HomeMy WebLinkAbout0179.093, ~ i I i , I I - -~----~---~~--------------~-..... Februat"¥ 25, 1992 HONORABLE CITY COUNCIL Palo Alto, California Members of the council: REPOnT IN BRIEF The purpose of this report is to inform the Council that construction of Quarry/ArbOret.um/Welch improvements will cause substantial traffi~ delays on Quarry and Arboret"lllIl. This is an informational report and no Council action is required. BACY;CROUNP Stanford University is required, by previously agreed upon environmental mitigation measures~ to ~iden Quar~y Road between Arboretum and Welch Roads and mak~ ~mproveme~ts at the intersection of Welch and Pastuer P.oads. In addition. at its own discretion,. Stanford has elected to include improvements to two short roadway segments, as part of the proposed project~ The first is to continue the widening of Quarry Road past Welc..h to a parking lot entrance that formally se:!"ved ~s Blake Wilbur Drive. The second is to widen the Welch Road approach to Quarry ROad, toO add an exclusive left-turr, lane. On .January 1.8, 1993 ~ Council approved t.he above improvements and authorized the Hayor to execute the l'ecessary easement agreementEi (CMR:129':93). stanford has completed the design and is now ready to proceed with the construction work~ CONSTRUCTION Stanford has awardEd the construction contract to Construction Company. Construction is scheculed to begin 1993 and is expected to be completed by July 31, 1993. Granite Ma.rch 1, ConstI'1.lction impacts along Welch Road and Pasteur DriVE! \rIill be minimal. Two-way traffic will be maintained at all times. The westbound right-turn lane on Welch at Pasteur will not be available to traffic for about a month during construction. Ho~ever, traffic impacts along Quarry and ArboretUm Roads will he, substantial. CHk:179:93 ~ " ! ! ! -- o BeginnIng the week of March 8, Quarry Road will be reduced to one lane of traffic in each dirsction, wi~h li~ited storage for the eastbound right-turn lane at .1~rboretum. The constrlJction ar~a will be separated from the travel lanes by a raised concr~te barrier. The exclusive eastbound left-turn lane on Quarry will be closed. The ent~ance to the parking lot on Quarry opposite Wel~h Road ~ill be closed; and temporary changes ~ill be made tc existing signals at Quarry/Welch and Quarry/Arboretuu:. D'Lle to the reduced capacity of-Quarry Road and its t~o inteLsections with Arboretum and Welch, and the temporary nature of the signals~ we anticipate that traffic will experience substantial delays throu9h this area. Staff is working with Stanford University to info:-m as :Many users as possible of this situatio~1 and to advise them to avoid thi$ area and use alternate routes. It is sugqested that drivers going to and from Stanford Hospital and Clinic and Welch Road addresses use alternate routes via Arboretu~/sand Hill/pasteur or Palm Drive/campus Drive/Welch Road (Attachment 1 is a map identifying the alternate rout,es) ~ Persons presently using the Quarry Road staff parking lot are being requested bj' Stanford to access Quarry Road via campus Drive. Stanford will prepare a press release outlining the above issues prior to beginning 'Work. Informational signs adVising dr-ivers about the construction and expected delay will be posted along Quarry Road. Adequate traffic control ~easures (including signs, barriers, and cones) warning users in advance about the trafEir, conditions, guiding them through the work area, and protecting the work area itself will be provided and maintained during tile construction period. Respectfully submitted, ./tt< .4,1 "'-~ ASHOK AGGARWAL city Traffic Engineer ~. I llw..vu FLEMING -!' Ass stant city Manag~r Attachment: Map of Alternate Routes cc: Mike Kuntz, Sta.!-.fora University Andy Doty, Stanford University ;t;?;d ;:;f. --id~7 KENNETH R~ SCHREIBER Director of Plannin7 and COl!lJ:llini ty EnvirorJ'lI'.ent Stanford University Hospital (Louis Saksen, Assoc. Director) Stanford Medical Clinic (Don Tower, Exec. Director and office of Planning & Business Development) New Childrens Hospital at Stanford (Chris Dawes. Tom Rieger:', Jim smith) Welch Road Properties CMR:179:9J 2/25/93 Page 2 I f- - -----~--- - . - -~.~--.~ ,