January
THE HONORABLE CITY COUNCIL
Palo Alto, California
St.atus of Neggt.iatic.ns on copper Reductions fZQro City Storm Water
and Wastewater pischarges
Members of the Council:
Report in Brief
This is an informational report forwarding a draft Memorandum ~f
Understanding (MOO) among local government entities in Santa Clara
County concerning the discharge of copper to San Fra::1.cisco Bay~ No
action by Council is requi"C'"eci.
As explained in a previous staff report (CMR:614:93), attachedl~
the July 1.993 discharge permit i 9Bued to the Regional Water Quality
Control Plant (RWQCP) requires the City to substantially reduce the
copper content of the RWQCP discharge to San Franci.sco Bay. In
addition, the permit requires the City to negotiate with ot,her
Santa Clara County local government entities and prepare a plan for
an additional copper discharge reduction of 950 pounds per year,
about 5 percent ot Santa Clara County' 8 total average annual copper
discharge to the Bay.
In order to prepare a plan to achieve the Countywide copper
discharge red\lction~ the Santa Clara Valley Non-Point Source
Program co-permittees {including Palo Alto) and the three
wastewater treatment plants (Palo Alto, SUnnyvale and San Jose)
convened the ~South Bay Copper Reduction Dialogue w (Coppe~
Dialogue). The Copper Dialog'-.1e includes ot.her reg".J.latory agencies,
businesses and environrr.ental g:::-oups. '-"ith the intent of obtaining
broad support for the plan.
DiB9u§sion
The attached MOU r..as been drafted by a subgroup of the Copper
Dialogue. Comments ar'e currently being solicited from all of the
Copper Dialogue participants. Staff antic~pate5 that a final MOD
will be submitted to Council in late February or early March. No
formal action will be required of Council at this time; because the
MOU by itself does not con6titut~ a specific commitment of
resources. The MOO does~ ho ..... ever; cO!11.mit the City to a subsequent
cO'..Lrse of action t.hat :fs 1 ikely to incre3se the existing Non-Point
Source Program expenditure of $80,000 by an additional 50 to 100
percent in future years.
Such additional resources will be budgeted from
Enterprise f~~ds in FY 1994-95 and thereafter.
CMR: 1~4: 94 -1-
the Storm Drain
Staff is taking
this commitment into account in budget preparations. It is becauee
of these budget implications that both the draft and final MOUs are
being sent to Council for review. Final Council approval will be
implemented b'}~ virtue of adopt-ion of the 19S4-95 budget.
The local gove:.-nrr.e.nt particip:a.nts have deternlined it-is more likely
that significan~ reductions above and beyond current permit
requirements carr be achieved from controlling discharges from storm
drains as opposed to sanitary sewers. Therefore, the MOD contains
a list of control meaS'Jre activities directed primarily towards
reducing the amount of copper in County storm water runoff
(Appendix A} . Preliminary reduction est imates are extremely
general in nature due to lack of data. Therefore, the MOU focuses
on a commitment to s.tudy and implement control measures, ""ith most
reduction ~stimate9 to come at a lat~r date when experience allows
the preparation of more accurate estimates.
Staff has continued to take the position thct numeric limit::: on
storr.:! water discharges are not appropriate at this time due to
severe difficulties in monitoring. let alone controlling~ the
discharge from large numbers of storm drains+ For this reason, the
MOU has been drafted to constitute a commitment to conduct control
measure activities~ rather than a cO':nmitment to a numez"ic discharge
limitations.
The control measure activities are focused on the following
sources:
~) Brake pads containing copper;
2} Other vehicle-related copper sources;
3) Copper-based pesticides;
4) Erosion; and
5) Industrial and commercial sources.
Respectfully submittcd~
~ 1\11-1'---_
KELl.Y D. MORk'!
M<L~ager~ Environmental ContrQl Programs
(i>A.:Ic.F ~ IC.
PHILIP BaBEL
MZL17ll;Y~liance
GLSNN S. ROBERTS
Director of ~~lic Works
~m:~
Assistant City Manager
-2-
Division
c-_' __ -
.",-"
-~:~:~ .
. . "-.: ....... ~, <'":,."'"
~£i.::2~." :.~!:~{~, '--~ ....................
South Bay Copper Reduction Dialogue
MEMORAJ'DUM OF UNDERSTAN'DING
1.7 i94 DRAFT
(Falk & Mul".y Comments)
SECTION I -PURPOSE & OBJECTIVES
The bask goal of chis effort is to aCCQrd priorirj touiare mal:ing reasonable furt.her progress
in reducing discharge of copper to the lower South Sa."l Francisco Bay a.OO. its lributaIy creeks
and rivers.
The San Francisco Bay Regional Water Quality Control Board (Regional Board) .')n June 1.6,
1993. adopted Resolution 93-61 to amend its Water Quality Control Plan for the San
Francisco Bay Region ('&SLrl Plan), to adopt a wasteload allocation for copper which requires
3' minimum of 20% reduction m average ar.nual copper mass leadmg by the [Santa Clara
Valley Nonpoinr Source] Dischar!= (Program) by 1998, The Discha'gers and !be three
Publicly Owned Treatment Works (POTWs) which discharge [0 Sou<l1 Bay are also required
to demonstrate an additional reduction of 950 pounds per year by 1998. Tbe State Warer
Resources Control Board has oot approved the BaSln Plan Amendment. In .llddition, in
NPDFS pennits issued [0 !be three lower South Bay POTWs, the Regional Bom! bas
required by January 31, 1994, submission of a proposal to achieve an additional 950 pounds
per year copper discharge reduction in coordination with the Progra..rn. On December 15.
1993, !be Regjonal Boord &IS<) issued a Cease and Desist Order (COO) to !be Program.
which required submission to the Board by February I, 1994, m:I June I, 1994, a progress
1
o o
report on the de .... ell"'pmeru of an...1 by October 1. 199-'. a final plan acceptable to the
Executive Offi.cer designed to reduce annuat copper mass loads in their discharges which ~'ill
attain appUcab!e 'Q.'2ter quality standards. The plao must inclu.dc control measures for copper
to be identified by the Progrom aad add itioll..a! control measures to .>e implemented by tho:
Program in conjunction with the three POlWs which rlischarg~ to South Bay. This
Memorandum of Understandmg {MOO) serves as the required PrcposaI. To obtain the
broadest possible input on the propow, and to fadhtare cooperative efforts among
government, busiDesses and ccncemed citizens, 2 South Bay Cupper Reduetion Dialogue
(SBCRD) was established. The SBCRD CVI1.'llsts of Regiona! Board, business. and
environme~ advocacy repn:sentatives (Stakeholders) in addition (0 the I:h:ree POTV,'s and
the Program. This MOU :has been developed with the input from the SWccholders.
SECTION IT • COl'o'TROL MEASlIRE ACTIVITIES
The Parties (00 this MOU agree to conduct the control measure activities contained in
Appendix A. These activities were selected from a lisl: of poteD!i:!li1 control measure activities
ilientifJed by the Stakeholder.; (Appendi, D). Commi.trnent to these activities is SUbject to
budget approval by governing Boards and Councils on an annual basis. The FOTVls.
Pmgr.m, and Stakeholde", further agree to estimate copper reductions that will be achieved
by the Program by the implementation of measures contUned in Appendix A, bill wiU
annually update AppendiJl D and AppendL~ C (Copper Source Estimates) as detailed in
Section ill (peliodic Updates) of this MOU. Appendb< Cis. compilation of Copper Soum:
Esrimales made by the ponies to this agreement and other.. Appendix D is the compilation
2
:~."
of potentia! control measure activities d~veloped by the parties during the SBCRD p.oce~s
from which the activit~s in AppendLx A were ~iected.
The Program's new SWMP shall incorporate the Control Measure Activities contained in
Appendix A. The Program shall submit to th: RegiorW Board and Stakeho1ders a progress
repon by Apnl I, j 994, and a revised SWMP by O<;leber I, 1994. The S WMP
development process shill iB;:lude. but Dot be li.'11ited to, the fenowing:
1. Preparation ofa SWMP outline bi' Febl1lary 1,1994.
2. Establishment by February I. 1994, of. SWMP Task Force chaired by the
Program Manager and consisting of appropriate Program co-penniuee
representatives with ex-offlCio representatives of tl'-iC Stakeholders, iocluding
business and industry representatives.
3. Deve!opmem of, and review by the SWMP Task Force, detailed outlines of
tile SWMP chapters. by March I, 1994 .
. 4. Prep:ll'2.tion by the Program with c-orrespondi.'1g review by and direction from
the SWMP Task Force of draft SWMP chapt~rs in a staged sequence:, and
submission of. revised SWMF Ie the Regional Board by October I, \994,
pursuant to the requirements of the CDO.
5. Preparation by the Program of the FY 95-96 Program budget, incorporating
the revised SW;\.iP by December I, 1994.
3
.".'
SECTION III -PERlODIC llPDA TES
The: parties to this MOU agree to annl.~3Hy update Appendices C alJd D by OctObel' i of each
year in conjun:tion with the Program~s annual reporting procf!ss. F...stima~es of average
annual copper reduction'; achie\'ed since Januarj 1. 1990 will be updated in conjunction with
submission of the Program's an.."'IUb.1 repoI1. New control measure actjvi~ies being pro~d
by the parties for implement3.t~oD will be addt"d to Appendix D annually and incorporated
1nto the SW1vIP to furure updates if estimated aveia~ annual topper r<:ductions fall ~hort of
the subject 950 additional pounds PC-f year by 1998. Ineffective control measures \l:m be
deJeced from Appendix A and the SVll\1P if the .annual e ... ·ajuation de[('rmines such action to
be appropn....
The annual updale process descnbed above will be linked (0 the foU('wing Progrdm acrivities:
L The Program's annual report will be submined to the Regionai Board: by
Seplernber I of each year_The updated Appendix D Control Measure Activities
Chart and AppendIX C will be companenrs of !be annual report. The Control
Mea:."Ure Activities contained in the SVlMP will be reprioritized if appropriate.
2. FoUcwing completion of L'>e revised SWMP in i 994, the SWMP Task Force will
be converted to an Annual Reporting Task Forc::: to provide for Smkeholder
participation in !be annual reporting and SWMP update process.
3. The Progrun Monitoring Plan will be updated "",ually by October 1. if
4
appropriat(!, .in conjunction wilh Lite annual reporting process, and will contain, bet
not be limited. to, r:he following ele:rr.erus:
a. Routine Monitoring;
b. Demonstration and Pllot Level Projects;
c, Special Studies;
d. Long Term Trend Analysis;
e. Control Measure Effe,,'tiveness Studies;
f. New Moni~oring Activities; and
g. PoinLs of Coordination with BASMAA, the Slate-wide Storm Water
Task Fo",., and Others.
h. Assessment of relevaru State Water Quality Assessment and Citizen
Volumeer Monitoring data.
5
December 9, 1993
THE HONORABLE CITY COUNCIL
Pale Alto r California
o
Status of Neggtiations on Ccpp~r Reduct; ..::ns from City Storm Wat~
and Wastewater Discharges
Members of the Council:
Report in Brief
This is an inforrr.ational report advising Council of the status of
preparation of 3. !><!emo.r-andum of understanding aF.long local goveon.ment
entities in Samta Clara County concerning the discharge of Copper
to San Francisco Bay. No action by Council is required.
Background
The July 1993 discharge permit issued to the Regional Water Quality
Control Plant tRWQCP} requires the City to substantially reduce the
copper content of the RWQCP discharge to San Francisco Bay. In
addition~ the Permit requires the City to negotiate with other
Santa Clara County local government entities and prepare a plan for
an additional copper discharge reduction of 950 pounds per year,
about 5 percent ct Santa Clara county'S total average annual copper
discharge to the Bay. This report focuses specifically on the
planning for the additional 9S0 pound Countywide copper di5charge
reduction.
Discussion
In order to achi4;.va the Countywide copper discharge red'JC'_t.ion, all
of the Santa Clara Valley Non-Point Source program co-permittees
and the three wastewater treatment plants will likely need to take
specific actions. To develop a plan for achieving the re~lired
discharge l:eduction, the Santa Clara Valley' Wat.er District convened
the "South Bay Copper Reduct.ion Dialogue," with t.he intent of
obtaining broad support for the plan. The Copper Dialogue includes
representatives of the Non-Point So~rce Prograw., the three cities
with wastewater treatment. plai1ts (San Jose, SU1U1yvale and Palo
Alto) r the Regional Wate.::: Quality Control Board~ area businesses
and environmental groups.
Through the Copper Dialogue, the participating agencies intend to
develop a Memorandum of Underst.anding \MOU} detailing the joint
plan to achieve the re~Jired copper reduction. While the group has
not selected a final format for the MOU r it is anticipated to
contain the following elements;
-1-
•
;Z1l r-.
a table"'''ldentifying sources of copper discharge to San
Francisco Bay from the County. •
• a list of actions that will be t.aken by the local
government er:tities to co::.trol coppe!"" discharges (ex;;tmple
attached) ;
• principles for aLlocation of programmatic and financial
responsibility for pilot f'rograms, source control program
development, and implementatior: of control meas'J.res i
• protocols for monitoring the di3charge reductions;
• procedures fCl!" reporting progress '""ith the plan'.s:
implementation;
• a road map for implementation of the plan;
• a procedure for revisiting elements of the agreement as
mere information is obtained about the cost, efficacy,
and feasibility of control measures; and
• draft permit conditions that allow the Regional Water
Quality Control Board to enforce the agreeTent.
A draft MOD .... i11 be submitted to Council as soon as it is prepared
{probably in January). Any guida!lce from Counci 1 ~'ill be followed.
and a final MOU will be prepared and returned to Council as soon as
possible. The MOO ... ·ill constitute the plan required by the
diBcharge permit and will be submitted to the Regional Wat'=!r
Quality Control Board (Regional Board) following action by Council.
It does not appear that the current deadline (Januarf 30, 1994) for
plan submitt-al allows sufficient time for action by all of the
various political jurisdictions in the County. Therefore, an
extension of several months is likely to be requested and obtained
due to the unique nature of this planning effort.
Staff does not anticipate that action items .in the MOlT will require
budget chfu,ges in the current fiscal year. It is not yet certain
whether FY 1994-1995 action items would require revisions to the
budget now being prepared. Staff will report O~ any such issues
during the upcoming budget process.
Respectfully submitted,
;!£I<OIh-
KELLY D. MORAN
M~~ager~ Enviror~ental
Control Prog~ams
GLENN S. ROBERTS
Direct,'::lr of Public Works
CMR:614:93 -2-
PHILIP BOBEL
Manager~ Environmental
ccmplia...ce Division
BERNARD M. STROJNi~
Assistant City Manager
"i"
status
Under
Development
x
Under
Research
New Researoll
Goal/Data
Prog.t"am Design or
Program
Implementa.tion
4 Complete SCV NPS
program study to
determine n~ount of
coppe:r coming from
brake pads.
Evaluate above study
and, if appropriate,
-Draft state
legislation to ban
after market
repairs with
Q:C!ending pads.
-Colisider
feaE:ibility of
local bans.
-Request State OZ'
Federal study to
ensure
availability and
safety of non~
copper pans.
-Request EPA to ban
,I L copper pads in new
cars.
Narrative
Descr.iption of
Control strategy
-Elilninate use
of copper
bearing brake
pads,
Evaluatioh
Criteria Foreoast
-Reduction
-U.oi t Cost.
-other
Environmental
-Reduction
estimates
will come 1\';
from SCV NPS @
study.
o
::!~". (,.:-!
\,
.'.