HomeMy WebLinkAbout0268.093\ - May 6, 1993 THE HOI/ORABLE CIT< COUNCIL Palo Alto, California fAl.Q. 1'.1 to Harbor .J,:mpr9vements. elF 1~'3:1S -Statu5~oor't. Members of the Council: Report in Brief Members of th~ cQuncil: This report provide9 information on the status of the Palo Alto Harbor Improvements Froject ~W'hich include:s mardh restoration, public access ~mprovements, sailing station construction, Harbor Master's Cottage restoration and picnic area improvements. No Council action is required. In Auqust 1992, staff received tinal permit approval from the Army corps of Engineers to construct improvemer,ts in the harbor area. In OCtober 1992. the first of three constructicn contracts ..... as awarded which incl"-lded the restoration of the Harbor Master's Cottage and picnic area. In Ncverr.ber 1992, the remaining t ..... o contracts were a.,:arded invel ving the Jr.arsh restorati c·n and sailing station. Discussio!'. The following is a. prief description of the current status and planned future actions on improvements in the harbor &rea. Karsh Restoration/Public Access: Marsh Restorati~n at Harbor Point began in December 1992. The ~or~ consisted of excavating 49, 000 cubic yards of earth from four acres of land at the southern tip of Harbor Point. Ccrdgrass ~as planted in the low channel areas belOW mean high tide to provide foraging area~ for the endangered California Clapper Rail. In addition, approximately 1700 feet of bicycle/pedestrian path and 1500 feet of cable and bollard barriers and four vista points ~ere -1- CM:R:268:93 -., ..• ""~'-#---"",,--;' t ! , d~···· .'.C .". '.' -t;-.•• ."'--" ".! . __ 5~:0L._ constructed, The oaths are located bEtween the s.aili.r.g station site at Harbor Point and the Lucy Evans Interpretive center pa~ki~g lot. The work was suspended on April 15 1 IS93, to comply with the Corps of Engineers permit conditions which ban construction activitiEs during ths nesting season of the endangered California ClapplO!r Rail. Construction ~ill resume on September 2, 1993, In order to keep the public informed regarding tbe status of the project during the interim period, a sign has been posted indicating the reason for the pause in co~struction, In September 1993 interpretive signs, conSisting of artistic renderings and information about 'Wildlife and flora in the San Francisco Bay marsh environment, will be placed at each of the four vista and interpretive stations. Shrubs lItill be planted bet\o'een the new paths and the marsh t.o provide a barrier into these sensitive habitat are,as~ Sailing Station: The sailing station will be locat~d at the eastern edge of Harbor Point parking lot and has been designed to accommodate small hand carried boats with shallow drafts such as lasers, sunfish, sail boards, canoes and rowing boats. The structure will consist of an elevated 10-foot wide pile supported pier, extendinq approxi~ately 200 feet out into the deepest part of the channel. Work on the sailing station will begin in Septe~ber 1993. construction 'Was postponed because the contractor, Ol,;,tr-a constrJction Company, Inc~, could not obtain and erect the concrete piles prior to the start of the nesting season~ Ho~ever, all other land-based facilities have been completed including the ' . .mdergrcund \:tilities, portable toilets and ch.e>.nging area. Removal of the old existing boat ramp vil1 take place after the sailing station is completed in Nove~ber 1993. cottage and Picnic Area: Work began on the restoration of the historic Harbor Master's cottage in March 199]. To preserv~ the original outline of the cottage, the lean-to additions and adjacent storage sheds were demolished~ Significant damage had occurred to some of the old adobe walls. These walls vere totally rebuilt with special hand­ made adobe bricks in order to metch the original structure. Due to excessive soil settlement, the building foundation ~as packed with concrete folloved QY a ternti te t;:-eatment and installation of a vermin proof, subfloor concrete slab. The remainir.g work consists of restoring the roof J plastering .2".nd painting the walls and -2- CMR:268:93 :~;1~' :;':-.:"':o:-i:.~ f'., I J landscapinq. Construction of the c-::lttage is expect:.ed to be completed in June 1993. The picnic area to be located east of the cottage consists of four t~bles.. two bencbes, a dr-ink ing fou.ntain, paths, fe~cing and landscaping. WorK on grading and landscaping began in April 1993 and the entire project is schedul~d to be completed by June 1993. R&spectCully submitted, 1::tG~ Assistant Director of Public Works GLENN S~ ROBERTS Director of Public Woeks ~~ Ci ty Manager Related .Reports C1tm:: 433:92, 520:~2, 521:9.2 -3- CKR:26S:9J .. ·~