HomeMy WebLinkAbout0127.094~ w
January 20; 1.994
THE HONORABLE CITY CODCNCIL
Palo Alt.o, California
Palo Alto Harbor Imprgyements Final st.atu.~Q1.:.t.
Members c.,f the Counc i1 ~
Report in Bri",f
This report provides inform3tion on the imminent completion of the
Palo Al~o Harbor Improvements Project, which includes marsh
reetoration~ public access improvements.. sailing station
construction, Harbor Master's cottage restoration and picnic area
improvements. No Council actio:, is required.
;t;!j.scYssion
Work on the Harbor Improvement Project began in late 1992 and was
substantially completed in December 1.993. All improvements are now
ope:!'ational and a-.railaLle to the public.
Staff has informed boat enthusiasts that the sailing station is
open. and several canoeists and kayakers are using the new facility
to launch their vessels. More boat enthusiasts and board sailors
are expected to use the s3.iling station to gain access to South Say
waters this summer. The facility can also accommodate the
launching of an infl~cable ~Jbper zodiac rescue craft l should the
Fire Department need to respond to an emergenc~'" aircraft landing in
the Palo Alto Harbor area.
The 4~5 acre marsh is rapidly maturing and is attracting
significant birdlife to the new tidal c~~nnels and island area.
Shrubs have been planted between the new paths and t.he marsh to
provide a buffer from these eenRitive habitat areas. The plant
liner stock will be protected from ground squirrel attack with
special w~re-netting barrier material. The netting material will
be removed once the plants reach a more matt.:re s.tage and becorr.e
naturally resistant to animal foraging.
Sta_ff is currently preparing plans for the installation of special
educational interpretive signs, consisting of artistic renderings
-1-
and information about wildlife and flora in the Palo Alto marE.h
enviro~~ent. These signe will be located near the pathway benches
and will be installed during early 1994.
The Harbor Masterl s cott.age has bee;,. r~stored to it s original
Spanish colonial revival style and is new oc~upied by park rangers,
who are using the facility as a ranger station. The adjacent
picnic area consisting -:>f four table~J two benches, a drinking
fountain, paths~ fencing and landscaping has become a popular
location for school children and other members of the public.
~ne new sailing station and marsh restoration have been completed
and accessible tc the public. The Harbor Master's cottage haa been
restored and is being used as a ranger stat.ion. Over the next
rear. staff will procee1. with the construction of a new path
between the d-.;ck pond and Embarcadero Road.
~=tt.d'
JAMES BARR INGTON
Senior Engineer
~ ;z".,,/ ""'",-
GEORGE BAGDON
mi~ubliC
GLENN S. ROBERTS
Director of Public Works
~V1\.~.
BERNARD M. STROJNY
Assistant City Manager
Related Report: 268:93
CMR:127:94
Works
·2·
>~>-::'<' .-: ',.