THE HONORABLE CITY COUNCIL
Palo Alto. california
""-'
6
Amendment No. 2 to Consultant Agreement for Phase II Design and
Con,struqtigD Administration of the Wa.ter. Gas and Storm_.at.ations.
Equipment Instrumentation Control and Telemetry System
Members of the Council:
This report reco;nmends that Council approve Amendment, No. 2 to
Consultant Agreemenc No. C0008089 with CH2M Hill California, rnc.,
in the amount of $440,534 for Phase II Design, Optional Services,
and Construction Administration Services. In addition, this report
recomw~nds that Council authorize the City Manager or her designee
to negotiate and execute arr,endments for services related to or
incidental to the scope of work or services, the value of all of
which amen~~nts shall not exceed $45,000+ Funds for thi~ project
are available in the FY 1993-94 Water, Gas and Storm Drain capital
ltnprovement Program Budgets.
Background
In September 1989, Council approved a consultant agreement with
CH2M Hill California, Inc., in the an~unt af $82,200 for the Water,
Gas and Storm Stations, Equipment Instrumentation Control and
Telemetry Study (STUDY). A!nendment Nc.1 was made to this agreement
by staff in 1991. The STUDY agreement included provisions for
adding Phase II Design, Optional Services and Construction
Administration Services (CMR:454:9}.
The purpose of the STUDY was to evalua.te exist ing control systE'T!-"s
and recommend improvements. Upon completion of the ST'"JDY in April
1991, an implementati,on plan was developed by staff which included
a recom .. nendation to CO!1str",ct a new control system. The CIP
budgeting process for FY92-93 was completed before the consultant's
final report was submitted and approved by staff. Staff did n~t
want to recommend expending funds for a ne .... control system design
until eystem constr~ction funding was included in the FY 92-97 CIP.
construction fund~ were added to the CIP in FY93-94 for Phase II.
CMR:191:94
.,'
The existing consul 'Cant agree-me::1t allowed staff to begin developing
the Phase II project scope of 'oIIork. A project design team ""as
formed wi~h staff representing Water. Gas, and Public Works
Engineering and Operations Divisior..s and IRD, and representatives
from CH2M Hill.
Discussion c£ Consultant's Recommendations
In the STUDY~ CH2M Hill recommended replacing the existing water,
gas and storm drain tone telemetry system with a ne:.ti personal
computer-based supervisory Control and Data ~cquisit ion (SCADA)
system. Existing City cOrTCl!unication circuits will be reused to
connect the recommended computer based system to new te1emet ry
equipment at all facilities included in the S~JDY. City staff has
experienced operational problems 'Wi th obsolete eq'Jipment,
purchasing replacement parts. and central rr:oni toring and
supervisory control of the existing water. gas and storm drain tone
telemetry system.
The new telemet.ry system will provide the followi.ng ca.pabilities
and benefits:
Discussion
Increased real time information in a re3dily
understandable form. This will result in operational
decisions being ~~de more rapidly, improved dispatching
of maintenance personnel and minimi 'Z-,i.ng damage to' system
equipment 4
The syst.ern ..... il1 continuously monitcr
record system operational data resulting
of water or gas sYl3cem 10"" pressures I
flooding.
facil ities and
in reduced risk
or stOVfl water
The system; s repcrting
hiatorical data analysis
trouble-$hooting.
capabilities will provide
capabl.lity for plar.ning and
The proposed sy9t~m will increase system contrel
cap;:;bilities to save operation costs by more quickly
adapting to ne~ information 0= situations. For example.
if time-of -day power rates, are im?lemented~ reservoir
filling can be automat.ed to avoid high-cost hours.
Services to be provided by ~~2M Hill include the development of a
pre-design report (eee Exhibit Al Task 1-Predesign). This re?ort
updates the STUDY recommen.dations for changes in technology and
CMR:191:94
.-----~-
requiremer..ts that have occurred since the STUDY was cnmpleted in
Ap:!'il 1.991. Also, tl]e consultant will establish design criteria
for the development cf preliminary plans, final plans.
specifications and system construction cost estimates. The
consultant will participate in the pre-bid conference, pre
qualification proposal evaluation and provide construction
management services (Elee Exhibit 01 Lump Sum Cost by
Deliverable} .
Included in the project scope of work al:-e Softwa.re Config'.lration
services. These s'!'!rvices will assist Palo Altc by providing
expel-tise in the development of application softlliare for the n~w
telemetrI system. The application software will be developed by a
joint team of CH2M Hill and Palo Alto staff. Experienced CH2M Hill
personnel will provide leadership for this scftware team~ and the
team~ s work .... il1 be reviewed by a Sof-:w.=.::-e R.z':i~·.;." Cornmi ttee headed
by Palo AJto staff. The Software Review Corr~ittee will also have
a senior CH2M Hill softwat'e d~velopment engineer to assist with
quality contro].
A separate system construction contract will be brought to Council
for award, after the consultant completes the preaesign,
preliminary design, final design and bid services portion of
Amendment No. :2. The estimated system construction costs are
included in the Total Estimated project costs below.
Funding
Water, Gas, and Storm Drain
The basic and optional
Funds are available in the FY 1993-94
Capital Improvement Program Budgets.
services total a -not to exceed-fee
system construction cost is $676,466.
follows:
of $44D~534. The estimated
These fees will be itL~ded as
SYSTEM
Water Fund
(Enterprise)
Gas FuI'.d
(Enterprise)
AOOPTED
FY 93-94
FUNDING
$560,000
257,000
Storm Fund 300~OOQ
(Enterprise)
(Bend Funding)
TOTAL $1~11',OOO
TOTAL BSTDIATED PROJECT COST
con.t~~tion coata)
CMR:191:94
BASIC
SERVICES
$196,972
90,9'11
PROJECT COSTS
OPTIONAL
SERVICES
$32,104
14,818
14,818
ESTIMATED
~CN
$330,924
151,271
194,271
$378,79'
$1,117,000
$61,740 $676,466
(includes system
", ,
-------------------.
o
~nvirQnmental Assessment
The consultant~s activities in connection wIth ~~end~ent Nc. 2 to
Agreement No. C0008089 are exempt from the California Environmer.tal
Quality· Act {CEQA) 2nd are not subject to environmental review.
Recommendation:
Staff recommen~s that Council:
1. Approve and authorize the Mayor to execute Amendment No.
:2 to consultant Agreement No. 0:0008089 with CH2M Hill
California~ Inc., in the amount of $440,534 for phase II
Design, Optional Services and Construction Administration
Services for Water, Gas and Storm S~ations, Equipment,
Instr~mentation Ccntrol r and ~elemetry System; and
2. Authorize the City Manager or her designee to negotiate
and execute one or more Amendments for servicec related
to or incidental to the scope of work or sErvices, the
V'alue of all of which Amendments shall not exceed
$45,000.
~"fJJ' ~~. :;}leer./
BDW ;~/~
Dire tor of Utilities
H1~
G~""N ROBERTS
Direc"tor of Public Works
~~
City Manager
Attachments; M.endrr..ent No, 2 to Agreement
Ccn9ultant Scope af Work
CMR,454,9
CMR:191:94
AMRNDMERT NO. 2 TO CONTRACT NO. COOC8089 BETWEEN
CITY OF PALO ALTO AND CH2M HILL CALI FOll!lIA, INC. FOI<
PHASB II DBSIGN AND CONSTRUCTION ADMZNISTRATION
OF THE WATER" GAS, STORM STATiONS BOOIPMENT,
UlSTR1lMENTATIOIi CON'l'IlOL, AND "l"ELEKKl'IlY SYSrBM
TH!S .PJomNDMENT NO.2 to Contract No. CQOOeOBS is made and
enteI:ed into this ___ day of _______ ~ 1993, by and between
the CITY OF PALO ALTO, a municipal corporation of California,
hereinafter referred to as ~City.~ and CH2M HILL ~~IFORNIAT INC.
(Taxpayer Ide!ltification l';"umber .94-14.971)60), a California cOLpora
tion, with ,offices at 1111 Broad""ay, Suite .1200, Oakland, Cl!..
94607-4046: hereinafter referred to as ~Con5ultant~;
RECITALS:
WHEREAS. Contract No. COQOeOa9 was previously entered
into between City and "Ccnsultant ll for the provision of profession·
al engineering services for a water, gas and storm stations
equipment, inst~~tationj control and telemetry study; and
WHEREAS. the parties may agree to amend said agreement to
from tiIr,e to time;
NOW, THEREFORE, in consideration of their m'.ltua.l
covenants .. the parties hereto agree as follows:
SECTIQN 1. The title of Contract No. COOOa08.9 is hereby
amended to read as follows:
-PROFESSIONAL ENGINEERING CONS~~TANT SERVICES FOR PHASE
II DESIGN AND CONSTRUCTION ADMINISTRATIO.r.r OF THE WATER,
GAS, STORM STATIONS EQUIPMENT, INS'I'RDMENTATION CONTROL,
AND TELEMETRY SYSTEM"
~. Section :L4 of the 1>.greement i!:'! hereby
amended to read as follo~s:
·Section ~.4 -PROJECT
Tha
Exhibit
attache~.
term ·Project P means the services described in
-AI-entitled "Scope of Work and Schedule~
hereto and made a part hereof."
~~. S~ction:2.1 of the Agreement is hereby
amended to read as follows:
9)1109 ,,.11 0070515
·Section 2.1 -CITY
The City Manager will be the representative 'Of City
for all purposes under this Agree.'"Ilent. Charles Berg
hereby is designated as the Project Manager for the City
Manager and shall supervise the progress and execution of
this Agreernen t . -
1
,; .;..
SECTION 4~
to read as follows:
Section 3 of t.he Agreement is hereby amended
·Sect.ion :3 -SCOPE OF PROJECT
The scope of the project to be executed by Consul
tant under this Agreement is as described in Exhibit "AI·
attached hereto and made a part hereof.·
SECTION s~ Section 4.1 of the Agreement is hereby
amended to read as follows:
·Section 4.1 -BASIC SERV~CES (Phase II)
Consultant shall provide all spe~ified services as
set forth in the scope of work as described in Exhibi t
·AII .•
saCTrON 6~ The first parag.raph of Section 4.2 of the
Agreement is hereby amended to read as follows;
·Section 4.2 -ADDITIONAL SERVICES
Consultanc shall perform or obtain any and all of
the additional services shown in Exhibit "BI" attached
hereto and made a part hereof and not included under
Basic Services, if 60 a~thorized in writing by City; and
shall be paid a~ provided in Section 6 of this Agree
ment .•
~CTION 7. Subsections 5 (c) and ~d) of the Agreement is
hereby ~~nded to read as follows:
'Section 5 -DUTIES OF CITY
!C) City shall fUI:nish all such information as are in
City;s files or a~e at its disposal, as listed in
Exhibit "C1-.
(d) City shall furnish all services list€'d
"Cl·~ provided sufficient notice is
Consultant.
in Exhibit
given by
SECTION 8. Secticn 6.1 of the Agreement is hereby
amended to read as follows:
nSection 6.1 -CONSULTANT'S FEES
In consider,'3tion for the full perforrnance of the
Basic Services described in Section 4.1 of this Agree
ment, City ag.rees to pay Consultant a fee based not to
exceed three hundred sixty-seven thousand one hundred
fifty-two dollars ($378, 794 ) for
(1) Phase II Design and construction; and
2
12 ) Administration of th-: Water. Gas.
Equipment, Instrumentation Control,
System.
Stonn Station
and Telemetry
The amount of Consultant's ccmpensation shall he calcu
lated on a lump-sum basis as set forth in the attach~d
Exhibit "Dl·, Lump S~~ Cost by Deliveracle.·
SECTIon 9. Subsection 6.1.1 of the Agreement is hereby
amended to read as follows:
·Section 6.1.1 -SUBCONS~uTANTS
Fees for subconsultants, hired directly by CODsul
tant. shall be included in the fees listed in Exhib
it -D1 .... •
SECTION 10. Subsection 6.1.2 of the Agreement is hereby
amended to read as follo~s~
·Section 6.1.2 -FOR ADDITIONAL SERVICES
For Consultant's additional services. as d9scribed
in Section 4.2 of this Agreement. compensation shall be
as prescribed in Exhibit -D1-attached hereto and made 3
part. hereof.
SECTION 11. Subsection 6.2.1 of t.he Agreement is hereby
amended to read as follows:
·Section 6.2.1 -FOR BASIC SERVICES
Payments fer Basic Services shall be made in
progress payments in proportion to services performed in
accordance with Exhibit IAlI within thirty (30) days
after receipt of invoice fram Coosultant~ provided
however, that aggregate payments to Consultant sr~11 not
exceed ninety percent (90%) of the not to exceed fee for
each task as stated in Section 6.1 until Consultant has
completed all services asso~iated with each ta5k.~
SECTION' 12. Section 7.1 of the Agreement is hereby
amended to read as follows:
~ IlOII.,.. 0010S i S
-Section 7.1 -PROJECT SCHEDULS
It is understood and agreed that time is of the
essence of this Agreement. and that work shall start
immediately upon receipt by Consultant of noticE-to
proceed. Consultant shall commence work on initial tasks
of study in accordance with t.he time schedule I Exhib
it -Al-. Th€' work on subsequent ta_sks shall proceed in
accordance with the time schedule.-
3
-~ .. '~'. '~ .. ,'.
"
' ......... ... ; . . ; , ::~ •.
~--' -~--'--'----
...... . -,
SECTION 13. Section 7.2 of th~ Agreement is '.hereby
amended to read as follows!
~Se~tion 7.2 -TIME OF COMPLETION OF EACH PHASE
Consultant agrees to perform the phased services
'Within. the time limit.s set forth in Exhibit ·Al-provid
ed, however, that any change in the scope of services or
other changes due t.o City' s operating requirements r or in
connection with other contractor's or consultant's
operatio~s, may require a revised tLffietable.-
SEG.'TION 14. Section 15.1 of the Agreement is hereby
amended to read as follows:
"Section 15.~ -LIABILITY INSURANCE
Consultant at its sole cost and expense, shall
obtain and maintain in f~ll force and effect thrc~9hout
the entire term of this Agreement the insurance coverage,
insuring not only Consultant, but also {with the excep
tion of orofessional liabil ity. worker~s compensation and
employer's liability insurance), City~ its cfficers.
agent6~ and employees~ and each of thsrn. but only in
regard to this project, as shown in Exhibit -E1-.-
~_ION 15. Section.22.1 (.If the Agreer.1.ent is hereby
amended to re3.d as follows:
-Section 22.1 -DUTY OF CONSULTANT
No discriminatior:. shall be made in the employment of
persons under this Agreement because of the race,
disability, color, national origin, ancestry, r-eligicD,
or gender of such person. If the value of this Agre~ent
is; or may be Five Thousand Dollars {SS,OOO) or more.
Consultant covena.'"1ts to meet all requirements of the Palo
~to MUniCipal Code pertaining to nondiscrimiDation in
employment and to complete and submit the ·Compliance
Report-NondiscrLmination Provisions of City of Palo Alto
Ccntracts· on the form furnished by City as Exhibit -Fl
attached hereto and incorpora.toed herein by reference.·
~lL_li. EXCept as herein modified, all
provisions of ~~d exhibits and arr~nQ~ents to said agree~ent
remain in full force and e!fect.
other
shall
IN WITNESS WHEREOF~ the parties hereto h~ve executed this
Amendment the day and year first above written.
CITY OF PArrO ALTO
City Clerk -------Mayor------------
4
-,.
APPROVED AS TO FORM:
Senior Asst. City Attorney
APPROVE!):
City Manager
Director of Finance
Risk Manager
APPROVED AS TO CONTENT:
Department of utilities
Attachments:
CH2M HILL CALIFORNIA, INC.
( c.~iI~\{~ Ey:
It. :-.J.H.L:~",J'-LfY=k,>";",,l <J=t--'-' '11", '(.::"":"''''''~'''i''-'-
Taxpayer Identification No.
94-1497060
EXHIBIT -A1-: SCOPE OF WORK AND SCHEDULE
EXHIBIT -El w : ADDITIONAL SERVICES
EXHIBIT lIel a : CITY OF PALO AVI'O SERVICES
EXHIBIT 'D1'. LOMF SUM COST BY DELIVERABLE
EXHIBIT -Fl-: COMPLIANCE REPORT -NONDISCRIMINATION
PROVISIONS OF rAE CIT"; OF PALO ALTO CONTRJI_CTS
FORM
EXHIBIT '61' CONSULTANT TEAM
5
9l1:;!09rrnOO70.5lS
o
STATE OF CALIFORNIA
56.
com;"IT OF SANTA C~.RA
On t 1933 1 before me,
a Notary Public in and for said County and State l personally
appeared I personally known to me
to be the person whose name is subscribed to the within inst~nt
and acknowledged LO me ~hat he/she executed the same in his/her
authorized capacity, and that by his/her signature on the instru
mentr the entity upon behalf of which the person acted, executed
the ill& t r'.mJent .
IN WITNESS 'WHEREOF, I have hereunto set my hand and
affixed my official Eeal the day and year in thiE certificate first
above iltri t ten.
Notary Public in and for said
County and State
6
--~---
IOOilBITA1
SCOPE OF WORK AND SCHEDULE
General
Exbibil Al
,.-.., -
SCOpe of Work and Schedule
Phase n
· ,;
Design and Construction Administration Services
for
Water, Gas, and Storm Stations, Equipment,
Instrumentation, Control, and Telemetry System
'The scope of work under this agreement is to design, prepare construction docurr-.tents, pr0-
vide assistance to the City of Palo Alto during the biddilJg and construcoon phase. and lead
the softwan: deve1opmen! for me telemetry system.. The: Vw·ater. gas, storm stations tdernetry
system (telemetry system) is generally described as foDow"
I. Central control and monitoring equipment for the water distribution, gas distnbutioc,
and stonn station con~tion system at the Municipal Service Center.
2. Upgrades of the monitoring and communication equipmeor at the e:dsting water, gas,
and storm statiOtlS.
3. Auxi.fuuy mo[)ito...-iP.g equipment at the utility control center, and City Hall engineer
iDg clepMtruents.
The following conditions a..-re the ~is for this scope of work
I. The Phase I study recommendations and data are the basis (If this Scope of Wod.
1lllless specifically modilied by this Scope of Wod:.
2. The sites li>terl in Table I, located at the end of Task I, OIl: the ba.,is of this Scope
of Wod ralher than the siles listed in Table 3-13 of the study.
ClflM HITL shall perform Task I thmugh 6 for the telemetry system proje<:t
Task I-Predesign
General
Prepare l pred:s:i:gn report. which will vpdate the sludy recommendations for changes in
technology and requirements that have occurred sin • ..e the study was completed in April
199!. 'The topjcs fo be updated include:
Resolve the locarjon of the computers for ffi0uitoring and control of the
telemetry system.
AI-J
,
..
Select the mcst suiubie software and hardware f..,.. the telemetry system.
Determine if radio is an effective alternative to te:Cphone communications in
the Palo Alto Foothills Mea.
.. Develop a projel..1: delivery plan mat includes Ownen'Engineer configu."'3don
of software.
Specific items or work: ~o be completed in the predesign indude the fOCowir.g.
Task 1.1 Workshop Number I
• Prepare an agenda that identifies specific issues that need to be discussed and
an approacb fO£ resQlving the issues. The agenda will toe sent to tl-.e City at
le3.3t ODe week before the first workshop.
• lIr-leet with City staff to expiore the issues and de,'e!op approaches to resolv
ing the isrues. 1be ccnsultant will docUIDerlt the diS(:ussioDS and conclusions
of the workshop, and transmit meeting notes (0 the Cit)'.
Task 1.2. System Coo.Oguration. Prepa.-:e, revised block diagram and description of the
system configuration to met.{ masrer staoOl"'1, coaununication,. switchover. a1anning. engi
:ceeri."'Ig data. and long-term needs. Send the block diagram and description 10 the City for
revision bef~", the second wodcsbop of Task 1.6.
Task 1.3.. Radio Communication in the Foothill Region. The consultant will investigate
the practicality of radio oonununicatioQ between the lI\aSler station ar"d the f<JothilLs facili
ties shOW!!. in Table 2. Il is assume.d that the communication between the nwJter statico and
all other f4Cilities wiD t.: by City owned circurls,. as recommended in the study.
The communication investigations will indude:
• Coordinate a frequency search to determine if any 900 MHz mu:!tipie address
system ~1AS) frequencies are available in the Paio Alto Foothills area.
• Analyze r.IWO propagation betweeD the Footh.ills facilities in Table: 2 to de
termine if 900 Wb: MAS or spread-spect.""Um radio can communicate be
tween fad] ities.
Select. the most appropriate radio type. i.e_~ sp~ad-spectrum or MAS, and
develop a communication block diagram a."ld a budgetary co::.1 estimate.
Summarize the results of the facI:o communicat~oQ investigation and reCQ!D'
mend whether radio or 1eased ~elephone circuits ~hOlltd be used for commu
nications in the Foothil ts 'Yea Send the s,.'mmary in the (onn of 2 letter
report to the City for ~"iew before the 5e-cond w()rkshop of Task 1.6.
AI·2
.~ .. /.:
Task L4. Software E,..aIuation and Selection. A nonproprietary SCADA sC'ftware pack
age would be procured as part of the project This package will provide the basic SCADA
and operator intetface function s. Because differC'DI vendors producu have different
streogths. a two-step evaluation a.,d. selection process will be used ~o select the package.
Evaluation will reduce the Dumber of vendors invited 10 put on a demonsttatiol'l st Palo AIlo
for final sele<;Cion.
Step 1. The C\'aluatiOD process will i'lclude:
Developing essential and weighted criteria
Select software packages for evaluation based on published data and
our ex.perience.
Evaluare up to 5 software packages using established crirena.
Recommend a short list of three sotn.'3Ie packages thct all meet the
esscntial criteria and score the highest on the weighted criteria.
Prepare an evaluatio!1 summary as a Jetter report and .rend fO the City
for review.
Meet with City staff [0 discuss e'VaJuation summary and confm:n
recommendation.
Step 2. The selection task includes:
Develop delUOll~1.ratiorl and selection criteria in the abo .... e evaluation
meeting and 5e'f1d a final copy to the City for review before £he
second workshop of Task J .6.
A.mlnging for software d("mor.strations by the short-listed vendo~ at
the .second workshop.
Tssk 1.5. Project Delivery Pian.
Prepare a plan based Ol] the discussions of t.lw fust ,workshop. The plan w'-1uld include:
cvor~I.51
A definition of how ail hardwa.re. St>fIWare, equipment, and services wouid
be procured.
How [he software development tearn would be organized. team member
respansibilitie--s, working relationships and practices, training. documentation,
schedule, and other related issues.
An overaH project del !very schedule.
AI·3
.. ~ "'
•
•
•
A dosign pI .....
TIle plan would be sent to !he City for review bef"'" !he =nd workshop of
Task 1.6.
Task 1.6. Second Workshop.
• Prepan: an agenda that identifies speci1k issues for resolution incIudiag;
System Configuration
Radio CommuniC'3!iotl
Software Sclection
PJoj"'" Deli,elY Plan
• Send !he agenda to the City for EOV;"W at least 1 week before !l>e .. or\;shop.
• Med with City staff to' evaluate softw;u-e demonsCI'i1licns. 1'L\.l;.()lYe predt:$ign:
iss .... , and plan dosign.
DocUlDe[)[ the discussions and conc1QSi~ of the 'Worhhop. and transmi! to
the City.
Task 1.7. Prede;igo Report.
• Develop • ewrunary of the !'redesign task.
• Fmaiize system c(lDfiguratioo., radio commu:.nic.a.tion, software selet1ioD. and
proie<t delivery pIons.
Send 10 copies o( pn:design report to the City.
Al-4
· .;. ..
o
TABLE 1 _._._--
__ --,--fOC--ilffy~U-~----1---::1!IU=-i"'SII~."'No.;--+F.x:-_-;-N"'o-l_I----S'!!=Name=-:----+M~Qmed 8 ~~No~,~~~~~-~ ____ -__ --~~------+,~
!GasFoc_ ! !
I--'--+! -;~G;.cl --tI-="i!"DistTib~" ·,=-"",U/:::ion=St",otion"",," =~,,"'~I,-_ 'PA Utifrties
GT.l . W29 IGengRemota i PA L'tiitie.l
2 G2 -, ~is:ribuIion.. Station'·--"N:70~~2,-__ 1 PA UtiIit1es 1--,;3:-.-t--,;~;:;3 .;-~il----k0is!ributi0n Station fie 3 r -'P::'A~'::;iJt;:;ilme.;=-l
4 ~~~-t" __ ~DistTibutiO<1 Station N~4"--___ +-_:E,~J!tjes
1--;5,--+_ G5 ISc' SerlSv,g station --PA Utilrties
6 G6 Wave<1 SenSng Siofioo I PA Utmties
t-__ 7;,--...,r-_G;::-;;-i-jI----tIGl;;;::enno"="'i:brLOOk Sensing Sfo1'ion i PA Utilifie$
8 ._+-~G8",--+_ _-rH"a>se=",n=w"oy"--,Seno=""ng=.,,SI,,,ofi=OO,,-__ -I PA l)!ih!ies
~onn ~~ -----+1-
1--f;9;-+-;S"'I--t----f.-;::;':::,o:;';SPS,::"O;;:------'I PA Pubic Wo"",
10 52 Metod"''' SPS PA Pub<lC Woe""
11 53 ,Univeni!V SPS I PA PubiC Wo""
12 +-;S4~-t ___ iIA=,,,rpo=r!-,SPS~=-_ _ ____ -+i ",PAPubfiC Wo'k,
f-_-.;;1_7'_+_-.;:SS",--+ ___ f.Co"",ioI=000"",,=SPS,,-,,=::c-_ i PA Fibre Woo<;
14 56 Embarcadero SPS ! PA Public Wo""
S7 California SPS PA Pub<lc Works
58 Oregon SPS 5C County
:::10.... . S'I I 1m SPS I PA Public WO"" ~-l--,s"",,-o--,Ir--__ '::::'Inde =e ---_-~_-~~~~-j~.!:FA Public wo""l
~--+. -.. I ! __ _____ ---i-I ____ ---1
Waler FocftHies j
17 WI I Lytton Connectian & BPS --··---(PA-uiiffies 1--;-;18;-+-;W2~-r---_fJctolifomio~=-"'Comec1lon -_' PA IJlilrties -
I 9Oc-+--;W3~-\ ___ -=:J C"'lorle>tor, RQ)!\JI5l!or I PA Uti!me,
<lJ .-1. --;;'N,.,4o-i-__ -fArostradefc Connection '-PA lmi!ie,
21 WS"-.+ ___ .. "H",iftvi","ewRegukrtor ---r-fA-Uiilities
!--=~=--+ ~--I-_--f~i~B~t . :~ :;;:;:;
24 we Mil COOnectioo PA Ulilities
25 W9 _MQYi\eIC l<ese<voir & BPJ;_ _PA Utili!ies
1-_;;26:;--t_WI"O:-t-__ -iic;C"o"'rt~_Mode!o Reservoir _ PA tffilrtiss
27 Wl1 Corte Madero BPS PA Utiities 1---2~B;-+-'C;W;-;l2-!-!--+F"'ooIt\&""''''' R to< 51= I PA Utilrties
29 WI3 __ ._ j Bo<ondO SPS__L_PA u1l.ities
-"iW"I,,3"fl-+ ____ fBo .. 'and.. a ReQU!art",,_... ...... I ~_ Util~ie,
30 -I WI"'4c-!-__ -f.:jBo<OflOO Reservoir ----l P"'-!Jtu1!ies f--'_=', lC-+ W15 Bbw.::Q....~egulcrtOl Stotian .... ___ ==-r~~ I
1--3"'2<--+-;.;WI67-.-_-+t----f.;'pa"'rk'C-'Rese<yOir " BPS I' PA '"'tiTRies ... ={. .
3J W17 Oo~R~",oir& BPS PA utilities
34 W18 r·--.... -!Monte Bello ReieNOir I PA Utilffies -,
CVOf'91fJO)..xt.s AI5
...... '-~
~&~
'!-
,0.1-6
Site Number
WIO
WII
W12
WI3
WI4
WlS
W16
WI7
WI8
W25
W26
CVOf>'UJ7I ,j I
Table 2
Foothills Facilities
Site Name
Corte Madera Reservoi:-
Corte Ma<lera Boo'ltt Pump Statioo
Foothills Regulator Station
Boronda Booster Pump Stanoc
Boronda ResetVoir
BlanCQ Regula.lo[ Smtion
Park Reservoir and Booster Pump StatiO!)
Dahl Reservoir amI Booster Pump Statioo
Monte Bello Reservoir
Hewlett Regulator
Foothill 6 Regulator
AI-7
u ,
-
Tuk 2-i7eliminary Design
Prepare preliminary dra\\oiogs and rechnical ~L'1cations to represent the design for tk
telemetry system.. The following condiLiofl..£ are the basis for this task:
1. No significant cMnges have occurred 10 the sites lis~d in T~Ie I since the study
other than !be change' lisle<! in Table 3 locale<! at t!te end of Task 2.
2. 1be Contract Documents will use Palo Alta's standard legal specifications, and
CH2M HILL will prepare only gcoeraJ and technical specifIcatiOns. The City "'ill
f.unl.sh copies of its standard legal specific.atl ons.
3. The City wiD fu!'!lisb reques;ed e-risting documentarion 01) sites listed In Table !.
Task 2..1. Site VISits. VLSit selected sites to verify new or changed site r:onditions sin<:e
the sites WCle visir.ed in the srudy phase (pb~ I). The si~s to be visited are listed in
Table 3. In addition. a sample af each type of site will be visited to refarniliarize the
design ~ -.iih lbe sites and the site visit notes from the Phase 1 5tUO y.
Task 1..2. Prelimiruu-y D .... wiDgs. Prepare preliminary drawing, that are representative of
the design. 'J1xo. sample preliminary drawings are listed in T3b!e 4 located at the end of
Task 2.
Task 2.3~ Preliminary Specifications. Prepare preliminary specifications that are repre
sentative of the fmal design. Toe ~ample specifications ~ listed in Table 5 located at the
end of Task 2.
Task 2.4. Third Workshop. (Preliminary Design Review)
CVQi"2,lJ7I.51
.Prepare an agenda that identifies the: specific issues th..at need to be dL..::cu..o;sed
in the preliminary design review wori(shop. 1be agenda., a."ld the prelirrunary
drdwi[lgs and specifications w!ll be sent to the City for review at 1easl
I week before the workshop.
Meet with City staff 10 discuss L'1e issues,. review comments oc the prdimi
Ila..."Y drawings and $pecifications. and resolve the issues il11d review com
ments. The consultant lIfill docuIW"..n~ t.'1e discusstons and conclusions of the
workshop, and tIansml! meeting notes to the City.
AI·E
iF'r! ...... _--
Site No.
510
W!5
W32
_0
1010
1040
1092
1300
1700
13400
13415
15495
16005
TabkJ
Sitos T. lie VLSited
Site Name
TId< Gate
Blanco BPS
Foo<hilJ RegulatOi
Table 5
SpecificatioD5
Title
Genenol
Summary of Work
Coordimuion
Abbreviations
Submittals
Contract Closeout
'{echnic21
SCAD ... System
Reason
Upgraded ,ince I"" visit
Not visited in Study PMse-,-_~
Ne ..... site
PrelimiDary
Design
x
x
x
X
x
InstrumeDratioD and Control Sys-•
tem
InstrumenLatlon Piping System •
6e<:trical
AI-9
-
\
-,
-~-+-------
--------------,-
-l--------------)(---x
!-----------
AHa
TasTe 3-FinDl Design
Prepare the final drawings and specifiCJ.tions for inclusion ic a 'Comple!e contract doc LL'UCnt
for advertising and bic!ding the telemetry system. The ioUowing conditions are the basis for
this task:
1. Palo Alto wdl prepare legal specifications for incorporation into the final review set
,md final set of contract documents.
Task 3.1. Ymal Drawings.
Inco~ into the drawings lhe c.oncIusions reached in the preliminary design review
workshop. Complete all L~e drawings listed in Table 4.
Task 3.2. F'ma1 Specifications.
Incorporate into the specifications the conclusions reached in the preliminary
deSign review WOf"kshop.
Fmisb all of the specifLc.arrons listed jn Table S.
Coordinate the gen~ra1 and technical 5pecifi~ons with rhe Palo Alto legal
specificat,jons, and send coordination comments to the Ciry.
Prepare a PrequaliflCation So::tion for inclusion in the Palo Alto legal re
quiremeuts. 'i"he intend' of this Prequalific.ation SectiOD is to establisb qualifi
cation crireria for bidders, and the form and fonnat of a PtequaIifi.;ation
Proposal thl11 the bidder must prepare prior '0 bidding. Also draft • Prequali
flCation EvalL.!.ittion Conn.
Task 3..3. ~""maI Cost F.stiroate and Implementation Schedule.
Review and update the construction cost estimate and the implementation schedule from the
pred'e.sign report..
Task 3.4. Fourth Woruhop. (fInal Design Review)
Receive the final legal specifications from Palo Alw and print a finaJ review
se~ of the drawings and specificatiQns.
Prepare an agenda t."at identifies the specific issues Ihat need to be reviewed
and rli,'iCussed in the fmal design revie'W· work~hop. The agenda, and the
fina1 design review contract documei1:ts wiJ1 be sent to the City fOT review at
least two weeks before the WOCK1ihop.
AI-II
• Meet with Clly staff to discuss the isslJes. the final drawings ond .peciflCa
ti~ and review corntJJent5. Resol .... c the issues and re .... iew comments. The
COnsWta. ... it will document t."le discussions and co!iclusioas of the workshop.
and tnmsmir meeting notes to the Ciry,
Task 3.5. Fmal Drawings and Spedfications.
• IncOIp<lr.lte iota the drawings Il!ld tcchnic.oJ specifications the teSUl<s of the
final ~ign review workshop conclusions.
• Receive from the City of Palo Alto. L~ final legal ,~~ifications for
incorporation into the final printing of the ccmtract documents.
CVOP'1.ml.:51
Prlnl 40 ccpies of the final fL~ed-liP contra...; documenl;; for advenisi.ng and
bidding purposes.
At·l2
0_
res/t 4-Bid SIJT'IU:U
As$ist City staff wi:h bid period servicc:s, prebid conference, prtqualification of suppJiers,
an-:i evall.mlion of hids. Tbe following conditions are the basis for this. wk:
The City will:
1. Distribute contract documents. t() potential bidders. and main:tain a pianho!den. list
2. Receive prequajii'katiQD proposals.
3. Rea::ive and revit:w the bid dOC:U01CDts. and award the contt:acl
Task 4.1. Advertising aDd Bidding.
During the advertising period CH2M HIlL will pG"tce advertisements for bidd:ng in
appropriate publicatiODS, in!e:rpI"er conttact documents, a..'ld prepare any necessary
clarifications or addenda.
Task 4.2. Prebid Conference.
Prepare conference .agenda and transmit the agenda to the City for revie'JI' at
least one week before the pn::bid wofe.n:nce.
Conduct the prebid ronference and lead a brief site. tour 10 a sample of sites.
Task 4.3. Prequaru: ... tioa Proposal Evaluatioa.
-Evaluate prequalificatioo propos.Jls in accordance with established ctireri~
Recornroend prequalified contractors.
.. Identify prequahfied contractors in .an addendum to the contract documents.
Task 4.4. Bid EvalualioJL
Assist the City of Palo A1t(' with the evaluation of the bids and recommendation of award.
AI-13
/
..
=-~:.~ .. ~-'-'.---.-------'---
Task 5-ConslTuctWlI Senius
Provide assistance to the Cicy in reviewing. and managiny the Contractor's work on the
1eleme1Iy .y.tem. The foUewing conditions are the b""is for this task:
1. The City will be primarily respons-ibie for construction management aud will provide
the following sc'lvices:
Day-tu-day inspection of the Contr4Ctor~s work and preparation of daily
r:JX<Is.
Attendance at an project status and scheduling meetings. and coordination of
Contractor's work schedule.
Manage review of ContractO!"'s submittals.
Ma~ae the contract and Contractor payments.
Task 5_1. Construction Management Services.
Assist t.."le City 5-taff with preparation of an agenda for the preconstructioo
confereoce. and assist in conducting the meeting and preparation of meeting
notes.
Review requests for clariI.cation and coordinate clarification co~nts with
the City staff.
As."iist City staff wilh Ie"iew, negotizrion, and documcntatiIJD of ciuu'lge
orders.
Assist City staff wjth evaluation of contractor claims for extra compensation
and time extension.
Attend monthly progress meetings, and as..~ist etcy staff with documentation
of discussions and resol:l1ion of isslJ¢S.
Task S.2. Review Contractor Submitta1s.
Review the required submittals and cocrdinate review comments with the City staff. Pre
pare a COllSOi.idate set of review ccmmeDt.s and return fo the City for transmittance to the
Contraclo<.
Al·14
". -:
(""I -..
Task S.J. InspectiolL
•
•
Visi, the construction approrunately once a ",,~.ek. .and inspet.'1 tlJe PfO"ctess of
the won'-Resolve installation and interface questions.
Observe the opern.tional rear..llness test an<! review ~ test documentation .
Prepan: • report on tile !IalUs of t/le !<sting and identif)' the completion of
the testing.
Conduct • final inspe<'jOD of t/le completed installation with tile Ciry. Pre
pare a final deficiencJ' list foe COJll..ptetiOl'l by the COJltrac:£or. Prepare a fmal
repon, including recomlDl:llda1ioD' from the Engineer fOt" """"ptao<e of the
wl\tk, that the amQunt of final payment is. appropt-la(e. ibid ttw the contract is
ready for clcseoat ".
AI-IS
"-"
Task (; S4lftw ... e Configuration Services
a.nerol
The intent of the Soth\'are Configuratjon Servi.~s is to assi.st Palo Alto in developmeDt of
appticotion __ (0< the Ielemc!ry system The applica.ion softw= will be developed
by • joinl Ieam of CH2M HILL and Palo Allo pe:sonoel Experieooed CH2M HILL per
sonne! will provide leadership for this software learn and the team', work will be reviewed
by • Software Review Committee beaded by Palo Alto persoonel" The Software Review
Committee will also have a senior CHZM HILL software engineet to assist :n the qaality
eontrol.
lbe following scope and ~ts have heel! developed based on CH2M HIlL·s experience
with similar projects. The following condition.; are the basis for this task:
• All Operatoc Statiml configuration Vrill be done using the !>elected SCADA
software package" The package "ill be GW (Graphical Use, Inted~)
based and the operating system will be a MD-proIJrictary version Cof 0512,
WmdoW5 3.1. ~"IX. or Windows NT. S<,lftwace configuration will be done
using graphics function blocks. table fLI1-in or use of a built-in programming
language 10 configure all required functi:ons. No external routines in FOR
TRAN, C. or other !iiDgu. will be requim:l.
PLCs (Programmable Logic Controllers) wi!! be used for r~mote terminal
units. PLC prognunming will be done by CH2M HILL.
'Ilic Software Review Committee will review software contigura!ion wori: at
forma] re,iew ,points and J1rQvid~ written acc:eptance of work or [iotificahco
fN correction. The review committee will witne$s Fundiona1 Acceptance
Tests and will provide notice of substantial completion when tests nteei lhe
requirements of the Software PredesigT'_ No other fonnaI tests .are expected.
• Configuration by CH2M HILL will be done primarily at CH2M HIl.L's
offices i~ Oakland. AU computer hardware and software required for
config.uation will be provided by the contractor.
CH2M H~ will pro"idc training and project managemenl servkes foe Palo,
Alto perwnnel to tDabIe them to p;L.tidpate in the software development. It
is assumed that PaJo Alto staff wili work 500 hours on software develop
ment Palo Alto staff team members will work: in the--K nonna! work location
and exchange data files with the Oakland offICe system over a ITlooem..
Duration of software development and testing L<;; shown in the project
schedule.
AH6
•
r'!,e •. ,
•
•
o.
"The maximum system configuration consists of the foUowing:
46 PLCs
700 real Inpao'OutpUl. points
200 calOlIalc<! poiuts iu addition to real 110 points.
48 custom process graphics
5 menu/overview ctispiays
2 trends (real-time and hislorical)
2 Custom !"CpOm
30 pages of customiud operator help displa)"s
The base software configuration (operatiug system, SCADA software, utili
ties, and LAN software) ~d versions will be "frozen" when the sofr.vare
configuration work begins. Software upgrades provided' by the Contractor O£
software manufacturer, unless ~ssary to correct critical problems. will Dot
he installed, bot turned oyer to the City for future installation by City staff.
An additiooal software license will he purchasc<l and CH2M HILL will retain
one Operator Stati.on and sofNi'are license to{' a period of 1 year following:
notification of substantial completion 10 sapport ongoing n::visions and pm
vide on-demand support. CH2M Hll..L will use a modem interface to the
installed system, which will provide dara communications with the instaI1ed
system.
CH2M HILL will provide programming services 10 assist in correction of
errors and omissions for a period of 1 year.after notice of subtlantiiI comple~
tion. Errors a..,-,d ormsskms are defiued as software that fails 10 fumi5b func~
tiooal requirements <!eliDed in the Software Predesign.
CH2M ~L will maintain two sets of an required documentation. One
documentatiOIl set will be returned to POlio Alto at completion of the
on--demand services.
Task 6.1 Project Coordination, AdministralWn, and Management
The scope of this task is to provide overall software development task project planning,
management and coordination efforts. aDd the daj..(o-day administrative tasks. required fOf
the software development team. This consists 0[:
• Provide administrative services related to project planning and management
work plan and schedule, scheduJe tracking, monthly reports, task trncking,
billing, et<:,
Deyelop project instructions for software development team :members.
CV0f'2.C7I-S1 AI-17
.-~-,
• Pro"'ide for wee.k.ly meetings with development team and monthly meetings
with Software Review Committee to coordinate software deveI(lpmcnf cffCn15,
review work-in-progress, acd to provide sratus updates.
Deliverables
• Project schedule and !ask list
• MODtbly progress reports and billing summary
• Meeting minUU:s (or meetings with Sofuliare Review Commirtee
Project instruction~ 10 Software Development team
• Softw.,. CoDfiguru;on Managemon. Plan (SCMP) (IEEE Standard No. 828)
Software Qualil)' Assurance Plan (SQAP) (IEEE Standard No. 730 (SQAP)
Task 6.2 Software PreJesig1l
The scope of this task. is to develop the complete function:tl requirements specificaticU) for
the software. This task defint:s the reqWn:IDf'Dts for -displays, controls, I7ll'!nus, reports.
alarms. and procedures. This effort includes:
Operator Interface Software Requiromenls
• Develop human fador.. standards for cfispIays, including symbols, color as
signments, display density. DevelOp a library of standard displays or subsec
tions of displays (i.e., conkoller !acepl .... , etc.),
Define displays and develop IOOgh displ.y layouts (sketcnes) for each dis
play.
Define requi.-emenLS for water and gas distnbution controL
Define requirements for reports.
Derme trends.
Combine and edit the final 110 points lists.
• Convert the 110 points list to a forra' installable for the SCADA software.
Define "",uriI)' groups and Ie vels. Define security for eocb display aod
report.
.Defme virtual points required for ~talus, alarms, and set poin ts.
Define alanns; priorities, levels.
AI-1S
--.. -
:.
o
Deliverables
• Software Requirement specifi<:ation IEEE Sid 830.
Task 6.3 Programming Equipment Setup and Training
The scope of this task ronsists of the: initW set up and ttaining. Only sliffici~Qt compo
nents "'l"ire4 for software development will be irutaUed '" the CH2M HILL Oakland of·
fj",. Other componenls will be retaioe<l by the Cootracro<. Training of key de<igo learn
members OD the system hardware and software will be done at: our Oal-Jand office. Thls
effort consists of the-follo'Wi..l1g:
• Coordinate delivery with. COntracLQ{.
• Install operating systems.
SeI up soft .... are development LAN.
Test telemetry system hardwar..! and system software when delivered and
insraDed in offices.
AttI':Ild training by Contractor on standard system software.
Task 6.4 DaIIlhase Configuration
Specify and input the daIBbas<:. This effort .... 111 include:
FIll out database configurotion forms '" specifY parameters of database
points.
Enter and verify database configuration fOffilS.
Update database on an ongoing basis to reflect additional d.3.ta reteived from
manuCacturers and contractors.
The (oHowing operator tennina1s wiU be confl~:
Centr..J Termirulls • 2 (identical).
• Municipal Sen-ice Center -Ba<:lrup control.
CVOi"2Kl7I,j I
City HaD Utility Engineering -Status, historical database access, access to
Sla...r'ldard historical report ...
City Hall Public Works E...f'lgrceenng -Same as Utility Engineering.
AI·19
.. "-
--,,, >fi:;
"'"
1bis is a total of three (3) unique configurations.
Deliverables
.. Summary prillt out documenting database C~figura.t!OD (part of Documen~
tion T"k deuverable).
TDSk 6.5 Dispkly Configuration
nu.. task consists of developing the ,,".!Slom graphic displays. configcring the defmed graph
ics and met:.woverview displays, and ti..-wng displays to the database. This effort coosi:.'"1s
of:
Develop custom graphics. Li.'1k process graphics to database p4l.-amerers.
Develop overview and menu graphics. Link meDU graphics to database
parameters.
• Develop alarm displays
Deliverables
• Graphic displays for Software Review CoITUrLittec review
TDSk 6.6 C01ltrol Functions
Comrol functions include manual and automatic water and gas distribution logic. This task
consists of the effOft to configure the SCADA software 10 execuie ~ functions according
10 the requirements of !he softwa .. predesign. as descnlled by the Softw"", Predesigo. This
effort consists of:
Configure !ogic according to the Sofr-Nan:. Predesign. Prov:de schedulmg,
multiple operations modes, interactive control
• Configure marb functions required
Integrate control functions with the graphics displays, menu, alarm • .&nd treDd
displays.
Deliverable.
CYOI"lN7I.:! I
Sum..rnary prim out documenting colltrol conflgu..ration (part of D-..x;umcnta
lion Task deliverable).
AI-20
o
Task 6. 7 Configure Reports, AUum.s and Treru/s
This task consiscs of the effort to configure o'.hc:r features or the tetemetry system. This
effort consis.ts of configuring:
Cuswm reports
Alacm messages. priorities, annuGnanon and reporting locations
• Real -time trends
fustorical aends
A total of two reports .. ill be confi8'.m:d.
T",L 6.8 PLC Softwart C •• ftguraJWn
This task CO!lSists of the effort to configure the PLC software tor the_ sy:;:tem. It includes:
Configuring analog and dis(:reIe 00 point tables for data acquisition and
supervisory control from the master.
Communications ronfiguratioJl_
System management duriDg development period.
PLC soft'Wate testing in the CHlM Hll.L offices.
Post-acceptance suppon for PLC software [oc 1 year.
This task does not in<:lude control programming such ~ pllmp start/S[Op. pump seqyencing
or level control, or special drivers for digital communications to local instruments.
TlJ.!k 6.9 System Management
This task consists of the effoit to operate and maintain the programming system during
software development and !he complete telemetry system during integration and testing.
This effort consists of:
Perform periodic backups on the system 10 protect lOCfemental wo~ from
being lost in the event of a failure. Provide for offsite storage of backups.
Doc".llDl:nt SCADA 50ftware problems and coordiuate with SCADA software
supplier for resolutions.. Provide yeriodic upgrades of software as :hey are
released by manlIfaC'tllrer. until software "freeze" dzre. Retain later revision. ..
and llpgra<j('''!' 10 be furnished to Palo All D.
AI·21
.... ;'~~:' .. ~ .. -
,'.;. -
,:, .-:.: .
....... .' f
../
• N ctify con tractor of equipment problellJ.'5. Coordinate with (.()Otr.i.ctor for
system repairs.
Maintain a list of hardware supplied 10 engineer. serial numbers. and mainte~
nance and repair history log so that problems with hardw .... ..,d ",ftware
COIl be quickly tlaa:d and documented. Maintain records of software ver
sions. revisions. and installatioo dates. Provide equipment lists for insurance
pWJ"'OCO. Mal.taln IisI of ",ftw:ue copy protection keys. Maintain security
for keys.
Deliverable:s
lnspeC'"..ionlprevective maintenance reporu
Soft~'afe bug fix and Wilrk -around reports
F.ardware and software lists
Repair hiS!cfy reports
Task 6.10 Test Plans and Testing
This task It:sts the oonfiguration of the telemetry system in both informal. in-house U:sting,
and a formal simulatioc of the system configuration witnessed by the Sofrtw>are Review
Q)mmittee. This effon consisrs of:
• Develop Software Testing Plan (STP). Format will be a<:cording to IEEE
StanclMd No. 829 (part of IEEE 5tanclMd for Software Test Documect3lion).
• Simulate various modes of operation and modes of control strategies before
starWp.
• Tes: interaction of strategies with graphic displays.
Simu1ate calcu!a%ed points and aU I/O points to verify that d<!tabase is
properly configured.
Tes~ warm points 10 verify proper ~ priority. report Jocation, and
trigger value.
Cenfum that trends operate and that :t'ports provide correct va1ues.
• PerfOfJD witnessed accepta.l'lCe test ~1th the Software Review Committee [0
verify that s;)fiware, displays, iind other functions satisfy requirements of this
sCQpe of work.
Supervise packing of system for s.hipJ11ent by cootra<:tor to jab site.
CVOi"2JI)7ISI AI-22
o.
Deliverable;;
• Formal ~ procedures
Wirnessed accepbnce lest res:;.dts and maintenance of punch li~1
Task 6.11 Startup
This task consists of the effort to start up l~ telemetry system in the field. This effort
consists of;
ObseIve Operational Readiness Tests when:: Contractor teru. standard hacl
ware and software through actual conullunication links.
Load software on telemetry systefU.
Perlonn f'unctioniJ Acceptance Tests. \' eriCy that operatiocal strategies are
correct FlX problems with software configured by Sof't\\.-are Development
Team.
Deli .erables
Fmal Functional Acceptance Test report
Task 6-12 D~umentDtWn
This task con.su,is (If the development and delivery of a telemetry system O&M manual and
sy5!Cm documentation as defined in the assumptions. This effort consists of:
0&."1 manoa!. Will be p~ a.< prinled documents. WordPerfect or
MJcrosoft Word for Window. files will be furnished to Palo Alto for future
use.
Provide system doculTJentation by printing arut assembling jists of database,
configuration parameters, control strategies. graphic di'ipIays, alarms., trends,
and reports.
Provide two sets of back up magnetic media of applications software config
uration.
Deliverables
CVOPl.o01l.51
Ten caples of me O&M manual
One copy of the O&M manual 00: magn..!tic media
Two copies of the applications so~are on magnetic media
Ten cnpies of the sys.tem documentati(l[l
Al·23
TlUk 6.13 Own.r Training
This task consists of the effort to aain Palo Alto operations. maintenance, engineering. and
management staff to use the relemetry system software in cf.co~-to-day operations. Operations
and maintenance !raining will be performed prUnarily by Palo Alto staff ",he participalCd in
3Oftw>re development. PLC ,y:stem maiotenacoc ond programming training will be supplied
to Palo Alto by !be syslem veo.dor. CH2M HIlL lI1Ii11ing will foc"" on !be management
""d engineering use. This effort consists of.
A l-<lay training session for Utility ond Public Works engincers on use of the
system for daUi acquisition and trouble analysis.
A balf-day seminar fN managemeDt petSonDel on normal and emergency use
of !be telemetry system.
Deliverables
• Training courses and materials
TlUl 6.14 POlt·.4.cCeptance Support
This task ccmsists of the effon 10 provide l-year post-acceptance support of the system..
This effort will include:
OIJ..demand and lelepbone stJpport of telemetry system configuratioD and control strategies.
Oo-demaod support Vr"lTt typically involve questiODS regarding the SpeciflC roDfiguration and
'its usc. On-demand supp.xt will be used to -cover corrections to applications software prob
lems dis...-overed after notire of substantial completioD of this software project AI. Palo
A.1to·s option. all<><:.rued support may be used to provide f"",lUeS or enIwlcements that Palo
Mo staff find desirable and allocated support may also be us<d for supplemental trniniiig.
Allocated support may also be used ;Q install upgrade releases of software packages.
AI-24
"
:, -
·-~~r·
0°" • 4
,'--,-
.... ,.
"
'"
:, ,
/
r' \,j
(
Palo Ano Water/Gas/Storm Telemetry System
EXHIBrr A1 OVERVIEW SCHEDULE
~,,-____ -;~I.~"~ __ r-_ 1~
~Ul:U! :;,~'!mllUllJUmW~l:UD~t .. mj,mWtA..·i;HfIl:llmiiKIfI~l -Ufii.HU, .. lMI\>\m.a.'i\')\1(.lmWRh"-dtllAt UHt~lml"IIIl.M:nMm<f'UM.l~'~W3
:~IU,'~' 1 ....... f~ ... > ..... , __ .....!a~~Z! __ ...... ~_~ ...... '.)« •• ,.'.' ..... ".. , .... u~H,~L" ..... e~'* ... ~ a...~:~ .. J ..... ~.Cl .. -~:I:-.~......' • ~ ::=v De~QN.i:r"':,f,: ,'" -'"1::,' "t~'-:l'-:j
... -,~",,(... . ... -t· -j." .. :'. .-.... +.. ".'-'--ii
/-""" ,",i-~, ...... l.. '-I' -i-.. i-.. ~ ,
a. I'iirW.. DE8JGN 'I" "_n. ,~r---... ..... ,j,.""... ,. ,. ,j-. ...j .. _... -t ..... '11
1 I\. 810 bEJMOEO 1 .-..... , ,,-;... ~ ''''-T-.. j._ .. _,-.-'1"-~ ,.--~
r~~TI~~~------"--------d:r"':.:·r;.:.::::;f
: x. ~['I)f1lONAl QEAVICf,$ ~ ~ ~8. SOfTWARE OONFIGURATION ---I \1' --r'-" . T ":;:"' ,~
: e.x AT\J Bollware oonligutaUon --t"I' ."; 'f 1:; J
III ij{lrAA'O{~lr.I'Yi··',I, ~"It ......... UhHill'hl{ll"II.>\'~H.,I"~.I'i\'" .. \~'\l<U, IOU HhJbi ill,' ,!t~.lflll Hhl>!li, I ,'I!AlnOIJ~l • .t11I1hlldtillUHI.I'r •• ,jr·aQ>;'JH"\' "hlh, ',_"_;" ,~,:
, '\ \.
~, .
'"
"/
<)'
,
""":'or}
o
EXHIBIT 81
CONSULTANTS APOmONAL SERVICES
Exbibit Bl
Consultant's Additional Servict's
Phase n
Design and Construction Administration Services
(or
Water, Gas, and Stonn Stations, Equipment,
Instrwnentatioo, OlDtrol, and Telemetry System
A. TIre Consulrant will perform or obta;" a"y and all of the following additional
3ervices not included u.nder Basic Seyvices~ if so aUfhorized in writing by rhe
City.
Task 7 Optional Senices
ibe fonowing tasks are Dot included in the basic Scope of WoU.-These items couid
be perfonned by CH2M HILL. if desired by the City. Fees wi1l be in "",,r<!mce
.... ;~> I'aragr.;>h B. Fee Schedule.
TllSk 7.1 Design "nd Constnu:lian Services for Radio CommullkatWn
If racfio communicatioo for the Foothills facilities is recommended in the predesign
and desired by the City. !he following lasks must be added to !he S<:ope of Walk.
Preliminary and Fmal Design
The following drawings need eo be added 10 Table 4.
Radio System Bloc1: Diagram
InstalJatioo Detul, (2)
The following specification needs to be .dd.ed to Table 5: 134~O. Radio SUbsystem.
Coostruction Services
The following addicio[l3) services will be provided:
Review of radio subsystem submittal:;
Im;~-tion or the instaUation of the radio subsystem
ObservatioD of .radi:o subsystem testing
Task 1.2 Po . .,·Acc'pl4m:. SUPpOrt
.' ..•.
This task consislS of the effort (0 provide an additional 1-year period of
pest-acceptance sofiwaI'l! support of the tel~metty system {in addition to the support
p"',ided by Task 6.1J). Thi.s effort will inclU<k:
On -demand and telephone s.upport of telemetry system ~onfigurntio!l and control
strategies. On-dernand support \\111 typic-aDy involve questi.:m.s rega..-ding the specific
configurati..Ji! and It.'<;; rue. Oo-demand support will be :used to cover coaec:tioIlS to
ap~ons software problems discovered after nfltice of substantial comp!eti on of
this ..,fiware project. At Palo Alto's option, aIlocate<\ support may De used to
provide featnres or enhancemen ... that Palo Alto staff fllld desirable and aIlocat..-d
support may also be 1!S:d for supplemental training. AUocated support mayaIs.o be
used to install upgr.tde release; of software paci<.>ges.
Task 8 A4diti0nal Meetings
The Consultant w~~ attend additional meetings as requested by the City. The
attendance for additional meetings will be as agreed upon. Fees will be in
ac<:O£dance with paragtapb B, Fee Schedule.
B. Fee Schedule
1. The ConsUltant will provide Task 7 Optional Servio:s, if 50 authol"iz-e.d by the
City, foe ll,e foUowing fees in Table BI-1 and BI-2.
2. The CCilSllltant will provide Task 8 additional meetings, as agreed cpon. for
the following fees:
CVOf"l.ffl2_WPS
a. Labor:
(I) For project personnel identified in Exhibil O. at rates listed, iD
Table BI·3.
(2) For other personnel,. at rates identified in Table BI-4
b. EJtpeoses:
(I) Actual cost plus 10 percent
BI-2
;
Io! I~I! I~
h~
Il Ii
I~
...
!;t I~
:q~ ::3
c:: ~~ .,.
10
-gl
!~;:
I;; I
-I! i· ~
:;;;
~ i
~ ~ la
L
~
12 t
1~ll m:u
~ 1
~
.~ ~ ~
i
~ ! J~~ )g
/
Tabk Bl·3
PrtndpaI Prejrd ~ Labar Fee ScMdulf'
Boori! RaU! .... .995
"'-
_ .............
C ..... .99J (-<-Bill Pttmchm.idt Project ~ 1..11/! bdio ~ 56 Sltl.OO Sll6..55 .$122..3S:
8ynm Posta>l 0i1iW lIld Softw:R Er.gince:' Eb ,22.., 1211.99 135_44
"""'''' SIwbn
lMna.memcuioll and CAI1trOi Ec~ fA 7&."15 12.6'l 86."
-==----
Hwrl, btt. .... ...,
GnNk """",-.993 (esthratea.1 ( .... "'"""J
E7 &Jbce: (Senic:) $15025 $15116 $165.65
56 EnrU= "O.so 131.0, 14J.83
E5 En,;-1 Hi.OO l2UO 121.IS
fA -98.00 "''-'" '08.OS
E3 -86.>0 90.1:3 95_11
E1 -77.50 aus ISM
E' "ED.gU-r (Juniof) 69.00 n..4S 76.07
'l> TechDiao (Sr. Des.i~~ !US ".36 90.63
T4 Technician (De$iBJ1el") "-75 7639 002'
n Tecbcicia.D (Sc. DWter) 6$.75 .. .04 "-"
n TccIuaiciaft (l)n.f-.oer) ";25 591)6 62.02
n Tcc:hn..ici.aro (1,.. Onha") SO.OO 52.>0 :ss.lf
TA T~Aid 31.25 32.1l1 34..45
Ill-S
:"-. -------'"--.--,-~---
EXHIBIT C1
cm OF PALO AlTO SERVICES
r;
E:dIibit Cl
City of Palo Alto Sen-ices
Phase II
Design and Construction Administration Services
for
Water, Gas, and Stonn Stations, Equipment,
Instrumentation. COlltrol, and Telemelry System
A. The City shall provide requested existing docu.'1leDtation to the Cons ultant for the
City's water distribution, gas distribuu'JD. and storm water pumping facilities. The
knO\lln faciiities requiring; new dOCW!1eDtatiOD are listed in Table 3 of Exhibit A
The required docamentatlon is as follows:
Facilities:
• Facility locations (name and street addresses)
• Site pIan and ec:luipment arrangement
• Equipmeot list
• Control and wiring di!1gr2lJ1S
• Instrument aDd telemetry et:lUipmenl list
0perati0llS and Maintenance:
• T)pica! daily, weekly, monthly, and annual reports
B. City personnel win be an integra] part of the software confIguration efforts
described in Task 6 of ExiIibi. AI. City personnel will participate in both tbe
Soft¥.oare Developmen1 Team and the Scftware Review Committee.
Software DevewplTUmt Team
This will be a joint team :-fforl., led by C~i .fiILL personnel City personnel will
participate in all phases of software configu.ratioo to gain the experience needed for day
IO--day support of waler. gas, and stonn operations. City personnc:l a.o;;signmenlS will
include:
Task 6.2. Softwa", Predeslgo. Assist with:
Standards development
• Graphical display layouts and content
• Contro] requirements
Report defmitioos
Security and aJarm planning
Cl-1
•
, .
. . \
.'
/'-
I
',I,
---~------------.-
o
T .. k 6.3. Programming Equipment Setup and Training.
Testing e'lLlipment and software
Training on standan.l system software
Task 6.4. DQ:tabase Configuration.
• Fdlins out database configuration fonns
• Entering and verifying the databas<
Maintaining the database
CODtiguring workstations
Ta:sk 6.5. Okp"'y O)ofiguraUoh.
Development of graphics fDr' operator and engineering tel11lio.aJs
• Linking of graphic displays to the database
Task 6.6. Control Fllllclions.
• Configuration of control logic
Development of calculations
Integration of control functions with the graphi(.':aI displays
Task 6.7. Configure Reports, Alarm .. , and Trend5.
Develop sample reports
Con1igurc operational alarms and trends
Task 6.8 PLC Software Coofigura/ion
• Configuring 3IlaIog 3J1d discrete 110 point tables for data acqulsition and
supervisory centrol from the ma.~er.
Communications configuration,
Task 6.9. SJSIem ManagemenL
Perform periodic software backups
Document software problerru;
Maintain hardware and software database
Task 6.10. Test Plaw And Ttsting.
Assist with developmenr of lest plam
Test software before startllp
PerfomJ software acceptance testing
CI-2
---------
Task 6.11. S!artup.
Observe Contractor·s operational re~iness-tests
Load so~'are on system
• Perform functional &C4;eptanC'C tests
Task 6.il. Docwn ... tatioo.
AssiM in preparatioll of the O&M manuals
Assi.or;:t in system software &x~ntatioD preparation
Task 6.13. Owner TraIn1Dg.
Prepare training ptaas for operations training
• Participate in operations training
Task 6.14. Post·Accep!an<e Support.
Coordimle system support by Eng;',eer
City pe1SOfliIel will provide at least 500 bours of support to the Software D<,velopmeot
TeanL A majority of tb< time can probably be spent in Palo Alto wori< 00 • persooal
computer supplied with the project. Bul at, leas, 32 boun; per mooth must be spe.1 at the
software development center in the Engineer's office in OakJ.and, California..
Software Review Committee
City per.iODD<l will staff and lead the Software Review Committee, A <em", CH21 .. 1
HllL software engineer will be a member of the comminee. This committee will be
responsible {or reviewing the work: products of the Software Development T earn to a.ssure·
that the ",ftware efforts meet the City' s needs and are of high quality, The Software
Re\'iew Committee will formally review LJ:Je Functional Acceptance Tests and dc1cnnme
sobstantiaI completion and final acceptance of the software.
CI-3
, '-_._--"
" .
o
EXHIBrTDl
LUMP SUM COST BY DF! NEAAflLE
§
~. -
trl\lbjtOl
LUMP SUM COST BY DELIVERABLE
I\PPOl!IlONEO COST
TASX DESCIifP'llON TOTAL WATU GAS STORM
1. PRED£S'GN .$32.841 517.077 57.882 $7.882
2. PREUMINARY DeSlGN 534. i il 517.769 sa.20l sa.201
3. Fi'W. DeSlGN S56.716 529.492 513.612 $13.612
4. BID SERVICES 5226.12 511.784 $5.= $5.439
5. CONSmVC11ON SfRVICES $40.298 520.955 59.672 $9.672
6. SOFTWAA!' CONFlGURATION 5192.106 $99.395 $46, iOS $46.105
TOTAl BASIC SERVICES 5378.794 5196.973 $'1(\911 $90.911
File: EXHB1D2.XLS DI 217/94
o
1'~Cj-1 "'""" ........ '" Sale s.-icc.s -, w, I l¥""''" rCor.¥:5-!~r..,!~! ~ !c:ADf_f_ ..... ~ ,~
.,ASl(,.~ _.-
U~ ..... , -....... " ..... ~ .......... ~ ---.. • • 1 ...... ..""..,'*'-'_ • • • u __
· , • ,..3_'::-"-' ~
... s.W'_.~ · ~ · u"""""~ ...... • • ~
,.~------~-..-.. "" --• • • , ... -~-• • • 1~~_
"'-" ''-'''''' "-' • • • -...--..".,....~ ...
',T"'-.~~ • " e · "'-,----, ,
'!.UIO:I.~~A;. ~ -.. ,-, ..
TA.$I(:a.~~
*"'.500_ I • I
~
~-,.... • • , • • ~
1<:a-,.~ • • • • '" z...n-...I-... -.~1 -~-..
~_'*'9'.P.I. -J. -",~-'~p.."n~-" , • 2._",.....",,_ , ~ .... DoIV1,......-....-,.
TASI(.z.~Df$llII<Sl.1JTO'''' • • ~ '"
"1' .... 1 ~ DSIC/oI
1,'-0.-.. • I • · '" I ,.
:::..z_so.-c-J & ~ • ~
Uc.oootb." .... ~ , " '. ~
'''-~ ---L -"",,,,",,,,,""" --.,,..,..
f'''''"'Doo9'_-'''' • 3.._--......_ • • :J'"",~ILsr-• • " • • • ",
""'0e0Iir'0""""'''''': " " ,.~:J.nvo..~s.,efOr ..... • • • '" • '. ~
~~
TM:I\4. .. SIP.'o'ICC$
.... l~ .. -....a 0 __ --~~ .. -Q_~S--
,U",,",-,",-~ M.,,_ .. _"""*-"'...,.... ,,-... .,-~ ....
T".. "" COIrIST'I'UC'nO SEIII'M:U ---.I~",,-
O-.-.~"-
~r--!C~~~~
T ....... 'IOI'tWM!.~'(I(M
.. ~"--"1oIgao
u __
U~~ .. ~ ... ~~
U __
uCwoIoIr_ U,..,..,-..,t_
UP<,(:_~
U __
L .. ,. .. ,...._--. .. n_ .... .. -.. q_r .....
~ .. I.Df'1WO.III!:~_~ .....
TatIIot01-1
LAOO!'l ES'TlUATE --..,G !ll'l' /.,.,.,p 1~!I.;:T .... 1 ~i '-" le.o.o,_J_ ... 1 1"..:
~ I~ I ---.-+-,;<-+-"~~+--~-".-i--~~-'~~~-+--'
•
• ~
~ • • " ,"
I I:l~-~-~.I ~I ~I 4.-
•
" •
•
•
• -
,:' ,
/
T..u;I.~ _.-
1.1~""1 ............. --... ......... ~ .. --I .• -.......'""'~
U~~
U_~
1 .• N<I<_a~
U"""""'~ .......
I.~-"" ----~"""' .. P'" --UI$oQn~_
l~""""~ "'-,.-..,. ~ -.............. "'" U~""""" __ ........... .........-
T.aI(I.~~Ol''''''
'IASIC:l. ~ DI15IaII t.. __
u-..,_ U __
~----."......-.,.
--~"P" ~~F'oto_
,.. ... 0.,.._ .........
~_.n..-.._ .... o..o:r-,..,...,....--.
'I'''''''L __ ~~''''
TASK1. ~l tJi$<GIo
l..'_~
~--1JC:IoIE!I ....... ~
1.r_-.:.. -----o.or..,."" ..... r __ ..,. ....... _
r .. ~_-..
I._-.....~
"'" -""-'90'" '-_""""''''''iooI .......
"""""_~Sl.l3'TC'TA4.
.'
l;·
i},,y;,
->-" _".:. ,:~---.-.--=..~
Table 0,·:
fEE Iii!> TlMATE ---..,,(OJ M" i"""~IC<OoDe!'\Il~!i",,"1"odo1 ~ I
1 -=,.=1 "" $,,~I "* b -A-I :::1 -.,-, ... .-"" -.-UO
1'.1. = =
~ -I ~
,,-.--..... .= -~
~ .--.-.--U'
lID 1"'-, "t __ ~ ... -=1"'-' -,,= I ~ "'" ~'I ~ " ...... "' .. ,,~, u= --J,'~i 00 ~
""I --J-~ ".~ -~ ",'. -,,~ =. ·~I p-
~lf ='/ "=1 "'" •. ~
~ --V."-, -I ,,~, I $','" ".
= .~ ~ ~
.~l ... ~~j I','. ~ . '-.... ,,-.. ~ .1II'.t-"" -.-.~ 1"1.1" ..... ,l ~
_ I ~1 '-'" lo.:J '_I
-
J
I'''' .~ " .. -
".,I ~I
O .. ..... ll .~
.~
:l<.lr~
---•• =
1' • .-RIA,_ "1..15:1
:--------
<~'.:;:~: .
. "~-,.:
__ 1_"""1
'*
= "'" -~ ,,~ -". U._ ... ,,~
~ -"'" ~ -= "U,.,
~ --= -~ -, --=
~, -= .. .~,
,,~ ,,~, -~,
"" I A~ ".5:11
.~
m = .. .. ---.m ."" " "" ~
_m
1 --~'O __
.~I no, -.. .. ---,,=
SO:,0\1
,,~ -". IISIlr,.
.-1_~
"--=-....... ~
c..a...~,,~_ oI.lI ....... ~_
...,,.,.... ....... -... ..,~
.. W-l'Wfoor .....
T_"_~~.q.
TASIC"~~ ~_e.-_
... ,c...-.,._ U"""""'" __
... -n.p:. ~Sl1I'W:P rut;7QrAl.
fASICt. ~JUIII: CCIM'IItUIAT1OII
1I., ........ ~.1oyoa
u __
u .......... ~~, ........ u __
u __
U ____
.. 1""""",,_T_
.1 :1 "::~! • :;-~'; J.::I.I JJJJ-Jg
-=1 :',;: ! !
~.. s,~
_ ..,1tl1
.. m
") .~.~. '
,
o.
amalIEl
INSURANCE REQUIREMENTS
-INSURANCE (lU!REMENTS -tong Form
".
TEAAIS AND INSTRUCTIONS
...all • Gh'DI1D Y'Ol.M ~ 4Gen1MOlCBl.
T .... GII'~.I:!JIIt~_ o;w.~
.. ~.#IU .. ~e~
TO;)O ,,,,,"u. .. "" VAll ~~
""'~.C'CIlW' ..... ~~"'1!Il1<lmol
MU."~ ~ "'" JIi'SIOIICTII"-"-;:L
RETURN TI<E COM?t£TED CUlTIFICATE TO TI<E ern' OF PALO ALTO, PlrnCHASING '" CONTRACT
2!)o HAMILTON AVENUE, PALO MTO 54301.
TYPE OF COVEftAGE
P'J .0_""_ G_ U.bi~y, 1tOOfl'r' W,JUAY
INCLVOINC;, ~OfI(MTY CAMA(il
• 1"VlS000L IN..Il.rRY
.. _OAC FO"M ~OP'!R'N DAMAG! BClDflY INNRY .. P'ROf'IERTt
.. 8lAHK£T COHTJU.c:r,JAL OAM.t.()! C OMSlNIED '1,000,000 tl.000.000
.. P.PIE lE3,l1. UAeIUTY
~-nr. Automobil, Uab3ity: BOOILY IN.1'..JfIY rE-.ch ".ff1H\t .'.000,000
INClUO<NG, IQQ!. Y !£lYRV I!!!!: ~ ,., oco 000
• OWN<D P'III:OP'JiIHY O ... MAGII! 11 qooaoo
aOCMt. y IHJUI'I;y .. ""'0I"tlI TV ....... OAMAGI! CCMSINED 1'1,0"'"...0.000
.. !:MOI'l5 ANa 0fWIIS:su:m5 All.. DAMAGES $1.000.000
A. 1M Oty ef ,.. AmI, n. omc.r.. ~ and' """FIPP" .. ., rwmed .. .oclltiGMI '.--..-.d. l)ut ody _ to 'll¥Dnr. p.rfOlTnW u~~
ellmtNC'C. ,.., ~ _ tit'" Clty.r~ .. Ahllll, IR: ..... " tIIi'WnMy ca" .... 'I1iI ••• j~ Gf!..-t; ........ Ciry'. nilting "'-'wane •
.nd "f'( III'tMr n.w-arrIIocI by '1M City ~ U~ ~~.~ .
.5. y.~ dW ~ ~ gr~ p..m.g. .. C~ 4riIIInt IN" att..1 vnd~",ound ..,9ril,. W 11l1li11<;., iMtud .. =.nr.n::Ii"" or ....iT.,.
c:~. ~ mMw. Of ed'Mt 1imiltIr"...ny IU MY ~1It.NtI ill conn~HujOM Uo.r .. ";:~ b.lQW u.. wrl..:"'l' or 'lIw ",,, .. nd ""'Md'N~
OomM by ~ ,.".. 01'" 11tII Oro, af ,. Allo.
C. ~ """ ... otn. ~ ~ coa.,.. ~~. pfCNicMd In 1M uno)VfIti 1Iba-.
D. n.~~.~s. •• ..-lt.f.",.....·PJ ..............
E. ~ _ UI,OOO muM 1M ...... e..r end WI! ~t 10 ~" ....
F. tf ~ paI~ .. ~ Of' ~ ctum-.v no.. p-"od (!f ~"""'1Ig'e .. I:l .. ad .... r .. n.1n INCh • ~ .. to eff,C1 11'1. Cllt'til'iUI.,
tmty '30) d~ Wtin..., na~ will 0. """;;ed fjI .... Oty 0' ~ .. Alto: Comr-t AdMini.v.rian" P.O. SG_ 10:2'50. ,.303
G. n.. ~ ~t Pf1Moy ~. cDncracl;\l.I.alOIiP:'l ..... ~"' p«I~ i ....... .-.c. o:-o .... ~. f.,.. C:ontr_r'. lIfjI""II ....... nt
ID jndownnify tM Oty,
H. r,.. ~~ .rro~~"'Id.'cn. PGliO::-.. NIl;.ct co .. It'"'" Gftfw po.fici." d .. ~.(.u ""rei" ¥Wi"",~, .. o::tf If>., p." .... .,." .... c..a .....
foo-,,-O ....
DA-rro If 1'119.3 , l
\
o
EXHIBIT Fl
CERDRCADON OF NONDISCRIMIHADON
-. .
CERTIFICA TlON OF NONDfSCRIMINA TlON
Certification of NQn<fiscriminatiQn: As suppliers of goods or services to [ne City of
Palo Alto, the firm and indivtduals listed below certifies that they do nOI discdminate
m employment with regards to age. race, color, religion, national origin, ancestry,
disability, or s~xual preference; that they are in compliance With all Federal r State and
local directives and executive orders regarding nondiscrim:nation in employment and
that they agree to demonstrate positive IV and aggressi ..... ely the principie of equal
opportunity in employment.
The SidderJProposer agrees speciftcally:
1.0 To estabHsh or observe employment policies which affirmativery promote
opportunities for minority persons at all job levels
2.0 To communicate this poncy to an persons concerned, including all
employees, outside recruiting services. -esp.eciafly those serving minority
communities, and to the minority communities at large.
3.0 To take affirmative action steps to hire mlnoriw employees within the
o.rgan1zatk:ln.
4.0 To be knowledgeable of the klcal. state. and federar laws and regulations
concerr.ing affirmative action policies and provide opportunities for
employees.
F~m: ____________________________________________ ~ __ _
TItle of Officer Sign1ng: __ _
Signa~ure ____ _
Oate _________________________________ _
Please include any additional information a .... ailable regarding equal opportunity
employment programs now in effect within your company.
------------
.EXHIBIT G1
CONSULTANT TEAM
r
!
F3e£XaTGt.OOC
TEA ill MEM SER
Bill Peterschmidt
B)-TOO P05ima
Carolyn Shadan
Exblb" G1
CONStll TANT TEAM