Loading...
HomeMy WebLinkAbout0476.092! October 22, 1992 TIlE HONORABLE CITY COUNCIL Palo Alto, California Sunnyvale. Material Recovery ang. Trct.lu;feI' station Update Members of the Council~ Report in Brief This is an informational report and no Council action is required. On May 4, 1992, council approved the plan for SunnY'J'ale t~ construct the SunnYVc!llle Materials Recovery and Transfer Station (SMaRT) [CMR:237:92]. Council also requested staff to report back in a few months and provide a status report of the construction of the Stat.i..c:n (CKR:2J!:92]. Backgrgund The cities of Sunnyvale, Mountain vie~ and Palo Alto entered inte a Memorandum of Understanding (MOU) to provide for the SMaRT station in sunnyvale. A request for proposal (RFP) fcr construction and operation of the S~~T station ~as d~veloped by Sunnyvale, as the le~d agency, with the assistance from the staff of Mountain vigw and Palo Alto. Two proposals were submitted and later rejected by Sunnyvale, and with concurrence of the cities of Mountain View and palo Alto, Sunnyvale opted to construct the SMaRT Station~ The Sunnyvale City Council authorized bond iinancing for the capital costs aS~DCiated with constructing the Station. The Resolution of Intent for the bond financing had clarifying language added to meet the standards of new re~11atory requirements. Sunnyvale's Council approved the changes September 15, 1992. The SMaRT Station is scheduled to he completed by July 1, 1993, to facilitate the citi~:;; sending their waste to Kirby Canyon Landfill, as required by the disposal agreements with Waste Management, Inc. (WMI) • Discussion The SMaRT Station construction is curtently on schedule as well as on budget. The entrance road construction began July 13, 1992. The work included excavation of approximat.aly 60,000 tons of qarbage and importat.ion of soil for the roads. -1- CMR:476:92 'p ',t:" Tn"" J; , i The overall desiqn of the SMaRT Station is 80 percent c0111plate. Desiqn changes have been made to the initial plan in order to reduce the high Cvot ofaxcavation and the import fill dirt for the Station's pad. currently, bids are out for the construction of the building, purchase of compaction equipment, and foundation piling work. Attachment IIAII is the preliminary construction schedule wi th approximate dates. Ground breaking for the building is scheduled to begin !n mid-November of this year. sunnyvale has submitted an operating permit application to Santa Clara county Health Department (Local Enforcement Agency). It is anticipated that final permit approval .. ill be secured by mid-February. ]I.. Request for Proposal (RFP) has been issued for the operation of' the station, and a s~lection of proposer is planned by mid-January 199~. ThE material recovery {recycling) element of the SMaRT Station is expected to be on-line to p~ocess materials by ~~ly 1, 1994. Wood yaste precessing will begin on a limited basis for the city of Sunnyvale by July 1, 1993. Attachment -A-is a preliminary schedule through June of 1994. Respe~tfully submitted, XI ClU>.EL H. KI LLER Deputy Director, Public Works Operations DAVID G. ADAKS Director of Public Works FLEXING Assistant City Manager Attachments: Attachment A Related CMR: 237:92 CMR:476:92 -2- , I SIl&.RT Station pre1iRipary -Schedule Tbrouqft JUly~! October 1992 November-1992 December 1992 January 1993 Februa.ry 1993 March 1993 April 1993 I'.ay 1993 June 1993 J"uly 1993 January 1994 July 1994 Order piling materials for Transfer Station. General construction contract bid due~ Entrance improvements complete. Transfer Station ground breaking. Compactor and convlyor bid due. Office building I"nd landscape contract hid due. Wood and yard waste equipment contract bid due. Award operator contract. Receive operatinq permit approval by CIWMB. Transfer Station frame l installed. ~ward contracts for equipment. Transfer Station building Landscape complete~ walls and roof material recovery structure complete. Shake down compactor and wood/yard ~aste equipment. Transfer complete~ Station Shakedown material equiPlllent. and office building recovery (recycling) Beqin full Eaterial recovery proqram~