Loading...
HomeMy WebLinkAbout0508.092>'1 ~ sta'L. +eN t __ /"_ November 5, 1992 THE HONORABLE CITY COv~CIL Palo Alto, california Attention: Finance Committee selection of a cor.sultant._for Preparing the rre-dl!'sign/EIR Reports for the Wastewater Reelamation Program for ~water Oualit.:x: Control Plant H~ers of the council: Report in Brief The purpose of this report is to request Finance committee approval of CH2M Hill as project ccnsultant for the wastewater Reclamation Pre-design/EIR 5tudy. Background The. Reclamation program has two major objec'tives. The first objective is to evaluate the diversion of a portion of the effluent from the palo Alto Reqional Water Quality Control Plant (RWQCP) to reduce the wastewater constituent mass emissions t,o South San Francisco Bay. The second objective is to evaluate reclaimed water as a dependable supplementary source of water supply to the ~ater utilities in the study area. The Reclamation program is a three step program. Under step 1/ the Master Plan, is designed to evaluate the technical and economic feasibility and to identify potential reclamation projects. Under step 2, the Finance/Pre-design/EIR reports will define and resolve the financial and environmental issues associated with the proposed projects identified in step 1. Under step )/ design and construction services -will be provided if the proposed projects: are. approved. The first twc steps of the program will provide the information necessary for project imple.mentation. Step 1, the Master Plan, 'Was completed in April 1992~ The Master Plan ~as presented to Council in a staff report, dated July 30, 1992 (CMR: 358 :92), -1- CMR:508:92 "." VI r. o / , With the completion of the Master Plan; staff is proceeding ~ith step 2 of the progr~m~ The proposed contract ~ith CH2M Hill yill provide 'thF.! errviroru:tental assessment and cost confirmation on the proposed projects. Discussion A Request for-Proposal to perform the Waste .... ater Reclamation Prede&ign/EIR was issued to nine consultant fi~s, and five responded. The propos a Is 'Werll;:! reviewed in accordance with the City's selection procedure for professional services. Three consultant firms were chosen to be intervie'«leo by the City's selecti~n committee. The selection committee included personnel from the City of Mountain View, Stanford University, Palo Alto'~ Planning Department, Utilities Departm9nt and the RWQCP. The three consultant firms inte.rviewed by the committee were Brown " Caldwell, CH2M Hill, and John Carollo Engineers. After the interviews, staff performed reference checks on similar reclamaticn projects that were listed on each firm's experience list. Evaluations of the firms 'Were done based on the firms' project team, approach, communication skill, team experience and references, and user training programs. CH2K Hill has excellent endorsements from the City of Santa Barbara and the City of Santa Rosa for whom CH2M Hill has completed the EIR, design and construction manage:ment of their reclamation facilities. The selection committee agreed that CH2M Hill has the most experience in addressing environmental concerns related to wastewater reclamation. CH2M Hill has successfully completed many wastewater reclamation projects in the Bay Area, all within the project budget. The comroi ttee ranked CH2M Hill as the ! irst choice and John Carollo Engineers as the second choice. The attached scope of work covers the consultant tasks to be accomplished under the Wastewater Reclamation Pre-design/EIR. The se::.-vices include preparation of an environmental imp2ct report (EIR} for the Waste .... ·ater Reclamation Master Plan, development of alternative pipeline routings and reservoir sitings for the preparation of the EIR, refining the Master Plan project cost estimate to plus 3Q percent and minus lS percent accuracy. If the reclamation project is approved, the consultZ'lnt l!iay be requested to perform the final design and construction management of the stage 1 project. The scope and fee for the final design 'Will be negotiated at such time. -2- CKR:508:92 • Funding Funds for the wastewater Reclamation P;:;-e-ries ign/EIR are j ncludcd in the FY 1991-92 Wastewater Treatment operating fund. Recommendation statf recommends that the Finance committee approve the selection of, and authorize staff to negoti~te an aqreement with, CH2M Hill to provide consultant sen-i<;:es ~or the Wastewater Reclamation PredesigTI/EIR. If a reasonablE: cor;;traC't agreement cannot be reached with CH2M Hill, staff further recommends that the Finance Committee authorize staff to then negotiate with John Carollo Engineers. Respectfully submit~ed, WrLLIAK Mrr.5 Kanaqer, Water Quality Control Plant ~JtJ{)JL-L_~ DAVID G. ADAKS Director of ~~lic Works ~~ Interim City Manager Attachroents~ SCQpe of Services Re:ated CKRs: 358:92 -)- CMR:508:92 Q EXHIBIT A SCOpg OF WORK WASTEWATER RECLAMATION PRE-DESIGN INTRODUC'I'IO!i The Palo Alto Regional Water Quality Control Plant (PARWQCP), operat~d by the City of Palo Alto, provides wastewater tr~atment and alsposal services for the citias of Palo Alto l Mountain View, Los Altos, East Palo Alto, the TOw"n of Los Altos Hills, and stanford University. The PARWQCP is an authorized generator of reclaimed .... ater for un-restricted u.se. Be-cause the reclaimed 'Water from the PARWQCP can provide beneficial reuse, and because potable water supplies are limited, the PARWQCP embarked on a Wastewater Reclamation Program. 'l'he program is structured in three steps: o o step 1 step 2 Master Plan Policy & Institutional ar~angements I Finance I Pre-design o step 3 --Final Insititutional and Financial Arrangements I Detailed Design I construction The PARWQCP has recently completed step 1, the Waste~ater Reolamation Master Plan. The PARWQCF is now proceeding with step 2 of the program. This project is for Consultant services to perform the Pre-design tasks of step 2. BACKGRO~ rNFORMATION The following are projects or reports that will provide. backgrcund information for the pre-design: o The Master Plan recommended the implementation of reclamation projects in three stages. o 1ni tial f fnancial planning work is being undertaken through a separa'te consulting contract administered by the cit}, of Palo Alto Finance Department. Findings of the financial plan will be made available to the consultant.. o The Notice of Preparation (NOP) for the Master Plan and stage 1 project is beir.g undertaken as part of the Master Plan project. The Consultant shall revie .... and address all Cuirlments received during the NOE' pro-::ess. The 1 I i i I ',. consultant shall also completE additional NOP ~orks as deemed necessary by the Consultant. The consultant shall obtain and revie .. ' .3.11 other relevant information on this project. The relevant existing infcnnation shall include locations of utilities, City and University policies and guidelines, aerial photographs, amon'1 otl:ers. OBJECUVES In general, the Pre~design consists of compliance with the California Environmental Quality Act (CEQA)~ stage 1 project pipeline routing, reservoir siting, and refinerr.ent of project cost estimates. The extent of the pre-desigr. scope are further discussed under section "Consultant ServiCES". CONSULTANT SERVICES The consultant \iill be responsible for the pre-design work of step 2 of the reclamation program. The Pre-design tasks are outlined belo .... Ta§~~~Docurnentation The primary goal of the PkRWQCP is the production of an objective and adequate Environmental Impact Report (EIR) for the Reclama~ion Master Plan as a disclosure document that presents information to decision-makers. The ErR shall thoroughly describe the impacts of the reclamation program and projects. The report shall meet the requirements of CEQA and the State and city guidelines, identify the approppriate-mitigaticn measures and monitoring methods in compliance with AB 31~a( and address all environmental concerns such as the long-tp-rm effect of reclaimed 'Water on plants and soils. The Consultant shall prepare an envi["~nmentally responsible and legally adequate EIRI attend meetings with City staff, and make presentations at public hearings conce;-ning the ErR before the city Planning Commission, the Utilities Advisory Committee (UAC), and the city Council as: r.ecessary. Step 1/ the Mast~r Plan, of the reclar.J.ation program identifies several projects to be implemented in three stages. The Consultant shall prepare the ErR for the Reclamation Master Plan. The EIR shall provide a prograJr"-level ana lysis for the reclamation program identified in the Master Plan and a project-lEvel analysis for stage 1 project of the Master Plan. Stage 1 consists of implementation, by 1994, of a reclamation project involving several sites between the PARWQCP and the stanford campus plus irrigated landscape areas on Stanford University itself. 2 ;"-" " , '- .. ~ I I I o The proqr3m level EIR shall address the following: • The potential short term and long-term effects or reclaimed water on plants and soils l including but not be limited to the effects :>f salir,ity, total dissolved solids, and metals. • The potential 9ro .... th-inducemer.t impacts. • The potent5.al geologic and seismic issues, including but not be limited to the potential reduction in flood capacit}~ due to installation of pipelines -and tanks, impacts to surf~ce and ground water, impa=ts on existinq planned land use. • The potential impacts to biological resources, including but not be limited to the impacts on existing habitats. • Public health and safety issues associated with use of reclaimed water, including but not be limited to odors, risks of upsets, and other nuisances~ • The Aesthetic impacts of reclaimed ~ate~ facilities. • The potential disruptions to traffic, and possible noise impacts associated 'With the construction of the reclamation facilities. • The potential i~pacts on cultural resources includinq a record search and a field reconnaissance. • Identify the appropriate mitigation measures. • Identify and discuss a.lternatives to the Reclamation Program and stage 1 proj£cts. Alternatives to he examined include no-prcje::-.t alternative, ne'" project alternative, and alternative pipelir,es routes and resp-rvoir locations. The project level ETR shall provide site specific analyses to determine the potential impacts listed above and to provid~ site specific mitigation measures. The EIR scope shall include the follOwing sub-t.asks: A-l. Administrative Draft E1R~ The Consultant shall prepare an Administrative Draft ErR that fully describes and evaluates all aspects of the Master Plan and stage 1 project. Alternatives to be evaluated shall include the no-project alternative, alternate pipeline alignments, and alternative reservoir sites. Other alterna,tives can he identified by the Consultant. A :mitigation monitoring program shall be prepared by the Consultant and included 3 I I ri ~ / in t:!'}e EIR. T'.oIenty coples of the Administrative Draft ErR :$hall be provided to the Pi\RWQCP for r:=vie",'. A-2. Draft EIR. The Consul t.ant shall revise the Administ4ative Dreft EIR based on th~ city's comments and produce a Draft EIR suitable for public release. The Consultant shall provide one hundre~ copies of the Draft EIR and technical appendices to the PARWQCP for distribution. A-J. Meet~n9S and Re&rinqs~ Throughout. the CEQA compliance process, the Consultant shall prepare and conduct project meetings with city staff/ public meetinqs to communicate with the public, and hearings as required by CEQA Guidelines. A-4. Response Document~ The Consultant shall respond to all oral ;;:md 'Written comments on the Draft ETR and shall prepare a separate Response Document. TWenty copies of the draft Response Document shall be sl.1.bmitted to the P.A.RWQCP for review. The Consultant shall revise the draft Response Document based on the city com.llents or any additional comments .. and prepare the final Responso:!. Document. One hundred copies of the final Response Document shall be submitted to the PkRWQCP. A-5. Final EIR. If necessary, the Consultant shall revise the draft ErR, prepare and submit one hundred copies of the final EIR to the ~ARWQCP. Task B: Pineline Routing __ anq _____ Reservoir siting The Master Plan identified tentatiVe pipeline routes and sites for two reservoirs for short term (daily) reclaimed water storage. The pipeline routes in the Master Plan were identified on the basis of the shortest route and avoj dance of obvious contil cts such as downtown arEcas ar:d heavily travelE!d streets. Limited discussions we~e held with City of Palo Alto and City of Mountain View staffs in determining these routes. The Pre-design routing ,",ork shall c:>ns ist of preparation of a detailed reclaimed 'Water pipeline alignment evaluation for the stage. 1 project identified in the Master Plan. The evaluation shall be carried out in suff icient detail to permit a pipeline route to be selected and to permit final design of the pip~line to be completed in the next step, step 3, of the program. The pre­ design routing investigation shall support thE: proj ect level EIR preparation for the stage 1 project. The pipeline routing evaluation completed in the Master Plan is expected to be sufficient for preparation of the program level ErR on the stage 2 and J projects~ The Master Plan identified two reservoir locations to provlde daily 4 .. (I b ;··.1 ~ 1 I I / , o flow equalization between recla,~ed ~ater productio~ and demand. Enclosed t"-nk-type reservoirs were identified, orle for the Stanford University carnpas and one fer Coyote Hill near Stanford Research Park. The pre-design shall determine the location and type of reservoir for the Stanford U:11versity Campus {part of stage 1 project) and will fUrther investigate the appropriate location and type of reservoir for the Stanford Resear-ch far].;:. The Stanford University campus reservoir, as part of the stage 1 project, must be evaluated in the project-level portion of the EIR. The stanford Research Park re~ervoir need only be eV2Iluated on a prcgral1l-Jevel basis for the £!R. The routing and Siting investigation 5hall include the following sub tasks: B-l. Xnvestiqate Baekqroun4 Data. The Consultant shall investigate all relevant back.ground data affecting pipe route and reservoir siting, includinq, without limitation, clearances from underground utilities and rights-of-way~ The consultant shall discuss pipeline alignment and reservoir siting issues with the appropriate city, railroad authority, Caltrans (HToitY 101 & Elcamino Real), and University personnel. For fee estimate p'.lrpose, assume that thp.; existing -::ity maps and apri.al photo are suitable for use, and aerial survey 'Will not be required under the pre-design task. B-2. Develop Design criteria. The Consultant shall develop the appropricte criteria for the design of pipelines and reservoirs including railroad right-of-way per-mit process, ;:o,nd regulatory requirements such as separation of reclaimea ~ater lines from potable water, type of pipe material, pressure class rating, service connections, backflo~ requirement, depth of pipe, etc. B-3~ Develop Alternatives~ For the stage 1 pipeline, three alterr,<.Jtive routss shall be identified. For-the Stanford University Cd~pUS reservoir~ three alternatives, including altprnate loc2lltions ana types of reservoir, shall be identified. B-4. Develop Se1ection criteria. The Consultant shall develop selection criteria for the stage 1 pipeline, the stage 1 reservoir site on the Star'1_ford University campus, and the stage 2 reservoir near Stanford Research Park. These criteria are expected to inclUde ( but are not limited to ) costs; constructabll i ty, permit requirements, community disruption, environment2lll impacts, and traffic impacts~ 6-5. select Routinq and Sites. For the stage 1 project, confirm and select the pipeline alignment and rese~voir site and type. For stage 2 and 3 of the the program, determine a reco~~ended site and type and identify any 5 '-~ \ .. additional York necessary to confirm the site selection. ~~ __ ser Agreement and Letter ot I.n~ent The Consultant shall confirm ~dditio~al users on the pipe route of the stage 1 project. The Consultant shall assist the City in developing preliminary user agreements. The consultant shall outline the user responsibilities including modifications to the user's facilities, record keeping and reporting, long term monitoring and management, vegetatio.'1 selection and planting, W'ater quality~ operation of irrigation facilities. Task~: Cost Estimate Th~ Consultant ,c;;hall refine the cost estimate in the Master Plan for the stage 1 project ba~ed on the selected pipe routa and reservoir siting. The revised cost estimates ,design and construct) shall be within plus t~irty percent ,+30%) and ~inus fifteen percent (-15%) accuracy. Task E: project Implementation S!"~,,.p~ The Consultant shall establish a detailed implementation plan tor the stage 1 p~oject. Plan E"hall include a step-by-step procedure to inform the public, obtain agreements ~nd approvals for the final design and construction, etc. It shall also include a list of agencies having jurisdiction, and a list of &gencies (including th~ environmental groups) that shall be informed of the revie~ and/or approval of the final design and construction of the r;taqe 1 project. ~ask F: prqgram Moni tQ,,:;: The Consultant shall identify and monitor all critic~l path items of the pre-design, and the various tasks in step 2 that ~il1 affect or be affected b;;' the pre-design effort. The conSUltant shall ccordinat.e and provide information as n'=.cessary. en a timely manner, to the other tasks in step 2 of the reclamation proqran.. Task. G: P_erm-1t The Consultant shall identify all per;nit requirements, the City may require all or some of the permitting work to be performed by the consultant as additional ",'ork. (Cal-Trans, Santa clara countYr railroad authority, State Health Dept.) PENDING CONSULTANT SERVICES Upon completion of step 2 of the Reclamation Program, the City Council will review and mak.e a decision on the reclamation projects. If the reclamation project is approved, the Consultant 6 - o may al:5:·e,. be requested to perform the final design and construction management of the stage 1 project. The detailed consultant services ~il1 he developed u~n completion of the pre-design and project approval. In general, the consultant will be required to provide the following tasks: P-l Final cesiqn. Complete all ~ork not covered under the pre-design ta5k which are necessary prepar3tions for the final design task. Prepare all design calculations, dr.awings, reports, specitications l cost estimates, bid documents necessary for the bidding and construction of the stage 1 project based on the pre-design report. Final design shall be performed with a sot, a 80% and a 99% sUbmittal. All review comments shall be responded or incorporated in the final submittal. P-2 Publ ic ConoernB. Attend rn-eetings with environmental groups and conduct public meetings as needed. P-3 Permits. Perform all permitting activities. P-4 Bid Pha.e~ Administer all bidding proce£ses, including responses to questions, conducting pre-bid meetings, bid eval~ations, negotiations, and recommendations. p-s CQnstructicn manaqement. Provide resident construction ~anagement team for on-site inspections and construction administrative functions, including submittal reviews, process progress payments; change orders; and miscellaneous, supervise construction activities and schedules, respond iJ"l. a timely manner to contractor requests and questions, testings, and start-up~. DELrvERABLES The Consultant shall prepare and submit the ErR as described in earlier sections. The Consultant shall prepare and s\;.bmit ten (10) copies of the draft reports and drawings for each of the remaining tasks.to the PARWQCP for City review. The consultant shall respond or incorporate the city review corn1"1en-t.s and t:iubmit twenty copies of the final version of each of the reports and dra'.ltlings. The Consultant shall ass~mble all of the final reports for the Pre­ design effort and submit forty (40) copies of the assembled reports and drawings to tne PARWQCP. PROJECT COORDINATION The Consultant shall coordinate project activities 'With the various 7 • other step 2 activities su~h as the ReCiamation Finance Study, the water Resource Study, ar.d the Reclamation Task Fo~ce activities. PROJE~ SCHBDULE A simplified schedule for step 2 activities is included in this scope of work. The i.ntent of the schedule is tCl provide an ov.erview of the time line vf the pre-design ar.d the various related step 2 activities. The Consultant sohall establish a detaileu schedule prior to ~tart of the project, showing the critical path, based on the information exchanges that .... i11 be needed ...... i th the various step 2 activities. The consultant shall update and maintairl the schedule throughout the project . • ** ...... 8