May 6 1 1993
THE HONORABLE CIT~ COUNCIL
Palo Alto~ CA
Arastrad~rQ Creek Acc,ss Road ImprQV9ments Project -St~ Report
Members ot the Co~ncil:
Rgport ip Brief
This is an informational report ~nd no council action is required.
The purpose of this report is to respond to Council's request for
s~Gii to review alternatives ot roao wi~~h and access methods to
~intain utility facilities.
Background
At the August 10, 1992 meetin9, Council continued the matter of
repairing the Arastraderc Creek Access Road and directed staff to
return with a b:"d for a dirt or gravel road no wider tnan the
equipment that ~ould be needed. Prior to that action, council also
requested staff to investigate other methods and equip:me.nt that
could be adopted to gain access to the facilities that require
maint~nance.
There are three utility systems that follolll the road for its entire
lenqth--an electric pole line, and water main and wastewater
colleotion pipe. Aiso l a gas main follows the read from Arastra
Lake to the Palo Alto Hills SUbdivision. Access to maintain and
replace t. ...... ese facilities during t.he infrastructure programs are via
this road. Minimal repair and maintenance has been required d1.lring
the last ten years. This has been primarili~ due to the age of the
systems and the good w~ather (lack of storms).
Th~ electric pole line has reached the end o~ its useful life and
inspections indicate the poles must be replaced now. The water and
wastewater systems are t~enty-nine years old. The ~ater system to
date has required some maintenance for leaks and cathodic
p~otection. The main is reaching an age where increaoing amounts
of maintenance can be expected. 'l'he wastewater collection system
has required mo~e maintenance than the ~ater line. The wastewater
main had two blockages in the laDt two years that caused sewage to
flow from manholes onto the adjacent ground. The wastewater main
has been crushed by tree root intrusion. This main is broken in
two areas and needs to be repaired no~.
CHR:2&2::'3
L
-
1
-
Mainta~ninq the fo~thills electric system requires a l~rge,
e)(pens.l·...-e ($3000-$5000 per day) helicopter or a class 8 size
vehicle (crane/auger/bucket truck{s) ,3-aAle. gross vehicle ~eight
{GVW) 53,000 pounds, 29 feet long and 8.5 feet ~id~). The total
length of a cl~ss S rnainten~nce vehicle approaches 90 feet ~hile
pulling a trailer '!Jith 45-60 foot poles. The electric \.!tility
requires this vehicle to maintain the foothill pole linoas. The
foothills pols line is 28-30 years old. Tha poles range from 45 to
60 feet in heiqht and support electric conductor3 ~hich trans~it
poyer at a voltage of 12,000 volts. A pole: survey in 1992
identified twenty-six out ot "fifty poles 'Which are d..;!teriorated
and/or danqerou~. State Law, General Order 95, mar.dates that these
poles be replaced. These old and deteriorated poles represent a
fire hazard and a liability to the City.
Helicopters are more dangerous, require schE"duling time, good
weather, and are not an option for emergency access at all times
ana weath€lr conditions~ Helicopters are ::langerou$ to use in hilly,
windy tree-covered areas 'With live electric lines. Poles and
equipment 'Would have to be lifted on long cables and would S'ilia:t
from side to side while being transported. Usinq a helicopter to
put a 12-18 inch diameter pole in an augured hele would put the
workers on the ground in a high-risk position. City maintenance
costs would increase, because of higher insurance premiums paid by
contractors using a helicopter for this type ot ..... ork. Finally,
statf believes that loud, overheaa helicopter noise would distress
the wildlife in this ar£a to a muc.h gre.ater extent than ground
construction it/crkers using a gravel access road.
Walking in equipment to make repairs to these foothill utilities is
not a practical solution for ul...ility ::>perations. The size and
types of equiptTlent the City curre.ntly owns end h,as trained
emplcyees to safely use to perform repairs can only be driven to
the ~ork sites. The access road is not just for planned activities
but, more i~portantly, !or q~ick emergency access to make
unforeseen repairs.
The Water Division requires a class 8 (3-axle, GVW 32,000 pour.ds,
24 feet long and 8.5 feet ... ide) size vehicle. The smallest
required vehicle is a te!"!;-wheel dump truck. A backhoe is also
required to dig and load at the. repair site~ The foothills
concrete cylinder water main ranges from 14 inches to 18 inches in
diameter and is installed at an average depth of 5 feet. Valves,
pipe sections and fittings used in repa.iring concrete cyli.nder pipe
of tr-.. is diameter are very t'.ea"''')t and need to be delivered to the
wor-k site and 1 i f't.ea iI'.to place by a bacy,.hoe. Preparing a safe and
properly shored repair pit for ¥ater, ~~stewatp-r and gas workers
requires removing sufficient pipe cover and surrounding soft \Jet
backfill to set shoring against £table trench walls. The material
CJlR:282:U
L
!
,~
I
I
I"
! ,
I
i ,
I
,
I ,
-
%'iaJnoved fTom these .... ork pits must be hauled. 3'Wa), from the sites.
suitable ~ackfil1 materials must be importEd to the repair $ite~
W3.ste'Wi!ter requires a class 8 Hydro Flushing (J-axle, GVW 38,01J0
pounds plus water lorfeight I .2 9 feet long and So teet '-"ide) vehicle to
cleer main blockages. The smallest vehicle r.equireti tor digging to
ma~e main repairs is the same as required by the Water Division~
A backhoe is also mandatory for making wastewater main repairs.
<:eneral1y, 'Waste\lo?ater mains are buried deeper tha.n 'Water lines
(State Depa~ment of Health SerY"ices requirement), to avoid health
related problems during repairs. The foothill vitrified clay
wastewater collection li~e varies in size from 2-10 inches4 The
depth of the ~astewater line in the foothills ranges from 5 feet to
15 fee~ at 35 ~anholes. The average depth is g feet.
The gas utility r~quires a ten-~heel dump truck, service truck and
a backtJoe to make gas main repairs. The size of the vehicles use~
to make qas main repairs is the samE as vehicles used by the Water
Division. The foothill gas main is an 8 inch steel line buried to
~n average depth of 36 inches.
The Fire Department has notified utility staff of their need for
ten foot minimum width access along the proposed access road
alignment. The Fire Department needs to provide access for the
mcst basic class 2 large fcur .. h~el drive pickup siz.e vehicles t'or
emergency fire response to utility lines~ Palo Al to Hills, 1..os
Altos Hills, Pale Alto Country club and Hewlett Subdivision. Fire
staff also requested the installation of fire hydrants on the
existing water main, so that class 8 pumper enginos (2-axle, GVW
35,000 pounds, 27.5 feet long and 8.5 teet wide) may also respond
to any futUre fires via thjs access road.
Gravel/pirt/Width Acces~ ROJlQ
Staff research found that rural gravel roads are generally designed
to be 11 f.aet~ al thOl,lgh 10 foot or eve:-.. 9 foot lanes are-use-d. for
gravel roads -vith low traffic voluu;.es and fev trucks. Common
design p-cdcticE.. includes a minim'J.,m 'i.""ight shoulder 'Width of 2 feet
for local roads, with an average daily traffic (ADT) volulIIe of
fifty vehicles or less per day.
staff also resea,rcned gravel road durability. The expected gravel
loss per year fox gravel roads ranged from 0.18 inch for a lightly
traveled. gravel road to 2.24 inches for a high traffic volume
gravel ["oad. The gravel losses are due to weather influences,
grade conditions and machinir.g, regardless of traffic volume.
The City should expect to lose approximately an inch of gravel per
year to 'Weather~ traffic and base soil conditions. The proposed 6
inch aggregate surface .. ill provide a safe surface~ An annual
progra~ of maintenance grading and spot additions of aggregate on
ClU<: 282: 93
. ~---'--' ---~." -L
..
.. , ..... __ .J ..
-
~~,~~ .
'--.,:.--
" -.
an as n!!eded basis can also be expected. Problems may occu!:" on tl:",e
stepper sections 0-: the proposed access read and more maintenance
may occur in thase areas. The s!ippel-ine.ss of unpaved roads in
both .... et and dry states is important fro!!: the safety aspect.
especially in dO*7mill curves ~here skidding and sliding are
dangerous. A gravel Eourface 'Will reduce slipperiness and
maintenance of the utility a=cess road.
staft recommends a gravel road to feet wide.
foot width is consistent with accepted lo~ ADT
road desig:n~ using a minirr.um a foot lane width
shoulder.
Discussion
~he recommended 10
yolume rural gravel
with a 2 foot right
The cost of constr~ctinq the proposed gravel access road at a 10
foot minimum width will be approximately $150,000. The incraased
cost, as compared to last year 1 s bid prices l are for additional
surveyir'9 and removal of additional vegetation grovth from within
the proposed project ali1nment.
Staff believes that a 10 foot wide gravel road is the minimum safe
access road that can b':! recommended. The saf"ety of the City
employees driving 8 foot 'Wide vehicles in the worst weather
conditions llIust be considered when determining tha ndn1rnum safe
vidth and surface type fer an access road.
Staff ~i11 return to Council ~ith a mitigated negative declaration
and a project bid to consider in June 1993.
ie ct~tted.
er CWiak
E i.7;::;t' WGW
Ed~a~· J. Mrlzek
I\ie~im D~r o~ Utilities
F emil! -
. ty Manaq1i~
Related CMRS; 246~, 31B:91~ 373:.92
CKR:282:U
r~