Storm Drain F!lmp Station and Pipeline Rehabilitatic"n PI-gject.. CIP
47702 -consultant Agreempnt
Members of the Council:
~t in Brief
This report recommends that Council approve and authorize the Mayor
to execute the attached (Attachment A) consultant agreement with
Brown and Caldwell in the amcunt of $483,7QS for design services
for the Storm Drain Pu.np Station and Pipeline Rehabilitation
project. Funds have been appropriated in CIP 47702. Collection
System Improvements.
Background
This consultant agreement will provide for three separate but
related services. Firet, the Capital Impro ..... ement Program included
funding in FY 1993-94 to retain a consultant: to design a project to
replace or repair damaged sections of the existing storm drain
system, as identified in the Storm Drainage condition Assessment
report. Second, funding i& also included for a consultant to
design storm drain pump station improvements. Thirdly, in 1992,
the £tate of California Office of Em~rgency Services requested that
the Cit.y prepare a. flood inundation map to identify areas that
would be flooded in the event of the failure of the Foothills Park
Dam. In order to expedite the implementation of these necessary
improvements, staff has consolidated these tasks into a single
consultunt agreement.
Discussipn of Consultant Selection
A Request for Proposals was issued to twelve e~1gineering firms that
appeared qualified to perform the required storm drain deaign work
and that had expressed interest in providing services to the City.
Four firms responded with proposals on June 29, 1993. A selection
advisory committee consisting of staff from the Engineering and
Operations Divisions of the ~~lic Works Department reviewed the
proposals and invited three firms to participate in an oral
interview on July 12~ 1993. Based on the quality of the written
proposals and the oral presentations, Brown and Caldwell was
selected by the committee because of the depth and quality of thei.r
experience on projects of a similar nature, the strength of their
proposed consultant team. and their well-defined approach to the
project design.
CMR,454 ,93 -1-
In July :1-993, the Finance Committee and the Policy and Services
Committee reviewed all consultant agreements to be awarded in FY
1393-94, in order to determine if they wanted to review staff's
consultant selection prior to Co~ncil award of an agreement. The
Storm Drain pump Station and Pipel ine-Rehabil i tation Proj ect
consultant agreement was not selected by either Committee for
review,
Discussion of Agreement:
The attached agreement with Brown and Caldwell is for the following
scope of work!
• Storm Drain Pump Station Rehabilitation
The consultant will identify options for the replacement of
the Airport Purep Station, which has inadequate pumping
capacity and is in poor operating condition. Issues to be
res':llved include the location. of the pump station and its
discharge point~ the possible use of a stormwater detention
basin on the Palo Alto Golf Course to reduce peak flows, and
coordination witb proposed paving and drainage improvements at
the Palo Alto Airpcrt+ The consultant will perform an
environmental assessment of the project and assist staff in
obtaining project approvals, including Site and Design Review
appr~val and regulatory agency permits.
The consultant will also visit and evaluate seV'"en other pv.:rtp
stations throughout the City and recorr.mend operational and
safet.y improvemen.ts. The evaluat.ion ,.,il1 include pumps,
structures, wiring~ instrumentation, lighting, security,
safety devices, and other related items.
The consultant will prepare a single construction documents
package (plans, specifications, and estimate) for the work at
all of the pump stations. The agreement also includes a
provision fer adding constn.lction administration and
i~spection services to the scope of work at a later date.
• Storm Drain Pipeline Rehabilitation
The consultant will prepare a second construction documents
package (plans, specifications, and estimate) for the repair
or replacement of 19 damaged storm drain pipeline segments as
identified in the Storm Drainage Condition Assessment report.
The consultant will review the existing video tapes of the
interior of the pipelines and recommend replacement or a
specific rehabilitation technique for ea~h segment based upon
the pipeline condition and the above-ground constraints
(traffic~ accessibility, hydraulic capacity, etc.).
• Foothills Park Dam Flood Inundation Map
The consultant will prepare a rr~p identifying areas that would
be flooded in the event of the failure of the Foothills Park
CMR,454,93 -2-
'.-;
' •...
, '.-
.@
"P
Dam. The map wi 11 be submitted to the State of California
Office of 2mergency Services for their revi€'!w and approval and
will be modified, as necessar/, to meet their req~irements.
EnyironIDf:Ilt' a1 Assessment
As part of the 1992-97 elP Program, staff indicated that
improvements to the storm d:tainag-e system might require further
e~vironmental assessment prier to implementation. A formal
evaluation of the environmental il:lpacts of the reconstruction of
the Airport Pump Station is included in the scope of this
agreement.
Recommendations
Staff recommends that Council:
1. Approve and aut.horize the Mayor to execute the attached
consultant agreement with Brown and Caldwell in the arr.OU:1t of
$483,70~ for design services for the Storm Drain Pump
Station/Pipeline Rehabilitation Project, CIP 47702.
2. Authorize the City Manager ~r he~ designee to negotiate and
execute amendments for services related to or incidental to
the scope of work: or services. the total value of which
amendments shall not exceed $70,000.
Respectfully submitted l
~~
GEORGE BAGDON
Assistant Director of Public Works
GLENN S. ROBERTS
Director of Public Works
~
City Manager
Attachment: Agreement
CMR:454:93 -3-
o
~'-.
A G ILJLB M B N T
VOR
P1Of'BSSIONAL ZIIGDlERRING CONSULTANT SE!!.VICES
BBIWlmlQ TBB CITY OF PALO ALTO AND BROWN AND
CALDWELL POR STORM DltAIN PUXP STATION AND
PIPELINE REHABILITATION PROJECT
TH!S AGRERMBNT is made and entered into this ___ day of
, 1993 1 by and. between the CITY OF P.~ ALTO, a
=='=i'"'c=-,'-"pa='l-c=o"rpo= ration of California, hereinafter referred to as
~CITY~· and BROWN AND CALDWELL (Taxp~yer Identificaticn No.
94-144i5346i ~ a California corporation, with offices at 3480 Buskirk
Avenue~ Pleaaa.TJ.t Hill, CA 94523~ hereinafter referred to as
• CONSULTANT· •
'If 1: T NBS SL_~~=
-'II'lHERF.AS~ CITY' desires certain professional consultant
services hereinafter described; and
WHZREAS, CITY desires tc engage CONSULTANT to provide
these services by reason of its qualifications and experience for
performing such services. and CONSULTANT has offered to provide the
required servicas on the terms and in the manner set forth heTein;
NOH~ THEREFORE, in consideration of their mutual
covenants~ the parties hereto agree as fellows:
SECTION 1 -DBFINJTIONS
1.1 l::llX
The term "City" shall mean the City of Palo Alto,
California.
1. • :2 CITY MANAGER.
The term "City Manager!! shall mean the duly appointed
City Manager of the City of Palo ~to, california, or his or her
deBi9nat~d repreB~ntative.
1.3 CITY CLRBK
The term aCi~y Clerk" shall mean the duly appointed City
Clerk of the City of Palo Alto, California, or his or her
designated representative.
1.4 RI$K MANAGER
The term ·Risk Manager" shall mean the duly appointed
Risk Manager of the City of Palo Alto, California, or his or her
deSignated representative.
1
""'-
C~·Shcn
RO'>'. lilly lS, 1993
· ",.'
-_-d __
1.5 PROJECT
The term ·Project· shall mean the senrices a.nd
improvements, if any, described in Exhibit nAIII entitled ~Scopc of
Pr.oject and Time Schedule, III &ttached hereto and made a part hereof
by this reference.
SECTION 2 -PRQJECT CooRDINATTON
2.1 CITY
The City Manager shall be representative of CITY for all
purposes under this Agreement. JOE TERESI is designated as the
Project. .Manager for the City Manager, and he or she shall superv-ise
the progress and execution of this Agreement. and shall be assisted
by MATT OOSTIGAS, the Project Engineer.
CONSULTAl.r:r shall assign a single Proje.ct Director to have
overall responsibility fer the progress a,1d execution of this
Agreement for CONSULTANT. ROBBRT GRACE hereby is designated as the
project. Director for CONSULTANT _ ROBERT OWENS shall be assigned as
Proj ect Coordinator for CONSULTANT and shall reprE"sent CONSULTANT
during the day-to-day work on t.he Proj ect. Should circumstances or
conditions subsequent to the execution of th:1.s Agreement require a
substitute Project Director or Project Cccrdinator for any reason
the Project Director or Proj ect Coordinator designee shall be
subject to the prior written approval of the Project Manager.
~Q!i 3 -SCOPE OF PRQJEC"'1"
The scope of the Project t.o be executed by CONSULTANT
under this Agreement, and the time schedule for the Project, are
describ.ed in Exhibi t • A' .
DUTIES OF CQNSULTANT
4.1 BASIC SERVICES
Unless otherwise indicated, CONSULTAJr."T shall perform each
task and accomplish each obj ective sununarized and more particularly
described in Exhibit -AI. CONSLlLTAN'I"' s Basic Services shall be
furnished as described in Bxhibit ·AR, Section I.
4.2 ADDITIONAL SERVICES
CONSULTANT shall perform or obtain any and all of the
following add:! tional se.ndces. not includ!E!d under the Basic
gervices~ if so authorized in writing by CITY, and shall be paid as
provided in Section 6 of this Agreement:
2
C~·Aon
Rev. July I.~, 1m
· -',
.",-;,..
, .'·-h -::~'.::'
4.:2.1 providing sE!l.-vices a.S an expert witness in
connection with any public hearing. arbitration proce~dj ng. or
proceeding of a courc of record_
4.2.2
f or CONSULTANT and its
the Basic Services.
Incurring t"Cav'el and sUbsistence expens~s
statf beyond those normally required under
4:.2.3 performing any other services that may be
agreed upon by the parties subsequent to the execution of this
Agreement_
4.2.4 Such other additional services as set
forth in Exhibit ~A·~ Section II.
4.3.1 CONSULTANT reprasents that it has the
expertise and professional qualificaticns to furnish the services
described under this J\gr€ement. CONSULTANT further declares tr.at
one or more members or employees of its firm ar.d that of its
subconsultants I if any~ are licensed by the State of California to
perform their services and that these services will be performed by
them or under their supervision. CONSULTANT shall furnish to CITY
for approval," prior to execution of this Agreement; a list of all
firms or corporations to be employed as subconsultants.
4.3.2 CONSULTANT states that it is aware of the
requirements of the federal Americans with Disabilities Act of
1990. and the Government Code and the Heal th and Safety Code of the
State of california, relating to access to public buildings and
accommodations for disabled persons~ and relating to facilities for
disabled persons. CONSULTANT s:C~ll comply with such provisions in
carrying out the terms of this Agreement. to the extent such
provisions are applicable.
4.3.3 CONSULTANT shall furnish CITY with every
reasonable cpportunity for CITY to a8ce~tain ~hat the services of
CONSU!.,TANT are being performed in accordance with the requi:rements
and intentions of this Agreement.
4 . 4 BIDS IN EXCESS OF FINAL ESTIMATE p.p COt'lSTRUC'IIQN
If the lowest responsible bid for the Storm Drain Pump
Station Rehabilitation or the Stor:m Drain pipeline rehabilitation
project received by CITY exceeds one hundred ten percent (110l} of
t.he amount: of the approved final detailed estimate of construction
cost (-fixed limit-l. CITY shall at its election (al give written
approval of an increase in such fixed limit, or (bl authorize
rebidding of the project within a reasonable time. or (c) cooperate
in revising the project scope and quality as required to reduce the
construc'Cior-.. cost~ In the case l):f (c). CONSULTAN'l' shall lTIOdify t.he:
drawings and specifications as necessary to bring the construction
3
c-Juno.,..,
Iln. July 1.5. 19'Jl
cost within the fixed lirrd.t. The providing of this sentice shall
be the limit of CONSULTANT' 5 responaibil i ty in this regard, and
having done so, CONSULTANT shall be t!ntitled to its fees in
accordance with Section 6 of this Agreement, provided. however, if
the lowest responsible bid exceeds 110\ of CONSULTANT's final
construction cost estimate. and CrTY wants to pursue option te);
CITY may hire an independent cost estimator t.o prepare a cost
estimate. If the i~dependent cost estimator's est.imate exceeds
110' of CONSULTANT's final construction co~t estimatei CONSuLTANT
shall pay for such independent cost estimate and revise the
cor.atract documents at its expense. If the independent cost
est.imator's estimate is less than Illyt of CONSULTANT's final
conStruction cost estimate, CITY shall pay for the independent cost
estimate and shall pay CONSULTAl-."T a reasonable sum to revise the
contract documents.
SECTION 5 -DUTIBS OF CITY
S.l CITY s~~ll provide full icfo~ation regarding its
requirements for the Project.
5.2 CITY shall examine documents submitted by CONSULTANT
and shall render decisions pertaining thereto promptly, to avoid
unreasonable delay in the progress of CONSULT~~'s work_
S.3 CITY shall fU~'ni8h all such information ii.ci are in
CITY's files or are at its disposal, as listed in Exhibit "A".
Section II1_
5.4
• A II I Section
CONSULTANT •
CITY shall furnish all services listed in Bxhibit
III~ providing sufficient no~ice is given by
5.5 The servic£sl information, surveys and reports
required by paragraphs 5.1 and 5.3 through 5.4 inClusive shall be
furnished at CITY's expense, and CONSULTANT shall be enlitled to
rely upon the accuracy thereof.
S.6 If CIT.!' observes or otherwise be-:omes aware of any
fault or defect in the project or nonconformance with the contract
documents, ClTY shall give prompt written notice thereof to
CONSULTANT •
5.7 CITY shall furnish informati~n required by CONSUL
TANT as expeditiously as possible.
SECTION 6 -PAYMENT
payment shall be made by CITY only for services rendered
and within thirty (30) days of submission in triplicate of monthly
progre8s payment requests. Bach invoice shall be itemized as to
the type of payment desc.l·ibed in this section.
~."""
R"",", July 1:5. 1993
6.1 ~SULTA!IT' Jl_FEES
In consideration fer the full performd.:1.ce of the &'sic
Services described in Section 4.1-of t.his Agreement:, Cl'l'Y agrees to
pay CONSULTANT a fee not to exceed four hundred three thousand
seven hundred five dollars ($ 403,705.00).
The amount of CONSULTANT's compensation shall be
calculated as set forth in Exhibit ~Bw, entitled WRate Schedule,n
attached hereto and p'.ade a part hereof by this reference" on a time
and materials basis, up to the maximu~ amount set forth in this
paragraph 6.1. CONSULTANT's Rate Sche~~le is attached to Exhibit
·B· and shall be updated and be etf~ctive as of Sept~ber 26 of
each year.
1;.1..1. Subconsultants. Fees for S\lb.consultants.
hired directly by CONSULTANT. shall be approved by CITY in advance
of incurring such fees.
6.1.2 For Addi t10nal Servic~. For CONSULTANT's
additional se.ndces, as described in Section 4 of tr,is Agreemant.
compensation shall be as set forth in Exhibit -B~ but shall not
exceed eighly thousand dollars ($ 80,000.00). The amount of
CONSULTANT's compensation for the additional services shall be
calculated as set fortb in Exhibit -B-, on a time and rr.aterials
basis l up to the ~aximum amount set forth in this paragraph 6.1.2.
6.1.3 for Extra Wor)c.......Q+ Changes. Payment. for
extra work or changes in the work not initiated by CONSULT~~ acd
authorized io writing by the Project Engineer shall be made within
thirty (30) days of submission by CONSULTANT of a statement in
triplicate ot itemized costs covering such work. Prior to
cammeficing such extra work or changes, CONSULTANT and CITY shall
agree apon an estimated not-to~exceed cost for such extra work. In
no event shall CONSULTANT be paid for design .,ork or change order
preparation which is neceesary because of COUSli'LTANT"s errors or
oversights.
6.2 PAYMENT SCHEDULE
6.2. ~ For Basic Services. Payments for the
Basic Services shall be made in progress payments in proportion to
services performed in accordance with Exhibit '8".
Final payment shall be made by CITY after CONSULTAl'IT has
submJtted all required products and reports and received approval
thereon from CITY~
6.2 . .2 For Additional Servic~+ payments for
additional services of CONSULTANT as defined in Section 4 shall be
made as part of the monthly progress payments for services
rendered.
5
C~·Sbo(l
(Uv, JIlIy 15, 1993
".<
6.:2.3 Payment Upon Suspension or Abandonment of
Project. If the I'roject is suspended for more than three (j)
months or abandoned in ... hole or in part. CONSULTANT shall bE paid
ies compensation for services perfor.med prior to receipt of written
notice from CITY of such suspension or abandonment, together with
additional expenses then due. If the Project is resumed after
being suspended for more than ninety (90) days, any change ir..
~~ULTANT's compensation shall be subject to renegctiation and. if
necessary, approval by the Palo Alto City Council (the IIICity
council-). If this Agreement is suspended or terminated for fault
of CONSULTANT, CITY ahall be obligated to compensate CONStJLTANT
only for that portion of CONSti"L7A.?IT' 8 services which are of benefit
to CITY, as such deteru~nation may be made by the City Manager in
the reasonable exercise of his or her discretion.
SECTION 7 -PRQGRESS ~~ COMPLETION
7.1. TERM __ OF AGR2~; '1'1$ IS OF T"rlE ESSENCE
The term of this Agreement shall corranence upon its
execution by CITY. Following the receipt of a Notice to Proceed,
CONSUL~ANT shall commence work on initial tasks in ac=ordance with
the time schedule set forth in Exhibit -Alii, Section IV. Work on
subsequent tasks shall proceed in accordance with the ti."ne
schedule. The parties hereto a·9ree that time is of the essence of
this Agreement. This Agreement shall terminate upon the completion
of all obligations required to be performed hereund~r by
CONSULTANT •
7.2 TIME OF COMPLETION OF EACH PHASE
CONSULTANT agrees to per:::oz."D'I the services within the time
Itmdts ~et forth in Exhibit -Alii provided, however r that any change
in the scope of services or other changes due to CITY's operating
requirements. or in connection with other contractors' or
consultants r operations, may require a revised time schedule.
CITY agrees to exerci~e
tasks to imp~ement CONSULTANT' 5
Exhibit ·A-~
due diligence in performing its
Lime schedule provided under
7.3 CITY'S Rgy'IRW AND APPROVAL
Between each phase of work there shall exist a review and
approval period by CITY. CITY shall exercise due diligence to
complete these tasks; however r it is recognized that the
interrelated exchange of information among CITY's various
departments makes it impossible to set a speCific time schedule.
Ncrmally, CITY'S estimated period ot review and approval will be
furnished to CONSULTAh~ at the time of submission of each product
of the work~
6
-.
7.4 EXTENSION OF TIME OF COMPLET~ __ QN
In the e?ent the services called for under this Aqreement
are not completed by CONSULTAl."IT within the time specified, CITY
shall have the option to extend the time of completioIL Th:i s
paragraph does not preclude the recovery of damages for delay of
either party. CONStTLTANT shall not be responsible for delay caused
by circumstances bE:yond its reasonable control, including (1)
strikes .. lockouts, work sluwdowns, or stoppages, or accidents, (2)
acts of God~ and (3) failure of CITY to furnish information within
a reasonable time. CONSULTANT shall not be 1 iable for damages
aris.ing out of an~zt such delay. ilor shall CONSULTANT be deemed to be
in default of this Agreement as a result thereof.
SECTION 8 -CHANGES IN WORK
CITY may order major changes in scope or character of
work~ either decreasing or increasing the amount of CONSULTANT's
servlces. In the event that such changes are ordered I CONSULTANT
s~ll be entitled to full compensation for all wo~k performed prior
to receipt of notice of change. Increased compensation for reajor
changes shall be dete~_ined in accordance with Section 6 of the
Agreement~ but in no event shall CITY be liable for payment unless
the amount of such extra compensation shall first have been agreed
to in writing by CITY.
I~ the event tr~t ~ajor changes are ordered pursuant to
this sect1on~ the schedule for-progress and completion under
Section 7 of this Agreement, a.nd compensa.tion under Section 6 of
this Agreement. shall be adjusted by negotiation between CONSULTANT
and CrTY. subject to approval if necessary by the City Council.
SECTION 9 -TlSRMlNATION OR sus ~S_IQN OF AGREEMBNT
9.1 CANCELLATION BY CQNS~~TANT
CONS~~TJUVT may ter.minate this Agreement or suspend work
on the Project by providing thirty (30) days' written Dot.ice
thereof to CITY, but only in the event of substantial failure of
performance by CITY or in the event CITY abandons or indefinitely
postponee the Project.
9.2 CANCELLATION BY CITY
Without limitation to such rights or remedies as CITY
shall otherwise have by law, CITY may terminate this Agreement or
suspend work on the Project with or without causer by providing
fifteen (15) days~ written notice thereof to CONSULTANT. or
immediately after submission to CITY by CONSULTANT of any completed
item of service specified in Section 4 of this Agreement.
CONSULTANT agrees to cease all work under this Agreement upon
receipt of such written notice.
7
COII:aIlIanI-SOOn
a.,..., July 15, J99J
9.3 COMPENSATION OF CONSULTANT IN TJi.~~_EVE_NT __ .oJ:
TEBMINATJ,PN OF THIS AGR EEMEh'T
In the ev~nt of termination of t~is Ag~eemeGt or
suspension of work on the Project by eithe~ CITY or CONSULTANT as
provided herein, CONSULTANT shall receive compensation as follows:
9.3.1 For approved items of service under
Se~tion 4 of this Agreement, compensation shall be in the amount
outlined under section 6 of thie Agreement for the items of service
fully performed by CONSULTANT.
9.3.2 For items of service on which a Notice to
Proceed has beeD issued by CITY, but \oJhich have not been fully
completed and approved, CONSULTANT shall be compensated for the
service in an amount which bears the same ratio to the total fee
otherwise payable for the performance of the service as the service
actually rendered bears to the total serv~ce necessary for the full
perfo~ce of thg item of service.
9.3.3 In no event shall the total compensation
paid in th,e immediately pr-eceding paragraphs exceed the payment
specif~ed 10 Section 6 for the respective items of service to be
fUrnished by CONSULTANT.
9.3.4 Notwithstanding anything in the preceding
paragraphs, upon tennination for fault of CONSULTANT. CITY shall be
obligated to pay for only that portion of the service which can be
inco~rated in the Project.
9 • 4 DUTIES OF CITY AND CONSULTANT
Upon tennination of this Agreement or suspens ion of work
on the proj ect by either CITY or CONSULTANT as provided herein. all
duties of CITY and CONSULTANT, as set forth in Sections 4 and 5
herei~~; shall terminate.
SECTION 1Q -QQNSl~T~(S ACCOUNTING RECORD$
Records of the following expenses pertaining tc t:te
Project shall be kept by CONSULTANT in acccrdance with generally
recognized accounting prinCiples and shall be made available to
CITY at mutually convenient times during the term of this Agreement
and for three (3) years following the te~~nation of this
Agreement~
(a) Direct personnel expenses r including consultant
expenses. {See Section 6 of this Agreement.)
Cb) Expenses pertaining to Additional services. (See
Section 6 of this Agreement.}
9
...
SECTION 11 -O~ERSHIP OF DOCu~NTS
11.1 Q..WNiRSH!P OF QRIG1'NJUd OOCUMENTS
Subject to the provisions of Paragraph 11.2 below, the
original drawings, maps, plans~ designs, records of survey, work
data, spe~ifications, and any other documents prepared by
CONSULTANT in the performance of this Agreement, although instru
ments of professional service, are and shall be the property of
CITY whether the project for which they arE made is executed or
not.
11.2 ~~SFER TO CITY
Upon termination under Section 9 of this Agreement and
upon CITY's payment of the amount required to be paid under same
section. the originals and all drawings. calculations,
specifications and any similar documents shall become the property
of CITY, and CONSi.JLTANT shall transfer tbern to CITY~ upon request~
without additional compensation. CITY shall have t.he right to
utilize any completed or uncompleted drawings, estimates,
specifications, and any other docureents prepared hereunder by
CO~~LTLTANT. CITY agrees not to use or reuse the docum~nt9 for any
purpose other than the project and scope of work for which they
were prepared.
SECTION 12
INDBPSNDKNT OF CIT"!
INTEREST OF CONSULTANT; CONSlThTAITI
'In accepting this Agreement, CONSULTANT covenants that it
presently has no interest, and shall not acquire auy interest.
direct or indirect, financial or otherwise. which would conflict in
any manner or degree with the performance of the services here
under. CONSULTANT further covena.nts t.hd.t, in the perforn-mce of
this Agreement, no subcontractor or person having such an interest
shall be employed. CONSULTANT certifies that no one whQ has or
will bave any fiLancial interest under this Agreew.en= is an officer
or employee of CITY.
It is expressly agreed that in the perfonna.nce of the
professional services required under this Agreement CONSULTANT. and
any of its tfI..IDconsul tants or employees, shall at all times be
considered independent contractors and not agents or employees of
CITY.
SgCTIQ~3 -OUTSIDE CONSULTANTS
CONSULT.I\NT shall be responsible for employing all outside
consultants (SubCoDBultants} necessary to aid CONSULTANT in the
perfopnance of the services listed in Section 4 of this Agreement;
provided. however, that all such subconsultants shall receive prior
a.pproval of CITY in writing and shall remain acceptable to CITY
during the ter.m of this Agreement.
9
Cc...wau ~ Sbor.
Rn.luly IS, 199~
. .; ,~-.
SECTION 14 -IND&'I1NITY
CONSu~TANT agrees to protect. inde~~ify, defend and hold
ha.rmless CITY, its Council mei1\bers, officers. agents and emplo~'eeF.l
from any and all demands, claims, or liability of any nature r
including death or injury to any person, property damage or any
other loss, caused by or arising out of CONSULTANT's, its
officers', agents', subcontractors' or employees' neg}igent acts,
errors, or omissions, or willful misconduct, or conduct for which
the law may impose strict liability on CONSULTANT in the
performance of or failure to perform its obligationg under this
Agreement_
~QN 1.5 -IN£.il-EANCS
15.1 INSURANCe COVERAGE
CONSULTANT. at its Bole cost and expense, shall obtain
and rnaintain~ in full force ~~d effect throughout the entire term
of this Agreement. the insurance coverage described in Exhibit "C·
to Chis Agreement, attached hereto and made a part hereof by this
reference, insuring not only CONSULT.~ and its subcontractors, if
any~ but also, with the exception of workers' compensation,
employer's liability and professional liability insurance, naming
as addi~ional inBu~eds CITY~ its Council members. officers, agents
and employees~ and each of them, concerning this Agreement and the
Project~
All insurance coverage required hereunder shall be
provided through carrLers with a A.M. Best & Co. rating of A:X or
higher that are admdtted to de business in the State of California.
Any and all subcontractors of CONSULTANT under this Agreement shall
obtain and maintain, in full force and effect throughout the term
of this Agreement~ identica1 insurance coverage, with CITY named as
additional insured under such policiec as required above.
1.5 . 2 gymENcE OF l.NSURA.~CE
Certificates of such insurance. preferably on the forw~·
provided by CITY, shall be filed with CITY concurrently with the
execution of this Agreement. The certificates 9hall be subject to
the approval of the R.iak Manager and shall contain an endorsement.
stating that t.he insurance is primary coverage and will not be
cancelled or altered by the insurer except after filing with the
City Clerk thirty (30) days' prior written notice of such
cancellation or alteration, and that the City of Palo Alto is named
as an additional insu:;.-ed except in policies of workers'
compensation, employer's liability f and professional liability
insurance. CUrrent certificates of such insurance shall be kept on
file at all times during the term of this Agreement with the City
Clerk.
10
.' ,
"-,,",, .......
Rev, t.dy JS, 1m
, ?-"
.. ,:
15.3 NO MIMIT OF LIABILITY
The procuring of such required p:;licr or pol icies of insurance
shall not be construed to limit CONSULTANT's liabili t-y hereunder
nor to fulfill the in~.emnification provisicn and re.qui rements of
this Agree."'!leot under Section 14 hereof. Notwithstanding said
901icy or policies of insurance, CONTRACTOR sha:l be oblj~ated for
the full and total amount of any damage, injury, or loss caused by
the services performed under this Agreement; including after the
Agreement has ter.minat~d Dr expired.
SECTI~~ \6 -WORKERS' COMPENSATrON
CONSULT~~. by executing this Agreement; certifies that
it is aware of the provisions of the Labor Code of the State of
california which require every employer to be insured against:
liability for workers; compensation or to undertake self-insurEU~ce
in accordance with the prO"'l.~i8ions of that Code r and certifies that
it will comply with such prOVisions before conu!'.encing the
performance of the work under this Agreement.
SECTION 17 -CQRRECTION OF P-NX_mERRQRS. OMISSTONs, AN"D
lIMIlIGI!ITIES m CQNTRACT DOC!JME..1!I~
Any negligent or willful errors, omissions, or
ambiguitie~ in the contract do~~ent8 which are discov~red before
the Project is invited for bid shall be corrected by CONSULTANT
without cost to CIn. CONSULTANT services required to make changes
in construction resulting from negligent or willful errcrs,
omissions. or ambiguities in the contract. documents whicb are
discovered after the contract is awarded shall be performed by
CONSULTANT without cost to CITY only insofar as they result in
unnecessary or non-beneficial changes in construction. CONSULTA.'I'tt
services required to make changes in construction resulting from
ne-g;ligen.t or willful errors, omissions; or ambiguities in the
contract document.s which are discovered after the cor:tract is
awarded shall be performed by CONSULTANT and shall be paid for by
CITY only insofar as they add benefit to the con8t~~ction work.
SECTION 1$ -AUDITS
CONSU" ... TANT agrees to perrcd.t CITY to audit. at any
reasonable time during the term of this Agreement and for three (3)
years thereafter, CONSULTANT's records pertaining to matters
covered by t~l~ Agreement. CONSULTANT further agrees to maintain
such records for at least three (3) years after the termination of
thi S Agreemen t .
SECTION 19 -AGREEMENT BINDING
The terms, covenants, and conditions of this Agreement
shall apply to. and shall bind, the heirs. successors, executors,
aCminist:rators. assigns; and subcontractors r as t.he case may be, of
both parties.
c.:.n...u..1lIIi -SWn
Ilcv ~u1y 1.5, 199)
SECTION 20 . NONAS~~~ILITY
20.1 PERSONAl. $RRVrCES OF CONS'JLTANT
Both parties hereto recognize that this Agreement is for
the personal services of CO~SULT~"'t and cannot be transferred,
assigned or subcontracted by CONSULT~ without the prior ~ritten
consent of CITY.
20.2 SERVICES OF Sl,lJll;Q!§]llil1\!IT AND THEIR EMPLO>'EES
CONSULTANT shall be responsible for employing or engaging
all per-sons necessary to perform the services of CONSULTANT
nereunder. No subconsultant of CONSULTANT will be recognized by
CITY as such; rather, all subconsultants a~e deemed to be employees
of CONSULT~VT, and it agrees to be responsible for their
performance. CONSULTANT shall give its personal attention to the
fulfillment of the provisions of this Agreement by 'til of its
employees and sub·consultant9~ if any, and shall keep the work
\L~der its control. If any employee or subconsultant of CONSULTANT
fails or refuses to carry out t~e prOVisions of this Ag~eeT£nt or
appear;:; to be incompetent or to act in a disorderly or improper
I!' mner, he or she shall be discharged i.mmediately from the work
under this Agreement on demand of CITY.
SECTION 2~ • RELIANCE upoN PROFESSIONAL SKIL~
CONSULTANT
It is mutually understood and agreed by and between the
parties hereto that CONSULTANT is skilled in the profes9ional
calling necessary~to perform ~e work agreed to be done hereunder
and that CITY relies upon the skill ot CONSULTANT to do and perfonn
the work in the most skillful manner, and CONSULTANT agrees to thus
perform the -work.. The-acceptance of CONSUL'I'ANT's work by CITY does
not operate as a release of CONSULTANT from the obligation.
BB crr ON 22 • WAIVERS
The waiver by either party of any breach or violation of
any tern'll covenant, or condition of this Agreement or of any
provisions of any ordinance or law shall not be deemed to be a
waiver of any such term, covenant, ~ondition, ordinance~ or law or
of any subsequent hreach or violation of the same or of any other
tenn~ covenant~ condition, ordinance or law. The subsequent
acceptance by either party of any fee or other rnoney which may
become due hereunder shall not be deemed to be a waiver of any
preceding breach or violation by the other party of any term,
covenant, or condition of this Agreement or of any applicable law
or ordinance.
C<.l..ult.aal. StoClI'I
Reo.',;..Jy 15,199'3
sECTlo.r:L ... ~_l ____ =--____ N:Q......I_MPLIED WAIVER
No paymenr'r partial payment, acceptance, or partial
acceptCL~ce by CITY shall oparate as a waiver o~ the part of CITY of
any of its rights under this Agreement.
SECTION 24 "'~TILAND A'ITQRN£YS' FEES
The prevailing party in any action brought to enforce the
terms of this Agreement or arising oue of this .:lj.greement may
recover its reasonable costs and attorneys' fees expended {n
connection with such an action from the other party.
SECTION 25 NONPISCRIMlNA'T ION; PENAr,'!I'X
25.1 DUTY OF CONSP;~
No discrimination shall bt:" made in the employment of
persons under this Agreeulent because of the age, race, color,
national origin, ancestry, religion, disability, se~ual preference
or sex Df such person. If the value of this Agreement is, or ma}~
be. Hive Thousand Dollars {$S,aOO~ or more, CONSULTANT agrees to
meet all requirements ot the Palo ~to MUnicipal Code pertaining to
nondiscrimination in employment~ including completing tl"'.e
·Compliance Report--Nondiscrirnination Provisions of City of Palo
~to Contracts· on the form furnished by CITY, attached hereto as
Exhibit -DW and made a part hereof by this reference 4
CONSULTANT agrees that each agreement for services from
independent providers shall contain a provision substantially as
foJ.lows:
~Provider shall provide CONSULTANT with a
certificate stating that he (or she) is
curre~tly in compliance with all Federal and
State of California laws covering
nOndiscrimination in employment; that he lor
she) will pursue an alfirmative course of
action as required by the Affirmative Action
Guidelines of the City of Palo ~tOj and that
he (or she) will not discriminate in the
employment of any person under this contract
because of t_he age, race, color, national
origin, ancestry, religion, diSability, sexual
preference or sex of such person.w
25 .. 2 PENALTY FOR ... DISCRIMINATION
If CONSULTA..lfl' is found in violation of the
nondiscrimination provisions of the State of california Fair
Employment Practices Act or similar provisions of federal law or
execut.ive order in the performance of this Agreement. it shall
thereby be found in material breach of this Agreement... Thereupon,
c.~-SItoon
Rev. luJy is, 1993
CITY shall have the power tc cancel or suspend this Agreement, in
whole or in part, :Jr to deduct fl"oITI the amount payabl E> to
CONSt,''LTANT the sum of Twenty-Five Dollars ($,,::1 for ea.ch person for
each calendar day during which such persor. was discriminated
againf.:ll.:. as damages for said breach of contract.: or both. Only a
finding of the State of California Fair Employ:n~nt Practices
Commission or the equivalent federal agency or officer shall
constitute evidence of a violation of conCract under this secticn.
If CONSULTANT is found in violaticn of the
nondiscrimination provisions of this Agreement or the applicable
affir.mative action guidelines pertaining to this Agreement,
CONSULTANT shall be found in material oreach of this Agreement.
Thereupon, CITY shall have tf1.e power to caficel or suspend this
Agreement, in whole or in part, or to deduct from the amount
payable to CONSULTANT the sum of Two Hundred Fifty Dollars ($250)
for each calendar day during which CONSULTANT is found to have been
in such noncompliance as damages tor breach of contract, or both.
SBCTION 26 -ARBITRATION
Upon agreement of the parties any controversy or claim
ariSing out of or relating to this Agreement may be settled by
arbitration in accordance with the Rules of the American
Arbitration ABsociation~ and judgment upon the award rendered by
the Arbitrators may be entered in any court having jurisdiction
thereof.
SECTION 27 -NOTICES
All notices hereuI4der shall be given in writing and
mailed r postage prepaid, by certified mail, addressed as follows:
To CITY: Office of the City Clerk
Post Office Box 10250
Palo Alto. CA 94303
To CONSJLTANT: Attention of the Project Director
at the address of CONSULTANT recited above
SBCTION 2 B -ALL COVlSNANTS ARB CONDITIONS
All prOVisions of this Agreement are expressly made
conditions.
SID;1'IDN 29 AGe EEMRNT CONTAINS ALL, UNDERSTAND INGS ;
This document: represent.s the entire and integrated
agreement hetween CITY and CONSULTANT and supersedes all prior
negotiacions, representations, and agreements, either written or
oral.
14
-. ,
,::-l
__ .J--'
Caaaul ..... -Sbon
"'-..1":"1:5,1991
This document may be amended only by written instrument,
signed by both CITY and CONSULTAWf.
~~ -GOVERNING LAW
This Agreement shall be governed by the laws of the State
of CalifC"rnia.
IN WITNESS WHEREOF t the parties hereto have executed this
Agreement the day and year first above written.
A'l'Tl!ST,
City Clerk
APPROVED AS TO FORM,
Senior ABst. City Attorney
APPROVED,
City Manager
Director of Finance
Director of Public Works
Risk Manager
Attachments:
EXHIBIT irA·:
EXHIBIT • B· :
EXHIBIT "C·:
EXHIBIT "D":
CITY OF PAW ALTO
Mayor
SCOPE OF PROJECT & TL'!E SCHEDULE
RATE SCHEDU'"...E & PAYMENT SCliETJULE
INSURANCE
NONDISCRThUNA'l'ION COMPLIANCE FORM
15
EXHIBIT A
SCOPE OF PROJECT AND WORK SCHEDULE
Task 0 -Project Management
Task 0.) Daily Management
Task 0.2 Subconsultan[ Coordination
Task 1 •• Feasibility Study and Needs Assessment
Task 1.1 Golf CounelDetention Basin Feasibility
Task L I.l Consultation with Golf CoUtS< Staff
Task 1.!.2 Meeting with City Starr
Task 1.!.3 Digiral Topographic Mapping
Task 1.!.4 Site Inspection
Task 1.1.5 Re'Yiew Existing OI'3WO_'lgs
Task 1.1.6 Sizing of StOImwarer Detention Basin
Task 1.1.7 Preliminary CO!!S1r\JCtion Cost EsWnate
Task 1.1.8 Analysis of Detentioo Basin Feasibility
Task 1.2 Relocation of Airpon Pump Station and Outfall Pipeline
Task 1.2.1 Consultation with Airpon Staff
Task 1.2.2 Meeting with City and Airpon
Task 1.2.3 Aeri.aI PbolOpapby
Task 1.2.4 Site lnspectioo
Task 1.2.5 Review Existing Drawing.
Task 1.2.6 Wetlands Deltteation
Task 1.2.7 Development of Alternatives
Task 1.2.8 Preliminary Construction Cost Estimate
Task 1.2.9 Comparison of Alternative,
Task 1.3 Evaluation of Seven Pump Stations
Task 1.3.1 Consultation with Maintenance Stafr
Task 1.3.2 Meeting With City Staff
TasIr 1.3.3 Review Existing Drawings and Records
Task 1.3.4 Site Inspection
Task 1.3.5 Review Pump Curves and System Hydraulics
Task 1.3.6 Pump Current M04SOrement
Task 1.3.7 Infra·Red Video Survey
Task 1.3.8 Code Compliance
Task 1.3.9 Preliminary Construction Cost Estimate
_:JL.iI:CI' ,.!--..~"" ........
. ,','
TasI: 1.4 Draft Report
Task 1.4.1 Develop Outline and Report Objectiv,,",
Task 1.4.2 Prepare Draft
Task 1.4.3 Review Meetlng
Task 1.5 Final Report
Task 2 -Design of Airport Pump Stallo. and Outfall Pipeline
TasI: 2.1 Geotechnical
Task :2.1.1 Subl;urface Explcration
Task 2.1.2 Laboracory Te£ting
Task 2.!.3 Engineering Analysis
Task 2.1.4 Report Frepantion
Task 2.1.5 Consultation
Task 2.2 Sun-eying
Task 2.2.1 Perform Field Survey
Task 2.2.2 Develop Scale Backgrounds For Drawings
Task 2.2.3 Locate Utility Lines
Task 2.3 Environmental
Task 2.3.1 Environmental Site Analysis
Task 2.3.2 Da1a ColJection
Task 2.4 Site ami Design Review
Task 2.5 Plans. Speciflcations and Construction Cost Estirnaie
Task 2.5.1 Project Reviews with City Staff
Task 2.5.2 Arcbltectural
Task 2.5.3 Site Design
Task 2.5.4 Structura1
Task 2.5.5 Mechanical
Task 2.5.6 Ek<:1rical and Instrumentation
Task 2.S.7 Plans and SpectHcations Subminals
Task 2.5.8 Construction Cost Estimate
Task 3 -Design of ModllkatiollS 10 Seven Pump Stallons
Task 3.1 Sorveying
Task 3.1.1 Pedorm Field Survey
Task 3.1.2 Develop Scale Backgrounds For Drawings
_UlftCII ................... WJ1 _.
-.i"·
Task 3.2 Plans. Speclf",.tions, ,no Construction Cost Estimates
Task 3.2.1 Project Reviews WIll> City Stair
Task 3.2,2 Archittctur.t!
Task 3.23 Site Design
Task 3.2,4 S !n:ctunl
Task J.2.5 Mechanical
Task 3.2.6 Electrical and instrumentation
Task 3.2.7 Plans and SpeciflCauons
TasIc 3.2.8 Construction Cost Estimate
TASK 4 -Design of Pipeline Rehabililalion fmprovements
Task 4.1 Geol2dmical
Task 4. LI Sobsurface Exp1on!!ion
TasIc 4.1.2 Laboratory T .. ,ting
TasIc 4.1.3 Engineering Analysis
Task 4.1.4 Rep"'t Preparation
TasIc 4.1.5 Consultation
Task 4.2 Surveying
Task 4.1.1 Pe:form F",ld S"""'Y
TasIc 4.2.2 Develop Sc.1IIe Backgrounds For Drawings
TasIc 4.2.3 Locale Utility Lines
T..x 4.3 PreIimiJwy Design of Pipeline Rehabilitation
TasIc 43.1 Meeting with City Staff
TasIc 43.2 Review TV Tapes
TasIc 43.3 Evaluate Hydtaulic Requirements
Task 4.3.4 Identify PotentW Permit Requirements
Task 4.3.5 Evaluate Rehabilitation Methods
Task 4.3.6 Draft 10 Percent Design Report
Task 4.3.7 Final 10 Pen:ent Design Report
Task 4,4 Plans, SpecifICations and Construction Cost Estimate
Task 4.4.1 Meetings with City Surf
TasIc 4.4.2 Utilities
TLik 4.43 PennilS
Task 4.4.4 Plans and Speclr",ations SubmilUls
Task 4.45 Construction Cost Estimate
Tast 5 -Flood luandalloD Map
TasIc 5.1 Surveying
Task 5.2 Prepare Map
Task S.2.1 Re'Yiew EJisting Drawings
Task S.2.2 Prepare Calcolations
Task 5.2.3 PreP"'" Map Overlay
Task S.2.4 u,tter Repnrt
Task 5.2.5 ConsulLation to Office of Emergency Services
EXHIBIT A
.. ~
'-~/
SECTION ll: ADDITIONAL SERVICES
Task 6 -ServiCES During Construcdon
Task 7 -Detention Basin
T ..... 8 -Airport Pump Station and Outfall Pipefine
Task 8.1 Geotechnical
Task 8.2 Surveying
Task , -5eYeD Pump StaIkms
Task 9.1.1 Pre..,nt to Azcbitectura1 Review Board
Task 9.2 Pump Testing
Task 9.2.1 Head YS. Aaw Test
Task 9.2.2 Remove Pumps and Inspec,
Task 9.3 Structur1!l
Task 10 -Pipeline Rehaldlltation Improvemeats
Task 10.1 Additional Soil Tests and Borin" ..
Task 10.2 Surveying
Task 11 -Pennlt AssIstana!
Task ILl Application for Corps of Engineers 404 Pennit. Section 10 Permit
Task 11.2 Sped"s RepliClitioo Plan for Vegetation and Wildlife
Task J 1.3 Weiland Compensation Plan for Lost Weiland
Task U -Operations and Maintenance Manu.al and Startup
Task 12.1 Preparation of Operation and Maintenance Manuals for selected pump stations
Task 12.2 Assistance and Training during start-up period for selected pump stations
MIQ"e4tcL,. ·H ....... 4NlXRA.WP5 --
· ..::,.--"
EXHIBIT A
SECTION I: BASIC SERVICES
IJ1tnx1uction
The scope of work under-this agree-men, includes the follo\l,'ing tasks: l} carry out a feasibility
study of fP.e. options for the replacement of the storm water pUr!! p station and outfall at the Palo
Alto Airpon and an assessmen[ of improvements needed at ,.he orner seven stonnwater pump
stations serving tile City • 2) provide design .services for a replacement 'IOrrowatec pump Slation
and aurian pipelin;! at the Palo Alto Airport. 3) provide des!gn 3ervices for mooiHcations to seven
(7) other !tOrnlwater pl.lmp stations. 4} provide design services for rehabilitation of 18 stormwafer
oollectio. pipeline.! in tile City. 5) prepare a 1100d inundation map for L~e area below the existing
Foolhills Park Dam, and 6) provide construction admi!1istration services during construction of
facilities designed under lltis contract. Brow. and Caldwell shall perform the following serviIXS:
Task 0 .., Project Maaagemeot
Task 0.1 Daily Managem.nt
Brown and Caldwen sball c .. duct reviews wiL~ senior level engineers; maintain crilical path
scbedules; correspond witb City; 'UpeM .. project SI.IIff.
Task 0.2 SubronsullBnt Coordination
Brown and Caldwell shaIl procure. supervise. and coordinate me actiYities of subcODtradors
prOviding geOieChnicaI~ surveying, and environmental services.
Task I -Feasibility Study and Needs Assessment
The basis for • feasibility swdy ioClude several conditions stated by the City in its request for
proposals. These 'lated conditions include Ibe following: (l) The existing SIOrmwater pump
staticn and oDlfall pipeline have a bydraulic capacity of 30 c(s. (2) the peak rate of stormwatcr
runoff into tile pump station is 90 cfs. and (3) Ibe physical condition of the existing 30-inch
corrugated steel outfl!ll pipeline is poor. Also stated are several concepts tbat are 10 be
considered as alternative designs of a new Airpon Pump Station with adequate capacity to seIVe
its mbutary drainage basin. These coneep'" are to (1) replace tbe existing pump SlaUon and _ ...... .., _ ....
2
outfall pipeline with a new pump station and a new pipeline that have a capacity of 90 cfs. (2)
construct a detention basin in conjunction wilh a new p'Jmp s~tion in order to reduce the
req\:ired pump capacity.
The City has stated! that the existing location of the pump station represenLs 4. maintenance
difficu1~y due (0 limited access. Therefore. they have requested that alternative locations be
considered as part of the feasibility Sl\Jdy. Brown and Caldwell shall identify alternative
locations agreeable to the staff of the Palo Allo Airpon and the City's Public Works Department
which. if chosen 10 consUUCt a new pump statiOI"l~ would eliminate the maintenance difficulty.
The City bas stated that the Palo Ailo MUnicipal Golf COUTS< should be considered in this
feasibility study t.S a potentiallocalion for i stormwater detention basin. The golf course ddviDg
range is one potential location that is con"enienlly close to Embarcadero Road and the
Embarcadero Road stormwater pipeline and is also devoid of existing vegetation. The area of
the sand-covered driving range represents the mest adaptabltlocat.ioD lO use as a detention basin
during peak storm runolf periods. Generally, the Golf Course is flat and other ""'as may aIso be
considered for a detention basin.
1be C'tber seven pump statioriS will be e'\laJuated for lIK.TeaSed reliabiliry. efficiency. safety, and
improved oppeararu:e. These stations include: Matadero, Adobe, Colorado, Universi,y Avenue,
Emban:adero Road, California A venue Bicycle/Pedestrian Undeq>ass, and m.
Task 1.1 Golf Course/Delenlion Basin Feasibility
Task 1.1.1 Consultation with Golf Course Staff
BlOW!! and Caldwell shall consult with the golf course staff and their !!laS"" plan
coDSUltant lO ~valua1e the pos.sibility of collSU'llcting a stormwatu ~teDtlOIl basin
on the golf course. The evaluation shall include the identificatioD of potential sites
for the <!elention basin.
Task 1.1.2 Meeting with City Staff
Brown and Caldwell man conduct one fonnal meeting with Public Works
Departmen, and golf course staff. The purpose of this meeting will be '0 present
the alternatives which would have an irnpacl on the golf course and to solicit data.
information, and other input appropriate to evaluate the impacts of those
alIerJWives.
#'iSeclCC __ oGDJlA...,., --
.. ' -
Task 1.1.3 Digital Topographic Mapping
Brown and caIdweli shall employ a suoconuacror [0 compile a digital topographic
map for the puq>ose of showing ground retief and surface features that affect the
selection of Jocation for a slonnwater detention basin. Scale of map shall be one
im:h equaL'i 200 feet. and contour intervals shall be two feet The map shall ~
compiled from existing aerial phOlOgraphy dated May 28. 1993 using ground
conlrol provided by the City. Digital data will be delivered in Au,oCAD Release
12.
TasIi: 1.1.4 Site Inspection
Brown and Caldwell shall perform a site walk to investigate currenl sire conditions
tt]at include such faclocs as surface evidence of substructures. physical
obstructions, site access, overhead utilities. golf course operational facilities. lind
1nca1 environmental conditions..
TasIi: !.l.5 Review Etisting Drawings
Brown and Caldwell sball obtain and review applicable record drawings available
at !he Public Wodcs Dep.utmenl and !he golf COUI>e and request coples as
necessary. City will provide copIes of all requested drawings. Brown and
Caldwell sbaIl also contact the City U!ilities Departmen, and other private utility
ccmpanies and request, "",eive. and review available utility record drawings.
TasIi: 1.1.6 Sizing of SWnl1 water Detention Basin
Brown and Caldwell sIlail calcolate the necessary volume of. stormwater basin
with the capacity to au..nuate the pell stonnw!ter flow rate from 90 cfs 10 30 cf>.
""d develop I preliminary design 10 the level necessary 10 prepare a preliminary
construction cost estimate. If such a decention basin is oot feasible dlle 10 limited
space or other restrictions, Brown ar.d Caldwell sItaIl detennine the capacity of the
largest feasible delenticn basrn.
TasIi: 1.1.7 Preliminary Construction COS! Estimote
Brown and Caldwell shall estimate the costs oC consuuction of !be stoJmwater
detention basin developed ahove.
-''''IIQI •• t.......-..~..., _.
", j
3
Task 1.1,8 Analysis of Detention Basin Feasibility
Brown and Caldwell shall perform an analys", of !he benefits .. ,d drawbacks of
constnJcting a ~etention basin at the Palo AJlo Municipal Golf Course.
Task 1.2 Relocation of AiqJon Pump Station >nd Ou<fall Pipeline
Task 1.2.·1 Consultation wi!h Airpon Slaff
Brown and Caldwell sh3.ll consult with airpon ~..atf and their deslg n COnsWt3.!lt to
evaluate !be potential areas of for constructing !. replacement pump station and
outfall pipeline wi!hin .he Palo Al.o AiqJort. Consullation shall include telephone
discussic-p.5 a...'1d a li mit of one meeting at lhe site.
Task 1.2.2 Meeting with C;.y and Airpon
Brown and Caldwell slulll conduCI one fonnal meeting with the City and airpOrt
staff. The J'1lIPGS" of this meeting will be 10 p,,,,,,,nl :he alterruuives foe the
location of:he Alrpolt Pump Station and ou<fall and to solici, data. information,
and other input appropriate to evaluare the impacts of the allemalives.
Task 1.2.3 AeriAl PbolOgraplly
Brown and caldwell slulll employ a suocontnlClot 10 condeel an aerial
pbotography site re<:onnaissance fo< the purpose of showiog ground relief and
surf""" features that affecl the selection of location for the Alrpolt Pump Station
and SIOnDwa1er outfall pipeline. Scale of map sIuIIl be Olle-incb eqUllls 200 feet,
and conteur intervals shan be two feeL The map sIuIIl be compiled from exi.<ting
aerlal photographY dated May 28, 1993 osing ground control provided by the City.
Digital data will be delivered in AutcCAD Release 12.
Task 1.2.4 Sire Inspection
Brown and Caldwell shall perform a site walk of potential pump station and
outraU locations to investigate current site conditions that inc1ude su<:h factors as
surface evidence of sut>structures. physical obstructions. locations of stonnwatc:r
facilities, sire access, overhead utili ties, airpon operational facilities, and local
environmental conditions..
4
Task: 1.2.5 Review Existing Drawings
Brown and Caldwell shall obtain and review applicable record drawings available
at the Public Worlcs Department and the airp,," and request copies as necessary.
City will provide oopies of requested drawings. Brown 31ld Caldwell shall also
contact the City Utilities Department and other private utiJj~y com pani~ and
request. rereive. and review availa b!e utility record ctra\\<ings.
Task 1.2.6 Wetlands Delineation
Brown and caldwell shan tmploy a subcontractor to canduci a weLIands
deliJ1e:Ltioo of the unpaved land surrounding the sou.th and east lIeas of the Palo
Alto AlIJ>ort. T:iis delineation will be f"" <he purpose of de!ermining the potential
lor impact upon wetlands soils in as~ng alternative locations of a reptacernent
pump station and outfall pipeline.
Task !.2. 7 Development of Alternatives
Brown and Caldwell shall investigate up to sU alternatives for the size and
location of the Alrpon Pump Sation and outfall nrn;luding a deteDtioD basin. if
t .... llle) in the feastllility sUldy.
Task: 1.2.8 Preliminary Construction Cost Estimate
Browu IIJId Caldwell shall estimate the COS" of ""nsauction for a1ternati=
considered for the evaluation for • replacement swnnwa<er pump station and
!>U!fall pipeline.
Task: 1.2.9 Comparison of Alternatives
Brown and Caldwell &hall evaluate the alternatives developed in Task 1.2.7 for the
factors of cost,. eovirorunenml impact, and ease of implemeDtation.
Task 1.3 Evaluation of Seven Pump Stations
Task: 1.3.1 Consultation with Maintenance Stalf
Brown and Caldwell shall meet ",ith maintenance staff to review operating
procedures and w obtain information on problems experienced with existing
eqnipment for eacb pump station .
• £wCPC"!_~M'S .........
Task 1.3.2 Meeting With City Staff
Brown and Caldwen shall conduct one fonnal meeting with the City staff to
review the resullS of Lhe other subtasks within Task 1.3 and 10 develop
recommendations ior the evaluation.
Task 1.3.3 Review Existing Drawings and Records
Brown and Caldweil shall ob[atn ana: review copies of record drawings of the
existing pump statiOtu. Contact pump rni111ufacturer's representatives to request
record pump CD.IVeS. Available pump curves. maintenance record.(j. and shop
drawings of equipment will be reviewed.
Task 1.3.4 Site Inspection
Brown and CaldweU shall visit ~h pump ~tat..ion and witness operation of
equipment, d possible. mvestigal.e for signs of distress. including vibration and
cavitation. Identify items fm correction in the followillg areas: pumps, pump
cootroIs., alarms. safety~ corrosion, painting. fencing, and standby power.
Evaluation of pumps oo-site will be to de""" sucb signs of wear as ooi.se. heal,
vibrati~ seal leakage. and irregular characteristics.
Task 1.3.5 Review Pump Curves and System Hydraulics
Brown an<! Caldwen sball develop a SYStem curve for each pump station based+
upon .... built construction drawings. Evaluate bydtaulic conditions based 00
'")'SIel!I curve 1I1!d pump perlormanc< curve obtained from the City or !he pump
rnanuf.acOlrer.
Task 1.3.6 Pump Currene Me ..... ement
Brown and caId-weil shan measure running currenl loads on each of the existing
pumps.. City win arrange for each pump to be ronning.
Task 1.3.7 Infra·Red Video Survey
Brown and Caldwell sball perfonn a video survey using infra-red media to scan
the mow breakers, staners.. ('{lntto1 panels. and electrical junction boxes at the
pumps.
Task 1.3.8 Code Compliance
Brown 3..Iid Caldwell sh.all examine pbysical conditions at each pump station and
identify potential improvements required in order to (omply with Cl!l'renL.
applicable oode standards. Applicable codes include NEe UBC. UPC. and Palo
Alto building code.
Task 1.3.9 Preliminary Con.~ction Cost Estimate
Brown and Caldwell shall estim:ne the CosLo; of reCommended rnodu.'<'8-tions and
impro,,-ements for the seven pumping stations.
Task;,4 Draft Report
Task 1.4.1 Develop Outline and Ropon Objectives
Brown aM Caldwell shall prepare an outline for the feasibility and ne.:ds
assessment report based tlpoD the results of the investigation conducted in S\lbta.s.b.
of Task I. The report oolline will be submitted to the Cily for review and
approyaL The report objectives shail include defining the requi....",ents fo; design
in Tasks 2 and 3.
Task 1.4.2 !':epare Draft
Brown and Caldwell shan develop a draft report based upon the outline and
objectives developed in Task 1.5.1. and approved by the City. Subntit five cop;.,.
to the City for review.
Task 1.4.3 Review Meeting
Brown aod COIldweU shall oonduct a fonnOll meeting with the Publio Works
Department, Golf Course. and Alrport Staff to review the draft report, and to
receive and discuss their comments before preparing the fmal report.
Task 1.5 FioOll Report
Brown and Caldwell sh.all prepru-e and submit five copies of a final report to the
City.
==.iE:IIWlI'Of''' "'i~~ -
7
8
Task 2 -Design of Airport Pomp Station and Outfall PIpeline
The design of !he Airpolt Pump Stolion and outfall pipeline will be based upon !he alternative
selected ~y !he City staff in Task 1. Brown and Caldwell shall develop a preliminary design
based upon we selected allemative. ("onducc detailed environmental evaluations on this
alternative. prepare material and attend meetings in )rder to obtain site a.'1d design approval for
the project. and conduct imal design based upon the criteria of minimal cost, environmental. and
implementation impacts.
Task 2.1 Geotechnical
Task 2.1.1 Subsurface Exploration
Brown and Caldwell shaU employ a subcomrac[Or to conduct two (2) borings in
!he area of <he new Airport Pump Station and flve (5) borings in !he area of !be
new outfall pipeline. The subcontractor shall provide an engineer wbo will
supervise, log, and """'pie from each of !be borings.
Task 2.1.2 LaboralOf)' Testing
J!rowIi and Caldwell shall employ a subcontractor to conduct in-place moisture
content and unit weigbt tests of soil samples selected in Task 2.1.1. and other tests
including Atterberg limits, sieve analysis, WlConfmed compression tests or direct
shear tests as appropriate, and cOll$()lidation tests.
Task 2.1.3 Engineering Analysis
Brown and Caldwell shall employ a subcontract.oc (0 perfonn arullyses in order to
prepare engineering recommel'ldalions for foundatioc design. pipe bedding. trench
stability. lrench backfill, seruemenl and construction considerations.
Task 2.1.4 Repon Preparation
Brown and ~dweU shall employ a subcontractor to prepare a report based upon
!be worll: perfonned in the geotechnical tasks 2.1.1 -2.1.3.
Task :U..s Consultation
Brown and Caldwell shall employ a subcontr.tctoc who shall be available for
coosul1ation to Brown and Caldwell during the study and design of this project.
o
Task 2.2 Surveying
Task 2.2.1 Perfonn Field Survey
Brown and Caldwell shall employ 3. sul)conu-ac:or to conduct a field survey for
the new location of the Airport Pump Station .,.,d outfall pipeline. Vp to two (2)
crew-weeks will be used to obLain surveying data for this task.
Task 2.2.2 Develop S<a1e Backgrounds For Drawings
Brown and Caldwell shall employ a subcontractor to reduce field data and develop
an AutoCAD fue background for scale dr.v.;ngs at one inch equals 40 feet. Up
to (one drawings wil) be developed fur this task.
Task 2.2.3 Locate UlCity Lines
Brown and Caldwell sh!lll employ a subcontractor to Jocatc surface evidence of
subsurface utility structures and lines witItin the alignment of the Airport Pump
Station and outfall pipeline and within SO feet tn either direction from their
alignrnenl
Task 2.3 Environmenral
9
BoalIse of its locaIion in the sensitive Baylands area of Palo Alta. the Airport Pump SIaIioo
improvements will be subject to extensive environmental rev'.ow. In a<XOrdance with the
requiremenu of the Dlifornia Environmental Quality Act. the environmental docmnentatioa Iha1
may be appropriate for the project would either be • Neg.tive Declaration (Neg Dec) or an
Environmental Impaa Report (EIR). To make thal determination. an initiill study shall be
prepared by a subeonttactor to Brown and Caldwell in consultation with the City and responsible
agencies.
The major issues anticipated for the project are weaands and tidelands impa<:'" daring
construction and polencia] habitat disturbance during construction.
The Initial Study will use a checklist format to review potential crlvironmental impactS-. Narrative
explanations will be provided for canclwions DO the signiflCallce of each impact area. When
signmc8!11 impacts are identified. measures will be included. if possihle. to mitigate impacts 1<>
• less than significant level. If the Initial Study idenli/i", signiJkan. issues that cannot he
mitigated. an Environmental Impact Report (EIR) will be required. Work in conr.cction with
an EIR will he considered extra work; • scope change will be provided '0 me City.
2:. :er -II II_at DEIDIA.'M·J -
10
Task 2.3.1 EnvironmenLal Site Analysis
Conduct a prelimin.lI)' site analysis. Based upon the Endings, discussions related to L'le
scoping of the environmental documentation will be initiated with the City of PaIo Alto
and with the a:ppropriare regulatory agencies. It is expected that consultation 'I,li"ill be
undertakea with the San Francisco District of the U. S. Army Corps of Engineers; with
the California Regional Water Quality Control Board. San Ft1I1\cisco Bay Region; and
the Bay Conservation and Development Commission. It is possible that additional
consultation with the V. S. Fish and Wildlife Service. the California Department of Fish
and Game, antj the CalifoI'J'<ia State Lands Commission may also be necessary.
Task 2.3.2 Data Collection
Col~t existing. (eadily available dam about lhe site amJ the proposed project Limited
field biological a.naIysis will be perfumed to establish the presence of rate and endangered
species of habital to support such species.
Task 2.4 Site and Design Review
1be plltJlO<" of this task: is 10 assure L'ult design of a new pump Slalion at the airport compli ..
wilb the process estrthlished by the City of Palo Alto for development in environrDentally
sensitive areas. 1be process includes preparir:g for, atlending, participating, and responding TD
commeats and questions arising from meetings with the Architectural Review Board, (A.R.B.l,
PllInoing Commission, IUld the City Council.
Brown and Caldwell will provide preliminaty site drawings, environmealAl assessmen~ and aerial
photograph for • Palo Alto Site and Design Review. As pan of the Site and Design Review,
Bro ... n and Caldwell shall meet subsequently wi!h the Architectural Review Board (A.R.B.l, the
Planning Commission, and the City Council. Browo and Caldwell shall provide :he required
number of copies of alI Site and Design Review subntitLals in 3CCorda.rtce with City Planning
Division reqlJire~nts.
Task 2.S P!ans. SpecifIcations and Construction Cost Estimate
Plans and specif!C2luons for Task 2 shall be prepared as part of. combined set of dOCllmenlS for
Tasks 2 and 3. Based co the information collected during the Tasks 2.1 through 2.4 and design
input from Task I, the Feasibility and Assessment of Needs Study Brown and Caldwell shall
formulate the ~rojecl design. Preliminary COnSL"llction plans and Brown and Caldwell
specifICations will be prepared for review at the 10%, 65%, and 95% complete stages. Aerial
photo-bAsed plan and proftle drawings of the pump station/outfall pipeline will be prepared at •
scale of 1"=40'. Specifications shall be wrinen in conformance with the Construction
==,,.,101 .. ...4NXR .... W91 _.
11
Specification Institute formal for section numbering and organization. The specifications shaU
consist of Bidding and Contract Requirements (Division 0), General Requirements {Division I).
and Technical Specifications (Divisions 2-16). Brown and Caldwell shall prepare Technical
sections of the specifications except for nivision 0 sections. which will be provided to Brown
and Caldwell ~y the City.
Five (5) St!ts of preliminary consU1lction documents will be provided for City review of eacb
submitbl. Prepamtion of the construction 90cuments will include a quality assurance review by
our departmental supervisors prior!O 10 % and 95% submlt:als.
The delivernbles for Task 2.5 are:
Five sets of prelimin"'Y construction documents at the 10%. 65%, iI1\d 95% complete
stages.
Task 2.5.1 Project Reviews with City Slalf
Bro,..,. and Caldwell shalJ conduct romtal meetings with Clty staff at the 10. 65,
and the 9S percent level of completion to present plans and specifications.
COIIIlDeI!lS and questions shalJ be considered to prepare [mal worir; product.
Task 2.5.2 Al1:hitectw:al
Brown and Caldwell shalJ design an above ground building to enclose the
npJacement Airp<>rt Pump Slalion. Building will enclose pumping equipment
including meclw>icaJ and electrical. lighting. and ventilation. Building .. terior
shall bave a rooforming appearance based upon tbe qaality of structures at the
Regional Water Quality ConlrQI PlanL
Task 2.5.3 Site Design
Brown and CaldweD shalJ design the Alrport Pump Station &ite for paving.
grading. and drainage. The bIliJding site s!tall be designed ID allow ease of access
for maintenance.
Brown and Cald ..... l1 ,!tall design the outfall pipeline to minimize the total coot of
construction.
Task 2.5.4 Structural
Brown and Caldwell shall design the Airport Pump Station substructure as a
sub grade structure. applicablt: for the airport site. The completed structure shall
be designed for submergence in sha.llow groundwacer. The interior of the
pumping station shall be dcsign~d as a wet pic type with an inlet trash rack.
Task 2.S.5 Mechanical
Brown and Caldwell shall design llle rep1acement Alrpon !\Imp Station to include·
constant speed, vertical, l'On-clog pumps. They shaD be designed as enclosed
units ",i:thin the: abovegroulld building. "!be building shall include ventilating
equipment
Task 2.5.6 EJe<: <rical and Inst,umentation
Brown and Caldwell shaD design the replacement Airpon Pump Station to include
an auromatic transfer switch. molor control center. and space for telemetry.
Task 2.5.7 Plans and SpecifICations Subminals
Brown and Caldwell sbaII prepare construction plans and spedflCalions foc Ibe
replacement Airport Pumping Station and outfall pipeline based upon !be olber
sublasks in Task 2.S. Snbmit plans end specifications for review by the City sWf
at 10 percent, 6S. percen~ and 95 percent of completion. After receiving !be
re"'.ow comments from !be City on rhe 95% documents, Brown and CaldweU sbaII
irK:orpoI3le !be comments into a fInal contract document bid paci".age. The
Q[;ginal drawings (vellum) and reproducible spectficatioru will be provided [0 !be
City for reproduction a.'1d distribution to prospective bidders on the project.
Cost eslimares shall be submitted at 10 percent and 95 percent..
Task 2.5.8 Con.struaion C06t 8tim..,
12
A preliminary (at Ibe 10% complete stage) and final (95%) corutruction cost estimate
shall be prepared by Brown and Caldwell in accordance with the contracI drawings and
specifications. Estimated cO!l5lruCtion costs for each bi d item will be projected to Ibe
anticipated cOllSll'UCtion bidding period.
Appropriate contingency, construction m!l!l8gemenr, and administration costs will be
determined, wilh City assistance, 10 develop a reaIlstic overall project budgel Brown and
CaldweU win use its proprietary BACP AC sySlem for rust estimating. The flll8! COS!
.... e • ""~_<IUDI'''''''"", -,
13
estimate will be used to develop Ole proposal form. which will be included with
specifications in the bid documer'lts.
Task 3 -Design of Modifications to Seven Pump Stations
The Design of the modificatio['l':; to the seven pump statIons; Matadero, AdiJbe, Colorado,
University Avenue, Embarcadero Road. California Avenue BicycleJPet1estriar. UndeIpass. and
ITI. shall be based upon the assessment of needs as outlined in the final report in Task 1 and
the fillJl! &Cope of wadi: as approved by City.
Task 3.1 Surveying
Task 3.1.1 Perfonn Field Survey
Brown and Caldwell s.hall employ a sLlbcontractor to conducl a fIeld survey for
the existing sires of the Matadero, Adobe, and Colorado pump ,tation sires. up
[0 one (1) crew-weeJ.c will be used to obtain s"JIVe:ring data. (or this wk.
Task 3.1.2 Develop S<ale Ba.:kgro""ds For Drawings
.8rown and CaldweO shall omploy a subcontrac'.nr l!! reduce r",ld data and deVelop
"" AutoCAD me background for scale drawiogs at one incb equals 40 reel Up
to three drawi.8S will be developed for this IaSlc.
Task 3.2 Plans, SpecificatiO'1S aod Con'lruction Cost Estimates
Plans and specifications for Task 3 shall be prepared as part of • combined set of documents for
Tasks 2 and 3.
Based O~ the infonnano. coUec",d during the Task 3.1 and design input from Task 1, the
F<> •• asibilltJ Srudy ,md Assessment of Needs, Brown and CaldweD shaD fOImclate !he project
design PreIlmUwy ccnslruCtion plans and speciflcations will be prepared for review at !he j 0%,
65% and 95% complete stages. Specifications shaD be written in confonnaru:e with !he
Construction Specification I=..stitule fonnat for :section numbering and or,ganization. The
specifications shall <onsist of Bidding and Conlral:t Requirements (Division 0), Genellll
Requirements (Division I), and Te<hnical Specifications (Divisions 2-16). Brown and Caldwen
shaD prepare technical sections of the speciIkations excep' (0£ Division 0 sections, whicb will
be provided to Brown and Caldwell by the City.
Five (5) sets of prelirrrlnary COnstructiOD documenu will be provided for City review at each
,. ::.as"' _4IlDH"_ --,
•
· ;:.... ... ,':: .. : ..
14
sublniaat Preparation of tbe construction documents wHl i~c1ude a quality assurance review by
our departI:lenl .supen'isors pnoi 10 10% and 95% submioals.
The deliveJ7JJles foc Task 3.2.1 are:
Five sets oC preliminary con.'itruction documents at the 10%, 65%, and 95% complete
stages.
Task 3.2.1 Project Reviews wilt! City Staff
Brown and CaldweU shall conduct formal meetings with City staff at the 10%,
65'%. and me 95% levels. The purpose of the meetings shall be to review the
design It!1d [0 obtain review comments whicb shall be considered in completing
the plans and specifications.
Task 3.'.2 A:ehlleCturaI
Brown ana Caldweil shan design minor a.rctlitectura! modifications to Adobe and
Colorado Pump Stations .in order to improve their appearar.ce.
Task 3.2.3 Site Design
BroW'!] and Caldwell shall design minor sire access improvements.
Task 3.24 Structural
Brown and Caldwell shall design improvements to make structural repairs.
ColoradO Pump Station requires structural repairs and minor repairs may be
required for Adobe Pump Sea.jon a."d Matadero Pump Station.
Task 3.2.5 Mech",";cal
Brown and Caldwell shall design mechanical improvements including replacemenl
plllIIping units foc all pump stations. Other mechanical improvements may include
piping and ancillary equipmenL
Task 3.2.6 Eleclrical and Instrumentation
Brown and Caldwell shall design electrical improvemenLs including new panel.\;,
pump con!mls, ttansfer switches, wiring, conduiL and outpul alann signals ready
to be supplied to the City's lelemeuy consultanL
$C., J •• "--'_-4N!lOU.'M'!l
<
Task 3.2.7 Plans and SpecifICations
Brown and Caldweil shall prepare conslruction plans and spedfkatioru o[ the
seven pump stations based upon the Olr.ef subtasks in Task 3.2. Submit plans and
s~ific.ations for review by the City staff at 10%.65%. and 95% of completion.
Af.U:,r receiving the review comments from the City on me 95% documents, Brown
and Caldwell shall incorporate the comments into a fmal contract document bid
package. The original drawings (vellum) :and reproducible specifications will be
ilrovided [() the City for reproduction and dis[l'ibution to prospective bidders on
the project.
Task 3.2.& CoroSUllction COSl Estimate
15
A preliminary (at the 10% complete stage) and frnal 995%) construetioo cost estimate
shall be prepared hy Brown and CaldweU in accordance with the contract drawings and
specification..~ Estimated construction costs for each bid item will be projected 10 lbe
aoticipated CO!lSlruction bidding period.
Approp!i.ate contingency. collStruction managemer.t. and administratioD coots will be
delellDiDed, wilb City assis!an<:e 10 develop. realistic overall projecl bud gel Brown and
Caldwell will use its proprietary BACPAC system for COSI estimating. The final cost
estimate will be use<! 10 develop the propos.1 form, whicb will be included wilh
specifICations in the bid docoments.
Task 4 -Design or Plpellne RebabilitatlOD Improyemenls
Brown aod CaldweU shall conduct. pre-design (10 percenl design) 10 verify the melbO<! of
rehabilitation tluu is mos. fe.sible for ea<:h of 18 pipeline segments. Following the j>re-<lesign,
compiete the design based upon the fuuJ p",·design repon. The Cil)! h.s identified
approximately 5,665 linear feel of storm drain pipeline at 18 individual locations in need of
replacement or rehabilitation. as outlined on the attached table.
Task 4.1 Geotec~.nical
Brown and CaldweU .ball employ a subcontractor 10 perform. geotechnical inYe.!tigation for the
segments of SIOml drain pipeline where excavation wiD be needed. The geotechnical
subconsultanl will provide periodic consultations with the project design leam concerning shoring.
dewatering. and backfilling requirements_ No hazardous marerial investigations 'IlIill be
perfol1lled.
STREET
Uncoln Avenue
Somerset Place
Embarcadero Road
University Avenue
Newell Road
~~rsitv Avenue
Waverley Street
Lytton Avenue
Lytton Avenue
Guinda Street
Oregon Avenue
louis Road
Higgins Place
Maddux Drive
Park BOlllevard
~erson Street
Bryant Stre.t
Barron Avenue
TOTALS
·
.~.
RECOMMENDED REHABILITATION PROGRAM
FOR STORM DRAIN PIPELINES
BASIN PIPE LENGTH PIPE DIAMETER
(It) Unl
NWB 217 12
NWB 231 12 --'--'
NWB 660 24
NWB 427 12 -
NWB 763 18
NWA 264 24
NWA 62 10
NWA 277 30
NWA 251 30
NWA 170 30
NWC 350 12
NWC I 364 12 _.
NWC 115 12
NWC 45 12
SEA 266 12
SEB 388 12
SEB 435 12
SEC 380 12
6,66611
REHABILITATION
METHOD
replacement
fBplacemont
slipline
replacement
slip line
slip!me
replacement
slipjine
slipline
slipline
replacernent
replacement
(oplacement -
inversion lin a
roplacement
replacement
replacement
replacement
Attachment A: Recommended Rehabilitation Prollram
PROJECTED
COSTS ($)
26.500.00
28.200.00
99,7~~
52.100.00 Q)
90.800.00
39,900.00
7.600.00
47,300.00
-
49.200.00 ~
,',
33.300.00
42.700.00 '.""
.', '
44.400.00
14,000.00
I;) ,-:~,i
5.200.00
" ',:'
32,500.00
47.300.00
53.100.00
46,400.00
$760.200.00 --'.! i'
Task 4.1.1 Subsurf"". Exploration
BrowD and CaJdwelJ shall employ a subcontractor to conduct 20 borings along the
alignments of the 18 pipelines idenLLfled for replacement or rehabilitation. The
borings will extend 10 • depm of 10 feet Additional depth of borings, numl>er or
borings. or traffic conuol will be additional service. The subconlractor shall
provide an engineer who will supervise, log. and .sample from each o(!.he borings.
Task 4.1.2 Laboratory Testing
Brown and Caldwell shall employ a subcontractor [0 conduct in-place moisture
confent and unit weight tests of soll samples selected in Task 4.1.1. and other tests
inc1udin,g Atterberg limits. s.ieve anaiysis. unconfined compres.liion tests or direct
shear teSLS as appropriate. and consoudatiotl tests.
Task 4.1.3 Engineering Analysis
Brown and Caldwell shall employ. su!x:<Jntraclor to perform analyses in order !o
prepare englneering recommerulations for pipe bedding, trench stability, trench
backfill, settlement and consuuction considerations.
Task 4.1.4 Report Preparalion
Brown and Caldwell shaD employ. subeontractor to prepare a report based upon
!be work performed in the geo!eCbnical r.uks 4. J.l • 4.1.3.
Task 4.1.5 Consnltadon
Brown and Caldwell shall employ a subcontractor who shall be available for
c<>nsultation to Brown and Caldwell during the study and desigo of !his projecL
Task 4.2 Surveying
Task 4.2.1 Perform FlOld Survey
Brown and Caldwell shall employ a subconttactor to conduct a fteld swvey for
the new alignment of 18 sections of storm drain as identified above.
16
Task· 4.2.2 Develop Scale Backgrounds For Drawings
Brown and CaldweH shall employ a subcontractor to reduce field data and dev~jop
Zll Aut;:lC::AD file background for scale drawings. Brown and CaldweU shall
prepare plan a.."ld profile bao;,e sheets at I,inch equals 40 feet horizontal scale and
" I-inch equals 4 feet venica! scale. The base sheets will he AutoCAD "Jawings.
Plan views wiD be line drawn topography. Base sheets will be developed from
ground survey. Su.1'Vey shall be based upon sire-specific hoo7.0o.tal coordillates
and azimuth and upon a\lailnNe City bench marks fm' datum Area of survey shall
include a 20-foot width of strip overlying the existing alignnLent of storm drain
pipe and !he entire area of [he appropriate intersections.
Task 4.2.3 Locate Utility lines
Brown and Caldwell shall empLoy a subcontractor to loca.te surface evidence cf
suhsurface utility structures and lines within the public right-of-way surtOl,lnding
the alignment of the 11 pipelioes thai are to he replaced.
Task 4.3 Preliminary Design of Pipeline Rehabiliwion
Task 4.3.1 Meeting with Cily Starr
BCOWli and Caldwell shall conduct a formal meeting with City staff at the 10
percent level of completion. The purpose of the meeting shall be to review the
evaluation and to obtAin review comments which sbaIl he coilSidered in preparing
the [mal plans and specifications.
Task 4.3.2 Review TV Tapes
Bro .... and Caldwen shail revi.", the TV inspection tapes of the interior of the lS
pipeliDes identified by the City for rehabilitation. Brown and Caldwell shall also
review the method of rehabilitation Of replacement recommended in the City·s
swrm drain condition assessment report.
Tatl: 4.3.3 Evaluate Hydraulic Requirements
Brown and Caldwell shall review available infonnation on design Dows and
determine: current and needed capacities of the stonn drain pipes .
•
Task 4.3.4 Identify Potential Permi1 Requu-ements
Brown and Caldwell shall identify potential pennitting agencies that will be
issuing permits for construt:tion.
Tasl:. 4.3.5 Evaluate Rehabilitltion Methods.
Brown and Caldwell shall identify potential rehabilitation methods (including
replacement) And evaluale methods for exb. storm drain to be rehabLlita1ed. The
evaluation shall consider pipe conditions. bydrauiic capat..;ty. C'o'l1munity
disruption, permit requirements. environmental impacLo;;., and cost. The most
ap.,roprlale rebabilitation m"tbod(s) will t.e identir.ed.
Tasl: 4.3.6 Draft!O Pe=m Design Repllrt
Brown and Caldwell sball prepare a draft 10 Percent Design Report thaI
summarize.s t.'1e above evaluation of the existing: stOrm dra!n pipes acd me
evaluation of potential rehabilitation me thods. The report will also include a
preliminaty cost estimate. Stonn drains 10 be replaced will be wumed 10 be
replaced in-place. Three copies of the drafl report .. ill be submitted 10 the City
for review and comment
Task 4.3.7 Fmal 10 Percent Design Report
Brown and Caldwell shall address comments from the City t)!i the draft report and
sball provide five coples of the final report 10 the City.
Tasl:. 4.4 Plans, Spedlkations and ConstrJction Cost Estimare
18
Plans an~ specifications for Tasl:. 4 shall be prepared as a complete set of documents f,.. bidding.
Ba.ed on the infonnation collected during the Tasks 4.1 tl>.rough 4.3, Brown and Caldwell shall
foonuJate the project design. Preliminary construction plans and specifications will be prepared
for review at the 10%,65%, and 95% complete stages. Ground survey b ... d pl4ll drawings of
the pipeline will be prepared at a scale of I" =4(]'. Specifications sball be wriuen in confonnance
with the Construction Specification Institute fonnat for section numbering and organiz.at.ion. The
spe<:U1C3tiOns sball consist of Bidding and Contract RequiremeDlS (Division 0), Geneial
RequiremenlS (Division I), and Technical SpecificaLions (D,visions 2-16),
Brown and CaldweI1 shall prepare rechnical sections of the specifications extept for Division 0
sections, whieb will be provided to Brown and Caldwell by the CITY .
. '
19
Five (5) sets of prelirninaf)' constructiO'1 dociJrnen15 will be provided for CITY review or eacb
sub;nittal Preparation of the construction documents will include a quality assurance review by
our department superviscrs prior to each submittal.
The deliverables for Task. 4.4 are: five sets of preHminaJ)' construction dacurnems a[ lhe 10'%.
65%, and 95% complete stages.
Task 4.4.1 Meetings with City Staff
Brown and Caldwell shan conduct fonnal meetings with City sUIff 31 the 65. and
the 95 percent levels of completion. The purpose of the meetings shall be :0
review the design and to obtain review comments which shaD be considered in
completing the plans and spectflCMions.
Task 4.4.2 Utilities
Brown and C81dwell shall COntaClthe City Utilities Departmenl and other private
utility ccmpanies to obtain as-built drawings of e_tisting underground utilities.
Existing utilities will be shown on the plan views of the drawings based on this
infonn.tion. Up to tv." days of poL~oling (sofl-<lig) will be peJfonned to locate
underground utilities. Potholes wiU be palched with temporary pavemenL
Task 4.4.3 Pennits
Brown and C81dwell shall assist the City in obtaining necessary penni .. for the
constn>Ctionoftheproject.
Task 4.4.4 Plans and Specifkations Submiuals
Brown and C81dwell shall prepare construction plar.s and s!>Ccifica:ions for the
rehabilitation of 18 pipelines Nsed upon the other subtasks in Task 4. Submit
plans and specif:'OatiOI!3 far review by tile City staff at lO percent, 6S pe=~ and
9S """",nt of completion. After receiving the review comments from the Cl1Y
on the 95% docnments, Brown and C81dwell sballlncO!pCl3le the comments into
• fmal conll3l:l documenl bid package. The original drawings (veUum) and
reprndDcibJe speciflC.1lions will be provided to the OTY for reproduction and
distribution to prospective bidders on the projecL
Task 4.4.5 Construction Cost E.mrnale
Cost estim""', shal..I be submitted at 10 percent .. ,d 95 percent A preliminazy (at the
10% complete stage) and fmal (95%) con..<truction cost estimate ,hall be prepared by
....... 4 + ~4NIXK4-"," -,
20
Brown and C:lldwdJ in accordan~e with the contract drawings and specifications.
Estimated construction costs for each bid item wUl be projected to tbe anticipated
construction bidding period. Appropriale contingency. construction management. and
administration costs will be determined. ""ilh CITY assistance, to develop a realistic
overall project budget Brown and r:al~well will use its prop!iew-y BACPAC system for
cost estimation. The fimJ cost estimate wm be used [!) develop the propo.s.al [ann, which
will be included with specifications in the bid documen ts.
Task 5 --Flood Inlmdation MRP
The California Offi~ of Emergenc! Services has required that the City prepare a flood
inundation map for the existing Foc-thills Park Dam. The purpose of the inundation map is to
serve as an aid in the development of a.'l evacuation plan, to provide for \.he safety of persons in
the area downstream of the dai'u in the event of a catastrophic failnre. The method for
developing an inundation map is to follow criteria based upon l1'1e recordN failure of the Baldwin
IIlli. Dam aftH an earthquake in southern California.
T35k 5.1 Surveying
Brown and Caldwell shall provide the services of •• uoc.mtrllctor for .urveyins
to perfonn topogtllpbic survey up to one-half day.
T35k 5.2 Prepare Map .
Task 5_2.1 Review Existing Drawings
Brown and Caldwell shall obtain, review. and use topographic information from
foothill& Park Dam record drawing'!, U.S.O.S. Quadrangle maps. other maps
provided by the City, and mapping doveloped by the surveying subcontractor
.poetIcally foc the inundatioo map.
T35k 5.2.2 Prepare CalcuJaCon.,
Brown and Caldwell shall develop. flood routing profile, flood flow hydrographs.
and supporting calc;uWioDS based upon existing drawings, and the cri1eria
specified by the Sw.. of Cilifomia OffICe of Emergency Services for theoretical
failure of dams such as the Foothills Pari< Dam.
" b
Task 5.2.3 Prepare Map Overlay
Brown and CaldweiJ shall prepare a il'lyJar overlay to the u.s.a.s Quadrangle map
that repn-.sents the area of inundation from the theoretical failure c.f Foothills Park
Dam. The overlay shall show the area Qf inundation in accordance with the State
of California Office of Emergency Service.1Ii c:1teria.
Task 5.2.4 Letter Repon
Brown and Catdwell shall prepare a letter {maximum five pages) outlining the
procedures and summarizing the results of the la..'ilcs taken w develop tire flood
inundl!ti.on map.
Task 5.2.5 Consultati(')n to Office of Er:u:rgency Services
Brown and Caldwell shall submit [mal calculations. hydrographs. and inundation
map 10 the State of CalifcnUa Office of Emergency Servkes foe their use. Brown
and Caldwell will respond to questions or comments following their review and
will modify the submittals. as needed, to receive Slate approval.
EXHIBIT A
. SECTION n: ADDmONAL SERVICES
Task 6 -Servias Dwing Construction
21
The [oUowing wort in ay be executed upon the CITY' s deci.~ion (0 proceed with the construction
of Ibe pump station and pipeli!le rehabilitation projects. The CITY may amend this Agreement
or obtain another consultant £0 perfonn the war.£. The CITY reserves the rigbt to engage a
different consultant for tbe construction administration services described below.
As the project proceeds into the consuucuon phase. Brown and Caldwell wiU maintain its
working partnership wilh City Staff by providing Construction Administration Serv~. as
authorized by the City. ConstnJ<:tion Administration Services will provide support for !he City
Project M311ager and lnspeclllr and are lisled below:
Assist City sraff in answering teciuuca! questions during bidding and construction.
Assist City sWf -with conducting the pre-bid and pre-construction mee!ings .
• "CI:OI_I~""~WPJ --
22
Provide construction staking.-
Review contractor s.ubmittals an,;! 5hop drawings.
Participate in weeldy project meetings at the projecl site with the City staff and the
Contractor and prepa..""e and distriDute meeting notes.
Conduct periodic site visits to observe the progre:.s and qU3.1ity of the work.
Assist City staff with review and processing of consouction change orders..
Attend !he final wallHltrough of !he project with !he City staff and !he Contractor.
Prepare record dniwing' using r""oro data supplied by !he Contractor or City staff.
BroMl and Caldwell will provide full-tim. Reside", Engineering setVices, as aulhorized
by the City. Other services including review and approval ot the contractor'. mODlhly
payment reque-siS. and review and monitoring of the contractor's schedule L",d uf>date:s
will be provided by Brown and Caldwell as authotiud by the City.
Test 7 -DeIendon Basin
If, as & IeSU.lt of !he feasibility study prepared in Task I, the City eJects 10 proceed with Ihe
construction of a detention basin in conjunction with Ihe Airport Pump StAtion and Oulfall
Pipe1lne, Bro..... and Caldwell shall provide design services as an additional service. The
semces, including geotecluUcal, surveying, environmental assessment, am: preparation of
consttuction p!.ans, specifications, and cost estimate, shall be perfonned in conjunctioo wilh
parallel !.asks as outlined in Task 2. The futal scope of worl: and design costs sbail be negotiated
and agreed to l>y the City and Brown and C,ldwell prior '0 proceeding with this task.
Test 8 -AIrport Pump Statlon and OutraJI PipeD De
Task 8.1 Geoltclmical
Perform additional borings as may be required in order 10 compleme I'll the work ouUined
in Task 2,1.
==.)£'1;" ·' __ ~WPl
23
Ta&k 8.2 Surveying
Pert'onn additional surve-ying as may be required in order to compliment the work
outlined in Task 2.2.
Task 9 -Seven Pump Stado,,"
Task 9.1.1 Present to Architectural Review Beard
Prepare drawings as necessary to present proposed modifications of the seven pump
stations Ie the A .. ·chireclurai Review Board.
Task 9.2 Pump Testing
Tests may be peJformed to physically evalua'" e.isting pumping units.
Ta&k 9.2.1 Head vs. Flow Test
C<lru!uct running load and flow meosuremen, IeSIS simultaneously of operating
plllDps and ma""'.
Ta&k 9.2.2 Remove Pumps anrl Inspect
Employ • subcoatr .. :tor to remove. disassemble. and inspect worlcing parts of
pumps.
Task 9.3 Structural
CondtlCl seismic analyses of pump support plares. SlrUCturaJ Op.nL1gs Cor pumps, above grade
stnlttllres. and engine base anchoring system.
T .... 10 -PlpeIlM Rehabilitation Improvements
Task 10.1 Additional Soil TeslS and Borings
LabooWlry IeSIS may be appropriate to resl Cor pH. resistivity. chlorides, and sulfates. Perfonn
additional soil bOrings and laboratory analyses.
an., ... ~I .. ,_...,...~"'" ....... '
•
24
Task 10.2 Surveying
Pedonn additional glound survo::y ir. addition to surveying perfonned iJo-1er Task 4.2.
Task 11 -P ..... mlt Assistan<e
CondL~ additional investigations and prepare appllcatirms as required (or necessary permits.
Task 11.1 Applkation for C'.orps of Engineers 404 Permit. Section La Permi!
Task L1.2 Species Replication Plan for Vegetation and Wildlife
Task 11.3 Wetland Ccmpensatioo Plan for lost Wetland
Task 1l -OpenldODS and M~ Manual and Slllrtup
11K L2.1 Preparation of Operation and Maintenance Manuals for seleclect pump stations
Task L2.2 Assistance and T1'llining during start-up period for selected pump Stll!ioos
EXHIBIT A
SECTION ill: DUTIFS OF THE CITY
For Task 1
Meeling with Brown and Caldwell to review aJlematives and select one for design
development
Provide copies of drawings of .,isling stornl draJn pipelines and pwnp stations.
• Maintenan<e staff meet with Brown and Caldwell 10 inspect pump stations and 10 discuss
maintenance problems .
...... ...,. '!_..r:lllDXA.~ ---
~ .-f.,i
25
Provide available records of contract servi.ce and equipment vendor expenditures and
descriptions of equtpment servLcing :lnd modifh:ations at pump stations. Other records.
as avaibble.
.. Arran.ge for water in wetwell! of pump stations of sufficient quantity to operate each
pump for a half~hcur. Arrange to have all electrical covers open or removed
simultaneously when these pumps will be operating.
For Task 2
Meeting with BroWll and Caldwell at 10, 65 and 95 percent of design.
Prepare staff report for Site and Design Review.
For Task 3
• Meeting with Brown and Caldwell at 10, 65, and 95 percent of design.
• Meeting with Brown and Caldwell at lV, 65. and 95 pe=nt of design.
For Task ~
Provide topographic drawIngs and reeord dra .. ings of dam.
a _.. _ • .QIICltHA..., _.
26
EXJfiBIT A
SEcrION Po'. WORK SCHEDULE
CITY OF PALO ALTO
S1URM DP.AIN P!J'MP STATION AND PIPELINE R.ElIABlLITATION PROJECT
-
Task Ilur.!lico (C31endar CaJeodar day> from
days} Notice 1.0 Proceed. LO
compIelioo
Task J -Fea$J:"biHty SrudylNeeds Assessmet1~
Task 11 30 45
Tat 1.2 SO I 6' !
TasIr: 13 45 W
Task 1.4 25 85
Task U 21 106
Tal; 2-IlesigJ> ADpon Pump SlalionlOutfaU Pi_
T":!.! I' 120
Test 2.2 21 121
Tast2..3 l! l21
Task :!.. 90 2n
T,,* 2.S 120 337
Ts l-DWan' 7 Pump _
Td 3.1 14 !20
Task 3.2 100 220
Task 4-Design: Pipeline Rd>abilli3lioo
Tad;. 4.1 30 90
Task 4.2 30 90
Task 4.3 60 ISO
Tilt 4.4 110 260
T_ '-Flood _ Map
Td.S.J 7 n
Tal; 5.2 45 67
a~ i.!.~~i.!.
a~:a:a;a
!i'S!:B:;;,:;
iii Ii !illill 1
;ii i
:i :2
Baa::.!
iii!
iili
",oCl~I~
as
anlin
iii
l~
aal!~=
"~i
=!5!
aai~·~5
-ii.
le;!
liIaaa~a.
&;
~!
sa
aa5
~i
~~,~.
iiii
~~
le~ 1&~Uili 8iil ..
a 5
! ~
:: !
i i lili
CI .i !
i;.~ ~aiai aaa a
ell ! ;'
~~ ~=~aii I~~aaa I"~ aaaaa ~ali
•
~:a;=ii Ii! ri,,;'
ilil:l~;:!
aaa!!!1
'i;'~
.~~
iii ..
.. ' .ii ...
alil~.3: a~~ _._ Ii;
-:::::1 ~~
BRCl'M'< NlD CALll..at. --
SCHEDUI.E OF HOURI. Y BIWNG FV.TES
EFFEcnll'E SEPTEMBER 26, 1992 TO SEPTEMBER 24, 1993
PAGE 1 Ol' 3
PERSONNEL ClASSIFICATION
ENGINEERING
EXEc:\I1MO •
EXECUTIVE f
EXEOJIWE ENGINEER
CHIEF ENGINEER
MANAGING ENGINEER
SUP£RViSlNG ENGINEER
PPiNClPALENGINEER
SENIOR ENGINEER
EHGINESl
ASSOOIATE ENGiNEER
ASSISTNIT ENGIJIEER
ENGI!EEPING AIDE
SUPElMSfNG CON>:lTRUCTlON ENGINEERlfNSPECTOR
PI'INQI'AL COHSTRUCnON ENGINeER,IINSPECTOR
SENIOR CONSlRUCTION ENGlNEERlfNSPECTOR
INSPECTOR
ItSSOCIA.TE INSPECTOR
ASSISTNIT INSPECTOR
INSPECTlON AIDE
lECHNiCAL
SENJOR ENGIIEEFING lECHNICIAN
ENGNlERING TECHNICIAN
JSSO::I .... lE ENGINEEANG lEctIN1CIAN
ASSISTANT ENGINEEPlNG lEctIN1CIAN
snfIDENTlIWNEE I
S1lJOENTllWNEE I
CHEF DRAFTER
SUPER\llSING DRAFTER
lEAD DRAFTER
SENIOR CW\flER
DIW'T1ER
ASSISTANT 0RAf1EIi
DRAFTER llWNEE
IoIAHAGER, ~l1IER ORAFTlNG
COMPI.IlER ORAFTlNG SUPERVISING OPERATOR
COMP\11E!; 0IWl1NG lEAD OPERATOR
COMPI.IlER 0IWl1NG SENIOR OPERATOR
COMPIllER ORAFnNG Of'SIATOR
COMPIllER DRAFllNG OPEAATOR TRAINEE
COMPUlE!l 0IW'Tl1lKl Pl.01""lER OPEAATOR
HOlJRI. Y BllLJ NG
R>.TE
187.00
142.00
142..00
142.00
129.00
115.00
107.00
94,00
B1,00
70.00
59,00
-'9,00
115,00
107,00
94.00
81.00
70.00
59,00
49.00
B1.oo
70,00
59.00
49.00
40.00
33.00
94.00
81.00
70.00
59.00
411.00
40.00
33,00
107.00
81.00
70.00
59.00
49.00
CO,OO
33,00
ZC2
· ~ ,
"', ;
~.
'.,
~.~
iii BROWN ,iNO CALDI'oSJ.
SCHEDUlE ~ HOOR\.Y BlWNG RAlCS
EFl'EC'Tl'IE SEP'TEMBER 26, 1992 TO SEFTEMBER 24, 1993
PA(lE 20F 3
PERSONNEl CLASSIFICATION
GRAPHIC DESIGNER
suPERVlSlNCl I\.I.USTIV. TOIl
LEAD IU.US'TRATOR
SENIOR IUUSlRATOIl
IlllJSTI!ATCR
ASSISTANT ItWSTRATOIl
CHiEF OES1ClNER
~DES~
PRlNClPAlIJESjGNER
SENIOR OESiGNER
DESIGNER
ASSISrANT DESIGNER
SI!NIOR FlED SERVICE TECHNICIAN
"IEI.D saMCE TECHNlCIAN
ASSOaATE FlED SERViCE TECHNICIAN
ASSi'>TANT FEl.O SERlllCETECHI'nCIAN
SCIENTIFIC
aiEF SCEN11ST
IoCANAGINGSCIENlIST
SUPE!1IIISING SOEN11ST
PFlNClPAlSCENTIST
SENOR SCEN11ST
SCIENTIST III
SClENTISTi
SClENTISTI
ASSOCIATE SCIENTIST
ASSISTANT SCIENTIST
CHIEF GEOl,oHYOROGEOI.OGIST
MANAGING ClEOlhffllROGEOI.OGIST
SUPERVISING GEOL'HYDAOGEOlOGIST
PRNClPAl GEOUHYtlROGEOlOGIST
SENIOR GEOI.iHYOAOGEOtST
GEOI.OGIST!HYDROGEOt.OC3I
ASSOCIATE GEOUHYtlROGEOlOGIST
ASSISTANT GEOUHYtlROGEOlOGIST
ADMIN1S!PA111IE
SENIOR PROJECT COOR)!NATOIl
PROJECT OOORDINATOR n
PRO.ECT COORDiNATOR I
SENIOR PROJECT ASSISTANT
PROJECT ASSISTANT
HOlll'L y a/UJNG
FlATE
81.00
81.00
70.00
69.00
4900
4O.OC
115.00
IIl7.oo
94.00
81.00
71l.00
SS.oo
59.00
49.00
40.00
33.00
142.00
129.00
115.00
107m
941lO .'.00
71l.oo
59.00
49.00
40,00
142.00
129.00
~ 15.00
1 OHIO
94JIO
81.00
70.00
59.00
70.00
S9.OC
49DO
40.00
33.00
_: Hourtr' -.g noes "'" _......ny 10 roIIocI changos in acIUaI pay raas. ZC2
•
. ,
" ! ,
\ ,
.: ~
BROWN ANI) CAl.DWEU. -"
SCHEDULE OF HOUI'ILY 81WNG RATES
EFFEC11VE SEPTEMBEl'II':8. 199210 SEl'TEMBER 24. 1993
PAQE3OF3
PERSONNEL CLASSlF~.noN
SENOR TECHNlCAL \YRIlER
TECHNICAL WInER
ASSOCIATE TECHNICAL WRJTEP.
ASSISi'ANT TECHNICAL 'NRI'tER
MAfII<E1lNG MANAGER
MAFII<IOTlNG m.>PORT MANAGER
B~NESS DE\'El.OPMI;NT COOF.llINATOR
EXECVTlVE SECRETARY D
ElIECVT1'VE SECRETARY I
SECRETARY.
SECRETARY I
SUPER'oIISOR. WORD PROCeSSING
V«lR> FROCeSSOR IV
WORD PROCESSOR III
V«lR> PROCeSSOR !
V«lR> AAOCESSOR I
ACCOUNTANT UI
IoWW3ER. REO A.:X:OUN'TlNG
ACCOUNTANT •
SUI'ERIIISOR. ACCOUN11NG
ACCOUNTANT I
senOR ACCOUHT1NG Cl£AK
SlFEJMSOR. UEIRAAY SERl/lces
I.IIIRARIAN •
UiIIWIN'lI
ADMINSTl'IATM: MANAGER
ADI/IiNISmAl1\OE S\Jf'£FMSOR
SUPERVISOR. OFFrcE SERl/lCES
0FFlCEW0RI<ER. III
0FFlCEW0RI<ER. I
0FFlCEW0RI<ER. j
Cl.EFl(III
CI.EFI( •
CI.EFI( I
SUPERVISOR. S'MTCHBOARO
'!ElB'HONE O'ERATOR
RECEPTlONISTD
RECEPTIONIST I
HOUf<!. Y 61 WNG
RATE
81.00
11).00
59.00
49.00
94.00
81.00
70.00
70.00
59.00
4 •. 00
40.00
59.00
59.00
4 • .00
40.00
33.00
70.00
70.00
~..oo
59-00
4&.00
49.00
7!J.oo
...00
.0.00
81.00
70.00
70.00
.0.00
33.00
28JXI
40.00
33.00
28-00
49.00
<0.00
40.00
33.00
Direct Expenses shlll be billed as follows:
Di=t Expenses are Iho.e c,,"1S in<"""d on or directly for the project including. but nOlIimiled
to~ reasonable and necessary transpcrt.3.tion costs, including current rates for Brown and
Cald .... ll· s vehicles; meals and lodging; laboratory Ie'" and analysis; compuler services; word
processing services, telephone. printing. reproduction char~es; 1Il reasonable and necessary <(>SIS
associated with outside consullants.. subconsultanlS and other outside .~rvices and facilities, snd
o!her similar costs. Reim burremeot (0< Direct Expenses will be en the basis of aclllill charges
when furnished by commercial "'=es and on the basis of cumot fa'" when furnished by
Brown and Caldwen. A service charge of 10 percent will be added 10 Direct E.pe ......
ACell ••
... lAoROtk( niSUIWICf EIP.OKE1l;S SAl' F"R.NI{IstO. IKe
333 IWSH :;:r •• WI II 600
SNI f1U«<CISif}. CA 94104-2816
(U!l)J91-2600
......."
BRM JJII) CALDHEH
P.O. so,; 804S
~Al"UT CREEl-, CA 94596
co ...........
~P"TtllJ.MiC)O.'Y'Il
07/"1.6/9J
T.-IS C!IIT"IFICA TE 1$ ISSUED AS A "A mR OF"INF-ORMA TiON OH.I.. Y AND
CONFEM NO RIGHTS lJf>ONil-lE \:'E~TIF1C"n HOlOE1'. 1'jo\iS CERT1FlCA.TE.
DOES Nor AMENC, £XTEN!l -:)R AL.TEA TH!. COVER.AGIE AFFORDED B'I' TME
__ ~QI,.I.9lg B.E19_w_" _____ ""
COMPANIES AFFORDING COVERAGE
T\iIS IS 10 ceRTIfY nv.,lll4E POlICIES Of 'NSU~E US\ED I!.ElO'N ~ .... ( £EEH ISSUED '1"0 THE '''$V .... EO w.MED ,I,SOIfE FC", r~E f>O\.\C'< !"'ER!OO
~TED. HCiTWiTkSTA~ ANY ~\jIUIREMEHr. TERJ:t OA COfOD<"1QN Of "''''Y CO"ljA~CT OF! OT~eF; I:XX.VMl:r>O Wmt RESPECT TO W~jC'" nus
CER11FlCATf MAY !If ISSUED OR MAY PERTAIN. TIlE I"'SU~E ~OED BY nlE POUCIES DESCRIBED 1-1£'"£:'" jS SUBJ~CT TO ,l,Ll THE TER"'~L
EXCUjSK)NS AIm CO/IIcmoNS OF SVCM POUCIE~_ uwrrs SHOWN MAY H.-liE BEEN ~DUCEC 9"1 P4JO CLAIWS
_" •• u"
~GIElfE'W...L.iA8IUTY VQ 847 25 l;"'il~
CU\IM8.1oUoOE X~;I;
0WIrEJr.s .. co.mucT'Ol'f'5 P'DT.
A""'OMOIM..e~
A I IM'lIoU":"O
AU. 0'fI'Hf0 AL!TOS
""""""" "'= .....,""'"
~""'" ........ -.rrv
-~ """"'''---
vt) &47 25 1.3·01
ltOUC'f lFnCl'M ~ lI!:tf'iiUTlOIf
.,An 11oIW.-oo.' 0'1 pan 1~U..,10('\'YYJo LIM'!'S
0.3/26/93
03/26/93
03/76/94
(l,ENEII'uIIJ. JIUi~G.4"T"E
~UCis.cOMPIOP ...oa
PEASOtoIAt. .. lJ)~ I""LlFOI~
E-OoCI< OC;:;U~PE"K:E
I'IPE ~E I.....,. _fl .. ,)
_ .. .e~.~)1
c.~!iil:UGL1'
03/Z6/!M UMr;
E--.cH oa:!.J~PE"ICE
""'G.iO.i ........ li.
UXXl,
1,000.
1.000,
1,000,
l"~,
lIiJ
1.0Q0.
___ ~c;;""~,~_~:.:""""",,,~~~! ..... !:!,,~ ___________________________ . __ . __
WOMu.""' IXJIIJ'GIYTlQtI ...., ---"'""'"
~ 113 3!l 19-01 03!Z(/9)
-------------------
SfUlJTO"'""",,15
E.I.CI< "'(;C..D~"'T
~S&>.SE-POllC.\' u ... :r
~~,,¥-f . .lC>' E ... '"l£'U
1 ,!roO.
I,OCO,
1,000,
Dt!~ Of DPPA11OIdo'L0CA~ rr... RE: S1~rrR SYSTEM 1!WR!l'JEM.[IiTS roo: P'UMPI«~ $TATI0ff5 JJIl)
!l.(¥.MtUTATlCl« Qf PIPEHII.E.S. P«.0JEC1 flU. ft.OO.IHIltAl. t!tSlJlEa {RE: GIL' AUTO): ern Of "AU} AJ.."!"O.
CIT'!' Of pAlO All:)
AnI!; JOE TfRfSI
Z~ IWHLTON AVEJWE, 1ST FLOOR
PALO At TO I CA M301
CANCEU.A. TlOtt
SHOULD J1.NI( OF TI"IE AeoVE OESGRllICO PO{..lC:E"S BE C.IIJ,,"CEl..LEtl Bf:F~1:: THE
E)(PI~TIGN DATE THEREOf". ~r: ISSUING CO/oIPAAY WILL £ND(J1.VOR TO
IrAAtl ~ O~YS WRITTf1><l NOTICE TO ~E CE:Ar~FIC:~TE HOLnE~ ,..A.MED TO THE
LE"FT. 8VT F,t,ILUAf TO MAIL SUCH NOTICE SHALl IMPOSe: ~o 06LIGATI01oI ~
LIABILITY Of ANY KINO UF"OfIj THE COt.lPAHY. ITS AGE"NTS 01'1 R.EPf:tESEIliTAn .... ES.
~ . JAA!).!~ "'"*',, .".,," SAIl '''''ClSoo ,,'-
11'(: 'Y.J, {"'«;ott. ( 1 k-
_____ ._.__ _ _____ ~~A~D.<;g.~~~.J.!!HJ
:9 Certificate of Ins urance
prc".,;s;onal Pradice IllS4Irance B~e~
10 CaUfomia street
Redwood City. CA ;.1063-1513
BRCWN .. CAUlWEll
:uaO Buskirk Avanue
Pleasant Hill. CA 94523
I, MATIEf.< OF INFORMATION
ONLY AND CONHRS NO RiGl-nS UPON THE CERTIFICA.TE
HO:'OER. TKIS C=-fHlf ICArE ~!;!; ;.:c i .<;.M~NO. EXTEND OR
AL TE-'~ n~.E COVERAGE AFfORDED T..,r POUCJES LISTED enow
Company A -Pi.ANElINSURANCE COMPANY lEeS)
Company B-
Cctmpany C-
~NCJI'jQ N("f~. 1EIW a. ~ OF loIN CO/o('RACJ 0It ~ 000 .. • •• EI"I1 ~ RUPECT T':) IMIO< TJ<I ~1'E ..... y lIE !$$..lED c... _ ...
PERT""", lHE NIULl.I«::IE~ iJV1I-EPC1.JCE8 ~ ~>$:ru6JECTm "4L 1').If TeJ<1.l!", ~ ~ COH!ln'o(lto$Of' $JO+P«ICI£S
•
G!NI5R.A1. UABI..JlY
I 1 Conm.. Gen. u.tlay
Il~M8de
1 J """""'"
! 0Wnet5& ConCractota -
·1oUTC UA8ILITY
1) ..... -.-
i j .... 0W08d ....
[I~--
11 Hhd ....
rl~'" 11 __
--.
COMl'EHSATIOOi
NIO EMPlOYERS'
UA8IUTY
POUCy POUCy
EFFEc-. DATE" E.XP1R. DATE LIMITS
Coml:Ioned SIfI9Ie Ur'nt
_'FI","""
BodIly IlPY ~ .acc:icIe'IC
"_","'. " ... 't,. ... ,
-= '----"'--> ... : Ea<h """'--StaI~Umh: --~aUcyLiml ,....... ....
E;r,-
a1l3D1!I3 A;g~lRnLII
DeSCription of Opeta1ionsllocalions/VehiclesIRe5tnctiDnsfSpecial rtems:
•
•
•
• • •
• •
•
11,GGG,AllCI
Ali operaHons or (he named insured rndUt1ing Stormwaier System Improvemenls for Pumping Stations and Rehabilitation
or Pipelines .
• Written at aggregate fmils of liabrlity not less than the amount sl'lO'WTl.
Certificate Holder.
CITY OF PALO ALTO
250 Hamilton AvenlJe 151 FIOOf
Palo AnD, CA 94303
Ann: Joe Teres;
nE IoGGAE-GATE UICf 1$ 11-£ lOT .... ~ .... .<oLoO.SI.E j;Qfi ~ PfI£SENTB)
~ llE PCIlJGY FOR AU. OPOVoTlOHS 01' "DE 1I.ISIJ£lI. CANCEUATION!
~ /IH( OF 11£ ,oJI()VE CESCRIl'IEO PO.JC£5 I!E CAH:UL£D IIERlft£ "TlE
£lO"RA11C#oI [i,O,l"E~. THE ~ COWPIUtY W1l1..1ML 10 0I'\'f"S \/III'WI~ NCmCE.
"1"0 !)IE aJfTl!'1C'ol"E HOLOER PWIIttI TO TIoE l8'T. E);CEpf '" Jlo4E EVUfT OF
CANCavo"T"U--I HlI'! ~",YWEJ.'T or: ~ IN~ CASE 10 CoI.'f'S NOTJt.::i: Wli &E
""'"
y" "
.(fu) ... If I'OU1
C<>mpJ;"
Cl),'JQ.ali
Cor11'8(
bpla..,
7QiiJ~ Ka"ll ;111
w>I'rt(:t
color, ItJ
• fder.ufy
~~ _m
CQMPUANCE RE:PORT l\Of1-0iSclimr,131ion Pro-.{i-siMS;:.t Palo Alto
Contra.:ts
Thls '~J'C>r'T rn~ll t>e t')r't1ople~«Il;., :-t,~
t.CIor>lrKn:.r .~ eac~ SlJtM:o~tt;)C'.or
C~{'!i IIh 1':."" Ut1IUS (l1~wiH
:r,!l'~td, u~ extra I~ts if
,""CI!s.'S<'''I, SUBMT ORlGIN,IIol 01" no_s
fiE~ORT DIRE;::: rtY TO.
Crty (>f "a~ A:-.o
Publi<: Woru E"9'i"H""QoISlarl $e(:r.u.rv
c;,..ic Cer>i'" . 61~ FIIge<
Z$.OHa""Il"" AIl4"UII
"51<.> A'to. CA 943() I
f.oje..."t .It",,, ~ .. [j " ____________ _
1. F..r. "t"'" IIN:1iddf.u PI 10m. Brown and CIIl.htdl
0' omer .-.;)Q!'TlnSllOn'l e(lllo~8d -:> J 4! () .tmU.1..r1l Avel;l'I!
b".ttu.s '~. 1'~&"'oIIollt-:e...!l. CA ~UlJ-4H"
:I. Name I':loC! .ud'~ 01' pr.nc:OIlt!
offie"" or rI\I~r, -:>
3. Name-and ad<!rHS o~ pNIop~1
otflOeof~ ->
., 1IIII,."......c acMre.u of ~r.rot
""bert !:. e,r4ce
Book.t ..... ~.
l~BQ au..kirk " ... eflu.
P:u&a::\t 1.:1. ...... CIt !J452l·n .....
UJ~ny ~ Ir. '"Moeled ... > lIiA
.orpo.-li!!oo,"
!-. N~rr~ III1d '<id,e1.S OJj p",".e
~"II~IO< ICCrT..,~I .. 0""" It
this i:I iI .sut>.;.()r1l<IIC'Of"',1
n!:F'"rt
6 S<liIrJ.1rur. ar"oCI tme 01
.!I<!tl>/;l~ ~her.lati~
8'1':
DATE:
RACIAL MAKEUP OF REPORTING UNIT
Name of Finn Bravo and Caldwell Submitted by _____ ~~~ __ ~ __ lZ! ( . O""'t'-u-s;±l~ __
Project Name S:YClM D46,U Yb .... s...,.. ..... tBM..Nf' I?tl'l'''uT/nKII)i
Co""act , __ 'i ........ T .. ::r-'--'O::..Z-= __ _(Indicate only for monthly report, No.3)
Three types of breakdown are required. This form is used for ~fI three. (Check)
cq -,. Permanent makeup a ~ company. { J ·2· Estimated makeup tor this project.
( '-3-Monthlv fO!port for _____ 19_ Submit once per month for dur.ltion of project.
1 = Permanent. 2 = Estimate for pWject. 3 = MOnth!y onJy.
Be sure to include II! employees in first column. not just minorities. Nos. j and 2 berow are required to be
filled in and submitted with Comptiance Report.
~-
Total aJI Asian American Spanish
J08 ,-ATEGQRIES ~~ "mDlo .". ~.m 1<>-Slack Ameriqiln Inrli::\n ~)Jrna",ed
1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 I 2 3
Mana.ement 6· 10 --c.L 4 --I
Prnf~"<;n""ls~ S .. , l.ll 2 63 } 15
Cleric.I-OIfi~~ 132 122 7 5 --5
Field SU""rvisor -
SkHl~ -ri:it
". Technicians 1091 21 9 12 -1 ) -
b. ~.---
c.
d. -~ ---
Unskfll!i!Q -Ii::it ,
a. Servic.e w(;rkers 20 9 3 1 --• -
b.
~--~ -
c.
d.
TOTAL OF A80VE 888 297 2 8S 4 36
This report must be completed by contractor and each subcontractor.
The term ·Spanish Surnamed" includes an persons of Mexican. Puerto Rican, Cuban, Latin American or
Spanish or~gjn.
Report or\ly emplo~es enroned in formal Ol1-the-job training programs.
RIo .. 11"'2
-5-
I
I
I
. -..,
SECl10N I
EQUAL OPPORTUNlTY POLlCY
Bra .... and CaIenren will administer jt5 personnel policies and conduct i!S employment prnctices
in • manner whlcll treats ea<:h employee and appli.:ant for employment on the basi! of merit and
experience, without rep"l Ie ra.:e. oolor. reliJion, sex, national origin. age. pbysical disabilities
or veteral! JIatUS.
REAFFIRMATION OF POLlCY
The Equal OppoI1Ilnity Poilcy of Bra"" aud Caldwell iJ ~ upon our philosophy !bat people
must be _ fairly and with dignily; and upon the belief that citizen. in a free society have
the right 10 self~on without fear of discriJrlln;Won as 10 personal preference or
cIlamcteristios which an> beyond their conl%Ol. Experience cootinue> 10 confirm our belief !bat
it iJ good business 10 have personIlel policies and pradices with a strong oomwllmen! to equal
oppottuDily .
In the appIic:dioo of the Equal Opportunity Policy of I'lli" Company, eacit of us as 1JW1a&"" and
supervi.ooo iJ IeSpoOllible 10 Jnsure !bat:
RecruitmeDl and ~t for fNtry Je-.-e1 and job classification are conducted
without tqanllo an Individual'. race, color, zdigioo, sex, rwional origin, age,
pbysica1 disability or veIer.In .t.!us.
Declsj...,. 011 promotions and transfers are in keeping wlth equal opportunity
principleo and are ~ on qualificalions as these relaze to the requirements of
the job for which !lie pencil iJ being considered.
Per>oonel policies, practices and actions are applied fairly to all t'ttIployees .
..... flirm"t;.·., Action Plans of the company "'" implemented within our
orgarUz.aIional units.
Noo .. segrqaled facilities ale maintained, and appropriate physical facilities are
provided for both male and female employees.
Employees are provided information concerning !be company'. Equal Opportunity
Policy, Affirmative Action Prognm and Fair Treatment Process.
The Equal Opport>mity Policy of the C<Jmpany is monitored by conducting
quarterly reviews to ddennine performance Ie the Affirmative Action Plan .
...
/
.---.
Performance ......tuatioru of _= and supervison mrorporate the q uali!y of
the equal opportunity envirooment and performance to the A ffirmarive Action
Plan obligations as significant elements of ovenIl perfonnance.
In addition, supervisors and other employees are held accountable for any cond~ towarrl their
subordinales or co-worms that may be defined as sexual harassment, including sexual advances,
~uests for sexual favors, or 0Iber physical or ve:baI conduct of a harassing nature which is
intimIDating and ~g. Any sucb proven misconduct may be ,,",use for immediale
tennination from employmenL
CIm:nce ~n, Rocruiting Manager, bas been designaled as the Company', EEO
Coonfmator. He bas respoos;bility fur monitoring our overall program effectiveness; OOwever,
program responsibility rests with line and !I3ff managers, wOO are involved in afflrnlalive actiOll
through annual goal selling, == counseling, and active community involvement with
orpnizations that support affirmative action programs. They un<fersIand their perfonr.ance in
!IUs area iA evalual£d 00 the basis of efforts and Ie:IIllts, as wen as other fact<>rS.
This policy sIaIemeftt iA ineluded io our Company', affirmati YO .roon program, whic.~ is ;ocated
01 3480 Bu3kirI< Avenue, Pleasant Hill, California. It is aIso available for inspection by
employees or applicants upon ~uest, by COIIlaCting Clatenor Ro<Iwell at (510) 937-9010,
between the hems of 9:00 a.m. and 4:00 p.m_