March 17, 1994
THE HONOR..lI.BLE CITY COUNCIL
Palo Altc, California
~,
-:~:-:"
1 9
Southgat __ ~ ___ Undi!'L:rsKound Conversion Pro';ect -Distric:t No. 3S
Members of the Council:
At its meeting of December 13, 1993, the Council passed Resol~tion
of Intent No. 7274 to establish Underground Utility District No.
35. The att~ch~d map shows the proposed boundaries of the project.
The Ccuncil meeting of t1arch 21, 1994, has been set. as the date of
th,=, Public Hearing on the matter. Notices announcing this meet ing,
with a description of the project and a cc.py of the resolution,
were mailed to all property owners in the proposed district on
February 18/ 1994.
'l'his report presents the map of the project area, intrcduces the
ordinance establi.shing the project area as Underground Utility
District No.35, and recommends Council ado9tion of the ordinance.
Background
As indicated in Offi:617:93, because. of recent agreements '.IIith
Pacific Bell, the Electric Utility is no .... able to shift its
undergro-unding proj ects from the dowrl town commercial areas to
residential areas. The major ccmsiderations given in 5pecif~cally
selec.ting Sout'ngate fOT undergrounding were:
First l about 55 ,percent cf the 77 pOles in the Southgate area
are det.eriorated and require replacemet'.t. The majority of
these poles are along rear lot easements. Replacing them is
expensive, because 'Of limited access; and in some cases, majer
trimming of mature tree:o: and/or (:ossibl e removal of structures
migr:t be required. J\r.alyses show that there is economic
CJoIR:192:94
----------
)
-
~. . ....
. "
.~-.~--..
o
benefit in replad_ng the existing overhead systeM lIIith an
undeo:rground system, I-ac.her than inve8t funds to reconstruct
the c,verheac. system.
The second reason is the rare opportunity to make this a joint
construction project: ... ith the Water and Gas l'oia.lfJ. and Service
Replacement project. scheduled for construction in July 1994.
By coordinating the design and ccnstrl.lction wi th 'Ct'le ~Jater and
Gas project .. t.he City w:ill avoid mUltiple, trenches .... hich
\liQuId be necessary if the project were done separ-ately. This
'..:ill not only minirr:ize the disruption but will al so reduce
expenses. since the cost of trenching will be shared bet\f\'een
the utilities occupying the trench.
Project Description
The project involves building a new under.ground electric. telephone
and cable TV {CATV) distribution system in the public right~of-way.
Conduits, va~lt6. splice boxes, se~ice boxes and CP.1V pedestals
and cabinets will be installed for placing the overhead electric,
telephone and CATV lines and equipment underground. The main
trench, along with the switch v~ult6, will be in the s~reer. The
splice boxes, CATV pedes'Cals/cabinets ari.d individual ser\tice boxes,
for property owners to connect to the underground system, will be
located in the planting strips, sidewalks or the existing public
utilities easements in back of the sidewalks. With the except-:.cn
of CAT' .. ~ pedestals/cabinets and padmoum:ed transformers, all of th2
ne ..... distribution system will be underground. This projp.ct will
provide undr':rground service to 24 ~ parcels or lots and will also
result in the removal of 77 poles located wi thi n the: proposed
boundaries.
service conduits on p:;,:'ivate prope!"ty for th.e electric, telephone
ar.d CATV will al so be. installed by the ci ty froIT, the service boxes
to the hOUSE. Again this is being inccrporat ed ber.:::ause of the
proj ect' 9 uniqueness, and t.his change will not affect t.he tctal
cost. To minimize any impact on landscaped private ya.rds, tr~e
proposed method of installing these service conduits is t\lnneling
or boring.
Staff would like to emphaS'is that this change, namely, t.he City
installing the service conduits, is being proposed because of
several contributL'1g fac'CoJ's noted belo'''' and, in no circumstance
should it be interpreted as the norm for future projects.
Conditions that influenced t,his approach are:
C.~R:192:94
~~~
" .
"11 major utilities in Southg.1.te are lccated along rear lot
easements. This makes boring sen-ice laterals safe, since the
risk of hit.tir.g underground utilities :is eliminated.
The water and gas utilities will be i~3talling (boring! the
service laterals as part of their project and, hence, it makes
economical sense to ut i 1 ize the equip:nent to also install t:he
E-lectrit:,; tel<aphon;e and CATV latercls.
The number of service boxes requir-ed will be 'Considerably
reduced (40%), since they will be needsd o~ly on one side of
the street. This res'.ll ts in less sidewalk an.d curb being
removed. It also means fewer distributicn cables and
conn~ctor9 ~ill be used.
There will be le.ss disruption to €:xistiT'lg mature 1 Cl.ndscape.
It reduces prop~rty OWT_ers' concerns of having to trench in
well la~d5caped yards.
Completion of this project will eliminate overhead distribution
lines in th~ southgate area, enable extension of the more efficient
12KV system into the. area '-area is now 4KV) and provide 3. future
12KV connecting tie to the College-'rerrace neigr..horhood_ Other
benefits include reduced tree trimming costs, increased safety due
to elimination of poles in the road ..... ays and in rear lot.s; and
improved reliability and aesthetics.
If an underground Utility District is cr~-:;ted, thp. Utilities
DEpartment will prepare bids for installa:. ion 'Of the l..!~dergrounc
substructure \cnnduits, vault.s and boxerl) as a joint construction
project ..... ith the water and gas main replacement. pJ:-oject. 'Lrpon
completion of Eubstructure ir.stallati()n, the utility crew \liill
install the distributi.on cables, transformers and'. switches. After
the cab) es are tested and e.nergized, all affected properly owners
will be notified that they have 60 days t.o prepare their homes for,
and cOr.lplete cOrl..'1ection to, the new system. As soon as the new
connections are complet.ed, utility CLews will remove the overhead
power lines from the poles .. following ... ·hich the Pacific Bell ~ .... ill
remove the remaining overhead facilities and poles.
CHR;192:94
'" _."
Fina:nci.D.g
The estimated cost of converting tne overhead dieLribution system
to underground in the p:roject a.r-ea is $1,300,000, af 'Which an
estimated $400,000 ..,ill be for the i:-:tstallation of telepho[i,e and
CATV conduit and hexes. The City will be reirr:b'..lrsed by Pacific
Bell Company and Cable Coop for this expenditure in accordance ~ith
an agreement, between these parties. Total cost of this proj ect is
included in the fiscal years 1993-94 and proposed 1994-95 Capital
Improvement P.r-ograr.1s.
Tr.e cost of the required service conversions on private property is
to be b':lrne by the: individual owners in accordance with Utility
Rule and Regulation No. 18. The total cost for the property owners
requiring ser..rice conversion from overhead to underground has been
esti;nated at $421, 000 or an aver-age of $2, 5("0 p~r parcel. The
property owners have been offered the optio!"'. of financing their
service conversion costs over a period of ten years in accordance
with the procedure given in Sections 1.2.16.090 t.hrough 12.16.096 of
the Palo Alto Municipal Code.
gnviro.:g.mental Impact Assessme.nt.
This project is categorically exempt from the environmental inpact
assessment -orocecure. as described in the PaID Alto Emrironment3.1
Procedures. -
Proposed ~X_Q.cedur~
It is proposed that:
1. U:r:.derground con·iE':rsion in the proposE';'d Southgate
initiated by the creation of Underground Utility
NO.35 as defined on the accompanying map_
area be
District
2 _ A contract:cr be retained to install power, trd ephon<S!,
communications, CATV ~ water and gas main and substr'!Jctures in
a jointly occupied trench_ Upon a-,.,iard of contr'dct by the
counc.i 1, an agreement for joint: participatior.. between the
City, Pac~fic Bell and Cable Coop ",ill be executed _ In crder
to properly distribute all of the cost of the proj€ct,
CMR: 192:94
,.----.
separate agreeT':1ents will spec~l:.y tl-.at Pacific Bell and Cable
Coop pay for their respective ccnd'..1.ic ~nd boxes and for th~ir
share of the trench and backfill, based upon the trench area
required by each util~ty.
3. The Council fi:1ds '...lndergrounding the project area to be of
general public interest and benefit. The cQnstruc~ion work on
the distribution system, therefore, will be done at the
expense ?f the utilities invcl vea, and no part of the
distribution cost wi 11 be a.ECs~ssed to the affected property
owners. Therefc.re, the only cost to the property m ... ners will
be tbat of replacing the overhead service equipment on their
buildings with underground servicE:s. Property owners will be
offered the optior. of financing their servi(:'e conversions
under Section 12.16.091 of the Munjcipal Cod~ and, in effect,
borrowing from the City and having th~ir r~payment costs added
to their tax bills ov-er a period of t-:r:l J"ears and at an
interest rate specified by the Council.
Council Action and Tentative Schedtl.1e
upon completion of
the proj er.::t will
schedule:
the p,;.blic hearing, a decision to pr~ceed with
resl.ll t in the following action and proposed
Introduction and first readtng
of Ordinance Es=ablishing
project Area as Underground Utility
District No. 35.
Second reading and adoption of ordinance
Resoluticn deter1r'1.ning property owners
electing to pay service-conversion cost
over a period of years.
Award of Contract to install substructure
(conduit '.r.lult et.c.) and Joint
Construction Agreement with
Pacific Bell and Cable coop.
o·m~192:94
March 21. 1..9.94·
i\pril lL 1994-·
August 1994--
July 1994'"
•
Instal1atiCln of uncergc'.)und fa<":.i.lities
(cables, switches etc.)
S~rvice Conversion work by
Property owner
Pole removal and project cGmpletion
* DenoteS Council Action
R~commendation
January 1995
thrt..! May 1995
t"'a)~ 15195 thru
Augu.st 1995
Fall 1995
Staff recommends that Council adopt the attached Ordinance to amend
Secti.on 12.16.02, of Chapter 12. j"f of Ti tIe 12. of the Palo Alto
Municipal Code by establishing Underground Utility District No. 35.
Reg;;:/~:u;;;:;
+ MICHAEL D. BE.~NI.JI..ND
Ef.~4:tJ_En;leerir.g Manaser
EDW~/;.~K
Director of Utilities
~LEMIN~
Attachment: Ordinance
District 35 Boundary Map
Related Q.1R:
CMR:617:93 Resolution of Intent -District 35
CMR,191,94
ORDINANCE NO.
ORDINANCE OF THE COUNCE OF THECITY OF PALO ALTO
AMENDING SBCTION 12.16.020 OF ClIAPTEIl. 12.].6 OF
TIT'..E 12 OF TI!B PALO ALro MUNICIPAL COOl! BY
ESTABLISHING UNDBRGROUND UTILITY DISTRICT NO. 35
)rHERBAS. this Council~ on December 13, 1993 r adopted
Resolution No~ 7274. declaring its intention to amend Section
12.16.020 of Chapter 12~16 of Title 12 of the Palo ~to Municipal
Code by establishing Underground Utility District No. 35 in the
City and by such Reaolutjon appointed MOnday, March 21~ 1994, at
the hour of 7:00 o'clock p.m., in the Council Chambers, City Hall,
at 250 Hamilton Avenue. Palo Alto, California, as the time and
place of hearing protests and receiving evidence for and against
the propo~ed action and notice of direction; and
WHEREAS. notice was gi.ven of t;he time and place the=ein
stated in the manner provided by law, as appears frOQ the affida
vits on file in the office of the City Clerk; and
~~ said matter came on regularly for hearing at the
time therein fixed; and
~, all written protests and other written communica
tions were publicly read at said meeting and evidence duly taken
and all per~on~ desiring to be heard were fully heard;
NOW, THERBFORE; the Council of the City of Palo Alto does
ORDAIN as tollows"';
SECTION 1. The public necessity, health and safety require
the removal of poles and overhead lines and associated overhead
structures from that certain area described in Resolution No~ 7274-.
SECTION 2. Section 12.16.020 of Chapter 12.16 of Title 12
of the Palo A1 to MuniCipal Code is amended by adding Subsection
(351 thereto to read as follows:
~(35} District No. 35. All of the area in the County of
Santa Clara. City of palo Alto. encompassing the a.rea
bounded by Alma Avenue ... Park Boulevard. Hl Camino Real, and
Churchill Avenue~ all as more particularly described on
that certain map entitled ·Southgate Underground Utility
District Num!:ler 35,.· on file in the office of tile City
Clerk. r
SECTION 3. The rUnde!'9['"ound Utility District
referred to in Section 12.15.020 shall be amended to add
areas shown 00 the map thOBE referred to in Resolution No.
Maps·
to the
72'74.
SBCTION 4, The City Council hereby finds that th.e adoption
of this ordinance is categorically exempt from the California
Environmental Quality Ac~~
1
->-." ,
.\ .
SBCTION s, This ordinance shall become effe::::tive upon the
expiration of thirty {30} days from its passage.
PASSIID,
AYES,
NOES:
ABSTENTIONS,
ABSBNT:
ATTI!ST: APPROVED:
City Clerk Mayor
City :Manager
APPROVED AS TO FORM:
Director of Utilities
Senior Asst. City Att.orney
2
" :~-.:~
1 * I
,.;--,
.::,,_.)
st·
ALIIA
EL CAIWIC REAL
SOUTHGATE
CITY OF PALO ALTO
CALIFORNIA
.~
~ ;0 $ • ~ " ~
r·3OQ'
,.,.. ,~
LEGEI>CJ
BOUNDAR'!' ~ PIlOJl'O~
IJNDEQG~UND DIS11i'1Cl
PQOf'OH If:! ... PllOFOSEO
UfII)EI!GAOVN[) ~STInCT
2161