HomeMy WebLinkAbout0175.094HON<JWllE CITY COUNCIL
Palo Alto. California
SELECTION OF CCHUlITY OCSIGII ~HOP STUlY AREAS: CCH'REHENSIVE PlAN
ADVISORY ClH4!TTEE (CPAC) RECQIt£NlEll STUlY AR£AS Fal TlREE COi'HJNITY
,'J£SIG/I I«lRJ(SHOI'S
Members of the Council:
REPORT IN BRIEF
This report presents to Council. for their endorsement or modification. the
CPAC's recoomended stucfy a~eas for the three hands-OI1 Coomunity Design
IIo!i:shops scheduled during Phase II of the ~rehensive Plan process.
At the February Ii. 1994. CPAC meeting. the CPAC recoomended that U:e
follOWing three areas be studied in the community workshops: 1) Midtown
[Area 16 0fI the attached mapJ; 2) South of Forest Avenue including c"rrent
Palo Alto Medical Foundatioo Sites (SOfNPAMF) [Area 113]: and 3) Section of
£1 Camino Real including El Camino Way thangle [Area flOJ. The staff
recOf1lTlendatiOfl is cOfIsistent 'o'ith CPAC for two of the study areas,
recoomending in the third case that the area 1ncluding the Fry's/395 Page
Hill Road He.llett-Packard sltes [Area 111] be studied in place of the
SOfAJPPI'IF stucfy area. The stU<\)' area selectiOfl was based 011 the criteria
listed in Attachment A from sites shown 011 Exhibit 1. (See Attachment A:
Memorandum dated February 3, 1994; Exhibit 1: Map ShOWing Potential and
Rec!Jll1lE!nded StU<\)' Areas.)
Background
On November 8, 1994. City Council adopted an expanded Comprehensive Plan
worlc program to inclu:le a Community Form. Character Element and a
Governance Element. That expanded program includes three hands-on
coomunity design ""rkshops. "'ere prototypical land use and design
issues identified by CPAC 'o'ill be tested 1n t..:>-and three-diRensional
studies by CPAC members, interested citizens. professional volunteers and
other stakeholders under the direction of the design consultant. A
proposed fourth design IoOrkshop was changed by Clty Council to focus
instead on cit yon de transportation iSSues. The objel~ives of the workshops
include evaluation of planning concepts identified in CPAC's Phase II IoOrk
and. especially if a particular planning concept receives strong cOOlllunity
support. development of area specific planning pol icies and programs for
the new Comprehensive Plan.
CI1IU75:94
P: \C!4:\SlDYSITE.OiI.
~ .. -----
2124/94
1
.~. ",-"
, '
' .. :-:: S:. -" ~ -. •
At the January 20, 1994. CPAC meeting, CPAC metTtlers identified areas in the
City ...nere they expected significant change may occur .l thin the next 15
years, Around each of these CPAC id€)lltified chanye are~s, staff del ineated
a potential stL~y area of manageahle size that could be the subject of a
community design workshop,
At the February 3. 1994. CPAC neeting. CPAC members were presented .nth a
map showing the identified 14 potential study areas and an attached memo
frem staff. suggesting criteria for selectlng three Io<lrkshop study areas
and mdicating loIlich three areas staff would recOl1ID2fid, The proposed
selection criteria were: 1) t.'le area presents opportunlties for
redevelopment or improvement: 2) the area embodies problems/elements and
potential solutions that are applicable to other areas of the City: and 3)
the ared can be addressed in a ooe-day Iofjr',shop, Staff recoomended that no
sites be chosen t.~at have current development proposals in process or are
the subject of a separate study 0(\0/ undeNdY,
CPAC members were aSked to conSider their choices before the february 17
CPAC meeting and to come to that meeting prepared to discuss the varlOUS
options. as well as to recommend to City Council three study areas for the
community design workshops.
SelectiO!l of the Recgmencled Three Study AreaS
At their February 17 meeting. CPAC dlSCUSSed toe various potential study
areas, including a discussion .nth the City Attorney regarding possible
legal coopl icatioos if the '!!:FA/PM area -.ere selected [see Attachment 8J.
heard C<lI1Ia'lts fran the general public, and then voted for thei r preferred
study areas . .n~h eaCh CPAC mentJer casting votes for three different areas_
The vote was as follows . .nth the three areas marked by an asterlsk being
recannended for study at the COOJ1Ulity I«)r<shops:
Area 6
Area 3
Area 10
Area 5
Area 11
Area 14
*MidtCWl
*SOfAfPAHf
*El Camino Reali Ei Camino 'ay
Ed~od Pla"
fry·siHewlett·Packard
Hyatt Rickeysl El Camino Real
29
21
15
13
12
1
At the City CounCil meeting, the CPAC Process Management Committee (PHCj
onll explain the reasons CPAC selected tt~se three study areas.
ClR175:94
P:\CHR\STDYSITf.CMR
2124/94
2
,
The City Attorney advi les that thE C()(T[)rehensive PI an cannot be amended
..t1ile the Develorxnent Agreement w,th the Palo Alto Medlcal Foundation
(PM) relMins in force. Moreover. fnxll both a legal and planning
viewpoint. consideration of Area 3 would significally complicate the
forthcOOing Envi ronmental lrrpact Report for PM· s proposed relocation to
the area south of the railroad trac~s betWP.en Holiday Inn and To.<1 and
Country Village. Accordingly. staff does nat support the (PAC
recommendation to study the SOFAiPAMF area at this time. Based on the
study area selection criteri •. staff reccmnends instead study Area 11 that
includes the Fry·s and Hewl~tt-Pac.ard Sites and adjacent areas. including
the California Avenue train station. The design consulta"t. Peter
Cal thorpe. has advised that. ""thin reasoo. relatively complex study sites
are JTK)f'e productive than sing;e-issue s1tes. presenting c3 richer mix of
issues end solutions and greater applicability to other parts of t<Jofl. For
this reasor .. staff believes the rry·s/Hewlett-Packard study area is
preferable to the Edge.ood Plaza study area . ..t1ich received Similar but
slightly higher support from CPAC.
Communitv De'ian Wortsh0Q5
The three Communlty design worts hops are .cheduled to occur on Saturday and
Sunday. April 23 and 24. and on Saturday. May 14. with the cOOllllJnity
transportation IOlrkshop to occur on Sunday. May 15. The workshops will
begin at 10:00 a.m. and end at 5:00 p.m.
Each of the three design w:lrkshops will begin with roorning presentations by
identified sta.eholders and an opportunity for members of the publi~ to
comment. In the afternoon. groups of partiCipants will work at separate
tables provided witll spec,.) materials to e.1able them to develop land use
and design concepts and solutions for the study area. At the end of tlle
day. the groups will share the results of their work.
After each of the design worksh(~s. the design consultant. Caltharp!'
AsSOCiates. will synthesize the information from the wor. groups and
produce plans illustrating the planning and design ideas developed in the
w:lr.shop. In any study a rea ..t1ere strong cC>"!JlUnity s uppert for a pI anni og
COllCept emerges. the pl ans could form tr,e baSls for poliCies and programs
in the new Comprehensive Plan and subsequent implementation through
techniques sueil as a SpeciflC PI an. In study areas ""ere no general
consensus is developed. the plans will serve to explore and clarify the
range of issues affecting future planning and development in the area.
Peter Cal thorpe will present plans and written slJllnaries of the results of
all three design ""r,shops to the CPAC at thei r June 16 meeting.
OtU75:94
p:\~\SmYSITE_~
2/24/94
3
RecqJlnendat j on
Staff recoomends that t~e Clty Counci 1 endorse the folla..ing boG of the
three stuQy areas selected by C~AC for stuQy at the COO'IIMlity cEslgn
\OiOrkshops: 1) Area 6 . MidtQ\oll: 2) Area 10 • El C,mino Reill f El Ctmino Way
Triangle,
Staff further recoomends that the City Council endorse study Area 11. as
the third stuQy area to be addressed in the coommity desigr. \OiOf'i:.shops.
Respectfully sutJnitted.
~..t.-U-R· ~i<.
KENNETH R. SCIfU: IBER
Director of Planning and
Commun1ty En,ironment
~~:~
City Manager
Attachment: Attachment A: February 3. 1994 Memorandum and ~ap
Attachnent B: January 4, 1994 Memorandum frem Ariel Calonne,
C1ty Attorney
cc: CPAC
Planning Comm1ssion
lkliversity Park Neighborhood Association
Hoover Pari:. Neighborhood AssociatiOO
Suzanne Shields
2/24/94
4
<
ATTACHMENT A
COMPREHENSIVE PLAN ADVISORY COMMITfEE
To:
From:
..
February 3, 1994
CPAC
Pllinnlng Staff
Calthorpe A.s..<oeiates
MEMORANDUM
1111' j ..
Subject: Site Selection for CO!llIIluniIY Design Worksbops
The attacbed map shows the change areas idelllifled by the CPAC. Based 0" these
areas, staff has 0IIllined potential study sit"'. At the CP AC meeting on February 17,
1994, the CPAC will cboose three of these areas for study at the three Community
Dceign Workshops. (These workshops are now scheduled 10 occur on April 23 and
24, and May 14, 1994.) The CPAC's selection will be forwarded to the City Council
for their appoval of the sites at the Council meeting of February 28, 1994.
To select • site the following criteria should be used:
• R""rtiness for Change
• Good DcmODStration Site
• Manageable Size
Area presenting opportunities for
redevelopment or improvemenL
Area that embodies problems/elements and
potential solutions that are applicable to other
areas of the city.
Area tbal can be addressed in • one-<iay
workshop.
Staff recommends that 00 siles be CbooeD that have current development proposals in
process or are the subject of a separate study now underway, (i.e. Dream Team Study
Area). Staff also recommends that Areas I, 2, 3, 4, 12, and 14 {"highlighted in pink)
be excluded from consideration.
,'I:"
PAGE TWO
SIte SeIedion • Community Design Worksbop
February 3, 1994
Of ~ mnajojDg sites, the conrultants and staff consider Areas 6, 10 and 11
(highlighted in greeIl) 10 best meet the sele<.1ioll criten. and recommends thai. these
sites be selected for study at the workshops.
TIle finaj recommendation is up to the CPAC. Please come prepared on February
17th to work with Peter Calthorpe in making this recommendation.
Attachments: Map of Potential Change Areas
(p: \CP\wkspste .mem)
File: Comnnmity Design Background
l
~ til
c::::J
o 2.000"'1' 40aOf'T
L_ I
-'
t.tHlIHI .i
Chnnv NeIlS m.:Wltitied by CPAC
Pntenti.a.l Study Artas [or DWgn Wor ... .shopi tdmtifi~ b,. titB.ff.
I. Slanfani WCltlSlanfurd Shoppml CenltrJSiIlId tlill Roidl
Stllflford Mtdir.;tj Center
2. Inltt1nudal Tl'l!lIsir Sla(ionlUrb.-, Lane
3. 50IiAIPAMF lhflll
4.
5.
6,
7,
8,
9.
10.
lL
Downtown Nonh Infill
Edgewood SiIopping Cer:ler
Midtown
Wtsl Bayshore Indl.imJallEHl }window CilcldEast BaYlhorr Indl1~lriH1
San Al".tonill Road lrulWlria\
Charie$/{1D Ct".I~rISpangltr SchooUCulJbo:rlr:y
EI Camino Rtal COrrid.orlE1 Cimino Way TriLlgle
Hewlett PickarJ, Fry". l.. P1I1.Iting Ind Co.mr,. Parkin.\! Lul Sil!!"
Al.t:rt.a COlTidoT/AIIlllI. Shopping Center
Stanford Rt~Mr,h FllkIPlgt Mill kvld·El CAmino Rul C(Jmer
CiIIllllwRnl
RECOMMENDED STUDY AREAS
STUDY AREAS ~ECO~~[ND[D BY CPAC
13, IG, ,10
STUDY ARfAS RE.COJll!r"[ND[D BY STAfF;
11'11, J?6. inO
i
}
•
"'-.'_.:
:j ....... ,/" --,
ATIACHMENT B
f------------------------------------------------~
FkOM CITY ATIORNEY
January 4, 1994
COMPREHENS IVE PLAN ADVISORY COMMl TTEE
Palo ~tOI Cdlifornia
RE: Site Specific Planuing Activiti.es
Dear CPA': Members:
I indirectly received a copy of a November 21/ 1993.
letter from Ms~ Jeanne Moulton regarding CPAC's upcoming site
specific Phase II efforts~ MS. Moulton's letter says:
·We have been told that some arcane legal
consideration would keep this area from being
selected as a site. 4 • • [referring to the South
of Forest Avenue neiqhborhoodj ~ ~ . Please don' t
let a legal concern that no layperson has been able
to explain convincingly become a pretext for
setting us aside.-
I thought it appropriate that this office respond.
I do not know each "legal-consideration described to
CPAC by staff with respect to this issuo:. The main concern c'[ this
office is simple.
The City Council promised not to change tbe Comprehensive
Plan designation on the PAMF dOwntOWll site. The promise tak.es
shape in a development agreement. The dev-elopment agreement. EIR,
and underlying planning decisions have been upheld by both the
trial court and court of appeal. In short, the City is not
currently in a position to change the Comprehensive Plan
deSignation on the PAMF downtow"fl site.
We are aware that PAMF is preparing to seek land use and
other entitlements to relocate its existing facilities. We are
also aware of <and indeed quite sencitive to) the desire of
SOPA/University Park neighborhood residents to playa significant
role in planning decisions which could affect their quality of life
and the des it_ability ot their property. The best information now
available to us suggests that the City will not be in a legal
position to modify the existing PAMF downtown site Comprehensive
Plan desi~~tion within a time fr~~e that is consistent with CPAC's
~10)1aeOOSIQJ5
CO"~
COMPREHE[>ISIVE PLAN ADVISORY COf-lMITIEE
Januar"I -4 r 1 ~ 9 4.
Page 2
RE: Site Snecjfic Planning Activities
activities. On the other hand, it would be lawful and ev-en
advisable (for reasons beyo~d the scope of this note) for the City
to commit to a site specific ge~Jivalent~ planning process for the
SOFA/University park ar~a in connection with any PAMF effort to
relocate to another area.
I hope the foregoing information is useful. The
seE".mingly hostile tone of Ms. Moulton's let.ter ("arcane"' legal
"pretext·) compels n".e to offer a reminder to CPAC on the role o.t my
office~ We provide legal advice on what can or cannot be done, not
whether it should be done. My job description does oot include
creating pretextual legal reasons for city decisions. I was
understan6ably pleased that we successfully represe1J.ted the
Council' B PAMP policy decisions both during administrative h~arings
and in court. But please rest assured that we remain personally
committed and ethically bour.d to do everything in our power to
assure that any fut.ure PAMF-related land us'=! decisions are both
lawful and inclusive.
APC:lac
cc: MS. Jear~e Moult~n
City Council
June Fleming. City Manager
Resp~~~
4:(~ CALONNE
City Attorney
Bernie Strojny, Assistant City Manager
Ke~ Schreiber, Director of Planning and
Community Environment
Nancy Lytle, Chief Planning Official
HOWJ *' OO.5UllS