Loading...
HomeMy WebLinkAbout0202.093- March 18, 1993 HONORABLE CITY COUNCIL Palo Alto, California SE~JOR CENTER STROCTQ_~_ UP~RADE-TEMPO~Y R.ELOCATION Members of the Council: Repcrt in Brie:( .~.----... - This is an informational report and no council action is required. The report presents staff's preliminary concept of how the senior Coordinating Council (SeC} staff and programs will be accorr~odated during the senior Center's structural upgrade construction period. Construction has been delayed until J:Jly 1994, pending further refinement of cost estimates a!';;d requiremc!".ts for the retrofit. Ba~_round staff indicated in a previous staff report (CMR:115:93) that it ~culd return to Council with information regarding the temporary relocation of the sec staff and programs during the Senior Center structural Upgrade project. originally, staff ..... as proposing to begin the structural upgrade l.n Septe-rnber ot 1993; but due to addi tional code requirement changes, changes in the scope of ,"'ork and uncertainty as to the estimated cost, the project '.fill be scheduled for a later date. The structural upgrade. Yw·i 11 sffe::::ti ve- 1y close the I:1ain pcrtion ot the senior Ce.'1tl2r. All of the interior walls and the floor on the second tloor ~ill be removed, str-engthened and replaced. The roofs and t!1e connection to the .... alls will be strengthened. The .... ·ork is expected to be disruptive to programs conducted on the first flocr. CMR:2C2:93 .JL - The sec provi1es serv; ces ::nd programs to an esti",.ated 6,000 seniors. There are thirty administration and staff personnel in the senior Center facility. The nucleus of the program services is the La Com ida hot lUilcn program. LU::1ch is serv ... d in i!I room that was added on to the rna in bui] di ng. CO:l.st.r-uction work. will be limi ted in the lUI".chroorn t.o the area where thls room meE':=ts the :main. building. La Comida's services ' .. dll -.::or.tinue thro~gh the construc­ tion process. sec rE>.presentativE:'s fe€l ~trcngly that the other Senior Center activities need to !:le located as close to the lunchroom 35 possible. The second fleor will not be useable by senior~ or staff during the construction periO<J. A large portion of the services provided by the center include counseling that is done on the first floor by phone and in person. senior Cente~ staff and ~ity staff agree that counseling on the first floor dllring construction ,""ould be next to impossible j and \o:ill recoffiIr,end the entire second floor operation and the counseling operation on the first floor be telTlporarily relocat.ed ur.til constructicl"l_ is completed. This is estimated to be in 12 to 14 months, and would involve thirty Senior center staff members. Dace Reguirerne~ __ ~~ For purposes of th~ temporary relocation, sec services fall into three :main areas: admin istratior./ conference and cl~ssroo!l1. The administration and conference are~s occupy about J." 00 square feet. IT! general, these spaces are define.d by portable partitior.s and most of t.he spaces are quite small. Staff' 5 intent is to tempo­ ra~ily relocate the 30 personnel and th~ir respect.ive counseling functions and administrative offices to commercial office. space available -within easy Vlalkirlg di~tar.ce of the current senior Cent.er. The Senior Center also has three classrooms. Classroom 1 is 7DC square feet in 5i ze, CJ assroom 2 1".a5 about: 400 square feet and Classroom 3 about 270 sguare feet. These c:a~sro0ms are heavily used by the seniors far exercise, instruction and recre.ational purposes. In staff's .ongoing discLIssions .... ith t.he Senior Coordinating Councii, it bE'.carne ~ppare:1t that in order to coordinate a move of this size .... ithout interruption of the services and progr-ans and with as little confusion as possible to the seniors, the aid of a professional moving consilltant ' .• ould be reqL.;ired. A consultant has been identi fied to assist in the move, pendin9 funding for the temporary relo~ation. CMR:202:93 2 ....... -------------.- Staff estimates the tempor'3ry relol:-ation ... iLll cost approxhr.ately $215,000. The costs are broken down as follows: R&nt (4 /000 sq. ft. @ $2.S{) per-sq.ft. for 14 mos.) Remodel ot 425 Bry~nt street Professional Moving Cvnsultant Professional }lolling Company 1.ot contingency Total $140,000 70. ODe l~. 5Nl 25,000 25.800 $275,000 Staff prcposes to add theSE casts to the existing Senior Center Capital Improvement Program (eIP} as part of the 1?94-96 annual elF p~oce~s. At the appropriate time, staff will submit a request for 1994-95 Community Development BloCK Grant (eDBG) funds to help defray the costs of the structural phase. Respectfully submitted, /11/; .i/d!/. (,.{/I.ut<:":t::(.., -',' /..(.l-.... -__ _ WILt,IAM w. FELLMAN Manager, Real Property .;: i / r (. i.: (t EMiiy'" HARRI j ity I,,,/Related Staif Repo!"ts: eMF.: 115: 93 cc: senior Center PubLi.c Works C~:202:93 3