Loading...
HomeMy WebLinkAbout0418.093July 22. 1393 HONORABLE CIT'L COUNCIL Palo A1to. california ': ;;"-d' .. ": ''''<,' '" .-! -. 651 Hamdlton. 536-576 ~ddlefield. 523-575 Byron Street: Applicat~on For Planned Community Zone and Approval of 36-pnit Senigr Condominium Project Members of the Council: REPORT IN lIlUKF '.,-:.. This report forwards to City Council recommendations by the Planning Coanission and the Architectural Review Board tba,t the Council approve, with cODditions~ the Planned Community Zone a~licatico for a 36-unit senior condominium project at 6S~ Hamilton Str~t. on JUne 3D, 1993. the Planning Comacisaion unanimously approved the proposed project. 6"-0. with Cocrmissioner Cullen abs~nt _ This staff report discusses two changes which the Planning COcmtiSbi.on action macie to the 1-ecoa:menQed C"Olld.itious of approval (regarding timing of the Below Market Rate units aDd protecting neighbors from noise impacts), an alternative garage pl.an being proposed by the applicant. and a proposed letter from the City Council to the Senior Coordinating Council regarding-the Hamilton Se-mer Project Bndowment fund_ The .ARB re ... -iewed the project Ol) June 3~ 19.93, and recommended approval with conditions. 4-0, ~th Board Membe~ Hise not participati~g due to conflict of interest, please see the attached Planning CommiG&ion Report~ JUne 25, 1993. for a complete hj,tory and description of the project. and the recommenda­ tions of the Architectur~l Review Board. ISSUES !'b''laf'l to COndition '2 regarding tho BMB agreement In a letter dated June 29. ~993. attached to thi& report; the applicant requested that the se~~n BMR units be provided to the city prior t~ occupancy of ~ project. rather than prior to is~ce of a building permit as stated in Condition '2. Staff supported the aG.:418 :93 . , • '1Jti, ;, " '~' .~ '. I applicant' s reque~t, noting that this ",""OUld be similar to the more usual situation in which the BMR units are constructed as part of the project and .eo are not available until time of occupancy ~ and the Planning Commission modified Condition #2 to include this change. rmoet Qf COnetrnction Noise On Neig~ Repres~tati~s of Mental Research Institute (MRI), located at 555 Middlefield Road across the street from the p~oject site. spoke to the Planning commission ahout t~eir concern that noise during con&tru~tion would interfere with the counseling and tra.ining se:::vices which they conduct in their huilding. They asked the Planning Commissioa to recommend that the applicant replsce the existing windows in their building with sound proof windows. as mitigat.ion for the noise impact. MRI presented a proposal from &n acoustical engineer. which suggested poss~ble impacts of the construction on their operations and briefly outlined how a study 'WOUld be condnct:.ed to determine projected noise impacts and recommended modifications to the building to reduce noise penetraticn. The proposa.l is attached to this report. The applicant's acoustical consultant, Charles Salter~ ~s present at the meeting and. discu6:5ed his opinion 'Of the noise impact. as outlined in a February 2, 1993 letter attached to the Planning Commission report. Mr. Salter is of the opinion that the. constr~ction noise would not significantly impact the activities of MRI., since the existing traffic noise would ~a6k most of the noise generated by ehe construction activities. He explained that this did not. mean that occupants of the MRI buildin~ waulC' not hear the construction noie:e, but that the level of increase over existing noiDe generat.ed by traffic would not be great enough to INllte a noticable difference in haw Doise levels inside the ~ building affected their activities. Re observed that the MR.I building currently has jalousie win.dow$ and window a.ir couditionere ~ both of which greatly increase the penetration of outside noise into the building + Xn a letter dated January 20~ 1'93~ MRI suggested that the applicant coorc1i.na.te their construction activities with MR..I's schedule for training cl8.$se~ in order to reduce interference ~tb this activity. In response to that suggestion, staff recommended in Condition #2 of the Plauniog Commission report Chat the appliCADt be required to coord.1nat8 with MRI'.s schedule:. Sowever, at t.he Planning Cc::m:uission he5.rillg. MRI representatives indicated that coordinating schedules would not be sufficient since they expect their counseling activities~ which are OIl~going. to be adversely affected by the construction nol.e. ~ PlanniDg Commdssion modified Qondjtion #2 to requi~e the applicant to ftlinimize construction !lOise to all neighbors, not just MR.I. and to accomplish this by temporary sound walls or other construction teChniques and also by construction timing and coordination ~tb neighbor6~ scheduled activities if this proves helpful. The Planning COI'IIlliBsion did not recommend that improvements be made to the MlU buildiug or any other neighboring buildings. OCR: 618: 93 p,\OGl\lIN'In.'IVII.OGl 7/22/93 Page 2 When City cauncil reviewed the project in ~anuary. ~9S1, they directed the applicant to work with staff to explore the possibility of providing additional parking. The applicant modified the plan to provide an on-grade space for deliveries. one additional on-grade visitor space and two additional spaces {total 71) in ehe garage. During ~ ARB re~iew, the Board concluded that the dead-end aisles in the parking layout made the garage difficult for some parkers to use. and directed the applicant ~o modify the garage layout to replace the dead-end aisl~s w1th a loop arrangement, if this could be done vtthout dropping below the number of spa~es (69) shown when the project was reviewed by City Council. They further requested t.hat this loop scheme return tc.. the ARB for approval. For Planning Commission revie~, the applicant presented botb the 71- space dead-end aisle seheme and an alternative '9-space loop plan. They also presented what they referred to as an ~eleventh hour Bolution~, work~d out shortly before the me9ting. which was a revision of the dead-end aisle scheme tJ:at attempted to answer the ARB concerns by providing turn-around room at the ends of the aisles. Julia Maser, ARB Chairperson, reviewed t~e loop plan and submitted a memo to the Planning ComaUssion stating that she believed that while it vas an improvement ove~ the dead-end aisle scheme, it posed problems with storage roems opening onto the drive aisle and it continued to include the bai:rpin turn a.t the ramp, which is t.he case with all schemes propos-ed. The memo is attached to this report:. The Planning commission approved the original staff condition requiring a loop s~·stem. but noted that the applicant would be continuing to develop the garage deSign. The applicant has done further refinement of the "eleventh hour solu.ti..on" dead-end aisle sch.e1'CJJe. They bave concluded that it is the best alternative and are asking that Council approve this scheme. raeher than the loop scheme. (See lettex: from the applicaut dated July 20, 1993, explaining Wby they prefer this plan.) The plans submitted iL your packet include two alternative garAge layouts, the revised dead-end aisle plan (Sheet ASal), and the loop plan (Sheet A6-2). R,evinRd "ead-end AtJilt llycut. This plan bas t\lw"O dead-end aisles, but turn-around space at the end of each .i£le is provided by ~eoesBing the lest two parking spaces on each aisle .12 feet eoward the center of the garage. It provid.es 11 p&rking spaces. The disadvantage of this arrangement is that a driver who goes to ~he end of the .isle ~thout finding 6 parking space must turn around to leave the garage. However, this plan avoids t.he problems of the loop layout described below. rom layout This plan provides fo:: continuous circulation t.brough the garage. It includes 69 parking spaces. The benefit to this scheme is that there are no dead-end aisles, so no one O!R,UB,n 7/22/93 ',\DIR'\IL'IIUtT'llll.aG Page 3 • 1 ! would ever be required to turn around in the garage. The disadvantages are: 1) the:e are two fewer parking spaces; 2) the amount o£ personal storage space in thg garage for residents is reduced by approximately 40 pe~cent; 3} some of the storage &reas open into the drive aislei ') excavating is required under approximately 40 perc~nt of the central courtyard. thu~ reducing .oil velume for trees and requiring trees and shrubs to be in planters rather than in the ground; 5) storage are •• are located under the courtyud deck which is vulnerable to leaKs; " aChieving the elevation change from the low south corner under the swimming pool to the high north corner will require mora excavation; 7) the change in elevation from the south to the north corner ..... -ill result in an aw}"'Ward slope in. the garage floor. After considering the relative merits of each plan. staff supports the applieant~s choice of the revised dead-end aisle scheme. We believe that since all res1deuts and all employees ~ll h3ve assigned parking 8~ace8~ and the ep&ces marked .nd reserved for guests are nearest the foot of the ramp and spaces at the ends of aisle:s are reserved fo~ ~loyees, there will be little occasion for anyone to get to the end of the drive aisles ~thout finding a parking space. In the event that this should happen. th1.5 echeme provides a turn-around. area at ebe end of each drive aisle. An unresolved issue ~th the garage design continues to be the hairpin turn &t the bottom of the garage ramp. The tight turning-radius requires a driver caning down the ramp to swing into the oncoming lane in order to complete tbe turn into the front P5tt of the garage. The applicant. working together with Chairperson Maser, bas identified minor ehanges to the design which will resolve this prohlem~ and they will present • sketch showing these propos~d changes at the council aeeting. Tbe modified garage design incorporating theBe changes should. if accept.able to the Council. ret.urn to ARB for incorporation i.nto the final garage plans. Letter FrOO! City cqunc;il R.e9AUiiuq The Kndoyment FUnd A draft agreement bas been worked O\:.t hetvee!l the app11cant and the city regarding the oblig&~1onE of the project to eontribute to the ~t fund being proposed as partial public bene£it tor the project. (This dra~t agreement is AttaChment '9 in the Planning commission report and. Exhibit "B" of the PC Ordinance.} In response to the Council's earlier discussion of this item. the City Attorney's Office. in consultation with staff from Planning. Finance and BurD&Jl SeTVicee=. and with Council Member Simitian, has drafted !!I. letter, addressed to che senior Coordinating Council, wbieh sets forth guidelines for use and cii sbursement of the Fund. monies. The letter has been reviewed by, and. is acceptable to, Kathleen GwyIm. Executive Director of the Senior Coordinating Council. A copy of the draft letter is attached to this report for Council's review and approval. CMR.:.18:93 p, \aG\,IUiIoItLTOW.aa 7/22/93 Page • COMPRXHENSIVlI PLAN COMPLtANCE The uses and site development regulations of the Planned Community zone must be found to be consistent with the Palo Alto Comprehensive Plan. Following are Policies of the Housing Element which are pertinent to the proposal. The proposal app~ars to be consistent with the following Housing ~~ement policies and Objectives: Poli~./ '7: Encourage and fos-ter the development of Ilew ilDd exi8ti~g housing units afforaable to low· and moderate-income households . The BMR agreement being proposed by the applicant would convert a minimum of seven existing market rate rental units into below market rate units. Policy 11 and Policy 1.3: Continue support for the Palo Alto Housing Corporation in the provision of low-and moderate-income housiog. and increase funding sourcet;: used to provide afforc1.able hO'..u:ing . These policies are suppozted by the applicant's stated intention to work wi th the PARe to look f or ways to provi de more than the required minimum. seven BMR un..ilts. Policy ~t.. support the mixing of residP-ntial uses in c~rcial and industrial areas. Locating the units close to downtown near shops, trans~t and other services !~s this policy. Second of the th.ree Hajor ~usi.c9 objectives identiLied in the Housing Element.. Maintain a div~rsity of housing opportunitie!~and provide a variety of housing types and sizes. ~ . mixture of ownership and rental housing. and a full range of housing cost-s. The p~8ed project furthers this housing goal by providing a type of high-income houSing ~th on-si~e services for seniors ~Oh is not presently available in the community. and thus provides the opportunity for residents in this housing market to vacate family haDes and move to a senior living corrmunity within Palo Alto. The BOuSLn9 Blement ident-ifies persons over 60 as an increasing population group with housing needs to be accOfM'Ioclated. In 1989, this age group made up one-fifth of the population and included 12.811 people, an increase of 26' since 1980. The proposed development viII serve this increi!Lsing segment of the popula.tion of Palo Al to. The projected Association of .Day Area Governments (ABAG) "fi!Lir share-housing need for Palo Alto is 1597 units. to be provided 0IR.:418: 93 7/22/9) Page 5 -.. ' between 19~O·19~S. Of this tot~l. '80 units are identified as housing for households with above moderate income_ The proposed development will provide 3& units of housing for above moderate­ income households. thus helping to address this identified ·tair Bhare~ housing need. The proposed project appears less consistent with the following Policies of the Housing Element: Pol.icy 2: P;reserve older iliingle·family homes and small apartment buildings. The proposed project would result in the demolition of a four­ unit rental apartment ~~ilding and three older single-family homes ..,hich are rented. Removing the (-unit apartment building ."1I9I11S particularly contrary to this policy. However. Program 9 provides that mitigation for the removal of rental housing may be made by increasing the nwnber of existing housing Wlits on site. 5lld providing 20 percent BKR. un.its, rather tha.n .10 percent. This project is meeting both of these st&nOards. Po~icy 6: Maintain at least the present number of multiple· family rental units wbdle working to increase the overall supply of -rental housing_ The proposed project will result .in a. net less of .four units in the City's renta.l housing stock. Four apartments. and three sill9le·fam.i.ly houses; which may be rented.. are being removed from the site. The seven BMR. units 'Which ere being provided are existing unit$ that are currently pa.rt of the City's rental housing stock. so they do not represent an increase in the supply of rental housing. program. 9 provides that OOubling the number of housing units en toe site, and providing 20 percent BMR units DdtigatE!s the re1IIOV&l of rental housing; and this project is meeting both these conditions. FINOINllS 1. Tbe site is so situat~d; ar.d the use proposed for the site is of such 6 characteristic that the application of ge~eral di8trict~ or combining dietriets ~11 not provide sufficient flexihility to allow the proposed development, in that the maximum floor area ratio 'FAR) allowed in t.he highest density multiple fam:i1y zone (RK-tO) is 1.0 while the FAR o:f the proposed project is 1, 70~ An FAR ~f 1.0 does not allOW' .. aufficient building volume to accon-Y"""!ate the activities and services of a semo::: living community; as evidenced by senior residences eonsiatently having an FAR exceeding 1 ~ 0 both in Palo Alto (Lytton I. FAR. 1. •• and Webster HOuse~ ~ 2.43) and in other communities_ 2. Development of the site under the provisicns of the Planned CO'''",ni ty district. will result in y.wlic benefits not otherwise attainable by application of the regulatioos of general districts or .oorahiniIlg districts, in that an Bndowment Fund to be DIR:tlB:93 ,,\oe'JI.U;.TQJt.~ 7/22/93 Page 6 • , "";.:..--'"":r~-~_ ,;-.. established by agreement between the City and the developer with monies to be provided by a $500,000 contribution from the &eveloper and a 2.S peroent resale fee will be used by the City to Pl."ovi.de bene:fits for seniors and aenior services. In addition. the senior living community will provide housing with support ser.rices, for which there is an unmet need in the community, thus enabling rc&ideDts in need of this type of housing to remain in the communit~~. 3. The use or uses permitted, and the site development regulations applicable within the district are consistent wieb Policies 7, 11, 13. and 14 of the Housing Blement of the Comprehensive Plan, as discussed in the Comprehensive Plan Compliance section above. The perm1tted uses and site development regulati~ are compatible with existing and potential uses on adjoining sites or within the general · ... ·icinity. in that. the site is appropri.ate for senior res~dences because of the close proximity to Lytton r and Webster &ou$e. to Downtown, the Senior Center, medical ~~rvices and public transportation. The location at the intersection of t~ major streets and at an entrance ~~town is appropriate for a bui.lding of this scale. providing balance for the Lytton I cOiaplex on the other side of University Avenue. The architecture and landscaping is designed to be visually compatible with nearby residential areas; the building mass is set back from the interior property line and the building height is lowered Wber~ it is opposite residential uses; the Middlefield Road ~acade is ~ated and detailed to minimize the size of the building; auto access is off ByrOD $tre~t to ~inimize conflict with existing heavy traffic on Middl.e.field :Road; all anticipated parking demand i-& being provided for on the si.t.e. CORDITIQNS JII!odifieaeions to the conditions reconnendeQ to the Planning Commission in the attached June 2S~ 1993 &luff report are shown in italics. The only aeaff-recorII'QIended modification to the Planning Conni6Sion action is Condition '1. 1. Tbe garage plan shall incorporate a loop system that mdnimizes dead-end aisles, ~illtain& overall approved parking numbers and maintains zoning regulations. Al. t:e.rna te condi tion recoaaended by staIr: 7'~*Je llpproved garage plan shall be the revised pla.r:. suboitted by the applic40t. datl!d July 20, ~!H3, showing the s.i.x spaces at the end oL the ramp r~served .for visitors and the six Bpliceli neerest the el2d.s or the t'wO drive a.1s1es re.cerved Lor employe,es, .and the four interior spaces a.djAcent eo the stora.ge area recessed 12 :Eeet each to provide turn-4.rcnmd space at the! ends or the aisles. In addition, the design shall be rurt:her modified to increase tbe turning r,.dius at the bottom of the rUlp to eliminate cODLlict with o.o-comi.og cars, with this modiLication returning to ARB for approva.l prior to issuance of a building penni t. om:"1~:93 ,,\a.~ILTOIt.a. 7/22/93 Page 7 . 2. Prior to issuance of a bui.lding permit, tM property owner sball provide a written plan, to the satis£aetion of the Planning D1viaion, ~pec1fying how Cbey will minimize noise impaets to neighbors. by sound walls or other caostruction techniques. and by cOIIstructioc timiJ:l9 and cc.>ordinat.:ion with scheduled actjvities o~ the neighbors; to the extent that t.:im.ing and' coordinat.ion are practicable. 3. Prior to issuance of • built1iIlg permit. the .followiog items shall return tor ARB review: &. b. c. d. e. f. 9". h. 0IR.:41B:93 Details of glass to exterior wall indicating de?th and design. Detail of garage vent exhaust. Samples of exterior materials ~d. et:Ilore and ad.ditional building details as required by the ARB. Pinal landscape plan to inc! ude a planting and. irrigation plan, si~es of plant materials and samples of pav.ing materials. The tinal lan:1scape plan shall show the location, size and species of all trees to be retained. both on the site and in the adjacent public right-of-way. The planting and irrigation plan shall be approved by the Ut.ilities Resource CCnservation Division. Fiz::.al lighting plan sbowing location and design of all exterior lighting fixture6 and II. photometric diagram showing light pattern and intenaity~ both em and off the property. of light cast by all exterior lights~ The design of the dri vew.y providing access to the Scholts property adjacent to ehe project site. to be developed in coorcUnation with the Transportation aDd. Planning Divisiaos. A parking plan showing the six surface parking spaces and six parkiDg spacea in the garage marked and reserved for guests; with II. minimum of six additional parking spaCtl:ii in the garage to be marked. and reserved for employeea. A tree protection plan prepared by a licensed. Arbor-ist specifying all measures to be t~ prior to. durLng aud after construction to protect the trees to be retained. both on the site and in the ac!jaceDt public right-of-way. The tree protection paD sball .include a site plan s~ the ~cies, size and location of all 't:rees to be retained. both on the ,i.te and in the adjacent public right-o£-way. In addition, the Pl&ml.ing Division shall be provided \rith a letter from a licensed ArboriBt verifying that he has been re'".i.ned by the applicant to see that the tree 1/22/93 Pase B .: __ ,f • protection measures are carried out and that. periodic field report a will be submitted ~o the Pl~ing Divieion confirming compliance with the tree protection mea~es, 4. Prior to i.suance of a damolition permit or a building permit, the A=bcrist retained by the applicant. shall submit a letter ver~fying that he has conducted a field inspection and that the protective fencing required in the tree protection p1~ is in place. S. Prior t.o issuance of a demolition or building permit, the applicant shall prepare. to the satisfaction of the Transportation Division and the Public:: Works Department. il Ccnstruction plan addressing location of construction staging Areas. travel routes for construction "\"ehicles of the construction erew~ fencing of the construction site. a plan for keeping nearby street~ and sidewalks free of dirt and other construction dehris as well as all other issues deemed necessary by the City to provide for the public safety and to reduce impacts of construction on the surrounding neighborhood. The plan shall include a proviSion t.hat construction fencing be installed in such a way that the adjacent driveway from Byron Street to the Schultz property is not impeded. ,. A planter strip and street trees shall be provided on all three street frontP~e8. with 8 minimum width of 5 feet on Middlefield Road and Hamilton Avenue and & minimum width of 2.5 feet on Byron Street, unl~s8 at least two feet of perimeter planting is provided inJ!lide the property line along the one-way driveway on Byron Street. in which case the curbside planter serip shall be a miDdmum of 5 feet wide. The planter st;rip shall be planted continuous1y with low shrubs or dense ground cover and shall be autc:matieally irrigated. The street trees shall be pl&"l1ted a aaximum. of 25 feet on eenteT. with the location and epecies to be approved by t!le City Aroorist and the Planning Division. All &tre-et t.re-ea shall be located in tree wells with a minimum dimension of 5 x 5 feet. and shall be installed according to the City Arborist~s ~pecifieatiODS. ~l street tree wells shall be provided with autCJmatic irrigation. 7. SUbclivision approval to merge the existing six lots into one parcel shall be obtained frCl!l the City prior to issuance of a buildill!l' permit. If the units are to be individually sold. a copd...,i niUJII suh4ivision map shall be approved by the City prior to sale of any unit. 6. Prior to occupancy of the project. the owner shall provide Ii minimum of seven BMR units in fulfillment of the owner's obligations under Programs 9 and 13 of the Housing Element of the Palo Alto Comp~bensive Plan, CMR.:41B:93 ,,\aa~ll.il ... _aa 7/22/93 Page 9' 9. Prior to issuance of a building permit l the owner shall enter into fill agreement with the City for the purpose of providing additional public benefits to the project in the form of contributions to the fund to provide services to aamore. 10. Construction activities are required to conform to tha Palo Alto Noise Ordinance. which restricts hours of activity and le~els of noise produced by individual pieces of equipment as well as noiae produced generally. as specified in Section 9.10 of Lhe Palo Alto Municipal Code. 1.1. To reauce dust levels .during cODStruct.ion l l. t shall be required that exposed earth surfaces be 'Wntered frequently. during the late C'IOrning and. at the end of the daYI with frequency of water~ng increa5ing on windy days. Spillage resulting ~rcm hauling operations along or eerosa any public or private property shall be removed inmediately and paid for by the contractor. Oust nuisances originating from the contra::tor's operations, either inside oz' outside the right· of~way~ shall be controlled at the contr&ctor', expense. If. in the opinion of the City Bngineer, the contractor tails to comply ~th any of tbe items concerning spillage and Oult control, and the contractor is either unwilling or unable to remedy the deficiency. the City Engineer ahall employ private or public work forces and equipment a8 required to correct the deficiency. The cost of employing such foreea and equipme.c.t shall be doubled as a penalty. and aueb cost shall be borDe by the contractor. Such action taken by the City shall not relieve the oont~actor of the reaponsibility eoneerning spillage and dust ogntrol. Tb~ following conditions shall be implemented to the-satisfaction of the PUblic works Department: 12. A performance bond must be posted prior to construction -of public right-of-way improvementa. 13. Plans for landscaping in the public ri3'ht~of-'W&y must have prior approval by Public works Departme.:lt_ 14 . Any existing unused dri vewaya Ill'Ust be replaced wi th curb~ gutter and sidewalk (Where app1ic4ble). 1.5. A grading &nd dra.inage plan must be subnitted to Public worb Engineering for the project. This report shall include calculAtions on how the ai te runoff will itapaet the City storm drain system.. stormwater from t.ha site shall be designed t.o be divided intr: t.wo watershed areas. part of the runoff from the site shall be directed to t.he public storm drain at the corner of Middl~field and Hamilton and the other part shall be directed to the publio storm drain at the corner of Byron and Bamilton. It is recoamended that an on-site detention system be considered to control the om,U8,93 p,\OIa\IIMCn.'!'CIf._ 7/22/93 Page 10 ,,' rate of dis.charge .from the site. The applicant must contact Jim Barrington of the Public Works Engineering Division prior to submitting formal drainage imprO'\"ement pla.o.s. 1,". Construct.ion is proposed to be constructed ..... ithin the City right-at-way. A permit for Construction 1n PUblic Street must be obtained !rom the Public Works Department. 17. A soils report will be :required to be submitted f~r the p=oposed l.lIld!;rground garage. A dra.inage plan for this underground struct!..lre will also be required. lB. Due to the detrimental impact the construction activity will ha'l1'e on B}"'Xon Street. the applicant shall be required to skin. patch and slurry seal Byron Street betW'een university and :Hamilton Avenues. 19. Construct.ion of approved handicapped ramps. is required: at the corner of Byron Street and Hamilton Avenue. 20. The applica.nt shall install red curb areas on By:-cn Street next to project driveways in order to aid turning ~nts into and out of the driveways. In order to obtain the maximum number of parking stalls on Byron and Bamiltoo~ the applicant shall submit a plan for, and reBt~ipe. all parking stalls on the applicant ~ s aide of Byron Street betweec Hamilton and. Un:iversity~ and on Hamilton between Byron and Middlefield. The above work shall be done to the satisfacti~ of the Transportation Division and the Public Works Deparement, and shall be completed before occupancy of the project. Based OIl the above f1ndingB~ staff recO!'t'lllell4s that the City council adopt the Negative Declaration and approve the applie&tion for a PC zone~ upon the above-listed findiDgs~ and subject to the above-listed conditi~. Staff further re~nds that the City Council approve the agreement between the City and the developer regarding 'the public benefit Endowment ~ {Exhibit B of the attached ordinance), and the attaChed letter to the senior Coordinating Council regarding use and disbursement of the Fund monie8. KRNNB'tk R. SCBRBrBER Director of Planning and community Environment 7/22/93 Page 11 AttacbmentB: 1. Ordina..noe 2. Draft Letter. dated July 16. 1993. from Mayor McCown to xathleen Gwynn 3. Letter tram applicant. dated ~uly 20. 1993. regarding garage layout 4. June 25, 1993. Planoing Commiasion Staff Report 5. Mental Research Institute. construction Noise AerOBS Middlefield Road, June )O~ 1993 6. June 29~ 1993 letter fran applicant regarding BMR agreelEM!nt 7. JUne 30~ 1~93 letter from Stephen Player 8. JUne 30. 1993 memo from Julia Maser. ARB Chair; regarding garage design :9. J'.me :IS. l.t:9l letter from Stephen and Debra Smith 10. JuDe 25. 199) letter from Dr. Arthur Bodin 11. June 23. 1993 letter from Lee weider 12. June 23, 1993 letter from homP.owners 13. June 22. 1993 letter from Charles SChults 14. Project Plans (Council Members only) cc: Arclti tectural Review Board James B. Hill, B&tr.ilton Aven-ole Properties. 555 Byron Street, Palo Alto, "" 9C301 Backen Arrigoni&; RoBS. Inc .• 1660 Bush Street.. San Francisco, CA 94~09 Leland K. Wieder. 210 San Antonio Circle. Ste. 235. MOuntain View. A., 94040 tJn1ver.1ty .Park Association t71Uveraity and. Crescent Park .IIomeOWlterB Association Ruth J. :Frapwe.ll. 571 'B&milton Avenue, Palo Alto. CA 94301 Bdward K. F.rapwell. 7.'0 Girard Avenue. La Jolla, CA '2037 ~thea Prapwell Ander.en, 18" Venetian Point. Clearwater. PI. 3'61.5 Mental Reaearch In8titute. SSS ~~ef~eld Road, Palo ~to. "" 94301 Charles Schcltz. 511 Byron Street. Palo ~to. CA 94301 CXR:418 :93 7/22/93 page 12 ·../ --_.--.,.",;.._ .. -----~-.----- AITACHMENT 1 ORDINANCE NO. ORDLllANCB OF THE COUNCIL "O"'P-THE="--'C"'I""TY OF PALO ALTO AMSNIlING SECTION lB. DB. 040 OF THE PALO ALTO MUNICIPAL CODE (THE ZONING MAP) TO CI!A!'IGE THE CLASSIFICATION OF PROPERTY KNOWN AS 536·576 MIDDLEFIELD ROAD, 535·575 BYRON STREET, AND 651 HAMILTON ~VENUB iTHE HAMILTON SENIOR LIVING COI'MlNITY) PROM RJoI(15) TO PC WB:BRBAS. the Planning Commission, after duly noticed public hearing held June 30, 1993 I and che Architectural Review Board~ upon consideration at its meeting of June 3~ 1993, have recommended that section 1B.08.040 [the Zoning Map] of the Palo Alto Municipal Code be amended as hereinafter set forth; and WHBRBAS, the City council, after due consideration of the reccmmendat.ions, finds that the proposed. amendment is in the public interest and will promote the public health, safety and welfare. NOW, THEREFORE, the Council of the City of Palo Alto does OR!UL[N as follows: SECTION 1. Section 18.08.040 of the Palo Alto MUniCipal COde, t.be -ZOning Mapll, is hereby amended by changing the zoning of certain property known as 536-576 Middlefield Road, 535-575 Byron Streett aD!' 651 Hamilton Avenue (The Hamilton Senior Living COIlIIIUIlity, the 'subject property') frcm 'RJoI115) Medium Density Multiple Family Residence' to 'PC Planned Com:ounity·. The subject property is shown on the map labeled Exhibit IA-, attached bereto and incor,porated herein by reference4 SRCTIQN 2. The City Council hereby finds with respect to the subject property that: {a) The site is BO situated, and the use proposed for t.be site is of such a characteristic that the applicatioc. of general districts or cambLning districts will Dot provide sufficient flexibility to allow the proposed development, in that the maximum Floor Area Ratio IFAR) allowed in the highest density multiple family zone CRK-40) is 1.0 ",hih the FAR of the proposed project is ~. 70. An PAR of 1.0 does not allow a sufficient building volume to accommodate the activities and services of a senior living caz'PIlD1ty, as evid.enced by senior residences consistently having an FAR exceeding 1.0 both in palo Alto (Lytton t. FAR 1.4 and Webster House, FAR 2.43) and in othe~ communities. Cb} Development of t.he site under the provisions of the PC Planned Comm1nity district will result in public benefits not otherwise attainable by application of the regulations of general diatricts or combining districts, in that the senior living cOllln\1D.!ty vill provide housing with support services, for which there is an unmet need in t.he community, thus enabl ing residents in need of this type of housing to remain in the cOltlDUD.ity. In addition, a tUIld to be established from contributions by the 1 9307l1_cmm12 • developer totaling $500,000 plus resale fees will he used hy the city to provide benefits for seniors and senior services. (el The use or uses permitted, and the site development regulations applicable. within the district are consistent with Policiee ? ~1, 13, and 14 of the Housing Element. of the Palo Alto Comprehensive Plan. The permitt.ed uses and site developzr.ent regulae ions are compat.ible with existing and potential uses on adjoining sites or within the general vicinity. in that the site is appropriate for senior residences because of the close proximity to Lytton I and Webster House. to Downtown, chI! Senior Center. medical services and public transportation. The location. at t.he intersection of two major streets and at: an entrance to DowntOWIl is appropriate for a building of this scale. p~iding balance for the Lytton I complex on the other side of University Avenue. The architecture and landscaping is designed eo be ~isually compatible with nea~ residential areas; the building ~BB is set back from the interior property line a.~ the building height is lowered where it is opposite residential uses; the Middlefield Road ~acade is modulated and de~ailed to mdnimize the size of the building; auto access is off Byron Street to minimize conflict with existing heavy tratfic on Middlefield Road; all anticipated parking demand is being provided ~or on the site~ SReTTON 3 ~ Those certain plans prepared by sa clcen Arrigoni ~ ROBBs Inc.s dated April 8, 1993~ and approved by the Architectural Review Board on June 3 6 1993, a copy ot which plans is on file in the Planning Division office, and to which copy reference is hereby made concerning the full particulars thereof, are hereby approved as the collective Development Plan for the subject property, pursuent to Section 1a.os ~20~ Said Development Plan is approved for the following uses 6 and subject to the following conditions: (a) Permitted USM. The use shall be limited to 36 independent living units for seniors plus carmon dinfng facilities and accessory uses typical of a senior living facilitY6 including. but not limdted to, iDahome personal care; a library and living room; bar/lounge; pool; exercise roam; jacuzzi p002; sauna and shower facilities; mail room; two private guest roans; and administrative facilities, including a clerical/reception area, work area, two private offices, a meeting room/privat.e dining room, aDd an employee lounge. (hl permitted. (el development Development the Special Copditipnal Uaea. No conditional uses shall be Site Pevelopment; Reg111i1tippB~ All improvements and ahall be substantially in accordance with the approved Plan, which shall be amended as required to comply with Requirements set forth in subparagraph (el. (d) Parking ang Lpadina RequiremeptR. The parking and loading requirements governing the subj ect property shall be in accordance with the Development Plan, which shall be amended as • required. to comply with the Special Require:nents set !orth in subparagraph (e). (e) Special RequirementB. (i) '!'he approved garage plan shall be the revised plan dated July 20, 199~, showing six spaces at the end of the ramp reserved tor visitors and six spaces nearest the ende at the two drive aisles reselVed for .employees, and f<Yllr inte.rior spaces a~jacent:. to the storage area recessed 1.2 feet each to p~avide turnaround space at the ends of the aisles. In addition, the deSign shall be further modified to increase the turning radius at the bottom of the ramp t.o eliminate conflict with on-coming cars, and this modificatiOIl shall return to ARB for final approval prior to issuance of a building per.mit. ~ii) prior to issuance of a building permit} the property owner Shall provide a written plan, t~ the satisfaction of t.he Planning Diviaian. specifying how they will mdnimize noise impacts to the neighbors by sound walls~ or other construction t.echniques, and by construction timing and coordination with scheduled activities of tbe neighbors, to the extent that ttmdng and coordination are practicable. (iii) EXterior materials, colors and additional building details shall be subject to final ARB approval prior to issuance of a building permit. (lv) ,prior to issuance of a building permit. the ovner shall submit a fiDal landscape plan that shall include a planting and irrigation plan, sizes of plant materials and samples of paving material.". The final landscape plan shall show the locaeion., &ize and species of all trees to be retained .. both on the site and in t.he adjacent public right of way. The planting and irrigation plan sbal.l :be approved by the Energy Services Division. (v) prior to issuance of a t,uilding permit, the owner shall submit a final lighting plan showing location and design of all exterior lighting fixtures and a photometric diagram shoWing light pattern and intensity, bOth OD and off the subject property, of light cast by illl exterior lighCS. {vi) The des ign 0 f the dri vevay providing access to the Schultz property adjacent to the north of the subject property shall be developed in coordination with the Transpol.-ta't:ion and Planning Divisions, and approved by the Planning Division prior to issuance of a building permit. (vii) prior to isouance of a building permit, the owner shall submit a parking plan Shoving the six surface parking spaces and. six spaces in ehe garage marked and reserved. for guests. with a minimum of six additional parking spaces in the garage to be marked and reserved for employees. (viii) Prior to issuance of a building permit. the owner shall submit a tree protection plan p=epared by a licensed arboriat specifying all measures ~o he taken prior to, during and after construction to protect the trees to be retained~ both on the site and in the adjacent public ~ight of way. The tree protection plan shall include a site plan showing the species; size sud location of all trees to be retained, both on the site and in the adjacent right of way. In addition, the owner shall provide the Planning DivilElion with a letter from a licensed arborist verifying that the arborist has been retaiced by t.he owner to ensure tha~ the tree protection measures are followed and that the arborist will submit periodic field reports to the Planning Division confirming compliance with the tree protection meaSures. (ix) Prior to issuance of a demolition permit or e. buildiog permit, the owner shall provide a letter to the Pla.nning Division from the retained arborist verifying that the arborist has conducted a field inspection and that the protective fencing required in the tree protection plan is in place~ (x) Prior to issuance of a demolition or building per.mit, the owner shall prepare, to the satisfaction of the Transportation Divi&lion and thl1 Public Works Department. a construct.ion P~an addressing locat.ion of construction Staging areas, travel routes for construction vehicles. parking for construction vehicles and private vehicles of the const.ru.ction crew, feneing of the construction site, a plan for keeping nearby streets and sidewalks free of dirty and other construction debris. and all other measures deemed necessary by the City ~o pr~~ide fer the public safety and to reduce impacts of construction on the surrounding neighborhood. The plan shall include a proviSion that construction fencing be insea11ed in such a way that the driveway adjacent to the .ite that provides access fram Byro~ Street to the Schultz property is not impeded. (xi! 1t. plant-er strip and street trees shall be proviOed on all three, str~et frontages I with a ndn~ vidth of 5 feet on Middlefield Road and. Hamilton Avenue and a minimum width of ,~S feet ill Byron Str~et, unless at. least 2. feet of perilileter planting i. provided inside the property line along the one-way driveway on Byron Street, in which c&s.e the curbside planter strip sha.11 be a minimun; of 5 feet wide. Tbe planter strip 8ba.l.l be planted continuously with low shrubs or dense ground caver and. shall be automatically irrigated_ The street trees shall be planted to a maximum·of 25 feet on center~ with the location and species to be approved by the City Arl>orise and the Planning Division. All street trees shall be located in tree wells with a m1n1a1m dimension of S x S feet, and shall be installed according to the City ArboriElt's specificaticnB. All street tree wells shall be provided with automatic irrigation. (xii) Subdivision approval to merge the existing six lots into one parcel shall be obtained fram the City prior to issuance of the building permit. It the units are to be 4 • -- indivic!ually sold, a. condominium subdivision map shall be approved by the City prior to sale of any units~ (xiii) Prior to occupaucy of the project. t.he owner shall enter into an agreement with the City under which the owner shall agree to provide a min~ of seven (7) BMR units io fulfillment of the OWDe~'s obligations under Programs 9 and 13 {the Below Market Pate (IBMRI) provisions) of the Housing Element of the Palo Alto Compre-.hensive Plan~ The BMR requirement shall l;e subject to the followi~g conditions: 1. A minimum of seven (7) BMR units will be acquired or constructed by owner and given to the Palo Alto Housing Corporation, free and clear of all liens, prior to the issuance of a building permit for the referenced project (-The Bamilcon-). These unite constitute compliance with Programs 9. 11 and 13 of the Housing Blement of the City, and their location Is) shall be subject to approval by the City Council. 2. owner will make good faith efforts to secure seven. (7) or more BMR. units with no studio units a.!ld at least three (3) two~bedroam units~ A mdx of studio, one-bedroom and two-bedroom units will be permitted, however, with at least three two-bedroom units and one additional two-bedroom unit for each studio includ.ed~ For example, a mix of two studio units and five two-bedroom units would be acceptable. 3. An BMR unite to be provided by owner shall be in reasonably good condition_ They shall be structurally sound with al.l plumbing. heating and appliances in good working order. It is understood. that such unite vill not be required to meet current Building CO<!es., but tbey shall be free of termite and other peSt infe.tatioo and seismically BOund. (xiv) Prior to issuance of a building permit, the owner shall enter into an agreement with the City in a form substantially similar to Exhibit -B" attached hereto and incorporated herein "by reference~ for the purpose of providing additional public benefits to the project. If} Dayelgp;rent Schedule. The development schedule shall be as follows: ~1_<m0'712 Ii) Site clearing and demolition: June to July 1994; (ii) Basement excavation: July 1994; (iii) Basement construction: August to September 1994; (1v) Concrete structure; OCtober to December 1.994; 5 .. -,. (v) :Roof structure and roofing: January to February 19 9 S ; (vi) Exterior skin: December 1993 to February 19$15 ; (vii) (viii) Interior improvementB~ February to July ~99S; Site work improvements and landscaping: April to July 1995; and (tx) Initial occupancy: August to September 1995. gECTlQN 4. The Council find that thiB project will not have a significant environmental effect~ SIc::.-rrQN S. This ordinance ahall be effective on the thirty· first day after the d_to of its adoption. III'1'ROIlUCBD : PJlSSBD: AYBS: ROBS: ABSTBNTIONS : ABSBNT: A'l"l'BS'l': City Clerk APPlIOVBD AS TO FORM: Senior ABBt. City Attorney 6 APPROVBD: Mayor City Manager Director of Planning and Coamuni ty Environment EXHIBIT "A" - This document is recorded for the benefit of the City of Palo Alto ancl is entitled to be recorded free of charge in accordance with Section 61Q3 of the Government Code ~ter Recordatjon, mail to~ OI'P'ICE OF TRB CITY ATTORl\IEY 250 Ramdlton Avenue Palo Alto, CA 9(30l aGPBBMlInfr BB1HB&II IlAlU'LTOIi AVEHO'Z PROPBRTIBS, Die. AIm Cln OF PALO ALTO :uGlUlDDlG 1'tIIlLIC BBlIIBl'XT FOR PC ZOHB 651 ~ltou Avenua, S3'~576 ~~.~i.14 Road, and 523~S'5 ByrOn Street, P.lo A1to~ California " TKIS AGRBBMRNT, made and executed this day of __ ~~~~ ________ ~.' 1993, by and between the CITY OF PALO ALTO. a municipal corporation of the State of California: hereinafter referr.ed to as ·City· r and HAMILTON AVENUE P:R.OPERTIBS, INC., a california corporation. hereinafter referred to as -Developer-; • t T • ISS I T HI ~, Developer is the owner of that certain real property situated in the City of Palo Alto, County of santa Clara, State of california, generally known and described as 651 Hamilton Avenue, 536·576 Middlefield Road and 523·575 Byron Street. Palo Alto, california (the -Property-); and ~, Dev~loper has applied to City for approval of a zone change en the Property from -RM 15 -Low Density Multiple­ family Residential-to·pc Planned Community-, to allow development of an approrlmatoely 9a~ 760~equare·foot senior condominium project with 36 residential unit.s and associated coomon areas (the -Project-); and 1fIIBRBAS. section 18.68.060 (b) of the Palo Alto MuniCipal Code provides that a PC district must result in public benefits not othel-nee attainable by application of the regulations of other districts; and 1fIIBRBAS.. City has determined that.. t.he nature of the Project, providing additional hOUSing for the elderly; i~cludiDg provisions for life~long medical care; provides an on-site or inherent public benefit; and WHEREAS, Developer has proposed to contribute to a fund tr.at would benefit seniors and senior services, for the purpose of 1 providing additional public benetit for approval of the PC zone; and WHER.EAS. City is willing to accept Developer's contribution as a public benefit in support or the PC zone, and desires to assure that the proposed fund will be established and maintained in accordance with the agreement of both parties. and that the obligations for cont.inued funding will be binding upon Developer. its successors and assigns. NOW. THEREFORE. for and in consideration of the approval of the PC ~ Planned Community Zone change, and in order to ensure satisfactory performance by Developer of Developer'S obligations under Chapter 18.68 of the Palo ~to MUnicipal Code, the parties hereto mutually covenant and agree as follows: 1. Creation of Fundi Yearly paymente. UJ Developer shall contribute to City the £fum of Five Hundred Thousand Dollars 1$500,0001 for the establishment of a fund (-Fund-) to benefit seniors and senior services. Citv shall establish and maintain the Fund~ Interest fram all monlea-in the Fund shall accrue to tbe Fund, {ii} The $500.000 contribution shall be payable in ten (10) annual installments of Fifty Thousand Dollars 1$50,0001 each~ subj ect to the requirement for a final 1 wop sum payment as described in subparagraph 1 (iiil, and subject to Developer's right to terminate future obligations~ as described in paragraph 3. The initial iruotallment shall be payable within thirty 1301 days after adoption of U1e ordinance amending the zoning on the Property to PC Planned CCI8IDWlity. Suboequent annual installments sball be payable on or before June 1 of each succeeding year. (iii) Upon the close of escrow for the sale of the 3200 unit in the Project~ Developet'" shall, within 30 days of such cloBing. pay in one lump sum to City the remainder of the $500,000 unpaid as of that closing date, Thereafter, no further annual payments shall be owing to City. 2, payment to "and Upon Subierment SalE': of Units, (i) In addition to the Developer's annual contribution described in paragraph 1, the seller, upon resale lall sales subsequent to original sale or each unit) of each unit in t.he Proj ect shal.l pay to City for the Fund an amou.o.t. equal to Two and One-Half Percent (.-1ntl of the sales price of the unit. The 'sales price' shall be the price established by the Santa Clara County Recorder's Office upon which the Cityis real property transfer tax is calculat.ed. (ii) Developer and subsequent owners shall insert in any deed or other coaveyance of each unit the specific requirement for payment upon resale set forth in subparagraph 2 I i). Any such deed or otber conveyance of each unit shall be re corded in t.he .:. County Recorder's Office and a conformed copy shall be sent to City. J. Deyel?Q9r~6 Right tq Termirate. On or before May 1 of any year prior to the start of cons~ruction on the project, Developer may terminate its obligation to contribute to the :Fund by giving written notice dated on or before such date to City of its irrevocable decision to abandon the Proj ect. Thereafter, no further contributions shall be required from Developer. Any contributions made to city by Developer prior to the giving of notice shall remain the property of City_ 4. Use of the Fund. The Fund shall be used by Cil-} ;.0 benefit seniors and senior services. MOnies in the Fund shall be &~located to the Senior Coordinating Council to supplement their delivery of senior services t.o the cOImIIunity i or to such other service provider(s) as the city Council from time to time shall designate, ~ on such t.erms as the City Council may establish. Developer shall have DO obligation to City or any ot.her Agency under this Agreement or any tern".B hereof wit.h regard to allocation of the Fund. other than to make the paym~~s to City as provided berein~ 5 _ Hold RannJ.eBB. Developer hereby agrees to and shall protect, indemnify and hold City~ its officer8~ agents, and employees harmless from and against any an.d all liabilities~ obligations, damages, costs, injuries, ox claims thereof. includ­ ing. but not limited to. claims for damage or personal injury, including death, and claims tor property ~S.;;, arising in any manner from the performance or failure to perform the provisions of this agreement, except for any such claim arising as a result of an act or omission of City, ite officers. agents or employees, hereunder that constitutes an act of negligence, gross negligence or willful misconduct. Developer agrees to~ and shall~ defend City. its officers, agents. a.nd employees~ from any Buits or actions at law or in equity for damages, liabilities. or obliga­ tions caused by or ari9ing from. or alleged to be caused by or arising from~ the perfor.mance of this agre~~nt, except for any ruit or action at law or in equity arising as a reault ot an act or omission of City. its officers, agents or employeeB~ hereunder that constitutes an act of negligence, gross negligence or willf I.ll miscanduct~ Notwithstanding the foregoing, Developer's. performance of this Agreement shall be deemed discharged as to each installment payment owing. upon payment of such inst.allment as provided for h.erein. 6 _ Assignment of Contract. Neither this agreement, nor any part hereof, shall be aS8igna.b~e by Developer without the written consent of City. which shall not. be unreasonably withheld. Any attempted assignment without first obtaining such consent shall be void and of no effect. 7. Binding on Succg!!i!flpre. The terms; covenants, and conditions of this agreement shall apply to, and 8ha~1 bind the 3 beirs~ sueC":e •• ora~ executors, administrators, assigns, contractors~ and subcontractors of the parties. 8. Costs And Attorneya' Fees. The pre,"~ilin9 party in any action brought. to enforce the terms of this agreement 0= arising out of this agreement may recover fram the other party its reasonable costs and attorneys' fees expended in connection with such an action. 9. Notices. All notices hereunder shall be given in writing and mailed, postage prepaid, by certified mail, addressed as follows: To City: To Developer: Office of the City Clerk 250 Hamilton Avenue Palo Alto. CA 94301 Ramdltoo Avenue properties, Inc. 555 Byron S~reet Palo Alto. CA 94301 rN ~TNBSS WHEREOF, the parties hereto have caused this agreement to be-executed in duplicate the day and year first above written. Cn'l' or P&I.O ALTO City Manager Senior Assistant City Attorney &PPJlO'9BZ) AS TO COW XU t I Director ot Planning and COIIIIIWl1ty Environment Director of Finance Director of CommJDity Services 4 IlAlaLTOII AVlIIIIJII PIiOPIIllTDIS. DIe. a California corporation By:=-__ ~ _____________________ _ President STAn OF CALIFORNIA COU!ITY OF SANTA CLARA SB. oc • 1993; before me, • a Nota.ry Public, personally appeared ~UNE FLEMING. personally known to me to be the person whose name is subscribed to the within iastrument and acknowledged to me that she executed the same i.e. her authorized capacity as City Manager of the City of Palo Alto, a municipal corporation. and that by her signature on the instrument "'he. ;;.ckn.owledged tha.t said municipal corporation executed t.he same. IN WITNESS I set my hand and affix my official seal. 5 Notary Public in and for said Coun~y and State STATB OF CALIPORNIA COUNTY OF SANTA CLARA 08. On i 1993, before ~, • a Notary Public. personally appeared • personally known to me to be the person whose name is subscribed to the within instrument ami acknowledged to me that beiahe executed the same in his/her authorized capacity as President of Hamilton Avenue Properties, Inc::. , a california corporation~ and that by his/her signature on the instrument he/she acknowledged that said corporation executed the same. IN WITNESS I set my hand and affix my official seal. 6 Notary Pl,.'blic in and for said County and State ATTACHMENT 2 July 16, 1993 xa tllleen Gwym1 Executive Director Senior Coordinating Council 450 Bryant Street Palo Alt.o, CA 9430~ R1!: Fund to be BstabUshed by Hamilton Avenue properties. Inc .. for PC Zone PubliC Benefit Dear MS. Gwynn: As you know~ Hamilton Avenue Properties, Inc. '-HAPW) is proposing to deve~op a senior housing proj ect. in the City ~ and bas applied for a PC Planned CCOIIIIUllity zone to allow the proposed developaent. The PC :zone regulations require a public benefit as part of the project, and HAP has proposed to establish a Fund that vould benefit seniors and senior services. paragraph 4 of the agreement between the City and HAP ,the -agreement-) states~ in part: 'Monies in the Fund shall be allocated to tile Senior Coordinati.r;,g Council to supplement their delivery Of senior services to the CC""""'lDi ty. or to such other service provider(s} as the City Council fram time to time shall designate, and on such ter.ms as the City Council may establish.' 1 , , onderst~ing that the allocation of moniee from the Fund will be a budget process I t.his letter will Bet forth the guidelines by which the Council expects to allocate the Fu~d monies. 1. Fund Ree i9! ent . The Senior Coordinating Council (-SOC·) shall be the recipient of the Fund monies 90 long as the sec is the City's primary provider of senior services, as specified in the lease agreement between the City and SCC~ for lease of the City's Senior center, and as ~videoced by the City~s continued funding of the sec through the Human Services Resources Allocation Process (. BSRAP·) • 2. Program Support.. Fund monies shall be used. to support the continuance of the Retired Senior Volunteer Program (-RSVP-). the Senior Home Repair 2rogram. and Senior Housing Counseling Services Dr their successor programs. In accordance with paragraph 3 of t.his 1etter, funda shall be allocated co t.he sec or successor provider in lump sum amountSj and the sec may use the funds for same or all cf the aboVe listed programs, as it deems most appropriate; provided, that by its receipt of the funds, sec voul.d agree to continue providing all of the above named programs, unless otherwise stipulated by the City council. 3 ~ FUDding Procedure. The original $5.00.000 payable from HAP will be allocated as follows: (a) lbe original $50,000 annual payment will be paid to the sec in a lump sum within 30 days after receipt of such 2 .. ; .-.; payment by the City, or by October 1, 1993, whichever is later. Adoption of a budget amendment ordinance will be required prior to the first $50,000 payment. Succ~eding yearly payments of $50,000, payable to t.he City before June 1 of each succeeding calendar year, will be paid to the sec or successor provider after City Council approval of the annual budget. but DO later than August 1 of the calendar year received. (l:l) If a lump sum of more than $50, 000 ie owing to the City pursuant to paragraph l(iiil of the agreement, the City will establish the lump sum amount received as an endowment and continue to make annual payments of $50,000 from the fund to the sec or successor provider as if HAP were still making annual payments to the City. (e) Payments to the City fran resale of the units, in accordance with paragraph 2 (i) of the agreement., 'Will be placed into the endowment, if Olle has been est.ablished pursuant to paragraph (b) of this letter. If no endowment has been established. an endowmen~ will be established upon receipt of the first resale payment. (i) No monies received tram resale payments shall be paid to the sec or successor during the years that annual pa~t8 frCllll the original $500,000 are l:leing made by the City. Any resale payments made to the City during that time will l:le accumulated in the endowment fund. 3 (ii) When the last annual payment from the original $50,000 is made by the City to t.he sec or successor provider. the City will thereafter make quarterly payments to the sec or successor provider. The amount of each quarterly payment will vary and will be the amount of accumulat~ interest then in the endowment fund as of the date of payment. It is the intent of the City Council that after the final annual $50~OOO payment is made. all payments made thereafter from the endowment fund will be from accumulated interest only. We hereby reiterate that the money payable ~er the agreement i8 separate from and supplements the funds allocaten to t..1Je sec or any other agency as part of the City's general fund budget allocations. Sincerely, JEAN McCOWN, Mayor JM: SIlC: lac 4 I EJ7/>:;1/93 15: 19 JAI-£~' HILL ET .::J... PAGE: 0:.:' H.'>MILTON AVENUE PROPERTIES. INc. S55 BYRON STREET' PALO ALTO, CA 94301 July 20, 1"3 HOIIORAllLE CIfi COOHCIL City of Palo Alto 250 Bamilton Avenue Palo Alto, CA 94301 Re: The Baailton Senior L1vin9 eo.munity aa ... ent Garage Parkinq Plan Ladie8 and GentlameD1 AITACUMENT 3 -HiE HAMILTON" TEL. 1415) J2~46M fAX. (115) )27.8197 We aDd our desiqner. have be~n .trugq11h9 with alternative plane for oar basement 9arage for the pa_t sev.ral weeki .nd have eo.e to the coDclu.ion ~hat •• od1fied -double aiele· 8cheme best auit. our need.w ~bi. plan, 1~claded in ou. current submittal d~awinq8 .a Sheet A6-1 r ia Buperior to th~ -loop· Bcheae ISheet A6-2) 1n the followiDg reapeoto, 1. It provide. two mo~e parkiB9 .pa~eB than the loop sche.e. 24 It pre.~rve. a .ubBt.nt1al area of deep earth under tbe courtyard for plantin9. r~e loop saerifices 4e, of the courtyard area, dr ••• tically radae1nq our landacaping pot_Ud.) 3. Zt pr091~e •• bout ~o-thirr.B more 8toraqe area without risk of leakage froB abov •. •. It reduce. the naaber of park1D9 spaces on • sloping f1oor. 2bf. 1. becaa •• the loop ache.. r~ires a slopinq ai81e in order to reach the lower elevation beneath the pool. s. It elL.inete. the d~.wbAek of atoraqe closet door. 6vinqing into a drive aisle. 6. It calli tor two-way drive ai*les ... en advantaqe o.eT the POSS.IBLE one-way .y.tell aU9geated tor the loop scheme. 7. ~e double aisle acheae f& MUch bet~er ~d.pted to our plana for Btructural 8hear walla withIn the buildinq above qr~e~. As .ust be apparent r we expended considerable tim. and thouqht in our effort. to oo.e up with a aound loop plan. Thi. vas ~ worth­ while exercise in that it foroad U8 and City ataff to look at alternatives that would .i~iq.te the probl~ associated with e ·dead-end-layoutw ?be -turn-around notches· near the end. of both drive ai8le. were BU9geated by etaft and refined by Our design team to provide a relat1vely painless way for -lost­ parkers to maneuver out of the dead end.. This reviSion to our oriqinal double 4ial. plan a.ouDta to a decisive improve.ent. CoupleC with the r.qul~nt ~t vi.itor spaces be close to the entrance, the lnelasion gf -turn-.round notches· has convinced U8 th.t we should .by with the double aisle concept. .el15 3~7 8197 CIn OF PALO ALTO July 20. 1993 Page ~" JAi'o£S H fLL £1 AI... Me ~t recently with Julia Maaer of the Arebit~ctYral Review DcAr~ to dl.cu •• way. in which tbe rath&r tight -hairpin turn- at the bette-. of the raap could be i-.pro"e4 ~ !'here appear. to be •• olution to thi. probl .. and we are prepared to .tu4y it further vlth our arcbitect and .truo~ur.l enqineer. W. erpeet to return to the ARB with our final revised plan for approval. Given that all parkin9 apace. vill be ••• i9Ded to lpenific r •• i4enta and .-ployee. of rbe a..ilton, &04 th4t eQploy~. apaces will be located at the ~e~y aDd of the two drive aisle., we feel confident that the propooed doable 8101e acheme will provide convenient parkinq and clraalatice patterns for all concerned. w. hope that you will a9r" thet the .dvant~9~. of thil pIa" will outwe19h ita dl •• dvant.&.,._ and that you will permit. tl. to proceed with O~ pr.ferre4 aouble ai31e plan~ Sincerely, ~TOII Ar~ PROPIllt'1'lBS. ,J.... B. lIill ident ce: Virginia Warbe! t I1IC. ATIACHMENT 4 PLANNING COMMISSION ~'TAFF REPORT OATE: June Z5. 1993 TO: PALO ALTO P~ING C(Ho1[SSION PREPARED BY: Virginia War~eit REPORT IN BRIEF: 651 Haml1t?n Avenye. 536·576 Middlefield. 5Z3·5ZS Byron ~. This proposal is to rezone t~e project site from Low Oeh,;t1 Multiple Family (RM·15) to Fl •• ned Community Zone (PC). and to construct a ~;gh·income sen10r residential living community. The proposal is i four-story, approxilHtely e7t6i50~squlre·foct structure, with 36 condom;"dwa linUs 'and common facilities which include dining room and commercia' kitchen, living room and two bar/lounge areas, eXerC1S! room, spa and enclosed pool, an office, and two guest rooms. Sixty-n1r.e parking spaces are provided in an underground garage and six spaces plus a loading area are provided at grade. The PC zone change is being requested in order to allow a larger floor area ratio (FAR) than ;s permitted i. multiple fl§ily lone districts, with. proposed FAR of 1.70 cOl1lJ>ared to • lIOXi ..... 5 FAR under the existing RM·1S zone designation and 1.0 FAR in R~-40. the highest density RUltiple family zone. To .atlsfy the 20% below market rate (BMR) housing requirement for t~is project, the applicant Is propostft9 to purchase sevIn off-Site rent.l units ""d convert them to BMR rental units to be ooned and managed by the Palo Alto Housing Corporation (PAHC). To fulfill the public benefit requireoent for the project. the applicant is proposing to contribute money to the City for a fund to benefit seniors and sen10r services. The ~nies -nil be pruvided by a $500,OJO contribution from the developer, and by a 2.5~ resale fee on the sales prfce when units are resold .fter the initi.l sale. Enyironmental AssesSPent: A negative declaration of no significant environment.l i~.ct has been prepared and is attached to this report. Zpng Distrjct: RH-1S, Low Density Hultip'e Family lane District FiJo Nos.: 9Z-ZC·3; 92-ElA-ZA; 9l·/IRB-1Z ..,._, .... '" 6/25/93 P,\PC$R\t!II4llTc.I. PeS Page 1 .. AppLICATION JNFOBMATJQtt IIpp llcant; Type of Application; Oat." sur INEpRMATIPN OWner: Hamilton ~Ye"ue Propertie!1 1nc. 555 Byron Street Palo Alto, CA 94301 Planned Com.unlty Zone Change 1Ip9'ic.tlon received April 3, 199Z; Application dee.ed tompl.te June 3, 1993 Mandatort action de.dline; Hone Ha.11tan Avenue Properties, Inc. 555 Byron Street Pilo Alto, CA 9430) Assessor's Parcel Number: APN IlO-Ol-047,04B,049,052,OS3,073 Compren.nsive Plan Designation: Multl;l. Fomlly R.slde.ce Existing land Use: Th~ee sin9le-fam"y houses; 1 foyr·un1t apartment building; J professional office buildings containing 10,800 squa __ feet of n oor arei. Surrounding land Use; North; Single family house, parking lot, Existing Zoning: Parcel Size; PROJECT JNfQBMATlPN Pro'tet Hi stcrv: prefesslonal office building East: Two prof.ssional office buildings South: Multiple-f .. lly reSidential tond01llinlUnis West: ChYfCh educlt~on buildin9 ind parlr.ing lot AM-IS low Density "ultiple Family Rosidenthl Zone District 51,500 square feet So.tembtr 30. 1992; At the first public review of the project before the Planning C~lssion, Dine meobers of the public spoke to the item and the public hearing .as closed. The item was continued to October l~, subseque.tly ch"19ed at the applicOllt's request to October 28, 1992_ WIA:"-1'taI.pc.5 p, \PCSIt\lWtll JOj.~ 6/25/93 Page Z ...... --....... "';'- : .. October 28, 1992: The Planning Commission discussed the project and adopted, 7-0 t a motion by Commissioner Ojakian, seconded by ~omD;ss;oner Marsh, to forward the project to City Council with • rec~ndltion for denial, but to indicate that some development greater than the current RH-1S zone designation may be appropriate for this site. Commissioner Carrasco stated, and Comm;ssioner Glazier agreed, that they did not believe the project .hould be denied, but would support the motion so that the project could be forwirded to City Council , The Planning Commission referred the project to the City Counc;r in order for the Council to resolve policy issues rais~ by the proposal, inc1uding the appropriateness of increased density a~ the proposed buildin9 mass at thi~ location, as well as the adeQuacy of the public benefit being proposed, NOVember 30. 1992: At the City Council1s initial review of t~e project, 22 aembers of the public spoke to the item and the publIc hearing was closed. The item was continued to Janu.ry 11, 199). (See attached minutes of the November 3D, 1992, City Council meeting,) JAijyary )1, 1993: After discussing t~e projett, City Council adopted, 8-1, Council Member Rosenbaum opposed, a mot~on b, Council Member Fazzino, seconded by Council Member Wheeler, to approve the project in concept and forward it to tnt Architectural Reyiew Soard (ARB) and the Planning Commission. The motion contained the following conditions and ~ndment5~ 1) 2) 3) 4) 'NIA:hM11tCIA.pcs At CouftCll ~~r Simitian's suggestion, the conceptual appro~al was made contingent on the project not requiring Iny Yariances; The ARB and Planning Commission were directed to address the appearance of the bulk of the project along Middlefield Road; Staff was directed to inYestigate the feasibility of restricted parking in the area of the project, and to work with the applicant to identify additional on-site parking; ~nd ~ amendme"t by Council Member Simitian, seconded by Council Member Huber, was adopted, 6-3, with Cauncil Members Anderson. McCown and Rosenbaum opposed, to direct staff to work with the applicant to provide services for seniors consistent with the memo from Council Members Huber, ~niss, Simit1ar., and Wheeler dated November 18, 1992, regarding a proposed Senior Coordin.tor Council Endowment Fund, but with. 2.5% resale fee rather than 2%, (See attached _inutes of the January II, )993, City Council meeting,) p , \PCSIl\tW<ILTCII, pes 6/25/93 Page 3 :' .. , ,.~ february 4. 1993; At t~e pre1imfnary arcnitectural review. one member of the public, Mr. Schultz, spoke to the item, e.pressing concern about parking impacts .od reQuesting that the ex;,ting ,outhernmost driveway to his prop.rtj ~e allowed to remain. The ARB wa, generally very supportive of the architectUre and gave the following direction to the applicant: 1) Cont1nu~ to investigate ways to increase and improve t~e amount and design of on-site parking and loadingJ inc1 uding stlJdy to eli.1nate dead-end aisles in tne parking garage; 2) Speclfy exterior b~ilding and landscape details int;uding size of plant lIater1als, exterior light; ng, garage 1i!)ht1ng~ l1YAC systees and penthouses; 3) Consider gaining natural light in interior corridors; 4) Pro~ide comparison of open space being provided in the project witn .u1ttple fa~iTy open spate requirements; 5) Try to reduce the height of the building by dropping f100r-to- ceiling heights; 6) Show impact of s.ls.ie sJst .. ; 7} Provide conceptual landstlpe p1an. and 8J Continue refining the ~;.dl.fie1d elevation and consider ways to reduce the appearance of height and bulk on the B,ron Street frontage. June 3. 1993-At the final architectural review, four aeobers of the public spoke to the proro.a1, including Hr. Schultz and Or_ Bodin, representing Mental Research Institute (MR1J, who expressed concern about noise I~acts during and after construction. The ARB approved the project, 4-0, with Mr. Hise not partiCipating due to conflict of interest. In the conditions of a~proyal, the ARB addressed the concerns of Hr. Schultz and Mr. Bodin by requiring that maintaining exi't;"~ access to the Schultz property be incorporated In the final landscape plans, and that the applicant establish a dialog with MRI to mini.ize the lop"ct. of noise during constructlon. The ARB also reQuired that the garage elrcu1.tlon be .edified to eliminate dead-end al,l.s, ~t "intain .t least the number of garage parking spaces (69) conceptually approved by City Council. (See attached minutes of the June 3, 1993, ARB ... tlng.) WlA::'-1ltaqa P; \l'CSI<\fWIIlllllL PCS 6/25/93 Page 4 This projtct received extensive revie ... during the conceptual reyiew process. Mahrials from these previous revi~ws i'ii!' .. e not been provided with this report, but ire ivailable upon reQuest by contact~n9 Virginia Warheit in the Plann1ng Division, Chic Center, 5th Floor, or by c.lling 329-2364. The following type, of materi.,s .re .vaI1ab1e: Planning Commi,s,on and City Council St.ff Reports Architectural Review Board ]~format1on ~~orandums • • • • • Minutes of Planning Commission, Clty touncl1 and ARB ~~etings Correspondence Previously submitted project pl.ns prgje&t Description: This proposal is to rezone six parcels at the corn!r of Middlefieid Road and Hamilton Avenue from RM-1S to Planned Commu~ity zent, and to construct I high- 1ncome condomi~ium project for se~ior community living. The architectural style is traditional Sp8n;s~ Colo~ia1 with stucco exterior, four storfes ~;gh ilonq Byron and Middlefield frantages, and three stor1es high along Ha.ilton Avenue, with a one-story pool structure it the Hamilton/Byron corner. The size of the structure 1 s 87,653 square feet, with a TDu1mum height of ~ feet. The main entry 1s located on Byron Street, where si~ surface parking spaces and a loading space ire provided .10ng the entry drive. Tne entrance to an underground parking garage w1th 69 spaces is also 1.ocated Ort Byron s.treet. The structure provides spacious priv~te units and cORIOn amenitles tc support older residents and to accOimOdate t~e activities of a senior residential community. The applicants expect t~e average '9~ of residents t. be between 75 and 80 years. The units range In size from 1,358 to 2,538 .quare feet. All units have two or two-and-one-ha1f bedrooms and two or three full baths, and are arrlnged to accOlROdate the issisted care of the resident if required. All of the uroits hi.e fuil ~Itchens, and there I •• 1 so a common c .... rcl.l kitchen and dining room where meols .i11 be available for residents. The other ComMOn facilities include twa guest rooms~ I 11Y~n9 room and two bar/lounge ireas, an exercIse roo., spa and indDor pool, an administrative off1ce and sleeplng room for 1 security person. OUtdoor common a~eas incl~de a central courtyard, two s~ller courtyards and i gardening area with raised beds. The app1ic.nts .xpect the proje<t will require a staff of ten full time employees with. &aXi..-of eight on the site at .ny one time. lWIA: t.1lton.pcs P:\PCSR\~LTON.PCS 6/25/93 Page 5 .'. Jable 1. project Comparison With Current 0rdjnance Requirements PROPOS~O ALLOWED ALLOIiED ALLOWED EXISTING ( amonded [Req"ired) [ReQ"ired) (Required) ro osal 1114-15 1114-30 1114-40 Sl,SS3 25,750 30,900 51,500 26,200 J. 70 .5 .6 1.0 _ 51 MaxilnUlll 48 feet 30 feet 35 f .. t 40 feet ilr>prox. 25 Hei ht feet Coverage 53.270 35"-40l1. 45"-2s?; NIJIIIber c f 36 18 34 47 7 Units Parki l.33/"nit 2_33 unit SO s aces Use Planned low Medium High Low Comunity Density Density Density Density Residen-Residen-Resfden-Residen- tiil ti~l thl ti.l; Profes- siona.l Office Dtyelopment Schedule; A tentative developoent schedule has been prepared by the ~plicant and is attached to this report. The scbedule indicates deeolition beginning in June 1994; excavati.n beginning in July 1994; exterior construction occurring fro. August 1994, to February 1995j interior construction and site work from February to July 1995; initial occupancy anticipated in August }995. ANALYSIS/ISsuES Bu1lding B~lk and MISS The City Co'..,.,;:;11 dIrected tile Planning '_iss ion and the AIU! to address the bulk and mas~ issues of the prDposed building during their rev1ews t particularly the Middlefield Road elevation. The •• erall size and the building was somewhat reduced and setbacks were increased between the Planning Coamiss1on review and the Clty Council rewiew. Further modifications and reductions were made prior ta the final ARB reYiew~ These changes are sumaarlzed .s follows: WIA: "-11tm.p:.'I P; IPCSRllWilL TCfj.ptS ......... ~.-------- 6/Z5/93 Page 6 • .' "', ~ • Parts of the building were set back fro. the int.rio~ property line and portions of the fourth floor wero eliminated so tn.t the project now caaplies with the RM-IS daylight p1ane_ • On tne ~;dd1efleld Road e1.Yation, section. of the facade and portions of the fourth floor were set back several f~et in order to break up the continuQus plane of th~ wall and visually reduce the size of this .ide of the building. • The loading zone off Hiddlefltld Road was eliminated, and a delivery space was add~ at the Byron Stre~t entri~ce. * A sixth visitor parking space was added ilong the entry drive. • Additional sinor refinements were made to further articulate the building, provide scale and reduce the appearance of bulk. These changes resulted in a reduction ~n square footige from 90,760 to 87,650; i reduction in FAR fro. 1.76 to 1.70; and a reduction fn coyer.ge from 55% to 53.2%. No Varjances A condition of City Council concoptual approval was that the project not require any variinces. 1he previous non~compliance with neight and dayl1ght plane requirements has been eliminated, and the current proposal does not require any variances. Parkjng City Council directed the applicant to work with staff to explore the possibility of providing additlon.1 parking on the site. The applicant modified the on-grade parkfng to add one viSitor parking space and to prQ~ide an add1tfonal space for deliyeries. They also aodtfied the garage layout to proyide two addition.l .paces (total 71) in the garage. Ho .. ,er, during the ARB review, the Board concluded th.t the dead-end .isle. in the parking 1.YDut lllade the g.·rage difficult for some pork." to use, and directed the applicant to .edify the 1.yo"t to eliminat. the dead-end .ls1e., if this could be done without dropping below the number cf spaces (69) shown when the project was reviewed by City Co"ncil. A reyised garage lay-out with 69 sp.ces and no dead end aisles, is included in the plans. I~ addition to no net gain in p~rking spaces, this reVised lay-out requires excaYlting under approxi~tely one-half of the central courtyard, thus red~cing soil volu.e for trees and requiring some trees to be 1" planters ~1ch ot~erwise could have been planted in the ground. This revised scheme also results in i1 somewhat reduced aJTIOUTlt of storage in the garage. City Council directed staff to ;nyestigate the f •• sibillty of restricted parking In the area of the prcject. The result. of the investig.tion by WIA: ... ltC11!.pc$ P,\PCSR\~LTON.PCS 6/25/93 fage 1 Transportation Division staff are discussed in tbe attached memo from Clrl Steffel. dited February 17. 1993. Restricted parking is f~asib1e in this block. It is contiguous with a two·hour parking zon, on University Av.nue. It would be important to be sure that peop1. already living and working on tne block understand that they .ou1d no longer be a~le to park on the street for longer thar. two hcurs if the restriction were implemented, and SOle are currently parking on t~e street for longer peri Dds Df time. Once the decision is mad* to extend two-hour p<rking to this block. it could be instituted within two to three .eeks. A resolution by City Council would be required to approve the new parking zone. Tne applicant is proposing to mark the six surface s~aces reserved for guest parking, in the garage to mirk an additional six spaces reserved for guest parking, and sfx marked reserved for employees. The hema1ning 57 spaces will be asslg.ed to reSidents. if needed. One space .i11 be provided with the unit and residents will be required tD pay an e.)(.tra cflarge for any additional spaces. The following table compare. the nu.ber of parking sp.ces being provided with the number required for multiple-family housing in the parking ordinance. Stoff believes that tn. proposed on-site parking will be adequate to leet the needs of the project. Attached to this report is a letter from the applicant explaining why they belie,e the proposed parking is adequate. QrjY~ly Accgss To Schyltz Property The parcel directly nort~ of the project site, owned by Charles Schultz. has for .any years been accessed by two driveways, one of which is a shlred driveway located partially on the property of the proposed project. No .as..ent exists and the project applicants do not want to continue the driveway crossing their property. although they have indicated an interest in aSSisting Mr. Schultz in continuing to use the drivoway if a suitable configuration can be worked out. After visiting the site with Mr. Schultz and taking ",suTOMentS. staff believes that there is sufficient distance (approxl .. te1y 8.5 feet) between the edge of the sidewalk next to the Magnolia street tree and t~e corner of the project parcel to permit hi. to continu" to access his property in this location. At the curb, th!s dr;vew~ access would be approxi .. tely 2 feet in front of the project property. angling toward Hr. Schultz's lot. It does not aopear th.t this would cause a conflict with the driveway of the proposed project. since It 1$ locatod 10 feet from the side property line_ Staff recommends that Hr. Schultz ,ontl.ue to have access to his lot from this location and that the design of the two adjacent driveways be sublltted with the final 1andscope plan. (See attached letter from Hr. Schultz dated Hay 12. 1993. with attached illustritlon.) 1IIIf1A.:a.1 ItDn.pc:s p, \~HIIOLT(lII_ PCS ::,~, . ,{ ........ 6/25/93 Page 8 ---------------------------;0'; • ~ ~ 0-' ==""-"'-_ ~J:_"_ ~-':"'-Y";':_~~' A, Moise Impacts on property Across Middlefield Rgad " ~ "-. Dr_ Arthur Bodin and other representative. of The Ment.l Research Institute (NRI), located at 5~5 Middlefield Road, have expressed concern tha~ nOise resulting fron the proposed project will 1r.terf!re w'th training sessions that ire In on-gG1Dg part of thefr activities. The training sessions occur in specially equipped rooms that are located on the Middl<field Road side of their building. NR[ is concer~ed bot~ about nOise during construction and abcut traffic nOise reflected off the build ing after construction. (See letter from NRI~ dated January 20, 1993, and letter re: aco~sticll consultation from Charles M. Salter ASSOCiate., dated February 2, 1993.) The appl~eant has submitted I letter (rom an acoustical expert, Charles M. Salter AsSOCiates, stating that in other sim11ar cases the~ ~ave found p.oise level increases due to ref1ectic~ off a buildtng tc be negligible. T~ey also state that the aMbient nOise level on K,ddlefield Road Is probably $0 lou~ that it wlll ~sk BDst construction noise. Dr. 80din states in his letter tnat he has measured noIse on Kiddlefield Roa~ to be over 90 decibels. Dr. Bodin requests in his letter that the applicant .ork together with NRI and take into acco~t the MRJ training scnadule in order mlnimize the ~mpact$ of construction noise on their activities. Tne ARB recommended that the applicant partiCipate In thi s effort with MRI to reduce ; lOp acts , and stiff belIeves that this is an appropriate .olution. Staff suggests that the City's Medi.tion Task force could be helpful In working out. mutually agreeable arrAngement ~ . PubJi c BeD.f; t In a aemo to the City Council dated November 18 t 1992. Council Members Huber, Kniss, Sim!tia~ and Wheeler outlined i proposal for an endowment to be provided by the applicant to benefit seniors and senior services to satisfy the public benefit requl .... nt for the project. (See copy of the meeo attached to this report.) The City Council's action on January 11. 1993, for conceptual approval of the project directed the applicant to present a proposal for such a Fund. A draft ag"eeoent between the City and the applicant for estoblishoent of. specl,l fund has been dra .. up and is attached to this ",pvrt as an eXhibit to the proposed ordinance. Th. proposal is for establishment of • fund that will be funded through. de.eloper contribution of $500,000 dollars, payable over ten years, plus payment of a resale fee of 2.5' ~f the .el1ing price whenever • unit is resold after the Initi.l sale. The monies gener.ted by the fund are to be Illocated to the Senior Coordinating Council to suppleoent their deliyery af senior services to the com.un1ty, or to such other service providers as the City Council May designlte, and on to .. s to be established by the City Council. 'lWlk'-iltO'1,JIC' p, \l'CSII.\HNU LTCII. PCS 6/25/93 Page 9 .. , I Below Harket Rate HOijsjng gequirement Four rental units are prestntly located on the proposed project site and would be displaced by the project. Since rent.l units are being disploced, the Below Market Rote (BMR) requirement for the project is 20%, rather than the stondard !O%. The applicant is proposing to fulfill the BMR requirement by p~TCha$1ng saven existing off-slte rental units and converting the. tD BMR rental units to be owned and .anaged by the Po'. Alto Housing Corporltion (PAMe). (See attached letter from the applicant describing the BMR proposal. ) COOREliEHSIVE PlAIt COMPlIAHCE The uses and site development regulations of the Planned Community lone must be found t. be consistent with the Polo Alto Coaprehensive Pl.n. Following are Policies of the Housing Element which are pertinent to the proposal. The proposal appears to be consistent with the following Housing Element policies and objectiyes, PorlCY 7: Encounge ilind foster Ute de¥elopment af new and i!xist1ng housing units .ffordabl. to low· and ~erate-income households. The 8MR '9re .... t being proposed by the applicant would convert • minimum of S@Yen existing .arket r.te rental units into below market rate units. Policy 11 and Policy 13: Continue support for the P.1. Alto Houslr,g Corpor~tion in the provision Df low-and BGderite·1ncome housing, and increase funding sources used to provide iffardible housing. The.e policies are supported by tne applicant's stated intention to -.rk with the PANe to look for ways to provide .. re tnan the required minl.u. seven BMR units. Po7icy 14: Support the mixing of reSidential uses in commercial and industrial areas. Locating the units close to downtown near shcps, transit and other services supports this policy. Second of the three I1iJjor hOusing alJjectives identified jn the HouSing Element: "olntoln. dlYersity of housing opportunities,and provide. variety af housing types and sizes, I .ixture of ownership and rental housing, and • full range of housing costs. 'lWIA:lIIB1l1:a1. pes P: IJ'CSRIfW!lL TOIl. res -------------------- 6/25/93 PO!je 10 The proposed project furthers this housing geal by providing a type of h1gh~inc~ housing with on-site services for seniors which is not presently av,il.bl. 10 the community, and thus provides the opportunity for residents 1n this fto'Jsing market to vacate fa:tHy homes and move to •• enior living coomunlty .'thi" Palo ~lto. The Housing Element identifies persons over 60 as an 1ncreasing population group with housing needs to ~ accommodated. In 1989, this age grcup made up one-fifth of the popul.tion and included 12,811 peDple, an increase of 26% since 1980. The proposed development wiTl serve this increasing segment of tne popullti~" of Palo Alto. The projected Association of 9ay ATea Go~ernments (ABAG) -fair share· housing need for Palo Alto is 159] units, to be provided between 1990- 1995. Of this total, 680 units are identified as housing for households with .bov. moderate income. Th. proposed development .ill provide 36 units of housing for abc~e ~erite-;ncome hoyseholds? thus ~elping to address this identified ·fair $~aTe· nousing ne!d. The proposed project appears 1ess consistent wltn the following Policies of the Housing Element: Policy 2: Prese"". older single-family homes and s ... l1 apartment bUildings. T~e proposed project would result in the demolition of • four-unit rent. 1 apartment building .nd three older 'inglE·family homes which .re rentod. Removing the 4-unit apartaent building seeas particularly contrary to this policy_ However, Program 9 provides th.t ~iti9.tion for the r .... v.1 of rental housing May be ,..de by inc ...... ,ng the number of ex1,ting housing units on site, and providing 20l BMR units, r.ther tha" lOS. This project is me.tlr~ both of these standards. Policy 6: Maintain.t le .. t the present number of ... 1tiple-family rental "~its while working to increa.e the overall supply of .... ntll housing. The proposed project will result in • net loss of four units in the City's rental housing stack. Four aparbaents, and three single-family houses, which •• y be r..,ted, are being I'eIIOved from the site. The 7 BIll. .. Its whic~ ..... being provided are existing units th.t ..... currently part of the City's rental housing stock, so they do not represent an increase in the supply of .... nt.1 housing. Program 9 provides th.t doubling the number of housing unit. on the Site, and providing 20S BMR units mitigates t~e removal of rental hOUSing, and t~is project is aeeting both these cond~tions. *I_:Mn''tOn.JIC$ p : \PCSR\IWU LT[)I. pes _. 6/25/93 P.ge II ·" -- F1N1lIi!GS 1. The site is :>0 situated, and tne use proposed for the site is of suen a characteristic t~at t~~ application of general districts or combining districts will not provide suffici.nt flexibility to allow the propo,eO development, in that the maxim~~ floor area ratio (FAR) allowed in the highest den,ity multiple family zone (RM·40) is 1.0 ~hil. the FAR of the proposed project is 1.70. An FAR of 1.0 doe, not allow a sufficient building volume to accommodate the activities and services of a senior living cCHllllunity, as evidenced by senior residences conSistently hat,.·ing an fAR exceeding 1.0 both in ra10 Alto (Lytton I. FAR 1.4 and Webster House, FAR 2.43) and in other communities. 2. D&velopme~t of the site under t~e provisions ~f the Planned Community district will result in public benefits not otherwise attainable by applicatiDn of tne regulations ~f general districts or combining distr1cts, in that an Endowaant Fund to be established by agreement between the City and the developor with .onies to be provided by a SSOO,DOO contribution from the de,eloper .nd a 2.5~ resa1. fee will be used by the City to ~rov1de benefits for seniors and senlor services. In addition, the senior living community will provide houslng with support s~rvices, for which there is an unmet need in the community, thus enebling residents in need of tnis type of hDusing to rev.ain in the c_unlty. 3. The use cr uses permitted, and the sit! development reg~lations Ipplicable .1t~in the district are consistent with Policies 7. II, 13, and 14 of the Housing Element of the Comprehensive Plan, a. discussed in the CDlprehens1ye Plan ton;liance section above. Tne penaitted uses and sIte developoent regulation, are compatible with exIsting and potentIal uses on adjoining sites or withi. the gener.1 vicinity, in that the site is appropr1ate for senior residences because of the close proxi.1ty to Lytton I and Webster House, to Downtown, the Senior Center, oedic.l services and public transportation. The location at the intersection of two major streets and at an entrance Downtown is appropriate for a building of this ,ca1e, providing balanc. for the lytton I coopl.x on the other side of University Avenue. The architecture a~d landscaping is ~esigned to be visually c~~tible with nearby residential areaSj tne building BaSS Is set back from the Interior property line and the building height fs lowered where it is QPpo~ite residential uses; the Middlefield Road facade is modulated and detailed to minillize the size of the building; auto access is off Byron Street to minimize conflict with oxhtlng he.vy traffic on Middlefield Road; .11 antic;pate<i parki1\9 deMand is being provided for on the site. "IA:~ltm .-:s p, \Pr.SI(~lHJI. ~ --------------,,--------. 6/25/93 Pig<! 12 ... -. - • C!l!!D lTIONS 1. The garage plan shall incorporate a loop system that minimizes dead-end ai sles, lTIaintains overall Ippro~'ed park.~ng numbers and maintains zoning regulations. 2. Prior to issuance of a building permit, the property owner shall provide ill written plan, tD the satisfaction of the Planning Oivision, specifying how they will minimize noise impacts to HRf by construction timing and coordination with MRI's training .e •• 10n schedule. 3. Prior to issuance of a building permit, the following items s~al1 return for ARB review: a. b. c. d. e. f. g. _IA:~1t.".,pcs p ,\PCSII.\IW1Il mL "'5 Details of glass to exterior wall indicating depth and design. Detail of garage vent exhaust. SaMPles of exterior materials and~Glors and additional building detail. is reQuired by the ARB. Fina1 landscape plan to inciude a planting and irrigation plan. sizes of plant matErials and sa.ples of paving .. terials. The final l.ndscape plan shall show the lotatlon, 5ize and species of all trees to be retained, both on the .1te and in the adjacent public right-of-way. The plantIng and irrigatIon plan shall be approved by the Utilities R.source Conservation Division. Final lighting plan showing location and design of .11 exterIor lightIng fixtures and a photOOEtric diagram showing li9ht pattern and inte~sity, both on Ind off the property, of light cast by all exterior l;g~ts. The design of the driveway providing access to the Schultz property adjacent to the project site, to be de.eloped in coordination with the Transportation and Planning Divisions. A parking pl,n showing the .ix surface parking .pace. and sfx parking spaces in the garage marked and reserved for guests, with a minimum of six add1tional parking spaces in the garage to be marked and reserved fOT employees. ;".'. 6/25/93 Page 13 h. A tree protection plan prepared by a lice"sed Arborist specifying all measyrts to be taken prior tOt during and after construction to protect the trees to be retained) both on the site and in the adjacent public right-of-way. The tree protection pan shall include a site plan s~owin9 the spe<ies. s1ze and location of all trees to be retained, both on U,. sit. and in U.< .idjacent publ ie right-of-way. In addition. the Planning Vivis: •• sh.l1 ~ proYided with. letter from a licensed Arborist verif)ing that he hal beeh retained by the applicant to se. that the tr •• protection measures are carried out .nd that periodic field reports will be submitted to the Planning Division confirming compliance with the tree protection measur~S. 4. Prior to issuance of a ~emo'ition per.a1t or a building permit, the Arborist ret.ined by the appliclnt shIll suboit I 1ett.r Yerifying that he hIs conducted a field inspection and th.t the protective fencing r~quired in the tree protection plw~ is in place. S. Prior to issuanc. of • d .... lition or building p .... it. t~. applicant shall prepare, to the satisfaction of the Transportltion Division and the Public Works Dep.rtment •• Construction Pl •• addreSSing location of construction staging areas. travel routes fer construction yeh;cl~s of the construction crew, fencing of t~e cDnstruction site , a plan for keep'ing nearby streets and sidewalks. free of dirt and other construction debrls as well as all other i ••• es deeoed nec •••• ry by the City to provide for the public safety and to reduce impacts of construction on the surrounding neighborhood. Th. p1.n shall includ •• provis!on that construction fencing be Installed in such. way that the .djacent driveway from Byron Street to the Schultz property is not impeded. 6. A planter strip .. d street trees shall be provided o. all three street frontag.s. with a .iolmwm width of 5 feet on Klddlefi.1d Road and Hamilton Avenue .nd •• ini>rum ~idth of 2.5 feet on Byron Street. unless .t l •• st two feet of perimoter planting is provided inside the propert~ line lloftg the one-wat driveway ~n Byron Street, in which case the curbside planter strip shall be I .inimuo of 5 feet wIde. Th. planter strip sholl be p1.nted continuously with low shrubs or dense ground cover and shall be lutoaatically irrigated. The street trees shall be planted a .axi ... of 25 feet on center. with the location and speei.s to be approved by the City Arborist and the P1anniog Diyision. All street trees shall be locoted in tree wells with a minImum diaension of 5 x 5 f.et. and shill be installed according to the City Arborlst's specifications. All stre.t tree w.1ls shall be provided with iutomltic irrigation. "'IA:"-11ton.pes P:\PCSR\tWOL~.PCS 6/Z~/93 P.lge 14 7. Subdivision approval to merge the existing Si( lots into one parcel shall be obt.ined from the City prior to issuance of • building permit. If the units are to be individually sold, a condOMinium subdivision map shall be approved by the City prior to sale of !ny·unit. 8. Prior to issuant! of • building permit, tho owner shall enter Into an Igreement with the City under which the owner sh.ll agre. to pra~ide i miniMUm Qf seven BKR units in fu1fillment of the owner's obligations under Programs g and 13 of the Housing Element of the Palo Alto Comprehensive Plan. 9~ Prior to issuance of a building permit, the owner shall enter into an agreement with the City for the purpose of providing additiQn~l public benefits to the project. 10. Construction activities ire required to conform to the Palo Alto Noise Ordinance, which T!strtcts hours of activity and levels of noise produced by indi~iaual pieces of equipment as we" as noise produced g.nerally, as specified in Section 9.10 of the P.lo Alto Municipal Code. 11. To reduce dust levels during construction, it shall be required that exposed earth surfaces be watered frequently, during the l~te morning ar><! it the end of the day, .nth frequency of ",tering incr.asing on windy days. Spillage resulting from hauling operations along or across any public or private prop~rty shall be reoovod immediately and paid for by the contractor. Dust nuisances ar'ginat1ng from the contractor's operations, eit~er inside or outside the right-of-way, shall be controlled at the contractor's expense. If, In the opinion of the City Engineer, the contractor falls to confp 1y wi th any of the ttems concern i"9 sPl' lage and dust ('olltro 1 t and the contr.ctor is either unwilling or unabl_ to reeedY the deficiency, the City Englneer shall employ private or public work forces and equipment as required to cGrrect tbe deficiency~ The cost of employing s~~h forces and eqyjpNent shall be doubled as i penalty. and such cost shaTl be borne by the contractor. Sucn actlon taken by the City s~al1 net re1ieve the contractor of the responsibility concerning spillage and dust cantrol. The folluwing conditions shall bt implemented to the satisfaction of the Public Works Department: 12. A performance bond BUst be posted prior to construction of public right-of-way improvements. 13. Plans for l.ndscaping In the p"blic right-of-way must have prior approval by Public Works Department. '*I"':-'ltcn.pcs P : \PCSR\IW4IlTCJI . PeS 6/25/93 Page 15 .. ... 14. Any ex;s~ing unused driveways must be replaced with curb, gutter and sidewalk (where applicable). 15. A grading and drainage plan must be submitted to Public Works Engineering for tho projoct. This report shall include calculations on ~ow the site runoff will !~paet the City storm drain system. Starmwater from the site shall be designed tD be divided into two watershed area.. Part of the runoff from the site Shill be directed to the public sto .. drain at the eor.er of Middlefield and Hamilton and the othor part shall be directed to the public storo drain at the corner of Byron and Hamilton. It is recommended tnat In on-site detention system be considered tG control tbe rate of disc~arge from the site. T~e applicant must contact Jim Harrington of the Public Works Engineering D'v;slon prior to submitting formal drainage improvement plans, 16. Construction i. proposed to be constructed within the City right· of·w~. A permit for Construction ;n Publi( Street must be obtained fr~ the Public Works Oepart.ent. 17. A soils report will be required to be submitted for the proposed underground garage. A drainage plan for this ~nd~rground strueture will also be required. lB. Due to the detrimental i~.et tho construction actiYity .ill ha.e on Byron Street, the appiicant shall be required to skin patch and slurry se.l Byron Str •• t between Uni.ersity and Hamilton Ayenues . . 19. Construction of approved harn!!capped ro"",s is required at the corner of Byron Street and H .. ilton Avenue. RECOIIIENDAT 1011 Based Dn the above findings, staff recooaends th.t the Planning Commission recooaend that tho tity Council adopt the Negative Declaration and appro.e tho project with t~e above listed conditions. WlA;'-Iltal.pcs p, \PCSRIIWIIL Ta<. PCS 6/25/93 Page 16 "",,', .-.";- Attachments : I. Environmental Impact Assessment 2. Minutes of City Co~~c11 meeting, Hovemter 30, 1992 3. Minute. o~ City Council .eeting, January II, 1993 4. Letter from Cnarle. Schultz and attached drawing, Hay 12, 1993 S. Letter from Ment.l Re.earch Institute, January 20, 1993 6. P.~kjng Memo from Carl Stoffel, Febru,ry 17, 1993 7. Letter ke: Ac()ustical Consulting;, Charles ~. Salter Assoc.iates, Inc., February 2, j993 8. Draft Planned Community Ordinanc. 9. Oraft Agre.ment aetwoen City and Applicant Regarding Public Benefi t Fund 10. City Council ~ dated Noyember IB, 1992 Materials provided by the applicant: 11. Development Schedu'. 12. Project Stati.tic. 13. DeYelopoent Program Statement 14. Concept for H.a,th Care/Senior Wellness Program 15. Letter Re~ ProvisiDns For Parking 16. Letter Re: Draft BMR agreement 17. "inute. of ARB meeting, June 3, 1993 18. Plan. (Planning Commissioners only} 'lW1.t:'-'IItaI.pc::s p: \f'tSR\HNULTClt PCS 6/25/93 Page 17 ce: Architectur.1 Review Board James B. Hill. ~ .. i1ton AVenue Properties. 555 Byron Street. Palo Alto. CA 9-4301 leland E. Wieder, 210 San Antonio Clrcl •• Ste. 235. Meuntlln View. CA. 94041) UnlYer,ity Park Association University and Crescent Park Homeowners Association Ruth J. rapwel'. 571 Komi1ton Avenue. P.1. ~lto. CA 94301 Edward H. Frapwell. 7440 Girard Avenue. la Jolla. CA 92037 A1the. Frapwel1 Andersen. 1866 Venetian Point. Cl.arwater. FL 34615 Nent.l Research Institute. 555 ~idd1efield Road. P,10 Alto. CA 94301 Charles Schultz. 517 Byron Street. Palo Alta. CA 94301 Utilities Resource Conservition Division Public Works Engineering Div1sio~ "IA:"-11t~.pcs P: \PCSlt\IWULT1JI. PCS 6/25/93 Page 18 EnvlroNOent.l Doc.ments -City of Palo Alto EHVIRQNKf~TAL ASSESSMENT AnACH~IENT 1 Proj!ct Description; Zone Change tp "zgne prQP~rty from RM-.lS Low [)tnsjh am on Pl an rrrnun1 tone n to constr 6~ -ar Stn1pr condominium prQject ~ith 36 residential units and aS$Qcfatgd common .reas including dining r09m. kitchen. public rooms. ex~rcise room and en~losed Poo] and two guest t9Dil1S. Si!venty-~rre parking spaces are provided in an underground garage Ind six spaces are provided at grade. Looatlon/Ad4ress: 651 Hamilton. SlS·57§ Mjddefield. 523-575 Bvron Sponsoring Agency/Appl1car.t: Hamilton Avenue Properties, Inc. Addr~ss and Telephone of Applicant: 555 Byr~n StTe~t, PaiD Alto. CA 943Q1. (415) .316-4616 Application for: Planned Community lone Change (e~g" 20n1ng chang., subdivision of property, architectural r~view, US! po.mit) Zoning at Project location: RM-!5 Fee Receipt No.: 92-179 HOTICE Of DETERMINATION Based upon review of t~e project files, the Qndersfgned ~r of the Planning Departaent has concl~ded: JXI Negatjve Declarat1on~ The pr~ject has no significant environmental iaplct. Ko [nvi ronmental lapact R.eport is required. ihe reasons for a Declarat10n are: in the attached Environment.l Impact Assess-ent (92-EIA- 15). A record af project action is ivailable for revfew at tne Paio Alto Plannina Deparb!enL locate-d on the 5t" floor of City Hall, 250 Hamilton Avenue. palo Alto. tA 94301 I_I T~e PrQject may ~aye a significant environmental impar.t. An Environmenta1 11II]>act Report wi 1] be prepared. .. PI aTlni n9 Oepartment Off; ci a 1: :;r:;-:,..%,' ',-:;:~;-.:.;,::....-~ . .,·.:cr_,c..-',/.o:'". '_:'~'''''~.:;',,' "~~"~-'!C"-:i'-;:-''',::-==:-:-:; Planning D;rector: ~ ·W?S·," .. lu;, Date: May n. 1993 (revised) The project has been approved. The project has been denjed. ENVIRONMENTAL DOCUKE~T5 -PALO ALTO ':\Mta.ilton."OO Oate: o.t.: ~~~~~ __ Fi 1 e No. :92-1(-3 91-EI~.-7 93 -ABll,J.? ENVIRONMENTAL DOCUMENTS -PALO ALTO INITIAL STUDY' I. Project Title/Address: 651 Hamj!ton. 536-576 Mi<idlefi'ld. 523-575 Byron 11. Project Description: lon@ Cha~ge to reZo"e prOpErty from PM·1S LoW Density Multir" family 2o~e to Planned COmmunity lone and to construct 87.653 sqUAre ~pet $tDjCt condominium prpigd wah 36 rtsident1 al units and juod,ttd cOnmon areu including dining rOM!. kitchen. pu{)lic rOQm'<:. eXfrcise room and enclosed pool ,nd two guest rooms. Seventy-on~ parking spaces are provided jn an yndergroynd carage and six spac~s are provided Jt grade. Ill. Environlgentll Setting: The site i::;; bordered 91'\ the east and SQutb s;d~ .rter;al $treets. Middlefjeld Road and ~amilton Avenue. and 9n tbe west by , local street. Byr<ln Street. Fxisting zoning and land uses acrgss these streets from the croject siti &rt: ]) acrgss Middlpfifl~ R~jd property zoned RM-3Q Medjum Density Houslng and eresent1 y occupied by one· and tWQ~ story office bu11ding$; Z) across Hamiltqn Avenue property zon~d RM-lS low t>ensjh Housino and DreSfmtly Qcct,migd by two-story residential cOndominjums; prqDerty .t the corner of Mlddlefield and Hamilton is ZQ~ B-2 Tl!Hl Family Resi4gnc;e District lild presently occlJ[!:ied bv jI one·stoq private residence; 31 aCr<lSS Byron Street prpDerty zpned RK-40 ~igb Dens i tv Res i dent i a 1 and presently Dccypi ed by a two-story church educat i on bLlildjng. Tb!? jnteripr 1at line at tne nort" side of the site adjoins property zoned AM-IS Low Densjh Housing and prtSf!:!'Itly occupied by a parkiM lot. a single family bm and a two stOr"i Dffic.e buildlrtg. IV. t"r1v1roMle~hl lmpatt Cn,eckl ist (Explanation of all "yes· answers are in Section YJ: I. kd,h. Will the pro~os.l result in: a. Unstable earttl conditions Dr ch.an;es in geologic subst~uctures? b. Ci sruptions I displacements, coepaction Dr overcovering of t~e soil? c. Change in topognphy or groLSnd surface relief features? x X X 'Adlpttd frr. ~pt:ndiill: 1, t.a.Hfgrni/il GuiOr,li~~ for I"",l_n:.at,on of CEOA, Oec.r.o.r 1', 1976 ~iled JIIfIII! 198.6 92-EIA-7 P,g. I .... ' .. d. The destruction. covering or IICIdificltion of arty IJrlique geclogic or physical feature? e. Any increase in wind or water erosion of soils, eit~er on or ~ff the site? f. Exposure of people or property to geologic hazards sucn IS e.rthquak~s, landslides, mudslides, ground failure or similar kazards? g. Changes in siltation, deposition. or erosion wh;c~ may modify the chlnnel of a ri~er or the bed of a bay or inlet? Z. 61!. Will the propos. I result in: l. Substantial air emissions or deterioration of ambient air quality? b. The creation. Qf objectionable odQrs? c. Alteration of lir mo~ement, moisture temperature, or any change in climate, either lGcal1y or regionally? 3. ~. Will the proposal result in: I. Changes in absorption rat.es, drainage patterns, Dr the rate and ~unt of surfac.e water runoff? b. Alterations to tne c.ourse or flow of f1 GOd Wi teTS? c. Discharge into stJrfic'2 waters, or any ~lteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? d. Altera.tion of the direction Dr rite of f1 ow of ~round waters? e. exposure of people or prDperty to water related bazards such is flooding or tidal wave? p:\wu.,tlton.el/11 X X I X ------.-.---. x X X X X X X X X 92-EIA-7 Page 2 f. Change In the quantity of ground waters. either through direct additions or withdrawals. or through interceptions of an aquifer by cuts or excavation:;? 4. plant Life. Will the proposal result in: l~ Cnange in the d1verstty of species, or n~mber of 1ny species of plants (including trees, shrubs, grass, crops, microflora and aquatlc plants)? b. Reduction of the nu~trs of any unique. rare or endangered species of ~lants? c. Introduction of new species of plants into an arei~ or in l barrier to the nor..al replenishment of existing species? d. Reduction in ac.reage of any agricultural c.rop? S. A"1.al life. Wi" the proposal res~lt in: a. Chinge in tl1e divers;t,. of sPPc:if!s. or nuaber of any species of ani.als (bird. land animals including reptiles, fish a~d shellfish. benthic organisms, \nsects or .icrofaunaJ? b. Reduction of the nu.bers of any uniQue, rare or endar.gered animals? c. Introduction of new species of animals ;nto an irel, or result in I barrier to the migration or movement of animals? d. Deter\oration in existing fi~h or wildlIfe habitats? 6. /!llu. wIn the proposal result in, ~~ Increases in ex~sting noise 1e~el$? b. Exposure of people to severe noise level s? 7. light and 61are. Will the propos.l produce new light glare? ,~ -,. L I X I X X X X X X x X x X X 92·EIA·7 Page l 8. land U,.. Will the propos.l result in a sub$t~ntial alteration of the present or planned land use of an area? 9. Er,@rgy/nitvn1 Resour(es. Will ~he proposal ... sult in: a. Use of 5ubstant1 a1 amounts CJf fuel or energy? be. Substantial increase ir'l demand upon existing so~rces of energy. or requir~ tf'le developa=ellt of new sources of energy? C. Increue in the rate of use of any nat~rll resource? d. Substantlal dep1 et ion Qf any nonrenewlble natura' resource? ]0. Risk Of Upset. Does the proposal involve a rist cf In explosion or the release of nazardoQs sub$tanc~s (including, but not 11.ited to, oil, pesticides, chemicals or radiation) in the event of an accid~nt Dr uput? 11. Pgpulation/Hgysjng. I. Will th& p"'oposal .lter tne location. distr1Dution, density or g~owth rite of the hUMan population of an area? b. Vill the propos. I effect existing hDusing. or create. demand for additional bousrrlg? 12~ Transport at jon/Circulation. Will the ~roposal result in: i. G.neratlDn of substantial addltlon,l vehicular ~vement? b. Effects on uisting parKing heil itil!'s OT demand for new parking? c. Alterations to present patterns of circulaticn Dr movement of people and/or goods? x 1 X X X X X X X I X' X X ,.\_V-il\.oIIIo.ei. 92-EIA-1 Page 4 d~ Increase in traffi c hazards to IIKItor vehicles, bicyclists or pedestrians? 13. PublIc Service. Will the propo.al have a" effect upon, nr res~lt in a need for new Dr altered governmental services i~ a~y of the following areas? il. fire protection? b. Po 1; ce protect I on? c. Schools? d~ Plrks or other recreational facilities? e. Maintenance Df public facilities including roads? f. Other governcental services? 14. Utilltj.s. Will the propo.al result in a need for new Iyste~s, or substantial alterations to the follOWing utilities? a~ POli€r or natural gills? b. Coaaunicltlons systems? c. Water? d. Sewer or septic tanks? e~ Storm water drainage? f. Solid waste and disposal? 15. H ... n H •• lth. Will the proposal result in: a. Cre.tlon of any h.alth hazard or potential) ,alard (excluding mental health)? b. txposur. of people t. pot.nthl ~ea1th hazards? 16. Ag$tbetj~s. Wlll the proposal result in the obstruction of any scenfc vista or view open to the public, or will the proposa1 r~sult in the creation of an lesthetically offensive stte open to public view? p. ' .... \h.lltG!'l ... la 1 X X 1 X X X • X X X' X' X X X X 92·EIA·7 Page 5 17. 18. 19. B.t:~[I!lthm4 Will the proposal result in an t~act upo~ the Quality Dr quantity ~f existing recre.tion.l opportunities? Cyltural Resources. a. Will the propos.l result in the .lteration of/Dr the de.truction of • prehistoric or historic archeol~9ical site? b. Will the prop, .. , result in ad,erso physi&al Dr a!st~etic effects to a prehistoric, historic bUilding, structure or object? c. Ooes the propos.' have the potential to clu~e i physical change ~ich would affect untqu! cultural values? d. Will the proposal restrict existing rel~g1ous Dr sacred uses within the potential impact orea? Hindat~t~ fjDd1D9~ ~f ~jgnifj'in~e. a. Does the project have the potentia1 to degrlde the quality of the .n.iroryment, substantially reduce the habitat of • fish or wildlife species. cause i fish or wildlife population to drop below self-sustaining lo.el$, threaten to eli.inate a plant or ant~' co.munity, reduce the number Dr restrict the range of I rare or endangered plant or an1.al or eliminate impDrtant examples Df thE _ajar perlods ~f California history or preh'\story? b. Do .. the project hly( the potenthl to achieve shortaten., to the disadvantage of long-term, envlrOnAentai goals? (A short· term impact on the environment is one which occ~rs in I relatively brief. definltl.e period of time while leng· ters impacts will endure well into the .ture.) x X X X X X X I p;\_\t ... nton .• ie 92-EIA-7 Pago 6 c. Ooes the project have impacts whicn are indiy1dual1y limited, b~t cu~lati~ely consIderable? (A project may Imp.ct on two or .are separate re,o~rces where the impact on eath resource is relat1vely $ •• 11, but where tne effect of the total of those Impacts on the environment is significant.} d. Ooes the project have environment., effects ~Iich will cause substantial ad~erse effects on h~an beings. Eitner directly or indirectly? I I x X Y. Explanation of 'yes" answers and 'no' answers mark.ed with an asterisk. {*) in envirDnmental chetklist. 1. Earth (b,U. In the construction of the underground 9iii1!"'age t approxiaately 12 ,000 cubic yards of s{li1 wi 11 be excavated ar..d dispo5ed of off-site. As the site is locited~thin a built urban anvi rOTIMnt, such i IIlIU.cts ire not con s i dered s ; gni fi cant. A detailed grading and dTaina9~ plan s"a11 be required for revi~ and approval of the Clty Engineer prier to i nuance of any grading Indlor building permits. The project s!te is located in a seismic area of moderate risk, and win be subject to lIery strong ground shaking in tn! event of an earthquake. All new construction on t~e site wi1l be subject to the previsions of the current Uniform Building Code, portions of which are directed It mini.izing seis.ic r~sk and preventing loss of life and property in the event of an e.rtkquake. ~. Air {a}, Gonstru~tion of the four-story condominium project will temporn11y result in an increase in dust enlissi(!.ns over e.)(isting Ulbient air conditions. The following dust control mitigation sha.l1 be required to reduce the impact tn an acceptable level: To reduce dust levels Quring construction, it shall be required that exposed earth surfac.es be watered frequently, during the la.te ItOrn;ng and it the end cf the day, with frequency of watering increaSing on windy days. Spillage reslJ1ting frDm "aul ing operations along or across any p'Ublic or private property shall be removed i..edlately and paid for by the contractor. Dust nuisances orlginating from the c.ontractor's operations, either inside of 92-E1A-7 Page 7 :.: .-_ ,,:;r. ., K'~ '.,. .... ' .-.. ,.."- . "'!'" o'Uts1de the rfght-of-way. shal-1 be controlle-d at the contractor's e)(pense. rf t in the opinion of th:e City Engineer. the contractor fails to comply wit~ any of tne items concerning spillage and dust control, and t~e contractor ;s eHh.er ur.willing or unable to remedy th:e defi~iencYt the City Engine~r shall employ prfvit~ or public work forees and equipgaent as requlred to correct the d~ficie,..cy. The ccst of employing such force. and equipment 5h,11 b. doubled as a penalty, lnd such cost shall be-borne by tne contractor. Such action taken by the Cit~ Engineer shall not relieve the contractor of the respo~sibi1ity concernlng spillage and dust control_ 3. Water (,aL The proposed ne~ construction may re-sul t in an increase in the rate and UKHmt of surface wAter runoff. In the proposed development, the site is c:ontintJously covered by btJI1ding or paving. except for porti.ons of a 16-25 feet wi!!e per!lI1eter setback, and there is-an underground garagi under most of t~e-str~cture. rn the existin; devel~pment, much of the site is covered by buildings or is paved. However, there are currently nO ~nder9round structures and de~elopment h more 5Cattered, with many small unpaved area.!. located throughout the site. providing opp~rt~nities for some run-off to be absorbed. See Section '14. Utilities for discussion of i~act on the increase in stOrM drain run-off and the stormdrain system. 4. Plant ~ife 'a" TIM: prcpo.sed project will resul t in a decrease in the n~r and species of plants and the amount of tree canop~ on the site. There are presently 23 canopy tree. of OBH iDiameter .t Bre.st Height) of B inches or greater, and 3 palm trees on the site. The development plan proposes to retain 11 of these tree-si tney are Magnolia. Ash and Pin. trees located .10ng the Hamilton and Kiddlefield frontage. of the site. Three palm trees May b~ rei~cated on the site or on a different site. ' The plan proposes to remove 12 of the 23 larger trees on the site. Five of these are not significaf1t or are' in poor condition. Seven of the trees proposed to be remov~d are substantial ~anopy tre~s in sound condition. They include 1 lOQuat tree 8.5 inch DBH. 1 tti11p tree 10 inches DBH, 1 C,liforn', pepper tree Z4.S inches DBH and 4 Chines •• 1. trees 12·20 lnches OaH. The C.llforni, Pepper tree h,s i canopy width of approximately 40 feet, and tne four Chinese [1m tree~ are grDuped together and form a continuous canopy of approximately 45 • 110 feet. !n addition to the 23 larger trees, there are at least 12 ~maller trees on the site, with DBH of 4~S tnches? including olives. birc~es. p;ttospo~m and fruit tre~s. all of whlch .ill be removed. The total ",umber of stree-t trees along both Hamil ton Avenue and Byron Street would be increased bi a~proximatel~ 3 trees on each " ,.' 92·El~· 7 P,ge B street, due to a reduct10n in the number of curb cut5. How<tver. tne proposed develo~nt pla~ WQuld require the removal of four existing strut tnes on Byron street because :Jf tne 1 oeat ions of the proposed new curb cuts on tn.at street. Then existing trees are Chinese Pistacne trees. Ippr~x1aately 4.5 inches DBH ind 18-20 feet tall. w,n. t,ey .re young trees, they are •• 11 established and represent sevtral years growth. The locat~ons of curb cuts for tne new project s~Duld be adjusted so thit these existing street trees are ~ot required to be removed. In the deyelopatent plan, areas which are not excillvated include port i{ln.S of tne peori !Deter setbiadc.s and ttl e buil d ; ng courtyard. S!nce these are~s will have adeq~ate soil volume to support subshntial canopy trees, u many sllch treE-s as Ciln be reasonably acco.aodated s~ould be planted in these areas is mitigation for the tree canopy to be removed from the site. Trees removed should be replaced at I ratio of 2:1, either on the site or in the immedlate vicinity_ 6. Noise ra), construction. of the project will result in teDlJlorary increases in ambient noise levels, CCU'lstruction attivities will be subject til the PalD AltD Noise Ordinance, which requires constrllct1on equipment to be muffl ed so is not to exceed a noise-em; 5S 1 on of 83 deci be 15 (dSA} at a di stance ef 2S feet, or a nelse leve1 exceeding 86 dBA outside the site boundary, unless an !xceptio~ is granted. Middlefield ~oad is I ~jor arterial street, and the traffic noise ~y be a disturbance to r~side"ts. The project will be required to comply with California State la., Title 24, which requi.es that • • Inl.um Interior 45 db CHEl (Coomunlty Nois. EQuiv,lent level) or le5s be maintained for new multiple·family projects. The project has been designed s. that the COOIlIOn patio area h located away from Middlefield Road and is partially surrounded by building .alls .hich will serve to protect the area from street nGise. 7 _ Ught ,"d Glare, The proposed four story building will Increase the alDOunt of 1 ight fixtures and the height of SOIle light sources on the site. These increases, particularly outdoor l1qhting, may have an idverse impact Gn adjacent residences. To mitigate tne potential for impacts on adjacent land uses, outdoor lfghting s~ould be kept to & Binimum and .11 outdoor 1lg~t fixtures s~ould be directional and shielded, with no light sources directly visible and ne light sp~llage beyond the property line. A detailed outdoor lighting plan sn~ing fixtures, lig~t throw patterns and intensity shall be reviewed and approved by the Architectural Review Board prior t{l iss~ance of a Building PeTllit. 92-E1A-7 Page 9 8. Land US!. The prop.csed project wll, change the present land use of the site frooo a c..,ln.tion of office, stngle family resldenthl and low density .,ltiple f .. lly residential to high density multiple family residential use. The present uses include approximately ]O,6~'J squ.re feet of office, three single f,mily residences and one 4-unit apart .. nt building. The pl.nned use for t~e site, .s indicated by the current zoning t h low density lIultiple fill!i1y residential. Thus, the proposed project would be IIOro consi stent with the planned use for ttl! site than the present uses. The new use would have a .. ch l''ger building and twice the residenti.l density permitted by current lon1ng, b~t is permis5ib~e _under the Planned Community Zo~e. 9. Risk of UDset+ Sa.e types of chemicals used ;~ the maintenance af po~ls and spas iI'~e potf"nthlly hazardous and ha"e spechl req1.lirements fDr their safe use and storage. A list ~f names t quantities and hazards of ,11 chemlclls shall be provldeo to tM Pa' 0 Alto Fire Department (PAfD). The developer .hall meet shndard. for the use and storage of the chemical., a. specified by tho PAfD. 10. papul.tjon/Housing <t,b). The proposed development will increase the tot.l number of residenti.l unlts presently on the slte and will also provide tW1ce the n~r of units allowed by ~urrent loning. There are presently 7 dwelling units on the sito, 3 .ingle family homes .nd a 4-unit apartMent building. The present zoning (RM·]5. low Oensit1 Multiple family Residential) would permit 18 units on the site, while the proposal I. for 36 units. The dev.lopment would cause the loss of 4 rental units and 3 single fa.i1y units all of Which are rented. Since the proposal does not reph.ce t~ase rent.l units. it wi 11 be required to provide a 2~ Solow Rarket Rate (BMR) component or .even Bel .. Market Rat. (BMR) units. The developer is proposing to purchase i lIinimum of 7 existing rental units off·s;te and transfer them to the Palo Alto Housing Corporation for the BHR rental pr09r~. Tna project would increase the supply of l1ark.et re.te housing designed espec-hllly for senior citizens, a type Df housing for which there "1 be at present .n.un .. t d ... nd in the c~nity. If the proposed ne. units are sold to senior residents who presently l;~e in the conmunity. the project llay result in an increase in. the availability of aarlc.et rate hmily housing when tnese un.its are vacated by residents of the new senior units. p:\w\"-lltClft.eh 92-ElA· 7 Pag. 10 12. Tran$PQrtitj9n/CfrculatjJuLJl~ Traffic VplUJllt Reduct jOll A traffl c .tudy of potential impact. of the proposed project was conducted by The Wilson Engineering Company. The City of Palo Alto Transportation Division has reviewed this study and found it to be .cceptable with rogard to the an,ly'is of troffic yol ..... The traffiC study has shown that the project is expected to resi.llt in .a net reduction in the "unber of trips gerl.gr~ted by the site, 'Wit~ 97 fewer trips per day than are g~nerlted by existing site use~. In arriying at this estimate, the study IssUfied no reduction for senior residents. using l;lstead a worst c~se scenario similar to a typical condomlnlum complex in a subu-ban ~rea. Tne expected trip distribution will bE a decreas! in traffic on Unlyersity Av!nue, Hamilton Avenue and Middlefield Road, wit" an increase on Byron Street of 105 trips per day, with 11 additional trips in the am peak period and 5 additional trj~s i~ the pc peak period. Thi $ ir.crease is cons.idered tn be mirtimal and to pass unnoticed by existing motorists. Begui red Parking Tne proposal provides fewer parking spaces f"r residents tfl,an is required by ordinance. The Phnned CODY/Iunity Zone Ordinance "requires projects to provide parking based on tnE TeQuire.ents of t~e Farking Ordinance unless it is snown by traffic engineering studies or other relevant data that less parking will Beet the needs of the project. The following table shows the number of pir~~~g spaces which are proposed by the project compared with the number of sp,ces r.quired by the Parking Ordinance. PARKING PROPOSED AND REQUIRED Zone Ordinance Proposed R!gufre.ent5 Resident Parking S9 spaces 72 spaces (1.6 per unit) (2 per unit) Employee 'arklng 6 s.paces 6 spaces ("timate) Guest Parking 12 spaces ]2 spaces TOTAL (33:1; of unit!.) (33" of units) 77 spaces 90 spices W~ile the need for parking is generally considered t~ be less for senior residences than for standard fa.ily housing. this may not be the case for luxury se~1or housing where residents are more likely to own cars, to entertiin guests., and where the program includes a higher levei of services to be prDvid~d by empl~y!es o~ the Site. p: \ .... \to..i.ltOtl. e II 91-EIA-) Page 11 T~e' project provides two guest quarters and spacious fa,11lties for entertlinlng. No information bas been provided whtcn would supp~rt a reduced need for visitor park.ing. In order to pro'Vide the required guest parking, 6 spaces in the garage should be reserved for guests and .5 well as 6 spaces in the surface parking area i~ front of the building. Curre9t1y, there is no excess street parkins in the Y1cinit, of the project site. If the parking needs of the project I~e not prDY1ded Dn~site, t~e 1hcreased shortage of parking for existing residents and uses could lead to rf_quuts fer residenthl parking zones or other parking controls. To provide the required nueber of par~ing spilces for elllployees and guests. 12 spaces should be res.erved for guests and 6 spaces for employees. Tnt remain'ng 59 spaces should be reserved for residents, providing a ratio of 1.6 spaces per unit for residents. The guest and emp10yee spaces s~ould be marked and reserved for that purpose. turb$1de Parkjna The prnposed project would result in a net gain of one curbside parklng space. The number of spaces along tne-Wami 1 ton Avenue frontage will increase from 2 to 3, due to closing of existtng curb c:yts. There wi1l co"tiJlue to be 1 curbside spaces along Byron Street I tnough existing curb cuts will be closed and three new driveways added, resulting in iI total of 10 curbs1de parklng spaces at the project site. Access to Adjacent Parcel Presently, one of the two drheways on the adjilcent property to the north is iccessed across the west corner of the project site, with the curb c.ut for ttlis drivewilY being in front of t~e project site. The plant~r strip and curb in front of the project sl'. should be constructed so that the adjacent driveway continues to provide access to the neighboring site. Sendce vehitles. Service vehic.le access is off Byron Stre-et, arid a loading zone is proyided in the Byron Street setback area. TUffic Control Pl an Prlor to any demolition or construction on thi! site , the Qeveloper will be required to provide a Traffic Control Plan for the construction period, to the satisfaction of the Public Works DepartlDel\t and the Transportation Division. ltems to be addressed in the plan will include, but "are not li.ited to, access to the construct1on $ite, parking for personal cars of construction "orkers, side"lalk iccessibillt,Y. lotatian of staging and delivery areas, truck routes and access to neighboring propi!rties. Construction fencing should be 10cated so that access to tne neighboring prcperty is n~t impeded d~ring construction. p:\-V-Ilton,ela 92-E1A-7 Page 12 14. UtilitIes Ic.d.!> The sewer IIIllns at Middlefield Road .and HiUIIilton Avenue Ire neu capacity. The Oe~elQper's engineers shall subm~t flow calculations which _'11 show that tne off-site and on-site water and sewer mains .,111 providf ttl! domestic water. fire flows and sewer capacity needed tD service the development and adjacent properties dur,ng &nt~ciplted peak loads. The applicant will be required to prove by one week of' flow monitoring that the sewer ma~n has adequate capacity to handle these puk flo.s. The Oeveloper will be held responsible fGT installing and U?9rading on-site and off-sit! water and sewer utilittes as neces51ry to handle anticipated peak load~. including th~ cost af all assoCiated utility instalhtior.s and upgrades. An increase in rl.tnoff from the site may adversely i~pac:t the City"s eXisting storw:ln:in systell. Both of the stormdnin s.ystems whic.h serve t~is site are currentl~ over ~apatity. In ~rder to reduce the impact on t~e stormdra1n system, and to comply with the reQuir!ments II)f tne National Pollution. Dischiirg~ Elimination System a.nd ttie Santa clara. Yal 1 ty Nonpo1nt Source Pol 1 IItion Control Program, steps should be tak.en to reduce both the amount and the rate of rlmoff frOll the site. The sto,..ater frOIn the site should be divided 1nto two watershed arelS, 'tI;th part of the runoff directed to the pub' ic itof1iidrillr'l it the corner of Middlefield Road a.~d Hamilton Avel"luE!", and the other part directed to the p"blic stormdrain at the corner of Byron Street and Hamilton .Avenue~ 1n order to :!l{lw thE!" fite of dischal'ge lnd reeI"ce the level of pollutants entering the stol'llldraln systea, on-site detention should be proYlded. The detenti~n may be provided hI swales located witilir. setback ;'re;ls, Dr fn expanded underground piping. or so.e ether fcnm of underground storage. The 'pplicant should aeet wlth the Public Works Department to discuss the ston. dri~nage requirements for the site prior to submittal of construction drawings. 15. Aesthet~ Tne IUssing of th!" proposed di!ve-loprnent was modified during the conceptual review proce~s, reducing height ind increasing setbaCKS in various loca.tions so that the proposal now complys with all setbiek, height and daylight plane requireRents lnd ~ini.;zcs cast shadows and aestnetic impilCt!; on nearby properties. £Xtensive la.ndstaping is proposed. induding the addition of lIany trees in the setback areas and new street trees along 01.11 t~ree street frontages, providing screening and reducing the v1sual impact of the building. The C1t,Y's Draft Urban Oe:;ign Plan calls for IlOre substantial building mass at the Middlefield/Unt~ers'ty Avenue intersection tG ~rk th~ entrance to Downtown, but it does not esp~cially cill for greater-b\J11ding mass at the Middlefield/Hamilton intersection whe-re p ~ \ItIj\hlll i It on . e ia 9Z-E1A-7 Page 13 the project site I. located. lhere could be urban design benefIts In locating a substlntl.l ind distinctive structure It this \ntersectian of two .lj~r street!, though it wo~ld not necessarily ~qulre is tail nor as large I building IS Is being proposed. The relative design aerits of t~e proposed Qtsign, including massing, &rchltecture, relationsn1p to urban fDrm a~ impact on neighboring prcperties should be evaluated by the Architectural Revi~ Soard and the Planning C ... I,slon. p:\w\,,-ilton.ei. 92·E1~-7 Page 14 ATIACHMEHT 2 651 ~ILTOM AVENUE CITY COUNCIL MEETING MINUTES NOVEMBER 30, 1992 7150, to ~ the salary and Benefits for the Position of city Attorney" XO'fIOlf PASSED fOl" Item Nos. 1, 2, 3, -4, 6, and 7, 9-0. ~OR PASSBD for Item No.5, e-O-l, Fazzino "not participatinq.· QNFIHISHEp BUSiNESS e. PUBLIC HEAR!NG: Pl",nning Commission recOlIlDe.nds to the city Council denial ot tl"-.·, application to rez.one property from RM- 15, Lo'aI' Density Hu _ple Family Zone, to Planned Community Zone, in oreer to Cc :truct a senior condominium project, for property located at 651 Hamilton Avenue, 5]6-576 Middlefield ~oad~ and 523-575 Byron street, but indicated to the Council 't.hat some development qreater than the RM-15 zone might be appropriate ~or tbe area (continued from 11/16}92) council Member Kniss said the decision making on the item would probably be postponed for another month ana queried whether there ~as any urqency on the part of the applicant~ Director of Planning and community Environment Ken Schreiber said he bad spoken to the applicant and recommended that if the item were continued, the date should be Janua~ 25, 199J~ Council Member Kniss said that seemed like a lonq time for the applicant. Mayor Fazzino elari~ied the public hearing would qc forward that evening and the question was when would the council make its decision~ city Attorney Ariel Calonne said it was appropriate to handle the contin~tion after the public hearing. Mayor Fazzino encouraged the~ CounciL.to -hold-off-on . ....substantive questions regarding the proj ect until the issue returned to the council for a decision. Council Member Wheeler concurred 'With. the comments of Hayor Fazzino but sl.Zqqested it might be appropria.te to ask quest.ions of substance 50 staff could research to those areas prior to the Council's action. Mayor Fazzino supported that sugqestion. Mr~ Calonne said ~ollowing the Planning commission's initia.l action, a Planned community (PCJ zone application would be forwarded to the Architectural Review Board (ARE), then to the Planning commission, and then return to the council with an ordinance. He understood the application .... ould still need to qo to the ARB, return to the Pl~nnin9 Commission. and then back to the council with a zoning ordinance. 11/30/92 69-456 ---------- .', -.... \; . , ·-, "', . / Hr. Schreiber said the proposed project "'as a senior citizen projoect, and its mass size W4S beyond the existing Lolr{ Density Multiple-Family (RH-1S) for the site and well beyond the allowed size for RM-40 which .as the city's hi9hest density multiple-family zoning~ The staff and the"Planning Commission had struqgled uith the issues of the mass and bulk and the public benefit co=ponen~ of th~ PC zone. The. City had approved in recent year,;. D n\l.!a.b@r of housing proj8cts tor the elderly that had exceeded normal zor.in9 constrAints. In _ost of the recent cases those projects had served low-and moderate-income seniors. The proposed project was desiqned to serve individuals 'Wb.o had accumulated consider-able wealth and who vantea to live in an environment that offered a considerable range of ilW:enities~ The Comprehensive Plan spoke directly about low-and ~oderate-income individuals and the high priority placed on finding housinq for t.."l.ose individuals in the community u~t did not speak directly aboct individuals who could afford Vlii!ry expensive units. Palo Alto had indicated over the years that it wanted 6 wide variety of people to be able to live in the community and want~ opportunities for people to stay in the community. There Yas no precedent for ~pproval of that type of project.. but staff was sympathetic to the rdche ot the housing '8Iar)cet that the proponents 'Were try ing to address ~ The city's regulations did not set out specific detail standards for public benefit which he believed vas appropriate since public benefit needed to be vieved in the liqht of a particular project. Staff had discussed extensively with the proponentlS of the proposed project the issue of public benefit. He said the applicant concurred with the staff's recommen~ation in its report (CMR:514:92) that there would be a public benefit of seven additional off-site Below Market Rate {BKR) in addition to the seven required as part ot the project. He referred to the alternate proposal in the .emor~ndum from council Members Huber. Kniss, Simitian, and Wheeler dated Noveaber le, 1992, wh5 .. ch involVed ~stablisbin9 funding tor a variety o~ senior programs in the community.. Staff was not opposed to thll.t alternative.. The Planning Commission haa forwarded the proposal to the Council with a specific recommendation to deny the project but recommended a higher de~sity zoning than the RM-15 on the site. Tne Planninq Commission was divided in terms of its support ana denlal~ The propose~ project was before. the Council for review ot the concept, and as such the detailed design issues were not bein9 dealt with at that time. He indicated tlle ARB haa not seen the project. Planninq cummissioner Pat CUllen said the Planning Commission vas unanimous in its support of the need f~r that kind of housinq in the community~ It was also unanimous that the design as presented oftered many qood qualities and vould enhance the City. There was division in the Planning Commission, and t~o commissioners wanted to iRove forward. with approval of the project as presented, two commissioners were opposed l and t~ree commissioners were concerned about the size of the development and other policy questions and wanted to forward the proposal to the Council. There vas concern about its adequacy and the connection of the public benefits with t..'le project. There ... a's also concern about whether the present RM- 15 zoning on that site was appropriate. She emphasized that the principal public benefit would not create new low-to moderate- U/JO/92 69-451 ""-----~ -.--- '. " , / • incc.e bousinq units but would convert units alre4dy in existence, 80 the City would lose some units to one segment of the market in order to convert them to lov-or moderate-income units. In other projects" new units 'Were created for the benefit of lov-to .oderate-income seniors~ Kayar Fazzino declared the Public Hearing open. Jim Hill, President, Hamilton Avenue Properties, Inc., 1010 Harriet Street, said seven people bad been 'Working for over a year with statf on _ l~~ of major i5sues~ He referred to a letter to the Council dated November 25$ 1992 (on file in the Clerk's Office), and said the discus5ion would focus on those points. A capable te~ had been assembled which could deal with all the espects of a very special project for seniors. Sam Webster, Partner, Hamilton Avenue Properties, Inc., 335 Lowell Avenue, said the project evolved after discussions a.bout how to continue to live in Palo Alto~ He said he had been a resi~ent of Palo Alto since 1941 and did not want to leave~ He said there was a lO-year wait for a tvo-bedroo& unit at .both the Channing-and Webst£r facilities. The public benefit was a consensus among many people t.'"tat somethinq significant could be given back to the senior citizens of Palo Alto, and a significant amount of money would be put into an annuity proqraa that would provide .benefitlS to the senior citizens in the City forever~ Mr. Hill said Mr ~ iiebster-was the developer of the Garden Court Hotel and the Gatebo~se complex Which were significant projects and representative of the kind of work that he had been invol vee! in the past. He said the next speaker was Candace Hathaway ~ho had been involved in additional aspects of Webster House and who had also been a consultant on sillli~ar ownership projects throughout the area. candace Hathaway, Hathaway Associates, 445 East Charleston Road, said if a person was an upper-incolle-senior-_in.Palo Alto,> the life-. style choices were limited. The people who were in the 7S-year plus category were look~nq for more than just housing and lIIere lookinq for a life-style envirorm.ent that provided a network of supportive services. Senior communities such as The Hamilton w.ou.ld prClvide a network of services which included care in the unit, Jeeal assistance, Ana help with shopping and medical services and would contain both a social and eaotional support network. :It would allow people to remain independent in their units as lonq as possible. The facility would also handle personal assistance and skilled Hursing services for the lifetime of the resident, so when a person moved into that type of senior community, all his or her needs were taken care of~ A recent survey showed that if a person were low income and qualified for a subsidized apartment, a place could be found in about two years, but for the uppe~-income seniors the waiting list was eiqht to ten years. A community such as The Hamilton not only benefitted the upper-income seniors but also ~nefitted the local economy. 11/30/92 69-458 ... ' -: Richard Beard, Backen Arriqoni • Ross. Inc., Architects, 1660 Bush Street j San Francisco, said his firm had just finished the Peninsula Reoent a:r.ld the Stratford in San Mateo. He said the prospect of licrkinq on a smaller, very desiqned seniors' community in a strong existing oI!rchitectural and civic context had become very interesting. He considered the site appropriate for the project beC".ause it was adjacent to the Downtolm core, medical facilities, and trafl.!'portation, and Middlefield Road formed a distinct boundary for the area of mixed and diverse uses. The City's t)'rban Desiqn Plan encouraged the promotion of Hamilton Avenue as an active mix use, the mair.tenance of Hamilton Avenue as a tree-lined pedestrian environment, and the mediUlll-to high­ density residential development in suppo~ of the Downtown core .. He said the project proposed the buildinq of one-, three-, and .four-story parts end would try to cO:':lcentrate. the bulk of the project tOWlU'Q the center of t..'le site to mitigate the adverse impacts of simple building mass. He said since the submittal there bad been five major desiqn revisions to the .project, and most significantly the bulk of the building had been chanqed to conform to the RM-15 daylight plane so that the project required nn variances under its PC zoning consideration~ He summarized that his cbarge was to design a senior community in a fashion that would function well tor the people wbo would occupy the facility but to be extremely respectful of Palo Alto's architectural tradition. Council Me~r Andersen queried what RM-40 constraints were encountered by Mr. Beard. Mr~ Beard said a 36-unit project was a marginal operation for a senior housing project. The cost of underwriting the operations and the insurance programs associatea with the services had to be amortized over a much larger bas.~ to be economically feasible. The number of unit~ had been reduced from 41 to 36, and he did not believ~ it vas feasible to go ~uch lower than 36 unit£ which bad a Floor Area Ratio (FAR) figure ot L 74 and a height limit of 44 feet. The RM-40 F~A~R was 1.0. Council MEmber Andersen queried 'Whether the RM-40 Wei,S not finan­ cially feasible or architecturally appropriate and queried the number of units that would need to be decreased. Hr. Beard said the number of units vould probably be under 30 with an JUi-40 zone~ Council Member Cobb said some of the objections raised about the project had to do with the issue of bulk, and Hr. Beard indicated a sub&tantial effort had been made to ~ork on the desiqn and deal with those issues. He queried .... hether there might still be opportunities available to deal with the bulk issue without dealing with the number of units and square footage.~ Mr. Beard said the five design changes that were undertaken since the initial submittal had maximized the kinds of changes that could be ~ade to the building and still have it function. The setbacks taken oft the fourth floor and the increase of the 3etbacks off the sides had maximized the perimeter ~rea and had maximi~ed the number 11/30/92 69-459 , · .. ~. of different unit types and the vari.tions that would have to be incorporated into the building to make it work. He kn .... from the beginning that the bulk of. t!'J.e building would be a siqniticant factor given the kind of developme.nt proqram it took to make a functioning seniors' ct.lDmlunity. The bulk of the building needed to be placed as close to the een~er of the project as possible. He had looked ~t various alternative.s fer assembling that program on the .ite and felt confider.t that ever)! device possible had been taken advantage of and still had the buildi.ng function on the property. Council Member Cobb queried whether landscaping solutions had been eonsidered that might soften the visual impact. Mr. Beard said a landscape architect would be involved in the next stage o~ desiqn, and that involvement "Wa.s paramount in that kind of development. Th~ setbacka on the street sides along Middlefield Road, H~ilton Avenue, and Byron Street were significant as well as an interior court. Great effort had been taker'l~ to :keep the parkinq confined to the bui1dinq footprint so the buildinqfs exterior could be developed with full depth planting. couneil Member Kniss said she and council Member Wheeler visited the. stratford and Peninsula Regent sites, and at both sites people were surprised that there were 31? units proposed. She asked if the base could have been 72 units with a different F~A.R. Mr. Beard said if the common areas were subtracted from the building-, the F.A.R attributable to the 4esidential units was 1.24. The area representec:J by the 0.5 F.A.R. was approximately 25,500 squa.re :teet which was the equivalent of 15 units,. and the total number of units would be si9nificantly higher. The absolute limit in terms of the development of the site was the heig}-i.t, and the distribution of the mass of the building on the site was qoing to be a critical issue. council Member Kniss queried.the .financiaLprDblems_that~ould be encountered. when the building was operated. Sbe observed from the other sites that when the services we~e incorporated, the financial picture changed.. Ms. Hathaway sa.id the type of"housinq that a targeted buyer would desire was the first consideration, e.q., square rootaqe, ameni­ ties. health plan. It was not ideal for a facility to have that amount of units because it would be expensive, but the people had a commi taent to contiJ"me to live in Pa 10 Al to and to make the project work. Douglas Norris, Senior Pastor, First united :Methodist Church, 707 Charleston Court, said many of his ~embers could not live in Palo Alto because of the lack of housin9. He was concerned about the housing, and he thought the project would be the ans:wer. The project would be located across the stree.t from the church and would enhance the neiqhborhood. People would be able to walk to banks, stores, and churches. 'l'here would be less impact on parking and traffic than what an office building would generate. 11/30/92 69-460 Bern Ann Abbaduska, Administrator of Webster House, a J7-unit upscale residence tor seniors, 40~ Webster Street, said that kind of boua1nq valli-needed in the area~ There were 24 couples on a vaiting list at Webster House for larger units, but he had not had an opening for a two-bedroom unit in four years. There vas at least & 10-to 12-year t.ra_iting list. A new OOW'ntovn senior t&eility would provide stability to the u-ea, and the kind ot resid.ent that 'Would purchase a unit at The Hamilton 'Would be II. good consu:aer for the Downtown area. He said there were 37 :J.nits at the Webster House and it was more costly per person., but he hoped that if the project were approved, the Webster House and The Hamilton could combine activities and services. He asked the Council to consider the positive benefits of· the project for t..'le seniors and for the city. council Member Wheeler querie.d if Mr .. Abbaduska bad comparable statistics for the Cbanninq House in Palo Alto. Mr. Abbaduska replied the Channing House offered a different packaqe from the Webster House or The Hamilton.. He thought there was probably a five-year waiting list at the Channing House. The waitiJl9' list waS long at the Webster House because the people wanted larger units .. Council Member Wheeler said one of the concerns expressed by the Planning Commission when the Webster House project VAS approvsl1 was the adequacy of parkinq s~ces provided tor residents and employ­ ees, ~r~ ahe queried th$ outcome of that concern. Mr. Abbaduska replied the average age of the residents was 75 or 80 years old, so the time span for drivinq was less than originally anticip.a.ted.. Seconde.ry parking behind Webster House was appro"..rec:!, and not all of those parking spaces were presently used4 He said there was adequate parking for employees. Vice :Mayor McCown referred to AttacluDent 6 in the staff report (CKR~514~92) which compared the Webster Bouse unit sizes and said the r~nge was be~we~~ 650 to 1,200 square feet. She asked the size of the two-bedrqom unit. Kr. AJ:Ibaduska said some of the two-bedroom units were sm.aller than SCDIe of the one-bedroom units. The largest unit we.s 1.110 square feet~ Vice Mayor Jo1CCown queried the square footage ranqe o.f the two­ bedroom units. Mr. Abbaduska replied the range was ~35 to 1.100 square feet. Yvonne Wellhausen t 628 Hamilton Avenue, had lived in Palo Alto for 12 years and opposed the zoning change fro~ RK-15 which would allow the Hamilton project to huild 36 larqe units. A project of that size was too big and too dense for the site. The proposed project -..'las a special service community and would involve deliveries and ancillary services. The streets would not accommodate the-already overloaded traffic conditions and inadequate parking that no. 11/)0/92 69-461 --' .. j , existe.da She asked wnat public good 'Would be done tor the neig-hborhood 'With the rezoning. The mixed use in the Downtown ~rea sho~ld not mean the aesthetic values or the area were expendable. 8ill Love, 650 M~r.nin~side. Los ~tos, had lived in Palo Alto until 1989 and had practiced law in the community for 30 years. lie moved from Palo Alto because he could not find the kind of housing h~ wanted in palo Alto~ He hoped there would be an opportunity in Palo Alto for ~~e kind of housing he could enjoy and hoped it would be 1arge enou9h and have the a=enities that would be attractive to people who had lived in lar-ger homes. Mary Williams, 575 High street, worked close to the project and was in favor of the project. She moved to Palo Ai to because she belie.ved it was a nice community. She supported any improvement in the eommunity# and the project ~as definitely an improvement over wha~ was presently on the site. She wanted to see the n8eds of people with higber incomes servec:'! as well as those with low incomes. Tbe project 'Would also ccntinue the vitality in the cOlllJllUnity. Tim....:-thy Oesc8.mpst 536 Fulton street, said he supported. Benio!" housing but was opposed to the rezoninq of the project to hiqh density hou&inq. J:!e did not believe the citizens should grant public A5sistance in the form of a variance to the zoninq to people who had the resources. to fu.,nction in a conventional housing Ilarltet. He thought the bulk of the project was excessive tor the neighbor­ hood, would destroy the integrity of the neighborhood, and would compound and a9'9%'avate an already serious traffic problem. He suggested a traffic impact stUdy should be done before a decision was made. The Comprehensive Plan state.d the chara.cter of neighborhoods would be preserved 'Which was small density, two-stot'}'~ types of structures or le!;.s, and that neighborhood mix worked Pecause the density was limited. Art Hammer, ~Ol Walter Hays Drive, had been a resident of Pa.lo Alto for over 25 years, served as the cbairperson...of .the... Administrative Council of the First United Methodist Church, and said on May 26, 1992, the Administrative Council voted unanimously to express support ~or the project. He believed the project would provide a mix of housing and balance in the area and would be an attractive addition to the city and the Downtown area. The Admini!'trat i ve council urqed the COuncil to move the project forward. in a positive direction. %moqene Chancellor, 298 walter Hays Drive, said as a realtor she had observed the difficulty seniors experienced \/hen tryin9 to make a decision to move from the home in which they had lived most of their adult life. Palo Alto had to address the needs of the entire community, i.e., seniors in need of low-income housing as vell as seniors for whom a high-income senior residential living community such as The Hamilton would be appropriate. Many of the facilities had a waiting list of over 10 years for units that would eCCODmQ­ date a cQuple~ Many seniors could not and should not wait that long to establish themselves in a residential envi~onment. The present facilities had only begun to meet the housing needs_of the 11/30/92 69-462 -------_ ... _---- , '- ,'.-' ." ,/"" ever increasing senior cOlllllunity. Hamilton project. She urged approval of The Ch~les Schultz, 3482 Kenneth n~ive, owned the building adjacent to the propoaed project and said he was personally and professionally aware ot the needs of seniors because his law practice had ~en primarily devotee to working with seniors~ The city needed to be car.tul as it planned. for the people who needed. the type of services that would be rendered by &uch a project because there were some very different needs ~nd expectations. He referred to his letter dated september 25, 1992, that cited. his concErns regarding the traffic impacts of the project. He said the project was a massive building and vas over t.."1e height limit. He referred to page 3 of his letter which referenced zoning_ The Council could choose b4twean either an RK-30 or RH-40 zone which wo~ld provide the zoning required tor the units requested. He was not totally opposed to a zone change but could not think of a good reason for the chanqe. He said several public ben~:fit..s had been discussed besides the seven units. Council.Member Simitian queried whether there were any other public benefits that Mr. schultz wished to discuss. Hr. Schultz referred to page 4 of his letter and said there was ~n indication that endoWJII:ent funds could be provided. He wondered if the money would come from -a tax from the unit each time it was sold or if it would come from assessments by the condominium associa­ tion. He had calculated a large profit and cOlIpilred to the cost of the site, it was a good return on the money. However, the public benefit money would CODe from the buyer's pocket. The discussion should. be ab?ut community benefit in Palo Alto and who needed the support of the project. Timothy Lindhol., 623 Middlefield Road, opposed the proposed project because of inappropriate mass density. He referred to an article in the San Jose Mercury News that stated city officials had presented an unusual proposal that t.~e developers create a l~s~ing endowment for the Senior coordinating Council (sec) to provide the public benefit required for PC z-oning. The. article cited developer Jim Hill as saying the idea 'Was for more well-off seniors to provide far less well-ott seniors. Althouqh the idea sounded good, it .iased the actual point which was that tbe developers of The Hamilton expected to make enouqh money on the development to fund the endOWlllent. He had to assume the. en<iovment had to come out of the developers' profit at the beginning. He was concerned that althouqh pu.shing the moneys around benefitted th.e city and. nut individuals, it read like 6 bribe to the City as a body to gran~ exceptions for projects that could not stand on their own .erits. He argued. if the city d.id not require benefits of the development to be inherent in the development and allowed payment in lieu of more tangible benefits, it was irrelevant where the money went. If that became standard practice, then Palo Alto might as well ask for a check to be made out to whichever project it currently needed to fund. The job of the Planning c.ommission and. the Council was to enforce development appropriate to its setting and not· to use siqnificant zoninq exceptions as a creative way tq raise ~unQs. 69-463 Roberta Yee, 470 Antone Court, worked with seniors and the Council on A9inq for santa Clara County and said Palo Alto was a qreat town for seniors because of tile aDlenities, health care, and the programs available. The basic needs of all seniors should be addressed~ Bill Jason.. 610 Middlefield Road, said the long-term parking currently available on Byron street would not be affected by the Hamilton project as proposed~ The Hamilton project would not create any 4ifferent parking impact. He said the church across the street used on-street parking after 5:30 p.m. and did not use on­ street parkinq during the day because church parking was available. He said the webster street parking garage with seven levels was a fine garage and coull:1 be utilized better. He thought it vas a dynamic project, and it not only would enhance the aes~~etics of Palo Alto but also would hopefully encourage homeowners and businesses alike to continue to make Palo Alto the most desirable place to live. Faith Briqel J 518 Byron Street, said she initially supported the project, but she real:i.zed there were a lot c,f problems intrinsic to the construction. She hoped the Council liould consider the project from the perspective of the people who lived and worked in the area~ She understood the need for senior citizens but believed it was the wrong location for the developlIlent. She thought the construction-WOuld probably last two or thre.e years and would cause a lot of problems. Byron street had the unique position of being nestled amonq three very busy streets, and people already took Byron street in order to avoid those streets. The main entrllnce of the proposed project was on Byron street, and all the traffic to and from that project would affect the SJIIall amount of peac:e-fulness that remained on that street. Her tenants had expressed to her that if the area became more crowded with parking and traffic probleas, they might move. The project was 'Out of character with the rest of the neiqhborhood. council Member ¥~iss queried whether Ms. Briqel" was the owner of the building. Ms. Briqel replied yes. Bruce Baker,.""' M.D. f 63 Middlefield Road, considered himself a futurist, environmentalist, and preservationist and had tried to approach the project objectively even though be lived close to the project. He believed :most of the people would consider the bodqepodqe of buildings and parking' lots as less than ideal for the area~ He could not imaqine any land use less intrusive than elderly housing. He questioned whether Lytton Gardens or Webster Mouse caused any big problems~ He passed those buildings twice a day and had never noticed any double parking, loud parties, huge aaounts of delivery trucks, or D large amount of people entering or leavinq those buildings. He thouqht four stories was a reasonable density for portions of the property. He was pleased to see more open space which would be aesthetically pleasing in ed~ition to the building itself. He could not imagine a better eer-vice to the elderly than to locate such units within walking distance of Downtown Palo Alto. He asked why there should be prejudice U/30/92 69-464 ----------, . ...-:;- aqainst the high capital citizens of Palo Alto who had been just as important to the City as anyone else who loved Downtown Palo Alto. Richard Fisch, 704 Sutter Avenue, opposed 'the proposed development. The developers and the proponents had portrayed the developers of The Haailton 4S an altruistic and charitable organization and that the prospective customer's last hope of housing was in the area of Middlefie14 Road l " Hamilton Avenue, and Byron street. All of that obscured the fundamental issue that the developers were asking the council to ratify .. precedent in which the quality of the City Would be changed and that there WQ\J,ld be a development that cO'.lld only 90 in the direction of urbanization of the City-change in the neiqhborhood quality, the access of small professional services, and the provision for people to live in modest hou5ing~ He hoped the Coun~il would not ratify that kind of precedent. Carol Christofferson Tapper, 604 Middlefield Road, was a homeowner and President of the Palo Alto Fountains Homeo'mers' Association which was comprised of 12 owner-awned homes directly across the street from the proposed pl"Q;ect ~ She said the hcmeowners' association at the annual meeting in Octo~r 1992 unanimously voted to be: in favor of the project, A qraat deal of time had been .. perot reviewing all the pres and cons of the project. and it was felt that the project Would enhence the neighborhood.~ Many people were afraid of change on that corner, but she thought it could only be a positive chanqe. contrary to what had been said that evening, she believed the site was selected by a very intelligent, far reaching qroup of people who wanted to live on that corner. Council Member simitian ~larified there was a unanimous vote of the homeowners' association and asked how :many of the l2 units 'Were represented at the ~eetin9~' Ms. Christofferson Tapper said 11 units were representea ana one was a proxy~ Leonard Ely, 2161 Bryant street, had lived in Palo Alto for almost 70 years and be1ieved it was an excellent lQCation because a project like that could not be put in a residential neighborhood:. He found it interesting that 50lH of the people who spa:ke had residences and opera ted businesses in the area. He said the property would have to be turned into residences. He said Webster House was on the cutting edge 10 years ago, and he wanted to help solve the senior housing and medical problems~ He said the project was not started to make a profit~ The Council had to decide whether the project was good for the community and if the project was the best use for the property. The City was not being esked to give the residents benefits but was trying to provide a place for people to live and maxe some contribution to the pUblic bene.fit, particularly the senior Center. He hoped the Council would approve the. project, council Member Kniss queried available as to the interest of unit in Palo Alto. whether there were any .arket surveys that miqht be generated for that type • . ,~-... , Mr~ Ely said a surv~y done hy Hathaway Associates of people 65 to 75 years old indicated it wa~ a place where they 'Wanted to live~ He said. the only reason Webster House was soun(j financially was because ~.he averaqe age was 10 years older~ Many times the people cou1~ not pass the physical and could not obtain residency. He was not certainl based on the cost of the ur.its and the dmmsizing, whether the project coyld be done, but he wanted the opportunity t~ try. Steve Player, 1874 Guinda Street. supported what the project would accomplish at that location. There were ar~uments in support of Lytton IV which would provide housing in Palo Alto for people who had low to moderate incomes, and a similar argument was being made in support of The Hamilton project which provided a housing market not available in the CitYa The city was being asked to provide amonq the housing stuck a particular type of housing which could adequately serve ,il certain niche-of tt-.e population that miqtt otherwise be forced to leave palo Alto~ He was on the Board at Channing House and verified that the bi9gest d~nd at Channing House was for the larger two-bedroom units~ The de~and was now a 1Cj-year wait. He believed the develDpers had been very responsive,. during the extensive preparation for the public hearing, not only to what was heard from the staff and the Planning commission but also tQ what was heard from the neighborhood as to the appropriate use ot the site~ That type of density and F .A.R :had to be provided for the project to work, ol!nd the PC wa.s being requested because the RM-40. RM-30. and RM-l.~ zones would no"C work for that type of development where common areas were necessary to provide the services ~ There bad been ar9WDents from both sides on the appropriateness or inappropriateness of public benefit at the sites~ He clarified the proposal was not being suggested in lieu of the seven BMR units that were required by the statute ~ He said the memorandum fram ~our Council members dated November 18, l.992. was initiated throu9h discussions and suggested a type of public be.nefit that could be very creative and innovative and could make a lasting, far-reaching impact on the community. He said the statut-e for the PC stated tbat-& component-foJ:;.-tbe PC would be a substantial public benefit that would not be available by any other type of zoning~ It did not :mention on-site or off-site publi.t:: benefits. He thought the determination of what was an adequate public benefit belonqea to the Council. The proposal was befo~e the Council for conceptual approval, not for detailed analysis of the project. The Council needed to determine whetbe:r the proposal made by the developers for the puhlic benefit fUnction vas leqitiaate, was appropriate under the zoning ordinance, would provide an ongoing public/private partnership I and would serve a large number of seniors in th£ community. council Member Wheeler asked about the size and number of two­ bedroom units at the Chann ing House. l'.r~ Player said he did not have those figures available that evening but would supply the information to the Council at a later date~ He said the aevelopment proposed tor The Hamilton was different from the Channing House which made the public benefit l.1/30/92 69-466 .- .. "" . -._-_ ~.-.... : ______ IOfiiiiii~ offered possible. There v~s no other housing in Palo Alto like the proposed project. Arthur Bodin, M.D., 555 Middlefield Road, was a resident of Palo Alto since 1965 and would speak on behalf of the Board of Directors and staff of the Ment~l Research Institute~ The Mental Re&earch Instltute had a history of interest in the problems of the elderly, yet the Board and stat.! voted unanimously to oppose the project ~CBU5e it would impact their work significantly. He noted that more of the residents seemed to favor the project and more of those who worked in the area did not favor it a~d explained that was because the residents would be away from the area during ~uch of t.he time the activity would occur.. The people who worked in the area would be considerably affected. He said Mr. Hill had visited his :facilities and had not realized that both of the traininq suites 'Were on the second floor. The noise was already bad on Middletield Road, and building a four-story structure would qreatly impact those traininq suites~ The parkinq was even aore critical since. seven parking spaces were recently removed due to the narrowing of the lane. on Hamil tOI) Avenue. The building would create more demand for parking at peak hours which were also the peak hours for family therapy. The concern was that the bulk of the building was out of ch.e.racter for the neighborhooa. He was alarmed whten a communication "from the City indicated the block: would now be unbalanced and th~ city might start thinking about building at the other end of the ~lock. Lee Wieder, ~37 Middlefield Road, said be liveq and worked about a half a block from the project an~ would be i~pacted most of the time by the proposed project. He had considered the project carefully as a resident, business owner~ and land use consultant. He thought the proposed project would have a positive influence on his home value or more likely no influence either way.. As a. resident, he would love to be the recipient of the public benefit since the project i~pacted his neighborhood, but he understood the ordinance did not stipulate that public benefits needed to be realized on the property itself or in the immediate neiqhborhood. It ~ade sense that the public benefit be a logical cor~ection to the type of project proposed.. An endowment :fund for the senior population of the City ~as an excellent idea. esp£cially one that would ensure the continuation of existing services for seniors in perpetuity. He wanted to know the number of seniors in the City who would be assured of L~cse direct services and for bow long as a result of the endowment fund. As a business owner, he. 'Would also be dramatically affected, but it was in a positive sense rather than a negativE sense. As a land use consultant, Hamilton Avenue bet~een Middlefield Road and Webster Street was a logical transi­ tion between higher density building mass aj,d height. He said the city had begun the process ror updating the comprehensive Plan, and the proposal· conformed to most of those policies and qoals. After reviewing the traffic studies~ there ~as no question the proposed project would result in less traffic than uncler the existing conditions. He said an open forum was planned tor December 10, 1992, to discuss the issues. He said one of the housing element objectives was -to maintain a diversity of housing upportunities 11/30/92 69-467 -.-.----~ /- and ;.~ovide a variety of housing types and sizes, a number of ownership and rental houses, and full range of Lousinq c~sts.· Bob 'Moss,. 4010 Orme Street, rem.inded the Council the proj~ct required a land use decision and was a public policy issue, not a debate on tbe merits of the individuals~ The question was whether er not the project was the right size and confiquration and whether the benefits were appropriate. He had ill problem with both the project design and with the benefits. He had no obje~tion to a project tor high-income seniors, but the project 'Wou ,1 replace affordable housing units with housing for seniors. New fo~dable construction should be provided for families if existing housing were removed. Anything else would make the job/housing imbalance worse. He found it remarkable that the City was beinq asked to subsidi:r.e people 'Who had the means to obtain hO'J.sinq without subsidies. Be referred to the memorandwa from four Council Me~rs dated November 18, 1992, which proposed that since it 'Was senior housing, contributions should be made to the sec and the Senior Center. Be said there was no assurance that once td~e endowment vas provided, a future Council would not use the fact that an endowment existed to reduce future fun4ing for the sec. He questioned why the endowment was for seniors since there 'Were othe.r worthy orqanizations that coul~ be funaed and alsD questioned what exaction would be held from the developers, where would it stop, and where was it rational~ It was a dangerous precedant~ The City should establish a clear nexus, and he urqed the Council to adopt a policy that if existing units were beinq removed from a housing project, L~e proper replacement would be additional new housing uni t5 . Be thought the F. A. R. was 20 percent too hiqh and the parking requira-ents were inadequate. Herb Borock., 2731 Byron stree.t, agreed 'With Mr~ Player that a conceptual approval of a PC zone was beinq requested, but the Council did not have legislation that permittee! that approval" Two years ago the Council rejected a request by staff to amend the PC zone~ The PC ordinance provided that when the Planning commission objected to a preliminary review of.a·PC,-that.was.the end of·it~ He said Mr~ Playe~ suggested that it was a fee-simple condominium project. but in co~parison 65 percent of the entry fee at webster House went to medical costlS~ The project·.s financial picture needed to be. clear both in terms of tile buy-ir.. equity, and monthly fees, and the costs for the project were important because a comparability was needed to determine the BHR contribution. He referred to his letter dated November 24, 1992 (on file in the Clerk's Office), regarding implementation of the BKR pro9ra.~ He referred to several possibilities for another location for the project and said Program 9 of tbe Comprehensive Plan provided a way to make those trade-offs.. He did not believe the project met those trade-offs~ It had been suggested that~ instead of e PC zone, a lower density in between the current RM-15 be proviaed.. If Council did that, it would lose the ability to link the rezoning to the particular type of project that was being proposed because neither of the projects had public benefit component6~ He believed it should still be a PC zone even if it were made a smaller density. 11/30/92 69-468 • John ~Jald, 261 creekside Drive, said he believed the conceptyal approval by the Council ~as based on one "issue-Palo Alto was one of the greatest communities in the world. The residents of the City were becoming older, and there was a need t? have residential fillcilities which did not rp.quire as much l:Ilaintenance~ He sa.w nothinq but overwhelminq public benefit from the project, and the project would not impact a large re5idential area. It was !i beautiful buildinq and would support the Comprehensive Plan's housing element. He recommend&d the Council's approval. Allen Brauer, 630 university Avenu~, said as 6 phjsician he was familiar with and supported the special needs of seniors l but he was concerned about the traffic since the.re vas already a great deal of activity on the street and parking 'Was a significant problem. He said the Webster street garage seemed reasonable since it was only a block and a half way, b1Jt that d.istance seemed unacceptable to a large n\lmber of his clients. He said disruptions had been significant durin9 a small project of undergrounding the cable, and be knav B project of that size would cause mor~ noise and disruptions than the cable project and would create a signifi­ cant hardship to his clients. He had made personal appe~rances before the ARB and bsd dealt with the Building Division and zoning ofticials regarding same minor construction to his buildinq. He had had detailed arquments on the ac:c<eptable di!yliqht plane and sign height for his project which seemed unfair co:opared to the level of exceptions that was beinq requested ~y the devslopers fo: such is :aassive project.. He &aid zoning existed tor a purpose, and a zoninq change required a coapelling, overwhelming ne.ed as a specific publio benefit. It was clear that none of the favorable arguments Added up to an overwhelming public henefit. The public benefit should be site spe:cifici otherwise, it represented the specter of zoninq for &&1e. He ""-as outraged at the. unfair discrimination aqa.inst individuals in the City that 'Were at a disadvantage compared to wealthy consortiums.. He thought the benefit of living within walking distance of the [)oTotmtOWT. was a. luxury rather than ill need since very few basic necessities were ~vailable. He was in favor of chang~ when there ~as a benefit. Loren Brown, 633 Kelloqq Avenue. one of the developers for the project, said if the council reviewed the other senior projects that had been developed over the years in Palo ~lto, none of them wt)uld meet the current z.oning. He believed senio.r projects hael special needs with respect to social, nutritional, and health issues which required additional square footaqe. The City needed to have senior projects, and if the mechanism to develop those projects were not there in the future, those kinds of projects would not De developed. He said several la~e bites haa already been taken out of the project, and two additional lots had been purchased to minimize the impact to the neighbors. The project had been downsized several ti=es in both square footage and the number ot units in an attempt to co~e as close as possible to the RM-40 zoning. Most of the objections ~ere related to parking and bulk, and a traffic report that h~d been submitted to staff sho~ed that the traffic would be ~e91iqible and would improve the sltuatio~. He said his firm would be the construction finn involved in the project" and the construction would probably take approximately one 69-469 \ ·'"'~1 -' ", -." , /" year. Once the under9round parkinq structure was co~pleted~ it would provide 70 parking spaces tor housing construction personnel and would, Jl..inillize tr.e.f!ic durill9 the construction period. Mr. Hill emphasized the concept was developed a lonq time a90~ and the developers of Webster House had looked at the site. There was a history to the site acquisition, and there was a lot of thinqs that made the site special. He said the issue of streets on three sides was really important and t.~e site was not acquired. to inconvenience the ~mmercial neighbors. Most of the block had prior existinq nonconfo~ing use which created some of the problems that were already there. He said other parcels were considered and there was no zone in Palo Alto that peraitted the development of that type of project. The Webster Bouse had a F.A.R. of 2.4~ was considered a model for the project~ and had an inherent public benef it hecause it provided a place for the. kina of people who would be living at The Ham.ilton~ He said at the neighborhooa meetin~ on December 10, 1992, the people wbo were &ost affected would have a chance to voice their concerns, and he hoped staff would be available to answer some of those questions. He said the results of that meeting would be co:mr~icated to the Council. council Member Kniss asked about the schedule. for the project since the item would probably not return to the Council until the end of ,january 1.993. Mr. Hill bad hoped th8t the item would return to the council before the January 25~ 1993, meeting~ Vice Mayor MeCoVn recalled that Webster House vas the fir6t facility that involved ~ medical package as part of the purchase. She queried whether eo medical pllck.aqe would be pa.rt of the proposed project .. . Hr .. Hill replied yes~ He understood Webster Houtoe was not a t'ee­ sizple ownership, and it was a health care and residential packaqe. It did not have the benefits of ·Tb~ Hamilton-which.W8s-a reinvest­ Dent of the funds when the people'& homes sold~ The Hamilton was like-the Stratford, the Peninsula Regent, the Forum, and the Waterford whic..'l were poP\.I.lar tor income and property tax purposes. The Palo Alto Medical Foundation's clinic was a prospect for the health care component, but the specifics were not yet available~ Vice Mayor McCown queried whether the health care package would be optional. PI. Hi~l said no; it would be part of the package which raised a lot of questions with respect to how DlUch o£ the investment a person kept~ The other projects had situations in which some of the .or~ey from the resales went back to the developer or ~ .as proposed ~or The Hamilton, to senior programs as a public benefit. Vice Mayor McCo~~ queried whether the description of Webster House in the PC %one included wording that incorporated the health care element and h~ the PC zone for the project would be set up. 11/30/92 69-470 -~------"---------'---___ "B ___ "'-~ Council Member Cobb said Mr. Schultz questioned 'Whether or not moneys were available to provide the kind of endowment that had been outlined. He van~ed to see some numbers that would confirm the basis for the endowment bef ore the item returned to the Council. Mr. Hill said it was very difficult to prepare actuarial studies due to tbQ death rates, and the numbers would have to be predicated upon the average stay in the projeot which was around 12 years. council Kember SiDitian clarified the applicant had responded to two different elements that were proposed in the memorandum dated November 18. 1992. In order to create an endowment, a period of time needed to elapse for the units to turn over and for a percent­ age trom the resale price to be placed in the endowment. Mr. Schultz suggested that if the endowment were drawn 'down over that S~ period of time, a large enough principal base would not be created to keep the endowment going in perpetuity~ He rete.rred. tD the .lament in the ~emorandum which spoke about a $45,000 cost to the developer, and the developer had suqqested .a $50,000 contribution per year over 10 y6ars~ During that ~O-year period, the a:::tual cos.t of those limited number of programs would bE!: borne out of pocket, year after year by the applicant. During that same lO-year period ana perpetuity thereafter, the endowment fund would be building from the percentage of the sale proceeds. Those two thinqs in tandem were designed to create the endowment. Mayor Fazzino said Mr. Hill had raised so~ issues that were not relevant to the council's dec-ision~ He thought eight weeks between the public hea.ring and the Council's decision making was a very long period of time and strongly recommended that the item return to the Council on January 11, 1993. Mayor Fazzino declared the Public Hearing closed~ RECESS 9:50 P.M~ to 10:Q5 p,~, Mayor Fazzino understood there was .a neighborhood me.eting on ~ December 10, 1992, and that a representativ@ from the Planning Department would be there to answer questions. He said the neighborhood meeting bad been initiated by the applicants and some of the neiqbbors~ He encouraqed those kind.s of meetings but emphasized the formal city decision-making pr-ocess was separa.te frem that meeting~ Council Member Simitian said additional .aterial on the item dated November 25, 1992, had been delivered to the council prior to the Council meeting, and he queried whether that information had been officially received by the staff. Mr. Schreiber said It copy had been obtained before the Council :aeetinq that evening. He said copies would be reproduced and provided to the public and the City Clerk's Office. Council Member Simitian referred to a comment in the ~aterial dated November 25, 1992, regarding variances and understood the applicant • .' to represent that the project as presently designed no longer required a variance. He queried ~bether that was correct. Hr. S~breiber said the applicant stated in the November 25, 1992, ;.e:c"'i..e;-~t the ..,:.,ieet would be redesigned so there 'Would be no variances, but stafi had not received .any dravinqs that had accomplished that yet. staff had recommended in the original staff report that if the proje~~ were approved, it should be vithout any variances. council Heaber Simitian 'Wan~"ed ate ~f' IS cC1lDltents on whether or not the applicant had. successfully i. icated a :manner in which the project could 90 forward without variances when the item returned to the Council in January 1993. He said there was a number of changes made to accoZllllodate the input troll the. cOlIDluni ty, the Council, Planning Commission t and staff, and he q~eried whether the .odel before the Council that eveninq accurately reflected. the last best efforts of the applicant. Mr. Hill responded yes. Council Member simitian was concerned, based on the Planning COIIlIlission's t~stimony and his own observation of the earlier plans, about the bulky appearance of the p~oject along Middlefield Road. It appeared two changes bad been made to the proj ect since it went before the Planning Commission. He said th.ere was a lengthy discussion in the staff report (CKR:514:92) about trees and queried. the status of the mature stroet trees along Hamilton Avenue and. Middlefield. Road. Senior Planner Virqinia Warheit said the project would. not add any curb cuts and would only close curb cuts on Hamilton Avenue; no street trees would be lost on Hamilton Avenue. The six large trees on the parking 1 at would tie reaoved. ·Council Member simitian asked for staff to comment on the proposed project's ability. to retain. the ~street...trees_or_.provide. mature 6treet trees. He urrderstocd from the sta.ff report (CHR: 514: 92) that there was an initial traffic stu~y and a request for-an additional traffic study.. He asked whether the second traffic study bad been submitted. Ms. Warbeit said there was no request for-an additional traffic studYt but the applicant vent back to the traffic analyst and asked for a reeva1uation. She believed that information was attached to the letter dated November 25, 1992. Council Member Simitian asked whether staff believed the original traffic study submitted was accurate. Ms. Warbeit said yes. The difference between thlE: two traffic stUdies was that the second study was based upon standard models for senior projects and the original analysis was based on standards for any multiple-family project. staff believed since it was not a normal senior project, the first analysis was reasonable. 11/30/92 69-472 • council Member Rosenbaum asked whether the~e had ever been an off­ site public benefit for a housing project. Mr ~ Schreiber said ye.s. He was not prepared that evening to offer details on that project . . Council Member Rosenbaum asked that infonaation be provided before the next Council lIIeeting on the item. He said the PC zoning ordinance stat~d that "Development of the site under the provisions of the rlann2d Community district will result, in public benefits not othervi.e obtainable by application of the regulations of qeneral districts or combining districts. He asked whether there were some oth~r public benefits. Hr. CalonnE said the specific purposes of the Ordinance, Section 18.68.010, st~ted -the planned community district is particularly intended for unified, compreh~sively planned developments which are of substantial public benefit.-He also referred to Section 18.68.060(b) which called particular attention to the requirement that -the Pla~"1in9' Commission and City Council cite the public benefits expected to res.ult from use of the. planned community district.1:I He sili4 those references reflected aTl interpretation of public benefit. Council Kember RosenbaUlll understood thllt to mean that a project could go to a PC if a certain structure could not be done under the existing zoning. He said the benefit of mor,ey cOllld not be obtained if the existi:,q zoning were used. Mr. calonne oaid an opinion could be prepared that 'Would "ttempt to catalog the previous actions to flush out the interpretation that bad been qiven to that section over the years. Kr .. Schreiber pointed out correctly that that was an interpretative question for the Council. He said the phrase expressed durinq the public heariFl9 of a concept of inherent benefit 'Wal5 refle.cted in the ordinance where it stated -the findings 8M!l specifically cite publio benefits expected to result from" use" of the PC district~· which seemed to be referring to something inherent about the site. He did not believe the Ordinance precluded benefits off-site and specifica.lly cited: the benefits from the use of that specific citation did not prevent the finding of benefits elsewhere as well. Council Member Rosenbaum said Mr. Borock raised an interest point reqarding the BHll. He recalled that Council had decided that 5 percent of value should be provided 'for the 14. u..:;its from the st. Mark's Episcopal Church project in lieu of providing 10 percent BMR. The 'proposed project had both the 10 percent and the 20 percent BMR because rental housing 'Would be removed. The proposal was 'for 7 units at approximately $100,000 each or $700,000, whereas 5 percent of the value of the project might be $1.5 million. He asked for an explanation o~ the establishment of the BMR ~or the p~oject. Mr. schreiber said for many years the City's policy had been to try to obtain units rather than dollars. The in-lieu fee was deliber­ ately set high to discourage the provi$ion of dollars and encourage 11/30/92 69-473 . -'~ the provision of units. He said in st. Mark's situation, it was not feasible to provicle a unit. There was a 20 percent SMR requirement for the proposed proiect which translated to the 7 units. At the beqinnin9 of the discussion, how to o:;et the units WaS determined, and once that was figured out, the issue of trying to get collars was not pursued. Council Member Rosenbaum said the purchase 7 units, whereas 5 percent of for St. Mark's, could buy 15 units~ $700,000 would be used to value, which was appropriate Mr. Schreiber said there was a discrepancy, and the city's history had been that oftentimes there had been substantial difficulty translating doliars into units. The general policy over the ye~rD had been to obtain units out of a d.evelopment rather than the dollars. Council Member Rosenbaum said staff suggested there was a service being provided by the applicant that was not provided by st. Mark's. He asked whether the applicant had the responsibility to find the _even units. Mr. Schreiber said yes. Council Member Rosenbaum asked whether the services of the Palo Alto Housing corporation (PARC) would be used. Jtr. Schreiber said it was the applicants' responsibility in consultation with staff and the PAHC to find the units. The applicants had to locate the units. acquire those units, complete all the legal transactions, and once the units were under the applicants" control, transfer them over. He said that whole process took a lot of time and energy and oftentimes delayed translating the dollars into units. Council Ji!:e:mber Rosenbaum said two ciifferent forms of publio benefit had been 8ug'qested, i.e." _the _sev:en_.units . aOO __ the .. alternative proposed by the four council Members, and the common denominator was money. He wanted staff to evaluate the present value of both proposal&.. He said the applicant men'tioned that the F .. A. R. ·.,as fairly strict and that at the time Webster House was developed, the F~A.R. restriction did not exiEt~ He said during the past few years, the staff, Pla~J1inq commission, and council had decided the strict F .. A.R. served a purpose. He wanted a review of the reasoning' behind those restrictions and lIo"bether it vas justifiable. Council Member Huber asked whether there had been a situation in which existing housing was purchased for BMRs as opposed to accepting mon~y for building new units. He wanted to know the current F.A.R. for the existing buildings on the property so a ccmparison could be made between what was proposed and what was already there .. Council Member Wheeler said at the Council meetinq in January 1993, she wanted the statf reoort to focus at the beginning on the kinds of q~estions the councii should address in the discussion end what l1IJO/92 69-474 , • should be avoided. She thought the Planning commission did fin e~cellent job of brinqinq to the floor some Teal policy issuefi. speeific poliey questions reqarding the rationale of the F.A.F. as it related. to lIIultiple-family projects needed to be dealt with~ She wanted staff/s response to the evidence heard from people who bad done 5i.i~ar &enior housing projects in other communities that it would be impossible to build such housing within the confines of t..'l~ City's T.A.R. standards. She reconfirmed that :Mr. Player promised to provide the statistics on the \o;aiting list and unit sizes for the Channing" House. she wanted to know if the trip generation figures that appeare~ in the staff report (CMR:514:92l took into account the service and quest trips to and from the site. Couneil Member Cobb asked Mr. Calonne if there waS any 'Way to clarify that the endowment would be locked into certain kinds of activit.ies. He asked whetber there 'Was some way to cre.ate a prererence mechanism fer the citizens in Palo Alto.· He vante~ to be clear wbether or-not the public benefit had to be on the site. Council Kember lCniss asked how housing could: be achieved if the ~ensity were not increased ana where that housinq would be located if it was not put in the industrial areas. Sbe asked whether that type o~ housing vas available in surrounding communities and what had been the experience of those communi ties \w'ith that type or housing. Council Member Andersen was unclear as to ho'&!' the e.qui ty and the health care issues would be addres~ed and how the amounts would be derived for the public benefit proposed. He asked for staff's response to the letter from the applicant dated November 25, 1992, a.nd, in particular, to 'the details ciescribed 'With reqard to the public benefit proposal and ~n an51ysis of any potential problems that council should be aware of. Hr. Schreiber said the applicant had a better understanding of the relationEhip of the equity and bealth care components of the public benefit and should respond to Council Member'Andersen's question rather than staff. Council Member Simitian asked that when staff provid~d the present value of the public benefit proposals,. staff elso provide the Council vi~n some information or assessment as to public benefit that would be derived from those various proposals. There was a distinction to be ~ade between the cost to the applicant and the present value of the contribilcion, and it was the Council's responsibility to assess whether or-not the public benefit was sUfficient to meet the requirements of the Palo Alto Municipal Code. A qreater weight needed to he 9iven to hOW' much public benefit was derived reqa~dless of What the cost was. Council Member Kniss asked whether there was a way to protect the endowment so that it did not become part of the expected amount to be given to the Senior Center or the SCC. She asked whether the exclusion of the F.1t.~R . .trOD. the common areas 'Was a reasonable argument. 11/30/92 69-475 o. council Member Andersen as~ed whether the applicant had explored parking alternatives in the area Which miqht allow use of parkinq by those people most adversely impacted. Council Member Rosenbaum aaked whether there was consensus on the part of the Council that Mr. Calonne would prepare II. brief opinion on off-site public benefits. Mayor Fazzino said t...'le Council 'Was:; supportive of that request, and • formal aotion was not needed. _orzOK: ~yor Fazzino moved, seconded by Kniss~ to continue the item to the Council meeting on Monday, 3anuary l~, ~993. lfOTl:OIf P AaSEn 8 -0 t McCown a.bs ent. 9. puBLIC HU'BING: Planning commission and Architectural Review Board Recommendation to introduce the revised ordinance amending the Palo Alto Municipal Code and the Municipal Fee Schedule to establish II De!;iqn EnhanCe.D!ent Exception (DEE) process (co~tinued fro2 11/16/92) Hayor Fazzino declared the Public: Hear-inC) open. requests frolll the public to speal-, he declared the Closed. Rece i ving no Public Hearing IlOTZOJf',I COWlcil Member HUber meved, secondea by Cobb, to approve the Planning ccmaission, Architectural Review Board and staff recommendations to adopt the Negative Declaration ana introduce the revised ordinance amendin<] the Palo Alto Municipal Code and 't;be Municipal Fee. Schedule to establish e. desiqn enhancement exception (DEE) process for cOlIDDercilll, multiple-family or any other development subject to architectural review under Chapter 16.48. Ordinance 1st Reading entitled -ordinance of the Council of the City of Palo Alto Add.inq Chapter 1.8.91 and Amendinq Chapter 16.48 (Architectural_Review}_of the_Palo Alto Munici-_ pal Code and Amendin9 the Municip~l Fee Schedule Relating to a Design Enhancement Exception Process· .IIO't%OII' PASSEl) 8-0, MCCown absent. 10. PUBLIC HEARING: Planning commission Recommendation to introduce the proposed ordinance bending Title 21 (continued from 11/16/92) Kayor Fazzin(:) declared the Public Hearing open .. requests from the public to speak, he declared the Closed. Receivinq no Public Hearing KO'l%OB: Council Member Wheeler moved, seconded by Cobb, to approve the Planninq .commission recomaenclation to adopt the categorical exemption and the proposed ordinance amending Title 21. Ordinance 1st Beading entitled ·Ordinance of the Council ot the City of Palo Alto Amending Title 21 of the Palo Alto 11/30/92 69-476 .--.,-------_.---- .. ATTACHMENT 3 CITY COUNCIL MINUTES :Regular Meeting .January Ilt 1993 ORAL COMMUN!CAT!ONS 70-10 ~NUTES OF NOVEMBER 9, 16, 23, AND 30, 1992 70-10 ~~ contract with Aratex Services, Inc. for Uniform P.ental and Cleaning . . • • . • .. • .. ...... .. 70-10 2. wahler « Associates for COnE~~tant Agreement with Baylanas Duck Pond CiP 19104 .• 70-10 3. contract with Systems for Public Safety for Backqrouna Investigation of Police Officer-Candidates .. .. .. . . . 70-10 4. A9'l"eements 'With Adolescent Counselinq Services and Co~unity Association fer Retarded, Inc. for Rehabilita­ tion Projects Funded by the community Development Block Grant program .......................... .... 70-l0 5. PUBLIC BWING: Planning commission rec::omDendation re Application to rezone property from RM-15 t Low Density Multiple Family Zone, to Planne.d Community Zone, to construct a senior condominium project, for property located at 651 Hamilton Avenue, 536-576 MiQd~efield Road, and 523-575 Byron Street {continued from 11/30/92) • 70-11 6. policy and Services Committee recommendation re Approval of the proposed lanquaqe in the City Attorney's report and. also for staff to develop wordinq as we.ll as language which could be used by way: __ of a preamble at public hearings' whiCll'explained-rules' -and ·procedures-involvinci Quasi-Judicial Matters .. . . . ~ . . . . oO· .. .. ...... 70-26 7. Finance Committee recommendation re Approval of the staff recommendation to create a Utilities Billing System (UBS) Renovation and Auqmentation project in the 1992-97 capital Improvement Program (elP) ana to approve a Budget Amendment O~dinance to appropriate $320,000 to the 1992- 93 CIP of the Utilities Department' 5 operating budget utilities Billing System • • • . . • • . . • . • • . . 70-32 01/11/93 70-8 8. The Financ~ Committee recommendation re Staff's analysis of four possible adjustments to the Electric Fund Reserve policy be forwarded to the Utilities Advisory Commis- sion • • • • • . . . . • • • . . . , • . . • • • • . . 70-33 g~ Finance Committee recommendation re Support of the expansion of cablecasting of Historic Resources Board and Human Relations commissiol".t meeting's and include explora­ tion of cablecastinq Palo Alto Unified School District (PAUSD} Board meetings and Comprehensive Plan Citizens Advisory Committee meetings . ~ • ~ . . ~ ~ ~ • • • • 70-34 10. Finance committee recommendation re Ap}XIintment of a subccmmittee'of two members of the Finance Co~ittee to work in conjunction with the. two members of City/School Liaison committe.e to a?proach the Palo Alto Unified School District (PAUSD) to address a series of issue.s: related to the water rates . • ~ ~ . . ~ • • • . ~ ~ • 70-36 11. OrcUnance Amending the Budget for the Fiscal Year 1992-93 to Provide an Additional Appropriation for Tax Auditinq services .. .... ~ ...... ~ • . . ~ • . 70-38 ~OURNMENT: Tbe meeting adjourned at 10:45 p.m .. 70-38 70-9 The City council of the City of palo Alto met on this date in the Council Chambers at 7:15 p.~. Mayor McCown announced that the City Council held a Special Meeting at IS: 00 p.m .. in the HWiI.en Resources/council Conference Roo;:n for th.e pCrpoS8 of a Closed Session re personnel pursuant to Government Code 554957; and re Instructions to Real Estate Negotiators regarding ne90~iations with Mr. Ken Jones regarding KFS Baylands Easement pursuant to Government Code 554956.8. PRESENT: Andersen, Cobb, Fatzino, Huber, Kniss, McCown, Rosenbaum, Simitian, Wheeler ORAL COMMUNICATIONS Naphtali Knox, 1025 Forest Avenue, spoke regarding The Cali:orni, General Plan Glo§sery published by The California Planning Roundtable being made available to the Comprehensive Plan citizens Advisory Commit~ee (on file in the Clerk's Office). Jill Kaleson l 280) Kipling, spoke regarding the Shoreline Amphitheatre issue and requested a breakdown of the $l5,000 spent on the subject. Edmund Power, 2254 Dartmouth Street$ spoke regarding the Palo Alto Harbor .. APPROVAL 07 MINUTES OF NOVEMBER 9. 16. 23. AND 30, 1992 KO'l':ION: council Member Simitian moved, approve the Minutes of November 9, .16, submitted. - KO"l'IOII PASSED 9 -0 • CONS ENT CAI,ENQAR seconded by Kniss, to 23, and JO, .1.992, as KOTION! Vice Mayor Kniss moved, seconded by Cobb, to a.pprove Consent calendar Item Nos. 1-4. 1. Contract with ArateJC Services, Inc. for Uniform Rental and • _." ___ ~_C ~_e_an!nq ~ ~ __________________________ ~ ______ -"_ ~___ _ _ _ _________ _ 2. Consultant Agreement with Wahler &: Associates for Bay lands Duck Pond CIP 19104; Change Orders not to exceed $2,448 3. Contract with Systems for Public Safety for Background Investigation of Police Officer Candidates ~. Aqreements with Adolescent Counseling Services an~ community Association for Retarded, Inc. for Rehabilitation Projects Funded by the Community Development BlOCK Grant Program IIOTIOII PASSED 9-0. 01/11/93 70-10 tlNFlHISHEP eUSIN~S S. pttBLIC HEARING: Planning Commission recommendation re Application to rezone p~operty from RM-15, Lov Density Multiple Family Zone, to Plannec Community Zone, to ~onstruct a senior condomini'l;Jll project, for proper-ty located. at 651 Hamilton Avenue. 536-576 Middlefield. Road, and 523-575 Byron street (continued f~om 11/30/92) (Public Hearinq Closecl) Mayor McCown noted the public hearing 'Was held on No .... ember 30, 1.992, and vaS now closed. The item 'Was before the council for discussion and decision making. The staff report {CMR: 117: 93) provided information in !esponse to questicns asked by the council. council MelQber Cobb aske.c. if flexibility was available development's bulk. the applicant hacl responded to vhether 'With respect to red~etion of the Jim Rill, President, Bamilton Avenue Properties., Inc., 1010 Harriet street, said there was no flexibility based on their analysis of ~.e warket that existed tor those kinds of units. council Member Cobb asked whethe~ anything could be done ~itb the architecture to pull some of the bulk away from the street. Mr. Hill said ye~, along Middlefield ~oad. cour~cil Member Si.m.itian !Said the.re was !Ii 9 percent discount rate applied in establisbinq the present value of the public benefits, and be asked the current rate of return on the City's investment portfolio. Assistant Finance Director Kevin Rip~r s:aid the current rate of return on the City's investment portfolio was slightly under 7 percent. cc;.-uncil Member Silli tian asked whether that was the average rate or the marqinal rate and 'Wbat the rate would be if investments were put in the portfolio today. Mr. Riper responQed it vas the ;average rate, and the marqinal rate would be substantially lower • . council--Member-Simitian-asked.-whether 4" plus -percent"-would-' be:-a--­ fair esti1aate. Mr. Riper said 4 percent would be correct if the city went out for one year on a Certificate of Deposit. council M~r Simitian asked the approximate size of the City's investment portfolio. Hr. Riper said it was approximately $175 million~ council Heaber simitian referred to the endowment option on page 3 of the s~ff report {CHR:117:93) which stated the present value 01/11/93 70-11 / ".-:c;t?~-. r ,~. -',:';" - would be evaluated ~ased on a constant purchas~ price of $1 million p6r unit~ While there was the const~nt purchase price, there v~s the discount rate over time Which would be applied to the receipts. He undustood the constant purchase price "'as dra..,.,. from the submittal re.ceived from the applicant. rf a discount rate were used to evaluate the proceeds., then appreciatic-n or inflation WO;Jld have t? be added onto the million dollar sales price each year. Mr. Riper said a project change up or down of purchase price could be built into the analysis over a period of time. r.ouncil Member Simitian said the discount rate projected tor'the next 30 years reflected both the value of being able to use someone else's money and the inflation factor during that 30-year period. Hr. Riper said that was 'Correct. Council Kember Simitian asked whether a rel!sonable approacb would be to include a calculation fer the inflation factor in terms of the impact of those purchase prices ~hich were held constant over the same :3 0 years. Mr. Riper said yes." Mayor McCown referred to a letter from the Palo Alto Housinq Corporation {PARe) dated January 6, 1993, that commented on its evalulition of the Below Mar~et Rate (BHR) proposal of seven additional units and how it measured up aqainst the way in-lieu cor.tributlons had been handled on other projects. The PA}{C suqgested the project was not comparable to what had been asked from other in-lieu contributions. Directo~ of Planning and Community Environment Ken Schreiber said the objective cf the BMR program was to obtain units rather than dollars. The starting point of the discussion with the applicant was units and the in-lieu payments as set out in the Coltlprehe.nsive Plan were for situations in Which .a satisfactory method for obtaining units could not be obtained. staff believed there was a satisfactory way of obtaining units fo~ the proposed project _hich was consistent with the City's policy. council Member Wheeler questioned the parking situation and the availability of on-street parking being jeopardized, and she asked ~hether-:'any" "·-of":':' tIle--:--S"treets-=-tnat-. bOrdered -:'-the -projecft"," " i"7e-;-; ". Middlefield Road, Hamilton Avenue, Byron Street~ had hourly parking restrictions. Transportation Enqineer Carl Stoffel said those three blocks had unrestricted parking4 council Member Wheeler " asked whether the City had the ability to place restrictions on one or more of those streets. Hr. Steffel said yes t but it "',as usually limited to the streets that were all coamerci~l an1 contiguous to other blocks. 01/11/93 70-12 council Member Wheeler clarified there was restricted parking on portions ot Hamilton Avenue which might be contiguous to an area that was restricted. Mr. stoffel balieved there was restricted parking on portions of Hamilton Avenue that might not be contiguous to an area that ~as restricted. Council Member Huber clarified the current proposec p:r:'oject 'With parking would not handle two cars per unit. Mr. Stoffel said that was :erre~t. Council Member Hube~ clarified the lower number ~as based on the supposition that a5 a person aged, a secvnd car .as not needea in a fu.ily. Senior Planner Virginia Warbeit said as dete~ined by the ordinance., the parking allocati,on a~commodated the 'required parking for employees and quests first anc the remaining parkinq vas for the :residents.. staff believed the project did not require two parkinq spaces per resident, and the applicant had innicated the project could 'Work with less than two spaces. The l." parking space per residenti~l unit allocated Lor the site was a qenerous parking requirement for quests and employees. Vice Mayor Kniss asked 'Whether any of the other senior projects had a special consi~eration that deviated from tha normal on zoning. Mr. Schreiber said in the last twenty years every senior project had tQo firlQ a way aroun~ the basic zoning requirements. Senio't' projects did not tit into the basic frame.work of the Cityts zoning~ Vice Mayor Kniss asked Whether staff had considered looking at senior housing differently from other projects~ Kt. Schreiber saie no because of the availability of the Pl~,ed Community (PC] zone as the mechanism for s~~iors or other unusual developments. Most of the senior projects had involved low-~nd moderate-income qualifications which sa~isfied most of the public benefit issues of the ordinance. Vice -Mayor·· Kniss referred to· "page 8 of -the staff -report {CMR: 117: 93J· -DoeS· the FAR -includ.e~ cOlllmon-areas?-'-and-asked--whetlier-­ a ITno!'lll.al-project would have. a similar ratio between Frivate living areas and access to units, e.g., stairs and hall~ays, or whether a different ratio was applieQ to senior projects. Hr. Schreiber said the breakdown betveen the private living areas and the access was typical. The rule was l5 to 20 percent of the total square footage 'Was involved in the access to the units~ Vice Mayor Kniss clarified the unusual part of the figures presented was the common facilities 'Which were woven into the Floor Area Ratio (FAR). 01/11/93 70-13 Hr. Schreiber said that was correct. Vice Mayer Kniss recalled from the Stratford that the COmll!on facilities usually took up approximately that ratio. Ms. Warheit deferred to the applicant for further response. Vice :Mayor Kniss said the congregate facilities had. to have a particular ratio th~t allowed it to fit into the senior needs and also fit in 'With the cost figure,s. Council Kamber Andersen referred to a meeting at the First United Methodist Church in December 1992 ana asked ~hether the statf vas involved in that ~eetinq. MS. Warhait.said she and Hr. Stoffel were present at the meeting. council Member Andersen asked whether any new infcnetion 'Was received during that me~ting ~hich had not been presented to the Council. MS. warheit said no. Council Member Andersen had heard from a constituent that consider­ ation wa~ being qiven for additional structures being built north of the proposed project and asked whether there was any basis for that speculation. MS. Warbeit said no. XO!IOll: Council Member Fazzino mcved, seconded by Wheeler, to approve the project in concept and forwarcl it to the Architectural Review Board and to the Planning commission for their review and recomtendaticn. Mayor McCown sU9'9'e5ted the Council organize :modifications or amendments to the project issues, i.e., parking, site and design, and then the pul::lic benefit issue associated with the PC. St.e clarified the motion included the public benefit that vas discuss~d at the Planning commission, and if there was a desire to have a different public benefit consideration, that could be part of a • proposed Ul'2.ndment. r -"---;-council"-Membe'i-s'fmit1.an"-sald-at --vari~us-=--t;.~tQ· in-tire -process the"­ application required a variance or variances in order to obtain approval, and staff indicated it did I believe ;a vari;anca or­ variances were appropriate. He agreed with the staff and said the applicant's recent commur~ication dated November 25, 1992, indicated the project would be submitted without the necessity of a variance. He suggested approval of the project be continqent upon no variances. MAXER AHD SECONDER AGREED TO INCORPORATE INTO THE MOTION that the approval of the project in concept be contingent upon no variance requests. Ol/ll/S) 10-14 "/ • <' ., • Council>Member Simitian said as he considered the project and heard f~cm community members, he kelieved the greatest issue was the size of the project on the site. The applicant made the argument th3t th~ bulk or the project had been aQQres~ed in three specific ways: 1.) a.rchitectural design of the project; 2) the placement of the project on 15 site 'Which was bordered or. three sides by streets which provided a greater sense of ope~~ess than if the project were situatea close to other structures on four sides; and J) landscape architecture which staff responded to in its staff r6port CCHR:117:9J). He agreed that the applicant. through those three devices, had s~ccessfully addressed most of the bulk issues except along the Middlefield Road corridor, which ~as vhere most of the pedestrian and vehicle traffic would be ~nd there was an unbroken vertical expanse that ran tt.e length of the project. That area of the project was problematic in terms of the aesthetics and preserving a sense of scale in the surrounding neiqhborhooQs~ Be haa spoken wit..~ the applicant and neighbors and suggested. the Architectura1 Review Board (ARB) and the Planni..~9 C'tjl!u!is5ion be directed to work with the applicant to address the appearance of bulk along Middlefield Road. H~ indicated several projects around the City broke up that sort of expanse, and it did not mean the number of units nor the size should be reduced. IO.UP. 1o!ID IIZCOIimElt AGllZZD TO UlCORPORA'rE INTO 'l'RZ 1I0nOR that the Architectural Review Soard and the Planning Commission be d.irec~ed to address the appearance of the. bulk of the project along Middlefield Road. council Member R05e~um said the amendments avoided the FAR and the real cause of the bulk. The City had a set of zoning regula­ tions that told property owners ana developers what was elloved~ There WAS room for variances, and the PC zone allowed for excep­ tions, The city in 1988 adopted a FAR of 1 which was the "",ximum for a multiple-family zone, and he believed the proposed 1.75 FAR resulted in a building that was too :big tor the site. The proje.ct vas not 50 special, and it the Council approved that proposal, he could nC't ~o!!~ !..Jly ra'(;.ional ba.sis for disapproval of other projects, whether senior or family, which came in with a FAR of that magnitude. It was pointed out that there were large waiting lists at Webster and Channing Houses and there was ~ lot of interest in l~er units. The larger units at both of those facilities were under 1,200 square feet. The proposed proje.ct could have the sallie --number-of-units with-an average lSiz:e-of-~1;200-square--feet,-e.nd a "·provision could. be made "for '8 nwnbe:r of extra-"large-units:-The··­ whole prcject could then come in with a FAR close to 1.25 which he did not believe was unreasonable for a senior conqre;ate facility. He opposed the project in its current fcrm~ CO~lcil Member Fazzino asked where the tYo-hour restricted parking began and ended in that area. ~J. Stoffel believed it was between Co~r and Webster streets. Council Member Fazzino clarified there 'Was no restricted parkinq on Byron Street .. 01/11/93 70-15 -----------, • Mr. Stoffel said that was correct~ council M~r Fazzino was concerned about the parkinq issues on Byron street. He suggested the staff present to the Planning commission and then to the Council a report on the possibility of restricted parking, e g~t t~o-hour parking limits on Byron Street so there could be the assurance of an ongoing movement of automo­ biles to meet the needs of the small businesses in that area as well as the needs of the development. The developers indicateu there was sUfficient parking' spaces to meet the needs of the residents and guests, and he did not believe a two-hour parking restriction dur:'nq the week would create any problems for the ..residents and would preserve options for the clientele of neighbor­ ing businesses~ Council Kember Heber asked Whether the maker and se~cnder would be willinq to consider as an amendme.nt that the developers and planners investigate whether the.re might be some more parking available on site. He did not necessarily disagree with ~hat was currently proposed., but if there 'Were a way to achieve more p2.rking space, it would solve a lot of problems. council Kamber Fazzir,o said he would be 1rIillinq to a$k the developex to work with staff to see about the possibility of additional parking spaces on site.. Mr~ SChreiber said the staff and applicant had talked about that issue before. The yay to accomplish more parking spaces would be to make the undergrourid parkinq garage larger which went into the setbacks and could substantially curtail the ability to have large trees on the site. ~h. staff was sympathetic with the applicant's de.slie to have large trees on the site, but it was an issue worthy o~ additional investigation. council Member Simitian was concerned further exploration miqht limit the appropri.te solutions. There Were other parkinq facilities in the area that were not used to capacity, and there might be a way to build in a performance standard so if it turned out the parking-was inadequate At a later date, some further acquisition of·parking spaces off-site might be feasible. He was conce.rned en-site meant to expand the project., and staff should ~ allowed to explore it mor~ broadly_ Council-MiimbiU---Faz-zino-"a·qreed there mIgh"¥ 'be -"anol:,"""tfOri" to use::"under-' utilized sites a block or two away. m.ltZR ~ SECONDER AGREED TO INCORPORATE III'I'O TllE KOTIOH that 1) staff be dire~ted to prepare a report for the Planning commission on the feasibility of restricted parking in the a.rea of the p~oposed project; and 2} staff and developer identify additional on-site parking or other ways to solve the parking problem. Vice Mayor Kniss understood the applicant approached the church to the west, and there was no possibility of utilizing its space. Ms. Warheit said that was correct~ 01/11/93 70-16 .< '- Mayor HCCovn agreed \to'ith council Member Rosenbaum in terms of 'Wanting to try to attach ill number to 'wIhat \ro'C"ulcl be acceptable as far as FAR and, therefore, bulk~ She concu~red with the motion of tryill9' to set design goals to be i!lc.J.dressed as the project went through the process rather than trying to decide what the number vas. She questioned what the city accomplished when it addad FARs to multi-family zones especially in senior projects. She referred to the FARs fer Lytto~ r and II and Webster House. Lytton I ~as 1.4 FAR, Lytton II was 1.75 FAR, Webster House was 2.' FAR, and Lytton IV. which was just approved, was 1.22 FAR. She did not know where the number was between 1.25 FAR and 1.4 FAR. but the proposal felt too big. She expected the response to the motion to address that number. She wanted to gIve both the Planning Commission and the ARB the opportunity to work with the applicant fro~ a design point of view rather than deciding ahead of time what the numbe~ was. Ultimately, the project \/ould return to the Council for final approva.l.. She agreed .. ith Council MelDber Rosenbaum that square footage might have to be dealt with in reality to make the project work. council Member Andersen said the question of mass was significant. The motion provide~ the applicant with the opportunity to try to address some of the issues, and if that meant reducing some of ~~e mass and F~~ ~y reducing the size of some of the units, that was an appropriate direction and encour-aqement~ He could support the :motion reoognizing that if those issues vere not addresseci, he 'WOuld not support the project when it returned to the CounciL Council Member Fazzino said it was evident to him that under the cu-~ent zoning, the PC tool bad to be used to achieve the senior housing objectives. The property clearly addressed the specific need for housing for higher income seniors in the community. With the 26 percent growth in seniors since 1980 and coupled with the fact that 20 percent of Palo Alto included seniors, the City had to continue to make senior housinq for .all income groups a major objective... He hoped the Comprehensive Plan Citizens Advisory Committee (CPCAC) would grapple with the challenges of senior housing projects during the update of the Comprehensive Plan. The.re was no way the Council could turn down a project of the proposed nature if it haa already approved a project on the order of Lytton IV which had similar density and was placed right in the middle of a residential ne.iqhborbood. He was concerned about some -issues-of-FAR-and believed Council" Member Simitian's"recommenda- " ... tions' addressed -it-;--· While the· FAR was-larqe, it·'was "comparable" to other senior housing projects in the community. The location had some. problems, a,nd he was sympathetic to the concerns raised by the small :business owners and res idents in the area. Parking and density were legitimate issues raised by residents and businesses, and he hoped Council's actions \/ould resolve those conc~. EVen though the location had problems, he asked. if anyone in the: community could come up with a better location in Pa.lo Alto for senior housing. It was close to Downtown, major services, health care, the Senior Center, and a major transportation corridor. If COuncil were going to folloW through ~ith its commitment to senior housing, it was important to try to find a way to support the proposed project. He had observed the traffic on Byron Street and 01/11/93 70-17 .--- ;/ .' did not believe the traffic was a significant issue. The residents of a senior project would not create traffic similar to .... ·hat the employees of an office developmer.t or a multi-family might create. He supported the project and believed the city should work closely with the developers to see whether those legitimate cor-cerns of parking and density could be addressed an~ to make the project a raality. He hoped that beyond that project the Council would take into account all those issues during the development: of the new Comprehensive Plan and come up with adequate zoning and procedures to provide for units of that nature. He said other communities in the Bay Area had done a much better job of providing senior housing than Palo Alto. • Vice Hayor Kniss Clarified the zoning alloYed was .31:5 FAR but could -­ go to a Dax~um of 1.0. Zoning was important ~nd allowed people to buy in the community and have predictability and fairnes5¥ She did not believe the council should chanq~ th~ zoninq on an impulse, but the project was unusual, and Palo Alto did not have a project of that type in the community. Sbe thought the project ~as exception­ al and supported going outside the zoning envelope beca'J.se the project had an unusual set o~ circUMStance~. The site was als~ unusual since it was located very close to other senior projects, the Senior Canter, and within walking distance of the oowntcw area ~ Those were three ·things that were '\~ery important to all seniors in the community. Zoning that dealt with seniors did not fit the usual pattern, and each of' the senior projects had required 5omethi~ exceptional for approval~ She thought the issue needed to be dealt with durinq the update of the Comprebensive Plan~ The council'a!:d the community supported increasing tbe ·housing stock in the City, and the proposed project ~as in an area that was Downtown enouqh, had enough of a feel of Palo Alto, was not in the heart of the commercial area., and would add J6 housing units in the community. Council Member Cobb drew a parallel ",-ith the Lytton IV project recently .before the council which both involved klulk t.hat the neighborhood would prefer not to have~ The Co~ncil vas ~i11ing to consider bulk because there was some benefit associated with havinq that bulk. He found the similarities and differences to be interestinq. The objections to the Lytton IV project came from residents in the area, and the objections to The Hamilton project came from businesses. The social klene.fit from Lytton IV was housin9 for SO loti-income senIors_ on site, and the soc~_~l benefit from The"":Hui"iton ~o\;ild -be-fOJ"r -: 3 6 -not -loW::income-Tllliii1:ies -wno' wouf"d­ live there which was probably more than 50 people plus the Belov Market Rate (SMR) units, pius the social benefit of saving some programs that were very important to hundreds o.f seniors over a lonq period of time. He pointed out that those proqrams were at serious risk of beinq lost if funding 'Were not provided. There were financing concerns regarding Lytton IV, but The Hamilton was well financed and not a risk to the city~ He thought the pri:i.ci­ ples 'Were the same and the only difference -was that the public: benefit was not on-site as it was for Lytton IV. Tha difference also 'Was that the city did not have any financial concerns associated with the project~ He said the phrase ·zoning for dollars. ""as A politically incorrect phrase, and every time the 01/11/93 70-18 · ... council made a zoning decision, it v~s made fo~ some benefit for the City. That was the purpose of the zoning la~s to henefit the larger community. He though.t there were substantial benet its to be obtained from the project ~hich argu~d in favor of the project. council Member Wheeler appreciated the debate the ~lanning commission had on the subject before it .... as sent to the Council 2: ~jd appreciated the request for an early input .from the C01...: 1 regardinq important issues. She had found through her e~per :e on the Planning COJM.ission that the staff from the Pla. :1q Department ana the Transportation Division was very conserve .~ve ·"hen it came to suggesting how mAny parking spaces wouli:. be required to se.rvice a multi-family prcjec:t~ If the staff ... ·as confident that the ratio of parking space.s proposed for the project was acceptable, she felt .fissured that the parking require.:.ents would be satisfied for the project. The Council had a confidence level because of its previous -expe.rience with other senior projects in the City although each project was different f:,:-oll! the other~ There .. as enough backqround in histo:"y of senior projects of varying types that staff could give the council some assurance on the parking nwr.bers. She thought all 'Of the Council struggled with the d:esiqn ot the project~ A leqitimate qu.estion was if the Council allowed ~ project to go beyond the allowable FAR and dense multi-fandly zones, then why vas there a FAR at all. When the multi-family FAR ",as imposed, it was an attempt to deal with designers and force a ~ore innovative ~nd a~tractive design. It was possible to design outside of the allowable FAR and still have an attractive project. She tbought the architect for the project had, in essence, been able to do that :Cut c,oncurred that there 'Was a considerable amour~ of work to be done along Middlefield Road. staff, in response to ner question, said it vas ~ssible to builo that kind of conqregate facility within any a110vable fAR in the Ci ty. .It was not a matter of qoinq above the FAR b\.:.t bow far abo'Ve the FAR.. She asked s;aff earlier that day whether a re~uction in the size Of the units could be considered. If the fourth floor el~ent 'Were elimir,ated which reduced the FAR, the project would still exceed the allowAble FAR by almost 50 percent. Nothing would be qained by mandating' an enforced reducti.on in the size of the units and the heiqht of the project. A more attrac­ tive, workable project could be obtaine~ if a strong message were sent to the developers and the architect that a better solution was needed along Middlefield Road. The neigh!>orhood had raised concern. --about· both the noise durinq the construction phase-" and the ongoing -"-noise "aft'er"·the"-project-was"· constructed:--" There--W-o-ula be-noise- during the construction period, and the City would impose condi­ tions that would lIlake tha.t as tolerable as possible. If the proposed project were not constructed on the site, there vould be another project proposed so there would be construction noise in the area in the future. She thol.lght the tenants of the proposed project would probably be very quiet neighbors. Council Member Simitian said during his ca~paign he had expressed concern aboUt the human scale of the co&munity. Most people valued the charm of Palo Alto, and that ~as vhy he had struggled with some of "'the bulk questions regarding the project. He felt his concerns 'Were being well addre:ssed on "three sides of the project and was 01/11/93 70-19 optim~6tic that the fourth Side ~ould be de31t vith~ He yas also concerned during his campaiqn about an issue h~ called Mthe concept of community An~ the balance and diversity of the population that ~as maintained~· He thought it would be difficult to find another community where a person would want to place hisjher million dollar )',OZle: a hal.! a block from a very low-income housing project, and that was o~e of things that appealed to him about the project and said a lot about th~ kind of co~unity and Downtovn that was being created. He said a number of people pointed out at t}1~e public hearinq that not everyone had the resources to choose that option Which brought up the question of hov the city' could derive from that project add.itional public benefit over and above what was inherent in the project Which would speak on the issue of how to do the qreatest qOOCS fer the greatest number~ In addition to the seven BKR units that the applicant ~as obliged to provide~ there W45 the question of pUblic benefit. The initial proposal that was made by the applicant in consultation with staff was an additional seven BMR units. He pointed out that was not seven new additional units added to the housing stock but was the acquisition of seven existing market rate units and conversion of those units to BMR units. Under that propo$al, there would not have been an increase in the housing stock but a conversion. That proposal prompted several Council Members to discuss ways in which a greater good for a greater number laiqht be achieved because there. wilre s.o many seniors that did not have the ability to live in a place like The Hamilton. He believed it was appropriate for The Hamilton to spin off a public benefit that served seniors over a wide. range of income levels not only in the Downtown bu~ throughout the entire community. The vehicle in -place that could channel those funds in an appropriate way was the Senior Coordinating Council (seC). He r~ferred to the memorandum dated November lB~ 1992, from Council Members Huber, Kniss~ Simitian~ and Wheeler that talked about how such an endowment fund to provide tor senior services might be set up. He referred to Exhibit A of the staff report (CMR:l17,93) which was a proposed sec endowme~t fund outline. ~:: Council Member simitian moved, seconded. by Huber, 'With respect to the public benefit component, that the statf be directed to -work with the applicant to provide services for seniors consistent with the memo from: Couf',cil Members Huber, Kniss~ Simitian, and Wheeler dated November 1B, 1992~ and the applicant's proposal and response dated November 25, 1992, regarding a proposed sec EndDlrlDlent_ Fund OUt]._i.!!~_ .. (on .. fJ~~ :.il!._t.h!!...t;j~y.~ ~l~:z:~~·.~ .. O_fJig~_-_. att.actJed-to"CxR:117:931, 'With the exception that there be a 2.5 percent resale fee instead of a :2 percent resale fee. Council Member Simitian said the concept was tb;'.t the project over a period of ti~e aauld establish an endowment fund, the proceeos cf Which 'Would go to funQ programs through the sec. The way to get the endowment fund started was by e commitment of $50,000 per year from the project developer for a lO-year period. If the project ~ere completed at an earlier date; the remaining funds that ~ould total $500,~OO would be paid in a lump sum. In addition to those payments of $50~OOO during that 10-~ear period of time, there would be • 2.5 percent resale fee or approximately $25,000 ~hen a million 01/11/93 70-20 ; I ! ( --'C-' dollar unit was resold. He clarified the staff report seemed to sU9gest there would be no resale fees during the period of time vhen that $50,000 per year was being contributed to the sec, but in tact, those resale fees started troll!. day one "that the project ""as occupied. For example$ if after the first four y~ars the project was complete and $200#000 had been contributed over four years, the project developer would be responsible for producing another $300,000 in a lump sum which would be the $500,000 total. But if in the fifth or sixth year units started to turnover, that resale ~ee would be imposed on every unit that turned over in spite of the fact that 10 years bad not elapsed and in spite of the fact that the full $500,000 had already been contributed by the project developer. He suggested that there were same partioJlarly "important programs that related to seniors and to housing that needed to be identitied as deserving attention and care. The details of the process could be worke~ out as long as the Council was clear that the general outline in Exhibit A of the letter from ~e appli~ant dated Nove~r 2~, ~992, and the memorandum from the Council MQmbers aated November 18, 1992, were the basic outline. The programs identified were the Senior Home Repair Program, the Senior Housing counseling Program, and the Retired. Senior Volunteer Program (RSVP] which wa.s a good example of a proqram that served bundreds l but throuqh the volunteers who participated, served thousands throughout the community. He had supported affordable housing opportunities in the past but thou9ht when compared to the opportunity to serve thousands as against the additional seven households that might benefit from ~e conversion of housing units, the project provided substantially greater benefit to the public. Vice Hilyer Kniss said the amendment accomplished the 90&.1 of spreading the amount over the greatest number of people. She recalle~ that there had only been two recent budget situations in Which the city had difficulty funding the programs at the Senior Center. The state's recent buClget might affect the funding of those current senior programs. She suggested the fiqures and facts be well known throuqhout the c:ommun i ty so the. t there was no perception that it was a windfall for the developer. She asked whethe.r there would be any problem making those figures and facts available. City Manager June Fleming said there. would be none. Vice --Mayor lCniss-clar if ie.d if the-maker --and -seconder -aqree.d,-that -direction wou1d-be--imp.licit-in tbe-amendment-. ----------------- council Member Simitian conC'..1rred with the sU9'gestton~ He said the most ilDportant thing was not what -would be extracting from the developer but the amount of the benefit t.o the community. He thought the present value was und.erstated.. He und.erstood. the information 'Would be prepared and available in a way that 'Was understanoab1e to the general public in terms of the public benefit component. Council Me:nber RosEmba~' did not believe off-site public benefit should be allowed. He felt the project ha.d sufficient on-site public :benefits not to make that unnecessary~ The project had been Ol/1l/93 70-21 designed in anticipation of an off-site public benefit. He said there was a letter from the FAHC dated January 6, 1993, .... hich statad th~ City should have the ~oney and a memorandum from the tour council Members in favor of the seniors. The Child Care Task Force had missed an opportunity tc present to the Council a proposal for an inter-generational reloationship that could be developed if the public bena~it from the pr~ject went toward the con!Otruction of a child care center. He urqad consideration of some synerqy. The BKR require:n;ent 'Was , units, and the staff proposed an increase to 14 units, but leverage was being forgotten. It was not necessary in the creation of BKR units, t~ fund at 100 percent. He said a 50 percent mortgage wo~ld create BMR units and then there woula be the potential to buy a 2B-unit project. He thouqht there was a great advantaqe to that possibility. He opposed the amendment, and the proper benefit vas the oriqinal one recoDDended by staff. ccuncil kemher Andersen asked whether the intent of the amendment was to specifically fund certain programs coordinated by the sec. Cou...,cil Hember Simitian said the answer ~as yes and no. There were s~cific problems that presently existed with those specific programs, i.E!., ~e Senior Home Repair Program and sentor Housing Counseling Program, which had been previously funded. from the community Development Block Grant (CDBG) program. He recalled the Council recently approved a policy statement that-indicated it hoped projects fUnded from both CDSG .and the General Fund would not continue.. That created a dilemma since the sec was .funded primar.l1y froll! the General FuncL He understood staff nad some alternative approaches as to how that miqht work. rt proposed public benefit might help preserve two hO\ising related proje.cts which.had a nexus to a housing development public benefit and miqht alsD solve the CDBG problem for the City ~s vell~ The RSVP va.s not funded. from CDBG but was a matter of particular concern to the council and the se:r:..ior community and had been a deficit of about $25,000 per year Which came from the SC::::'s reserves. As the council's liaison to the sec, he had identified those three proqrams and had sU9gested those prC)9'raDIs had SOlDe nexus in terms· of senior !lousing and as progr~:ms that had some particular financial problems. He was not suggesting the sec be locked into using the procee.ds of the fund in perpetuity for those t.h.r$e programs. He. looked to staff to work :with the sec to determine a structure that 9U&:ralltee..d. that the funds vere ... lJ.se.c\ ...... ~n a ",ay "" consiStent-with -the 'purposes-ideritii"ie;:!-butwould"-still =provide­ some flexibility over time. council Member Andersen wanted a response from see regarding that approach. Kathleen Gwynn~ President , Chief Executive Officer, Senior coordinating council, clarified the question was whether the sec agreed with the use of the proposed public benefit for those specific three programs. 01/11/93 70-22 Council Member Ande~sen said that was correct, and he asked whether there would be some element of direction to th~t funding and how that coincided with the sec's decisions regarding its bUdget. Ms. Gwynn said after Council Member Simitian spoke to the Boa~d about the proposal, the sec's Board of Director's had ~ substantiC\l discussion regarding the proposal.' There were t.o programs th~t had been funded by CDBG vhich dealt ~ith both housing counseling and heme repair. There wa.s cor-cern about having that funding availahle for other projects within the community. It ~ould be a way to relieve the city of responsihility of funding those projects. The Board of Direct.crs felt that it could s.ay there would be a public benefit to the community if those two projects cculd continue."" to exist .. The Senior Home Repair program ""'as put on hold lest year because it could not continue if additional ongoing support w~s not received. T~e Council would have to determine in terms of housing counseling how that shoUld be funded. RSVP was also another program that was put on held last year~ The sec currently ieceived no direct support for RSVP. Fundinq for that project would. qive the sec the opportunity to cot'ltinue: that program. Flexibility for the funds would be appreCiated after a pEriod of time so that the funds could 90 into a g~~eral fund to support operatin9" costs for senlor services. The. Board of Directors wanted to make certain the moneys were going to the most important senior services in the co~unity~ Council Meeer Andersen recalled the sec diC! not consider the funds a replacement for the city's previous funding co~tment. Ms~ Gwynn said the Board o~ Directors made that statement in its letter of November 1992. The position was that if the public benefit were a zero sum to the sec, it was uncertain 'Wh~th~r those programs could :be ma.intained.. The sec needed additional net funding because the d~ficit was increasing. If the money was a direct trade-off from current support from the. City" sec 'Would lose money. The $20,000 of the $50,000 would be an exchange for the City, but $30.000 would be net new dolla~s. Council Member Anderse.n asked to what exte.nt vould those funds be \lsed for low-to moc\erate-incame. individuals.: :If the suggestion vas that it would be part of the sec's general fund, then that waS B different concept. Ms. "Gwynn" said l!1ore than 50" percent-of the:'"Palo Alto" seniors had" incomes less than $25,000 per year~ Council :~ember Andersen askad whether the proqrams specifically reached low-income people~ )f...s. Gwynn said yes. Council Member Fazzino said there was an inherent public benefit of senior housing for the community with the provision of the seven BMR units. He comme~ded :both the devel.opers and his fellow Council Members tor recommending the additional public benefit of funds for senior programs that benefited seniors of all income levels in the 01/11/93 70-23 community. He disagreed with ttle off-site public benefit issue and had long s~pported a new approach to the development of mitigation in the community. The efforts of the PAHC to address the needs for low-income housing were very important. but the low-income community needed %dditional services in the area of child care and seniors. Many communities had a piecemeal approach to individual services, and he wanted to address those low-income communjty needs on e. comprehensive basis. There 'Was plenty of nexu.s betyeen the proposed public benefit and the proposed project. He supported the proposal and would argue against any effort to preclude the Council from considering off-site benefits. couneil Member Huber said planned communities requir-ed public benefit that needed to be on-site and could possibly be oft-site. The Webster House benefit was defined ~ith housing for the eldp;rly which included medical care. The Palo Alto Commons benefit was housing tor elderly and included residential care. The proposed project 'Would provide senior housing with a medical/residential component that would be sufficient for a finding of public benefit. The COW'lcil had. qone off-site for public benefit on several occaSions, e.g., the Downtown child care facility and Civic center Plaza. He had argued while on the Planning commission that the City could not always have on-site projects because thp.:re were proposals being presented that were reasonable but did not meet the zoning. The city Would have to look elsewhere for benefits. He agreed with the proposal dated November 18, 1992, because it was an absolutely connected and reasonable proposal under the circumst~nc­ es and. would provide onqoinq benefits for tha seniors. Mayor McCo'WTl agreed with Council Member RosenbaUll'!. She was concerned about the issue of otf-site and preferred the original housing concept proposed :by the sta.ff. She thought that 'Was a more closely connected benefit with the leverage aspect referred to by Council Member Rosenbaum. She preferred that to be the public bene! i t if there were to be a related public benet it beyond the inherent public benefit but did agree with the comments of council Kember Huber regar~ing the inherent pUblic benefit. ~ PASSED 6-3, And.ersen, McCown, Rosenbaum "no.- City Attorney Ariel Calonne clarified the outline in Exhibit A of the. letter from the. applicant dated Novelrlber 25, 1992, was an ~ll~!...i!l!!J-o-_all~_th~.: qQ,.tJnc.t.L ~~d.,. n.ot".._!mpl;ed_ th~~'"_ tb.~ ._~t..!..f_~~c211l.od_l)ot make suqgested changes. Mayor McCown said that was correct. Council Member simitian referred to paragraph 6 of the letter from the applicant dateo November 25, 1992, that spoke about the ability to terminate the commitment if the project had not been built after a ce~~in number of years. He unaerstood the applicantts desire not to make payments if there ~ere no prG~~ct, b~t he was uncertain whether that particular ~anguage ~as appropriBte~ !lOTION AS AH£NDED PASSED 8-1, Rosenbaum. IIno.· 01/11/93 70-24 ". Mayor KcCown asked staff to explain the next step for the proposed project. Mr. Schreiber s< 'd the Council had indi~ated the referral fro~ the Planning commis-_on .... as the first part of the PC tone. The proposed projec would now proceed to the ARB for design review, and after that it ~ould return to the Planning Commission. Atter review by the Planning Commission, the project w~uld then return to the Council for a public hearing and approval of an ordinance. MOTIOll YO RUER: council Member Rosenbaum moved, seconded by Andersen, to refer to the staff and ~he Planning Commission the policy question of the appropriateness to satisfy In whole or in part the-question' of off-site-public benefit. Council Member Rosenbaum believed 1 t 'Was bad fontl for elected officials to demand gifts from developers in r-eturn for zoning changes. The public benefit proposed completely forgot that there was a serious zoning change. The existence of the public benefit and the need for the developer to take that into account tended to exacerbate the problem that caused the need for the %one change. Developers hAd to take into account the fact that they 'Would :be required to come up 'Wi~~ a certain amohnt of money to provide the public ben~fit which would add to the density problem. outside of the context of the specific proposal, there should be 8 discussion regarding the direction of the o.ff-site. public bene.fit. The proposed project was the first residential project in which that issue existed, and there were special circumstances in the Downtown. He wanted a discussion before the Council continued 'With the process. Council Member simitian could not ~~derstand why seven BMR units three miles away from the project was not an otf-site public benefit, but the funding o£ services to serve people Who live~ in the project as well as other seniors was an off-site public benefit. Off-site. public benefit discussion should include not only the question of :funding public services but also the BMR project.. He said the discussion needed to inclune the existing public benefit program in terms of the a~ program. He was not certain he unQerstood what the distinction was between requiring those kinds cf benefits for residential projects. When it was a ~-rcial project, those off-site public benefits vere considered ... ~g!,~_-:.!.£.£.ept~}._~~. _:_ EI_e _ w~~ a.1~~_ .¥.r.lce;:t;~i..~ _:Yhy:..therew~s -a-p):"pP£~~=­ referral when there was a communication fro~ the City Attorney dated January 5, 1s;o93, which answered that question. Tile City Attorney said it was legal, and there needed to be some inherent public benefit. If the council believed the project should generate ~ore p~blic benefit than was inherent on-site, then that could be indicated by the Council. He 'Was open to the pursuit of a broaDer policy issue of whether or not that vas a sound public policy, but it _as a misstatement of what bad just been approved to suggest there was some legal question unresolved or to suqqest the off-site nature o~ the benefits .... as ir~erently different from BMR units. He did not think that inherent difference was there. 01/11/93 70-25 I ,-' ." Council Member Rosenhaum said the BKR applied to every housing project, end there was a similar provision for a commercial project. He 'Was specifically referring to the pUblic benefit re.quirement for the PC. He said there was real concern because that had not been done before and should be explored. KOT%ON TO REFER FAILED: 3-6, Andersen l McCown, Rosenbaum "yes.- RECESS: 9!10 P.M. -9:25 P.M. REPORTS OF COMHITTEES AND COMMISSIONS 6~ Policy and services Committee reco~endation re Approval of the proposed language in the city Attorney's report and also tor staff to develop wording as·~ell as language vhich could be used by way gf a preamble at public hearings 'Which ex­ plained rules and procedures involving Quasi-Ju~icial Matters City Attorney Ariel calonne said staff had been previously requested to find a mere streamlined way to disclose site visits~ He referre.d to his report dated Ju).y 1., 1992, which was the core of the Policy and services (P&'S} committee's recommendation. He directed attention to page 3 of that report which indicated the proposed policy for quasi-judicial decision making. That document was reviewed by the P'S Committee and was then recommended to the council. During the course of the P&S committee meeting, there was discussion about the value of having some statement which miqht be read at the beginning of public hearings in ordar to inform the public of the rules of those proce.edings. He referred to the proposed preamble in his report dated January 7, 1993. The dratt was intende.Q to stimulate dis~~ssion. MOTZOR: Vice Mayor Kniss for Policy end Services committee movad to appr"ove the proposed language in the Citr Attorney's report dated July ~I 1992, with the additional recommendation that staff develop wording fer staff reports as well as language which could De used by way of a preamble at public hearings which explained rulas and procedures involving ~uasi-Judicial Matters. Vice Mayor Kniss asked for the city Attorney's assdstance with portions of the preamble language . . Mr "_..t..a.lonnA...iiaid_thEt_pr.eamble._.tried to_ identify_.issues .. that_".the . Council might wish to consider. The P&S committee expressed concern that members of the public often came to a council meeting and did not realize the purpose of the public bearing, i.e., that the public hearing was limited and the Council was t~yinq to get evidence from the public and interested parties that bore on ~he findings, required by the Palo Alto Municipal Code (PAJ1C). He understood the P,S Committee wanted a statement for the use of the Cou:lcil, zoninq Administrator ~ and the Chair of the Planning Commission that could be read wh~ch would explain to the ~embers of the public the value of what would be heat-d by the Council and how the Council would use that inform.ation~ He tried to identify findings and in the third paragraph on page 2 of his report dated Ja.nuary 7., 1993, hI!!. identified some basic:: procedural rules that Ol/11/93 70-26 .-~: aight apply to p~blic hearings. The draft preamble ~ent beyond the Council's direction in that those procedural rules we~e his best estimation of the 'Way thing:5-had been done, e.g., he could not point to a policy that said the burden of proof ~ould rest on the applicant. That .... as a correct statement of the law ~ but the Council had not adopteQ that statement. Each of the sentences in the third paragraph carried a procedural concept. Council Member Wheeler referred to the third paragraph of the City Attorney's report dated January 7, 1993, and said the language was unclear to her after ftevidentiary objections .•. ~ She thought the purpose of the preamble ,,~as to state very clearly both to members of the Council and the community .... hat yould be accomplished at a -public hearinq .. -She did not think that statement qave the Council nor the p~lic the direction that ""as intended. Mayor McCown said there ""as a difference :between the draft preal&ble prepare.d by the City Attorney which had not had the benef i t of revie"," by the P&:S committee and the proposed policy for quasi­ judicial d.ecision making which ha~ been reviewed by the P&S Committee. She had discussed with the City Attorney that there miqht be some other Council operating procedures that were practiCQd but were not always written do ... -n in a logical manner. The City Attorney had pointed out that there were some procedures in the PAMC that might be Dore U5aful if those procedures were put in the form of a resolution of Council procedures which could be in a handbook readily available for any member of the public. There --was also discussion about the Mayor's creatinq an ad hoc cCllUllittee. to assist with the city Attorney's preparation of procedural rules of practice for the Council. She suggested action be deferred on the preUlble until a review by an ad hoc committee. A 'Whole package of procedura~ practices could then be brou9bt back to the Council .as part of the communication for the public. The council's consideration that evening should be confin~d to the policy which had be~n reviewed by the PbS Committee. ~: council Member Fazzino moved, seconaed by Wheeler, to defer to an 3d hoc committee of the Council r to be appointed by t."'le Mayor, a review of the preamble for quasi-judicial hearing matters as well_as an in-depth review of th~ counc~1.Rule5 ~nd Procedures, specifically Palo Alto Municipal Code Chapter 2.04. Hr. Calonne referred to his memorandum dated July 1, 1992, which made the recommendation that the procedures should reflect the fabric of the Council's decision making. He th~ught the Council vas re~ctin91 asi.:ie from the cumbersome languaqe, to the idea that the concepts were foreign and ove.rlain. That was not his ebjective in the creation of those quasi-judicial rules, so the process with the P&:S COllUllittee was very valuable in that it gave a sounding­ board/reality cheCk to the proce5s~ Mayor McCown raised a broader concern that he had been interested in for a~hile, i.e., to look at Chapter 2.04 of the PAMC Which con"taincd a number of rules and procedures, some of which the council followed with reqularity and some of Which it did not follow with as much regularity. 01/11/9] 70-27 .. CHARLES G. ScHCLZ 317 l'Y1I~ 1aT_r:T ro.-r o-'Ic-.-oX ~8lt PALO ALTO, C.&.l..IP'OB.."'f"lA CH.aoa-12ge P/Lll ,..,.111 oae-oe.H May i2~ 1993 Architectural Review Board City of Palo Alto 250 Hamilton Ave. Palo Alto, CA 94101 AnACHHENT 4 FiECEI\,'EO ~~.'.\' '2 m3 [~A~·:::."";':'1~ :;:...:J":(!~G A..'"~:' ~;:' .• :._";:::-':::-::::F;,::NT Re: 651 Ha.ilton Ave., S3€-516 Middlefield l 523-575 Byron st~, May 20, 1993, e a.m.: priveway Access to 517 Byron Ladies and Gentlemen: I own 517 Byron street, which is the property on th~ northern boundary of the applicant's property. My parcel. 50' x 125'1 is zoned RM-1S with a 9randfathere~ profes5i~nal U5&. I have conducted &y law office on this property since 1969, and my predecessor in title, Kenneth R. HcDouqall, conducted a law office on the property for approximately 17 years before that. There are six parking spaces in front of my office buildin9~ They are accessed by a driveway entirely on my property, at the northern boundary (next to the Palo ~to Dental Clinic, 511 Byron street), and a shared driveway at the southern end of my property. The shared driveway serves both my property and 52~ Byron street, which is the northernmo&t parcel of the applicant's property. There are two large magnolia trees in the planting strip in front of ~I property. One, about 7' north of ~j southern property boundary, constricts the access to ~ parkinq lot trom the south. OVer a period of 28 years, use of the driveway shared by 517 and 523 Byron has been arranged by me and my predecessor with the owners of 523 Byron Street. Those owners have never been willing to grant an easement, so the use has been by means of a license. Because the front of both lots is 21 inside the sidewalk line, there has beQn a very small angled portion of the actual prop~rty at 523 Byron Street Which has been subject to the license. Because that is at the far corner of the driveway to 523 Byron. there has been no need to be more specific~ Under the applicant's plan, the 10' of 523 Byron adjacent to the southernmost boundary of my property will become a buffer strip with plantings. The appl;cant does not want to grant me any Architectural Review Board Re: 651 Hamilton etc. Page two May 12, 1993 easement over eny portion. If I have no opportunity to use any portion of the applicant's property at 523 Byron Street. I Jnust at least be able to continue to use a portion of the city-owned 2' strip inside the sidewalk line for continued access to my property. virginia warheit of the Planning Department has examined the access to the property. Together~ we determined that there i~ approximately 8 1 4" between the corner of,the sidewalk nearest the magnolia tree and the southerly corner of my prQperty. Although not ideal, this provides enough space fer a vehicle to enter and exit the southern portion of my parking lot. so long as the vehicle can continue to use part of the driveway apron in front at 523 Byron and angle across a portion of the city-owned strip between the sidewalk and 523 Byron Street. See the diagram enclosed. 1. Wben the applicant's plans are approved, I request that they not include planting all of the 2' portion owned by the City inside the sidewalk line, at least to an extent which accommodates tbe passaqe of ~ vehicle to the southernmost portion of my property. I believe that a 45· engle ·wedqe", 21 x 2' X 3' would be sufficient~ It should continue to be maintained with the same materials in my parking lot, which is asphalt. 2. Further. anticipating that a construction fence will be erected around the applicant's property, I re~lest that the construction fence not be placed at the interior sidewalk line for a distance of 2' from the applicant's property line so that my utilization of a piace, 2' x 2' X 3', of the city-owned strip ~y continue durinq construction. 3. The shared driveway apron, on the street side of the sidewalk, should be retained to a width of 11' (approximately 5 1 S" in front of 517 Eyron and 5 1 2" in front of 523 Byron). The alternative to maintaining the eXisting driveway and southern access to my property would be the removal of the southernmost magnolia tree. Then, unimpeded access to the parking lot could be achieved by widening the driveway apron in front of ~y property. My property has been in continuous use for many years and the two-driveway access has been existing and functional for at least 28 years. Retention o£ full access to my parking lot is essential. Parking is at a premium on Byron street. and the use ',-" " . Architectural Review Board Re: 651 Hamilton etc. Page three May 12, 1993 of my property requires a minimum of six spaces~ It is impossible to access all ~he spaces on my property from the northern driveway. Having access at both ends of the parking lot allow~ traffic to move more freely and will enable vehicles to enter and exit more smoothly then i~ all traffic must enter and exit at the same driveway. Thank you for your attention tc this request. CGS:bh Enclosure Sincerely, / . /J-.. '-~ CHARLES G. SCHULZ --~ ---------- _________ :?C~L) l:-'?­ so_ 8y,eoiJ HAt.li/...'OI,,. eY120N 1---------------------,--------- I [-----. I \ I ------j ----------------------i -------------- ------._------------... f'<t~ I _ _ _ ___ _ ----1-1'"--,1-----: ----~~ ---- ----; ~ ____ .;; CD _ WJ\ ... ", I , I 1 _ \ i \ I "\! --:A--=--'-----_~ ______ --_H _ " ' \:J 4,k \ /- ---------_---1 -------+-\ -----------.- 11-----_-1:;o! ~ ·-_S:t'-'(_\ ___ 'f'_a'_~ __ ---.----1---_~=--_ -Pt>.\,,~ wAY -liI---------'==-=~--'~ ~ ~ C~rb o-A: -_.--\: ____ --".L-_ __________ __________ __ p'l_ _ ___ _ ------1 ------------------------------- _____ 1_ --:...---,-----------~Yf< ON -S ere, e;:t= 'j - _ -_ t I ------I .$c~L-I<_, ___ Y4._" =---_I~ ______________________ -____ _ _ S<')"'7HE"zllv D(t(V'!lId.'1 t4Cc.~ss -z:;. ~!7 (3y{Cv IJ 'STI:fJ"ET --------1----j) f2-1 \IE-w I't y __ s ~ I'>.I2-CI> '-J1 Tt-I b.2-3 tB '{RON MRI Architectural Review Board City of Palo Alto Planning Department P.O. Box 10250 Palo Alto, CA 94303 Dear Member: -, Janua~y 20, 199) I am .Titing as Interim Board Chair of the Mental Research Institute, world renowned for its pioneering of QQth family therapy AnQ brief therapy~ MRI has led in conceptualizing and de'"elopinq t:.hese fields and in training ~ny of their leaders. We have a staff of about twenty-five and about fifteen additional Board members. Psychothe~apists from all parts of the United ~tates. Canada, and Mexico, as well as from all' other continents attend training workshops of various durations held at HRI. Even Bay Area trainees eat lunch or dinner in Palo Alto and the others usually stay in local hotels while partici~ting in our training. These trainees are thus contributing to the economy of Palo Alto~ in 1992, our training registration was 488, of which only 47 were from Palo Alto. Thus, more than 90% came from ou~side Palo Alto. We have three main areas in our building dedicated to training~ The only place in the building in which it is possible for us to have our conference room is on the ground floor, facing Middlefield Road. ~~at makes this location possible is that the pa~ticular room is 't.wice the size of any of our others~ o~ the second story level we have our two training suites, each consisting of a therapy room and en observation room separated by a one-way mirror. These mirrors are actually two pieces of glass built into the wall at a special an91~. permitting viewing in one direction but not in the other. In one of these training suites the Observation room is on the Middlefiela side of the building; in the other training suite the therapy room is on the Middlefield side of the buildinq. Audio and video recording equipsent is located in each suite, and the electronic wiring is built into the wall in each case. Specifically, there are audio recording wires, video recordir~ wires, special switching arrangements, and some remote control pan and tilt capabilities for aiming the wall-mounted video cameras. Thus I these suites are not mobile and--even if •••• --< • space were available--they could not practicably be moved to any other location(s) in the building. Our concerns about DThe Hamilton-are three: (1) n~ise­ -the echoing of Middlefield's heavy traffic--as well as the admittedly temporary sounds of construction, (2) parking. and (3) the triple mass of this building compared to anything on Middlefield south of University. The noise problem vill be considerable during construction unless we can coordinate it some way so that the construction does not occur while we are operating our sound systems and recording systems in our two training suites. We can pro· ... ide the schedule we have published and distributed to therapists across the country and abroad and I hope the ARB will be receptive to some form of coordination on this serious matter. Even after the construction, however, we are convinced that a four-story buildinq both facing and towering above ours, will exacerbate the already extremely loud noises resulting from the heavy traffic on Middlefield and from the fact that there is a red light at each end of our bloc~, thus causing cars and heavy trucks to make ~ven more noise as tqey accelerate from these lights. I personally measured the sound level at about 4:30 pm in front of our building as reaching 91 decibels and, one block north, where the traffic is a bit lighter, 96 decibels. I believe the reason for the considerably higher reading one block north of our building is that ~ block bas the Lytton Gardens four-story Structure Which, t.~ouqh set back, apparently reflects considerable sound~ Because of the loqarit~~ic scale of decibel readings, 96 decibels is about three times as loud as 91 decibels. Thus, our training is almost certain to be disrupted--or at least the sound quality degraded--on a permanent basis l ~~less the ARB helps prevent this foreseeable and avoidable consequence. Addressing our primary concern--Middlefield's heavy traffic noise being reflected by such a tall building--would also address our concern about this structure being three tiaes as large as permitted ~y the zoning that the developers were aware of when they purchased the property. Two specific actions can be taken which, even together I will only somewhat ameliorate the problea. This JDakes it all the more vital that b2th aeasures be taken. First, the £al2 Alt2 Weekly reports that these apartments will have unusually high ceilings--specifically ten feet hiqh. This is an egregious excess in view of the already triple mass of t-~is building compared to what the property vas zoned for. FUrthermore it is not public-spirited in this age of understanding the importance of conserving enerqyl to intentionally bllild a structure which contains a permanent gross energy-wasting feature: high ceilinqs. We all know that heat rises and it will cons~e more energy to r adeq:uately he.et or cool a room t;"J.at is ten feet high than one with noraal eight-foot ceilings. This measure would shave two feet from each of the proposed four stories, brinqing the heigbt down from fony-six fe ... t to thirtY"eight feets though this still leaves this bu~lding as a monstrous maJIUIIoth compared to thos e around it. A second measure to ameliorate the imposing size of this proposed building and bring it down toward human scale and neighborhood standards would be to have a total rather than a token elimination of the fourth story. According to co~ents at the last city council meeting to consider the re-zoning, such a reduction could be achieved by maKing ~ of the apartments smaller than the 1700 to 2200 square-teet range currently contemplated. This would have the added advantage ot showing greater reqard for the concept of diversity so highly praised at the recent city Council Ree~inq, and would probably make it easier for th~ developer~ to fill the building with tenants. Thus, this is a win-vin 5i tuatio~"I. This could shave oft an additional eight feet from the thirty-eight ~oot height which the first measure could achieve, brinqinq the buildinq down to thirty feet, a height ~ in keeping with the neighborhood, though the structure would still tower over its neighbors. This project is not the only economic benefit to Palo Alto in the neighborhood. Our Institute has bro~qht income to the City of Palo Alto for close to thirty-four year~, and we would like to continue to be able to do so through oonductinq training, research, and servjce activities at 555 Middlefield Road, Palo Alto. 'I1le Board of Directors and the professional and administrative staff members of the Mental Research Institute join me in urging most strongly that the Architectural Review Board require the implementation of both the suqgestions made in this letter, each o.f wtdch will have an ameliorating effect on the height and aaSE of the building and thus will go some of the way ~oward meeting the primary purposes for which they were promulqated--and each also is associated with additional advantages which make the two modifications presented highly desirable both for the conservation of enerqy and tor the good of the neighborhood and the public. consideration. S I G NAT 0 R I E S (All .re ~, of the HRI 80 •• d of Oirectors) Arthur M. Bodin, Ph.D. He~n Ohme. Ph.D. ~~rvey Pirofsky. K~D~ Lawren=e Harkowitz ThDmas Nagy, PO.D. Ju1es Riskin. M.D. Mary Grace Bertsch David Faigerbaum. Ph~O. Clifford Levin. Ph.C. Diana Everstein. Ph.D. Paul Watzlawick. Ph.D. Robert H. Hiller, J.D. ./ -'''' . .......--A ,'fEN 0 \ X • Infi HtDyer Canyon i.sl S,UI Jos~, till' cOlild bt used arler lM prtielll Iota! lile$ at~ clo~~. The P310 Aha ~yJands b.."ldl"J.I will no! be lV.ail!.ble afl~r the ~uly 1990s. Noise 2[ ~~~~~~~~~, ~~~~~,~,,~"~"~,~m~"~,,~,,~~~I~~II:::Ct ~ If thC'te e{fr..::t1 IJ'r ("Qrltinued. I1!t)l etr. ClllU' Vtty 5ttjot.:! ~ Thf. to aiM ProbllL!m Neil«' is • plrt of modem loQ4ity-l'loise' (lom motorized labor-savini dfflccS, tr&nlp<lrution vehickl, and lCl:reation ~s. hople CIlI lolt'r.lle or iPlort l ~.rWn amour::l of !loUt: but advent c:ffed.s incJudicl Q·.ltrighl he-ariJlg jm.. pa.ir1'be:lt .and o'!.iu:, cWl~rs to health are f;rtJnll in many cXpoiu.rH 10 noise. ~ot:onal and psyc:hc.JOjkaJ FtoblcmJ, The 1l.Oi~ en~i· rorunenL is o(~en flOI bLa.-n.ed dl!ectly rOI tnt's:-rnctions if The cb~tive Gf this ~on of 'Ok!: Pan llld p~o Allo's con~1 Noise Control Program !s 10 redu::t cctu wltith &!feas hwnuu adYerscly. The-Effects of Noise 00 People The problem of controlling no!se is diffICUlt beawc it ti· fC'cu Heh lndMd~ in :I diffeunl W2y. Pco-pie do J:!('t bear SC"lttIcU allU or react to them in the same qy. Ea.:h pe-CSOlI'1 n.aclicm to nOise depeodt on cha.~teris1k3 of the noise l:.sdf-W loudMu. chlt.tio. .... and frequency COtIu:nt, (;:II c.xample. The effect of lloUe .or! people is aha "teor· minte by the wlenu and the siluation. The effe:;:t gf nffig mrs above SO dBA can !'&be fl"Ol1l a IC'l'ZlPQrUY lou I)r abili:v to hn: quiet!r9W!ds Hp 19 ~ %Wt1t and ilrevt!rs:r:1;;le loss of normal. ~ Fortunately. I"' exposures to noise Incls ClusmJ pe1ntl.!lent hPrlnf dan. Occur in Palo Alto. Rowenr. -lome probkms may 0C:c.Ul lOf thOle wh-::. &ue:nd lood mU5l~ gJ rtt:-talJnual' nrots gr fot peU>OM wbose-join in\7'Olft high noiR lndl.. (kc.up:LCioMl noiu: b n-gWaled by mte and feder.ai Jeps1atl<XL Noise may altq ifWJIp! ytjyjtig .nodt as JIup, ccnftr~ ~OD, rhdipr Wenin! 10 N!C9n1a elf watching tdrrisioo. IlUjar IKIl:rc!1 cr InfflOC J!aiH .an-Juec=:.J .;u. IIICh .-ol'll.mu, h;,h ~. I b.!tc-%tll!!lbei ar-tu,1Tx eonC"Clls elf IIIIIIY tnlW. ~""M!. Inli othn laud midn. S':;IlltlMm Paei!ic thl-"~ 1:1: r.K::Itbu m.ajar ~ureJ: 01 .IIi)o~ Ou.illl 'PQk lnfTl.e pc:no4l. me IKlUoe ~'f!II:b In PUUlltl'tUI'I an-~r ~ l" pt:I cc." or !he time I' 50 ("I fiOll! m' tnlfrlC. NQUr IIr..a or 50 to 60 dBA Irt~:¢:aJ in M"Jchborl;O(lIj~ DOt 1lIbjc~ Ie bcaY)' L"'lIofl'k Rdati,.,: Inttmity of sound J ,000,000.000,000 UIO,OOO,OOO.ooo 10.000,000,000 1.000,000,000 100,ll(,J,OOO I O,OOO'(x)() 1,OOCl,COO 100,000 HI,OOO 1,000 100 lO J Sound Lc"el 4' dBA Autohom(J'~ ...,..,.,,«100') ('11 as -ll \. Io\.~ 120 "\ .Rock mu~ insHie nigfltc:lub \ N. ........::....-~:\h ... l I. ,1 1lOj Motor~de wjthOU! mumtr ,"clerl ting. JlIckh.a.mmcr (15·) ~.!:t ... .'::, J 100 Sl~ molOrcyclt acc~:r.ltifl& (2S') S, .... S """'-., ........ ...J...d-r 90 Power L1wn moW'u(20) M A"I:. ...... ~\.f!\ t-.... + ac Ste-ady urb&n tralIic (25 ') "';1 70 Noma.! ~'mSation (3') ISO Daytime !V~l., no nearby lroom, SO Qu;eloffice. QlJiet neighbomcod 40 l;uide qwct home. 50f1 whisper (10') 30 MO\'it or J'ecO:dinl studio 20 Butly luw'ble W<Jnci' Ie Thresh old of he~int: 0 j A dKlltd Ida .... ) ~.:; ...... 0' mUlUrcmC1lI indi~.Ii", Il:e r.::1.a1""'t inlclUIly of .. _00 .. ," LI he~ by the hum~ c..:u l.uy ." ...... ..., Qr 10 dBA. ,,~blu II\c pua:~d fOU4nc:U alLbOll.£h !he nO .... ISo .aclU .. lly kn ~ mOn: inleAlll: Far e:umplc. I~' I .... n mo"'u rSO dB") l«n'IIWlCr u loud ill ~y ultl:ln 1I'..mc PO dBA) _ .. - • .. '* ~ .. • CITY O~ PALO ALTO INTEROFFICE MEHORANDUH Febru~ry 11, 1993 'roo FROM.: Virginia Warheit/Planning Division carl stotf~Transportation Division SUBJE~: Parking tor ~The Hamiltqn tt ~nACH)1fN7 6 * • * • * • * * * * * * • • • • • * * * • * • • * • • • • * * • * This is in response to the Council request t.o investigate the feasibility of instituting two-hour parking, Monday through Friday, in the block of Byron between University and Hamilton~ - This is fe.asible. This block is contiguous 'wIith the two-hour parking zone on University Avenue~ The Police Depar~ment would be able to enforce this new area. usually, we institute time-limited parking only on block faces which are commercial I and not residen­ tial. Residential users normally want to be able to park all day in front of their res.idences4 Once the Hamilton goes in, this block would be predominately residential~ Ho~ever, because residents of the Hamilton have their own dedicated parking, and we are addressing a specific council concern, it would be acceptable to have 2-hour parking installed in a predominately residential block. Presv~ably~ it is the people who currently live and have offices in this block 'Who are worried about the Hamilton using up their parking. Before anyone directs that two-hour parking be institut­ ed, it would be important that these people understand that, if it ~ere, they would no lunger be able to park there all day as ~hey do no ..... Once the decision 'Were made to extend two-hour parking to this bleck, it could be j,nstituted within two to thre.e 'Wee.ks. The only necessary actions are to notify the residences and businesses locate.d on this blOCK, install proper signing, and allo~ time for the Police Department to issue warning citations. If it is not done at the time of approval of the Hamilton, a resolution would have .to go to council at a later date. on consent calendar. t-? approve the new parking zone. cs Cogoa.ull.lr'lll\ ... ~ &A<..-;Ii(j'Y_' t:~.~1J"I 'Xl Sill ... Stret1 ~"~'iI~Jm (',;(II·~g.,l!lo4 ~:d~:w;QotJl2 F'U-l1!!!:J'J"~ ~"S-;.,I'f. ........ , ........ "t: ..... " .. -- '_5.~;>( .... ':t>;.III'~1'!: 1'Im".ohti"o..· _1IoCo ___ a...s;,K>...,.. ......... Jlc-., ATTACHHE~T i 1\(-US 3"7 6197'= ,. ~ •. /: ~~.;<,:,,"':"" i.(,~':'·,,,::" . Chilrl •• M Selt.r A ... oc .i·· •• Inc • ~' 1;-. 2 Februruy 1993 Ric:bard Beard Backen Arrigoni & Ros.< 166ll Bush SlIce I Slln Francisco. CA 94109 Subject: The Hamihon -Acoustical Con,'ulting CSA Project No. 93-024 Dear Ri cilllTd: Thi5 kner i$ in respo",e to a letter prepared by the MRI Company to tbe Architectural Review Board dated 20 Januruy 1993 regarding the subject project. k we di""JSSed. my firm has conducted specific noise analyse' of the claim., which arc rcrnlered in thi,letter regarding the effed of refleruoll.< off lb. future Hamilton building as well., the short-term construction noise impact of the Hamillon on the M Rl facility . Dealing witb each oC thr", issues separately: 1. 2. Reflectiom;; When we have specifically studied the effect ofreflections off the facade of a three-stQr), building, we ha •• measured about half. decibel increase in ooise due to Ibe building. A> you know. a balf a decibel increase in noise woul~ be indi"inguishable and have virtually no effect on people in thc hwlding aer",-, tbe street C.Qru.tOlct jon Noise Juwact: Wt do not believe that the noise generated by construction of the subject project wiU "impacl" Ihe people in tile MRI building in that the curren, :acoustic-.tI environment al'lng Middlefield Road i:; relativel, loucl. Therefore, th, noise generated by the construction "ill be ,-utlmlly indistingui,bable in terms of "maximum noise"' and "average noise-as compared to the floiJ.e gone rated by traffic on Middlefield Road. '," . Richard Beard 2 FebruaJj' 1993 Page 2 in conclusion, it is our 'oXpert opinion that Ihere ",iII.!!l11 be a noise impact on zhe MRI activities due 10 reflcctio.,. of! the Ham"!on as well as lhe noise due to ronstruction. 1 would be pleased to aD.<wer any specific concerns orzhe Arohitecrural Review Board II:ld people wilh the MRI organization a., required to deal with this issue. Please call if you have any questiom. Sincerely yours, CHARLES M. SALTER ASSOCIATES, INC. a~.k,,Laz Cbarles M. Salter. PE A.( Pre.'<ident ATTACHMENT 8 S 9 ORD INANCE NO. =-;;;;=="" ORDINANCE OF TIlE COUNCIL OF THE CITY OF PALO ALTO AMENDING SECTION 18.08.040 OF THE PALO ALTO MUNICIPAL CODE ITHE ZONING MAP) TO CHANGE THE CI.l'.BSIFICATION OF PROPERTY KNOWN AS 536·576 MIDDLEFIELD ROAD, 535·575 BYRON STREET, AND 651 HlIMILTON AVENUE I THE HAlULTON SENIOR LrJING COMMUNITY) FROM RM115) TO PC WHEREAS. the Planning Commission, after duly noticed public hearing held June 3'0. 1.993, and the Architectural Review Board, upon consideration at its meeting of June 3. 1993. have recommended that section 18.06.040 [the Zoning Map] of the Palo Alto MUnicipal Code be amended as hereinaft~r set forth; and WHEREAS, the City council, after due consideration of the recommendations. finds that the proposed amendment is in the public interest and will promote the public health~ safety and welfare. NOW, THEREFORE, the Council of the City of Pale Alto does ORDAIN as follows: SECTION 1, Section 1B.06.040 of the Palo ~to Municipal Code ~ the • Zoning 'Map", is hereby amended by chaoging the zoniog of certain property known as 536·576 Middlefield Road, 535-575 Byron Street, and 651 Hamilton Avenue (The Hamilton 'Senior Living Ccmmunity, the "sJ.,lbject property") frQ:Q:l "RM(l.S) Medium Density Multiple Family Residence'" to 'PC Planned Ccmnunity· ~ The.. subject property is shown on the map labeled Exhibit wAil, attached hereto and incorporated herein by reference. SECTION 2. The City Council hereby finds with respect to the subject property that: (a) The site is BO situated. and the use proposed for the site is of such a characteristic that the application of general di6trict~ or combining districts will oct provide sufficient flexibility to allow the pr~sed development, in that the ~ Floor Area Ratio (F~~) allowed in the highest density mu~tiple famdly zon~ (RM-40) is 1.0 while the FAR of the proposed project is 1.70. An FAR of 1.0 does not allow a sufficient building volume to aC:COIIU!lociate the activities and services of a senior living community, as evidenced by senior residences consistently having an FAR exceeding 1.0 both in Palo Alto (Lytton I. FAR 1.4 and Webster House, FAR 2.43) and in other communities. (b) Development of the site under the provisions of the PC Planned Community district will result i~ public benefits not otherwise attainable by application of the regulations of general districts or combining districts~ in that the senior living coumunity will provide housing with support services, for which there is an unmet need in the community, thus enabling residents in need of this type of housing t.o remain in the coamuni ty. In addition, a fund to be established from contributione by the 1 ~ /. developer totaling $500,000 plus resale fees will be used by the city to ~rovide benefits for seniors and senior services. (c) Tne use or uses permitted, and the site development regulations applicable within the district are consistent with pOlicies 7, 11. 13. and 14 ot the Housing Element of the Palo Alto Comprehensive Plan. The permitted uses and site development regulations are compatible with existing and potential uses on adjoining sites or within the general vicinity, in that the site is appropriate for senior residencas because of ~he close proximity to Lytton I and Webscer House~ to Downtown, the Senior Center, medical services and public transportation. The location at the intersection of two major streets and at an entrance to Downtown is appropriate for a building of this scale, providing balance for the LyttOD I complex on the other side of university Avenue. The architecture and landscaping is designed to be visually compatible with nearby residential areas; the building mass is set back from the interior property line and the buildi~g height is lowered where it is opposite residential usee; the ~~ddlefield Road facade is modulated and detailed to minimize the size of the building; auto access is off Byron Street to minimize conflict with existing heavy traffic on Middlefield Road; all anticipated parking demand is being provided for on the site. SECTION 3. Those certain plans prepared by Backen Arrigoni _ Ross. inc~1 dated April 8, 1993. and approved by the Architectural Review Board on June 3. 1993~ a copy of which plans is on file in the Planning Division office. and to which copy reference is hereby made concerning the full particulars thereof~ are hereby approved as the collective Development Plan for the subject property. pursuant to Section 18.68 1.20. Said Development Plan is approved for the following U8e8~ and euhject 'Co the following conditions: (a) Permitted Uses ~ The use shall be limited to 36 independent living units for seniors plus common di~ing facilities and accessory uses typical of a senior living facility, including, but not limite.d to, in~hom.e ~rson.al care, a library and living room; bar/lounge; pool; exercise roam; jacuzzi pool; sauna and shower facilities; mail room; t.wo private g'.J.eat rooms: and administrative facilities. including a clerical/reception area, work area, two private offices, a meetiog room/private dining room, and an employee lounge. (bl permitted. (el development Development the Special CQndi t; iona 1 Uses. No t,;onditional uses shall be Site PeVftlgpment Regulations. All improvements and shall be substantially in accordance with the approved Plan. which shall be amended as required to comply with Requirements set forth in subparagraph (el ~ Cd) Parkina and Loading Requirements. The parking and loading requirements governing the subject. property shall be in accordance with the Development Plan~ which shall be amended as 2 • required to comply with the Special Requirements set. forth in subparagraph (e). {e) Special Reguirgments. {i) The garage plan shall incorporate a loop system that minimizes dead end aisles, maintains overall approved parking numbers and maintains zoning re~Jlations. (ii) Prior to issuance of a building permit, the property owner shall provide a written plan, to the satisfaction of t...lJe Plamling Division, specifying how they will minimize noise impacts to MRI (th2 occupants at 555 Middlefield Road) by construction timiDg and coordination with MRI~8 training session schedule. building issuance (iii) details shall ot a building Exterior II".a.terials~ colors a.nd additional be subject to final ARB app~oval prior to permit. (iv) Prior to issuance of a building permdt~ the OWIler shall submit a final land~cape plan that shall incl'ude a planting and irrigation plan, sizes of plant materials and samples of paving ma.terials. The final landscape plan shall show the location, size and species of all trees to be retained, both on the site and in the adjacent public right of way.. The planting and irrigation plaIl sha1.1 be approved by the Energy Services Division. !v} Prior to issuance of a building permit, the owner shall submdt a final lighting plan showing location and design of all exterior lighting fixtures and a pbotometric diagram showing ~ight pattern and intensity, both on and off the subject property. of light cast by all exterior lights. (vi) The design of the driveway providiDg access to the Schultz property adjacent to the north of the subject property shall be developed in coordination with the Transportation and Planning Divisions, and approved by the Planning Division prior to issuance of a building permit. (vii) Prior to issuance ot a building permdt, the owner shall submit a parking plan showing the six surface parking spaces and six spaces in the garage marked and reserved for guests, witb a minimum of six additional parking spac .... in the garage to be marked and reserved for employees. (viii) Prior to issuance of a building permit. tlle owner shall submit a, tree protection plan prepared by a licensed aroorist specitying all measures to be taken prior to, during and after CODstruceion to protect the trees to be retained. both on the sit~ and in the adjacent public right of way. The tree protection plan shall include a site plan showing the species~ size and location of all trees to be retained, both on the site and in the adjacent right of way. In addition~ the owner shall provide the Planning Division with a letter from. a licensed arborist 3 c .... · ~:. . ,. : -:-r ,t-:"~ ,;, ....... f_ , " -'".' -t-_ verifying that the arborist: has been retained by the owner-t.o ensure that the tree protect.io~ measures are followed and that the arboriet will submit periodic field reports to the Planning Division confir.ming compliance with the tree protectior. measures. (ix) Prior to issuance of a demolition permdt or a building permit .. the owner shall provide a letter to ttuo. Planning Division from the retained arborist. verifying t.hat I:he arborist has conducted a field inspe~tion and that the protective fencing required in the tree protection plan is in place. (x) Prior to issuance of a demolition or building pe~t. the owner shall prepare, to the satisfaction of the Transportation tlivieion and the Public works D~partment, a Construction Plan addressing location of const.ruction staging areas, travel routes for construction vehicles, parking f~r construction vehicles and private vehicles of the construction crew, fencing of the construction site, a plan for keeping nearby streets and sidewalks free of dirty and ~ther construction debris, and all other measures deemed necessary by the City to provide for the public safety and to reduce impactn of construction on the surrounding neigbllorhood. The plan shall include a provision that cc.ost=uction fencing be installed in such a way that the driveway adjacent to the site that provides acce9B from Byron Street to the Schult< property is not impeded. (xi) A planter strip and street trees shall be provided on all three street frontages, with a minimum width of 5 feet on Middaefield Road and Hamdlton Avenue and a minimum width of 2.5 feet in Byron Street. unl.ess at least 2 feet of perimeter planting is provided inside the property line along the one·way driveway OIl Byron Street, in which ease the curhside plaoter strip shall be a minimum of 5 feet wide. The planter strip shall be planted continuously with low shrube or dense ground cover and shall be automatically irrigated. The street trees shall be planted to a maxfm'm of 2S feet OD center, with the location and species to .be apprO-Jed hy the City Arborist and the Planning Division. All street trees shall be located in tree wells with a min~ dimension of 5 x 5 feet, and shall be installed according to the City Arborist's specifications. All street. tree wells shall be provided with automatic irri~:jation. {xii) Subdivision approval to merge the existing six lots into one parcel sha11 be Obtained from the City prior to issuance of the building permit~ If the units are to be individually sold, a condominium subdivision map shall be approved by the City prior to sale of any units. (xiii) Prior to issuance of a building per.mit, the owner shall enter into an agreement with the City under which the o~ner shall agree to provide a mdn~ of spven (7) BMR units in fulfillment of the owner's obligations under ~rograms 9 and 13 (th~ Below Market Rate (·BMR·) _ provisions) of the Housing Element of the Palo Alto Comprehensive Plan~ The BMR requirement shall be subject to the following conditions: 4 .. 1. A minimum of seven ,7) BMR unit.& will ~ acquired or constructed by owner and given to the Palo Alto Housing Corporation, free and clear of all liens, prior "~o the issuance of a building permit for the refere:lced project ("The Hamilton-). These units constitute compliance with Programs 9, 11 and 1~ of the Housing Element of the City. and their location(s) shall be subject to approval by the City Council. 2. OWner will make good faith efforts to secure seven (7) or more BMR units with no studio units and at least three (3) twc·bedroam units. A mix o~ studio, one-bedroom and twa·bedroom units will be permdtted r however, with at least three two-bedroom units and one additional two-bedroom unit for each studio included. For example. a mcix of two studio units and five two-bedroom units would be acceptable. 3. All BMR units to:t'le provided by owner shall be in reasonably good condition. They shall be structurally sound with all plumbing, heating and appliances in good "-"orking order. rt is understood that such units yill not be re~_:ed to meet current Building Codes, but they shall be free of termite and other pest infestation and seismically sound. (xiv) Prior to issuance of a building permit, the owner shall enter into an agreement with the City in d form subst4ntial1y similar to Exhibit -8-attached hereto and incorporated herein by reference~ tor the purpose of providing additional public benefits to the project. (f) PeY~lopment Scbed'lle. Tbe development schedule shall be as follows: (i) Site clearing and demolition: June to July 1.554, 'ii) Basement excavation: J'uly 19!H; (iii) Basement construction: August to September 1994, (iv) Concrete structure: October to December 1994; (v) Roof structure and rooting: January to February 1995; (vi) Exterior skin: Dt:cember 1993 to February 1.995, (vii) (viii} Interior improvements: February to July 1.995, Site work improvements and landscaping: April to July 1.995, and 5 ·c (ix) Initial occupancy, August to Septe1Mer 1995. SECTION 4, The Council find that thi~ project will not have a significant environmental effect. SSCTION 5. This ordinance shal.l be effective on the thirty· first day after the date of it~ adoption. INTRODUCED, PASSZD, AYES: NOllS, ABSTl!NTIONS , ABSJ!lIlT: ATTEST: City Clerk APPROVED AS ro FORM: Senior Asst. City Attorney 6 APPROVED: Mayor City ~ger Director of Planning and Community Environment • .. . \ f , EXHIBIT "A" .. , -I ~ "' ..... · rti -r~·.~ .:~_ :=..J ~ I v_, 1,,;:16 _ _ ""'-~1 I: ""ZP :; 1 d!3 &0 !. !IO ~ ~. fP' . ti.~ "" ·~~I~ I~ ;;;-. ~~ !~I~ ¥ , ~~ll: ::::~, I~'rm H M1 • ~ !~; 11" ~ ~ ~ I~ ~ ;~ .~ I; ~ rH ,YO"'"" ,,,s_1 ~ ITG. ~ I~ ,,<!.. .:. "1 H ~ ~ .. -r5r 1': {,~ ,~ [w '" ~~ 1$S1~ ;," 11< F ~ ~ I~ . ~ !!. ~ ~ " ",I. .~7S :~: & ~ ~ f*1 r ~~ ~ ~~Wl .. ',~'~; f I:~~i; , 3:.... I~ I~ [~ ~~ ~ 'ft. l:i -" F . , :rc P~649 '-I~'£ ~~ I~ ~1--~ I~ • .., . . .•.• j' ..•• ::;1 : .." 1""- .... i~ . I;;. 1.; .,,""'-, OS! i: ~ . or-PC -I-"'" R !"Si 10*> ..... 2968 I ,It ,:;." "':. f-' n '"'' ~~~J.f§ W !~Ii ~,! JI --NI}f~ . "Ef: . Ji . !J.~ l ~ fl "'-s WEBS IH; .~ Iii I:r SITE LOCATION H ~I~~: II E t~f _ r HI-' i ~:.::, . " Iilr'l-r,~ ~E; '!i~ $C:·lb1. ~t,o.n'~,'W -=- S>n •• ~ "~: ~ '3499 ~ .h: Pg-S'!f1.·'5~ ,)O-C~!' ~' 1----- J;:;,( p ) 5-';... 1;;~~1 I""" ffi~ H; '5<>1 . Cit:-'" ~ ~ • r-l'""r-r ,.. COWF , il ~'J.lp $1 i:f ,,,,,I 1r¥1.~ I:>~ ~~I ! II 'I~,,~J'I IL tip i~ I~ ~ GRAPHIC ATTACHMENT DATE: 0I1GI02 -. TO STAFF REPORT . F J L E tio. -12-2C"~ .2-EIA .. 7 PROJECT: ZONE .CHANGE FROM RN-t5 TO PC lOCATIOrI HAP: '. , This document is recQrded fol.' the BDIBIT -B- benefit of the Clty of Palo Alto and is entitled to be recorded free of charge in accordance with Seetion 61Q3 of the ,~ernment Code After Recordation, mail to: OFFICE OF THE crrY A TTORNE'l 250 Hamilton Avenue Palo Alto, CA 94301 ~ lUfrWBBh HAM.ILTOK AVENUE PROPD.TIES, me. AI!lll CX'l'T OF FALO ALTO JtBGARI)llilG PmlLIC BENEPXT FOR PC ZONE '5~ Eaadlton Avenue, 536-576 Kid41efield Koad, and 523-575 Byron Stre~t, PaiD Alto, California THIS AGREBMBNT. made and executed this day of =C~~~~~~~~~' 1593. by and between the CITY OF PALO ALTO, a m.micipal corporation of the State of california. hereinafter referred to as "City". and F...AMILTON AVENUE PROPERTIES, INC., a California corporation, hereinafter referred to as "Developer"; • IT. B SSE T H: WHEREAS, Developer is the owner of tr.at certain real property situated in the City of Palo ~to, County of Santa Clara, State of california, generally known and described as 651 Hamilton Avenue, 536~576 Middlefield Road and 523-5'5 Byron Street, Palo Alto, ~ifo~ia 'the "Property"); and WHEREAS, Developer t..as applied to City for app~oval of a 20ne change OD the Property fram -RM 1S -Low Density MUltiple­ famdly Residential-to "PC Planned Community·, to allow development of an approximately 90. 760-square· foot senior condominium project with 36 residential unite and associated COJrmOO areas (the "Project"); and 1IHER..BAS~ e:ectioD 18.68.060 (b) of the Palo Alto Municipal Code provides that a PC district must result in public benefits not otherwise attainable by application of the regulations of other district.Si and 1IHER..BAS, City ha.s determined that the nature of the Project, pr~#iding additional housing for the elderly, including provisions for life-long medical care, provides an on-site or inherent public benefit; and ~S. Developer" has proposed to contribute to a fund that would benefit seniors and senior G~rvices, for ~he purpose of 1 '"" . / -, >/", . ,.-:-~-~~:' " 0'f&£;,;: -'. _.1. providing additional public benefit for approval of the PC zone; and WHEREAS. Cit~i" is willing to accept Developer's contribution as a public henefit in support of the PC zone; and desires to assure that the proposed fund will be established and maintained in accQrdance with the agreement of both parties~ and that the obligations for continued funding will be binding upon Developer. its successors and assigns. NOW, THEREFORE, for and in consideration of the approval of the PC -Planned Community Zone change~ and in order to ensu~e satisfactory perfo~ce by Developer of Developer's obligations under Chapter 18.68 of the Palo ~to MUniCipal Code, the parties hereto mutually covenant ana agree as follows: 1~ Creation 9= Fund; Yearly Payments. (i) Developer shall contribute to City the sum of Five Hundred Thousand Dollars ($500~OOO) for the establishment of a fund '-Fund!!) to benefit seniors and senior services. City'shall establish and maint&in the Fund. Interest from all monies in the Fund shall accrue to the Fund. (i1) The $5(10,000 contribution shall be payable in ten (~O) annual installments of Fifty Thousand Dollars ($50,000) each, subject to the requirement for a final lump sum payment as described in subparagraph 1 [iii), and subject to Developer's right to terminate future ohllg:!ltions, as described in paragraph 3. The: initial instal1meDt shall be payable within thirty (30} days after adoption of tbe ordinance amending the zoning on the Property to PC • Planned CODI!DJnicy. Subsequent annual installments shall be payable on or before JUDe 1 of each succeeding year. (iii) Upon the close of escrow for the sale of the 32no1. unit in the Project, De'I"eloper shall, within 30 days of such closing. pay in one lump sum to City the remainder of the $500,000 unpaid as cf t.hat closing date. Thereafter. no further annual payments s~l be ~lin9 to City~ 2 • Payment to Fund Qppp Subs egugDt Sale of llnit..s.. (il In addition to the Developer'S annual contribution described in paragraph 1, the seller ~ upon resale (all sales subsequent to original sale of each unit) of each unit in the Project shall pay to City for the Fund an amount equal to Two and OOe·Balf Percent (2-1/2t) of the sales: price of the unit. The ·sales price" shall be the price established by the Santa Clara County Recorder's Office upon which the City's real property transfer tax is calculated. (ii) Developer and subsequent owners shall insert in any deed or other conveyance of each unit the specific requirement for payment upon resale set forth in subparagraph 2 (i) _ Any such deed or other conveyance of each unit shall be recorded in the 2 • I , ~ · >' " ~'+;';';" .• -./ :;: ~~ ....•. " < County Recorder's Office and a conformed copy shall be sent to City. 3. Develgper's Bight to Terminate4 on or before May 1 of any year prior to the start of construction on the Project, Developer may terminate its obligation to contribute tD the Fund by giving written notice dated on or before such date to City of its irrevocable deciaion to abandon the Project. Thereafter. no further c::o:ltributicns shall be required from Developer. Any contributions made to City by :Developer prior to the giving of notice shall remain tbe property of City. ". Uee of the Fund. The Fund shall be used by City to benefit seniors and senior services. MOnies in the ~~d shall be allocated to t.he Senior Coordinating council t.o supple:nent their delivery of senior services t.o the comnunity ~ or to such ether service provider (s) as the City Council from time to time shall designate, and on such terms as the City Council may establish~ Developer ehall have no obligation to City or any other Agency under this Agre~t or any terms hereof with regard tc allocati?n of the Fimd. other than to make the payments to City as provided herein. 5. 501d RarmleBs~ Developer hereby agrees to and shall protect, indemnify and hold City~ its officers, agents. and employees harmless frcxn and against any and all liabilities, obligations, damages, cOSt8~ injuries, or claimB thereof, inciud­ ing, but not limited to. claims for damage or personal injury, including death, and claims for property damage, arising in any manner fran the performance or failure to perform the provisions of this a9reement~ except for any such claim arising as a resu!t of an act or omission of City. itE; officers. Agents or employees, hereunder that constitutes an act of negligence, gross negligence or willful misconduct~ Developer agrees t.o, and ehall, defend City. it-s officers, agents, and employees, from any suits o:!' actions at law or in equity for damages, liabilities, or obliga­ tions caused.. by or ..arising from, or alleged to be caused by or ariaing from, the performance of this agreement, ~~cept for any Buit or action at law or in equity arising as a result of an act_or omission of City, its offic.ers, agents or employee8~ hereunder that constitutes an act. of negligence, gross negligence or willfu.l misconduct. Notwitl"o..standing the foregoing. Developer's performance of this Agreement shall be deemed discharged as to each installment payment owing. upon payment Of ,such installment as provided for herein. 6. Assignment of Contract. Neither this agreement, nor any part hereof, shall be assignable by Developer without the written consent of City. which shall not be unreaso~ly withheld. Any attempted assignment without first obtailling such consent shall be void and of no effect. ? conditions of Binding gn Successors. The terms, covenants, and this agreement shall apply to, and shall bind the 3 " .'. heirs, successors, executors, administrators., assigns, contractors. and subcontractors of the parties. 8. Coot' and Attprneys' lees~ The prevailing party in any act.ion brought to enforce the terms of this agreement or arising out of this agreement may recover fran the other party its reasonable costs and attorneys' fees expended in connection with su.ch an act i OIl. 9. Notices. All notices hereunder shall be given in writing and mailed. postage prepaid, by certified mail, addressed as follows: To City: To Developer: Office of the City Clerk 250 Hamilton ~ve~ue Palo ~to, CA 94301 Hamilton Avenue Properties, Inc. 555 Byron Street Palo Alto, CA 94301 :IN Wl:TNESS WriERBOF, the parties hereto have caused this agreement to be executed in duplicate the day and year first above written. CrrY OP PALO AL'l'O City Manager APl'ItO'IBD AS TO PORI" S!mior Assistant City Attorney APPaovED .as '1'0 C(MIBRll Director of Planning and Ogmp,nity ~Iironment Director of Pinance Director of CoaDunity Services BAIaL'l'OR' AVBIIllB noPEn"rKS. DIC. a california corporation ~:n.=~~~------------­president 4 STATE OF CALIFORNIA COUN'l'¥ OF SANTA Ct.'IRA as. On ; 1993, before me, , a Notary Public, personally appeared JUNE I'LEMING, personally known to me to be the person whC»Je name is subscribed to the within instrument and acknowledged to me that she ~ecuted the SaIPe in,her authoriz.ed capacity as City Manager ot the City of Palo Alto, a municipal corporation, and that by her signature on the inst~ent she acknowledged t.hat said municipal corporation executed the. Bm-.e. IN WITNESS I 8et my hand and affix my official seal. 5 Notary ~~blic in and for said County and State STATE OF CALIFORNIA 8S. COIlNTY OF SANTA CLARA On • 1993. before me.. • a Notary Public, personally appeared , personally knOWD to me to be the person whose name is subscribed to the within instrument and acknowledged to me that be/she executed the same in his/her authorized capacity as President of Hamilton Avenue Properties,. :Inc~, a CAlifornia corporation, and that by hie/her signature on the instrument he/she acknowledged that said corporation executed the emne. IN WITNESS I set my hand and affix ~ official seal. Notary Public in and for said COunty and State ATTACHMENT 10 MEMORANDUM TO: Council Colleagues FROM, Joe Huber, liz Kniss;Joe Simitian & La!ue Wheeler RE: 651 Hamilton· Public Benefit Component DATE: November IB, 1992 We ",·ould like to suggest that the Council consider an alternative to the public benefit component currently proposed in connection ~ith the 651 Hamilton Avenue SerUor ConclomiItium project. The public benefit currently proposed is the acqulsltion of seven market rate units for ronversion to below-mArket-rate (BMR) status (over and above the seven units which are requine<! as a matter of code). We propose a public benefit which would benefit substantially larger numbers of residents, focus the benefit on seniors and senior housing in particular, and create some sort of lasting endov."Inent to benefit seniors in need in perpetuily. Our initial proposal for consideration by the Council, the staff and the applicant would require the applicant to fund a portio!"! of the cost for three imporr..nt senior programs: The Retired SerUor Volunteer Program (RSVP), the Senior Home Repair Program. and the SerUor Housing Counseling Program. :rhe Senior Coordinating Council', current annual deficit for RSVP i. approxiIDately $25,000. Our CDBG support for Home Repair subsidy and Housil\g Counseling currently totals $20,000 annually. Initial support from the applicant covering these three costs ($45,000 annually) would be a good start Additionally, however, the applicant would be required to create, over time, a Senior Services Endowment Fund to fund a broader, and costlier, range of senior services. By coUecting some percentage of the proceeds on an ongoing basis from recurring unit resales .. an ever increasing endowment could be created. . For the record l our interest in improving the pubUc benefit component of the project exists indepencient of the position(s) any of us may eventually wish to take on the application. We are open as to the details and the mechanics of making such a. proposal work. We !ook forward to pursuing this approach to public benefit with you when the project application reaches the CounaL (Note: 1t is the intent of the ;authors Hut Ihis memorandum lJ.!o.a public docu!'nC11! as of the above date.) .. -'. ,: ' lLooLTON A VENUE PROPERTIES. INC. 5SS BYRON STREET· PALO AI.TO, CA 94301 PROPOSED sec ENtlOWIIENT FONO _. OuTLINE "THE HAMILTON" TEL 14 i51 )26-4626 FAX. (~15) 327·8191 EXHIBIT A. To 11/25 Letter 11 We will contribute $500,000 to an endowment fund established by and for the benefit of the sec. This contribution will he made in annual installments of $50,000 on June 1 of each year from 1993 throu9h 2eO', subject only to the conditions set forth in 5) ~nd 6J below. 2) In addition to the $500,QOO initial contribution, ~e will contribute an ~dditional amount equal to 2 , of the net sales price of ea~n residential unit in The Hamilton when it is RE-SOLD by the original or subsequent owners. 3) Opon closinq of the 6ale ¢f our 32nd unit (out of the 36 units proposed), W~ will promptly contribute all &nnual inBtal~nt5 which r~in unpaid at' that timer e.q. if the 32nd unit sale closes in OCtober# 1997, we vill ~ediately pay the remaining five instAllments.totaling $250,000 • • ) The June lr1993 install~er.t fer FY 1993-9~ will be paid promptly upon the City's approval of our rezoning application reqardless of the date of such approval~ 5) On April 1st of any year prior to the start of construction we may terminate OUr obliqation to contribute to the endow­ ment fund in the future by givinq written notice to the sec of our irrevocable decieion to abandon the project. All contributions made prior to any such notice will r~ein in the sec endcwmect fund. 6) In the event that we fail to close the sale of at least 32 units in Tbe Hamilton within three years followinq the start of construction, we may terminate by written notice to the sec our obligation to contribute the 2 \ -re-&31e fees­ de5C%ibed in 21 above. All of the obligations and conditions outlined above ~re intended to apply to any successor to our position as applicaht and/or oeveloper~ .. ATTACHKrNT 11 'rhe Bami 1 t on Development Schellule (All dates are approxi ... te \,'" 13 1~93 May 3. 1993 preparation of Working Drawings; City of Palo Alto plan Check Re,,·iew: Site Clearing and Demolition: Basement Excavetion: Ba&~ent Construction: Concrete Structure: Roof Structure and Roofing! EXterior Skin: Interior Improvements: Sitework ~rovements and L!t.ndsC4pinCj: Initial Occupancy; ': i August 1993 -January 1994 Febru.8 ry -May 1 199-4 June -July, 1994 July 1994 ~U9ust -Septerober l 1994 October -December, 1994 January -February, 1995 December l'S3 -Pebruary 1995 February -July, 1995 April -3uly. 1995 Auqust -September, 1995 :-'lJ#/r". EXHIBIT Ii -'fa ~rogram Development Statem,..··t - B:\CKEN ,\IU{]( ;0:-:1 K· ROSS. I Nt:. ~ •• t .. , •• , ",. 1"1.''''''''1: .. I" •• ,,,,, n.,." .. I,il ... I;:"'~t<~" ",'I HAMILTON AVENUE PROPERTIES 41&'93 !>. ... ! , .. , .. '" , •• (,J\ ~b "~1·1;;1 Palo, Ailo, California BAR #90062-3 ~,'. l~; 1~~ IJ', ~ iHI,,,... ... I'LANNElJ CO~tJI1UN11Y ZONE CIIAN{;E -I'ROJECT ST 1\ nSTICS ·IJI ztluinies dr' pu/imiMFY Unit UciIMa IlaIc..Aru· 10 FIr_ A 1,54! sf 70 sf B 1,358 sf 78 sf D 1,424 sf 61 sf C 1,825 sf 58 sf C-I 1,839 sf 84 sf E 1.61l sf 14Ii sf F 1,974 sf 90 sf G 2,069 tf 154 sf H 2,538 sf 84 sf I 1,757 sf sf K 2,356 sf 5f TOTAL .JU:onyIJTN6 ..... r)./N,. ~ in.kllD1l'Jg GROSS BUIlDING AREA LEVEL 1 OROSS BUIlDING AREA LEVEL 2 GROSS BUILDING AREA LEVEL 3 GROSS BUIlDING ARE" LEVEL 4 BUILDING ARE" GARAGE TOTAL GROSS .uu:A Total D.U. Avo-Unit Size Site A ..... F.AA COVERAGE CALCULATION RESlDENI1AL AREA COMMONS POOL BALCONlES COVERED EXTERIOR SPACE TOTAL COVERAGE I 1 2 ... imit>H. !w ..... ,~ Vi ... 1"r .... ic1 .. 'u, 150....~.dj ..... ~ ... , 'AI.~ "' ...... , \·A .. «, .. ,-AI~ 1~_"'''''·hrII .• li'I.' liC .. h .... <l1J ", ... 01. 1\ til I_~. (J ... "' ... .,~ 1 ... ,~(J, .... .l r_lJ-nl .. -. J Ie .. tu.d t~, .. I"", .. 2nd fir. 3rt! FIr. 2 2 I I 1 1 I 2 2 2 2 II II 36 units 1759 sf 51,500 sf 4th FI;'.--.TOTAL 1 6 3 3 3 3 5 1 7 I 3 6 1 1 36 9,246 sf 4,074 sf 4,272 sf S,475 sf S,5n sr 8,055 sf 13,818 sf 6,207 sf 2,538 sf 1,757 sf 2,356 sf 63,315 sf TOTAL 25,636 sf 22,706 sf 22,217 sf _____ --;17,094 s!. 87.653 sf 33,381 sf 121,034 sf 1.70 "'11tC~s ilbow: g1'3lh ~f<KlfiJl~ 0IIIy IS,367 sf 8,313 sf 1,956 sf 677 sf 1,060 sf 27,373 sf 53.2% J .. l." \' r I ..... ]· .... I'~ 1C .... ' .. IlooI, Vicr t't ......... m' ~1"ri. '" It, ... " v .... n ...... , I' H"ll.orHI U ... -..1I";oc'1 " .. , ....... 1, r. JU"I: ~'''Q\I;L.<''o DEVELOP~ENT PROGRAM STATEMENT Re: 'I'hld' Hil:Dlilton Senior Living Community 536-576 Middlefield, 535-575 Byron and 651 Hamilton (92-zC-3, 92-EIA-" Applic~tion for Re-Zoning from RM-15 to PC ATTACHMENT 13 .. ~ . ~ ' .... . . .", " --._' ., -----.::--f (aJ Statement 'of Necessity of Application for PC Oistrict: The special characteristics of a senior living co~~unity are such that an econOJnically viable project of this type cannot b~ built within Palo Al~o's highest reside~tial Floor Area ~atio (FAR) of 1.0. Discussions with City staff led the applicant to the conclusion that the application of gen~ral districts or'combining districts w~uld not provide sufficient flexibility to allow the proposed development. rt quickly became apparent that only a PC district. could accomodate the relatively 11i9h FAR required by a fe~6ible community development fer seniors. Development of the site under the provisions of the PC planned .community djstrict will result in public benefits not otherwise attainable by application of the regulations of general districts or combining districts4 These public benefit& are as follows: 1) An inherent public benefit of t~e proposed development i5 that it will provide additional housing for the elderly, inclodin9 provisions for life-long medical care4 2) The applicant will make arrangements to provide long-term funding of programs sponsored and maintained by the Senior Coordinating Council of The Palo ~lto ~rea. (The detail~ of t~ese arranqements will be spelled oot in a document being prepared by City staff for signature by the applicant4) The proposed use of the site and the site development regulations applicable within the proposed PC district appear to be qenerally consistent with the Palo Alto comprehensive plan~ A detailed anaJ.ysis of t.lle project as it relates to various Policies of the Housing Element of the comprehensive plan is included on pages 13 and 14 of the 9/:25/92 stat! report to the City Council .. Great care has been tak,en by the applicant and by City staff to create a site plan and building plans which Bre compatible with existing and potential uses on adjoining sites and within the general vicinity. No variances are required wjth reqard to set­ back5, daylight planes or any facets of the design that could adversely affect neiqhboring parcels4 The ·Spanish Colonial~ architectural style is particularly appropriate within the downtown area and has been well received by our neighbors and other nearby residents and property ownerS4 .. - The site of the proposed development presents uniquely favorable conditions for accomodating the proposed FAR of 1.7: 1) Only one edgp of the property is adjacent to nei9~borin9 propertie~. The other three sides are adjacent to City 6treets~ This results in far less impact on nei9hbors than 'Would be ex;>erienced if there .... ere adjoir.ing parcels on three sides~ ~lthou9h the proposed design meets all required daylight plane and setback requirements at all four of its boundaries, ~ny substantIve impact on neighboring properties is diminished du~ to the streets which separate neiqhbors from the site on three out of four sioes. 2) The site is bounded by major traffic corridors, Middlefield Ito-ad and Ba~ilton Avenue, which helps to mitigate any possible negative impact on neighboring properties due to altered tr~ftic patter~s. 3) Th~ proposed developroent is less th~~ one block from ~he Lytton Cardens complexes and Webster House, all of which are very dense ~ousin9 for seniors. Such proximity to these relatively bul~y structures and to the Fi~st ~ethodi6t Church facilities oirectly across Byron Street would seem to make the site particularly appropriate in an urban desiqn ser.se~ ~n addition, this proximity will allow for shared access to such facilities as the Lytton III s~illed nursinq center by ~bulatory residents. (b) Liot1nq of All Use. Propooed, 1) ~esidential. A tote I of 36 independent living units plus common dining facilities and o~her amenities typical of a well proqrammed and desiqned senior livinq community~ A complete description of these facilities and their nature is included in section (c), followinq~ Addi.tional detail and statistic6 are s~t forth in section Cd), fol1¢wi~9. (el Description of the Nature of Propo£ed Uses: Th~ Hamilton will provide comfortable and s~cure retirement housinq with attendant provisions for life-long ~.dical care. It will create an alternative to the relatively small residential units at existing Palo Alto retirement communities, all of which have Ions waiting lists at present. All units will be completely self-contained and each includes an entryway, kitchen, dininq aree, extensive closet space ano at least two full hathrooms. It is &nticipated that twelve units will h~ve three bedrooms and twenty-four units will h~ve two bedroorn~. In addition, there will likely be twenty units with dens and some units will have a half ~~throom for quest~. All units are arranged to accomodate the assisted care of one spouse witholJt. qreatly imposinq on the other. If the need arises, a person qualified to provide 2 , i • ~ , -" . in-home personal care could be evai]~ble around the clock~ All unjts will be designed tc be handicapped accessible and will be equipped with medical alert and security systems. All units hav~ at least one accessible balcony or, in the case of 9rou~d floor units, a private patio. The average unit Bize is 1,759 squa~e feet and the range i~ from 1,358 square feet to 2,069 square feet plus t~o larger units on the fourth floor~ The attached Exhibit B4 presents details as to 5i~e and other relevant information. Common amenities i~clude a commercial kitchen and dining areas {main dining room, ·solarium-and private dinili9 room) which will seat up to a total of 72 persons~ ~ library a~d livin9 ro~ are located on the ground floor ~nd a bar/lounge ~ith large balcony is Situated on the top floor. A three-lane pool, exercise room~ j~cuzzi pool, S8un~ and bathroom with shower are on the ground floor. Mail will he delivered to a conveniently located alcove near the lobby. Men's and women's re5trooms with generous faciliti~s are located quite near the dining rooms and living room. ether common amenities include two private quest rooms on the fourth floor, a large sun-lit courtyard, two smaller landscaped courtyards and e generous vegetable/flower garden with raised planter bedsa AdminiEtrative facilities include a clerical/reception area, work area, two private offices and direct access to a roeetinq room which do~bles as a private dining ~oom. An employee lounge and bathroom are provided for Xitchen and housekeeping employees. Detailed staffing plans have not yet been finalized but it i& antiCipated that a total of 10 persons will be employed full time~ The staff will be quite similar to that of Webster House, a nearby 37-unit senior living community~ A manager and an assistant lrlanaqer ",-ill be on site during regular daytill"le hours~ A combination ~aintenanee man/driver/part-time security person will be available around the clock~ including the 'Weekends. (It is clear that this job will be shared by at least two persons.) There will be 3 housekeepers and 4 kitchen/serving personnel. In addition there are apt to be 8 number of part-time ~or~ers. It is expected that no more than B employees would be on the premises at any qiven time. In previous submittals the applicant has mentioned the need for a "~edical director-and an -activities director-. The medical director will be a physician with offices located els~where who n',ey make occasional visits to the site. There will not be an activities director per se, but it is expected that the assi$tant manager and manaqer will be involved in arranqing the limited social programs expected by owners of the 36 residences. The provision of health care and the availability of appropriate wellnese. progra"ms for the residents are as important to the 3 • .. applicant a8 is the design of the physical improvereents. The development will be licensed by the State of Californja as a Senior Continuing Care Community in order that it may offer the kinds of health related s~rvices and facilities that the owners of its residences are entitled to. This a~pect of the project is 80 important and so often misunderstood that a separate document entitled -THE HAMILTON: Concept for Health Care/Senior Welln~ss Pro9ram-has been prepared by the applicant. This outline of the programs planned and a brief definition of relevant terms is attached hereto as Exhibit A. ~Q) Project Statistic. {floor areas, etc.): The attached Exhibit B., ·Project Statistics·, indicat~s the number of livinq units proposed and their floor areas as well as ether relevant data. A precise count of bedrooms is not possible since three of the fourth floor units have not been planned in det~il and a number of other units may well be modified to suit thE specific requirements of their o~~ers. A realisitic estimate at this staqe. however, would be a total of 8~ bedrooms. Projected sales prices for the eleven different unit plans have not been finalized. Prices will vary according to each unit's location within the building, but it is anticipate~ that prices will range from about $675,000 to as hi9h as $1.200,000. The average unit price 1s expected to be just under $900,000. leI Additional Xnformation. The attached Exhibit C., ·Prelimin~ry Zoning Analysis and Comparison-, compares the present desiqn (6/10/93) with the design presented to the City Council (11/10/92). Note that the FAR wes reduced from 1.74 to 1.70, Useable Open Space was increased b1 about 20 " two surface parking spaces ~ere added (sub-surface spaces rerr,ain at 6~) and the Site Coverage was sli9htly reduced. Ccmp~riBonE of key planning criteria for RM-IS and RM-40 zones with our design B:re also included in this table. Below Market Rate (BMR) units must be provided by the applicant in accord: with City ordinances. Since rental units are pre&ently located on the project site, the number of B~ units required is equal to 20 , of the 36 units proposed within the project. Thus a total of 7 BMR units must be provided. The aetails involved in the provision of these units by converting existin9 market rate off-site rental· units to BMR units Cor constructing new units} are contained in a letter dated E/22/93 from the applicant to Kenneth Shreiber. Please be advised that the 6/22/93 letter supercedes an earlier letter dated 9/23/92 which dealt witt. the subject of 8HR units~ • ! ! I HAMILTON A VENUE PROPERTIES Palo Alto, Cali romi> 6121193 BAR #90062 I'Rt:J.IMINARY 7'()NING ANALYSIS ANI) COMPARISON RM·I~ 11!lU/Y~ Design IUOfISIty a· " UUlAL jJ • 4V UU/AL jIJ.) UU/AL l')lte Area !~Sfmjn. B~s!m\n. 51~sf. I,ide + Rear yard !~ smgle sJorr; !~ up to 2~' hL Yaries, 16'· j.l' Selbacks 25' up 10 30' hI 25' up to 40' ht MHk!leneJQ Road D' D' L)' Selba<:k Maximum Heighl " "ones, .V ..... 44' 10 """. or mansard roof Maximum e 3)".18.= sf. 4~ '10 •• 3.175 sf. 1:>4'10; 27,802 sf. I (jroond FIr, Usable j,,,,. I •• u", st. "I .... JU,.!UIJ". 1-'4':'''; IJ;/OlS 51. Open Space 110JaJ Unlls Allowed 17 DU 47DU j3<iDU I Parking !!DU (Somor lIDO. (5en;0< 174 opaces, Hoosing) Housir.g) 1.44IDU(reserved) TOIa! Building Mea N.A. IN.A. I~:~~: :';: = 122.657 sf. lOIal F.A.R. O.5G l.w 1./4 t',,, .. ,; .• I. ... "" .. \'" ........ 10·.,'. , ... ~" ... 110 ... , \I~,' ,I.. ~ .. ' \,. I" ,1'1 "'''''', /<0. I ,,,. " .• , ~ I, 'I':" 1,_.,,· 1.".1, ,,,,, , .. ",', ..... , .... , \ "Ii"" :1, III 1;71 I I ~ Ii, ~ tI ,.. I< ,., 611 UI'J.l o.o.ign i-'U'~ UvlAc 51~.f. Vanes, 10' • 43..5' I"" 44'10 ~ko! mansard roof IB.2.".; 27;373 sf. 412,.; 21,IY"f. 13<i DU 75 spaces, 1.47IDU(reserved) • :.~j~. anv. grade 33;381 sf. bill!. grade 12;,034 sf. lOla! L70 . .. I lJ. .... "~lr.,,,',,,l\l\ I(.~ .. t' \ \" 'I:' .,., .. \1 \ I-~. \1 ... ', I' 10111.\ 1 ... 10,( "''''' r .... 1 t "l~·, ...... " , I·· t~ .. , l ". " •.. ~,. ~ .. ,. ",., I~'" ,,~I I'~ ~II ...... ' ...",,,11, .. to"', , •. "'.,,~ I.· .. 1:. .. 1 ..... • I. t ... ",1 ,,\ I 1t .. 1,~ .. 1 1., .. 1"", EXHIBIT A -To Developmont Program Statement -May 10, 1993 ATTACHMENT 14 C~eembcr 23, 1992 •• ' 1" 1'10"'"1 THE. tt"kJLTON: Concept for Health Care/Senior Wellnes's '"p';.o9i~m Our goal is to lI\a)i.imi ~e the-indepel"'odence and wel..l...":'".being of ':The. __ , Hemilton'& re&jder.t5~ This means designin9 and man8ging a life­ style pro9ram with a &tronq focus on health and fitness. This program will have a broad ran~e of ·continuing care­ services. Continuinq care refers to an organizeo program of ~onitorin9 and supporting ~ellnes6. The monitoring can be very active or relatively passlve, dependin9 on the health and needs of the individual. The Ha~ilton's over!ll lifestyle p~o9ram, encompassin9 both preventive servieee fp), and c~!'"e-service:::; (e), ..... ill: • • • • • • Create an eamily acees&ible support and social network (p) - Provide daily ~ •• 15 with good nutrition (pl. Provide planned and 6upervised wellness activities (p)~ ~rovide qualifie~ staff to assist with medications, sp~ci~l diets, provide blood pressure checks or other health care conc.rns that require attention (e). Provide assistance in the home for chronic or debilitBting conditions ec). Assure pre-arranged Bccess to personal care, assisted living, or skilled nursing (c}. The Hamilton ~ill ~ licensed by the State as Q Senior Continuing Care Community. ~uch licensed communities must offer long-term contracts that provide a residence (in The Hamilton's ease through condominium ownership) ana a range of services and amenities which focus on maintaining an independent lifestyle. This includes the reqoirement to make available to each resident three meals per day. In ~ddition, there must be pre-arranged provisions for a ·continu~ of health eare-(in-home personal care, essisted living and skilled n~rsin9 •.. see definitions below). We plan to provide assisted living ~ithin the individual residences end. when appropriate, at a qualified nearby facility. Sxilled nursing services will be provided as well at a nearby facility .. The licensing process for 8 Continuing Cere Community through the California Department of Social Service& is arduous and costly. It requires an approved business and manaqement plan bS well as the pre-sale of apprcxi~ately 60 , of the living units prior to the start of constructjon~ There is a very real need for the sort of lon~-term care plan to be offered by The Haroilton. It is estimated that 2 out of every ~ people ~ill require one or ~ore forms of long-term care at &~me time in their live&~ The average length of such cere i~ 3 years and the averaQe cost is about $90,0001 ~ost people assume that P.ledic:are and/or Medi-9ap insurance policies cover long-term assisted ljving and skilled nursing care. The reality is that ~edicar~ pays for less than 2 , of skilled nursing stays. Neither )Iedica::-e nor private Meoi-gap insurance covers ttle cost of assisted living services. We plan to Hamilton. following! create a lonq-term care plan for the residents of The This pl.en will incorporate one or more of the • • • A long-term care group insurance policy designed to cover expenses, such as those mentioned above, which are not covered by Medicare or traditional ~edi-gap policies. A pre-arranqed agxeement with long-te~ cere entities that provide in-home personal care, assisteo living and skilled nursing services. Arrangements that take full ad~antaqe of ~nticipated new national health programs. Given that health care and health insurance programs are in a hi9h 5t.ete ·of flux, it is impractical for us to precisely define the long-term care plan for a community that has yet to be approved for con&tr~ction. As necessary approvals are Obtained and as national health caze policy is redefined, however, we will refine and revise our long-term care pla~ to meet the anticipated needs of the residents of The Hamilton. !-1onthly costs for the longo-term care plan lind proposed wellness ~rograms will be included in the common charges for each unit. The overall cost.s of operating and maintaini'Hl The Ratr.ilton are presently being rOlJ'Jhly estimated on the basis of the operating cost experience of Webster Bouse and other somewhat similar seniors' communities4 However, firm figures will be cetermined durin9 the St.te licensing ~rocess and in the course of obtaining approval from the California Department of ReAl Estate to 6ell corldominium units. Brief aefinition of terms used above: Home Care There are a number of home care services that may be used dependins on the residents' need~ and the appropriateness of r~m8~nlng at home to receive care. These services range from ho~ernaker activjties !cleaning, shopping, laundry, errands) to home delivered meals ouring a recuperati on and olltpatierlt care with wedical supervision. Assiste:J Living This refers to help with the -activities of daily living­ including dressing, bathing, toileting, eating and administering ~edications. Assisted living provides 2~-hour# on-call staff. ~esidents must. he ambulatory, perhaps with the assistance of wheel chairs, wal~ers or canes, and able to move around without harming themselves or ot~ers~ All ~eal6 are supervised and special diets are often required. Intermediate Care and Skilled Nursinq The.re are two levels of skilled care, depeodinq on the amount. and xind of nursinq required~ ~ emphasizes personal care, rehabilitation and wit.h regular but not round-the-clock nursing care. It Is for people who are not .c3pable of livinq on their awn but arc not ill eno~9h to require 24-ho~r attention from a nurse. Skilled nursins is the closest to the lev~l of hospital car~. It includes 24-hour nursinq care with medical supervision. '" -'.':--' ""," HAM1LTON A VENUE PROPERTIES. INC, ~S5 BYRON STREET. PALO ALTO, CA 94301 June 23, 1993 Xen Schreiber Director of Planning and Community Environment CITY OF PALO l\LTO ,"50 Hamilton Avenue Palo Alto, california 94301 Ret The Hamilton Senior Living Community Provisions for Parkin9 Dear Ken: AnAC~M£Ni 15 "THE HAMil TON' TEL IllS) 326·~l6 FAX. 1415) 327·8197 ~ .. "' <'"I • H93 , .. ":", As you know, we have revised our plans once a9~in and, in the process, have increased the number of par~in9 spaces from a total of" 73 as of September, 1992 to a present total of 75~ This amounts to an overall parkinq ratio of 2~08 spaces per unit. Of the eleven senior residential projects in the Bay ~rea which we have studied, far and away the highest parking ratios were found at three owner-occupied developments such as ~e are proposing. These are The Stratford in San y~teo C1~69), The Forum in CUpertino tl.~8) and th~ proposed Park View Villages in Los Altos (1.71). With nearly 2S , more total parking spaces than are provided by the most heavily parked sites devoted to seniors' housing in the Bay Area, The Hamilton can be expected to take care of all of its parking needs ON SITE. (Please refer to Exhibit A. submitted with our letter of 10/27/92 to the Planning Commission for a det6iled comparison of parking provisions at a number of B~y Area senior residential project •. ) The revised plans provide for parking spaces as follows: A. Surface: 5 visitor spaces and 1 handicap space for a total of~aces (pl~a loading space). B. Lower Level: 7 visitor spaces, 3 handicap spaces, 6 employee-spaces, an1 53 unistall spaces to be assigned to residents~ The qarage lev~l total is ~9 spaces~ Since we have reduced the number of residential units from 38 to 35,,' the totel of 12 visitor spaces appears to comply -with the applicable ordinance. It is important to note that ~ost visitors to The Hamilton will come during the evening and on weekends when there ere neaEly always numerous parking spaces on nearby streets. In addition, there is a large City parking structure within a block and a halt of The Hamilton's site. We feel that the 6 employee spaces are adequate since a number of the 8-1Q employees who ~ay be on the premises at any given time will use public transportation, ride-share or be dropped off and picked up by "friends or relatives4 ~his is the case at Webster House. every si=ilar operation to that which we propose. CITY OF PALO ALTO May 7. 1993 Page 'TWo Re; The Hamilton Senior Living Community Provisions for Parking We continue to feel that the most significant issYe to be addressea is that of reserved residents' spaces. We propose 53 spaces for 36 residence units or a ratio of 1.47 spaces per unit. These spaces will be sofficient for 18 units whose owners have two cars, 17 units with a single C&r$ and one unit without a car. This should be adequate since the -typical-seniors project is occupied by at least two-thirds sinqle persons. The most comparable local project to The Hamilton in terms of quality and price, The Stratford p has sold more than two-thirds of its units to single persons. Even though couples who choose to liv~ at The Hamilton will ordinarily have two cars at the outset, they are apt to dispose of one car for many reasons. These include: . 1. Proximity to downtown" convenient public tre.!lsport.ation and numerous services within easy walkins distance. 2. The availability of a van or other suitable vehicle for trips to doctors, Stanford Shopping Center" theatres, the train 6tatio~. etc. 3. Illness or the reluctance to drive on the part of one or both members of the family. (The Hamilton's health advisors will enco~rage poor drivers to use ~lternative transport.) 4. The relatively high cost of a second parkinq space. (We anticipate including only one space in the basic price of a resiClence.) Onc~ again we wish to state our view that enouqh parking spaces must be provided to meet t~e requirements of the relatively affluent persons who will be attracted to The Hamilton. At the same time, we ~ust 8vQid any siqnificant negative impact on the availability of nearby on-street parking~ With these goals in mind we have r~viewed our parkinq program with our architects" other know,ledgable consultants and developers of like projects. OUr conclusion is that the proposed parking facilities are more than adequate to meet the stated goals. Sincerely" ATTAC~MENT 16 IMILTON AVENUE PRoPERTIES,INC. 555 BYRON STREET. PAW ALTO. CA 94301 June 22, 1993 Ken Schreiber Director of Planning and Community Environm~nt CI'l'Y OP P.>.LO ALTO "TKE HAM lL TON" TIL. 1415) 326-1626 FAX. (~15) 327.8L97 .JUi~ 22 1J£3 C?';:-;-:-.~::-7":: "::"~::::"!!JG 250 Hamilton Avenue Palo Alto, CA 94301 ;:':..J:':'':'':,: . -" _~ ._.~._. Re1 The Hamilton Senior Living Community BaKUlton Avenue Between Middlefield and Byron Application for Rezoning f~om AM-15 to Planned C01IlIIIuni ty (PC I Assessor's Parcel Nos: 120-03-047, 048, 049, 052, 053 and 073 Dear J::en: This letter sets forth the specific proposal of Hamilton Avenue Properties I Inc. (~Applicant·) to provide the City of Palo Alto (·City·) e ~inim~ of seven (1) BMR units in conjunction with the above-referenced project. The BMP. units will be identified and funded in accordance with the following conditions; 1. A minimum of seven (7) BMR units will be acquired or oonstructed by Applicant and given to the Palo Alto Housing Corporation. free and clear of all liens. prior to the issuance of a. building permit for the referenced project ("The Hamilton-). These units constitute compliance with programs 9, 11 and 13 of the Bousing Element of the Palo A!to Comprehensive Plan and their location(s) shall be subject to approval by the City Council. 2. Applicant will make good faith efforts to secure seven (7) or more BMR units with no stUdio units and at least three (3) two-bedroom units. A mix of studio? one-bedroom and two-bedroom units will be permitted, however, with at least three 2-BR units and one additional 2-BR unit for each studio incl~ded. For example, a mix of two studio units and five 2-BR units would be aeceptable. 3. All BHR units to be provided by Applicant shall he in reasonably good condition. They shall be structurally sound with all plumbing. heatins and appliances in qood werking order. It is understood that such units will not be required to meet current Builaing Codes, but they shall be free of termite and other pest infestation and seismically sound. 4. In cooperation with the Palo Alto Housing Corporation and the City. Applicant will explore other possibilities for financing additional BKR units, using SecLion 8 money, CDBG funding. conventional financing or other sources of fundin9~ Such an approach could well lead to the provision of more than the seven (71 units offered herein at the ~ame cost basis to the CITY OP PALO AL'I'O June 22. 1993 Pa9'e 'l"wo R.~ The Bamilt~n Senior Living COmMunity Applicant. Applicant fully recognizes the need for aHR housinq in Palo Al~o and ~ill ~ake every effort to explore all reasonable alternatives with the Sou&inq Corporation and the City. We feel that the foregoin9 represents an effective approach toward add~essinq the need for low to moderate income housinq in the comsunity. As ~et forth above s we wi!h to retair._ the flexibility tQ look at &ltern.tives that will increase the number of SMR units that can be made a~ailable to the City and we will we.lcome C'Q1'I'mtent& from s.taff tow",rd this end. Sincerely, a~ILTON AVENUE PROPERTIES, .INC. " :--.> ~ W2f ~ B. Bill. President co: Steve Player ARCHl TEC'roRAL REV lEW BOARD HEARING June 3. 1993 65J Hamiltgn Ayenue 53§w576 Middlefield Road 523-$75 Byron Street Hamilton Avenue Properties: Inc. 93-ARB-12 92-ZC-3 92-EIA-7 Final review of design for senior condominium project not to exceed 94,000 square feet and 38 units. Ma. Kaser: This is the final ARB review of the proposed project and the environmental assessment and recommendation to the Planning Commission and City Council. If there are members of the public preee.."'1t who intend to speak to this item, please fill out a card. Thomas aiae needs to Btep down, due to a conflict of interest. Are there any additional comments by staff on this project7 MS· Weiss: Virginia warheit is prese~t to answer questions that the board might have. Ms· Wilson: I have a question. I look at the drawings and I read the text. and I get confused about this parking strip issue, the 245 feet~ etc. When I look at this drawing. it looks like the parking strip planting area is the same all the way around the site. Yet when I read it~ it makes it souna like it is substandard. Where do you think they can get the space from to make it wider? And wby would it be wider if it is different? That is confusing me. Ms. Warheit: First the present situation with planting strips is varied on all three sides. It is not as ever:. as it is shown on the plans. Sometimes it is two-and-a-half feet ,: sometimes it is all concrete. It i& real spotty. Hamilton is the most conGistent~ and even here# it varies f~ three-and-a-half to five feet. So on all three sides# it is just' 'ery irregular. Ms. Wilson: What is going on at the Byron Street side? The property line is ten feet from the curb,. Ms. warhelt: Right:~ The planting strip is generally two·-and-a­ half feet wide with a six-inch curb and a five-foot sidewalk l for a total of eight feet. There is an additional two feet to the property line. That is not the current standard. The current standard is a five-foot planting strip and a five-foot sidewalk. SO if you install the current standard, the sidewalk would be at 6/03/93 -1- I the edge of the propert.y line. But that is not the current situation. The current situation is that there are two feet between the sidewalk and the property line. The building is proposed 23 feet behind the property line. They are showing a five-foot. sidewalk directly next to the face of the building, an eight~foot parking space and a ten-foot driveway. That is the 23 feet. That brings you to the property line, with no room for planting between there and the sidewalk. But what the applicant is proposing i~ that we ~aintain the two-and-a-half foot planting strip and the five foo~ sidewalk. and that they use those two feet of public right cf way to provide a hedge planting between the sid~walk and the driveway. Ms. Wilson: Staff thinks there should be no planting between the driveway and the sidewalk? MR. Warheit.: On the contrary, staff thinks there definitely must be planting between the sidewalk and the parking. We think that this proposal of using the two feet of public right-of-way ia minimally acceptable; since it would provide a hedger and probably one that is two or three feet high. That kind of thing can work. It is just not ideal. It would be preferable to have a five-foot planting strip, a five~foot sidewalk r and five feet of perimeter planting of 3-5 provided inside the property line, as required in the parking ordinance. But the distance betwc~n the proposed front of the building and the property line does not allow for that. HI Kaser: The dimensions of the drop-off parking area there are pretty minimal. as set forth in this plan --eight feet for the car and ten feet for the aisle. Are those acceptable with the Traffic Department? Ms Wa~heit: They are acceptable with the Traffic Department. We also ran it by the Fire Department. a!ld they said it is okay; because right bere wbere you have this space in front of the door; it is fairly wide, about eight or ten feet; and of course; there is no parking there, so loading and unloading, if done right in front of the door, has more space. Both Transportation and the Fire Departments found it acceptable, even though it is technically shy of the current standards, which is 12 feet in width. I would point out that Byron Street is 30 feet i curb to curb, so half of Byron Street. provides 15 feet for one-way traffic and parked cars. This is 18 feet, so compared to half of Byron Street, this is wider. Ms HaBer: Getting back to these trees~ if they are planted in a narrow planting scrip like that, will the city have requirements for watering mechanics for trees like that? ".,;" 6/03/93 -2- Ms. Warbeit: Let me just say that the Public Works Department s done a lot of patching of that sidewalk within the last yea ~ two. So they can live with it the ~ay it is~ but it is my feel ~ I have talked to them to get their response to this, witt amount of changing of curbs that would cause, closing some, ope. ~ others I new driveways, that is going to go on at, the Byron Street 6ide~ the applicant will probably prefer to take out that sidewalk ~~d replace it. As I expect what is going to happen is that this whole frontage will be redone, including the planting strip and the Bidewalk~ In that case, the tree well could be madE larger. There are ways to plant shrubs and tZ'ees so that they will have adequate root space. We have places in town where the trees are planted in sidewalks and the side~alks go all the ~ay to the curb~ and the tree is in a large ~ell covered by a grate. Me Maser: width. In this case, that would encroach on the sidewalk Ms. Warheit: That is correct. the grate. When we get down to need to be specified~ Part of the sidewalk would be over the final landscape plan, that will Me ~ Maser: We will want the landscape archi teet' e comments on this particular issue in the ~regentation. If there are no other questions, we will have the presentation from the applicant. I met with the applicant last nlght. Mr-Hill: I am Jim Hill of Hamilton Avenue Properties, and we our architect, Richa,rd Beard of Backon, Arrigoni and Ross, Eldon Beck.. our landscape architect. They will handle presentation . have and tr..e .Mr k ard : Since our last mee t ing when we had t he pre 1 i Tf'.inary review, we were given a charge for some details and things YO'.J wanted to see us work on. These plans before you are our best efforts in that regard. 0 am going to try and touch on the major ones. Then I am sure that if you have any questions, from my experience last time, you will not hesitate to ask! Ms Maser. We are not shy. Mr. Beard: This time, we responded by incorporating structural engineering data to make sure that the building was as realistic as possible. We had several parking options; we reviewed mechanical and electrical input to make sure that what we wer~ showing you from an architectural design point of view was workable and would not bring you any surprises when we came back for final review~ Also l there were all the architectural details of height and bulk concerns. Then finally, what Eldon will discuss, landscape design, which is critical to any project in Palo Alto, but especially in this location. Compatibility of style here is vital. Eldon has prepared an excellent design to show you today. £/03/93 -3- To deal with some of the more technical things to get them out of the way first. for parking, we have submitted several alternative parking schemes for you to review that addxess the issue of dead­ ~d parking aisl~s. The one that we are continuing to propose is slightly modified from our previous s~,ittal: but it still maintains the dead-end aisles. We found that we could not incorporate the complete circulation system without a substantial loss of st~rage or particularly~ a planting area for the courtyard, which other members deemed as a very important part of the project. We do feel that the staff recomrnend3tion that we place the staff parking at the ends is an excellent one. We will take care of that problem since it is a resident parking situation, not an itinerant one, like an office building. The parking count, in total, is 77 spaces now, which incorporates 12 guests. The resident spaces are now at 1.S3 spaces per resident. Jim checked just last week with the Stratford, which is the most recent and~ he t-hir..ks, the lowest age of any senior project in the area that is comparable. They curr.ently have ~.26 cars per resident. That is as of last ~eek. We have made our best efforts at getting mecha.'"1i.cal equipment located on the roof as accura.tely as possible. Electrical rooms in the basement reflect the electrical engineer's input on what they need for switch gear. Transformer locations are shown on the landscape plan~ and we will cover that4 In terms of a~chitectural issues, I think our greatest concern and where. we focused fl'K)st of our effort was in development of details at this stage and continuing the mitigationa of the sketches that we showed you the last time, relative to height and bulk issues. particularly on Middlefield~ but also on Byron. On the Middlefi.eld side. we had shown a very rough sketch before that modified the unit plans on the building perimeter in this area. It showed a larger recess at the center of that elevation. and stepped back toward "the edge, which we wanted to use to break the extent of the unbroken horizontal plane along that side. This elevation alters the unit plans and the building perimeter at the center to provide this extra deep recess in the center of the building so that the unbroken parts of the horizontal plane are not this piece. this piece, and this piece, and the step back at the corners. We had previously reduced the four stories to three at the corners. We ma;..ntained the pieces stepping back at these cornere and broke the eaves. In general we lowered eaves at the edges in various different places around the building to bring th~ eave line down at the C01~er8. Along the Byron Street side, there had been a piece of the building at this part 'Which catne out to 16 feet from the property line. That is now back to 23 feet from. the center pieces, with these slightly recessed pieces on the side. That will decrease the amount of building that was projecting against the adjacent property line. It also helps to focus the facade of this building on the centerpiece, where the entry facade is located. 6/03/93 -4- "/<c' J " .•.. " ~.':.:'<--. ~ ;: I also brought a material sample board to give you an idea of the materials we are developing to use. We took the sections of the details that are included in the drawings you have and have keyed them. I think the important pieces are all here. The importan~e of getting the roof tiles with the right kind of blend so that it does not have a monochromatic appearancs where you get the kind of richness in the tile glazing. The body field color of the building ~e these. The wi.ndow details, you may remember from the preliminary presentation. in this kind of style as you are familiar with in Palo Alto, this atyle depends on the really elegant execution of just a. few details, rather than an exuberance of detail in a Baroque kind of style. We want to get the kind of window that has the narrow Btyle while still maintaining the energy efficie~cy you W~lt to get for th~ building, in general. So we have cbosen the clad wood window, double glazed, and it has a very nice profile4 It is not too overscaled to get the little bit of detail that will provide. Using a very thick exterior wall, we do get some shadow detail around the opening of the ~indow itself. At the entry, we do have a terra cotta base, with pre-cased concrete columns. We are showing two colors in the terra cotta base, because I think we w.i.ll use a two-color process. We have some modelling on the base of the building, so we have to get a final piece made of what we are going to actually come up with to bring back here. There are some ornamental iron grills in several different places in the building. using a ve~y dark green, almost black paint on them. There are several places in the building, here on the balcony and on the balcony at that recess on Middlefield where we are doing some decorative tile work. This is a glazed tile sample which is made in San Jose. We will use that as accents. The copper detail on the eave is important. because it weathers nicely over time. It will provide a color that will start to pick up on some of the other green accents that are involved. The lighting was mentioned. The standards that are proposed in the frent of the building, seven of them, are atypical of a residential project in Palo Alto. We will come back and pick out some alternative to that. I shall now turn this over to Eldon to talk about the landscaping. eldon Beck I Landscape Cgnsultant: The concept is pret ty lIIell described on the plan. Our approach has been that the landscaping. instead of being an institutional type and the same on all sides, Bhould be more like private gardens and grow out of a sense of older gardens outside. So the choice has been on the darker side, the north edge, there will be darker foliage planting. clustera of redwoods. and the bigger scale trees related to the bigger scale street. and supported with darker plants below that. so that when you go by, it is a type of landscaping that has evolved from its environmental condition. At the corner, where there i8 better sunlight. I thought it would be interesting to turn the corner with more flowering plants. some hedges close to walls. so that the character of the corner is different, being lighter and brighter. T 6/03/93 -5- , --. wi~h more color. Coming on down this way~ this ends up having a hotter exposure with some west sun. This would move into a range of gray foliage plants with blue and purple flowers, so that each of thes~ zon~s would have a quality that really relates to the way the sun shines. Thie also breaks down in scale where the building is lowest, so that it feels mOl.-e like a garden related to a Mediterran~an corner. There are some palm trees on this site, so we are proposing that three of those that are a pretty good size be moved to this spot. 90 that they are a bit like a skyline tree against the lower sized building, so that they are organized in that way. Along the front at t:.he area where we are concerned about screening and the visibility of cars, there are t:.wo kinds of myrtle plants used. This is quite a good hedging material. It t~s red in the sterne and is a more liv~ly plant that the boxwood and things like this. It' B a more interesting plant. This would be the larger growing type on either side to screen the service area, and then we would use the dwarfed version of that which ~ are able to keep better in the scale of the 2-3 foot hedge on the narrower site there. So the foliage would have similarity, but its growth habit will lend to the growing condition. The condition you are talking about is -how do street trees grow in strips-? There are two techniques that make those work in narrow places. One is that when the plant is planted, under the "I-oat ball we use a crossing pattern of perforated drain pipe, and drip irrigation on the top of those to get water down fairly deep and encourage the root growth_ The other is under the sidewalk, we lay a layer of porous gravel. Within that we also put. perforated pipe, so you are able to broaden the surface--getting air and wate= under the pavement. Actually air is the most important part; to have air available to the roots below. So I have no problem with that planting space_ Technically it can work. On this plan there are, I think, three major things to look at. These are private patios that are behind the walls at the base of the building. We are showing what would be intended as specific trees to be planted. The rest of the landscape development would be by the individuals. We thought it was important that these have a relationship to what was on the other side. This would be a garden growing area for the reSidents: vegetable garden; flower garden. So it's their own private place to do that. The sunlight is really quite good in that spot, so this is a use area for them. It shows a small potting shed area that would go with that. On this side, and then along that side, there is a ten foot wide planting buffer strip that is a requirement by the City. So these would be planted with both shrubs and small trees, so that there would be a very sou...,.d and solid edge of planting, and on those edges the inner terrace patio is a real important feature of this. 6/03/93 -6- When I knew at the beginning that this was all unexcavated through here (the central courtyard), I was deligh~ed, because there is no way I know of comfortably to make a garden feel like a garden on a roof deck. The whole feeling is dramatically different, so if parking underneath drove this to be something other than that. I think you would lose something very strong to the project. The attitude toward this is that it is a very formal pattern because the building has your public spaces: living room; exercise room; dining room on either side, 50 the design of the plaza is that there is the ability to circulate through these spaces. So, in effect, those public spaces are extended through the middle through a long garden, ao as you move from place to place you are able to wander through and you come to a resting spot or a stepping spot, 80 it is a bit out of the traffic way. As people sit here they are able to look through the long garden, through the dining room. and tr~gh the terrace on the other end. So that tries to give the maximum amount of dimension out of the terrace space. The trees here are very importa.-,t. They put a canopy on the garden, which helps keep the scale and brings the size down. There would be a trellis at this back end with tables and chairs under it. Older people. in particular, are comfortable on tables and chairs rather than on other types of things. Instead of sitting on seating wallsr it is better to have furniture. So this would be almost 411 outdoor furnished room like that. Water against the wall here. There is a wall here that separates this from the private terrace--a small water feature here that is visible from the dining area. These are all deciduous trees~ The sunlight in the Winter is low over the one story roof, yet can still come in so it has really good sun year-round. The danger often~ of course, is heat so .l think the overhead canopy would give some degree of shade and really hE",lp the scale. Thank you 1 and I'm sure we'll r~ve some questions for are some cards that have been filled out here, public YOU'll have five minutes to make cotranents. MB Maser: you. There corrments. Arthur Bodin. or. Bodin: I'm the President of the Eoard ot Directore of the Mental Research InBtitute~ and we continue to have a concern about not only the noise during construction period which alarms us because we ha.ve two training suites on the very side of the building which faces it, and which can't be moved because they are wired electroni~ally with all kinds of video and one-way mirrors and so forth. r don~t know what could be done about that, except if we were. given the money to have double glazing there because training has to go on, people have to be able to hear, therapy sessions will be going on in the rooms which are on the inside but the class sits on the 6/03/93 -7- , .•. outside and you can't rever~e that because the one-way mirrors only work in one direction. You have to be able to make decent audio and video recordings and that presents another problem in that with double glaz.ing you can't get ventilation, but we can live with that. sound is the most important thing. The other thing, about the 8ound~ is that I~ve been out there with a decibel meter, and I think I've reported befora. in City Council meeting, that it got up to eighty-six just from the normal traffic in the street, Btanding in OUI doorway. That's pretty loud-~thElt'B what we hear from the drums of Shoreline, as I~ve been out there with a decibel meter for that too. Now you put a four story structure right across from us that will create an echo chamber. I actually took comparative measures where there isn't a str",cture opposite us, and I went down to where Lytton was and it was louder there even though there was lesa traffic there. So, I don't understand the negative findings of the environmental impact study. I've repeatedly raised this question and it feels to me like they have ignored it. The other thing is that on that side of the building {may! look at the d~awing?) [goes to plane and uses pointer, points co Middlefield]. From our point of view~ it would have been a lot better if they had the tall part at tbe end l which wasn~t rtght qpposite us. We're the middle building of the three buildings on the block. And if they were going to lower it, that would have been more helpful. As for the parking, we cont inue to ~ very perturbed about tha t., because we have enough spaces in our lot for the tenants of the building ~ but patients have to park. on Hami~ton or somewb~re around. We~ve been told in the City council presentations by the devefopers that this group is going t-o be younger and more affluent than any other project l and more vigorous besides that. They have shown t:heir awareness that this is not comparable to the very figures we ar~ asked tc accept as comparable for parking standards. And they don't even meet the parkin3 standards which exist, which I say are inadequate~ because this is a younger group and more likely to have two cars per unit. The standard calls for 72 assigned parking spaces for residents. They are proposing to have 65 assigned parking spaces for residents. It doesn't even meet the existing standard which. by their own admission, is inadequate for the kinds of people who are going to be there. Sa, where are they going to go? They can't prohibit them from having more than one car. They are going to park on Hamilton. That is going to mess up everybody's schedule, including the 17 therapists in the building and the training people. Hi, HaBer: Would you point out, on t.his site plan over here, where your building is. 6/03/93 -8- .. Dr. 891in: It isn't shown. Ms. MaBer: On Middlefield up there. It' s the square right in the middle. Right there, to the left of the text. or. Bodin: It doesn't ehow the right aide of it. We~ve had, over tha years, an increasingly difficult time getting ou~ of the one­ way ·0" we hav~ for a parking lot. YCIU sometimes have to wait several lights, and those are long lig'hts at Middlefield and University. So, there~B no way these 39 families l with between one and two cars each. and plenty of business (as these are people with socia.l contacts), are going to have enough parking. I can't imagine what.' s going to happen on holidays when they all have visitors and not enough spacea, although during holiday time we're probably not going to have much training going on. In conclusion, we're concerned about the parking. and about having some help overcoming the noise, not only during con9truction l but afterwards ~ Me Maser: Steve Smith. Mr. Smith: I've never been to one of these meetings before. Mg.Maser: Welcome. Mr Smith: minutes~ Hi there. Let me just epee 1 on for a couple of Me Maeer: Would you like to come up here and speak into the ~crophone so we can hear what you're saying? Mr. Smith: My wife and I moved in just about 5 or 6 months aQ'o, in December~ at 640 Middlefield which is half a block away from this building. MS'Maser: In which direction, Bouth or north? Mr. Smlth: Between Hamilton and Forest. We're south by, I think three doors. We didn' t know about the proj ect u.. .. t i 1 May 6 when the notice came out that there was going to be a meeting. So, I had gODe upstairs to get some information that you could look at and sucb~ So I went up there just to read that over. I had never done this before and I asked, what do you do? There was a packet of stuff. and I read through some of it (there was a lot of it). The initial reeotmnendation by their department was that this not happen. I asked how it got from there to here where it's happening, which is curious to ",ne. The sense I got was that this is a very speCial kind of project for people who really wanted to ~4intain a residence close to downtown, that they could walk to. People who. are elderly and ,,~an't maintain a heme, that kind of thing. 6/03/93 -9- But it sounded like a pretty upscale project to me. We had just moved in, we had no idea that this was happening and we have two kids. 4 and 2. We'd like to put a little fence up out front, and we·~e between two bU8iness~s and zoning is such that my pla~e is not a busine.ss. We're just trying to make it there. It was the most we could afford. We wouldn't have been on Middlefield if we had a. choice. Thf!o:''l, all of a sudden, we hear that this thing is going to happen half a block away. How do they get to do that? I don't think I could get away with very much+ So, my concern is: 1. I drive up and down Middlefield, (we've lived out here for 15 years from Ohio). and have always lived in Menlo Park. Co:mting down Middlefield. there~ s nothing this big, and no~ we're going to live half a hlock away from it. My concern is the size. It's just this huge thing. My preference is chat nothing be built there, and that what is there remain there. That, apparently. isn~t going to happen~ but I'll voice that it's just very big. Yell drive down Middlefield and there's nothing that si:ze~ and now it's going to be next to us. I have parents who are in their seventies and were just out here a few days ago, so I understand why people would want this, but I don't understand why it has to be so big. It seems to me that people cO'..lld probably still build this and even make money off it and not have such a big building. Me Maaer: O.K., thank you very much. Charles Schultz. :Mr. Schultz: Thank you. I'm Charles. Schultz: and I own the property immediately to the north of this project at 517 Byron Street. I have heard one very specific Bet of issues and some general comments. Does everyone have a copy of my letter of May 12? Ms. Ma§er~ It's in cur packet. Mr S¢hultz: That issue ian't really addressed in any of the drawings that are around here today, and I JUBt dall that to your attention. The real problem is being sure that I can retain access to my property through an existing, commonly shared driveway. The pra.posal closes part of that driveway but, according to the sketch, it could still work. Yet that: doesn't appear on any of the drawings. It would also require u~ilizing a fragment~ a metered corner of the City-owned property between parcel property line and the sidewalk that will give me the necessary acceMS to get a car through the area between the magnolia tree and the property line. Otherwise the magnolia tree I I think, is at riak--which would be a tragedy. So that'. a very specific concern. and it also affects the way the property is landscaped and the way the construction goes up. I don't know if any of the pictures you have there.~~ 6/03/93 -~o- Ms. Maser: Is this your property? Mr· Schultz: Yes. Here's another one by Mr. Schultz., Here's a better picture that shows it head-on, of the same. (Board looks at pictures provided Ms. Mgser: Okay~ There were so~~ other issues? "J. Schult z: Yes. My concern about parking is the number of places allowed~ or assumed, for the trillions of people who will be living in this unit. Twelve guest spaces a~d spaces for the support people whom these people will utilize in their daily lives. It seems to me to be inadequate. You've got 36 ~.its, and if theBe people have cleaning personnel or people who come to assist them during the day~ those people aren~t going to come by public transportation far the most part. Some will get dropped off~ but it is going to add a pignificant amount of street parking to the area~ I don't think the project bas addressed that concern adequately. Whether people can get in and out of the p~rking garage, I think we'll only find out after its built and that~s a little bit hard for me to ..... ait and see. I guess that the solution t.hat the architect says will work. I still think it's a dead· end arrangement and I feel uncomfortable that way, Byron Street is narrow. There's no do~wt about it. It doesr.'t get any wider for this project. I'd be glad to answer any questions. fiB. Maser; We may have some for }"OU, eo st ick around. Thank you. Are there any further COOllTJ.ents from membere of the public? Dr, Bodin: May I ask a question? Ms. Maser: If it's brief, sure, A-~hur. Dr. Bpdin: I was thir~ing of a possible solution to something that Mr. Schultz raised. And that is could they, and I don't know if this is Constitutionally possible, forbid having outside maids and, instead, provide a maid service. That way you wouldn't have, maybe, 20 maids coming. Ms. MaRr: I think, in fact, that is the case. might want to clarify that. The app 1 i c ant Mr. Hill: That is the case. It's in our letter, I helieve, in our program development schedule. Ms. MaBer~ Would you like to make a statement about Dr. Bodin's question? Mr. Bill: We certainly don't anticipate each person having their own maid. We' re patterning this project significantly after Webster House. It's a good model for us~ it's been in place for quite some time. There are certain things about Webster liouse that " .' 6/03/93 -11- are not good, such as parking. They have far less parking than we have. In our p!'esentat.ion we gave to you, in the development progra.m statement we do mention the fact that we will have housekeepers. There will be 3 housekeepers and 4 kitchen serving personnel. We patterned this after extensive conversations with Bcrnar~e. who manages Webster House and who experiences the.t some of those people, in their easej are dropped off at work+ We can't guarantee that they will be dropped off or use public tr~~sportation. And the staffing includes around the cleek. The details on that, I could show you. I did study this to a degree and we pointed out how many would be on site at any given time. It is certainly our intention to have 3 housekeepers--if it's 4~ it wouldn't be that far out of line for the number of units that we have . .I2r.....-Bodin: Is there any way to require that pecp~e use those rather tha~ to employ outside help of their own? Mr Hill: I appreciate your comment. about Const itutionality in that regard. I'm not sure what the answer is. MS'Maser: sut. Jim. aren't people paying for that in their fees: Why would they pay for it twice, This is part of the deal when you take a unit there, you get housekeeping. Mr-Hill: Yea, that is part of the service. housekeeping service. Mr. Jason: Can someone e1 se make a comment? Linen service and Ms. Maser: Yes. We haven't closed the public hearing. Would you like to come forward and fill out a card + [He does so]. Okay, Bill Jason. Do you want to sta.y up here? Nt JaRgD! I live at 610 Middlefield Road. I've lived here for the last 51 years. .Personally, I'm excited about this project. 11 ve heard the other sides to it. but I lbre right here on the very corner {points to plan]. I look at everything that goes in on this site and everything I've seen here that theY've done has been on the positive side. I'm excited about this. I'm excited about what they're doing by basically enhancing the neighborhood. gett.ing everything pretty well the domino r and/or to be able to get a project of this caliber into our neighborhood. I'm excited about it. I live on the very corner, so I'd be the one it probably effects more than anyone else in this whole room, and I'm excited about it. No, 11m not planning on moving. MB Maler: You live in a nice building, too. Mr JaQQD! Thank you. 6/03/93 -12- .. -._';'- -...,'. Ms. Maaer: With that we close the public hearing and come back to the board for questions of the applicant or members of the public. Does anybody have any questions? Ms. Pa Rosa: I'd like the appli~ant to respond to the public with several questions that were raised~ 1. If you could review your parking rational and then talk about other projects. We talked about it piecemeal. but if you could go through it just once. 2. Also~ talk about Bound control. Someone raised an issue about building mass creating more scund. 3. Discuss access to Mr. Schultz~B property and what kind of cooperation would work there. 4. If you could briefl), mention in regard to the mass of the buildiDg~ what you've done to scale down the appearance of the mass of the building. Mr. Hill: Richard and I have worked as a team pretty well in the past so I'll grab a few of those. I think I probably, the simplest o.""le is what we were doing a minu te ago when Mr. Schul t z wa s up there. We talked to Virginia Warheit. She's been out there with Carl Stoffel and the staff l and we think handling of the access BO that he has 2 driveways is totally acceptable to us as long as it works with the City. We think it'S appropriate. I'm sorry that it wasn't included in these drawings. I t should have been. but I thought it was basically accomplished after we talked to the staff about it. So you have a eketch, I think, in your pack-et .. MS. Maser: It wasn't very clear from the sketch what was going on, but I think. if I understand all of you, you're working this out together and you're OIl a course that is going to be acceptable for everybcjy. Virginia does have to leave soon, maybe you could comment 00 that, Virginia, before you leave. NI Warbeit: one of the conditions being recommended by staff is that the detail be worked out with the final landscape plans, showing how this is going to work. In fact~ it won~t involve any of the applicant's property within their property line. The only thing that needs to be adjusted here is how the public right-of-way is h9.ndled. The whole purpose of it is not to take out that magnolia tree. and to continue to provide Mr. Schultz access. Mr Hill: I think it's very important, also, that it originally was thought it 'might requ.ire sort of a joint driveway. This clearly segrega~es the 2 driveways I eo there's no confusion as to whether you're going to start coming in or out of our parking area. What's the distance between the two curb cuts? Ms. Warbeit: Since their project has a 10 foot landscape strip required on the property line l their driveway is over 10 feet from the property line. And his driveway only needs to come a couple of feet into that 10 feet~ so there will be a space of 6-8 feet of parking strip to separate the two driveways. Mr. Hill: The second thing I'd like to addrel!ls~ Which is tremendously important, is this parking situation. In trying to .. j. 6/03/93 -13- / compare this project with others I we think we' re closest to the Stratford~ a project of Some 6~-67 units in San Mateo. We think that whatever ·youngez" is. the average age at Webster House is close to 80. We thought that 'We would probably have a younger average age. The average at the Stratford is 74. I do know that their parking ratio at about 2/3'8 occupancy (some of the units haven't been occupied yet 1 is 1.26 parking spaces per unit. Exactly 60\ of the people who have moved in are single ... 24 widows and 5 widowers. There 19 cvuples_ Th~re are 4 people there who have no cars. We 'Will be providing transportation as part of our State licensing requirement. The complete summary of our position on this is in the letter that I wrote on May 7 to Ken Schl-eiber, which is in your packet. I could reiterate some of the things in there, but I think that we're a bit overparxed, and that there is going to be room for some more visitor space and employ~e space than we actually show here, but werre certainly not eager to label any more spaces than we've shown as being visitor ot' employee parking. We ha~TE:~ as I've shown on an earlier presentation to the Planning Commission, a table 30mewhere in the packet that shows wa have more parking tr...a.n any project in the Bay Area (of this typel. The ratio of employee parking per uniti visiter parking per unit and resident parking per unit. On every level we l"....ave more. I think that we're adequately covered. We are very interested i from our standpoint i ~~d the City has been curious about this, too. We don't want to h';.!rt our own marketing efforts by not being able to provide enough parking. There have been discussions in the past about charging for a second parking space when you purchase. The idea here is that when one purchases a unit, these are ownership units, that one parking space goes with it and a second parking space can be secured. 'there was a discussion with Mr. Schultz some time ago at the neighborhood meeting about what the charge is going to be. We havenit defined it yet, but as my letter indicates, we're going to make every effort to discourage people from driving when. they shouldn~t be driving, aE they age. And that's a place where they will stay until they die, to be bl~nt about it, and I think the project can haD,dle that. So I feeJ. very comfortable about it. In regard to the other 2 questions regarding mass and acoustical, Richard is going to take thoee. Mr. Beard: Regarding the acoustical issue, I wanted to ask either Lorraine or Virginia if you have a copy of the letter we filed from our acoustical engineer~ Charles Salter. I didnit bring it with me. While you look for it~ I'll go over some of the history of the size of the project and what we~ve been working on. The design of the building on the side was to maximi~e the amount of bulk located at the center of the site and to put as little of it out of the perimeter as we could. This haa been through a lot of different processes and even I can't remember quite all of it. but in the process of going through Planning CommisBion~ Council, and then what we brought to the first ARB hearing. we Btepped the 6/03/93 -14- • bUilding down f~om 4 stories to 3 stories at the corners of those 2 sides on Middlefield and kept a one story piece of it at the corner o! Hamilton and a}~on. And then kept a 3 story piece that goes all che way around the front, all the way around the corner into the courtyard along Hamilton. When we came h~re from Council, the Council conceptually approved the project and asked us t.o review the desigtl. of the project with the Architectural Review Board and to address further the issue of the setback along Hamilton and we brought in design sketches at that time that said we would look at alterations of the building, so that as you view the building from down t.t.e street you can see the actual break in the lines and then, in addition to that, we stepped the 4th floor back between tt/ 3rd and the 4th floor, 4. feet back. so that a pedestrian on the ~~reet wouldn't be aware of the 4th floor. Ms. Da Rosa: parking? What is the paving at the entry. and the surface Mr. Beard: We decided on a virtcally unbroken horizontal surface for paving material. Eldon and ! talked about using a stone that we used successfully on another residenti.al project which is a sandstone but it is a honed and machine finish, like flagstone in shape, but more informal than that. But it had the benefit of having an almost smooth surface, and you can set it very level. That's what we talked about using in the courtyard and outside the little diamond courtyard, and I can see us using the same material in the entry. In the driveway and the entrI path we may use the same material, or a mortar-set tile that would also be smooth. [discussion about the Stratford Senior residence in San Mateo while waiting for letter to be brought in} Mr. Lyzwa: While you"'t'e still h2re, V.i.rginia, if this project. were an RM-40 development I ,,"~a: would be our maximum site coverage allowed? Ms Warhe it: project. Mr. Lyzwa; drained? RM-40 coverage is 45t~ compared to 53.2% for this Drainage of gutters on balconies .. how are those Mr. Beillrd: We wanted to take a small drainage leader back into the wall and drain it down into the interior. It~s a more costly solution. but people can be alarmed about the dripping. Mr. Lyzwa: So your solution is going to bring gutters inside and have down water leaders internally, in the wall itself? 6/03/93 -1.5- Mr, Beard: That will occur at every balcony that you put a gutter on, at the second, third and maybe the fourth l~vel. Mr, Lyzwa: 'to landscape a.rchitect~ A question on the narrow strip. yo~ mentioned that the nu~ber one issue is getting air to the roots of the trees. How will you de this in a very narrow strip: Mr. Beck: Wnat you o:ic is uee the space under the sidewalk ?y having a gravel drain field under the walk. Within that there 19 a bed of perforated d~ainpipe which then outlets air into the base of the tree~ and often into a little catch basin-like grate whether it's in the pavement or along the edge. What this d~es is let air move thro~gh that bed under the pavement. The watering, then, is by drip eystems right at the tree in two deeper perforated pipes~ so that gets the water down and leta it apread out. This is often used as it is very attractive and allows air to circulate under the surface. Ms Wilson.: The character of the wood on the balconies, could you r.on.ne.nt? Mr· Be~rd: The balcony pieces shown here are stained wood beams~ re-SAW material, not rough; opaque, heavy-bodied pigmented stain. We haven't selected the color. Most of the fencing is around the individual, private gardens. There is actually access into the ground floor through the ga.t~. Mr. Hill: Can you tell me about the exhaust fans in the garage. Mr Beard: They are shown on the Landscape Plan~ A SlIlall fan room he"l."e (looking at plans) that ducks over to about a 2 1/2 x 2 1/2 piece there that is enclosed by the wall of that priv~~e garden. And then there'S another one there inside of that corner. It is 4 1/2 feet tall r I think. There is a third exhaust that comes up from the garage to the poolboUBe roof: shown as a chimney on the elevation. We use a long RPM high-volume fan to cut down noise. The transformer pad is located off Hamilton and ie screened off. Virginia found the Acoustical Engineer' a letter. This is from February .2~ in response to the MR.I company to the Architectural Review dated :2 0 January. The points: In another case, wben -we studied the effect of reflections off the aide of a three-story building there was a half decibel increase in noise, which would be indistinguishable. We do not believe the noise caused by construction will impact the people in the MRI building, as the cu.~ent acoustical environment along Middlefield Road will mask the noise of the construction project. Ms. Maaer: Lorraine, could you make sure copies of chat letter go to the interested parties. With that, I have aome further questions. Would you clarify where the guests are going to park? 6/03/93 -16- .. ' .... HI" Beard: There are a total of 12 designate:::) guest parking spaces. There are 6 on surface and 6 in the garage at the bottom of the ramp. MI. Maser: Have you ~rked out the details through any of your typical windows? Where will the outside face of the glass be in relation to the outside face of the wall? Aloe .. the lighting-­ could you t.alk about your concept visually and why you are reconsidering your original idea? Mr. B@ard: The glass will be about 3-4 inches from the face of the wal14 These 2 decorative fixtures at the entrf are very important to the entry. The 7 standards indicated are ~2 feet high.. and might detract from the street lighting. Decorative fixtures on the building might ~ more appropriat~ along with Ivw-level landscape illumination that will illuminate the path more, as well as avoiding a potential glare source for people walking out of the building~ We agre~ with staff's concerns about the lighting~ and will be coming back with different lighting. fI'l.r. Beck: We thought lantern light~ used in the courtyard, is appropriate, as well as safer as the visible light source minimizes the glare. Ms· Kaser: Is there going to be a sign? Mr BeArd: We PAve considered a sign. but haven't ~orr~ up with a design to propose to you. We will come back to you on that. Dr. Bodin: I would like to comment on the Sound Engineers letter, since we did not get an opportunity to see it in advance. I think it was a clever use of semantics to cover over a very real problem. The problem is that when I said it was 86 decibels, that is peak-­ when cars are starting up from the light. That's an occasional thing that definitely does noise out and is very annoying. You know what a jackhammer and riveting sound like. If we have what is peak~ go~ng on for minutes and minutes at a time. that's going to totally erase of ability of people to hear in the training source. T!lat~ s what people c~ to us for I from this Country and abroad. I don't think a semantic trick on his part answers the question at all. The double glazing and the fact that you gave them an easement or variance to build there, imposes on us an expense. We~re a small non-profit. We would like either to have them put in double glazing or else to coordinate with us and not do that kind of noise when we're in training. We don~t have training all the time, Ma MAser: Thank you. We~11 return to the board now. Michael, would you like to start. 6/03/93 -17- M;, LViwa: I have a lot of concerns about this proj ect, My conce.rns are based on the following reasoning: 1, I' m very concerned about the site coverage. The building is really very large and has a very large site c~verage--almost 54\. Whereas the maximum housing site coverage that we would allow in Palo Alto under any ciz-cumstance would be under the RM-40 zone and that would be 4St. So I do l'!.ave i'. great deal of conCern with t.he site coverage, which leads me into another matter. 2. The ma:x:imum floor area ratio allow~d in Pclo Alto is 1 to 1 for high density hcusing, and here we have a 1.7 floor area ratio site coverage. My concern all has to do with the size and bulk of the building. r am very. very concerned about this. 3. I am concerned a great deal with visitor parking. I think having 6 visitor parking spaces at grade level is not enough. I do not believe, from my design experience, that suhterr~,ean visitor parking spaces are really very effective: or utilized. People prefer to park in the street and there will be definitely more than 6 visitors .. ~not even during holidays, Regular visitors to the building itself. The difficulties I'm having with the whole project itself are: site coverage; floor area ratio; massiveness; lack of visitor parking, as well as parking in general. I believe there should be 2 parking spaces per unit. These [issues] give me a great deal of concern in reference to this proposal at this particular loc~tion. On the otber hand, I look at the floor plans, the elevaticns~ the building mater,ials, sections that are being proposed and this is a quality building; a. quality a.rchitectural solut.ion. The landscaping works correctly with this proposal. So I am left in a perplexing position as to why the,City Council is allowing this type of a proj~ct with such an enormous density in a zone that has been previously zoned for a much lesser use. It's obviously had the COuncil's approval. I don't understand it in view of the fact that. for the past decade. we've been very vehement about develop~t in Palo Alto and really held a. very strong line on how much development can occur per our zoning reg-... Ilations. Teis goes off the Richter scale. if you will, on zoning regulations that arE currently in our book. I have a lot of difficulty with the project pe r the zoning ~ The architectural solution is a very safe solution, certainly nothing novel or innovative, but very well detailed with :rela.tively high quality materials used, and has a very well thought out circulation_pattern. The courtyard wi~l be very effective--quiet and serene. The fact that seniors have access to ground level landscape areas .. as well as the above balconies and larger open-air uses .. gives me a lot of comfort in this solution. 1 feel the architect has done a very good job of addreeaing our issues and concerns of detailing and how the parking .. structural system and various components of the building solution come togetber~ 1 feel very comfortable that this building can be a quality building in Palo Alto~ The discomfort I have is with the whole philosophy with the zoning, and making an exception here when we're not willing to make exceptions in other areas~ I would feel much more comfortable 6/03/93 -18- if we had an overview and re-evaluation of our housing regulations, and if it doesn't pencil out to have ~-to-1 floor area ratio. and regulations that don't make sense because no one is building them, then let's cbange that. And it this leads to the final solution as to how our ~oning will operata in the future, then let's go in that direction and let's admit it. But I have a problem with the fact that we have current regulations we go by, and then we make a proposal and we make all these exceptions. I'm very perplexed by the whole pattern and the politics involved and solutions reached, that this is the final solution. Architecturally, I feel comfortable with what is being proposed, but discomfort with the zoning r\!gUlations and the planning direction that we currently have in the City. tIe. Wj lson: I certainly appreciate Mich..3el is ccmments and understand what he says. This is a PC and I think the rules sort of get thrown out ~ith a PC, and you save yourself by design and mitigation BO, chat's what's happening here and that's easy for me to understand~ I, too, am very comfortable with the architecture and I appreciate che strides that have been made. I think this issue of constructicn noise is one that can be dealt with in some way, and I would want to make it a condition that there is dialogue with this party in this effort. It may not be a totally positive solution, but I think some strides can be made in dealing with their needs during the construction p.ariod. I think demolition will be a particularly noisy time. Some of this can be coordinated with this party--an effort needs to be made. This is a building in an urban setting. The people coming to live here expect to live in an urban setting. 1 don't think they need a huge amount of outdoor space or they wouldn't be choosing to live in a place like this. I feel comfortable with the balance; the good, usable space that is here. My experience in observing senior residences in the last few years due to family situations, and in various states$ even places where there are huge amounts of outdoor space, ! see very few people outside. So. I think. the limi~ed. well-studied outdoor apace is very viable to this kind of housing. I'll be looking for the final rr.aterials in colors. I'm very comfortable wi~h the direction of these colors. In fact, I like them very much, there is a certain freshness to them; they are not trite, like teal. The landscaping, the lighting issues: I, too, am not too comfortable with the tall lantern fixtures by the or~veway. I think it's too much like street lighting, too close to the building and doesn't work very well. I am comfortable with the arguments about parking. and feel they have been studied adequately for this type of project. In the evenings, Byron Street will be fairly clear for parking, and I'm comfortable with the study that's been done. congratulations. Ms. Da Rgsa: I think I'm probably a little more enthusiastic than ny colleagues. The architects have done a very nice job of a large project, of making it look like a home even though it's a large building; of scaling down the mass, of using materials that will age well and weather well. This building will be attractive when .1'1. 6/03/93 -19- it~s built and get better and better wjth age. I think that ~e don't see a lot of these buildings in Palo Alto. A lot of them are temporary buildings. I really like the materials we've chosen, as well as the detailing. In terms of the ELA I have a lot of respect for Charles Salter, but there's nothing that will match the Bound of a jackhammer, no matter how many cars start on Middlefield at a given time, a jackhammer is a piercing sound and no matter what size project goes O~ this site, there's still demolition and jackhammer work. What makes this project different is that this is a PC. and so the City is in a position to ask for mitigation that they might not ask for in a regular project.. I think thet'e needs to be some dialogue with the neighbors to see what types of mitigation would be reasonable and appropriate. The parking is an issue that ~e'v~ struggled with. This kind of housing is kind of new. It's not straight multi-family housing~ so to ~pply the multi-familY housing regulations to this project is no"_ necessarily appropriate. I accept the applicant' Ei rational r"Jgarding the parking. The area I'm u.~comfortable with is the ;~unt of guest parking. Parking on a grade is very comfortable. Once you have to get down to an underground garage, I think people tend to p.u."k on the street. I dOD' t kno..... wha t you can do to encourage visitors~ especially visitors coming a second time who know where the parking is, to park in the underground parking and keep. them off the streets. I would like to see an elevation of the sound wall with fencing where the exhaust from the parking garage is not an eyesore. The tree planting is interesting: bow the vegetation varies as it goes around the building. My only concern is that on the north side, which is already a dark side, that the ":.~~etation is going to be very dark; what the experience will be for those whose --:.mits face that area. When I look at Lytton Gardens~ it seems very dark. You might reconsider that. I share Shirley's comment on the lighting. I think that this is a PC, the site coverage, the FAR. and all of those things are appropriate to be reviewed by the City Council as it is a change in zoning. Ms. MAser: I share your enthusiasm. I think this is a smashing design and .is going to be a beautiful additi.on to downtown Palo ~to. The improvements and efforts you've made in breaking down the building facade and bre.a:king down the scale has been well worth the effort, and I feel very comfortable ~ith the elevations ~e've seen today_ As excited as I am with the elevations, I am really unhappy about the garage and I think you have a very bad situation with the garage. I just don't think this works, especially considering the age of the people living here and the fact that many of them are going to have fairly large cars. As you're coming dolt'll thifll ramp, 6/03/93 -20- "' '-"':t: ''''. _. you're on the right hand side and have to make literally a hairpin turn to get around to this aisle. If you're a visitor coming down here and these visitor spots are filled, then you're going to keep going until you find an empty space. You end up either at this dead end or this dead end where. as I uneerstand. you're planning to have employees park. Employees will have to ~aneuver out of these dead end pockets. You are going to have the occasional visitor who is going to get stuck in these dead end corridors~ What do they do if these places are all filled with employee cars. They are going to have to back up; back: around here and there--several rnatleuvers they are going to have to make that are going to be uncomfortable. A hairpin turn at this point couldn't be made in one move by most cars. You are going to be tempted, because of that hairpin curve, t.o swerve to the left. to get a decent turning radius to make this maneuver. Itla just not working. I'm not a traffic engineer, but would be willing to go along with it if a reputable traffic engineer said it was fine and would work perfectly. ! frankly t.hink you ha~}"e a dangerous garage design. WitL architects who work on projects where we have underground parking. we titart with this. This is what sets our scheme, because this is the most difficult to design. This iE so importcu~t. If we 3howed this to one of our commercial clients, ~ wouldn't be in business. I'm sorry that you didI~'t't study this. I think that the ideal solution would be to come in here, then to have a simple circular movement. then on out~ The fact is you' re coming over here where you have an immediate maneuver you have to make that sets up a series of maneuvers that are difficult. for even the moat adept dri ver ~ I car. see ways that you can get around this, but I'm not designing this building .. If you have to go down here to get under the pool. maybe you go down under anc. create more parking under here. Maybe the storage comes over in this area; maybe the ramp char.gea location so you have an easier time of maneuvering in the garage. As much as I love this project, and this really pains me, I cannot support it at this point. If you go throulJh our standards of review, the 10th standard that we have to review states: -to review whether access to the p:~:operty and circulation thereon are safe and convenient for pedestrians. cyclists and vehicles ...• ',.', 6/03/93 -21- To me, this isn't safe or convenient. I think this is going to come back to haunt you. If thia is approved the way you desi~~ed this. I think you are going to have lots of trOuble with unhappy occupants of your building and guests and visitors who are going to be unhappy. also. I love this project, but I felt strongly about this project last time and I feel even more strongly about it today. I will not be able to support the project until either my fears are proven to be totally unbiased by some traffic engineer who can convince me otherwise, or you come back with a redesign on this. Mr· Beard: I think the points you make are very good ones~ and they have me sufficiently concerned to offer that, in the development of the plans we come up with, Bome solution be made to the problems you mention. Either a new circulation system or sometbing that addresses this. I feel comfortable that we can get a solution. Mo Maoer~ I really hope you can. I really just don't think this is going to be acceptable. Hr· Hill! Richard, Eldon Beck and I had a meeting this morning regarding the depth we want under the courtyard~ and some other items. including amount of storage space. We have more storage space than is required but. from a marketing standpoint I we want to have overly adequate storage space. We have to balance the requirement for storage and work out a way to get rid of dead end aisles. We will go back to the drawings; check with the Stratford (in San Mateo) and see what their experience has been with parking. Ms. Maler: I want to make it very clear that I can't go along with you people . .I donlt know what kind of a motion is going to be made up here .. and it's not because I don't think this is a wonderful project. Whoever sees this in City Councilor Planning Commission will have the minutes. I think the building is needed~ is 'Wonderful, is such an improvement over what'p there now, it·s going to be well ma~ntained (we a:l know that because cf the people who are building this building} and Palo Alto is fortunate to have this kind of proposal. I can't go along with it until the garage is working. Mr Hill: Bow can we handle it administratively? To be very honest about it~ we're working on a schedule that puts us now, we hope, before the City Council the 26th of JulYI and before the Planning Commission June 30th. Is there a way ~o deal with this to allow that procedure to take place? Mr, Gilliland: We can approve with conditions. But if the conditions are such that a garage re-design causes a significant change in the design in the building, which it could very well do, you;re talking about getting rid of the turns at the beginning, I don~t know how we could take it forward. 6/03/S3 -22· Mr: Lyzwa: Also~ traffic implications. If you cha.~ge the location of the drive it bas to be re-studied by the Transportation Department. MB Ma@er: Well, if I'm the only person on the Board who feels strongly abo~t it, I don't know how it'S going to go. Practically speaking, if this is a loop system~ then you would have to make this hairpin turn to get to these Bpot~. Mr icArd: The solution that seemed workable and still maintain planting in the courtyard was what we submitted. It Btj 11 maintains the code re~~ired amounc of storage for the units: But it does give that loop in there, and then you can make this turn and have another solution if it turned out to be a problem. It wouldn't impact the location of the driveway and we could~ I think~ keep the same number of stalls. Ms. Maser: I would be ecstatic. I wonder if ~e could make it a condition to check with the Structural Engineer if this would be workable from his standpoint. Mr Beard: It would take some changes to the system that is there now, but it's not ... Me MaBer; What this does is allow somebody to get to those spote another way, preserves your courtyard and st.il1 gives yeu the storage you're required to have. And these units have quite a bit of storage, as I understand it. MB Do Rpaa: What this does, is allow us to approve the conditions and this is one solution. You may come up with something you like better, but we know that it's poBsible~ Mr. ieard: You could certainly condit jon it on the parking scheme that at least satisfies circulation to the extent of Scheme 3, dated 2/12/93. Nt LY2wa: Let me ask you, this scheme ... what is the parking count; are we losi~g any parking? Mr: Beard! rnis one has ?O. The current one has 71, but that~s after we worked really hard on that one to gaiL!. every space ..,e cculd. Our original approval from City Council was 69. Mr. Lpwa: These storage spaces are the minimum required~ 250 cubic feet, that you're showing here? Mr. Beard: These are actually 285, r think. Mr Lyz:g: And are the parking stalls reduced because storage all along this perimeter? They are not reduced? standard 9 x 18 spaces. you have They are 6/03/93 -23- Ms. MaBer: As long as they can make thi~ 'Work: and they don' t reduce the cars below what was approved .... Hr. Lyzwa: Do we word the condition that ~e base our approval on a sketch that was presented to us, and that no parking spaces be lost and that the standard sizes and tl'le standard driveway widths be held to? I don't want a situation where under the PC we go back and say the storage, and the standard aisles, and the standard spaces have been reduced because W~ couldn't work it out, Ms· Maser~ I think we can Bay that we would approve this project on the condition that the dead aisles are eliminated, that the parking i6 not reduced beyond the 69 cars which were approved previously, and that the standard acceptable car dimension spots and aisle widths are maintained as written in the code. Mx'..a... Gilliland: I'm a little bit uncomfortable if you use the language specifically that the dead end aisles are eliminated. That's a sketch that we haven't reviewed or been able to look at to compare to ~he zoning ordinance to see if it meets those regulations I ~~d certainly to see if we have the same number of parking spaces. To make it a flat.-out eliminate the dead end aisles, I'm uncomfortable with saying that it would definitely go fo:z:ward after you put that language in there. I would have to check with the people in the Department. I think you've made your point very clear that you want the dead end aisles eliminated and that would be the objective here. They've stated that they very much think that they can go try to do that, and that they can do it. What 11 m concerned about is we may find that they cannot eliminate those dead end aisles~ and still meet all the rules and regulations. Mr. INzwa: Julie raised the critical issue of the turning radius. Bow do we eliminate that? Ms· Mager: It's diffe~ent going at it from the other side. As lor~ as you~ve eliminated the dead end aisles, that does not become a huge iSS"..le, because you can approach it by going around. You donI t have to maneuver your car around that hairpin t·.lIU. I frankly don't think I can accept this project without the eli~tioD of those dead end ai81es l Jim, and I don't see why we can't include that condition. Mr Gil1ilil1ld; Because you could end up with a dead end situation, where you have. cars in a dead end aisle. If you're putting all of the same requirements on it that they have, the number of spaces that are there are not reduced l the number of spaces meet all the current requirements, I don't have a drawing in front of me that says we can do that. I could say that's a very good sketch~ but '" " ! 6/03/93 -24- ,-- .t-· ,,:i-: it~s not been plan·checked. ~ you well noted when you started talking about it, you start with the garage. The garage dr~ves the project. I'm very uncomfortable with taking it forward without having plan 4 checked all those things to know that the garage is going to work, if you're going to make it exact that they've got no dead end aisles. Mr Lyzwa: Also, Julie, t.hey've got a shear columns throughout this whole thing and 'We' re time reconsideration in the structural system. matter of -let' B lJr,'ipe this out and put in a talking about ~ .. wall, theY've got talking about big This isn't just a driveway". We're Ms. MAser: I know, b'lt this is paper right now, and to build this as a real project the way it's shown is absolutely wrong. Mr. Lyzwa~ I agree with you completely that this has to change. What concerns me is moving ahead on a sketch and a prayer that we' re not going to lose anything.. and still hope that it' s not going to affect the current facade and the current floor plan layout and everything else. Me. Maser: Does the applicant t.hink he can get back to us on consent on this particular issue in 2 weeks? Then they could go forward, couldn't they. on the schedule that they~re on? What if they just dealt with this one issue between now and then. "9 W1itiee: I dontt believe that we have time in our Transportation Department to have this circulated, analyzed and st· _~ in time for our next meeting. First of all .. you have to wait .,plans to be submitted, then we have to give departments ample time to review. Two weeks is quite short notice to have that done. especially for a project of this size. Mr Gilliland.: I'm just real concerned with saying that you specifically have to eliminate the dead end aisles without having a plan and still allowing it to go forward, but it could significantly change the project. MB' Haser: We're talking about a loop system and I could foresee a loop system that would still have a very short dead end aisle. Do you oot want to use the term dead end? Are we just arguing about semantics? Are you suggesting (to Jim) that we just accept what' e heret Mr. Gilliland; No, I'm telling you that you have a conflict. Their need and desire to go forward with the project, and your Deed and desire to have the garage re-designed. Mr Hill: I appreCiate this. There are ~ partners in this, and time is money. I wish that there were not the 4 meetings to consider. Some other things could go wrong. MS. Do Rosa: How many projects that are PC's come to be aired .. 6/03/93 -25- make recommendations with conditions, go back to City Council and Planning Commission? Mr, Gilliland: Absolutely. In fact. you're going to see things on this one later, including the landscaping plan, lighting QIld several other things. M)' concern is t.hat this project. has some very specific requirements right oow--the number of parking spaces. and the b.lsic zoning rules and regulations regarding the garage. Prom my standpoint. the change you're asking for, part.icular1y with the shear wall and those columns as possibly causing a lot of change to the project its-elL Including those numbers, and we don·t know traat they work right. If the Board looks at it and says ~we think i~ can be done-and you want us to direct us to go ahead and take it forward, w~ will do that. But from a standpoint of having to check plans and look at it. I'm uncomfortable with just flatly eliminating the dead end aisles and saying the project can go forward and that they CL~ find a re-design for it that won't atfect the project itself, or won't affe.ct the exterior of the building upstairs, the ramp, the courtyard or ~ I don' t know what all is invol ved, But what I'm hearing from the Board is tr.at maybe you don't share that concern and that's fine. Ms. Da Rosa: I~m just trying they ended up moving the ramp, some ~hanges in the building. City Council? to understand th~ process. Suppose or something major where there were Would the project have to go back to Mr Gilliland: It would depend. If you were moving the ramp, you probably would have to re-do the environmental assessment and look at traffic and all of that again. For a project this large with this much interest. it probably would. MB pa Rgsa: Suppose they don' t. move the ramp. but do end up making changes to the building? Mr. Gilliland: More than likely~ probably not. as we're not affecting environmental documentation. Richard~ based on the sketch you have there, do you think you can maintain the "" Kr BCard: If you condition it with providing a loop circulation in the garage that minimizes dead end aisles. I think we can get a solution that meets that criteria. MB. MaBer~ A loop system in the garage is going to eliminate the dead end aislea~ but if it·s a question of wording, .... The loop system would be completely acceptable to me, The loop system is what I'm after. Then all your problems with the hairpin turn become a mute point, 6/03/93 -26- Mr· Lyzwa: But then you al~o are ending up in their 9ket~h with storage units that are directly in front of the parking spaces, and alBo~ some storage spaces that face the driveways directly. Now you have the double problem o~ parked cars in front o! storage spaces. If yO'l,l want to get in your storage space, you have to move your cars. What if you don't have the same storage unit and adjacent parking space. Even if that's worked o~t; how do we handle the storage spaces that face the driveway. Mn Wilngn: I think the problem here is semantics. We need to state this in a way that isn't problematic. It's the applicant'S choice to take this risk; we don't need to second guess them. Ms Maa-r: With that, make a motion. I'll throw that to you, Shirley. Ms. W~lsQn: I'll try. I move for approval with staff conditions r specifically that final materials and colors come back. final landscaping. lighting, signage come back. That the issue of the parking be addressed per this meeting, incorporating a loop system in the garage to eliminate the difficult turn and much of the dead end parking~ yet still maintain the standard space per the City zoning r~~lation~ In addition, I would like to add a condition that the applicant enter into dialogue with MR.I including an initial meeting to set perimeters during the construction period. that construction schedules be ahared on a regular basis with MRI. as they will share training schedules with you, and t}l..at a cooperative attitude to minimize the impact of construction noise be developed between these two parties. I think that requires some give and take on both sides. Both of you should take the approach that you work with each others echedules~ Ms Maser: I·d like to add one more thing: a drawing showing the relationship of the glass to the exterior wall with a dimension. so we know that that's been studied and you're going to hold to that as a typical dimension. Mr. Lyzwa~ I would also like to add that if the exhaust fans h~ve to go beyond the 4 foot perimeter fence, that return to us a detail. Ms. Wilpgn: I have lingering concerns about exhaust in a place like this where there are windows. Are these operable windows? Then. is there any way to direct the exhaust so it doesn't go right into a unit. with the wrong wind. Mr. Lvzwa: Same thing on the other side. I just think that has to be dealt with. MR. Da Rosa: Shirley, are you accepting the landscape plan as it is, or are you going to require the 5 foot parking strip, condition number 4? 6/03/93 -27- " ~.' .. -... ~." " .. ' Mar Wilson: I prefer this sol~tion they presented, wlth the hedge between the driveway. It seemed to me that some of t.hem W'ere really in accord with that. We'll JUBt accept it as presented. Hr· Hill: Is there any condition about the parking? Ms· Wilson: y~s~ that should be ~dded, also. Definitely. The driveway issue with access to parking~ I don't know how you want to dssignate that property. Are you the owner of the propez"ty or the tenant, Mr. Schultz? Be resolved .... Mr Gilliland: That's condition 1. O. We're o-k there. It r S already in there. Mr LyzwA! I assume in your statement that the parking will be maintained as currently proposed. Ma Mager: That would be my intention. To give them 69 spaces that were approved by the Council. Obviously. if we can get more, so much the better for you. Nr: Hill~ Can I ask a question about the motion? Me. Da Rosa: I second that motion. Mr. Rill: timing of this give I have it .... us the a question about clarification with regard to the Realistically are we looking at a delay? Does option to come back with something. Mr· Gillilond: What I'm hearing is that the Architectural Review Board believes there is a reasonable resolution out there that can meet this and we would go forward to Planning Commission on June 3 0 ~ our regular schedul e . MB Kgiao: If the applicant wishes to submit a revised parking circulation plan, he can certainly do that~ and we make every effort we can to re"riew and study it. I cCCl~ t promise you we will have the answers you need by the Planning Commission date. It would have to go to us, Public works and Transportation. A lot of people are on va=ation now~ and having to work between different schedules is difficult. M9 Pm Rgsa: I~m curious about Public Works and Utilities ... the garage is still undergr~~d~ the ramp is in the same place. What kinds of issues could ~ up? Mr Gilliland: They'll find something. They always do. Mr. Lyln: resolution. they've got Emergency access. But agaio. this is all This resolution is not found to be made to the Planning Commission .... Ma. MAser: Then it's their problem. based on this to work, then 6/03/93 -28· Mr· Lylwa: They're taking that risk. Mr· Bill: Is there one other meeting, Jim? Would there be any advantage if we appeared before the Council~ or is it possible to appear before them on August 3~ rather than July 22? It~s not? Mr. Gilliland: agenda. it~s ones are work We would not be able to get a planning item on that the one before they leave~ and normally the first sessions for them and they're not going to have one .... Mr Hil': The reason I asked is because we just found out recently that we were bumped off the 19th ... that's too bad. Mr. Gilliland: likely. I won't tell you it's impossible, but it's not Ms. Maser: May I ask if the revised design you~re proposing for the garage, will that be presented at this Planning Commission? Ms. Weiss: Only if we get it in time and~ by chance we are able to review and analyze it. Ma· Maser: And that is scheduled for June 30. Mr. Ly%wa! Will we have ilL chance to comment on their design before it goes to Planning commission? Mr· Gilliland~ Not the way it stands right now, unless they want to get it to us personally. That's it. Ms. Maser: There is a reluctance on the part of many of the Board members to handle a situation that way. But,! don~t know wby it. couldn~t be included for informational reasons in the packet we get~ even though we're not accepting it. Can that happen? It's for our information if you want to give drawings to Lorraine to include in our next packet. Mr Hill: I, for one; feel that i this is not flatter)~, but, I think this sort of thing is useful to us. So I welcome the chance:. I think we should react to your comments, too. Because if this was~ ~. ~ If we were strongly opposed to your comments, too, I think we~d say so. But we could get some benefit out of this and, therefore, lid like to have/come back with what we're thinking about. Quickly. We can discuss this since we've talked about the fact that we~ve talked about it before. discuss this matter with you, can I not? it, we've disclosed 1 can continue to MO weipl: This disadvantage is that the Planning Commission will not get it in their minutes, so it's something that's happening Bort of as an aside and that communication might not be transferred to them. 6/03/93 -29- Ms· Maner: Will the Planning Commissi~ be aware of this at all? Ms· Weiss: They will have the minutes from today, but if you make other commenl:s, unless you write a letter that gets sent to the Planning Comml.ssion. the Board's comments may not get to the Planning Commission. Ms. Maser: I'll write a letter to the Planning Commissicn. Again, that d~te--I didn't get it. June 30. Thank you. I'll just handl~ it with a letter to them~ Alright~ there'S been a motion and a second. Ie there any more discussion. ~l those in favor {all said "aye"). Opposed (none opposed) ~ Let's ta,ke a break. r..s. Maser: We go on to the cancellacion of ARB mee.ting. Does everybody know I~ve manipulated Jim, he was ve~y resistant, but I was persistent and~ finally, we're having the 2 meetings in July on the 8th and the 22od, inst~ad of the 1st and 15th. Is everybody o-k on that'? Michael won' t be there and Aino is going to b~ missing 1 hour of that next meeting in June. and Shirley is going to be missing another hour and BO I we're going to have musical chairs at. the next meetir..g. Everybody can attend that next ':neet.ing? ! have a problem with the next item¥ and that is !'m goi~g to be in Monterey on the 30th of June, so I c:an~ t be at the Planning commission meeting, although I can be ,at the City Council meeting on the 19th of July_That 19th of July will be changed to the 26th? I may Dot be able to be there. Is there anyone who ca..., volunteer to be at the Planning Commission meeting on the Hamilton project on June 30th, at 7:30. MI. Da Rosa: I can go if I can be a teeny bit late~ Chances are, it won't start at 7:30 because there is always oral communication. Mr. Lyzwa: What are the two projects at 625 El Camino Real and 3401 Alma_ Mr. Gillilapd: 625 HI Camino Real is the Holiday Inn. It~s not going to involve any architectural changes, so you may not have to have a representative there. 3401 Alma is an addition to Alma ShoppLng Center~ Where tbe gas station used to bel out in front, they're going to put another building up there. You~ve seen it in a preliminary meeting a long time ago. So we do have Aino on 651 Hamilton? Ms. Kaser: I have to check my cal~r. I think I'll be out of town on the 26th of July~ but I'll let you know. Leave me on there. At the next meeting I would like to have 5 minutes to bring everyone up to date on the CPAC meetings that I~ve been attending~ as' they are of interest to everyone here and I'd like to get En1ggestions from all of you. Are there any other meetings that anyone has attended? 6/03/93 -30- IV. REPORTS OF BOARD MEMBERS OR STAFF REGARDING MEETINGS OF OTHER CITY BOARDS OR PROFESSIONAL CONFERENCES Ma. Pa Rosa: Yes, I went to a tree task force meeting last night. It was our first meeting. Weire going to review existing tree plans of various kinds. and whether we should have a heritage tree ordinance. It was really an introductory meeting. Ms. Maser: Would you be willing, at some point, to come to one of these sub-committee meetin9s on CPAC and talk about the Heritage program. Mp Pa Rosa: The first meeting was to introduce the players and talk about what our charge is. Weire gOing to be meeting every 3 weeks. The next 9 weeks are taken care of. After that. we will probably have some idea of where we're going. Ms. Maser.. There i B no hurry. One of the i terns that I' ve brought up for our sub-committee is tree preservat.ion and the possible introduction of a heritage program. Me Pi BpRa: That's my bias: tree preserva~ion in a positive way. An awards program for the best heritage tree. or anything to make people happy that they have trees on their property. Otherwise you ~ re always contrclling by ordinance. Is there anything from staff on the status of the secret garden in that thing? I forgot to go by. Mr-Gilliland: I asked Virginia to look into it because she was the one who worked on the project. MI:!.. Pa Rosa: It is a wishing well, poorly constructed~ a big lump in the middle of a secret garden, not approved by anybody. Mr, Hise: I have a code violation also. Gang at 6600 block of Emerson. It's a 6i~. a -God-awful-sign painted on the aWl'Iing+ we didn' t approve it. It's called the Chain ordinance issue. It's It's terrible. I know Ma MOser: I had a conversation yesterday with Carol Jansen and she would like to have a representative from ARB meet with her and with people from the Co-op Market on the deSign of the building. This bas been before us twice and, I guess, members of the Board of the Co-op are disturbed by the fact that they're meeting with such opposition. I think she feels that they need a member of the ARB to help guide their solution and lend eome advice to the situation and help come up with something that is satisfactory to everybody. I missed the last meeting. but I could go ahead and meet with them. I suggested Michael would be a good person because he -thinks on his feet" of design SOlutions. I don't know, Michael, if you're willing to do that, but I mentioned your name to her as a possibility and said I would bring it up today. 6/03/93 -31- I Hr· Lyzwa: This is Carol Jansen? And what would you like me to do? Ms. Miser: If you're willing to entertain the idea of attending a meeting I maybe both of us could go, and sit down wi~h the Co-op people. It's getting to be a tremendously difficult situation. I tbink anything we ca~l do to help facilitate tt.at project 'Would be of benefit to all of us. Mr. Lyrwa: I'd be happy to do that as long as it's in June. and not the late part of June. Mr· Gill;l~~d: I would encourage both of you to look at the tapes from the last meeti~g. which neither of you were able to attend. There is an ongoing problem there with design. I'm uncomfortable with those of you who were not here being the representatives to go. I'm very uncomfortable with the fact that thi~ is coming from another office and not our office. We were in the process of starting to work with them, on thie and I would prefer that you let us coordinate this, and get back to you. Ms Mase&: Why don't you talk to Carol about it. Mr· Gilliland: 1 would like it if she would talk to us. Ma. Maser: I happen to be meeting with her on another subject, and she~s mentioned this twice now. I think thF.! people from the Co-op have approached her, for some reason. So I think she'S been brought into it that way. Mr. Gillilgpd: What! would like to ask is, who would like to volunteer to do it. I would like it to be someone who was at the las~ meeting, because a lot was discussed and we had ~pecifically put it 00 the last agenda, even though it wasn't complete i there weren't sufficient drawings and we know that. But i because it was a fairly sensitive situation, we felt like we should pu~ it on the Board's agenda. BO the Board could tell them at least. they were going in the right direction. To go back, deveiop some better drawings: ge~ some more complete information etc .• which is what we~ve been trying to tell them at our staff level for some time~ and not been extremely successful. And I will tell you that at the last Board meeting, the Board members did a very good job of telling them tbilt. They still went away makir..g the same statements that weire not being helpful, that we're being obstructionists etc. I am extremely bothered by this. ~r HiAe~ That was my impression, also. When I left, I was so concern~ about it~ that I wanted to say that if you don't want to hire an architect to help YGU with this~ 'cause that's -...:hat you need, at least hire one to interpret what we're saying, because you're not getting it. Just someone to listen to the tape, and tell you what we're saying. I would probably be the least popular one to go. but I will go. ' 6/03/93 -32- Mr. GillilM.d: Lorraine and I were working witt t.hem so much they weren't hearing us either. We thought what we should do is get another staff member. We thought Virginia might be very good at it. We were trying to work something into her schedule, so 9he could sit down and work: with them. We don't have the time to design the p~oj~ct. Mfl Da Bosil: They~ re groping and it's human nature to do what tbey~re told. If they keep getting the same answer from everybody, maybe they will get it through their thick heads. Mr Gilliland: We waneed to do it this way before it got to that ki.nd of explosion. I'd have no problem if this went to the Council. We'll set up a meeting. Thomas, we'll include you 't • .-ith the people from the Co-~p and from our office. I'll be h~ppy to get back to Carol. M$ pa RQsa~ It's unbelievable--the quality of what's coming from members of the Board. They should be embarrassed Ms. Maser: We probably ehouldn't have been discuS'sing this project like this. It does fall under "new and old business". You can't a,lways follow the rules all the way and get something accomplished. If there's no other business. then we adjourn. i 6/03/93 -33- ATrACHMENT 5 INDUSTRIAL NOISE ACOUSTICAL SERVICES (1. N.A.S. ENGI NEERI NG) NOl.. C~trol ~cial!.t. P. O. BOX 3074 San Ia Clara, CA 95055 Voice: 408 241 090 1. FAX: 408 241 0270 Mental Research Institute Construction Noise Across Middlefield Road Prepared for: Prepared by: Date: Mental Research Institute 555 Mldd lefie Id Road Palo Alto, CA 94301 Attention: Dr. Arthur 80d in James Sidney Mills, EngIneer 30 June 1993 Mental Researc~ Insf" 'Ie 30 June 1993 Dr. 4rthu r Boelln Introduction The pu~se of this proposal is to provide the The Mental Research Instilule with some background infoornalion on Indu.trial Noise Acoustical Ser<ices whIch is a dba of James S. Mills and associ~s in Santa Clara County, Califomia. The foilowing is range 01 servic~ provided by lIli. firm, and are fisted for your coovenienee. Proposal II is the purpose of this sec:lion of lIlis documenllo pr<>Yide a short descnption of both lIle services 10 ba performed and the methods to be employed 10 obtarn Ill. ",.ults requ'rad. First a statement of ttle problarn wili be given to make c9,1ain that this engineering finn understands the problem;. to be solved. Statement of Problem There is a new b~ilding planned fo be constructed directly across Middlefield Road. about eighty reet from the front of the Mental Research Institute (MRI), that will ~ave an of the incumbent construction noise associated with new bu"ding construction. The bu"ding in which MRI i.loeat&d is a brick bu"ding. with a flat roof. Wlth a parapet aroond the roof, and the heatil)Jl ventilation and air ccnd,toning system is lceated beneath the bunding near the rear, not on the roof. Therefore. this construction r.oise wjll penetrate the windows. existing, which a'" single pane windows. Nominally a 1i8' l!1ick single pane window wi~ have an A-weighted attanuaUO'l value (noise A!ducton ~veQ of from 16 to 23{ dBA]. The noise !evel from a jack hammer ranges from 95 to 125tdBAj. a nail gun may range as high as 140!dBAJ at the source. a slapie gun (used to nao wooden stmctural members together) will range up to l00[dBA], and cemeO[ delivery trucks will range from 85 10 105[dBAj. Since the therapy and training sessions which occur at ~,;1RI are either privale or scm~· private consultations between patient ard skilled professionar, comrtlunicatioDs -I.S aose1ut&ty necassar/. Typically. a private: offica or quier laboratory spac8 without conVErsation has a background noise level of 45[dBAJ. With a jack hammer. nail gun or other loud oper3hol1 in piogress across Middiefie:d Road. l!1e noise level at MRI will be from 90 to 10<l(dBA]. Which will e!evale the noise iElve:. inside ti1ese private offices and work spaces from 70 to 84[dBA]. lor di reot path ncisa. Tnis!s from 1:5 to 29[dBA] louder than an average qui€-I conversation in eriE of these training or pm..ate offices. Likely Solution !f ~ese WlndOWS are the -cnly paths for noise to enler the MRI b'Ji~ding. then II will be nec6ssary to replace the sing!s pane Windows With raasonable double pane 'Nir,dows. TypicaJly. when loud impulSe noise levels like the ones expoS-Cted hers. do~ble pane INAS Engineering ·2-ConstrucUon Noise level Reduction " -.. M""tal Research Insr ~e 30 June 1993 Dr. Arth u r Bodi n iaminated windows are recemmended. Method of Approach This finn will inspect the premisas to de!ermin.; any :!anking paIns measure the actual ·working~ distances involved. calculate the rnaflstic expected nais.e levets, arId make recommendations. least expensive, but adequate window replacemel1t f·:)r adequat~ solutions of the proble".. About the Owner: J ... "es S. Mills, Engineer. Mr, Mills has been praetlcing acoustical .IIsineering sinc. 1971. He has owned and op<IratGd Industrial Noise Acousti"al Services dba James S. MHis and Associates, since 1978. He is a sraduate of the University 01 Calil",mia at Berkeley. with a BS in physics (S June 1957). He studied graduate physics at Stanford University and holds two prof.ssional engineering licenses in California; one in Nuclear Engineering (#1066); the other in Electrical Engineering (E9657). He reeendy retired from teaching Electrical Engineering at San Jose State University. He is also licensed in Electrical Engineering in the state of Orego!!. Mr, Mills· acoustical uperience includes: .rchitectural ~eoustical design; product design noise reduction; aircraft noise abatement: industrial noise reduction; community noise reduction from many different kinds of . 9ourees; sports event noise reduction; vibration noise control and reduction; room acoustics such as church •• , casinos. theaters and so on. This experienca 1ncJudes appearances, in court. as an expert witness, dealing with acoustical legal problems, some included product liability. His acoustical d.sign experience includes: churches; a jail; court rooms: country club: showroems: sea 90ing ships; aulo repair body shops; manufacturing facilities; hot.ls; motels; multi­ family housing units; single family housing units; restaurants; and so on. Many of these projects included sound reinforeement; the design of audio amplification systems. Community noise impact analysis has been involved in most of the community noise relllt~ projects, and was developi!d if such information were not available prior 10 accepting the design responsibility. Mr. Mills is the a.ou"tical engineer of record lor the Santa Clara County Fair Association. The Sunnyvale Rod and Gun Club, and Westfield Corporation owners of Vallco Fashion Park in Cupertino. Cafitornia. Acou"tical Engineering is not yet a category 01 Architectural Engineering in the state 01 Carol","ia as is Civil Engineering, Mechanical Engineering, or Electrical Engineering_ Therefore. in order to be responsibre, fOT acoustical archi1ectural design problems, one or these three engineering licenses must be held by the acoustical practitioner. Mr. Mill. operating license is Electrica! Engineering (E9657), California, its 'ee 1s payabJe every fOIJr years, and C:!Jr.~ntjy expires 9130194. IN AS Engineering • 3 -Construction Noise Level Reduction .. . ·,:'"~::t~~~~~:~:-~"~·~:, ~ . .. -, "'- Menial Research Insti, • 30 June 1993 Dr. ArlI1ur Bodin Acoustical Engineering Expertise • Building f"'rmits, calculation and design. lor buildings planned for high noise level zone, above CNEl-l oN"60[dBAj. Allows developers or a contract""' to obtain a building permi~ in a high noise level zone by proper acoustical structural design and specificationsi' . • Noi .. l.~el Studl .. for undevele>ped or use modification real estale. &len a study relates local ambient noi .. levels to sources so that future noise level. may be accurately predicted; • Extorior no i •• ,eduction by engineering methods 10 reduce the local noi •• for nearby neighbors due to commercial or industrial op ...... tions; • Office acoustical privacy, both from Interior and ext.".ior noi.e sources. Interior acoustical privacy i. a iawful requirement tor attorney", evan in :he same ftrm, alae psychologists or psychialrists who provide psychological consultation services. Noise from exterior sources may interrupt productive though! for people who do cor:cenlrative work in offices; /10 Churches, auditoriums, restaurants, conferanee rooms, and looms where room acoustics 1. impor1an~ may be daoigned for the mo"t efficient and most economical cust",,, room acoustic performance; • Industrial workplace noise level reduc'!ion by engineering <!Hign: Product noise level rati ng and reduc~on; Reinforced sound system design. Sound reinforeement systems usod in dance halls, auditoriums, churches. clubs. gymnasiums, sperts arena •• and so on~ • Unusual noise lever problems. This is for auto or motorcycle races, gun clubs. dog kennels. play yards lor schools. security installations. and so on: • Expert witness. We provide .xpert testimony in cases involving product "ability, neighbor noise level problems, use permit situations, and so on. Resp&etlully submitted. earifomia Electncal Engine-er E9657 Expires 9/30;g..l James Sidney Mills. En(;lneer lNAS E~oineerfng -~ -Construction Noise Level Reduction '," i . ; I \ Acoustics for You James H. Prout Associate Prolessor of Engineering Research Penn State University University Park. Pennsylvania by Gordon R. Bienvenue Associate Professor of Audiology State University of New York C",'ege at New Palll ~ AQbert E. Krieger Publishing Company Malabar, Florida 1990 1-111 Muuud 'It"lIl1111ntlnCuu Table 1.1. Trpical Power J,.evftl. fur V.riou. Acoultl(! Sourul. --- p...." (Wa"'" POIWriAlHll (dB rt IO-It Waul ---------!6 lU 40 million IHtl )00.000 170 10,OllO IfiO 1.0110 100 JUO 140 10 130 •. J O.OOJ 0,0(101 0,00001 O,OC'tlOUl 0, OOOQ('.IO] (t,I~.UI(lO,m O,{II.IIJ.lJC.lO,OOI 1211 ll. 9U .. 70 '" 50 ,(l '0 s ..... &iturn RuckHt RamJflt TurboJet EnJin. 75-Piece Orclie.tra lJipe Ol'(l:lh '--- Small Airtraft EngShe LaI1!:ft ChlJ1ping Hammer Pilino Hl.llrlng Rlltlio, lAntrifujflll Ventilatina rail Auto on Wghway Vantflud .. ] Ventilating I"lIn Vuil't'-Shol.ltin8' V(,jre-QmvtrNItionIllLuvul "~'i(',,-Verr &In WhiJ;jH'r pit'l'e 'l .. ch~Hlnl ill Go dB MbMto' the It'vel o( c(jnvers~lionlJ.l Rfl~t!c:h, Likl!wifle. it can ~ ub!\crved thal /I llhoullng voir€! iH at a le\rel (.If 2(J dB .. bove con\'eraaliunai ie\'el and III whi&pcr is about 41.1 dB below conren;ationalle-vel. The IeI'm dt'cibei (uB) is commonly ufloed U5 the unit fol' level ntlhlJr than tho? fundamental unit be-I t\o that. decimal notation iii unne(E'IiSa'1' fO!' most apJllie",tiol'ls, Fot example, 195 decibel/i iii the SlUne Rs 111.;:; bels, 'it\we\'er, in r:erta.in sit,uatiol18 retjuirillg extra-predai4)h mea"u~, ments, it i~ a(hi~able and custvmal',Y to ex-press levels to oll<>-tcmtn Ijf II decibel, - Sound Intenslly and Souhd Intensity Level , S~u"d iuJensitll at any llpecined location mtty be defined M thl'1 average aC'ou8tit' enerk,Y pel' uniL time p&8sirlg t1mJUgh Ii unit ar~1I. that ,-\<'U!.I,litl r!)f rOY UI is honnal t..o the direrliOll of lII'Opugatiol1, &UhcJ inlf'IINt~' Ut. the~rore, related to ~und )lOWer by; \I' I .. --"'1; "lr ,'. (~.2) where I is; the aVe!.·age l'Ound intensity ill watts llel' Ul,it area, IV ir. the l'ound power in watt8. and r ~ !.he djlf.lance l'J'om the P-Ourt'@, The quantity 4ttr:: jll the area of II sphere sUI'rDllllding tite Jout1."e Qver ,,'hieh thE' ilJt~JJlllit,\' ill Hn~rllged, It is ob,'loul$ (1'O1ll equntiotl ~9,2' thlll the Intenait), will df'(l'l'aflt' with the ~q\li\fe o,)f ~hl" di!'Lanl'f' from !-he ~ouret!:; hellce. th'" well~kl,o~'n ilwei'se'IOquare law, Sound inlell.lQty ullits, liJut N)!'.IIId power unils, ctwer a \\'idt' range, ,110 agai1l h~re it j, dt'!l'irabl(' to nllt" th .. dO notation to ('ompl'f'SS thf' Illt'iIlt ui'ing ocale, The jnt.en~ity 1I;"\'c' i; de-hned It,.; J 1() )(rK ~ dB l~, ' L/ '" (R3J whel'(' J i~ Ow tllek(l.Un"<1 inll'lltlitr at soml;'" gl\'t'li dl~llInC't' from thl;" r.ource, Mild III III a r('fer@Hl'e ilitentlll;., The refert'ncl' intel1t'iry ('ornmotily ueed is ]0-":1 Wlm!, Soul,d I'reSilUIT und Sound l'rtl8ure Lutl Very ('ompJex )Jl'tl{'mh.ll't'll lUX! 11c.>l'1!1'I5AI·y Iv llIt'iI!'IlI'P' :<lIlIud power ;l1l.1 ~lInd illtenttit~,; Cllll~tluc.>lItl~', it j~ ('illlil'r to 1Il1.'aflUI'j:I s(.ultd prep(l.llre. sim.·(, till' outvut of 1I10i:.t mh~I'uphont'fo i1\. lib-tid I,\' rfhlt~~II(l_tht' sound preS!lIll'E' (;In the mirro/1hm"" dia"hr.~, ~ill~'E' the l'r{'!'$UI'(" \'ariell abl,wt a.lld beluw the atlllu!!l'hf!l'it' •• I'l'~JI;Urt·, thip. nU,)-ing: l'llllllWllwnl erf the prC!ll'lurt' l~ expl'('II:\(·t\ !\to. th<' Hlllm'c n~t of the IIWal1 fliluilre of lh(" ill!!oiRntane(I\l1t fJrt'I'!lurf!!l meRflUI't'rl ('I\'el' It rull (',\'l~It" o( ~resl\ul'£o \'llriatioI1, T:li~ Htryi,ng cOmpOIlp.llt i" written llI..' th~ /"{KII IJ'~"II ~'1uore (nnSl) pl'e5~ul'e, Whene\'{'r w{' jl('~ the eXllrt=sRion lUI/(II(1 /WfMUI'e. the l'lnll, "wlup ill lWiumeu unleij(: flpeciliclI!iy ~Iat@(l othel'wi~, JU!\t lUI with i!lIJUnd Jluwer and Mllind intem>it,L the I':lug'" o( BOund PJ'CfI!'III'CI' if! "HI';" wide, SOIne cnmmlJnl,v en('Qunlt'rpd t'mmd l~rCf;ttUre:! HI't: Hhown in Flgurt: 9, l, Sound Jlr{'~ure~ Ilur th(" " .. ill thl'E'.!=hold (about 20 N/ml!) are found In IllAny work aro9.~ audio)o .. -';""t);. l'ommollls work with Round pre~uref. n~a.I· th(1 tbr('[lhold or hflQI'illll; (about Q,(1(1(1(n !'IiI m;:"), 'fhe 1!o(1U1U1 pl'esst .... e I:OI'·c~IXllldjll}.: III 1 he thr.:tchilld or hUmall bQlll'ing hilS been ,ht"~n lUI thtl l'ef@N!Il('tl PI'Ctlll-lIl'f! fOl' ('akuhlf,iun of 80QIlii pl'elC8url" 1r:'\''?I. Other P,UIllIIlf(1 rerUth{'~ qoantitiep; are listed in Table 8.2. .' . ',-,-0 '.~:: . ','; . , ,:~ ,,,_In-~ .. ~: l II I = = -:::. -.:: tor; "=' .. !;;/" .s -6 i: ;:..;' t t _'" t ~ ~ ~ _ a _ ~ ~ -~ .~ =:=-:==-= I A Y ~ Y , ~ • ~ ~ ~i .-- - - - -.-- .tl~~~~JI"! "I~;.·; ;<""fL I ~ ~~~'~~~~~~I,! :>1 _______ _ .~~~I~.~ }>~~ ~ . 7§"~ I ~Z::::2~~=='3.."3. ~~=;::..:..::=--I~~~~~~~~~ I .. ~ ~ I H . '" 1j ~ o <0 ~ ;: IlP J,1t SSO"j Ilnl"";II~!>II'JlJ I t::~3~!,:!£ ..... . . . . ~ . .., ;; r: ~ " ::l = .., t '" -, ." " .. <.; '-~ '. ;:: "'Z 3 .:!! = ~ .. § :;: '" ..; z .., -'" " .. i.: ~ :=. ~ , PRfluuci TIIICKtlESS ilISIDE. CDNSIR. SPACE O~TSIDE SIC VALUE UlnInaIed GlasS' 114" (7.24 mm) us-0031r Safi ... liS' J~ 318" 19.53 m m) 114' 0.030" Safltx 1 la-36 3IB' (10.5 mm) 114' O.ll6Ir Salle' II!" 37 112'(12.1 mm) 114' 0,030' SaIIex ,,4' 3lI 112' (12.9 mm) 114' 0.061T San .. "4' J~ 5/8'{16,2 mm) 3/8' 0.030" sane, 1i4-40 3/4" (15.9 mm) 112' 0.060" Sano. 1/4-.. !.aminated-~1'(26.1 mm) 1/4'l8minal. 112', air 1/~' 39~ 1nsull.litIg Glass' 15116"(24.6 mm) 114' laminale 112'". air 3/16' 39 H~(29.3mm) 3IB' laminali HZ'. air 1/~ 4U H/16' (37,3 mm) 1/4' laminal. 1", a:r 3116' 4, H/1. (62,7 mm) 114' laminate 2', air Ji16' 45 4,1i2' 11'3.5 mm) 1I4"1aminatl 4", aif 3i"6~ 4" 4-5/8' II 19.1 mm) 112' lam inal. 4", air 3116' .~ ,'127.9 mm) 114' laminat. 112", aU , {4" laminale 42 4-3/4" 1120.7 mml tIT mmflTltl!! .4", iir , 14" IImmat£ .5~ "'''paad Giass' la (14,5 mm) II!" 114'. all II!" 26 " m.9 mm) 114" la. air 1/4' ,s Ha 1"0.6 mm) 114" '., air 1/4-'7 ,. MOI101ithic Glass' 1/4"" [:,;:: mmj "4' 3) 1i2"' (12.': mml 112' :.l8 Walls' .. 1/2" Gyosum board (bot' sides/ screweCl :0 :;~5ie· me.tal ~1Uds ,li ~. Face brick, mortared !og!'!thef ': c" t.ightweight C"I,crele ::Jlcx:k, rNa coats of pJir.1 ear.;n side '6 4· HoP-ow. !I~htweigtlt masanrj bloct\ plastered 0:1 boln sides "e g' Oelisa CGncffle !)t(;Ck waf! , two coats 'Of paint !aC!'1 ::irutl ., "-Doubl. layer gyl)'sum walilloard. betl) si005. 3516' metal SludS, 54 '3" sound; attenuation blanket ItDrt1· IJ 1~S1tId IIIlMt ~S7'J,f i::O·SJ. ~~ c~ rtI,:.uc.1Wtr wcoo.n :RCIpS.,., ~'W II'I<ny 2; T~,..oUl1lW.:IS-;"M i<JC 13 .!.t1l""~".liI"iid~lw:&IG"""~oI ~ ','d.'Q,03C"" 54r.tt~· l'S":row: ',r/hfCi(J, 1.'-1' ;;;,:]JQ.~ •. !,~ rww 3'" ,'hi(ij. 1;';' . C. Q1O"'" S;JIIIf.l"· 1/"'" .le,QJ 1. Z-~I. ::v "oO"· (!, ~ ~ • 11]", ;'Ic,rOli ~";" rfll(;/r.J. ,;)<I"'" c:.3Vl/llI'd ,.1.il~ :n ~~ ... /r.I"~"'" oa>OOC"..-l s:~ ,Jnd ~/,f';;J ;lJr1r :"11II.5 olII'III iC'S1 1I1dr! '0 ~~ ~ t.:ICTOf) , .. ~ ,./1 ,:!"!Itf'";r.tt -era ::::n5r"'~-c-!l!d·~ ~:l. 7EC'" 11.·sv..,.r.:. HAMILTON AVENUE PROPERTIES, INc. 555 BYRON STREET. PALO ALTO. c.~ 94]01 June 29, 1993 A'ITACHMENT 6 "THe HAMIL TON" TEL (415) 326-1626 fAX. 1415) 327-819) Xen Schreiber JI.m Z 9 ,9S3 Director of Planning and Community Environment CITY OF PALO AL'l'O 250 Hamilton Avenue Palo Alto, CA 94301 Re: The Hamilton Senior Living Community O!?:J'i7"':?J~'~'" '~:...'~: -~ :-'"t: .r:::;c.(:.:~, ..:':,~ .. '-:- Ha~ilton AVenue Between Middlefield and Byron Application for Rezoning f~om RM-1S to Planned Commun i ty (PC) Assessor's Parcel Nos: 120-03-047, 048, 049, 052, 053 and 073 (Specifically, BMR Unitsl Dear Ken: In my letter of June 22, 1993 in ~ragraph 1. I etated that we were to acquire or construct seven (7) BMR units prior to the issuance of a building permit for the referenced project~ I would appreciate it if yoo will accept a revision to this requirement wbich calls for us to acquire or construct these units prior to the granting by the-C',ty of an occupancy perm! t for the referenced project. All ether conditions set forth in my earlier letter are to remain unchanqed. Please let us know if this revision is acceptable to staff and can be incorporated into the required approvals and forthcoming PC ordinance. Sincerely, RAKIL'l'ON AVENUE PROPERT!ES, INC. ~~H~l~ident cc: Steve Player -'.~ ~ . --- VoW OFI'JC(S ATIACHMENT 7 ~1I"'1TM _r.1CMI'.i _.­ ~ ........ ~,­ ....,... '" "",",,-T CruST, GB.1.FPITHS, SCHULZ & :BIORN June 30, 1993 H_·I ... ·, Writer's Direct Line: (US) 321-5005 Palo Al~o PlarJOinq comsiooion 250 Kaailton Avenue Palo ~to, california 94301 Re: Baail ton Avenue Properties, Inc:. 651 Haailton Avenue, 536-576 Middlefield Road, 523-575 Byron street File Nos: 92-ZC-3, 93-ARS-12, 92-EXA-7 Dear Keabera ot the Planninq comaission. This letter b "ul:uu tte4 on behalf of an<S in support of Baailton Avenue Properties, Inc. and its proposal to rezone the above property fro. low <Sensity multiple raaily (RM-15) to planned co_unity SOM-{PC) tor the purpcsu of constructing & h1gh-incoae senior reol<sential livinq ca..unity on that cite. As indicated in the staff roport prepared by Virqinia Warheit, this project vas brought befDra you for the first time on September 30, 1992, ancS since that time bas received conceptual approval froa the City COuncil and the approval of the ARB by unaniaoua vote at ita aeetinq beld on June 3. 1993. The favorable report by the ARB end the conditions suqqested therein ~~fleet the effort wade by the applicant to comply with the ;eneral policy qui<Selines set forth by the City Council in qrantlnq ita conceptual approval. As sot forth in the Staff Report, the council required that the project C01l8 back without tbe requ.ireaent of any variances, that an architectural solution to tha appearance of bulk and maS8 of the project be addressed, and that work be <Sone to i<Sentify a<Sditional on-site parking. All of these issues have been addressed in the submittal before you. In addition, the Counoil instructed applicant to reach an agreeaent with the City which will provide for an endowment 'fund of at least $500,000, with additional contributions to such tund coming fro. a 245' resale fee on future resales of units. The Aqreeaent attached to the staff Report as Exhibit B is acceptable eRln. OazrrttBS. 5CBULZ .. .81 .'i Palo Alto Planninq comaission June 30" 1993 Pa .. e 2 to the applicant and ~ill provide a fund for the benefit ot 8eniora and senior services in future years and will help to inaure the delivery of hiqh quality services to our senior comaunity. The agreeaent provides a Machani •• whereby the 2.5' fro.. resale at future. u....,it. will be assurea by the inclusion of a condition 1n all deeds or instruaent. of conveyance. The public benafit contained therein provides a creative, innovative way to allow a larger population ot aenicra to continue to· be Berved by the proqrams provided by the Senior Coordlnating Council" or such other organizations as aetermin.scJ by the City council. In addition to the &bave public benetit, the applicant vill provide aeven (7) BHR units to the City. As indicated in Ji. Hillis letter. dated June 29 , 1993 to Ken SChreiber, the applicant is requeating' that the proposed PC be modified to provide that the aeven :BKR un! bJ not be requiretd to be d.el i vered untll the qranting 0 f an occupancy permit for tha proj act. TIli. lU!Iendment vill allow flexibility to the applicant to no~ only l~-ate the &ppropriate unita" but turther to exp10re with the Bouainq Corporation the opportunity to lev&raqe the aoney required for the purchase ot the seven BXR units to acquire oil ~ter n1lJlber ot units. On behalf at aa..il ton Avenue Properties" Inc~" I vlsh to thank the Planning' Coami.sion for cDnsideration of the request and \lrge its a.,pport. I beJ.ieve that the project is a pollitive add! tion to the bousing' stock of th .. City of Palo Alto and "ill be an outstanding architectural omhancement to the downtown area. The project that 1. ~fore you reflects the e.f.forts of -..any people working' toqether to arrive at a Project and pUblic benetit ot which the City ""y be proud. Thank you for your consideration of this request. Vert / lY)lourS/2 ..,2t:i'$J;:/J-;;' ?tJ iP ~ STE w. PLAYF:R~~ SWP.dItt ATIACHMENT 8 June 30. 1993 Palo Alto Plan ning Commission "ll . A r. ~ 10 . .£1 'z Cily of Palo Alto ~'\.l :> (I 250 Hamilton Avenue Palo Alto. CA 94301 Re: Hamfllon Avenue Properties Palo Alto, California Dear Commissioners. Although the ARB approved this project at tts meeting of June 3.1993. we requested tha! the garage plan be restudied to e~ minate the two dead end aisles which WIlTS a part of the in~;al desiijn. As was discussed at that meeting. we felt thallhe unresolved circulation coupled with the right, hairpin tum II! the base 01 the entry ramp. constitute dlfficuft and dangerous situations, M. our meeting of J una 17 we received the revised plan you have belore you lonfght We have independentiy reviewed this new plan and feel ft is a decided Improvement. However. there is stili some discomfort associated with the placement of many of the storage unM along the two way drive aisle. There is a poIential here k>f accidents to occur. We are aiso COl ocemed tI111! atthough the spaces along the Sout_ wan can now be accessed without having to negotiate the hairpin tum mentioned above, (by driving around the loop in a clockwise direction), there w<1i be a great temptation to by the difficuH tum in order to save time. Drivers coming down the ramp may swing into the tell lane in preparatior. ior this manewer. conflicting with oncoming cars exiting the garage. We berleYe there may be a solution to help ease these situalions. and respectfuHy suggest that you urge the applicant to further refine the plan to this end. Sincerely yours, .-/" <:j,~~an Palo Alto ArchHectural Review Board SlCphen & Oem Smith 640 Middlefield Road Palo Alto. CA Jun< 25. 1993 RE: "THE HAMILTON" Dear Members of the Planning: Commission.: ATI'ACHMENT 9 I am writi.,g this lener on be~.alf of myself. my wife 3Ild ,",vera! of our neighbors. Uofonunatcly. my wife and I will be away on Jun<: 30 w~Jch prohibits us from attending !be PlJuming Commissioo meeting scheduled for that same date. Please find below a brief summary of some of the thoughL' of several of the members of !be neighbor..ood coocemiDg The Hamilton. We purchased our home a!: 640 Middlefield 00 New Year's Eve.. 1992 and were not made aware of lhis proposed project until a mailing from your office on May 6tk We are aware that many good people have been involved with this issue since the summer of la.o:.t year. On M0nd2y June 21 my daughter and I dropped invi .. tions in the mailboxes of some of our neighbors inviting !bern to attend a gathering with the intention of bringing os all up to date and 10 assess current neighborbood sentiment. This meeting was held in our home on the evening of June 24th_ 1bae are several members of the community who an: opposed to this project and there are some: who approve of irs bemg buill You should know, however. that there was a clear sense that without exception. ~ 'Would prefer a projec[ with less mas."i;. On tlili. \!,'C were aIIagr=i 1bae are many teasOI1. for this, mO<t of .,hieh are ra!her seII~ident and documented in the minuteS of previous meetings in the fonn of c:cncems prnc.nted for your review or for ~iew by !be ARB and City Council We sttODgly urge you.o review !be initial ~ of !be zoning department which stated that this project not be allowed to go forwatd as proposed. There continue to be ""ideots (not employers or employees or church staff) who have no fU'.ancial. personal or political gain to be realized by the fruition or demise of the proposed project and whose principal opposition is base<l upon their desire to maintain their Deighborbood atmosphere. These neighbors include ourselves, Tim Lindholm, and Lucy Gaylord, all of whom are homeowners and live in !be 600 block of Middlefield -In block from the proposed prop We are people who can: about Palo Alto and have sentiments foe the elderly as weD as others. We are residents who feellhaJ the building and its deoign. the landsc3ping and materials, are all very beautiful and of high quality· these have no reiev",,' bearing. however. on our submission that this location is a poor location for a project that is this immense.. We each would love 10 see more dollars go towards senior programs in this city bot do no! see thal!be monies that would be realized by the seniors or !be BMR bousing interests to be ajuSJ: compensation forme mass of this facilicy. We are neighbors who include Mrs Tinney who fives I block from th is proposed projecl She has beeo unable to attend city meetings because she herself is a senior whose physical health prohibits her doin@ so. She does not know any of us from Adam. She respcnded to .our invitation, ho\IICVer, and]efl a phone message concerning her feelings. Mrs.. Tinney is flatly ovvoscd to its being built on 1hc groonds thai: this cite is not the proper location. S he is probaoly older than any senior who will likely occupy The Hamilron. She has an opini.Qn which should be be given very sensiti"e consideration -certainly more thar. our own . as she has owned. lived in, and paid lUes on her home for 60 years., most likely longer tf-.an YOll or I have been alive and c:mainly longer than any of 1J.5 Mve been ""idents of this ci~'. I mmt tell you Ihaa: we f~l pretty discouiaged. There is Il sentiment that 1be Hamilton is a "done deal" as they lay. Despite this sense:, we do IKlt believe that mere are any "bad guys~ in this scenario. w. ~ convinced that !here = goo<! people involved with this project, oowever .... " also r..,l that the city SI3ff woo have viewed the proposed plaM Mve done so with ·...nous degn:es of bias based upon a histnry of relationships between themselves, project pri~ipa1s. those who stand to gain increased revenues from additional pa";shoncrs. and olber persons who have been long time residc:nts ami respected citizens of Palo Alto. Unlike Mrs. TUU1eY. !here are thme of us who are not 100% opposed to this project We are very simply in1>lcring you to .... jew the volume of this structtn proportionate to the land parceL Although !here are tilose woo are pleased with this project. we are asking you to eor.sid", the wishes of SOIT'<: of those who will ~ in its midst We fel that this project can be greBliy improved upon by deaeasing its size and we mainlain that it would be an unfonunate misclIlculatioo on our pan not to have full faith in you.-ability and williogoess 10 re.pond 10 our plea 10 pr=:rve 0Ul' neighbomood and 10 adhere to plorming standards that pl'OmoIe 1 •• po/lSible groWlh and development in OUI colllnumity. '," . ATIACHMENTIO MRI '" RES-EARCH AND rRAJNI"-tG INHITUTl FOP THE INTlRACTION.I4,t STUDY OF THl' INDIVIDUAL. rHE MMj('( AND THI COMMUNITY June 25. 1993 TO: Planninq Commission FROM: Dr. Arthur M. Bodin Chairman, Board of Directors Mental Research Institute RE -; The Hami 1 ton '" . l:' _ , The Mental Research Institute Board and staff are unani.ous in their concern about disruptive noise from jac~rs~ riveting} hammers, etc., during about 18 months of construction of the Hamilton. The HRI, founded in 1959 and located at 555 Middlefield Road since 1967, conducts psychotherapy all day every weekday and conducts tr~inin9 at various times throughout the week.. In both cases, video and audiotape recordings are often essential, as is the ability for patients I therapists and trainees to hear--even if some have reached the age at which it is difficult to screen out t~y loud background noise. Our two training suites face Middlefield Road. In addition, the main conference room for staff l Board, and training meetings faces Middlefield Road. Last and at least equally important, there are 28 psychotherapists in our buildinq conducting individual, couple, fa.ilYI and group psycho~~erapy starting about 8~OO am and sometimes going as late as 9:00 pm~ SOme of this therapy is through HRI's Brief Therapy Center, some is through the Mal Clinic} and some is independent practice by staff and other tenants. The bettOR line: it is essential for our therapy, traininq, and research that we are able to bear well and make hiqh quality video and audiotape recordings. There is no way to schedule around the therapy, since it is continuous. Thus we need two things from the Planning COBDission and city oouncil~ 11 A requiresent that the HaJ!I.ilton developer pay tor double-paned glass to be installed throughout our building to l2Y~ the jackhammer noises And 2) a requirement that all loud construction procedures be scheduled so as to avoid our training tilles. OVer the past 34 years, MRI has drawn many thousands of people to Palo Alto from a~ound the state; the nation, and the world--for training in family therapy and (fer 26 years) for training in MRI Brief Therapy. Th2se people stay in local hotels, e&t in local restaurants, and buy in Palo Alto stores. This training continues. Let's make it possible for this training to continue and thus function BS a business asset in Palo Alto. Arthur M. Bodin, PtL. D. Chair, Board of Directors Mental Research Institute ---".- I, 111M 23, 1993 PIaunin, Commlosion City of Pal<> Alto 2SO Hamilton Avenue Paro Alto, CA 94301 ATrACHMENT 11 i RE: 6S1 Hamilion Avenue, 536-576 Middlefield Road, 523-515 Byron Street I Dear P1aonillj COOunissIooetJ: I wish to ~ my otr"", support ..,cl the wpport of • n~· of Illy imm<dia'" oc:iaI>bon fOT Ihe propooed 36-Wllt .... 10< 1ivm& community. My reoidenao aDd ~ are witllin ODe bIocl: of Ihe propcoed project. I will penona!ly be imJ'OCled as .. ucla if man: than any of my nsidMtial neighbors. From my third-1Ioor oIIi<e window at Ihe c:omer ~"toD aJId Webstu, J will ........ bee tops where Ihe project rises 10 okIorics. Rcpr_ of an io, J have 10 .., Ihlll this project for a!lluent reuion, with itt semitMo deoilJ> throusJ! its '. ure, Jan<I&capiDg am! oet.-, makes .sense. in this location. 'l' It is within Ihe "",,1m! of aome of Ihe IUrtWDdiDg ~ t propooc<l Urban Desi&n PI"" that I find thai the heicb~ bulk aDd ...... of the project appro . o· in this location. The .... 1fug <OJJcIominiums at the comer of Middlefield aDd H.omiIton on: 2 12 aoricI high compared with the project" proposed :w.o.y elements at tho.ame corner. Mo,...,.." oI<mg Hamilton A..,..= between MiddlcfickI and WobI1er, the Fin! United Methodisl Churoh', 6DetUlllY riIeI to an cic>atioD of 4 rtories pl.,. on Hzrw1tcn ODd extcnIivelJ-along Webs"',. There ~ exists substantial bulk, mass and height betweec Middlefield and WobI1er. j I firmly believe this project ...ru DOt let pr=:dcnt fu, futun: ~r """tit of Hamilton along M'or\dIefield, but if there were 10 be any futute ,edevdopotent r4tth of Hamilion aIooJ Middldicld it would retain its _ty reskIootia! c:bataeter. In abort, l...!Ha.nntcn Avenue and MiddIcIicId Road as the 'zoning alp" in this port of our city that provide .lramition from d,"""""", mix,uses to tho residential Dci&bborhoodl ooulh of HanultoD mel east of~. The propooed Urban l>esiin Pimt 011 pa", 29 _ the Middlefield edge and en'1 ccmc, to ou' City at Middlefield Road and Univcmty A .... uo as follows; l Eoooaroge __ '" bip deasiIy rajdeptjal uses i Mjddlcjjcld Road and W_ Sba:~ with the tro.iIdiI!I .......... IIw ...-~~ pIaoed _ Univcm1y A_ ... tnmiIioo. to ___ ..... "'&Ie~t:-~ lqinon tbeDOdhDle ofM' ....... 6e!dRood. 1 i M.aIDtain an open cPI1y_ lit M"orkIcCodd Road and ~ Avenue 10 <n:a'" om ""lI)' __ priaaorily Ibrou&It r.-..., ~! ~ 06/:5/93 lO: SC 415 327 81'97 P\annina Commiuioft Joot 2.1.1993 Pa", 2 JArES K!:"L E1' ..u. p~. ·D:; The adoption of the propoocd p.e Zonin& will allow £or 18 IIIOre residential uoi .. than does t!>e pt<SC!lI~. and even with this iI is difficult for m.= to ia"IiaC how !he additi<>nal can fro", lbe<e 18 r .. ~b, tlIelr ...... and ""'" the few deIMlfy ~ ttucli!< will ~ the ..-_ for __ dal will be derived at I lime Iba' _ ICllim IeI\'I<a will be eIiminIted from oW' al)' budget. MorO<JYel. the ~I of approximately 11.000 "I.ft.; of oxistiD, commtreW UICII and ill rclaLe<! traffic lurtheroflicu the addltiDnaJ a"'_"'";' Iripo..,..,,"'" by tbeoc 18 =Iden .. 0!Id!heir J\IICIts. :l .. my urwkntandbl, tha'. in a4diticm to meet:iDlme City's requirement of providing 20% affordable bousins (7 rclidentioJ rcoW units). the appti<anl will;crcate.., ""dowment iuD<! dat will provide for servicet to oen.iors wbo ocberwiIe oould not _ ....., ~ It is fur th= """"'" plus additional reosom from 01)' DOi&/l .... lb., "" "'I" )'Ou to IUjlpOr1 this project. Very truly you,,- r-WICder 631 Middlefield Road (_) ODd SSO HamillOD Avenue, SIC 307 (oIlice) RFSIDENIS SUPPORTING TInS:l6:UNIf ~OR PROJECT (Name) (Address) June 23, 1993 Planninq Commission City of Palo Alto 250 Hamilton Avenue Palo Alto, CA 94301 A'ITACHMENT 12 . --' -.. ,. JIJh 3 ~ 1993 : ::-=-__ .~_~ J Re; 651 ~ilton, 536-576 Middlefield and 523-575 Byron Dear Planninq C~i89ioner&: The undersigned are homeowners in the immediate vicinity of the proposed sftniors' cOlllll\unity known as The Hamilton. We are . familiar with the plans and other relevant details of this project and have followed its progress thr~cqh the City approvals process. Several of us have attended public hearings and spoken in favor of The Bamdlton and/or written letters in support of the proposed re-zoning in the past. Although a number of us plan to attend the public bearinq before your Commission on June 30, we want ~o take this opportunity to once again express to you in writinq our support for this fine project. We urqe e~ch of yo~ to vote in favor of a motion to recommend to the City Council that they approv~ the re-zoning required for The Hamilton .. very truly yours, b7XJ :J ... dw" .JJ::t<J.f, (fIV:(1 ait., ,JJ f,,-/.. I'd?:, (li·~, f{2--tVI " I (2'b G'C"f(r hi), 1~'~ }ill, ,~ ~h;- >1 . ff· fk7=-; v /L t-!-d. .... /v( 17; CHARLES G. ScHm.:z e!'17 IIYIlON .e"nla1l'T f'OtI'1' OPPICII BO--X ~ PALO ALTO. CAUPO.R.N'1A &4302'.te99 'I".I!ILBP-RO.'QI 1411:1' .3l1&-.aoeo .P.t.l£ 1411!) ::lllIe-o.2e. June 22, 1993 Palo Alto Planning commission 250 Hamilton Avenue palo Alto, CA 94301 ATIACHMENT 13 Re: 651 Hamilton AV4inue, 536-5'76 Middlefield RO'., 523-575 Byron Street, Hamilton Avenue Properties, Inc. 92-ZC-3, 93-ARB-12, 92-EIA-7 (revised) Ladies and Gentlemen: ~ own the property at 517 Byron Street~ r continue to oppose The HaKilton, 36 luxury condominium units for seniors, because of its size and impact on parkinq and traffic in the neighborhood. 1. The Arcbitectural Review Board ~as concerned about the circulatio~ of traffic in the underground garage, referring specifically to dead-end aisles. At The Stratford, 601 Laurel, San Mateo, CA, a project with 67 condominium units, there are two floors of underground qaraqe. According to the staff person there, there is a full loop on both floors and there are no dead­ ena aisles. The Hamilton should haVp. a full loop for traffic in its qaraqe s no dead-ends, and a less-constricted turn trom the ramp to enter the loop4 24 At ~e stratford, the person in charge informed ~e that there are 45 employees to serve the 67 units. There is a kitchen which prepares, on site, one evening meal each day and one luncheon on Thursday. The Hamilton proposes staffing 36 units with 8-10 employees, providing the residents with at least one meal a day, and allocating 6 parkinq spaces for its 8 -10 employees. The H~ilton, more than half as big as The Stratford, proposes staffing with less than one-quarter the staff. It seems obvious that there will be more ~ployees at The Hamilton and that insufficient parkinq spaces have been provided for them. The extra employees, as well as persons hired by the residents for their own needs, will have to park in the neighborhood, thus addinq to congestion~ palo Alto Planning commission Re: The Hamilton Paqe two June 22, 1993 3. Each unit at The Stratford, I was info~ed, is assi9~ed two parking ~paces. Many couples there have tw~ cars: some of the people are still working. The Hamilton proposes 59 spaces for the residents and 12 spaces for guests. Developers of The Hamilton have indicated that one space will be assigned for each unit for parking and that additional spaces can he purchased by the residents. The residents of The Hamilton are described as active seniors~ with a minimum age either 62 or 65. If only one space is provided, residents yill tend to parK extra vehicles elsewhere. If residents do acquire more underground spaces, there will be fewer parking spaces available for guests and employees. In short, there is not enough parking provided on site for the realistic needs of residents, staff, employees, and quests. ". All service trucks and moving vans for The Hamilton ei~er will have to double pa~k on Byron street or use the space in front of the entrance. Compare this narrow $treet, 30' wide, with what is available at Peninsula Reqent an~ The Stratford, projects in San Mateo which are stated to be cOMparable to The Hamilton. Both Peninsula Reqent and The Stratford front on streets wider than Byron street, and, in each case, the access parking for drop-off and visitors is larger than what is provided at The Hamilton. Byron Street is already congested from time to time with delivery trucks and other vehicles qoinq to and from the Palo Alto Dental Clinic, Brauer Pain Control Center~ First United Methodist Church, and two professional buil~ings. 5. The .floor area ratio of this project is 1.7. The maximum regular zone, RM-40# would allow 1.0 FAR. All problems related to The Hamilton?s parking , traffic circulation, and congestion flow from its size. The neighborhood and the City 5hould not be asked to make sacrifices because the applicant desires to maximi~e its developmant investment. Sincerely, . '/7. -CX ' ~ 'UM. Le-' CHARLES G. S HULZ ~ CGS:bh P.S. I request that any approval he conditioned on ~y property's continued driveway access via the driveway immediately to the north of the applicantls Byron street property. See the ARB1s minutes and action, June 3, 1993, in this regard.