Loading...
HomeMy WebLinkAbout0381.093July e. 1993 THE HONORABLE CITY COUNCIL Palo Alte, California Everett. Avepne/Hawthorne Avenue Storm D::::ai~l Improvement Project CIP 47702 -Increase in Contingent Authority for Proie __ £t.....bl..oseout MemPers: of the Cou..."'1cil; Report. in Brief This report recommends that Council al.lthorize the City Manager or her designee to negotiate and execute one or more additional change orde:rs to Contract no. C3032.994 t;l'ith D. W. Young Construction Company. Inc'r in an amount not to exceed $15,000. This represents ax .. increase in staff's change order authority from $290~OOO to $305,000 fo,r-all change orders through project .;;loseout. Funds are available in elP 47702~ Collection System Improvements at no incre~~e in prcject budget. Background On August ~O. 1932, Council approved a construction contract with D. w. Young Construction, Inc. for $1,469,407.75~ plu? $290,000 in change order authority, for the Everett Avenue!Hawtho.t·ne Avenue Storm Drain Improvement Project (CMR:374:32). It should be specifically noted that the contract award amount was 29 percent below the engineer's estimate of ~2,C~9,435 for the work. The sc~pe of the project includes the construction of approximately 680D feet. of storm drain (:r·anging fr<?m 12 incbes to 54 inches in diameter) from the intersect jon of Univ~.csity Avenue/F.arw.:ma Street to an outfall into Sa~ Francisquito Creek at the end of Everett Avenue. The work also includes constructicn of manholes, catch basins, curb and gutter, curb ramps foz the disabled. and pavement restoration. During the course of construction, some of the contract quantities increased signifir:antly and seve.t·al unforeseen items of work were added to the contract. These chang~s have resulted in a measurably improved final product benefitting the City. Examples of these changes include: • Increase in pavement restoration quantity due to the failure of existing pavement adjacent to the trench. Many of the streets, particularly those cons~ru.cted with concrete, had existing crack.s and defects ';oI'hich caused the pavement to break CMR:381:S3 --.... ~~----'- , 1 7 • up once i~ was t~enched. replaced. /- The failea. pavement was re~oved and Increase in number of curb ramps due to a revised interpretation of the Americans with Disabilities Act (ADA). Curb raTr.ps were installed at all fO'..lr corners of an intersection even when only one corner was modified for the installatic;n of a catch basin. ~ Reconstruction cf the full oavement structural section rather than grinding and asphalt o~erlay at ten intersections. Since the eXisting pavement was in a condition worse than expected and was further weakened by the extensive trenching, it was necessary to remove and reconstruct the pavement in order to maintain the structural integrity of the str€.et. • Modification of stcrrr. drain installation to a.ccommodate unanticipated conflicts with exLe-ting '..ltilitier.;. Storm drai:1 pipeline~ manholes, and catch basins were required to be ralocated in order to avoid interference with utilities that were unknown or at differ~nt locations than expected. Six change orders totalling $279.755 have been issued to the contractor to date for changes in the work. The original change order authority has been reduced to approxima.tely $10,000. Within the final block of construction~ on Ramona Street between university Avenue and Lytton Avenue, the contractor encountered two u..,expected site conditions. This resulted in 3. contractor's request for compensation for increased construction costs even though the scope of work did not increase. First of all, there was an unexpected change in subsurface soil conditions. Throughout the earlier stages of cO.1struction, the soil was consistently firm and stable as describp.d by the soils report. prepared during the design of the project. For a distance of s"3ve:r-al hundred feet on Ramona Street, however, the soil was of a loose sandy nature and susceptible to caving+ In order to maintain the structural integrity of the trench. the contractor had to increase the shoring of the trench walls and change the pipeljne installation technique. This resulted in slower production rates. Secondly. the contractor discovered tL~der9round telephone cables which had not been identified by Pacific Bell during proje~t design and which conflicted directly with the proposed storm dr3~n alignment. In orde't" to avoid the telephone lines, the .storm drain had ':0 be rerouted and several manholes had to be a~ed to Lhe line at an additional cost. The contractor has re~~ested a change order to cover the cost of the additional labor and materials charges and time delays caused by these unforeseen conditions. Staff has evaluated the contractor'S request and believes that approximately $25,000 of the requested costs are justified. The alternative would be to deny the contractor's request for additi0nal compensation and await the contractor's initiation of legal action against the City. -2- , .. ::~~>~~ Therefore, staff recomT'lIends that the: authority to issue change orders be increased by $15,000 to cover the cost of these items. Funds for this increase are budgeted in CIP 47702 from the balar.ce available due to the favorable bid for the project, Re comme ndat ion Staff recommends that Council authorize the City Manager or her designee to negotiate and execute one or more adcitioIial change orders to Contract No. C3032994 with D,W. Young Construction Compc:ny, rnc., in an amount not to exceed $15,000. This represents an in,~rease in staff's authority from $290,000 to $305,{JOO for all change orde rs . Respectfully subrnitted~ Gs.:ORGE BAGDON Assistant Director of ~lblic Works Related Report: CMR:374: 92 C'MR.:3Bl:93 -3-