.1 BASIC SERVICES Unless otherwise indicated, CONSULTAJr."T shall perform each task and accomplish each obj ective sununarized and more particularly described in Exhibit -AI. CONSLlLTAN'I"' s Basic Services shall be furnished as described in Bxhibit ·AR, Section I. 4.2 ADDITIONAL SERVICES CONSULTANT shall perform or obtain any and all of the following add:! tional se.ndces. not includ!E!d under the Basic gervices~ if so authorized in writing by CITY, and shall be paid as provided in Section 6 of this Agreement: 2 C~·Aon Rev. July I.~, 1m · -', .",-;,.. , .'·-h -::~'.::' 4.:2.1 providing sE!l.-vices a.S an expert witness in connection with any public hearing. arbitration proce~dj ng. or proceeding of a courc of record_ 4.2.2 f or CONSULTANT and its the Basic Services. Incurring t"Cav'el and sUbsistence expens~s statf beyond those normally required under 4:.2.3 performing any other services that may be agreed upon by the parties subsequent to the execution of this Agreement_ 4.2.4 Such other additional services as set forth in Exhibit ~A·~ Section II. 4.3.1 CONSULTANT reprasents that it has the expertise and professional qualificaticns to furnish the services described under this J\gr€ement. CONSULTANT further declares tr.at one or more members or employees of its firm ar.d that of its subconsultants I if any~ are licensed by the State of California to perform their services and that these services will be performed by them or under their supervision. CONSULTANT shall furnish to CITY for approval," prior to execution of this Agreement; a list of all firms or corporations to be employed as subconsultants. 4.3.2 CONSULTANT states that it is aware of the requirements of the federal Americans with Disabilities Act of 1990. and the Government Code and the Heal th and Safety Code of the State of california, relating to access to public buildings and accommodations for disabled persons~ and relating to facilities for disabled persons. CONSULTANT s:C~ll comply with such provisions in carrying out the terms of this Agreement. to the extent such provisions are applicable. 4.3.3 CONSULTANT shall furnish CITY with every reasonable cpportunity for CITY to a8ce~tain ~hat the services of CONSU!.,TANT are being performed in accordance with the requi:rements and intentions of this Agreement. 4 . 4 BIDS IN EXCESS OF FINAL ESTIMATE p.p COt'lSTRUC'IIQN If the lowest responsible bid for the Storm Drain Pump Station Rehabilitation or the Stor:m Drain pipeline rehabilitation project received by CITY exceeds one hundred ten percent (110l} of t.he amount: of the approved final detailed estimate of construction cost (-fixed limit-l. CITY shall at its election (al give written approval of an increase in such fixed limit, or (bl authorize rebidding of the project within a reasonable time. or (c) cooperate in revising the project scope and quality as required to reduce the construc'Cior-.. cost~ In the case l):f (c). CONSULTAN'l' shall lTIOdify t.he: drawings and specifications as necessary to bring the construction 3 c-Juno.,.., Iln. July 1.5. 19'Jl cost within the fixed lirrd.t. The providing of this sentice shall be the limit of CONSULTANT' 5 responaibil i ty in this regard, and having done so, CONSULTANT shall be t!ntitled to its fees in accordance with Section 6 of this Agreement, provided. however, if the lowest responsible bid exceeds 110\ of CONSULTANT's final construction cost estimate. and CrTY wants to pursue option te); CITY may hire an independent cost estimator t.o prepare a cost estimate. If the i~dependent cost estimator's est.imate exceeds 110' of CONSULTANT's final construction co~t estimatei CONSuLTANT shall pay for such independent cost estimate and revise the cor.atract documents at its expense. If the independent cost est.imator's estimate is less than Illyt of CONSULTANT's final conStruction cost estimate, CITY shall pay for the independent cost estimate and shall pay CONSULTAl-."T a reasonable sum to revise the contract documents. SECTION 5 -DUTIBS OF CITY S.l CITY s~~ll provide full icfo~ation regarding its requirements for the Project. 5.2 CITY shall examine documents submitted by CONSULTANT and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULT~~'s work_ S.3 CITY shall fU~'ni8h all such information ii.ci are in CITY's files or are at its disposal, as listed in Exhibit "A". Section II1_ 5.4 • A II I Section CONSULTANT • CITY shall furnish all services listed in Bxhibit III~ providing sufficient no~ice is given by 5.5 The servic£sl information, surveys and reports required by paragraphs 5.1 and 5.3 through 5.4 inClusive shall be furnished at CITY's expense, and CONSULTANT shall be enlitled to rely upon the accuracy thereof. S.6 If CIT.!' observes or otherwise be-:omes aware of any fault or defect in the project or nonconformance with the contract documents, ClTY shall give prompt written notice thereof to CONSULTANT • 5.7 CITY shall furnish informati~n required by CONSUL­ TANT as expeditiously as possible. SECTION 6 -PAYMENT payment shall be made by CITY only for services rendered and within thirty (30) days of submission in triplicate of monthly progre8s payment requests. Bach invoice shall be itemized as to the type of payment desc.l·ibed in this section. ~.""" R"",", July 1:5. 1993 6.1 ~SULTA!IT' Jl_FEES In consideration fer the full performd.:1.ce of the &'sic Services described in Section 4.1-of t.his Agreement:, Cl'l'Y agrees to pay CONSULTANT a fee not to exceed four hundred three thousand seven hundred five dollars ($ 403,705.00). The amount of CONSULTANT's compensation shall be calculated as set forth in Exhibit ~Bw, entitled WRate Schedule,n attached hereto and p'.ade a part hereof by this reference" on a time and materials basis, up to the maximu~ amount set forth in this paragraph 6.1. CONSULTANT's Rate Sche~~le is attached to Exhibit ·B· and shall be updated and be etf~ctive as of Sept~ber 26 of each year. 1;.1..1. Subconsultants. Fees for S\lb.consultants. hired directly by CONSULTANT. shall be approved by CITY in advance of incurring such fees. 6.1.2 For Addi t10nal Servic~. For CONSULTANT's additional se.ndces, as described in Section 4 of tr,is Agreemant. compensation shall be as set forth in Exhibit -B~ but shall not exceed eighly thousand dollars ($ 80,000.00). The amount of CONSULTANT's compensation for the additional services shall be calculated as set fortb in Exhibit -B-, on a time and rr.aterials basis l up to the ~aximum amount set forth in this paragraph 6.1.2. 6.1.3 for Extra Wor)c.......Q+ Changes. Payment. for extra work or changes in the work not initiated by CONSULT~~ acd authorized io writing by the Project Engineer shall be made within thirty (30) days of submission by CONSULTANT of a statement in triplicate ot itemized costs covering such work. Prior to cammeficing such extra work or changes, CONSULTANT and CITY shall agree apon an estimated not-to~exceed cost for such extra work. In no event shall CONSULTANT be paid for design .,ork or change order preparation which is neceesary because of COUSli'LTANT"s errors or oversights. 6.2 PAYMENT SCHEDULE 6.2. ~ For Basic Services. Payments for the Basic Services shall be made in progress payments in proportion to services performed in accordance with Exhibit '8". Final payment shall be made by CITY after CONSULTAl'IT has submJtted all required products and reports and received approval thereon from CITY~ 6.2 . .2 For Additional Servic~+ payments for additional services of CONSULTANT as defined in Section 4 shall be made as part of the monthly progress payments for services rendered. 5 C~·Sbo(l (Uv, JIlIy 15, 1993 ".< 6.:2.3 Payment Upon Suspension or Abandonment of Project. If the I'roject is suspended for more than three (j) months or abandoned in ... hole or in part. CONSULTANT shall bE paid ies compensation for services perfor.med prior to receipt of written notice from CITY of such suspension or abandonment, together with additional expenses then due. If the Project is resumed after being suspended for more than ninety (90) days, any change ir.. ~~ULTANT's compensation shall be subject to renegctiation and. if necessary, approval by the Palo Alto City Council (the IIICity council-). If this Agreement is suspended or terminated for fault of CONSULTANT, CITY ahall be obligated to compensate CONStJLTANT only for that portion of CONSti"L7A.?IT' 8 services which are of benefit to CITY, as such deteru~nation may be made by the City Manager in the reasonable exercise of his or her discretion. SECTION 7 -PRQGRESS ~~ COMPLETION 7.1. TERM __ OF AGR2~; '1'1$ IS OF T"rlE ESSENCE The term of this Agreement shall corranence upon its execution by CITY. Following the receipt of a Notice to Proceed, CONSUL~ANT shall commence work on initial tasks in ac=ordance with the time schedule set forth in Exhibit -Alii, Section IV. Work on subsequent tasks shall proceed in accordance with the ti."ne schedule. The parties hereto a·9ree that time is of the essence of this Agreement. This Agreement shall terminate upon the completion of all obligations required to be performed hereund~r by CONSULTANT • 7.2 TIME OF COMPLETION OF EACH PHASE CONSULTANT agrees to per:::oz."D'I the services within the time Itmdts ~et forth in Exhibit -Alii provided, however r that any change in the scope of services or other changes due to CITY's operating requirements. or in connection with other contractors' or consultants r operations, may require a revised time schedule. CITY agrees to exerci~e tasks to imp~ement CONSULTANT' 5 Exhibit ·A-~ due diligence in performing its Lime schedule provided under 7.3 CITY'S Rgy'IRW AND APPROVAL Between each phase of work there shall exist a review and approval period by CITY. CITY shall exercise due diligence to complete these tasks; however r it is recognized that the interrelated exchange of information among CITY's various departments makes it impossible to set a speCific time schedule. Ncrmally, CITY'S estimated period ot review and approval will be furnished to CONSULTAh~ at the time of submission of each product of the work~ 6 -. 7.4 EXTENSION OF TIME OF COMPLET~ __ QN In the e?ent the services called for under this Aqreement are not completed by CONSULTAl."IT within the time specified, CITY shall have the option to extend the time of completioIL Th:i s paragraph does not preclude the recovery of damages for delay of either party. CONStTLTANT shall not be responsible for delay caused by circumstances bE:yond its reasonable control, including (1) strikes .. lockouts, work sluwdowns, or stoppages, or accidents, (2) acts of God~ and (3) failure of CITY to furnish information within a reasonable time. CONSULTANT shall not be 1 iable for damages aris.ing out of an~zt such delay. ilor shall CONSULTANT be deemed to be in default of this Agreement as a result thereof. SECTION 8 -CHANGES IN WORK CITY may order major changes in scope or character of work~ either decreasing or increasing the amount of CONSULTANT's servlces. In the event that such changes are ordered I CONSULTANT s~ll be entitled to full compensation for all wo~k performed prior to receipt of notice of change. Increased compensation for reajor changes shall be dete~_ined in accordance with Section 6 of the Agreement~ but in no event shall CITY be liable for payment unless the amount of such extra compensation shall first have been agreed to in writing by CITY. I~ the event tr~t ~ajor changes are ordered pursuant to this sect1on~ the schedule for-progress and completion under Section 7 of this Agreement, a.nd compensa.tion under Section 6 of this Agreement. shall be adjusted by negotiation between CONSULTANT and CrTY. subject to approval if necessary by the City Council. SECTION 9 -TlSRMlNATION OR sus ~S_IQN OF AGREEMBNT 9.1 CANCELLATION BY CQNS~~TANT CONS~~TJUVT may ter.minate this Agreement or suspend work on the Project by providing thirty (30) days' written Dot.ice thereof to CITY, but only in the event of substantial failure of performance by CITY or in the event CITY abandons or indefinitely postponee the Project. 9.2 CANCELLATION BY CITY Without limitation to such rights or remedies as CITY shall otherwise have by law, CITY may terminate this Agreement or suspend work on the Project with or without causer by providing fifteen (15) days~ written notice thereof to CONSULTANT. or immediately after submission to CITY by CONSULTANT of any completed item of service specified in Section 4 of this Agreement. CONSULTANT agrees to cease all work under this Agreement upon receipt of such written notice. 7 COII:aIlIanI-SOOn a.,..., July 15, J99J 9.3 COMPENSATION OF CONSULTANT IN TJi.~~_EVE_NT __ .oJ: TEBMINATJ,PN OF THIS AGR EEMEh'T In the ev~nt of termination of t~is Ag~eemeGt or suspension of work on the Project by eithe~ CITY or CONSULTANT as provided herein, CONSULTANT shall receive compensation as follows: 9.3.1 For approved items of service under Se~tion 4 of this Agreement, compensation shall be in the amount outlined under section 6 of thie Agreement for the items of service fully performed by CONSULTANT. 9.3.2 For items of service on which a Notice to Proceed has beeD issued by CITY, but \oJhich have not been fully completed and approved, CONSULTANT shall be compensated for the service in an amount which bears the same ratio to the total fee otherwise payable for the performance of the service as the service actually rendered bears to the total serv~ce necessary for the full perfo~ce of thg item of service. 9.3.3 In no event shall the total compensation paid in th,e immediately pr-eceding paragraphs exceed the payment specif~ed 10 Section 6 for the respective items of service to be fUrnished by CONSULTANT. 9.3.4 Notwithstanding anything in the preceding paragraphs, upon tennination for fault of CONSULTANT. CITY shall be obligated to pay for only that portion of the service which can be inco~rated in the Project. 9 • 4 DUTIES OF CITY AND CONSULTANT Upon tennination of this Agreement or suspens ion of work on the proj ect by either CITY or CONSULTANT as provided herein. all duties of CITY and CONSULTANT, as set forth in Sections 4 and 5 herei~~; shall terminate. SECTION 1Q -QQNSl~T~(S ACCOUNTING RECORD$ Records of the following expenses pertaining tc t:te Project shall be kept by CONSULTANT in acccrdance with generally recognized accounting prinCiples and shall be made available to CITY at mutually convenient times during the term of this Agreement and for three (3) years following the te~~nation of this Agreement~ (a) Direct personnel expenses r including consultant expenses. {See Section 6 of this Agreement.) Cb) Expenses pertaining to Additional services. (See Section 6 of this Agreement.} 9 ... SECTION 11 -O~ERSHIP OF DOCu~NTS 11.1 Q..WNiRSH!P OF QRIG1'NJUd OOCUMENTS Subject to the provisions of Paragraph 11.2 below, the original drawings, maps, plans~ designs, records of survey, work data, spe~ifications, and any other documents prepared by CONSULTANT in the performance of this Agreement, although instru­ ments of professional service, are and shall be the property of CITY whether the project for which they arE made is executed or not. 11.2 ~~SFER TO CITY Upon termination under Section 9 of this Agreement and upon CITY's payment of the amount required to be paid under same section. the originals and all drawings. calculations, specifications and any similar documents shall become the property of CITY, and CONSi.JLTANT shall transfer tbern to CITY~ upon request~ without additional compensation. CITY shall have t.he right to utilize any completed or uncompleted drawings, estimates, specifications, and any other docureents prepared hereunder by CO~~LTLTANT. CITY agrees not to use or reuse the docum~nt9 for any purpose other than the project and scope of work for which they were prepared. SECTION 12 INDBPSNDKNT OF CIT"! INTEREST OF CONSULTANT; CONSlThTAITI 'In accepting this Agreement, CONSULTANT covenants that it presently has no interest, and shall not acquire auy interest. direct or indirect, financial or otherwise. which would conflict in any manner or degree with the performance of the services here­ under. CONSULTANT further covena.nts t.hd.t, in the perforn-mce of this Agreement, no subcontractor or person having such an interest shall be employed. CONSULTANT certifies that no one whQ has or will bave any fiLancial interest under this Agreew.en= is an officer or employee of CITY. It is expressly agreed that in the perfonna.nce of the professional services required under this Agreement CONSULTANT. and any of its tfI..IDconsul tants or employees, shall at all times be considered independent contractors and not agents or employees of CITY. SgCTIQ~3 -OUTSIDE CONSULTANTS CONSULT.I\NT shall be responsible for employing all outside consultants (SubCoDBultants} necessary to aid CONSULTANT in the perfopnance of the services listed in Section 4 of this Agreement; provided. however, that all such subconsultants shall receive prior a.pproval of CITY in writing and shall remain acceptable to CITY during the ter.m of this Agreement. 9 Cc...wau ~ Sbor. Rn.luly IS, 199~ . .; ,~-. SECTION 14 -IND&'I1NITY CONSu~TANT agrees to protect. inde~~ify, defend and hold ha.rmless CITY, its Council mei1\bers, officers. agents and emplo~'eeF.l from any and all demands, claims, or liability of any nature r including death or injury to any person, property damage or any other loss, caused by or arising out of CONSULTANT's, its officers', agents', subcontractors' or employees' neg}igent acts, errors, or omissions, or willful misconduct, or conduct for which the law may impose strict liability on CONSULTANT in the performance of or failure to perform its obligationg under this Agreement_ ~QN 1.5 -IN£.il-EANCS 15.1 INSURANCe COVERAGE CONSULTANT. at its Bole cost and expense, shall obtain and rnaintain~ in full force ~~d effect throughout the entire term of this Agreement. the insurance coverage described in Exhibit "C· to Chis Agreement, attached hereto and made a part hereof by this reference, insuring not only CONSULT.~ and its subcontractors, if any~ but also, with the exception of workers' compensation, employer's liability and professional liability insurance, naming as addi~ional inBu~eds CITY~ its Council members. officers, agents and employees~ and each of them, concerning this Agreement and the Project~ All insurance coverage required hereunder shall be provided through carrLers with a A.M. Best & Co. rating of A:X or higher that are admdtted to de business in the State of California. Any and all subcontractors of CONSULTANT under this Agreement shall obtain and maintain, in full force and effect throughout the term of this Agreement~ identica1 insurance coverage, with CITY named as additional insured under such policiec as required above. 1.5 . 2 gymENcE OF l.NSURA.~CE Certificates of such insurance. preferably on the forw~· provided by CITY, shall be filed with CITY concurrently with the execution of this Agreement. The certificates 9hall be subject to the approval of the R.iak Manager and shall contain an endorsement. stating that t.he insurance is primary coverage and will not be cancelled or altered by the insurer except after filing with the City Clerk thirty (30) days' prior written notice of such cancellation or alteration, and that the City of Palo Alto is named as an additional insu:;.-ed except in policies of workers' compensation, employer's liability f and professional liability insurance. CUrrent certificates of such insurance shall be kept on file at all times during the term of this Agreement with the City Clerk. 10 .' , "-,,",, ....... Rev, t.dy JS, 1m , ?-" .. ,: 15.3 NO MIMIT OF LIABILITY The procuring of such required p:;licr or pol icies of insurance shall not be construed to limit CONSULTANT's liabili t-y hereunder nor to fulfill the in~.emnification provisicn and re.qui rements of this Agree."'!leot under Section 14 hereof. Notwithstanding said 901icy or policies of insurance, CONTRACTOR sha:l be oblj~ated for the full and total amount of any damage, injury, or loss caused by the services performed under this Agreement; including after the Agreement has ter.minat~d Dr expired. SECTI~~ \6 -WORKERS' COMPENSATrON CONSULT~~. by executing this Agreement; certifies that it is aware of the provisions of the Labor Code of the State of california which require every employer to be insured against: liability for workers; compensation or to undertake self-insurEU~ce in accordance with the prO"'l.~i8ions of that Code r and certifies that it will comply with such prOVisions before conu!'.encing the performance of the work under this Agreement. SECTION 17 -CQRRECTION OF P-NX_mERRQRS. OMISSTONs, AN"D lIMIlIGI!ITIES m CQNTRACT DOC!JME..1!I~ Any negligent or willful errors, omissions, or ambiguitie~ in the contract do~~ent8 which are discov~red before the Project is invited for bid shall be corrected by CONSULTANT without cost to CIn. CONSULTANT services required to make changes in construction resulting from negligent or willful errcrs, omissions. or ambiguities in the contract. documents whicb are discovered after the contract is awarded shall be performed by CONSULTANT without cost to CITY only insofar as they result in unnecessary or non-beneficial changes in construction. CONSULTA.'I'tt services required to make changes in construction resulting from ne-g;ligen.t or willful errors, omissions; or ambiguities in the contract document.s which are discovered after the cor:tract is awarded shall be performed by CONSULTANT and shall be paid for by CITY only insofar as they add benefit to the con8t~~ction work. SECTION 1$ -AUDITS CONSU" ... TANT agrees to perrcd.t CITY to audit. at any reasonable time during the term of this Agreement and for three (3) years thereafter, CONSULTANT's records pertaining to matters covered by t~l~ Agreement. CONSULTANT further agrees to maintain such records for at least three (3) years after the termination of thi S Agreemen t . SECTION 19 -AGREEMENT BINDING The terms, covenants, and conditions of this Agreement shall apply to. and shall bind, the heirs. successors, executors, aCminist:rators. assigns; and subcontractors r as t.he case may be, of both parties. c.:.n...u..1lIIi -SWn Ilcv ~u1y 1.5, 199) SECTION 20 . NONAS~~~ILITY 20.1 PERSONAl. $RRVrCES OF CONS'JLTANT Both parties hereto recognize that this Agreement is for the personal services of CO~SULT~"'t and cannot be transferred, assigned or subcontracted by CONSULT~ without the prior ~ritten consent of CITY. 20.2 SERVICES OF Sl,lJll;Q!§]llil1\!IT AND THEIR EMPLO>'EES CONSULTANT shall be responsible for employing or engaging all per-sons necessary to perform the services of CONSULTANT nereunder. No subconsultant of CONSULTANT will be recognized by CITY as such; rather, all subconsultants a~e deemed to be employees of CONSULT~VT, and it agrees to be responsible for their performance. CONSULTANT shall give its personal attention to the fulfillment of the provisions of this Agreement by 'til of its employees and sub·consultant9~ if any, and shall keep the work \L~der its control. If any employee or subconsultant of CONSULTANT fails or refuses to carry out t~e prOVisions of this Ag~eeT£nt or appear;:; to be incompetent or to act in a disorderly or improper I!' mner, he or she shall be discharged i.mmediately from the work under this Agreement on demand of CITY. SECTION 2~ • RELIANCE upoN PROFESSIONAL SKIL~ CONSULTANT It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the profes9ional calling necessary~to perform ~e work agreed to be done hereunder and that CITY relies upon the skill ot CONSULTANT to do and perfonn the work in the most skillful manner, and CONSULTANT agrees to thus perform the -work.. The-acceptance of CONSUL'I'ANT's work by CITY does not operate as a release of CONSULTANT from the obligation. BB crr ON 22 • WAIVERS The waiver by either party of any breach or violation of any tern'll covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of any such term, covenant, ~ondition, ordinance~ or law or of any subsequent hreach or violation of the same or of any other tenn~ covenant~ condition, ordinance or law. The subsequent acceptance by either party of any fee or other rnoney which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance. C<.l..ult.aal. StoClI'I Reo.',;..Jy 15,199'3 sECTlo.r:L ... ~_l ____ =--____ N:Q......I_MPLIED WAIVER No paymenr'r partial payment, acceptance, or partial acceptCL~ce by CITY shall oparate as a waiver o~ the part of CITY of any of its rights under this Agreement. SECTION 24 "'~TILAND A'ITQRN£YS' FEES The prevailing party in any action brought to enforce the terms of this Agreement or arising oue of this .:lj.greement may recover its reasonable costs and attorneys' fees expended {n connection with such an action from the other party. SECTION 25 NONPISCRIMlNA'T ION; PENAr,'!I'X 25.1 DUTY OF CONSP;~ No discrimination shall bt:" made in the employment of persons under this Agreeulent because of the age, race, color, national origin, ancestry, religion, disability, se~ual preference or sex Df such person. If the value of this Agreement is, or ma}~ be. Hive Thousand Dollars {$S,aOO~ or more, CONSULTANT agrees to meet all requirements ot the Palo ~to MUnicipal Code pertaining to nondiscrimination in employment~ including completing tl"'.e ·Compliance Report--Nondiscrirnination Provisions of City of Palo ~to Contracts· on the form furnished by CITY, attached hereto as Exhibit -DW and made a part hereof by this reference 4 CONSULTANT agrees that each agreement for services from independent providers shall contain a provision substantially as foJ.lows: ~Provider shall provide CONSULTANT with a certificate stating that he (or she) is curre~tly in compliance with all Federal and State of California laws covering nOndiscrimination in employment; that he lor she) will pursue an alfirmative course of action as required by the Affirmative Action Guidelines of the City of Palo ~tOj and that he (or she) will not discriminate in the employment of any person under this contract because of t_he age, race, color, national origin, ancestry, religion, diSability, sexual preference or sex of such person.w 25 .. 2 PENALTY FOR ... DISCRIMINATION If CONSULTA..lfl' is found in violation of the nondiscrimination provisions of the State of california Fair Employment Practices Act or similar provisions of federal law or execut.ive order in the performance of this Agreement. it shall thereby be found in material breach of this Agreement... Thereupon, c.~-SItoon Rev. luJy is, 1993 CITY shall have the power tc cancel or suspend this Agreement, in whole or in part, :Jr to deduct fl"oITI the amount payabl E> to CONSt,''LTANT the sum of Twenty-Five Dollars ($,,::1 for ea.ch person for each calendar day during which such persor. was discriminated againf.:ll.:. as damages for said breach of contract.: or both. Only a finding of the State of California Fair Employ:n~nt Practices Commission or the equivalent federal agency or officer shall constitute evidence of a violation of conCract under this secticn. If CONSULTANT is found in violaticn of the nondiscrimination provisions of this Agreement or the applicable affir.mative action guidelines pertaining to this Agreement, CONSULTANT shall be found in material oreach of this Agreement. Thereupon, CITY shall have tf1.e power to caficel or suspend this Agreement, in whole or in part, or to deduct from the amount payable to CONSULTANT the sum of Two Hundred Fifty Dollars ($250) for each calendar day during which CONSULTANT is found to have been in such noncompliance as damages tor breach of contract, or both. SBCTION 26 -ARBITRATION Upon agreement of the parties any controversy or claim ariSing out of or relating to this Agreement may be settled by arbitration in accordance with the Rules of the American Arbitration ABsociation~ and judgment upon the award rendered by the Arbitrators may be entered in any court having jurisdiction thereof. SECTION 27 -NOTICES All notices hereuI4der shall be given in writing and mailed r postage prepaid, by certified mail, addressed as follows: To CITY: Office of the City Clerk Post Office Box 10250 Palo Alto. CA 94303 To CONSJLTANT: Attention of the Project Director at the address of CONSULTANT recited above SBCTION 2 B -ALL COVlSNANTS ARB CONDITIONS All prOVisions of this Agreement are expressly made conditions. SID;1'IDN 29 AGe EEMRNT CONTAINS ALL, UNDERSTAND INGS ; This document: represent.s the entire and integrated agreement hetween CITY and CONSULTANT and supersedes all prior negotiacions, representations, and agreements, either written or oral. 14 -. , ,::-l __ .J--' Caaaul ..... -Sbon "'-..1":"1:5,1991 This document may be amended only by written instrument, signed by both CITY and CONSULTAWf. ~~ -GOVERNING LAW This Agreement shall be governed by the laws of the State of CalifC"rnia. IN WITNESS WHEREOF t the parties hereto have executed this Agreement the day and year first above written. A'l'Tl!ST, City Clerk APPROVED AS TO FORM, Senior ABst. City Attorney APPROVED, City Manager Director of Finance Director of Public Works Risk Manager Attachments: EXHIBIT irA·: EXHIBIT • B· : EXHIBIT "C·: EXHIBIT "D": CITY OF PAW ALTO Mayor SCOPE OF PROJECT & TL'!E SCHEDULE RATE SCHEDU'"...E & PAYMENT SCliETJULE INSURANCE NONDISCRThUNA'l'ION COMPLIANCE FORM 15 EXHIBIT A SCOPE OF PROJECT AND WORK SCHEDULE Task 0 -Project Management Task 0.) Daily Management Task 0.2 Subconsultan[ Coordination Task 1 •• Feasibility Study and Needs Assessment Task 1.1 Golf CounelDetention Basin Feasibility Task L I.l Consultation with Golf CoUtS< Staff Task 1.!.2 Meeting with City Starr Task 1.!.3 Digiral Topographic Mapping Task 1.!.4 Site Inspection Task 1.1.5 Re'Yiew Existing OI'3WO_'lgs Task 1.1.6 Sizing of StOImwarer Detention Basin Task 1.1.7 Preliminary CO!!S1r\JCtion Cost EsWnate Task 1.1.8 Analysis of Detentioo Basin Feasibility Task 1.2 Relocation of Airpon Pump Station and Outfall Pipeline Task 1.2.1 Consultation with Airpon Staff Task 1.2.2 Meeting with City and Airpon Task 1.2.3 Aeri.aI PbolOpapby Task 1.2.4 Site lnspectioo Task 1.2.5 Review Existing Drawing. Task 1.2.6 Wetlands Deltteation Task 1.2.7 Development of Alternatives Task 1.2.8 Preliminary Construction Cost Estimate Task 1.2.9 Comparison of Alternative, Task 1.3 Evaluation of Seven Pump Stations Task 1.3.1 Consultation with Maintenance Stafr Task 1.3.2 Meeting With City Staff TasIr 1.3.3 Review Existing Drawings and Records Task 1.3.4 Site Inspection Task 1.3.5 Review Pump Curves and System Hydraulics Task 1.3.6 Pump Current M04SOrement Task 1.3.7 Infra·Red Video Survey Task 1.3.8 Code Compliance Task 1.3.9 Preliminary Construction Cost Estimate _:JL.iI:CI' ,.!--..~"" ........ . ,',' TasI: 1.4 Draft Report Task 1.4.1 Develop Outline and Report Objectiv,,", Task 1.4.2 Prepare Draft Task 1.4.3 Review Meetlng Task 1.5 Final Report Task 2 -Design of Airport Pump Stallo. and Outfall Pipeline TasI: 2.1 Geotechnical Task :2.1.1 Subl;urface Explcration Task 2.1.2 Laboracory Te£ting Task 2.!.3 Engineering Analysis Task 2.1.4 Report Frepantion Task 2.1.5 Consultation Task 2.2 Sun-eying Task 2.2.1 Perform Field Survey Task 2.2.2 Develop Scale Backgrounds For Drawings Task 2.2.3 Locate Utility Lines Task 2.3 Environmental Task 2.3.1 Environmental Site Analysis Task 2.3.2 Da1a ColJection Task 2.4 Site ami Design Review Task 2.5 Plans. Speciflcations and Construction Cost Estirnaie Task 2.5.1 Project Reviews with City Staff Task 2.5.2 Arcbltectural Task 2.5.3 Site Design Task 2.5.4 Structura1 Task 2.5.5 Mechanical Task 2.5.6 Ek<:1rical and Instrumentation Task 2.S.7 Plans and SpectHcations Subminals Task 2.5.8 Construction Cost Estimate Task 3 -Design of ModllkatiollS 10 Seven Pump Stallons Task 3.1 Sorveying Task 3.1.1 Pedorm Field Survey Task 3.1.2 Develop Scale Backgrounds For Drawings _UlftCII ................... WJ1 _. -.i"· Task 3.2 Plans. Speclf",.tions, ,no Construction Cost Estimates Task 3.2.1 Project Reviews WIll> City Stair Task 3.2,2 Archittctur.t! Task 3.23 Site Design Task 3.2,4 S !n:ctunl Task J.2.5 Mechanical Task 3.2.6 Electrical and instrumentation Task 3.2.7 Plans and SpeciflCauons TasIc 3.2.8 Construction Cost Estimate TASK 4 -Design of Pipeline Rehabililalion fmprovements Task 4.1 Geol2dmical Task 4. LI Sobsurface Exp1on!!ion TasIc 4.1.2 Laboratory T .. ,ting TasIc 4.1.3 Engineering Analysis Task 4.1.4 Rep"'t Preparation TasIc 4.1.5 Consultation Task 4.2 Surveying Task 4.1.1 Pe:form F",ld S"""'Y TasIc 4.2.2 Develop Sc.1IIe Backgrounds For Drawings TasIc 4.2.3 Locale Utility Lines T..x 4.3 PreIimiJwy Design of Pipeline Rehabilitation TasIc 43.1 Meeting with City Staff TasIc 43.2 Review TV Tapes TasIc 43.3 Evaluate Hydtaulic Requirements Task 4.3.4 Identify PotentW Permit Requirements Task 4.3.5 Evaluate Rehabilitation Methods Task 4.3.6 Draft 10 Percent Design Report Task 4.3.7 Final 10 Pen:ent Design Report Task 4,4 Plans, SpecifICations and Construction Cost Estimate Task 4.4.1 Meetings with City Surf TasIc 4.4.2 Utilities TLik 4.43 PennilS Task 4.4.4 Plans and Speclr",ations SubmilUls Task 4.45 Construction Cost Estimate Tast 5 -Flood luandalloD Map TasIc 5.1 Surveying Task 5.2 Prepare Map Task S.2.1 Re'Yiew EJisting Drawings Task S.2.2 Prepare Calcolations Task 5.2.3 PreP"'" Map Overlay Task S.2.4 u,tter Repnrt Task 5.2.5 ConsulLation to Office of Emergency Services EXHIBIT A .. ~ '-~/ SECTION ll: ADDITIONAL SERVICES Task 6 -ServiCES During Construcdon Task 7 -Detention Basin T ..... 8 -Airport Pump Station and Outfall Pipefine Task 8.1 Geotechnical Task 8.2 Surveying Task , -5eYeD Pump StaIkms Task 9.1.1 Pre..,nt to Azcbitectura1 Review Board Task 9.2 Pump Testing Task 9.2.1 Head YS. Aaw Test Task 9.2.2 Remove Pumps and Inspec, Task 9.3 Structur1!l Task 10 -Pipeline Rehaldlltation Improvemeats Task 10.1 Additional Soil Tests and Borin" .. Task 10.2 Surveying Task 11 -Pennlt AssIstana! Task ILl Application for Corps of Engineers 404 Pennit. Section 10 Permit Task 11.2 Sped"s RepliClitioo Plan for Vegetation and Wildlife Task J 1.3 Weiland Compensation Plan for Lost Weiland Task U -Operations and Maintenance Manu.al and Startup Task 12.1 Preparation of Operation and Maintenance Manuals for selected pump stations Task 12.2 Assistance and Training during start-up period for selected pump stations MIQ"e4tcL,. ·H ....... 4NlXRA.WP5 -- · ..::,.--" EXHIBIT A SECTION I: BASIC SERVICES IJ1tnx1uction The scope of work under-this agree-men, includes the follo\l,'ing tasks: l} carry out a feasibility study of fP.e. options for the replacement of the storm water pUr!! p station and outfall at the Palo Alto Airpon and an assessmen[ of improvements needed at ,.he orner seven stonnwater pump stations serving tile City • 2) provide design .services for a replacement 'IOrrowatec pump Slation and aurian pipelin;! at the Palo Alto Airport. 3) provide des!gn 3ervices for mooiHcations to seven (7) other !tOrnlwater pl.lmp stations. 4} provide design services for rehabilitation of 18 stormwafer oollectio. pipeline.! in tile City. 5) prepare a 1100d inundation map for L~e area below the existing Foolhills Park Dam, and 6) provide construction admi!1istration services during construction of facilities designed under lltis contract. Brow. and Caldwell shall perform the following serviIXS: Task 0 .., Project Maaagemeot Task 0.1 Daily Managem.nt Brown and Caldwen sball c .. duct reviews wiL~ senior level engineers; maintain crilical path scbedules; correspond witb City; 'UpeM .. project SI.IIff. Task 0.2 SubronsullBnt Coordination Brown and Caldwell shaIl procure. supervise. and coordinate me actiYities of subcODtradors prOviding geOieChnicaI~ surveying, and environmental services. Task I -Feasibility Study and Needs Assessment The basis for • feasibility swdy ioClude several conditions stated by the City in its request for proposals. These 'lated conditions include Ibe following: (l) The existing SIOrmwater pump staticn and oDlfall pipeline have a bydraulic capacity of 30 c(s. (2) the peak rate of stormwatcr runoff into tile pump station is 90 cfs. and (3) Ibe physical condition of the existing 30-inch corrugated steel outfl!ll pipeline is poor. Also stated are several concepts tbat are 10 be considered as alternative designs of a new Airpon Pump Station with adequate capacity to seIVe its mbutary drainage basin. These coneep'" are to (1) replace tbe existing pump SlaUon and _ ...... .., _ .... 2 outfall pipeline with a new pump station and a new pipeline that have a capacity of 90 cfs. (2) construct a detention basin in conjunction wilh a new p'Jmp s~tion in order to reduce the req\:ired pump capacity. The City has stated! that the existing location of the pump station represenLs 4. maintenance difficu1~y due (0 limited access. Therefore. they have requested that alternative locations be considered as part of the feasibility Sl\Jdy. Brown and Caldwell shall identify alternative locations agreeable to the staff of the Palo Allo Airpon and the City's Public Works Department which. if chosen 10 consUUCt a new pump statiOI"l~ would eliminate the maintenance difficulty. The City bas stated that the Palo Ailo MUnicipal Golf COUTS< should be considered in this feasibility study t.S a potentiallocalion for i stormwater detention basin. The golf course ddviDg range is one potential location that is con"enienlly close to Embarcadero Road and the Embarcadero Road stormwater pipeline and is also devoid of existing vegetation. The area of the sand-covered driving range represents the mest adaptabltlocat.ioD lO use as a detention basin during peak storm runolf periods. Generally, the Golf Course is flat and other ""'as may aIso be considered for a detention basin. 1be C'tber seven pump statioriS will be e'\laJuated for lIK.TeaSed reliabiliry. efficiency. safety, and improved oppeararu:e. These stations include: Matadero, Adobe, Colorado, Universi,y Avenue, Emban:adero Road, California A venue Bicycle/Pedestrian Undeq>ass, and m. Task 1.1 Golf Course/Delenlion Basin Feasibility Task 1.1.1 Consultation with Golf Course Staff BlOW!! and Caldwell shall consult with the golf course staff and their !!laS"" plan coDSUltant lO ~valua1e the pos.sibility of collSU'llcting a stormwatu ~teDtlOIl basin on the golf course. The evaluation shall include the identificatioD of potential sites for the <!elention basin. Task 1.1.2 Meeting with City Staff Brown and Caldwell man conduct one fonnal meeting with Public Works Departmen, and golf course staff. The purpose of this meeting will be '0 present the alternatives which would have an irnpacl on the golf course and to solicit data. information, and other input appropriate to evaluate the impacts of those alIerJWives. #'iSeclCC __ oGDJlA...,., -- .. ' - Task 1.1.3 Digital Topographic Mapping Brown and caIdweli shall employ a suoconuacror [0 compile a digital topographic map for the puq>ose of showing ground retief and surface features that affect the selection of Jocation for a slonnwater detention basin. Scale of map shall be one­ im:h equaL'i 200 feet. and contour intervals shall be two feet The map shall ~ compiled from existing aerial phOlOgraphy dated May 28. 1993 using ground conlrol provided by the City. Digital data will be delivered in Au,oCAD Release 12. TasIi: 1.1.4 Site Inspection Brown and Caldwell shall perform a site walk to investigate currenl sire conditions tt]at include such faclocs as surface evidence of substructures. physical obstructions, site access, overhead utilities. golf course operational facilities. lind 1nca1 environmental conditions.. TasIi: !.l.5 Review Etisting Drawings Brown and Caldwell sball obtain and review applicable record drawings available at !he Public Wodcs Dep.utmenl and !he golf COUI>e and request coples as necessary. City will provide copIes of all requested drawings. Brown and Caldwell sbaIl also contact the City U!ilities Departmen, and other private utility ccmpanies and request, "",eive. and review available utility record drawings. TasIi: 1.1.6 Sizing of SWnl1 water Detention Basin Brown and Caldwell sIlail calcolate the necessary volume of. stormwater basin with the capacity to au..nuate the pell stonnw!ter flow rate from 90 cfs 10 30 cf>. ""d develop I preliminary design 10 the level necessary 10 prepare a preliminary construction cost estimate. If such a decention basin is oot feasible dlle 10 limited space or other restrictions, Brown ar.d Caldwell sItaIl detennine the capacity of the largest feasible delenticn basrn. TasIi: 1.1.7 Preliminary Construction COS! Estimote Brown and Caldwell shall estimate the costs oC consuuction of !be stoJmwater detention basin developed ahove. -''''IIQI •• t.......-..~..., _. ", j 3 Task 1.1,8 Analysis of Detention Basin Feasibility Brown and Caldwell shall perform an analys", of !he benefits .. ,d drawbacks of constnJcting a ~etention basin at the Palo AJlo Municipal Golf Course. Task 1.2 Relocation of AiqJon Pump Station >nd Ou<fall Pipeline Task 1.2.·1 Consultation wi!h Airpon Slaff Brown and Caldwell sh3.ll consult with airpon ~..atf and their deslg n COnsWt3.!lt to evaluate !be potential areas of for constructing !. replacement pump station and outfall pipeline wi!hin .he Palo Al.o AiqJort. Consullation shall include telephone discussic-p.5 a...'1d a li mit of one meeting at lhe site. Task 1.2.2 Meeting with C;.y and Airpon Brown and Caldwell slulll conduCI one fonnal meeting with the City and airpOrt staff. The J'1lIPGS" of this meeting will be 10 p,,,,,,,nl :he alterruuives foe the location of:he Alrpolt Pump Station and ou<fall and to solici, data. information, and other input appropriate to evaluare the impacts of the allemalives. Task 1.2.3 AeriAl PbolOgraplly Brown and caldwell slulll employ a suocontnlClot 10 condeel an aerial pbotography site re<:onnaissance fo< the purpose of showiog ground relief and surf""" features that affecl the selection of location for the Alrpolt Pump Station and SIOnDwa1er outfall pipeline. Scale of map sIuIIl be Olle-incb eqUllls 200 feet, and conteur intervals shan be two feeL The map sIuIIl be compiled from exi.<ting aerlal photographY dated May 28, 1993 osing ground control provided by the City. Digital data will be delivered in AutcCAD Release 12. Task 1.2.4 Sire Inspection Brown and Caldwell shall perform a site walk of potential pump station and outraU locations to investigate current site conditions that inc1ude su<:h factors as surface evidence of sut>structures. physical obstructions. locations of stonnwatc:r­ facilities, sire access, overhead utili ties, airpon operational facilities, and local environmental conditions.. 4 Task: 1.2.5 Review Existing Drawings Brown and Caldwell shall obtain and review applicable record drawings available at the Public Worlcs Department and the airp,," and request copies as necessary. City will provide oopies of requested drawings. Brown 31ld Caldwell shall also contact the City Utilities Department and other private utiJj~y com pani~ and request. rereive. and review availa b!e utility record ctra\\<ings. Task 1.2.6 Wetlands Delineation Brown and caldwell shan tmploy a subcontractor to canduci a weLIands deliJ1e:Ltioo of the unpaved land surrounding the sou.th and east lIeas of the Palo Alto AlIJ>ort. T:iis delineation will be f"" <he purpose of de!ermining the potential lor impact upon wetlands soils in as~ng alternative locations of a reptacernent pump station and outfall pipeline. Task !.2. 7 Development of Alternatives Brown and Caldwell shall investigate up to sU alternatives for the size and location of the Alrpon Pump Sation and outfall nrn;luding a deteDtioD basin. if t .... llle) in the feastllility sUldy. Task: 1.2.8 Preliminary Construction Cost Estimate Browu IIJId Caldwell shall estimate the COS" of ""nsauction for a1ternati= considered for the evaluation for • replacement swnnwa<er pump station and !>U!fall pipeline. Task: 1.2.9 Comparison of Alternatives Brown and Caldwell &hall evaluate the alternatives developed in Task 1.2.7 for the factors of cost,. eovirorunenml impact, and ease of implemeDtation. Task 1.3 Evaluation of Seven Pump Stations Task: 1.3.1 Consultation with Maintenance Stalf Brown and Caldwell shall meet ",ith maintenance staff to review operating procedures and w obtain information on problems experienced with existing eqnipment for eacb pump station . • £wCPC"!_~M'S ......... Task 1.3.2 Meeting With City Staff Brown and Caldwen shall conduct one fonnal meeting with the City staff to review the resullS of Lhe other subtasks within Task 1.3 and 10 develop recommendations ior the evaluation. Task 1.3.3 Review Existing Drawings and Records Brown and Caldweil shall ob[atn ana: review copies of record drawings of the existing pump statiOtu. Contact pump rni111ufacturer's representatives to request record pump CD.IVeS. Available pump curves. maintenance record.(j. and shop drawings of equipment will be reviewed. Task 1.3.4 Site Inspection Brown and CaldweU shall visit ~h pump ~tat..ion and witness operation of equipment, d possible. mvestigal.e for signs of distress. including vibration and cavitation. Identify items fm correction in the followillg areas: pumps, pump cootroIs., alarms. safety~ corrosion, painting. fencing, and standby power. Evaluation of pumps oo-site will be to de""" sucb signs of wear as ooi.se. heal, vibrati~ seal leakage. and irregular characteristics. Task 1.3.5 Review Pump Curves and System Hydraulics Brown an<! Caldwen sball develop a SYStem curve for each pump station based+ upon .... built construction drawings. Evaluate bydtaulic conditions based 00 '")'SIel!I curve 1I1!d pump perlormanc< curve obtained from the City or !he pump rnanuf.acOlrer. Task 1.3.6 Pump Currene Me ..... ement Brown and caId-weil shan measure running currenl loads on each of the existing pumps.. City win arrange for each pump to be ronning. Task 1.3.7 Infra·Red Video Survey Brown and Caldwell sball perfonn a video survey using infra-red media to scan the mow breakers, staners.. ('{lntto1 panels. and electrical junction boxes at the pumps. Task 1.3.8 Code Compliance Brown 3..Iid Caldwell sh.all examine pbysical conditions at each pump station and identify potential improvements required in order to (omply with Cl!l'renL. applicable oode standards. Applicable codes include NEe UBC. UPC. and Palo Alto building code. Task 1.3.9 Preliminary Con.~ction Cost Estimate Brown and Caldwell shall estim:ne the CosLo; of reCommended rnodu.'<'8-tions and impro,,-ements for the seven pumping stations. Task;,4 Draft Report Task 1.4.1 Develop Outline and Ropon Objectives Brown aM Caldwell shall prepare an outline for the feasibility and ne.:ds assessment report based tlpoD the results of the investigation conducted in S\lbta.s.b. of Task I. The report oolline will be submitted to the Cily for review and approyaL The report objectives shail include defining the requi....",ents fo; design in Tasks 2 and 3. Task 1.4.2 !':epare Draft Brown and Caldwell shan develop a draft report based upon the outline and objectives developed in Task 1.5.1. and approved by the City. Subntit five cop;.,. to the City for review. Task 1.4.3 Review Meeting Brown aod COIldweU shall oonduct a fonnOll meeting with the Publio Works Department, Golf Course. and Alrport Staff to review the draft report, and to receive and discuss their comments before preparing the fmal report. Task 1.5 FioOll Report Brown and Caldwell sh.all prepru-e and submit five copies of a final report to the City. ==.iE:IIWlI'Of''' "'i~~ - 7 8 Task 2 -Design of Airport Pomp Station and Outfall PIpeline The design of !he Airpolt Pump Stolion and outfall pipeline will be based upon !he alternative selected ~y !he City staff in Task 1. Brown and Caldwell shall develop a preliminary design based upon we selected allemative. ("onducc detailed environmental evaluations on this alternative. prepare material and attend meetings in )rder to obtain site a.'1d design approval for the project. and conduct imal design based upon the criteria of minimal cost, environmental. and implementation impacts. Task 2.1 Geotechnical Task 2.1.1 Subsurface Exploration Brown and Caldwell shaU employ a subcomrac[Or to conduct two (2) borings in !he area of <he new Airport Pump Station and flve (5) borings in !he area of !be new outfall pipeline. The subcontractor shall provide an engineer wbo will supervise, log, and """'pie from each of !be borings. Task 2.1.2 LaboralOf)' Testing J!rowIi and Caldwell shall employ a subcontractor to conduct in-place moisture content and unit weigbt tests of soil samples selected in Task 2.1.1. and other tests including Atterberg limits, sieve analysis, WlConfmed compression tests or direct shear tests as appropriate, and cOll$()lidation tests. Task 2.1.3 Engineering Analysis Brown and Caldwell shall employ a subcontract.oc (0 perfonn arullyses in order to prepare engineering recommel'ldalions for foundatioc design. pipe bedding. trench stability. lrench backfill, seruemenl and construction considerations. Task 2.1.4 Repon Preparation Brown and ~dweU shall employ a subcontractor to prepare a report based upon !be worll: perfonned in the geotechnical tasks 2.1.1 -2.1.3. Task :U..s Consultation Brown and Caldwell shall employ a subcontr.tctoc who shall be available for coosul1ation to Brown and Caldwell during the study and design of this project. o Task 2.2 Surveying Task 2.2.1 Perfonn Field Survey Brown and Caldwell shall employ 3. sul)conu-ac:or to conduct a field survey for the new location of the Airport Pump Station .,.,d outfall pipeline. Vp to two (2) crew-weeks will be used to obLain surveying data for this task. Task 2.2.2 Develop S<a1e Backgrounds For Drawings Brown and Caldwell shall employ a subcontractor to reduce field data and develop an AutoCAD fue background for scale dr.v.;ngs at one inch equals 40 feet. Up to (one drawings wil) be developed fur this task. Task 2.2.3 Locate UlCity Lines Brown and Caldwell sh!lll employ a subcontractor to Jocatc surface evidence of subsurface utility structures and lines witItin the alignment of the Airport Pump Station and outfall pipeline and within SO feet tn either direction from their alignrnenl Task 2.3 Environmenral 9 BoalIse of its locaIion in the sensitive Baylands area of Palo Alta. the Airport Pump SIaIioo improvements will be subject to extensive environmental rev'.ow. In a<XOrdance with the requiremenu of the Dlifornia Environmental Quality Act. the environmental docmnentatioa Iha1 may be appropriate for the project would either be • Neg.tive Declaration (Neg Dec) or an Environmental Impaa Report (EIR). To make thal determination. an initiill study shall be prepared by a subeonttactor to Brown and Caldwell in consultation with the City and responsible agencies. The major issues anticipated for the project are weaands and tidelands impa<:'" daring construction and polencia] habitat disturbance during construction. The Initial Study will use a checklist format to review potential crlvironmental impactS-. Narrative explanations will be provided for canclwions DO the signiflCallce of each impact area. When signmc8!11 impacts are identified. measures will be included. if possihle. to mitigate impacts 1<> • less than significant level. If the Initial Study idenli/i", signiJkan. issues that cannot he mitigated. an Environmental Impact Report (EIR) will be required. Work in conr.cction with an EIR will he considered extra work; • scope change will be provided '0 me City. 2:. :er -II II_at DEIDIA.'M·J - 10 Task 2.3.1 EnvironmenLal Site Analysis Conduct a prelimin.lI)' site analysis. Based upon the Endings, discussions related to L'le scoping of the environmental documentation will be initiated with the City of PaIo Alto and with the a:ppropriare regulatory agencies. It is expected that consultation 'I,li"ill be undertakea with the San Francisco District of the U. S. Army Corps of Engineers; with the California Regional Water Quality Control Board. San Ft1I1\cisco Bay Region; and the Bay Conservation and Development Commission. It is possible that additional consultation with the V. S. Fish and Wildlife Service. the California Department of Fish and Game, antj the CalifoI'J'<ia State Lands Commission may also be necessary. Task 2.3.2 Data Collection Col~t existing. (eadily available dam about lhe site amJ the proposed project Limited field biological a.naIysis will be perfumed to establish the presence of rate and endangered species of habital to support such species. Task 2.4 Site and Design Review 1be plltJlO<" of this task: is 10 assure L'ult design of a new pump Slalion at the airport compli .. wilb the process estrthlished by the City of Palo Alto for development in environrDentally sensitive areas. 1be process includes preparir:g for, atlending, participating, and responding TD commeats and questions arising from meetings with the Architectural Review Board, (A.R.B.l, PllInoing Commission, IUld the City Council. Brown and Caldwell will provide preliminaty site drawings, environmealAl assessmen~ and aerial photograph for • Palo Alto Site and Design Review. As pan of the Site and Design Review, Bro ... n and Caldwell shall meet subsequently wi!h the Architectural Review Board (A.R.B.l, the Planning Commission, and the City Council. Browo and Caldwell shall provide :he required number of copies of alI Site and Design Review subntitLals in 3CCorda.rtce with City Planning Division reqlJire~nts. Task 2.S P!ans. SpecifIcations and Construction Cost Estimate Plans and specif!C2luons for Task 2 shall be prepared as part of. combined set of dOCllmenlS for Tasks 2 and 3. Based co the information collected during the Tasks 2.1 through 2.4 and design input from Task I, the Feasibility and Assessment of Needs Study Brown and Caldwell shall formulate the ~rojecl design. Preliminary COnSL"llction plans and Brown and Caldwell specifICations will be prepared for review at the 10%, 65%, and 95% complete stages. Aerial photo-bAsed plan and proftle drawings of the pump station/outfall pipeline will be prepared at • scale of 1"=40'. Specifications shall be wrinen in conformance with the Construction ==,,.,101 .. ...4NXR .... W91 _. 11 Specification Institute formal for section numbering and organization. The specifications shaU consist of Bidding and Contract Requirements (Division 0), General Requirements {Division I). and Technical Specifications (Divisions 2-16). Brown and Caldwell shall prepare Technical sections of the specifications except for nivision 0 sections. which will be provided to Brown and Caldwell ~y the City. Five (5) St!ts of preliminary consU1lction documents will be provided for City review of eacb submitbl. Prepamtion of the construction 90cuments will include a quality assurance review by our departmental supervisors prior!O 10 % and 95% submlt:als. The delivernbles for Task 2.5 are: Five sets of prelimin"'Y construction documents at the 10%. 65%, iI1\d 95% complete stages. Task 2.5.1 Project Reviews with City Slalf Bro,..,. and Caldwell shalJ conduct romtal meetings with Clty staff at the 10. 65, and the 9S percent level of completion to present plans and specifications. COIIIlDeI!lS and questions shalJ be considered to prepare [mal worir; product. Task 2.5.2 Al1:hitectw:al Brown and Caldwell shalJ design an above ground building to enclose the npJacement Airp<>rt Pump Slalion. Building will enclose pumping equipment including meclw>icaJ and electrical. lighting. and ventilation. Building .. terior shall bave a rooforming appearance based upon tbe qaality of structures at the Regional Water Quality ConlrQI PlanL Task 2.5.3 Site Design Brown and CaldweD shalJ design the Alrport Pump Station &ite for paving. grading. and drainage. The bIliJding site s!tall be designed ID allow ease of access for maintenance. Brown and Cald ..... l1 ,!tall design the outfall pipeline to minimize the total coot of construction. Task 2.5.4 Structural Brown and Caldwell shall design the Airport Pump Station substructure as a sub grade structure. applicablt: for the airport site. The completed structure shall be designed for submergence in sha.llow groundwacer. The interior of the pumping station shall be dcsign~d as a wet pic type with an inlet trash rack. Task 2.S.5 Mechanical Brown and Caldwell shall design llle rep1acement Alrpon !\Imp Station to include· constant speed, vertical, l'On-clog pumps. They shaD be designed as enclosed units ",i:thin the: abovegroulld building. "!be building shall include ventilating equipment Task 2.5.6 EJe<: <rical and Inst,umentation Brown and Caldwell shaD design the replacement Airpon Pump Station to include an auromatic transfer switch. molor control center. and space for telemetry. Task 2.5.7 Plans and SpecifICations Subminals Brown and Caldwell sbaII prepare construction plans and spedflCalions foc Ibe replacement Airport Pumping Station and outfall pipeline based upon !be olber sublasks in Task 2.S. Snbmit plans end specifications for review by the City sWf at 10 percent, 6S. percen~ and 95 percent of completion. After receiving !be re"'.ow comments from !be City on rhe 95% documents, Brown and CaldweU sbaII irK:orpoI3le !be comments into a fInal contract document bid paci".age. The Q[;ginal drawings (vellum) and reproducible spectficatioru will be provided [0 !be City for reproduction a.'1d distribution to prospective bidders on the project. Cost eslimares shall be submitted at 10 percent and 95 percent.. Task 2.5.8 Con.struaion C06t 8tim.., 12 A preliminary (at Ibe 10% complete stage) and final (95%) corutruction cost estimate shall be prepared by Brown and Caldwell in accordance with the contracI drawings and specifications. Estimated cO!l5lruCtion costs for each bi d item will be projected to Ibe anticipated cOllSll'UCtion bidding period. Appropriate contingency, construction m!l!l8gemenr, and administration costs will be determined, wilh City assistance, 10 develop a reaIlstic overall project budgel Brown and CaldweU win use its proprietary BACP AC sySlem for rust estimating. The flll8! COS! .... e • ""~_<IUDI'''''''"", -, 13 estimate will be used to develop Ole proposal form. which will be included with specifications in the bid documer'lts. Task 3 -Design of Modifications to Seven Pump Stations The Design of the modificatio['l':; to the seven pump statIons; Matadero, AdiJbe, Colorado, University Avenue, Embarcadero Road. California Avenue BicycleJPet1estriar. UndeIpass. and ITI. shall be based upon the assessment of needs as outlined in the final report in Task 1 and the fillJl! &Cope of wadi: as approved by City. Task 3.1 Surveying Task 3.1.1 Perfonn Field Survey Brown and Caldwell s.hall employ a sLlbcontractor to conducl a fIeld survey for the existing sires of the Matadero, Adobe, and Colorado pump ,tation sires. up [0 one (1) crew-weeJ.c will be used to obtain s"JIVe:ring data. (or this wk. Task 3.1.2 Develop S<ale Ba.:kgro""ds For Drawings .8rown and CaldweO shall omploy a subcontrac'.nr l!! reduce r",ld data and deVelop "" AutoCAD me background for scale drawiogs at one incb equals 40 reel Up to three drawi.8S will be developed for this IaSlc. Task 3.2 Plans, SpecificatiO'1S aod Con'lruction Cost Estimates Plans and specifications for Task 3 shall be prepared as part of • combined set of documents for Tasks 2 and 3. Based O~ the infonnano. coUec",d during the Task 3.1 and design input from Task 1, the F<> •• asibilltJ Srudy ,md Assessment of Needs, Brown and CaldweD shaD fOImclate !he project design PreIlmUwy ccnslruCtion plans and speciflcations will be prepared for review at !he j 0%, 65% and 95% complete stages. Specifications shaD be written in confonnaru:e with !he Construction Specification I=..stitule fonnat for :section numbering and or,ganization. The specifications shall <onsist of Bidding and Conlral:t Requirements (Division 0), Genellll Requirements (Division I), and Te<hnical Specifications (Divisions 2-16). Brown and Caldwen shaD prepare technical sections of the speciIkations excep' (0£ Division 0 sections, whicb will be provided to Brown and Caldwell by the City. Five (5) sets of prelirrrlnary COnstructiOD documenu will be provided for City review at each ,. ::.as"' _4IlDH"_ --, • · ;:.... ... ,':: .. : .. 14 sublniaat Preparation of tbe construction documents wHl i~c1ude a quality assurance review by our departI:lenl .supen'isors pnoi 10 10% and 95% submioals. The deliveJ7JJles foc Task 3.2.1 are: Five sets oC preliminary con.'itruction documents at the 10%, 65%, and 95% complete stages. Task 3.2.1 Project Reviews wilt! City Staff Brown and CaldweU shall conduct formal meetings with City staff at the 10%, 65'%. and me 95% levels. The purpose of the meetings shall be to review the design It!1d [0 obtain review comments whicb shall be considered in completing the plans and specifications. Task 3.'.2 A:ehlleCturaI Brown ana Caldweil shan design minor a.rctlitectura! modifications to Adobe and Colorado Pump Stations .in order to improve their appearar.ce. Task 3.2.3 Site Design BroW'!] and Caldwell shall design minor sire access improvements. Task 3.24 Structural Brown and Caldwell shall design improvements to make structural repairs. ColoradO Pump Station requires structural repairs and minor repairs may be required for Adobe Pump Sea.jon a."d Matadero Pump Station. Task 3.2.5 Mech",";cal Brown and Caldwell shall design mechanical improvements including replacemenl plllIIping units foc all pump stations. Other mechanical improvements may include piping and ancillary equipmenL Task 3.2.6 Eleclrical and Instrumentation Brown and Caldwell shall design electrical improvemenLs including new panel.\;, pump con!mls, ttansfer switches, wiring, conduiL and outpul alann signals ready to be supplied to the City's lelemeuy consultanL $C., J •• "--'_-4N!lOU.'M'!l < Task 3.2.7 Plans and SpecifICations Brown and Caldweil shall prepare conslruction plans and spedfkatioru o[ the seven pump stations based upon the Olr.ef subtasks in Task 3.2. Submit plans and s~ific.ations for review by the City staff at 10%.65%. and 95% of completion. Af.U:,r receiving the review comments from the City on me 95% documents, Brown and Caldwell shall incorporate the comments into a fmal contract document bid package. The original drawings (vellum) :and reproducible specifications will be ilrovided [() the City for reproduction and dis[l'ibution to prospective bidders on the project. Task 3.2.& CoroSUllction COSl Estimate 15 A preliminary (at the 10% complete stage) and frnal 995%) construetioo cost estimate shall be prepared hy Brown and CaldweU in accordance with the contract drawings and specification..~ Estimated construction costs for each bid item will be projected 10 lbe aoticipated CO!lSlruction bidding period. Approp!i.ate contingency. collStruction managemer.t. and administratioD coots will be delellDiDed, wilb City assis!an<:e 10 develop. realistic overall projecl bud gel Brown and Caldwell will use its proprietary BACPAC system for COSI estimating. The final cost estimate will be use<! 10 develop the propos.1 form, whicb will be included wilh specifICations in the bid docoments. Task 4 -Design or Plpellne RebabilitatlOD Improyemenls Brown aod CaldweU shall conduct. pre-design (10 percenl design) 10 verify the melbO<! of rehabilitation tluu is mos. fe.sible for ea<:h of 18 pipeline segments. Following the j>re-<lesign, compiete the design based upon the fuuJ p",·design repon. The Cil)! h.s identified approximately 5,665 linear feel of storm drain pipeline at 18 individual locations in need of replacement or rehabilitation. as outlined on the attached table. Task 4.1 Geotec~.nical Brown and CaldweU .ball employ a subcontractor 10 perform. geotechnical inYe.!tigation for the segments of SIOml drain pipeline where excavation wiD be needed. The geotechnical subconsultanl will provide periodic consultations with the project design leam concerning shoring. dewatering. and backfilling requirements_ No hazardous marerial investigations 'IlIill be perfol1lled. STREET Uncoln Avenue Somerset Place Embarcadero Road University Avenue Newell Road ~~rsitv Avenue Waverley Street Lytton Avenue Lytton Avenue Guinda Street Oregon Avenue louis Road Higgins Place Maddux Drive Park BOlllevard ~erson Street Bryant Stre.t Barron Avenue TOTALS · .~. RECOMMENDED REHABILITATION PROGRAM FOR STORM DRAIN PIPELINES BASIN PIPE LENGTH PIPE DIAMETER (It) Unl NWB 217 12 NWB 231 12 --'--' NWB 660 24 NWB 427 12 - NWB 763 18 NWA 264 24 NWA 62 10 NWA 277 30 NWA 251 30 NWA 170 30 NWC 350 12 NWC I 364 12 _. NWC 115 12 NWC 45 12 SEA 266 12 SEB 388 12 SEB 435 12 SEC 380 12 6,66611 REHABILITATION METHOD replacement fBplacemont slipline replacement slip line slip!me replacement slipjine slipline slipline replacernent replacement (oplacement - inversion lin a roplacement replacement replacement replacement Attachment A: Recommended Rehabilitation Prollram PROJECTED COSTS ($) 26.500.00 28.200.00 99,7~~ 52.100.00 Q) 90.800.00 39,900.00 7.600.00 47,300.00 - 49.200.00 ~ ,', 33.300.00 42.700.00 '."" .', ' 44.400.00 14,000.00 I;) ,-:~,i 5.200.00 " ',:' 32,500.00 47.300.00 53.100.00 46,400.00 $760.200.00 --'.! i' Task 4.1.1 Subsurf"". Exploration BrowD and CaJdwelJ shall employ a subcontractor to conduct 20 borings along the alignments of the 18 pipelines idenLLfled for replacement or rehabilitation. The borings will extend 10 • depm of 10 feet Additional depth of borings, numl>er or borings. or traffic conuol will be additional service. The subconlractor shall provide an engineer who will supervise, log. and .sample from each o(!.he borings. Task 4.1.2 Laboratory Testing Brown and Caldwell shall employ a subcontractor [0 conduct in-place moisture confent and unit weight tests of soll samples selected in Task 4.1.1. and other tests inc1udin,g Atterberg limits. s.ieve anaiysis. unconfined compres.liion tests or direct shear teSLS as appropriate. and consoudatiotl tests. Task 4.1.3 Engineering Analysis Brown and Caldwell shall employ. su!x:<Jntraclor to perform analyses in order !o prepare englneering recommerulations for pipe bedding, trench stability, trench backfill, settlement and consuuction considerations. Task 4.1.4 Report Preparalion Brown and Caldwell shaD employ. subeontractor to prepare a report based upon !be work performed in the geo!eCbnical r.uks 4. J.l • 4.1.3. Task 4.1.5 Consnltadon Brown and Caldwell shall employ a subcontractor who shall be available for c<>nsultation to Brown and Caldwell during the study and desigo of !his projecL Task 4.2 Surveying Task 4.2.1 Perform FlOld Survey Brown and Caldwell shall employ a subconttactor to conduct a fteld swvey for the new alignment of 18 sections of storm drain as identified above. 16 Task· 4.2.2 Develop Scale Backgrounds For Drawings Brown and CaldweH shall employ a subcontractor to reduce field data and dev~jop Zll Aut;:lC::AD file background for scale drawings. Brown and CaldweU shall prepare plan a.."ld profile bao;,e sheets at I,inch equals 40 feet horizontal scale and " I-inch equals 4 feet venica! scale. The base sheets will he AutoCAD "Jawings. Plan views wiD be line drawn topography. Base sheets will be developed from ground survey. Su.1'Vey shall be based upon sire-specific hoo7.0o.tal coordillates and azimuth and upon a\lailnNe City bench marks fm' datum Area of survey shall include a 20-foot width of strip overlying the existing alignnLent of storm drain pipe and !he entire area of [he appropriate intersections. Task 4.2.3 Locate Utility lines Brown and Caldwell shall empLoy a subcontractor to loca.te surface evidence cf suhsurface utility structures and lines within the public right-of-way surtOl,lnding the alignment of the 11 pipelioes thai are to he replaced. Task 4.3 Preliminary Design of Pipeline Rehabiliwion Task 4.3.1 Meeting with Cily Starr BCOWli and Caldwell shall conduct a formal meeting with City staff at the 10 percent level of completion. The purpose of the meeting shall be to review the evaluation and to obtAin review comments which sbaIl he coilSidered in preparing the [mal plans and specifications. Task 4.3.2 Review TV Tapes Bro .... and Caldwen shail revi.", the TV inspection tapes of the interior of the lS pipeliDes identified by the City for rehabilitation. Brown and Caldwell shall also review the method of rehabilitation Of replacement recommended in the City·s swrm drain condition assessment report. Tatl: 4.3.3 Evaluate Hydraulic Requirements Brown and Caldwell shall review available infonnation on design Dows and determine: current and needed capacities of the stonn drain pipes . • Task 4.3.4 Identify Potential Permi1 Requu-ements Brown and Caldwell shall identify potential pennitting agencies that will be issuing permits for construt:tion. Tasl:. 4.3.5 Evaluate Rehabilitltion Methods. Brown and Caldwell shall identify potential rehabilitation methods (including replacement) And evaluale methods for exb. storm drain to be rehabLlita1ed. The evaluation shall consider pipe conditions. bydrauiic capat..;ty. C'o'l1munity disruption, permit requirements. environmental impacLo;;., and cost. The most ap.,roprlale rebabilitation m"tbod(s) will t.e identir.ed. Tasl: 4.3.6 Draft!O Pe=m Design Repllrt Brown and Caldwell sball prepare a draft 10 Percent Design Report thaI summarize.s t.'1e above evaluation of the existing: stOrm dra!n pipes acd me evaluation of potential rehabilitation me thods. The report will also include a preliminaty cost estimate. Stonn drains 10 be replaced will be wumed 10 be replaced in-place. Three copies of the drafl report .. ill be submitted 10 the City for review and comment Task 4.3.7 Fmal 10 Percent Design Report Brown and Caldwell shall address comments from the City t)!i the draft report and sball provide five coples of the final report 10 the City. Tasl:. 4.4 Plans, Spedlkations and ConstrJction Cost Estimare 18 Plans an~ specifications for Tasl:. 4 shall be prepared as a complete set of documents f,.. bidding. Ba.ed on the infonnation collected during the Tasks 4.1 tl>.rough 4.3, Brown and Caldwell shall foonuJate the project design. Preliminary construction plans and specifications will be prepared for review at the 10%,65%, and 95% complete stages. Ground survey b ... d pl4ll drawings of the pipeline will be prepared at a scale of I" =4(]'. Specifications sball be wriuen in confonnance with the Construction Specification Institute fonnat for section numbering and organiz.at.ion. The spe<:U1C3tiOns sball consist of Bidding and Contract RequiremeDlS (Division 0), Geneial RequiremenlS (Division I), and Technical SpecificaLions (D,visions 2-16), Brown and CaldweI1 shall prepare rechnical sections of the specifications extept for Division 0 sections, whieb will be provided to Brown and Caldwell by the CITY . . ' 19 Five (5) sets of prelirninaf)' constructiO'1 dociJrnen15 will be provided for CITY review or eacb sub;nittal Preparation of the construction documents will include a quality assurance review by our department superviscrs prior to each submittal. The deliverables for Task. 4.4 are: five sets of preHminaJ)' construction dacurnems a[ lhe 10'%. 65%, and 95% complete stages. Task 4.4.1 Meetings with City Staff Brown and Caldwell shan conduct fonnal meetings with City sUIff 31 the 65. and the 95 percent levels of completion. The purpose of the meetings shall be :0 review the design and to obtain review comments which shaD be considered in completing the plans and spectflCMions. Task 4.4.2 Utilities Brown and C81dwell shall COntaClthe City Utilities Departmenl and other private utility ccmpanies to obtain as-built drawings of e_tisting underground utilities. Existing utilities will be shown on the plan views of the drawings based on this infonn.tion. Up to tv." days of poL~oling (sofl-<lig) will be peJfonned to locate underground utilities. Potholes wiU be palched with temporary pavemenL Task 4.4.3 Pennits Brown and C81dwell shall assist the City in obtaining necessary penni .. for the constn>Ctionoftheproject. Task 4.4.4 Plans and Specifkations Submiuals Brown and C81dwell shall prepare construction plar.s and s!>Ccifica:ions for the rehabilitation of 18 pipelines Nsed upon the other subtasks in Task 4. Submit plans and specif:'OatiOI!3 far review by tile City staff at lO percent, 6S pe=~ and 9S """",nt of completion. After receiving the review comments from the Cl1Y on the 95% docnments, Brown and C81dwell sballlncO!pCl3le the comments into • fmal conll3l:l documenl bid package. The original drawings (veUum) and reprndDcibJe speciflC.1lions will be provided to the OTY for reproduction and distribution to prospective bidders on the projecL Task 4.4.5 Construction Cost E.mrnale Cost estim""', shal..I be submitted at 10 percent .. ,d 95 percent A preliminazy (at the 10% complete stage) and fmal (95%) con..<truction cost estimate ,hall be prepared by ....... 4 + ~4NIXK4-"," -, 20 Brown and C:lldwdJ in accordan~e with the contract drawings and specifications. Estimated construction costs for each bid item wUl be projected to tbe anticipated construction bidding period. Appropriale contingency. construction management. and administration costs will be determined. ""ilh CITY assistance, to develop a realistic overall project budget Brown and r:al~well will use its prop!iew-y BACPAC system for cost estimation. The fimJ cost estimate wm be used [!) develop the propo.s.al [ann, which will be included with specifications in the bid documen ts. Task 5 --Flood Inlmdation MRP The California Offi~ of Emergenc! Services has required that the City prepare a flood inundation map for the existing Foc-thills Park Dam. The purpose of the inundation map is to serve as an aid in the development of a.'l evacuation plan, to provide for \.he safety of persons in the area downstream of the dai'u in the event of a catastrophic failnre. The method for developing an inundation map is to follow criteria based upon l1'1e recordN failure of the Baldwin IIlli. Dam aftH an earthquake in southern California. T35k 5.1 Surveying Brown and Caldwell shall provide the services of •• uoc.mtrllctor for .urveyins to perfonn topogtllpbic survey up to one-half day. T35k 5.2 Prepare Map . Task 5_2.1 Review Existing Drawings Brown and Caldwell shall obtain, review. and use topographic information from foothill& Park Dam record drawing'!, U.S.O.S. Quadrangle maps. other maps provided by the City, and mapping doveloped by the surveying subcontractor .poetIcally foc the inundatioo map. T35k 5.2.2 Prepare CalcuJaCon., Brown and Caldwell shall develop. flood routing profile, flood flow hydrographs. and supporting calc;uWioDS based upon existing drawings, and the cri1eria specified by the Sw.. of Cilifomia OffICe of Emergency Services for theoretical failure of dams such as the Foothills Pari< Dam. " b Task 5.2.3 Prepare Map Overlay Brown and CaldweiJ shall prepare a il'lyJar overlay to the u.s.a.s Quadrangle map that repn-.sents the area of inundation from the theoretical failure c.f Foothills Park Dam. The overlay shall show the area Qf inundation in accordance with the State of California Office of Emergency Service.1Ii c:1teria. Task 5.2.4 Letter Repon Brown and Catdwell shall prepare a letter {maximum five pages) outlining the procedures and summarizing the results of the la..'ilcs taken w develop tire flood inundl!ti.on map. Task 5.2.5 Consultati(')n to Office of Er:u:rgency Services Brown and Caldwell shall submit [mal calculations. hydrographs. and inundation map 10 the State of CalifcnUa Office of Emergency Servkes foe their use. Brown and Caldwell will respond to questions or comments following their review and will modify the submittals. as needed, to receive Slate approval. EXHIBIT A . SECTION n: ADDmONAL SERVICES Task 6 -Servias Dwing Construction 21 The [oUowing wort in ay be executed upon the CITY' s deci.~ion (0 proceed with the construction of Ibe pump station and pipeli!le rehabilitation projects. The CITY may amend this Agreement or obtain another consultant £0 perfonn the war.£. The CITY reserves the rigbt to engage a different consultant for tbe construction administration services described below. As the project proceeds into the consuucuon phase. Brown and Caldwell wiU maintain its working partnership wilh City Staff by providing Construction Administration Serv~. as authorized by the City. ConstnJ<:tion Administration Services will provide support for !he City Project M311ager and lnspeclllr and are lisled below: Assist City sraff in answering teciuuca! questions during bidding and construction. Assist City sWf -with conducting the pre-bid and pre-construction mee!ings . • "CI:OI_I~""~WPJ -- 22 Provide construction staking.- Review contractor s.ubmittals an,;! 5hop drawings. Participate in weeldy project meetings at the projecl site with the City staff and the Contractor and prepa..""e and distriDute meeting notes. Conduct periodic site visits to observe the progre:.s and qU3.1ity of the work. Assist City staff with review and processing of consouction change orders.. Attend !he final wallHltrough of !he project with !he City staff and !he Contractor. Prepare record dniwing' using r""oro data supplied by !he Contractor or City staff. BroMl and Caldwell will provide full-tim. Reside", Engineering setVices, as aulhorized by the City. Other services including review and approval ot the contractor'. mODlhly payment reque-siS. and review and monitoring of the contractor's schedule L",d uf>date:s will be provided by Brown and Caldwell as authotiud by the City. Test 7 -DeIendon Basin If, as & IeSU.lt of !he feasibility study prepared in Task I, the City eJects 10 proceed with Ihe construction of a detention basin in conjunction with Ihe Airport Pump StAtion and Oulfall Pipe1lne, Bro..... and Caldwell shall provide design services as an additional service. The semces, including geotecluUcal, surveying, environmental assessment, am: preparation of consttuction p!.ans, specifications, and cost estimate, shall be perfonned in conjunctioo wilh parallel !.asks as outlined in Task 2. The futal scope of worl: and design costs sbail be negotiated and agreed to l>y the City and Brown and C,ldwell prior '0 proceeding with this task. Test 8 -AIrport Pump Statlon and OutraJI PipeD De Task 8.1 Geoltclmical Perform additional borings as may be required in order 10 compleme I'll the work ouUined in Task 2,1. ==.)£'1;" ·' __ ~WPl 23 Ta&k 8.2 Surveying Pert'onn additional surve-ying as may be required in order to compliment the work outlined in Task 2.2. Task 9 -Seven Pump Stado,," Task 9.1.1 Present to Architectural Review Beard Prepare drawings as necessary to present proposed modifications of the seven pump stations Ie the A .. ·chireclurai Review Board. Task 9.2 Pump Testing Tests may be peJformed to physically evalua'" e.isting pumping units. Ta&k 9.2.1 Head vs. Flow Test C<lru!uct running load and flow meosuremen, IeSIS simultaneously of operating plllDps and ma""'. Ta&k 9.2.2 Remove Pumps anrl Inspect Employ • subcoatr .. :tor to remove. disassemble. and inspect worlcing parts of pumps. Task 9.3 Structural CondtlCl seismic analyses of pump support plares. SlrUCturaJ Op.nL1gs Cor pumps, above grade stnlttllres. and engine base anchoring system. T .... 10 -PlpeIlM Rehabilitation Improvements Task 10.1 Additional Soil TeslS and Borings LabooWlry IeSIS may be appropriate to resl Cor pH. resistivity. chlorides, and sulfates. Perfonn additional soil bOrings and laboratory analyses. an., ... ~I .. ,_...,...~"'" ....... ' • 24 Task 10.2 Surveying Pedonn additional glound survo::y ir. addition to surveying perfonned iJo-1er Task 4.2. Task 11 -P ..... mlt Assistan<e CondL~ additional investigations and prepare appllcatirms as required (or necessary permits. Task 11.1 Applkation for C'.orps of Engineers 404 Permit. Section La Permi! Task L1.2 Species Replication Plan for Vegetation and Wildlife Task 11.3 Wetland Ccmpensatioo Plan for lost Wetland Task 1l -OpenldODS and M~ Manual and Slllrtup 11K L2.1 Preparation of Operation and Maintenance Manuals for seleclect pump stations Task L2.2 Assistance and T1'llining during start-up period for selected pump Stll!ioos EXHIBIT A SECTION ill: DUTIFS OF THE CITY For Task 1 Meeling with Brown and Caldwell to review aJlematives and select one for design development Provide copies of drawings of .,isling stornl draJn pipelines and pwnp stations. • Maintenan<e staff meet with Brown and Caldwell 10 inspect pump stations and 10 discuss maintenance problems . ...... ...,. '!_..r:lllDXA.~ --- ~ .-f.,i 25 Provide available records of contract servi.ce and equipment vendor expenditures and descriptions of equtpment servLcing :lnd modifh:ations at pump stations. Other records. as avaibble. .. Arran.ge for water in wetwell! of pump stations of sufficient quantity to operate each pump for a half~hcur. Arrange to have all electrical covers open or removed simultaneously when these pumps will be operating. For Task 2 Meeting with BroWll and Caldwell at 10, 65 and 95 percent of design. Prepare staff report for Site and Design Review. For Task 3 • Meeting with Brown and Caldwell at 10, 65, and 95 percent of design. • Meeting with Brown and Caldwell at lV, 65. and 95 pe=nt of design. For Task ~ Provide topographic drawIngs and reeord dra .. ings of dam. a _.. _ • .QIICltHA..., _. 26 EXJfiBIT A SEcrION Po'. WORK SCHEDULE CITY OF PALO ALTO S1URM DP.AIN P!J'MP STATION AND PIPELINE R.ElIABlLITATION PROJECT - Task Ilur.!lico (C31endar CaJeodar day> from days} Notice 1.0 Proceed. LO compIelioo Task J -Fea$J:"biHty SrudylNeeds Assessmet1~ Task 11 30 45 Tat 1.2 SO I 6' ! TasIr: 13 45 W Task 1.4 25 85 Task U 21 106 Tal; 2-IlesigJ> ADpon Pump SlalionlOutfaU Pi_ T":!.! I' 120 Test 2.2 21 121 Tast2..3 l! l21 Task :!.. 90 2n T,,* 2.S 120 337 Ts l-DWan' 7 Pump _ Td 3.1 14 !20 Task 3.2 100 220 Task 4-Design: Pipeline Rd>abilli3lioo Tad;. 4.1 30 90 Task 4.2 30 90 Task 4.3 60 ISO Tilt 4.4 110 260 T_ '-Flood _ Map Td.S.J 7 n Tal; 5.2 45 67 a~ i.!.~~i.!. a~:a:a;a !i'S!:B:;;,:; iii Ii !illill 1 ;ii i :i :2 Baa::.! iii! iili ",oCl~I~ as anlin iii l~ aal!~= "~i =!5! aai~·~5 -ii. le;! liIaaa~a. &; ~! sa aa5 ~i ~~,~. iiii ~~ le~ 1&~Uili 8iil .. a 5 ! ~ :: ! i i lili CI .i ! i;.~ ~aiai aaa a ell ! ;' ~~ ~=~aii I~~aaa I"~ aaaaa ~ali • ~:a;=ii Ii! ri,,;' ilil:l~;:! aaa!!!1 'i;'~ .~~ iii .. .. ' .ii ... alil~.3: a~~ _._ Ii; -:::::1 ~~ BRCl'M'< NlD CALll..at. -- SCHEDUI.E OF HOURI. Y BIWNG FV.TES EFFEcnll'E SEPTEMBER 26, 1992 TO SEPTEMBER 24, 1993 PAGE 1 Ol' 3 PERSONNEL ClASSIFICATION ENGINEERING EXEc:\I1MO • EXECUTIVE f EXEOJIWE ENGINEER CHIEF ENGINEER MANAGING ENGINEER SUP£RViSlNG ENGINEER PPiNClPALENGINEER SENIOR ENGINEER EHGINESl ASSOOIATE ENGiNEER ASSISTNIT ENGIJIEER ENGI!EEPING AIDE SUPElMSfNG CON>:lTRUCTlON ENGINEERlfNSPECTOR PI'INQI'AL COHSTRUCnON ENGINeER,IINSPECTOR SENIOR CONSlRUCTION ENGlNEERlfNSPECTOR INSPECTOR ItSSOCIA.TE INSPECTOR ASSISTNIT INSPECTOR INSPECTlON AIDE lECHNiCAL SENJOR ENGIIEEFING lECHNICIAN ENGNlERING TECHNICIAN JSSO::I .... lE ENGINEEANG lEctIN1CIAN ASSISTANT ENGINEEPlNG lEctIN1CIAN snfIDENTlIWNEE I S1lJOENTllWNEE I CHEF DRAFTER SUPER\llSING DRAFTER lEAD DRAFTER SENIOR CW\flER DIW'T1ER ASSISTANT 0RAf1EIi DRAFTER llWNEE IoIAHAGER, ~l1IER ORAFTlNG COMPI.IlER ORAFTlNG SUPERVISING OPERATOR COMP\11E!; 0IWl1NG lEAD OPERATOR COMPI.IlER 0IWl1NG SENIOR OPERATOR COMPIllER ORAFnNG Of'SIATOR COMPIllER DRAFllNG OPEAATOR TRAINEE COMPUlE!l 0IW'Tl1lKl Pl.01""lER OPEAATOR HOlJRI. Y BllLJ NG R>.TE 187.00 142.00 142..00 142.00 129.00 115.00 107.00 94,00 B1,00 70.00 59,00 -'9,00 115,00 107,00 94.00 81.00 70.00 59,00 49.00 B1.oo 70,00 59.00 49.00 40.00 33.00 94.00 81.00 70.00 59.00 411.00 40.00 33,00 107.00 81.00 70.00 59.00 49.00 CO,OO 33,00 ZC2 · ~ , "', ; ~. '., ~.~ iii BROWN ,iNO CALDI'oSJ. SCHEDUlE ~ HOOR\.Y BlWNG RAlCS EFl'EC'Tl'IE SEP'TEMBER 26, 1992 TO SEFTEMBER 24, 1993 PA(lE 20F 3 PERSONNEl CLASSIFICATION GRAPHIC DESIGNER suPERVlSlNCl I\.I.USTIV. TOIl LEAD IU.US'TRATOR SENIOR IUUSlRATOIl IlllJSTI!ATCR ASSISTANT ItWSTRATOIl CHiEF OES1ClNER ~DES~ PRlNClPAlIJESjGNER SENIOR OESiGNER DESIGNER ASSISrANT DESIGNER SI!NIOR FlED SERVICE TECHNICIAN "IEI.D saMCE TECHNlCIAN ASSOaATE FlED SERViCE TECHNICIAN ASSi'>TANT FEl.O SERlllCETECHI'nCIAN SCIENTIFIC aiEF SCEN11ST IoCANAGINGSCIENlIST SUPE!1IIISING SOEN11ST PFlNClPAlSCENTIST SENOR SCEN11ST SCIENTIST III SClENTISTi SClENTISTI ASSOCIATE SCIENTIST ASSISTANT SCIENTIST CHIEF GEOl,oHYOROGEOI.OGIST MANAGING ClEOlhffllROGEOI.OGIST SUPERVISING GEOL'HYDAOGEOlOGIST PRNClPAl GEOUHYtlROGEOlOGIST SENIOR GEOI.iHYOAOGEOtST GEOI.OGIST!HYDROGEOt.OC3I ASSOCIATE GEOUHYtlROGEOlOGIST ASSISTANT GEOUHYtlROGEOlOGIST ADMIN1S!PA111IE SENIOR PROJECT COOR)!NATOIl PROJECT OOORDINATOR n PRO.ECT COORDiNATOR I SENIOR PROJECT ASSISTANT PROJECT ASSISTANT HOlll'L y a/UJNG FlATE 81.00 81.00 70.00 69.00 4900 4O.OC 115.00 IIl7.oo 94.00 81.00 71l.00 SS.oo 59.00 49.00 40.00 33.00 142.00 129.00 115.00 107m 941lO .'.00 71l.oo 59.00 49.00 40,00 142.00 129.00 ~ 15.00 1 OHIO 94JIO 81.00 70.00 59.00 70.00 S9.OC 49DO 40.00 33.00 _: Hourtr' -.g noes "'" _......ny 10 roIIocI changos in acIUaI pay raas. ZC2 • . , " ! , \ , .: ~ BROWN ANI) CAl.DWEU. -" SCHEDULE OF HOUI'ILY 81WNG RATES EFFEC11VE SEPTEMBEl'II':8. 199210 SEl'TEMBER 24. 1993 PAQE3OF3 PERSONNEL CLASSlF~.noN SENOR TECHNlCAL \YRIlER TECHNICAL WInER ASSOCIATE TECHNICAL WRJTEP. ASSISi'ANT TECHNICAL 'NRI'tER MAfII<E1lNG MANAGER MAFII<IOTlNG m.>PORT MANAGER B~NESS DE\'El.OPMI;NT COOF.llINATOR EXECVTlVE SECRETARY D ElIECVT1'VE SECRETARY I SECRETARY. SECRETARY I SUPER'oIISOR. WORD PROCeSSING V«lR> FROCeSSOR IV WORD PROCESSOR III V«lR> PROCeSSOR ! V«lR> AAOCESSOR I ACCOUNTANT UI IoWW3ER. REO A.:X:OUN'TlNG ACCOUNTANT • SUI'ERIIISOR. ACCOUN11NG ACCOUNTANT I senOR ACCOUHT1NG Cl£AK SlFEJMSOR. UEIRAAY SERl/lces I.IIIRARIAN • UiIIWIN'lI ADMINSTl'IATM: MANAGER ADI/IiNISmAl1\OE S\Jf'£FMSOR SUPERVISOR. OFFrcE SERl/lCES 0FFlCEW0RI<ER. III 0FFlCEW0RI<ER. I 0FFlCEW0RI<ER. j Cl.EFl(III CI.EFI( • CI.EFI( I SUPERVISOR. S'MTCHBOARO '!ElB'HONE O'ERATOR RECEPTlONISTD RECEPTIONIST I HOUf<!. Y 61 WNG RATE 81.00 11).00 59.00 49.00 94.00 81.00 70.00 70.00 59.00 4 •. 00 40.00 59.00 59.00 4 • .00 40.00 33.00 70.00 70.00 ~..oo 59-00 4&.00 49.00 7!J.oo ...00 .0.00 81.00 70.00 70.00 .0.00 33.00 28JXI 40.00 33.00 28-00 49.00 <0.00 40.00 33.00 Direct Expenses shlll be billed as follows: Di=t Expenses are Iho.e c,,"1S in<"""d on or directly for the project including. but nOlIimiled to~ reasonable and necessary transpcrt.3.tion costs, including current rates for Brown and Cald .... ll· s vehicles; meals and lodging; laboratory Ie'" and analysis; compuler services; word processing services, telephone. printing. reproduction char~es; 1Il reasonable and necessary <(>SIS associated with outside consullants.. subconsultanlS and other outside .~rvices and facilities, snd o!her similar costs. Reim burremeot (0< Direct Expenses will be en the basis of aclllill charges when furnished by commercial "'=es and on the basis of cumot fa'" when furnished by Brown and Caldwen. A service charge of 10 percent will be added 10 Direct E.pe ...... ACell •• ... lAoROtk( niSUIWICf EIP.OKE1l;S SAl' F"R.NI{IstO. IKe 333 IWSH :;:r •• WI II 600 SNI f1U«<CISif}. CA 94104-2816 (U!l)J91-2600 ......." BRM JJII) CALDHEH P.O. so,; 804S ~Al"UT CREEl-, CA 94596 co ........... ~P"TtllJ.MiC)O.'Y'Il 07/"1.6/9J T.-IS C!IIT"IFICA TE 1$ ISSUED AS A "A mR OF"INF-ORMA TiON OH.I.. Y AND CONFEM NO RIGHTS lJf>ONil-lE \:'E~TIF1C"n HOlOE1'. 1'jo\iS CERT1FlCA.TE. DOES Nor AMENC, £XTEN!l -:)R AL.TEA TH!. COVER.AGIE AFFORDED B'I' TME __ ~QI,.I.9lg B.E19_w_" _____ "" COMPANIES AFFORDING COVERAGE T\iIS IS 10 ceRTIfY nv.,lll4E POlICIES Of 'NSU~E US\ED I!.ElO'N ~ .... ( £EEH ISSUED '1"0 THE '''$V .... EO w.MED ,I,SOIfE FC", r~E f>O\.\C'< !"'ER!OO ~TED. HCiTWiTkSTA~ ANY ~\jIUIREMEHr. TERJ:t OA COfOD<"1QN Of "''''Y CO"ljA~CT OF! OT~eF; I:XX.VMl:r>O Wmt RESPECT TO W~jC'" nus CER11FlCATf MAY !If ISSUED OR MAY PERTAIN. TIlE I"'SU~E ~OED BY nlE POUCIES DESCRIBED 1-1£'"£:'" jS SUBJ~CT TO ,l,Ll THE TER"'~L EXCUjSK)NS AIm CO/IIcmoNS OF SVCM POUCIE~_ uwrrs SHOWN MAY H.-liE BEEN ~DUCEC 9"1 P4JO CLAIWS _" •• u" ~GIElfE'W...L.iA8IUTY VQ 847 25 l;"'il~ CU\IM8.1oUoOE X~;I; 0WIrEJr.s .. co.mucT'Ol'f'5 P'DT. A""'OMOIM..e~ A I IM'lIoU":"O AU. 0'fI'Hf0 AL!TOS """"""" "'= .....,""'" ~""'" ........ -.rrv -~ """"'''--- vt) &47 25 1.3·01 ltOUC'f lFnCl'M ~ lI!:tf'iiUTlOIf .,An 11oIW.-oo.' 0'1 pan 1~U..,10('\'YYJo LIM'!'S 0.3/26/93 03/26/93 03/76/94 (l,ENEII'uIIJ. JIUi~G.4"T"E ~UCis.cOMPIOP ...oa PEASOtoIAt. .. lJ)~ I""LlFOI~ E-OoCI< OC;:;U~PE"K:E I'IPE ~E I.....,. _fl .. ,) _ .. .e~.~)1 c.~!iil:UGL1' 03/Z6/!M UMr; E--.cH oa:!.J~PE"ICE ""'G.iO.i ........ li. UXXl, 1,000. 1.000, 1,000, l"~, lIiJ 1.0Q0. ___ ~c;;""~,~_~:.:""""",,,~~~! ..... !:!,,~ ___________________________ . __ . __ WOMu.""' IXJIIJ'GIYTlQtI ...., ---"'""'" ~ 113 3!l 19-01 03!Z(/9) ------------------- SfUlJTO"'""",,15 E.I.CI< "'(;C..D~"'T ~S&>.SE-POllC.\' u ... :r ~~,,¥-f . .lC>' E ... '"l£'U 1 ,!roO. I,OCO, 1,000, Dt!~ Of DPPA11OIdo'L0CA~ rr... RE: S1~rrR SYSTEM 1!WR!l'JEM.[IiTS roo: P'UMPI«~ $TATI0ff5 JJIl) !l.(¥.MtUTATlCl« Qf PIPEHII.E.S. P«.0JEC1 flU. ft.OO.IHIltAl. t!tSlJlEa {RE: GIL' AUTO): ern Of "AU} AJ.."!"O. CIT'!' Of pAlO All:) AnI!; JOE TfRfSI Z~ IWHLTON AVEJWE, 1ST FLOOR PALO At TO I CA M301 CANCEU.A. TlOtt SHOULD J1.NI( OF TI"IE AeoVE OESGRllICO PO{..lC:E"S BE C.IIJ,,"CEl..LEtl Bf:F~1:: THE E)(PI~TIGN DATE THEREOf". ~r: ISSUING CO/oIPAAY WILL £ND(J1.VOR TO IrAAtl ~ O~YS WRITTf1><l NOTICE TO ~E CE:Ar~FIC:~TE HOLnE~ ,..A.MED TO THE LE"FT. 8VT F,t,ILUAf TO MAIL SUCH NOTICE SHALl IMPOSe: ~o 06LIGATI01oI ~ LIABILITY Of ANY KINO UF"OfIj THE COt.lPAHY. ITS AGE"NTS 01'1 R.EPf:tESEIliTAn .... ES. ~ . JAA!).!~ "'"*',, .".,," SAIl '''''ClSoo ,,'- 11'(: 'Y.J, {"'«;ott. ( 1 k- _____ ._.__ _ _____ ~~A~D.<;g.~~~.J.!!HJ :9 Certificate of Ins urance prc".,;s;onal Pradice IllS4Irance B~e~ 10 CaUfomia street Redwood City. CA ;.1063-1513 BRCWN .. CAUlWEll :uaO Buskirk Avanue Pleasant Hill. CA 94523 I, MATIEf.< OF INFORMATION ONLY AND CONHRS NO RiGl-nS UPON THE CERTIFICA.TE HO:'OER. TKIS C=-fHlf ICArE ~!;!; ;.:c i .<;.M~NO. EXTEND OR AL TE-'~ n~.E COVERAGE AFfORDED T..,r POUCJES LISTED enow Company A -Pi.ANElINSURANCE COMPANY lEeS) Company B- Cctmpany C- ~NCJI'jQ N("f~. 1EIW a. ~ OF loIN CO/o('RACJ 0It ~ 000 .. • •• EI"I1 ~ RUPECT T':) IMIO< TJ<I ~1'E ..... y lIE !$$..lED c... _ ... PERT""", lHE NIULl.I«::IE~ iJV1I-EPC1.JCE8 ~ ~>$:ru6JECTm "4L 1').If TeJ<1.l!", ~ ~ COH!ln'o(lto$Of' $JO+P«ICI£S • G!NI5R.A1. UABI..JlY I 1 Conm.. Gen. u.tlay Il~M8de 1 J """""'" ! 0Wnet5& ConCractota - ·1oUTC UA8ILITY 1) ..... -.- i j .... 0W08d .... [I~-- 11 Hhd .... rl~'" 11 __ --. COMl'EHSATIOOi NIO EMPlOYERS' UA8IUTY POUCy POUCy EFFEc-. DATE" E.XP1R. DATE LIMITS Coml:Ioned SIfI9Ie Ur'nt _'FI",""" BodIly IlPY ~ .acc:icIe'IC "_","'. " ... 't,. ... , -= '----"'--> ... : Ea<h """'--StaI~Umh: --~aUcyLiml ,....... .... E;r,- a1l3D1!I3 A;g~lRnLII DeSCription of Opeta1ionsllocalions/VehiclesIRe5tnctiDnsfSpecial rtems: • • • • • • • • • 11,GGG,AllCI Ali operaHons or (he named insured rndUt1ing Stormwaier System Improvemenls for Pumping Stations and Rehabilitation or Pipelines . • Written at aggregate fmils of liabrlity not less than the amount sl'lO'WTl. Certificate Holder. CITY OF PALO ALTO 250 Hamilton AvenlJe 151 FIOOf Palo AnD, CA 94303 Ann: Joe Teres; nE IoGGAE-GATE UICf 1$ 11-£ lOT .... ~ .... .<oLoO.SI.E j;Qfi ~ PfI£SENTB) ~ llE PCIlJGY FOR AU. OPOVoTlOHS 01' "DE 1I.ISIJ£lI. CANCEUATION! ~ /IH( OF 11£ ,oJI()VE CESCRIl'IEO PO.JC£5 I!E CAH:UL£D IIERlft£ "TlE £lO"RA11C#oI [i,O,l"E~. THE ~ COWPIUtY W1l1..1ML 10 0I'\'f"S \/III'WI~ NCmCE. "1"0 !)IE aJfTl!'1C'ol"E HOLOER PWIIttI TO TIoE l8'T. E);CEpf '" Jlo4E EVUfT OF CANCavo"T"U--I HlI'! ~",YWEJ.'T or: ~ IN~ CASE 10 CoI.'f'S NOTJt.::i: Wli &E ""'" y" " .(fu) ... If I'OU1 C<>mpJ;" Cl),'JQ.ali Cor11'8( bpla.., 7QiiJ~ Ka"ll ;111 w>I'rt(:t color, ItJ • fder.ufy ~~ _m CQMPUANCE RE:PORT l\Of1-0iSclimr,131ion Pro-.{i-siMS;:.t Palo Alto Contra.:ts Thls '~J'C>r'T rn~ll t>e t')r't1ople~«Il;., :-t,~ t.CIor>lrKn:.r .~ eac~ SlJtM:o~tt;)C'.or C~{'!i IIh 1':."" Ut1IUS (l1~wiH :r,!l'~td, u~ extra I~ts if ,""CI!s.'S<'''I, SUBMT ORlGIN,IIol 01" no_s fiE~ORT DIRE;::: rtY TO. Crty (>f "a~ A:-.o Publi<: Woru E"9'i"H""QoISlarl $e(:r.u.rv c;,..ic Cer>i'" . 61~ FIIge< Z$.OHa""Il"" AIl4"UII "51<.> A'to. CA 943() I f.oje..."t .It",,, ~ .. [j " ____________ _ 1. F..r. "t"'" IIN:1iddf.u PI 10m. Brown and CIIl.htdl 0' omer .-.;)Q!'TlnSllOn'l e(lllo~8d -:> J 4! () .tmU.1..r1l Avel;l'I! b".ttu.s '~. 1'~&"'oIIollt-:e...!l. CA ~UlJ-4H" :I. Name I':loC! .ud'~ 01' pr.nc:OIlt! offie"" or rI\I~r, -:> 3. Name-and ad<!rHS o~ pNIop~1 otflOeof~ -> ., 1IIII,."......c acMre.u of ~r.rot ""bert !:. e,r4ce Book.t ..... ~. l~BQ au..kirk " ... eflu. P:u&a::\t 1.:1. ...... CIt !J452l·n ..... UJ~ny ~ Ir. '"Moeled ... > lIiA .orpo.-li!!oo," !-. N~rr~ III1d '<id,e1.S OJj p",".e ~"II~IO< ICCrT..,~I .. 0""" It this i:I iI .sut>.;.()r1l<IIC'Of"',1 n!:F'"rt 6 S<liIrJ.1rur. ar"oCI tme 01 .!I<!tl>/;l~ ~her.lati~ 8'1': DATE: RACIAL MAKEUP OF REPORTING UNIT Name of Finn Bravo and Caldwell Submitted by _____ ~~~ __ ~ __ lZ! ( . O""'t'-u-s;±l~ __ Project Name S:YClM D46,U Yb .... s...,.. ..... tBM..Nf' I?tl'l'''uT/nKII)i Co""act , __ 'i ........ T .. ::r-'--'O::..Z-= __ _(Indicate only for monthly report, No.3) Three types of breakdown are required. This form is used for ~fI three. (Check) cq -,. Permanent makeup a ~ company. { J ·2· Estimated makeup tor this project. ( '-3-Monthlv fO!port for _____ 19_ Submit once per month for dur.ltion of project. 1 = Permanent. 2 = Estimate for pWject. 3 = MOnth!y onJy. Be sure to include II! employees in first column. not just minorities. Nos. j and 2 berow are required to be filled in and submitted with Comptiance Report. ~- Total aJI Asian American Spanish J08 ,-ATEGQRIES ~~ "mDlo .". ~.m 1<>-Slack Ameriqiln Inrli::\n ~)Jrna",ed 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 I 2 3 Mana.ement 6· 10 --c.L 4 --I Prnf~"<;n""ls~ S .. , l.ll 2 63 } 15 Cleric.I-OIfi~~ 132 122 7 5 --5 Field SU""rvisor - SkHl~ -ri:it ". Technicians 1091 21 9 12 -1 ) - b. ~.--- c. d. -~ --- Unskfll!i!Q -Ii::it , a. Servic.e w(;rkers 20 9 3 1 --• - b. ~--~ - c. d. TOTAL OF A80VE 888 297 2 8S 4 36 This report must be completed by contractor and each subcontractor. The term ·Spanish Surnamed" includes an persons of Mexican. Puerto Rican, Cuban, Latin American or Spanish or~gjn. Report or\ly emplo~es enroned in formal Ol1-the-job training programs. RIo .. 11"'2 -5- I I I . -.., SECl10N I EQUAL OPPORTUNlTY POLlCY Bra .... and CaIenren will administer jt5 personnel policies and conduct i!S employment prnctices in • manner whlcll treats ea<:h employee and appli.:ant for employment on the basi! of merit and experience, without rep"l Ie ra.:e. oolor. reliJion, sex, national origin. age. pbysical disabilities or veteral! JIatUS. REAFFIRMATION OF POLlCY The Equal OppoI1Ilnity Poilcy of Bra"" aud Caldwell iJ ~ upon our philosophy !bat people must be _ fairly and with dignily; and upon the belief that citizen. in a free society have the right 10 self~on without fear of discriJrlln;Won as 10 personal preference or cIlamcteristios which an> beyond their conl%Ol. Experience cootinue> 10 confirm our belief !bat it iJ good business 10 have personIlel policies and pradices with a strong oomwllmen! to equal oppottuDily . In the appIic:dioo of the Equal Opportunity Policy of I'lli" Company, eacit of us as 1JW1a&"" and supervi.ooo iJ IeSpoOllible 10 Jnsure !bat: RecruitmeDl and ~t for fNtry Je-.-e1 and job classification are conducted without tqanllo an Individual'. race, color, zdigioo, sex, rwional origin, age, pbysica1 disability or veIer.In .t.!us. Declsj...,. 011 promotions and transfers are in keeping wlth equal opportunity principleo and are ~ on qualificalions as these relaze to the requirements of the job for which !lie pencil iJ being considered. Per>oonel policies, practices and actions are applied fairly to all t'ttIployees . ..... flirm"t;.·., Action Plans of the company "'" implemented within our orgarUz.aIional units. Noo .. segrqaled facilities ale maintained, and appropriate physical facilities are provided for both male and female employees. Employees are provided information concerning !be company'. Equal Opportunity Policy, Affirmative Action Prognm and Fair Treatment Process. The Equal Opport>mity Policy of the C<Jmpany is monitored by conducting quarterly reviews to ddennine performance Ie the Affirmative Action Plan . ... / .---. Performance ......tuatioru of _= and supervison mrorporate the q uali!y of the equal opportunity envirooment and performance to the A ffirmarive Action Plan obligations as significant elements of ovenIl perfonnance. In addition, supervisors and other employees are held accountable for any cond~ towarrl their subordinales or co-worms that may be defined as sexual harassment, including sexual advances, ~uests for sexual favors, or 0Iber physical or ve:baI conduct of a harassing nature which is intimIDating and ~g. Any sucb proven misconduct may be ,,",use for immediale tennination from employmenL CIm:nce ~n, Rocruiting Manager, bas been designaled as the Company', EEO Coonfmator. He bas respoos;bility fur monitoring our overall program effectiveness; OOwever, program responsibility rests with line and !I3ff managers, wOO are involved in afflrnlalive actiOll through annual goal selling, == counseling, and active community involvement with orpnizations that support affirmative action programs. They un<fersIand their perfonr.ance in !IUs area iA evalual£d 00 the basis of efforts and Ie:IIllts, as wen as other fact<>rS. This policy sIaIemeftt iA ineluded io our Company', affirmati YO .roon program, whic.~ is ;ocated 01 3480 Bu3kirI< Avenue, Pleasant Hill, California. It is aIso available for inspection by employees or applicants upon ~uest, by COIIlaCting Clatenor Ro<Iwell at (510) 937-9010, between the hems of 9:00 a.m. and 4:00 p.m_ January 1, 1993 4t:;;:;l ~.Fisher ~ , Chairman of the Board and Chief Executive Officer