HomeMy WebLinkAbout0159.093\
~.
• •
.' ,,'." ,';'; ,-
February 11, 1993
THE !;oNORABLE ClTY COONCIL
Pal~ Alto, C~liforn,a
STATUS OF ;RASTRADERO PARK APARTMENTS. 574 ABASTRADERO ROAD
ReRort in Brief
This report forwards to Council a status report on th~ federally subsidized
Arastrtdero Park Ap~rtments at 574 Arastrade~a Road. This report is for
1nfo~tjon only and no Council action is required~ The Arastraderc Park
Apartments is a 66 r unit, feder.lly subsidized. family complex. On December 1,
)992, the own~rs, Araspark Associates, filed a formal "Notice of I .. tent~ to
offer to sell the property unde'r the provisions of tne federal low rncome
Housing Preservation and Resident Homeownership Act of 1990 (LfHPRHA). This
report s~ariles the procedures and ~chedule which will be followed under the
law ind describes the protect;~ns which are provided to the tenants. There is
also discussion of the federal subsidies available tD assist in the purchase
and preservation of the complex as low income rental housing.
Background
Arastradero Park Apartments "as built in the mid-sev~nti..-s and financed by HUD
under th! Section 236 mortgage program. In return for advantageous financing
at a very low interest rate. the de~eloper was required to rent to lo~ income
te'lants at rents control led by HUD. The origi nal mortgage terms al 1o~ed
pa~off of the loan and termination of the low income use restrictions after 20
years. ArlStra6~"'rQ Park is one of the 1,£00 HUD subsidized rental pt'ojects
(containing 117,~OO units) in California which are eligible for conversion
frorn low incomP housing by the year 2008. In response to publ i c outcry about
the hardsnip ",nat could resu"lt from tne 1055 of su<:h a 1.irge proportion of the
country's low income rental stock, Congress passed a series of moratori lJrns and
laws to limit the ability of owners to prepay their mortgages and thus
terminate the use restrictions.
The law in effect today is the low Income Housing Preservation and Resident
Hn"",o.nership Act (LlHPRHA) as im.nded in 1992, lIHPRHA sets "P i specific
CMR:159:93
-----------~----------------
/ -----------~
o
process and time frame within which det:isions are made on the future of the
property. The key steps and the timetable for Arastradero Park ire:
1. O\iner Files Fir::.t Not (.:;e of Intent to Sell: Done 12/1/92
2 _ HUO appraises property (the appraised va1ue determines the owner's
equity and the permitted sa1es price); HUD a150 determines the
higher rents · .... hid will be necessary to cever operati!'1g costs and
paympnts 071 a neloi p'Jrc~ase mortgage; Deadl ine: 9 mCl~ths or
8/31/93
3. Owner F11es Second Notice of Intent to Seli: 30 days later
4. Property A'lai1abl~ for Offers from {lualified 8uyers: 15 months
A. Tenant Purchase: 6 months
B. Nonpr<:lfi t Purcha.se: 5 mO"lths
C. P .... rchase by Any Buyer with Continued Use Restrictions: 3
months
5. OWner Accepts an Offer/~PTan of Action~ prepa~ed a~d appro¥ed by
HUDj P1an describes rehabilitation p1ans and fina~cing: 3 to 5
months
6. loan Application and Processing: 6 to 12 months
7. Purchase Conel uded: 2 to 3 months (U kely date June, 1995)
Congress has pro¥ided separate funding for the ccst of preserving these
projects. for fY 93, $538 mi n i on is author i zed and fer FV 94, .5665 milli on
is authorized. HOME funds cannot be used for LIHPRHA projects, although COBG
funds could be utilized. Adoitlonal detad on the steps invoived is pro'lided
in Attat~nt 1.
Impact Upon Current Tenants and Rent Increases
The Act provides numerous prot~'tiQns to current tenants of these
developme~ts+ In the wor~: case ,in which no purchaser is able to
successfully complete the acqulsition under the Act and the owner is thus able
te> convert the project to market rate housin~', the l'Jw income tenants would
be provided with their own Secti~n 8 certificate or voucher. Fifty percent of
thE tenants' ~~in9 expenses are a1so paid. In tight r~ntal markets such as
Palo Alto's, tenants wauid be allowed to re~ain in their units for three years
at current r~nts before having to reloca~e.
In the situation where the project remains as affordable re~tal housing, part
of the incentive packCige j available lioth to owners ... ho continue {)",ner~h~p and
to new purchasers, is a project-based Section 8 contract. Section 8 rental
assistance is provided to all low income tenants, which wruld be about
CMR:159:93
p:\CMR\AAAS,~
2/11/93
Page 2
/
I --
~-c
-
---~-----=~=.~~----------
a8 ptrcent of tnt existing Arastradero P .. r~ tenants. Undilr Section 8~ tenants
Pi.Y 30 per':ent of their 'income fo,-rent. For tt:@ ter1aots whos.e inco~s exceed
the Section 8 limits (ex.mple: $38,600 for a family of four), their rent wil'
become the full fair market rent allowed by HUO for the project after
acquisition.
For SOle tenants, the change to Section S, may mean a significant increase
ever their curr~~t rent payments. This is because under the Sectio~ 236
prognm. T(:nts are based upon the project's operating costs and de-bt service
costs, not upon the tenants' incomes. For exa~p'!r some te~ants will face
onl,)' fairly modest increas!!s of QbolJt 10 percent or $50 per m!lnth, while
others will see their rent ir.crease 100 percent OT more. Federal r!Qulations
require that 1.1'1)' h.rge rent increas.es {exceeo)lig '50 percent} be phased :,n O'ier
a three year period. Generally, the tenants with th! ~ery lowest incomes will
benefit from t~e Settion 8 assistance, while tenants with ~i9het incomes will
have to pay more. S!E Attachment 2 for the existing rent stru,ture.
Prilfile of Arastradero Park
fn Jun! of 199L the Palo Alt~ Housin-g Corporation suneyed an e:<isting
subsidized housing within the City. Information was gathered on the existing
rent lewels end the occupancy characteristics of the tenant.. The inf~rmation
from that survey for Ar~stradero Park is included in this report. Some of
t~is information has been updated oj' the resident rrrat'liiger. According to the
manager, the tenants are very stable~ with 13 bein9 original Gccupants and
IR(Ist hillv'ng 11Y~d there for 8 to 10 years. Turnover averages only two or
three units per year. Tn! typic~ tenant is a low income, ~orking, single
mother ~
SeYenty·five percent {o'!" 49} tlf t~e 65 rented uflits ife occupied by ve~·y low
income tena~ts (below 50 percent of median inc~me). Ten of the units are
ilc.cupied by elderly households. Two hOllsenolds are headed by w"eeTdlair
us~rs. Seven households are large families with five Dr more persons.
lnttmes range fr"m a low of 53 1 000 per yea!'" to a high of $50,000 per yea!" for
a household ~f four. ~ee Attac~ment 3.
Firancial Assistar,ce from HUD for Pre-Acquisition Costs,
Tenant Organizing and Technical Assis;."'aC2Jn .. c"e ____ _
HUO hlS technic.1 assist~nce and pre-acquisition grants of up to il2S,UQO
available t~ ajd a resident 9rouP or a low income/community based group in
organizing themseTve~ to purchase the property. Up to 525,000 is available
for start-up funding. Up to S50 ,000 'is alj~1'able to prepare and submH a
purchase offer and ar,other 550,000 can bi: obtained to secure financing and
conclude the 4c.Quisition. The Palo Alto Housing Corporation can access these
grants 2nlY if they plan to use the grants to form a separate, community based
nonprofit with Doe-third of its board composed of low income persons or
r!presentatives of' low income perscns.
CMR: 159:93
-·.'-'L-··
1/11/93
Page 3
-.--~.----~-..
..
-0. -. ------~-''''' .. ----~---.... -
o
Estlm.ted Cost. tn.t City Mi9ht be Asked to
fay to Suppqrt a NonRrofit Pyrcha$e
At this point, it ;s not possiole to makE ever a rough estimate .of costs that
the Cit~ eight be asked to pay if a final decision is made to preserve
Arastradero Park as law lr;CQIIH:! rental hOlJslng. Jf i nonprofit housing group
should b~y the property, t~e City would probably be as~ed to pro~;de funds to
cover the required S percent equity and so~ predeyel0pm~nt costs. T~e main
u~known$ are: the ~irket ~alue of the property. the amount of necessary
repairs, the am01Jnt of rerlts HUD will agree to pay under the new Sectio~ 8
contract and the amcunt of pre-acquisition costs t"at will not be funded by
H~D.
Conclusion
Staff and PAHC will continue tn monitor the vwn€r's proposa1 tn sell the
Arastradero Park Apart~nts and will keep the Counctl inforrr~d.
Respectfully submitted,
:J£tlUu ~~
CATHERINE SIEGE~ --67-~~
Senior Planner, Ho~s!ng
~. FLEMING MJ~IV""'Q,. ~~y anager
KENNETH R. SCHREIBER
Director of Planning and
Community Environment
Attachment s: 1. Steps Inyol~ed In A Sale With Incenti~es
2. Current Rent structure
3. Occupancy Characteristics
cc: Arastrad~ro Park Tenants c/o Sally Croft, 574 ftrastradero Rd., Apt. 34,
Palo Alto, CA. 94306
Araspark Associates ~/o Sam ~ebster, General Partner, 265 lytton A~e.,
Palo Alto, CA. 94301
firit Charter Propejties, c/c Mona Dean. 1752 Techn~lcgy Or. Suite 120,
San Jose, CA. 95110
Marlene Prendergast, Palo Alto Housing Corp. 540 Co~per St. Suita G.
Palo Alto, CA. 94301-1806
Lucy Btlokbinder, U. S. Department of HUD, Housing Management Division,
P. O. Box 36003, San francisco, CA. 94102
lisa G. Harnilt~n, G. R. Bill Company, 2333 Camino Del Rio, South ;150,
San Diego, CA. 92108
CMR: 159:93 2/11/93
Page 4 p'.1CMR\AAAS CMP.
-'-'-,:;;:(,.~" ':-' • u •.... ' .. ' .•....•. -. •..•.... ' •.•• '._. :?L~ .. ' ..... _-.: :.'""'0 ';-
:' ,"'--'''-
'/.:' '.
Step I.
• •
Step 2.
•
• •
Steps rnvo1<~ In A Sale With Incentl,.s
Notice of Intent filed b~ owner with HUD, (l.Y and t.enan~~.
This starts the clock on the appraisal pt'ocessj (Dec. 1. 19~2)
[ndicates owners' intentions, but is not binding.
Appra1sal Process:
Property is apt'raised; HUD and OW:le,.. agree on a "P,..ese-rvation
Value~; HUD calculates equity, ·Preservation Rents· and
determines if 9roject can fit wit~in the ·federal cost 11mit~·:
Deadline: August 31, 1993; und~rway now.
City provided 1nput into the appriisal research.
Step 3. Owner Decision / Second Notice:
Step
• o.~e,.. decides whether to continue ownership lnd seek fina~cial
incentives f~om HUn OR OWner files a Second Notice of Intent To
Sell:
• Oeadline: 30 days from Step 2: (5.pt. 30. 1993)
• The second notice starts the IS r~nth period wtthin whlch
interested b,Jyers may submit offers to purch~se to the owner.
• ihe owner may still change this decision and lat~r decide to
keep the property.
4.
• • • • •
I.
~Dluntary Sale & Gontinuation Of USt As low Income Housing
Mast likely scenario in this case.
T; .... Frame: October, 1993 through December, 1994 (15 months)
Owner 1S not obligated to accept any purchase offers.
All effers must be at the HUD approved va1ue.
Proce o;s:
Months 1-6: Offers on11 from ten.nt councils for
homeownership or rental or from a Community Housing Oevelupment
Orqanization, "CHDO" (a nonprofit '.hid includes low income
representat 1 on)
2. MontHs 7-12: Offers from the above or from a nonprofit housing
organization.
• Tnis is the point in the process when the Palo Alto Housing
Corporation could offer to purchase the property. be~innin9
in April. 1994.
3. Months 12-15: Off~rs may be made from any purchaser who is
,dlHng to continue the long··term low income use restrictions
including for profit developers.
\
"
o
step S. Offer Accepted 8y ~er / Owner and Buyer SubmIt ·Plan ~f
Action-to HUD Requesting r~nao'i.l Assistance To C~Tete the Sa1e
• Time F~ame: 3-6 months
• Buyer a~pl1es for HUD finanting tT~e A,t p~~vid~$ fede~.l
finarlcing for 95% of the ac~u1s1tlr)n price and .. n of He
rehabilitation c~sts) a"d ~UD gr~nls for re1mbur~ement of
acquisition costs.
Step 6. Final l~~n Packagin; and Escrow Closing
• Time Fr~: 8 -IS months
• New rent structure art~r change of ownership
--", ",,'
Notes:
"""" . . _c:::::.~
/
Attac~r.t 2
AAASTRADERa PARK APARTI!ENTS
Current Rent Structure Under Sec. 236 Pro r~
Mlnl_ Rent R.nge of Max 11lU11 l~nt Una She -Basic· Le\lel' Basic Rel"t.t ·Mark:et ll level3
I S' $285 $285 351 $352
2 6R $337 $338 415 $4l6
3 BR $390 533l 3BI 5482
4 BP. $432 1433 533 5534
Ga t 1t rent is paid by th~ low~st income tenants. Som~ of these tenants
aay be currently paying more than 30t ~f their income for rent.
As a tena~ts/ income increases, the basic rent goes up. Each year, the
basic rent tenants are recertified.
After a tenants' income exceeds a certain level {based on the sile of
unit they ire living in), then their rerlt is set at the "market-1e'l'el.
For example, fer a two bedroom un;t, iii tenant with an income over
$17,000 pays t"~ market rent. ~arket rents only increase when permitted
by HOD based on operating costs. Market rent tenants do not ~ave their
incomes recertified. Thert is no max;~um income for market rent
tenants.
t<, ,~
j:'.''t
,,>," -
~ ---~'-'.'---~--' .
•
-.----. ------------.~----~"---'-----_"I!r.
Yery low
[ncOllle
lew [ncORle
noderate
["COM
TOTI.t.S
l!!!1!.,
Source:
--~---~-.---
J ~
Attachlllent 3
ARASTRAOERO PARK APARTM£KTS
Occu ancy ChaTacter1st1~:!
Oc:cu anc-os of 6 91
Total Elderly Sm F"", 19 Fom Other
2-4
49 10 29 3 7
9 0 6 3 0
8 6 0
66 11 41 7 7
Incomes rang! from • low of 53.000/year to • nign of
SSO,OOO/year for a household of 4.
Surve,Y of £Xfstfnq Subsidized Housing Cmrrpleted for tnf:! eH.AS
Updated wlt~ Resident Manager, January '93
. -.
, ".
/