HomeMy WebLinkAbout0178.094City of Palo Alto Proposed 1994-99 Capital Improvement Program -. ~, .. • • March 10. 1994 THE HDtlDRABLE CITY COUNCIL Pal Alto~ California AttentioOn: Finance committee Members of the Council: ~' ~ityof Palo Alto Officeofl-'", City />. fmwg.r Transmit~ed herewith for your review ~nd approval i& the 1994-99 capital Improvement Program (CIP). .!j. ~CIP Projects Map" is included in this document to provide information on the qeographical location of selected projects. General F111ld Financial summary For 1994-95, a CIP budqet for General Fund projects is recommended at $4.56 million. This figure includes $2~94 million in new and ongoing CIP projects; $1.24 1:Ii1110n in utility user tax funded street, sidewalk, and CUbberley projects; S.CS million trom reserves for a downtown parking structure reasibility study, which will eventually be reimbursed trom bond proceedsi and $.3 million in increased park improv~ment5 and library autom~tion projects to be funded froll:'. the one-time electric r'}bate. The electric reba.te to the City resulted from a reser~e surplus in the Electric Fund, due to savings in electric pover purchases and other factors. The $4.56 million recommendation is noteworthy, given the continuing and col'lsiderable pressures on General Fund financial resources as evidenced by reductions which ~ay need to be proposed tc the city's operating budget~ As the £ollo~in9 graph indicates, the total of $4.56 ~illion for the 1394-95 General Fund CIP is the highest level of support fro. 1991-92 throcgh 1994-95. The $~.56 million ~undin9 level repre­ sents a 4:1 .. 6 percent increase in real dollars over the ~9511-92 General Fund CIP~ CMR:17B:94 Po. BU:lI 1 aaJ !"cJh !\lID, CA 9OJ3 415. J29 2S63 41!1 J28..?6...-:t1 Fa>; -" "I! .'---/ --. -- ·,------------------===~ • I i ~ , o ~locatloD of 11.4-95 GeDeral Fund ClP aesource. All in the past, Ceneral Fund CIP projects: have been categorized by function. The following chart indicates where 1994-95 General Fund resources are directed: 1994-95 General Fund CIP !_c __ I ---Opon~J omrr--.... -k_sr-no --EquIp. om:178:94 2 -> General FUnd Hiqhligbt9 Pprks and Open space Imp~ovements BUilding upon the momentum initia.ted in the 1993-94 CIP budget, a total of $761,000 in funding is included in the 1994-95 elP for parks and open space improvement. Parks and open space CIP projects have :been allocated 15.6 ;,ercent of the General FUnd budget. The condition and quality of city parks, facilities and open space will be addressed through the following work: o replacement of park playground equipment, benches t and picnic tables; o renovation of athletic fields ar:.d tennis and basketball courts; o repair or park pathways and irrigatlon SYSt6:clS; o restoring plants, shrubs and ground cover; o increased tree trimming and roo~ pruning within park boundaries; and o beautification of University Avenue, California Avenue and Midtown business districts. These projects emphasize both long-term benefits to the City's park infrastructure and immediate needs to revive the City's physical environment .. As part of a continuing effort to beautify the environment of Palo Alto's business districts, a second year of funding ($45,000) is recOllIaended for landscaping and to steam clean the sidewalks 4 This project represents a step toward a larger, joint effort between the business community and the City toward iroprov ing the business district surroundings~ As part of this effort, the City will e~lore ~ith the business community the formation of t.provement/beautification assessment districts. These districts would provide the sustained funding necessary for ongoinq maintenance and improvements. Likewise, the City envisions active business involvement with ongoing project planninq and implementation. Infrastructure l.ntrastructure replacement and improvement continues to rece.ivB strong emphasis in the General Fund CIP budget. A total of CMR: 178:94 3 --"l.; I .. ,-~" ... $2,686,OOO~ or 55.1 percent of the General Fund CIP budget, is for infrastructure projects. Major components of the 1994-95 General ~ Fund ir.frastructure effort include: o seismic retrofit of the Senior Center; o modifications to city streets and facilitie.s based on the Americans With Disabilities Actj c accelerated street and sidewalk repai~s; o desiqn for Dovntovn Library beam repair; o pathway lighting for the Lucie stern Community Center; o roof repairs at the Municipal Service Center, Civic center, Fire stations 1 and 4 and CUbberley community Center complex; o design to waterproof the Civic Center Plaza; and o feasibility study for downtown parking structure($). As part of a multi-year, major project to seismically retrofit public b\11ldings, $675,000 is pro-tided in 1994-95 for the structural retrofit of the senior Center. Of the tot,al, $300,000 1. budqeted for 'the relocation of Se.nior Center occupants; and ~'" $375,000 is for construction which viII occur in 1995-96. An \iWf' additional $725,000 is budgeted for Senior Ce~ter seismic retrofit construction in 1995-96. F1..Iture seismic retrofit sites include COllege Terrace Library, the Children's Library ana the Junior RUssum. It is important to note that future-year CIP costs for seismic retrofits 'Will be updated from year to year, based on preliminary design studies. Stre~t and Sidewalk repairs represent a large share of the city's intra structure program. Capital projects funded by ~~e utility users te.x total an additional $1. 0 million for the accelerated street ($600,000) and sidewalk ($400 1 000) proqram. The City's effcrt to maintain its streets is supplemented by a recommended $970,000 in Street I~provement (gas tax) funds. Information Systems and computer Replacement A total of $618,500, or 12.7 percent of the General Fund CIP buQ93t, is recommended fo!" information systems and computer-related improvements. These improvements allow City staff to provide more rapid and accurate information to the public, to gather and analyze data for better lIIanagetllent decisions. and to maintain existing service levels without inc~easing staff levels. project$ recommended include; CMR:17e:94 4 o , i .. o new techn;:)loqy and computers to improve class l"eqistration systems in the Community Services Depart~ent; o a new payroll/human resources system that will tacili tate implementation of Mi3sion Driven Budgeting; o replacing obsolete eight-year-old personal computers; o purchasing a new, centreli2eo Unix comoute~ that will efficiently support city financial, payroli/human resources and planning information systems; o final funding for the Fi~e Department IS Communications computer System, which implem.ents a state-of-the-art fire management and Computer Assisted Dispatch system; and o final .funding for placing all city base lfI.aps into a qeographical information system database. Of special note are the proposed technological improve.ents .for COmmunity Services 1 Recreation and Arts and Culture operations .. This project will provide a computerized and decentralized class, workshop, racility, and field enrollment and reservation system. The new systea will substantially improve the Department's ability to provide prompt and quality lien-dee to its customers, while iBprovinq operating efficiencies .. CUstomer Service The City continues to place a high priority on projects that enhance service to the citizens of Palo Alto. These include: o i~lementing a voice processing system that provides automat~d information during non-business hours; o remodeling the Civic Center's Revenue Collections area to improve access to customers paying bills; o providing a public information services system in the Civic Center Lobby; o impleaentinq a permit information tracking system that monitors all types of permits, applications, licenses, inspections, complaints and code enforcements on a citywide basis; and o continuing funding to automate and enhance the daliv{:Iry of information in the City's librarie~. 0!R:178,94 5 / :--'.' ...... In 1993-94, coun~il approved replace~ent of the Librarj"s central computer to ensure curr-ent levels of service t~ Library patrcns. 0 Replacement of the computer represented Phase I of a five-pha6e implementation plan, to develop the Library's computer system into a~ information netw~rk th~t can deliver new and emerging products and se!"Vices to all library facilities and re.mote users~ The Libraryts multi-phase plan pl6,ces sustained and significant funding requirements on the General Fund eIP budget. In addition to aaint.aining current levels ?f service to patro!1s, it incorporates increased levels of infon1ational services not provided in the past. Included in the General Fund base recommend~tion for 1994-95 is $86,000 to replace Library terminals, add an indexing service to the online catalog, and add specialized computers and software for children's use of t..'1.e online catalog. This funding ..... ·ill ensure the continuity of current ser;ices. Another $211,000 is earmarked from one-time Electric utility rebate .onies to fund additional parts of the Library's 1994-95 request~ The 1994-95 tundinq would be usea prima~ily for n~tworkin9 some or all of the libraries by ca~le and providing additional computer equiP1lle:nt~ By connecting the branches via .~ble, the Lihrary would position itself to provide new and sophisticated informational services and databases, such as Internet, in the future. With the ability to access new information networks and to provide information direotly to homes and businesses, the City will need to address issues such as how best to apportion the cost of providing ~ these services~ Funding sources 5\1ch as grants, private donations, and user fees will he explored to support these higher levels of service. Enterprise FUnds Enterprisf:! Fund ,projects totaled $12.96 million in 1993-94 and $17.1.5 million ~n 1994-95. The Enterprise Funds continue to improve I repair and maintain their infrastructure through steady inve2tment in ongoing capital projects. Projects that account for the increase in Enterprise Fund capital spending in 1994-95 include: implementation of the Electric Fund's Barron Park Oistribution System Improvements ($1.0 million); SUbstation Transformer Replacement ($.4 million); iroplem&ntation of the Southqate Underground conversion ($1.32 million); and increased activity in the continuing Street Liqht System Conversion project ($.7 million). The Electric Underground Conversion program is proceeding as planned. Major ~ork on the Channing/Addison Avenue project ~ill essentially be co~pleted ~n 199~-S4, with final funding in 199~-95. CKR,17e,94 6 "'.' , / -.--~---~ The southgate Underg~ound project construction begins in 1994-95. The Byron/Cowper, Bryent/Wa~erley, and Ramona/Alma Underground projects have been postponed; and construction work in 1995-96 is .xpec~eo in the East Cnarleston/East Bayshore commercial are~_ Another project contributing to the inc'!"ease in capital expenditures is th~ wastewater FUnd's System Rehabilitation and Augmentation project. This $L4 million project to improve t.~e City's collection systen"Ls represents a $2.9 million increase over 1993-94 fundin9. This project is part of the planned, accelerated infrastructure enhancements within the Wastewater Fund. A $3.1 million collection system Inp~ovements project in the storm Drainage Fund, with a request for a t,hree-year debt-financed proqra~, is scheduled for 1994-95. The program includes work such as constructinq pump station improvements ~ desiqning and constructing a project to correct recurring straet floodinq throuqhout the City, and replacing and repairing: deteriorated sections of the City's existing storm drain system~ As a result of the debt issuance for storm drainage improvements, a request for a rate increase in 1994-95 can be anticipated. xaintenance Projects DUritl9 the CIP process, one of staff's qoals was to identify projects that involved either ongoinq maintenance or ongoing equipment replacement activity. These projects, which are listed on Attachment C, do not adhere to the CIP definition (see Attaclment B) used to screen CIP requests. Implu.ent&tion of Mission Driven Budgeting in 1995-96, which emphasizes the provision of services~ vill be the time to transition these projects to the operating budget~ Tbe effect of incorporating these pr":ljects within the 1995-96 operating budget will be to reduce the capital bodget by approximately $526,OOO~ This would revise the target base capital budget from $J. 0 million to approxi:mately $2~ 5 million, unless Council ~irects otherwise. lAoieets Con5ide~ed and Not fUnded Several requested projects not included in the CIP budget are called to Council's attention. Funding 'Was oriqinally requested by the community services Depart~ent for the second and third phases of the Golf Course Improve1!lent Elan. However, since the Golf Course Master Plan (contract ~as awarded on October 25, 1993) bas not been completed, s~aff will return to Council with a detailed financial and implementation plan at a future date. CMR: 178:94 7 -- . -. .... .. ) -' Another projer:t request~d by the community services Depl!rtment involved Cubberley :Master Plan improvements. Before Cubberley 0 Master Plan improvements are imple~entedl it is important that they be reviewed :by a citizen's co-rnmittee. Staff is organizing a CUbberley citi~enr6 committee to review proposed improvements. Other projects that ~ere requested but not recommende~ because of runding and other factors ara listed on Attachment A. Conclusion This recommendation rep~esents the highest level of General Fund support for capital improvements since 1991-92. The importance of the rec-emmendation is highlighted by the ccntrasting financial constrair:ts facinq the General FUnd operating budget. The 1994-~5 elP stresses the areas of par~s and infrastructure improvements that City resjdents and Council have found neglected. In addition, it continues the City's cOlMlitment to imp:r-ovinq its delivery cf services through ne~ and more 2fficien~ infocmation systems and to aaintalning a high level of cystomer services. The future breadth of services Council ~ishes to make availa:ble through the Library Automation services project will be discussed in a session fooused on that issue. The project recommended in this CIP leaves a variety of service options open. The tac:t that the recoRlltlended fundinq level has increased over past 0.,., years 15 primarily due to the fact that the electric [""efund has been used to f'und projects which need special attention, are essential, and tit with council's priorities. The electric refund allOWS the CIP to automate and enhance the delivery of information in the City's libraries. The library automation program is a service approach which ~e must continue to move forward ona Each year the council and the community express dismay about the condition of our City park system. Therefore, the second bene'!actor of the electric refund. is the City's parks, where funds are ded.icated to improving the softscape~ A caution in funding these cwo areas with the electric refund is ~at this is a one-time source ~hich will not :be available to maintain either of the recommended projects in future years~ one objective for this elP budget ~as to be responsive to council's continued request for staff to identify and eventually remove -maintenance-projec~s from the CIP. The first step, identifying -maintenance-projects, has been taken. Durinq t,he CIP process, staft carefully evaluated each projeot to identify those projects that should be moved into the operating :bUdget. The transition will be completed in 1995-96. In 1995-96, the operating budget will be formattad to focus on services provided. At that time, projeots from the CIP that have been identified as "~aintenance~ will be budgeted with the services they support. CMR:178:94 a .'~~-'.' o • '. '.- '. -----.-.------------~--..... - As usual, thEre were worthy projects submitted for consideration and which 'Jere not recommended fel: a variety of reasons. The primary# major constraint was funding. It did not appear prudent to include projects where resources could not be ide.ntified to aaintain and support them in future yedrs. l!.cknovlelSqements Preparation of the CIP has involved staff members frOiD all city departments~ All who participa,ted .are thanked for the.ir e.fforts. Tbe CIP Soreeninq Committee was chaired by Finance Director Emily Harrison, who deserves special I"lI:':cogni,tlon for her leadership. Membership on the Committee: included Glenn Roberts (Director of Public Works), Ke~ Schreiber {Director of Planning and community Environment)# Paul Th11tqen (Director of community Services}, and Ed Mrizek (Director of utilities). These Committee members put in CO\!J1tless hours analyzing and reviewing projects and are to be thanked for their dedication. The committee w~s ~bly support~d ~y Joe Saccio, who acted as staff to the Committee. Without bis attention to detail and follow throuqhl the committee's work would not have been successful. The staff makes a conscious and dedicated effort each year to make this document more ·user friendly· and hence, easier for Council and the public to read and understand. I aa assisted in that process through th.e secretarial support of Fan ventura and the graphi~ expertise and assistance of Dave Matson and Oave Hatunen. Their special skills have been utilizea to improve the presentation of the document~ Their contribution is appreciated. Finally # I vent to recognizoe all the individuals, too numercus to list, who engaged in the tea~ effort to p~ovida the 1994-99 CIP. Recommendation Every project in this document, and those not included. have been rEvi~~ed and approved by me. I recommend for your approval the 1994-99 Capital Improvement Progr-am budget for the City of Palo Alto~ It carr-ies with it my full endorsement and approval. CKR:178:94 9 --------- ," 1ITT1ICHMENT A GBBBRAL FU50 PROJECTS CONSIDERED AND NDT RBCOMMENDED FOR 199'-95 As in the past, proj~cts Yorthy of reco~~endation have not been recommended b~sed on funding constraints and other factors. These proj~cts are listea below. o o o o Wide Area Networking $100 1 000 This project would link remote aree computers in the libraries~ Lucie Stern, Mitchell Park, the Junior Museum, ~~ltllral Center and Cubberley ~ith central computers in City Hall. This project is not recommended for 1994-95, based on fundinq constraints. Median Landscape Improvements $52,000 This project would plan the replacement of landscape plan~s on the qateways and medians throughout Palo Alto. This project is not recommended for 1994-95, based on funding constraints. Eleotric and Water Service Outlets Civic Center Plaza ~40,000 This project would install electrical and 'Water-connections at two locations on the Civic Center Plaza to accoimllodate hookups: for special events and possible vendor-utili%ation~ This project is not recommended for 1994-95, based on fundinq constr-aints and the available alternatives to hold special events through the use of extension cables4 Mobile Emergency Command Post $140,000 This project provides for a completely mobile emerqency command post for use by the Fire and Police Departments in the event of a major disaster or critical incident. staff needs to include more justification for-this project, coordinate the p~oject ~ithin the eXisting command system, and explore alternatives that fulfill the project's purpose. am: 178: 94 10 __ •. 0/ ." o o o o o o ;:' . .;.i.. ;--<' , '~ "~~t,· Wildland Firefighting Equipment $200,000 This project 'WOOlld purchass a bulldozer-'With discs to maintain fire breaks in t.he foothills. Public Works &nd Fire Departments will explore equipment for creating fire breaks. community Alerting System $40,000 transport staff in the joint and th_ use A computer-based community alerting system ~ould be purchased to ailow the Fire and Police Departments to notify residents of emerqencies. This system is new and needs additional research and testing. Relatively few cities have implemented the alerting system. Based on limited use in other cities and limited funding, this pilot project is not recommended. Station 8 Landscaping $25,000 This project involves hirinq a landscape designer and contractor to design and install a model "greenbeltinq landscape system" around Fi~e Station 8. This project is not recommended at this time due to financial limitations. Downtown Urban Design Improvements $50,000 Funding is for a schematic design and feasibility study for projects to improve the aesthetics and functionality of the downtown area. Since funds are provided in the Business District Improvements eIP and an improvement/beautification assessment district is recommended for discussion with the business community, this project is not recommended at this time. Children's Theatre Stvraqe Shed $25,000 This project would replace an eXisting shed and provide a storaqe area. This project will be accomplished through the operatinq budget. Lucie Stern Patio and Secret Garden Brick Pathway and Patio Improvements $25,000 This project would repair/replace brick pathway and patio areas. Staff will study potential alternatives and long-term solutions to path~ay and patio problems. CMR: 178:94 11 o o o o Pa~ks New V~hiele Purchase $18,000 A new vehicle 'Was requested to support a Parks Supervisor position. Through operational efficiencies within the filxistin9 fleet structure, a vehicle W'ill he provided as necessary. Golf Cou~se Improvement Plan $250,000 -$355,000 This project viII be revisited upon completion of the Golf CoursE Master Plan. Foothills Park TUrf and Irrigation Replacelhent $189~500 This project to improve the turf and irrigation systems in Foot~ills Park is postponed until a feasibility study conducted by the Water Utility is completed. The study will determine whether well vater can be used in Foothills Park for irriqation .. Cubberley Master Plan Improvements $590,000 • This project includes work such as exterior repaintinq of all ~ CUbberley facilities. floor covering and interior repaintinq ~ of the Multi-PUrpose Building, improved exterior liqhtinq o~ the buildings and walkways facing Middlefield Road, and improvements to the walkways and areas between CUbberle.y buildinqs. Before these projects are implemented" it i~ recOJIUIIer_ded that they be reviewed by a Cubberley citizens committe-e. CKR: 178,94 12 ATTACHMENT B 1'94-99 CIP DEFINITION, G~IDELINES AND RANKING CRI~ERrA Department CIP requests for 1994-99 must follow the elP definition and quideline~ prcvided below. Definition A capital project is defined as follo~s: Q has a minimum cost of $25,000 for each stand-alone unit or for each usable system or network~ Combining sever-a 1 similar purchases of stand-alone units under $25,000 each would not qualify as a capital expenditure. An example is the purchase of nine $3,000 computers. However, grouping related components that together work logically as a usable system or network qualifies~ An exalflple is upgrading all playground equipment in a park# the individual pieces of which do not cost $25#000. o has a useful life of at least 5 to 7 years. In other words# the purchase or project will still be functioning end not be obsolete wi~hin at least 5 to 7 years. o extends the lif'e of an existing asset or provlaes a new tUl"lctional use. for an existing asset for at least 5 to 7 years. Examples are extensive root rehabilitations or a buildcut to acconunodate new workers that cost 1C.o['"e than $25#000. These improv~rnents are distinguished fro~ ongoing naintenance work which may exte~d the life of the asset, but is done on a routine basis .!!lInd froD minor re'lilodeling such as replacement of furniture or partitions. Note: If a department ha3 a project that is less than $25,000 and believes it should be a elP project, submit the project and justify wby it should be a elF project. CMR:17B:94 Gui4elines: 'I'he follo'lJting guidelines apply to General Fund and Er.terprise Fund project submissions: o Leqal Requirements -Needed for compliance with codes or la~s o Health and Safety Protection -Mitigates existing health and safety risks as identified by the Public Works, Fire or "Building Divi!!ion inspectors, or prevents potential future health and safety risKs o Infrastructure Augmentation viability of the infrastructure Preserves the ]on~-term o Investzae.nt for Lonq-Tenu Benefit -Generates benefits over time which will more than offset the investment o Projects that Creatoe. operating Efficiencies or rmprove customer Service o Projects Partially Funded or Having Prior Commitments Ranking criteria o Government Mandates o Health and Safety o Replacement of Needed Pacilities o Asset Enhancement o Economic Imnact o Budgetary Impact o Projects Partially FYnded or Having Prior Commitments CMR: 178:94 14 1 o o ATTAcHKEN"r C' KAintenaaee knd Equip~ebt Replacement proj6ets Parks Pathway Repai~s Parks O!fstreet Tree T~imrning Open Space Lakes vegetation Clearing ~ennis & Basketball Court Renovation Busins$s District Improvements Athletic Fields Renovation Personal Computer Upqrades Information systems Development Radio Replacement Total CMR:178:94 15 $21,000 $85,000 $85,000 $25,000 $45,000 $~!, 50D $54,000 $88 1 275 $91.500 $526,275 Eovi r~ntal Documents -City of Falo Alto EN\llRONME~TAl ASSESSMENT ProJect DescnptlC11/Tltle. ~f Palo .~ito 1994·1999 Caplt,' I.oro""nent Pc r m r Pl f r n ~ v nts and mir10r x ansions of the C~t 's capita1 Vmo~oveme~t~ inclUding the utllity systems parks streets and §ldewal!;~ a6!! p!!llll;; illllltl~. location/Address: ~C2i~t~~~·~d~e ____________________ . ______________ __ Sponsoring Agency/Applicant; Cjt! Of Palo Alto (415) 329-2288 Address and Telephone of .llppl icant: _250 Hami lton Avenue P,lo Alto eft. 94301 Application for: Amendments to Capital Iroorovement Prooram Zoning at Project location; varies Fee Receipt No. NQTICE Of DETERMINATION Based up<l!'l review of the project fi ,.S. the undersigned wember of the Planning Department has concluded: Negative Declaration: The project has no significant environmental impact. N0 Environmental Impact Report is required. The reasons for a Negative Declaration are: On the attached sheet A record of project action is available for reView between the hours of 8'00 a m to 12 noon and I:JlQ pm. to 5·00 ~ m at the Palo Alto Finance QeDart~nt at the Palo Alto City Hall ocate<! at 250 Hamilton Avenu p 2nd F oor Palo Alto. The project may have a significant env;,onmental impact. An Environmental Impact Report '11 be prepar Planning Director: The proJect has been approved. The project has been denied. 16 ,~dJ Date: o:j6-l;/;>Y Date: Date: Fl1e No. 94-EIA-2 94-£11.-2 • o .--. ':;-. The proposed 1994-1999 C,pital Improvement Program (erp) includes 94 projects Forty projects are contiT1L!1ng with f1D re'.'lslOns and have Deen assessed in prelli ous env; rOn.'nenta 1 impact assessments. Twenty-one are cont i nUl ng wi th re .... isions that involve timing or funding change'S. Thirty-three a~e nc"Yrt projects. PROJECTS CONTINUING ~I]H REVISIONS; four of these projects are not considered a project for CoDA purposes: 1. Per~onal CO!T\)Uter llJJ9rades (19117) 2. Payro 1l/Personroe I System-Revi sed (19012) 3. Information Systems Development (18812) 4. Radio Replacement (9403) Twelve of these projects are ~ategorically exempt: 1. 2. 3. 4 5. 6. 7. B. 9. 10. 11. 12. Civic Center Lobby Renovation (19402) University and California Avenue and Midtown Business Landscape Improvements (19412) Athletic Fields Renovation (19413) Backflow and Irrigation Improvements (19414) Parks facilities Improvements (19415) Sidewalk Repairs (Utility Users Tax -18903) Street Maintenance (Utility Users Tax -18971) American Disabilities Act Compliance -Revised (193G9) Public Buildings Structura1 Repair -Revised (18508) Street Maintenance (Gas Tax -18670) Storm Water Discharge Improvements (9180) Traffic Signals Upgrode -Revised (8930) One project has had a previous neg,ti,e declarotion issued by the Fire Department on May 7, 1993. The proposed changes are minor and do not modify the previous environmental findings. 1. Natural Gas Vehicle Conversion (923G) Four of these projects will require further environmental documentation as the prcject proceeds: l. 2. 3. 4. Major Intersection Improvements at Page Mlll/Foothill and at Foothill/Hillview and Foothill/Arastradero (Revised 19073i Collection SYstem Improvements (8870) Water Quality Control Plant Expansion (8926) Effluent Line Modifications (9503) These four projects are considered to be exceptions to the recommended adoption of a Negative Declaration and have been previously identified as being subject to further environmental assessment. 94-tlA-2 JIG I CPI A:'.aAS-Cl 17 NE~ PRQjE(TS Nine of the new projects are not con,ldered a5 projects under CEQA: 1. Revenue ColI ecti ons Rel1'<lde 1 (195051 2. Police Loc,er Room Renovation reaslbll ity Study (19513) 3. Permit Information Tracking System (9516) 4. Teclmology/Cor.:puter lmprovements/Cotmlunlty Services (19525) 5. Geogrophic Systems App1ications (19518) 6. Wireless Vehicle Management System (19521) 7. MSC Garage Improvements (195221 8. Geographic Information Systems Applications (9507) 9. Supervisory Control and Data ftcquisiti~n (SCJlDA) System Upgrade (9515) Twenty of the new projects are categorlcally exempt: 1. Parks Offstreet Tree Trimming (19506) 2. Open Space takes Vegetation Clearing (19507) 3. Tennis and 8asr.et~all Court Renovations (19508) 4. Parles pathway Reeai rs 5. Parles "Softscape Ground Cover/Plant Replacement (19510) 6. lucie Stern Pathway Lighting (19511) 7. Civic Center Plaza Waterproofing (19512) 8. Dance Studio L-Wing Cooversion (utility Users Tax -19531) 9. facility Roof Replacement (19514) 10. Downtown Library Beam Repair (19515) 11. library .l\utomation Service, (19517) 12. Multi-Line Telephone System Replacement (19519) 13. Fuel Site Improvemer~s (19520) 14. E1 Camino Real Intersection Safety Improvements (19523; 15. M5C Bulk Storage Improvements (9506) 16. 60 KV Bus Tie Breaker Installation (9509) 17. Substation T,ransformer Rep1acemeflt (9510) 18. Future Underground Districts (9511) 19. Aeratior Tank Inlet Structure (9513) 20. Secondary Clarifler Modifications (9514) Four of the new projects win requ~re further environmental documentation as the project proceeds: L Downtown Parking Structure Feasibility Study (19530) 2. Bikeway System Improvements (19524) 3. Arastradero Creek Erosior PJepairs (95G8) 4, Foothills City Water Replacement Study (9512) These four projects are considered to be exceptions to the recoomended adoption of a Negative Declaration. 94-E1A-2 18 o o :.... ... ... ~ .. AMERICANS WITH DISABILITIES ACT (ADA) STATEMENT In compliance with the Americans with Disabilities Act (ADA) of 1990, this document may be provided in other accessible fonnats. For information contact: Dianah Neff, ADA Director City of Palo Alto 250 Hamilton Avenue Palo Alto, CA 94301 4151329-2313 (voice) 415/328-1199 (TDD) 19 THIS PAGE INTENTIONALLY LEFfBLANK 20 ., • • Selected 1994-95 City of Palo ~ Alto Irn.proven1en t f)rogranl Projects ~Iap~) <-,. 1(" "--r·· .J Capital ,'" . / / THIS PACE I,\TENTIONALLY LEfT BLA:"" • SELECTED 1~9$ CITY OF PAW ALTO CAPITAL IMPROVEMENT PLAN PROJECTS' MAP , PROJECI' TITLE AlIt'D NO. ; NlJMBER ... ---_ ..... _.. . .. _. CITY AREA AFH:CTED BY PROJECT Parks and Open S pa<:e Projects 2 3 4 5 6 7 Parks facilities lmpro'lt:meots , (19415) Parks 'Sof&ap<' Ground Cover/Plant Repla~men~ (19510) Business District Improvements (19412) Athletic f iclds Renovation (19413l Tennis and Ba .. kerball Coun Renovations (]95081 . Parks Pathway Repairs (19509) Rinc.cnada Pool Site Improvements (19406; Playground equipment win be replaced at the . following parks: Robles. Seale. Cameron alK1 : Werry. ~ Park amenities s.uch as benches, signs, fences and ~ pi(.:nic equ:pmellt will be repaired or f('"placed at the ; following parks: Ramos. Boulware and R0bles. Ground c("\o'er and plant n:placemcnl<; wilt be p!amed at: Te[man, BU\lo·den and Wallis parks, Lucie Stern C'!;!nler, ('ollege Terrace Library and the Sayl2.!irls Athletic Cenl.er. Other sites include (not indicated on map) Embarcadero Islands, and Oregon Expressway . . IAnd-.cape and orher improvements will be made in lhe Cj[y'~ three main business distn,t5: Universi(y. Ca]ifomia and: Midtown. Greer, El Camino, Mitchell and Terman par~s and the Bayiands Athletic Center. Mitchell and Terman parks. : Bowden, Briones, Eleanor, Monn .. "'le and Rob!es : parks. R inconada P'drk. 8 Parks Irrigation fmpravemcms and Peers, Eleanor. Rinconada and E::! Camino parks . . Renovadons (19414) • Projoas diIpIaym 011 !lie ClP _ rqmscnI GtnenJ Fund J>rol'CU !hat are ""'" easily <ti.<pIayrd. FOr. ~ Iistiog .... ~ of ... CiI]I's C.tpCaJ _emont projccu; ...... tilt Five Year capw _~ I'W!. 23 • THIS PAGE INTENTIONALLY LEFT BLANK o 24 "~i.; ~·~;~~~'c SELECTED 1!'94-95 eny OF PALO ALTO CAPnAL IMPROVEMENT PLAN PROJECTS' MAP , PROIECT TITLE AND !".()_,J_NUMBER CITY AREA AFFECTED BY PROJECT lornl'OtnJd lire Projects ~ Lucie Stem Pathway Lighting Lucie Stern Center. _____ :n:J.5)I)_ 2 i Downtown Library Beam Repair Downtown Lihrary. , (l~1_5) 3 j Public Buildings (Senior Ceme,) , StnK:tural Repair (18508) 4---Tc~~;i~;c;;d;R;;;;iR~~ ! 09(18) •. -t-.-.. ~ ..... " •..• -., H'_'H' _._ •• Bryant Street between University and Lynon Avenues. Cubberley CommuniI}' comprex. 5 i Crvic Center Plaza Waterproofing Civic ('.enlcr. _ (19512) ._ .. _._._._ 6 : Facilily Roof Repl~cement __ .L(!'?5}4L_ _ . ... ... .._" 7 ~ Americans with Disabilities Act . Coml'lianc<:-Revised (19309) Municipal Servia Cem.r and City Hall, Curb ramps will he renovated in the three business dL5bic3 and Channing Street. Elevators wHl be made accessible at Civic Center and Cubberley. Accessibility will be improved ar emrance 10 ,::e~~.~.,~~p.i~.I.: .................... _..... .. .. _._ .. , .. ""._,,._ ... . 1otenection and Bike ... y Improvements 1 : EI Came"" Real Intersection __ "L~ty!1!'l''''yelI1e~'''JI952_3) 2 : Pedestrian and Bike Grade : Feasibility Study (! 9502) : E1 Camino and Los Robles, EI Camino and Maybell, , and EI Cam ina and Charles"'" interSeCtions. . -- ; Intersections at Alma and Meadow, Alma and j Charleston, Atma and Chu,chill, and Alma and Palo : Alto Avenue. j'---'S:;;;i-HilJ Rood Bridge-Bike Lanes'LS;;oo Hill and Son Francisq~i';;c;;;;;k: .. ----. j (19503) . • • _ ••• ~ __ ._, M",_'«_. ___ ••• • •• _ ~ 4 ! Major Intersection Improvements 'Interse<lions at Foo<hill and Araslradero and foothill . (19073) 'and Hillview, and Foothill at !be YeIllrdJIS i Adm inistratKm entTa.nce, " .... -+---...................................... ', ..... --.... --........... --. : Embarcadero PedestrianlBike Pedestrianlbicycle bridge over Embarcadero and off-5 6 : Bridge/Path (19310) street bike path adjacenl '" railroad tracks from : Bikeway System Improvements : (19524) ~.h.~.~~.i~I ... ~ .. ~L~j.~~.ry.iry .. ~yenue~. . ............ _._ louis Road to Moturose A\.'enue. Park. Boutevard to , WilI<ie W. ' and 0100-.. 0l'nljo<ls diipIorc4 em die CIl' __ GeocnJ Fuod projcas .... oro ""'" wily <IiIpIayeoL ""'. """*" ..... II11II dcsuipioa of Ole CiIy" C..,aJ '-projeaI, ........ Five Year c.p;w '-"""""" ..... 25 " THIS PAGE INTENTIONALLY LEFT BL"J\'K 26 • • • ·", c', GENERAL FUND General Fund capital projects a."'e for the purchase, cons.tr~ction, replacement, and enhancement of the physical assrts of the community, The projects are separated jnto descriptive categories as follows: New Projects: Ccntinuing Projects, Ll Sf, of Projects: N ... Projects Projects presented to Council lor the flrst time are labeled -New,- Projects which have been re .... iewed by Council in previous eIPs are labeled "Contin\Jtng." CUSTOMER SERVICE Revenue Ccllections Remodel (19505) . • . . . . . . . • . . . • . • . . . . • . . . . . . .• 29-30 Library Automation Services (19511) ...•.....•..•..•••....•...... 31·33 _I Information Tracking System (19516) ......•............•.... 34·35 CooliDuiDa Prnjects Ci>ic Center Lobby ReliO\'2tioo (19402) ....•........•....•.......••• 36 Voice Processing System (19404) . . . . • . . . . . . . • . . • . . . . • . . . . . . . . . •. 37·38 . PARKS AND OPEN SPACE N .... Projects Pub Pathway Repair. (19SQ9) ...•......•.• ' •..•.......•. ' . . . .. 39-40 Pub "Sofuc'pe" Ground CoverlPIant Replacemen t (19510) ............•.... 41 Parks Offstreel Tree Trimming (19506) . . • . . . . . • . . • . . . . . . . . . . • . . • .. 42-43 Open Space Lakes Vegelalion Qearing (J95Q7) ..•••.•..•••..•...••.•• 44-45 Tennis and Ba.skeIball Court Renovation (1950&) .•.••.•...•...••...•.... 46 ContInuing Projects Rinconada. Pool Site Improvements (19406) .........•....•.... ,..... 47-48 University Avenue, California Avenue and ~dtown Business Districts wdscape and Impro'leJ1lellIs (19412) .......•..•.........•..• 49-50 Athletic Field. Renovation (19413) ..•....•..•..•....... ' ..... , ' . . .. 51 Parks Irrigation Improvements and Re."lovatiOT1S and Backflow Replacements (19414) •.....•.......... ,....... 52·53 Parks Faa1itie, Improvemenls (19415) •.•..•...•..•. '............. 54·55 27 " · ".- GEl'Ii~RAL FUND (continued) Il"IFXASTRl'CTIJRE Ne .. Projects Facility Roof Replacement (19514) .........•......•............. , 56-57 Downlown Library Beam Repair (19515) . . • . . . . • . . . . . . . . . . . . . . . . . . . .. 58 Police Locker Room R."ovation Feasibility Study (19513) ......•......... 59-60 Lucie Stem Pathway Lighting (19511) . • . . . . . . . . . . . . . • . . • . . . . . . . . . . .. 61 Civic Center Plaza Waterproofing (19512) •........................ ' 62-63 Downt<.>wn Parking Structure Feasibility Study (19530) ......•........•.. 64-65 Dance Studio L·Wrng Conversion (19531) ....•....................... 66 Continuing Projects Public Bwldings Structural Improvements (18508) ..................... 67-68 Cubber1ey Code Roof Repair (19')18) ........•..................•... 69 Sidewalk Repairs (18903) ..........•.•...........•........•.... 70 SIRe! Maintenance (18971) ...•..•....•.•......•.....•.......... 71 Amcrioans with Disab;tities Act Compliance (19309) . . . . . . . . . . . . . . . . . . .. 72-73 INFO~fATION SYSTEMS Ne .. Prnjects Geogtaphic L,formation Systems Applications (19518) •.•.......•..•.... , 74-.79 Technc!ogicai Improvements to Recreation. Open Space and Sciences and Arts and Cul",re Facilities (19525) . . . . . . . . . . . . . . . . . . . . . . .. 8()'81 ComimJlng Projects Personal Computer Upgrarles (19117) .. . . . . . . . . . . . . . . . • . . . . . . . . . .. 82-83 Pa)TOllIHuman Resources System (19012) .......•.•.............•.... 84 FirelCommunir.ation, Computer System (19312) •......•.............. 85-86 Information Systems DevelopJTlellt (18812) ......•............•..•.. ' 87-88 Geograpbic Information Systems (18822) . . . . • . . • . . . . . . . . . . . . . . . . . •. 89-90 EQUIPMENT/MISCELLANEOUS N" Projects Multi-Lin. TelephOfle System Replacement (l9519) •... _ . • . . . . . . . . . . . . .. 91-92 Coutiuuiog Projects Paramedic Ambulance (19409) ....••......•....••. _ . . . . . . . . • . . .. 93-94 Radio Replacement (19403) •...•...•..............•.•....•..•. 95-96 i Q Art in Public P!aces (18617) .•.......•..... " ................. " . .. 97 0 28 .-~-<;. --- .-, ." --'--------- NEW CUSTOMER SERVICE PROJECT REYFNUE COLLECTIONS REMOpEL !I9505J " \ PrplOd. Description: This project includes. design for remodeling Revenue Collections work IDd CIIStomer -w:. CXHmter areas on the first floor o( City Hall 10 ensure security. enhance custOmer semoe, efficiently use available floor space, and d<aease the possibility of employee injury while WNking at the oounter_ l'n!it!<t C!llQpgnenfs: The components include an engineering and design phase for new ooc:urity doors bctwocn the euSlOmet semoe area of Revenue Collections and !he first floor lobby. In the first year the following work will be accomplis.~ed: ; sectior. of !he customer .aervice coo.nter will be removed to make room for one modular work station, two new work IIaIioos using modular furniture ,.ill be installed, and or.c work station will be modified, The _ year will include the removal of non-supporting walls. the iIl ... llarion of new se.:urity cbn, IDd the n:modcling of the customer -w:. OOWIter. Prpla;t 19<t!fk:atlog: Current security doors are diffICUlt 10 close and have required mquent maintenance. Older citizens have complained that there is inadequate space at the current IlOIIIIII>" 10 write. AisI .. between current work areas do nOl meet minimum space standards. T_ .. y smff have been providing customer serv'.oe for pamng ci!&ions, but in 199'3-94, 2_5 po:nDODmI posmoo. were added (or Ihls function and a .S position was added 10 process the increu:d volume of pa.-.mcdic bills resulting from the seoor.d panmedic unit. Temporary use of dcob aDd the large f\oor space needed 10 !lOre the CUl=1 doors result in inefficient usc of c:WIinc spo;ce. Modular work stations would aa:omnsoda~ new staff and mm safely RgUiation •. ImOld and Sgpport Analx:sir. • Eztvirorunenllll: • Opecating: • Telecommunications: Ji'lnancial AMiD is: Not a proj ect under CEQA. No additional operating costs. Computer prln~ connection would need to be moved. Cormtcnt with Plan 1994-95 $25,000 Design of new security doors and other enhancements 10 coordinaUl with Civic Center lobby remode.L This project aIso incllides the removal of part of !he counter and inslllliation of modular workstations. 1995-96 TBD 29 • 1996-97 1997-98 1998-99 Sou= of FIIIlC!ing; General Fund • • \ .1-- NEW CUSTOMER SERVICE PROJECT LIl!RABY AUTOMATION SERYICES 119517'. Pmlret Ilrsrrlptlon; This project represents 3. multi-year implementation plan to develop the Litmry" computer system into an information networl; that can deliver new and omorging savH:es 10 an library facilities and remo!J: users. This project is based on the complcrion in 1993-94 of Phase I, which replaces the ll.'r.,y's cu=1 computer p14tform with. Unix-based o:ompulI:I'. Phases 2 1hrougb 4 repl= and develop ~"e compuler'. network S)'Slem, adds new informatio1l dal8l>a ... to the online cotalog, provides access to the Interne! informatioo system, netwmb CD-ROM serviI:es, adds tenninaIs and dial-in !ines, replaces outdated terminal. with in1dligent workstations, and introduceo ~ional information networking. PIuIse 5, which will bring !!Ophisticatod services cIirocUy 10 the home and office and to an expanded regionaJ network, may begin in 199s,,99, but ",ill probably npt be complete until 2003. CouDCil will diseuss and review the loog-range pIan for the ll.brary's Automation Services request. 1994-9S: S297 ,000 Phase 2, planned for 1994-95, has three major componen!S: network development, adding seIccted information services 10 the ll.'rary's online catalog, and replacing eiliting t<rminals will! persooal COmplllelS. Network developmenl ""tails replacing the communication net",or1l:, DOW based on low-spoed telephone links belween the computer .ystem and !he library br.IncIIes, with a sy1Ien: that will.send information more rapidly and efficiendy. This will be accomplished by Cling the City's utility C3ble system 10 linl< hcrari<>s. The second component is to load • periodkaJ indexing servtre directly on to the l.Jbrary's cata1og. This will e7.p3l1d the ability to search for magazir,e articles to all libraries. A third componeni in trjs phase includes replacing 40" of the If:rmir.als that bav~ ~ usW by patrons and staff 10 = the romjlUler with more modem equipment, adding some dial-in lines and terminals for patron use, including some opecialiud per>onaI romputen (pc'.) with softw-.re oriented 10 the cluldren', use of the online catalog. For funding and planning purposes the components of Phase 2 can be divided into th.,...., parts: a) Incorporating • periodical inde<ing service on the Library'. ouilne cata1og, replacing 40" of !lie l.Jbrary" terminals with PC's, and adding public use equipment including two PC', with the ~zed children', interface to the online catalog. 586,000 in GenenI Fund monies will support !his pan of Ph ... 2. 31 b) Connecting Main, Mitchell, and the ChildreJ1.'s Libraries by using the City's broadb3Jld utility =ial cable sySlem to enhar.<e n<twork development. This part of Ph..,., 2, costing $87.000. would be funded from one-time monies available from the Electric Utility's rebate In the City. o} The thin! part of !'base 2 includes: cennecting the remai;ung three libraries. Downtown. College Ternc.e. and Terman via cable ($83.000); installing a Local An2 Network within the Main ubrnry (56,000); and purch.as.ing additional ~uipment sLlch as PCs, Kid', CaIaIog units. and aMitional mooelrls and printe" to .>pand access to Libnuy inform2lion ($35.000). Funding for this part of Phase 2. a lotal of$124.000 would also come from 1be one-time Electric reb .... to the City. 1995-96: S204_803 Pbaso 3 provides new Je1'Vi<:es using CD-ROM in • centraliud. LAN-based envitOllmenl; proYidos limited access to Internet through the Library" catalog; and offer. remote access to fulI-text and indexing dalabiue>. Some additional terminal. would be added for patron and staff ...... and the rest of the old terrnin>.h would be replaced with newer .... hnology. Local area ootwom would be instalkd in targeted branches. 1~: $90.129 o The fin! part of Pbaso 4 would occur this year. Phase " would extend the availability 0( ~."~" !ldWOOEd services by addin& access to world-wide Internet services and connection to regional V or Ioca1 Detworl<s. Such a !ink cculd bring govern",.,.,t informatioo. direct access to regional "1",u), c:atalogs. and • hosI of other ....-vices. 1997-98: $90.129 This would fund the second ~.alf of Phase 4. TOlliI project ceots for Phase 4 .. " highly speculative at this time. and details of whlch elements would oe<:ur in each year of Phase 4 would be finalized closer to phase implem""talicn. 1998-99: TBD This would begin Phase S in which the regional netw<rl: would be expanded providing Iibnuy information services to bornes. busin ...... and other organi.?atioos which have the capability of COIIJlO:tiog to cable faCIlities. This phase involves the high SJ""d transmission "f image and data services. Projcd Jm.1jrgjlon! The project will utilize the capabilities of the Uni.-based computer installed during PIlase r Df the Libmy', Automation Development Plan and will proYide a more stable network on whicb it will operate. Increased and improved access to information services can be provided to all 32 "" .'"" .. ' citi1:eos without having to come in • specific location, and the capability .. ill exiS! 10 share information: resources. with PAUSD's library sYStem, City offices, and regional libraries.. Irrmert and Supnqrt A[jalysIs; • Environmental; • Opclating: CaIr.goricaJly exempt under CEQA. There win be additional hardware and software maintenance costs reWed 10 new services and equipment added through i'l'.ases 24. Some m:lassiJicatiOll of h.rary staff!lUiY be neeOed 10 provide syS!em lUJ'POTL Ongoing subscription, charges to new online services will be added; some of these m.ty be offset by canceling existing paper subscriptions. • Telecommunications: Tbe addition of dial-in lines will entail additional expense. MOIIthly fees paid 10 PAC Be!! for =t da!a service, 10 link bl'llllCh"" to the compuler will be eliminated when the network is based on the City's cooxiaI esble system. A new coS! for Utilities lease of the City', cable is anticipate. Cm!nhmc!yr PI!m; ConsiswIt witb Cultural Resource oIemenls of the Plan. 1994-95 $297,000 1995-96 $204,1103 1996-97 1997-98 1998-99 $90,129 $90,129 TBD ($86,000 Genernl FiJIld, S211,OOO Electtic Rebate monies) Source of FlIIKfing: In 1994-95, Genernl Funds will be csed for the project with suppln !rom ClDC-Iime Electtic Utility Rebate monies. In future yean, outside funding sources suc!! as gtalIlS, privaSe donations, and user fees will be explored 10 luppon higher levels of service that include new and \eclmoIogicaily sophisticated informational services for patrons. 33 r· NEW CUSTOMER SERVlCE PROlECl' PEBMJT INFORMATION TRACKING SYSIFMll'H§} Pmlect DMttjptlcm: This projecl will implement an ilU(Omated Permii Information Tracking ~. TIIil system will be used to track >lid monitor all types of permit> and other activity socb as applicarioos, li=, inspections, complaint> and code enforcemenL One of the most advanIagOOU! use. of the sySlem would be 10 monitor the complete developm=nt process, from initial plannilt& en~tle""",1 roque.!.< Ih"",g~. the final building inspeetion, including Oflgning COIIditions of approval following occupancy. The 'Y'lem wotlld be interoonnOC'.ed so that iDformaIion regudin& any opplication car: be obtainod by all participating departments and provided to appE""'lS during the application process. The system would calculate f"". pIa", bolds, route information, require online department sign off, monitor conditions of approval and monitor special fees. II is anticipoled thai the curre<lt Building Inspection Perm;t System (BIPS) would either be InInSfetred to Ihe new system Jr would interact with it. The Geogr.!phic Information Sysrems (GIS) would &Iso interact with the new sySlem. I'r!ritd CI!JIIJ!OIle!1ts 1994-95 S1O,OOO Sotrwa:e jRII"Cbase for up to SO user log"""s, implementation assistana. and ttainlng to bring ckpartmal1s and activities online (mdudes fust year so!'1w= maintenance). 1995-96 $20,000 Fonds far additional implemen tation assistance and training would bring additional departmcnlS onliDe or add acti.,.ides 10 L'>e system. PrgJect luslirq,tiou: The Interdepartmental Cooperation Subcommittee of the Customer Service Committee has identified over 5<l different types of permit pro<:e<l ures that require inlerdepoa","",laI apptoval and coordination, and has identified. need for improved traclcing systems. The Hugbes Heiss evaluation has also ideoti fied this need. as have members of the JIIIhlIc wbo obtain various City approva!.. Most of these permit procedures could be significantly improved through L'le use "f an automated pormit tracking sySlem. Interdepart­ meata1 coordination necessary lo take action on these requesled permit> is hindered by the need 10 manually transmit ill Connation and verification that requirements have been mel. A oentralizod information system, which can be a=ssed by all involved departments, ,,"o\lid ROluce permit issuance delays and COfIfusion due to missed or !ale communications. Information ,..anIing permit SIaIUS can be provided quicldy and accur.llely upon customer request, at the point of <:usWJIlei" contact. 34 \, 'Ibi& system would also in= Gur abiEty to !!'~t legal ot:ligation. in regard to condition mooitoring and code enr~ement for development projects. Cu.rrently. we do nO( have a ...ori<able system for monil<>ring project oondition. of approY1!l. Different departments are l'CSpOBgble (or ~"iag conditions at!! met and enforced'. Without a cefltraIi.zed, easily .......wle informalioo and oign off system, oonditicns are inconsist""Uy administered. Expected operating efficiencies resulting from the sy.tem include: \) decreased time opent ~g fuI permits, application., CIe.; 2) easy .cce>5 to au"""t 'latus in~onnaIion fa< ~I proj<CIS, permits and oIber activity; 3) use of autm""ud approY1!l. and cIe:uanoes; 4} dec:n:aso:d lime opent coordinating inlenlepartmental review; and 5) decreased time spent ....,,"ving prcblems arising from inoonsist<nt or inadequate monitoring of development project 0CJIIIfiti0ns. ImIWd 1M Support Allltnis: Cam" ebaIsitt Plan: Ph.'EIa] AllalyD: NO! a project u,der CEQA. Software maintenance costs ostimated at $6,500 will be nec=I2I)' Sl:!rting in 1995-96. None No! iooonsiste1lt with currenl Plan. 1994-95 m,ooo 1995-96 $2\),000 1996-91 1997-98 Im-99 So!Rc of Funding' General Fund with $10,000 Reimbursement from the Elo:tric Fund in 1994-95 and 1995-96. 3:1 CONTINUING/BEI'/SED CUSTOMER SERVICE PROJECT CMe CENTER lOBBY RENOVATION (19402) fmjed: »czrintiPP: This project ren~ ~l A and first floor lobbies in tile Civic C<nler aDd ~ for public information resources in the lobby in 1993-94. It includes dl:sign and in ... lIation of wall finioIIes, improved lighting, floor tr<atments, directories and furniture for boIh lobbies. Areas for roIating art displays will also be provided. Funding for 1994-95 provides for developing City-wide applications for the public to access information declmnically. Funding in 1994-95 represents the final ph...., of this project. Project Com_Is; LOOby dl:sign and construction is p1>nned for 1993-94. As part of the remodel, a citizon and business committee identified, and local businesses funded, a P\lblic information oomponent in the lobby. In 1994-95, $25,000 in funding will be used to develop City-wide appIi<aIions for the public to access electronically. These funds n:pre<ent the City'. CCIIIributioo in • joint effort by the City and the business commurJty to provide public informatioa raoun:es. fmje!:l; lpsl!tlre'jgp, The Civic C<nrer building is 23 years (lld and has no! had • c:omprcilalsivc upgrade of the lobby areas. Th. City's Customer Servia: Committee bas Identified Ibia project as 0 high priority. The rcnovotiOll will make til ... lobby ...... more 0IttaCIive aDd more func:lionaI for the public. Aside from aesthetic improvements, informatiooal and dim:tiooaI gnopItici will improve public -= to the building. Impact and Sgpopd ApaJnh: • EDvirorunental; • Operating: Categorically e •• mp' from CEQA ",,<fer Section 15301 None • Telecommanications: None Comprebens!v, Plan: Coosistent with PlJin. 1994-95 $25,000 19%-96 1996-97 1997-98 1998-99 Sounx Df FU!Id'mg: Geneml Fund 36 '''c--''' '-':-- o CONTINUING CUSTOMER SERVlCE PROJECT YQJcr PROCESSING SYSTEM O<Wl4) Prgftrt!!rgdptlgn: This project implements a voice mali system which will be integrated with !be City" =t tclepbone (PBX) system. This system will 2.Ilow u>en '" send, receive, forward and dimibute voice messages 10 other users via tile tclephone. The system will provide information !o the public, provide call ~ during off hours, as well as allow callers 10 talk directly with a City employee during business bours, 1992·93 1993-94 19'J4.9S PIwe I: Conduct voice mail needs survey (oompletedl Pbue II; Prepa:e sy.wn RFP and cooduct software/hardware evaluatioo Pbue m: Implemcnt system, prioritizing departments saving the p<!blic, including hardware and phone upgrades to accommodate !be system. Pbue IV: Implement system fO£ remainder of depa:tmeflts serving !be public; begin implcmentation for central-service departments, including llanIware and phooe upgrades. Plwe v: 1mpIcmentation of system for tem2ining departments and for areas II()( idcIItitied;o initial needs assessment. Prpfm JU:FtjCqtiQD: A voice messaging system is a customer service tool to improve City RSpOIlsiv ...... 1.1> tile public as well as 10 intema1 d'l""'ments. The system will provide 24-hou: aca:ss, allowing: the pubUc to receive important Cjty information during non-bu$l.nes5 hours. General information on: services, meetings, jobs, Of other City infortT'..ation C8I'! be given at any hour _t the necessity of staff assistanee. Information can be availahle to the pu~lic regarding City emergencies, utilities outages, amstruclion activity, etc. The system will improve em;>Ioyee efIicirncy on the telephone and en,ure thal calls are answerod and processed more quickly. Impart Iud Support Analysis; • Envi!c.runental: • Openting: • Telecommllllicalions: Not a project under CEQA. In 1994-95 an estimated $9,000 in cngoing: annual maintenar.ce costs (to iru:reose 10')1 per yoar) for hardY.llll'e and software maintenance will be required. System hardware and software will reside in Tnfornwion R=urces. loformatior Resouroe, staff will be impacted during system implemelltll­ lion, hardware cbanges, and during software updates. 37 , CQlllprtbeo.dye Plan: Coruis~t with PI.n 1994-95 $140,500 1996-97 1997-98 1998-99 s=te of FUllding: Generu Fund with $21,000 in rcimoursement from the Enterprise Funds. System = ore based on preliminary system sizi0-8 cstimatu, and discussiOllS with veruIor$ and other voice mail users, and are .. >bject to change following firmer pricing level, resulting from the RFP process. 38 . :~~. ",.....,.~ '-"---' -'--,'-,-" NEW PARKS AND OPEN SPACE PROJECT PARKS PtiJHWAY REPAl!lS (]9~ Pmicd: DngJpclon: This project involve:; me repair and pl'e"l"entati ve maintenance of City pa.rk padlwayo. Empha.sl, i.s plac<>! on pathway, identified as safety hazarris such as pathway, where upIIaIt surface mas an: ClaCking. Repain include slurry or cap sealing defective asphaIl surface ....... and the addition of surface materials such as decomposed granite to pathway, !hat do not have banllW'faces. *Thi.s project i.s required for the ongoing maintenance of City facilities. Based on the need for OJIIIaaI fimding. these maintenance expenses will be ttansitionod from the capilal budget to the operW1S ~ in 1995-96. l~ $21,000 Sevcu _ lineal feci of park pathway repairs ':1(1 preventative !IIlIintenance work will be implcmeoled at _. Bricnes, Eeanor, Monroe, and Robles parks. ,2} 1995-96 $27,300 Njne thousand lineal feet of park pathway repairs will be implemenled a! Hoover, Rinconada, and Ramos l'arb, 1~ $41,500 Tbirteal thousand eight hundred IineaI feel of path repairs will be implemenled at Mitchell and 0.-l'arb. 1997-98 TBO 1998-99 TBD ProIcct Jw!jf""",tion: Improvem""" are necessary 10 increase public safely and prevent fuItber cWnaae to existing pathways and eatensivo renovation in the future. Impact and Support Analysis: • EDvirooll'trntal: • Operating: Categorically exempt under Section 1 S30 I of CEQA • PatlcslPublic Works -will reduce higher future repair or replacoment costs and litillation issues, 39 :~,,;;~ /" • Telecommunications: N()!)e 1994-95 $21,000 1!l9S-96 $27,:lOO 1996-97 $41,SCO 1997-9B 'Jill) 1998-99 1110 o 40 NEW PARKS AND OPEN SPACE PRO!ECf PARKS 'SOF!'SCArE' GROUND COVERlfLANT REP!,ACEMENI (]~!Q) PrqIe<:t !!ooniptjon: This project provides for replacement of plants, .trrubs, and ground cover marerials Ii City paW, parking lots, _ closure areas, and small median divider locations IIInJuJhout !he City. . This project is funded from one-Iime monies rebated to the General Fund by the Electric Fund. fnieet Cgpmgn!:T!W The major component of this project is the purchase and planting of replacement plants, .trrubs, and grmmd covers. Ground cover and plant replacements will be planted II :riles where iIrigatiOll systems have been renoV2ied and can support the replace""",!. P)yIe<:t JpstjCgtiog: An invenloly completed in 1993-94 identified ap;>IOXimaleIy 50,()()() oqDI%e ra.t IhaI need grouod cover and plants. Inefficient iIrigation, the hard rr-several years ago, aDd !he =t dnought, have IaUlted in • severe diminishing of plant ~ at pori< sUes. This request will enhance !he City parks and replace n=led plant materials. Ipmert 1M Smmgrt Apalysk; • BDvirorunen1al: Categorically exempt under Section 15301 of CEQA. • Operating: • Tdr.com:Jn.U4icatiOl'is: Parks-increase maintenance costs during the first year of the project. None Cmmn:!JfRc!ye PIau: Consistent with the Parks and Environmen1al Resoo= JeCtions of Ibe Plan. F!paDdaI Analysis' 1994-95 $40,000 1995-96 1996-97 1997-98 1998-99 Sou= of Funding: This project i. proposed to be funde<! from one·time monies n:bated to the ~ Gene<al Fund in 1993-94 by the Electric Fund. 41 .~ : /' NEW PARKS AND OPEN SPACE PROJECT PARKS OIDTREET TREE TRIMMlNG (19506)' ProIm Prcrr!"'!on: This project provides for Iree lri mming and 1001 pruning within the boundaria of the City parks and ccmmunity =ters. "This project is teljuired for the ongoing maintenance of City facilities. Based on the need for IIUUlal funding, Ihe:;e mainll:nance expellses .. iU be tnutsitionoo from the capita! budget kl the ~ budget in 1995-96. ~ This is an ongoing project to perform tree maintenance tasks that have been deferred or <leIayed as • result of higher priorities. The major components of the project iDclude tree trimming and root pruning. ProIcct11!5tlf...,tIon: Public Works oIIocatesapproxirnately 10% of its tree mainteilan<ebudget for maintenanoe work on trees within City parlc: and oommunil)l center boundaries. Many of the _ OR growing at • IlIpid pore, particularly as a result of. constant supply of irrigation water_ Years of limited and deferred maintenance has resulted in overgrown 1reeS, crowding, and low hanginc Immcbes. These oooditions have resulted in safety issues for park patrDIls and additional mainizaaDce efforIs and costs. An example of additional maintenance activity artd safety hazards tCSUlling from ....ergro'''''' trees is eviden<:ed at tennis c:oum ad";=t to large, overhanging trees. 'The COUI13 become Iitte<ed willi Iree debris resulting in Iitte<ed and unsafe rourts. Over time, tbeso courts will deteriOIate as • consequence of the Iree debris. 'The trees of Palo Alto are an imporunt beoefit to the rommunity and must be maintained to pn:serve the Cil)l's Utlique ambiance. Immd Bnd Support Analysis: • &vitonmental: • Operating: categorically exempt under &ctioo 15301 of CEQA. Parks-Wlli increase oper.iting efficiencies Public W()[ks-Root pruning could alleviate future sidewalk replaoement costs. • Telecommunications: None Ccmprebcnsh'c f\an: Consistent with Environmental Resource sections of the P!an. 42 ,,---' , , • Flnanl Analysis: 1994-~S $SS,OOO 1995-96 $89,000 19%-97 $93,000 1997..98 m,ooo 1998-99 $103,000 Scuroe or FUlIdisIg: General Fund • 43 I"?" -r ",. ,~Al :~. NEW PARKS AND OPEN SPACE PROJECT OPEN SPACE LAKFS VEGETATION CLEARING !I9S!17l Proiec:t 1les:ripling; This project will mechanically remove pond weed and catWl plants from Boronda Lae in FooIhills Park. Cattails located near t~e island, boat docks, rhe boot launching uca, ten shoreline fishing areas and off rhe face of the dam will be removed. Pond wee<! from Ihroullilout Boronda Lae will be eliminated. In addition, catWl plants at eight shoreline lis.iing Joc:atioo. II LlIe Aruttadero PreserYe Lae will be removed. Prolec:t ComIl!l""!l'S Callail plants and !I1eir roots will be removed from Boronda Lae and the ~ Praen .. Lae, Pond wee<! and their roots will be cllnailed o' Boronda Lake. Emaded plants will be dumped and composted at Joc:ations 10 be determined by Park staff in FooIIliIls Park and the AJasIradero Preserve. Profl:d Jpdjrgtj1m; As. ~It of the drought and low water ccnditioos, pond wee<! and cattail plants became established in areas ofBoronda Lake wbere they normally could not grow. CoouI:q1>enlly, park v;sitms cannot fish or boat in much of the lake. o The pood weed and cattail plants are also a safety hazard. The Stare Division of safety of Dams C' RqUires 1beRDJDYal ofcatmils from dams because lheirroots weaken lbedam's structure. Pond ~, weed in IIorooda Lake iIas grown so Ei,nificanlly that ;t could ..,tangle anyone flIJling in. Pond weed bas clogged the motor of III. lake'. rescue boot, sometimes making it inopetab"'. Cattails '-' 10 be mDO\"ed from the Arastradero Preserve Lake to allow access by fishermen. Removing cattails and roots in combination wirh !=ping Boronda Lake fuTI will prevent regrowth in !he deeper areas of both lakes for Ihree 10 five years. Pond weed will begin to grow in two years. Money will be requested in future Open Space operating budgets for mowing regrowth of bo!h plants. Impart Iud Support Aualysis; • Environmel\taI: • OperatiDg: • TelecommUru:\i3tions: Categorically ele",p' under Seedon 15301 of CEQA. Removiog plants will provide safe access far park visilOr aetivities. Plant removal will also satisfy requirements of rhe Stak Division of Safety of Darns. None CGmIlRhe!!!i!.., Plan: Consistent with Parks and Environ mental Resource sections of the Plan. 44 • Hnenrial ADlb'sJs; i994-95 585,000 1995-96 1996-97 1997-98 1998-99 Souroo of Funding: GenenJ Fund NEW PARKS AND OPE!" SPACE PR01ECT TENNIS AND BASl(£TBAI.L C::Ql]RT RENOVATION (J95lll!l! Pmlrrt J\rs:rIptlcm: "This is an ongoing project to provide preventive m2ini:f:nance for City _ courts and baslcetoo.n oourts. Necessary repairs ""d resurfacing will be implemenled at various sileS throughout Palo Alle. *This proje<t is RqUim;! for the ongoing maintenance of City facilities. &.ed on the need for annuaIlimding, these maint=lan<:e expenses will be lIlIllsitioned from the capilli! budget Ie the opr:nIing bo<!gd in J995-96_ ProJect Cpmpogent.s: 1994-1995: $2S ,000 Sewn .....w courts will be rcpairod and .... urfua:d at MiJcbe..'l Park and a basketba!J coort at Terman Park will be resurfaced. Prntld: JuclEr1Clfjgp: On-going maintenance will reduce haz.ard:ii. such as slipping, tripping and faiIiD&, 10 court wen and will rMuce the need for major expen<Iilu= for court repairs. !ppwt and Sgpport Analysis: • &viromnental: • Operating: Caregorkally exempt under Section 15301 of CEQA_ ParklPubIic Works implementation. • Telecommunications: None Ctspprehcpsi"rC nan: ConsL~t 'With tht Parks and Environmental Resource sections of the Plan. fipanrlBl AnalySis: 1994-95 !99S-96 1~ 1997-98 J99S-99 .som.e of Funding: $25,000 TBD TBD TBD TBD General Fund 46 ~~ . .. ,:'. :'-','-.. ~.' '~ • '~- ·-.-, CONTINUING PAR.KS AND OPEN SPACE PROiECf RINCQNAIIA pooL SITE IMPROVEMENTS f19406l Pmlm Desc;rlptkm: This project continues to implement a 3 year site improvemenr plan at the !Ii""",,,," Pool to "'Place old deteriorated piping, resurface wo:m decking, enlarge undersized sIoI'age and c:onditiooiDg rooms, and modify the public address system 5C as not to disturb other pork users and neigbbon, 1993-94: S4OO,ooo During 1993-94, cIeI£riorated pool water inlet pi""" are being replaced to prevent corroded iron JlOIfIicles from damaging or 5IBining the pool's bottom and siding. The pool deck area will be oaudblasIied iDcI resurli!oed, deck dIainage pipe will be replaced and deck drainage will be improved, In additioo, tile Ihn:shold edging will be installed on the large pool, and missing and CIlIClIzd til .. and exposed aggregate surfacing will be replaced on beth the large and omaIl pools, 1994-95; $80,000 'Ibis .,..... will include II pre&bricated pool """"" facility to !:lore pool SIlpplies, cbemical c:kaning eqoipment, and swim meet equ.;Pment The filciliry will replace tile existing, ina.deqUate cllaiD link fmce and p\asti<: IlUp area currently being used for this puIJ>05e. Based upon the nosuIl& of an an:hi1eClUIal design, a raised floor may be installed ""or the existing concrete deck 10 _ proper drainage. 1995-96: $50,000 This final phase includes expansion of the existing cor.ditioning building by approximately JSO IQuare feet to a.xommodale the increase in prog.'1lm usage. This will provide: more area for !Image of swimming equipment and office space for administration of the swim program. The public address sySlem speakes. will be modified and relocated. EroIe!1 Jugjrgtion, ImprovemenlS are needed to increase public safoty, l'n-vent furthu damage to existing pool facilities, provide increased space for sv.im equipment and slOr.lgei swim admlnimation, and to replace an inadequate pool equipment storage area. 47 .. !rom and SupPOr1 Analysis: • EnviroDmental: • ()pcraIina: • Telecommunications: eat.gorically •• empt from CEQA under Section 15301 for 1993-94. In 1994-95 and 1995-96, may require further environmental a.ss<ssm<:nt, as the project design is completed. Public WorksfFaciIities maintenance time will decrease, None CHIp ebcn,dn Plan: Consistent with objectives ofPcub and Environmental Resource secticms of 1bc Compr<IIensive Plan. FlDapciaJ AnalyBi: 1994-95 $80,000 199.5-96 S50,OOO 1996-97 1997-98 199&-99 Soun:e of Funding: General Fund 48 o - CONTINUING/REV/SED PARKS AND OPEN SPACE PROJECT J!NIVERSITY A\1ENUE. CALIfORNIA AVENUE, AND MIDTOWN BUSIlIIESS DJSnuCfS LANDSCAPE AND IMPRQVEMU.'TS !l941ll Ptpject DqcrIpli<>n: This proje.:, "ndertakcs a b<autification program for business district areas, including landscape 2nd other improvements, and sidewalk cleaning, The thRe business cfistricts are california Avenue, University Avenue and Midtown. Ptplcd ComPOnents: 1994-95 S4S ,000 Major components of the proje<:t include replacement of annual aIld peren niallllndscape plantings OIl city owned streets alld parking JOIS, cl=ing of .idewalk areas and other improvements, 1995-96 1996-97 1997-98 1998-99 TBD TBD TBD TBD Prqie<t Iustjr!Cl!i2n, The '"vcrall.ppear. .... "" of the business districts has declinocl OVCT the past yeatS as • result of insufficient resources, This has loci, in part, to difficulties in retaining busir>eso custmners. Minor improvements were made in the fall "f 1992 and again in !he fall of 1993, In 1993-94 more subS!3n1ial improvements were implemented in the University and California districts. Improvements were wen received and the area gained a neoN appearance which helped attract ~'USIOmers, In 1993 the business community held discussions with the City \0 develop publicJpnvate parmersl'Jips to e:lhance klng term maintena.'lce and improvement effw~. The City \\,111 continue to work with the district business communities io develop a Joint effort to beautify the business disaicu. Pzrt of this effort includes working with businesses to form beautification assessment districts, which will provide funding (or sustained improvements. Impart and SupPOrt Analnis.: • Environmental: • Operating: • Telecommunications.: Categorically exempt under Section 15301 of CEQA, Parks -Landscape Maintenance m fnimal cost increase. Public Works -No impacr. None Cmnprehel1$ive Plan: Consistent wit.'1 Urban De3ign elements of the Plan. 49 . ~,,--.J';' j flMncit' Analysh: 1994-95 S4S,OOO 1995-96 TBD 1996-97 TBD 1997-98 TBD 1998-99 TBD Soun:e of Funding: General Fund .~ CONTINUING/REVISED PARKS AND OPEN SPACE PROJECT Am,mc fIEU)S RENOVATION (19413)' Prp!m Pesdpt!on: This prnjed is an "",oin~ renovation progtarn for athletic fields to provide quality playing fields at City park locations, The City', baseball, softball ar:d soccer field<, 'IriIicII are in use year round, are in need of annual spring and WI major sodding, seeding, and imeDsive turf renovatioo pm:ticcs. The primary areas for athletic field """",ali"" work are GJecr PlItt, Mitchell Park, Terman Park, El Camino Park, and the Baylancls Athletic Qnrer. *This project is mjUired for the ongoing maint<roanC% of ell}' facilities. Based on the need for aDDua] funding, these maintenance "pen"" will be transitioned from the capital budget to the opetating budget in 1995-96. Prgj!c! JU!!IIfJs:atj1ut' Yeor-l'OImd, exlenslve use by organized ."d nor.~ u.ser groups ,... 1CC<Cr. foodJalI, baseball, volleyball, and other activities ""'.:lIS in minimal turf ra:overy a-mel _y worn out areas of turf. These worn areas bec<ome devoid of turf causing boles mel deprasions wlricb ultiruateIy become safety problems. rntense renovation and inoorpon;tion of additionIll turfgrass is necessary 10 prev<IIl deterioration. Otganized users groups are cllarged fees for field U50 and consequently they requesl safe, and well-lurf<:d fields for their use. • Environmental: • Operaling: • Teb:ommun.ic:ations CategoricaI1y exempt under Section 15301 of CEQA. SUJl!Ilcrnental to ongoing maintenance function,. None Cgmnbemiye Plan: Coosistent with the Pirks .and E.r.V=uonmental Resource sections of the Plan. FlgandaJ An,eWjs: 1994-95 531,500 1995-96 533,250 1996-97 $34,850 1997-98 $36,600 199&-99 TBD Source of funding: Genetal Fund 51 • . , CONTINUING/REVISED PARKS Arm OPEN SPACE PROJECT PARKS IRRIGATION IMl'RQVEME.'ITS ANI) RENOVATIONS ANIj BACKf1,OW REPL,f,CEMENTS l!9414) Protect I\r:sn:ipCigp: This project consists of ongo!ng improvements initiated in 1993-94 for cIeveIoping plan! and specifications for irrigation improvements at various city facilities; the ...".""""""1 of incfficiall and ineffective irrigation systems; installation of irrigation satellite 00IIlr0I S)'1Icms as part of the central irrigation l1l3!".agemcnl program; and the remcvaI and rep1acement oi backflow de\ices. 1994-95 578,000 IrrigaIioo p!ans and speci6ra~ons will be develop<d for irrigaliro improvements at Peen Park and BIamor Park. lrrigatian satellite control sySlemS will be ino;taJJed at Rinconada Park and EI Camino Park. Sixly backflow devi= will be installed at the City" parks. 1995-96 $281,000 Irrigatioo sysIemS will be repIa=I at Eleanor and Peers Park. lnigation satellite control sy=s wiD be instaJled at Terman Park and the Rayland, Alhletic Center. Sixty backflow devices wiD be insIaIled at !he City's p<irk1. I9%-97 $60,000 Designs and specification. ",,11 be developed for replacirg irrigation systems at Cameron, Hopkins, Boulware, and Robles Parks. In,talla:;on of the final, remaining 53 backflow devices 81 the City's parks will be implemented. 1997·98 $140,000 Irrigation sysIemS wiD be replaced at Careeron, Hopkins, Boulware and Robles Parks. 1998-99 TBD Prciert Justjrgtjoo: Backflow rep1a-~ment is required as a result of Tifie ] 7 of the California Administtative Code which mandates that each public water ulility i.'spect piping systems to _ !be system is protected against contami .. tioo of potable water 'upplies. Irrigation improvements will allow for centralized management of irrigation programs mlucing penon hours needed to manually adjust controllors and inspect for irrigation problems, upgrade worn and inefficient irrig.ation systems, and rcduo;.."e water consumption. -. • ..... o • DPM1 ,ud SPPPOrt Ana!,...: • Environmental: Categorically exempt under Section 15301 of CEQA. • Opaating: • TelecommGnications: Parks DivUion -.reduced 'water cons!Jmptior! and associated c:oY.s. Telephone lines for modem connections. Cpmprrhrmh" Plan: Consistent with Parks and Environ mental Resou."Ce sections of the P1an~ Duocia' AMb. 1994-9S: $78,000 1995-96: $281,000 1996-97: $60,000 1997-98: $140,000 1998-99: llID Sautee of Flmdinll: Oecera! Fund 53 CO!lfTINUlNG/REVISED PARKS AND OPEN SPACE PROJEcr PARKS FACJ1.!J'W) IMI3!0YEMENTS (19415) Pror.ct T!rcrrjotioo: 'I1tiJ is an oo~oir.g project that include! the replocement of old and noo­ aocessible playground cquipmellt It w;U provide new. modern equipment nec=sary for IIeYelopment of socia! and muscular skills. Specialized equipment will be purchased enabling access and use for persons with disabilities. Thi. project also inciudes the rq>lacement and upgrade of park be.nchcs 1 blea-· .~, .. , signs) picnic area improvements and other amenities. Pm1rn CIIDponmts: 1994-9S: $270,500 PlaypouDd equipment will be replaced at Robles Park, Seal. Park. Cameron and Werry Park. Park bencbes. sips, fenoes and picnic area ameniti .. will be repaired or rq>1a=l at Ramos Park. Boulware Park. and Robles Park. l'layg1cund equip~1 at Briones Park will be replaced should an appUcatio.l for Community Development Block Gran! (CDBG) Funds be successful. If funding is not available, Briones play""""" "'Placement will oct\l! in • 1995-96. 1995-96; $195,500 Playpounds and equipment will be renovaledlreplaced al Rinconada. Scott. Bol. M"""", and CanImJn parks. Park blcache<s w;U be replaced al the Baylands Athletic Center, EI Camino Park, and RinOllflll£ia tennis courts. Park bene! .... signs. and picnic are:! ameoities wiU be tqJOiRQ or replaad at Mitchell Park, Pee" Park. Seal. Park. and Scot! Park. 1996-97: TBD Playground and infrastrucwre improvements for major upgrades to Mitchell Park are planIlCd. Pmlect Justlf!C3tion: This project will reduce playground safely hazarrls due to deterioJ1llioo of old equipmer:t,enhanoc mowr skills of usen. and provide accessible equipment for penons with disabilities. Park equipment and infrastructure "JC~ as benches, baJtecues. signs, fences. and trash rcccpIaCles have detcriorued and .>eed 10 be rq>laad or refurbished. This project will enhance !be safety. quility. and condition of the City's parks. 54 .. .. Em.ironmental: • Operating: • Td<a><lJmurtiooti01l1: Clttgorially exempt ,,<>de! S<cti'''' 15301 of CEQA . P>tI<s\Publk Works N<>ne fdw.Dp rlm"'c Plan: CcmaistQ'lt with the P#ks ana Environmental Resovrce ~jvn~ of' ~ l'IaIl. 55 NEW INFRASTRUcruRE PROJECT FACILITY ROOF REPLACE.'I1£,NT (195141 Prghrt PrrrIIII!on: This project will replace and repair roof. at • variety of City facilities. A DeW roof over 1he CounC11 Chambers and the Police Deparunent is required. The new roof abo indudes repair of flasbicg, repair of chipped COIlc~te and repair of the drainage systems. In addrtion, 1he roofl; of Buildi.,g. A. B and C It the Municipal Service Center (MSC) and the roofs at F"m: Stations II and #4 will be repaired. This includes all roofing, roof deck n:pIao:ment, flashing and gutter replacements as ID'\y be required. Structurnl repairs which may be deII:rtniDed as a result of ~fing work .... not included in the proj ect rosts. 1994-95 Pbase I: The design and constrolCtion for roof repairs at the Civic Center, Building C at the MSC, and Fire Sialions II .nd 14 will be aooomplished. 1995-96 Pbase II: The design and construction fN roof repairs at Buildings A and B at the MSC will be accomplished. -", 1· o Prg!rn Jmtjficalion: The roof over the Council Chambers and Police !>epanment is 24 yean 0 old and is at the end of its wefullife. Flat roofs of this type have an average life of 2lJ 10 2S years. The Municipal Service Center roof. are approximately IS yean old and have required ex1mSive patching over 1he past two years. Roofs at Fire Stations II and 14 roof are approximately 40 yean old and have reached the end of their useful lives. Impen and Support Analysis; • Environmental: Categorically exempt untier Section 15301 of CEQA. • Oper.uing: Public Works (F;;cilities Ma:!agement)-wiil reduce maintenance requirements. • Telecommunications: None Comm')!;.!': PhlQ: Consistent with Plan. flnancial Analysis: 1994-95 $32S,OOO 1995-96 S230,OOO 1996-97 Phase 1 Ph .... n 56 c .. 1991-98 1998-99 Soun:e of Fundina: General Fund 57 '-.- NEW INFRASTRUCTURE PROJECT DOWNTOWN LmMRY BEAM REPAIR 09515) Prclm Desgjqjpn: Four main double girder bums at Ole Downtown Library F:lcility are experieDcjnll saious decay d"" to dry rot. These beams ",111 be repaired or replaced. Roof repairs may be necessary depending upon <he ex!ent of beam decay. The remedi<ll repairs will be ooosisten! with the existing architectural style of the building. Thi. project provide' for <he doslp and construction of necessary improvements. Prgjer1; Cosnpgm-gIs: The design will be a.:complished in 1994-95. Construction will be accomplished in 1995-96. PrgJed; JJl5tjrg'Wn: There are (our beams requiring repajrs. They are the main structural I<IppOrts of tile inn<:r perimeter roof and the .-.Ierior roof of the flIcility. The beam. have expericDced oxtemive dry ro! at <he extremities and wiU mjuUe significant removal of dell:riomted maleriaJ.. Beam areas with decay mUSl be replaoed with new, par!ial matching beams of originaI structural qU3lity. A Structu.-al Engineer Consultant has revi.-wed <he <oDditioo and coocun with propo!ed corrective measures. The Downtown LIbrary is approximaIeIy 22 years old. Impeel Ind Snppre1 Anllysls: • EnviroomentaJ: Categoric:ally ... emp! under Section 15301 of CEQA. • Opeming: • Telecommunications: Cgglpt'l'llemrve Plan: Consistent with Plan. Ymarx;ial Analy:;js: 1994-95 $25,000 ArclritecturallEngioeering Design fee only 1995-96 Cost To Be Determined Based on Archila:t'siEngineer'. Final Design 1996-97 1997-98 1998-99 Source of Funding: Gen=J Fund 58 • o o , •. .. "'" NEW INFRASTRUCTURE PROJECr POLlCE LOCKER ROOM RENOVATION FEMIBlLITY SillIlY C!95131 , , \ lrIIa:I. J\egription: This project i..'lYolves il space utilization ar.a1ysis for the renovation o( i.be Police ~t )ocker rooms and shower facilities, l'tesent facilities are old and cIeIerioraIing and are unable 10 a&quately """,,,,,,modale Poilee staff as "'ell as other City dep&rtmcIIts' IIaff who have increasingly utiliwllocker room space in recent years, In addition, Police locker rooms are in fiye sepaI3le locations ",ithin tile facility, Finally, adequate locker space for WOmc! Police ofii<:eIs bas not kept up with the increaslng number of ,",omen in tbe Police DepartmenL This project will examine tile feasibility of providing central locker rooms for women and men, PrPIect Componepts: Feasibility study for the """'" figuration of Police Departrnent locker rooms, Prp!cct InstIfigrtlon: The Police Depanment bas outgrown exis!illg locke; room space, Some modifications have -. mad. over !he yean in an effort 10 accommodate tile increase of police officcn. As a n:suIt of these modifications, tile department bas live sepaIate locke; room fac...ljljes Based Illl =t st>.ffing levels, the department ....ss an additional 18 lockers., The CIURIltlockers are approximately 16 years old and are at tile end of their serviceable life, Costs for repair and maintenance have been steadily inaeasing. The Police Department locker rooms are used by Police and Fire ~t personnel, and OCher City penonne1 during luncll and after work, as well as by City penonnel who bike 10 tile Civic Center. This usage has caused ""'Ole crowding during peak Ii",... The shared amngt:mOl'ot ~ police and city personnel, particuao1y in the women's locker room, bas Illi5ed cone,'''' over the security of police equipmenL This project will .. amine design moditica!ions which w'JI a<Idress both city ard Police per;onnel usage as well as equipment socurity. This project will aloo evaluate tile cos! 10 upgr.irle bathroom and sIlower facilities to meet ADA ""IIlirements. Imgoc:l and Sul!l!OJ1 Analysis: • EnvirOflmcntal: • Opentin&: • Td=mmunlcations: NO! a project under CEQA, None None CoosiSlent with Plan. 59 1994-95 1995-96 19%-91 1997·98 1998-99 $10,000 TIID Based upon Feasibility Study. (Iowa, of fundin&: Uer.mU Fond 60 NEW INFRASTRUcruRE PROIF..cT UJCIE STER.,.. Pi\TIlWAY LIGHTING (! 95!1l '-~ """; -~­ :-~~-~. Pro!tct Pwr!ption: nu. project will install ground pe<!estriJln traffic I;ghting for two access ~)'1 from 1hc _ and parking"""", to the Lucie Stem Compl... Lighting will be similar to dw ill 1hc Lucie Stem Coortyard. ProIcd CIHII'hdIfld:i: P>.thway ligbting will be instaJled at the Lucie Stem Complex in 1994- 95. Profut Jpstlrqtlpp: Compietion of this project resuits in safer and more aocessible pathway:; for ...... or 1!>e Lucie Stern complex. • EavirorunentaI: Categorically exemp! under Section IS301 of CEQA. • Operating: • Tdecommunications: p",., '«'+ ftu: Consistent with the Parks and Envimrlmental Resource sections of the Plan. 1994-95 $25,000 1995-96 19%-97 1997-98 1998-99 Soun1e of FWIIIiDg: Gcmr.!I Fund 61 ... •. j NEW INFRASTRUCTURE PROJECT CIVIC CENTF.!l PLAZA WATERPROOFING 095121 Pntiect Description: This project consists of necessa.ry repajrs 10 leakage in the Civic Center PIa2a slab ana at and near perimecer planter boxes as well as to the planters themselves. W~ is leaking from planter boxes and is appearing at • crack in the Police parking garage, in si_ ...as on the plaza levels, in the stairwells of L"e Police Wlng and at the expansion join' .. at the main _e ..,ttance. The ""use of the leaking caMO! be detetrnined by • visual i1Ispection. The leaks need to be mod before the structuTlll Lotegriry of the building is compromised. The project inciudes removing all plants from the boxes. waterproofing within the pIaruer boxes, and repairing anyoractcs in !he plaza slab. A consultant will provide 311 initial in~, • scope of work, and construction documents. Pxojcr;! Cgml!!!!!tDl:!: The initialinYestigaticrn and design of the project will occur in :994-95. CcDstrucIion will occur in 1995-96. The c:o<ts for construction will be determined by the final cIesip. Project lpSi'atign: Water is penetrating the bwlding in several areas inclooIng the Police DeparImoDI office areas, sWrage areas, and garage. The exact source and extent of these leab is II\ICaIain and needs furthe:-investigation. Ongoing leakage in these areas could lead to IIItUCtUtaI damage of the facilily. ImP'l'f ,ud Sgppgrt Analysis; • .Environmental; .~: CategoricaIly exempt under Section 15301 of CEQA . None • Tdecommanications: None Cpmprehtpsjve Plan: Consisten t with the Environmer.tal Resource sectjons of the Plan. Fmapcjal Analysis: 1994·95 $50,000 Design only 1995-96 Cost To Be Determined Based O!l ArchitectlEz1gilleor's Final Design. 1996-97 J!I97-98 1998·99 Source of Funding: General Fund 62 o ,.' .' ' , ~\ " . "'J. ( . ,~,\ ?': " ,', i ,', '\ . ,', ," ",,- G::l ~ z ~ > <C z o E-< ~ ~ ..,... ~ <C ::t BRYANT STREET ~ PLAZA PLANTERS PLANTERS 1---__ IW --1 TOWER 1--j I . _I-~ ~ ~ ~ Z W > <C E­m W ~ o :t'1<'f//@ ~ PLANTERS RAMO N A STREET LEG END PLANTERS W~ PLANTERS SUSPECTED OF LEAKING EB INTERIOR LEAKS .., '" CIVIC CENTER PLAZA WATERPROOFING 3) ~ I .. 18II'f,J~ lt~ to fl;tII' , / " i .~ : .. / -~:~ NEW INFRASTRUCTURE PROJECT DOWNTOWN PARKING STRUCJ'URE fEASIBlLffi STIIDY U95301 Prolt!:t D!!!crlptlgn. This project is • feasibililJl study 10 assess options for oonstructing a parIdnc Slruct!m:(s) in downlm\'D Palo Alto. The .tudy will include an enviroomental -1, iiscaI impa.."t5, and !I1ixod use concepts which, for example, would include jotogratioo of the structure', F.rlIl floor wi!h re!ail and/or other .... on same site. 1'l1!!a:t C .... gooenls' A oonsuItant will be reWned in 1994·95 to conduct a feasibility study to identify and de\lelop various alternatives for a parking structure. The stIldy will include ~ daign. cost ~mares. environl1".ental j ssues, and economic impac"..s. Subject to 5Il1dy finding. and subsequent to Council direction, formation of "" assessment district to pay .far deaigD and consttudion may be punued. at which time !he General Fund would be ~ for the OOSI of the study. c I'l1!!g:I JmtjDral!op. The current parking deficiency, as indicated in the annual Downtown Moaituring Progmm lepOrt, is estimated 10 be 1,500 spaces. A significant number of downtown paIroDs and empIcyees intrude into the adjoining neighborhood. north and >DUll! of University A......... The Cbamber of eommero.. J:lo7intown Marketing committee and property owners baYe voiced serious = regarding the parking deficit. A study is essential to determine QiI the bsibilliy of consttucting • parking structure downtown to provide needed, additional parkinc. JmO'd ,pel Support Analnk; • IlDviroom<ntal: • Operating: • T_m1ll1icolions: An environmental assessment will be done as part of the study. The 5Il1dy will have DO operational impscu None Cgmprehensjyt PIaru This proj<Ct is consistent with Transponation Policy Number 10: Reduce employee or commuter parking in residential neighborhoods. 64 c FInInc:fI i "",Ink: 1994-95 S8O,000 1995-96 19%-91 1991-98 1998-99 Source of FIIDdini: GaJaal Fund ~es (The costs for thl. study would eventually be paid by the bonc! proceeds generated 10 ronstruCI the parking r.ciIily, sboWd an wessment district be f<>rm<>:l.) . -,,- ': NEW INFRASTRUCl'URE l'ROJECr DANCE STIJJ)IO kWlNG CONYERSlON 11953]) Pmied J)agipUon: The proje::t "ill convert an existing 3,500 square foot auto ShOP building iJIto a daI!a: studio, The 'I""'" will then be rented on an bourly basis ID individuals and COIIUIIImity ~0IlS for da."lCe ~'struction and other compatible uses, ProJect c"nootttJlbi: The comp:menb C1f this project include minor design work, COflStruction of dme sound v.Iils between studios; inslaJIGtion of. cusb;one<! plywood floor overlaid with a "Madey" dance surface, mim>rs and dance bar.; reiOOVal of existing prage doors and interior paintlIeatmenL Pr9k!!1 Jrttfiretion: The project will take an under-utilized 3J'!d inadequate room and con\~ it iJIto space which will be usable, meet increased demands and generate additional ",",enues, ImJII!:t apt! SoIl!!O!1 Anal*- • Environmental: • Operating: • Telecommunications: CaIegoricaIly exempt under Section lJSOI of CEQA, Cubba-ley custodial maintenance and utility costs approximalely S2,()(Xl- None CemrbmdYe PJan: Consistent with the Schoch; and Parks element of the Plan. flga"",1 AaalYSi<: 1994-95 S40,OOO 1995-96 1996-97 1997-98 1998-99 .. ill be Soma: or Funding: Utility Uset Tax (FWlding for !his project is continge .. upon resolution of L-Wmg leases,) 66 '-, '-... • 1'"'". ~ • '"j CONTINUING/REVISED INFRASTRUCTURE PROJECf PUJlUC BlJILI)frlGS; STRllCTIJRAL IMPBOY}:MI.NTS 1!3S!!Bl PrQiut Dest;rigtjon; This project provide$ far the seismic retrofit of City buildings. Facilities idcDIifi<d as requiring repairs are !he Senior Center, College Terta<% ul",,,y, ClIild...,,', LiInry, and Junior Museum. Seven.! projects already completl:d as part of this progr.un inclu4e the Main LiInry, Cultural Center, Civic Center, and Lucie Stern Cenler. The Senior Center at 4SIJ Bryant SIreel is cumntly being designed and the seismic retrofit work will be performed during FY 1995-96. Due 10 the increase in tho budget for the Senior C""ter, oonSlnlc:tion was c!e!ayed 10 fund tile project ov« a l~year period, FY 1994-95 and FY 1995-96. The increased IrJ<!gel was caused by changing code requirements, new laws such as the Americans wit!! Disabilities Ad (ADA), inclusion of relocation costs in L~. ClP budget and additional structUral ODd archiIectm:aI wori: not included in the COS! estimate prepare<! in 1988. Funding 1hrough FY 1998-99 accomplishes all seismic retrofit wori: identified in a 1981 COIIsuIlant IOpCrt which assessed tile pbysical conditioo of City-cwned buildings. The COIISIruCliOll projects for the CbiJdren', Library, College Terrace Library and lunior Museum are phased """'. three year period, which provides the preliminary design in tile fin! year, the final design in the second year and the oonstruction in the third year. The phlWng]XO\'ides en improved meIbod 10 budget building construdioo projects. As. re3Ul1 of phasing in these projects, the original onst esti!ll2les from the 1981 study may require updating. Prior 10 the compledon of the above impl'O'o'emenls, another evaluation will made of the City', baiIdinp. As a raull of the evaluation, iffipl'O\·cments may be ne.:essary beyond FY i998-99. fmia:l Jus!lfl£llloD; The S!IuClur.II adequacy of public buildings needs 10 be insured given safety and liability comideratiOllS. Impact and Sappm1 Analysis; • Ilnvironmenlal; • Operating: • Te1ecommunicaliOllS: Categorically exempt under Section 15301 of CEQA. Public WOii<; (Facilities Managemert) -Will .oouco SIruClural mair.tena..I'lC:e requirements. None Comriensiyc ean; C.onsistent with objectives of Saicty Subsection: Reduces potential for injury and loss of life and possibililJl of property damage. 67 • 1994-95 $675,000 1995-96 $725,000 1996-97 5)20,000 1997·98 $450,000 $575,000 Soun:e or Funding: Gc:neral Fund ( . Senior Center seismic retrofit relocation costs (S3OO,OOO) and """'<rUCtion (5375,000) in 1995·96. Senior Center seismic retrofit constrUCtion ($700,000) and CtlUqe Terrace LfDrary preliminary design ($'25,000). Ccllege Temce Lil>rary design ($70,000), Children's Ubrary and Junior Mu","", preliminary design (550,000). College Terrace Library c:onstruction ($350,000). CJ-.iJdren·s Ubrary ."d ] u.ior Museum Design ($100,000). Children's illra,), ($275,000) and Junia< Museum ($300,000) c:onsuuctiotl. 68 • .. ~-.: .... ...:.:...-..: ~ ' ... .... --0. _____ .. CONTINUING n.'FRASTRUcruRE PROJECl' CUBBERLEY CODE ROOF REPAIR (l !I1!18l Pl!Iftct Pcp=rjptlgn: This project provides for n=ssary roof repairs and ~lacement at tile Cubberley Comlmmity Center facilities. PrpItd CompqgepIs: The roofs ",,~uIecI for replacement or major repair work over tile next two years And lisIed in priority orc!er are: Pavilion, Building H, Building M, Building L, JluiIdinc I, Building D, !Iuilding K, G}m5 A and B, and Building 1. The rove.red walkways IIm>ucbout Ibo sile, though needing attention, an: l!l1! included in this work as, according to til. Muu:r P'..", Iboy "'" to be removed. Prpird lmfjfirptign: Many of the roofs at the Cubberley Community Center are in r.eed of npI __ t Scwer.tI of the roofs leak. This WOIt is """"""""Y 10 preserve the integrity of roof aod roof ftaming sysItms, and to protect tbe building intmors from damage. hmwt 1M Support AnalYSis: Categorically exempt under Section 15301 of CEQA. Public Works (Facilities Mainlerlance) -.oou<:es maintenance .n:qliimnents . • Telecommunications: None C "d""-wmJn ftwg: Consistent with the intent of the Safety Subsection of Plan. flnanda' Analnjs: 1994-9S 5200,000 1995-96 $200,000 1996-97 1997-98 1998-99 Souroe of Funding: Utility Users Tax 69 .. ~. CONTlNUINGiREVISED INFRASTRUcruRE PROJECT SIDEWALK REPAIRS (I89l!3l Pra!tct Q=rrI!!Ilog: Sidewailr. repair program to reduce the bacldog in sidewalk repairs. PrgIcd J!MI!!I!:atlgg: AIIevia!illg!be bacldog of sidewalk repairs will ennaoce citizens' safety aDd comCon. IIeUI:< sidewalk conditions wiU result in reducing the potential for sidewalk-related injuries, with I reduced liability risk 10 the City. By providing a me!hod of bi-annually pri<Irili.zin& sidewalk repairs and with an annual ;nainrenance program, the City i. systematically redueiDi !be sidewaIk repair badlog. Irnw1 apd Support AnaInb: • llavinx!moaIal: • 0pezIIinc: Catt:gorically exempt under Section 15301 of CEQA. No additional resourtes required. • TeIecommuui<:aIi: Nooe CmOl"d dye "'PI Consistent with Transportation Element Program 37 -to improve pedcIIrian safety. 1994-95 $400,000 1995-96 $400,000 1!/%.97 $400,000 199i-98 $400,000 1998-99 $400,000 Source of Funding: Utility U sen Tax 70 , . , " .... • J:, "'-' ....... '-C __ " _________ ...:'~~ __ ..::_ ... ~_._::._ CONTINUING/REV/SED INFRASTRUCTURE PROJECT STREET MAINTENANCE (18971) fto;m Der;giptjog: This project provides fN annual resurfu:ing and reronstruction of various City streets. The 1ist of streets will be prioritized to coordinate with the 5tOrm ~ and utiIiliet UIIIIc:rgroundig pr<>gJamS 10 the extent feasible. fto1m JusclrJgtlpp: The Pavement Maintenance Management System (PMMS) bas identified !bose streets whose condition po.es • potential liability 10 the City ",til respect 10 reliability and safety. This progtam lessen. this liability by sySlemati.caIly scheduling the highest priority tqIlirs. By providing a systemized bi-annual rating of street imprcvements and a yearly mainreoance program, the City addresses the n=:l to provide a functioning street system and reduces the maiJo.tawlCe backlog. _pert ap4 Sgpmrt Anal*- • IlIIvirorunetUal: • CIpeRIing: Categorically exempt Wlder Section 15301 of CEQA. Public Works «)penIDDIIS DivisiOl\) -no additional resources will be required. • Tdecommunic:alions: None Cqgmrrhrpsjve Plan: Implements Transpottalion EJement Program 17: Make operarional and iD ... ..ai.on improvements to ease traffic flow Of! major streets. fJpapdal~ 1994-95 S6OO,OOO 1995-96 $600,000 1996-91 S6OO,JlOO 1997-98 S6OO,JlOO 1998-99 S6OO,ooo Soun:e of Funding; Utility Users Tu. Additioual funding is also included in Street Improvement Fund. 71 CONTINUING/REVISED INFRASTRUCJ"URE PROIECT AMER)CANS WITH DISA!IlL!TIES ACT COMPLIANCE <t93(9) Prplcd Pegri!!ljgo: This project will continue 10 implement the transition plan and self­ ewluatioo sIlidy which was developed 10 meet the requiremonts of the Americans with Disabilities ~ (ADA) of 1990. The purpo<e of the Act is to make City facilities, programs, ..mea and activities accessible to people with disabilities. ProI'" CoumonMls: ProjectS for FY 1994-95 include modifICations to the City'. facility Jestrooms, drinking fountaim, wilderness and recreation area entrances, and for curb ramp ftquests for patIl-of-travel a<:ceS> 10 City facilities. In additioo, elevators will be modified to impr<Mo access to City scrvi= and programs at the Civi< Center and CubberJey. ~ lor 1995-96 iDcIude modifications 10 fir. stations, the Golf Course and curb ramps at public tao'ities Completion of ADA wort in 1995-96 finalizes implemenlation of the Cirj's forma! Transition Plan and Self-Ev.oluation Study. As the Federal Government issues new guiddincs. suoh as changes for chlIdren's facilities, requests for ADA project work may be ~ in the future. ProjccCs for FY 1993-94 iDcIuded Main Library modifications to the front circulatioo <:oWIt.er, patio doors, restrooms, and the north public entrance; replacing or adding curb rnmps in three main busiDess districts • University Avenue, California A venue and Midtown; improving interior 1'OUICS in ~ buikftngs including widening doors and "'POiring thresholds and S!ai.. .. 10 proYide aa:ess to programs, JerVices, and activities that cannot be provided througb non­ _al moc!ifi<:aIioos; prm.iding 1is1ening _ devices and de.scn'bers in the Community and Children', Theaten; providing fax macltines at three add; tionallibraries or bigh use facilities to allow requested marerial to be faxed di=tJy 10 people with disabilities; and provwmg access to Rinconada Pool for .... immers willl disabilities. Prpim Jgst1!k;dign: The Americans with Disabilities Act of 1990 affects mOS! aspects of the City', progmms, services and facilities. In order 10 comply with the federal law and related toplations, the City prq>aICd • =ition pi.\n and seli·evaluation study that identified physical obstades; described in detail methods in make facilities, programs, services .and activities ~le; and. specified schedule for steps to be implemented. Ali structural program, service and activity changes must be acctlmplished as soon as poss1l>!e, but no larer than Iuly 26, 1995. Imppct and Support Analysis: • Environmental: • Operating; • Tdec:om.municatioos: Categorically .. empt from CEQA under Section 15301. None None n • Cem,prcIJC#Clfrc Plan: Consistent with Parks, Urban Design and EmrironmentaI .Resources occti<>M of !he Plan. $256,000 Im-96 $,S,OOO TBD 1997-98 TBD 1998-99 TBD ~ of Fanding; General Fund NEW INFORMATION SYSTEMS PROlR7 GEOGRAPHIC INFURMATION SYSTE~{S APPLICA TI.J:lliS (]95IS) Proi«t DesgiptjQP: In 1994-9:5, funding for the Geographic lnfomation Systems projects (Proj«:es Ism and i94S) will be complete. The system will contain • complete set of all City­ -maps. This new project develops application software which will allow easy and quick access to City dalaand maps. Beyond compul<:r'.zing maps, Geographic Information Systems (GIS) produces iD1dIigeal geograpruc infonnation which can be recoxded and dispLaye.! in graphic and llOO­ gmpbic form. Application development would begin in 1995-96. City ~epartments "'" dcpe:Idem on maps and land-based relaled information in delivering services to tile public. This project provides application development for Utilities, Planning, PIlblic Works, Police and Fin:, and !be equipment ".,..,...,.,. for tile Information Resources Department to support tile cIa<d""mau and USC of GIS in tile organization. The following table provides • ccmplete financial summary of L~e GeognIphic Infonnatioo SysIemS Applicalion project by fund. See NuI.ti.-EnIclprise Fund Project 9507 for UIility Fund GIS expenses. Gaoaol """'" Total food -W .... e.. w........". o..m.p 1_ $I!1O.400-S79,ooo. $S),I()()' $<3,100' S2S,ooo. $17,400-$401,0()(). $210,100 $93,000 $59,600 549,600 $28,000 5I1?BOO $459,000 1996-97 S110,400 54,200 $2,100 $12,100 $1,100 $2<),100 $150,000 1997~ 546,400 54,200 $2.100 $2,100 SlI,lOO $100 $66,000 1_ $6,400 $1'_200 $'2,100 $2,tOO $1,100 $100 $26,000 The following sections display General Fund department requests. I'LANlljlNG fToIcs;t Jus( IrtQltlon: GIS applications will improve public counter service, project analysis, maps, da1abase management. and data mOnitoring. The public counter application will increase customer service. This application would also allow 74 o ".0, j !lie lI:clmieian working the public counter to readily provide property data reports with information aboul zoning, parcel geometry, special restrictions, and other information applicable 10 !hat property. Nonnally the customer would It ... to visit several department! iO obtain !his information. TIle applicalion will help eliminate sUIJlnses for applicants who find oUllat. in the =t process cruciaJ information about their property. Application, CUrrtntly under deYelopment will provide access to <:ounty Assessor data 0., properties Md proc!uo: form letters or public notices. Other applicatioru would allow the Planning staff 10 quickly and efficiently manage and lICCeOS data when Dmling m;ommendations on dcvelopmenl project or Ian<! use issues 10 the City Council and wilen providing maps, dala and other information to cuslomen. ProJect Cornpgnegts, 1995-96 $42,000 1996-97 $34,000 512,000 Ink Jet Plolter S10,ooo New Personal Computer (PC) and Softwa,. License 515,000 Public Counter Customer Service Programming $5 ,000 Map and Database Man38ement PrograntOting SIS ,000 Replacement of Workstation SI2,ooo ProjocI Analysis Prognl!nmin, $7,000 Data Monitoring Programming 75 -. PUBLIC WORKS Fraim JlldJOgptjan: Speria1i.".n scftware wHl allow sta.rt' to query and do anaiysis of map "'fonnation. The application. will include: !. Basic user ;nkrlllces III allow for easy. accurate updating of the base map. 2. Slandard query screens b allow casual u,"", of the system to extract information. E.'listing pennit, insurance, maintenance agreements and relatOO information databases will be linked io the system so the information can be extracted and displayed graphically. 3. Utilization and enhancement of the Permit Tracking System proposed by the Planning J)qmtment. As the primary repository of parcel based information in the City, GIS will beoome an inlegnl CUSIOmer service 1001. To better extracl the wealth of informatioo noiding on !be system, an appllcation mu st be developed which will make il easy rOt" staff to aa:ess the information or f<>r citizen. to extract the data themselves. 4. _ of the tree management progrun software to allow for the City" ttee m-nory to be displayed graphically. U<ing the digital imag .. provided by the base map, the infurmation in Ibe present program can be tied 10 a picture and a map making it tool lDIIly times more "oeful than the presenl software. lmla1 Cpmpont;nts: 1994-95 1995-96 1996-97 1997-98 $40,000 510,000 f<>r new PC and software Ii""" .. 510,000 for map update menu inlerface 515,000 for query screens, penni, tr.Icking, etc. S 5,000 for public counler :application $40,000 512,000 for project conflict mapping application S15,OOO for pavelTl<!llt maJ1agement program S13,OOO for graphical interfare to develop monitoring $40,000 515,000 for ttee management program $10,000 for hazardous materials 3Jtd moniloring well tracking $15,000 for optical document storage 1998-99 THD 76 -, o • POlleE AND FIRE Hect Iwir"",Iion: In 1994·95, !he Police and Fire Departments will be implementlr.g • ~ Aided Dispatch 'YS!ern. The dispatoh ,y.tem is IMld baJed and provides an exceUent opportunily to be able to link with GIS. This linkage will allow staff to be able to provide 'willie,1 information to !he public in graphical format such as crime reports by neighborhood, buIrdous matcrial incidents, and traffic corridor problems. It wit! also &Dow public safety ofIioen 10 access maps for-inquiries and reporting. 1994-95 1995-96 S45,OOO S30,OOO one workstation and software license $l~,OOO CAD-G1S linkage 1996-97 $3O,OO'J $20,000 two new PCs and software licen5e SIO,OOO criltIe and incident program 1997-98 TBD 1998-99 TBD n .,--. -. ~-.- .. /: -~"""------ INFORMATION RESOURCES JIr:pitd Juairqtion: The current V AX computer equipment '..vas purchased in December. 1988 and is ruruting II capacity. To enable the departments 10 develop additional applications, add addiIiOllOl ...... and print and view Digital Ortho Photos (specialized maps). it will be necessary 10 upgnde !be centr.ll computer and three (lenora] Fund work stations. (Nine Utility work SIlIIioN will be upgraded. See Project 9507.) The upgrade can be =mpli .. ~ed i.~ seve."lII di1rettot ways: Chance ClltICllt proprietary operating system to migrate 10 HP-UX Unlx operating system and upgrade the current hardware to • larger mo model (approxinwely $46,(00) '" support GIS; or Upgrade current V AX system to VAX 4000 Mooel 500A (.ppro<imately $85.(00); or 1I.epIace the current computer with Digilal Alpha 4000 Model 610 (approximately 597.000). ..., J • Eslimatt:s could char.ge by 1995-96. The estimates for these oplioos. bowevet. give a good apprtIltimalion of !be systems and dollars oe<:essaI)' to accommodate the expect<d J:nlwth and <0 !ISO of GIS. W'JIIt tile proposed change In the computer eovirortmenl. the dedicated work stIlion would have 10 be replace<! in an ope!l-S}'=s environment a. UNIX. It is estimated thai each work station wwld ccst SI5.000 In "",lace. Protcc;t CompofIcn\i': ~FWld EmnprueF ..... Totil (GF) 1~ 1_ SII,400-m.800 $17.6O"...$50,lOO 546.000-$97,000 Cenlral computer upsnde $005.000 J OF wcntsu.tioa ft4I' la l~ S4S.400 '0.600 SI6.0c0 Mditi.ocW memory .md disk eopacioy 1997-91 56.400 $9.600 S]6.000 Addiooaal """""'Y ODd disk .."...oy 1_ ''''00 1'.600 $16.000 Additional memory fJJd dU;k <apadly 78 o "; " .,~;!; -.:;. Impact and Support Analysis: • E.1Mronmental • Operating • TdeaJmmunications Not • project under CEQA Inter-<lepartmetlt project; Utilities, Public Works, Planning, Polia:, Fire and Information Resources. Appllcation maintenance will in= and llanlw.,.. mainlOnar.ce will decrease approximaldy offsetting each other. There wiU be increased CllstomeT """"" through • one Slep shared systan, increa.<cd productivity and improved analytical capabilities. None Cqnp'dlCl..tye Plan: Coosistent will> the PlJIn. Will enham", database for land use planning and communilJl infonnation. 1994-95 1995-96 $190,400-$210,800" 1996-97 $110,400" 1997-98 $46,400" 1998-99 $6,400" "IlIeoe are Del GcIlerlII Fund .. penditures for GIS. Enterprise Funds will rdmburse the General Fund for computer upgr.idcs, additional memory, and disk capacity. 'l9 e __ .'· .' . -------- NEW INFORMATION SYSTEMS PROJECT TF&H'NOLOGlCAL IMPBID'EMF.N'rS TO RE(;BEATION. OPEN SPACE AND SC!ENCE1i AND ARTS AJIlD CUl.TITRE FA.ClLmES nW51 ~: This proj"'t will provide for the purclwe and installation of a oompura and Ielecooununications network to provide decentralized and computerized class, workshop focility, and field JeServaliOl\S. Campule! wor\swions will be ;,>stalled in three Recreation, Open Space and Sciences facilities and one Art5 and Culture facility to implement a decentraliud regi5tration pruc:css. The system can be expanded to ~,clude other Community Ser>kes DepoItmal\ OOIilies. Expomsion of the system is dependeDt upon the results cf • proposed computer need. assessment Sllldy ard <!e>o1opment of • five year depanment.il information systems plan. l'rIIlCd CompogeuIs: This project would be oompleted in one phase and would include the purdwe and instaJlaIion of computer bardwan: and software for six worbtations in four fac:ilities in the twc divisions. An Ul'grade for the tclep/lone system at the Lucie Stern Cenrer is included io ProjO£! Number 19519. Prglc<& lqSjfkatjon: This system would Cteate "JIOIalianal efficiencies and subSlantWIy improve tI!e ability to provide qaality, prompt customer service. Currently, there is only <me COIIIpuICr avaiIabk to process and track class and workshop registr.llioos for the Recreation DMsiott, and the cbilcirea', art program of the Arts and Culture Divioion. ReglS1r1llions for aduII classes at :be CuIturol Center are done manually. An class registration information has lD be input on one computer between the begiMing of class registration and the start of classes. Only one laSt can be accx>mpIislted at & tim. on this computer SO program staff inquiring about c:w. sizes, rosters and other cLass data interrupt t~e processing of t~ dati and slow the registratioo process. The current registration system is inefficient, slow and prevents staff from offering a hlgh level of c<!Stomer oervi<:e for class and workshop n:pstrations. Facility reservations for the Lucie Stern Com munily Center. Mitchell Park Com munity Center. the JunicJ< Museum, and the Cullur,u Center are processed at ea<:b t\lcility. A member of the public wishing to rent space at a facility mUS! travel to !hat facility and inquire about space f(lf tbat facility. Field reservations are processed at the Mitchell Center, as are park picnic area ~ons. A multi·facility computer I\etwQrk woold allow !be pubIi, to =e= space in any of the facilities, regardless of whicb facility !hey enter to make the ", •• "vatioo inquiry. Tltio project will enhance :h: Department·, ability to provide effi<iert, quality service to !he public. New computers are needed to replace CUlTC1!1 oor:.puters whicb do not have tie capacity to ope!8le the ~onIreservation software that will be purchased. When nol being used for class regislmion and facility and field reservations, tile computers installed tIlrough this project wi1l be wed by staff at each facility 10 automate. number of tasks and would allow for the use 80 -. • ., or SI:Uldatdiz<d software for word processing, data collection and aMlysis, and interaction with 1be mainfnm. computer at tlte Civic Center. Inqact aDC! SUJIllOrt Analy$: • Envilolunelita1: • Opc!atin&: • Tdecommunications: Not a i>'<!itct under CE1;)A. 52 ,000 per y= for software upgr.lClt:s and computer repairs This project is dependent on tho devdopment and instalLation of • local a= n<tWOr\: for <ht Lucio Stml Community Cen"" and <ht estIblWlIl1ent of telec<>m muoication wu.. between Lucie Stem, Mirclte1J Pat/.: Community Center, the Cultlffill Center and the Jumor Museum. This is part of • I"9j<ct which is being submitted by the Informatioo R=u,O!S Depa,1ment. ' .... PR'mm .. Plan: Consistent with Plan. 1ilraendpl A.".. 1994-95 $5$,000 1995-96 1996-97 1997-98 1998-99 Soon:oe of Fundiltt: Genen.l FlIftd 81 CON17NUINGiREVISED INFORMATION SYSTEMS PROJECT PERSONAL COMPUTER UPGRADES !!9!17l o Pmi= Derriptigp: This project will replace person31 computers which are obsolete, failing oc cannot fuoction in • networked environment with computers meeting current City standards. The City cum:otly has 182 penonaI computers !hat "eo<! Iq>Iacing. "This project is required for the ongoing rep1acemenl of City equipment Based on the r.oed for 8/Ulual funding, Ihese rq>I.remenl eJ<pense$ will be Ir.in,itioned from Ibe capital budget 10 !he operating budget in 1995-%. Pnrical::mJlImMTtts : 1994-95 1995-96 1996-97 1991-98 PcnonaJ. Computer rq>Iacement3 $62,000 $154,000 594,000 $54,000 Units 31 11 41 27 \ o Prgjert ,rm1jlkatjog: City staff use over 500 personaJ computers (pc') in periOl"l1l3l>C>' of their ~ jobs and in pnMding service 10 citizens. PC models !hat .,., six yean or older cannot be "'" upgraded to ahSOJb DeW memory, disk space and Ibe network '"'!uil"ements of new software. 'I'bese PC's are obsoIcte and repair parts are no longer available ill reasonable prices. This project will rq>Iace 1985 and 1986 modei' in 1994·95. As the City moves forwanj in using new software and I<Chnologies such as Wtndows, graphical in~ sot\ware for GIS, and optical imaging, additio:W PC's will have 10 be replaced. In geuc:raI, the expocIed, useful life of. per.;onal computer is approximately five 10 six years. Rt;>I""""'C"t of penonaI computers will continue in future years. ImJlIct and Sgpport Analysis: • Tclecomm:micatior.s: Not a projecl under CEQA. Information Resources Departmelll-contracl labor neo<!ed 10 deinstal! and install Ibe penonaI computeT> . None Comprelumsj"e; Plan: Consislenr with Plan. Could assist in impJementing several programs whlc:h require data collection and analysis. 82 o • flpIpdal AMI. 1994-9S $62,000 ($8,000 Reimbursed by F~terprise Funds) 1995·96 SIS4,ooo ($20,000 Reimbursed by EJ'terprise Funds) 1996-97 594,000 1997-98 SS4,ooo 1998-99 TBD 80urce of Funding: Gmem Fund with partial Reimbur:Ie!Ilenl by Enterprise Funds. <,,' COt.TINUlNGlREVISED INFORMATION SYSTEMS PROJECT PA\'ROU.!RUMAN RESOURCES SYSTEM !190121 Prplrc:l Drzrir'!an' ThiJ project implements an automated PayrolllHuman Resources sy<tem for inlepUioa willi !he City', FinAncial Data Base mod u1<s. The investigation of available ~ iI ..... coqh m. aM the cost to purchase and implement L~e syst.", has been identjfird, n ·11 riDi a revision in the estimated cost of the project. Pra!rd C. h II> 1993-94, • PayrolllHuman R"""urces System software package w-JI ha.... ~ oeIecUoL DuriDJ 1994-95, tile __ 'Y""'" will be implemented and coonected to the e.istinc fInonciaI .,..., doIabue. Prp!!!CI: 1pM!OratIep. TIle _ Payroll/Human Resources System will allow online entty of _cis ODd pcnonncI data. TIle oew system is required Ie implement Mission Driven IIudgetina. IA 1ddiIiaa, IIW project will RIIIuce labor time required to process paychecks and ~ inIr:moJ peynIII conInlIs. Not • project under CEQA. EstimaJed at S2(),OOO year for software maintenance. Cnmpn:ltcmdu PlaP! Not incoosistenl with Pian. FiDapc:j!ll Anal'flls: 1994-95 $46,000 1995-96 S60,OOO 1996-\17 1997-98 1998-99 Source "rFunding: General Fund willi 3OlIo zrimbunc:ment from Enterprise Funds. 84 o o " . CONTINUING INFORMATION SYSTEMS PROJECT mm:COMMUNlCA1JONS COl'tfPUTER SYSTEM 1193121 Prg!ert IlnrtiptJOQ: This project replaces the current Fire computer system with a sWe-of-the-an integnUed Fm management and CAD (Computer Assisted DUpatch) compull:r application system, which is cornpatil>le with the approved Pollee Communications Computer System oapilaj project. Prokrt Components: 1991-92 Phase I -Conduct Data Needs Analy,;, Phose n -Condyct Software and Hardware Evaluation 1992-93 Pbue m -Implemcnt Communicatims Add,... FL'Id system, incidecl IqXJ<ting 10 comply with state reqummenls, and sel<cted field efficiency systems (i.e. , poramedic reporting) 1993-94 Pbue IV -Implement Fire station alerting system and peripherals, and Fire Prevention f Hazmat reporting system to oomply with state requi.-emenls 1994-95 Pbue V -Implement CAD (Computer Assisted Dispatching), scheduling, and adminisuative managemer,t modules lJ:pIert IJUtjf'qtlo!!: A SIaIe-of-the-an Fire records ma.'I3gernent and CAD computer system will meet all of the fOllDwing needs as identified in the Fire Infonnation Master Plan: 1. Reduoe dlspalcll and rosponse times to fire and mediC<!.l emergencies by as much as 1 to 1. 5 minutes thereby resulting in • higher degree of survival for medical patients and a greater IiIzJihood of contmilrng fires II their heginnil1g phase. 2. Conform to California State Fire Marsbal incident reporting requirements under CFlRS (California Fire lncident Reporting Sy,,,,,") which went into effect Jan, I, 1992, as wen as IIIaJe mandated reporting requireme"ts in the Health & Safety Code for Business Plans fClr Hazanlous M.aterials Community Right-t<,·J(now legislation, 3_ Increase efficiency of personnel by reducing redundant reporting and data entty, while iDcreuing availability of most ClJrretlt a vaHable infonnanon to emergency responders at critical ir.cidenls. 4. Provide. method for lrackjng department and individual training required by Federal, Sial<:, and county agencies, as well as exposure and incident tzacking required by OSHA. S. Provide coordinated system with Police Departmem, then:by mini mizing redundant City data sySIems, ,~ 6. Addlases all major problem, identified in Data NeWs Study by independent ronsultant. 85 Jgp:w;t and Support Aqlysis: • Envilonmenta1: • apem;ng: • Telecommunications: }landal ADalysls: NO! • proj",,[ under CEQA. Fire Department -Estimated $15,000 ongoing anneal mllintenanee costs and software upgrades. Upgrade of Fin Department modems 10 9600 baud anticipaied Of evaluation of Wide Area Networking during third year of chi 5 projecL ConsisIont with Plan. 1994-9S $185,000 ( 46,2:50) Reimbursement 1995-96 19%-91 1997-98 1998-99 SouI<:e of Funding: <lI:neru Fund with 2S:it; mmbursemen. from S .. nford University 86 , CONTINUING/REVISED INFORMATION SYSTEMS PROJECT INFORMATION SYSTEMS DEVELOPMENT (18812)' Frnlp=t Drsrripnon: This project provides for the long·tenn development of a centralized """'JlIIIa" sySlem which will support the City" stIalegi" data bases (such as the City's major fiJIanciaI. _,aphieaI and personnel information systems); support individoal City departments as they deYdop their own informalion syS!em5; and Sllpport the addition of local and remote hcilily !!dworking. "This pmj= is ""!uireG for !be ongoing repb<ement of City equipmen:. Based on the need for """uai funding, these replacemen! expeoses will be transitioned from the "",;ta1 budget to tile operating budget in 1995-96. 1994-95 New UNIX System 2 Dis!:: Drives Opeming Software 1995-96 System Memory Data Commu,1:ications UNIX Communication Components 1996-97 System Memory and Disk Drives 1997-98 System Memory and Disk Drives $ 109,500 14,000 .!ZJll!!l SI60,500 $ 30,000 15,000 ..l2..llQQ $64,000 $60,000 $60,000 Profect Imtlfqtmp: A new UNIX system wJl allow for the acquisition and use of a new Pmmit Tncl<ing System by Planning, Bailding Inspection, Public Works. Fino, Finance and the Utilities. In addition, the City's Financial and PayrolllHuman ResourteS systems will be plOCO<l GO 1IIe IICW Unill oomputer. The Unill computer will reduce ongoilljl maintenance activity and aIJow for the introduetion of additional and more powerful software applications. This project includes computer equipment and software for the continued development and ezpansioo of the City'. centraliud computer facility_ The capacity of the current system is n:adting its limits. Planned improvements will expand the workstation network citywide allowing COIItrolled external = via telq>hone and wide area network to computer resoun:es; ensure. adequate computer res}X)n5e time fO£ users as planned expansions and conversions occur; 87 :.~ ..,.. -. md build i.ncreased capabilit}' for eJlchanging com putenzed infonnation betwe.e1l departments locally and at remote facilities. "n=ct Ind SupPOrt AnslySis.: Telecommunications: Not • project under CEQA. Information ReSO\lrces Department -Improve ovezaJl efficiency and productivity in system development and app1ications progr.unming for staff programmers. Increase disc Slonge available and respoo'" time fO£ lISen using HPDESK, Geographic Inf()rmation System, Financial Da.Ia !lase (IFAS), Customer Service and user develope<! programs. As identified. Cmmrrbrmjyr Plan: ConsisIent with Plon. Could assist in implementing sevetal programs whic.b requize data collection and analysis. 1994-95 5160,500 1995-96 564 ,000 1996-97 560,000 1997-98 $60,000 1998-99 TBD Somte of FUDding: General Fund witll 45" reimbursement from EnteJprise Funds. 88 • ..... JI o CONTIN(}JNG INFORMATION SYSTEMS PROJECT GEOGRAPHIC JNIDRMATlQN SYSTDIS (8822) Prplcd Poydpljon: This is a joint project between the Enterprise Funds and Public Worb to systematieally input the City base maps into a computer system datal>ase. Maps will contain all informalion currently en the City" block maps and Utilities' maps, plus any additional infonnatioo '"'Iuited or needed by other City departments. The base hardware/software system was purcbtsed in fiseaI year 1989-90. The project Geographic Information Sy5lcms combines ~y titled Computer Aidc:cl Mapping and Computer Aidc:cl Drafting into one project. This project will be completed in 1994-95. Pm1crt Ju:stifqtion: This project greatly increases the ease of maintaining accurate maps. As I!ICR utilities arc WIdcrgrounded, tiJere is an increased need for accurate infonnatioo 011 all c:xilJting City utilities, as well as telephone, and Cable TV. This project creates up-to-daIe 00IIIplI1eri2l0 maps for !he entire City. NOl>-eOIDpOltcrized maps "'" difficult 10 maintain and are not accurate. They '"'I uire a large IIIIOUII! of lime 10 update since aD nMsioru and updates must be band drafted. Computerized maps aJlow!he ~ 10 immediately =-iew a customer'. permit '"'lues! at Ihe rount.er due to the added detail the maps pnMde. This!!peOds up the permit r" ... iew process. In addition, updating of new subdivisions and irnprove;m<:lts can be done faster and allows depar1ments to tapOnd to citiaen RqUeSts amceming 101 lines quickly and accurately. 1pmad and Support Anply:;is: • .E.nvirot1meotal: • Opeming: • Telecommunications: No; • project under CEQA. Interdepartmental projcc~ Public Works, Utilities and Information Resources. Reduced oper.uional cost, increased produttivity orA iml'='cd Malytical capabilities. Ir.creased loading on Local Area Network (LAN) and wide area network. Consistent with Plan. Will enbance data base for land use planning. 89 Figandal AnalYSis, l!l94-9S S1l0,OOO General Fund 1995-96 19%-97 1997-98 1998-99 Soun:e of Fun<Iil\g: Gener.iJ Fund. Compl.", project (utanci!lg by fund is shown below: Electric ~N atJ:r Gas Waste-Storm Total ~ Drainage 1994-9i S110,000 $6),000 $36,000 $35,000 $35,000 $40,000 1319,000 90 • ._,:.:... . ;'~£'!-' NEW EQUIPMENT/MISCELLANEOUS PROJECT MJ!J,TI-UNE TELEPHONE SYSTEM REPLACEMENT (!95!9l ! / ProIe!:t l\esrrjptjop: Tltis project will replace tile multi-line, central tcl<phone SYS1ems at dtineat City I'3cilities that include: Animal Services, Water Quality Control Ptlnt, Lucie Sttrn (two iyJIemS), Junior Museum, Main Library, Mi:CbeD Park Libra.')', FL>'e Stations One, Two, and Six, Cultural Center, Downtown Library and Cubberley, ProJm ComQODeD1s: !994-9S $100,000 The I'3cilities schecIuled for telephone .ystem replacement during FY ! 994-95 are: MitcheD Park UIJa%y, Junior Museum, Lucie Sttrn, Main Library, W2ler Quality Cootrol Ptlnt and Anima! Suvices. 1995-96 $40,000 '?\ The I'3cilities schecIuJed for telephone sysaem replacement during FY 1995-96 are: Fire Stati<XIS '-" Oac, Two and Six, Downtowu Library, Cultural Center and Cubberley. ProIecI JdiflCl!jon: The C<:Iltral telephone systems at 13 City facilities are obsolete and 110 Iooger supported by vcmlors. Rep2ir parts are difficult to Ioeate. In addition, lI>ese systems, 1IIIlila: the sysIems in other City facilities, do not allow production of tdephone management u:ports. Because <>f!heir age and Bmiled capacity, these systemS canna! accommo<la!e expansion to DeW men, Wllh expansion of pe~ at tile Warer Quality Control Plant (WQCP), the old a::otral telepbone systems limits the ;number of phone system users and communication between WQCP and the public, IrurMr* and SupPOrt "nalm,: • Environmental: Categorieally exempt from CEQA. • Operating: Reduce down-time and on-going maintenance cost. • TeIecommunications: IRD will continue to maintain the key telephone sy!:o1em'S. CqmprehtNjn Plan: Consistent will> Plan. 91 --.-----_.-. . -", 1994-95 $100,000 1995·96 $40,000 1996-97 Im·98 1998-99 Scwee ofFl1I>dine: Gener.Il Fund wit!\ S5O,000 reimbUNemellt from &lterprise Fund£ in 1994· 95 CONTiNliING EQUIPMENT/MlSCELlANEOUS PROJECT PARAMEllli' AM»ULANCE (194\12\ Prolect Dgcrjlrtjon, This project involves the pure ..... of a paramedic ambulance 10 be plactd in rotational """"CO for use by the Fire Department The project includes the consuitatio<!, design, and all minimal hardware and equipment necessary for a funotionaJ alt=ate paramedic ambulance. Proicd; ComPOnents: 1993-94 Phase I -Specifications and Purchase of Unit 1994-95 Phase n -Equipping and Octfirting Unit Proicd Jgs!jfoqtjqp: In D=mber, 1992, the Santa Clara CooDty Emergency Medical Services DirocIOr advUed the PaJo AlIO Fire Department !hal all emergency medical patients must be tramported by • poramedie unit This mandate re>u1ted in a 25 percent increase in service demand for paramedic tmlsportS. The volume of call. and demAAd for pawnedic Iransports bas inaeasod 10 the level !hal there is the nctd 10 keer two pa,amedic ambulances operatiooal during the peak demand periods (8 LmA p.m.). Th. third ambulance is necessary 10 insure thai two ambuIanoes are always available should one ambulance become inopernhle 01' Ul1ZViI.Ilable fOl' service. This will occur during routine rruUntenance, mecbanical failures, 01' otller out of servke periods expected for paramedic ambulance operation. Imner' anel Support Analysk: • Environmental: • Opaating: • Telecommunications: Compn:henslve Pipn: Fupmdel Analysis: Statutory exemption under CEQA Section 15269. Results in safety enbancement for tile ""mmunity by reducing longer response times to rnedirnl emergencies. Provide more reliable emergency operations and capability required during disasten and other major incidents which is not currently available. Esti mated increase in vehicle allocation fund of $19,000. Fire Department radio .. im mutual aid frequencies! cellular phone, duplex command and control system, CAD MDT when implemented. Coosistent with Environmental Resources section of the Plan. 1994-95 $10,000 J99S-96 93 19%-97 1997-98 1998-99 Soun:e of Fundilii: Capitll Improvement Fund with 25" rcimbu""ment from Stanford University. -94 o --; .~ . " ,. ------ CONTINUING/REVISED EQUIPME'ITIMlSCELLANEOUS PROJEC.' RADIO REPLACEMENT 11'4031 l'JWsc:t Jlnrrlptl!m: The City of Palo Alto owns and operates approximately 54{l tw<>-wa)' adios llllitl (ponabIa, JlKibil .. and base $lations). This equipment provides ,iw two-way radio COIDD',mjcarioa. fo< nearly t:VCt'J department in the City, including Police, Fire, Utilities and Public Worn Depanments. This project replaces the existing City radia equipment a=rding 10 the equipment'. expected service life. This project i, required f<>r the ongoing replacement of City equipme!lt. !lased "" the need for annual fUnding. these replacemenl ei<pellSeS will be lIa.,:ritioned from the capiw budget to the opezating budget in 1995-96. Pnkct 0."' .. "wmMi, Radio repJacerrte'nt pIan as follows: 1994-95 2 Base radios $24,000 23 Mobile radios $46,000 T1 Ponable radios S54,OOO .;f3 1995-96 2 Base radios $24,000 30 Mobile radios $60,000 " 27 Ponable radios 554,000 1996-97 2 Base radios $24,000 32 Mobile radios 564,000 31 Ponable radios $62,000 1997·98 2 Base mdios $24,000 13 Mobile radios $16,000 36 Portable radios 572,000 1998-99 2 Base mdias $24,000 10 Mobile radios 520,000 40 Portable mdios 580,000 Pmted lustifqtiog~ To ensure that the City's communications equipment and systems cootinue to provide reliable two-'a"3Y radio communications, a new replacement schedule was. iniriared in 1993-94. Replacement _ far each piece of equipment are ~ 00 age, I)ipe of service and maintenance history. However, io an attempt 10 balance the number of units n:pJaced cadi year, some equipment replacement is delayed beyand the prescnbed \en-year service life. Every effort has been made 10 limit those radios baving a deJa yed repIaoemenI to radios in non.rn.tica1 functions. 95 • <¥?C -'~-::. ;. '"'~~> Impact ,tad SUpppd Apal"Js= • En\'irmunenlal: • Operating: NO! • project under CEQA, Police Departtr'.ent (ComrnuniCo1.tionl Divi~lon) -ir.cf'e3Sed efficiency and reliability of current communications infrastructure. Reduced communications oeqwpment failures. None Consi'terlt with Plan. flnanriaJ AIIIIJn!s: J994-9S 5124,000 $66,000 General Fund $34,000 Fire-Stanford ReimburSement ($8,500) 524.000 Enterprise Fund 1995-96 $138,000 $76,000 GenenI Fund $34,000 Fire-Stanford Reimbursement ($8,500) $28,000 Enterprise Fund 1996-97 $150.000 $80.000 Ge"oraI Fund $4(J,OOO Fire-Stanford Reimbursement ($10.000) SJO,O(lO EnlCIJ1r ... Fur.d 1997-98 5122,000 $74,000 General Fund $24,000 Fire-Slallfold Reimbursement ($6,000) $24.000 Enterprise Fund 1998-99 $114,000 $72,000 General Fund $26,000 Fi.re-Sranford Reimbursement ($6,500) $26,000 Enterprise Fund Somoe of FUIIding: General F""d with 25" reimbu=ment of Fmo', expenditures from Stanford University and 100% of all Enterprise "".1.5. 96 o $: CONTINUING EQUIPMENT/MISCELLANEOUS PROJECT ART IN PUBIJC PLACfS !18617} Pmlcc;t Dgg;dptfgm This project supports innovative projecu for both interio! and cxtnior public spaces by rommiuionlng or pun:hasing wo;]e. by living artists. In addition, funds may be used 10 maintain and rdurbish visual art in public places, obtain professional COnsullaSUS 10 assW m selecting artist> and works, and preserve meritorious works. Pro!g:t CmpI!O!!C!l!<: Project componenrs inclUlle purchasing, installing, and maintaining WClks of an. Pro1ect JmljrgtiOJ!: The project will enhanre public buildings or parlclands and other sites """" 10 frequmt public view. The il'.dividual artists are expected 10 r=ive some support and ,""""irion as a!aUlt. 'I"h«e Is expected 10 be a reduction in pcter.tW vandalism, and Ihe dewIop ... ,,,t of a ...... of community pride and ownt:nhip at location. where Art in Public Places is installed. Impact and Support Analysb: J . EnYirnnmenlal: Nat • J>f'!iect under CEQA . ~ • Operating: • Telecommunications: Community Services! Art & Culro'" Division Oll!tJftbendft Pbn: The project is consistent with three objectives of Urban Design Section: pn:oerve Palo Alto as a acative environment where pwpIe can live and wort; identify and maintain the smaller scale visuaI fearures :hat give char.icter to Palo Allo and irs neighborhoods; and promote visual environments which are of high aestiletic quality and variety and considerate "f one another. FlnandaI Analysis: 1994-95 $15,000 1995-96 $15,000 1996-97 S15,000 1997-9B $15,000 1998-99 $15,000 Soorce of Funding: Gene!31 Fund 97 I 11crs PAGE; INr£NnO/l{~ty LE;l<7' ltl.4.NJc • • • EQUIPMENT REPLACEMENT FUND Equipment Replacement Fund capital projects are for the enhancement of facilities a.'1d S) stems and the purchase of equipment to maintain the City's v<hides. US! of Proiects: Ne .. Projects Fuel Site Improvements (19520) •...........................•..... 100 Wireless Vehicle Management System (19521) ....................•..... 101 Munidpal Servic:e Center Gara&e Improv<ments (19522) ................ 102-103 99 .. ~ '". " NEW EQUIPMENT REPLACEMENT PJND mEI. SITE IMPROVEMENTS (tWill PmI .... llt:s:r!otl!!D' Thi! project will repjace ten fuel dispensers at five Cil)' locations where fuel is stored and di.speM<d into eil)' vehlcI... These dispensers are reaching the end of their usefuJ life and are IKII performing optimally. PntIm Comwns:nts: Fuel dispen""" will be!tpl&oed at the follov.ing locations in 1994-95: File Statioo I 2 2 File Station , 4 I F"" Station'S I File Station , 7 I Golf Course I MSC 4 Meet Justjf'>g!Iion, Six of ten di>pensen to be !tplaoed are more than !weill)' yean old and ..., DO( compatible with the City" automated fuel systems. Four of the len dispensers ane twenty • yeaB old and dispense fuel at 50" of ",ted capacity. The dispenser. do DOl have leak oonWnment features and have the poter.tiaJ to oontaminate the soil which would requiIe 0 c:oasidel3ble cleanup casu. I'OO'C' Il!ld SlIppgn A.111lfyW.: • EnviroruDonI3l: • Operating: categoricaDy .. empt under Section 15301 of CEQA. Reduce "'l"'irs to old dispensers. • TeIecommunicaJions: Dial up lines to 5 sites or eonnect to Wide Arc! Network. Cquriensi,""c Plan: Consistent with Environmental Resource sections of the Plan. Flnapclal Anatym: 1994-95 1995-96 1996-97 1997-98 1998-99 550,000 Soun:e of Fund'lllg: Equipment Replacement Fund 100 o ~::.L...~ .. "':':' ...... _ . __ .... _-.. - NEW EQUIPMENT REPLACEMENT FUND WlREl.ESS YEHICLE..MANAGf,MENT SYSTEM !195m Prple!t Dl:grlpt!on! This project will prov'.Jk an automated sy>lem for collecting vohiel. usage data used in tile City's l'reventive mainter.once program. A small box containing senso" and tnnSCelv ... will be mounted OIl eaeh fleet vet,iele. As vehicles enter or !ea" Ute MSC (or any City facility), a receiver mounted near the entrancei .. it gates will automatically collect data from vehicles and .. irelessly transmit the data Ie a site control computer. This data will t/len be inlegra1ed into a vehicle usage database. l'ntlect Cgmponents! 1994-95 Install IOftware and hardware for ISO vehicles 1995-% lnsIalllrudware on ISO vehicles 1996-97 lNIall hardware on ISO vehicles $65,000 $50,000 550,000 Prgjec:t lmtifgtlo!!! The City's $14 million flee! is an important asset that merits careful IIIOJIIFI11<'lt. Manually ttaclcing vehiele usage presents an administr.tive challenge. Developing sound mainlelWtce ocIwdules based on current data gathering efforts i. difficult. The wireless 'I<IIicle system would provide departments with pertinent and brief tepOrts 00 vehicle usage and supp«I the maintenance efforts of Equipment Management staff. It is anticipated that real-time data collected from each vehicle will heip redLK% fleet costs, reduce the liequency of 1ID!Cbedu1ed malntenance. and increase vehicle safety. Jmmrt ,nd Support AnalYSk: • EDvittwunetual: NO! a project under CEQA. • Oper.ding: • Telecommunkatior.s: On-going maintenance ",ould be 53,000 annually Use the Wide Area Network to transmit data. Consis\tl1\ with Plan. fjoancfa1 Anainis: 1994·95 $65,000 1995-96 $50,000 1996-97 $50 ,000 1997-98 1998-99 Soun:e of Funding: Equipment Replacement Fund 101 , .. " NEW EQUIPMENT REPLACEMENT FUND PROJECT MllNIClPAL SERVICE CENTER GARAGE IMPROVEMENTS U252Z1 Prolm Jles:r!ptlgp: This project will fund Lire purohase of equipment to improve Municipal Sctvicc Caller (MSC) gang. productivity and safei)'. Prolcrl Cgmpgpenl.<, 72,000 lb. portable wheel lifts 0Yerbead eothauJt sr-n Coavcrt manual roll-up bay doors to electrically powered doors 565,000 515,000 $25,000 fn>ia1.1m1jrq!jgn: The City's fleet contains 12 vehicles that are either too long or too heavy 11> be Ii&d with existing ic-ground hoists. Mechanics mu S! lie OIl !he floor 10 o::rvi<:e these ~ requiring additional repair time and presenting safety ronoems. The portable wheel lifts will anow for lifting of exceptiooally heavy and long vehicles, redu,..., repair lim., and improve wod:iDg oondiliOllS. The exisIinj: in-floor exhaust system is not efficient in cap!Uring fumes because of 1iIe numerous adapcetI tequited 10 fit !he variety of vehicles and equipment wItich .,. serviced. An ovm..ad exhaust sy-., adds f1ellbility 10 adapt 10 various exhaust ronfigun"klns on • fleet of IlIOIe !han SOIl vdliclcs and pieces of equipment. All overhead system will exhaust fumes (especially diesel fumes) Ihal .,. tr.Ipped in the ceiling and perm""'" offi= locatfd 00 !he se::ond floor of BuildinC B '" the MSC. The existing shop bay doors must be manuilly rai-"'<I and lowered. This 4< resulled in !he infrequent closing of the bay doors during L'>e wi nter month. resulting in considernble beat loss. Electric powered doors would encourage n,,,,hanics to close doors, reduce heat loss and result in a more productive work environment Jrrmec:t and Svppgrt Ana'M: • Environmental, • OperaIing: • Tclecommunicatiotls: em. prebensi!J! Plan: Not • project under CEQA. None None Not inconsi1tent with Plan. 102 • Jl1DancIaI Analylls: 1994-95 $105,000 1995-% 1~ 1997-98 1995-99 Soun:e of Fundin,: Equipment Rep1acomal1 Fund 103 TJDSPAGEI~~1nONALLY LEFT BLA."IK 104 • ., • • STREET IMPROVEMEl'"JT FUND 'The Street Improvement Fund is c:itabhsl",w in cornplia..:ce wit."" Sections 2106 and 2105 of l1'1e California Streets and Highways Code to alXou.n~ for the City~s share of the Si.ate-ccHected tax "" gasoline. Street improvement projects are-primarily fmanced by revenue coHected under Section 2106. This revenue is first allocated to the counties on the basi:; of vehicle registration, and is tt"1en funber apportioned witt-.in eazh county between incorporated and unincorporated areas in proportion to their relative assessed va1uatioos. Funds so apportioned to cities are Ulen dh'ided OCC<>!<fing to their respective pcpulation. Sec::tion 2106 revenue must be expended on the State-approved -select system-ofslreets, uruess 90" 'Of such system has been oonstru{:ted. The Law allows. revenues 10 be ac,cumlllatcd over a period of time, if desired, in or;:k:r to fmance large-scale projects. TIle Palo Alto City Council has declared that more than 90% of !he City" select system of streets bas t>een constructed. 2106 revenue may, therefore, be e.pended on improvements or acquilitiCX! of any City streets. un of ProlCCl$: NewProj .... El Camino Real InteI=tion Improvemu.ts (19523) ..............•..... 107·108 Bikeway System Improvements (19524) •.•......•.................... 109 e..."jnuing Projed5 PedestrianlBike Grade Separation FeaSlbililjl SOldy (l95O'1) .....•..•....•. 110-111 Sand Hill Road Bridge-Bicycle Lanes (19503) •.•. . . . . . . . . . • . . • . . • . .. 112·114 Street Maintenance {18670} .•.•....•....•....••....•.•....••.•.. 115 M>jor Inter=tion Improvements (j 9073) . . . . . . . . . . . . . • . . . . . . . . . . .. II 6-117 Embo",adero Pedestrianillicycle Bridge and Bike PaL; Extension (193JO) ...... 118·120 105 • nus PAGE lNTElIo'TIONALLY LEFrBLANK • • 106 t~~ ".;.". I ~) NEW STREET IMPROVEMENT FUND PROJECT EJ., CAMINO REAL INTtRSECfV,N SAFETY I]\:!PRQVEME"''IS fl9523l Proiect Pt:sojJJtjon: Tltis project jnvolves traffit: signal modifications and related inler5eCtion improvements 10 improve pedestrian and bike safety at three location 5 along El Camino Real wbicb WCle identifi<d in the Me;;dowlCharleston School Ccrridor Safety Study. The three interseCtions ""': EI caminolLes Robles, EI Ccmino/MaybelI and EI Cam; nc>iCharlcSlon. The projects would be designed and constructed by Caltr1lJ;s, with joint funoing by the State and City- Proim Compsmpn15: 1994-95 $70,000 The proposed improvements at the EI Camino ReaIILos Robles intenection ($50,000) include modifying the existing five-pI!ase signal opet1Ition to a. eight-phase operation, installing new ieft-tum signal indications foc Los Robles and El Camino Way approaches, and reconstructing the pavement and making striping improvements on Los RobJ:.es Avenue . .:) This project includes modifying me southwest comer and/or median island to provide additional ..... for bicyclists at the Et Camino Rea1!CharlestonlArastradero intersection ($20,000). 1995-96 $90,000 E. Camino Rt:a1IMaybe11 inter'iec1ioo -The proposed improvements at this. k>cation ccnsist of <x>overting the signal from a five-phase to an eight-phase operation (with protect<d left turns from El Camino Way and Maybell Avenue), installing longer mast arms and a second crosswalk across El Camino Real on the south side of llJ.c intersections, reconstructing We intersection. to close off tlie free right turns from northbound EJ Camino Real onto El Camino Way. &'r'ld installing new sidewalks and new landscaping. ProJect ltlstlr-gation: These impro\lements were :<.U:ntified in the Meadow/Charles\on School CorriCor Safety Study as :measures that would improve the safety of school age pedestrians and bicydisu traveling from the Barron Park neighborhood and residential areas west of EJ Camino Real, to J. L. Stanford Middle School. as well as stud~nt5 en route 10 Gunn High School. Los Robles, El D.mi!'lO Way. An~tradero, and Charlestvn are destgnated bike routes. Impact and Support A nalysi.,. • Environmental: • Operating: • Telecommunications: "---.-- L Categorically exempt under Section 1530) of CEQA. Slight increase in m3intena..,~ expense. None 107 l:- , " .·;i'i-;;.··::'·' \'.' , \ ,it.. Cmpprrhtndn naD! This project is c.onslstent with Transportation Program 37: Make improvements in peGestr1an and bicycle safety to make it ez.siel for studen ts to get to schoo! as _ travel paIbmU change becauSe of schoo! clooings. flpppdel Analysis: 1994-95 $70,000 1995-96 $90,000 1996-97 1997-98 1998-99 Souroe of Funding: Street Improve"'""t Fund 108 £". '~ , .. /. NEW STREET IMPROVEMENT FUND PROJECT BIKEWAY SYSTEM IMPROVEMENTS fl95241 Pro1ect Desrrjptjon! This project provides (Of improvemenu in the Palo Alto bike routes :system and upgrades of bicycle amenities at City facilities. Prolect Cl!!!!IlOJW!ts: This project imp!emeots .. tensions of existing City bike routes along Pad: Boulevard and from Louis Road on to Montrose A venue, 10 complete segments "f the adopted Bilreway W.w,u Plan. The project also includes removing the sidewalk bike (lOths along Embarcadero Road, Middlefield Road, Alma Street, Charleston and San Antoni" Roads, and "",lacing biC'jcIe 13m at City facilities, including the libraries, Cultural Center, and Mitchell Pad: Community Center. Prolm Jp5tiroation: Improvements in the Palo Alto bilreway system wiD enhance public safety and proIIlDIe bicycle use. The proposed bike routes a101lg Montrose and Park lIouIevan.1 will ~ ac=s to major octi,·ity centers, including the Cubberley Community Center and California Avenue Bu>lness District. Eliminating the City'. sic!ewaJk bike paths is consistent wilh CUIreIlt bikeway design guidelines, which disoounge the use of sidewalks due to pot.....,tiaJ conflicts between biCYClists and pedestrians, and between bicyclists and motorists at driveways and intersection •. 19qwd and Support A1JIbsis: • Environmental: • Operating: • Telecommunications.: Comprebensin flan: bicycle use. financiAl Ana1v:sls: Further en"\i..'I"OI1mentaI asse..ssment rna)' be :equired. Public Worts (OperatiQns Division) wiD experienre a slight increase in bilreway maintenance. None This projeci is consistent with Tra.., 5pC'rtadQt1 Policy 12: Promote 1994-95 530,000 1995-96 1996-97 1997-98 1998-99 Source of Funding: Street Improvement Fund with Potential Reimbursement from ::t 1DA Grant. ;"?j~" : . .;:< . 109 ~ . /c'"'... --------- CONTINUING STREET IMPROYEME.Vf FUND PROJECT rEDFSTRJAN/BTKE GRADE SEPARATION FEASIBILID' STIIDY (19302) Meet Dt:xrIption: This project is a feasibility study to assess the "It-mous options for providing pedesIri1nIbike ~ separ&tions at !he JPBlCalTrain railroad tracks and Alma Streel ilfout dlff .... l1 cross streetlo<alions: Meado .. Drive, Cl-.arleston Road, Churchill Avenue, and Palo Alto Avenue. The. study is to include consideration of both unde:r-and overctOSsings, as wdl as the-possloie closure of Meadow Drive and/or Chure'hil1 Avenue. The study will not include coosideratioo of vehicular grade separations at these locations. Prnlm Cpmponent" A consultant will be retained in 1994-95 \0 conducl a feasibility study to identify and develop information including functior:;a1 designs, costs, right-of·way I utiliz.:ation, mvironmental issues, traffic impacts, economic impacts, and emergency response impacts for various opIiorIs. Subject 10 !he findings of the feasibility study and subseq~t Council direotion, design and eoostruction of. project at one or more location s may foDow. ProJu;t lmtifqfiom A feasJ.bility study js essential to determine kmg·tenn solutions 10 ~ ttain conflicts at Crossings. The closure of Meadow and/or CIl urcltili A venue would rtcIuc% tnffic 011 the _ and would compel '~Jdents 10 use grade separ.iled crossing. There have been faIaI acctdents at Charleston and Meadow crossings involving students and trains. The Council and community are looking fur long-term solutions to elimlnate pedestrian ttain coa1Iicts and to improve pedestrian and bicycle safety along Meadow and Charleslon corridors to lLS SdJooI. Impart and Suppgrt Analysis: • Environmental; • Operating: • Tcl.ccommurricaJ:ions7 Not a proj xt under CEQA. Planning Department, Transportation-No additional re~urces required None ,Comdemivt Plan: Consistent witlt T;ansportation , Uman Design and Environmental Rcsoun:es sections of the Plan. FillllDdal Analysis: 1~95 SI5O,ooo 1995-% TBD 1996-97 TBD , \ .", .L· • 1997-98 0 110 1998-99 Source of Funding: St~ Improvement Fund III " CONTINUING STREl:.. IMPROVEMENT FUND PROJECT SAND HILL RQAD BRIDGE -BICYCLE LANES 09<03) Prpir:d Dr;:niJJtlnD! This projec! designs and constructs the widening of the existing ~'O lane bridge to install OIl-road bicycle IlInes over San Francisquito Creek along Sa.,d Hill Road. and COI!tinue bicycle lanes west to the intersection of Sand Hili RoadISanta Cruz Avenue. lmiert Compgnents: 1be components of this proj~ indude ~nir.g a consultmt to complete !he design \Om. constructing • widened bridge deck (8 feel) to provide bicycle lanes and pe<lestrian walkways. and continuing llIe bicycle lanes west to the Sand Hill Road/Santa Cruz intenoctioo. The work will include necessary approvals from the Santa Clara Valley Water District and San Mateo County for the bridge w'.dening, and execution of. cost-sharing and maintenance agreement(s) with the City of Merlo Parlt. The City of Menlo Park is the lead agency Cot !his project. PrvIert .lpstIf!qtion: Sand Hill Road is • major bike route connecting Menlo Park to Stanford Shopping eerter. Stanford Unh·miry. and llIe City of Palo Allo. Bicycle lanes exist on Sarod Hill from Santa Cruz A"",ue 10 Interstate 21!0. ar.d east of the bridge in Palo Allo. \Vidoring the bridge and installing bicycle 1anes will complete a major missing gap in the area bikeway system. This will improve the attractiveness of this corridor as a commute altemati>e for bicyclists and enhance bike safety. The project al", adds pedestrian facilities on both sides of !he bridge. Cumn!ly. a pe<!estrian walkway eltisIs OIl only one side of the bridge. Therefore. !he project "ill al", enhance pedestrian safety. Impad Ind Suupcrt Analnjs: • Emironmenlal: An enviroomcnlal assessment will be dOlle as part of tI'.e project desigr.. • Operating; Public Works-Additional maintenance will be ""luired after completion. The costs have not yet been determi ned. • Telecommunications: None ComprebeMjve Plag: This project is consistent with Transportation Program 33 of the Comprellonsive Plan; Complele the Bikeways Master PLm. FjAAnr;ial Anglysis: 1994-95 $40.000 1995-% 1996-97 112 1997-98 1998-99 SoIm:e of Funding: Street Improvement Fund = $40,000' 'Ibis i. a $400,000 project jointly sponsored by Menlo Park and Palo Alto, for which Federal funds an: being lOugbt. Fodo:al STP funds Menlo Park Palo AIle 5320,000 $40,000 $40,000 113. ";.. (~ \~ '~~=?~!=.=~=-==~:--~-==tr$~'\~- ::::::: tcMN'It. '"" ........ .' .. STANFORD UNIVERSITY SAND HILL ROAD BRlD(,E -BICYCLE LANES (]9503) 114 /' CONTINUING/REVISED STREET IMPROVEMENT FUND PROJECT STREET MAINTENANCE 08670> ProIcct Dt!aiption: This project provides for annual resurfacing and reconstruction of various City SlIMS. The list of meets will be prioritized 10 coordinale with Storm Drainage projects aod Utililies lIJI.C!Bgroundig projects to the extent f<asib1e. Prolect Compom:nts; Included in 1992-93 and 1993-94 w-ere the f""sibility study and euviroomental JeViews for Los Trancos Road. In 1994-95 the design and construction of bik< lane improvernaIts on Los Robles Road from El Camino Real 10 La Donna Street will be UnpIemcoted. PrnIcd .lus!if"1C!!!ion: The Pavement Mainle"'''' Management System (PMMS) bas identified _ strr:eIS whose condition poses • potential liability to the City with respect to Ieliability and safety. This progrun lessens this liability by systematically !Cheduling the higbe<t priority IOpIin. By providing • systemized metllod of bi-annually rating streets for improvements and a yearly maintemmce progrun, the City addresses the need to provide a functioning street system ... 0<1 mlures the maintenance l:acklog. ImMct and Supood Anglyr;i=i: • Envimrunenta/: Categorically exempt under Sa.-tion 15301 of CEQA. • Oporll!ing: Public WorlcsIOperations Division-No additional usoun:es will be required. Street repair will be rec!uC<Od, • Telecommunications: None Compn:I!m$l,. Plan: Implements T=sp<>rtation Element Program 17: Make operational and intersection improvements to ease traffic flow on major streets. Fmancial Analysis: 1994-95 5970,000 Los Robles Road 1995-96 $880,000 1996-97 $980,000 1997-98 5980,000 1995-99 $980,000 () Soun:e of Funding: Street Improve,,,ent Fund (Additional projects are included under L'" Utility Users Tax.) liS , , CONTINUING/REVISED STREET IMPROVEME."IT FUND PROJECT MATOR INTERSECTION IMPROVEMENTS !I2!rul l'mlm Destr!ption, This proj .... ~ will fund majnr capo<ity and bike rela~ improvements at loc:aIiOllS as identified in th~ Citywick Land Use and Transporblion Study to reduce congestion aDd improve II3ffic flow. All intcrsCCtions wculd be heavily irnpocred by the ttlIffio generated by poteDlial <kveloprnenl in lIle Slanfotd Research Park. CO"""luently, a traffic impact fee was impIeme..!ed to help fund the improvements. 11Ie FOOIhillIHiIIv\cw/ AnsttadcroIVCletans Administration rv A) Driveway project will likely be approved for Federal funding (lntcrmodal Surface Transportation Efficiency Act \lSTEA) and Surface Transportilion Prognm (STP) funds) and there is a possibility of participation by the VelUanS Administration. Thi, project is being revised and rescheduled to reflect Ihe CUttent UIIdersIanding of the appfu:able Federal funding cycle and PIwe I resource requirements. Pra!ot:t Cl!!Imoneu!s; 1994-95 Pbase I includes mm.ing a consuitant or negotiating wit1'. Santa Clara County 10 complete the desi&n, ... vironmental documents, right-<lf ....... y certification, fmal pi>.ns, and bid documents. 1996-97 Pbase n includes Ietaining a contraclor to construct the project. DesigII and constIUcIioI! will be subject to (1) aYallabiHty of Federal fund, and ttlIffic impact f.., fundi (2) approval of ... vironmen:al documents, (3) securing right-of-way, and (4) Santa Clara County roview and approval. Proied JuSiCutlon: Traffic congestion will decrease in areas targeted for improvements. Ironer' .,d Suppm1 Analysis: • Enviroru:nental: Further environmenfal assessment will be required as the projects are developed. • Oper.lIing: Public Works, Operations Division·no additional resources will be required. • Telecommunications: NOlIe CopurmJensI •• Plan: Consisleol with Comprehensive Plan Transponation Program 17: Make operational and intersectiOD improvements to ease traffic flow on major .streets. 116 lJntndaJ ADlh'sis: 1994-95 $500,000 1995-96 19%-97 $2,290,000 1997-98 199~ Soo=ofFtirocIing: FcdcnI STP funds Traffic lrnpeet foe Tolal SlSO,OOO $ 388,000 S 112,000 $ 500,000 Footblll/Hillviewl AraslraderolV A driveway (Phase I - Design, and Environmen!.31 and Right-of-Way Documents) foothilliHiIlviewl AI>StraderolV A driveway (phase n c""struction) MiddlefieldlOIegon (design) In .'--. COII/TlNUING STREET IMPROVEMENT FUND i'ROJECT EMBARCADERO PEDESTRIAN/BICYCLE BRIDGE AND BIKE PATH EXTENSION 1l2Jl!ll PNlect Dosc:r!ptlOD: Construct a grade-separated pedr.strian and bicyole bridge aver Embarcadero Road between Palo Alto High School and Town and Country Shopping Center and off-street bike path west oCthe railroad tracks between Churcbili Avenue and Univemty Avenue. This project has been revis.W to include design work: and construction. PtoJcd; ComPOnents: 1993-94 Ra:ailI CGlllUltant to complele design worl< and start construction, which includes illstalling • ~fabriaIed (or """'parable) bridge at Emban:adero and constructing bila: path and related signUIa &Del stripiIlg. This project also includes negotiating right..,C-way easements with the Joint Foor.'US Board and Palo Alto Unified School District, and coordinating all work with Caltrans' Local Assistaoce office. 1994-95 Coasttuction of bicycle bridge and bike path extension. Prqlt!:t JPSirqljon, This project provides an essential link in a designated City bikeway that parallels the CaITrain right"'f-way from the north to .!OU!h city limit. The bike route is identified as a "proposed bikeway" in Palo Alto's Bikeways Master Plan. It facilitates bike travrl to the Downtown and California A venue Business Districts, two CaJTrain stations. the Palo Alto T"",si, Cooler, and Stanford Unlvenity. Impprt Ind Support Analysis: • Environmental: • Operating: • Tdecommunkations: AD environmental assessment will be done as part of the design. Public Works·Additionai maintenance will be required after completion of projecL The costs have not been determined. None C18u p;'eheIFshe Plan: The projecl is consis:eG1 with Tra."Isponatioo Program 33 of the Compu,bensive Plan: Complete the adopted Bikeways Masrer Plan. ' .. • flNgc;lat Analys.is: 1994-9S $500,000 (Cons<ruction)" 1995-96 1996-97 199'7-96 1998-99 Source of Funding: "To be reiml>ursed as fo!lows: Federal CMAQ Funds S-TSMFunds ~TDAFunds Holiday Ian SpociaI Funds S_ impn>vement Fund ~ $280,000 40,250 100,000 32,750 ~ $500,000 119 PED/BIKE BRIDGE BIKE PATH EMBABc .... DljRJ> PEDESTRI .... N/BICyCLE BRIDGE Al'm BIKE PAm EXTENSION JillW no , c • MULTI-ENTERPRISE FUNDS These projects involve funding from more than one enterprise fllnd providi ng an overall summary of funding requirements. Ust of Proiect:;: New Projects Geognphic Informarioo System Applicatioo s (9507) ....•..•........... 123-125 Municipal Service Center Bulk Material Improvements (9506) ...............• 126 Coutiouin& Projects Geographic Information System (8945) .......•............•...... 127·128 121 THlS PAGE INTENTIONALLY LEFfBLANK 122 • ~ ,.r" NEW MULTI-ENTERPRISE FUNDS PROJECT GEOGRAPHIC INFOB..VlATlON SYSTEMS APPLICATIONS (9507\ UTILITIES Prglm Descriptioo: In 1994-95, the Ge<JgraphicaJ Information Systems projects (projects 18822 and 8945) will be complete, The system will contain a comple!;: sol of all City-base maps, which incl~ Utility maps, This DeW project devdops application software which will allow easy and quick access 10 City data and maps, Beyond computoriz:ng maps, Ge<JgraphicaJ Information Systems (GIS) produces intelligent geogf'aphic infonnation which can be recorded and displayed in graphic and DOll­ graphic form_ Applicalioo development wooId begin in 1995-96, City deportments "'" d ,pt Not otI maps and Jand-bascd re1ated information in delivering services 10 the public, This project provicIet application development for the Utilitieo. See GemnJ F\lIld Pror-ct 19518 for General Fund applications. ProIIXS !::IImJ!<lll"nts: -W..., Gao< w_ -.. TOIaI l>ninq< 1995-96 _Module $7,000 $7,000 $7,000 $7,000 $7,000 $3',000 "!II", Ii.-. 510,000 $10,(0) 520,000 w_ $60,000 $)Q,OOO S3O,OOO $15,000 $135,000 ~ ~ UppooIo" Sll.OOO-$6,11lt). $6.100-.S3,CXX).. ~S800 $27.~ $26,000 $12,600 SI2,600 $6,200 SSl,200 TOT AI. IJI9S.96 s,,~~ S5l~100.. 543,100. m,OOO-117,_ Sl17.AO- m,DCt $5',600 $49,600 $l8,100 $17,8OC1 SZ4&,2OO 123 , .' Water W.ut~r To<aI Sronn Dl"Iinalle -----+--~----+_--+_--~~~F___4 $10,000 $10,000 STORMS """""'" $2l),OOO 120,000 $2,'00 $2,100 $1,'00 $100 $9,600 $2.100 SU,IOO $1,100 $20,100 $39,600 $]0,000 $10,000 $4,200 52,100 $2,100 51,100 $100 $9,_ $2.11t Sl,l00 $1011 SlJ~" :- '10,000 $10,000 $2.100 $2,100 $1,100 $100 $9,600 TOTAL1m-" S14,lGO $%,100 $2.100 Sl,lDl SlOil $1',_ "The F.rue:prise Funds will reimburse the Generu Fund for compuJer costs. Pmiec:t JUSIlroration: A major Utility netwoTk moou!. with sub-modules CUSIOmized for each of !be City', five utilily networb -waJer, gas, wastewater, electricity, and slorm drainage. will be dc<eIoped. This modul •. provides the ~mty for a design :echnici:miengineer to trace a utility network: by creating a mOOeI which, for example, identifies direction of flow. nodes, and W-. The base module will be modified for <ad, utility's specific requirements. To enable die cIeportmcnlS 10 develop additional application" add additiooal users, and print and view DigiIal 0:'.1>0 Photos (specialiud maps), it will be r.ecessary 10 upgrade the centr.U compuJer and .,.;m"g wotk statioos. Tho storm drainage module will be integrated with the STORMS software already developed. This mhancement w"Jl allow graphic display of the output from STORMS and allow queries <nc:ompassing all map features such as the location of all proposed utili ty replacement and street paving projects ever the next five yean in • project conflict tracking application. 124 Impact and SupPOrt Analysjs: • Environmenlal: • Opcraling: • Tekc:ommunications: Not a project under CEQA Inter--department project Utilities, Public Works, Planning, Police, Fire and Information Resources. AppHcation maintenance will increa.le and hardwar:: maintenance will decrease approximately offsetting each other. There will be increased customer service through. one-step _ system, increased productivity and improved analytical capabilities. None CIIDpn:btml .. PIau: Consistent with the Plan. Will enhance database for land "'" planning aDd c:ommunity information. -Wale< 0.. W-...,. Stunn Ihainsge Tobl 1-m,ooo-$53,IOIJ. $43,I01J. $25,000-117,4IJ(;.$17,BOO $217,600- m,ooo $59,600 $49,600 120,000 $241,200 1-"" $4,200 $2.100 .$12,100 $1,100 $20,100 $39,600 1997 .... $4,200 $2,100 $2,100 $11,100 1100 $19.600 1-514,200 $2.100 $2.100 11,100 $100 119,600 For a oornplde, Citywide overview of funding for GIS applications, see Project 19518. Source of Funding: Entezprise Funds NEW MULTI-ENTERPRISE FUND PROIECf MUNICIPAL SERVICE CEl\TER BULK MATERIAL ElNS 19m Proiect Desg1oti!!p. This project will construct reinfurted <XlfIcrete bulk materW storage bins at the Municipal Service Center. Th_ bins w'Jl replace the old wood light ""Ie storage faciliIi .. coostructod many y ...... ago. The plOpwed replacement bins are identified in the 1987 Municipal Services Cenrer Master Plan for Buil<fmgs, Pa .... king and Storage. n ... replacement SIOOIge bins will be amstructed in the same location as the existing wooden bins. This project abo involves l.andscaping areas bel!ind the bins 10 prevent their being viewed from the Bay, thus aJhaDcing L~e environment for users of the Bay. Prolert JugiOcatjon: The Water, Gas, Wastewater and Electric Opel1ltions Divisions of the Ulilitit:s Department store and use bul.lc trench backfill materials at the MSC on a daily basis. n.... maJeria!s are sand, gnvel, base rock and asphalt cutback for ternpwary pa,ing. The DIIIeri.aIs are loaded inbJ • dump truck with • backhoe. The existing wooden bins bave deIr:rioraIed and ore unsafe. The reinforced concrete bins are .tronger, more durable and safer. ImPM1 RJJd Support Ana"'si:i: • Eavironmenta1: • Operating: • Tdecomrnunicat:iO:1s.: ClItegorialIy exempt under S<ctioo J 5301 of CEQA. UtiJiti"" Department·Water Utility: No additional resources lequire<!. None Cqppn:bemive Plan: Consistent with Plan. Consistent with the MSC Master Plan. Flnanci&J AnalYSis: 1994-95 $70,000 1995-96 1996-97 1997-98 1998-99 Soorce of Funding: Water SII,500, Gu $23,500, Wastewater SlI,SOO and Electric 523,500 Funds. 126 • o .\, CONTINUING MULTI-ENTERPIUSE FUNDS PROJECT GEOGRAPHIC INFORMATION SYSTEM CS94Sl PtpIm Prxr!ptlon: Tl"Js i. a joint proj«t between the Enterprise Funds and Public Worn 10 lY"""",riea"y input the City base maps into • computer .y .... m dalabase until all IIIllps are on die compuIer system. Maps will contain all information currently on the City'. block maps ""d Utilities' maps, plus any additional information required or needod by o!her Ci~j departments. !be base hardware/software .ystem was purchased in fLSCa! year 1989·90. 'Ibis project will be completed in 1994-95. Meet Jpmrqtion: 1bis project &reatly increases the ease of main taining accurate maps. As mare utilities underground, there is an increased need for accurate information on all eiliting City UIilities, as well as1Clep/lone, and Cable TV. This project creates u~to-date computerized mapo lor tile <mire city. C<lmputerizecI maps allow Utilities 10 I1lakr rapid revisions, make base maps for each individual utility as needed and spot conflicts between different underJ:round systems. Older non- 0ClIIIpUteri:red maps were dilflCUlt 10 maintain and were not a=:rate. They required a laIge amount 0( time to IIjldate since all the revisions/updates were hand drafted. In addition, the new maps allow customer e<>gioeers 10 review a customer's pennit request at the counter. Thi • ........ up the permit review process. !be EIccIric Utility uses tile GIS system 10 locate CIlstomcr OIllages as calls come in during an outage. The DeW system displays cuslDmers by add,... and shows which circuit ~.,.y are served by. The system speeds up the restoration process and helps pinpoint outages. Imp3s;t Iud 5uppgrt Analysis: • Environmental: • Operating: • Telecommunications~ Cmmrrbrmfve Plan: Not a project under CEQA. IncreasOO cost for hardware/softwa", maintenanu. Increased loading on LAN and wide-area network Consistent with Plan. 1994-95 $209,000 {Eectrie, Water, Gas, Wastewater and Stonn Drainage Funds} 1995-% 1996-97 127 • • • • REFUSE FUND Refuse Fund projects are those necessary to maintain aflod close solid waste disposal sites. in a sanitary. safe, and environmentally protective manner [0 comply with regulatory agencies and local, Stale and Feder.oI mandates. No new or continuing projects were submitted • 129 TIllS PAGE [N'TEJ'."TIONALLY LE¥I' BLANK 130 • • • • • STORM: DRAINAGE FUl"m The Storm Drainage FUr'ld provides funding for improvement.s to the st.orru drainage system and toxicity rontrol of storm water IUn-.off in accordance with regulatory agencies and local, State, IUld Federal mandates. . NewPrnJeds ArasIradero Crcdc Erosion Repain (9508) .•.......................... 132 Continni"( Prnjects SIDml WaIeZ Discharge Improvements (9180) ...•.............•.•.....• 133 CoIJerooo. Sy!lem Improvements (8870) • . • . . . . • . . . . . . . . • . . . . . . . . .. 134·135 \31 ..,..,....,.,"",-,::---......, .•. -_ .. -----.;~---.-. ,:.".: ." :. NEW STORM DRAINAGE FUND PROJECT ABASTRADERQ CREEK EROSION REPAIRS (956!1) PrpIm DrrrjptinD: This project will design., environmentally assess and construct impnwements to A!astIadero Creek between the dam and Arastradoro Road. Improvements .iDcJ.ude repairing or !eplacing culverts and the erod«! creek embankment at four culvert locatio", 10 preva!1 further croelc erosion. Additional improvements involve placing fill, fabric, and rock fiUcd baskets; and implementing native seed revegetation. This work will be done in conjunction with repaiIs to the darn whicb were funded in FY 1993-94. Profert Justificatlnn: Recer.t inspections of Arastradero Creek revealed Olat very large sections of croelc embankment and bottom adjacent to the trail/culvert crossings have been washed away by hoavy 12ins. Improvements should be constructed 500ll to prevent further erosion and iDa<as<d repair oo.ts. Project funding may increase by 301'1> if additional heavy winter rains 0IlCIIr beyond FY 1994-95. Improvements ant needed to the trailIculvert crossings to prevent 1in1her damage m the environment and tile loss of accesstbility to the park for hikers, bicycles ODd rangerl fire light-vehicle pkk-ups. Jamect 'lid Support ADltym: • Environmental: • Operating, Envi."3Drnentai assessm<nt will be done as part of the desicn. No additional resources will be required • Te1ecommuniauions: None Cgppnflcmj!e nan: Consis!ent with Parks and Environmental Resource sections of the Plan, f)nprJal A.m 1W; 1994-95 1995-96 1996-97 Im-98 1998-98 $170,000 DesignlEnvironmenW As.sessmenUConstruction Sowa: of Funding: Storm Drainage Fund ":- • o CONTINUlNGlREl'lSED STORM DRAINAGE FUND PROJECT STORM W AIER DISCHARGE IMPROVEMENTS (9180) PrpJect Desgiption: This project provides for the City~s continued :>Mticipation in the Santa Clara Valle) Nonpoiot Source Pollution Control Program (Program) "" mandatfd by !lie Rt:giooaI Water Quojity Centrol Board (RWQCB) and the Program's National Pollutant Discharge Ell:ninatioo System (NPDES) Permit for storm water discharge. The Program is drignrd 10 improve stoon wa1lor 'lualiry .hroogh new <eg11latory controls, development of best management practices (or various industri.e.s and acti .. <ities, and a public education/out:reaCb progtam. The Program also fund, a storm water monilOring program designed 10 identify !he type, sevmty, and origin of storm W"..ter ponutants, and demonstration projects 10 measure the effectiveness of various control measures, such as detention basin s and improved maintenance tneIhods, in removing pollutants, Funds will be use<! 10 pay the City's proportionate ,flare of Program costs and for implementation of tbe City',s; 0"-'"0 storm water quaIicy control measures? such as public ed!lal!ion, catcll basin stencillin&, and demonstration projects. PntIect Jwtj!icalion: As a result of this project, !he City will comply with Regional Water Qua1lty Control Board Basin PIa., requirements for s..uth San Francisco Bay nonpoint source discl>arge$ and NPDES $form water discharge permit «mdition.. The research and te<hnical auidanco provided by !be Program will also assist !he City in implementing local efforts 10 iDlptoYe storm water qualiry, Imps:( gnd Svppprt AnaJym: categorically exempt under Section 15301 of CEQA. Public Worle; Department. Storm Drainage: lncIease in resources to manito< and implement NPDES pennit conditions . .. Telecommunications: None Cmpriem.in P\an: Col'lsl.stent with Ezr'lironmental Rcsou.rce sections of the Plan. Jilmmda1 Analysk: 1994-95 5100,000 1995-96 $100,000 19%-97 $150,000 1997-98 TBD 1998-99 TBD Souree of Funding: Bond Funding 133 CONTINUING/REVISED STORM DRAINAGE FUND PROJECT COLLECTION SYSTEM IMJ'Rm'EMF.N]'S !S870) PmI .... J\cs:rfplkm: This project provides improvements to the storm drain sysu:m as identified in the Storm Drainage Mas!er Plan and Condition Assessment Studies completed in 1993. The _ Plan identified projects ~ to atlgment the capacily of the existing stann drain sy.tem to bandIe projected l~ycar """" events. The CorAition Assessment identifoed portion. of the IIDml drain ~ Ibat need to be "",laced or rehabilitated due to their deteri",ated condition. Revenue bMds will be Wucd to fund proposed improvornent projects. 1994-9S: $3,095,000 • ConsIrucI pump swjon ionpmvements (Including new Airport Pump Station). • Design and comtruct a project to correct =t street flooding at locations throughout the City. • Calilmue the storm drain computer model by comparing it 10 actual rainfall and flow \ ). I • lIIIOUIImIIeIIlS. _ • Design a project to r<place/repair lOS of the deteriorated sections of the e<istinC storm drain 'WI IysIenI as identified in the c.:.ndition Assessment Study (Phase 2 of 10). • Design conOdi"" sySIem ionpmvemenlS in the Barron Parle neighborhood as identified in the Storm Dtairlqe Master Plan. • ConIinue curl> and gutter Iq>Iacement program. 1995-96: $2,87Il,ooo • ConsIrucI collection system improvements in ihi: Barron Park neighborhood, as identified in tile Storm Drainage Master Plan. • Coostruct a project '" replaceJrepair 10" of the dereriorated sections of the existing storm drain sy.aem as identified in the Condition Assessment Study (phase 2 of 10). • Design collection sy,uem improvements along Newell Road as identified in ti.e Storm Drainage Master Plan. • Design a project to replaceJrepair 10" of the deteriorated sections of the existing storm drain sy.aem as identified in the Condition Assessment Study (phase 3 of 10). • Join in erosion COf'Itrol and other storm dt2ln improvement oost-sharing agreements wil>:!. the Sanla Clara Valley Water District. • Continue curb and gutter replacement program. 134 o '. • 19%-97: $2,8SO,OOO • Construct collecti01\ system improvements along Newell Road as identified in the Scorrn DnUnage Maste: Plan. • Cor.struct a project to replace/repair 10% of the-deteriorated sections of the existing stonn _ system .. identified in the Condition Assessment Srud y (phase 3 of 10). • Design oo1.1ecCon system impro .... ements along Harker A venue, as identified in the Storm l>rain:I;-Master Plan. • Design. proj<Ct 10 replaceJr<pair 10% of the deteriorated sections of the existirg storm drain system as identified in the Condition Assessment Srudy (Phase 4 of 10). • Join in erosion control and other storm drain improvement cost-sharing agreements 'lwith the Santa Clara Valley Water District. • Continue curb and gutter replacement program. 1997-91l: TBD 1998-99: TBD PrpIeu J!!!tI!IqtIog: Provides needed system improvements, expansion, repair/replaoonent, mel erosion control to enhance aginl infrastructure and augment sySlem capacity to minimize Citywide flooding. ID"PIrt 1M SupPOrt Analn": • Enviroamental: An environmental assessment will be done as part o( the project design. • Operating: Public Works Department, Stonn DrairJ3ge: Reduced maintenance mel minor repairs as SYSlem is upgr.uled . • T~~ons: N~ CmmrrhemiVf; Plan: Consistent with Environmental Resource sections of the Plan.. Flpanl Analysis: 1994-9~ 199.5-96 1996-97 1997-98 1998-99 Source of Funding: 53,095,000 $2,870,000 S2,8SO,OOO TBD TBD Bond Funding --.-:~~" -. '. ~\ ~ • 135 • TIDS PAGE INTENTIONALLY LEFI'BLANK 136 • • • ELECTRIC FUND Electric Fu.'ld proj~ts serve electric customers, replace equipment, provide street lighting, provide traffic: signals, and upand existing facilities to accommodate load growth. Project Catqories Major. Major projects are of Jarge dollar amount or with a :special fo...-us. Rootine; Routine projects are Illose related 10 normal operations Ill.t oa;ur annually. These include providing services (0 customers and maintaining the infrastructure of the utility. Undergrounding: Be<:ause there is typically • major project involving tile undergrounding of Ille electric utilities every yea::, Ille,. projects are grouped togclller in Illeir own section of Ille Electric Fund CIP. Mi SCf'llaneous: Miscellaneous capital projects focus 00 support or ancillary activities of the utilities. Screet lights and traffic signals, for example, are nO! a direct part of provimng customers with electrie service, but are funded by u~1ities. DISTRIBUTION SYSTEM· MAJOR PROJECTS Comtinujn& Projects Barron Part Distribution System Improvemenl (9452) .•.•...... . . . . . • . . • . . 139 4 10 12 XV Cooversion (8856) ........•....................•. , •.. 140 Alma 12 XV Substation Addition (9250) ........•. _ . . . . • . . . • . . . . •. 141-142 DISTRIBUTION SYSTEM" ROUTINE PROJECTS Ne .. Projects 60KV Bus T .. B=l;er Installalion (9509) ........•........•.. " ....... 143 Substation TIllIlSformer Replacement (9510) ....... _ ................... 144 Supervisory Control and Data Acquisition System Upgrade (9515) .. _ ....... 145--146 137 --. . ELECTRIC FUND (continued) DlS11U8UT10N SYSTEM -ROL'TlNE PROJECTS «ontinued) Conti nn ."& Projects S'=t Ugh! Rep~ts (9354) .•...••........................... 147 SubsWion ProIection Improvoment (3938) •........•........ , ..•...... 148 SubswiOll Facility Improvements (8944) ............................. 149 'I'rantfo:men (mS) .•....•...•....•.•...................... . ISO U~ Extensions and RepJacements (E92S) .........•............. 1 ~ 1 0Yerbead EJttensions and Replacement.> (g928) ....................•..•. 152 Electtie Se:vices and MetefS (8928) .................... .. .. . . .. . .. . 153 UNDERGROUND CONVERSION liew Projects FII!We Underground Conversion Districts (9511) ..........•.....•..•. 154-156 Contlnujug Projects Sootbgrale Underground Convernon (9453) ............•........•..... 157 OlannlnglAddison Avenue Underground Conversion (9350) ..•..•.•......•.. 158 MISCELLANEOUS CoatiDuiDg PnUects Ulilicies Billine System (9357) .•............................•. 159·160 Communicali.,. SySWn Improvement (8931) ..........•..•.......... 161·162 Sinel Ugh! Systerr, Conversion (8929) .•....•.•.......•............. 163 TraffiC Signals Upgrule (8930) .. . • . . • . . . . . . • . • . . . . . . . . . . . . . • . . . . . 164 138 ,.". ~ • o MAJOR C0N11NUING ELECfRIC FUND PROJECf BARRON PARK DlSTRmrmON SYSTEM IMPROVEMENT (9452) Project Desctiptjom This project will replace pole., IJ'anYonners, and overhead equipmenl to improve !he electrical reliability of !he Barron Park eloctrical system. The existing overhead ekcIricaI distribution system will be relai.,ed. l'rnls:;:t l!I5!jIkJticm; The electrical distribution system in Barron Park was purchased from Pacific Gu &. Electric in 1912. The overhead system does no( meet currenl City construction SIandards. Many of the poles were dWned inadequate during. 1991 inspection. A significant munber of low voltage complaints occur in this area due to the inad«juate distnllution system. The system, purchased from PG&.E, was designed 10 operate at 12,000 Volts rather than the City SIaIIdard 12,470 Volts. The individual transfonners providing service to our customeIs IIIU3t be purdwed Ii> operate at 12,000 Volts nther than the City standard 12,470 Volts. Special mpdown transformers reduce the voltage of power being fed into Barron Park from 12,470 10 12,000. This project will """vert tile area 10 12,470 Volt opention, stIeIlgt.'Ien the distnoution system ID improve ne.fuility and reduce low vol .. go comp1.aints, and replace deteri<>raIed overhead oquipmeIIl ODd poles. The system will remain an overhead distribution system. Impart Ud Support Ana]YSis: • Environmental: Categori<:ally exempt under Section 15302 of CEQA. • Operating: Utillti"" Deportment-Electric Utility. Reduced trouble calls and maintenance. • Tdecommunications.: None Comon:bmsiy: Plan: Cons.istenl with Plan. FQlIm;;jaJ Analysis: 1994-95 $1,000,000 (Construction) 1995-96 1996-97 1997-98 1998-99 Source of Funding: Eiectric Fuod 139 "0",<. '<:-'------- ·"~r;:~~:--,'.:-~<., ~~ ' . . -';,: ; .. ~ ~" ~-" .. -. MAJOR COJV17NVING ELECTRIC FUND PROJECr 4 TO 12KV CONVERSION (8856) Pn!Itd Drsrrlptjog: This project converts the 4KY distribution .ystem in areas that will IiIciliwe utilization of 12KV capacity avoilablc at Park Boulevar.l, Maybc1l, Quarry and CoIor:Ido su!>staliom, and allow retirement of older and unrcliable 4KY equipment. ""'ecl Jns!Ilkotion: Thi. is an ongoing projecl to canvon, where practical, the exis:ing 4KV .,.." 10 12KV, Thi. will alleviate low voltage problem. rxperienced during eme:gcney ~ oponIions 00 the 4KV sySlem." Additional benefits of the proj oct in<lude reduction in syJCt:m losse$, reduced mainterwtce. and improved reliability due to eliminarion of :Lengthy 4KV fe<Iders wilh poor ties to other circuits . ..,., apd Sgpport Anatysb: • Eavin:ruDe:mal: Categorically exempl under SectiOll 15302 of CEQA, • Opetaiing: Utilities Department-El .... "Iric Utility, No additional required. • Tdec:ommunicalions: None Cd" i h wjyt Plan: Consistt;nt with Plan. fhwnritJ A.palysis: 1994-95 5240,000 1995-96 $247,000 1996-97 $254,000 1997-98 $262,000 1998-99 $270,000 Source of Funding: Electric Fund 140 .. ,..~ .. • o M.4JOR CONTINUING ELECfRlC FUND PROJECT ALMA 12 KV SUBSTATION ADDmON mw Pto!cd Pcp=rillljgn: Thi. project replaces the 4KV switchgear .. ,d transformers at the Alma Subslation with new 12KV transformers and switchgear. An architectural faoarle at the IIIbsIatioo along Alma Stl<et will be <onstrucU:d. Pto!cd JustlrlQlljon: The City corrent1y bas four 12KV ciJ'C'Jits from the Alma Substation serviD& the downtown area. One circuit is. a dedicated tie circuit to the northeast portion of Palo A1lo. ThiJ Ii.~ cimrlt is also used as a tie to the Quarry Road area. This !eaves only three circuiu to handle the downtown area and the SlllTounding residential areas. Two more feeders arc Deeded to separate the underground commercial ~ from the residenli.aI a...reas. In the near term. the Quarry Road Substation \\111 support the Alma Substation by picking up :some of the raideotiallROS north of University Ave. Because of. _I fail"", of some of the 4KV equipment at the Alma Substation, a program 10 RIire all of the Alma 4KV equipment is lncluded in this 12KV project. The p:ojecI also includes construction of an architectural facade on the Alma Street side of the subIIaIion fo!Iowing installation of the new 12KV transformers and switchgear in 1995-96. Ulilities bas been working with the Art:hitectural Review Board and Planning Department staff OIl this project. Impact and Sumnrf Analysis: • Environmental: Calegoricall Y exempt under Se<tion 15302 of CEQA. • Operating: Utilities Depanment-EIe<:tric Utility. No additional resources required. • T~mDlunic:ations: None ~Drel! .... i .. PIa.: Consistent with Plan. flpandtl AnalYSis: 1994-95 $15,000 Design new 12KV installation 1995-96 $1,000,000 Purchase ""d instaD 12K\, 1996--97 5200,000 InstaD new 12KV feeders 1997-98 141 i' 1998-99 Soun:e of Fun"i",: E!e<:tric Fund • 142 • ~ . -- ROf.;71NENEW E!..ECI'RlC FUND PROJECT /jOKY IDJS TIt BREAKER INStA!.LATION f9S091 Pro!ect Desgiptlqn: This project inslalls the secood 60kV bus tie breal<er at the Colorado Power SIaIioo as IOCOmmended in the initial design of the facility. Prtit£t lmti[Jalign: Installation of • new tie breaker will improve tbe reliability and ease of maintenance of the Cok>rulo Power Station, the main receiving station fa:: all power coming into Palo Alto. The main bu, tie breaker was installed in 1992-93, 'Ibe new tie breaker, on main bus 2. 'Will matcb the existing bus ti~ breaker on main bus 1. The bRabr all<>ws for WIer service restoration, greater flexibility when performing maintenaoce, and enbances system rniability_ • &vironmenta/: Categorically exempt under Section 15302 of CEQA. • Operatin" Utilities lleperunent-Electric Utility. No additional resources roquired. • Tc:Iecommunications: NODe CgnpnftemiR-Ran: Consistent with Plan. 1994-95 $150,(0) 1995-96 1996-91 1997-98 1998-99 Sou= of Funding: Electric Fund 143 . ,:, "'-~------- . "". f . ~ . . .. '." " . " ROVTINENEW ELECTRIC FUND PROJECT jil!l\STATIQN TR6NSUlBMtB REPL,\CLm:NT (9519) frgi«t Deo:rill'ion: 'IbU projoct replaces old and under-capacilY substation tnlnsf"""",, (60,000 Volts to 12,470 Volts) to maintain eloctric sySlem reliability. Several of !he substation Iransformers are about 30 years old, have been heavily Ioade<l, or have a hUtory of poor reliabiliJy. This projoct will replace and relocate transformers ra increase overaIJ system reliability. Nee! ,lmtl!k:atlon: The existing electric distribution system includes nineteen 60,000 to 12,470 Volt and twenty·two 60,000 10 4,160 Volt YOltage-regulaling transformers 10 reduce subtransmissioo voltages 10 distnbution feeder vOltages. Under normal loading, t.-anYormen !>ave an oxpecIed life of 30 years. After 30 years, spare parts are usually not available and _fumed moiDleiIaDCe is difficult. Transf= have an mcr.a.ed Iikclihood of failure as they .. because !be insulating rnatainls _rare. In addition, tnlnvonncr lifo is affc:cted by loading. Several of Palo Alto', current transformers hove ",perien<:ed Mavy usage. A transfmmer that is heavily Ioadoo will have a sborter usefilllife than one thai is only partially ~. The components of the transformer wear down more rapidly with heavy use" Heavy use also iDcreases the transformes temperature, leading to dec=3ed transformer life" ImMd IUd Suppor1 4Dpl".: • EDviIonnenlal: Categori<ally exempt under Section 15302 of CEQA. • OpeaIiDg: Utilities Department·E1ectric Utility. No aciOitionaI resowte1 required. • Telecommunications: None Comprehtnsi", Plan: Consistent with Plan. Ji1I!IJpcial Analysis: 1994·95 $400,000 1995-96 5375,000 19%-97 S380,OOO 1997-98 $400,000 1998·99 $400,000 Souroe of Funding: Electric Fund 144 • o ROUTINE NEW ELECTRIC FUND PROJECT SUPER\1SORY CONTROL .... NP D"'TA "'COJ!!SmON (sc ... n",) SYSTEM UPGR ... pE !93151 -, . " Pmi«t J'!es.:dpiioo! This project replaces the 1984 vintage computer. operating software, oppIi<aIioD ..,fu;me and operator consoles in the SC ... D ... system. 'Wert Cgmpoqent\: This projecl will replace the master computer hardware, main operating syscem. application software, operator consoles. and communication protocol of L'le existing SCADA S)'1IeIn. Pnlcd luitill!:&lim!: The SCADA system was purcha;ed in 1984 and u,"" computers and <lpCtIlDr consoles of Ibal vinl>8e. Digiti! Equipment CotpOration, maker of the ccmpuler banIwaJe DO longer can maintain the hardware. The operating system (main computer software) am DO longer be UWaded because the hardware =Il0l suppoJ1 • new operating sy!lem. The lIIIlIufactuI<r of the operator consoles has notified the City lilat they will no longer support nor maintain the consoles. The SCAD ... systen, supplier, Landis and Oyr, has IlOl made a similar J)'IIem since 1986. The existing system cannot communicate with newer Landis'" Gyr system, IiDoe the oommuni<ation protocol is no longer suppoJ1ed. The new S)'1IeIn will be based on wor1o;tations and file setVerS rather than mainfrllInt computer>. Operating and application software will use a modem "P<'"-system. approach. Operator consoles will be worbtations rather than dumb terminals. Inter-romputer communication will be by nenvork raIber than custOm hardwire inter".ace. Imppct JlId Support Analysjs: • Fnvironmental: • Opc:ratirIg: • Tdea.mtmunications: flnpdal Arndnis: Not • project under CEQ .... Utilities Department-Electric Utility. No additional resources required. SCADA uses the existing Utilities broadh."d and will, therefore, incur no additional costs foc line usage, Consistent with Plan. 1994-95 $100,000 Specification development by consultant 1995-96 51,000,000 System purer",.. and installation 1996-97 145 -._--,--' 1997-95 1998--99 SocLee of FuDding: E1eetrk Fund 146 • • ,- ROUTINE CONTINUING ELECJ'RlC FUND PROJECT STREET lIGHT REPLACEMENTS (93541 PrRicc:t Prgripti!lll' This project wiil replace =t light pole" pole foundations, lumin.ain;, and wiring as needed to maintain or improve =t lighting at Ille request of residents and the Public Works Department. Prpled ,h§!ifIgrtlon: There art over 6,000 street lights in Palo Alto maintained by the Ulilities Dopartmml. Ulilities maintains the poles and luminairs and installs new street lights as ~ '" approved by the Public Works Department. Pole installation. are required wh<n an ana is ccoverted hum an overhead to underground distribution system, Pole replacerneftts are reqcired when existing poles fail or are aoei<kntaJj y damaged. Luminairs art replaced to improve lighting levels and safety. In some parts of Palo Allo, existing ooncreie '" cast iron street light poles are failing and an: 110 loop:< sezvi<:able. This project funds their replacement. Replacement poles .. ith designs and fir<:ades similar 10 existing poles will be purchased when =sonably priced. Iqns=t and Smmort Analnk: • Environmental: • 0peraIiDg; CategorialIy exempt under Section 15302 of CEQA. Ulilities Department-Electric Unli!)". Reduced trouble calls resulting in reduced mair.lenanCe. • Tdecomnumicarions: None Cgmrimdyc p;gn: Consistent with Plan. Fmanda) AlIIlYS!:;: 1994-9S $ 50,000 1995-96 $ ~S,OOO 1996-97 $ 61,000 1997-98 $ 67,000 1998-99 $ 74,000 S9wce of FWlding: Electric Fund 147 -. ROlf TINE CONTINUING ELECTRlC FUND PROJECT SUBSTATIQN PROTECTION IMPROVEMENT (89~ ProiectDescrjotiQn: The project coosists of th~ purchase of relays ""d high' voltage fuses, to be in~ or used 10 replace existing devices, 10 improve protection of the power system and achieve _ coonlination with """10"",,,' protective devices. Praies:! Ipstllk:a!lgn: In recenl yean Illere have been a number of power outages ",used by equipmont faillIR in CUSIOmerS' facilities. These outages nO( only cost the City lime to restme power, but also cause inoonvenienoe to other cu3tOmets on the same circuit. AJ customecs' load increases and !he distribution system becomes more complex, changes :0 protection equipmenl 11K required. It is aI.a ne::es.sary 10 continuously teView and revi"" the protection progtam by changing relay scbemes, relay settings, and """";ibraling relays on • coclinuous basi •. Additional funding is proposed to replace old air cirelli, breakers with vacuum brealrers on critical switcbgear. The existing air brealrers are affected by contamination and we.,.. Breaker td>uilding and replacement with vacuum breaker> provide extended life 10 expensive ... ilcl!gear. Jguprt aDd Smmarl Anplysk! • Environmental: Categorkally exempl under Section lSJOl of CEQA. • ~: Utilities Depo.r!menI-E1ecttic Utility. No additional resources required . • Telecommunications: None Comprehensive Pbm: Consistent with Plan. Flnandal AnaJv<ls: 1994-95 590,000 1995-96 $93,000 1996-97 596,000 1997-98 599,000 1998-99 $102,000 Souroe of Fun<5ng: Electric Fund 148 ROUTINE CONTINUING ELECrRlC FUND PROJECT SUBSTATION FACILITY iMPROVEMENTS (~ Prolut Desq!ptlon: This project include" replacement of batteries and battery cbargers based upon their 1m expectancy, Jet>ovatlon of the security rence. and entry gales, upgrading of the substat:iao drainage system and miscel.lantow other improvements, It also includes capacitor jnstallations. ProIectlustRlCIljon: Timely repiaJ:emtnt of batteries and battery chargers is vital to .ubswion opention. T.te batteries provide critical direct curreS1t ('.(Jntrol power to operate the protective deW:e3 and the remote terminal units. The chJlrgers rnai.ulaln the batteri", at full cha!ge in addition to supplying all the SJJbstation direc:t current power requj~ments. Capacilna for power factor correction will be inslalled to maintain a 95" or better power faetor althe tiJne of peak demand. Renovation of the security fences and gale!l is needed 10 make the substations less ru5CCptl"ble II> vandalism. Miscellaneous work, such as adding a transfer swilch, improving drainage, and rnck 1aIlI"facing, will aOO be required to upgrade the substation interior and its auxilWy i}) .,....... Jmswt .nd Support Analysis: • .Eoviroomental: CategoricaIly exernp< under Section 1S302 of CEQA . • Ope:ating; Utilities Departmenl-Electric Utility. No additional "'Iuired . • Telecommunications: Nooe Cglll9' eltensive Han; Consistent with Plan. Jilpancial Anafys§: 1994-95 $90,000 1995-96 $93,000 1996-97 $96,000 1997-98 $99,000 1998-99 $102,000 Source of Funding; Electric Fund 149 ,------ ;,.;: . ROUTINE CONTINUING ELECIRIC FUND l'ROJaT TRANSFORMERS 18928) PrpI"" Do:!cr!p!Ioq: A. necessary. this I'roj""l will pu.'"Chase and install distribution 1rusfonnen 10 provide adequaIe seIVice to !he Electric Utilirj', customers. The Tnmsformers. Overl>ead Extensions and Replacements. Underground Extensions and RtpIaa:maiI!. and Electric Services and MeIerS capital improvement projects C<lmbine 10 provide !be funding for all customer seIVice connections. PIp!"" jgSlr..:atfon: This project provides the necessary fund, to purchase and in.tall dbtribution power ttans!ormers b serve residential, commercial and industrial customers, 1he City purdwes and retains ownenhip of transformers used in the distribution syS1em. Additional IDnsfOrm<n ~ requited 10 serve new CUS1onIJlr.!. increase the capacity provided 10 individual .-....s. JqIIa<e failed transformen, provide tnlnsformers used in the conversion from o.abcad S)'SIeIIlS 10 undcIpound systems. and JqIIa<e high-maintenance submersible tnutsfmme .. with padmounted transf<J<lTlml. Imrwt and Sgpport AWms: • Environmcn!lll: • Opaating: Categorically exempt under Section 15302 of CEQA . Utilities Department-Electric Utility. mcn:ase in maintenance of additiooal pL1nt. None CmmphmsSB! Plan: Consis1Ef1t with Plzn. 1994-95 5600.000 1995-96 $618.000 1~97 $637.000 1997-98 $656.000 1998-99 $676,000 Sooroe of Funding: Electric Fund 150 • o ..... .. j. . ..t ... " ROUTINE CONTINUING ELECTRIC FUND PROJECT UNDERGROUND EXTENSIONS AND REPLACEMENTS (8228) Pmlm Jlr;;rdpCJon: This project purchases and installs conduit systems, cables, switches and U*Xiated equipmenl as necessary to.serve new or .remodeled residential, commercial and in­ dustrial development and modifies eIectrica! disnibution circuitry to maintain continuity of oervice 10 CUSIOmers. Tho Ttansfonnen. Overbead Ex!e/lsions and Replac"mcnts. Underground Ex!ellsions and Rcpl""""Crls, and E10ctric Services and Meters capital improvement projects combine to provide the ~.ng (or all customer service connections. Prrdc:rt JRdIfkat'on : This project provides the necessary funds to serve UJe varieDS residential. <X>IIUIICrCiaI, and industrial developments that aceur during the year. It also allows for the ·.mdet",ound circuit m<XIification. requin!d for roadway altmations, large load increases by major indusIriaI cwtomers. and zr.any other underground changes tllat ue required because of ground surW:e chang .. and mail.:enance problems. Jrnpert and SuPPOrt Ana lysis: • Environmental: Categorically exempt under Section 15302 of CEQA. • Opet2Iing: Utilities Deportment-Electric Utility. Slight L'\Crease in maintmance. Revenues from new customers will ofhet the additional maintenance costs. • Telecommunications: None Cc!mprebensjve Plan: Consistent with Urban Design, Trafficway., Program 12: Uodergrounding of Utility Lines. Flm;J!!jaI Analnls: 1994-95 $600,000' 1995-96 $618,000' I9%-97 S637,<XiO" 1997-98 $656,000' 1998-99 $676,000* Source of Funding: Electric Fund. • Tbcsc figures represent utility costs. Customer reimbursement pays for approximateJy 2S % of expenses each year. lSI , . ROUTINE CONTINUING ELECTRIC !'UND PRO!ECf OVERHEAD EXTENSIONS AND REPI..l.CEMFNfS (8228) l'rgi<g J!eocriptjon: This project purclmses and installs pole line hardware for overhead distribution system improvements, replacements, and cxten sions. 1bc Transformen, Overhead Extensions and Replacements, Underground Extension. and RA:pIa<:emalls, and Electric Services and Meters capital improvement projects ""mbine to provide !be funding for all CUSIOmer S<n'ice ",,"nection •. ProJect C9mponeg!s: This project includes rep1arement of dettriorated pole lines, rep1arement of storm-<lamaged facilities, re::on<luetoring of overllead lines for higher capacity, and temporary e:xtcnsions to new customers in locations where undergrounding is not yet practical . .....,Iect Iust/fqtjgn: Based on. pole testing program in 1991, an OtIgoing pol. replllcement program is requlml. All fund. a!e for replacenw\t and reinforcement of existing fio..--ilities. No DeW overbead facilities are conSllUC!ed in PliIo Alto. Impact pd Sppport Analy:sk: • Environmental: CalegoricaDy exempt under Section 15302 of CEQA. • Openting: Utilities Deponment-Elect.oi<: Utility_ No arlditional required. • TeIecoml!lunicati0fL5: None C!I!II!!!l:bemj •• Plon: Consistent willl ElwiromTlental Resooroes, Hazard Reduction Program. Fi03nrjal Analysb: 1994-95 $400,000 1995-96 $412,000 1996-97 $424,000 1997-98 $437,000 19911-99 $450,000 Soorcc of Funding: Electric Fund 152 • o o .. ' .. ROUTINE CONTINUING ELECTRIC FUND PROJECT ELECmIC SERVICES tI NO MITERS (8928) Pmia:t DesqjptioR! As necessary. purchase and install cor.duCtors, instrument tral\sfonners, 2!Id _ 10 deliver electric power to customers and to meter for billing. Typical activities are installation of metering for new customers, upgrading of undersized or obsolete insta1!atioru~ "'P1acomenJ of damago<l !erVi"" oonduetors, and the ongoing meter replacement program. The Ttansformers, 0ver!Iead ExtensiO!l.i and Replacement>, Underground Extensions and R<placernmts, and FJeetric Servi= and Met= capital improvemert projects combine to provide the funding for all cu""mer !erVice connections. Pmlrrl IlIlIlI!ls:a!jon, Specialized equipment and fadlities are needed to lest a.,d monitor power quality. ~ ClI5IO«nml instaIJ ""'''' power-sensitive equipment, which create problems with pow..-quality, m= elaborate monitoring eqwpment and elegant solutioos are """"0<1 to mainlllin customer satisfactioo. Some of the funding pw.-ido<! here is wed for power q ua1ity mooilming. o c;>; This project includes purcbases or upgrades for various power and power factor meters, load ~ ........wng and researcb equipment and meter reading equipmonL ~ Im.d apd SUPpOrt Analysis: • EIrvirorune!!tal: Categorically exempt under Section 15302 of CEQA. • Operating: • Te3ecommunications: Utility Deputrnent-Elc::lric UtililJl. No additional resourD"..s required. None Comurcbmsl'. Plan: Consistent with Plan. Finaocial Ana.vsis: 1994-95 5300,000 1995-96 S309,OOO 1996-97 5316,000 1997-98 5328,000 1995-99 5338,000 Sourt:e of Funding: Electric Fund IS3 UNDERGROUND NEW ELECTRlC FUND PROJECT FUTURE UNPERGROllND CON)'ERSJON DISTRICTS 195m Prglcct PccgiptjQo: Utilities is nqotialing several future areas 10 be undergrounded. Utilities makes rec:ommenc!aliOl!5 10 Pacific Bell and Cable Coop based 00 L~e age 2lld .. isting overhead electric system. Pacific BeD determines whether the suggested lmderground conversion area _ their criteria for funding. A=s thal meet both Utility and Pacific Bell criteria an: scbedult>:I for WKleJgrounding. Pacific Bell i. required by the California Public Utilities Comm;ssioo to pay for all work done in the public right-<lf-way if lOW e.'peilditures are kEpt below :2" of the City" Electric Utility annual g= revenu.. Work ex~ng that level must be paid for eotircly by the City. Utilities maintains a program alth. 2" level. Tbis project invol> .. <:reatin& underground utilities districts and performing iii. work on • amc:nI beoefit basis under the provisions of Utility Rule 18, WIDell requires the utilities 10 bear the COS! of IIDdergrounding the disIl'ibution system and property ownen 10 bear the COS! of UDderpouocIing the services on their individual bIlildings. 1996-97 1997-98 19911-99 Daign of district San Antonio Commercial Area (DisIrict 136) Construction of San Antonlo Commerc'oaI Area, design of Embarcadero/Seale! Middlefield (District #37) Construction of EmbarcaderoiSealelMiddlefield, design of Central Middlefield (District #38) Constnu;tion of Central Middiefield, design of Oregon/ColoradoiCowper (District 139) ConSlrUClion of Oregun/ColoradolCo1llpeI. design of Middlefield/Cowper/ CoIO<ado/Oregon (District #4{) Pmlec;t Justif1(alion: This project is proposed to continue the cmgojng underground conversion progmn and also because the areas specified meet iii. Cal ifomia Public Utilities Commission !UIes which dictate the areas where PacifJC Bell can underground tlteir lines. l!a>cfits of undergnouuding include system betterment. higher reliability, reduced tree trimming and ;"'proved aesthetics. 154 .;D Wille:! .nd~ • Environmental: • 0perati.1g; • Telecommunications: CategoricaHy ex.empL under Section J 5302 of CEQA. Reduced tree tine clearing requirements; slightly undergrol.lnd syst~m maintenane<:; reduced overheld rr..ainten31K'.e. None increased system ComllRhtmjye Plan, Consistent with Urban Design, Trafficway., Program 12: UodorgrounOmg of Utility Lines. Flnarx:ial AnalYSis: 1994-95 $75,000 1995-96 $2,380,000 1996-97 $2,560,000 1997-98 $2,670,000 1993-99 $2,780,000 Souroe of Funding: Electric Fund. PacifIC Ben and Cable TV pay approximalely 40lIi of project constntCtion rosts. 155 DlSnE"r 35 asmcr A OSmeT 8 DlSTRcT C CEmcT D asTJlCr E 1IJaW.l._~ ENGa. MANAGUl ------__ lOOT .,.---­__ am UNDERCROUND CONfERS ION PROJECTS CITY OF PALO ALTO CALIFORNIA 6 "\. !If\' DA TE O£SCW"llON APril I--'--+--''''''=--f ..... -"""--.-----.... -+~::J SCALE UC-£o-E--fKU • • ../ "-.'. UNDERGROUND CONTINUING ELECTRIC FUND PROJECT SOUTHGATE UNDERGROUND CONVERSION /9453J Mea Prsnintjon: This project will underground the existing overhead diStn'buti01l system in !be IIU roughly bounded by El Camino Real, Churchill Ayenue, Alma Street, and Park Bookwrd. Undetgroundin& will be complet<:d in 1995·96. This new project is being done 10 be ooincident with • mojo< reno\'3.0oo of gas and water liMO in the Soothgare area. lJ will involve creating an unde.'l:"!Und utilities distric, and perfonning the work on a general benefit basis under the pnwisiOilS of Utility Rule 1 g, which require< the utilities 10 bear the cost of undergrounding the di.tn"bution system and property (oWIIUS 10 bear the cost of under­ grounding the services on tIIeir individual buildings. ProJect Jmtmgtioo: Undetgrounding is primarily proposed to continue the ongoing onc!erzrouIId cooversioo program and also because the """ meets !he California Public Utilities CommissUm ruI", which dicwe !he areas wbere PacBeU can underground their lines. Benefits of undergrounding include system betterment, higher reliability, reduced tn,,, trimming and improved aesthetiC<. 3 Innw1 Ind 5l1ppnn Ana1ym: • Environmental: • Operating, • Tdcc:ommunication.s: CaIegoricaJly CJ<empt under Section 15302 of CEQA. Rlx!uoed tree line cJeating requirements; slighdy increased underground system maintenance; reduced overhead sy.rem maintenance. None Comprehensive Ptan: Consistent with Urban Design, Traffl"""ys, Program 12: Undetgrounding of Utility Lines. Jilnancial Analysis: 1994-95 $2,200,000 1995-96 $75,000 1996-97 1997-98 1998-99 Soutce of Funding: Electric Fond. Pacific Bell a."d ~Ie TV pay approximately 40% of project construction costs. 157 C---__ kk_~_-·- " ~-" ::--. . , .' '.-""' . .. ------'-- UNDERGROUND CONTINUING ELECTRIC FUND PROJECT CHANNING/ADDISON A~ UNDERGROUND !lliQl Prola:t IlogrjpljO!l: This projecl will underground the existing overhead distribution system in die area bounded by Channing Av""",,. Cowper SIn:el. Addison Avenue and High Street. II wiII involve creating an uru!erground utilities district and perfonni rog the worle on • general _lit basi, under the provisions of Utility Rule I S, which requires the utilities to bear the COS! of undergrounding the distribution system and property owners 10 bear the cost of under­ gtCIUIICfu1g !he servi= on their individual buildings. Thil project will be ::ampleteO in 1994-95. 1'rpi«!t lwtlrl<lllkm: Undergrounding in this com merciallresidenlial area is proposed primarily becanse it meets Pacifu: Bell'. requirement foe llOOergrouOOing and would also permit tbe City ID ronliDue die ongoing undergroancI conversion program. In addition, since the 4KV system in this area is being phase<! out, llIKIergrounding will eliminate the D<ed to reinsulale the ovedIead lines to 12KV. Bendits of undergrounding incillde system betterment. higber ft:iiabiIity, noduced tree trimming, ar.d improved aesthetics. Immr; Inri Suppqrt Anajrsi5: • &viromnenta1: • Openting: • Telecommunications: Categorically .. empt under Section 15302 of CEQA. Utilities Depar!rru:nt-Eectric Utility. Reduced tree line clearing requirements; slightly increased underground system maintenance; nodllOed overbead System maintenance. None Cqmprehemjye Plan: Consistent with Urban Design, Trafficway._ Program 12: Undergrollnding of Utility Funds. finlnd,1 Analysis: 1994-95 $70,000 1995-96 1996-97 1997-98 19911-99 ." • o Soun:e of Funding: Eeclri<: Fund. Pacific Bell and cable TV pay approldmaJely 40% of 0 project construction ccsts. ISS " .. MISCEllANEOUS CONTINUING ELECTRIC FUND PROJECT L'TILITIES BILLING SYSTEM (93S7l ProIcc:I Dosg1!21!on: The Utilities Department relies heavily on a computeriZ<d billing system for the timcly and aecurate billi.~g of customer accounts. A Utilities Billing System (UBS) is also an important management inion-nation system for responding to customer inquiries iU well os sales revenue forecasting, rate anaI)"is, Iransfanner replacement, meter inventory, and Illll1H:roUS anaIytial studies. This proj"'t provides for the renovation and augmentation of the current ODS 10 include the purehase of new, more powerful hardware, the introduction of a UNIX operating system, and the CODvenion kl "ORACLE" software relational data base technology. l'n!!m JostjflCltjon: The old UBS consisted of approximatel y 200 software programs which evolved over a period of time. 1"lUs system was created 20 year. ago during an era of lEdmology wbidi by today', standards is obsolde. The many shoncomings of the old ODS resulted in inefficiencies and customer and staff dissatisfaction. Thi' project is justified because it iDaaJes cusromer satisfaruon, staff efficien,y, and because the old UBS has reached its !imitations . . ~ Impact Inc! Support Analysis.: • Environmental: • Opc:rating: • Tdccommunications: Comprebenme Plan: Fmandal Analysis: NO! a project under CEQA. Information ResoLlfOOS Department will require outside consulting services, whiclt are included in the financial analysis below. Not inconsistent ...,11b Plan. 1994-95 S155,000 1995-96 1~ 1997·98 1998-99 159 . , Sou:te of F • .mding: Enterprise Funds as shDwn below. • Electric w ..... au Wutewater Ro"'" ''''no TooaJ !>nol. 1_ 90,000 16,000 22.000 10,000 16.00Ci 1,000 lSS,OOO 160 . .. 1M. '3 ". ,J MISCElLANEOUS CONTINUING ELECTRIC FUND PROJECT COMMUN!CATIONS SYSTEMS IMPROYEMENTS (8931) Prpjes:t Qrscri2l!on: This project installs hardwire alld coaxial cable and related equipment .u DfICIeSSaI)' to provide. communications senices for traffic !ignal coordination, telephone links? COIlIjJUIet data ttansmission ar>d Supervisory Control and Data AC'Iuisition (SCADA) links. CommUl!ioa1ions """version in undergrounding projects is also included. PtpI .... CO!!!!!1!J!tn!5: In 1986, W Utilities Department installed. broadband coaxial-cable JooaI ....... network for data transmission. Currently, the system is used to link: traffic signal controllers to the computer at the Municipal Services Center (MSC) to provide traffic signal ClOOI"IIiJIation; tlte telepltone system at the Civic ecoter to the MSC; a computer at the Civic eemz.. 10 II:mlinaIs in the MSC; and electric substations to the SCADA master station. The broodbond S)'!Iem is the _k ronnecting the major Local Area Networks (LANs) at the MSC, Wm.-QuaIiIy Control Plant ar>d City Hall into a Wide Area Network (W ,..N). This WAN ... iIl enbanee communication between City facilities. This .ysaem will continue 10 expand to link additio,.aI data ac<juisitian equipment installed at the deeIric subswions 10 the ma.sIQ SCADA computer at the MSC and to link additional traffic sigDa! COIlIrOlItn 10 the coordination system. This project also includes work in !'Cheduled lIIIdc:rgrotmd cfistric!s. P'rRicd JgBqte;ation: Installation of communication li!les are essential for ,,"e provision of City oervices. The communications Systems operated by the Utilities are becoming more important 10 the City. Additional fa...--ilities are being connected. Improvements to the system 10 enhanoe n:li3biIity are needed. lmDact and Supocr1 Analysis: • Environmental: • 0pez2ting: • Telecommunications: Compr]!hensjve P1un~ flnapclR! Analysis: Categorically .)tempt under Section 15302 of CEQA. Utilities Dep"rtment-Elfdric Utility. No additional resources ""Iuired . Provides more COIlS; Stent suppon to City telepltone links and wide-area network:. Consistent with Pla.'1. 1994-95 S50,OOO 1995-96 $52,000 161 1996-97 554,000 1997-98 S56,OOO • 1998-99 558,000 Source of Punding: Electric Pund MISCEILAIVEOUS CONTINUING ELECTRIC FUND PROJECT STREET LIGHT SYSTEM CONVERSION 18929) Prafed Dnnjption: This project oonvens all street lights to high pressure sodium. The pIOjoc:t was initialed in 1985-86. Pra!ect Cmpponen1s: The """venion project i, 75'10 complete. The remaining lightS, opproximately 1800, n:quUe installation of new ronduits and wire. These old incandeswlt lights are aIC'..nected by a sir.gle~ direct-buried wire in sene5 fashion, much like Christmas lights. To """"on _ lighls n:quim< installation of conduit and new wireo. Thi, has proven 10 be much more expensive than originally anticipated in 1985-86. An additional SI,OOO.OOO is necessary 10 instaIIlbc oonduils. Typioal condllls oo,t between 51,000 10 53,000 per street light. A Stlldy .... JI be c:onducteclto delenrJne the least expensive melhod to install the conduits. l'tp!ecf JUSllk:atioq: Existing din:ct-buried, high-voltage series circuits need to be replac<d _ DeW circuits in conduit to impru\"e safety and reduce maintenance costs. Convenion 10 hi&b pressure sodium V>pOr lighting will reduce energy costs to the City. lmP'rt Ind Support Analysis: • Envitoruncntal: • Ope:ating: • Telo::ommunications: Cgppn:lten.sjve Plan: Fjnapcial !.nu1Ws: C3fqorically exempt under Section 15302 of CEQA. Utilities Department-Electrio UllliE}'. Will reduce maintenance and energy costs. None Consistent wi'" Plan. 1994-95 5690,000 1995-% 5500,000 1996-97 1997-98 1998-99 So\m::e of Funding: Ele<;mo Fund 163 MISCEllANEOUS CONTINUING/REVISED ELECI'RlC FUND PROJECT TRAme STGNALS PPGR4DE C8930l , . ...., . Prpi"'" Dr:;g1pt!nD: This projo:t upgrades wrong traffic signals to incn:ase safely and rdiability, and 10 meet current standards. The need foe replacing obsolete in ter.section COI1IrolIers and the master control unit will be investigated. Prol"", Components' Sampling detecton, signal heads, poles, signal COlttroliers, alld related equipm<nt will be installed. Because the existing ""ffic signal controller> are no longer made, a study of the entire traffic signal system will be cooducted to determine a long-term pIon for replacing existing controllers. This plan will identify future repJacement costs. PrpIe<t JgstIOratlpp, Upgrades to existing equipment will improve ttaffic flow and safely wiIbin the City, and provide • recluction in accidents, travel time, energy ror.sumption and air poIIulioo. ""rert Ipd Sppport Analysis: • J:!m.hWDlbltal: . ~: Categorical!y exempt under Section IB01 of CEQA . Utilities Department-Electric Utility. Slight increase in maintenanoe expense. Will requite int=onnection with broadband or fiber optic system. fgrmrbmdye Plan: Consistent with Transportation Policy Program I7 -Make operational IIId mlenec!ion improvements 10 ease tIaffic flow or. majO!' streets; and with Program 37, bicycle and pedestriar. safety. 1994-95 $160,000 Upgrade existing ,ignaIs $60,000 1995-96 1996-97 1997-98 1998-99 $63,000 566,000 $70,000 $74,000 Soarce of Funding: Electric Fund " Feasibility study $100.000 164 ~<»,,:f: ~~: .J o • • • • WATER FUND Water Fund projects provide funds for water .services to C1.lstomers includir.g reservoir improvements and main, service, and meter replacements. List gf Pmis;ct:;: NewPrvjeds Foothill> Park Water Replacement Study (95 12) . . . . . • . . . . . . . • . . . . . . . . • . . 167 Coutlnulng ProJe<ts Water Sysrem E<tensions (SOI3) .......... . ...............•... 168 &!vice and Hydrant Repiacem""ts (SOI4) ..... . .•.........•......• 169 Water Meters (8015) ......•..........................•..•.... 170 Water Main Replacements (8016) . • . • . . . . . . . . . . .......•. , ......•. 171 Water Reservoir lmprovemer:ts (8749) ...•. , ..................•..... 172 165 TIllS PAGE INTENTIONALLY LEFI'BLANK 166 • ~ NEW WATF..R FUND PROJECT rooTIW I 5 PARK W ATEE REPLACEMENT (9<12) Prolm Da<:rjutjon: This project may replace 2.l1 Helch H~hy waler us<>! in Foothills Park in well water. Project: Comoonents: The project will be divided into two pans: I. A feasibility study and economic a.ulys;,; 2. Imp!em..,ti.!ion (ie" appropriate). PrpIm JusljrlC:llljon: Approximately 35,000,000 gallons (S132,000) of City Retch Hetchy WIder is used in Foothills Park annually. Foothills Park's y<arly water oo.t. may be decmlsed ifwelJ water is substituted for Retch Hotchy warer. )flbi. project proves feasible, well water would be available y<ar round for Bcronda LaIce. During the last drougbt, Hetch Hetcby water wu DDt available. 'The resulting low water conditions in the lake resul ted in a severe decrea.se in fJAhing and booting opporrunities for park visitors, possibly affecting park atu:ndanoe. Low wale< also permitted pest plants, including cattBils and pond weed, to increa!e in Boronda UW:. JnuwrS and Support AnaTni$: • Environmental: An environmental assessment 'i.'ill be done as pa..-'1 of the design of the proj .. :t. • Operating: The project could result in lower annual water and maintenance costs for the Park. a Telecommunic:a.tions.: None Compreh<nsive Plan: Consistent with Parks and Environmental Resource sections of the Plan. Flnapda! Analysis: 1994-95 $30,000 Cost for Feasibility Study 1995-96 TBD By Feasibility Study 1996-97 1997-98 1998-99 Source of Funding: Waler Fond 167 .-'''' .. CONTINUING WATER FUND PROJECT WATER SXWM EXTENSIONS (8013) Proltd Pngjptipn: System exlensions are required 10 provide service to new customers and 10 satisfy incrca.sed demands of existing 1.."Ust!lmen. These improvements include new mains, valves, domestic services (and moters on unraded existiog "",;ces), fire services, and hydrants. Pmied IWitif'x;ation: Changes in land use, the development of unimproved properties and the ~opment of existing sites require expenditures by th. Wale' Utility 10 meet the needs of ~. While the new customer growth rate remains stahle, requests fOl" larger domestic and fire services continue. This is an ongoing project. Igmed Ind Support AMJy:;k~ • Eavironmenbd: Categorically exempt under Section 15301 of CEQA. • Operating: Utilities Department·Water Utility: Sligh, increase in water system maintenance cffset by increased revep,ue. • Telec:ommunications: None CgppnJremiye Plan: Consistent with UncI Use and ""vimnmental Resource sections of the Plan. 1994-95 $139,000 1995·96 $146,000 1996-97 $153,000 1997·98 $161,000 1998-99 $169,000 Sotm:e of Funding: Waler Fund with approximaleiy 75% ,eimbursemeo, from customers. 16S • o CONTINUING WATER FUND PROJECT SERVICE AND HYDRANT REPLACP.fiNrS.~ "' . ....... .1 Prall¥« PorrigtigR: This ongoing project involves replacing old deteriorated gaIvar-ized service !ina and lead goosenecks, replacement of fire hydrant assemblies as required by the Fire Ilepllrtment flow testing results, upgrading of fire hydrants on main replaoement projects, and replacing existing deleriorated copper water services. Upgrading hydrants is censistent wit.~ Fire protecIloo policies. Pndcrt Cgmppnrnts: Replacements occur when c.ustomers experience an abnormal pressure drop due to corroded servire line> or when an area of the City cbange., from single-family residential 10 multi-family dwellings, commercial or industria!. PlpIa; Jpstlf!c:at!og: The level of lead found in some United States water supplies with lead _ lines bas ",ceec!ed ptlblic health limits. Palo Alto ""ppIies have no( exa:cded these -. since November 1993. Hydrant replacements and additions are requested by the Fire IIqIartmerlt to upgnide water distribution syotem flows and firefighting capabilities. This is an angoing project. :) Jqmesj Inri Syppon Analnb;: ~ "";-.:. • Environmental: • Oper:ating: CalegorkaIly •• emp! under Section 15301 of CEQA. Utilities Depan""",t-Waler Utility. No additional resources required; maintenan<:e and operaticcs unaffected. • Telecommunications: Nace Consistent with Plan. EQlndal Analysis: 1994-95 $63,000 1995·96 $66,000 1996-91 $69,000 1997-98 $72,000 1998-99 $76,000 Source of Funding: Water Fund 169 ."'1 .... i' .. ;;' .: .< >iti: CON17NCJlNG WATER FUND PROJECf WATER METERS (SOl 51 Pndcd Dacrlgtlo0: This: ongoing. project includes purchasing meters for new ClJStometa. upgndina _ for current customers and replacing obsolete meters that are nO longer IrpOiraoIc. nu. pro'p:t repllI<:es meters on • ten year replacement cycle. Pruled JustlI'iClfjQD: To maintain me!er accuracy, reliability. and to !!tock meter equipment and ~t parts, an ongoing meter n:pairlreplocement program is requir<d. The 1994·95 replacemcou cy<:Ie is 10 years. The increased t're<!,ueru:y of meter replacement will enhance infonnatioo on system water volume, align the meter replacement cycle with current recommendations of the American Water Works A!SOCiation~ and enS~Jfe the com:ct revenues for !be Waicr Utility. Additional meters will be purchased for new and replacement irrigatioo avic:a. The project replaces obsolete equipment and increases measurillg accuracy. This i. an ongoing project. Iguact and Sgnporl AgaJ,.;m= • Environmental: Categorically ... mpl under Section 15301 of CEQA. • OpetaIing: Utilities Department·W.ter Utility. No addition.a! resuum:s requir<d; maintenance and generations unaffectOO. • Tdeeomm~oos; None Cmmn:IJemjye Pian: Con:!isterJt with Plan. FiDlntiad Analysis: 1994·95 $96,000 1995·96 $101,000 I9%-97 $106,000 1997·98 Slll,OOO 1998-99 $116,000 Source of Fundi",: Water Fund 170 • o o ~ " CONTINUING WATER FUND PROJECT WilIER MAIN RFPLACEMENTS fl\Q16l Pmlm Description: As the tiistnDution system ages, it becomes necessary to replace specific WISeI' maiDs and appurtenances. Some mains are inadequate in size 10 supply required flows and presswes for fire protection; others are subject to recurring break:5 due to construction material5 IDd C<In'ClSion. Staff b2s identified maill5 tIla! are undersized, corroded and subject 10 breaks; IDd b2s developed a plan 10 acceIerall: the replacement of these critical elements of the water distriNJtion syuem inft3structure. The main '"Placements identified under this proje<:1 are coordinated with the Public Works Department's Five-Year Paving Plan on the GIS/GDS system. Emlecl ,lm!U""",lion: This proj"'1 improves system flows and pressures for domestic and fire pmIieaioII uses. New data iruIitates • need f", fu:iber acceleration of the water main replacemellt program. Approximately 78 miles DC the total 223 miles of the City'S water mains .,., in need of rep1aeemenl or rehabilitation. The rate of main replacement bas ""'" increased, _g in 1993-94, 10. rate of three mil .. per year. In additioo, al', Ol'.alysis of cost eff~ve syuem improvements was initiated in 1993-94. The project will1ake up 10 25 years; priotity will be given to the most def~ve portions of IiI< system. This i. an ongoing project to replace obooIcIe wale< clisbibutioo system infrastructure. Imptrt and Support Analysis: • Environmental: Categorically exempt under Section 15301 of CEQA. • ()penIIing: • Telecommunications: Utilities Department-Water Ublity. No additional resowres required. None Consistent with Plan. DpapciaJ Analysis: 1994-95 $1,800,000 1995-96 $1,890,000 19%-97 $1,990,000 1997-98 $2,089,000 1998-99 $2,194,000 Sou= of Funding: Water Fund 171 ''''':-, ----' CONTINUING WATER FUND PROJECT WATER RESERVOIR IMPROVEMENTS fl!749l ProJect De:ig1pt!9!!: This project include! inspection of the following resefVOirs; Cone Mad<n, 1Ioronda, and Montebello. 1'h. <aervoirs are chocked for corrosion and seismic capability. Necessary repairs, rehabilitation, and improvements 10 steel reseIvoirs, concrete ..-voiIo and site fadlities will be pert'ormed. PntIc:rt JgscffkatlQD: Consultant examinatioo of corrosion and strUCtural (seismic) condition of1lle ~ indicaJes L'>c need for repair and improvements. Coating de:erioration over 1lIe past 2S years, updated codes. and Health Department ~uJ ation. require =ti"g, cathodic ptotection systems and strUCtw'3l improvements in the next few years.. Due 10 changes in llqmtmc::r>t of Healtb Iqulalioru for coatings used in wale! reservoirs, the interiorfexl<:rio< c:ooIings will be n:pIaced as neces.wy. The work is prioritized in ac<:ordance with apparmt -. In 1996-97, th= project will end and !be reservoir> will rerum 10 • maintenance program. Igloo and Svpnort Analni$: • EnYironmen1lll: • Operating: • Teb::ommunkations: JlnaD(iQJ Anal. Categoric.aIly exempt under' Section 15301 of CEQA. Utilities Department-Water Utility. No additional resoun:es ""luired. Comistent with Plan. 1994-95 $160,000 Cone Madera 1995-96 $168,000 Boronda 1996-97 $176,000 Monte Bello 1997-98 1998-99 Soun:e of Funding: Water Fund 172 • • • • GAS FUND Gas Fund projects are those necessary to provide gas services to c.ustomers including main service, and meter repW:ements. Us! of Pmiects: CGnI1nn1nl Projects Gas System Exl<mions (SOl?) .•.•....•..........•............•.. 175 Gas Main Repla=nents (S018) .•.. . . . . . . . . . . . . • . . . . • . . . . . . . . . . . . . 176 Gas Me:ers and Regulators (8019) ., ........................•..•... i77 Compressed Nalutal Gas Vehicle Convernon (9230) . . . . . • . . . . . . . . . . . .. 178-179 173 '.--. y .I • TIDS PAGE INTENTIONALLY LEFT BLANK \14 -' ;' • CONTINUING GAS FUND PROJECT GAS SYSTEM EXTENS[ONS (8017) Proh:rl J\rs:rlptipn: This project extends the gas distribution system to provide servke to new' customen and augment service 10 CUSlomors wiL~ increased demand. These improvements include !leW mains, valves, services and appunenances. PntIC(t IUltir1(2tiDn~ The cost of providing system extensions is partially financed by ClOIIII<:Ction charges pairl by the customer. This i. an on-~oing proj oct. ImpIcf Iud Sgpport Analysis: • EavitonmentaI: • Opemting: • TelecomJIllmicalion" Categorically exempt under Section 15302 of CEQA. Utilities llepartm::nt-Gas Utility. N..:liglble impact. None Consistent wilh Plan. FINny"! Analysis: 1994-95 $79,000 1995-96 $83,000 1996-97 $87,000 1997-98 591,000 1993-99 596,000 &l-.m:e of Funding: Gas Fund with appro,imately 75% reimbursed by cuslOmers. ) ---' - " . CONl1NUING GAS FUND PROJECT GAS MAIN REPLACEMENTS /811IS) PrRI!!d DEss:r!ptlon: This project replaces leaking. inad<:<jLZalely stud and structurally deficient existing gas mains and services. Tho main repia<e"""," identified under this project .re coordinated with the Public Works Dopartmenl', Five-Year Paving Plan. Plpl .... Jostlf!eotlon: M.lins must be replllad wl1<:n leaks present a pc>tential safely hazard, or wben leak repair is no looser COSl-dfective. Calitodic protection of sle<:l mains is being mainlained, but bas decreasing effectiveness. The main replacement progr.m was increased from 7,000 to 20,000 linear feet per Y""T in 1992-93. certain plastic pipe materials, fouod to be lIirucIuraIly delidalt as wen as producing. high JeaJcage rate, will be replaced ova a 36-year period starting in 1992-93. Detmcrating disttibution system steel mains will be replaced. 'Ibis project is mandatory due to the need to repLace aging infrastructure and 10 comply with DqJartrnenI of Tnlnspomtion regulations. This is an ongoing project Jpmert III!d Support Analysis: • Environmemal: Categorically exempt under Section 15302 of CEQA. • Operating: • Tderommunlcaliom: Utilities Department-Gas U~lity. No additional resources required. None Cgmpr'Chen9re Plan: Consistenl with Plan. FlMncla1 Apalysk: 1994-95 52,300,000 1995-96 $2,400,000 1996-97 $2,520,000 1997-98 $2,646,000 1998-99 $2,m,ooo Soma: of Funding: Gas Fund 176 • o o .J .:-...,;.:.:....--~-------------.--.~-- CON11NUING GAS FUND PROJECT GAS METERS AND REGULATOR!' (8019) PmJu; ]')r:cqjpliQD: 'I"h.6 projecl instaJls new meters and regula!ors to serve new customers, .. r<pIa<:e existing meIen and regulaoors whell required. Regulators "'ith relief valves will be pl'OYided. Modificalions and replacements wiD be made at the rate of about 2,200 meter and tqulator sc:t.s per year. New electronic pressure and !Cmperatllre compensating meters will be instaIlcd at large deIlW1d customer sites in order to increase measurement .accuracy and allow monitoring of mll time gas flow consumption. New flow regulators, COIltrols and sit:: improvements meeting Federal Department of Transportation regulations wiD be installed at dm:e gas receiving stations to improve site safety and gas flow control. Pnrica: J!15liCgtjon: R..~ meters and regulators are required to safely serve new customers ODd also to r<pIa<:e ur.i!s that cannoI be economically repaired. The J'UIJXl5e of the meter t<pIacemcut progmn is to reduce revenue loss from under-registering gas meters in the field. I! is anticipated tbat by maintaining the large meter (675 CFH and larger) excru..oge cycle at ~y 10 y..,. and residential meters at 17 years, the annual revenue loss from under­ registt:ring meIlm wiD be significantly reduced. This is an on-going projocl Jmmrf ,ud Support Analysis: • Eavirorunenta1: Categorically exempt under Section 15302 of CF.QA. • Operating: • Telecommunications: Utilities Department-Gas Utility. No additional resources required. None Curpprebensire Plan: Consistent with Plan. FlpanrloJ Analnis: 1994-95 $3()4,OOO 1995-96 $250,000 1~97 $263,000 1997-98 $276,000 1998-99 $290,000 Source of Funding: Gas Fund 177 """"':-._-----.'. CO!llTIl'I'UINGIREVISED GAS FUND PROJECT COMPRE5SED NATURAl. GA.S VEHICLE CONVERSION (92301 ProJect l)egrjntjpn: This project converts one third of the light duty vehicle fleet from psoIioe ~ ID <Xlmpressed .,tun.! gas (CNG) It includes all usoclated infraslnlct\u< imptovemonts. The first fueling stJUion was installed at the Municipal Services Center (MSC) in 1991-92. A consu!laIlt is currently working on a proposal to modify the MSC Master Plan. The modi.lkatioos may include. fueling station outside of the MSC security fence which WOtlld allow public acoess to tbe proposed CNG fuel1"g site. 1f the MSC Master Plan m<X1ificatiOlls for .. public fueling station are nO! approved by the City, the CNG ft1eling >tation will be located ",,-site and be foe City use ooIy. This project .. ill convert approximat.ely 50 vehicles per year 10 opezate on CNG 1 with a total of 104 vehicles planned for conversion. Pm!ec! JIISjllgtjgn: The project will improve aIr quality by substi.uting natural gas as an aUernali,.., lIansportalicm iud. Federal and State legislation associated with amendments to the Clan Air Act recognize nalUr.!l gas as a means to lower emission,. The Sooth Caul Air Quality Management District has adopted nogulations that a percentage 0' fleets ccovert 10 clean fuels. The Bay Area Air Quality Management District is preparing. proposal that will include fleet emissioo control measures. This proposal, if accepted, will be developed in 1995 and iJItplemented in 1996. 1bc ps utilities must take the initiative to act as facilitators to demonstraTe the benefits of eNG &lid provide the necessary inftutt\1<:!\\te Ie promote incn:ased use of Compn:ssed Natun.! "as as a clean burning vehicle fuel. The use e>f CNG "'ill become more important to aJ111eet vehiole opcraIDrs in Palo AlIO. The CNG statier. program may be expanded in the fulUno to inolede industrial customers in l'lIlo Alto. CNG i3 an alternative fuel ,,"lat can ffit'et future emis.sion standards while saving approximately 30~ of fuel cos:s wben <Xlmpared to gasoline (per equivalent gallon). Impact and Support Anah1iioi: • Environmental: A negative declaration was issued for tile project by the Fire Department on May 7, 1993. • Operating: Utilities Department-Gas Utility. Training Funds will be added 10 1994-95 project budget to :rain/certify eight mechanic, to n:pair CNG fueled \'ehicles. • Telecommunications: None Starting witb 1994-95, the P1..blie Works Equipment Maintenance Budget will include SIO,OOO :fur estirn.atec5, annualized fueling station maintenance COStS. 178 CQIIlIH"CheMf?e Plan: CO!lSistent with Pian. FlIIIndaI Anll.., 1994-95 $275,000 (Co"~ .. ot Conversion of 50 vehicles a.od High PYesstlre Gas 1995-96 1996-97 1997-98 199&-99 Sowoe of Funding: Gas Fund Receivil,g Station at MSC) and an odditional S20,OOO is for aaining eight mechanics 10 be certifiet.l in eNG vehicle repain 179 " ' ,l I',,! '\ f i \ I: "r c c '. ~ J ; ....-"'";" WASTEWATER FUND Includes both wastewater treatment activities provided by the: Water Quality Control Plant and the war~Ler coHectiol1 activities which provide sewage collo.::ticn system rr.a.intenancc and upgrading. Lia.l!f Projects: N .... Prujects Aeratioo Tank Inlet Structure (9513) ................................ 183 Secondary Clarifier Modificatioos (9514) . . . . . . . . . . . . . . . . . . . . . . . . . . .. 184 Ccmtiuuing Projects Wastewater Collection System Exlensions (8020) ........................ 185 Wastewaicr Collection System RehJbilitationlAugmentation (9173) .......... 186-187 WalU Quality Control Plant Expansion (8926) ...•.................. ' 188·189 Plant Equipment Replacement (8021) .....•....•...•.•.............. 190 S~ Flow Metering Replacement (8022) ..•..........•.............. 191 Effiuent Line Modifications (9503) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192 Interceptor Maintenance, Cleaning and Repair (9504) ................•.•.. 193 Incinerator Stack Gas Particulate Removal (9505) . . • . . . . . . . . . . . • . . . . . . . . . 194 > i , . , . , .' r I I . ""-----"-'-·-__ "' .. _ ..... c nns PAGE INTENTIONALLY LEFT BLANK 182 • o NEW WASTEWATER FUND PROJECf AERATION TANK I!\HT STRUCTURE (95!31 Me:<:! ~: This project will double the size of the existing aeratior, tank inlet diversion box and add control valves and baffles. The diversion box allows for the rerouting of wa.stewatcr to rontrol the amount of wastewater fIov.ring to each aeration basin. Pmject Compomnt,: In 1994-95,. the existing diversion box will be expanded to r.nhance the distttlJution of activated sl'lidge and primary effluent into the four aeratIon basins. Proiect Instjrgtjon: This project will improve !he reliability and flexibility of the aeration system and improve the efficiency of copper metal remova1 at the plant. 1pmMr:t and Supopd Anplyds: • En..-ironmenta1: • Operating: Categorically exempt under Section 15302 of CEQA. Improve oper"'.ttionaI flexibility and reliability. • Tdec:ommunications: No impact. J Cgnpnllepsiyc PlaO! Consistent with Environmental Resource sections of the Plan. flnagcial Aoolysk: 1994-95 1995-96 1996-97 1997-98 1998-99 $100,000 Source of Funding: Wastewater Fund 183 ! ! NEW WASTEWATER FUND PROJECT SECONDARY CLARlF!ER MQDlflCATIQNS (9514) Prp1ed D=rdm'gn: This project v.i1l modify we exiwng clarifiers, which WeT: designed in 1m, to provide improved solids capture, scum removal, and chemical a<lditions IIlaI w'Ji inc:reaso meIal """ovaJ. To dcIennine the appropriate clarifier modifications 1!tCded, a number of modj!icarinns for in=sed copper removal will be invts1igated and tested in 1993·94. ptoin;t Cgnagnw:nts: Project components include desigroing and constructing baftles. which COO1rol !be flow of wastewatu, ana a chemical feed system to enhance the set~ ing and capture of solids in the seoondary clarifiers. Pmk:ct lmtfrgtion: Modifications !O the four secondary clarifiers will improve treatment and mcta1 temOYaI. Tbe additional meta1 removal will belp in meeting requiml copper discharge limils eoIablished by the RegioaaI Water Quality Control Boord. lrmwrt lad Support AnalYSts! • Environmental: • Ope:a!ing: • TeIetommunialtions: CatqoricaIlY Cl<empt under S<cIion 15302 of CEQA. Wastewater Fund. No additional ",,"uroes required. NOlle Cgpmpitcmfyc PIa!l: Consistent with Environmental Resource sections of the Plan. FhIIndcl AnaJysjs: 1994-95 i995·96 1996-97 1997·98 1998-99 $200,000 noo,ooo TBD Soun:e of Funding: Wastew= Fund 184 \. '~~t,J <:) o o ._------ CONTINUING WASTEWATER FUND PROJECf WASTEWATER COl J,EOJON SYSn;,'\! EXTENSIONS C!!020l Protect Deserjption: This proj cct provides for the insta..l.la.tion of sewer lateral connex.iions and appul1aWlces for new or existing customers off eJlisting mains or extensions or mains. Prqted lostirgtigp: It is necessary to provide sewer connections to senle new custorners and ID !eSpOI'.d to changes in sewer requirements due 10 redevelopment. The cost of such syS1ern exfalsioru is pa.'1ially fina.,oed by connection charges p2id by the customer. Th;, is an ongoing project. 1mpnd Ind Support AnalYSt!: Categori<:ally exempt under Section 15302 of CEQA. Utilities Deportment-Was1ewater Utility. No additional IeSOurces required; minJmal increase in maintenance . • Tclecomm1il1ications: None Cgnpn:bcnsjrc Plan: Consistent with La."\d Use Plan. FinandaJ AMJnJ:;: 1994-95 $28,000 1995C96 $29,000 19%-97 $30,500 1997-98 $32,000 SI998-99 $34,000 Sou= of Funding: Wastewater Fund "'th awrol<imately 75 % reimbursement by customers. 185 --'--'----_ .. '- CONTINUING WASTEWATER FUND PROJECT WASTEWATER WLLECTION SYSn:.",,: REHi\BILITATIQN/AUG!I1L..NT,o,IION !2ill.l Proim De:sqjpl jon: This project completes the remaining high priority rehabilitation work which reduces inflow of !'3.infall and ground water into the collection system. ]n addition, specified mains and trunk sewers with capacity deficiencies 10 handle eusting and futu'" wastewater flows ",iiI be enlarge<!. Contrac, cleaning and vidootaping of large diIDneter sewer trunks and main, appunenances will be conducted. 1be rebabilita1ion, augmentation a'ld main repla~menu identified under this project are coord.i.na.ted with the Public Works Department's Five-Year Paving Plan. Parii!d Jusijrgtion: Since the heavy rainfall in the winters of 1982 and 1983, studies bave beeu perfonned anaJyzi.,g tile extenl and sources of infiow(mfiltratiOll in'o !he W35IeW2lcr system. Initial rehabiliration w.xk was done "nder ~mited bond funding, ConsidCIable work .rcnJ2 il'l.S in order to complete the most cost--effective rehabilitation of the waste .. "ater-collection system. The last colIection system capacity study was performed in 1965. System augmentation done following !bat study was accomplished and some facilities are cn"" again n .... -;"g their useful capacity. A coDfClion system Ma.!'er Plan Study, completed in 1989, indicrue, certain facilities are in need of enlargemenl 10 handle growth and peak flows. This study incorporated findings from !he pl<'vious inflowlinfiltration sl\l(fle5, The recommended combined project will """""",llsh !he work over a 22 year period, starting in 1994-95, and will target the highest priority work first. Impad and Supoo." AJYllm: • Environmenral: • Opernting: • Telecommunications: CQlDriemive Plan: financial Analysis: Categorically exemp' under Sectioo 15301 of CEQA. Utilities. Depa."'1ment-Wastewater Utility. No additional resources required. None Consis.tent wlth PWt. 1994-95 $4,400,000 1995-96 $4,620,000 186 , :in II. o o f l , r I I I [ r I "' r ! . --.l. ''''.'';~p~ " , , ...,. , 'to. --< -'- 1996-97 $4,850,000 • 1997-98 $5,092,000 1998-99 55,347,000 Soma: of Funding: Wastewater Fund 187 \ CONTINUING/REVISED WASTEWATER FUl'.'D WATER OUALm' CONTROL PlANT EXPrl,NSION (89~ l'nllectPescrlpljon: Phase I of the Fl:mt capacity expansion was oompleted in January 1989. Completion of Phase I increased dry we.atMr capacity to 38 milli~n gallons per day and wet weather capacity to 80 million gallons per day. This was accomplished through by·pa.<.Sing the dual media filters and blending secondary emuent. In 1996-97, an C\'1Iluation will De conducte<i 10 determine bow the Water Quality Control Plant functions in we! weather. This evaluation may p-reclude the need for adding additional pumping faeil ilies end filters which we~ anticipated in Phase fl. Phase II of the capacity expansion would require building new influent pumping facilitieo and additional dual media filters .., requi~ by the California Regional Wa!cr Quality Cotrtrol Board. Project eomponmts: This project will evaluate the need for building additional influent pumping fiIciIities and filters. The previoo. drooght hin~ the ability to evaluate the water" qualily control operation since plan. water flow was so low. Should the evaluation result in the need for additional infI uent pumping facilities and filters, pte-design work will Degin in 1997·98. l'n!I!d JustHk.aljog: The California Regional Water Quality Control Board (San FIll/lcisco Rqion) agteed with the COIlcepl of blendu.g secoodary emuent wi~~ fi.!lering effluent for flows above 45 million gallons per day. If effluent limits are not met during this operation, however, additional filter. and j>l!mping facilities will De requ;~ under Phase ll. Impart .Itd SlIppm1 Ana 1m: • Environmental; • Operating: Envi..ronmenlal analysis was completed at the ti me of design review Phase I; additional analysis will need to be conducted for Phase 11 . Wa.s+.ewater FU:1d: NCI additional resources required . .. Telocommunications.: None CpmQi dUJtsi't Plan: Flpsptjal Anatnis: J994-95 1995·96 1996-97 1997·98 ConSrsteilt with Plan. $180,000 TBD 188 np WU!cwaler F "nd .. @) 189 CONTINCilNG WASTEWATER FUND PROJECT rIM. mUIPMENT REPLACEMENT (SOl\) I'ntIC<! D!:igigtiog: AJ neressary, this project replaces PWlI "Iuipment in order to maintain _1 reliability. Pmltd JI!Itl!!grtjgp: Original ec;uipment requires periodic replacement in order to maintain reliability. Environmental Protection A:ency regulations f"I uire equipment replacement funds 10 insure odequate treaU\1ent reliability and equi pmenl mainteruulce. ImpIq lod Support Analysis: • En¥iIcxtmmtal: • Openting: • Tclecommunicatioos: Compnbcmlye Plan: Categorica!ly exempt under Section 15301 of CEQA. Wutewaler FlUId: No additioruti r=urces required, Nooe Consistent with PWl. 1994-95 $200,000 RepJa<:ement of aeration tank blower 1995-96 $200,000 Replacement of odor control scrubbers al fixed film reactor toW"..fS 1996-97 $330,000 S=ulary clarifier equipment 1991-98 $200,000 Motoc replacement in pumping PWlI 1998-99 $200,000 Return activated sludge pump and system Soma: of Fur.ding: Wastewater Fuod 190 COfl,71NUING WASTEWATER FUND PR01ECf SYSTEM FLOW METERING REPLACEMENT fROGRAM !SQ22) Pr(\1;:!:t Daq!lltjog: 1nis project will replace s)'st.em flow meters based on the Wa.!teWater Fund's rqJhw:cment schedule. Prcaied 199Kiqtiog: Magnetic flow meters have a life of five years. Af rlle end of five years, ldiability of !be meters is suspect. Scheduled periedic replacement is required 10 ensure reIlability and """",,,y. Impart and Soppori AnalYSis: • &viroame,nal: • 0pcraIing: • Telceommunications: Categorically exempt under S<ction 15301 of CEQA. Wastewater Fund: No additional resource. required. None Ct.". die." Plan: Consistent with Plan. fjnIncial AD".: 1994-95 $30,000 1995-96 $30,000 1996-97 $30,000 1997-98 530,000 1998-99 530,000 Soma: of Funding: Wastewater Fund 191 CONTINVlNGIREVISED WASTEWATER FUND PROJECT EFFLUENT LU."E MODmCATIONS (9503) Frp!!id Pepz!ptlon: The existing effluent line is • 54· diameter combination of galvanized sled pipe and zdnforced concteIe. The size of this tine limits the plant's discharge flow rate 10 80 million gaIlons per day. The discharge point of the current pipe creates foam at low tide. This pmjoct modifies the effluent line to manage present plan, flow requirements and adds • special foam-limiting discharge ""tie, to the pipe. Ptgi!!d Cil!!!I!O!IefIts: In 1997-98, the effluent line will be modified '0 increase flow capacily and 10 add • speciaI foam-limiting discharge outlet to the end pipe. Ptgi!id Jvstif"JC:3tIon: The capacily timillltioo caused by the existing effluent line binder"s the JeIiability of the Treatment PJa.,t 10 control flows during high flow and high tide conditions. The S<>-fooI pJvanized Cil<I JeCtion of the line will read! the end of its useful life in 1997-98 and roquires replacement. In additiOll, the DISCharge point of the line is creating large quantities of foam DCal' the Bayland.s nature IraiI and the foam is observable 10 all Baylands users. Jmppct apd Suppot1 AnaJysb: • Environmental: • Operating: An etI\riml mental assessment wiG be required at the time of deslgn of theproj= • Tolecommunicatioo,: Wastewater Fund: No additional resources required. None Comprtbmsive Plan: Consistent with Environmental Resource ~tions of the PIan. FJDlucla1 Analysis: 1994-95 1995-96 1996-97 1997-98 1998-99 $150,000 Source of Funding: Wastewater Fund 192 CONTINUING WASTEWATER FUND PROIECf INTERCEPTOR MAUITENANCE. CLE"NJNG AND REPAIR (95041 Pnried !lrsrrI!ltIQ\\' The large 72" intercq>'.or sewer line thai carries over half tile total flow 10 the W= Qualily Treatmcnl Plant from Mountain View. Lo. Altos, and parts of Palo Alto. has dirt and sand bui1<fulg up in the line. Continued build "P rould restrict the flow to Ille plant, !O this project wi1I use a sewer maintenance contractcr to clean and repair the pipeline. ProIr4 Justtrqtion: An inspection in 1992 revealed sand and dirt bUlld-.p which can impair the capocily of the sewer line. Restricted capacity oould causc • ba<k-up in Ille streets or in tile Ba~ Heavy rains in the winter could a1,0 increase Ille amount of build-Up. Tmeet and Support Anahvv • Emoirorunental: Categorically exempt under Section 15301 of CEQA. • ()pe:luing: Cleaning and repair operations will bave to be oonducted during low flow conditions. • Teleccmmunications: None $ 0" ..... 1151\1' Plan: Consistent with Plan. 1994-gs $150,000 1995-96 $200,000 199&-97 1997-98 1998-99 Source of Punding: WasIeW2ter Pund 193 -.-..,.". : ." " :t' CONTINUING WASTEWATER FUND PROJECT INCINERATOR STACK GAS PARTICULATE REMOVAL !95OSl Pr!!!@ Ilrcrr1r!lIOD: EPA Title S03 Sludge Regulations were rel<ased February. 1993, requiring !hat me ~ contmt of incinerato< stack gases be monitored, Ii mited and cootmIIed. The City bas to insIaIl higher efficier.cy scrubbers andIor electrostatic prtcipiwor. 10 .-me projected limits. PmJ"., Cpmpqpcnts: Stack gas testing, engineering. design, fabrication and installation of new ICr1Ibber eqttipment. One incinerator w'JI be modified in 1994-95 and one will be modified in 199.5-96. I'm! .... 1as!lrqtlon: Required by Federal regula nons. • Eovironmental: • Opo:mting: can,gorically exempt under Section 15301 of CEQA. Increased electrical power consumption • Td«:ommunk;ations: None P·hid. 'emitt nag: Qmsistent with Plan. 1994-9;5 $200,000 1995-96 5200,000 1~97 1997-98 1998-99 Scun:e of Funding: Wastewater Fund 194 • o • • : FINANCIAL SUM,.'\IARY The Financial Summary provides <!e1lliled fin."'llcial information for all capital projects for !be Five Year Capital Improvement Plan. Projects are separated by funding source such as General FUDd and Utilities Fund, and within funds by general categories such as Parks and Ope!l Space and Infrastructure. For projects which have been approved by Council in prior years for multi­ year funding, the project balance as of November 30, 1993 is shown in the tint eelumn. For all projecu the indicated columns show funding projections for the five-year program. Rloimbunemerlts from !be Genetal Fund to !be Utilities Funds or vice versa as well as n:irnbursemrnts from other funding sources such as grants, customers, arid debt fmancing are displayed in !be Financial Summary. 195 '-.. ~--~---" I I '--...... _--, ., ,,:'= U (;b ~y ,_ CAl'tTAL IMPltOVEMENT PROJECTS _Aaof !1~ ,_ '" .... ,_ ,"7'" ,_ TOTAl. Q!N!RAI. 'UND , 1'nIjoajo ........ 1ri .... tIhId8 ott ..... iIio)tdil," , '~~"'!4'" ~'''''-'1''' '), .. ·r .... , 'fi'-i; :" li'\~ll;~r: ,~ '.j , . THO II To Be OelermiMd C_Ultqmlr h~ ": ,-~ .. --~ ,. R...,... eonoollono A._ (1Q!I05) ", ':i~,cIoO: ""mB' :is,OGO LIlnII'/ Automollon SonII_ (19517) 217,000 ,~"IO:I QQ,I21 90,129 TBO 682,081 l' 'l'wIdng Ira .. Qno-11m. E_ Rebate t. CIty (211,000) ",.:!'~: (211,000) P ..... InIOf ... 1Ion T ... klrig I\yItem ('15'.) • 10,000 ,", 211,000 ~ : 90,000 • -R,Imbur8emeht froRl EnhwpftINI FI.I1dJ (10,000) (10,000) (2P,OOO) /' CMc C._ LoOby Ronov ..... ('9402), R ....... d 40,000 25,000 ~5,OOO V..,. Prooeulng "rote .. (19404) 100,000 140,500 2(O,!iOO \ .'.-, ·Relmbul'Mment ffoltl EnteJprt&e Fundi (21,000) (21,000) SUbtat." Customer SItNIce "p,ooo 315,500 21.,803 9O,12~ 90,129 850,561 ~OaenSDKAI Po"," Pethwar Rep .... (1 tSOt) 21,000 27,300 .,,500 TBO TBD 81,l!OO Perb 'So_po' Gn>I01d eo..rlPtont Rop/.oomonl (11510) 40,000 (0,000 'p..,<Ing from 0. .. TIme _ R .... t. to City (40,000) (~,OOO) P ..... otrm>., Tr •• Trtm ..... (11IS08) 11,000 '8,000 83,000 111,000 103,000 ~,OOD Open SpoOl Lok .. V--.. CIr,.rIrig (I ~7) 1&,000 reb a~,OOO TonnIo.nd a •• kohl C .... _ (19508) 25,000 TBO TBD TBD 25,000 Rlncon.d_ Pool Sltelrnprowmentl (19406) 3",000 50,000 58,000 529.000 u ... , & Col, A .. , & M_lmPf"', (INI2} _.d 13,980 .5,000 T80 TaD TaD TBD 58,960 _tic Field< R."""oIIon (19413) ·1'I_d 1,847 31,500 33,250 34,850 38,600 TBD 137,847 Irrtg.t\Qn Improve. & Baoldlow Rep\IIce. (1904''') -RNMd 18J,DOO 78.000 .81,000 150,000 '40,000 TBD 742,000 f'al'kt F •• eslmpt'ovaments (1904'5) -Revilled 132,000 270,'" 195,500 TBD TBD TBD 598,000 -ReirnbtnernenC from COBG (60,000) (00,000) -,"WIding from One-Time Eleotrio Rebate to City «5,000) (45,000) I ,; Subtotal, Parte & Opl/lh SPIl4J1/I 7;l'9,607 616,000 676,050 229,350 274,600 103,000 2,6:lil,601 .' ,'. " ",;.;-' ... / t_ CAPITAL IMPROVEM~"T PRO.l~CT8 .. _hoi ll1IG .. 13 11M .. ' I ..... 1111-17 ,m ... , ...... TOTAL ...... - ",; ---. PIOIIIy Roof flopIoootnool (19514) bS.oGO· ":\~m;cioo . '~ .' '11 sM.ooO ' " ; ~ . ~ LI>nNy ".m flep_ (19515, . 25,ooo\Tllltl .' 'I 2'.000 :, """'" Lock., Room R_ F~SWy (19513) 1 1 f: lD.<IOG I 0,000. )~,T8 ,.; lJIOIe stem Polhwoy I.IctGhg (18511) ,2a,OOO. 1'-:",'" 25.000 I' CMc eo.-Pia"" W~ (18512) , . SO.OOO it fBb' 50.000 , .. ' O-' ..... P.~ __ ~SbIy(11151D) " 10,000, 'l. TBQ 1D.000 ' ' 0.,.,. _ L·M1g Corworoioo (UUT .19531) ".ODD 'O.<IOG PubIo Bldgo, S ........ ,"' __ (I850B)· A_d 232.'''' 875.000 125,000 120.000 4$0,000 575.000 2.777 •• 36 CubbeI1eyC.d. Roof Rep." (UIJT·I9018) 328.413 200.000 200.000 728,"'3 Sidawalk Mep8" (Utility UIlItnI T81-18903) ~ Reviled 250.582 400.000 400.000 400.000 400,000 400.000 2.250.5112 Street M .. lntenl"alJ (UtIlity Ua,,~ T8)(-18971) M R.vluct 450,364 eoo,ooo 800.000 600.000 600.000 800,000 3,"80,3&4 Amln'.llllil D1ublltitM Am Compliance (10309) • Revteed 648,348 258.000 75.000 TBD T8D TBD 877.346 Subtotal, Infr.~ U34,541 2,88e,Of:'O 2,230.000 1,120,000 1.'50.000 1,515,000 10,e99,641 ~Snmm G __ """ Inloonallan S)'Idemo Appallon& (leI5) 281.000 120,000 !iI.ODD 1.,000 481.000 ·A.efmbunement fram EotetptiM Ftnit (58.200) (8.Il00) (8.600) (9.600) (87,000) TocIv!oIc>gy lmptv .. 'n_ ..... IIoo. MIl & CuI, (111525) &5.000 55.000 Ptf'IOnlill Computer Upgrlde. (19117) * ReYfsed 8.344 82.000 154.000 ",000 5<1.000 TAD 370.:w. -Aembll'1oment frOM En'lltIprtse F",..,. 11,000) (20.000) (:10.000) PlyroIIHufhan ReaourCM SyMem (19012)· Revtaed 80,000 ".000 8O.00n 186,000 ·RetmblM"Mrnerwt I'rom Ente,.".e Fundi (13.100) (1'.000) Ill.8001 Flre/Communh)ationll Computer sy.fam (19312) ;1110.810 1'5,00. 453,86(1 ·RelmblifHmem from Stanford (".~50) (46,250) Il'Iformal1on Sy.teme Development (1S812) -R~lMed 83.091 llD.800 54.000 80,000 80.000 TeO 427.591 -M.elmbtnement from Ef1t8fp18e F~ (72,225) 128.800) (:17.000) (:17.000) TSO 1'55.025) GIOQl'lpNo In'ormltion SyttOml (188Zl) 136_ 110.000 2'0 .• 00 112.000 4'.000 reo 819,268 SUbtotlll, In'ormatlon Symeme 578,763 47',225 832.800 349,400 181,400 6,'00 2,224.961 1 ' , ,/ 0 0 0 / , .' ; / ( ,.i,').' ,c·- ~ ~ .. TolepMM S\'Ifoni R ....... ment (lISio) " __ men! tom Entof1>rtM PMatnedo Ambul.noe C1 9409) "Relmbtnemtnt from Stanford R.4Io Repleo.menf (1840)) -Relmblftemerrt from Stanford "~"mburMmen!: from Ent~ Art In Pub, •• 1oceo (1"17) Subtotltl. Mllcttllf'MIOta SUMMARY: OE~ERALFUNO Total PrflJecfa Low: ReimburMrnehbt Enterprise Funds StanfanlU~ On&-TIme EJeotr1o Rebet. MonM CDBG Funda Subtotal, RillmblQemont. TOTAL NET GENERAL FUND UtIty Uteri Ta)C Projects n .... "'-L-Wlng C ..... .-(19531) Sidewalk Rep ... (11903) -ReviHd She! M.Int." .... (10.1,) -ReII1oo<I C_rtoy CodolRooI Rep.~ (19018) <"",".d __ 110"" "Mlt3 75,000 B9,1~ 23,1193 181,139 t.:"", V ._ CAPlTAlIMPIIO\I1!M./ff PROJ!CTlI , ..... , 'a .... 100 00i1 '';::'411'00& (511:0001 i:,,,,J;:, 10,000 (2,500. 124,000 (B,"') (24,000. 15,000 1",000 131,000 (1,500. (28,000. 15,000 158,500 " ,- 150,000 (10,000) (30,000) 15,000 125,000 ,m ... -',','''' 122,000 (6,000) (24,000) 15,000 107,000 ,- i" 124,000 (6,500. (21,000. 15,000 106,500 3,472,050 4,012,000 4,081,653 1,990,479 2,1 •• .n9 1,"'3,000 (1",025) (57,250) (216,000. (80,000. (812,275) (183,000. (1,500) (171,500) (66,600. ('0,000) (18,600) (60,Il00) (6,0001 (ee,600) (35,600. (8,500. (42,100. 3,412,850 4,259,125 3,110,103 1,913,879 2,103,129 1,100,900 40,000 400,000 000,000 200,000 199 400,000 000,000 200,000 400,000 600,000 400,000 800,000 400,000 600,000 ~ TOTAl . 140,000 (50,0001 85,000 (2,500) 747,1~ (39,5001 {132,000) 98,693 M6,139 18,419,711 (524,825) (00,250) (~,OOO) (60,000) (969,015) 11,450,636 .0,000 2,OOD,OOO 3,OOO,ODD ~OO,OOO "~:, '-':' , ,1.'-:-:':; " : .. -/ " ! §I !I 0 ~ !I ~ I §l II I I . ~ ! 4 I. ~ I • ! ~ ~ ,.: I I I ;1 § • I I ~ ! t ::l I -. .. I i I: ~ ;: I -.. i I t ~J " I <> ~ ~ -.... • • 'Ii" II ~i r ri • • / / ~ _Aoot 11_ ~ 1_ ¢lll'lTAL .ROVEMI!NT PROJEI;l1I ,nu' 1_ , ... ..., 1117 ... CII' ___ 01' Equl __ lIap/a lllOO1d p ........ TD" T ..... _ Ii> '"l1-li Opoon1fng Budgol TBD • To fie oetermlned Pam PaltMrRy Rep.1re (15509) P .... 01ID1m.! Tr .. T,,",_ (19.03) Open Spl .. LIm V ..... 1Ion Clooring ('8501) T'-and B_oI couot R......uon (19S08) UnlvoAlty& C.~f.A .. , & MIdtownlm_. (190412)-RMod A_ Floidl R ..... 1Ion (19413) - R .... . P ...... I C ......... r L/pgrodos (I.' 17) -II ..... . *R4tImbunement from EI'IIfipriM F""" Inform.tIon SyoIo ... Development (IUI2) - R ..... d -M.elmbunMHnent from enterprtte Flilda Radio ~eplac.ment (18403) -Relmblftelllent from Stanford -Re!mbLnernent from EntefprtH Totaf ProleDhlIo a. TrillWoferred to Operating Budget 13,_ 1,847 a,lot .. 83,091 81,1.(8 1904,108 21,000 15,000 1.,000 25,000 45,000 31,000 82,000 (e,oOO) 180,500 (72,225) 124,000 (8,500) (24,000) 5lII,21' 27,300 41,500 TBD 1.,000 93,000 01,000 T80 TBD TBD T80 TaO TaD 33,2~ 304,850 lI,tIOO 154,000 904,000 54,000 (20,000) 84,000 60,000 80,000 (28,800) (27,000) (27,000) 138,000 1~,000 122,000 (8,500) (10,000) (6,000) (28,000) (30,000) (24,000) 420,250 .06,3~ 313,600 @l '-TOTAL TaD 89,800 103,000 4",000 S~,OOO TaD 25,000 TBD 58,9110 T!lD lJ7,847 TaO 37O,JA04 (28,000) I: ,ilMilj, , ~-'f./J.:;,:.\ :-' t':',' :f,-},:-" ' TaD 427,591 TBD (155,025) 124,000 7,(7.1.6 r (6,500) (39,500) (26,000) (132,000) '114,500 2,1Y.>5,183 I J f., I " ',,\ -k', '. \. .\ '" .. i~:!t,- ._ .. !QUII'III!NT REPLAt:e .. ENT fUND r fIIoj_ ....... In ......... ..ellfJWihIoOto: 'I'uo! Slte 1_ ...... (i.52O) _ .. Vehido M"""gomonl S_ (19521) MtnaIpal Sa"""" ContorG ... ao I_m_ (1ts22) TQTAl EQUIPME~T REPLACEMENT fUND o "_lWo/ 11_ ,_ CAPITAL _OVEM!~ I'ROJ!CT1I 1",",' ,_ ,_ 1m'" ,_ . ", '.'" '" ,;,""'" . "".,.""",mr 'w,.·,... .... ""'Ii';' "00"",. '1 .," ,," •..• , '. ," , ',"'. ~j.I~}i;'if':,~ ,,1i\.l::j1;~,'lr~"r",,":t:b ,~'~'...,,~.,,~,{I"i", f,:;(,,_ ;-t/1'(" '~;·'!"-.,,-:'h~ ,''':_ ,I'," " , ,,,,' .-F1:;~'~1,;,~,Sd;000 ,':'::,;,~;:: .15,000 :;;,;:'~ ':';';, -;-t04,OOO 220,000 .I;:",":';tl !l,;~,ooo 1.,'1), 50,000 "' ;; " $0,000 " 50,000 TOTAl. 50,000 165,1XHI '0$,000 320,000 .............. ..... ... ........... ~ ....... . Ii!) o i I , I ! .' . ,. , ' . . :,~,.-,/ ',' "". ; • :J,' '/ ··1, I I I I I j • \29 ITREETIMPROVEMEHT'UND , PrnJ-........ h tHo ... 1ft M'II projocll" TBD • To a. Oole!mhod Ei Comlno A.oIl_lllljlnMmenIo (115:/3) BII<_ /Iyotom 1....-_,," (19$24) '/loIm_ont""" TOIl P_nlBl" Grado ~op,,,tIon F •• oIblity Study (19502) S."" HI Rood BtIdge. Bloyde La .... (18503) Street Mlljr,t.nanoe (0. TIX -11870). Re'tiHd Mlljor InffnemlGn Improvem.htII (19073) -R .... ct ·A:~rnburlOment Faderal STP -RelMbt.nemllnt Trlll1k: Impact Fe .. Embarcadero Pademenl8lke Brlrtlta' & Path ~ (1931 ·M:eimbunemenf Feder.1 CMAQ ·Ralmbu"ument s .... TSM ·Rl'!irnbtn.m.ni State rnA ·Relmbursemn Holdey 1m Subto .... street Improwment Food Projects SUMMARY: STREET IMPROVEM~NT FUND TOTAL8TREETIMPROVEMENT,UND L ... RetmbutHmerdil TOTAL NET aTREET IMPROVEMENT FUND --.---- ();; ~ l_IlAPITAL IMPROVEMeNT PROJECTS _As 0/ 11_ I_ I ...... 1 ... -17 1917 ... 111M ... TOTAL " . ····'11' .')l " ··,k."r", I ·76;000 ." '16,00/1 180,000 30,000 ~:.. 30,000 (lG,1IOO) I (30,000) 150,000 TBD TBo 150,000 40,000 40,000 las,931 170,000 "0,000 980,000 980,000 !MO,ooo 5.675,931 1,2S8,220 51)0,000 2,290,000 150,000 4,198,220 (318,000) TUO THO (38a.oOO) , . -'.-" (112,000) TBD TBD (112,000) 121,218 500,000 e71,216 (210,000) (280,000) (40,250) (40,2"..0) (100,000) (100,000) (32,750) (32,750) 2,263,367 1';177,000 970,000 3,270,000 910,000 1,130,000 9,890,367 2,2e3,317 2,260,000 810,000 3,270,000 980,000 1,130,000 10,873,367 (913,000) (983,000) ----- 2,2e3,3el 1,217,000 8'10,000 3,27~,000 980,000 1,130,000 9,890,317 ............ *--.............................. ~ ........................... " -, '-'>-;". .. 203 IIII~MN1"ER_I'UNQ PROJEcn "~i/iiMit,IriM~"""~.'~'!,' o __ pHo inionn ..... $yoIoIII AppIiJa&no (t601'l MSC_8 .... go ........ _~ 000"0,,,," Inf __ SysteM (8"5) / TOTAL MUL11-eNTERI'IUSE FUND , "_Aaal ,,- t_ CAPlfN.._R_NT PROJECT8 , ..... ,-1l1l-I7 ,lIT'" ,...... ""'"1" ";""''''''' •• '''o;~''.""-",, "'I"i""'''-I' .,".". "","' ,,' 'l''''~~' "'''''''''';'''''1 .' ~J '!I , • .,'!' "'~~~""-:'II!;'r~'fr.\,!ift:'~,~ '~~~, ~~f~' ''t9IJttf~_Pr,,,~''~t'N~ i' .', i~~<r"! \ ~,~ ',""r,l\l\P-rd,'l'~~' '( 1, " '" Ii' ,\ ): "~rlili;CI/III ':s/I.cIIlO ',: id,ood 10,000 I"~ 70,000 ,\:,.~!;; , \ 204,130 2011,,,, 204,130 m,ooo lto,OOO 30 .... 10,000 '0.000 TOTAl. , 1" :z.46,000 70,000 413,130 n3,13D .. _ ..... • ......... ~* ..... ~ ............. ._111 ..... _· •• \, , " i ~._/ I I I '. I!it REfUSE FUND RoimIHnernont .. elo«. Fund tor U9S Relmbtnement 10 OIfttf'M Fund RoIm_men! for Mulll-Fund P'.Joo11 TOTAL REfUS~ FUND _110'" ,,_ ,I.. CAl'lTALIMPROVEMENT 'ROIIECTS • ,~. In .... , .... 7 1m ... ,_ TOTAL 18.0lI0 18,000 1~,411 .,sse 8,370 26,439 31,411 ",6~1I 0,370 42,439 *··· .. · .. ····· ... ··· .. · ..... **-........................ ft .......... . ·,,1 , )'. .\ • 205 , ,,-J ' ,'f "1 -r STORM DRAINAGE PUND 'i>i..j .... iI1own iftiNd "",de "'i\eW~: TBD If; To Be Detwmlrltd Ai .... _. creok EnIoIon Ropan (HOe) stOIln w_~ Im __ (918O)-I\_d "RelmburMment from Bond ProoaedI. Coloodon ~m I""" ... m_ (6870) -R_ ·R~mtKnement from Bond PfOCe_ Relmburaemenl10 E'-et. Ftbi tor UBS RelmlHQement to General FWld RoImbtnom ... for ........ WId Protoo1B Subtotal, SID ... Onolno00 Proj • .,. SUMMARY: STORMDRAlNAOEPUND TOTAL "ORM DRAINAGE Lea RelrnbLnementl TOTAL NET STORM DRAINAGE fUND o ',' _Aloof 11_ 'rr(~' ',' 131,551 1,051,023 1,182,574 1_ CAPITAL .PRQIIEMENT "'0JI!C1'8 1,"",' 1"ut 1_ 1117-81 1.'" TOTAL ;' ~,:,:,,~ ):~';IWJ~,:' ;; ,: 1,;'-;;: ' .. !If·-' ,~ 'W\·:1t6.0d0,~ "( \'~f .'; 110,000 100,000 100,000 1tSo,OOO TBO TBO 481,551 (100,000) (100,000) (150,000) TBO TlIO (350,000) 3,015,000 ~,'70,OOO 2,880,000 TBO TBO 9,1196,023 (3,005,000) (2,'70,000) (2,110,000) TBO TBO (0,845,000) 1,000 1,000 7,103 2,782 <,611 12,995 40,000 17,000 ;;!O,OOO n,ooo 218,103 19,782 22,611 1,.443,570 , \ .. ,) r ;.~-;/ .. () o " ~ i.." . ;.. }, , / ", Q;,) ELECTRIC FUIIO , Projd ~ in IHio ~ oii n6iiI iw'oJoo/i:": ~h9JGII Barron tJ.~ f,)IftI,ution Sy.tem Improvement (94~ 4 to 121<V Convo/IIon (l1li58) A.ima 12KV &bQlIon Addition (9250) S~t OIItr')l~iWI Sywtflm M_Jor PrGJectB ..DII!rIHdIon.Smo .. R..".,. prol'" eo I<V e.. TIt BreoI<M ""-tIon (9SOt) __ T_fonnlf R~ment (9510) /1 ... CAPll'ALIIII'ItOVl!MENT PRoJECTS _,,*01 111_ 11M ... t_ ' ..... 7 ~. , ,'"~., ':Ji iY'~'I!'.~' "~lf\':iI .. ~: 'i'n::.o,~·':'): """,,,,, .• 1,II·~.-iC'II!R~,' C' ,'~' ",' ". :" . ,::', ';,'(~' -, ,;~~. r' '~:~ "I: ,:~, :'t r'~~:-ll'I.T'~' ;,;' q', ".... .1 eo,ooo 1,000,000 lB3,3~2 240,000 2:47,000 254,000 100,438 15,000 1,000,000 200,000 323,788 1,255,000 1.247,Il00 454,000 1110,000 "",000 ~7S,000 380,000 ,"7'" 262,000 262,000 ~OO,OOO Sup ........ ConINI& DatoAcqUoillanSyo, Uwocfe(1I515) 100,000 1,000,000 _ Ught RepIa .... _ (9354) 158,781 50,000 5~,ooo It ,DOD 67,000 s~ Prohtclt!on Improvement (8938) sa,514 80,000 '3,000 ",000 99,000 Substation Facility Improvemttntl (8944) 94,790 80,000 tl,OOO 96,000 99,000 Tr.,...fotmenl (8928) 1,098,1117 eoo,ooo tUI.OOO BJ7,OOO 656,000 Uhd .. gmund ExI_ & RopI ......... (6928) eoo,ooo IfR,OOO 637,000 656,000 ·RoImbtnemerd: from Customer (150,000) (154,000) (159,250) (''',000) o..m..d E>d_ & RopIo .... _ (8928) 400,000 412,000 424,000 437,000 EIe_ S_ & Mota .. (8928) 300,000 308,000 3'1,000 328,000 9_', 0I0tr..-Syotem R..-Prol_ 1,407,010 2,130,000 3,418,500 2,489,750 2,578,000 Unllll1nllldC_ f'rojoo!l FuILft UncIergmund C<!nvonoIon DIilricIa (9511) " 78,000 '2,)80,000 2,580,000 2,670,000 'ReIIn_1ram Po. aoi 01. CaI>Ie lV or ',. (30,Il00) (952,000) (1,02.,000) (1,0IItI,000) So;:lthgate UndMQI'OW'Id COf'MIfUDrI ("$3) 88,000 2,200,000 15,_ 207 ~ t ...... TOTAL .,~ . 1.060,000 210,000 1,436,352 1,315,438 270,000 3,Bl1 ,7" F> " , .. 150,000 400,000 1.~55,OOO 1,100,000 74,000 463,789 102,000 5)5,514 '''',000 574,790 ~76,000 4,2el,SII17 676,000 3,187,000 (169,0<10) (196,150) 4SO,OOO 2,123,000 338,000 1,593,000 2,649,000 15,172,_ 2.780,000 10,465,000 (1.112,000) (4,168,000) L .. , l.., ,I 2,143,DOO ,~,./-' . • fi'M~' ~f.. 1 . ,.;,.'" "'f:,_ " , I., . '~ .. \_CAl'ITM. _0WtI8tl1'ltOJl!l:U _Aldl ,_ _ _ _ 1m... I...... TOTM. _~_I ... ft_" .. e.u~'\V \21,2001 (110,000) !3O,OOOJ (9nJOOI ~ __ ~~<t»a) "1,211 70llflll 1m,2M ~_ .. ""'_""'Il<oI,.c.w.'!\I f,/22,1l4) !2t,OGO'I (2SO,t«) _, ~C __ P..... ~'$,112 \,407,000 1,471,000 I,m,_ l,W,-1,_,Il00 $,001,112 ~ ~-.,&!*m(93~?) ~ IS5,OOO 539,917 '0!IMr F_ "" \.III, 91. sy.tJI<n 1'15,00II) (*.000) ~ s~ Improvo ....... (!$lll 19)49 50,00II n,lIIXI 54,000 NJ,OOII sa,1IIXI <<9z.t _\.WIfS .... m C_(_~ e3t,lI2! 810,00II Il(10,000 2,0:11,&2\ r,_SlgMIolJpgrldHI_(U3O} 731.1,212 1110,00II 11),000 .IIIXI 7o.oOC 74,000 t,t6un _, ..,._Ptojeo!o 2,1M,l]. 910,000 .,~_ 120,1lOO 116,_ 131.1,_ ',O!lI,l7. /' ", . _v; flECTIIlC FUN!) rt>!ol_Pro!_ .,~4,"'3 1,43S,000 7,J91),OOO V33,<lI)Il ~,eoo.QOO . MOIl,OOO 31,311.41Il \ I 1Ioltnbtnom."H.O......tFIiM M,II:W el!:,~ l!It,l~l n,m I~~,!&) I' _tor~un4P"'" _,OlIO .r,_ 10,000 IU,OOII ( TOTAl.I!1.ECTRIC Filii\) 4,484,403 1,~",O:W ~O",&\4. S,IN,le3 5.,813,223 e,OIO,OOO n,"",92'l\ t . l_·R .. ",bl_rn"''''' . "OtI>of , .... tor \JII, aa, ,........ f!J/f,000) (6S,1lOO; ·Po. 9 .. & C_ 'IV {ltoIl,114) !e3*.OOIl) \m,000) ~I,ll1"OOO> (l,tItIUCll) 11,112.000> 1~,374,lH) ._ c_..... (150,0001 1'54.$(0) (ISt,<M) ItU,OOO) (\&9,000) \11101,700) _, R_ (250,114) II,\$$,OOO} II,I~,SOO) (l,le3,2$V) !l~~,OGO'I (1,281,000) (6.2l$~1 TOTAl. NET Ul!CtRI(; PWW 4,21',-',422,~ &.ae:t,* 4,12$,_ 4,&11,223 .,l';19,OIlO 31,4&1,fJ111 4W......... .. __ . __ .. _____ .... __ ...... _ ... _ J, .'~ j , @ ~ ,_ CAPITAL IMPRO\II!MENT Pllo.IECTlI Vj ... _Ioaaf 11130"3 1tM4. tltUl 111t14l' 1m .. ,_ TOTAL WATER FU"O , Pnol ..... ot-lri ... IhIidO ... n.w~:,' ',~'d~H/~:ij;'~";,;." I: '-,~" .',1 " • " TBD • To Be Demmlned P_PIlkWot .. R~..tSb/y(ll!!l2) , 30,000 ~~~':teb· 30,000 Wlto, Syotom e.tonsIono (l1li13) 120,124 131,000 141,000 153,000 181.000 1611,Q!lO •• 8,1124 -Relmblnemenl: ttom Cu.tomere (90,1'3) (''',2lK1) (109,500) ("4,7lK1) (120,750) (126,750) (666,693) SaMes end Hydrant Replaldetnentll (S01") 102,"33 '3,000 158,000 69,000 n,ooo 70,om "8,433 V'<""~"'~'" "CO " W_ Motl .. (80'5) 1~,ag:z 11,000 101.000 1oe,ooo 111,000 1 "',01)0 542,812 '~e¥ i--';"~ -.-'." . "I J~--" " " ·~':·f t::'.",-;;>:;· ~'-.. \' ,. ',- Watef Mtln ..... o.menta (80H~) 1,025,360 1,100,000 1.110,000 1,110,000 2,019,000 Z,194,OOO " ,5811,310 W .... R_ ImpIovom_ (8749) 78,1158 '00,000 188,000 178,000 580,166 ! I '" ' " ',' I 1" DhII Wllter ProJ •• 1,1141,011 2,1e3,750 2,281,500 2,379,250 2,312,250 2.428,250 13,412,082 SUMMAIIY: WI,TER 'UNO .' " t , Total Water p,oJeota 1,937,775 2,281,000 2,37',000 2,494,000 2,433,000 2,5~5,OOO 1.(,0"11,775 ! " Relmb\Qement to EJect, Fund for uaS 18,000 15,000 RtHmbtnement to Oeneral I"lII'ld 14,549 ",992 ',284 4',824 RllmblnamentforMufd-FlftI ~ 47,500 41,000 94,500 ----- TOTAL WATER fUND 1,137,775 ~,386,049 2,43e,t!r.': 2,502,284 2,433,000 2,"~,OOO 14,231,019 • Lea RelmburumenC from CUltORIert (00,.'3) (''',250) ('09,500) (114,750) ('20,750) (126,750) (666,603) TDTAL NET WATER fUND 1,847,082 2,281.799 2,327,492 :Z,387,534 2,312,250 2.428,250 13,504,406 .............. ---.. " ........ _.-................. _ ..••.... ----......•...... " \ '} ',-, , ,--.. ~ 1_ CAPITAL .. PROWII""" 1'tI0000C'!1I __ Aoof 11_3 1,"'" 1M .... 1_ .tI7'" 1 ...... mTAL OAS'UIID 0 .. SyMom &10_ (8017) 4:_ 79.000 13.000 81.000 01.000 ".000 ~71.5" 'ReI_mont from C_ (58,250) (V2,250) (8~.:150) (8B,25OJ (12.000) (321.000) G •• Main Rept.oementa (101') .... 041 2.lOG.000 2~,ooo 2.~~,00G 2,&4e,OOO 2.118.000 13,630,041 000 MotoN & Rogul._ (8018) 4411.775 3M,ooo ~,ooo 2e3.000 271.000 200.000 1.7111.775 N .... , 000 V_ C<>rwoIIIon (1230). _ IOII.~I 275.000 381.~1 ---- T otat Go Proj.cta I.Ml.155 2",.150 l.eTO.7!!!) 2.IfM,750 2."'.750 3,092,000 15."'2.855 8U11M/lRV: OIlS fllNO TotolOn Pmj_ 1,541,'55 2.904.000 2lll,OOO 2.870.000 3.DU.000 3,164,000 16.278.855 RHnbtnemom to Eleo{, Food far ues 22.000 22.QQQ I, ' ,', ' ','I Relmburwem.nt to Gttnefat flRf 16._ 1' .• 55 e,'11 2.100 47.2n ,/ n_t.no to< M~"'" ProJ_ M.5OQ 37.000 '0,000 '05.500 TOTAL OAS FUNO 1.$41.I5!I 3.055.105 2.781.555 2.88'.111 ).015.100 1.1(14.000 1'.4$4.627 • lea ~elmblftOmentil from C.,.rom.,. (",250) (fI2.2S01 (55.2501 (65,250) (72.000) (127.000) TOTAl NET OM FUND 1,.1.855 2.115.555 2.7Z1.405 2.823.1161 2,~.tt50 3,092:,000 1'.'27.827 .. ---"' .. _--_-··11111 ........ -................... ..-.-. ...... --...-. , .,'.\ " ", -.;·"'.\~'i .. ' >.,.J • o 20 • .:' , " ft'" Je!..CN'!!M._~~ ,/, "" )j" ~""'" 11_ ...... I-t_ 1m ... -TOTAl. WAlI'fI!WA'fER FUN!) ~~l1IN.t.j""~~; ,." ~;,"~:,:~" :~?::r<:':"-'~1,i,~f •• t~} ,,(',. tiJf+,:', I~\:\, v'" " .. ,; , 't'BO--r. ~ DMemYMtS AoIstloI\ r""" Wei~. (ei3i ", ':' "100:* '(,,..." .. ",'~ 100,000 ~,,' "~W S~CIII<ftItr_(lI5t~l , '~,ooo ... :iIl<!,IlOQ 'I1Iti .oo,OOQ W._I« CoIo __ System E_ (6020) 3II,lQ 2t,m 21,000 ><1,_ n,m 1O,m \1~,162 -.......... " .... ~ (n,rm (;If,1lI'III} (.!1,~ \21,11'5) (2~,>li1Gj (25,500) (131,!lt1) _CocI.SyoIom __ .... ...,.,m_(9173) 8OU.l .,.t&&,$'J& ~,82!I,w. ",-!M'." l,m,@ !,~1,000 25,1'4,011 _~C_"_~(!lt26)._od It,m '''',000 fSO T80 111"72 _~R~l3ll;!!)·~ SOIJ1l1t2 m,OOO m,llOQ 330,IlOQ 2OQo,i)t)O =,000 ',IJ9,082 !I)oofom''-Mt!eriotI II..,.. ........ (80Z2) !07,le5 30,000 )(1,000 30,000 ><l,DIIII 10,000 ;>51,265 E_Unt --I&5Q3j·".-. 1~,IlOQ 1M,_ , intftmoplor MOlIn ......... c~..., R.., ... (lI5Q<I) 150_ itA/m 350,000 I _to< llW>l<o.. P __ (11505) m,ooo m,OOII oWO,DOO TrAalWuI_l'toj.'" 1,460,111 51017~(JOO 5,.57,250 5,597,125 5,'80,000 5.535)500 28,661,26$ SUIllMAltV, WA$T1!WA'rElt FUNO ToW_, Pn>l-I,<l6l,1J4Z ".-HM:,m-~,.l'!I,!IOO UN,m ~,~,OOG 5,.11,000 21!1,eOS,182 __ ioEloof._r..VB$ to,(l(f(t 10.000 "_"'_I'und 110,123 2&.S6' 14,113 1,100 !Z!,6M ~''''_F.m'''''j_ <lMoo ~OOO 10,_ 78,500 TOTAl. WMTaI/A'!Elt fU1tO 1,~),trrl 5"~~,n~ £,$:21,$61 5,~,6n ~,515,;00 5,811,000 29,016.3:10 ·l"'1W~from Cuetonun (22,772) (21,>li1Gj (ZI,no) (22,&1~) ~.ooo) (25,500) (137,897) !'Or"" Nf:T~A'!Elt Fflf/O I,<WI"'! uz",m 5,~,tll MIt.l'fl ~,4.'t,i1lO 5,5«5,500 2S,&1M21 -----____ • ... ·~u ......... ...aA •••• ___ e. _ •• _ I \.,.1 '. ~ .",,' a ·°1 at ;, ~ U 0 J',l'" J III ~ ~ .. I ~~I ::~ ~ p ,.; i ; ~~I 'c I i~ .. I l~1 u I .. I ~ll ... 0 I sf! • • n I:!~I :r2i J~ .1 • • i ~,"'::.~~ -::>i',,, • • .'/ii!>. -0!!iP ,~ .. CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECT STATUS REPORT JANUARY 1994 GENERAL FUND 18S!4 PUBLIC BIm.DINGS STllUCI1TRAL IMPROVEMENTS ) Tb.is project provides for tbe design and con strUction of structural improvements to public buildings. The structuru retrofIt of the Polk" Wmg was completed in early 1993-94. In addition, 95 percent of the fmal design fOl'.: Senior Center structural improvements was compleled after close consultatioo with the Senior CoordL'18ting Council. ~ is expecta:l ro =r when full funding beoomes available in 1995-96. Structul3l improvements '0 Fm: Slalion #2 will be completed by ",mmer 1994. BUDGET THROUGH 6/30194 $3,257,910 ACTUAL EXPENSE TIlROUGH 12131193 $2,858,584 EXPECTED COMPLETION: FIRST QUARTER 1994-95 18614 FINANCIAL DATA BASE Staff is in the process of implementing the stores inventory, budget position control, &nd fixed >SSet znd cash receipt S)lSIem'-Completion of the .. 'ystem, i. expected by Iuly 1993. Publication of a uset manual "rillen by staff was also completed. City sWf will be trained on how ro use the publi ,hed user manual. StAff reviewed and purchased • budget explanation S)lSltrn \hal was installed aM used in the 1994·95 budget p.roce.s. BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12131193 EXPECTED COMPLETION OF PHASE 1: 18617 ART IN PUBLIC PLACES $ 944,~OO $ 527,187 ONGOING The Hans Werli sculpture, "Nude in S'eel", w-.s refurbished and painted. A base was installed for the David Bot'Jni s<:ulpture, ·Untitled", and the sculpture was relocated 10 tho Culruru Center sculpture ganlen. The Public An Commission purchased three 213 · :~', ' sculp=: "Skyhook Boca Raton," by Peter Shire, located in the Cullural Center sculpture courtyard, "From Sea To Shining Sea," by Joan Wenski, locate<! in G""" Park; and "Tangents '0 1.2: by Paul Gore, located in Ash mini-park. Security lights have been inSlaJled and repairs and fumigation of "Frren Vnner" have been ~mpJeted. The Public Art C.oHection continues to be refurbished in accordance with the priority repair schedule. BUDGET THROUGH 6130194 ACTUAL EXPENSE TIlROUGH 1213l!93 EXPEC!ED COMPLETION: 18806 RENQV.\UQN OF !REm .... nOt.' SYSTEMS $ l3l,l09 S 106,065 ONGOING This project includes improvements 10 irrigation systems at MitchclJ and Bowde:o Parks and !be Cultural Center. Improvements to !he Mitchell Park ar.d Cultural Center systems wae «Jmpletod in 1une 1990. Rooovation of !lowden Park-, irrigaIiou sysIcm will be e>mpleled in 1993-94. BUDGET THROUGH 6/30194 ACTUAL EXPENSE THROUGH 12131193 EXPEC!'ED COMPLETION: Isal2 INFOBM .... TION SYSTEMS PfV5!QPMENT $ 390,000 $ 291,654 FOURTH QUARTER 1993-94 This ongoing ~ will provide compurer equipment and software for lb. continued de".-eIopment and expansion of \he City's <:entraliw! compUleT facility. Disk drive> and additicnaI system memory were purchased L~ 1992-93. The 1993-94 project calls for \he purchase of online backup software and additional disk drives and memory_ BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12131193 EXPEC!'ED COMPLETION: 11m. GEOOMPHlC INFORMATION SYSTEM $1,259,040 SI,163,341 ONGOING The purpose of tl!is multi-year project is '0 create a computerized map of the City's infrastructure. The aerial base map of tl!e City has been C<>mplete<! and 70 perw1t of 214 / .. ' ~~---~-----~---'-- the lot lines have been digitized into the computer. As a qu.ality control measure, utility infrdStn."CtUre locations in a pilot area will be checked for accuracy in spring 1994. Once this is ccmplet.ed , all City uti lity information wia be digitized into the computer ever the next year. BUDGET THROUGH 6130194 ACruAL EXPEl'lSE THROUGH 12/31193 EXPECTED COMPLETION: 189Q3 SIDEWALK RErr\JRS $ 705,000 $ 402,550 ONGOING Thill project provides for repairs 10 .adewalks in the area bounded by COrnell Street, Amherst S~t. Stanford A venue and CaliJmnia A venue, and curb and gutter .repairs throoghout the City. BUDGET THROUGH 6130194 AcruAL EXPENSE THROUGH 12131193 PROJECT COMPLETED: 53,200,000 52,616,869 THIRD QUARTER 1993-94 1ll908 MllNlClPAL SERYlCE. CENTER (MSC) SITE lMPRO\lEMENTIi Thill is • multi~year project. The current project modifies the vehicle wasil pad -= 10 recycle wash walel inlC a clo>ed loop system, thereby conwrung pease and nducing watec consumption. The design has be.:;l completed and construction i. expected to be completEd by the end of 5pring or early summer. BUDGET THROUGH 6/30/94 AcruAL EXPENSE THROUGH 12/3l193 EJ.."ECTED COMPLETION: $ 380,000 S 332,316 FOURTH QUARTER 1993~94 18916 FIRE STATION DORMITORY MODIFICATIONS This project funds modifications to fIVe. exi sting flrc stations over a period of five fiscal years, and includes separate locker, bath, and dormitory facilities for male and female firefighter.. Modifications to fire stations 1, 3 and 5 were completed in tile third quartet 1991-92. The contracts for .tations 2 aod 4 were awarded L" January 1994, and COIl.StrUCtion will begin in February J 994. 215 "':::--_., ~-."'-------;,J BUDGET THROUGH 6130/94 ACTIIAL EXPENSE THROUGH 12/31193 EXPECTED COMPLETION; 1891& HARBOR lMPROV"..MENTS $ 605,000 S 310,541 FOURTI! QUARTER 1993·94 n.-elements of the _ Improvement project were oompleted at the en<! of 1993. They include<l a 4.5·acre marsh created along Harbor Poim, a new sailing station for hand-<:arried cnft near Mayfield Slough, and the existing Harbor Masters Cottage was miI.ored to its origin3l Spanish Colonial Revival sC/le. Other improvements included the installation of new paths, picnic areas a..d Ia.,dscaping. A new path will be inS1alled in 1994-9:5 from the duck pond to Embarcadero Road. BUDGET THROUGH 6130194 $1,535,000 ACTIIAL EXPENSE THROUGH 12!31193 $1,127,936 EXPECI'ED COMPLETION: FOURTH QUARTER 1994·95 1 S971. 18670 STREEt MAINTEl'{ANCE nu.. project provides foe the annual resurfacing of streets, identified by the City's Pavement Maintenance Ma.""&ement System as needing improvemenL The 1992·1993 program was completed and included IeSWfacing approtimately 18 lane miles of _ •. Major arterial _ paved were Hanover Street, Porter Street and East Bayshore Road. The conceptual design of Los Trancos Road will be completed in 1994-1995. Information from the design will determine whether road improvements are economically and environmentally feasible. BUDGET THROUGH 6130194 ACTIIAL EXPENSE THROUGH 12!J1/93 EXPECTED COMPLETION: I WI. 1!!604 18803 TANK REMOV AVCLEANl.!r. $4,901,500 $4,081,900 SECOND QUARTER 1994·95 Some contamination was found at the tank removal site at 1901 Embareadero Road (airport). The extent of contamination was identified and a risk analysis was submitted to !be Sanla Clara Yalley Waler District for review. Although it appean tha! the co;)tarnination bas not migrated, a t\\'o-year-mOnitoring program that is cwrently 216 undc:rway will :dentify any 11teessa1)' future c1e.a:: up and/or containr'"Jent action, A KpOrt will ~ made to the Di5triCt in late 1994, based on the monitoring results, Retrofit of the landfill fuel tank was completed in 131e 1993, BUDGET THROUGH 6/30194 $1,760,083 ACfUAL EXPENSE THROUGH 12131193 $1,152,925 EXPECTED COMPLETION: SECOND QUARTER 1994-95 19002 MSC FUEL TANK MQprru;ATION Modificalion of the fJeI tlnk above'ground storage area a: the Municipal Service CeotJ:r was completed at the end of 1993. The project inctoded new piping ""d a pump which dr2ins I/Ie area into. sewer, preventing I/Ie escape of petrol""m into the Baylands area. BUDGET THROUGH 6130194 $ 20,000 AcruAL EXPENSE THROUGH 12131193 S 14,106 PROJECIED COMPLETED: SECOND QUARTER 1993-94 19009 FINANCE VAULT REMODEL This project provide> for \he remodel of \he second floor Finance Department vault. This project will be accomplished along with the Civic Center Remodel and Relocation CIP. BUDGET THROUGH 6i30194 $ 33,000 AcruAL EXPENSE THROUGH 12131193 $ o EXPEC'Fcl> COMPLETION: SECOND QUARTER 1994-95 19011 RECORDS MANAGEMENT This project creates a centralized I'f;C{)rds management system for the collection. control" indexing, protection. stonge, security. and destruction of City' documents and records. In FY 1993-94 an additional jukebox will be R<lded 10 the system 10 allow for the ~-ekJpment of a FL~ Department application a.",d to I-.andle computer output of acr..ounting files to laser disk. 217 ~--- BUDGET THROUGH 6130/94 ACTUAL EXPENSE THROUGH 12/31/93 EXPECTED COMPLETION: 19Q12 PAYRmVHllMAN RESOURCES SYSTEM S 510,000 S 286,502 ONGOING A vendor was selected in 1993·94 and the system wiU be implemented in 1994-95. BUDGET THROUGH 6/30!94 S 80,000 ACTUAL EXPENSE THROUGH 12/31i93 s a EXPECTED COMPLETION: FOURTH QUARTER i994-95 19018 (;!fflBER' BY SCHOOL SITE BU!LD]NG COPE MODIFICATIONS This project provides for Wti>l work at the Cubborley Schoo! site 10 O$!abli.!b code compliance wjth current public facility fire, life safety, and handicap access regulations. The projt:Ct scope bas been expanded 10 include roofing repajr or replacement and other necessary site impro""""",ts. Work is pr<><:ce<ling on prioritized projects. BUDGET THROUGH 6130194 $ 647,000 ACTUAL EXPENSE THROUGH 12/31193 S 283,111 EXPECTED COMPLETION: ONGOING 19073 MAlOR !NTERSECDQN IMPROVEMENTS Improvem<nts 10 the AlmolCharleston ar.d Alma/Meadow intersections were completed. Improvements ir,c)uded new turning lanes, II3ffic signals, sidewalk, re.wfacing, bus duclc-OUls and bicycle lanes, In addition, the Joint Powers Board (JPB) installed new pedestrian gates, cantilever signal., and vehicular gates at the railroad crossing adj""",,( 10 these intersections. A fence and landscaping al Alma/Charleston will be installed after ~ City completes ~ purchase of the new road right-of-way from ~~e IPB in 1994. The design of Page Mill Road/Foothill Expressway inler;ection improvements will be complet<d in 1994, with construction in 1995. Work includes adding new turning and bicycle lanes and repIwing the signals, 218 c' "--, ---------'-- BUDGET THROUGH 6130194 $2 I QC(), 000 ACTUAL EXPENSE THROUGH 12/31/~4 $ 656,366 EXPECTED COMPLETION: FOURTH QUARTER 1995-96 19101 TANK INVESTIGATION AND REMOVAL This project includes the inve...l:'f..igation~ testiJlg, design and removal of 1.md:rground tanks discoveml on City propert)' or within the City righ,,,f-way. Over the last year, a tank disc:overed in the alley in the 800 block of Alma Street was tested and the fuel removed. Another tank, discovered in the 300 Block of Atma Street, is being reinvestigated. In addition, 3 diesel fuel tank was remo .... ed at Fire Station #6. BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12/31/93 PROJECr COMPLETION: 191m ARAmADERQ LAKE PAM $ 170,000 $ 25,357 ONGOING This project includes replacing the Araslrndero Dam spillway to adequately handle overflow WlIters during htavy storm' and to repair the dam face to withstand earthquake fon:es. A fina! scope of work cunently being developed will evaluate environmentl.! concerns prior to proceeding wit!> the design. Construction is anticipated for summer 1995. BUDGET THROUGH 6130194 $ 24Q,000 ACTUAL EXPENSE THROUGH 12131/93 $ 53,i17 EXPECTED COMPLETION: FrRST QUARTER 1995-96 19103 PLAYGROW .. 'D fURNITURE Alill wmPMENT REPLACEMENT Playground furniture and equipmen' has been replaeed at Gree" Eleanor and Hoover Parks. Replacements at Peers Park will be completed in 1993-94. BUDGET THROUGH 6130194 $ 205,000 ACTUAL EXPENSE THROUGH 12/31/93 $ 169,814 EXPECTED COMPLETION: FOURn; QUARTER 1993-94 219 19108 CMC CENTER BUlLDING flRE SPRfNKLER SYSTEM This project prov.ide.~ for the engineering anal ysis. design and installation of a !ire sprinkler protection system for those areas of til:! Ci llie Centei (incl~ing the Police Department wing and the City Council Chambers) whi:h are presently without a sprinkler system. This work wlIl comply wil1'l t. ... e Uniform Fire Code requirements. This project is cu!'rently und!!T construction. BUDGET TIlROUGH 6130194 ACI'UAL EXPENSE THROUGH 12/31/93 $ 130,088 EXPECTED COMPLETION: FOURTH QUARTER 1993-94 19102 POLICElCOMMlJNJCATIONS COMPUTER SYSTEM This multi-phase project improves police and dispatching informatiOl! management pr'K! SI:S. W«k completed includes an integrated, singJe access to law enforccm.e:nt data bases, an upgrlIde of the minicomputer, implementation of. records managOJTlel\I system, and the introdoction of notebook computers for aUlomaled repott writing in the field. Work that has 1\01 been completed includes the implementation of • oompuler aided dispatch system (10 be completed in late 1993-94) and access to law enf"""""",,l ""lahoses from patrol vehicle$. BUDGET TIlROUGH 6!3()/94 ACI'UAL EXPENSE TIlROUGH 12/31/93 EXPECTED COMPLETION: J 9111 tNyENTORY CONTROL SYSTEM $ 855,000 $ 309,601 1994-95 This project replace, Ill. ould2ted 5IOres inventory OOfl!rols at the MSC warehoose willl efficient inventory control and • bar coding sySlem. Staff is in the process of testing the stores inventory software and expects completion by July 1994. Bar coding and related controls software were purchased in the first quarter of 1993-94. Citywide training by staff will also be conducled during It.e fourth qoa.-rer of 1993-94, prior-10 the instafJation of !be new stores inventory sySlem. BUDGET TIlROUGH 6!3()i94 ACI'UAL EXPENSE THROUGH 1213!/93 EXPECTED COMPLETION OF PHASE I: 220 $ 19,500 $ 8,960 FOURTH QUARTER 1993-94 \ " - 19116 ""IDE AREA NETWORKING Thh is a joint project with the Utilities. Department to design and install a wide are.!: network \'11 AN) for comP\lter data communlca1iom. for an of tne City's remote f~lities !hal require the u.e and exchange of data. The pW> and d'Sign Request for Proposal (RFP) was issued in 1992-93 and in,tallation will be completed in 1993-94. BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12131193 EXPECTED COMPLETION: $ 225,000 S 89,000 1993-94 IW7 HP 150 PERSONAL COMPIITER REPLACEMP,NT This proj= included replacement of 42 obsolete HP 150 personal computers and 6 EOC training compuren. These computers will be comple<ely replaced by the end of 1993-94. Replacemezll of penonaJ compurers is an ""going activity. BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12131193 EXPECTED COMPLETION: $ 110,000 $ 103,000 ONGOING 19119 cryrr. CENTER REMODEL AND RELOCATION This ~ect will address space Iimiration s on the second, lhird and fourth floors of the Civi<: Center. The projecl components include space planning and design, construction remodeling, voice and data "iring, and mcving. The project will be completed in conjunction with t.'le Civic Cen ter Buildout Project BUDGET THROUGH 6130/94 ACTUAL EXPENSE THROUGH 12/31193 EXPECTED COMPLETION: 19204 eMe CENTER CQOIJNG TOWER REBlnI'p S 513,150 S 32,325 SECOND QUARTER 1994-95 This project includes replacing the cooling tower metal framework and piping. Work will lake place in spru1g 1994 as part of !be Civic Center Build-(}Jt project. 221 \ · . \ -i~t '~7~{[ ..... ..' .. .;..- BUDGET THROUGH 6130194 $ 5O,VOO AcrtTAL EXPENSE ,dROUGH 12131/93 o EXPECTED COMPLETION: FOURTH QUARTER 1993-94 1929:5 FUEL TANK UPGRt DE This proj<d modifies ellisting piping of underground st<Jrage tanks '" current standards and installs metering equipment for remote monitoring of fuel inventories from the MSC garage. BUDGET THROUGH 6130194 S 75,000 AcrtTAL EXPENSE THROUGH 12131193 $ o EXPECTED COMPLETION: FOURTH QUARTER 1993-94 19206 WATER RESCUE EOUIPMENT PurcIwe of the water rescue equipment is near completion. Two boats have been • ]lUl'Cbased and are in the final smges of being ootfiltt<!. Per>onnel ate being tnined 10 0 opera!<> the new equipment. Policic3 10 operate the equipment are being developed ' .• jointly with the Menlo Park Fir: Protection District. BUDGET THllOUGH 6130!94 S 40,000 AcrtTAL EXPENSE THllOUGH 12/31193 $; 30,687 EXPECTED COMPLETION: fOURTH QUARTER 1993-94 19209 GOLF COURSE RECLAIMED W bIER SuppLY This project will install a reclaimed water line from tl,e Palo Alto Regi.oaol Water Quality Control Plant (RWQCP) 10 the Golf Cou,..,. A reclaimed water blending tank, irriga:ion booster pump station and control, will be instalied on Golf Course property. (Also ..,. Project Number 9220.) BUDGET THllOUGH 6130194 AcrtTAL EXPENSE THROUGH 12131193 EXPECTED COMPLETION: 222 $ 50,000 S 9,212 FOURTIl QUARTER 1993-94 o ·':',~;~:" .J.;.. • 12212 BRYANT STREET SICveI F BOULEVARD F.TIENSlON -' . This proj«t;' being coordinated with the Electric Fun~ traffic signal instalIaUo<. project at Bryant Street and Embarcadno Road. This Clf fund, the temporary street closure on Bryant and signing and pavement marki ng changes on Bryant. Waverley, Addison and Coleridge, associated with the Bryant Street Bicycle Boulevard Extension Project. After the !.ix-month trial street ciosure, staff returned 10 C01Jr"lCil with an evaluation report. Council dire<:tM staff to remove the b"";er, replace it 1>ith 2tlOther traffic contra! device on an additional trial basis, and return to Council a:fter completion of !.hat tri.aI period. BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12/31/93 EXPECTED COMPLETlON: $ 69,000 $ 15,650 SECOND QUARTER 1994-95 192\3 CAl reORNJA AVENUE PARKlNG STItpCTIJRE This project will e<>nstruct a new 'we level, 186-space parking structure on Cambridge Avenue, including landscaping and adjacent alley improvements. Construction began in early 1994 and will be completed by the 1994 Christmas shopping season. BUDGET THROUGH 61'.>0/94 ACTUAL EXPENSE THROUGH 12131/93 EXPECTED COMPLETlON: 51,829,500 $ 198,250 SECOND QUARTER 1994-95 12214 HAZARDOllS MATERIALS RESPONSE EQUIPMENT 90 percen' of the equipment has been ordered or reeeived. Specifications are being developed for !be ",maining equipment. Training for certified personnel is in progress. Development of response policies and operatioruJ proced ures are near completion. Joint response agreements are being evaiuated and discussed with other North Couniy fire departments . BUDGET THROUGH 613(J/'j4 ACTUAL EXPENSE THROUGH 12131193 EXPECTED COMPLETION: 223 $ 75,000 ~ 22,826 FOURTII QUARTER 1993-94 lml Mn"'ND ",IHLET!C CENTER CIRCUIT RENOVATION This. proj.ect provides for the rcp:1acement of aU direct burial underground cable Vw'ith new c:on<!wl and wiring. Work i, currently scheduled to begin in the third quarter 1993-94. BUDGET THROUGH 6/30194 S 50,000 ACI'UAL EXPENSE THROUGH 12131!93 s ° EXPECIlID COMPLETION: SECOND QUARTER 1994-95 19304 BAY!.AND AMENITIES IMPROVEMENT This project involves replaument of basic park equipment, such as garbage cans and signage, at the Baylands Nature Preserve, as we!l as the installation Q( a gate at the entrance. Work is tJtpectccl to be complet<od by September 1994. BUDGET THROUGH 6130194 $ 26,000 AcruAL EXPENSE THROUGH 12!31f93 $ o EXPECrED COMPLETION: SECOND QUARTER 1994-95 193Q5 FOOTHILL PM\( PICNIC FACILITY This project lnclwkd the replacement of picnic tables, BBQ's and trash cans in Foolhills Park. To dale, picnic tables, BBQ's and necessary tool' and supplies needed 10 compl& 111. project have been purchase:!. There has been some difficult'} in finding .. vender wIlo meets current specifications for trash cans. BUDGET THROUGH 6130/94 ACI'UAL EXPENSE THROUGH 12131193 :EXPECTED COMPLETION: 193Q6 PARK IMPROVEMENTS AND REPAIRS $ 30,000 S 23,600 FOURTH QUARTER 1993-94 BoulW3.I--e, Bowen, Briones, ~mGS, Robles, Rlnconada. Seale, Peers, Baylands Alhletic and Mib:h.U Park.'i scheduled repairs and replacements are expected to be """'plett<! in 1993-94. 224 BUDGET THROUGH 6/30/94 AcruAL EXPENSE THROUGH 12131/93 EXPECrED COMPLETION: 19m BIcYCLE BRIDGE RENOV AlJON .-""-'-' $ 70,000 S 62,862 FOURTH QUARTER 1993-94 This projecl will replace and secure planking at t.~e bicycle bridge at Wilkie Way. between Monroe Drive and Vt'hitcl~m Dri\le. BUDGET THROUGH 6130194 $ 30,000 AcruAL EXPENSE THROUGH 12131/93 s o EXPECrED COMPLETION: FIRST QLTARTER 1994-95 193!!8 FACILITIES REROOFING Roof replacement of two mainlenance bul1dings at Foothill Parle and Mitchell Park Community Center are included in this project. The Foothill Park wQr'" was completed in !he third quarter of 1992-93. The roof at the Mitchell Park Community Center will be rq>1aced in 1993-94_ BUDGET THROUGH iil30/94 AcruAL EXPENSE THROUGH 12131193 EXPECrED COMPLETION: S 90,000 $ 19,990 FOURTH QUARTER 1993-94 19309 AMERICANS '\lITH llISABll,mES ACT COMPLIANCE In order 10 comply with the federnl law and related regul4lions, !he City p<epared • transition plan study in March 1992 thaI: I) identified physical obstacles; 2) descrih<d in detaIl m".hods to make facilities accessible; and 3) specified a schedule of steps 10 be implemented. All structural changes must be accomplish:d as soon as possible, but no laler than luly 26, 1995. 1992-93 funding included making all •• Iemal paths of travel at City facilities accessible and designing and replacing signage as required. In 199)-94, interior paths of travel al City facilities will be made accessible and .ccessib!e curb ramps will be installed in the three business districts. ]n 1994-95 9 eleo.-Cloors, rest rooms, drinking fountains. and curb rnmps at otheT public facilities will be modified to comply. 225 BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12i311~3 EXPECTED COMPLETION: S 593,6:>0 $ 47,275 FIRST QUARTER 1994·95 19310 EMB,o,RCADERO ROAD BRIDGE'" BIKE PATH EXTENSION ) The project includes the design and con.truction of a bike/pede.sttia:n bridge over Embarcadero Road and a bike path on the west side of the railroad tnlcks from Churcltill Avenue to University A~ue, including obtaining right"'iJf-way easemen!s from the Palo Alto Unified School District a.od IPB, and approval. from Caltran. (due to the inclusion of federal fund.). A vendo' has been ",!ained to complete the design and bid documents. The JPB has given its conceptual approval It is anticip"ted that design bid documenlS will be completed by fall 1994 a.'ld construction begun in spring 1995. BUDGET THROUGH 6130194 $ 131,415 ACTUAL EXPENSE THROUGH 12131193 S 12,326 EXPECTED COMPLETION: FOURTH QUARTER 1994-95 19311 MUNICIPAL SERVICE CENTER CMSC) SECURITY IMPROVEMENTS This project will improve the security at the MSC warehouse and yard area to increase safety and cIecre> .. potomtial theii and vandalism. An improved card access system for the front gate i. currenUy being inslalled. BUDGET THROUGH 6130194 $ 100,000 ACTUAL EXPE."ISE TIlROUGH 12131/93 $ 1,782 EXPECTED COMPLETION: FOURTH QUARTER 1994-95 19312 FIRE/COMMUNICATION COMPl'TER SYSTEM Thi$ is a mUlti-year project. The department is continuin~ fo e\·aluate different Computer AIded Dispatch (CAD) sy.tem. and fire information systems. All stations have been upgnded to 9600 BOD modems. The Fire Department is working Closely with Police Communications in the evaluation of various CAD systems. Portable notebooks have been purchased for selected fire vehicles. 226 I j 1 BUDGET THROUGH 6130/94 ACl11 AL EXPENSE THROUGH 12131193 EXPECTED COMPLE'llON: 19313 BIcycLE LANE IMPROVEMENTS $ 300,050 $ 31,190 ONGOL'IG The lnsWJa:ion of bike lanes on Loma Verde Avenue (between Bryant and Middlefield) and on EI Camino Way (between Mearlow a.,d E! a.mino at Los Robles) was completed in Fall 1993. 1be re .. naining elements of the project are replact:ment of existing bike and vehicle lanes with standard bike and vehicle lanes on East Meadow Drive east of Alma, and inslalIation oi bike lanes on the south segment of E! Camino Way beIween Mearlow and EI Camino III Maybell. Before proceeding to design the E! ('.amino Way project, staff will meet with business ownen, residents, and school representatives 10 address parking issues related 10 the installation of bike lanes. BUDGET THROUGH 6/3(Jt94 ACl11AL EXPENSE THROUGH 12l3l!93 EXPECTED COMPLETION: $ 58,000 $ 10,746 FIRST QUARlER 1994-95 19401 eAWQRNIA AVENUE UNDERPASS IMPRC>vEMENTS A consultant will be retainoo by the first quartor of 1994-95 to conduct a feasibility study regarding upgrading llte Cali fornia A venue underpass to m~ current pedestriar., bike, and ADA requirements. It is expected that the study will be completed by the fourth quarter of 1994-95. Once the study is completed. estimates far the improvements will be determined. BUDGET THROUGH 6130194 $ 30,000 ACl11 AL EXPENSE THROUGH 12131193 $ o EXPECTED COMPLETION: THIRD QUARlER 1994-95 19402 eMe CENTER LOBBY RENOVATIONS This projoet will ","ova'" the first floor and Level A lobbies at the Civic Center. Design and installation of wall finishes, paint, improved lighting, floor treatments, direcrorie$~ 227 ''-. --- • . -. ,- <; ".-~ 1<. and furniture are included. A coosultam has been hired and improvementS are -expected 10 be completed by April 1994. 0 BUDGET THROUGH 6130194 $ 40,000 AcruAL EXPENSE THROUGH 12131193 s o EXPECTED COMPLETION: FOURTH QUARTER 1993-94 19403 RADlO REPLACEMENTS This ongoing project repla~s all existing City owned two-way radiIJ communications equipmenl in accordance with. 1m-year replacemenl schedule. Replaoemenl of this equipment at the end of its normal service life ens.ures reliability and provides vital two­ way ndio communic:at:ions for nearly every department in the City. including Polio:., Fire, Utilities and Public Works Departments. Purchases for 1993-94 v.ill be completed ;n fourth quane:-1993-94. BUDGET THROUGH 6130194 AcruAL EXl'ENSE THROUGH 1113i193 EXPECTED COMPI.ETION: 19404 VOICE PROCESSING SYSTEM S 101,000 $ 12,556 ONGOING This is • two-year project to implement a voice processillg sys1em to allow !he City to provide information to Ihe public and eaIJ coverage during off hours. In 1993-94. 5Iaff will esl3blish policy and procedures for the use of the sysrem and issue an RFP. Implemenlation of !be sy= is expected 10 occur in 1994-95. BUDGET THROUGH 6130194 S 100,000 AcruAL EXPENSE THROUGH 121)]193 $ o EXPECTED COMPLETION: FOURTH QUARTER !994-95 19406 RJNCQNADA POOL IMPROVEMENTS This project oonsists of replacing deteriorated piping, installing new de<:king and pool edging, replacing cracked tiles and installing a prefabricated pool storage facility_Design of the improve,ner>u will be completed in 'pri ng 1994 and cortstrt;ction is expected 10 o occur in the faIl a."{'t.er the. peak summer swimming season. 0 228 \ ..1 _____________ -: BUDGET THROUGH ~130194 S 400,000 ACTUAL EXPENSE THROUGH 12131193 $ o EXPECT COMPLETION: SECOND QUARTER 1994-95 19407 CITY HCU,ID WATER BACKfLQW This is the fi .. ,t phase of the project to imWI backflow devices on water services to City facilities to prevent contamination of the City's water supply, BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12131193 EXPECTED COMPLETION: 19408 PBX UPG~ $ ro,ooo o SECOND QUARTER 1994-95 This proj",,1 will expand the current telepbone line eapacity by adding 368 ports, The upgrade is necessary to implement a voice process~ng system and add additional capability for fu and modem communications. The project is expected to be completed in 1993-94. BUDGET THROUGH 6130194 ACTUAL EXPENSE THROUGH 12131193 EXPECTED COMPLETION: 19409 PARAMEDIC AMBULANCE S 49,000 s o nURD QUARTER 1993-94 Pun:hase of the Paramedic ambulance has beer. compleled and the ambulance should be operational by the end of the third quarter. BUDGET THROUGH 6130194 S 85,400 ACTUAL EXPENSE THROUGH 12131193 $ o EXPECTED COMPLETION: THIRD QUARTER 1993-94 229 194!O CMC CENTER GARAGE IMPRQVE~ This proj~l includes paintin,. steam cleaning, lighting repair. restripiog and new directional slgns And arrows. BUDGET THROUGH 613019. $ 200,000 ACI1JAL EXPENSE THROUGH 12131193 $ o EXPECrED COMPLETION: i-1RST QUARTER 1994-95 19o!! ALMA STREET B!KE BRIDGE This project consists of ronstructing a new bicycle bridge over San Francisquito Creek at Alma Str=! and sbol1 bilio path segments between Aln,. Street in Palo Alto and Alma Stroel in Menlo Park. The design will occur in 1994 and be coordinated with Menlo Park, !be Sanl3 CWa Valley Water District and the Sl3te. C<mstruction is eJtpected to 0<CIlt in 1995. BUDGET THROUGH 6130/94 $ 241,000 ACI1JAL EXPENSE THROUGH 12131/93 $ o EXPECTED COMPLETION: FOURTH QUARTER 1994-95 19412 UNIVERSJIT AVENUE AND CALIFORNIA AVENUE LANDSCAPE AND amER IMPROVEMENTS This project un~ a beautificatinn program for the bus'.ness district areas, including Ian<lscape and other improvements and sidewalk cleaning. In the fall of 1992 and 1993 improvements were made. BUDGET THROUGH 6130194 ACI1JAL EXPE.~SE THROUGH 12131193 EXPECrED COMPLETION: 19413 ATHLETIC FIELD IMPROVEMENTS $ 30,000 $ 17,240 ONGOING TI,is project provides for ""going renovation of athletic fields", ensure safe &lld playable conditions. Soccer fields at El Camino. G .... r and Terman Par1cs and the Baylands Athletic Center BasebaIl Diamond were reno,,,ted in the fall of 1993. 230 BUDGET THROUGH 6130/94 ACTUAL EXPENSE THROUGH 12/3l/93 EXPECTED COMPLETION: $ 25,500 $ 3,188 ONGOING .. ----- 19414 PARKS BACKFI OW IMPROVfoMliliIS AND IRRIGATION IMPROVEMENTS This projecl is part of. muld-year effon due 10 Title 17 of the Cali fom:" AdminisfIalive code, which mandates that each public water utility system is protected .against amtaminatiOll of po""'le water through backflow improvements. During 1994 drinldng Countain:i connected to irrigation !;ystems wllI be disconnected and approximately 10 backflQWS will be rep!aced. Plannoo irrigation improvements will reduce person hours Meded 10 manually adjust oonlrollers, will upgrade aged irrigation system. and reduce water consumption. The installation of satellite CCJntrol systems ",ill OCC\lT at Mitchen Park, the Cultural Center and the Main Lib""y. Irrigation sprinlders and sow powered controllers will be installed at park sites t.hat are inigaled manually. BUDGET THROUGH 6130/94 $ 183,000 ACTUAL EXPENSE THROUGH 12131193 $ o EXPECTED COMPLETION: ONGOING 1941:5 PARKS FACILITIES IMPROVEMENTS This is • multi-year projecl that includes Ihe replacement of old, unsafe, and non­ accessible playground equipment. This project also incl:K!es the replacement and upgrade of the park benches, signs, fences, trash re<ep"",les and other ameniti... Playground equipment will be replaced at Peer'. Park .nd Ventura. School in 1993-94. Benches, signs, barbecues a.."ld other amenities will be rep!are1 or repaired at Rinconada, Boulware, Bowden and Ramo, Parks. BUDGET THROUGH 6J3O!94 S 172,000 ACTUAL EXPENSE THROUGH 12131193 $ o EXPECTED COMPLETION: ONGOING 19416 MYLANPS hTH!.E!1C CENTER RECI .... IMED W"-IER See Water Project 922ll. 231 --.,--,----------_. , } -- \. 19417 m EASEMENT PllRCH'.SE Completion of this ;1roject is subject to the owner. KFS Com munication. obtaining Fedua1 Communications Commission approval and moving the radio receivmg SLanan to a new location. It is not po!lSloie 10 predict whe11 this win occur, BUDGET THROUGH 6130194 S 412.000 AcruAL EXPENSE THROUGH 12/31/93 $ o EXPECTED COMPLETION: To Be DeIc:rrniMd 232 • o • , , .,~, lif -; ...... ~ ...... ~ /,. ENTERPRlSE fUNDS Due 10 diff~ ill &!e'I!rUe Fund ,""",unting, !be ''''v'';\al>Je BU<!get Through 61)()I94 , is dlsplayed far each &t<:rprise Fund project. The 'Available Budgel' ""n<isls of a project's net available budge< dallan oarried forward from prior years and any <ioU"" budgeted foc 1993-94. 'AauaJ E<pense for 1993-94" include.onJy 1993-94 expenses, EnC1lmbrances arenotlnclU<!ed in !he 1993-94 expense f41ure. 233 :-:::" ,-,~~ ... .r~~~~ • TIllS PAGE lNTIlNTlONALLY LEnnLANK 134 STORM DRAINAGE ENTERPRISE FUND SS70 em 1 fCDQN SYSTEM IMPROYEMENTS 10 1993 a wn~ition ass.....s.sment of the ex.isting storm drain system and development of an t.-pdated storm drain master plan were completed. These two studies provided a blueprint for future storm drain improvement piOjec ... ,S. Construction ot a new storm drain line along Everett and Hawthorne Avenue. was <ompleted in 1993. Design of stann drainage pump station jmproVt:mcpts, including a new Airport Pump Station, bas begun, .. ith construction scheduled fo.-fall 1994. Design is also underw>.y OIl • projecl in summer 1994 to replace damaged section:; of me existing stonn drainage system. Staff is W'odd."lg with the Santa Clara Valley Water District to developajointly-funded erosion control project for San Francisquito Creek at Tasso Street for summer 1994. Curb a.1le! gutter repairs were completed this wir:ter as part of the Sidewalk Repairs CIP. This project will oor.tinue i~def11\jtely as storm drain improvement projects identified in the rondition assessment an~ master plan are implemented. AVAILABLE BUDGET TIIROUGH 6130194 ACTUAL EXPENSE FOR :993-94 EXPECTED COMPLETION: $2,139,596 $ 226,937 ONGOING 9180 IjTORMWATEJ! DISCHARGE IMPROVEMENTS Palo A1lo continues 10 participate in the Santa Clva Valley Nonpoinl Soorce Pollution Control ProgIalll (NPDES), an area-wide cooperative effort 10 reduce ponution from wban runoff. A five-year NPDES permit was issued 10 Ille Progtam by the RWQCB in July 1990. The permit requires the City 10 perform specific long-term activities, such as elimination of illegal dumping to storm drains, modifications 10 City ordinances and procedures, ptlblic education. and monitoring of stonn water runoff to improve storm water quality. A pilot project to divert a Ilmited quantity of stomrwater to the sanitary sewer for treatment was rompleied in 1993. A ptogIalll to identify and eliminate illegal connections to the Stonn dra.i:il system was completed in Ia:e 1993. This project, though subject [0 revision, will continue in some form indefinitely. AVAILABLE BUDGET TIlROUGH 6130194 ACTUAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 235 S 278,857 S 95,483 ONGOING REFUSE FUND :K!9O GAS CONDENSATE COU.ECTION AND DISPOSAL SYSTEM This project .is to construct a collection and disposal system for gas condensate accumulated in the methane gas coLlection sy~1em. The system is reqUIred to comply with Enviror.mental Protection Agency requirements. The A~cy has delayed implementatio!'! of this requirement pending revisions. A V AlLABLE BUDGET THROUGH 6130194 S 80,000 ACl1!AL EXPENSE FOR 1993-94 $ o EXPECTED COMPLFrION: TO BE DETER.',IINED 9051 LA.NDF!Jl LEVEE PROTECTION This project is to coo!truCt a flood pmU:ctioo levee on 1M northwest quadrant of 1M JandfiIl to withstand washout from Ill. 1000year flood, as required by !be RWQCB. This project has been delayed pending decision. from the RWQCB. AV AILA.BLE BUDGET THROUGH 6130/94 ACl1!AL EXPENSE FOR 1993-94 EXPEC1ED COMPLETION: 236 $ 150,000 $ o • o ELECTRIC FUND 8741 El ECrBIC LOAD RESEARCH SYSTEM This project monitors; electric power consumption on a real-time basis on selected customers f(lt rese3J'Ch purposes. A fief a lengthy evaluation period. new recorders and a new data-gathering system have been purchased. The flew recorders are being placed into service. The new data-gathering software is being used to program the recorders, gather the data, and prepare bask reports. A V AILARLE BUDGET THROUGH 6130194 AcruAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 88S1i CONVERSIONS FROM 4kV to I2kY $ 333,054 $ 104,682 ONGOING This is an ongoing project toeonvert. where practical, the existing 4KV system 10 12KV. ~""'ti"" of Ill. convmon between ColonWo and Lorna Venle and ll..,.. and Greer is underway. Design work for convenion of circuits in Barron Pa.rk: area is underway. AVAILABLE BUDGET THROUGH 6130/94 $ 430,286 ACTUAL EXPENSE FOR 1993-94 S 265,732 EXPECTED COMPLETION: ONGOING 8918 EAST BhYSHQRE SWITCH CONVERSIONS The substructure is complete and switches are being replaced. The redesign of the .Em~ero Road area is rompleted and th:: substructure is mstaUed_ AV AlLABLE BUDGET THROUGH 6/30194 $ 243,591 ACI'UAL EXPENSE FOR 1993-94 $ 47,874 EXPECTED COMPLETION: THllID QUARTER 1993-94 237 ). I 8928 DlSTRIBlmON SYSTEM IMPROVEMENTS This ongoing CIP is a composite of the Transformers, Underground Extwsions and Repla.cements., Ove.rhead Extensions and Replacements, and Electric Services and Meiers elP; IUld provides for all customer service and connection work. AVAILABLE BUOOET THROUGH 6130194 ACfUAL EXPENSE FOR 1993-94 EXPECrF.D COMPLETION: 8929 STREET UGHUNG COl!YERSIQNS $2,018,910 $ 6S9,~67 ONGOING This project converts an street lights to high pressure sodium. To date, about 4000 of 6000 lights have been converted, Remaining work involves mostly series incandescent circuits requiring extensive sub.structure and wire installation. AVAILABLE BUDGET THROUGH 6130194 ACfUAL EXPENSE FOR 1993-94 EXPECTED COMPl.ETION: !l23!) TRAFFIC SIGNALS SI,282,ooo $ 33,475 1995-95 This project upgrades existing tIaffic signals to increase saf~ and rdiability. The MW pedestrian signal in MidtoVin is comp1eted. The new signal at Bryzr.l and Emban:adero is completed. Future signals at Waverley and East Meadow and Embarcadero Road and Palo Alto High School are being designed. AVAILABLE BUDGET THROUGH 6130194 S 742,465 ACTUAL EXPENSE fOR 1993-94 S 7,380 EXPECTED COMPLcJION: ONGOLNG 8931 COMMUNICATION SYSTEM IMPROVEMENTS As necessary. this project installs ha...-dwire and coaxial cable to provide communications services fur traffic signal coordination. telephone links, and computer ~ta transll'.ission. Ties between the three legs of the sys<em are ;nstalled and operatiortal. 238 AVAILABLE aUDGET THROUGH 6/30194 S 196,133 ACTUAL EXPENSE FOR 1993-94 $ 35,391 EXPECTED COMPLETION: ONGOING am OUAR.!W ROAD SUllSTATiON EXPANSION This project ind\Wcs installation 'Of new swi lchgear. re!ocatioi'l of power transformers, and inslallation of 60KY cimJir breakers_ Switchgear, .ubstructure, and cable is installed. New equipment is in service. Old equipmen.t is being prepared for removal, Fou.,dations for the reloe;ation of transfonners and installation of circuit breaktrs has been designed. AVAILABLE BUDGET THROUGH 6130194 S 332,443 ACTUAL EXPENSE FOR 1993-94 S 45,809 EXPECTED COMPLETION: FOURTH QUARTER 199:!-94 8938 SUBSTATION PROTECTION IMPROVEMENTS This P"'!iect purc:twes relays and high VOltage fuses to: install or replace existing devices, improve protection of the power system. and achieve better coordination with CUSlCme1S' protective devices_ Instali>.lioo of 60kV tie breaker at the C<llorado Substa.tion is complete. Other activities are ongoing.. A V AILAllLE BUDGET THROUGH 6130194 ACTUAl, EXPENSE FOR 1993-94 EXPECTED COMPLETION: 8940 IJNpERGROUNP SWITCH REPLACEMENT $ 238,988 $ 107,184 FOURTH QUARTER 199>-94 Underground .. ",itches are replaced on an ":as needed" basis only_The move to padmounting of switches redLK:es the need for future switch replacements. AVAILABLE BUDGET THROUGH 61J()194 $ 57,841 ACTUAL EXPENSE FOR 1993-94 $ o EXPECTED COMPLETION: ONGOING 239 :--;: _._-----.,- 8944 SUBSTATION fMPRQVEM!iliIS. This project includes replacement of batteries and battery charges based upon their life expectancy. renovation of the securify fences and entry gates, and upgrading of the s:Jb.station drainage sy3tem. Substation Supervisory Control and D-",u Acqu!sition (SCADA) work is complete. Paved driveways at Ea.<! Meadow and Hansen Wayare completed.. Landscaping work al Hansen Way Substation is pending. A V AlLABLE BUDGET THROUGH 6130194 $ 156,971 ACTUAL EXPENSE FOR 1993-94 S 57,349 EXPECTED COMPLETION: FOURTH QUARlER 1993-94 8945 AlITOMAIED MAPPING (CAM This project is staged over five years to perform aerial photography, digitize aeriloI phoIograph.s and digitize the existing otility infrastructures fer !he City. A conttact for oompl .. .e aerial photography, digitizing and verification has b= assigned. A V AILABLE BUDGET THROUGH 6130/94 $ 636,447 ACTUAL EXPENSE FOR 1993-94 $ 99,019 EXPECTED COMPLETION: 1995-96 9105 WIDE AREA NET\\'ORK This project is to design and install a wide area network for computer data communications. for remote facilities that require the use and e,,"change. of data. Jtfaterials are on order following feasibility s~dy. Installation planned for early 1994. A V AILABLE BUDGET THROUGH 6130194 $ 130,214 ACTUAL EXPENSE FOR 1993-94 $ 18,210 EXPECTED COMPLETION: THIRD QU ARlER 1993-94 9152 DOWNTOWN UI UNDERGROUND CONVERSION This project undergroun:dc:d the existing overl:lead electrical distribution system. Installation is complete. Pacific Bell is stiH completing its conversion and pole removal. 240 --------"-._-_ ......... A V AlUBLE BUDGET THROUGH 613()194 $ 231,191 ACTUAL EXPENSE FOR 1993-94 $ o E.XPECTED COMPLETION: FOURTH QUARTER ,993·94 9250 ALMA SUBSTATION 12kV ADDmON An;hitecturnl Review Boaro approval of a temporary fence has beeil oblained, Demolition of building at 841 AJma is scr.eduled for eany 1994. AVAILABLE BUDGET THROUGH 6130194 $ 110,345 ACTUAL EXPENSE FOR 1993·94 $ 11.211 EXPECTED COMPLETION: 1996-97 9251 BlIS TIE BREAKER AI COLORADO SUBSTATION The breaker has beeil installed and is openltional. This br<aker prevented a potential citywide blackout 011 November 5, 1993, when half of the Colorado SubSlalion failed. AV AII.ABLE BUOOET THROUGH 6130194 ACTUAL EXPENSE fOR 1993-94 PROJECr COMPLETED: S 63,180 S 56,292 SECOND QUARTER 1993-94 !l2S2 OOWNTOWN IV UNPEEGED!!ND CONYERSIOI'( This proj«:t undergounds the existing overhead electrical distnoution $Ystem. The design and substrucMe insbllation is complete. Equipment installation is scheduled for 1994. A V AlLABLE BUDGET THROUGH 6130194 ACTUAL EXPENSE fOR 1993·94 EXPECTED COMPLETION: 241 $1,685,058 SI,220,384 1994·95 9254 PADMOUm TRANSFORMER SEISMlC RESTRAINT This project designs and installs seismic restrain t devices that \\;11 seelJ re transformers 10 their support foundations. Design work is ongoing. Installation of restruints is being evaluated. AVAll..~BLE BUDGET THROUGH 6130194 $ 182,075 ACTUAL EXPENSE FOR 1993-94 $ 7,041 EXPECTED COMPLETION: 1994-95 9350 CHANNING/ADDISON UN))ERGROU!lID This project undergounds the existing overhead electrical distribution system. Design and .ubslructllre inS12llatioo i. complete. Equipment instillation is scheduled for 1994. AVAlL'JILE BUDGET THROUGH 6130194 ACTUAL EXPENSE FOR 1993-94 EXPECTED COMPLETiON: 93S2 CMC CF.NIER B1ID D-QUT $2,365,000 $l,727,909 1994·95 This. project provides for the huild-out of the: Civic Center 8th floor and mezzanine into office space. The desisn is oomplered. The oontract has been awarded for building modifications. AVAILABLE BUDGET THROUGH 6130194 ACTUAL EXPENSE FOR 1993-94 Ehl'ECTED COMPLETION: 9354 STREET LIGHT IMPROVEMENTS $1,292,297 $ 69,BOI 1994-95 The project provides ongoing funding for replacement of deteriorated street light poles and foundations. Replacement of 30 iailed concrete .treet light poles is pending the delivery of poles in early 1994. 242 . -;-" · . AVAILABLE BUDGET THROUGH 6130194 $ 257,860 ACTUAL EXPENSE FOR 1993·94 $ 47,163 EXPE(TED COMPLETION: ONGOING 9452 BARRON PARK IMPROYEMFNfS This project will rebuild the overhead electrical system in Barron Park to conveIt it from 12,000 Volt operation to 12,470 Volt operation, the Cily standard. Low voltage problems and tree interference problems will also be cor=:ted. AVAILABLE BUDGET THROUGH 6130/94 $ 60,000 ACTUAL EXPENSE FOR 1993-94 $ o EXPECTED COMPLETION: 1994-95 94S3 SOUTHGATE UNDERGROUND This project undergounds the existing overhead electrical distrIbution system. The Southgate area has been established as the nexl un<lerground conversion an:a. This project will be implemenled simultaneously with water and gas main replacemellt. AVAILABLE BUDGET THROUGH 613()194 $ 68,000 ACTUAL EXPENSE FOR 1993-94 $ o EXPECTED COMPLETION: 1996-97 9356 AlITOMATIC METER READING PILOT PROJECT This project involves the purchase and in staIlation of aUfomatic meter reading equipment which will allow customer meters to be read remo:ely. A RFP has been issued for a feasibility study to implerneot a pilot project utilizing aUlomated meter reading teclmology. AVAILABLE BUDGET THROUGH 6130194 $ 120,000 ACTUAL EXPENSE FOR 1993-94 $ o EXPECTED COMPLETION: 1994-95 243 "-'-. '. '. ! WATER fUND BOI3 WATER SYSTEM EXTENSIONS This is an ongoirli CIP which 1 bued on customer demand change$:. exfends or repIaees mains, fire hydranl'i, domestic services and fire services to new and existing cuvomefS., AVAILABLE BUDGET THROUGH 6130/94 AcruAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 8014 SERVICE AND HypRANT REPLACEMENTS $ 162,000 $ 47,015 ONGOING TIIis ""going CIF replaces approximately 100 water services annually to remove old ~ ga!va.-uzed JIeeI, corroded copper """ices and lead g"""""",k service leads which were installed in the City'. warer distribution .ystem prior 10 1937. The project also replaces or repairs deficient /ire hydral1U and valves which are di5<Xlvered durin3 tile yearly water .ystem fluslling program or througb routine inspection. performed by tile City'. Fire Departmen~ TIle work is oompleted through a combination of contract coostrucIion and use 0( in-hoose staff. A V All..ABl..E BUDGET THROUGH 6130194 AcruAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 8015 WATER METf&S. $ liO,OOO S 7,5fi7 ONGOING This ongoing ClF reploccs worn and broken meters that are no longer ~le. Meter replacements are scheduled 10 replace two-inch and larger meters on a ten-year cycle; one-inch meters on • IS-year cycle; and 518 inch meters on a 14 10 2<J.-year cycle. Older mete:'s that carry the heaviest volumes are given tligher priority fOl' replacement. Test resula from removed meters are accumulated to make assumption!. regardmg meter sensitivity to l<>w flows and If,eter replacement cycles are adjusted accordingly_ This ClF also purchases meters for new customers, AVAILABLE BUDGET THROUGH 6130194 $ 94,850 AcruAL EXPENSE FOR 1993-94 $ 54,474 EXPECTED COMPLETION: ONGOING aol6 WATER MAIN REP! ACEMENT This "'ngoing. CIP .replaces the aging water main infrastructure based on brea.lca&e? maintenance expcndirore5, corrosion, materials, demand increases in the sy~m and fire protection rec;:uirement~. This project will replace aging cast iron mains ;n the water dist;noution flJ'St. Construction (If to'lese new mains will procef".d at a rate of approximately 16,000 linear feet per year. AVAILABLE BUDGET THROUGH 6/30/94 AcruAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 8!i36 WE' T SITES REHABILITATION 52,508,719 5 343,102 ONGOING This ongoing CIP provided funding to study ,he City's ten weI! sites, FoIl""ing • coo.suJiant's recommendations and an in-house study, four of the Vw"Cll sites YlI'eI'e abandoned and two were recomm."ded fo< further srudy and refurbis.hinJ. The remaining four well sites may need improven'l.ents in the future to maintain their emergency C3p'"odCities for potable ground water production. AVAn.ABLE BUDGET THROUGH 6130194 AcruAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 8749 WATER RE$ERVOlR IMPROVEMENTS 5 183,335 $ 7,545 ONGOING This. project inc1uded funding for a srudy to determi oe the condition of intema.l and external coatings on the City·s fi\le foothill re~rvoirs 4fld their seismic capability. The study has been completed. Consultant examination of corrosion and structur.Jl (seismic) condition of four steel and' one CO:.'1CTCte reservoir indicated the need for repal~ 2nd improvemen ts. Coating deterioration over some 2:5 + years since construction ~ pl us DeW codes and Heal&. Department regulations, require recoating, cathodic protection systems and structural improvements over the next few years. This is a five-year project. 1be work GI1 the reservojrs is prioritized in order of appuent need. Corte Madera Reservoir repairs are in progress, Boranda and Mon,e BeHo repair> will follow_Dahl and Park Reservoirs have been recoated. AVAILABLE BUDGET THROUGH 6130 194 ACTUAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 245 $ 437,085 $ 145,15S 19%-97 \ , 8915 ARASTRADERO CREEK ACCESS ROllO IMPROVEMEIIru This project is funded by the water. gas, wa"itewater and electric utilities 10 provide access on the Arastradero property for utiliry operations and mainte:nance vehicle!. The design of the road has been completed and C01lstruction of improvements rook: place in the faIl of 1993. Hydro seeding of lIle cut banks along lIle road is proceeding now. In the !pring of 1994, the project will be toured by SIlIff and IocaJ environmenlaJiJtS in order to prepare a list of constructiC!n activity mitigation. After me mitigation work is approved by Council and construct<d, the project will be .:ompleted. AVAILABLE BUDGET THROUGH 6130194 AcnJAL EXPENSE FOR 1993-94 EXPECrED COMPLETION: 1923 WATER STATION IMPROVEMENTS $ 242,016 $ 126,751 1994-95 This proj«t included funding for an engineering study and de5ign 10 Olt_ SCADA into the wale!' disttibuti<>n facilities. The engineering study has !>eon CGmplcted and • remmmendalion had !>eon included in the 1992·97 CIF to con.struct a PC-based SCADA system for the Water Utility. After approval "fthe 1992-91 err, the conlI3cl will! the existing ""nsultan! was amende<l to continued the !"'liee! into the design pbu:. The project is now enrering the design phase and construction will follow in the faIl of 1994. AVAILABLE BUDGET THROUGH 6130194 AcnJAL EXPENSE FOR !993-94 EXPECTED COMPLETION: $ 122,247 $ 5,295 1994-95 2120 WATER IRANSMlSSJON!E! ECTIHC METERING FAClLmES This projeel will ""nstruct a 5000 square foo< new facility 01 the MSC 10 bouse the Water Transmission and Eleclric Metering staff. A consultant is currently worldng on a ptOpOSal \0 modi fy the MSC M2ster Plan to allow constructiQll of Ibe new facilily. AVAILABLE BUDGET THROUGH 6130194 $ 39,047 AcnJAL EXPENSE FOR 1993-94 s 578 EXPECTED COMPLETION: 1995·96 246 i 2220 GOLF COURSE RECl.AIMED WATER SUPPLY This project will instaU z recWmed water line from the Palo A!lo RWQCP to the Golf Course and install en Golf Cour"'£ propeny a recJaimed water blending tank, irrigation booster pump station aJ1.d controls. The design of the project has been completed. The project was sent out for competitive bids and bids were received. The cost to construct these improvements is higher than originally estimated, due to changes in the project ccncept and location of the pump station. The project may go before the Council in 1993·94 in order to request more funding and to av.-ud the construction contract. AVAILABLE BUDGET TIfROUGH 6/30194 AcruAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 9221 MSC RECLAIMED WATER SIll'Pl.Y $ 191,899 $ 8,599 1994-95 This project will jnstall a reclaimed water line from the Palo A110 RWQCP to the MSC and instai! on MSC property a reclaimed waler booster pump stati01l and controls. The project is designed and will go before Council to award a construction contract later this year. AVAILABLE BUDGET THROUGH 6130i94 S 78,181 AcruAL EXPENSE FOR 1993-94 $ o EXPECTED COMPLETION; 1994-95 247 8017 GAS SYSTEM EXTENS!QNS, , , CAS !'UND This ongoing elP ute:lds the gas distn"bution system to provide service to new-customers and to augment service to customers with increased demand. AVArLABLE BUDGET nmOUGH 6130/94 ACfUAL E.XPENSE FOR 199J.'M EXPECTED COMPLETION: BOlli GAS MAIN REPLACEMENTS $ 128,761 $ 99,154 ONGOING This ongoing CIF replace> leaking, inadequately sized and strucrunUly deficient gas mains. Construction was 'YJ'icalJy completed by City staff until 1990, when • combinaJion of main projects installed by contractors and Cry staff was initWed. This project replaces approximately 20,000 linear feel of gas main. per year. The replacements are pt.nned 10 continue for approximately 34 years. AV AlLABLE BUDGET THROUGH 6130194 ActUAL EXPENSE FOR 1993-94 EXPECIlID COMPLETIONS: 8019 GAS METERS AND REGULATORS $2,3B3,557 S 759,174 ONGOING "Ibis ongoing elP installs new meters and regulators on existing serykes, rep1ace-s existing services and instaIls new re)i.ef v.alves .in tlle gas distribution system. AVArLABLE BUDGET THROUGH 6/31)194 ActUAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 8919 GA& STATION IMPROVEMENTS S 492,322 $ 108,229 ONGOING This project included funding for an engineering. study and design to e~tefJd SCADA into the gas di'Stributior\ facilities. The engineering study has been completed and a recommendation had been included in the 1992-97 CIP to construct a PC-based SCADA • o system for the Gas Utility. After approval of the J992-97 CIF, the contract with the 0 248 existing consuita."lt was amended to co!ltnue the project int;) the design phase. The project is now entering the des.ign. phase and construction "''ili follow in the faIl of J 994. AVAILABLE BUDGET THROUGH 6130/94 ACTUAL EXPENSE FOR J 993-94 EXPECTED COMPLETION: $ 195,393 s o 1994-95 9"-<-10 COMPRESSED NATI1RAL GAS VEHICl.E CONVERSION This project includes funding to convert one third of the light duty vehicle fleet from gasoline 10 compressed natural gas (CNG), incl uding all associate<! infrastructure improvements. The fueling station is currently under construction at the MSC~ TIle fueling statioo will be for City velricle use. Future use oy the public with a fillin& isIznd in front of the MSC may be eonsidered at a later date. The vehicle conversion portion of this CIP will be administered by Public Works Equipment Management staff after the CNG SIalioo is complete<! in the spring of 1994. The "",version of velricles is expected to be ph2sed in over • tIlree-year period after the fueling ""lion is oomplete<!. A V AlI.ABI.E BUDGET THROUGH 6130/94 ACTUAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 249 $ 408,598 $ 64,534 TO BE DETERMlNED WASTEWATER flJ!'.TI !!(fA! WASTEWATER CQU FITION SYSTEM EXTENSIONS This ongoing ClP installs new sewer latera! connections to existing l!13.ios. A V AlLABLE BUDGET THROUGH 6130194 AcnrAL EXPENSE FOR 1993·94 EXPECI'ED COMPLETION: S 56,500 5 21,151 ONGOING 2m WASTEWATER CO!JFrTlON SYSTEM REHABlI,ITATlONIAUGMENfATION This ongoing ClP is a combination of two, existing ongoing projects (8693 and 8694) that were combi.ed under. new Major Project Number (9173) at the beginning of 1990- 9 L The CJP will complete high priority rehabilitation work lo reduce inflow of rainfall and ground water into tl'.. 0011""000 system, will augment the existing system by ~g certain mains and trunk sewers with identified deficiencies; and will corutruct diversion mains to mnsfer flows from near capacity basi.1S to basins or mains wi!!::J. remaining capacity by contract construction and City mff. Mains will be cleaned ""d • >ideo taped, anaIyted foe proper maintenance, re-sized or replacement and scheduled fot' ~.,. construc:1ion. \WI AV AlLABLE BUDGET THROUGH 6130194 AcnrAL EXPENSE FOR 1993-94 EXPECTED COMPLETION: 250 $1,867,827 $ 546,400 ONGOING o .,~ WASTEWATER FUND 9454 INDUSTRIAL W 6SIE LAB RELOCATION This project will add space 10 tho Rt.g;cnal Water Quality Control (RWQCP) Plant Administration Building for the Industrial Was!e tat-by building out to the existh1:g fo1.ll1datiOfl Jine. Design and construction is scheduled to begin in June 1994. A V AILABLE BUDGET THROUGH 6130194 $ 175,000 AcroAL EXPENSE FOR 1993-94 $ o EXPECTED COMPLETION: FOURTH QUARTER 1994-95 8022 SYSTEM FlOW METERING REPLACEMENT PROGRAM This ongoing project provides for scbeduled replacement of system flow meten at the RWQCP to ensure reliability and a::curacy. AVAILABLE BUDGET TIlROUGH 6/30/94 $ 117,741 AcroAL EXPENSE FOR 1993-94 $ 10,476 EX1'ECrED COMPLETION: ONGOING 8021 P1 ..... m F.QIlJ1>MENT REPLACEMENT This ongoing proje,;t prmides for scheduled replacement of RWQCP eq"ipment for rnzintainmg treatmetlt reliability. Variable frequency drives were purchased for replacement of influent pump speed controllers, AVAILABLE BUDGET TIlROUGH 6130194 $ 721,427 AcroAL EXPENSE FOR 1993-94 $ 49,662 EXPECTED COMPLETION: ONGOING 8926 PLANT W AT"....R SYSTEM This project will replace a portion of piping fOT the #4 water system to provide reclaimed water for equipment washdown and landscape irrigation at the RWQCP. 2S1 " A V AILABLE BUOOET THROUGH 6I3fJ194 $ 39,795 ACJ'UAL EXPENSE fOR 1993-94 $ o EXPECTED COMPLETION: fOURTH QUARTER 1993·94 81!65 LAIlORAIDRY FAQLITIES AND srJDJES This RWQCP project provides for new bioassay I effluent chara.:::enzation and cf.aQ management, and repla"""""'t of ceru.in laboratory instruments to meet Regkmal Water Quality Control Board (RWQCB) requirements. The bioassay testing room was completed in July 1990. Effluent characterization 15 being condoc,ted. The projecc also provi<!cs fur remodeling the laboratory to accommodate additional equipment and staff. The laboratory remodelling was completed in September 1993. Chronic bioassay testing equipmellt h.>.s been purchased and installation ",iU be complete in 1993-94. AV AlLABLE BUDGET THROUGH 6130194 $ 164,828 ACJ'UAL EXPENSE FOR 1993-94 $ EXPECTED COM.DLETlON: FOURTH QUARTER 1993-94 911(1 WASTEWATelt REel &MADON This RWQCP project includes preporaUon of. plan to study the economic, teclmical, enviror.m<ntaJ, and institutional feasibility of utilizing reclaimed W2steWater to irrigate large turf and larodBoaped 3m!.5. The project also indudes RWQCP modificalions and purclwe of equipment to produce reclaimed water. Ph.>.se One, the f.nanciaJ and environmental impacl review. has been completed. AVAILABLE BUOOET THROUGH 6130194 ACJ'UAL EXPENSE FOR 1993-94 EXPECI'ED COMPLETION: S 122,509 $ 1,670 FOURTH QUARTER 1994-95 9260 INSTRUMENTATION AND ALARM DISTRlBlWON CONTROL SYSTEM This multi-year projecl includes d:velopment and installation of a standanliud distribution conlrol system fora plant-wide alarm s/stem. pumping eontrol system (three locations.). fiUration. chlorination, dechlorination, incineration. and polymer and lime/caustic control sysrem.s. 252 • A. \I AlWIB1../i B{JO(;S'r 1JiR.Oll Gli 61 30194 A.Cl'trAo1. Exl>ENS13 FOR 1993_94 ~~ CO},fpLS'r;ON: .-:- $ 267.586 $ 90.936 FO!JR'rH QV4RTER 1994-9$ THIS PAGE INTENTIONALLY LEFT BLAl'IK 254 • • INDEX 8Y TITLE Project Title 4 to 12KV Conversion (8856) , ... , ............................................................... .. 60KV 8u, Tie Breaker lnslallation (9509)......... .. ........................................... . Aemion Tank lnlet Structure (9513) ............................................................ .. Alma 12KV Substation Addition (9250)................ ....... ........... ....................... . Americans with Disabilities Act c<>mpUa.'lCo! (19309) ......................................... . AIastradero Creek Erosion Rep.airs (9508) .................................................... . Art in Public Places (18617} ...................................................................... .. Athletic Fields Renovation (19413) ....... , .... , ........... , .... , ... , .... , .... , ... , ..... , ......... . Barron Park Distribution System Improvem<nt (9452) ......................... , ............. . BiJceway System Improvements (19524) .......................................................... . Capital Improvement [)efinition ......................... " ........ , ... , ............. , ............. . OIanningiAddison Avenue Underground (9350) .... , ..... , ............ , ........ , ...... , ....... . CIP Project Map .................. , ................................................................. . Civic Center Lobby Renovation (19402) ......................................................... . CMc Center Plaza Wale1proofmg (19512) .................................................... .. Collection System Improvements (8870) ........................................................ .. Communications Systems Improvements (8931) ...... , .......................... , .............. . C<>mpressed Natural Gas VeJ.jcle Conversion (9230) .......................................... . CUbberiey Code Roof Repair (Utility Users Tax·I9018) ..................................... . Dance Studio L-Wing C<>nversion (19531) ..................................................... .. Downtown Lib.-"')' Beam Repair (19515) ........................................ , ................ . Downtown Parking Structure Feasibility Study (19530) ..................................... .. Effluent Line Modifi"'.tions (9503) .......... , ......................... , .... , .............. , ....... . EI Camino Reallnter:=tion Safety Improvements (19523)......... .. ................ .. Electric Services and Meters (892 8) ............................................................. .. Embarcadero Pedestrian/Bicycle Bridge and Bike Path E.tension (19310) ............... .. Environme1ltaJ Impac! Assessment ......................... , .................................... , .. Facility Roof Replacement (l9514) ............................................................ .. Y.rn.a.n.cial Summaries ....... ,., ...................................................................... . Fire/Communications Computer System (19312) .............. , ................................ . FOOIhili. Park Water Replacement (9512) ............................................... , Fuel Site Improvements (19520) .................................................................. . Future Underground Convention Districts (951 I) ............. eo ••••••••••••••••••••••••••••• ' Gas Main Replacements (8018) .... , .......... , ................................................... . Gas Meters and Regulators (SO 19).......... ............ .... .. ............................ .. 255 Pzge 140 143 183 141·142 7].·73 132 97 51 139 109 13-14 158 21·26 36 62-63 134-135 161·162 178·179 69 66 58 64·65 192 107·108 153 118·120 16-18 56-57 195·212 85-86 167 100 154·156 176 In , .~-----.-- . , .. ,,",,;,::.-: . "~~~ ~:.~~. --, INDEX BY TITLE PnQecI TJtI. Gas Sy<fem Extensions (3017)"""""""""", """""""""""""""""""""""" Geographic Information System (8945)"" .. "", .............. , .......... , .. , ........ ,,, .. , .. ,,, G<q:rnphic Information Systems (18821),,, .... ,,, .. ,, " .......... """ , " , ... " .. ", .. " .... .. Gcopaphic Information Systems Applications (9507)." .... , .... "" ...... " , .. " .......... ,,, Geographic Information Systems Application. (19518) .. , ...... , .... " .. ,,, .. , .. , .. " .. ,." .. " Incinerator Slal:k Gas P..;rticle Removal (9505)" ........... " ... ". ,"",,, , ... "" ........... " Information Systems o.veiopment (18812), .......... " ... , ........ , .. ", .. ", .... "" ......... .. Interoeptor Maintenance. Cleaning and Repair (9504) ......... " ........... " .... , .. ", ...... " Ltlmry Automatioo.Services (19517) .... , .. ,." ....... ,,, ..... , .... , .. ,,.,.,, .. ",."".""."." Lucie Sf:m Pathway Lighting (19511).. .............. , .. ,,, ........................ " ' .. " .. ,," Major Intersection Improvements (19073)." .. " .. "", ... , .. ,."., ..... ,.".".""",,,.,, .. ,,. Mes$age." ....... , ... ,'" ... ". , .... ,."., ............... ". ,.''', .. , "., .. , ....... , .. ,., ... " .. "'., ..• Multi-Line Telephone System Replacement (19519)" ... " .. , ...... ,"" ......... " .... " .... " Municipal Service Center Bulk M.teriallrnprovemrnts (9506) .... " ... " .... " .. "" .. " .. " Municipal Servk<: Center Garage Improvements (19522) ..... " .. , .. '" """ .. " ..... ,,, .. .. Open Space Lakes Vegetation Clearing (19507) ......... _ ........ , ....... , .. """ ............ .. Ovemead Extensions and Replacements (8928) .. "" " ... " ............... ,,' "" ............. , ParamedicAmbulance(I9409)., ... ,', .. , ...... ".,'''''''''', ................ '''''''''''''''''''''' Parks F~ties lmprovemer.ts (19415) ... , .. ".,."",,,.,,.,,, .. ,, ... ,,, ... ,,.,,,,.,.,,,.,,,,,,,. Parks irrigation Improvements and Renovations and BackIlow Replacements (19414) ...... , ..... " .. , .... ,""., .. ' .. , .... ,., .. ".,."",",,., Parks Offs=t Tree Trimming (19506)" ..... "".""" , ''''' .... " .... " ....... " ........ " .. , Parks PathWlly Repairs (19509),,,, ....... ,, ...... ,, .... " .... " .... ", ... " ........ " .. ,,, .. , .. , .. Parks 'Softscape" Ground CoveriPlan! Replacement (19510) ....... , .. " .... " ... " .. " " .. " PayroWlioman Resources Sysrem (19012)".,., .... , ..... , .. ,.", .. ,"',."., .. , ... "., .. , .... ,' Pedesttian!Bike Grade Separation Feasibility Study (19502) .... ", .... , ... " ......... ,,,.,, .. Permit lnformation Tracking System (J 95(6),.,."., .. ,." .. , ...... ,.,."., .. " ... , .... , .... ,.,. Personal ComJ>llter Upgrade. (19117),.",,,., ... ,,., .... ,, .. , .... ,, ......... ,, .... ,.,, .... ,., ... . Plan! Equipment Replacement (8021)".,."., .... , ... "., ..... "."., .. , , .... , .... , .... , .... , .... . Police Loclrer Room Renov>tion Feasibility Study (19513)" ... " """'''''''''''''''''''''' Project Statu. Report." ..... , .... , .... , .... , .... , ... ,."." .... " .... ,." .. , ............... , .. ,., .. . Public Buildings: Structural Improvements (18508) .............................. " ............ . RadioReplacement(19403), ....... , ...... , .. , ........... , ..... , ........... , ....... , .. , ............ ,. &even"e Collections Remodel (19505) .................... " .................................... .. Rinoooada Pool Sire Improvements (19406) ............ " ................................. " .... . 256 ~ '. , Page 175 127·128 89·90 123-125 74-79 194 87-88 193 31-33 61 116-117 1·15 91-92 126 102·103 44-45 152 93-94 54-55 52-53 42-43 39-40 41 84 lIO-1i1 34-35 82-83 190 59-60 213-253 6H8 95-96 29-30 47-48 • 0 0 \ INDEX BY TITLE Project TIlle Sand Hill Road Bridge-Bicycle Lanes (19503) ................................................. . Secondary Clarifier Modifications (9514) ....................................................... .. Scnice and Hydrant Rep!acemeni: (SOU} ................ , .......... , ........................... . Sidewalk Repairs (Utility Users Tu-18903) ................................................... . Southgate Undergrourul Conversion (9453) ...................................................... . Storm Water Discharge Improvements (9 I SO) ................................................. . Snoot Light Replacements (9354) ................................................................ . Str<e! Light System O)llYl:rsion (S929) ......................................................... .. Street MainteruLoco (Gas Tax-J&670) .......................................................... .. Streel Maintenance (Utility Users Tax-18971) ................................ " ... " ........ .. Substation Facility Improvements (8944) ......................................................... . Subslatioo ProJection Improvement (893S) .................................................. , .. .. SUbilatiOl1 Transformer Replacemer.t (9510) .................................................... . Superv;.ory Centro! and Data Acquisition (SCADA) System Upgrade (9515) ............ . System Flow Me:ering Replacemen! Program (8022) ......................................... . Teclmological Improvements 10 Recreation, Open Spooe and Seiences and Arts and Culture Faeilities (19525) ...................................................... .. Tennis and Basketball Court Renovation (19508) ............................................. .. Traffic Signals Upgrade (8930) .................................................................... . Transformers (892S) ................................................................................ . Undergroond aten,io.s and Replacements (8928) ............................................ . University Avenue, California Avenue, and Midtown BusiLles~ Districts Landscape and Improvements (19412) ................................................... . Utilities Billing System (935T) ..................................................................... . Voice Processing Syslcm (19404) ................................................................ .. Wastewater CoUeotior. System atensions (S020) ............................................. .. Wastewater CoUection System Rer.abilitation/ Augmenialion (9173)., .... , ... _, __ , __ ... _.' __ Water Main Replacements (8016) ................................................................. . WaterMeIen(SOI5) ................................................................................ . Water Quality Control Plan! apansion (S926) ................................................ .. Water Reservoir Improvements (S749) ......................................................... .. Water System E.<tensions (8013) ................................................................ . WIreless Vehicle Management System (19521) ........... " .................................. .. 257 •. 1 112-114 184 169 70 157 133 147 163 115 71 149 148 144 145-146 191 8O-S1 46 164 ISO 151 49·50 159-160 37-3S ISS 18&-187 17! 170 188·189 172 168 101 " 11IlS PA.GE 1lio'TelV170NItLL l' Lf:fiT lft'l\lVJ( --¥t -. • .". " -'}', ',.~ ---. - o o Project Nwnber 8013 8014 8015 8016 8017 8018 8019 8020 8021 8022 8749 8856 8870 8926 8928 8928 8928 Projecl Till< LNDEX BY PROJECT NUMBER Water SY3tem Extenslons (8013).. . ................. . Ser'o'ice and Hydrnnt Replacement {8014),... . ............. . Water Meters (8015).................................. . ......... . Water Malr. Replacoments (80i6) ............................................ . Gas System E,tensior.s (8017) ................................................ . Gas Main Replacements (8018) ............................................... . Gas Meters and Regulators (8019) ........................................... . Wastewaler Collection System Extensions (80201 ........ , ................. . Plant Equipment Repl.",ment (8021) ......................................... . System Flow Metering Replacement Program (8022) ..................... . Water Reservoir Improvements (8749) .. _ .......... , ........................ . 410 12KV Conversion (8856) .................................................. . Olllwjon System Improvements (8870)...................... . .......... . Waler Qoality Control Plant Expansion (8926) ............................ . Electric Servi",s and Meiers (8928) ......................................... . Overhead Extensions and Replacements (8928) ............................. . Transformers (8928) ............................................................ . ) Page 168 169 170 171 175 176 177 185 190 191 172 140 1~-135 188-189 153 152 150 8928 Underground Exlen.,ions and Replacements (8928)......................... 151 8929 Street Ligllt Syslem Conversion (89"9)....................................... 163 8930 Traffic Signals Upgrade (8930)......... ... ...... ............................... 164 8931 Communications Systems Improvements (8931)............. .... ........... 161-162 8938 Substation Prote-:tion Imp,ovement (8938)............ ... ......... 148 8944 Substation Facility Improvements {8944)....................... ..... 149 8945 Geographic Information System (8945)........................................ 121-128 9173 Wastewater Collection System Ren,bili""ion! Augmentatio" (9173)............................... .... 186-187 9180 Storm Water Discharge Improvements (9IS0)................ 133 9230 Compressed Nan,ral Gas Vehicle Conversion (9230).... ..... .............. 178-179 9250 Alma 12KV Substation Addition (9250)................... .................... 141-142 9350 9354 9357 9452 9453 Channing/Addison Avenue Underground (9350) .......................... . Street Light Replacements (9354). ... . .................................... . Utilities Billing System (9357)... . .................................... . Barron Park Distribution Sysrem improvement (9452) ...... ., ............ . Soutt,gate Underground {94S3)..... . .......................... , , .... . 259 158 147 159-160 139 157 • . ,'\. ProJ"'t Numbec 9503 9S04 950S 9506 9507 9508 9509 !lS1O 9511 !lS12 !lSl3 !lSl4 9515 18508 18617 18670 18812 18822 18903 18971 19012 19018 19073 19117 193O!l 19310 19312 19402 19403 19404 19406 19409 Projed Title I!'>'DEX BY PROJECT l'o'UMBER Effl'Jent Line Modifications (9503) .... < ••••••• _ •••••••••••••••••••••••••••••• Interceptor M.intef1.a..,Cf, Clear!jn~ and Rep.a3r (9504) .................... " Incinerator Stack G as Particle Removal (9505) ....... .. ............... .. Municipal Se!'Vice Center Bulk Malerial Improvements (9506) .......... . Geographic Information Systems Applications (9507).. .. ............ . Arastradero Creek Erosion Repairs (9508) ................................. .. 60KV Bus Tie Breaker Installation (9509) ................................... . Substation Transfor.ner Replacemen t (9510) ..... , .......................... . Future Underground Convcr5Lon Districts (9511) ............. , , ........... . Foothills Park Water Replacement (9512) ................................... . Aeration Tank Inlet Structure (9513) ........................................ .. Secondary Clarifier Modifia.tions (9514) ................................... .. Supervisory Conlrol and Data Acqui,ition (SCADA) System Upgcade (9515) ................................................ . Public Buildings: Structural Improvements (18508) ........................ . Art in Public Places (18617) ................................................... . Street Maintenance (Gas T .. -18670) ........................................ .. Informali"" Systems Development (18812) .............................. _ .. .. Ge<!graphic Information Systems (1S822) .................................... . Sidewalk Repairs (Utility Users T .. ·18903) .............................. .. Street Maintenance (Ublit)l Users Tax-18971) ............................. . l'2yroll!Human Res<lurces System (19012) .................................. . Cubberley COOe Reof Repair (Utility Users Tax·19018) ................. . Major Intersection Improvements (19073) .......................... + ••••••••• Personal Computer Upgcades (19lI7) ...................................... .. Americans with Disabilities Act Compliance (19309) ........... _ ......... . Embarcadero Pedestrian/Bicycle Bridge and Bike Path E<t""sion (19310) .......................................... .. Fire/Communications Computer System (19312) ........................... . Civic Center Lobby Renovation (19402) .................................... .. Radio Replacement (19403) ................................................... .. Voice Processing System (19404) ............................................. . Rinconada Foot Site ]mprovelnerus (19406) ........ , ..... , .................. . Faramedic Ambulance (19409) ................................................. . 260 ---_. J. 192 193 194 126 123-125 132 143 144 154-156 167 183 184 145-146 67·68 97 115 81-88 89-90 70 71 84 69 II6-ll7 82-83 72·73 118·120 85-86 36 95-96 37·38 47-48 93-94 ~ l'roject Number 19412 19413 19414 19415 !9S02 19503 19505 19506 19S07 19508 19509 19510 0 19511 19512 19513 19514 19515 19516 19517 19518 19519 19520 19S21 19522 19523 19524 19525 19530 19531 .~ J Project Title INDEX BY PROJECT IIolJ~fBER Un.iversity Avenue, California Avenue, and Midtown BUS!i\e5S Districts Landscape and Improvements (19412) .. , ..... ' Athletic Fields Renovation (19413) ....... ">.,.">">">"">."> .... ,">">">"> .. "> .. Parks Irrigation Improvements and Renovalion.s and Backflow Replacements (19414).">">">">.">">."> .. ">.">,.">">"> .. Parks Facilities Improvements (19415) ... ">"> .. ">">">"> ">">"> .... ">.">.">."> .. PtdestrianiBike Grade Separation Feasibility Study (19502).">">.">">"> .. Sand Hill Road Bridge·Bicycle Lanes (19503). . , ..... ">.">. Revenue Collections Remodel (19505)">"> .. "> .. "> .. "> .... "> ..... Parks Offstreet Tree Trimming (195Q6), ">."> ... ,"> Open Spaee Lakes Vegetation Clearing (19507)"> .... ">.">">"> .... "> .. "> .... Tennis a.,d Basketball Court Renovations (19508).">"> ... "> "">.">">">"">' Parks Pall1way Repairs (19509)">">"> ... ,"> .. ">"> "'">">">'">'">'">">'"> .. ">"> .. Parks "Soft=pe" Ground Cover/Plant Repla",ment {195 \OJ"> ">">">"> .. , Lucie Stern Pall1way Lighting (19511)">."> ........ ">">.">">"> ... ">"> ... ">"> .. Civic Center Plaza Waterproofing (19512)."> .. ">">">">">">">">">">">">">"> .. Police Locker Room Renovation Feasibility Study (19513) ..... _____ , ... . Facill<y Roof Replacement (19514) .... ">.">">">"> .. ">">"> .. "> ... '.">'"> ..... .. Downtown Library Beam Repair (19515)">">"> .. ">">">.">">."> .. ">">.">.">">. Permit Infonnation Tracking System {l95 j 6) .. , .............. ,. ............ . Library Automation Service, (19517) ......................................... . Orographic Information Sy"ern, AppliC>.tion, (19518) .................... . Multi-Line Telephone System Replacement (19519) ...................... .. Fuel SilO Improvements (19520), ............................................. . Wireless Vehicle Management System (19521) ...... , ...................... . Municipal Service Center Garage Improvements (19522) ................. . E Camino Real l'ltersectio!l Safety Improvements (19523) .............. . Bikeway System Improvements (19524) .................................... .. Tedmologica! Improvements to Recre-ation, Open Space and Sciences and Arts and Culture Facilities (19525} ................................. .. Downtown Parking Structure Feasibility Sludy (19530) ................... _ Dance Studio L-Wing Conversion (19531) ........................... , ..... .. 261 '-.....,--_._- 49-50 51 52-53 54-55 1I()'111 1I2-114 29-30 42-43 44-45 46 39-40 41 61 62-63 59-60 56-57 58 34-35 31-33 74-79 91-92 100 101 102-103 107-108 109 80-81 64-65 66