Loading...
HomeMy WebLinkAbout0552.091- December 12. 1991 THE HONORABLE CITY COUNCIL Palo Alto, California Members of the Council: :Report in Brief This report presents the results of a study made on the condition of Arastraderc Lake Dam. No Council action is required. Bagkground As part of the 1990-95 Capital Improvement Program, Council approveQ $30,000 (CIP 19102) for testing and design develop~ent services to analyze the condition and adequacy of the dam to withstand major storms an1!jor earthquakes. On April 18, 1991 Council approved an agreement with Geomatrix Consultants, Inc. to provide these testing and design development services (CMR 225:91j. The consultant has recently completed an evaluation of the dam and has found that the dam spill'io.'ay is under!:; ized and too poorly constructed to handle the volume of ¥ater generated from a 1D year Qr greater storm. As a result. the lake ~ould fill and overtop the crest of the dam causing additional erosion on the downstre~m face. Previous e~osion on the face due to p~st storms over the last 35 years has created large gullies which have eroded the 55-foot crest width to 35 teet.. continued erosion due to major storms could result in a poE-~ble breach of the dam. This erosion also has the potential to weaken the dam's resistance to seismic deformation~ The darn \IIould likely aeform downwards approximately foi.u· feet in the. event of a major earthquake, resulting in a possible breach (approximately +8 on the Richter Scale on the San Andreas fault) .. -1- CMR,552:91 --~ o Staff surveyed the houses downstream ~hich could b~ i~pacted in the event of a breach in the dam. There are seven houses cDnstructed adjacent to the <!;rcek ",hich leao3 from the daM. Of tnese, three houses are located close enough to the cre~'k and 10\01 enough in elevation to experience some risk of flooding above their finished fleors. Ho'Wever, it is unlikely that these buildings .,.:auld pe structurally damaged. Discussion Based on the results of the consultant stud~~, staff has examined the follo'Wing options~ • Do Nothing.. Under this option, no improvements "Would be Ir.ade to the dam. Although it is u;11ikcly th"t one large storm would cause an immediate breach of the darn. a series of starros or a significant earthquake could cause dam failure, resulti~g in flood da~age to dc~nstream houses~ Fo~ this reason staff does not recommend this option. II DecomI!'tission th-E.......ne..m. TJnder this option, the lake .'ould be permanently drained. A small pond \-,.ould remain to mitigate State Fish and Game ~etlands reguir~~ent5. Several trees and shrubs would be lost and thereiore need to be mitigated. A culvert pipe through the dam .... ould be installed to handle storm runoff ~ The lakebed .... ould be graded to provide drainage, and the existing spill-....:ay .. -auld be filled .'ith seil. This option would cost approximately $170,000. Because the cost of decommissioning exceeds that of imprOVing the dam, staff does not recommend this option. • Improve the o.~_m. This option .. QuId provide protection from both major storms and earthquakes. Itt\prQve~\ent.5 -.. 'Quld consist. of constructing a concrete spill+ ... 'ay, clearing most of the trees and vegetation from the do· ... '['stream and upstream face of the dam, filling all holes an\:! gUllies +with engineered fill (soil) ~aterial, a~o hydroseeding. No .. etlands but some tree and shrub mitigation .. ould be. required. Staff recoTI\l!1ends this option, which would cost approximately $150 /000. Conclusion Staff believes that improving the darn is the pre.ferable course of action~ This option is less cost ly than deco:-:'.miss ion ing the dam and results. in fewer environment.al irr.pacts. It 'Will provide protection against dam failure and resulting property dam3ge. Staff will include a project for inproving the dam in the F'f -2- CMR:5S2:91 , '~-~~1.~,: ~., '. ~. 1992-94 CIP program. Proposed timing and phasing ""ill be presented during the FY 1992-94 budget process. Respectfully submitted, ~~A~ Assistant Director of ~~blic Works DAVID G. ADAMS Director of Public Works ~, 2- WI LL! AM ZANER City Manager Related Ct'!R: CMR:552:91 225:91