HomeMy WebLinkAbout0299.093'., -o;;;,~~;,,>~,."". _ ~~~1F .. - May 13, 199) THE HONORABLE CITY COUNCIL Palo Alto, Cslifornia Civic Center Fire Sprinkler system -CIP 19108 Award of Cont--....a~ Members of the Council: Report in Brie' This report recommends that Council award a contract to Grinnell Fire Protection Systems Company, Inc. in tne amount of $341 1 548 to install a fire sprinkler prc,tection system in those areas of the Civic Center which are currently ..... ithout sprinklers. Funes have been appropriated in elP 19108, Civic Center Building Fire Sprir~ler System~ Background The City'S High Rise Ordinance and Appendix 1-8 of the uniform Fire Code require installation of fire sprinklers in ~igh rise buildings~ The Civic Center currently has tire sprinklers in the three basel!lent levels only. This project 'IoI'il1 install fire sprinklers throughout the tower. council Chambers, and the Police Department to provide a fully sprinklered building. Bids were received froUL three qualified cO:1tractors as shown on the attached summary. Staff reconu=lends that the bid of ;;341,548, submitted by Grinnell Fire Protection systems Company, Inc .• be determinea by Council to be the lowest responsil:lle bid and that the contract be a~arded accordingly~ This bid is five percent belOW the e~qineer's estimate of $360,000. Due to the high probability of unforeseen job conditions on a project of this type, involving modifications to concealed facilities in a 20 year old building, a 1~ percent contingency is ~einq requested. This will cover items such as repairs which may -1- C>!R:299:93 1 be req".lired to the existing main line piping ",-hich • ..-ill be reused, and any other unforeseeable job conditions. Work is t~ntatively scheduled to co~~ence in July 199) and viII last tor 12 months. construction in occupied office areas will be scheduled between 6:0C p.m. and 7:00 a.m. so as to avoid di~ruption during the work day. Recommer.dations Staff recommends that Council: 1. Approve and authorize the Mayor to execute the attached construction contract wit_h Grinnell Fire Protection Systems Company, Inc. in the aTI10unt ot '$341 1 548 fer the Civic Center Fire Sprinkler system. 2. Authorize the City Manager or her designee to negotiate ana execute one or more changs orders to the construc~ion contract with Grinnell Fire Protection Systems Company, Inc .• the to'=:al value of .... hich change orders shall not exceed $50,000. Respectfully submitted, KAREN SMITH Acting Facilities Engineer £d~!I4- Director of Public Works ~ JI.utWly' JUNE FLEMING City Manager Attacl"'unents: CMR:299:93 Bid Summary Contract Pages -2- • / ; I ! ! , i I I Grirmel Fire Protection COseo Fire Protection Superior Auto Sprinkler bidsum 05/05/9) ~c CENTER FIllE SPRINKLER SYSTEM UPGRADE BID flUMIWlX IlA2l:: ADQ lI.oIj';RNAT~ ~ l!lIl Al:oI U AloI...1. lllJ.l $341,538.00 9,600 750 351,888.00 $451,230.00 2"1,450 5,000 463,680.00 $518,800.00 14,860 7,420 541,080.00 - o ) " ~ , I j , 1 , , ,/ . .:, , ; .. '~~ _" J - -------------------~ PART II • FORMAL CONTRACT SECTiON 00500 CONTRACT This Contract, dillted' c' is entered into by and between the City of Palo Alto, iii m\mi(:ipal corporation of the State of California ~·City·) • and G r i nne 11 Fire Pr 0 te.: t i 071 Systeos Conpany. Inc. ,a , ,"Contractor"), Wh9S8 Taxpayer IcUintification Number is ___________ ~~_ For and in (;onsi.darstJon of the following CovitOlnts, terms itl'1d conditions, City ana Contractor '-the parties"', ag:CIHl: 1. I.D.c:m.. This COtltta::t ,h.iln c:ommence cn. and be binding on the parties on, the Delta of Execution of this Contract and $han upi"e on the date Of recordation of the NotIC:':' of Substantial Completion, OJ, if no such n01ice is required to be filed, on tt1e date that final pa'lment 1.5 made hereunder, subject to the earner termination of this Contract. 2. Gentr.1 Scppe gf Prpjw and WQrX. Contractcr shall flJrnish labor, servlces, materials "ilf'ld eQuipment in connection with ttw constrUction of the Project and comp'ete the Work in ilccordanc-e wrth tne cove· nants, terms and conditions of this Contract to the S31istaction of City. TM Project and W<JrJe is generallv described as fono ~-{s: !ttle: Civic Center Fire Sprinlder Sys@m Upgrade NQ.: FQ02~93 8ase~: • __ -C~~4~1~,~j::4~C~' ________________________________ __ Add Altemates {if any): S __ "'?:.:./.:.A'-____________ _ 3. Contract p!?Cumtflts. T:iis. Contract sha!i consist of we docurroen!5 set forth below, which are.:ll"'i file with the City Clerk an\:! are hereby incarporated by refe.'ence. For the purposes ot construin~, ""t&fJl"!'eting ana resolving inconsiStencies between the provisions of this Cont,iict, lhese documems and the provi'iions tnareof ar~ set forth in the fcHowing descend~nQ. order of precedence. •. Thf! Contract. b. Noticl! InYrtin~ Formal Bids. e. Contract Sp&cifi.catioM •. d. Drawings. 8. Change Orders. f, S;d, Suppl&m~ntary Conditions. General Comfl1iDns Standard Drawings and Specificaticn.s. (1992). Certificate of Insurance, Performar'lce Bond and Liilbor and M~terials 8ond. Affirm":tive Action Guide-fine$ and Compliance Repon. g, h. ;, j, k, I. Other Specifications, cr Pi!ltt thereof, not expressly incorporated in thIS CoMracl Specification" or the Standard Df.;Jw~ngs and Sp~cification5 11992). m, Altv other document not expressly mentioned herein which is i$suecl by City or entered into by \he parties. CITY of PALO ALTO: ronnal Cormact (Sample) NIFB (10/921 SECTION OO!iOO-1 '~'. -.:;. -'-,0<-, .::.:2<,::, , .. ;~~f¥f· .. ........ : PART II -FORMAL CONTRACT SECTION 00500 •• CQmOiln.silticn, In considaration of Contractor'S pcrform.lr'lce of its obli"a:ions hereunder, City shall pay 10 COlltraCtO~ the amount set forth ir, Contr<:1ctor's S'ld in accordance ..... -Ith tl'1e p:cviSiO:1S of this Contract and u~n the rEceipt of wri'Nen invoices and Oll! necessary sup;JQrtin~ docwmentation within the time 5Ct forth in the Contract Speciffcati",ns ant:! the StMdard DraV'iiIlg'> and Specifications I' 992), or, if"o time is stated, within thiny (301 Days of the date of receipt of Contractor's in\lokes. 5, InSUrance. On or before the Data of Execution, Contractor st-,all obtain and main:ain the policies of Insurance eoverage described in the Notice tnvitin~ FOi'ma~ Bid's on terms and cond'itlons and in amounts as may be I"~uired by the Risk Manager. City snail not be-obli~ated t.J take out insurance on Contractor's personal pooperty or the personal property of an,,:"' persor. ...,erform:ng fabor or services or supplyin~ materials or eQuipment under tht:" Project. ContriC1o( shall furnish City with the certificates of ;nsur~rv.:e and with oti:;:ir,al endorsements affecting cO\lorage requirEd under this Contract nn or before tho! Date of Execwtion. The certificates anlt endo(sftmeniS for Mcn insurance t?oH;:;y shall be signed by a person who is authorized by that insurer to bind cover.arile in its behaif. Proof of "insurance shall be maned to the Project Mana!;ler to the address 59; forth in Section 15 of this Contract. 6_ Indemnification, Contractor a!;l'rees to t?rof6ct, defer,d, indemnify and hoid C,ty, its City CouncH members, officers, and employees harmless from and against any and all claims, demands, liabi!ities. losses, damages, costs, expenses, rlens, ~enalt~es, suits, o( jud'!;lments, arising tn ,Nhole or in pa,""t. cflfectJy or i.'1directly, at any time from any injury tc or death of persons (X da:na~e to property as a resuh: 01 the willful or nlSrgfigent act or omission of Contractor, or which resu!ts from Cont,acto('~ nOl\Compriance with ;my La...v rflspecting the C"onditit:ln, us.e, occt,;paticn or safety of :he Project site, or any part thereof, or which arises from Contractor's failure to da ilnything required under this Conuaet Of' for doing anything which Cor;tr.ct(X is ret:juired not to do under thls Contrctct, ar which arises from conduct fer which ."'y Law imposes strict liability on Contractor in the performance of or failure to ,perform the terms an,j conditit:lns of this Contract. ~xcept as may arise from the sole willful or neg~gent act or omission of City or any of its City Cour.cit members, officers, or emplo\lees, This indemnification shan extend to any and all claim:;;;, demands, or liens made or filed by reason of Clny constnlction, renovation, or remcdefina wore. performed by Contractor under this Contract at any time during the term of this Conrract, or ari:iing tt'lereafter. 7. AssurT'ption pf Risk_ Contractor agiees tc \loluntarily 3:;su~e any and all risk of loss:. d.!ma~e, or injury to t."'e ptopert-: of Contr;;ctor which may occur in, on, or abou! the Project site at any time and i., any manner, uCepting such loss, injury, or damage as may be :::aused b\l the sole willful or nEigligent act or omission of C'rty or any of its City Council m&mbers, officers, or employees. 8. Waive.!. The acCeptal1Ce of ally payment or performance, or any part thereof, shall ~ot operate .as a waiver by City of its rights under this Contract. A war .... er by City -of any breach of any part or provision of this Contract by Contrac'tor sh;;11 not op~rate as a wai\ler or continuing wai\ler of any subsequE.n1 breach of the same or any other provisrol"1, nor shall any custom o( practice which may arise between the parties in the administration of any part Of provision of tl'1is Contract be construed 10 waive or to lessen the right of City tt:l insist L!pon the performance of ContraClor ,n strkt compliance with the covenants, terms and cona'iti{H'.s of this ConUact. CITY of PAlO AlTO: Formal Contract fSarr.pJ£-1 NrFB 00,l92l SECTION 00500-2 ~ , " ~ ::; , ti~ PART II -MAL CONTRACT SECTION 00500 9. ~ .;;1 with Llws. Contractor .shall comply ..... ith aillilws now in ferce or wh.ch mClY hereafter be in !orce pertaining to the Project and Work and this. Contract. with the reqIJirement of any bond or fire LUlder .... rrters or Other similar body now or hereafter cons1itu--::I, with any discretic.,ary ncense Or p&m1Et i.u.uad pursuant to any Law .of any pu!:llic agency or officli2~ as we!1 as with any prQvision of ail record&d documenta aHec:t:i"g: the Project site. j"sofar as any are requireo b~ !f~ason of tt.! usa or occupancy of the PrOJ8ct site. ~nd with all Laws pertainirg to nondiscrimination and affirmative action in employment and haziilrdous materials. , O. ~. As .. condition precedent to Crty's Obligation to pay compensati~n to ContraCior, and on Or before the O"te of Exec-Irtion, Contractor .shan furnish to the Project ManagE-r the Bonds as reQuired under the Notice InvitinQ" FOr!'nal Sjds. T 1. ReW$'ntations and WarIi!!li.U.. In the supplV of any matetials 2nd eQuipment and the rende,in~ of labor and' services during the COlJrse _nd scope of the Project and Work, Contractor represents anc wauartts.: .a. Any materials and eQuipment which shan be used durinll the course .. nd sCIJpe of the Project and Work shan be \/esteC: in Contrilctor; b. An.,. materials and equipment which shan be used durln;l the course and s,ope af the Project aM Woric: .shan be merchantable and fr1 to t:>e used fC>f the pa rticular purpose for wf'Iich the m.sterial$ are required: c. Any labor and services rendered anc materials and equipment used or employed during the course and scope of the Project and Work shall be free 01 defects in workmanship far g period ",-f one (1) year after the recordation of the Notice of Suhstar.tial Completion, or, tf i'\O such not!ce is re\:juired to be filed, on the date that final payment is made hereunder; d. Any manufacturer'. warranty obtained by Contractor shaM be obtained or shan be deemecf obtained by ContraCtor for an d on behalf of City. e. Ar.y information submitted !:Iy Contractor prior to the a ...... ard cf Contr",cl or thereafter, upon request. whether or not subm:tted Imder a continuing obliljation by the ~rms of the Contract to do 50, Is t1\Ie and" co~ at the time suel'1 information is submitted or made a .... aliable \0 U',e CIty; f. Conttactor l':.as not coRuded, conspired, or agreed, directly or indirectly. with any person in regard to the terms and conditions of Contra[:1Or's Bid. except as may be permitted by the Notice Invmn~ Formal Bids; g_ Contractor has the power and authority to enter into tt'lis Contract with City. that the lndividuaT executing this Contract is duly aL'thorized 10 do $0 by appropriate resolution, and ;:hat th~s Contract shall be u:ecuted, dehered and performed pursua"lt to the PQWE:r and authCirffY conferred' upon the person or ~rson~ ~lJ1'horized tC' bind Co'ltraeto."; h. ContTactor hall not made an attempt to exert undu& influence with the Purchasing Manager or Project Manager or any other person wtlo has diree(}y COniributed to City'S decision to award tM contract 10 Contractor; CrTY of PALO ALTO: F(),I'maj Contract (Samplel NIF5 /10/921 StCT JON 00500-3 .-........ ~,.-----_._--, .... ,._ ...... , " .> '~ -' .. '­. • o PART II • FORMAL CONTRACT SECTION 00500 t. TMfe are 110 unresolved claims or disputes between Contractor and City which would materially affect Contractor's atili", to perforM under the Contract; j. Contractor has furnished ~nd wflJ furnish t~ue and accurate st:nilmer,ts, records, repOrtS, re;f'ofutions. ctlrrificaticon:;. and ctl'1er written informatic.n as rna.,.· be requested of Contractor by C!ty from timflla time .juring the term of th'l$. Conuact; k. Contractor and any per$i:on perlormlr.~ labor and :§;ervices under thi"! Project is duly ficensed as a contractor witM the State "f Cal~fo,l1ia as re~uired by Califcm1a Business & Professions Coda Section 70~8, u amended; and I. Contractur hn fully examined and inspected the Projec1 site and has full ktwwledge of the ph'i'SiCiiill conditions of the Project si':e. 12. Assignment. This Contract and the performance required hel~aunder is personal to Contractor, clnd rt shall not be as.si~l1ed 0)1 Contractor. Any anempted assignment shari tN!! null and vcid. 13. Claims pf Contractor. An claims pertainin~ to extra work. additional charges, or delays within the Contract Time 0( othet dIsputes ouisrn!;l out of the Contract 5han be submitted by Contractor to City in writing bv certified or regi5tered mail within ten (1 Ot Days efter the claim 8!'OSf! or within s-u~h oiher ~me as may be PitrmmfJd or reQuired by law, and shan be described in sufficisnt detail to give adequats notice of tha liubstance of the claim to City. 14. Aydhs by City. During the term of th.i&. Contract end far a period of not :&5S than thlee (3) years after the ltJq;ir;ation or earfier termiJ"lation of this Contract" CitY shall have the right to au(fIt Contractor's Proj&Ct-rtiated' and Work-related writings and business record's, as such terms are defined in California Evidence Cod~ Sections 250 and 1271, as amended, during the regular busineu hou"-s of Conn actor, or, if Contnu;tor has no stich hours, during the regular bus~ness hou~ of City. 15. ~. An agreements, appointments, approvals, authorizations, claims, demands, Change Orders, consents, desigr!ations. notices, offers, requests anJ statements "iven by either party to the other sl-)a:1 be in writing and' lihall be sufficiently gi .... en and se~ed upon the other party if fl) personaliy ser"'ed, (2) !ient by the Uni!ed States mail, postage prepaid, (3) sent bv private express delive!y service, or 14) in the case of a facsimile transmission, if sent to the telephone FAX numbe!" set forth below durinQ re;ul.ar busin"&. hcur.s of the receivin!;l' party and followed wit'lin two (2) Days by deJiverj of a hard copy of the materiar sent bV facslm<1e transmis$ion, in accordance with (1), (2) or ~3) above. Personal aervice ;han i~clud8, without I1mitation, service by delivery and service. by facsimile transmission. To City: City of Palo Alto City Clerk 250 Hamilton Avenue P.O. Box 10250 Palo Alto, CA 94303 CITY Df PAlO ALTO: Former Contract ($ample) MFa jlOl92J SECTION 00500·4 PART II -fORMAL CONTRACT HCTION 00500 Copy to: City of Palo Alto Department of Publ ic '\.;od:s 250 Hamilton Avenue P.O. Box 10:<50 Palo Alto. CA 94303 (415) 329- FAX: (4151-3"'2:-::9:----- ATTN: Project Manager for Project To Contractor: L...-I _________ _ FAX:L...-I ____________ __ ATTN: _______________________ _ 18. AopmDriQlipn Of Chy Fynds. This Contract is subject to the fisc-sf "fo ... is:ons of Artie-le III. Section 12 of 'the CINIrtef of the CIty of Palo Mo. AnV chargei' hereunder for I .. bof'~ "!Vices. materials and equipment may .accrue only after sucJ1 expencfrtures ha '018 bee;; approved' in advance in writing In lI'C(X)t'dance ~ith apptlcabl.uws. This Can'tiract shall t9rmina.l~ wi'thovt pe.r.aity (il at tll4's It'd' of any fbcal year in the e ..... nt tt-.at fLlnds are not appropriated f{Jf!he followinl;i fis..::a! ysar. or fii' at any time within I fiscal year in 'the eVent that funds are only IiPpropriated for a p.:)ftion of the fiscal year and fundI for th:lS Cpnttact are no 10:-:g61' available. This S9Ction 1 e shall (;ontroi in the e .... ent of I confllct wtth Uly ether provision of this Conuact, 17. MjAceRalltOtls. I. &~e. Oisclaimer. The partie:s Imderstal1d ,nd agree that Cjty dOAS not purpor1: to t;,e ContractOr"i bailee, and Crty is, therefore. not responsible fer any damage to the personal property of ConlractOf. b. ConsenL Whenever in this Contract the apprcwa[ or consent of ill party is rOQlJile'd, :such approval or censent shall be in writing and shall be ue-cu1ed by i1 person ha..nng the express authority to grant such appro valor consent. c. COMrol!ing Law. The partIes aQ"ree that this Contract sh.!!1 be governed and construed by and in accordance with this Laws 01 the State of Cililifomia. CJTY at l'A.lO Al.TO: Formal Contract 'Sample) MFa POf92) SECTION 00500-5 ".~ . o PART II -FORMAL CONTRACT SECTION 00500 d. Definitions. The definitions and ter.-ns set fanh in S'"ect~on 1 of the Standard DrOiwinQs and Specifications (19721 o".,is Cr.ontract artt in~orpo(ated herein by reference. •. FOf~ Majeure. Naitl1er party sh .. !1 be jeemed to be in defaurt en account of any delay or failure to ,perform its o1::1iQa!~ons under this COntract which diraClly resu'ts from an Act of Gad or an act uf a superior govemmental authcrity. f, Headin.g.s. The pa{a~raph headings are nOl a part of this Contract Md sJ'lan h,",V9 no effect lIpon the construction or interpretation of any part of this COl"~tract . .;. lncorporation of Documents. AH documents const;tu~ing the Contract d'ocuments described in Section 3 tlereof and aU documents which may, from time to time, be ref~rted to in 31'lY dulV executed amendmef1.t hereto afe by such reference incorporated in this Contract and shall be deemed to be part of this COntraCL h. Irnogration. This Contract and any amendments hereto bet ...... een the parties constitute the entire agraement between the parties concernin~ the Froj'9ct and Work, and thefe are no !lther prior oral or written agreements De-tween the parties that are not inCvrpmated in this Contract. i. Modification of Agreement. This Col'Itract shan not be modified or be binding upon tht! parties, unless such modification is aQ'reed to in writing and sigl1eod by the parties. j. Provi&.ion. Any acreement, covenant. condition, clause, qvalification, restrictior., reserva"Uon, term or other stipulation in the Contract shall defiM or otr.erwise contrOl, establish, or iimit tha performance requlred or permitted or to b'! required cf cr permitted b.,. either party. ArT provisions, whether covenarrts or conditions, shatl be deemed to iMt beth covenants and conditions. k. Reso!ution. Cootracror shan s.ubmit with its Bid a copy of an.,. Corperate or partnership rtlsolution or O".her writing, which authorizes any director, officer or other employee or panner to act for or on beha!!' of Contractor or which authorizes Conuactor t.o ente; jilto t!lis Contract. i. SelM!rabi!ity. If a Court of competent Jurisdiction finds or ruleS that any provision of this Contract is .... oid or unenforceable, me provisio;'ls of this Contract not se affected shan remain in fl.111 forclS' and effect. m. Status 01 Contractor. rn the exercise of ri~hts .nd obliQations under this Contract. Corltractor acts as an independem contractor and not as an .gEnt or em"loyee 01 City. Contractor shall not be entitled to any rig1'lts and benefits accorded" or accruing to the C"ltv Council members. officers or employees of City, and Contractor expressly waives any and an clarms ttl such rights and ben efits. n. Successors ana Assigns. The provistons of this Contract sl"lctli inure to the benefit of, and shall apply to and bind, the Sllccessors and a.ssigns of the ,panles. crrv of PAlO ALTO: fOrrnaj Contr:lct ISample) NIF8 110192) SECTION 00500·6 ,I ~ 'I , , PART II • FORMAL CONTRACT SECTION 00500 o. p. TIme of the Enenc8. Time is of tilt' essence of this Contract and' each of its prO'lis.iOl'1s. In me calculation of tim. hereunder. the time in wh;ch an act is to be performed shail be comput~ bV excluding the first Day and incrudlng the la~t. If the time in wh:ch .m iiIIct is to be perfo,,",ed faITs .on 3 Saturday, Sunday, or any Oa)l O~S'l!!"V~ is a Je,,~1 hclida 'If by City, the time for perfonnar.ce shan be extended to the following Business Day. Venue. In the 1\l8nt that .suit is b~o\.Jght by efther party hereunder, the parti~s 81;lree that triOtI of ~(':h action shaiJ be vested exclusi ..... ely L., the state courts of Cariforl1ia in the COL!rltv of ~nta Clara in the City of San JQse or in the United States Dis~rict Court tor the Northem District of California in the City of San Jo~. q. Recovery of costs. The pravaiHl1Q party in any action brought to enforc-:, ms term.s of this Contract or arising: OUl of ttlis Contract may recover fts reasonabfe costs, including reaionable attorney's fess, incurred or expended' in connect,on with such action against the non-prevailing par1y. IN WITNESS \\'HEREOF, the parties heve eXEcutfid this Contr&ct on thfl date first above stated in Palo Alto, California. ATIrST, CITY OF PALO ALTO, CAliFORNIA By' ____________________________ ___ City Clerk MeWOf' CONTRACTOR: ________________________ __ By' __________________________ ___ City Manager Name: ______________ . ________________ ___ Ciraetor of Publit Works Tit~e: Director of Finance Taxpayer I.D. No. __________ _ Risk Manager APPROVeD AS TO FORM: Senior Assistant City Anomey END OF SECTION CITY of PAlO ALTO: Formal COtItract ISample) N1F6 \10192) SECTION 00500-7 .. ,' , 1: •