HomeMy WebLinkAbout0260.093-
~.: " sta
" " \c', .'. . .'
10
April 22, 1993
THE HONORABLE CITY COUNCIL
PALO ALTO., CALIFORNIA
Members of the council:
The Board of Dire~tors of the Palo Alto Centen~ial 1994, Inc. made
its report to the Council on April 19, and rCl"TUested increased city
support of the Centennial activities. This report ccmme:nts on
those requests. The response is outlined below:
1. Convert Centennial Loan to a Grant.
Th~ Board requ~sted that the $75,000 loan to the centennial
Ccmmi ttee be con~.rerted into a grant of support.
If Council approves this item, a Budget Amendment Ordinance
will be required. The council has total authority to make such
a qrant, and the funding would come from the ~udget
stabilization ~eserve (cost -$75,000).
~. May Fete Parade
The centennial co:m.mittee requested that, in connection 'Wit..,.
the City of Palo Alto being a major sponsor of centennial
activlties, the 1994 May Pete Parade be a part of the birthday
celebration.
The city staff will stage a May Fete parade in
current plans are to develop the event with a
theme. Staff ~ill explore and implement any other
recognition that is possible. No additicnal
resources are needed to n;.ake tr.is event compatible
official Centennial activities (no cost for this
CMR:260:93
1994, and
centennial
cente:nn ial
financial
with othel"
i te:rn) •
. __ ._---
-
paqe Two
3. Centennial Pla~a
The committee suggests that dono= bricks be used to develop a
centennial Plaza at the Civic Center.
Staft is not able to determine at this time ho ... to implement
this recommendation. 30wever, ~e ~il1 ~ork with the
Centennial committee O!l the "concept" ~ If any fu.nding is
needed to implement the concept, once approved, statf ""i 11
retur:"n to Council for a budget ame-ndrn~nt (cost to be
determined) .
4. Centennial Office Space
The Committee has requested the City to make a City Utility
owned buildinq available for office space.
The building being requested is owned by the Gas utility.
Council can authorize the rental of the space and enter into
a lease with the committee for a designated period of time at
the rate of $1.00. Staff requests the option to negotiate
with the committee fer the amount of space need ad for
Centennial activities and leave open the possibility of having
some City materials remain stored in the building. It is
staff's belief, based on conversation 'With several members of
the Centennial Board, that this proposal is acceptable. If
Council approves the conc~pt, staff will put the necessary
paper work in process to initiate the lease. However, 425
Bryant cannot be made available immediately, because a) the
building will have to be made accessible to handicapped
persons, in order to meet Americans ..... ith Disabili-ties Act
standards; and b) some items stored in the facl Ii ti' ..,-i 11 have
to be rearranged.
Upgrading to l1\eet ADA standa!'ds would include rest room
conversion, ramp construction at the entrance and interior
door widening. If Council approves the suggested use of the
facility, funds ~ill have to be allocated to make the repai~s.
Staff has no cu.rrent plans to 'Use the facility (estimated cost
$10.000) •
5. Centennial Staffing
'I'he centennial Report requests that the City :make available a
full-time emplo:aree to assist as centennial staff for a period
of one yea~, beginning July 1, 1993.
Staff can be assigned to work full time with the centennial
Committee, if Council 'Will authorize expenditures to backfill
the position made vacant by the person on loan to the
Committee.
CMR:260:93
I
~" rl f\ ,
j
i
~ ; , ,
1
-
page Thr~e
At this time, the exact person to be assigned to the committee
cannot be determined. I will work with the committee to
identify the skills needed and then make an assigrcment, if
council concurs.
Council 'Will need to approve the funding to backfill the
vacated position (estim3ted cost $40,000)4
6. Centennial Theme
The request fro~ the centennial Committee is for the City to
give a Centenni-al tbeme to .as many City planned events as
possible.
Staff already has extensive plans to incorporate the
Centennial theme into the city' 5 regular act,ivi ties as
appropriate {no cost).
7. Liability Insurance
The City has been re.quested to cover the cost of general
liability insurance for the Centennial Corporation, with the
City being named as an additional insured.
This is a request which staff supports (cost -not to exceed
$5,000) .
staff is excited about, and supportive of~ providing as&istance to
the centennial Committee, as the city celebrates the momentous
milestone of its looth birthday. The requests made by the
Committee are reasonable a:1d can be acconuraodated, with Council
approvaL The:-e are costs th~t cannot be estirnated at this tiIIl,e;
however, ?f those that can be estimated, the cost ~ill be
approximately $175, DOa to respond to the Centennial COn'",..i ttee' S
requests. Staff ..... i11 attempt to return to Council with one action
for the needed funding tc put the recommendations in place. Every
effort will be m3.de. to bring the funding rEquests back on the
Consent Calendar of the May lOth Council meeting. If all costs are
not firm by that date, staff will return ~ith just those items that
have been finalized.
CONCLUSIOt{
If Council supports the requests of the Centennial Committee, then
Council should:
1) Convert the $75,000 Centennial Loan to a grant;
2) Direct staff to stage the 1994 May Fete Parade as a
CentenrJ.ial event j
•
?!l9t! Four
J) Direct staff to .Ot'K 'With the Centen.n.i..al Committee to
i~plement the ccncept of a Centennial Plaza~ with the
City funding the cost for implementing the project;
4) Rent Ci ty of Palo Al to Gas Util i ty office space to the
Palo Alto Centennial Comreitt~e at 425 Bryant street at
the rate of $1.00 per }'ear, and approve $lD,OOO to fund
the ADA retrofit;
5) Direct one staff person be assigned to \oIDrk with the
Centennial committee through f'!ar 1994, and that rerso;l
will be reassigned to that responsibility~ The City 'Will
backfill the position for the period of time the position
is vacatea~
6) Agree to pay the cost for the liability insurance fo~ the
centennial committee, and the City will be named as an
additional insured.
CHR:260:93
"
\